									   Doncaster Local Development Framework




     Core Strategy
From Options to Preferred
        Options

            December 2005
DONCASTER LOCAL DEVELOPMENT FRAMEWORK
            CORE STRATEGY
   FROM OPTIONS TO PREFERRED OPTIONS



            DECEMBER 2005
      DONCASTER LOCAL DEVELOPMENT FRAMEWORK

                          Core Strategy
                 From Options to Preferred Options

The table in this report relates the Core Strategy Options to the Core Strategy
Preferred Options and draws upon:

    The Core Strategy Options Report (June 2005)
    The Sustainability Appraisal Report of the Core Strategy Options (May
     2005)*
    The Report on public consultation responses to the Core Strategy
     Options (October 2005)

These three documents are publicly available and can be viewed on the
Council’s LDF Web site.

*It will be noted that some of the Preferred Options are derived from Options
which were assessed as “unsustainable”. The Preferred Options are more
specific about sustainability issues and have since been subject to
independent sustainability appraisal; this appraisal is also publicly available
and can be viewed on the Council’s Web site.

Address:     LDF Team
             Doncaster MBC
             Freepost NEA 196
             Doncaster DN1 1BR

Telephone: 01302 734419

Email:       LDF@Doncaster.gov.uk

This document and other supporting documents can be accessed on the
DMBC Website:

www.doncaster.gov.uk/ldf

If you are unable to access this website or need any further information please
contact the LDF Team
Core Strategy       Core Strategy Options considered      Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                         of the           consultation on the   Preferred Option
Policies &                                                Sustainability   Core Strategy
Proposals                                                 Appraisal of     Options
                                                          the Options
Theme 1 –
Sustainable
Settlements
The Main         Proportion of growth to be               Option1          Broadly even          The Core Strategy is not specific about
Doncaster        directed to The Main Doncaster           was              support for all       quantities of growth but reflects most
Urban Area:      Urban Area                               considered       three options         closely Option2. This places an urban
Policies include Option 1: The Main Doncaster             to be clearly    Option1 (32%)         renaissance emphasis on the principal
CS-S1, CS-S2, Urban Area to be the principal focus        sustainable.     Option2 (31%)         area of settlement and focus for the
CS-S3, CS-S4     for new growth (e.g. 75-90%).            Options 2&3      Option3 (37%)         Borough whilst recognising and
and CS-S5        Limited growth in the outlying           were                                   supporting the valuable service role of the
                 settlements.                             considered                             outlying towns and the need for
                 Option 2: Main growth (60-75%) still     to be                                  regeneration and to address social
                 directed to The Main Doncaster           broadly                                deprivation in many of these settlements.
                 Urban Area, but only in so far as        sustainable
                 opportunities exist within and
                 adjoining the more sustainable
                 urban neighbourhoods.
                 Option 3: Less growth (e.g. 50-60%)
                 in The Main Doncaster Urban Area.
                 Increased emphasis on those
                 outlying settlements where
                 sustainable growth can be
                 accommodated.

The Principal       Distribution of growth outside the    Option1          Option2 received Option 3 was selected as the preferred
Outlying            Main Doncaster Urban Area             was              the most support. option because it supports a sustainable
Settlements:        Option 1: Growth which is not to be   considered       Option1 (32%)     settlement hierarchy and recognises the
Core Strategy       Core Strategy Options considered       Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                          of the           consultation on the   Preferred Option
Policies &                                                 Sustainability   Core Strategy
Proposals                                                  Appraisal of     Options
                                                           the Options
Policies include    accommodated in The Main               to be clearly    Option2 (42%)         differing levels of service provision, urban
CS-S6, CS-S7,       Doncaster Urban Area to be             sustainable.     Option3 (26%)         potential, housing renewal and
and CS-S8           concentrated in the Principal          Option 2                               regeneration needs and potential for
The Potential       Outlying Settlements of                was                                    growth. The policies for the limited growth
Growth              Mexborough, Thorne, Adwick,            considered                             settlements do however make it clear that
Settlements:        Armthorpe, Askern and                  to be                                  growth will only be accommodated where
Policies include    Conisbrough.                           broadly                                it would not lead to outward expansion
CS-S9, CS-S10       Option 2: As per Option 1 plus         sustainable.                           and in the case of some of these
and CS-S11          growth in the Potential Growth         Option3                                settlements that will mean very limited
The Limited         Settlements where planned major        was                                    growth.
Growth              infrastructure works and potential     considered
Settlements:        brownfield opportunities could         not to be
Policy CS-S12       support sustainable outward growth,    sustainable
                    that is in Rossington, Stainforth/
                    Hatfield (Dunsville/Dunscroft).
                    Option 3: As Option 2 but with some
                    growth also in the Limited Growth
                    Settlements where this can be
                    accommodated without outward
                    expansion, that is in Edlington,
                    Denaby, Moorends, Tickhill, Bawtry
                    and Carcroft/Skellow.

