Statement of Qualifications by zhouwenjuan

VIEWS: 21 PAGES: 69

									December 2008 




           




                 Statement of Qualifications




                                        NYS Certified
                                    Woman-Owned Business
                                          #49360
Table of Contents 


         

        Section 1       Our Company 

        Section 2       Services and Experience 
                        Environmental Site Assessments 
                        Investigations/Audits 
                        Remediation 
                        Drilling and Probing  

        Section 3       Our People 

        Section 4       Health and Safety 

        Section 5       Equipment 

        Section 6       Representative Clients 

        Section 7       Licenses, Certifications and Memberships 




AZTECH TECHNOLOGIES, INC.                                           DECEMBER 2008 
 


 
    Section 1 

    Our Company 
     

    Company Overview    pg 1 

    Company History     pg 2 

    Our Approach        pg 3 




 
Section 1                                                                                                             Our Company 



Company Overview 
 
Aztech Technologies offers a full spectrum of environmental services, self‐performed by Aztech Technology employees.  
This  includes  site  assessment  and  investigation  services,  drilling  and  probing,  remediation  system  design  and 
construction, dewatering and onsite treatment, and petroleum tank system audits.  Our clients have the confidence that 
we  will  plan  and  execute  all  aspects  of  a  project  to  their  total  satisfaction.    Every  project  receives  the  hands‐on 
attention,  guidance  and  accountability  of  a  company  principal  —  from  planning  through  completion.    Because  of  our 
experience and knowledge, we can successfully tackle large and complex projects, yet we are still small enough to offer 
you an extraordinary level of personal attention. 
 
Aztech Technologies is headquartered in Ballston Spa, NY. A combination office, shop, and warehouse, the facility boasts 
state of the art energy efficiency, utilizing ground‐source geothermal heating and cooling, advanced lighting and other 
energy saving measures.  It is our way of reducing our footprint on the environment as we help our clients reduce theirs.  
This location allows us to serve the needs of our clients throughout the Northeast and beyond. 
 
Aztech Technologies has a committed and dynamic work force.  We pride ourselves on the fact that many of our people 
have  been  with  us  since  the  beginning.  Firms  who  typically  turn  over  employees  at  a  rapid  rate  cannot  duplicate  the 
depth of experience that our people bring to your project. 
 
President Mary L. Passaretti, Senior Hydrogeologist and Vice President Fil Fina III, PE, Aztech’s executives, are seasoned 
professionals and leaders in their respective fields.  They take an active role in every phase of every project, providing 
expertise and accountability. 
 
Mary  and  Fil,  along  with  our  staff  of  dedicated  and  talented  technicians,  drillers,  engineers  and  geologists  pride 
themselves on providing the top level of service our clients deserve. 
 
                                   Aztech Technologies has the EXPERTISE you can count on. 
 




AZTECH TECHNOLOGIES, INC.                                                                                                           1 
Section 1                                                                                                               Our Company 

 
Company History 
 
                                                                       Aztech  formed  as  a  joint  venture  between  Passaretti 
                                                                       Geological & Environmental Consultants, Inc. (established 
                                                                       1991)  and  F.  L.  Fina,  PE  PC  (established  1992).    These 
                                                                       entities already had a history of partnering on projects to 
                                                                       coordinate  their  complementary  services.    The  original 
                                                                       venture,  formed  as  a  dba  in  1995,  was  incorporated  as 
                                                                       Aztech  Technologies  in  1997.    Together  at  one  facility,  a 
                                                                       former  bulk  storage  plant  in  Saratoga  Springs,  NY,  the 
                                                                       three  companies  operated  with  centralized  management 
                                                                       and  accounting.      Today  we  are  one  company  with  one 
                                                                       vision,  providing  our  client  with  comprehensive, 
                                                                       professional and reliable environmental services. 
                                                                        
                                                                       Aztech  Technologies,  Inc.  applied  and  received  its 
                                                                       certification  from  New  York  State  as  a  Woman  Business 
                                                                       Enterprise in 2004. 
                                                                        
At the beginning of 2006, Aztech moved into a state of the art, highly energy efficient new building in Ballston Spa, NY.  
The  building  was  designed  and  project  managed  in  house  with  geothermal  heating  and  cooling,  a  super  insulated 
building envelope and intelligent lighting systems. Completely customized to meet Aztech’s unique needs, the building 
provides  a  high  bay  shop  and  warehouse  space  with  loading  docks,  overhead  doors,  and  radiant  floor  heating.  This 
climate controlled environment provides a closer proximity to tools and machinery. The result of this has increased the 
efficiency  and  decreased  the  costs  associated  with  producing  custom  designed  remediation  systems.    The 
environmentally  friendly  design  of  the  building  is  in  line  with  the  culture  and  operations  of  Aztech  ‐  protecting  and 
restoring the environment.  
 
 




AZTECH TECHNOLOGIES, INC.                                                                                                              2 
Section 1                                                                                                                  Our Company 



Our Approach 
 
We offer a full spectrum of environmental services, and our clients have come to expect that we will plan and execute all 
aspects  of  a  project  to  their  total  satisfaction.  Maybe  you  only  need  one  or  two  of  our  services,  but  you  will  get  the 
benefit of our knowledge of the entire picture. It’s one of the ways that we are able to complete projects as quickly and 
efficiently  as  possible.  And  when  you  need  a  company  that  can  be  your  one  source  to  take  a  complex  project  from 
beginning to end, we are ready to get it done.  
 
Every project we work on gets the hands‐on attention, guidance and accountability of a company principal — from the 
planning  phase  all  the  way  through  to  completion.  It’s  just  how  we  do  business.  Because  of  our  experience  and 
knowledge,  we  can  successfully  tackle  large  and  complex  projects;  but  we  are  still  small  enough  to  offer  you  this 
extraordinary  level  of  personal  attention.  Because  we  operate  a  highly  efficient  and  tightly  run  organization,  we  can 
deliver a high degree of cost‐effectiveness, responsiveness and creativity, as well as accountability.  
 
                                        In other words, we are a different kind of company. 
                                                                       
                                       You will know it from your very first meeting with us. 
 




      Expertise                      YOU CAN COUNT ON




AZTECH TECHNOLOGIES, INC.                                                                                                                 3 
 




    Section 2 

    Services and Experience 
     

    Environmental Site Assessments  pg 4 

    Investigations/Audits           pg 9 

    Remediation                     pg 20 

    Drilling & Probing              pg 44 

     




 
Section 2                                                                                                  Services and Experience 


Environmental Site Assessments 
 

        Transaction Screen Environmental Site Assessments 
        Aztech  performs  Transaction  Screen  Environmental  Site  Assessments  (ESAs)  for  property  pre‐purchase, 
        refinance, and insurance purposes.  A Transaction Screen ESA is a useful tool to preliminarily identify potential 
        or existing environmental liabilities associated with previous or current land usage. 
 
        Transaction  Screen  ESAs  are  performed  in  accordance  with  ASTM  E  1528‐06.    However,  Aztech’s  Phase  I  ESA 
        typically  provides  more  information  than  is  mandated  by  the  ASTM  standard,  providing  clients  with  more 
        comprehensive  level  of  risk  assessment  and  environmental  liability  protection.    Transaction  Screen  ESAs  are 
        always  conducted  by  an  Environmental  Professional  (EP)  and  include  an  onsite  evaluation,  a  single  source  of 
        historical  research  (e.g.,  Sanborn  Maps,  environmental/regulatory  database  review),  a  questionnaire  for  the 
        current  owner/occupant  and  EP,  review  of  governmental  databases  and  a  final  report.    Turnaround  on  a 
        Transaction Screen ESA is typically swift and they are less costly than Phase I ESAs.  However, Transaction Screen 
        ESAs are best used for properties that have a land usage history clear of potential or existing  liabilities (i.e., low 
        risk properties or small loans in the case of lenders) as they do not allow a lender or property owner to satisfy 
        one  of  the  requirements  necessary  to  qualify  for  the  innocent  landowner  defense,  contiguous  property  owner 
        defense, or the bona fide prospective purchaser limitations for liability under the Comprehensive Environmental 
        Response Compensation and Liability Act (CERCLA).   
 

        Phase I Environmental Site Assessments 
        Aztech's  Phase  I  Environmental  Site  Assessments  are  the  industry  standard  to  determine  potential  or  existing 
        environmental liabilities associated with previous and current land usage. 
 
        Phase I ESAs are conducted in accordance with ASTM E 1527‐05 and the Environmental Protection Agency's All 
        Appropriate  Inquiry  rule.    When  warranted,  Aztech  also  performs  Phase  I  ESAs  according  to  ASTM  E  2247‐02: 
        Phase I ESA Process for Forestland or Rural Property, and ASTM E 2600‐08: Assessment for Vapor Intrusion into 
        Structures on Property Involved in Real Estate Transactions.   However, Aztech’s Phase I ESA typically provides 
        more information than is mandated by the ASTM standard, providing clients with more comprehensive level of 
        risk assessment and environmental liability protection.  Aztech's Phase I ESAs can be tailored and customized to 
        each of our client's needs.  Suspected  asbestos containing  material and lead  based paint  observations, a New 
        York State Department of Environmental Conservation spills database search and regulatory compliance are all 
        added value to our client.  This assessment also includes historic research from multiple sources, Sanborn Maps, 
        environmental/regulatory  database  review,  historical  aerial  photographs,  historical  topographic  maps,  city 
        directories, chain of title search, and information gathered from municipal offices.  A Phase I ESA also provides a 
        more  in‐depth,  on‐site  investigation.    A  few  of  the  things  our  professionals  are  trained  to  look  for  include:  
        geologic/hydrogeologic  conditions,  sources  of  potable  water/utilities,  inactive  and  active  above  and 
        underground  storage  tanks  (ASTs  and  USTs,  respectively),  suspected  hazardous  substances  or  petroleum 
        products,  odors,  liquids,  drums  or  containers,  suspected  polychlorinated  biphenyl‐containing  (PCBs)  materials, 
        suspected  asbestos  containing  materials,  suspected  lead  based  paint,  petroleum  storage,  chemical  storage, 
        wells, and waste water discharge.   Our professionals complete these assessments expeditiously and conform to 
        all deadlines.  A detailed report is provided to ensure that due diligence is completed prior to closing deadlines 
        for each property. 




AZTECH TECHNOLOGIES, INC.                                                                                                            4 
Section 2                                                                                                                                   Services and Experience 

                    Phase I Environmental Site Assessment vs. Transaction Screen Environmental Site Assessment 
 
                                       Phase I ESA                                                                Transaction Screen ESA 

        Applicable Standard(s): ASTM E 1527‐05 and EPA's All                              Applicable Standard(s): ASTM E 1528‐06 
        Appropriate Inquiry (AAI).  
        When  warranted,  Aztech  also  performs  Phase  I  ESAs  according  to 
        ASTM  E  2247‐02:  Phase  I  ESA  Process  for  Forestland  or  Rural 
        Property,  and  ASTM  E  2600‐08:  Assessment  for  Vapor  Intrusion 
        into Structures on Property Involved in Real Estate Transactions. 

        1.  Completed by: Environmental Professional (mandatory)                          1.  Completed by: Environmental Professional

        2.  Historical Research:  Multiple Sources                     2.  Historical Research:  Single Source‐required
        (i.e., Sanborn Maps [when available], historical aerial        (Aztech frequently uses multiple sources) 
        photos, historical topographical maps, city directories [when 
        available], Chain of Title [deed search]) 

        3.  Standardized records** & review (Government records)2                         3.  Standardized records** & review (Government records)2

        4.  Site Inspection1                                                              4.  Site Inspection1

        5.  Interviews                                                                    5.  Interviews
              a. Current Owners                                                                 a. Use Questionnaire for Owner/Occupant Inquiry 
              b. Past Owners 
              c. Local Agencies 

        6.  Research for Property Encumbrances                                            6.  Research for Property Encumbrances 
             a. Activity Use Limitations                                                                         Not Applicable 
                      1. Engineering Controls 
                      2. Institutional Controls 
                      3. Environmental Liens 
        7.  Documentation & Report                                                        7.  Documentation & Report
             a. Findings, opinions, conclusions, and                                           a. Completed Questionnaire 
                recommendations3                                                               b. Report4 
                                                                                                      1. Findings, opinions, & conclusions 

        8.  Phase I ESAs satisfy EPA AAI for CERCLA Liability                             8.  Limited AAI application and no protection from CERCLA 
                                                                                          liability 
     


    1
         See Site Inspection Comparison below 

    ** Includes NYSDEC Spills database review (above and beyond ASTM Standard) 
    2
        Federal Databases utilized include: National Priority List, CERCLA, RCRA hazardous waste generators, RCRA transfer facilities, RCRA Corrective Action sites. 
    2
        State Databases utilized include: State Superfund List, NYSDEC Spills Database , Solid waste landfills, Petroleum Bulk Storage sites, Major Oil Storage Facilities. 
    3
        Above and beyond ASTM Standard.  Written report from EP is not required under ASTM E 1528‐06. 
    4
        Above and beyond ASTM Standard 




AZTECH TECHNOLOGIES, INC.                                                                                                                                                      5 
Section 2                                                                                                                     Services and Experience 

                                                            On‐Site Inspection Comparison:  
                                                         Phase I ESA vs. Transaction Screen ESA 
 
                                          Phase I ESA                                                        Transaction Screen ESA 

          1.    Visual physical indicators of possible contamination                       1.   Visual physical indicators of possible contamination
          2.    Property                                                                   2.   Property
                    a. Site Walkover                                                                a. Site Walkover 
                    b. Periphery of Property                                                        b. Limited Assessment of Surrounding 
                    c. Views from adjacent roads                                                        Properties 

          3.    Structures                                                                 3.   Structures
                    a. Accessible Common Areas                                                      a. Accessible Common Areas 
                    b. Sample of Occupant Spaces                                                    b. Sample of Occupant Spaces 
                    c. Maintenance Areas                                                            c. Maintenance Areas 
                    d. Boiler Rooms                                                                 d. Boiler Rooms 
                    e. Excludes Hidden Areas                                                        e. Excludes Hidden Areas 
          4.    Site Observations1                                                         4.   Site Observations – no specifics in ASTM 
                     a. Current & Past Uses                                                     Standard** 
                               i. Of Property                                                        a. Current use of property 
                              ii. Of adjoining and/or nearby                                         b. Past use of property 
                                  properties                                                         c. Current use of adjoining or nearby 
                             iii. Surrounding area                                                      properties 
                     b. Geologic, Hydrogeologic Conditions                                           d. Utilities 
                     c. Sources of Potable Water/Utilities 
                     d. Identify above and underground storage 
                        tanks (ASTs, USTs) 
                     e. Identify hazardous substances or petroleum 
                        products 
                     f. Odors, liquids, drums or containers 
                     g. PCB‐containing materials 
                     h. Asbestos containing materials * 
                     i. Lead based paint * 
                     j. Petroleum Storage 
                     k. Chemical Storage 
                     l. Wells 
                     m. Waste water discharge 
                     n. Additional discussions when warranted 
                        (pits, ponds, lagoons, staining, stressed 
                        vegetation, solid waste disposal areas, 
                        loading areas, septic system, catch basins, 
                        pipes) 
 

    1
     This is not an all‐inclusive list 

    * Above and beyond ASTM Standard 

    ** Specifics only discussed when warranted (i.e., no mention that USTs were looked for unless one is found) 




AZTECH TECHNOLOGIES, INC.                                                                                                                              6 
Section 2                                                                                                    Services and Experience 

             CASE STUDY‐ Phase I Environmental Site Assessment 


             On  behalf  of  a  lending  institute  that 
             represented  a  commercial  client, 
             Aztech  Technologies,  Inc.  performed  a 
             Phase  I  ESA  at  a  property  in  Broome 
             County,  New  York.    The  results  of  the 
             Phase  I  ESA  solidified  the  opportunity 
             for the commercial client to secure the 
             loan they desired for refinancing of the 
             facility. 
              
             The  site  was  a  PVC  manufacturing 
             facility  that,  because  of  the  nature  of 
             this type of  business, had the potential 
             for  numerous  environmental  concerns.  
             The  building  contained  areas  where 
             extrusion  and  fabrication  processes  occurred,  along  with  the  associated  support  equipment, 
             supplies, chemicals, and maintenance areas necessary.  In addition, the property was situated within 
             an industrial area and adjacent to a landfill with known tetrachloroethylene (PCE) contamination.  
              
             As is the case with most of the Phase I ESAs conducted by Aztech, all work for this project involved 
             tight deadlines.  The extensive background research performed by Aztech revealed that the property 
             had  been  used  as  a  gravel  pit,  and  prior  to  that,  undeveloped  land.    After  researching  the 
             environmental  and  regulatory  databases,  Aztech  discovered  that  petroleum  storage  tanks  (both 
             underground  and  aboveground)  had  once  been  present  and  removed  from  the  property.  Further, 
             after  researching  a  database  that  is  not  required  in  the  ASTM  standard  for  Phase  I  ESAs,  Aztech 
             identified  past  petroleum  spills  at  the  property  in  association  with  these  former  petroleum  tanks.  
             During  the  site  inspection,  Aztech  noted  potential  Environmental  Protection  Agency  underground 
             injection  control  (UIC)  violations.    As  such,  Aztech  recommended  a  review  of  permits  acquired  by 
             the  facility  and  also  a  review  of  available  documentation  related  to  the  petroleum  tanks  and  past 
             petroleum  spills  at  the  property.    Without  this  information,  a  potentially  intrusive  investigation 
             would have been warranted, resulting in additional costs and possible time delays for the client. 
              
