Photo Album - Terra Crystal Galleries

Document Sample
Photo Album - Terra Crystal Galleries Powered By Docstoc
					  The Evolution of the
TERRA Crystal Galleries
  Mineral Showroom
     The Evolution of the
   TERRA Crystal Galleries
     Mineral Showroom




A work in progress lasting 7 long years….
                 - 1995 to 1998 -
Uncapped rock is left in ½ of the basement pending
         future development ideas …..
     - 1999-
Excavation begins!
      to 2004 -
 - 1999
Slow progress is
    made….
As the rock is whittled and hauled away,
               bit by bit ….
By bit ….
                   - June 2005 -
And is turned into walls and used as fill around the
                    property…
             - June 2005 -
The excavation is complete, the footings
 poured and the floor is prepared for
              concrete….
-




                                Gyproc dust!




            -October 2005 –
    Jim wires and puts up gyproc ….
-




             - November 2005 -
    The gyproc is completed and the room
                is painted ….
                 - November 2005 -
The furniture is built and painted before the floor is
        painted and the carpet installed ….
               - December 2005 -
The carpet is installed and so is the lighting ….
          - December 2005 -
Rocks are unpacked and reviewed ….
    - December 2005 -
Furniture is assembled ….
        - December 2005 -
The room starts to come together ….
 The end (finally!)




We hope that you enjoyed your
       virtual visit to
 TERRA Crystal Galleries ….

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:5
posted:2/17/2012
language:English
pages:29