									Project Name              Respective Total investment
             Advanced stage             districts Advanced stage             Major equipment
                                                                Construction period Project          Construction unit
                           of project approval      Environmental Impact Excavators, Project is******
             Verification New dual-Ming Avenue (public Guangming South Central - Long Road) Municipal Engineering
                                                                                                      cranes, road rollers, High-tech tour of
Shenzhen Guangming Guangdong198.2912 million yuan. 2011 2012 Assessment bulldozers, located in Shenzhen compactors, stirrin
             Engineering  Beijing                     roundabout) Road
                                       East BridgeSurvey and Design Improvement Project    Project is******
                                                                                                      cranes, road rollers, compactors, stirrin
Shunyi Fuqian (Yingchen Bridge - 217.018 million yuan. 2011 2012 Excavators, bulldozers, located in Shunyi, road length of appro
Suizhong Binhe road works
             Engineering               About                     Design
                                                    Survey yuan, funding.                  Project is******
                                                                                                      cranes, road rollers, starting the stirrin
                          Liaoning Province114.5 millionand2011 2012 Excavators, bulldozers, located in Suizhong, compactors,North
Petrochemical six middle of stage
                          GuangdongNot available.                 of                                 ******
                                                    Preparation2011 2012 Excavators, bulldozers, cranes, road rollers, compactors, stirrin
             Feasibility study the road municipal road projects feasibility study report Project Gaolan Port in Zhuhai Economic Zone, c
             Project municipal road
                          GuangdongNot available.               2011                                 ******
                                                                                           Project Gaolan Port in rollers, compactors, stirrin
Four mid-level Bay proposal phase projects Project proposal 2012 Excavators, bulldozers, cranes, road Zhuhai Economic Zone (S
             Feasibility study stage - financial width yuan, 2011 - 2013
                          Fujian Province                        funding.
                                                    Pre-feasibility study prepared         Project is******
                                                                                                      cranes, road rollers, compactors, stirrin
Fuqing vehicle lanes (Tiger Creek 494.8116 millionloop) road works Excavators, bulldozers, located in Fuqing City, west Hogye, ca
Beijing, Hong Kong and Macao highway Yongxing cable project
             Verification Hunan
                           of project approval
                                       241,437,330 yuan.        2011 2012 Excavators, Project is******cranes, road rollers, Yongxing Xiangyi
                                                    Environmental Impact Assessment bulldozers, located in Chenzhou compactors, stirrin
                           of project 1.295 billion yuan.
              312 Shangzhou to approval                         2012 -2014Excavators, Project is******
                                                    Environmental Impact                              cranes, road northwest side of the G3
State Road Verification ShaanxiDanfeng highway expansion project Assessment bulldozers, located in therollers, compactors, stirrin
Shenzhen Guangming Guangdong119.46 (Komeito North 2011 2012 AssessmentMunicipal is******
                           of project approval      Environmental Impact Excavators, Project Engineering rollers, Guangming stirrin
                                                                                                      cranes, road
             Verification New Futura Road million yuan. Central - House Road) bulldozers, located in Shenzhen compactors, New
                           of project approval
             Verification Jilin                     Environmental Impact Excavators, Project is******
                                       5,035,568,300 yuan. 2011 2012 Assessment bulldozers, located in Changchun City, east, far ea
Two vertical and two horizontal Changchun Expressway System Engineering                               cranes, road rollers, compactors, stirrin
Huaxian County Tai (Ching) Canton (state) highwayyuan. 2011 project
             Verification Henan                                                                      ******
                                       455.9053 Environmental Impact Excavators, Project starting in the south county Shen Chuang
                           of project approval million connector 2012 Assessment bulldozers, cranes, road rollers, compactors, stirrin
Xu Village, Shanghai-Hangzhou Expressway Interchange2011 - 2013
             Engineering                                          project    Rigs,         Project is******bridge machines, hammers, in the
                                                    Survey yuan, construction funds in tower cranes, provincial Department downgener
                                                                                                      the
                          Zhejiang About 128.6 millionand Design (update) cranes,addition to located in Haining City, setof Transport
             Engineering                            Survey and2011 - provincial funding.Yantai is ****** within rollers, compactors, into th
                          Shandong Not section of the road Design
S202 Weiqing line Yantai environmentavailable, the central and 2013                                   cranes,
                                                                   renovationExcavators, bulldozers,located road the project, divided stirrin
Provincial Tanghai highway reconstruction project (update) 25%, 75% of domestic bank loans.