             Aztech reviewed regulatory paperwork at the facility, contacted regional regulatory personnel, and 
             performed  research  into  the  past  environmental  activities  in  relation  to  the  former  tanks  and 
             petroleum  spills.    The  resulting  information  revealed  that  the  facility  was  in  compliance  with 
             applicable UIC regulations due to the possession of relevant permits.  Additionally, Aztech acquired 
             information documenting the tank removals, petroleum spills, and associated follow up paperwork.  
             With all the necessary paperwork and permits in hand, state regulatory officials were satisfied with 
             regard to remediation of the past petroleum spills. 
              
             The lending institution expressed concern to Aztech regarding the adjacent landfill with the known 
             PCE  contamination,  in  that  the  contamination  may  be  encroaching  onto  the  subject  property.  
             Although Aztech could have confirmed or refuted the possible encroachment of PCE contamination 
             onto  the  subject  property  via  a  Phase  II  investigation  requiring  soil  borings,  monitoring  wells  and 
             additional cost, it was more expeditious and, in this case, just as effective, to obtain the information 


AZTECH TECHNOLOGIES, INC.                                                                                                          7 
Section 2                                                             Services and Experience 

                                 from  the  regulatory  agency.    Aztech  contacted 
                                 the regulatory agency and acquired the relevant 
                                 paperwork  that  showed  that  groundwater  was 
                                 not  flowing  toward  the  subject  property.    It 
                                 became  Aztech's  professional  opinion  that  PCE 
                                 contamination  was  not  encroaching  onto  the 
                                 facility  property.    The  lending  institution  was 
                                 satisfied,  and  proceeded  to  grant  their 
                                 commercial  client  the  financing  they  had 
                                 requested. 
 

 




AZTECH TECHNOLOGIES, INC.                                                                   8 
Section 2                                                                                                    Services and Experience 


Phase II Environmental Site Assessments and Investigations 
 
If a Phase I ESA determines that further assessment is required, or there is certainty of environmental impact, a Phase II 
ESA will be developed that will further evaluate the nature and  extent of those impacts via subsurface and groundwater 
investigations.    Aztech’s  team  of  geologists,  drillers  and  environmental  technicians  are  experienced  and  capable  of 
handling the tasks required for the successful completion of Phase II ESAs. 
 

        Subsurface Soil Investigation 
        Aztech  geologists  are  talented,  thorough  and  well  versed  in  conducting  soil  investigations  that  range  from 
        advancing soil borings in shallow and/or deep overburden to bedrock coring.  The scope of the subsurface soil 
        investigation is developed based on the findings of the Phase I ESA as well as other existing information for the 
        site to be investigated.  The goal is to determine if any environmental impacts to the subsurface soils exist at the 
        site. 
         
        Aztech geologists and drillers collaborate to advance soil borings to depths sufficient to spatially and vertically 
        evaluate the soil quality down to the top of bedrock, if necessary. Depending on the nature of the soil materials 
        present beneath a site, soil borings are typically advanced using either a track or truck‐mounted, hydraulic drill 
        rig using either direct‐push probing methods with macrocore sampling or split spoon sampling.  Depth‐discrete 
        soil samples are collected and the soil samples are examined in the field for grain size, color, odor (if present) 
        and moisture content.  Each soil sample is placed in an airtight container and the headspace is screened in the 
        field using a photoionization detector (PID) calibrated to a standard isobutylene calibrant gas. 
         
        In many cases, the soil sample from each soil boring location exhibiting the highest PID reading in the headspace 
        is  submitted  to  an  approved  laboratory  for  analysis  of  the  contaminant  of  concern  (COC).    Typically,  in  the 
        absence  of  PID  readings  or  other  evidence  of  COCs  in  the  soil  headspace,  the  soil  sample  collected  from  the 
        soil/water interface is submitted for laboratory analysis. 
         
        Drill  logs  containing  pertinent  information,  such  as  the  geotechnical  qualities  and  classification  of  soils,  the 
        location  of  the  soil  water  interface  and,  the  depth  interval  of  the  soil  sample  analyzed  by  the  laboratory,  are 
        kept for each respective borehole. 
         
        The soil characteristics and analytical data obtained from each borehole tell a story.  Aztech geologists evaluate 
        these data and are able to determine the presence and concentration of COCs, the depth and lateral distribution 
        of COCs and, the pathway in which the COC has traveled through the various soil types.  This information allows 
        us  to  identify,  define  and  delineate  the  area  in  the  subsurface  in  need  of  remedial  activities  and  develop  a 
        remedial approach specific to the COC and, the job site. 
         

        Groundwater Investigation and Monitoring 
        During  drilling  activities  temporary  or  permanent  monitoring  wells  can  be  installed  to  assess  the  quality  of 
        groundwater on a job site.   An Aztech geologist will log the geotechnical data associated with the site soil and 
        identify the position of the water table during advancement of the borehole.  Based on the observations made 
        during drilling, the geologist will develop specifications for and oversee the construction of the monitoring well.  
        Typically, soil borings are converted into 2.0‐inch inside diameter (ID) or 4.0‐inch ID schedule 40 PVC monitoring 
        wells that are constructed in a manner that is consistent with industry standards. 
         

AZTECH TECHNOLOGIES, INC.                                                                                                              9 
Section 2                                                                                                    Services and Experience 

        After  completing  the  monitoring  well  installation,  the  top  of  the  well  casing  elevation  is  determined  at  each 
        location  and  is  generally  tied  to  a  site  datum  of  100.00  feet.    The  purpose  of  establishing  the  top  of  casing 
        elevations to the site datum is to collect subsequent depth to water measurements from each monitoring well 
        so  that  groundwater  elevations  at  each  location  can  be  determined  and  the  direction  of  groundwater  flow 
        beneath the site can be evaluated. 
         
        After  the  depth  to  water  measurements  are  obtained,  groundwater  samples  are  collected  from  the  newly 
        installed  monitoring  wells,  using  disposable  bailers,  in  order  to  evaluate  the  groundwater  quality  beneath  the 
        site.  The groundwater samples are analyzed for COCs suspected at the site in accordance with state and federal 
        regulations. 
         
        The  data  obtained  during  the  field  activities  is  compiled  into  a  comprehensive  draft  Phase  II  ESA  report  that 
        summarizes the field methods, observations, and analytical results for soil and groundwater sampling.  The draft 
        Phase  II  ESA  report  will  also  provide  recommendations  regarding  future  work  at  the  site.    This  can  include 
        recommendations  for  additional  soil  borings  and/or  monitoring  wells  and  can  establish  a  frequency  for 
        subsequent  groundwater  sampling  events.    These  recommendations  can  also  be  used  to  develop  remedial 
        alternatives for a site, if warranted.   After the draft report is completed, it is sent to the client for review and 
        comment.  The Phase II ESA report is subsequently finalized. 




AZTECH TECHNOLOGIES, INC.                                                                                                             10 
Section 2                                                                                                    Services and Experience 


             CASE STUDY‐Phase II Environmental Site Assessment 


             •   Aztech was requested by the New York State 
                 Department  of  Environmental  Conservation 
                 (NYSDEC)  to  continue  a  site  investigation 
                 initiated by a previous consultant at a former 
                 gasoline station. 
             •   NYSDEC  suspected  that  the  site  and  study 
                 area  were  underlain  by  a  sinking  MtBE 
                 plume. 
             •   Soil  and  groundwater  analytical  results  from 
                 previous          investigations         indicated 
                 concentrations  of  petroleum  hydrocarbons 
                 and  other  volatile  organic  compounds 
                 associated with gasoline in excess of NYSDEC 
                 standards. 
             •   Site investigation included a review of existing geologic and analytical data collected from the 
                 30‐acre  study  area  by  previous  consultants.  Data  gaps  identified  during  that  effort  were 
                 addressed by two subsequent phases of investigation: 
                      o 1st  Phase:    advancement  of  soil  borings  that  were  focused  toward  evaluating  soil 
                          characteristics  and  quality  laterally  and  vertically  within  the  known  source  area.  
                          Additional  exploratory  soil  borings  were  also  advanced  on  order  to  identify  potential 
                          unknown source areas within and adjacent to the former gasoline station. 
                      o 2nd  Phase:    installation  of  nested  wells  at  strategic  locations  based  on  the  findings  of 
                          the  1st  Phase  –  this  would  help  to  develop  an  understanding  of  the  subsurface 
                          conditions that control the movement of site related compounds from the source area. 
             •   Results  of  the  investigation  identified  shallow,  intermediate  and  deep  hydrogeologic  zones 
                 within a glaciofluvial depositional environment. 
             •   Groundwater  quality  monitoring  found  that  the  plume  emanating  from  the  source  area  had 
                 reached static conditions where further expansion and migration of site related compounds are 
                 impeded by natural attenuation. 
             •   The spill file associated with this site was subsequently closed. 
          
NYSDEC requested Aztech Technologies to continue a site investigation on a 30‐acre parcel that had been initiated by a 
previous  consultant.    NYSDEC  suspected  that  the  site  and  study  area  were  underlain  by  a  sinking  MtBE  plume.      The 
overall size of the study area, situated within a glaciofluvial depositional environment, and the identification of shallow, 
intermediate and deep hydrogeologic zones were a challenge to fully assessing subsurface conditions. The importance of 
proper assessment of the site hydrogeology was accentuated by the known impact to nearby potable water sources.   
 
Aztech initiated their investigation of the property by reviewing geologic and analytical data previously collected from 
the study area.  Soil and groundwater analytical results indicated concentrations of petroleum hydrocarbons, and other 
volatile  organic  compounds  associated  with  gasoline,  in  excess  of  NYSDEC  standards.    Based  on  the  direction  of 
groundwater  flow  and  the  nature  of  the  compounds  impacting  soil  and  groundwater,  the  source  was  previously 
determined to be associated with the petroleum storage and distribution system at a former gasoline station.   
 



AZTECH TECHNOLOGIES, INC.                                                                                                         11 
Section 2                                                                                                      Services and Experience 

The  investigations  previously  conducted 
resulted  in  the  installation  and  operation  of  a 
soil  vapor  extraction/air  sparge  (SVE/AS) 
remedial system and a groundwater extraction 
and  treatment  (GWE&T)  system.    The  SVE/AS 
system  was  permanently  out  of  service  and 
the  GWE&T  system  was  operating  at 
approximately 20 percent of its design capacity 
and was only able to extract groundwater from 
a relatively small portion of the impacted area. 
 
After  reviewing  the  data  available  from  the 
previous  investigations  at  the  site,  Aztech 
identified  data  gaps  within  both  the  source 
area and the overall study area and proceeded 
with  a  phased  approach  of  soil  boring 
advancement and monitoring well installation.  
The  first  phase  of  investigation  included 
advancement  of  a  series  of  soil  borings  that 
was  focused  toward  identifying  the  lateral  and  vertical  extent  of  the  source  area  as  well  as  identifying  potential 
unknown  source  areas  within  and  adjacent  to  the  former  gasoline  station.      Strategically  selected  boreholes  were 
converted  into  monitoring  wells  during  that  initial  phase  of  drilling.    The  goal  of  the  second  phase  of  drilling  was  to 
provide a network of soil borings and monitoring wells that would help to develop an understanding of the subsurface 
conditions that control the movement of site related compounds from the source area. 
 
The  findings  of  the  investigations  previously  conducted  at  the  site,  as  well  as the  investigations  conducted  by  Aztech, 
helped to identify key subsurface characteristics, including complex groundwater flow patterns in multiple water bearing 
zones, discontinuous clay layers, a confining clay unit, and stratification of site related compounds within the saturated 
zone.  Groundwater quality monitoring also found that the plume emanating from the source area had reached static 
conditions, where natural processes, such as chemical/biological decay and advection, impeded further migration of site 
related  compounds  downgradient  from  the  site.    The  spill  file  associated  with  this  site  was  subsequently  closed  by 
NYSDEC.  




AZTECH TECHNOLOGIES, INC.                                                                                                               12 
Section 2                                                                                                      Services and Experience 


        Soil Vapor Intrusion 
        The phrase “soil vapor intrusion” refers to the process by which contaminants migrate from a subsurface source, 
        through soil vapor and into the indoor air of a building where an anthropogenic exposure is possible.  Soil vapor, 
        also  referred  to  as  soil  gas,  is  the  air  found  in  the  pore  spaces  between  soil  particles.    After  the  contaminant 
        partitions from the source and into “vapor” it travels through the pore spaces of vadose or unsaturated soil via 
        diffusion  or  advection.    If  the  contaminant  vapor  migrates  into  the  radius  of  influence  of  an  existing  building, 
        then  typical  building  pressure  differentials  related  to  heating  or  cooling  systems  can  draw  the  contaminant 
        vapors  into  or  below  the  structure  where  it  could  accumulate.    In  order  to  properly  evaluate  the  soil  vapor 
        intrusion  pathway,  Aztech  uses  the  recommended  multiple  lines  of  evidence  approach  where  samples  are 
        collected from soil vapor, sub‐slab vapor, indoor air, outdoor air, groundwater and soil.  Aztech geologists are 
        fully  versed  and  experienced  in  collecting  these  samples  in  accordance  with  pertinent  state  and  federal 
        protocols  and  regulations.    All  soil  vapor  and/or  air  sampling  is  done  using  summa  canisters  set  to  specific 
        sampling durations.  The sampling durations are dependent on site conditions.  After the samples are collected 
        they are sent to a certified laboratory for analyses. 

        Soil Vapor Point Installation 
        Soil vapor points are typically installed by Aztech drill crews using: hand tooling; geoprobe sampling tooling; split 
        spoon sampling tooling; or, small diameter casing.   The installation method generally depends on site  specific 
        information  regarding  depth  of  impacts  and  geology.    If  an  aqueous  groundwater  plume  is  suspected  as  a 
        potential  soil  vapor  intrusion  source,  then  the  soil  vapor  point  is  installed  to  approximately  one  to  two  feet 
        above  the  groundwater  table  to  evaluate  the  soil  vapor  concentrations  just  above  the  area  of  contaminant 
        partitioning.  Then a six‐inch stainless steel screen is installed and connected to either Teflon or nylon tubing, 
        which  extends  up  to  grade.    The  annular  space  between  the  screen  and  borehole  wall  is  then  filled  with  a 
        certified clean material (i.e., glass beads or silica sand) and the borehole is sealed above the “sand” pack with 
        bentonite slurry to grade.  The necessary wellhead protection is then installed. 

        Sub‐slab Vapor Point Installation 
        Typically, a sub‐slab vapor point is installed by advancing a drill bit through the concrete slab.  After the concrete 
        slab is penetrated either Teflon or nylon tubing is installed just below the bottom of the concrete slab and the 
        penetration  through  the  concrete  is  sealed  with  a  combination  of  beeswax  and/or  bentonite  slurry.    Prior  to 
        sampling the seal of each sub‐slab vapor sampling point is evaluated for adequacy using standard protocol for a 
        helium  tracer  test.    The  sub‐slab  vapor  point  is  then  purged  accordingly  and  sampled  to  evaluate  the 
        accumulation of contaminated soil vapors beneath the concrete slab.  After the sampling is completed, the seal 
        is tested a second time for adequacy for quality control and assurance. 

        Indoor and Outdoor Air Sampling 
        Prior  to  sampling  indoor  air  all  potential  cross‐contamination  sources  are  evaluated,  inventoried,  and  either 
        removed from the premises or sealed and stored appropriately.  After the zone of exposure is identified, which 
        is typically the breathing zone, a summa canister is installed to sample that zone for a specified duration of time 
        which is dependent on site conditions.  Outdoor air sampling generally provides a control.  Similar protocol to 
        indoor air sampling is used during outdoor air sampling, however the location of the outdoor air sampling point 
        is specified to evaluate the potential ambient sources of impact, if any.  

AZTECH TECHNOLOGIES, INC.                                                                                                                13 
Section 2                                                                                                   Services and Experience 

             CASE STUDY‐ Soil Vapor Intrusion Investigation 


             •   Initial Site Assessment including Soil and Groundwater Investigations. 
             •    A  semi‐confined  water  bearing  zone  was  identified  within  the  first  20  feet  below  grade  (fbg) 
                  underlain by bedrock. 
             •    Soil  borings  were  advanced  to  the  bottom  of  the  semi‐confined  water  bearing  zone  and 
                  monitoring wells were installed. 
             •    NYSDEC  and  New  York  State  Department  of  Health  (NYSDOH)  requested  a  supplemental 
                  soil/groundwater investigation and vapor intrusion study. 
             •    The  vapor  intrusion  study  included  installation  of  sub‐slab  vapor  sampling  points  and 
                  establishing indoor and outdoor air sampling points. 
             •    The  supplemental  soil/groundwater  investigation  included  installation  of  onsite  and  offsite 
                  monitoring wells. 
             •    NYSDEC and NYSDOH requested additional vapor and soil/groundwater data in response to the 
                  above work.  The data were needed to evaluate potential for vapor intrusion into neighboring 
                  residences. 
             •    The second supplemental investigation included installation of additional site monitoring wells 
                  and soil vapor points. 
             •    A second round of vapor intrusion sampling was also performed. 
             •    Aztech is currently negotiating the scope of work for an additional phase of investigation with 
                  NYSDEC and NYSDOH. 
 
