logistics_cluster_zmb_liste_damaged_roads_east_province_080223 by xiagong0815

VIEWS: 1 PAGES: 27

									                                                         List of Damaged Roads inChipata District(Eastern Province)
                                                                                        22nd February 2008




                                         Name of river
        Name of the Road   District        crossing           Ward/Constituency           Road #

Mbenjele                   Chipata    Msandile           Sisinje/Chipangali

Mtewe                      Chipata    Ching'ma           Sisinje/Chipangali

Msoro                      Chipata    Msekere            Kanjala/Msanga-Chipa Central




Mnukwa                     Chipata    Lunkhuswe          Msandile-Chipangali


Mnukwa-Chitanda            Chipata    Msandile           Msandile-Chipangali
Chitanda-Chizukwe          Chipata    Chizukwe           Msandile-Chipangali
Vizenge-Mwita              Chipata    Chinunda           Chipangali
Kapasa-Chinunda            Chipata    Kamwankhuku        Chipangali
Rukuzye-Mafuta             Chipata    Rukuzye            Chipangali


Mphofu-Matani              Chipata                       Chipangali
Chipangali-Chamakanga      Chipata    Kasenga            Chipangali
Nthombimbi-Nkhoto          Chipata    Rukuzye            Chipangali
Chingamba-Khosolo          Chipata    Phululu            Chipangali
Madziatuwa-Mwadauka        Chipata    Rukuzye            Chipangali
Kabuluma-Betaniko          Chipata    Rukuzye            Chipangali

Chipangali                 Chipata    Chamatundu         Chipangali




Old Msoro Road             Chipata    Kanzutu            Mboza-Kasennengwa

Old Msoro Road             Chipata    Chiwayu            Mboza-Kasennengwa




Old Msoro Road             Chipata    Kasenengwa         Mboza-Kasennengwa



Mona-Mpato                 Chipata    Mkotamu            Ngo'ngwe-Kasenngwa



Maguya                     Chipata    Kololokhova        Khova-Luangeni




Sairi                      Chipata    Nyakalungu         Khova-Luangeni
Sairi                 Chipata   Mtalalika     Khova-Luangeni




Kazimule-Chadiza      Chipata   Katawa        Kataba Luangeni




Mbambo-Kaluwawe       Chipata   Kalube        Ngo'ngwe Kasenengwa




Mducha-Mchanga        Chipata   Mkotamu       Ngo'ngwe Kasenengwa




Chankhanga-Chichere   Chipata   Vubwi         Muzabwa Luangeni




Mwami-Chichere        Chipata   Vubwi         Muzabwa Luangeni



Kalichero-Mtowe       Chipata   Msupazi       Makangila Luangeni




Mtowe-Kanyanja        Chipata   Chibelia      Makangila Luangeni




Kawaza-Mkowe          Chipata   Mkowe         Mkowe-Chipangali




Kamubwatika-Mafuti    Chipata   Kamubwatika   Mkowe-Chipangali




Kanyanja-Mulonyani    Chipata   Kanyaja       Makangila Luangeni




Mshawa-Kanyanja       Chipata   Kanyaja       Makangila Luangeni
Chimupinga           Chipata   Chikando    Chikando-Luangeni




Mtenguleni-Mangawa   Chipata   Mangawa     Chikando-Luangeni




Nzamane-Kazimule     Chipata   Mtetezi     Chikando-Luangeni




Lunyike              Chipata   Lunyike     Nsingo Luangeni




Gendar               Chipata   Luthwele    Nsingo Luangeni




Lufazi               Chipata   Mwami       Nsingo Luangeni




Dalala-Mafuta        Chipata   Kasenda     Kasenga-Chipangali




Molozi-Kasonjola     Chipata   Kasonjola   Msandile-Chipangali




Chamasaongwe         Chipata   Muchedwa    Msandile-Chipangali




Chamasaongwe         Chipata   Namangwe    Msandile-Chipangali




Chamasaongwe         Chipata   Mekhuku     Msandile-Chipangali




Mugwazo              Chipata   Molozi      Msandile-Chipangali
Molozi-Chamasaongwe   Chipata   Musabata      Msandile-Chipangali