             Engineering  Hebei                                  Design
                                                    Survey and2011
                                       2.5 billion owner financing - 2013                  Project is******
                                                                                                      cranes, road rollers, City, starting at Zh
                                                                             Excavators, bulldozers, located in Tangshan compactors, stirrin
             Engineering  Hebei                     Survey and Design        Excavators, domesticis******
                                       About 10.906 billion yuan, raised 2011 December -2014 bank loans. rollers, compactors, stirrin
                                                                                           Project cranes, road
Shijiazhuang City, South Ring Highway project (updated) December 25%, 75% of bulldozers, located in Shijiazhuang City, the startin
City-by-line Engineering  Zhejiang                  Survey and Design                      Project is******
                                        Gate (Bridge) yuan. 2011 2012 Rigs, cranes, tower projects (update)
                                                                                                      located in machines, hammers, startin
             Ninghai County, South311.456 millionto the former foreign section of highwaycranes, bridgeNinghai, Ninghai routegener
Ning-Lian Expressway Jiangsu Province
             Engineering  Chengqiao 62 million yuan. (Updated) - 2013
                                                    Survey
                                        exchange project and2011 Design                    Project is******
                                                                                                      located in machines, hammers, gener
                                                                             Rigs, cranes, tower cranes, bridgeNanjing, Cheng highway brid
             town to Suining Dapozhen other 16 decapitated highway to higher subsidies, the****** bywithinrollers, compactors, stirrin
Anyue Yao Engineering                  126.6807 million yuan, September reconstructionProject is other roadlocal self-government solu
                          Sichuan Province                       design      2011 - 2013 project cranes,
                                                    Preliminary in addition Excavators, bulldozers, located the the respective township
S314 Le De Line Ningjin county section of thePreliminary 2011 2012Germany and Project is******
             Engineering                             highway provincial
                                                                 the shore Excavators, local self-investment. rollers, compactors, 5.4k
                                                                                                      cranes, road
                          Shandong 220 million yuan, the to design government bulldozers, located in Dezhou Ningjin, a road,stirrin
Qing Zi S246 Provincial Highway 315 junctionPreliminary 2011still Gaijian Gongcheng
             Engineering  Shandong Not available. the town design
                                                     to                                    Project is******
                                                                                                      cranes, road rollers, road length stirrin
                                                                  hall 2012 Excavators, bulldozers, located in Dezhou, a compactors, of 5.5
             Engineering  Shandong Not available.   Survey and2011 2012 Gongcheng Project is******
                                                                 Design                               cranes, road rollers, compactors, stirrin
S215 Yellow waterline Longkou Zhaoyuan sector to Zhu Fan Gaijian Excavators, bulldozers, located in Yantai, Longkou Zhaoyuan f
             Engineering                                         Design
                          Shandong Not available, the provincial government investment.    Project is******
                                                    Survey and2011 2012 Excavators, bulldozers, located road rollers, compactors, stirrin
                                                                                                      cranes,
S352 Tan Xue wire victory in the township to repair section of the road sector projects Zaozhuang in Linyi, Zaozhuang victory rura
North Pine Road, Songjiang District, (contact Road - car road) alterations
             Engineering  Shanghai 410 million Preliminary 2011 - 2013
                                                    yuan.        design                    Project is******
                                                                                                      cranes, road rollers, District, North Pin
                                                                             Excavators, bulldozers, located in Songjiang compactors, stirrin
                           Phase
             Construction Preparation               Construction preparation (EIA yuan. Project is******
                                       169.1327 million Road Phase II) Excavators, bulldozers, located in Dongfang compactors, stirrin
                                                                    169.1327 million
East Industrial Avenue Hainan II (Industrial Park Exityuan. 2011 2012 Project at the same time)       cranes, road rollers, City, Hainan Prov
Quangang Yi Feng Road East (two) public works
             Verification Fujian Province
                           of project approval                  2011 2012 Excavators, Project is******cranes, road rollers, Houlong, under Q
                                       Unknown. Environmental Impact Assessment bulldozers, located in Quangangcompactors, stirrin
             EngineeringCounty                                   Design
                                                    Survey andDecember 2011 in addition              ******
                                       134.66 million yuan, construction project (updated)to nationallocated in channels County, allstirrin
                                                                             Excavators, Projects are and road rollers, compactors, line
Channel Island to Pine Hunan Jing Wu Bridge Road reconstruction funds - 2013 bulldozers, cranes, provincial subsidies for thebut t
S315 Wing Engineering
             Hall Road, Shandong Not available.                  design
                                                     Lingxian Xiaofeng Gaijian Gongcheng   Project is******
                                                                                                      cranes, road rollers, compactors, stirrin
                          Linyi Lingxian sector toPreliminary 2011 2012 Excavators, bulldozers, located in Dezhou, secondary road, len
             Project Longgang District available, funding. of project Excavators, Project is******
                          Guangxi                    standard road network project                    cranes, road rollers, compactors, stirrin
Nanning Yongning proposal phaseNotPhase APreparation2011 2012 proposals bulldozers, located in Nanning Yongning Pu new r
Qinghai S101-lane section of arms2.009 billion yuan.