The  site  owner  requested  Aztech  to  perform  an  initial  site 
assessment,  which  included  a  soil  and  groundwater 
investigation.  This  initial  investigation  and  all  supplemental 
investigations  were  preceded  by  detailed  work  plans  that 
were  submitted  and  approved  by  the  NYSDEC  and  the 
NYSDOH.  During  the  investigation,  Aztech  identified  a  semi‐
confined water bearing zone within the first 20 fbg underlain 
by  bedrock.  Aztech  advanced  a  series  of  soil  borings  to  the 
bottom of the semi‐confined water bearing zone. Aztech then 
installed  monitoring  wells  that  screened  the  bottom  portion 
of  the  semi‐confined  water  bearing  zone  and  sealed  the 
boreholes  (above  the  screen)  through  the  overlying  semi‐
confining layer. 
 
After  reviewing  the  results  of  the  soil  and  groundwater 
sampling associated with the initial investigation, the NYSDEC 
and  the  NYSDOH  requested  that  a  supplemental  soil/ 
groundwater  investigation  and  a  vapor  intrusion  study  be 
performed.    Aztech  initiated  a  vapor  intrusion  study  within  the  subject  area  that  included  the  installation  of  sub‐slab 
vapor sampling points and established indoor and outdoor air sampling locations.   
 
Prior to sample collection, the quality of the seal around the sub‐slab vapor sampling points was tested using a helium 
tracer.    Summa  canisters  were  subsequently  used  to  collect  the  sub‐slab  vapor  and  indoor/outdoor  air  samples.    In 
addition  to  the  vapor  intrusion  study,  the  supplemental  soil/groundwater  investigation  included  the  installation  of 
onsite  and  offsite  monitoring  wells.  The  additional  monitoring  wells  were  installed  and  screened  in  the  same  semi‐

AZTECH TECHNOLOGIES, INC.                                                                                                            14 
Section 2                                                                            Services and Experience 

confined  water  bearing  zone  observed  in  the  initial  investigation.    The 
offsite wells were installed within the NYS Department of Transportation 
(DOT) right of way (ROW).   
 
The  results  of  the  vapor  intrusion  study,  and  supplemental  soil/ 
groundwater  investigation  were  tabulated/graphed  and  presented  in  a 
report to both the NYSDEC and NYSDOH. In response to the supplemental 
investigation,  NYSDEC/NYSDOH  indicated  that  additional  vapor  and  soil/ 
groundwater  data  were  needed  to  evaluate  the  potential  for  vapor 
intrusion into neighboring residences.   
 
Aztech  performed  a  second,  supplemental  investigation  which  included 
the installation of additional site monitoring wells in both the NYSDOT and 
Village ROWs, and the installation of several soil vapor points.  A second 
round  of  vapor  intrusion  (i.e.,  sub‐slab,  indoor  air  and  outdoor  air) 
sampling  was  also  required  and  performed.    The  results  of  the  vapor 
intrusion  study  and  supplemental  soil/groundwater  investigation  were 
tabulated/graphed  and  presented  to  both  the  NYSDEC  and  NYSDOH  in  a 
report. 
 
Aztech is currently negotiating the scope of work for an additional phase 
of  investigation  at  this  site  with  the  NYSDEC  and  NYSDOH.    Aztech  has 
performed all of the oversight, reporting, consulting, and field work (i.e., 
drilling and vapor point installation and sampling) for this site.   
 




AZTECH TECHNOLOGIES, INC.                                                                                 15 
Section 2                                                                                                 Services and Experience 


Petroleum Bulk Storage Equipment Removals and Compliance Auditing 
 
Our  geologists  and  engineers  are  experienced  and  capable  of  handling  all  petroleum  tank  needs.    From  installation, 
compliance and audit issues to the removal and subsequent sampling and remediation techniques, Aztech can do it all. 
 

        Petroleum Equipment Removals and Excavation 
        When Aztech Technologies, Inc. (Aztech) oversees the removal of petroleum equipment, our clients are assured 
        of a professional outcome.  Aztech geologists are well versed in state and federal regulatory requirements and 
        provide  informed,  experienced  solutions  to  any  environmental  problems  encountered  during  the  removal  of 
        petroleum equipment.  Aztech has provided oversight for hundreds of petroleum equipment removals.  As an 
        experienced consultant, Aztech documents all of the site activities, which include the conditions of the USTs and 
        post  excavation  soils  and  groundwater  quality.    The  documented  information  is  then  presented  in  a  concise, 
        succinct  closure  report.    Aztech  also  provides  assistance  with  the  completion  of  required  NYSDEC  regulatory 
        paperwork and any potential litigation.   
         
        A  typical  tank  removal  scenario  starts  by  removing  the  USTs  and  associated  infrastructure.    Then  the  soil  and 
        groundwater are evaluated by an Aztech geologist.  If soil impacted above NYSDEC regulatory guidance values is 
        identified then the soils are excavated to the extent physically possible or practical.  Post excavation side wall 
        and bottom  soil samples are collected and sent to a laboratory for analysis.  The excavation is then backfilled 
        with a suitable imported clean material, or new petroleum infrastructure is installed.  After submittal of the tank 
        closure report the activated NYSDEC spill file is generally closed.  
         

        Petroleum Bulk Storage Compliance Audits 
        NYSDEC  mandates  3rd  party  audits  of  petroleum  bulk  storage  (PBS)  facilities.    Aztech  understands  the 
        complexities of the PBS regulations and proper operation of petroleum storage equipment, and are capable of 
        providing  clients  with  experienced  and  informed  feedback.    Aztech’s  goal  during  a  facility  audit  is  to  both 
        identify  the  problematic  or  deficient  equipment  or  paperwork,  and  provide  solutions  and  education  to  fix  the 
        identified problems or deficiencies.  Aztech’s geologists and engineers are trained and capable. 
         
        Some commonly deficient areas that will be identified quickly are: 
                     •    PBS Paperwork (i.e., Certificate…)  
                     •    As Built Drawings 
                     •    Daily Inventory Records with Reconciliations 
                     •    Cathodic Protection Systems (testing and design) 
                     •     Leak Detection Systems 
                     •    Electronic or Mechanical Line Leak Detector (system compatibility, operation and testing) 
                     •    Automatic Tank Gauge Monitoring System (functionality, programming, and monitoring) 
                     •    Aboveground Storage Tank (design, monthly monitoring and containment) 
                     •    Overfill Prevention Device (functionality and monitoring) 
                     •    Spill Prevention Device (functionality, monitoring and design) 
                     •    Electronic Sensors (functionality and application) 
                     •    API Color Coding 
                     •    Dispenser (monitoring and design) 
                     •    Any additional routine maintenance 

AZTECH TECHNOLOGIES, INC.                                                                                                          16 
Section 2                                                                                               Services and Experience 

         
        Aztech  understands  that  NYSDEC  audits  are  both  costly  and  stressful.    Aztech  has  educated  and  certified  UST 
        inspectors on staff who are thorough and empathetic.  We strive to help solve our client’s compliance issues in 
        the least stressful and cost effective manner possible. 




AZTECH TECHNOLOGIES, INC.                                                                                                       17 
Section 2                                                                                                     Services and Experience 


             CASE STUDY‐ Tank Compliance Audit 


             •   Proactive  Audit  for  a  regional 
                 petroleum  distributor  and  retailer 
                 in Eastern New York at one of their 
                 truck stops. 
             •   Aztech  evaluated  the  design  and 
                 operation  of  the  truck  stop’s 
                 petroleum  tanks,  piping,  ancillary 
                 monitoring equipment, testing and 
                 paperwork for deficiencies.   
             •   During  the  inspection,  Aztech 
                 identified  the  deficient  areas,  and 
                 provided solutions to address each 
                 deficiency.  
             •   It was determined, after reviewing 
                 the NYSDEC penalty matrix, that if 
                 NYSDEC  had  audited  this  truck 
                 stop prior to repair, a total of over $50,000 of fines would have been assessed.  
             •   Aztech also trained the PBS owners and operators while onsite.  
             •   After  the  equipment  and  paperwork  repairs  and  Aztech  training,  the  site  was  audited  by 
                 NYSDEC.    During  the  NYSDEC  auditing,  the  PBS  owners  and  operators  were  able  to  provide 
                 informed feedback to NYSDEC. 
             •   NYSDEC found the site to be in complete compliance; no NYSDEC fines were assessed. 
         
                                                                                Aztech  recently  completed  a  petroleum  bulk 
                                                                                storage  system  compliance  audit  for  a  regional 
                                                                                petroleum distributor and retailer in Eastern New 
                                                                                York  at  one  of  their  truck  stops.  The  audit  was 
                                                                                performed  on  a  proactive  basis,  as  the  NYSDEC 
                                                                                had  increased  inspection  activity.  Aztech 
                                                                                evaluated  the  design  and  operation  of  the  truck 
                                                                                stop’s  petroleum  tanks,  piping,  ancillary 
                                                                                monitoring equipment, testing and paperwork for 
                                                                                deficiencies.   Aztech provided informed solutions 
                                                                                to  address  the  site  deficiencies  and  training  for 
                                                                                the site owners and operators.   
         
                                                                                During  the  inspection,  Aztech  identified  the 
                                                                                deficient areas, and provided solutions to address 
                                                                                each deficiency.  
         
        If  a  state  inspector  visited  the  site  prior  to  Aztech’s  audit,  the  site  owner  may  have  incurred  many  notices  of 
        violations (NOVs) which would have resulted in over $50,000 in fines. 
         



AZTECH TECHNOLOGIES, INC.                                                                                                              18 
Section 2                                                                                              Services and Experience 

        Through education and cooperative work with the operator, the records were brought up to standard, and the 
        deficient  issues  were  addressed  quickly.  A  focused  visit  from  the  site's  service  contractor  addressed  the 
        petroleum equipment deficiencies.  
         
                                  Average      During  a  subsequent  audit  by  NYSDEC,  the  facility  was  found  to  be  in 
               Observed           NYSDEC       compliance. Additionally, after Aztech's training, the site owner was able 
               Violation          Penalty      to  provide  informed  feedback  during  the  facility  audit.    The  site  owner 
                                               also avoided numerous NOVs and substantial fines, which are costly, and 
          Top sumps or fill            $600  disruptive  to  business.  The  proactive  decision  to  seek  help  early  saved 
          ports not                            significant time and money. 
          maintained 
         
          Leak detection             $2,500 
          equipment not 
          maintained 
             Monitoring               $1,000 
             records not on 
             premises 
             10‐day                   $2,500 
             reconciliation not 
             sufficient 
             Insufficient               $300 
             labeling at fill 
             port 
             No labeling or fill        $100 
             color coding 
             charts 
             No As Builts             $1,000 
             Monitoring               $1,000 
             records not 
             maintained for 
             leak detection 
             Unreported spill         $5,000 

             Total                   $14,000 
      Examples of NYSDEC Violations and Fines 




AZTECH TECHNOLOGIES, INC.                                                                                                     19 
Section 2                                                                                                  Services and Experience 


Remediation 
Aztech Technologies, Inc. specializes in site remediation.  We design, build and install all industry standard remediation 
systems  and  are  experts  in  remediation  techniques.    From  the  corner  gas  station  or  dry  cleaner  to  a  major  landfill, 
Aztech has successfully remediated hundreds of sites while delivering cost effectiveness, responsiveness and creativity. 
 

        Remediation Equipment Design/Construction/Installation/ Monitoring and Maintenance 
        Remediation system design is site specific. The systems are designed to utilize the technology that is best suited 
        to the geology of the site, the COCs, the media in which those COCs are located (i.e. vadose zone soil, saturated 
        soil and/or groundwater) and the client's budget. The systems are designed to run, to the extent practical, with 
        minimal attention and maintenance. They are energy efficient, thereby reducing client operational costs. 
         
         The  key  to  the  superiority  of  the  equipment  engineered  and  constructed  by  Aztech  is  the  control  system. 
        Instead  of  using  a  number  of  independently  operating  subsystems,  Aztech's  remediation  equipment  is 
        controlled  by  a  centralized  logic  system.  This  logic  system  is  constructed  of  readily  available,  inexpensive 
        components. Each subsystem uses input from the other system components to operate only when needed. This 
        attention to detail produces cost efficient site remediation.  
         
        Aztech’s  remedial  systems  are  pre‐assembled  at  our  manufacturing  facility  in  Ballston  Spa,  NY.  System 
        construction is done with the anticipation of accommodating future changes in the site remedial approach. An 
        example of this may be a site that is utilizing GWE&T to control plume migration and recover free product during 
        the initial stages of remediation may be a candidate for a combination of soil vapor extraction and air sparge in 
        the future.  In this scenario, installation of the underground infrastructure for each possible remedial approach 
        (GWE&T,  SVE  and  AS)  is  done  during  the  initial  phase  of  system  construction  in  order  to  accommodate  these 
        changes in remedial approach without further excavation and disruption in later stages of the project.   Aztech 
        personnel  have  experience  working  with  pump  and  tank,  excavation  and  building  construction  contractors  to 
        integrate the installation of remediation system infrastructure into existing facilities or new construction.  
          
        Aztech  performs  routine  monitoring  and  maintenance  for  its  remediation  systems.  Routine  monitoring  is 
        performed  to  optimize  system  performance  and  to  ensure  compliance  with  discharge  regulations.  Routine 
        maintenance is performed to minimize downtime, maximize the life of the system and to ensure that the system 
        is adjusted for changing site conditions.  
         

        Groundwater Extraction and Treatment  
        Aztech  has  the  expertise  and  experience  to  identify  and  match  the  appropriate  GWE&T  technology  to  site 
        characteristics and accommodate your specific needs.  
          
        Our experience includes installation, operation and maintenance of: 
          
            • Pneumatic down well pumps  
            • Electric down well pumps  
            • Hand Vacuum and Total Fluids Extraction 
            • Air‐stripper tray systems and stripping towers 
            • Carbon treatment and water polishing systems 
            • Advanced oxidation 


AZTECH TECHNOLOGIES, INC.                                                                                                          20 
Section 2                                                                                                 Services and Experience 


             CASE STUDY‐Groundwater Extraction and Treatment 


             •   Facility  reconstruction  project  at  a 
                 gasoline station and convenience store. 
             •   Installed  several  soil  borings  to  define 
                 the  source  material  excavation  limits 
                 and pre‐characterize soil for disposal. 
             •   Installed  additional  geotechnical  soil 
                 borings  for  shoring  and  dewatering 
                 system design. 
             •   250‐gallon/minute  trailer  mounted 
                 portable  treatment  system  was 
                 constructed by Aztech and used to treat 
                 approximately  1.8  million  gallons  of 
                 groundwater. 
             •   Approximately  3,600  tons  of  petroleum 
                 impacted soils were excavated and treated using thermal desorption. 
             •   Seven  groundwater  monitoring  wells  were  installed  following  reconstruction  activities  to 
                 determine the effectiveness of the source material excavation. 
             •   Oxygen  releasing  compound  was  injected  into  selected  wells  to  further  reduce  localized 
                 groundwater impacts. 
            •    Spill file has since been closed. 
           
A  regional  petroleum  distributor  contracted  with  Aztech  Technologies,  Inc.  to  oversee  a  facility  soil  excavation  and 
reconstruction project at  one of their  gasoline stations and convenient stores in Westchester County,  New York.   The 
site is located in a deltaic sand deposit near a major body of surface water, and the local groundwater table is tidally 
influenced.  To facilitate the excavation and reconstruction activities, soil dewatering was implemented at the site.  In 
order  to  achieve  the  goals  set  forth  by  the  client,  Aztech  worked  with  the  general  contractor  to  develop  a  concise 
schedule, engineer and build a portable treatment system capable of treating 250 gallons per minute, to oversee the soil 
excavation,  and  implement  in  situ  chemical  oxidation  to  stimulate  the  natural  biodegradation  of  residual  petroleum 
compounds in post‐excavation soil and groundwater.   
 
During  the  preliminary  stages  of  the  project,  Aztech  advanced  geotechnical  soil  borings  to  provide  information  to  the 
general contractor, so that specifications for a proper shoring and soil dewatering system could be developed.  Aztech 
used their truck‐mounted, hollow‐stem auger drill rig, equipped with soil sampling equipment, to advance and sample 
the geotechnical soil borings.  An Aztech geologist oversaw the drilling operations and logged the soil cores.  Additional 
soil borings were also advanced to evaluate the lateral and vertical extent of the petroleum impacted soil on the site.  A 
total of nineteen soil borings were advanced as part of this preliminary stage of the project. 
 
Prior to commencing with dewatering and soil excavation, Aztech obtained a Stipulation Agreement with the NYSDEC for 
the  treatment  and  discharge  of  petroleum‐impacted  groundwater  at  the  site  on  behalf  of  the  client.    Additionally, 
Aztech  obtained  a  discharge  permit  with  the  Westchester  County  Department  of  Health  for  point  emissions  air 
discharge.   
 
