Hazard by huanghengdong

VIEWS: 2 PAGES: 5

									                                            Summary of Local Solutions Liverpool Watersport Centre Risk Assessments

           Activity: Paddlesports/ Sailing / Windsurfing / Powerboating/SUPs/improvised rafting Site: Queens Dock Liverpool

           Date of Assessment: 13th March 2011                                       Review Date:      Ongoing

           Assessment Undertaken By Centre Manager                                      Signed By

Hazard         Water Level    Who Might      Probability   Severity   How is the Risk Controlled       Action By                          Special              Outcome
               Variance       be harmed                               Generally                        Whom                               Circumstances        Probability
                                                                                                                                          Control variance      Severity


                                                                       Buoyancy aids to be worn at     Checked and implemented             Recognised       Low
Drowning       All Levels     Staff /        Low           High         all times on the water and       by Instructional Staff, before       Exemption
                              Service                                   lower level of the Centre by     moving to the lower level.           from BA
                              users                                     staff and service users                                               Control
                              Site User’s                              BA’s to comply with CEN         Admin staff to ensure that all
                                                                         standards                       necessary paper work                None
                                                                       A swimming disclaimer to be      relating to service users is
                                                                         completed by all service        completed prior to first
                                                                         users when completing the       lesson.
                                                                         booking form.
                                                                       Water manned by power           Centre staff check
                                                                         boats                           emergency provision daily
                                                                       All staff by Radio contact       and prior to opening
                                                                          when on the water

Hypothermia
               All Levels     Staff /        Med           Med
                                                                        Service users required to        Instructional staff to            Instructional    Low/
                              Service                                    wear appropriate clothing         monitor participants               staff are to     Medium
                              users                                                                                                           monitor
                                                                         and footwear
                              Site User’s                                                               Instructional staff to monitor       conditions and
                                                                       Established Wind chill ‘cut-     and implement as required            are
                                                                        offs’ if required                                                     responsible
                                                                       Water manned by power           Centre staff to check daily          for ‘cut-offs’
                                                                        boats
                                                                       Radios
                                                                       First aid provision on site




                                                                                                                                                           1
                                               Summary of Local Solutions Liverpool Watersport Centre Risk Assessments

              Activity: Paddlesports/ Sailing / Windsurfing / Powerboating/SUPs/improvised rafting Site: Queens Dock Liverpool

              Date of Assessment: 13th March 2011                                        Review Date:     Ongoing

              Assessment Undertaken By Centre Manager                                    Signed By
Hazard            Water Level  Who Might    Probability      Severity   How is the Risk Controlled        Action By                             Special                 Outcome
                  Variance     be harmed                                Generally                         Whom                                  Circumstances           Probability
                                                                                                                                                Control variance         Severity


                                                                         Circulation                      Instructional staff to set and         None                Low
Collision         All Levels     Staff /        Low          Med
                                                                                                              monitor
                                 Service
                                 users                                   Zoning                             Instructional staff to maintain
                                 Club Site                                                                    circulation routes and zoning
                                 User’s                                  First aid provision                Centre to provide



                                                                         Wind – Established ‘cut-offs’    Centre Manager and                     Instructional       Low
Weather           All Levels     Staff /        Med          Med          for each activity                                                         staff make
                                                                                                              Instructional staff
                                 Service                                                                                                            decision on
                                 users                                   Weather monitoring for                                                    The Day
                                 Site User’s                              adverse conditions and
                                                                          establish ‘cut-offs’ point.




                                                                         Instructional Staff to               Centre Manager /                 Monitor traffic       Low
Other water       All Levels     Staff /        Low          Low                                              Instructional Staff                 coming from
                                                                           Monitor other traffic i.e.
users                            Service                                                                                                          and travelling to
                                                                          Duck Tours
                                 users                                                                                                            marina
                                                                          Skylark, rowing/dragonboat
                                 Site User’s                            clubs

                                                                         Set – up signalling system to
                                                                          control through traffic.




