2011_eco_innovation_partc_detailed_budget

Document Sample
2011_eco_innovation_partc_detailed_budget Powered By Docstoc
					                                                                         Proposal identification number   (to be inserted by
                                                                         the EACI)




                                            Call for proposals 2011

                                    Call Identifier: CIP-EIP-Eco-Innovation-2011



                                            DETAILED BUDGET
                                             (PART C and A3)


 CIP Eco-innovation first application and market replication
                           projects


Full title of the
proposed action1


Acronym of the
proposed action2

                                                  Proposal Cover Sheet




c7c659fb-1728-4bb9-b77d-9e7f44e1e918.xlsx                                                                                      Page 1 of 57
                                                  Executive Agency for Competitiveness and Innovation
                                  CIP Eco-innovation first application and Market Replication Projects Call 2011
                                                         Call Identifier: CIP-EIP-Eco-Innovation 2011
INDICATORS                                                                                                           0
At the end of the project
                                                                       Absolute
Objective              Indicators                                                        Relative Impact   Comment
                                                                       Impact
                                                                                         in % change to
                                                      CO2              tons / year
                                                                                         baseline
                    Greenhouse gas                                                       in % change to
                                                    Methane            tons / year
                      emissions                                                          baseline


                                               Particulate matters     in ppm
                        Air quality


                                               Irritant / Corrosive
                       Reduction /          Mutagenic / Carcinogenic
                      substitution of
Improved                                            Toxic
                       dangerous
Environmental                                     Persistent /
                       substances
Performance                                    Bioaccumulative

                                                                                         in % change to
                                                   Prevention          tons / year
                                                                                         baseline
                                                                                         in % change to
                                              Waste minimization       tons / year
                                                                                         baseline
                                               Reuse of waste /                          in % change to
                                                                       tons / year
                                              Substance recovery                         baseline
                  Waste management                                                       in % change to
                                               Material recycling      tons / year
                                                                                         baseline
                                              Waste diverted from                        in % change to
                                                                       tons / year
                                                   landfills                             baseline
                                                                                         in % change to
                                               Hazardous waste         tons / year
                                                                                         baseline

                                                                                         in % change to
                   Reduced resource                                    tons / year
                                                                                         baseline
                      consumption
                   (excluding energy)
                                                Reduced water                            in % change to
Better use of                                                          liters / year
                          Water                  consumption                             baseline
natural
resources
                                                                                         in % change to
                                               Energy from RES         kwh / year
                                                                                         baseline
                         Energy                 Reduced energy                           in % change to
                                                                       kwh / year
                                                 consumption                             baseline

                      Business
                    development /                                                        not applicable
                   Market replication
                                             market size in million
                                                                     Euros               not applicable
                                                     Euros
                    Market potential
                                            market size in number of
                                                                     customers           not applicable
                                                  customers
Economic           Entry in new
Performance / transnational markets                                                      not applicable
Market
Replication     Entry into different
                                                                                         not applicable
                     sectors

                  Reduction of cost per                                                  in % change to
                                                                       in Euros / unit
                    unit or process                                                      baseline
                                              capital invested / net
                     Payback Time                                      in years          not applicable
                                                     income
                         Patents                                                         not applicable




Others




c7c659fb-1728-4bb9-b77d-9e7f44e1e918.xlsx                                                                                Page 2 of 57
                                                  Executive Agency for Competitiveness and Innovation
                                  CIP Eco-innovation first application and Market Replication Projects Call 2011
                                                         Call Identifier: CIP-EIP-Eco-Innovation 2011
INDICATORS                                                                                                           0
Two years after the project
                                                                       Absolute
Objective              Indicators                                                        Relative Impact   Comment
                                                                       Impact
                                                                                         in % change to
                                                      CO2              tons / year
                                                                                         baseline
                    Greenhouse gas                                                       in % change to
                                                    Methane            tons / year
                      emissions                                                          baseline