             Verification Qinghai approval Japan                2011 2012 Excavators, Project is******cranes, road Golog Tibetan Autonomo
                           of project to reach Environmental Impact Assessment bulldozers, located withinrollers, compactors, stirrin
                           east road projects       Environmental Impact Excavators, Project is******
             Verification of project approval million                                                 cranes, road town of the British stirrin
Zhanjiang coastal townGuangdong25.2153Leizhouyuan. 2011 2012 Assessment bulldozers, located in therollers, compactors,East L
New Street Construction Preparation
             to a small ridge road projects
                          Hainan       349.9843 million yuan. 2011 - 2013 million at the same time)  ******
                                                                    349.9843Excavators, bulldozers, cranes, Dongfang City, Hainan Provinc
                                                    Construction preparation (EIA yuan. Project starting in road rollers, compactors, stirrin
             Construction Preparation
                          Tianjin                   Construction Preparation
                                       249.5256 million yuan. 2011                         Project is******
                                                                                                      cranes, road rollers, compactors, stirrin
Xiqing District Zhangjiawozhen two major supporting projects 2012 Excavators, bulldozers, located in Tianjin, the total road length
                           of project of the
             Bamboo Avenue side approval
                                       Not available.             the
                                                    Approval of2011 2012                   Project is******
                                                                                                      cranes, road rollers, compactors, stirrin
Nanjing Fu Verification Jiangsu Provincelake marsh project record Excavators, bulldozers, located in Nanjing, starting in the Fu ed
             Verification District, three roads Environmental Impact Excavators, Project is******
                           of project Unknown.                    construction                        cranes, road rollers, compactors, stirrin
Ying Yu Road, Qingpu Shanghai approval and other new2011 2012 Assessment bulldozers, located in Qingpu District, Shanghai Yi
             Verification Shanghai Hong Cao Environmental 2012 Excavators, Project is******
                           of Road Unknown.                     2011                                  cranes, road rollers, compactors, stirrin
Statewide Road (Gui Jing project- approval Road) Project Impact Assessment bulldozers, located in Xuhui District Caohejing plac
             Xin Xin lines crossing 377 million,Started in the construction and local Project is******
                          Shandong                   the provincial government
                                                                2011 of                    self-funding.
                                                                                                      cranes, road rollers, compactors, at Ke
S316 Yong In the build-up phase the river to Shengtuo section 2012 Excavators, bulldozers, located in Dongying City, starting stirrin
                           of project approval
             Verification Shanxi                                2011 2012 Excavators, project ******
                                        to Datong Environmental Impact Assessment bulldozers, cranes, road rollers, compactors, stirrin
Victory Highway Xiaojiazhai mouthUnknown. to change Weizhou Tuan section lineYan Zhuang project is located starting at about 5
Xing Gang Road (South Circular Road - Pan Road) road project
             Verification Shanghai approval                     2011 2012 Excavators, Project is******cranes, road rollers, Island marine eq
                           of project Unknown. Environmental Impact Assessment bulldozers, located in Changxingcompactors, stirrin
             Verification Shanghai approval                                                          ******
                           of - Hing Unknown. Environmental Impact Excavators, Supporting the project rollers, compactors, stirrin
Long Tao Road (co-Road project Kong Road) road project2011 2012 Assessment bulldozers, cranes, road is located in Changxing Is
                           Xing Guan Road ~                     2011 2012                            ******
             Road (Xing of project Unknown. Environmental Impact Excavators, Supporting the project rollers, compactors, stirrin
Long Quan Verification Shanghai approval Ben Road) road project Assessment bulldozers, cranes, road is located in Changxing Is
             Verification Shanghai approval                     2011 2012                            ******
                           of Guan Unknown. Environmental Impact Excavators, Supporting the project rollers, compactors, stirrin
Long Ge Road (Xing Xing projectRoad ~ Magpie Road) road project Assessment bulldozers, cranes, road is located in Changxing Is
Xing Guan Road (South Circular Road - Pan Road) road project
             Verification Shanghai approval                     2011 2012 Excavators, Project is******cranes, road rollers, Island marine eq
                           of project Unknown. Environmental Impact Assessment bulldozers, located in Changxingcompactors, stirrin
                           of project Unknown. Environmental Impact Excavators, Project is******
