Docstoc

ROGUE RIVER GREENWAY TRAIL 5-21-09

Document Sample
ROGUE RIVER GREENWAY TRAIL 5-21-09 Powered By Docstoc
					ROGUE RIVER GREENWAY TRAIL


Gold Ray Road Solution Team Meeting
          May 21, 2009
Feedback from May 7th Meeting…
• Remove All Vehicle Pullouts
• Make Solid Fog Stripe into Dashed Stripe
• Where Trail is Separate from Road, Make Road 14-
feet Wide
• Consider a Protected Viewing Area Near Gold Ray
Dam Area
• Add a 2-foot “Shy Distance” to Bike Lanes Where
Retaining Wall is Present
• Use 25-foot Length for Parking Spaces
• Add More Parking Were Trail is Separated From Road
• Add Equestrian Trail Route Above Railroad Tracks
into BLM Land
• Improve Existing Boat Ramp as appropriate
•Add Fencing Between Tracks and Road/Trails
       Preliminary Cost Estimate
•   Construction and Paving = $3,452,000
•   Contingency Fund (Unknowns) = $1,036,000
•   Engineering & Survey = $1,348,000
•   Environmental Clearances = $100,000

• Total Estimate = $5,936,000 *

• *Does not include Right-of-way Costs

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:2/16/2012
language:
pages:20