                                               Particulate matters     in ppm
                        Air quality


                                               Irritant / Corrosive
                       Reduction /          Mutagenic / Carcinogenic
                      substitution of
                                                    Toxic
Improved               dangerous
                                                  Persistent /
Environmental          substances
                                               Bioaccumulative
Performance
                                                                                         in % change to
                                                   Prevention          tons / year
                                                                                         baseline
                                                                                         in % change to
                                              Waste minimization       tons / year
                                                                                         baseline
                                               Reuse of waste /                          in % change to
                                                                       tons / year
                                              Substance recovery                         baseline
                  Waste management                                                       in % change to
                                               Material recycling      tons / year
                                                                                         baseline
                                              Waste diverted from                        in % change to
                                                                       tons / year
                                                   landfills                             baseline
                                                                                         in % change to
                                               Hazardous waste         tons / year
                                                                                         baseline

                                                                                         in % change to
                   Reduced resource                                    tons / year
                                                                                         baseline
                      consumption
                   (excluding energy)
                                                Reduced water                            in % change to
Better use of                                                          liters / year
                          Water                  consumption                             baseline
natural
ressources
                                                                                         in % change to
                                               Energy from RES         kwh / year
                                                                                         baseline
                         Energy                 Reduced energy                           in % change to
                                                                       kwh / year
                                                 consumption                             baseline

                      Business
                    development /                                                        not applicable
                   Market replication
                                             market size in million
                                                                     Euros               not applicable
                                                     Euros
                    Market potential
                                            market size in number of
                                                                     customers           not applicable
                                                  customers
Economic
Performance /      Entry in new
                                                                                         not applicable
Market        transnational markets
Replication
                Entry into different
                                                                                         not applicable
                      sectors
              Reduction of cost per                                                      in % change to
                                                                       in Euros / unit
                  unit or process                                                        baseline
                                              capital invested / net
                     Payback Time                                      in years          not applicable
                                                     income
                         Patents                                                         not applicable




Others




c7c659fb-1728-4bb9-b77d-9e7f44e1e918.xlsx                                                                                Page 3 of 57
                                           Executive Agency for Competitiveness and Innovation (EACI)
                   CIP Eco-innovation first application and Market Replication Projects Call 2011:
                                            CIP-EIP-Eco-Innovation-2011                                                                                     A3: BUDGET
                                                 Do not fill out this sheet
              This table contains exactly the data that you must encode into the A3 form of the online submission system (EPSS).
                                       Its purpose is to help you to ensure consistency between the forms.
                                                                                                                                                                                       0
                             It is automatically completed with the data you enter into the subsequent worksheets.
                                   Attention: the numbering of the participants has to be the same in all forms.

                                                                                                                                                                       Requested
                                                                                                                  Total hours                         Requested                      Expected funding from
Participant    Participant   Participant                                                     Organisation short               Total eligible costs                  funding in % of
                                                       Organisation legal name (in EN)                                per                          funding from the                  other external sources
 number       legal status    Country                                                             name                             [in EUR]                           total eligible
                                                                                                                  participant                        EC [in EUR]                            [in EUR]
                                                                                                                                                                          costs

     1             0              0                                   0                              0                 0                        0                0              0%                        0


     2             0              0                                   0                              0                 0                        0                0              0%                        0

     3             0              0                                   0                              0                 0                        0                0              0%                        0


     4             0              0                                   0                              0                 0                        0                0              0%                        0

     5             0              0                                   0                              0                 0                        0                0              0%                        0


     6             0              0                                   0                              0                 0                        0                0              0%                        0


     7             0              0                                   0                              0                 0                        0                0              0%                        0

     8             0              0                                   0                              0                 0                        0                0              0%                        0


     9             0              0                                   0                              0                 0                        0                0              0%                        0


    10             0              0                                   0                              0                 0                        0                0              0%                        0

    11             0              0                                   0                              0                 0                        0                0              0%                        0

    12             0              0                                   0                              0                 0                        0                0              0%                        0


    13             0              0                                   0                              0                 0                        0                0              0%                        0


    14             0              0                                   0                              0                 0                        0                0              0%                        0


    15             0              0                                   0                              0                 0                        0                0              0%                        0

  Total:                                                                                                               0                        0                0              0%                        0




              c7c659fb-1728-4bb9-b77d-9e7f44e1e918.xlsx                                                                                                                                                       Page 4 of 57
                                                                                                                            EACI                                          CIP Eco-innovation first application and Market Replication Projects-Call for proposals 2011:
                                                                                                                                                                                                          CIP-EIP-Eco-Innovation-2011