Molozi-Chamasaongwe   Chipata   Molozi        Msandile-Chipangali




Molozi-Chipembele     Chipata   Chipembere    Msandile-Chipangali




Molozi-Kasimango      Chipata   Kasimango     Msandile-Chipangali




Nyauzi                Chipata   Kamwankhuku   Chipangali-Chipangali




Mudemba               Chipata   Kachikuni     Rukuzye-Chipangali




Kapasa-Tamanda        Chipata   Kachikuni     Rukuzye-Chipangali




Mugubudu-Mukanda      Chipata   Kasenga       Rukuzye-Chipangali




Mutaya                Chipata   Nyakatali     Msanga-Chipata Central




Magwero               Chipata   Chipoza       Dilika-Chipata Central

College-Mchini        Chipata   Mchini        Dilika-Chipata Central




Old Chadiza           Chipata   Lutembwe      Kanjala-Chipata Central
Nabvutika   Chipata   Nabvutika   Kapata-Chipata Central
ed Roads inChipata District(Eastern Province)
         22nd February 2008


                                                                    Specifications (m)

                    Distance(Km) from Type of structure along the                             Status of Road, Bridges and
                      District Centre            Road               Length      Width                   Culverts.
                                                                                         Wing/wall erosion. Erosion of road
                           43          Bridge Span                    25           4     depth 3m x 1.5m

                           25          Culvert                         4           5     Culvert washed away by rains.

                           10          Culvert                                           Culvert washed away by rains.




                           30          Shallow Bridge                 40           5     Cracks on the whole structure.
                                                                                         Wing/walls completely washed away
                                                                                         after the bridge was completely silted
                           37          Bridge Span                    20          5.8    with logs.
                           62          Culvert                                           Culvert washed away by rains.
                           47          Culvert                                           Culvert washed away by rains.
                           42          Culvert                                           Culvert washed away by rains.
                           42          Culvert                                           Culvert washed away by rains.


                           49          Culvert                                           Culvert washed away by rains.
                           59          Culvert                                           Culvert washed away by rains.
                           67          Culvert                                           Culvert washed away by rains.
                           66          Culvert                                           Culvert washed away by rains.
                           78          Culvert                                           Culvert washed away by rains.
                           39          Culvert                                           Culvert washed away by rains.
                                                                                         Erosion is close to the culvert. 1 line
                           60          Culvert                                           completely washed away.
                                                                                         Concrete and embarkment washed
                                                                                         away. The proposed intervention is to
                                                                                         increase the lines of culverts to 3, rise
                           22          Culvert                                           the structure 8m, double lines.
                                                                                         Section of road cut: 4m length, 1.2m
                           28          Culvert                                           width Culverts damaged.
                                                                                         Section of the road cut(Northern side:
                                                                                         8m x 3m x 1.8m,Southern Side: 11m x
                                                                                         5.6m x 1.2m) and 12 lines of culverts
                                                                                         damaged. Proposed immdiate
                                                                                         intervention is to increase the number
                           38          Culvert                                           of culverts.
                                                                                         Culverts completely washed away by
                                                                                         rains. Immediate intervention are that
                           50          Culvert                                           the culverts be replaced .
                                                                                         Chisinde bridge span(12 x 5 ) is
                                                                                         washed away and section of the road is
                           38          Culvert                                           cut(13m x 5m x 3m)

                                                                                         3x 600mm lines of Culverts completely
                                                                                         washed away by rains and section of
                           32          Culvert                                           the road is cut(6m x 5m x 2.2m)
               2x 600mm lines of Culverts completely
               washed away by rains and section of
               the road is cut(6m x 5m x 2m).
               Proposed intervention isthat increase
               number of culverts lines to 2-3 x
45   Culvert   900mm.

               2 x 600mm lines of Culverts completely
               washed away by rains and section of
47   Culvert   the road is cut(10m x 5m x 2m)


               1x 600mm line of Culvert completely
               washed away by rains and section of
               the road is cut(10m x 5m x 1.5m).
               Proposed intervention isthat increase
45   Culvert   number of culverts lines to 2 x 900mm.