Aztech  developed  the  specifications  for  the  trailer‐mounted  treatment  system  using  the  groundwater  quality  data 
provided from routine quarterly monitoring and sampling events and pump‐down test data collected from the site.  The 

AZTECH TECHNOLOGIES, INC.                                                                                                         21 
Section 2                                                                                                Services and Experience 

                                                                      portable treatment system was designed to effectively 
                                                                      treat up to 250‐gallons per minute using four sediment 
                                                                      filters,  two  air‐strippers,  and  computerized  system 
                                                                      controls.  The treatment system was constructed in 17 
                                                                      days  and  mobilized  to  the  site.    The  dewatering  and 
                                                                      portable  treatment  systems  were  operated  by  Aztech 
                                                                      remedial  technicians  throughout  the  reconstruction 
                                                                      activities.    Approximately  1.2  million  gallons  of 
                                                                      groundwater were treated over the initial eight days of 
                                                                      the  project  as  the  water  table  was  lowered.    An 
                                                                      additional  600,000  gallons  of  groundwater  were 
                                                                      treated over the subsequent seven weeks of project.   
                                                                       
                                                                      During the soil excavation and reconstruction phase of 
                                                                      the  project,  Aztech  coordinated  with  the  general 
                                                                      contractor, the construction contractor, the client, and 
                                                                      the  disposal  facilities  to  progress  the  project  and 
maintain  the  milestones  and  deadlines  established  by  the  client.    In  total,  approximately  3,600  tons  of  petroleum 
impacted soil was excavated and treated by thermal desorption during an eight‐week period.  Following completion of 
the soil excavation and reconstruction  activities, Aztech installed  seven groundwater monitoring wells throughout  the 
site.  These monitoring wells were used to determine the effectiveness of the source material removal on restoring and 
remediating  site  groundwater  quality.    Aztech  also  performed  one  in  situ  chemical  oxidation  injection  event  using  an 
oxygen releasing compound to further reduce localized groundwater impacts.  In July 2007, the NYSDEC closed the spill 
file associated with this site.  




AZTECH TECHNOLOGIES, INC.                                                                                                        22 
Section 2                                                                                                     Services and Experience 


        Soil Vapor Extraction 
        Soil vapor extraction is an in situ unsaturated (vadose) zone soil remediation technology in which a vacuum is 
        applied to the soil to induce the controlled flow of air from soil pore spaces and remove volatile COCs, and some 
        semi volatile COCs, from the soil.  In some cases, the soil vapor extracted from the subsurface may need to be 
        treated  in  order  to  recover  or  destroy  the  COCs.    Typically,  this  depends  on  local  and  state  air  discharge 
        regulations and the concentration of the COCs extracted from the subsurface.  
         
        Aztech personnel are experienced in the design and placement of SVE wells.  SVE well design is accomplished by 
        evaluating the soil characteristics, vertical distribution of COCs and position of the water table at each location.  
        Aztech  develops  specifications  for  SVE  systems  by  first  installing  a  pilot  test  well  that  is  anticipated  to  be  of 
        similar construction to the SVE wells for the site.  Pilot testing helps to develop specifications for the SVE system 
        by determining the volume of soil vapor that can be drawn from the subsurface at a variety of applied wellhead 
        vacuums.    Observations  made  during  the  pilot  testing  also  help  to  determine  an  appropriate  SVE  well 
        distribution and spacing for the final SVE system.  
         
        SVE is typically via vertical extraction wells that average 5.0 feet to 20 feet in depth.  In some conditions, SVE has 
        successfully been applied via wells as deep as 300 feet.  SVE can also be successfully applied via horizontal SVE 
        laterals,  depending  on  source  area  geometry,  the  position  of  the  water  table,  drill  rig  access,  or  other  site‐
        specific factors.  
         
        SVE  can  be  enhanced  by  placing  geomembrane  covers  over  unpaved/undeveloped  soil  surfaces  in  order  to 
        prevent  short  circuiting  and  to  increase  the  radius  of  influence  of  the  SVE  wells.    Ground  water  depression 
        pumps may also be used in conjunction with SVE in order to minimize the upwelling of the water table induced 
        by SVE or, to increase the depth of the vadose zone by lowering the water table.  
         
        SVE typically has a medium to long term duration. 
         

        Air Sparging  
        Aztech typically installs AS systems to enhance the effectiveness of SVE and to help decrease the remediation 
        time needed with SVE alone.  This is because SVE alone can only address impacted soil located above the water 
        table within the unsaturated (vadose) zone.  Air sparging helps to remediate soil located below the water table 
        by delivering pressurized atmospheric air to the saturated zone. 
         
        Aztech personnel are experienced in the design and placement of wells constructed specifically for air sparging.  
        AS  well  design  is  accomplished  by  evaluating  the  soil  characteristics  and  vertical  distribution  of  COCs  at  each 
        location.  Aztech  develops specifications for AS systems by first installing a  pilot test well anticipated to be of 
        similar construction to the AS wells for the site.  Pilot testing helps to develop specifications for the AS system by 
        determining  the  breakout  pressure  and  airflow  needed  to  accomplish  effective  dispersion  of  atmospheric  air 
        into  the  subsurface  below  the  water  table.    Observations  made  during  the  pilot  testing  help  to  determine  an 
        appropriate AS well distribution and spacing for the final AS system.  
         
        Air  sparging  helps  to  expedite  soil  and  groundwater  remediation  by  the  fact  that  injected  air  traverses 
        horizontally and vertically through the saturated soil column.  This “bubbling effect” creates a condition within 
        the  saturated  zone  whereby  COCs  dissolved  in  groundwater  are  transferred  from  the  aqueous  phase  to  the 
        gaseous  phase  by  volatilization.    Continued  injection  of  the  atmospheric  air  helps  to  flush  (bubble)  the  COCs, 
        now in the gaseous phase, up into the unsaturated zone where the vacuum generated by the SVE system draws 

AZTECH TECHNOLOGIES, INC.                                                                                                              23 
Section 2                                                                                                 Services and Experience 

        them  out  of  the  subsurface.    Additionally,  the  oxygen  added  to  the  groundwater  and,  the  saturated  and 
        unsaturated (vadose) zone soil and also enhances the biodegradation of COCs both above and below the water 
        table  
         
        Depending  on  the  site  conditions,  AS  can  be  deployed  under  a  low  flow  condition  whereby  a  low  volume  of 
        atmospheric  air  is  introduced  below  the  water  table.    In  this  configuration,  the  purpose  of  AS  is  to  enhance 
        natural  biological  activity  to  help  degrade  the  COCs  in  saturated  soil  and  groundwater.    AS  typically  has  a 
        medium to long term duration. 




AZTECH TECHNOLOGIES, INC.                                                                                                          24 
Section 2                                                                                             Services and Experience 


             CASE STUDY‐Soil Vapor Extraction/Air Sparge 


             •   Plume  area  containing  elevated  concentrations  of  total  VOCs  and  MtBE  in  groundwater  was 
                 identified. 
             •   SVE/AS Pilot testing was performed at a variety of vacuum and pressure combinations. 
             •   SVE/AS system was designed, constructed and installed.  3,350 pounds of VOCs were removed. 
             •   MtBE concentration in groundwater was reduced to below laboratory reporting limit. 
             •   No rebound in total VOC and MtBE concentrations in subsequent groundwater sampling. 
             •   NYSDEC has closed the spill file for this site.  
            
A  regional  convenience  store  chain  in  upstate  New  York  requested  Aztech’s 
assistance  to  evaluate  existing  information  regarding  site  conditions  at  one  of 
their  operating  stores  in  the  Capital  District.    The  store  and  surrounding 
properties, which include light commercial businesses and private residences, are 
served by a municipal water and sewer system. 
 
An  assessment  of  subsurface  conditions  indicated  that  the  site  is  underlain  by 
well‐sorted  fine‐  to  medium‐grained  sand  with  groundwater  encountered  at 
approximately  12  feet  below  grade.    Groundwater  flow  is  generally  to  the 
northwest  at  a  hydraulic  gradient  of  0.4  percent.    Headspace  screening  of  soil 
encountered during soil boring activities indicated that elevated concentrations of 
VOCs were not present above the water table.  Rather, the highest concentrations 
of  VOCs  were  encountered  below  the  water  table  within  a  1.0‐foot  thick  zone            Total VOC Distribution 
characterized  by  dark  gray  staining  and  strong  petroleum  odors.    Staining  and                 At Start‐Up 
petroleum  odors  dissipated  rapidly  beneath  this  zone.    Groundwater  analytical 
results prior to site remedial activities indicated a defined plume area containing 
elevated concentrations of total VOCs and MtBE in groundwater. 
 
After determining the lateral and vertical extent of the plume area, SVE/AS pilot 
testing  was  conducted  at  a  variety  of  vacuum  and  pressure  combinations.    The 
SVE component of the pilot testing indicated a radius of influence (ROI) in excess 
of  35  feet  at  a  a  wellhead  vacuum  of  14.5‐inches  (water  column)  and  an 
anticipated flow rate of 75 ft3/min.  Pilot testing for the AS component indicated 
an ROI of 20 feet at a flow rate of 7.0 ft3/min.  The conceptual design for the site 
remedial  system  was  based  on  simultaneously  extracting  an  estimated  300 
ft3/min of soil vapors from four (4) SVE wells and introducing 7.0 ft3/min of sparge 
air via four (4) AS wells.  The AS component was programmed to introduce sparge                    Total VOC Distribution 
air  via  two  wells  simultaneously  for  a  period  of  one  hour,  while  the  other  two          After 48 Months 
wells were at rest.  After one hour, the active AS wells were shut down, while the 
two previously inactive wells were subsequently activated. 
 
The SVE/AS system removed approximately 3,350 pounds of VOCs from the subsurface during approximately 48 months 
of  system  operation.    Significant  reductions  in  the  magnitude  and  distribution  of  total  VOCs  in  groundwater  were 
achieved and MtBE concentration was reduced to below laboratory reporting limits at the time system operation was 
terminated.    A  rebound  in  total  VOC  and  MtBE  concentrations  was  not  indicated  in  the  subsequent  groundwater 
sampling events.  NYSDEC has since closed the spill file associated with this site.  

AZTECH TECHNOLOGIES, INC.                                                                                                    25 
Section 2                                                                                                    Services and Experience 


        Total Fluids Extraction 
        Total  Fluids  Extraction  (TFE)  is  a  remedial  technology  that  is  typically  applied  to  sites  that  have  generally  low 
        permeability soil and are characterized by impacted soil and groundwater.  TFE technology can also be applied 
        to  sites  with  limited  amounts  of  free‐phase  product.    TFE  operates  on  a  similar  principle  as  SVE  whereby  a 
        vacuum is applied to a series of vertical remedial wells to facilitate removal of COCs from the subsurface.  The 
        exception is that TFE removes all fluids, including groundwater, liquid phase product (if present) and soil vapor, 
        via drop tubes that transfer fluids from the remedial wells and into a network of underground piping.   
         
        Fluids drawn into the underground piping are conveyed to the remedial system shed via a positive‐displacement 
        blower  (either  a  rotary  lobe  or  liquid  ring  blower)  and  are  deposited  into  a  separator  unit  that  separates  the 
        vapor phase fluids from the liquid phase.  The vapor phase continues to the atmosphere where it is discharged.  
        If necessary, the vapor phase can be treated prior to discharge.  The liquid phase is transferred into an oil/water 
        separator  that  separates  liquid  phase  product  from  the  extracted  groundwater.    Liquid  phase  product  is 
        transferred  from  the  separator  to  a  product  storage  vessel  while  the  separated  water  is  pumped  through  a 
        particulate filter and then to an air stripper for treatment.  Once the treated water leaves the air stripper, it is 
        polished via granular activated carbon prior to discharge. 
         
        Aztech  personnel  are  experienced  in  the  design  TFE  systems  and  placement  of  TFE  wells.    TFE  well  design  is 
        accomplished by evaluating the soil characteristics, vertical distribution of COCs and position of the water table 
        at each location.  In a similar fashion to that of an SVE system, Aztech develops specifications for TFE systems by 
        first installing a pilot test well that is anticipated to be of similar construction to the TFE wells for the site.  Pilot 
        testing helps to develop specifications for the TFE system by determining the volume of soil vapor and liquids 
        that can be drawn from the subsurface at a variety of applied wellhead vacuums.  Observations made during the 
        pilot testing also help to determine an appropriate TFE well distribution and spacing for the final TFE system.  




AZTECH TECHNOLOGIES, INC.                                                                                                             26 
Section 2                                                                                                Services and Experience 


              CASE STUDY‐TOTAL FLUIDS EXTRACTION 


             •   Plume  area  containing  elevated  concentrations  of  total  VOCs  and  MtBE  in  groundwater  was 
                 identified.  
             •   TFE pilot test was conducted at a variety of vacuum and flow conditions 
             •   TFE system was designed, constructed and installed; 7,096 pounds of VOCs were removed. 
             •   Subsequent analytical results have not indicated a rebound in total VOC or MtBE concentration. 
             •   Spill file has since been closed. 
          
A regional convenience store chain in the Hudson Valley region of upstate New York requested Aztech’s assistance to 
evaluate existing information regarding site conditions at one of their operating stores in western Dutchess County.  The 
store  and  surrounding  properties,  which  include  light  commercial  businesses  and  private  residences,  are  served  by  a 
municipal water and sewer system.  
 
An  assessment  of  subsurface  conditions 
indicated  that  the  site  is  underlain  by  low 
permeability  silt  to  a  depth  of  11  feet  below 
grade,  where  a  stiff  clay  layer  was 
encountered.    Headspace  screening  of  soil 
samples obtained from the silt indicated total 
VOC concentrations as high as 200 ppm.  Total 
VOC concentrations decreased to less than 10  Total VOC Distribution at Start‐Up                  MtBE Distribution at Start‐Up
ppm  within  the  clay  layer.    Groundwater  was 
generally  encountered  at  approximately  5.0 
feet below grade or less, and the movement of 
groundwater  beneath  the  site  under  static 
conditions  was  toward  the  south‐southeast  at 
a  hydraulic  gradient  of  5.7‐percent.  
Groundwater  analytical  results  prior  to  site 
remedial  activities  indicated  a  defined  plume 
area  containing  elevated  concentrations  of 
total VOCs and MtBE in groundwater. 
                                                        Total VOC Distribution after 48          MtBE Distribution after 48 hours 
After determining the limits of the plume area,         hours (no contour line needed) 
a  TFE  pilot  test  was  conducted  by  removing 
soil vapor and groundwater from the tested well via a one‐inch diameter drop tube.  The pilot testing indicated a 20‐foot 
ROI for the SVE component when 10‐inches of mercury vacuum was applied to the tested well.  Pilot test data suggested 
that  each  operating  TFE  well  would  also  withdraw  a  total  groundwater  flow  of  0.25  gallons  per  minute  and  induce  a 
capture area of approximately 15 feet.  A 13‐point TFE system was subsequently installed.  The TFE system subsequently 
removed approximately 7,096 pounds of VOCs from the subsurface during approximately 48 months of operation. 
 
Analytical results obtained in four consecutive quarterly sampling events conducted after suspending operation of the 
TFE  system,  have  not  indicated  a  rebound  in  total  VOC  or  MtBE  concentrations  in  groundwater.    NYSDEC  has 
subsequently closed the spill file associated with this site. 
 


AZTECH TECHNOLOGIES, INC.                                                                                                        27 
Section 2                                                                                              Services and Experience 


        Advanced Oxidative Remediation Technology /Chemical Injection  
        Aztech  Technologies  has  experience  utilizing  in  situ  and  ex  situ  oxidative  processes  to  remediate  petroleum 
        contaminated  groundwater.  Aztech  Technologies  has  designed,  installed  and  operated  remediation  systems 
        using advanced oxidative technology to treat groundwater ex situ in trailer mounted systems. Aztech has also 
        performed in situ treatment including the injection of oxygen releasing compounds to stimulate bioremediation 
        and the introduction of hydrogen peroxide to directly oxidize organic compounds.  

        The  chemical  oxidants  most  commonly  employed  to  date  include  peroxide,  ozone,  and  permanganate.  These 
        oxidants have been able to cause the rapid and complete chemical destruction of many toxic organic chemicals; 
        other  organics  are  amenable  to  partial  degradation  as  an  aid  to  subsequent  bioremediation.  In  general  the 
        oxidants have been capable of achieving high treatment efficiencies (e.g., > 90 percent) for unsaturated aliphatic 
        (e.g., trichloroethylene [TCE]) and aromatic compounds (e.g., benzene), with very fast reaction rates (90 percent 
        destruction in minutes). Field applications have clearly affirmed that matching the oxidant and in situ delivery 
        system to the COCs and the site conditions is the key to successful implementation and achieving performance 
        goals.  