                                                                                                                                                                                                         9
                                                                                                                                                                                                              8
                                                                                                                                                                                                                    7
                                                                                                                                                                                                                         6
                                                                                                                                                                                                                               5
                                                                                                                                                                                                                                    4
                                                                                                                                                                                                                                          3
                                                                                                                                                                                                                                               2
                                                                                                                                                                                                                                                    1




                                                                                                                                                                     15
                                                                                                                                                                             14
                                                                                                                                                                                   13
                                                                                                                                                                                        12
                                                                                                                                                                                              11
                                                                                                                                                                                                   10
                                                                                                                                                                                                                                                        Participant No.6




                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                                        Participant Legal Status8




                                                                                                                                                                                                                                                    0




                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                        Participant Country9




c7c659fb-1728-4bb9-b77d-9e7f44e1e918.xlsx
                                                                                                                                                                                                                                                        Participant Name




                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0




                                                                                                                                                                                                                                                        (Organisation Legal
                                                                                                                                                                                                                                                        Name in English)5




                                            Footnotes refer to numbered points in chapter II.3 of the Guide for Proposers
                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0




                                                                                                                                                                                                                                                        Organisation short name4




                                                                                                                                                             TOTAL
                                                                                                                                                                                                                                                        Number of hours
                                                                                                                                                                                                                                                        budgeted for the project17




                                                                                                                                                             0



                                                                                                                             Share of total eligible costs
                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                                                                                      C1 Cost summary in EUR




                                                                                                                                                                                                                                                        Direct Staff
                                                                                                                                                                                                                                                        Costs18




                                                                                                                              #DIV/0!
                                                                                                                                                             0
                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0




                                                                                                                                                                                                                                                        Sub-contracting19




                                                                                                                              #DIV/0!
                                                                                                                                                             0
                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0




                                                                                                                                                                                                                                                        Travel costs and
                                                                                                                                                                                                                                                        Allowances for




                                                                                                                              #DIV/0!
                                                                                                                                                             0                                                                                          Staff20
                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                                                               Direct eligible cost




                                                                                                                                                                                                                                                        Equipment and
                                                                                                                                                                                                                                                        Infrastructure21
                                                                                                                              #DIV/0!
                                                                                                                                                             0
                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0




                                                                                                                                                                                                                                                        Other Specific
                                                                                                                                                                                                                                                        Costs22
                                                                                                                              #DIV/0!
                                                                                                                                                             0
                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0




                                                                                                                                                                                                                                                        Subtotal of direct eligible
                                                                                                                                                                                                                                                        costs
                                                                                                                              #DIV/0!
                                                                                                                                                             0
                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0




                                                                                                                                                                                                                                                        Indirect eligible costs1
                                                                                                                                                                                                                                                                                                      0




                                                                                                                              #DIV/0!
                                                                                                                                                             0
                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0




                                                                                                                                                                                                                                                        Total eligible costs
Page 5 of 57
                                                                                                                                                             0
                                                                                                                                                                     0
                                                                                                                                                                             0
                                                                                                                                                                                   0
                                                                                                                                                                                        0
                                                                                                                                                                                              0
                                                                                                                                                                                                   0
                                                                                                                                                                                                         0
                                                                                                                                                                                                              0
                                                                                                                                                                                                                    0
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                    0
                                                                                                                                                                                                                C2 Funding summary in EUR                                                                                                                                                                                                     0




                                                                                                                                                                                                                                                                                                                                                                                                               % Expected Funding from




                                                                                                                                                                                                                                                                                                                                                                                                                                         Cost distribution between
                                                                                                                                                                                                                          Organisation Short Name




                                                                                                                                                                                                                                                                                                       Requested Funding from




                                                                                                                                                                                                                                                                                                                                    % of Requested Funding
                                                                                                                  Participant Legal Status




                                                                                                                                                                                                                                                                                                                                                                                  Expected funding from
                                                                                                                                                                                                                                                                                                                                                                                  other external sources




                                                                                                                                                                                                                                                                                                                                                                                                               other external sources
                                                                                                                                                                                                                                                                               (Small, Medium, Large