               3 x 600mm lines ofCulverts completely
               washed away by rains and section of
               the road is cut(5m x 5m x 4m).
               Proposed intervention isthat increase
60   Culvert   number of culverts lines to 3-5 lines.

               3x 600mm lines of Culverts completely
               washed away by rains and section of
35   Culvert   the road is cut(15m x 6m 1m).

               3x 600mm lines of Culverts completely
               washed away by rains and section of
57   Culvert   the road is cut(3m x 3m x 1m).
               8x 600mm lines of Culverts completely
               washed away by rains and section of
19   Culvert   the road is cut.

               5x 600mm lines of Culverts completely
               washed away by rains. It is proposed
21   Culvert   that the structure be raised to 8m high.


               2 x 600mm lines of Culverts completely
               washed away by rains and section of
               the road is cut(8m x 5m x 3m).
               Proposed that the lines be increased to
26   Culvert   5 lines x 900mm culverts.


               2 x 600mm lines of Culverts completely
               washed away by rains and section of
               the road is cut(9m x 5m 2.5m).
               Proposed that the lines be increased to
29   Culvert   4 lines x 900mm culverts.


               2 x 600mm lines of Culverts completely
               washed away by rains and section of
               the road is cut(6m x 5m 2m). Proposed
               that the lines be increased to 4 lines x
23   Culvert   900mm culverts.


               2 x 600mm lines of Culverts completely
               washed away by rains and section of
               the road is cut. Proposed that the lines
               be increased to 4 lines x 900mm
22   Culvert   culverts.
                          4 x 900mm lines of Culverts completely
                          washed away by rains and section of
                          the road is cut(8m x 5.5m x 1.8m).
                          Proposed that the lines be increased to
43     Culvert            7 lines x 900mm culverts.

                          Approches washed away and section of
                          the road cut off. It proposed that the
                          embarkment be raised to 20m stone
49     Box Culvert Span   pitching on both sides.


                          2 x 600mm lines of Culverts completely
                          washed away by rains and section of
                          the road is cut(3m x 5m x 2.2m).
                          Proposed that the lines be increased to
56     Culvert            4 lines x 900mm culverts.
                          Section of road cut off, 25m length,
                          5.5m width, 1.2m depth. It proposed
                          that the length of the box culvert be
19     Culvert            increased.
                          Section of the road cut off,65m
                          length,4m width, 1.2m depth. It is
                          proposed that embarkment and stone
23     Box Culvert Span   pitching of 15m both sides.


                          2 x 600mm lines of Culverts completely
                          washed away by rains and section of
                          the road is cut off: 4m length,2width,1m
                          depth. Proposed that the culverts be
20     Box Culvert Span   raised by putting lines on top.
                          4 x 900mm lines of Culverts partially
                          washed away by rains and section of
                          the road is cut off: 5m length,3
                          width,1.2m depth. Proposed the line for
                          culverts be increased x 2 and 6 lines of
40     Culvert            900mm culverts on top..


                          3 x 900mm lines ofCulverts completely
                          washed away by rains and section of
                          the road is cut off: 7m length, 5m width,
                          3m depth. Proposed intervention is that
32.5   Culvert            a bridge be constructed.
                          1x 600mm line of Culvert completely
                          washed away by rains and section of
                          the road is cut. Proposed intervention
                          isthat increase number of culverts lines
28.5   Culvert            to 2 x 900mm.
                          1x 600mm line of Culvert completely
                          washed away by rains and section of
                          the road is cut. Proposed intervention
                          isthat increase number of culverts lines
29     Culvert            to 3 x 900mm.
                          1x 600mm line of Culvert completely
                          washed away by rains and section of
                          the road is cut. Proposed intervention
                          isthat increase number of culverts lines
30     Culvert            to 3 x 900mm.
                          Concrete drift(18 x 5.5m) partially
                          washed away by the rains. It is
                          proposed that a new bridge be
35     Culvert            constructed.
                 2 x 900mm lines of Culverts completely
                 washed away by rains and section of
                 the road is cut off: 3m length, 2m width,
                 1m depth. Proposed that the lines be
27     Culvert   increased to 3 lines x 900mm culverts.


