									        Presentation on
     Ganjam Rice mill Cluster
      Ganjam, Orissa State



                By

Zenith Energy Services (P) Limited
             Hyderabad

                                     1
Schedule of Implementation
Zenith Energy Services Pvt. Ltd. Will start
Energy use and Technology Audits during
the 1st week of December 2009, as the
mills are not in operation due to un
season.




                                              2
No. of units Covered for Energy
  use and Technology Audit
• Total No. of units in Ganjam Cluster are
  around 200
• No. of units to be covered in the Cluster
  are 60 units




                                              3
         Products
•   Raw Rice
•   Boiled Rice (few rice mills)




                                   4
Process Flow Diagram




                       5
Main Energy Forms used

• Electricity
• Rice Husk




                         6
Major Energy Consuming Process
          Equipments
  •   Boilers
  •   Screeners
  •   Rubber Sheller
  •   Whitener
  •   Graders
  •   Sorters
  •   Elevators
  •   Dryers
  •   Blowers
  •   Pumps
                            7
               Energy Scenario
• The average electricity consumption per
  month varies from 18,000 to 25,000 kWh
  depending on the capacity of the raw rice
  mill for 12 hours of operation of the unit.




                                                8
               Possible Areas of
              Energy Conservation
• Installing variable frequency drives FD fan and ID fans
  etc
• Replace the husk blowers, bran blowers with new
  efficient blowers
• Replace the hullers and whiteners with new systems
• Replacement of canvas iron/aluminum buckets with
  nylon and plastic buckets for elevators
• Replace single drive system with individual drive system
  for all machines to reduce transmission losses.
 Replace inefficient design bucket elevators, paddy cleaners, graders
  etc.

                                                                         9
       Issues and concerns for
           Implementation
Financial Issues
• Involves high investment for technology
  change of various equipments and low
  returns
• Lack of interest in investing in energy
  efficiency measures and more concentration
  on trading/ business activity

                                               10
Technical Issues

• Lack of awareness on technologies
  available in the market
• Absolute Rely on local equipment suppliers
  and boilers are also locally fabricated
• Lack of awareness on energy saving either
  for the management or workers



                                               11
Other Issues

• The project proponents are interested in
  implementation of successful technologies
  implemented in the cluster units or rice
  mills




                                              12
         Implementation Plan
• Dissemination Program : March 2010
• Energy use and Technology Audit will be
  completed by April 2010
• Cluster manual preparation by June 2010
• DPR Preparations from July 2010
• Local Service Providers Workshop September
  2010
• Other programs as decided by BEE
                                         13
Thank You

            14

								