The Larger          No growth settlements                  Option1          Clear support for     Option 2 was selected because it reflects
(Defined)           Option 1: Development of these         was              Option1               Government guidance and will provide
Villages:           settlements to be confined to infill   considered       Option1 (62%)         opportunities to meet affordable housing
Policies include    within existing settlement limits.     clearly          Option2 (38%)         needs in small rural settlements.
Core Strategy       Core Strategy Options considered       Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                          of the           consultation on the   Preferred Option
Policies &                                                 Sustainability   Core Strategy
Proposals                                                  Appraisal of     Options
                                                           the Options
CS-S13 and          Affordable housing opportunities       sustainable.
CS-S14.             which cannot be accommodated           Option2
                    through infill to be concentrated in   was not
                    the nearest service town/village.      considered
                    Option 2: Some limited small-scale     to be
                    expansion of some villages for         sustainable
                    100% affordable housing schemes
                    where environmentally suitable site
                    exist and appropriate affordable
                    housing opportunities in the nearest
                    larger settlement do not exist.

The Smaller         No options considered.                 N/A              N/A                   No options were considered reasonable
(Undefined)                                                                                       given national and regional policy and
Villages; new                                                                                     sustainability objectives
settlements.
Policies include
CS-S15 and
CS-S16

Theme 2:
Population
and Housing
Housing land        Brownfield land target                 Options1         Clear support for     Option 2 was selected because it
requirements:       Option 1: Housing supply to meet       and 3 were       Option2               emphasises the need to meet a wide
Policies include    the brownfield target for Doncaster.   considered       Option1 (21%)         range of sustainability objectives whilst
CS-H1, CS-H2,       Option 2: Housing supply to meet       clearly          Option2 (52%)         retaining support for meeting the
Core Strategy       Core Strategy Options considered         Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                            of the           consultation on the   Preferred Option
Policies &                                                   Sustainability   Core Strategy
Proposals                                                    Appraisal of     Options
                                                             the Options
CS-H3, and          the brownfield target only if            sustainable.     Option3 (27%)         brownfield target.
CS-H4               consistent with other sustainability     Option2
                    objectives.                              was
                    Option 3: Housing supply to exceed       considered
                    the brownfield target provided this is   broadly
                    consistent with other sustainability     sustainable
                    objectives.

SEE ABOVE           Housing renewal policy                   Assessment Clear support for           Option3 selected because it prioritises
                    Option 1: All new housing (including     inconclusive Option3                   housing renewal schemes over non-
                    replacement of demolitions) within                    Option1 (20%)             renewal schemes and extends that
                    Pathfinder Area (Mexborough,                          Option2 (33%)             support to renewal areas across the
                    Conisbrough, Denaby, Edlington)                       Option3 (47%)             Borough and not just Pathfinder Area.
                    and other housing renewal areas to
                    be part of the Borough-wide
                    housing requirement and be subject
                    to phasing policies.
                    Option 2: Replacement of
                    demolished housing on cleared
                    sites within Pathfinder to be
                    permitted as an additional supply to
                    that needed to meet the currently
                    Borough-wide requirement and not
                    to be subject to phasing policy.
                    Option 3: As Option 2 but extended
                    to include other identified Housing
                    Renewal priority areas elsewhere in
Core Strategy       Core Strategy Options considered         Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                            of the           consultation on the   Preferred Option
Policies &                                                   Sustainability   Core Strategy
Proposals                                                    Appraisal of     Options
                                                             the Options
                    the Borough (e.g. Town Centre, the
                    Green Corridor, the M18 Corridor).

SEE ABOVE           Release of Greenfield sites              Option1          Relatively equal      The Core Strategy policies include a
                    Option 1: Retain moratorium on           was              support received      housing allocations search sequence
                    Greenfield releases until Housing        considered       for both options      which could be used by a Greenfield
                    DPD can assess the relative              clearly          Option1 (53%)         Moratorium review as the basis for
                    sustainability of different allocation   sustainable.     Option2 (47%)         releasing some greenfield sites along the
                    options.                                 Option2                                lines of Option 2 but it does not itself
                    Option 2: Include criteria based         was                                    amend the Moratorium. The issue will be
                    policies in the Core Strategy which      considered                             addressed directly through the Housing
                    would allow for the release of           to be                                  DPD.
                    sustainably located greenfield sites     broadly
                    within the Main Doncaster Urban          sustainable.
                    Area prior to the delivery of the
                    Housing DPD.