                                                                                                                                                                    2
                                              Summary of Local Solutions Liverpool Watersport Centre Risk Assessments

             Activity: Paddlesports/ Sailing / Windsurfing / Powerboating/SUPs/improvised rafting Site: Queens Dock Liverpool

             Date of Assessment: 13th March 2011                                        Review Date:       Ongoing

             Assessment Undertaken By Centre Manager                                     Signed By
Hazard           Water Level  Who Might    Probability       Severity   How is the Risk Controlled         Action By                         Special                Outcome
                 Variance     be harmed                                 Generally                          Whom                              Circumstances          Probability
                                                                                                                                             Control variance        Severity


                                                                           Close Supervision of service      Centre Manager /                                     Med
Slips / Trips /   All Levels    Staff /        High          Med            users within pontoon areas         Instructional Staff
Falling into                    Service
water                           users                                      BA’s to be worn on pontoons
                                Site User’s                                 and identified safety areas



                                                                           Monitor water pollution
Poor water        All Levels    Staff /        High          High           levels, history and quality       British Waterways will keep                          Med
quality                         Service                                                                        the Centre notified of any
                                users                                      Water Quality tested               changes
                                Site User’s                                 regularly



                                                                           Access, egress and activity       Centre Manager                   Emergency          Med
Abrasions         All Levels    Staff /        High          Med/           briefing provided for all                                            Protocols in
cuts and                        Service                      High           activities                                                           place if
bruising                        users                                      Supervision by staff on                                              required
                                Site User’s                                 pontoons, loading and
                                                                            unloading



                  Water Level   Who Might      Probability   Severity   How is the Risk Controlled         Action By                         Special                Outcome
Hazard            Variance      be harmed                               Generally                          Whom                              Circumstances          Probability
                                                                                                                                             Control variance        Severity




                                                                                                                                                                3
                                             Summary of Local Solutions Liverpool Watersport Centre Risk Assessments

            Activity: Paddlesports/ Sailing / Windsurfing / Powerboating/SUPs/improvised rafting Site: Queens Dock Liverpool

            Date of Assessment: 13th March 2011                                       Review Date:        Ongoing

            Assessment Undertaken By Centre Manager                                      Signed By

Major incident                 Staff /        Low          High          1st aid provided                    Emergency Protocols in                 Low
                               Service                                   All staff first aid trained         Place if required
                               users                                     Entry / exit route maintained
                               Site User’s                                for Emergency Services




Vehicle Injury                 Staff /        Low          High          Vehicle access / no go               Centre Manager                       Low
                               Service                                    areas set
                               users                                     Speed limit enforced
                               Site User’s




Manual                         Staff /        Med          Med /         Appropriate Lifting                  Managed by Instructional             Med
Handling                       Service                     high           procedures implemented                Staff and all staff briefed on
                               users                                                                            Assembly, Location and
                               Site User’s                               All craft move with                   Mooring of craft
                                                                          appropriate manpower
                                                                          resource




                                                                                                                                                 4
                               Summary of Local Solutions Liverpool Watersport Centre Risk Assessments

Activity: Paddlesports/ Sailing / Windsurfing / Powerboating/SUPs/improvised rafting Site: Queens Dock Liverpool

Date of Assessment: 13th March 2011                                     Review Date:     Ongoing

Assessment Undertaken By Centre Manager                                    Signed By


Likelihood                                   Severity                                   Risk Rating           Priority

1. Low (seldom)                              1. Slight (off work for up 3 days          1                     No action
2. Medium (frequently                        2. Serious (off work for over 3 days       2                     Low priority action
3. High (certain or near certain)            3. Major (death/major harm)                3                     Medium priority action
                                                                                        4                     High priority
                                                                                        5                     urgent actions
Equipment

           NUMBER OF CRAFT                        SAFETY POWERED CRAFT                      PERSONAL

TOPPER                                X 10                    X1/2

OPPIE                                 X8                      X1/2                            X1/2

WAYFARER                              X2                      X1/2

DRASCOMBE LONGBOAT                    X1                        X1                              X2

WINDSURFING BOARDS                    X6                        X1                              X1

KAYAKS                                X 16                                                      X2

OPEN CANOES                           X 10                      X1

INFLATABLE RAFTS                      X2                      X1/2                            X1/2




                                                                                                                                   5

								
To top