									                                                                               Job – 1
                              SCHEDULE “B”

                                Bill of Quantity
Name of Work               : Renovation of Inspection House 77 Cantt, Bareilly

Tender Notice              : 02/EE/2009-10

Time of Completion         : Two Month                Approx Cost Rs. 7.80 Lacs.

Sl.             Item of Work                Approx. Unit         Tendered Rates (Rs.)
No.                                          Qty                 In Words      In Figure
1.    Dismantling of Door/Window              22.00    M2
      Chaukhat with hold fast including
      cost of labour & T&P etc.

2.    Dismantling of Plaster with            175.00    M2
      racking of Joints including cost of
      labour & T&P etc

3.    Shishum wood work in chaukhat            1.00    M3
      including cost of Material, labour
      & T&P etc.

4.    Ist Class brick work in 1:4 cement,      3.50    M3
      sand mortar including cost of
      Material, labour & T&P etc

5.    32mm thick shishum wood work in         53.00    M2
      shutter including cost of Material,
      labour & T&P etc

6.    12.50mm thick Plaster in 1:6           400.00    M2
      cement, sand mortar including
      cost of Material, labour & T&P etc
7.    40mm thick cement conc. 1:2:4 in       285.00    M2
      roof terracing including cost of
      Material, labour & T&P etc
8.    Supplying & fixing ceramic wall &       94.00    M2
      floor tiles including cost of
      Material, labour & T&P etc
 9.   P.O.P False Ceiling including cost   150.00     M2
      of Material, labour & T&P etc

10.   Punning (with Birla Putty) of wall   610.00     M2
      including cost of Material, labour
      & T&P etc

11.   Supplying & Fixing vitrified tiles   190.00     M2
      in flooring including cost of
      Material, labour & T&P etc

12.   R.C.C. 1:2:4 including cost of         0.40     M3
      Material, labour & T&P etc. but
      excluding cost of Reinforcement.

13.   Tor steel Reinforcement including     0.05 .   M.T.
      cost of Material, labour & T&P etc
      with Cutting, Bending, Binding &
      Placing in position etc.

14.   Centering & Shuttering for R.C.C.      5.00     M2
      work including cost of Material,
      labour & T&P etc

15.   25mm thick Kota Stone Flooring       120.00     M2
      including cost of Material, labour
      & T&P etc

16.   Granite Stone Platform in kitchen      2.50     M2
      including cost of Material, labour
      & T&P etc




J.E.            A.E. III         Executive Engineer         (Tenderer’s Sign.)
R.C.D.          R.C.D.            R.C.D., Bareilly
                                                                                Job – 1

                              SCHEDULE “B”

                                Bill of Quantity
Name of Work               : Renovation of Inspection House Bhojipura, Bareilly

Tender Notice              : 02/EE/2009-10

Time of Completion         : Two Month                 Approx Cost Rs. 7.30 Lacs.

Sl.             Item of Work                 Approx.    Unit       Tendered Rates (Rs.)
No.                                           Qty                  In Words          In
                                                                                   Figure
1.    Dismantling of old damaged plaster      1267.00 M2
      with racking of joint including cost
      of labour & T&P etc

2.    Ist Class brick work in 1:4 cement,       95.80 M3
      sand mortar including cost of
      labour & T&P etc

3.    12.50mm thick Plaster in 1:6            2124.00 M2
      cement, sand mortar including cost
      of Material, labour & T&P etc

4.    40mm thick C.C. in 1:2:4 Coarse          197.00 M2
      Sand & 12mm to 20mm gauge
      shingle over the roof including cost
      of Material, labour & T&P etc

5.    32mm thick Shishum wood                    0.43 M3
      chaukhat     including  cost    of
      Material, labour & T&P etc
6.    Supplying & Fixing 40mm thick             21.00 M2
      Shisham wood work in shutter
      including cost of Material, labour
      & T&P etc.

7.    Dismantling of old chaukhat               15.00 M2
      including cost of labour & T&P
      etc.
 8.   R.C.C. in 1:2:4 cement Coarse          12.25 M3
      Sand, and Shingle including cost
      of Material, labour & T&P etc
 9.   Tor steel reinforcement including      14.40    Qtl.
      cost of Material, labour & T&P etc.

10.   Centering & Shuttering for R.C.C.     149.00    M2
      work including cost of Material,
      labour & T&P etc .

11.   Supplying & Fixing 6mm China           91.70    M2
      White Clay tiles in flooring and
      wall with 1:3 Cement and Sand
      finished with White Cement Slurry
      etc.

12.   Supplying & Fixing Kota Stone          78.30    M2
      25mm thick in flooring including
      cost of Material, labour & T&P etc




 J.E.          A.E. III          Executive Engineer          (Tenderer’s Sign.)
R.C.D.         R.C.D.             R.C.D., Bareilly
                                                                                 Job – 2


                               SCHEDULE “B”

                                 Bill of Quantity
Name of Work                : Renovation of Inspection House 77 Cantt, Bareilly

Tender Notice               : 0 /EE/2009-10

Time of Completion          : Two Month                 Approx Cost Rs. 10.50 Lacs.

Sl.             Item of Work                  Approx.    Unit       Tendered Rates (Rs.)
No.                                            Qty                  In Words          In
                                                                                    Figure
 1.   100mm Thick Base Cement Conc.           460.00     M2
      1:4:8 with brick ballast in approach
      road etc. including cost of Material,
      labour & T&P etc .

 2.   40mm Thick Cement Conc. 1:2:4           460.00     M2
      over base Conc. In making
      approach road etc including cost of
      Material, labour & T&P etc .




 J.E.           A.E. III           Executive Engineer              (Tenderer’s Sign.)
R.C.D.          R.C.D.              R.C.D., Bareilly
                                                                                Job – 2
                              SCHEDULE “B”

                                Bill of Quantity
Name of Work                : Renovation of Inspection House , Bhojipura Bareilly

Tender Notice               : 02/EE/2009-10

Time of Completion          : Two Month                Approx Cost Rs. 4.00 Lacs.

Sl.             Item of Work                 Approx.    Unit       Tendered Rates (Rs.)
No.                                           Qty                  In Words          In
                                                                                   Figure
 1.   C.C. 1:4:8 in bace Concrete             81.50      M2
      including cost of Material, labour
      & T&P etc .

 2.   C.C. 1:2:4 Cement Coarse Sand &         65.30      M3
      shingle including cost of Material,
      labour & T&P etc .

 3.   Earth Work in filling including        107.80      M3
      ramming & dressing manually with
      Carriage upto 1.00 Km. distance
      by tractor trolley.

 4.   Centering & Shuttering for C.C.        104.00      M2
      including rent of shuttering, labour
      & T&P etc ..