Housing mix,        Affordable housing policy                Option1          Clear support for     Option 1 was selected because it will
size, type and      Option 1: Retain current Borough-        was              Option1               provide the flexibility needed to ensure
tenure:             wide flexible Policy (which allows for   considered       Option1 (66%)         that the right amount, type and quality of
Policy CS-H5        built units or commuted sums)            broadly          Option2 (34%)         affordable housing is provided in the right
                    amended as necessary to reflect          sustainable.                           locations throughout the borough.
                    current quantitative affordable          Option2
                    housing local needs.                     was
                    Option 2: More prescriptive policy       considered
                    specifying requirements for different    clearly
                    sites or locations and specifying        sustainable
Core Strategy       Core Strategy Options considered          Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                             of the           consultation on the   Preferred Option
Policies &                                                    Sustainability   Core Strategy
Proposals                                                     Appraisal of     Options
                                                              the Options
                    whether built units or commuted
                    sum, tenure, type and number of
                    unit etc.

Gypsies and         No options considered.                    N/A              N/A                   No options were considered reasonable
travellers:                                                                                          given current and emerging national
Policies include                                                                                     policy.
CS/H6 and
CS/H7

Theme 3:
Economy and
Employment
Employment          Location of new employment                Options 1,3      Options 1 and 2       Option 1 was selected (but amended to
land                allocations                               and 4 were       were the most         include an element of Option3 with the
requirements:       Option 1: Emphasis on locations           not              supported with a      inclusion of Carcroft Common) as this
Policies include    attractive to the Market i.e. M18         considered       slight preference     would best achieve a balance between
CS-E1, CS-E2,       corridor and Main Doncaster Urban         sustainable.     for Option1           support for the the objectives of growing
CS-E3, CS-E4,       Area.                                     Option2          Option1 (38%)         and diversifying the economy and
CS-E5, CS-E6,       Option 2: Emphasis on locations           was              Option2 (33%)         providing jobs on sites accessible to
and CS-E7           which support all three RSS               considered       Option3 (10%)         communities
                    Regeneration Priority Areas and           broadly          Option4 (19%)
                    Objective 1 SEZs (i.e. M18 corridor       sustainable
                    from J3 to J6; Doncaster Urban
                    Centre and The Dearne).
                    Option 3: Emphasis on a wider
                    distribution of sites to directly serve
Core Strategy       Core Strategy Options considered       Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                          of the           consultation on the   Preferred Option
Policies &                                                 Sustainability   Core Strategy
Proposals                                                  Appraisal of     Options
                                                           the Options
                    a greater number of communities
                    Option 4: Emphasis on locations
                    which meet a broad range of
                    sustainability criteria

SEE ABOVE           Phased release of employment           Options 1&2      Evenly balanced       Option1 was selected as the most
                    Option 1: No phasing – allocations     were             support for both      sustainable option and one which would
                    to be released in accordance with      considered       options               enable coordination of infrastructure
                    market demand                          to be            Option1 (51%)         provision, efficient use of land and
                    Option 2: Phasing of allocations       broadly          Option2 (49%)         minimise unnecessary loss of land to
                                                           sustainable                            development

SEE ABOVE           Employment allocations for             Assessment Evenly balanced             Option2 was selected as this will best
                    specific use classes                   inconclusive support for both          support economic diversification and
                    Option 1: All or most allocations to                options                   sustainability objectives
                    be available for B1, B2 and B8 uses                 Option1 (49%)
                    and not tied to particular user                     Option2 (51%)
                    requirements
                    Option 2: Where appropriate,
                    Allocations to be tied to particular
                    use classes, minimum or maximum
                    user size, users which will use
                    available rail links and other
                    particular requirements.
Core Strategy       Core Strategy Options considered        Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                           of the           consultation on the   Preferred Option
Policies &                                                  Sustainability   Core Strategy
Proposals                                                   Appraisal of     Options
                                                            the Options
SEE ABOVE           De-allocation of unsustainable          Option1          Strong support        A hybrid Option was selected between
                    UDP employment allocations              was              for Option1           options 1 & 2. Policy CS-E5 is not
                    Option 1: Widespread de-allocation      considered       Option1 (70%)         specific about the scale of de-allocation
                    of UDP employment allocations           to be clearly    Option2 (30%)         and reflects a desire to achieve some sort
                    which have proved unattractive to       sustainable.                           of balance between two competing (to
                    inward investment and/or are            Option2                                some extent) objectives: 1)removing
                    unsustainably located. Re-allocate      was not                                allocations which have proved
                    brownfield sites within urban areas     considered                             unattractive to the market and freeing up
                    for housing where appropriate.          to be                                  land for housing or green uses and
                    Extend green belt or countryside        sustainable                            2)retaining a greater spread of
                    policy area over sites which are                                               employment opportunities particularly in
                    greenfield and/or are on the urban                                             the less accessible communities. The
                    edge or outside urban areas.                                                   development of some employment
                    Option 2: More limited de-allocation                                           allocations for mixed-uses could be
                    of UDP employment allocations                                                  appropriate. The Housing and
                    aimed at retaining a good                                                      Employment DPDs will address the issue
                    distribution of sites across the main                                          in more detail.
                    urban area and some economic
                    investment opportunities in most or
                    all coalfield and market towns