                                                                                                                                                                                                                                                                                                                                                                                                                                                                             between participants
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Funding distribution
                                                                                                                                                                                          (Organisation Legal
                                                                                                                                             Participant Country




                                                                                                                                                                                                                                                    Total eligible costs




                                                                                                                                                                                                                                                                                                                                                               % of Own Funding
                                                                                                                                                                                          Name in English)5
                                                                                                                                                                       Participant Name
CIP Eco-innovation first application and Market Replication Projects-Call for proposals 2011:




                                                                                                                                                                                                                                                                                                                                                                                  (public + private)3




                                                                                                                                                                                                                                                                                                                                                                                                               (public + private)
                                                                                                Participant No.




                                                                                                                                                                                                                                                                                                       the EC [EUR]2
                                                                                                                                                                                                                                                                               Organisation
                                                                                                                                                                                                                                                                               Status of the




                                                                                                                                                                                                                                                                                                                                                                                                                                         participants
                                                                                                                                                                                                                                                                                                                                    from the EC
                                                                                                                                                                                                                                                                               Enterprise
                                                                                                                                                                                                                                                                               or Other)




                                                                                                                                                                                                                                                                                                                                                                                  [EUR]
                                                                                                    1                   0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                    2                   0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                    3                   0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!
                                CIP-EIP-Eco-Innovation-2011




                                                                                                    4                   0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                    5                   0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                    6                   0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                    7                   0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                    8                   0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                    9                   0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                10                      0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                11                      0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                12                      0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                13                      0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                14                      0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                15                      0                         0                0                                                  0                                                    0            0                                           0.00%                    100.00%                                               0.00%                 #DIV/0!                             #DIV/0!


                                                                                                                                                                                                                                                                           0                                                    0   0.00%                    100.00%                                       0       0.00%
EACI




                                                                                         c7c659fb-1728-4bb9-b77d-9e7f44e1e918.xlsx                                                                                                                                                                                                                                                                                                                                   Page 6 of 57
                                                                   EACI
                                                                                                            CIP Eco-innovation Pilot and Market Replication Projects
                                                                                                             Call for proposals 2011: CIP-EIP-Eco-Innovation-2011




                                                                                                           SUBTOTAL
                                                                                                                                                                                                     Subcontracting
                                                                                                                                                                                                                                           Cost category




                                                                                                                                                                                                                      Direct Staff Costs




                                            Total eligible costs
                                                                                                                      Other Specific Costs
                                                                                                                                                                            Travel and Subsistance


                                                                                                                                             Equipment and Infrastructure




                                                                      Total eligible indirect costs (7%)




c7c659fb-1728-4bb9-b77d-9e7f44e1e918.xlsx
                                                                                                                                                                                                                                           Workpackage 1:
                                                                                                                                                                                                                                           Management




                                            0
                                                                       0
                                                                                                           0
                                                                                                                                                                                                                                           Workpackage 2:
                                                                                                                                                                                                                                           INSERT NAME




                                            0
                                                                       0
                                                                                                           0
                                                                                                                                                                                                                                           Workpackage 3:
                                                                                                                                                                                                                                           INSERT NAME




                                            0
                                                                       0
                                                                                                           0



                                                                                                                                                                                                                                           Workpackage 4:
                                                                                                                                                                                                                                           INSERT NAME
                                            0
                                                                       0
                                                                                                           0
                                                                                                                                                                                                                                                                         C3 Distribution of costs per work package




                                                                                                                                                                                                                                           Workpackage 5:
                                                                                                                                                                                                                                           INSERT NAME
                                            0
                                                                       0
                                                                                                           0




                                                                                                                                                                                                                                           Workpackage 6:
                                                                                                                                                                                                                                           INSERT NAME
                                            0
                                                                       0
                                                                                                           0




                                                                                                                                                                                                                                           Workpackage 7:
                                                                                                                                                                                                                                           INSERT NAME
                                            0
                                                                       0
                                                                                                           0




                                                                                                                                                                                                                                           Workpackage 8:
                                                                                                                                                                                                                                           INSERT NAME
                                            0
                                                                       0
                                                                                                           0




                                                                                                                                                                                                                                           Workpackage 9:
                                                                                                                                                                                                                                           INSERT NAME
                                            0
                                                                       0
                                                                                                           0