AZTECH TECHNOLOGIES, INC.                                                                                                     28 
Section 2                                                                                                Services and Experience 

             CASE STUDY‐Chemox Injection 


             •   Aztech  recommended  use  of  chemical 
                 oxidation  injection  to  reduce  the 
                 dissolved petroleum compounds in one 
                 offsite monitoring well. 
             •   900  pounds  of  RegenOx™  and  2%  by 
                 weight oxygen releasing compound was 
                 injected hydraulically upgradient of the 
                 impacted well. 
             •   Since  the  injection,  dissolved  oxygen 
                 concentrations,  oxidation  reduction 
                 potential,  specific  conductance  and  pH 
                 have been monitored. 
             •   Results  indicate  a  reduction  in  the 
                 dissolved phase VOCs and the site looks 
                 favorable for spill closure. 
          
Aztech Technologies has been providing environmental consulting services to a regional petroleum distributor at one of 
their gasoline stations since 1994.  In the mid 1980s, a NYSDEC spill number was issued due to a failed UST integrity test.  
Prior  to  Aztech’s  involvement  on  the  project,  several  subsurface  investigations  and  remediation  plans  were 
implemented.    The  remediation  activities  included  source  soil  excavation  and  the  operation  of  a  soil  vapor  extraction 
system in the early 1990s.   
 
Aztech  has  been  conducting  groundwater  monitoring  and  sampling  on  a  quarterly  basis  since  2002.    Following  an 
evaluation  of  the  historical  groundwater  sampling  data,  and  discussions  with  the  client,  Aztech  recommended  using 
chemical oxidation injection to reduce the dissolved petroleum compounds in one offsite monitoring well. 
                                                                   
                                                                  In March 2006, Aztech injected approximately 900 pounds 
                                                                  of  RegenOx™  and  approximately  2%  by  weight  oxygen 
                                                                  releasing  compound  using  their  own  drilling  equipment.  
                                                                  Aztech  mixed,  and  injected  the  product  over  a  two  day 
                                                                  time  period  at  eight  locations  hydraulically  upgradient  of 
                                                                  the  most  impacted  monitoring  well.    Since  the  injection 
                                                                  Aztech  has  monitored  the  dissolved  oxygen 
                                                                  concentrations,  oxidation  reduction  potential,  specific 
                                                                  conductance  and  pH  using  their  YSI  multi  probe  system 
                                                                  meter.    Initial  groundwater  sampling  results  indicated  a 
                                                                  reduction  in  the  dissolved  phase  VOCs.    The  site  looks 
                                                                  favorable for spill closure.  
                                                                   




AZTECH TECHNOLOGIES, INC.                                                                                                         29 
Section 2                                                                                                Services and Experience 


        Catalytic Oxidization  
        Aztech Technologies is experienced in the installation of Catalytic Oxidization (Cat‐Ox) systems for the removal 
        of  volatile  compounds  from  vapor  emissions.  These  units  are  installed  to  treat  the  discharge  from  soil  vapor 
        extraction systems when the volatile emissions from these systems exceed regulatory standards. Effluent from 
        the vapor extraction system is conveyed to a Cat‐Ox unit, and subsequently discharged to the atmosphere after 
        thermal  treatment.  The  Cat‐Ox  unit  typically  consists  of  a  propane‐fired  internal  combustion  engine  and  an 
        electronic control system. 
         

        Biological Enhancement  
        Aztech  Technologies  has  experience  using  biological  processes  to  remediate  petroleum  contaminated 
        groundwater  and  soil.  Nutrients  and  oxygen  are  added  to  the  groundwater  or  soil  to  enhance  the  growth  of 
        microorganisms that consume petroleum and speed bioremediation.  
         

        Potable Water Treatment  
        Aztech  Technologies  has  experience  in  the  design,  installation  and  construction  of  Potable  Water  Treatment 
        systems  for  residential  and  commercial  use.  Aztech  has  experience  with  multiple  treatment  technologies 
        including carbon adsorption, reverse osmosis, filtration, ultraviolet sterilization and chemical treatment. 
         

        Hazardous Waste Removal  
        Aztech Technologies has experience in the removal of hazardous wastes, such as PCBs, from contaminated sites. 
        Typical site work has consisted of excavating contaminated soil and debris. Aztech personnel are experienced at 
        performing soil sampling and field screening at hazardous waste sites. Field screening is performed to separate 
        the excavated soil and debris into hazardous waste and non‐hazardous waste for disposal. Aztech also collects 
        post‐excavation  samples  for  laboratory  analysis  to  ensure  the  sites  meet  regulatory  standards.  To  complete 
        remediation of the sites, excavations are backfilled and graded.  
         

        Engineering & Design 
        Aztech  Technologies  provides  customized  engineering  solutions  for  petroleum  bulk  storage  facility  design  and 
        permitting. 
         
        Engineering and design experience includes: 
                     •   Petroleum Bulk Storage Facility Design 
                     •   Underground Petroleum Storage Facility Design 
                     •   Engineering Project Management 
                     •   Spill Prevention Control and Countermeasure (SPCC) Development 
                     •   Spill Prevention Report (SPR) Development 
                     •   Air and Water Discharge Permitting 
                     •   Air Contaminant Dispersion Modeling 
                     •   System Process & Instrumentation Design 


AZTECH TECHNOLOGIES, INC.                                                                                                        30 
Section 2                                                              Services and Experience 

                    •   USEPA Title V Air Pollution Permitting  
                    •   Army Corps of Engineers (ACOE) Permitting 
                    •   NYSDEC Water Quality Certification Planning 
                    •   Storm Water Management Planning 




AZTECH TECHNOLOGIES, INC.                                                                   31 
Section 2                                                                                                 Services and Experience 


Additional Experience and Case Studies 
 

             CASE STUDY‐Full Array of Aztech Services 


             •   Phase I, II and III implemented at 27‐acre parcel of land. 
             •   Phase I Environmental Site Assessment revealed past usage of property and adjacent properties 
                 and warranted a Phase II. 
             •   Phase II Site Investigation involved installation of 17 shallow monitoring wells and investigation 
                 of two orphan vent pipes. 
             •   Phase II indicated petroleum impacts in the subsurface, 2 NYSDEC spill files were opened and 2 
                 previously unknown USTs were discovered. 
             •   Groundwater Analysis and Monitoring program was implemented then Drilling and Excavation 
                 program. 
             •   Phase  III  Site  Remediation  was  completed  that 
                 involved  removal  of  USTs  and  excavation  of 
                 petroleum‐impacted soil. 
            •    NYSDEC has subsequently closed the spill file. 
          
On  behalf  of  a  not‐for‐profit  client,  Aztech  Technologies 
performed  a  Phase  I  ESA,  implemented  a  Phase  II  Investigation, 
and  performed  Phase  III  Site  Remediation  at  a  property  in 
Saratoga County, New York.  The site was a 27‐acre parcel of land, 
which  the  client  was  interested  in  acquiring  for  a  new  facility 
location.    The  client  was  concerned  about  existing  or  potential 
environmental liabilities at the site. 
 
As  is  the  case  with  most  of  the  ESAs  conducted  by  Aztech 
Technologies,  all  work  for  this  project  involved  short  turnaround  and  tight  deadlines.    The  Phase  I  ESA  performed  by 
Aztech  revealed  that  the  past  usage  of  the  property  and  adjacent  properties  warranted  a  more  extensive  Phase  II 
investigation.   
 
The  scope  of  work  of  the  Phase  II  investigation  included  the  installation  of  17  shallow  monitoring  wells  and  the 
investigation  of  two  orphan  vent  pipes  on  the  subject  Property.    The  investigation  was  expedited  and  costs  were 
mitigated because Aztech Technologies was able to self‐perform the work.  The Phase II identified petroleum impacts in 
the subsurface at the subject Property. As a result of the discovered contamination, two NYSDEC spill files were opened.  
A  portion  of  the  Phase  II  investigation  was  to  determine  whether  the  two  orphan  vents  pipes  had  associated 
underground tanks.  Two previously unknown USTs were discovered. 
 
Subsequent  to  the  drilling  and  excavation  program,  Aztech  Technologies  implemented  a  comprehensive  groundwater 
analysis  and  monitoring  program.    The  subject  Property  was  surveyed  and  the  wells  were  gauged  to  determine 
groundwater level, flow direction, and hydraulic gradient. 
 
The  ultimate  outcome  of  the  Phase  II  investigation  indicated  the  existence  of  two  unrelated  petroleum  sources.  
Contributing  factors  leading  to  this  determination  were  1)  the  groundwater  flow  direction  and  2)  the 



AZTECH TECHNOLOGIES, INC.                                                                                                          32 
Section 2                                                                                                    Services and Experience 

concentration/signature  of  the  petroleum.    Both  dissolved  petroleum  plumes  were  well  defined  and  measured  by 
Aztech Technologies. 
 
Aztech  Technologies  performed  the  Phase  III  site  remediation  after  the  drilling  program  was  completed.    The  two 
previously unknown USTs were removed, and associated petroleum‐impacted soil was excavated.   
 
Aztech  Technologies takes pride in finding ways to remediate sites at a cost  that is reasonable while still bringing  the 
sites  to  spill  closure.    At  this  particular  site,  the  site  excavation  activities  were  used  for  remediating  soil  and 
                                                            groundwater,  using  and  applying  oxygen‐releasing  compounds  to 
                                                            hasten petroleum decomposition. 
                                                             
                                                            Aztech Technologies was able to recommend to the NYSDEC that any 
                                                            spill  remediation  at  the  adjacent  site  be  done  independently  of  the 
                                                            spill associated with the subject property.  This resulted in significant 
                                                            cost  savings  to  the  client.    Aztech  Technologies  also  recommended 
                                                            the  wells  at  the  subject  Property  installed  during  the  Phase  II  be 
                                                            sampled  on  a  quarterly  basis  to  document  groundwater  quality 
                                                            trends  and  the  anticipated  reduction  of  petroleum  hydrocarbon 
                                                            compounds  dissolved  in  groundwater  as  a  result  of  enhanced 
                                                            biological degradation.  The spill was closed by the NYSDEC, resulting 
                                                            in a site with no remaining environmental liability. 




AZTECH TECHNOLOGIES, INC.                                                                                                             33 
Section 2                                                                                                  Services and Experience 


             CASE STUDY‐Light Non‐Aqueous Phase Liquid Recovery and Overburden/Bedrock Investigation 


             •   Emergency response to hydraulic oil spill into an overburden / shallow bedrock geologic setting. 
             •   Excavation and removal of a problematic hydraulic lift inside an active repair garage. 
             •   Recovery of approximately 320 gallons of Light Non Aqueous Phase Liquid (LNAPL). 
             •   Removal of approximately 200 tons of impacted soil. 
             •   Installation of 5 nested well sets that consist of a 2.0‐inch overburden monitoring well nested 
                 with a 4.0‐inch bedrock monitoring well. 
             •   Bedrock monitoring wells were advanced through permanent steel casing. 
             •   Since completion of the source removal activities, LNAPL has not been observed. 
             •   Aztech requested spill closure due to minimal groundwater concentrations. 
          
The site owner contacted Aztech for an emergency response to 
a  release  of  hydraulic  oil  from  an  in‐ground  hydraulic  lift  into 
an overburden/shallow bedrock geologic setting. 
 
Aztech  developed  and  implemented  an  aggressive  work  plan 
that  included  LNAPL  recovery,  source  removal  via  excavation 
inside  an  active  repair  garage,  and  the  installation  of 
overburden  and  bedrock  monitoring  wells  for  post  remedial 
monitoring purposes.  This work plan was developed, reported, 
implemented and completed in approximately eight months. 
 
During  the  initial  two  months  of  recovery  activities,  Aztech 
recovered approximately 320 gallons of LNAPL.  The LNAPL was 
pumped from the subsurface via a recovery pump into a series 
of  onsite  drums  for  temporary  storage.    In  addition  to  the 
LNAPL,  a  total  of  approximately  1,000  gallons  of  impacted 
groundwater  was  recovered.  Subsequent  to  the  LNAPL 
recovery activities, Aztech mobilized to the site to remove the 
problematic lift equipment and excavate the soil affected by the release.  The excavation was performed inside an active 
repair garage.  Prior to excavation, selected parts of the garage’s concrete slab were saw cut. Then the problematic lift 
and approximately 200 tons of impacted soil were removed.  
                                            
                                           After  the  source  excavation  was  complete,  NYSDEC  requested  the  installation  of  a 
                                           total  of  five  (5)  nested  well  sets  of  overburden/bedrock  monitoring  wells.    Each 
                                           nested  well  set  included  a  2.0‐inch  overburden  monitoring  well  and  a  4.0‐inch 
                                           bedrock monitoring well.   
                                            
                                           The  bedrock  monitoring  wells  were  advanced  through  permanent  steel  casing, 
                                           which  was  grouted  into  place  to  avoid  communication  between  saturated  zones 
                                           within  the  overburden  and  bedrock.    The  bedrock  wells  were  advanced  via  air 
                                           hammering. Bedrock cores were also obtained at selected locations to evaluate the 
                                           secondary features of the bedrock.  The drilling program included the installation of 
                                           one overburden/bedrock monitoring well set inside the site garage. 
 

AZTECH TECHNOLOGIES, INC.                                                                                                           34 
Section 2                                                                                           Services and Experience 

LNAPL  has  not  been  observed  at  this  site  since  the  source  removal  activities  were  completed.  Post  excavation 
groundwater  monitoring  activities  identified  minimal  concentrations  in  groundwater  within  both  the  overburden  and 
bedrock. In response, Aztech has requested spill closure.   
 
Aztech performed all consulting, drilling, reporting, and most of the construction activities at this site. 
         
         




AZTECH TECHNOLOGIES, INC.                                                                                                 35 
Section 2                                                                                                Services and Experience 


             CASE STUDY‐Advanced Oxidative Remediation Technology 


             •   GWE&T installed at a former petroleum bulk storage facility where gasoline from a leaking UST 
                 impacted groundwater. 
             •   GWE&T  used  advanced  oxidative  technology  to  remove  dissolved  petroleum  hydrocarbons 
                 from the groundwater. 
             •   GWE&T was installed to increase the hydraulic gradient via re‐injection of treated groundwater 
                 to help flush impacted groundwater from under the building and source area. 
             •   Groundwater  was  extracted  by  five  recovery  wells  and  conveyed  to  a  trailer  where  it  was 
                 treated  by  electrochemical  peroxidation  (ECP),  a  technology  based  on  Fenton’s  Reagent 
                 Chemistry. 
             •   The  treated  groundwater  was  temporarily  stored  in  a  holding  tank  then  pumped  to  an 
                 infiltration  gallery  located  hydraulically  upgradient  of  the  source  area.  The  purpose  of 
                 infiltrating  treated  groundwater  was  to  flush  the  impacted  groundwater  toward  the  recovery 
                 wells.  
             •   The  GWE&T  provided  hydraulic  control  of  the  site  to  prevent  off‐site  migration  of  petroleum 
                 hydrocarbon compounds. 
             •   GWE&T operated continuously for several years and significantly decreased the magnitude and 
                 distribution of petroleum impacted groundwater beneath the site. 
           
Aztech  Technologies  designed,  installed  and  operated  a 
GWE&T  system  using  advanced  oxidative  technology  to 
remove  dissolved  petroleum  hydrocarbons  from 
groundwater.  The GWE&T was installed at a site that had 
previously  been  operated  as  a  petroleum  bulk  storage 
facility.  Gasoline from a leaking underground storage tank 
impacted groundwater at the site.  The GWE&T system was 
installed in order to increase the hydraulic gradient via re‐
injection  of  treated  groundwater.    Treated  groundwater 
was  introduced  via  an  infiltration  gallery  located 
hydraulically upgradient of a site office building and source 
area  in  order  to  help  flush  impacted  groundwater  from 
under the building and source area. 
 
The groundwater extraction portion of the system included five recovery wells.  Groundwater extracted by the recovery 
wells  was  conveyed  to  a  treatment  trailer  where  it  was  treated  by  a  process  known  as  electrochemical  peroxidation 
(ECP).    ECP  is  a  technology  that  is  based  on  Fenton’s  Reagent  chemistry.    The  Fenton’s  reaction  produces  hydroxyl 
radicals (OH‐) that are used to completely decompose VOCs dissolved in the extracted groundwater. 
 
The ECP treatment was performed in a trailer mounted unit that consisted of an influent holding tank, the ECP reactor 
and an effluent holding tank.  The ECP process began with pH adjustment of the extracted groundwater by the addition 
of sulfuric acid.  The pH adjusted water was temporarily stored in a holding tank and then pumped into the ECP reactor.  
Concentrated  hydrogen  peroxide  (H2O2)  was  added  to  the  pH‐adjusted  groundwater  as  it  was  transferred  from  the 
holding tank into the ECP reactor.  Within the reactor, ferrous iron (Fe2+) was produced electrochemically and added to 
the extracted groundwater by sacrificial iron electrodes.  The addition of hydrogen peroxide and ferrous iron to the pH‐
adjusted  groundwater  produced  a  hydroxyl  radical  (OH‐)  that  aggressively  oxidized  dissolved  VOCs.    Effluent  from  the 


AZTECH TECHNOLOGIES, INC.                                                                                                       36 
Section 2                                                                                                 Services and Experience 

ECP  reactor  was  free  of  VOCs  and  semi‐VOCs,  and  contained  low  concentrations  of  iron  oxide,  iron  hydroxide  and 
hydrogen peroxide and elevated levels of dissolved oxygen. 
 