Diversification     No options considered.                  N/A              N/A                   No reasonable alternatives were
of the rural                                                                                       identified for development within the
economy:                                                                                           Green Belt and countryside.
Policy CS-E8
Core Strategy       Core Strategy Options considered       Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                          of the           consultation on the   Preferred Option
Policies &                                                 Sustainability   Core Strategy
Proposals                                                  Appraisal of     Options
                                                           the Options
Theme 4:
Accessibility
and Transport
Robin Hood          Doncaster airport                      Both             Strong support        Option2 selected subject to appropriate
Airport:            Option 1: Doncaster Airport            options          for Option2           environmental safeguards; recognises
Policies CS-A1      confined to current permitted growth   were             Option1 (21%)         the huge potential to transform
and CS-A2           targets                                considered       Option2 (79%)         Doncaster’s economic fortunes.
                    Option 2: Doncaster Airport growth     broadly
                    beyond current permission to be        sustainable
                    supported provided it is supported
                    by M18 link and meets agreed
                    sustainability objectives

Improvements        Major improvements to the              Neither          Strong support        A hybrid option was selected
to roads,           highway network                        option was       for Option2           comprising five of the nine schemes. This
strategic           Option 1: Roll forward main            considered       Option1 (30%)         still provides a sharper focus than the
transport           priorities only                        to be            Option2 (70%)         “long list” and therefore clearly identifies
infrastructure      • Finningley and Rossington            sustainable                            priorities to be brought forward within the
projects, and       Regeneration Route Scheme                                                     plan period.
airport access:     (FARRRS) M18 link
Policies include    • White Rose Way dualling
CS-A3, CS-A4,       Option 2: Roll forward all existing
and CS-A5           proposed major improvements to
                    the highway network
                    • FARRRS
                    • White Rose Way dualling
                    • Woodfield Link Road
Core Strategy       Core Strategy Options considered       Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                          of the           consultation on the   Preferred Option
Policies &                                                 Sustainability   Core Strategy
Proposals                                                  Appraisal of     Options
                                                           the Options
                    • M18-A614 link road (J4);
                    • M180-Hatfield/Stainforth link road
                    (J5);
                    • B6094 Conisbrough link road (new
                    M18 junction)
                    • A1(M)-A19 link road.
                    • Hickleton & Marr By- Pass
                    • West Moor Link dualling

Public transport    Public transport                       Option1          Strong support        The Core Strategy does not allocate sites
and car             Option 1: Development allocations      was              for Option2           but various settlement and development
parking:            only where good existing public        considered       Option1 (17%)         policies will support certain allocations
Policies include    transport access exists                to be clearly    Option2 (83%)         subject to public transport improvements
CS-A6 and CS-       Option 2: Development allocations      sustainable.                           which can be tied down through green
A7                  where good public transport access     Option2                                travel plans etc.
                    either already exists or can be        was not
                    created                                considered
                                                           to be
                                                           sustainable
Contributions to    No options considered.                 N/A              N/A                   No reasonable alternatives were
environmental                                                                                     identified for contributions to
improvements:                                                                                     environmental improvements.
Policy CS-A8
Core Strategy       Core Strategy Options considered        Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                           of the           consultation on the   Preferred Option
Policies &                                                  Sustainability   Core Strategy
Proposals                                                   Appraisal of     Options
                                                            the Options
Transport           No options considered.                  N/A              N/A                   No reasonable alternatives were
system                                                                                             identified for transport system
sustainability                                                                                     sustainability and safety.
and safety:
Policy CS-A9

