					PHASE GATE REPORT
Kirkland Transit Center Project

MEETING                              DATE            STAFF CONTACT                                  PHONE
Board                                12/16/2010      Ahmad Fazel, Executive Director, DECM          (206) 398-5389
                                                     Barry Alavi, Project Manager                   (206) 398-5433

    GATE 1       GATE 2          GATE 3        GATE 4          GATE 5          GATE 6          GATE 7         GATE 8
Enter Project     Identify     ID Preferred   Enter Final     Establish      Proceed to      Transition to   Close Out
Development     Alternatives    Alternative    Design         Baseline      Construction      Operations      Project




PURPOSE OF REPORT
Notify the Board that the Project is transitioning from construction into operations and project close out.

BUDGET                                                        SCHEDULE
Baseline Budget: $13.3 million                                Baseline Schedule: December 2010
Estimated Final Project Cost: $13.3 million                   Substantial Completion: January 2011 for
                                                              the February 2011 service change

PROJECT DESCRIPTION
The Kirkland Transit Center Project will increase capacity and operational flexibility for local and express bus
service at the existing on-street transit center. Enhancements include:

•    Bus bays accommodating up to a total of ten buses with weather protection
•    Bike facilities
•    Pedestrian/bike crossings and connections to the surrounding community
•    Lighting, landscaping and public art
•    Intersection improvements to enhance pedestrian safety
•    Traffic signal modifications

Sound Transit will own and maintain the bus shelters, benches, and related assets. The City of Kirkland will
own and maintain the trellis structure, recycling facilities, in-pavement flashing crosswalk, median and
pedestrian lighting, landscaping, irrigation, median railing, traffic signals, utilities (storm, wastewater, water),
plaza lighting and vehicular operations painting/thermoplastic markings.




REPORT RECEIVED


____________________________________                                          ____________________________
Board Chair                                                                   Date

				