					                                                                           DTFAWA-07-C-00015
                                                                                Task Order 001

                         SECTION J .2 Contract Task Orders
  Program Management, Acquisition Management, System Engineering, Operations Planning


Task Order No: 001/CLIN 001               Revision No: __ __________Date: ________

Traffic Alert and Collision Avoidance System (TCAS) TASK 001/CLIN 001


1.    Task Order Originator: Office of Technology Development
Mr. Neal Suchy 202-493-4233

2. Statement of Work: The General Scope of Work described in Section C applies to each
Task.

BACKGROUND:

The Contractor shall provide quality technical, engineering, analytical, and planning support to
achieve the requirements of this SOW. The Contractor shall furnish and make available all
personnel, supplies, equipment, materials, data, facilities, and services necessary to assist the
Technology Development Office in accomplishing its mission. As determined by the FAA, the
Contractor may be required to interface with system integration Contractors, equipment
manufacturers, airport personnel, various FAA offices, U.S. Government civilian and DoD
organizations, VNTSC, RTCA, NASA, MIT/LL, MITRE CASSD, unions, universities, and
international organizations such as Eurocontrol and NAV Canada.

The Contractor will support the Federal Aviation Administration’s, Operational Planning,
Technology Development Office, in numerous advanced aviation research and development
projects. The following bullets outline envisioned Technology Development task areas. The
subsequent paragraphs further discuss specifics of this Technology Development Task.

TASK SPECIFICATIONS

Traffic Alert and Collision Avoidance System (TCAS) TASK 001/CLIN 001
TCAS helps reduce the potential for midair collisions between aircraft. The FAA mandated the
system as a result of several prominent midair collisions. However, a critical safety deficiency in
TCAS reversal logic was recently discovered and a solution to fix the problem has been
developed. The Contractor may support the solution by conducting the following similar work
activities, such as:

      Assessing the safety analysis performed on the reversal logic fix
      Working with the FAA safety oversight office to ensure that appropriate safety work has
       been performed
      Overseeing any additional safety work that may be needed
                                                                          DTFAWA-07-C-00015
                                                                               Task Order 001

                            SECTION J .2 Contract Task Orders
     Program Management, Acquisition Management, System Engineering, Operations Planning




3. Period of Performance

Start date of Contract Award or _______ 2007 with support provided as described above
contingent on level of ordered labor hours expended. Completion date is ______________ . The
total period of performance may be up to 4 years should all Option Periods be exercised.


4.       Agreed upon Level of Effort

     The FAA anticipates the following labor categories are required at the estimated labor hour
     levels of effort shown below.

                                                            Est Hours
                                                           for Base Yr
                                                            & Option
CLIN       Labor Category                                  Periods 1-3.
0001       Direct Labor
           Program Manager                              1       102
           Senior Project Manager                       2      1097
           *Project Manager A Type                      3       957
           **Project Manager B Type                     4       823
           **Project Manager C Type                     5       823
           *Lead Systems Engineer                       6       957
           Senior Systems Engineer A                    7      1097
           Senior Systems Engineer B                    8      1097
           Lead Engineer                                9       957
           **Senior Engineer                           10       823
           **Senior Test Engineer                      11       823
           Administrative Analyst A Type               12      1097
           Administrative Analyst B Type               13      7680
           Lead Systems Analyst                        14      7680
           Senior Systems Analyst A Type               15      7680
           Senior Systems Analyst B Type               16      7680
           Systems Analyst                             17      7680
           Travel and ODC’s, Materials, equipment
           Consultants/Subcontractor
* starts 6 months after award, ** starts 12 months after award, as noted in J.4 Labor Categories
                                                                             DTFAWA-07-C-00015
                                                                                  Task Order 001

                         SECTION J .2 Contract Task Orders
  Program Management, Acquisition Management, System Engineering, Operations Planning


CLIN 0001 (Task 001) Traffic Alert and Collision Avoidance System (TCAS)
Total COST.
* Estimated Fee Bearing Costs(Labor & Overheads)      $

  Fixed Fee ( 0.00%)                                          $

  Travel and ODCs (includes 0% O/H)                           $

**Subcontractor Cost (includes 0% O/H)                        $

Total NTE Estimated CPFF                                      $

Level of Effort (prime and subcontractor’s manhours): xxxxx prime manhours only.
Cost per Period
      Base Period $
      Option Period 1 $
      Option Period 2 $
      Option Period 3 $

5. Appropriation and Accounting Data



This task order is issued on a not-to-exceed basis and the Contractor shall not exceed the not-to-
exceed level of effort stated above without the prior authorization by the Contracting Officer.

The Contractor is authorized to expend up to the amount shown above if necessary. In the event
that the task described herein cannot be completed within the authorized NTE, the contractor
shall not proceed without prior written authorization by the Contracting Officer.

It is understood that labor, travel and shipping costs are included in the prices set forth above.
The contractor shall bill for actual costs incurred subject to the Joint Travel Rates. Monthly
invoices shall reference this Contract and Task Order number #. Documentation shall be
provided to support incurred costs.

Should the Contractor not accept this task order as written, the Contractor must reply back within
2 days and submit your Task Plan and proposed price/cost efforts within 3 days.

4. Authorization

Technical Officer Signature: _______________________Date: _________________


Contracting Officer Signature * : ____________________Date:                    _________________
* Contracting Officer Signature is required for effort on task to begin.
                                                                     DTFAWA-07-C-00015
                                                                          Task Order 001

                         SECTION J .2 Contract Task Orders
  Program Management, Acquisition Management, System Engineering, Operations Planning

                                       Task Order Request #


Contractor's Task Plan:
    a. Contractor's approach toward accomplishing the Statement of Work:




(continue on additional page(s) if more space is needed)
________________________________________________________________________
. Suggested revisions to the Statement of Work and/or period of performance




________________________________________________________________________

      c. Contractor's proposed cost:

CLIN No      Labor Category            Hours   Rate   Total Price


* Estimated Fee Bearing Costs(Labor & Overheads)            $

  Fixed Fee ( 0.00%)                                        $

  Travel and ODCs (includes 0% O/H)                         $

**Subcontractor Cost (includes 0% O/H)                      $

Total NTE Estimated CPFF                                    $

Level of Effort (prime and subcontractor’s manhours): xxxxx prime manhours only.


(continue on additional page(s) if more space is needed)