Docstoc

utility conflict matrix _blank_

Document Sample
utility conflict matrix _blank_ Powered By Docstoc
					Project:                                                                                                                                                                                STATE PROJ. NO.    SHEET NO.
                                                                                                                                                                                                           X of Y
Utility Agency:
Contact Person:
STATION                        OFFSET              UTILITY       MATERIAL            DESCRIPTION            TO        TO BE        TO BE        TO BE       TO BE       INCLUDED     PRIOR    CONCURRENT   REMARKS AND COMMENTS
                                 (m)              TYPE/SIZE                          OF CONFLICT          REMAIN    REMOVED      ADJUSTED      RETIRED    RELOCATED       IN FDOT   TO FDOT    WITH FDOT
                                                                                                                     OFFSITE                  IN PLACE                   PROJECT    PROJECT     PROJECT




* ALL CONFLICTS IDENTIFIED ARE PRELIMINARY. ADDITIONAL CONFLICTS MAY BE IDENTIFED.
* THE CONFLICTS IDENTIFIED IN THIS MATRIX BY THE F.D.O.T. DO NOT RELIEVE THE UTILITYCOMPANY/OWNER FROM THE RESPONSIBILITY TO IDENTIFY ALL CONFLICTS WITH THEIR FACILITIES.
*FAILURE BY THE OWNER TO IDENTIFY A CONFLICT MAY RESULT IN A CLAIM BROUGHT AGAINST THE UTILITY AGENCY BY THE FDOT.
*STATION/OFFSET REFERENCED FROM CENTERLINE OF CONSTRUCTION UNLESS OTHERWISE SPECIFIED.




             a646ca7a-46bd-4cd7-bb6c-27ee8f0a96be.xls

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:27
posted:2/26/2012
language:Latin
pages:1