After  passing  through  the  ECP  reactor,  the  treated  groundwater  was  transferred  into  a  second  holding  tank.    The 
effluent  was  subsequently  pumped  to  an  infiltration  gallery  located  hydraulically  upgradient  of  the  source  area.    The 
goal of re‐injection by way of the infiltration gallery was to increase the hydraulic gradient through the source area in 
order to flush impacted groundwater toward the recovery wells where it would be captured and brought to the surface 
for treatment by the ECP reactor. 
 
The GWE&T system was designed to provide hydraulic control of the site.  The purpose of establishing hydraulic control 
was to prevent off‐site migration of petroleum hydrocarbon compounds from the site.  The effectiveness of the GWE&T 
system  on  groundwater  quality  was  evaluated  by  comparing  the  distribution  of  total  VOCs  and  MtBE  in  groundwater 
between  sampling  events,  and  observing  long‐term  concentration  trends  in  specific  wells.    Evaluation  of  the 
groundwater  quality  data  indicated  that  the  GWE&T  system  operated  continuously  for  several  years  and  significantly 
decreased the magnitude and distribution of petroleum impacted groundwater beneath the site. 
 
This process effectively treated the groundwater above what was believed at the time to be a continuous confining clay 
layer.  However,  seasonal  historic  low  groundwater  elevations  would  result  in  a  temporary  resurgence  of  dissolved 
petroleum hydrocarbons in the groundwater. Targeted excavation was later employed by stripping the remediated soil 
and removal of the effected soil in proximity to the clay layer. The spill file has subsequently been closed. 
          




AZTECH TECHNOLOGIES, INC.                                                                                                         37 
Section 2                                                                                                   Services and Experience 


             CASE STUDY‐Litigation Support 


             •   Client named responsible by Attorney General’s office for spill at a service station. 
             •   Client owned a UST at the service station that was removed in 1996. 
             •   Copies  of  spill  investigation  were  obtained  and  further  investigation  into  spill  was  made  by 
                 Aztech and state contractor. 
             •   Data indicated spill was result of an older spill or source area and not the client’s UST. 
             •   Strong  case  was  presented  to  the  client’s  attorney,  regional  NYSDEC  spill  investigator  and 
                 counsel for the Attorney General’s office. 
             •   Client  reached  settlement  with  Attorney  General’s  office  without  accepting  responsibility  for 
                 spill. 
           
Aztech  provided  litigation  support  for  a  client  in  New 
York State who was named a responsible party by the 
Attorney  General’s  office  for  a  spill  at  a  site  they  had 
previously  supplied  with  gasoline.    The  Attorney 
General’s  office  sought  to  bill  the  client  for  cost 
recovery of the spill investigation and remediation.   
 
The subject site was a service station located near the 
intersection  of  two  state  highways.    The  client  had 
supplied  gasoline  to  the  service  station  and  owned 
one  UST  at  the  site.    The  UST  was  removed  by  the 
client in 1996 and showed no indication of leakage.   
 
In 2002 the New York Attorney General’s office named 
the client a responsible party for a petroleum spill on 
the site of the former service station and on property 
downgradient.    The  client  contacted  Aztech 
Technologies  to  review  information  about  the  spill  and  work  with  their  attorney  to  develop  a  response  to  the  State.  
Aztech obtained copies of the spill investigation from New York State under the freedom of information law.   
 
Reports from the NYSDEC and their contractor indicated that the UST owned by the client was not the most likely source 
of  the  spill.    After  the  tank  was  removed,  NYSDEC  issued  a  letter  stating  that  the  UST  owned  by  the  client  and  the 
associated piping did not appear to be the source of the spill.  Since the spill consisted of weathered gasoline, NYSDEC 
considered the previous owner of the site to be the responsible party.  Later, in 1997 the New York Attorney General’s 
office named the client a responsible party along with the former owner and the operators of two other service stations 
in the vicinity of the spill.  Subsequently NYSDEC hired a consultant to investigate and remediate the spill. 
 
By  2002,  the  Attorney  General’s  office  focused  solely  on  Aztech’s  client  despite  the  findings  of  the  state’s  own 
representatives  and  consultants.    Aztech  reviewed  the  consultant’s  reports  which  indicated  that  the  pattern  of 
contamination  in  the  monitoring  wells  indicated  unknown  sources  of  contamination  including  a  possible  upgradient 
source.    The  state  contractor  recommended  conducting  an  additional  investigation  along  the  state  highway  at  the 
nearby intersection which is upgradient from the spill site. 
 



AZTECH TECHNOLOGIES, INC.                                                                                                           38 
Section 2                                                                           Services and Experience 

                                 Aztech  also  reviewed  Sanborn  fire  insurance  maps  which  indicated 
                                 the  presence  of  multiple  USTs  and  service  stations  along  the  state 
                                 highway  between  1925  and  1955.    Based  on  the  results  of  the 
                                 contactor’s  findings  and  Aztech’s  own  investigation,  the 
                                 preponderance  of  data  indicated  that  the  source  of  the 
                                 contamination  was  an  older  spill  or  source  area  and  not  the  client’s 
                                 UST.  
                                  
                                 Aztech  presented  its  findings  to  the  client’s  attorney,  the  regional 
                                 NYSDEC  spill  investigator  and  counsel  for  the  Attorney  General’s 
                                 office.  Based on the strength of Aztech’s report, the client was able 
                                 to  reach  a  settlement  with  the  Attorney  General’s  office  without 
                                 accepting responsibility for the spill. 




AZTECH TECHNOLOGIES, INC.                                                                                    39 
Section 2                                                                                                 Services and Experience 


             CASE STUDY‐Controls Upgrade 


             •   Upgrades to a controls system at a PCB Landfill. 
             •   Existing system designed to pump and treat landfill leachate from a shallow well and to exert 
                 hydraulic control on the higher concentrations found in an adjacent deep well. 
             •   Existing  system  was  a  number  of  independent  control  systems  due  to  prior  upgrades  and 
                 expansions over several years. 
             •   Proposal was generated to address and upgrade the system in stages. 
             •   Existing equipment was reutilized wherever possible. 
           
The client requested Aztech’s assistance in accomplishing upgrades to 
a  landfill  leachate  treatment  system  at  a  PCB  landfill  in  upstate  New 
York.    The  existing  system  was  designed  to  pump  and  treat  landfill 
leachate  from  a  shallow  well  and  to  exert  hydraulic  control  on  the 
higher  concentrations  found  in  an  adjacent  deep  well.    The  existing 
equipment and control scheme was the result of several upgrades and 
expansions over the past years, resulting in a number of independent 
control  systems  located  in  different  areas  of  the  treatment  building 
and site. For example, the well pump controls were situated at the well 
access manholes located up a steep incline from the treatment system.  
The liquid piping and power conduits were run along a suspended pipe 
bridge  through  the  roof  of  the  treatment  building,  allowing  only 
seasonal usage due to concerns of freezing. 
 
Site  visits  were  conducted  with  NYSDEC  personnel  and  the  client  to  review  the  treatment  stream  as  designed,  the 
present  functionality  of  equipment  and  controls,  and  the  additional  needs  of  the  operators  for  safety  and  efficiency.  
Strengths  and  weaknesses  of  the  present  control  system  were  discussed  at  length.    From  the  site  visits  as  well  as 
telephone discussions, emails, site photos, engineering drawings, and records, the project scope started to emerge. 
 
Considering  the  several  areas  of  concern,  Aztech  personnel  generated  a  proposal  to  address  and  the  system  them  in 
stages,  while  reutilizing  existing  equipment  wherever  possible,  including  float  sensors,  pumps,  blowers,  and  conduits. 
The stages were as follows: 
           
                o Design and complete engineering drawings for the complete system electrical schematic, main control 
                   panel, switch / indicator light panel, load center layout, sized conduit map with all infill wires, sizes, and 
                   functions.   
                o Deconstruct pipe bridge, relocate pipes and conduits underground. 
                o Remove old coalescer elements, replace with new elements. 
                o Replace  old  low‐pressure  carbon  vessels  with  new  high‐pressure  units  filled  with  fresh  liquid‐phase 
                   activated carbon media. 
                o Remove several existing small control panels, disconnect switches, and 480V transformer. 
                o Run  new  conduits  and  pull  wires  to  several  areas  inside  and  outside  the  treatment  building  to 
                   accommodate the existing and new sensors as well as the expanded control capabilities. 
                o Move all control equipment to a central location in the treatment building; centralize power distribution 
                   of 480V, 120/240V, and DC voltages to the same area. 



AZTECH TECHNOLOGIES, INC.                                                                                                          40 
Section 2                                                                                    Services and Experience 

             o   Replace  rudimentary,  decentralized,  line‐voltage  control 
                 setup with a new programmable logic controller that will: 
                     • Allow  plain‐language  programming,  password‐
                          protection, and remote access. 
                     • Replace existing alarm autodialer with a daily fax 
                          report  of  all  system  readings  and  functions, 
                          supplemented by alarm faxes when necessary. 
                     • Support  remote  system  login  for  status, 
                          adjustment  of  alarm  levels,  and  remote 
                          startup/shutdown. 
                     • Incorporate  datalogging  with  remote  access  for 
                          recordkeeping and system troubleshooting. 
             o   Reutilize existing equipment wherever possible, including        Pre‐existing Control System 
                 existing float sensors, pumps, blowers, and conduits. 
         
             o   Add  new  analog  sensors  for  high‐accuracy  temperature, 
                 pressure,  flow,  and  liquid  level  measurements, 
                 supplementing or replacing old on‐off switches. 
         
             o   Construct  the  new  control  center  in  Aztech’s  facility, 
                 incorporating  the  main  control  panel,  the  switch  panel 
                 with  indicator  lights,  a  480V  safety  switch,  and  a 
                 120/240V load center. 
                  
             o   Install  new  control  system  onsite,  hook  up  all  input 
                 sensors and motors, test and calibrate sensors, test basic 
                 operation  and  fax  reporting,  and  develop  new  control         New Control System
                 program onsite with system operation personnel. 
 




AZTECH TECHNOLOGIES, INC.                                                                                         41 
Section 2                                                                                                    Services and Experience 


Portable Dewatering Systems 
 

        Portable Air Stripper System  
        The portable system is contained in a 16' enclosed, dual axle trailer. Upon arrival on site, the system can setup 
        by  one  technician  and  be  operational  in  less  than  one  hour  if  suitable  electrical  service  and  water  discharge 
        points are available.  
         
        The system is constructed around a Shallow Tray 2630 air stripper. This stripper is factory rated at 100 gallons 
        per  minute.  The  control  circuitry  is  located  on  the  nose  of  the  trailer  and  is  enclosed  in  a  weatherproof  box. 
        Indicator lights are used to show component operation. The wiring is entirely NEC Class 1, Division 1 rated for 
        explosive environments. The NYS Department of Labor has inspected the system for OSHA safety standards. The 
        system  is  equipped  with  kWh  electric  meter  and  an  hour  meter  that  totalizes  the  operational  time  of  the 
        stripper pump and individual hour and event meters for each well pump. 
         
        Water can be pumped from drilled wells, culvert wells or an excavation by as many as three pumps. The system 
        has additional controls for pumping from wells into a large external settling tank and then from the settling tank 
        into  the  equipment  trailer.  Each  pump  is  connected  by  1"  or  2"  hose  equipped  with  quick  disconnects  to  a 
        manifold  on  the  trailer.  Each  port  can  be  sampled  individually  and  pumps  may  be  throttled  at  the  manifold. 
        Available  pumps  include  1"  deep  well  pumps  and  2"  submersible  construction  pumps.  Any  combination  of 
        pumps may be used. The pumps are connected to the electrical panel by twist lock plugs. Power to the pumps is 
        ground  fault  protected  and  control  circuitry  is  intrinsically  safe.  Each  pump  control  system  is  equipped  with 
        selector switches that allow manual or automatic control utilizing probe water level sensors. Each pump power 
        circuit is equipped with a panel‐mounted ammeter to monitor pump load.  
         
        Water  enters  the  system  through  the  manifold  and  fills  a  500‐gallon  product/water  separator.  This  is  a 
        coalescing separator rated for 100 gallons per minute. The separator is also used to knock out silt. The separator 
        contains weirs and the coalescing unit can be removed if not needed. If substantial amounts of free product are 
        encountered, a skimmer can be fitted and product diverted to 55‐gallon drums. Water flows from the top of the 
        separator  into  a  250‐gallon  staging  tank.  This  is  done  to  prevent  level  fluctuations  in  the  oil/water  separator. 
        Water is then pumped from the staging tank into the air stripper. A water flow rate meter is utilized to adjust 
        the flow to the air stripper. The separator tank/staging tanks are fitted with high level controls to shut down the 
        well pumps in the event of high water levels. The control circuitry is designed to allow intermittent operation 
        and  blower  overrun  when  the  stripper  pump  shuts  down.  Water  is  then  pumped  from  the  stripper  through  a 
        discharge water meter and can be diverted through carbon units if desired. The stripper is equipped with a low 
        air  pressure  shut  down  switch  and  high  water  level  shutdown.  The  carbon  units  are  equipped  with  a  high‐
        pressure shutdown switch. 
         
        The system is capable of operating unattended. When a safety circuit shuts the system down, it only shuts down 
        the effected components. When conditions return to normal, the system will automatically restart. The controls 
        have been designed to prevent short cycling of shutdown and restarts. The system is equipped with 500 feet of 
        2" hose in 50‐foot sections, as well as 400 feet of 1" hose in sections of varying length. Each pump is equipped 
        with wiring and probe contacts and quick disconnects. Each pump wire loom is contained in a fiberglass sleeve 
        which terminates with a single weather proof twist lock connector for control and power hookup at the panel. 
        Discharge is through 1‐1/4" hose for low flows (under 50 gpm) or 2" hose for higher flows.  
         


AZTECH TECHNOLOGIES, INC.                                                                                                             42 
Section 2                                                                                               Services and Experience 

        A separate 110 volt panel is available for operating two pumps and a carbon treatment system. This panel can 
        be used in conjunction with the air stripper trailer to allow pumping from as many a 5 wells simultaneously.  
          
        The entire system including control circuitry was designed and constructed by the principals and employees of 
        Aztech, thereby giving us a very thorough understanding of the capabilities and logic of the system.  

        High Volume Portable Air Stripper System  
        Aztech's high flow unit is contained in a 26' enclosed, dual axle trailer. Like its 16' counterpart the system can be 
        setup by one technician and be operational in less than one hour. 
          
        The high flow system can be configured to meet the needs of each site. The system contains two air strippers 
        that operate in parallel, one Shallow Tray 3640 and a 5 tray STAT80 from Carbonair. The system can be operated 
        with either stripper running independently in moderate flow conditions. When a high flow condition exists both 
        units are run simultaneously. 
          
        Water  can  be  pumped  from  drilled  wells,  culvert  wells,  settling  tanks  or  an  excavation.  The  system  has  the 
        capability to control up to 7 pumps. 
         
        The  system  can  be  operated  24  hours  a  day/7  days  a  week  to  keep  the  excavation  dry  and  the  job  moving. 
        Aztech's advanced control package helps automate the system and keep labor costs down. 
        When needed carbon treatment is used for final polishing to ensure discharge limits are met. 

        Activated Carbon Treatment 
        Aztech  uses  activated  carbon  treatment  as  polishing  behind  our  Air  Stripper,  or  as  a  standalone  option  when 
        either contaminate loading is low or controlling vapor emissions is critical. 
          
        Aztech has carbon pressure vessels and activated carbon in stock. We can be ready to go on short notice to get 
        your project up to speed or to keep it going smoothly. 
 
 




AZTECH TECHNOLOGIES, INC.                                                                                                       43 
Section 2                                                                                                  Services and Experience 

Drilling and Soil Probing  

All drilling and soil probing is performed in accordance with State Environmental and ASTM standards. The rigs available 
from Aztech include a track‐mounted Geoprobe, a Foremost Mobile B3500 and a Boart Longyear BK66.  Aztech’s drillers 
and drill rigs can handle even the most challenging drilling conditions. 

With  our  track  mounted  Geoprobe  6610  rig,  soil  probing  offers  a  quick  and  inexpensive  mechanism  to  evaluate  site 
stratigraphy  and  delineate  contaminant  plumes,  install  monitoring  wells  and  investigate  property  for  real  estate 
transactions. The small size and low clearance allow this rig to be used in areas of limited access, low clearance areas 
and, inside of buildings.  The Foremost Mobile B3500 rig offers more power and versatility as it is mounted on a four‐
wheel  drive  vehicle.  It  is  equipped  with  both  a  soil  probe  hammer  and  rotary  top  heads.  Operations  can  be  switched 
from probing to drilling and back without moving the equipment from the hole. The high torque rotary tophead, enables 
the use of 6‐5/8" hollow stem augers and the hydraulic mast drop enables operation in areas of low overhead clearance.  
The Boart Longyear BK66 is our most powerful rig with the capability to advance large diameter augers as deep as 200 
fbg. 