             Verification Shanghai approval                     2011 construction                     cranes, road rollers, compactors, stirrin
Zhujiajiao Town, Qingpu District, the road (tentative name) new2012 Assessment bulldozers, located in Qingpu Zhujiajiao D6, D7 blo
Harbor CityVerification Shanghai approval
                           of project construction B5           2011 2012 Excavators, Project is******cranes, road rollers, compactors, stirrin
              the main city road newUnknown. Environmental Impact Assessment bulldozers, located in Harbor City the main city, len
Planning allVerification Shanghai approval
                           of project Unknown. works            2011 2012 Excavators, Project is******cranes, road rollers, compactors, stirrin
               the way to the drainage and road Environmental Impact Assessment bulldozers, located in Dachang Town, Baoshan Di
China and China RoadShanghai Unknown. Construction preparation (EIA at the same time)
                           (public road -                       2011                       Project is******
                                                                                                      cranes, road rollers, starting in the pub
             Construction Preparation Man Yiu Road) Project 2012 Excavators, bulldozers, located in Shanghai, compactors, stirrin
Public road Construction Preparation China Road) Project preparation (EIA at the same time)
              (by the Road - China and
                          Shanghai Unknown. Construction                                   Project is******
                                                                                                      cranes, road rollers, starting in by the
                                                                2011 2012 Excavators, bulldozers, located in Shanghai, compactors, stirrin
Cao Road Town by Road (public road - Jinhai Construction preparation (EIA at the same time)
             Construction Preparation                           2011                       Project is******
                                                                                                      cranes, road rollers, starting in the pub
                          Shanghai Unknown. Road) Project 2012 Excavators, bulldozers, located in Shanghai, compactors, stirrin
                           Road ~ Kay Rd) residential facilities Impact Excavators, Project is******
             Verification of project Unknown. Environmentalprojects Assessment bulldozers, located in Shanghai, compactors, stirrin
Ruiping Road (DonganShanghai approval                           2011 2012                             cranes, road rollers, starting in the Don
                           of Road Arimidex Environmental Impact Assessment Project is******
             Verification Shanghai approval                     2011 2012 Excavators,                 cranes, road rollers, starting in the pla
Kay Rd (Planning Ruipingproject~ Unknown.Road) Residential facilities projects bulldozers, located in Shanghai, compactors, stirrin
                           of project 262.7619 Environmental Impact - Silver Road) under is******
             Verification Shanghai approval nine Road, Ming 2012 Excavators, Project railway overpass and road projects
                                                                                                      cranes, road rollers, District, Shanghai
Songjiang District, Shen North Road (Spring million yuan. 2011ZhongAssessment bulldozers, located in Songjiang compactors, stirrin
                           of project Unknown. Environmental Impact Excavators, Project is******
             Verification Shanghai approval                     2011 project                          cranes, road rollers, compactors, stirrin
Show Pu Road (A3 highway ~ Shenjiang Road) reconstruction 2012 Assessment bulldozers, located in Pudong New Area, show Pu
             Verification Shanghai approval Chungong Road - Shengang Road) under railway******
                           of project (Chen         Environmental Impact Excavators, Project is located in Songjiang District, Shanghai
                                                                                                      cranes, road road projects
Songjiang District, Ming Hua Road128.5106 million yuan. 2011 2012 Assessment bulldozers, overpass androllers, compactors, stirrin
Qinzhou coastal city road project approval
                           of projects                            the 2012
                                                    Approval yuan, record                  Project is******
                                                                                                      cranes, road rollers, compactors, stirrin
             Verification Guangxi About 1,054,385,000of2011self. Excavators, bulldozers, located in Qinzhou Whitehead Lake Ar
Baotou tumd flag Aletan Street reconstruction Survey tumdDesign Inner Mongolia Project is****** highway constructionflag, west
             Engineering               Not          project         Baotou,                 flag government road rollers, compactors, stirrin
                                                                                                      cranes,
                          Inner Mongolia available from and2011 2012 Excavators, bulldozers, located in Baotou City tumd financing
Mengzhou Guanghua Road Project
             Verification Henan
                          of project approval
                                      Approximately 43 million self-financing.