                 3 x 900mm lines of Culverts completely
                 washed away by rains and section of
                 the road is cut off: 7m length, 5m width,
                 3m depth. Proposed that a bridge be
27.9   Culvert   constructed.

                 2 x 900mm lines of Culverts completely
                 washed away by rains. Proposed that
                 the lines be increased to 3 lines x
29     Culvert   900mm culverts.

                 3 x 900mm lines of Culverts completely
                 washed away by rains. Proposed that
                 the lines be increased to 3 lines x
30.5   Culvert   900mm culverts.

                 2 x 600mm lines of Culverts completely
                 washed away by rains. 1line x 600mm
                 culvert broken. Proposed that replacing
45     Culvert   stone pitching 40m both sides.

                 1line x 600mm of Culverts completely
                 washed away by rains. Proposed that
                 the lines be increased to 2 lines x
36     Culvert   600mm culverts.
                 2lines x 600mm of Culverts completely
                 washed away by rains. Proposed that
                 the lines be raised to 2 lines x 900mm
39     Culvert   culverts.

                 1line x 600mm of Culverts completely
                 washed away by rains. Proposed that
                 the lines be increased to 2 lines x
35               900mm culverts.

                 1line x 900mm of Culverts completely
                 washed away by rains. Proposed that
                 the lines be increased by 1 lines x
12               900mm culverts.


                 1line x 900mm of Culverts completely
                 washed away by rains and section of
                 the road cut off: 4m x 5m x 0.5m.
                 Proposed that the lines be increased by
 6               1 lines x 900mm culverts.
                 Road cut off: 3m x 5m x 1.2m. On site
 3               all 600mm culverts to be alined.
                 3lines x 900mm of Culverts completely
                 washed away by rains. Approach
                 eroded. Proposed works are that
                 additional rings have to put on to the
10               structure.
     3lines x 600mm of Culverts completely
     washed away by rains. Cracks on the
     whole bridge. Proposed works are that
     the bridge be demolished and another
10   one constructed in its place.
   Remarks-proposal works to the existing
              infrastructure.

Bridge to be urgently repaired.
Increase lines of culverts from 4 to 6. Rise the
drift culverts.
Putting up 4 lines of 900mm culverts. Bridge to
be repaired urgently.

Raise it to the height of 20m once new bridge is
constructed. In due course the structure will not
stand the pressure from traffic and water.

Raise the bridge to a height between 25-30m
extriction.
Bridge requires urgent repairs.
Bridge requires urgent repairs.
Bridge requires urgent repairs.
Bridge requires urgent repairs.


Bridge requires urgent repairs.
Bridge requires urgent repairs.
Bridge requires urgent repairs.
Bridge requires urgent repairs.
Bridge requires urgent repairs.
Bridge requires urgent repairs.

Bridge requires urgent repairs.




Bridge requires urgent repairs.

Bridge requires urgent repairs.




Bridge requires urgent repairs.



Bridge requires urgent repairs.



Bridge requires urgent repairs.




Bridge requires urgent repairs.
Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.



Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.
Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.
Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.




Bridge requires urgent repairs.

Bridge requires urgent repairs.




Bridge requires urgent repairs.
Bridge requires urgent repairs.
                                                                                    Width of river
               Name of the Road                  District   Name of river crossing basin/stream(m)

Miinga-Nyalukomba                           Petauke         Msumbazi Stream              20
Kalindawalo-Chitimba                        Petauke         Chitimba Stream              30

RUT Petauke-Luanfwa via Ukwimi/and Sandwe   Petauke         Chilimanyama Stream          30

RUT Petauke-Luanfwa via Ukwimi/and Sandwe   Petauke         Lusandwa Stream              30

RUT Petauke-Luanfwa via Ukwimi/and Sandwe   Petauke         Chamilando Stream 1          10