Transport           No options considered.                                                         No reasonable alternatives were
planning                                                                                           identified for transport planning
obligations                                                                                        obligations.
Policy CS-A10

Theme 5:
Town and
District Centres
Doncaster,          Definition of Doncaster Town            Option1          Strong support        Option 2 was selected (but with different
Mexborough          Centre/Urban Centre                     was              for Option2           terminology) because it recognizes the
and Thorne          Option 1: Doncaster town centre to be   considered                             aspirations for a larger town or city centre
town centres        defined as per the UDP                  broadly          Option1 (24%)         and that some uses such as hotels and
and other town      Shopping/Office Policy Area             sustainable.     Option2 (76%)         offices need to be directed to the town
and district        (extended to include the                Option2                                center but do not necessarily have to be
centres:            Interchange/Frenchgate extension        was                                    located in the retail core.
Policies include    site and Southern Bus Station). Key     considered
CS-T1, CS-T2,       town centre uses to be directed here.   clearly
CS-T3, and CS-      Option 2: Doncaster town centre to be   sustainable.
                    defined as above. A limited “Urban
T4
                    Centre” zone to be defined around
                    this to embrace that part of the
Core Strategy       Core Strategy Options considered         Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                            of the           consultation on the   Preferred Option
Policies &                                                   Sustainability   Core Strategy
Proposals                                                    Appraisal of     Options
                                                             the Options
                    Waterfront which lies south of the
                    canal and west of Chappel Drive, The
                    UDP Commercial Fringe Policy Area,
                    Marshgate, St Sepulchre Gate West
                    and College Rd. Certain key non-
                    retail town centre uses (e.g. offices,
                    hotels, leisure) could be sequentially
                    acceptable here.

SEE ABOVE           Identification of ‘Quarters’ within      Option1          Strong support        Option 2 was selected because it was
                    Doncaster Town Centre and/or             was              for Option2           considered to be more sustainable
                    Urban Centre                             considered       Option1 (32%)         because it would permit a greater mix of
                    Option 1: Define Distinct quarters       to be not        Option2 (68%)         uses.
                    within the town and/or urban centre,     sustainable.
                    such as a leisure quarter where          Option2
                    uses associated with the evening         was
                    economy will be concentrated             considered
                    Option 2: Encourage and permit a         to be
                    mix of different but complementary       broadly
                    uses throughout the town and/or          sustainable
                    urban centre

SEE ABOVE           Establishing a hierarchy of              Option1          Strong support        Option 1 for the hierarchy of centres was
                    centres                                  was              for Option1           considered to be more sustainable and in
                     Option 1: Maintain the existing        considered       Option1 (77%)         line with national policy guidance. Policy
                      hierarchy of town and district         to be            Option2 (23%)         CS-T4 supports development which
                      centres as set out in the UDP from     broadly                                would support the vitality and viability of
Core Strategy       Core Strategy Options considered         Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                            of the           consultation on the   Preferred Option
Policies &                                                   Sustainability   Core Strategy
Proposals                                                    Appraisal of     Options
                                                             the Options
                      Doncaster town centre, through         sustainable                            centers subject to the scale of
                      Thorne and Mexborough to the           Option2                                development being appropriate to the
                      smaller town and district centres      was not                                scale of the centre.
                      in the former colliery and market      considered
                      towns.                                 to be
                     Option 2: Where existing town or       sustainable
                      district centres are showing signs
                      of decline reclassify them within
                      the hierarchy as lower order
                      centres and allow retail units to
                      change to other uses and/or
                      reduce the size of the commercial
                      policy area designation.