     Soil Probe Services 
         • Continuous Macrocore sampling 
         • Depth discrete sampling 
         • Bio‐remediation compound injection 
         • Monitoring well installation 
         • Depth to bedrock investigations 
         • Angle probing, from horizontal to vertical, enabling probing under structures and foundations 
         • Dual wall tooling (i.e. drive outer casing and split spoon sample at discrete depths or continuously) 

        Track Geoprobe 
            • 66‐inch probe cylinder stroke allows use of 5‐foot probe 
               rods 
            • 21  ton  pulling  capacity  for  today's  larger  sampling  tools 
               and deeper depths 
            • Wireless remote control 
            • Built‐in rotary spindle for concrete drilling, augering, and 
               anchoring 
            • Two‐speed  probe  cylinder  cycles  from  bottom  to  top  in 
               less than 5 seconds 
            • Independently driven rubber tracks 
            • Powered by a four‐cylinder, 54 HP, liquid‐cooled Kubota 
               turbo diesel engine 
            • Hydraulic  movement  in  all  three  axes  allows  easy  probe 
               alignment with tool string 
            • Auxiliary  hydraulic  ports  provide  power  for  remote 
               equipment 

    Drilling and Coring Services  
    Aztech  Technologies  offers  versatile  equipment  to  drill,  core  and  install  wells.  The  Foremost  Mobile  B3500  rig  is 
    configured  to  operate  in  areas  of  clearance  of  less  than  10  feet  (e.g.  under  canopies  and  inside  buildings).  The 


AZTECH TECHNOLOGIES, INC.                                                                                                          44 
Section 2                                                                                               Services and Experience 

    Geoprobe  6610  Rig  is  capable  to  conduct  soil  probing  or  advance  hollow  stem  augers  in  areas  of  limited  access 
    (inside buildings, narrow spaces).  
      
         Drilling capabilities include: 
              • 2" monitoring well installation with 4‐1/4" hollow stem augers 
              • 4" monitoring well installation with 6‐5/8" hollow stem augers  
              • 6" monitoring well installation with 8‐1/4" hollow stem augers  
              • Rock drilling with 4" and 6” down hole hammers or roller bits 
              • Well decommissioning and grouting 
              • Angle drilling, from horizontal to vertical 
              • Geotechnical drilling 
              • Soil vapor extraction and sparge point installation 
              • NX Rock Coring 

        Drill tooling includes:  
             • Small diameter single / dual wall probe tooling 
             • Large diameter double wall probe tooling 
             • 4‐¼", 6‐ 5/8 " and 8‐¼" hollow stem augers 
             • 175 and 300 pound safety hammers 
             • 2" and 3" spilt spoon samplers 
             • Roller bits and down hole air hammers, to 5‐5/8” 
             • Grout and water pumps 
             • NX Rock Coring Tooling 

        Foremost Mobile B3500 Truck Mounted Drill Rig 
            • Off road capabilities 
            • Suitable  for  shallow  augering, 
              direct  push/probing,  and  rotary 
              drilling 
            • E‐Z  select  feature  provides  one 
              touch  hydraulic  control  to  change 
              from rotation to direct push 
            • Hollow  Stem  Auger/Soil  Sampling 
              with 4‐1/4" HSA: 50 ft. 
            • Rotary  Drill  with  NwML  2‐5/8"  OD 
              Drill Pipe: 200 ft. 
            • Direct Push Exploration: 80 ft. 
            • Pulldown Force: 11,000 lbs. 
            • Retract Force: 11,000 lbs. 
            • Rate of Feed: 53 ft./min. 
            • Feed Stroke: 6 ft. 




AZTECH TECHNOLOGIES, INC.                                                                                                       45 
Section 2                                                   Services and Experience 

        Boart Longyear BK66 
           • Hollow Stem Augering: 
                • Soil Boring to 175 ft. bgs. 
                • 2" & 3" wells to 175 ft. bgs. 
                • 4" wells to 125 ft. bgs . 
                • Tooled to 100 ft. 
           • Torque ‐ 13,000 ft/lbs spindle torque. 
           • On‐board water tank. 
           • Dimensions: 
                • Length: 28 feet 
                • Height(mast down): 12 feet 
                • Height(mast up): 31 feet 
                • Width: 8 feet 
                • Max. auger size: 10‐¼ in ID; 15 in OD 
                • Max. rated depth with augers: 200 feet 

     




AZTECH TECHNOLOGIES, INC.                                                        46 
Section 2                                                                                                      Services and Experience 

             CASE STUDY‐ Landfill Site Investigation – Borings Cased through Liner 


                                                                                 Aztech Technologies installed ten four‐
                                                                                 inch ID protective PVC casings through 
                                                                                 an  industrial  landfill  constructed  for 
                                                                                 storage  of  PCB‐impacted  soil.  The 
                                                                                 borings  were  advanced  via  6‐5/8  inch 
                                                                                 hollow  stem  augers.  One  split  spoon 
                                                                                 sample  was  collected  from  the  first 
                                                                                 four  feet  in  order  to  verify  the 
                                                                                 presence  of  the  landfill  capping 
                                                                                 material. The hollow stem augers were 
                                                                                 subsequently  advanced  to  a  depth  of 
                                                                                 approximately  15  feet  where 
                                                                                 continuous  split  spoon  sampling 
                                                                                 commenced.  The  boreholes  were 
                                                                                 continued  incrementally  until  they 
             were  advanced  two  feet  into  the  clay  liner  material.  Four‐inch  ID  PVC  casing  was  subsequently 
             installed inside of the hollow stem augers and seated into place. A cement‐bentonite grout mixture 
             was tremied into the annular space between the borehole walls and the PVC casing as the augers 
             were  withdrawn  from  the  borehole.  This  technique  ensures  that  the  casing  is  sealed  into  the 
             borehole and prevents leakage of potentially PCB‐impacted liquids from the bottom of the landfill. 
             Aztech returned to the site in the following weeks to collect 2‐¼ inch diameter MacroCore samples 
             at  each  cased  location  using  direct  push  technology,  from  the  native  soils  below  the  landfill  liner. 
             After  completing  the  soil  sampling,  each  boring  was  tremied  with  a  cement‐bentonite  mixture  to 
             extend up into the protective casing. 
 
 

             CASE STUDY‐Chemical Facility Supplemental Investigation – Bedrock Coring and Wells 


             Aztech  Technologies  installed  a 
             series  of  overburden  monitoring 
             wells  and  direct  push  soil  borings 
             that  included  collection  of  both 
             continuous  and  depth‐discrete  soil 
             and/or  groundwater  samples.  The 
             scope  of  work  also  included 
             completion  of  monitoring  wells 
             within  the  bedrock/overburden 
             interface  as  well  as  cased  bedrock 
             monitoring  wells.  The  cased 
             bedrock  monitoring  wells  were  completed  by  tremie  grouting  a  four‐inch  steel  casing  into  a  “rock 
             socket”.  Bedrock cores were obtained after the grout mixture had sealed the steel casing into the 
             rock  socket  at  each  location.  Well  depths  associated  with  this  project  ranged  from  15  to  82  feet 
             below grade. 
 

AZTECH TECHNOLOGIES, INC.                                                                                                           47 
Section 2                                                                                                Services and Experience 

             CASE STUDY‐Major Oil Storage Terminal Remediation Infrastructure Installation and Investigation 
             – Craning the Rig into Tight Spaces 


             Aztech Technologies installed a series of 
             two‐inch and four‐inch ID stainless steel 
             remedial wells in the footprint of a four‐
             acre  petroleum  product  plume.  The 
             wells  were  installed  for  the  purpose  of 
             free  product  recovery  via  down  well 
             pumps  and  soil  vapor  extraction.  The 
             stainless  steel  remedial  wells  were 
             completed  at  depths  ranging  between 
             12  feet  and  25  feet  below  grade  in 
             boreholes  that  were  continuously 
             sampled  to  depths  as  much  as  32  feet 
             below  grade  depending  on  their 
             location. Several of these remedial wells 
             were  installed  inside  of  the  secondary 
             containment  areas  of  two  major  oil  storage  terminals  and  many  of  these  locations  were  situated 
             between  aboveground  tanks  with  working  spaces  tighter  than  60  inches  in  width.  Our  48”  wide 
             track‐mounted  Geoprobe  6610  drill  rig  was  placed  into  locations  between  tanks  via  crane  and 
             navigated  over  the  aboveground  piping  on  a  system  of  cribbing  and  temporary  bridges  that  were 
             designed and constructed by Aztech Technologies. 




AZTECH TECHNOLOGIES, INC.                                                                                                     48 
 



    Section 3 

    Our People 
     

    Mary L. Passaretti       pg 49 

    Fil L. Fina, III PE      pg 49 

    Consulting Geology  
    & Engineering Staff      pg 50 

    Environmental Field 
    Professionals            pg 50 

     

     




 
Section 3                                                                                                               Our People 


Aztech Technologies, Inc. Principals 

        Mary L. Passaretti 
        President 
         
        B.A.  Geology,  1980,  Skidmore  College,  Saratoga  Springs,  NY,  M.S.  Geology,  1988,  University  of  Tulsa,  Tulsa, 
        Oklahoma.  Mary  has  over  twenty‐five  years  of  experience  as  a  geologist  and  hydrogeologist  in  both  the 
        environmental  and  petroleum  fields.    Expertise  in  the  environmental  field  includes  real  estate  environmental 
        site assessments, compliance audits, environmental drilling and sampling, petroleum storage tank removal and 
        upgrades, and design and installation of soil and groundwater remedial systems for petroleum contamination.  
        Mary’s  experience  in  the  petroleum  field  includes  clastic  and  carbonate  core  description,  thin‐section 
        petrography,  scanning  electron  microscopy,  X‐ray  diffraction  and  electron  microprobe  study  for  use  in 
        petroleum research, exploration, and production. 
         
        Accomplishments  include  successful  completion  of  thoroughly  researched  Phase  I  ESAs  and  successful 
        management  and  completion  of  Phase  II  groundwater  studies.    Responsibilities  include  installation  of  soil 
        borings  and  monitoring  wells,  soil  and  groundwater  sampling,  aquifer  testing,  and  report  summarization  for 
        optimal remediation.  Design and implementation of Phase III remediation projects, including soil vent systems, 
        soil and groundwater bioremediation projects, carbon filtration units, air stripping systems, air sparge and high 
        vacuum  extraction.    Work  aiding  clients  in  interaction  and  compliance  with  local,  state,  and  government 
        regulations  including,  but  not  limited  to  PBS  (compliance  audits),  Resource  Conservation  and  Recovery  Act 
        (RCRA),  Comprehensive  Environmental  Response,  Compensation  and  Liability  Act  (CERCLA),  Superfund 
        Amendments  and  Reauthorization  Act  (SARA),  Toxic  Substances  Control  Act  (TSCA),  Clean  Water  Act  (CWA) 
        (National Pollutant Discharge System (NPDS) and State Pollutant Discharge Elimination System (SPDES) permits), 
        and  Clean  Air  Act  (CAA).    Additional  work  includes  successful  completion  of  subsurface  profiles  for  use  in 
        foundation  designs.    Mary  is  certified  by  the  National  Registry  of  Environmental  Professionals  as  a  Registered 
        Environmental Manager and a Certified Environmental Auditor. 
         
        When she isn’t shuttling her two active girls to swim team events, Mary serves on several corporate boards and 
        enjoys gardening and skiing. 
                  

        Fil L. Fina III, PE 
        Vice President 
         
        B.S.  Mechanical  Engineering,  Clarkson  College,  1979.    M.S.  Mechanical  Engineering,  Rensselaer  Polytechnic 
        Institute, 1988.  Originally from Saratoga, Fil worked as an engineer for a petrochemical pump and seal company 
        and a consulting engineering firm prior to returning to Saratoga. He then managed a regional office of a medical 
        waste  transportation  company  for  two  years.    Next  came  a  stint  as  an  engineer  for  a  petroleum  product 
        distributor/retailer prior to private contracting.  His responsibilities included management of all engineering and 
        environmental  affairs.    Related  engineering  and  contracting  has  included  pump  and  tank  installations  and 
        removal,  aboveground  petroleum  and  chemical  bulk  facility  design,  Spill  Prevention  and  Control 
        Countermeasures  (SPCC)  plans,  SPDES  permitting,  process  exhaust  and  ventilation  permitting,  Department  of 
        Transportation  and  spill  response  training,  retail  facility  construction  and  bulk  storage  facility  construction.  
        Remediation system design and construction includes soil vapor extraction, groundwater pump and treatment, 
        free product removal, high vacuum extraction, total fluids extraction and oxygenation. 
         

AZTECH TECHNOLOGIES, INC.                                                                                                         49 
Section 3                                                                                                                Our People 

        Fil  has  successfully  designed  hundreds  of  remediation  systems  using  all  the  accepted  technologies,  and  also 
        directs  the  Aztech  research  and  development  program  that  has  invented  and/or  refined  several  products  and 
        technologies involved in the measurement and treatment of environmentally impacted materials. 
         
        Fil enjoys skiing with his daughters, training his Chesapeake Bay retrievers, and flying light aircraft. 
         

Consulting Geology and Engineering Staff 
 
Our  professional  staff  members  have  over  75  years  of  combined  experience  in  the  environmental  field.    Integrated 
programmable logic controllers, bedrock drilling, engineering technical expertise, PBS compliance, project management, 
feasibility  studies,  pilot  tests,  remediation  system  design,  emergency  spill  response,  blast  monitoring,  governmental 
agency  compliance,  these  are  only  a  few  of  the  skills  Aztech  professionals  bring  to  our  clients.    Our  engineers  and 
geologists  have  advanced  degrees  from  prestigious  institutions  in  geology,  hydrogeology,  mechanical  engineering, 
environmental  science  and  biology.    They  are  active  members  of  their  communities,  churches  and  sports  leagues  and 
their interests vary from trout fishing, remodeling, and golf to bike riding, running and spending time with their families. 
 

Environmental Field Professionals 
           
Aztech Technologies' field professionals are at the heart of our operations and play a key role in the services we provide 
to our clients. Collectively they have over one hundred years experience sampling, building and operating remediation 
equipment. They are knowledgeable in sampling and drilling techniques for soil, air, and groundwater. Our people are 
skilled  machinists,  welders,  woodworkers,  mechanics,  and  electricians  and  drillers.  They  have  constructed  and 
maintained systems for total fluids extraction pump and treat, dewatering operations, soil vapor extraction, air sparge, 
indoor vapor abatement, and domestic water treatment and they have drilled through some of the most frustrating and 
difficult  conditions.    Many  are  also  skilled  heavy  equipment  operators  capable  of  handling  the  in  ground  and  above 
ground aspects of remediation system installation. Aztech personnel have experience in working with tank installation 
contractors and excavation and building construction contractors to integrate the remediation system installation into 
existing facility or new construction. Aztech professionals monitor sites to optimize system performance and to ensure 
compliance  with  discharge  regulations.  They  are  skilled  at  interpreting  the  output  of  programmable  logic  controlled 
systems to identify potential issues, and perform maintenance to minimize downtime and maximize the lifetime of the 
system.  Our  environmental  professionals  have  degrees  in  fields  such  as  Electrical  Construction  and  Maintenance, 
Engineering Technology, and Equipment Repair. 
 




AZTECH TECHNOLOGIES, INC.                                                                                                          50 
 


 
    Section 4 

    Health and Safety 




 
Section 4                                                                                                         Health and Safety 


Health and Safety 
 
Health  and  safety  of  employees  is  a  critical  consideration  by  the  nature  of  the  work  we  perform.    During  the  pre‐
execution phase of the project we perform a health and safety analysis and development of the site specific Health and 
Safety Plan (HASP). The HASP identifies hazards, risk levels, and countermeasures associated with the tasks included in 
the scope of work.  The HASP is typically developed by the Project Manager with review and input by either the Health 
or Safety Officer, the Health and Safety Coordinator or both. 
 
Each project begins with an initial health and safety meeting and they are conducted at the start of each day throughout 
the  specific  project  field  or  data  collection  task.    The  purpose  is  to  identify  changing  field  conditions  and/or  new 
potential hazards.  The goal of the daily health and safety meeting is to convey information to project field staff and to 
minimize the potential for hazardous situations to occur on the job site.  
                                                            
                                                           The  Project  Manager,  Contract  Manager  and  Health  and  Safety 
                                                           Officer  conduct  routine  quality  assurance  inspections  to  document 
                                                           compliance  with  the  scope  of  work,  specifications,  regulations  and 
                                                           internal  (including  health  and  safety)  procedures.    On  the  spot 
                                                           corrections are made, if necessary, and follow‐up counseling and/or 
                                                           disciplinary action is taken for severe (or repeat) non‐compliance. 
                                                            
                                                           Aztech  personnel  have  had  OSHA  40  hour  training  and  NYS  Labor 
                                                           Department  /  OSHA  "right  to  know"  training.    Eight‐hour  refreshers 
                                                           are performed yearly. Employees are also trained in first aid and CPR.  
                                                            
All employees (with the exception of administrative staff) are enrolled in a medical monitoring and random drug testing 
program  upon  initial  hire.    A  fit  for  duty  physical  and  initial  monitoring  session  is  conducted  at  the  Center  for 
Occupational  Health  of  Glens  Falls  Hospital  located  in  Wilton,  NY  and  overseen  by  our  Medical  Consultant.    An 
evaluation and clearance for respirator use is also done at this time. 
 