                                                                                                                                                                                                                                           Workpackage 10:
                                                                                                                                                                                                                                           INSERT NAME
                                            0
                                                                       0
                                                                                                           0
                                                                                                                                                                                                                                                                         0




                                                                                                                                                                                                                                           Total eligible direct costs
                                                                                                           0
                                                                                                                        0
                                                                                                                                                0
                                                                                                                                                                              0
                                                                                                                                                                                                      0
                                                                                                                                                                                                                        0




                                                                                                                                                                                                                                           Total eligible indirect
                                                                                                                                                                                                                                           costs (7%)
                                                                                                           0
                                                                                                                        0
                                                                                                                                                0
                                                                                                                                                                              0
                                                                                                                                                                                                      0
                                                                                                                                                                                                                        0




                                                                                                                                                                                                                                           Total eligible costs
                                                                                                           0
                                                                                                                        0
                                                                                                                                                0
                                                                                                                                                                              0
                                                                                                                                                                                                      0
                                                                                                                                                                                                                        0




Page 7 of 57
                                                            Executive Agency for Competitiveness and Innovation (EACI)

             CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                                C4.1                                                                                0
                            4                                                                            6                                             7
Organisation short name                                                                 Participant No                     1        Participant Role                           CO

Organisation legal name in
                                                                                                     Participant legal statuts8                Participant Country9
English5

Status of the Organisation (Small, medium, large
enterprise or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
  Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                                  Direct Staff costs (EUR)
                                                                                                         Hours on Project14 (A)   Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)
                                                       13
                                                                                                                                                                        (AxB)16

                                                                                                                                                                        0.00
                                                                                                                                                                        0.00
                                                                                                                                                                        0.00
                                                                                                                                                                        0.00
                                                                                                                                                                        0.00
                                                                                                                                                                        0.00
   Total17, 18                                                                                                     0                                                    0.00
   Subcontracting19
    Name of sub-contractor              Country                                       Description                                    Work package no.                Total [EUR]




                                                                                                                                                   Subtotal:              0
                                                                       20
   Travel costs and subsistence allowances for staff
                                                                  Number of travels                            Travel and Subsistence rate [EUR]                     Total [EUR]

              International travels                                                                                                                                       0

                 National travels                                                                                                                                         0

                                                                                                                                                   Subtotal:              0




                                                                                                                                                                                    Page 8 of 57
                                        Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                 C4.1 (continued)                                                                           0
0                                                                                                         0                     0               1

                                        21
Costs for Equipment and Infrastrucure
                                                                                         Period of
                                                                                          months     Depreciati % Allocation
Description                                         Work Package no.        Cost/value                                          Total [EUR]
                                                                                         used for    on months to the project
                                                                                          project
                                                                                C            A           B             D            (A/B)xCxD
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                                       0
                                                                                                                    Subtotal:          0
Other specific costs22
Description                                                                                             Work package no.        Total [EUR]




                                                                                                                Subtotal:              0
                                                                                            Total eligible direct costs:               0
                                                                                               Total eligible costs:                   0




                                                                                                                                                    Page 9 of 57
Page 10 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                             C4.2                                                                                0

Organisation short name4                                                              Participant No6                  2          Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 11 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                 C4.2 (continued)                                                                         0
0                                                                                                       0                     0               2


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                                  Page 12 of 57
Page 13 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                             C4.3                                                                                0

Organisation short name4                                                              Participant No6                  3          Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 14 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                 C4.3 (continued)                                                                         0
0                                                                                                       0                     0               3


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                                  Page 15 of 57
Page 16 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                             C4.4                                                                                0

Organisation short name4                                                              Participant No6                  4          Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 17 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                 C4.4 (continued)                                                                         0
0                                                                                                       0                     0               4


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                                  Page 18 of 57
Page 19 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                             C4.5                                                                                0

Organisation short name4                                                              Participant No6                  5          Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 20 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                 C4.5 (continued)                                                                         0
0                                                                                                       0                     0               5


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                                  Page 21 of 57
Page 22 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                             C4.6                                                                                0

Organisation short name4                                                              Participant No6                  6          Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 23 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                 C4.6 (continued)                                                                         0
0                                                                                                       0                     0               6