Out-of-town         No options considered.                   N/A              N/A                   No reasonable alternatives were
development:                                                                                        identified for out-of-town development.
Policies include
CS-T5 and CS-
T6
Theme 6: The
Natural
Environment
Green Belt and      Maintenance of the Green Belt            Option1          Evenly balanced       The Core Strategy identifies just one area
Countryside         Option 1: New employment                 was              support for both      of search for development which would
Policy Areas        allocations to be allowed in the green   considered       options               involve amending a green belt boundary
Policies include    belt if it can be demonstrated that      to be            Option1 (52%)         (at Rossington Colliery) and whilst this
                    economic growth (of individual
Core Strategy       Core Strategy Options considered         Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                            of the           consultation on the   Preferred Option
Policies &                                                   Sustainability   Core Strategy
Proposals                                                    Appraisal of     Options
                                                             the Options
CS-N1 and CS-       settlements or the Borough as a          broadly          Option2 (48%)         would provide for an employment site on
N2                  whole) would otherwise be                sustainable.                           land currently in the green belt it would
                    unacceptably constrained. Elsewhere      Option2                                also provide for a greater area of green
                    no new development allocations of        was not                                belt and a more defensible boundary.
                    any kind in the green Belt.              considered                             Elsewhere areas of search have not
                    Option 2: No new development             to be                                  included sites within the green belt.
                    allocations in the green belt.           sustainable
SEE ABOVE           Countryside Policy Area                  Option1          Strong support        Option 1 was selected because it was
                    Designation                              was              for Option1           considered to be more sustainable, likely
                    Option 1: Countryside beyond the         considered       Option1 (69%)         to command widespread public support
                    Green Belt (i.e. in the eastern “half”   broadly          Option2 (31%)         and because it provides a stronger basis
                    of the Borough) to continue to be        sustainable.                           for protecting the countryside.
                    protected through Countryside            Option2
                    Policy Area designation and firm         was
                    development control policies within      considered
                    it (as per UDP)                          to be not
                    Option 2: Countryside Policy Area        sustainable
                    designation and village
                    development limits replaced with
                    generic development control
                    policies applying to rural areas in
                    general.

Areas of            No options considered.                   N/A              N/A                   No reasonable alternatives were
Special                                                                                             identified for protecting areas with Special
Landscape                                                                                           Landscape Values or Parks and Gardens
Core Strategy       Core Strategy Options considered        Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                           of the           consultation on the   Preferred Option
Policies &                                                  Sustainability   Core Strategy
Proposals                                                   Appraisal of     Options
                                                            the Options
Value and                                                                                          with Historic Value.
Parks and
Gardens with
Historic Value
Policy CS-N4

Nature              No options considered.                  N/A              N/A                   No reasonable alternatives were
Conservation                                                                                       identified for protecting nature
Policies include                                                                                   conservation given national and regional
CS-N3 and CS-                                                                                      planning policy and bio-diversity
N5                                                                                                 objectives

Avoiding areas      Areas vulnerable to flooding            Option1          Slight preference     A hybrid option was selected based on
at risk of          Option 1: Avoid any new                 was not          for option1           a sequential policy which is in turn based
flooding            development, except for those           considered       Option1 (57%)         on national policy.
Policy CS-N6        where a particular location is          to be            Option2 (43%)
                    essential e.g. essential                sustainable.
                    infrastructure, where there is a high   Option 2
                    risk of flooding.                       was not
                    Option 2: Assess flood risk as one      considered
                    sustainability factor among many        to be
                    and, where there are other factors      sustainable
                    in favour of a site, including its
                    likelihood of coming forward, sites
                    may be allocated provided that sites
                    can satisfactorily be defended.
Core Strategy       Core Strategy Options considered        Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                           of the           consultation on the   Preferred Option
Policies &                                                  Sustainability   Core Strategy
Proposals                                                   Appraisal of     Options
                                                            the Options
Effects on air,     No options considered                   N/A              N/A                   No reasonable alternatives were
water or land                                                                                      identified for minimising effects on air,
quality                                                                                            water or land quality. Policy reflects
Policy CS-N7                                                                                       national and regional planning policy

Renewable           No options considered                   N/A              N/A                   No reasonable alternatives were
energy                                                                                             identified for renewable energy. Policy
Policies include                                                                                   reflects national and regional planning
CS-N8 and CS-                                                                                      policy
N9

Theme 7: The
Built
Environment
Effects on local    Defining a local character of           Both             Preference for        Option 1 was selected because it will
context and the     development                             options          Option1               help to strengthen local identity and
built heritage      Option 1: Identify and define a local   were             Option1 (62%)         improve the quality of design of
Policies include    built environment character in          considered       Option2 (38%)         development within the context of the
CS-B1 and CS-       towns, villages and neighbourhoods      broadly                                settlement. It also reflects the approach
B2                  which is to be reflected in new         sustainable.                           of the adopted Renaissance Towns
                    development and regeneration.                                                  Charter for Doncaster
                    Option 2: Allow a more flexible
                    approach to development based on
                    general best practice in urban
                    design.
Core Strategy       Core Strategy Options considered        Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                           of the           consultation on the   Preferred Option
Policies &                                                  Sustainability   Core Strategy
Proposals                                                   Appraisal of     Options
                                                            the Options
Conservation        Conservation of the built               Both             Slight preference     The Core Strategy commits to no
Areas               environment                             options          for Option1           additional conservation areas but rather
Policies include    Option 1: Designate additional          were             Option1 (56%)         places the emphasis on carrying out
CS-B3 and CS-       Conservation Areas from the list in     considered       Option2 (44%)         character area assessments of the
B4                  the current UDP and include new         broadly                                existing conservation areas in line with
                    areas such as early 20th Century        sustainable.                           Government priorities and in recognition
                    inner suburbs.                                                                 of likely available resources.
                    Option 2: No new conservation
                    areas designated other than those
                    identified in the UDP