Health  and  Safety  Training  and  review  of  HASPs  are  provided  by  Saratoga  Safety  Inc.  in  Schuylerville,  NY.      Saratoga 
Safety  is  a  retained  consultant  serving  as  Aztech  Technologies’  Health  and  Safety 
Coordinator. 
    
Each  employee  is  issued  a  safety  gear  bag  that  includes  a  hard  hat,  hearing  and  eye 
protection,  safety  vest,  steel  toed  boots,  gloves,  respirator,  dust  masks  and  other  safety 
related equipment.  
 
Personnel  performing  specific  tasks,  such  as  confined  space  entry,  forklift  operations, 
electrical  work,  welding,  excavation,  respirator  use  and  ladder  /  harness  use,  have  been 
specifically  trained  in  the  use  of  that  equipment.    Employees  are  also  issued  job  specific 
safety equipment. 
 
Each company vehicle is equipped with a MSDS notebook, the Aztech Technologies general 
Health  and  Safety  Plan  and  Written  Hazard  Communication  Plan.    Each  vehicle  is  also 
equipped with a first aid kit and fire extinguisher.  
 


AZTECH TECHNOLOGIES, INC.                                                                                                           51 
 



    Section 5 

    Equipment 




 
Section 5                                                   Equipment 


Company Owned Equipment 

Drill & Soil Boring Equipment 
 
BOART LONGYEAR BK 66  
     • 13,000 ft‐lb of Torque  
     • 4 ¼” Augers  to 175 ft 
     • 6 5/8” Augers to 100 ft 
     • 8 ¼” Augers to 100 ft 
     • On‐board Stainless Steel Water Tank  
     • Grout Mixing Pump 
     • 2” and 3” Splitspoons 
     • NX and HQ coring 
     • 4” and 5” flush joint casing 
 
FOREMOST MOBILE B3500 
     • Environmental / Geotechnical Rig 
     • 3500 ft‐lb of Torque 
     • 4 ¼” and 6 5/8” Augers 
     • 2” and 3” Splitspoons 
     • DT21 Groundwater Sampling 
     • SP16 Groundwater Sampling 
     • Direct Push Equipped 
     • Discrete Groundwater Sampling 
     • 2 ¼” and 3 ¼” MacroCore Sampling 
     • Soil Vapor Point Installation 
 
GEOPROBE 6610 DT 
     • Limited Access Capable 48” Wide 
     • Track Mounted Platform for Off Road and Wet Areas 
     • 6 5/8” Hollow stem augers 
     • 4 ¼” Hollow Stem Augers 
     • SP16 Groundwater Sampling 
     • 3 ¼” MacroCore Sampling 
     • 2 ¼” MacroCore Sampling 
     • DT 21 Discrete Groundwater Sampler 
     • Soil Vapor Point Installation 
 
DRILLING AND SAMPLING TOOLING 
     • NX Coring Equipment 
     • HQ Wireline Coring Equipment 
     • Shelby Tubes 
     • Flush Joint Casing 
     • 140 and 300 Pound Safety Hammers  
     • 2”, 4” and 6” Down Hole Air Hammers 
     • 3 7/8” and 5 7/8” Roller Bits 
AZTECH TECHNOLOGIES, INC.                                          52 
Section 5                                                            Equipment 


Remediation Equipment 
 
SOIL VAPOR EXTRACTION / AIR SPARGE TEST EQUIPMENT 
    • Regenerative blowers (up to 10 hp) 
    • Rotary lobe blowers (up to 30 hp) 
    • Compressors (up to 5 hp) 
    • Pilot testing equipment 
 
HIGH VACUUM PILOT TEST TRAILER 
    • 8 hp Rotary Lobe Blower 
    • 3 hp Regenerative Blower 
    • 2 hp air sparge compressor 
    • Cyclonic Knockout 
    • Discharge pump and Carbon Polishing 
    • Automated Controls 
 
VAPOR PHASE CARBON TREATMENT 
    • Vessels up to 1000 pound and 1000 cfm 
 
FREE PRODUCT RECOVERY  
    • Remote Monitoring Capability 
    • Cabling Lengths up to 300’ 
    • Short and Mid Term Rental 
 
CLEAN EARTH SPILL BUSTER TERMINATORS 
    • Up to 45 GPH at 0 psi or up to 15 GPH at 50 psi 
    • 50‐150 foot Well Depths 
    • 0 to 10cp at 700 F Viscosity 
    • Pumps hydrocarbons, LNAPL, DNAPL 
 
VAPOR PHASE CATOX UNIT – 1000 CFM 
    • Gas Fired Global RemediCat 1000 unit 
    • Optional SVE blower, knockout and intake filter 
 
GW PUMP AND TREATMENT CONTROLS: 
    • PLC control and power distribution units 
    • Controls well and frac tank 
    • Interfaces with other Aztech treatment systems to add 
       additional recovery wells, air strippers and pilot testing 
       equipment 
 
SOIL VAPOR EXTRACTION SKIDS 
    • Various units, skid mounted and enclosed, up to 7.5 hp 
 




AZTECH TECHNOLOGIES, INC.                                                   53 
Section 5                                                 Equipment 

400 ACFM TOTAL FLUIDS EXTRACTION SYSTEM 
    • 400 ACFM Travaini Oil Sealed Liquid Ring Pump 
    • Heated, Lighted, Insulated Sea Container 
    • Cyclonic Knock Out and Product / Water Separator 
    • 40 GPM Low Profile Air Stripper 
    • Carbon Polishing 
    • Automation and Control Package 
    • Remote Reporting and Operation Capable 
 
RSI ENGINE 
    • 1 Million BTU / Hour VOC Destruction 
    • SVE / TFE Capabilities 
    • Dual Phase Extraction 
    • Hydraulic  Module 
    • Remote Reporting and Operation Capable 
 

WATER TREATMENT EQUIPMENT 
 
250 GPM TREATMENT TRAILER 
    • Dual Air Strippers 
    • Heated, Lighted, Insulated Trailer 
    • Sediment Filtration 
    • Separator / Equalization Tank 
    • Automation and Control Package 
    • Remote Reporting and Operation Capable 
    • Operates off Three Phase Power 
 
100 GPM TREATMENT TRAILER 
    • Air Stripper 
    • Heated, Lighted, Insulated Trailer 
    • Sediment Filtration 
    • Separator / Equalization Tank 
    • Operates off Single Phase Power 
 
25 GPM TREATMENT TRAILER 
    • 500 lb Media Vessels 
    • Heated, Lighted, Insulated Trailer 
    • Sediment Filtration 
    • Separator / Equalization Tank 
    • Operates off Single Phase Power 
 
2000 LB MEDIA VESSELS 
    • Lined Steel Pressure Rated Vessels 
    • Activated Carbon & Organoclay Treatment 
    • Ion Exchange Resins 
 

AZTECH TECHNOLOGIES, INC.                                        54 
Section 5                                                                     Equipment 

800 LB MEDIA VESSELS 
    • Fiberglass Pressure Rated Vessels 
    • Activated Carbon Treatment 
    • Organoclay Treatment 
    • Ion Exchange Resins 
 
CHEMICAL FEED EQUIPMENT 
    • LMI Chemical Feed Pumps with PLC Interface 
    • pH Monitoring Equipment for PLC Interface 
    • Anti Scaling Chemicals 
    • Flocculants and Coagulents 
    • Chlorination equipment 
 
PLASTIC SKID MOUNTED WATER TANKS 
    • 500 to 1000 gallon capacity 
 
UTILITY CLEARING EQUIPMENT 
    • Trailer Mounted, Self Contained SAFEX Clearance Unit 
    • Air Compressor with Air Knife / Lance 
    • Vacuum Unit with Debris Tank 
         

Construction And Field Equipment 
 
SKID STEER: GEHL 6625DX  
    • 4 Wheel Drive with Forks 
    • Bucket  
    • Drum Carrier 
    • Snow Blower 
 
SKID STEER: KOMATSU CK30  
    • 4 Wheel Drive with forks 
    • Bucket  
    • Drum carrier  
    • Snow blower 
 
FLEET OF VEHICLES  
    • Six Automobiles, inclusive of small cars (Toyota matrix), SUV’s 
    • Eight Pickup trucks, inclusive of 1 ton, ¾ ton, half ton and smaller 
        units. 
    • Two Rack trucks; GMC 5500 with Liftgate and Ford 550 
    • Box truck 
 
EARTH‐WORKING AND MOVING EQUIPMENT  
under long term lease 
    • International 9400 fourteen yard dump truck, 56,000 GVW 
 

AZTECH TECHNOLOGIES, INC.                                                            55 
Section 5                                                                        Equipment 

FLEET OF EQUIPMENT TRAILERS  
    • Flatbeds and Liftgate 
    • Jobsite Trailers  
    • Enclosed Cargo Trailers 
 
PORTABLE WELDING EQUIPMENT 
    • Wire feed  
    • Arc welders  
    • Plasma cutting equipment 
 

Shop and Field Equipment 
        
   • Core Drills Up To 9” 
   • Aluminum Tripod Chain Fall Hoisting Equipment, Equipment Rigging Slings  
   • Corded and Cordless Drills, Saws, Etc. 
   • Power and Hand Pipe Threading and Cutting Equipment  
   • Conduit Benders, Heaters and Power Wire Pulling Equipment 
   • Electrical Testing and Monitoring Equipment. 
   • DOT Barricading and Signage 
   • Portable Gasoline and Electric Pumps 
           o Hoses In 1, 2, 3 and 4” Sizes   
           o Hundreds of Feet of Suction Hose 
           o Thousands of Feet of Discharge Hose 
   • Portable Work Stands 
   • Generators 
   • Steam Cleaners 
   • Portable Air Supply Breathing Equipment 
   • SCBA Equipment 
   • Sand Blasting and Painting Equipment 
   • Portable Air Compressors  
           o Gas and Diesel Powered Units Up To 175 CFM 
           o Jackhammers 
           o Air Knifes 
           o Pneumatic Tools 
   • Portable Concrete Mixer 
   • Jumping Jack Tamper 
   • Pavement Saws, Hand and Walk Behind 
   • Chainsaws, Weed Cutters, Commercial Mower, Gasoline Pole Saw, Etc. 
   • Fall Protection Harnesses and Confined Space Entry Tripod 
   • Hydraulic lift tables 
   • Metal Working Equipment  
           o Bridgeport Mill  
           o Lathe  
           o Band Saw 
   • Wood Working Equipment  
           o Panel Saw 

AZTECH TECHNOLOGIES, INC.                                                               56 
Section 5                                                                                                Equipment 

           o Table Saw 
           o Chop Saws 
    •   Control Panel Assembly Area and Workbench 
 

Materials Inventory 
 
Aztech maintains a warehouse with an extensive stocked inventory of materials and parts: 
 
       • Well Installation Materials Inclusive of: 
               o PVC well screen and casing from 1” to 6” 
               o Stainless steel well screen and casing from 2” to 4” 
               o Steel Casing in 2”, 4” and 6” 
               o Sand, Bentonite, Concrete 
               o Sample Sleeves, Core Boxes, Shelby Tubes, Etc. 
       • Piping and Supplies in Galvanized and PVC, Inclusive of Fittings, Pipe, Valves, Etc. 
       • Electrical Supplies Inclusive of PVC and Steel Conduit, Wire, Circuit Distribution Equipment 
       • Centrifugal Pumps, Seals, Etc. 
       • Regenerative Blowers, Filters, Etc. 
       • Curb Boxes Including 6”, 8”, 12”, 18”, 24” and 36” 
       • Well Protective Casings in 4” and 6” 
       • Drums (Dot Rated 55 Gallon), Overpack Drums (85 Gallon), Spill Booms and Pads 
       • Carbon, Virgin and Regenerated, Vapor and Liquid Phase 
       • Domestic Water Treatment Equipment  
               o Filtration 
               o Carbon vessels 
               o UV Lights and Spares  
               o Water Softeners 
               o Resins 
 

Instrumentation 
 
    • Photo Ionization Detectors 
           o BW GAS ALERT 5 PID MULTI‐GAS DETECTORS 
                      0‐1,000 ppm measurement of VOCs (Volatile Organic Compounds) 
                      Carbon Monoxide, Oxygen, Hydrogen Sulfide 
                      Lower Explosive Limit 
                      Audible and Visual Alarms 
           o MINIRAE PID 
                      0‐10,000 ppm measurement of VOCs 
                      Visual Alarm 
           o PHOTOVAC 2020ppbPRO 
                      0‐2,000 ppm measurement of VOCs 
                      Visual Alarm 
           o THERMO 580B OVM 
                      0‐2,000 ppm measurement of VOCs 
                      Visual Alarm 

AZTECH TECHNOLOGIES, INC.                                                                                       57 
Section 5                                                                  Equipment 

    •   Magnetic Line Locators 
            o Including Remote Transmitters  
    •   Water Level Meters 
    •   Interface Probes 
            o SOLINST INTERFACE PROBES 
                          5/8" (16 mm) diameter P1 probe 
                          1.5” (38.1 mm) P2 probe 
                          Tape lengths 65 to 100 feet 
    •   Total Station Electronic Survey Equipment 
    •   Optical Survey Equipment 
    •   Laser Site Level 
    •   Ultrasonic Leak Detection Equipment  
    •   Noise Level Measurement Equipment  
    •   Water Quality Meters by YSI 
    •   Dissolved Oxygen Meters by YSI 
            o YSI 55 DISSOLVED OXYGEN METERS 
                          Dissolved Oxygen: 0‐20 mg/L 
                          Temperature: ‐5° to +45° C 
            o YSI 556 MULTIPROBE SYSTEMS 
                          Dissolved Oxygen: 0‐20 mg/L 
                          Temperature: ‐5° to +45° C 
                          Conductivity: 0 to 200 mS/cm 
                          pH: 0 to 14 units 
                          ORP: ‐999 to +999 mV 
    •   LEL Meters by Thermo Instruments 
    •   pH Meters 
 

Office Equipment 
 
    • Five licensed copies of AutoCad software 
    • Linux based main file, email and web server with remote access 
        capabilities 
    • E size color plotter 
    • B size color laser printer  
    • Dedicated notebook computers with wireless air cards for key 
        employees 
    • Three notebook computers available for sign‐out by technicians as 
        required 
    • Portable color printers for field use 
 


 




AZTECH TECHNOLOGIES, INC.                                                         58 
 



    Section 6 

    Representative Clients 




 
Section 6                                                                          Representative Clients 


Below is a representative section of Aztech Technologies by sector. 
 

    Engineering and Environmental Firms                Construction Firms 
      • Arcadis                                          • The Chazen Companies 
      • CDM                                              • Clough Harbour & Associates 
      • EA Engineering                                   • D.A. Collins Companies 
      • Earth Tech                                       • J.R. Pietropaoli 
      • HRP Associates                                   • LeChase 
      • MACTEC                                           • VMJR 
      • Malcolm Pirnie                                   • W.J. Morris 
      • Shaw E&I 
      • URS Corporation                                Governmental Agencies 
                                                        • City of Saratoga Springs 
    Petroleum Retailers and Distributors                • New York State Department of Environmental 
      • Apache Oil                                      Conservation 
      • Drake Petroleum                                 • United States Army Corps of Engineers 
      • Red‐Kap Petroleum                               • United States Department of the Navy 
      • Stewarts Shops                                  • United States Environmental Protection Agency 
      • WAREX Terminals Corporation 
                                                       Other Sectors 
    Banking and Financial Institutions                  • Dry Cleaning Facilities 
      • Berkshire Bank                                  • Manufacturing Facilities 
      • First Niagara Bank                              • Real Estate and Property Development 
      • General Electric Commercial Finance             • Small and Medium Business Owners 
      • Glens Falls National Bank 
      • Saratoga National Bank 




AZTECH TECHNOLOGIES, INC.                                                                              59 
 


     
        Section 7 

        Licenses, Certifications 
        and Memberships 




 
Section 7                                                                   Licenses, Certifications and Memberships 


Licenses and Certifications 
  •     NYS Women‐Owned Business Enterprise ‐ #49360 
  •     New York State Licensed Professional Engineers Cert # 0003009 
  •     New York State Department of Environmental Conservation 
  •     Well Driller Registration #NYRD10789 
  •     Pennsylvania Department of Conservation and Natural Resources 
  •     Water Well Drillers License #2527 
  •     Rockland County New York Driller Registration #0027 
         
         

Memberships 
  •     New York State Society of Professional Engineers 
  •     Environmental Business Association of New York 
  •     Northeastern Subcontractors Association 
  •     Association of Ground Water Scientists and Engineers ‐ National Ground Water Association 
  •     American Society of Testing and Materials 
  •     National Registry of Environmental Professionals 
  •     New York State Department of Environmental Conservation Spills Contractor 
  •     Empire State Petroleum Association 
  •     New York State Association of Convenience Stores 
  •     Saratoga County Chamber of Commerce 
  •     Upstate New York Better Business Bureau 
  •     Hudson Mohawk Professional Geologist Association 
  •     New York State Council of Professional Geologists 
  •     Independent Bankers Association of New York State 
  •     International Ground Source Heat Pump Association 




AZTECH TECHNOLOGIES, INC.                                                                                         60 

								
To top