Designed for the future



A finalist in the best Public/Community Project category of this year’s LABC National

Built in Quality Awards, the £2.7 million Stafford Children’s Centre is a shining example

of how sustainable design and collobarative working can achieve excellent results



he new Stafford during the building process by “KITCHEN radiators installed on the first









T

Childrens Centre, a careful choice of sourcing floor. Automatic controls

VENTILATION

built by Thomas Vale materials, sub-contractors, maximise the condensing

Construction, was components and local labour. SYSTEMS mode of the boilers which has

required to By maintaining a close INCORPORATE CROSS the effect of inceasing off-peak

incorporate working relationship with the HEAT EXCHANGERS seasonal efficiency.

Sandyford Nursery School, a supply chain the impact on Kitchen ventilation systems

THAT PRE-HEAT COLD

90+ place 0-5 year nursery, the environment was incorporate cross heat

14 place crèche, toy library, decreased through reduced INCOMING AIR FROM exchangers that pre-heat cold

health consulting rooms, transportation and WARM EXTRACT AIR” incoming air from warm extract

multi-purpose community specification of materials air. This reduces the energy

room and training/admin obtained from sustainable needed to raise comfort levels

facilities. sources. before the air is supplied at

The design, construction The operational servicing of required temperatures. Natural

and client team, including the building is designed to ventilation has been used

Stafford Borough Council use no more energy than that throughout the building

Building Control, has strived of comparable notional wherever possible in order to

to produce an innovative buildings as described in Part minimise the amount of

design through a process of L2 of the Building Regulations. mechanical ventilation and

collaborative working and The systems that have been consequential running costs

extensive stakeholder installed have been designed incurred.

consultation. to operate in an efficient and Lighting systems incorporate

Sustainability has been cost effective way in order to passive infrared detectors that

viewed from two primary minimise fuel consumption turn lights on automatically

points: operational usage and and maximise comfort when areas are occupied and

minimization of waste environments. Energy targets off when the area is vacated.

(materials and resources). The do not exceed those Only essential circulation areas

operational usage of the permissible under current EU are controlled manually for

building essentially concerns directives. Condensing boilers health and safety reasons.

mechanical and electrical supply efficient low-grade Sub-metering has been

servicing and construction heating to underfloor heating installed so that fuel

whereas minimisation of waste circuits at ground floor and consumption and electrical

was considered prior and low surface temperature energy can be monitored and

to ensure that any unexpected

load profiles can be identified,

investigated and rectified.

All habitable areas have

been designed to maximise

use of natural daylight and

passive ventilation through

generous opening lights. The

design also incorporates a

green roof thereby

encouraging urban bio-

diversity, reducing storm water

discharge from the building

and for educational benefit. As

the project is located in an

area liable to flooding all

residual surface water has

been taken to soakaways thus

reducing load on the public

drainage system.



www.labc.uk.com | winter 2008 | 99


Related docs
Other docs by JimmyPavel
The Value of Good Credit to Your Future
Views: 1  |  Downloads: 0
Area for Future Expansion
Views: 2  |  Downloads: 0
Copy of Copy of top 100 stockholders as of
Views: 69  |  Downloads: 1
High Schools of the Future ProgramAgenda
Views: 6  |  Downloads: 0
All-FCIAC Softball copy.indd
Views: 60  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!