BCC - Full Plans SubmissionBCC - Full Plans Submission
Document Sample


BUILDING CONTROL CONSULTANCY
To: Head of Building Control FULL PLANS
Wallfields
Pegs Lane
SUBMISSION
The Building Act 1984
Hertford SG13 8EQ The Building Regulations 2000
Tel: 01279 655261
Fax: 01992 531439
e-mail: building.control@eastherts.gov.uk
This form is to be completed in full by the person (or agent) intending to carry out building work. If the form is unfamiliar,
please read the notes on the reverse side or consult the office indicated above. Please type or use block capitals.
1 Applicant’s details (see note 1)
Surname: Forenames: Title: (eg Mr/Mrs/Miss)
1
Name of Company or Partnership (if applicable) and Status eg Ltd/Plc:
Address:
Postcode: Tel: Fax:
2 Agent’s details (if applicable)
Name:
Address:
Postcode: Tel: Fax:
3 Location of building to which work relates
Address:
Postcode: Tel: Fax:
4 Proposed work
Description:
Is the proposed work, or any part of it subject to Partnering or a current LANTAC approval? (see Note 11) YES/NO
Name of Partner Authority
5 Use of building
1 If new building or extension please state proposed use:
2 If existing building state present use:
3 Indicate if the building is a workplace that will be subject to provisions of the
Regulatory Reform (Fire Safety) Order 2005 (see note 5).
YES/NO
6 Conditions (see note 6)
Do you consent to the plans being passed subject to conditions where appropriate? YES/NO
7 Relevant Period (see note 7)
Do you consent to the statutory period being extended to 2 months, if necessary? YES/NO
8 Fees (see note 3 and separate Guidance Note on Fees for information)
1 If Schedule 1 work please state the total number of dwellings - Total:
2 If Schedule 2 work please state floor area: m2
3 If Schedule 3 work please state the estimated cost of work excluding VAT (see note 3): £
PLAN fee: £ plus VAT: £ Total: £
9 Are there, have there recently been, or are there likely to be, any trees, shrubs or hedges within 30 metres (100 ft) of any proposed
foundations? YES/NO
(Details, eg type, distance, date removed or to be planted, shown on drawings)
10 Statement
This notice is given in relation to the building work as described, is submitted in accordance with Regulation 11(1)(b) and
is accompanied by the appropriate fee. I understand that further fees will be payable following the first inspection by the
local authority.
Name: Signature: Owner/Agent Date:
PLANNING APPLICATION REFERENCE NO:
Is this the only Planning Application relevant to the site? YES/NO
Notes
1 The applicant is the person on whose behalf Workplace includes any premises or parts of
the work is being carried out, eg the premises, not being domestic premises, used
building’s owner. for the purpose of an employer’s undertaking
and which are made available to an employee
2 One copy of this notice should be completed as a place of work.
and submitted with plans and particulars in
duplicate in accordance with the provisions 6 Section 16 of the Building Act 1984 provides
of Building Regulation 14. for the passing of plans subject to conditions.
The conditions may specify modifications to
Subject to certain exceptions where Part B the deposited plans and/or that further
(Fire Safety) imposes a requirement in plans shall be deposited.
relation to proposed building work, two
further copies of plans which demonstrate 7 In the event that the statutory 5 week period
compliance with the requirements should be proves insufficient to give a satisfactory
deposited. decision, eg a Notice of Rejection would have
to be issued if amended details were still
3 Subject to certain exceptions, a Full Plans awaited, consent is sought, in accordance
Submission attracts fees payable by the with Section 16(12) of the Building Act 1984,
person by whom or on whose behalf the work to the period being extended to a maximum
is to be carried out. Fees are generally of 2 months from date of deposit.
payable in two stages. The first fee must
accompany the deposit of plans and the 8 These notes are for general guidance only.
second fee is payable after the first site Particulars regarding the deposit of plans
inspection of work in progress. This second are contained in Regulation 14 of the
fee is a single payment in respect of each Building Regulations 2000 and, in respect of
individual building, to cover all site visits fees, in the Building (Prescribed Fees)
and consultations which may be necessary Regulations 1998.
until the work is satisfactorily completed.
9 Persons proposing to carry out building work
Schedule 1 prescribes the plan and or make a material change of use of a
inspection fees payable for small domestic building are reminded that permission may
buildings. Schedule 2 prescribes the fees be required under the Town and Country
payable for small domestic alterations and Planning Acts.
extensions and for the addition of a small
garage or car port. Schedule 3 prescribes the 10 Further information and advice concerning
fees payable for all other cases. the Building Regulations and planning
matters may be obtained from your local
The appropriate fee is dependent upon the authority.
type of work proposed. Fee scales and
methods of calculation are set out in the 11 LABC Services provides a Partner Authority
Guidance Notes on Fees which is attached. Scheme and also National Type Approval
(LANTAC) for a range of building types,
4 Subject to certain provisions of the Public building systems and major building
Health Act 1936, owners and occupiers of elements where they are used repeatedly. If
premises are entitled to connect their this proposal is to use the Partnering scheme
private foul and surface water drains and please answer YES and provide further
sewers to the public sewers, where available. details, including name of the Partner
Special arrangements apply to trade effluent Authority, in section 4. If the work proposed
discharge. Persons wishing to make such or any part of it is subject to a LANTAC
connections must give not less than 21 days approval please answer YES and enclose a
notice to the appropriate authority. Work copy of the appropriate current certificate(s).
affecting the public highway would require If there is any variation in this proposal from
the separate approval of the highway that shown on the LANTAC type approval
authority. plans attention should be drawn to it in a
covering letter. Further information on
5 The Regulatory Reform (Fire Safety) Order LANTAC schemes is available from this
2005 applies to all premises that are office.
‘workplaces’ and imposes a duty on the
responsible person to comply with its
requirements. It also applies to the common
(shared) areas of residential buildings such as
flats, hostels and care homes. .........................
Related docs
Get documents about "