Theme 8:
Minerals
Future minerals     Designation of land for aggregate       Assessment Very strong                 Option 1 Option 1 was selected because
extraction          limestone extraction                    inconclusive support for               there is a substantial surplus of permitted
Policies include    Option 1: No additional land                         Option1                   reserves. It is considered therefore, that
CS-M1, CS-M2        designated for aggregate limestone                   Option1 (94%)             there is no requirement to designate
and CS-M3           extraction                                           Option2 (6%)              additional areas for limestone extraction
                    Option 2: Additional land designated                                           for aggregates. The SA Report was
                    for aggregate limestone extraction                                             inconclusive.

SEE ABOVE           Designation of land as ‘Industrial      Assessment Strong support              Option1 (designate land) was selected
                    Minerals Area’.                         inconclusive for Option1               because it would provide long-term
                    Option 1: Within “industrial minerals                Option1 (65%)             security of supply of an economically
                    area” the map could make a                           Option2 (35%)             important resource. The SA Report was
                    commitment to sustain production.                                              inconclusive.
                    The principle of mineral working at
Core Strategy       Core Strategy Options considered       Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                          of the           consultation on the   Preferred Option
Policies &                                                 Sustainability   Core Strategy
Proposals                                                  Appraisal of     Options
                                                           the Options
                    some future date would be a priority
                    issue when making land use
                    decisions.
                    Option 2: No land designated as
                    “Industrial Minerals Area”.

SEE ABOVE            Designation of land for sand and      Both             Strong support        Option 2 (designate land) was selected
                    gravel extraction, including the       options          for Option1           because the information available
                    separate designation of soft sand      were             Option1 (65%)         indicates that, while there would appear
                    and sharp sand and gravel              considered       Option2 (35%)         to be a small surplus of permitted
                    Option 1: No additional land           to be not                              reserves, this does not take into account
                    designated for sand and gravel         sustainable                            the proportion of permitted reserves that
                    extraction                                                                    may be made up of soft sand, rather than
                    Option 2: Additional land                                                     sand and gravel suitable for use as
                    designated for sand and gravel                                                concrete aggregate. The conclusion to
                    extraction, including the separate                                            be drawn from the figures is that
                    designation of soft sand and sharp                                            additional permissions may need to be
                    sand & gravel                                                                 granted as the 16-year period
                                                                                                  progresses.

Theme 9:
Waste
New Waste           Identification of sites for waste      Option1 and      Strong support        Option 3 (Hybrid strategy) was selected
Facilities          management facilities                  Option 3         for Option3, no       because it is considered broadly
Policies include    Option 1: Identification of specific   were             support for           sustainable, received the greatest
CS-W1, CS-          sites                                  considered       Option2               support and is in accordance with
W3, CS-W4           Option 2: Criteria based policy        to be            Option1 (30%)         Government guidance.
Core Strategy       Core Strategy Options considered         Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                            of the           consultation on the   Preferred Option
Policies &                                                   Sustainability   Core Strategy
Proposals                                                    Appraisal of     Options
                                                             the Options
and CS-W5           Option 3: “Hybrid” strategy; a           broadly          Option2 (0%)
                    combination of criteria based            sustainable.     Option3 (70%)
                    policies, preferred areas and site       Option2
                    specific allocations                     was not
                                                             considered
                                                             to be
                                                             sustainable