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                                  Page 24 of 57
Page 25 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                             C4.7                                                                                0

Organisation short name4                                                              Participant No6                  7          Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 26 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                 C4.7 (continued)                                                                         0
0                                                                                                       0                     0               7


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                                  Page 27 of 57
Page 28 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                             C4.8                                                                                0

Organisation short name4                                                              Participant No6                  8          Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 29 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                 C4.8 (continued)                                                                         0
0                                                                                                       0                     0               8


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                                  Page 30 of 57
Page 31 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                             C4.9                                                                                0

Organisation short name4                                                              Participant No6                  9          Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 32 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                 C4.9 (continued)                                                                         0
0                                                                                                       0                     0               9


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                                  Page 33 of 57
Page 34 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                            C4.10                                                                                0

Organisation short name4                                                              Participant No6                  10         Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 35 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                C4.10 (continued)                                                                         0
0                                                                                                       0                     0           10


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                               Page 36 of 57
Page 37 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                            C4.11                                                                                0

Organisation short name4                                                              Participant No6                  11         Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 38 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                C4.11 (continued)                                                                         0
0                                                                                                       0                     0           11


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                               Page 39 of 57
Page 40 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                            C4.12                                                                                0

Organisation short name4                                                              Participant No6                  12         Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 41 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                C4.12 (continued)                                                                         0
0                                                                                                       0                     0           12


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                               Page 42 of 57
Page 43 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                            C4.13                                                                                0

Organisation short name4                                                              Participant No6                  13         Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 44 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                C4.13 (continued)                                                                         0
0                                                                                                       0                     0           13


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                               Page 45 of 57
Page 46 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                            C4.14                                                                                0

Organisation short name4                                                              Participant No6                  14         Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 47 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                C4.14 (continued)                                                                         0
0                                                                                                       0                     0           14


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                               Page 48 of 57
Page 49 of 57
                                                         Executive Agency for Competitiveness and Innovation (EACI)

              CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011


                                                            C4.15                                                                                0

Organisation short name4                                                              Participant No6                  15         Participant Role7                          CB


Organisation legal name in
                                                                                                    Participant legal statuts8                 Participant Country9
English5

Status of the Organisation (Small, medium, large enterprise
or Other)10



   N° of productive hours / month11




   For participants which are associations with members12:

   Do you intend to have part of your work
   performed by one or several of your members?


   If you intend to work with some of your members, please ensure that the hours worked by the members as well as all other direct costs
   are included in this worksheet. Thus, the total costs of the association and all its members will be included in the project budget.

   Direct staff costs
   Please Note: Hourly rates cannot include overhead costs like (e.g. secretariat, office rent, computers, etc.)

   Categories of staff to work on the project                                                                                                               Direct Staff costs (EUR)
                                                                                                    Hours on Project14 (A)       Hourly Rate (EUR) (B)15
   (e.g. senior expert, expert, junior expert, etc.)13                                                                                                               (AxB)16

                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
                                                                                                                                                                      0.00
   Total17, 18                                                                                                 0                                                      0.00
   Subcontracting19
     Name of sub-contractor             Country                                     Description                                     Work package no.              Total [EUR]




                                                                                                                                                Subtotal:              0
                                                                    20
   Travel costs and subsistence allowances for staff
                                                                Number of travels                          Travel and Subsistence rate [EUR]                      Total [EUR]

              International travels                                                                                                                                    0

                 National travels                                                                                                                                      0

                                                                                                                                                Subtotal:              0




                                                                                                                                                                                       Page 50 of 57
                                      Executive Agency for Competitiveness and Innovation (EACI)

        CIP Eco-Innovation first application and Market Replication Projects - Call 2011: CIP-EIP-Eco-Innovation-2011

                                C4.15 (continued)                                                                         0
0                                                                                                       0                     0           15


Costs for Equipment and Infrastrucure21
                                                                                       Period of
                                                                                        months     Depreciati % Allocation
Description                                        Work Package no.       Cost/value                                          Total [EUR]
                                                                                       used for    on months to the project
                                                                                        project
                                                                              C            A           B             D            (A/B)xCxD
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                                     0
                                                                                                                  Subtotal:          0
Other specific costs22
Description                                                                                           Work package no.        Total [EUR]