                                                                 the record             Project is******
                                                                                                   cranes, road rollers, Guanghua stirrin
                                                   Approval of2011 2012 Excavators, bulldozers, located in Mengzhoucompactors,Road,
Zhangzhou Project proposal phase4 billion yuan.
                          Fujian Province          Project                              Project is******
                                                                2011 -2014Rigs, cranes, tower cranes, bridgeZhangzhou, Xiamen Haixian
                                                                                                   located in machines,
              section of National Highway 319 reroute a new (inter-city fast-track Xiamen-Zhangzhou) Engineering hammers, gener
                          Guangxi
             In the build-up phase 33.37 million yuan.                                  Project is******
                                                                2011 2012 Excavators, bulldozers, located in Nanning City, the west coas
Nanning Liangqing off Ridge Street project Started in the construction (EIA at the same time)      cranes, road rollers, compactors, stirrin
                          Lung, as                 Started      2011 2012               Project is******
             In the build-up phase 128.1 million Zone Road Project Excavators, bulldozers, located Liangqing like Tai Long Industr
Nanning Liangqing Tai Guangxi No. 9 Industrialyuan. in the construction (EIA at the same time)     cranes, road rollers, compactors, stirrin
             In the build-up phase                 as No.
                          Long Industrial District Started in Road Project              Project is******
                                                                2011 2012 Excavators, bulldozers, located in Nanning Liangqing Tai Long
Nanning Liangqing Tai Guangxi 86.04 million yuan. 21 the construction (EIA at the same time)       cranes, road rollers, compactors, stirrin
                          Long Industrial          as No. 7 Road Project                Project is******
             Construction Preparation District Construction preparation (EIA at the same time)     cranes, road rollers, compactors, stirrin
Nanning Liangqing Tai Guangxi 103.9853 million yuan. 2011 2012 Excavators, bulldozers, located in Nanning Liangqing Tai Long
                          Project                                                       Project is******
             In the build-up phase 92.2073 Started in 2011 2012 Excavators, bulldozers, located in Nanning city, north Yinhai Av
Nanning Yudong RoadGuangxiArea No. 2 million yuan. the construction (EIA at the same time)         cranes, road rollers, compactors, stirrin
                                      480.876 Being approved
             Yibin to createproject approval million yuan.
                          of a new county                                               Project is******
                                                                                                   cranes, road rollers, Yibin County, Pin
Ping Shan, Verification Sichuan Provinceroad a project 2011 2012 Excavators, bulldozers, located in Yibin City, compactors, stirrin
Tong Cheng Expressway Phase II 2.802 billion yuan, raised 25%, 75% of bank loans.
             Engineering  Tianjin                                Design                 Project is******
                                                                                                   cranes, road rollers, compactors, stirrin
                                                   Survey and2011 -2014Excavators, bulldozers, located in Tianjin, Beijing-Shenyang Ex
             Construction Preparation available.