Waste               Minimisation / reduction of waste        Option1          Support               Option 2 (new policy requiring demo for
management in       Option 1: New policies relating to all   was              balanced              major projects) was selected because it
new                 developments, to demonstrate that        considered       between               was considered that it would provide
developments        waste arisings will be minimised and     to be            options1 & 2          significant progress towards the
Policy CS-W2        the use of recycled materials in         broadly          Option1 (51%)         minimisation /reduction of waste without
                    construction maximised. Provision        sustainable.     Option2 (41%)         placing an undue burden on developers.
                    for temporary inert waste recycling      Option2          Option3 (8%)
                    facilities at demolition, dredging,      was
                    construction and highway projects.       considered
                    Option 2: Introduce new polic(ies),      to be clearly
                    which requires proposals for “major”     sustainable.
                    developments to demonstrate that         Option3
                    waste arisings during the                was not
                    development, use and                     considered
                    decommissioning of the site will be      to be
                    minimised.                               sustainable
                    Option 3: No new policy on waste
                    minimisation
Core Strategy       Core Strategy Options considered            Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                               of the           consultation on the   Preferred Option
Policies &                                                      Sustainability   Core Strategy
Proposals                                                       Appraisal of     Options
                                                                the Options
SEE ABOVE           Provision of waste management               Options 1 &      Support               Option 2 was selected because it was
                    facilities with new development             2 were           balanced              considered that it would provide
                    Option 1: Introduce new policy that         considered       between Options       significant progress towards the provision
                    requires proposals for all new              to be clearly    1 and 2.              of waste management facilities within
                    developments to provide                     sustainable.     Option1 (54%)         new development without placing an
                    appropriate waste management                Option3          Option2 (41%)         undue burden on developers.
                    facilities. For residential property, for   was              Option3 (5%)
                    example, appropriate facilities would       considered
                    include provision for bin storage           not
                    within each property.                       sustainable
                    Option 2: Introduce new policy that
                    requires proposals for “major” new
                    developments to provide
                    appropriate waste management
                    facilities.
                    Option 3 No new policy requiring
                    new developments to provide
                    appropriate waste sorting, recovery
                    and recycling facilities.

Theme 10:
Community
Needs
Protection and      Surplus community facilities                Option1          Option2 broadly       Option 2 was selected as being more
enhancement         Option 1: Explore all opportunities         was not          supported             practical and a way of facilitating tangible
of greenspaces      for alternative community uses for          considered       Option1 (37%)         community benefits more quickly.
and the             surplus community buildings and             sustainable.     Option2 (63%)
Core Strategy       Core Strategy Options considered         Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                            of the           consultation on the   Preferred Option
Policies &                                                   Sustainability   Core Strategy
Proposals                                                    Appraisal of     Options
                                                             the Options
provision of        land                                     Option2
other               Option 2: Time-limited search for re-    was
community           use; if appropriate use not identified   considered
facilities          then redevelopment of the site with      to be
including for       a planning obligation requiring          broadly
sports, leisure     investment in community facilities       sustainable
and cultural        elsewhere in the community.
activities
Policies CS-C1
and CS-C2

SEE ABOVE            Surplus urban greenspace             Option2             Option1 was not       A hybrid policy was selected between
                    Option 1: Redevelop underused         supported           considered to be      options 1&2 which recognises that there
                    urban greenspaces for housing and                         sustainable.          may be cases where there are
                    other uses where there is a                               Option2 was           demonstrable surpluses but also cases
                    demonstrable greenspace surplus                           considered to be      where loss of a small part of a site may
                    in that locality and provided some of                     broadly               be the best way of retaining and
                    the monies generated are put back                         sustainable           enhancing facilities.
                    into greenspace improvements                                                    .
                    Option 2: Redevelop greenspaces
                    only exceptionally; if underused
                    then change the type of greenspace
                    use e.g. from underused playspace
                    to nature conservation
Core Strategy       Core Strategy Options considered       Conclusion       Results of            Preferred Option and reasons for selecting
Preferred Options                                          of the           consultation on the   Preferred Option
Policies &                                                 Sustainability   Core Strategy
Proposals                                                  Appraisal of     Options
                                                           the Options
Provision of        Implications for schools arising       Both             Option2 broadly       Option 2 has been selected as this is fair
school facilities   from new residential development       options          supported             and reasonable and consistent with
Policy CS-C3        Option 1: Require all new housing      were             Option1 (38%)         Government policy on planning
                    developments to contribute through     considered       Option2 (62%)         obligations.
                    planning obligations to the            to be not
                    provision, extension or improvement    sustainable
                    of schools
                    Option 2: Require only those
                    housing developments which will
                    create a school capacity issue to
                    make good that capacity through a
                    planning obligation

Planning            New greenspace in residential          Assessment Option2                     The Core Strategy is not sufficiently
obligations         developments                           incomplete supported                   detailed on this issue. More detailed
Policy CS-C4        Option 1: Retain existing policy                                              policy will be set out in the appropriate
                    requiring developments of 10+                                                 DPD.
                    houses to provide new, or
                    enhancements to existing,
                    Greenspace and recreation facilities
                    Option 2: Require all family houses
                    to contribute to the provision or
                    enhancement of
                    greenspace/recreation facilities

								