                                                                                                              Subtotal:              0
                                                                                          Total eligible direct costs:               0
                                                                                             Total eligible costs:                   0




                                                                                                                                               Page 51 of 57
Page 52 of 57
Austria
Belgium
Bulgaria
Cyprus
Czech Republic
Denmark
Estonia
Finland
France
Germany
Greece
Hungary
Ireland
Italy
Latvia
Lithuania
Luxembourg
Malta
Netherlands
Poland
Portugal
Romania
Slovakia
Slovenia
Spain
Sweden
United Kingdom
Afghanistan
Albania
Algeria
American Samoa
Andorra
Angola
Anguilla
Antarctica
Antigua and Barbuda
Argentina
Armenia
Aruba
Australia
Azerbaijan
Bahamas
Bahrain
Bangladesh
Barbados
Belarus
Belize
Benin
Bermuda
Bhutan
Bolivia
Bosnia and Herzegovina
Botswana
Bouvet Island
Brazil
British Indian Ocean Territory
BRUNEI DARUSSALAM
Burkina Faso
Burundi
Cambodia
Cameroon
Canada
Cape Verde
Cayman Islands
Central African Republic
Chad
Chile
China (People's Republic of)
Christmas Island
Cocos Islands (or Keeling Islands)
Colombia
Comoros
Congo (Democratic Republic of)
Congo
Cook Islands
Costa Rica
Cote d'Ivoire
Croatia
Cuba
Djibouti
Dominica
Dominican Republic
Ecuador
Egypt
El Salvador
Equatorial Guinea
Eritrea
Ethiopia
Falkland Islands
Faroe Islands
Fiji
Former Yugoslav Republic of Macedonia
French Polynesia
French Southern Territories
Gabon
Gambia
Georgia
Ghana
Gibraltar
Greenland
Grenada
Guam
Guatemala
Guinea
Guinea-Bissau
Guyana
Haiti
Heard Island and McDonald Islands
Holy See
Honduras
Hong Kong
Iceland
India
Indonesia
Iran (Islamic Republic of)
Iraq
Israel
Jamaica
Japan
Jordan
Kazakhstan
Kenya
Kiribati
Korea (Democratic People's Republic of)
Korea (Republic of)
Kuwait
Kyrgyzstan
Lao (People's Democratic Republic)
Lebanon
Lesotho
Liberia
Libyan Arab Jamahiriya
Liechtenstein
Macao
Madagascar
Malawi
Malaysia
Maldives
Mali
Marshall Islands
Mauritania
Mauritius
Mayotte
Mexico
Micronesia (Federated States of)
Moldova (Republic of)
Monaco
Mongolia
Montenegro
Montserrat
Morocco
Mozambique
Myanmar
Namibia
Nauru
Nepal
Netherlands Antilles
New Caledonia
New Zealand
Nicaragua
Niger
Nigeria
Niue
Norfolk Island
Northern Mariana Islands
Norway
Oman
Pakistan
Palau
Palestinian-administered areas
Panama
Papua New Guinea
Paraguay
Peru
Philippines
Pitcairn
Qatar
Russian Federation
Rwanda
Saint Helena
Samoa
San Marino
Sao Tome and Principe
Saudi Arabia
Senegal
Serbia
Seychelles
Sierra Leone
Singapore
Solomon Islands
Somalia
South Africa
South Georgia and South Sandwich Islands
Sri Lanka
St Kitts and Nevis
St Lucia
St Pierre and Miquelon
St Vincent and the Grenadines
Sudan
Suriname
Swaziland
Switzerland
Syrian Arab Republic
Taiwan
Tajikistan
Tanzania (United Republic of)
Thailand
Timor Leste
Togo
Tokelau
Tonga
Trinidad and Tobago
Tunisia
Turkey
Turkmenistan
Turks and Caicos Islands
Tuvalu
Uganda
Ukraine
United Arab Emirates
United States Minor outlying islands
United States
Uruguay
Uzbekistan
Vanuatu
Venezuela
Viet Nam
Virgin Islands (British)
Virgin Islands (US)
Wallis and Futuna
Yemen
Zambia
Zimbabwe

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:6
posted:2/25/2012
language:
pages:57