					                                                                       Instructions




Risk and Issues Template
Use this template to track the project's risks and issues. The risk log provides a calculation based on the identified
Risk's probability and impact. Probability is a drop down list of: Certain, Expected, Likely, Possible, Unlikely. Impact
is a drop down list: Very High, High, Medium, Low and Very Low. - The template also controls issue log items by
using the log to update the issue "n" sheet.


General        1     On the first time to use the template:
                      a) Update the headers on all worksheets to reflect the PROJECT NAME

Risk Log             List Identifed Risks and Calculate Risk Rating with suggested meanings
               1     Enter or Update the following:
                       a) Risk Number
                       b) Risk description
                       c) Probability (use dropdown list)
                       d) Impact (use dropdown list) e) Risk Rate color will change based on formula
               2     If Sorting is desired Sort all lines using the Header Row by Rating (descending) Number (ascending)
               3     For additional risks, Insert new rows, and then copy the Complete "template line" (At least cells A-R) and
                     insert it after the last identified risk
Issue Log            For Tracking all Issue Items - Log is used to provide information to the specific issue sheet
                     (Issue summary, Responsible Person, Issue Date and Status)
               1     Enter the following on the Issue Log worksheet:
                       a) Next sequential issue number
                       b) Issue description
                       c) Name of person assigned/responsible for the issue
                       d) Date the issue is being added
                       e) Status (use the dropdown list)



                                                                                      D:\Docstoc\Working\pdf\0285ce89-c879-4a3e-9106-12f8f4c6f836.xls
                                                                      Instructions



Issues worksheet   For tracking details of each identified Issue
             1     Make a copy of the Issue Template worksheet by right clicking on its label - choose "Move or Copy".
                   Choose both (move to end) and create a copy.
             2     Rename the copy of the Issue Template worksheet to "Issue "n" where n = the issue number
             3     Link the fields (Issue Description, Name of person Assigned, and Date of Issue) from the Issue Log
                   to the appropriate fields on the Issue worksheet: On the Issue "n" sheet for each field type in "=", then go
                   to the issue log sheet and click on the field there. Hit "enter" and you will come back to the Issue "n"
                   sheet with the value filled in.
             4     Enter the following on the Issue worksheet:
                     a) Level - High, Medium or Low
                     b) Class - Impact Area
                     c) Originator
                     d) A brief description of the consequences
             5     Update the Resolution with the steps completed to resolve the issue. At a minimum, this should include
                   the date, action taken, who took the action. This should reflect a historical sequence of events

             6     Make any changes to Issue Description, Person responsible or status in the issue log and they will be
                   updated in the Issues Worksheet




                                                                                     D:\Docstoc\Working\pdf\0285ce89-c879-4a3e-9106-12f8f4c6f836.xls
<Insert Project Name>                                                                         Risk Log                                                                                   3




Number         Risk                                           Probability        Impact      Rating      Contingency Plan              Mitigation Plan
  1            Example                                          Certain           High       0.7125
    2                                                                                        0.0000
    3                                                                                        0.0000
    4                                                                                        0.0000
    5                                                                                        0.0000
    6                                                                                        0.0000
   7                                                                                         0.0000
   8                                                                                         0.0000
   9                                                                                         0.0000
  10                                                                                         0.0000
  11                                                                                         0.0000
  12                                                                                         0.0000
  13                                                                                         0.0000
  14                                                                                         0.0000
  15                                                                                         0.0000
  16                                                                                         0.0000
Legend:
               Minimum risk - Acceptable
               Some risks - Monitor at PM/Team Level
               High risks - Active monitoring with ongoing Contingency/Mitigation activity
               Show stoppers - Active participation with steering committee to mitigate




    X          template line                                                                 0.0000




                                                                                                                            D:\Docstoc\Working\pdf\0285ce89-c879-4a3e-9106-12f8f4c6f836.xls
<Insert Project Name>    Issue Log


                                     Person                 Date Opened -
Issue No.      Issue                 Responsible            Month/Day/year        Status
    1          Example               Project Manager               03/15/07      Open




                                        D:\Docstoc\Working\pdf\0285ce89-c879-4a3e-9106-12f8f4c6f836.xls
<Insert Project Name>                                                 Issue Template


                                                                                       Date
Issue No.                                       Level                                  Opened                                             Status
  (From                 Responsible             (High,             Class               (From                                              (From
  Issue                 Party (From             Medium,            (Impact             Issue             Date                             issue
   Log)                 Issue Log)              Low)               Area)               Log)              Closed             Originator    Log)
     1                   Project Manager                                                 03/15/07                                         Open


            Issue (From Issue Log)
                      Example



            Consequence(s)
                    If not resolved this issue could delay the project by 30 days, resulting in a fine for non-compliance




            Resolution
                        Hiring a contractor could resolve this delay at a cost less than the fine for non-compliance