RUT Petauke-Luanfwa via Ukwimi/and Sandwe   Petauke         Chamilando Stream 2          10

RUT Petauke-Luanfwa via Ukwimi/and Sandwe   Petauke         Peta Stream                  100

RUT Petauke-Luanfwa via Ukwimi/and Sandwe   Petauke         Kamembe Stream               10

RUT Petauke-Luanfwa via Ukwimi/and Sandwe   Petauke         Lusangazi River              50

Ukwimi B -Kasangazi                         Petauke         Chakwenya Stream             10


RUT Petauke-Luanfwa via Ukwimi/and Sandwe   Petauke         Kasangazi Stream              8
Mumbi-Manyane-Matonge                       Petauke         Milindi Stream               15

Mumbi-Manyane                               Petauke         Manyane Stream               20

Nyanpande-Mwabula                           Petauke         Kakulo Stream                15

RUT Petauke-Luanfwa via Ukwimi/and Sandwe   Petauke         Songovya Stream              10

Nyanje-Chikhomo Mission                     Petauke         Chawaluzu Stream             10

Kawele Turn Off-Mtukuzi School              Petauke         Kawombwe Stream               8

Kawele Turn Off-Mtukuzi School              Petauke         Mphala Stream                 8

Minga Mission-Chilimaziche                  Petauke         Minga Stream                 15

Minga Mission-Chilimaziche                  Petauke         Minga Stream                 15

Chizalira-Sandwe                            Petauke         Lusangazi River              100

Kawere Turn Off-Mtukuzi School              Petauke         Kaulu Stream                  8

Misolo Mkonda-Kalomboka Game Reserve        Petauke         Chimpondwe Stream            10

Misolo Mkonda-Kalomboka Game Reserve        Petauke         Chikhade 1                   10

Misolo Mkonda-Kalomboka Game Reserve        Petauke         Chikhade 2                   10
Misolo Mkonda-Kalomboka Game Reserve   Petauke   Chikuyu Stream             10

Chibuye-Kalomboka                      Petauke   Mukwale Stream             12

Misolo-Sikabi                          Petauke   Mukwale Stream             30

Kakwiya-Nsenya School                  Petauke   Nsenya Stream              30
Nyanpande-Old Pet                      Petauke   Nsenya Stream               5

Kawele Turn Off-Mtukuzi School         Petauke   Lwambala Stream            10

Kawele Turn Off-Mtukuzi School         Petauke   Sukulu Stream              10

Kawele Turn Off-Mtukuzi School         Petauke   Sukulu Stream              10

Kawele Turn Off-Mtukuzi School         Petauke   Mtira Stream               10

Kawele Turn Off-Mtukuzi School         Petauke   Kaluvya Stream             10



T4-Mumbi                               Petauke   Mvuvye River               50

T4 Kawele Turn Off-Mtukuzi School      Petauke   Chisenjere Stream          20

T4 Kawele Turn Off-Mtukuzi School      Petauke   Chawaluzu Stream           20

T4-Mumbi                               Petauke   Kanzala Stream             20

Off Chikuse-Chipungu                   Petauke   Chikuse Stream             30

Boma-Chikuse                           Petauke   Malenga Stream              8
Manyane-Matonge                        Petauke   Nyimba Mwansa Stream       20

Chipungu-Chilando                      Petauke   Msanzala River(Chipungu)   40

Mwanza via Lutwazi-Msanide             Petauke   Lutwazi Stream             40

Mumbi-Manyane                          Petauke   Nkhonzi plain              150

Kalongonda-Kapungwe School             Petauke   Ndondela Stream            15

Mtukuzi School-Mzonza Village          Petauke   Katete Stream 1            50

Mtukuzi School-Mzonza Village          Petauke   Katete Stream 2            50.5

Petauke via Kasuma-Malumbe             Petauke   Singozi Stream             15

Mawanda School-Sichilima Village       Petauke   Mawanda Stream             12

Makale Village-Makowa Village          Petauke   Kamana Mseje Stream        10

Msapenda Village-Chizalira School      Petauke   Mutu Stream                15

Chizalira-Mawande                      Petauke   Kazinda                    10

Makina-Msawa                           Petauke   Walokwa                     7
List of Damaged Roads in Petauke District(Eastern Province)
                     22nd February 2008


