E.ON to Invest $1,301.5 Million in Amrumbank West Offshore
Wind Power Project in Germany - Deal Analysis from
GlobalData
Reference Code: GDAE0117M&A Publication Date: January 2012
1 Table of Contents
1 Table of Contents.................................................................1
1.1 List of Tables .................................................................1
2 Summary .............................................................................2
3 E.ON to Invest $1,301.5 Million in Amrumbank West
Offshore Wind Power Project in Germany ...........................2
3.1 Deal Overview ...............................................................2
3.2 Deal in Brief ...................................................................2
3.3 Comparable Deals.........................................................2
3.4 Features of Amrumbank West Offshore Wind Power
Project ...........................................................................2
3.5 Key Drivers of the Deal .................................................3
3.5.1 E.ON’s Drive to Become a Leading Green Energy
Provider ................................................................3
3.5.2 Capitalizing on Offshore Growth Prospects..........3
3.5.3 E.ON’s Proven Expertise in Offshore Wind
Projects ................................................................3
3.5.4 Government Support for Development of Offshore
Wind Power ..........................................................3
3.6 About the Companies ....................................................3
3.6.1 E.ON AG. .............................................................3
3.6.2 Siemens Energy ...................................................3
4 Appendix ..............................................................................4
4.1 Abbreviations.................................................................4
4.2 Methodology ..................................................................4
4.2.1 Coverage..............................................................4
4.2.2 Secondary Research ............................................4
4.2.3 Primary Research ................................................4
4.2.4 Modeling and Forecasting ....................................5
4.3 Contact Us.....................................................................5
4.4 Disclaimer......................................................................5
1.1 List of Tables
Table 1: Comparable Deals ....................................................2
Table 2: Abbreviations ............................................................4
GDAE0114M&A / JAN 2012
E.ON to Invest $1,301.5 Million in Amrumbank West Offshore Wind Power Page 1
Project in Germany © GlobalData. This report is a licensed product and is not to be copied, reproduced,
shared or resold in any form
2 Summary 3.3 Comparable Deals
Power and gas utility company E.ON AG (E.ON) announced an
Table 1: Comparable Deals
investment of €1,000m ($1,301.5m) for the construction of the
offshore Amrumbank West wind power project in Helwin Deal
Announced Value
Headline
Economic Zone, Germany. The total installed capacity of the Date
($m)
project will be 288 MW and will use 80 Siemens-made turbines.
The investment per MW will be approximately $4.51m. Blackstone to Invest $1,761 Million in
04-Aug-2011 Offshore Wind Power Project in 1,760.50
The electricity generated from the project, which is expected to Germany
become operational by 2015, will be sufficient to power about Dong Energy to Invest $1,714 Million
300,000 households. 24-Feb-2011 for Riffgrund I Wind Power Project, 1,714.16
Germany
3 E.ON to Invest $1,301.5 Million in E.ON to Invest $156 Million in
Amrumbank West Offshore Wind 15-Dec-2011 Karehamn Offshore Wind Power 156.17
Project in Sweden
Power Project in Germany