                          Shandong Not             Construction Preparation             Project is******
                                                                2011 2012 Excavators, bulldozers, located in Xintai City, Xiangyang stirrin
                                                                                                   cranes, road
Xintai City, Shandong Province Bureau of Housing and Urban Xiangyang Road South Extension Project rollers, compactors,Road
              anterior (petrochemical South - Development 2011 2012 Excavators, The road******
                          of project approval                   Avenue) road works                 cranes, road rollers, compactors, stirrin
Hong Kong Verification GuangdongUnknown. Environmental Impact Assessment bulldozers, project is located in Hong Kong (petroc
Qingfeng Guangqing highway tollapproval            Environmental Impact Excavators, Project is******
                          of project station turn Voeux         2011 2012                          cranes, road rollers, compactors, stirrin
             Verification Guangdong36.16 million yuan.Road Project Assessment bulldozers, located in Baiyun District of Guangzho
                          of project approval                   2011 the                          ******
             Verification GuangdongUnknown. Environmental Impact Excavators, Longgui City land project is located east and sou
Longgui City project supporting municipal road projects around 2012 Assessment bulldozers, cranes, road rollers, compactors, stirrin
                          Guangxi
             In the build-up phase 50.23 million yuan.                                  Project is******
                                                                2011 2012 Excavators, bulldozers, located in Nanning City, North Ridge S
Nanning Liangqing off Ridge Street project Started in the construction (EIA at the same time)      cranes, road rollers, compactors, stirrin
             Construction Preparation Zone 4, as yuan. 2011 2012 (EIA at the same time)
                          Long Industrial          Construction preparation             Project is******
                                                                                                   cranes, road rollers, compactors, stirrin
Nanning Liangqing Tai Guangxi 71.8379 million the road project Excavators, bulldozers, located in Nanning Liangqing Tai Long
             In the build-up phase                 Started 6th as the road project      Project is******
                          Long Industrial District, on the in 2011 2012 Excavators, bulldozers, located Liangqing like Tai Long Industr
Nanning Liangqing Tai Guangxi 125.89 million yuan. the construction (EIA at the same time)         cranes, road rollers, compactors, stirrin
             In the build-up phase 160.98 million yuan.2 Road Project
                          Guangxi                  Started                              Project is******
                                                                2011 2012 Excavators, bulldozers, located Liangqing like Tai Long Industr
Ning City Liangqing Tai Long Industrial District as No. in the construction (EIA at the same time) cranes, road rollers, compactors, stirrin
             In the build-up phase project
                          Guangxi                  Started                              Project is******
                                                                2011 2012 Excavators, bulldozers, located in Nanning Liangqing Economi
Nanning Liangqing off Ridge Road26.24 million yuan. in the construction (EIA at the same time)     cranes, road rollers, compactors, stirrin
                          Guangxi                                                       Project is******
             In the build-up phase 50.2948 million yuan. 2011 2012 Excavators, bulldozers, located in Nanning, the starting point th
Nanning Jianye Road Reconstruction Project Started in the construction (EIA at the same time)      cranes, road rollers, compactors, stirrin
Golden Apple Road (Green Loop approval million yuan. filed (EIA at the same time)
                          of project Lin Li bridge) project 2011 2012                   Project is******
                                                                                                   excavators, road rollers, compactors, s
             Verification Guangxi -17.1989 Has been (updated) Excavators, bulldozers, located in Nanning Qingxiu District, sta
New Unitech Road Project
             Verification Zhejiang approval                     2011 2012 Excavators, Project is******
                                                                                                   cranes, road rollers, compactors, stirrin
                          of project Unknown. Environmental Impact Assessment bulldozers, located in Fuyang City, Zhejiang Provin
Samsung Jintang Avenueproject board - Dobashi (music to the -2014Excavators, projects is******
                          of - high approval
                                      4.347        Approval the record                  Project cranes, road rollers, compactors, in th
             Verification Sichuan Provincebillion yuan. of2011 world) of highway bulldozers, located in Jintang County, startingstirrin
                                      836 Engineering Jianyang record
             Verification Sichuan Province
                          of project approval      yuan.         the Hefeng             Project is******
                                                                                                   cranes, road rollers, compactors, stirrin
Shing Yu highway connecting Highwaymillion Approval of2011 -2014Excavators, bulldozers, located in Jianyang, route length 13.91
Nanning Liangqing Tai Guangxi 185.49 million yuan. 1 2011 project
             In the build-up phase                                                      Project is******
                                                   Started in road 2012 Excavators, bulldozers, located Liangqing like Tai Long Industr
                          Long Industrial Zone as the No. the construction (EIA at the same time)  cranes, road rollers, compactors, stirrin
             Verification Guangxi approval roadmillion yuan. projects million yuan.
                          of project Is 28 #         infrastructure 420.1684                      ******
                                                                2011 2012 Excavators, Yinhai Avenue project rollers, compactors, stirrin
Nanning International Logistics Base420.1684Environmental Impact Assessment bulldozers, cranes, roadis located east of West Av
             Verification Sichuan Province
                          of project approval      yuan.
                                      583 million Approval the record                   Project is******
                                                                                                   cranes, road rollers, compactors, stirrin
Shing Yu Jianyang stone bell cable highway highway of2011 -2014Excavators, bulldozers, located in Jianyang, route length 10.51
                          GuangdongNot
             Construction Preparation available.   Construction Preparation station siteProject is******
                                                                September Navigation lights, powerlocated in Shenzhen communications
                                                                            1,           construction
Shenzhen Baoan International Airport Terminal Area Expansion Project2011 August 30, 2012distribution systems,Baoan Internation
           S         Time
Design units ummary table
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******     ******    ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******
******   ******   ******

								