                               Distance(Km)                            Specifications (m)
                               from District      Type of structure
 Ward/Constituency    Road #      Centre           along the Road      Length     Width

Msumbazi                            18         Box Culvert                   30         4.5
Kovyane                             25         Box Culvert                   40         4.5

Chilimanyama                        20         Culvert                       40             3

Ukwimi                              80         Culvert                       60             5

Lusangazi                           75         Box Culvert                   15         4.5

Lusangazi                          75.01       Box Culvert                   15         4.5

Lusangazi                           87         Box Culvert                   10         4.5

Lusangazi                           91         Box Culvert                   15         4.5

Lusangazi                           112        Lusangazi Bridge              55         4.5

Ukwimi                              80         Chakwenya Culvert             15         4.5


Ukwimi                              70         Kasangazi Box Culvert         12             4
Manyane                             60         Box Culvert                   20         4.5

Manyane                             55         Manyane Culvert               22         4.5

Nyakawise                           26         Kakulo Culvert                20         4.5

Ukwimi                              70         Songovya Culvert              15         4.5

Kapoche                             75         Chawaluzu Culvert             15         4.5

Kovyane                             20         Kawombwe Culvert              10         4.5

Kovyane                             25         Mphala Culvert                10         4.5

Msumbazi                            32         Minga Culvert 1               15         4.5

Msumbazi                           32.5        Minga Culvert 2               15         4.5

Ukwimi                              50         Lusangazi Bridge             100         4.5

Mbala                               15         Kaulu Culvert                 10         4.5

Mateyo Mzeka                        33         Box Culvert                   12         4.5

Mateyo Mzeka                        40         Box Culvert                   12         4.5

Mateyo Mzeka                       40.5        Box Culvert                   12         4.5
Mateyo Mzeka   52     Box Culvert            12    4.5

Mateyo Mzeka   50     Box Culvert            12    4.5

Mateyo Mzeka   38     Mukwale Culvert        12    4.5

Mateyo Mzeka   28     Nsenya Culvert         12    4.5
Mateyo Mzeka   18     Nsenya Culvert         12    4.5

Mbala          20     Lwambale Culvert       10    4.5

Kovyane        25     Sululu 1 Culvert       10    4.5

Kovyane        26     Sululu 2 Culvert       10    4.5

Kovyane        30     Mtira Culvert          15    4.5

Kovyane        40     Kaluvya Culvert        15    4.5



Ongolwe        12     Mvuvye Bridge          50    4.5

Kovyane        45     Culvert                10    4.5

Lusinde        50     Culvert                10    4.5

Mbala          10     Kanzala Culvert        11    4.5

Singozi        29     Chikuse Culvert        12    4.5

Nyika          13     Malenga Culvert        10    4.5
Manyane        40     Drift                  20    4.5

Singozi        27     Msanzala Box Culvert   20    4.5

Singozi        30     Culvert                15    4.5

Manjazi        32     Drift                  150   4.5

Matambazi      40     Culvert                20    4.5

Lusinde        50     Culvert                50    4.5

Lusinde        50.5   Culvert                50    4.5

Mwanda         40     Culvert                20    4.5

Mwanda         32     Culvert                14    4.5

Mwanda         38     Culvert                12    4.5

Mwanda         36     Culvert                17    4.5

Mwanda         32     Culvert                12    4.5

Lusinde        40     Culvert                 9    4.5
  Status of Road, Bridges and              Remarks-proposal works to the existing
            Culverts.                                 infrastructure.
Culvert completely washed away by the
rains.                                It is proposed that a construction of a new culvert.
Deck Collapsed.                         Construction of a new Culvert.
Embarkment and under side of culvert    Construction of embarkment,apron and back filling to
completely eaten up.                    suspended rings.
                                        Construction of another structure 2m above the
Low bed structure damaged               existing structure.
Culvert completely washed away by the
rains.                                  Construction of a new Culvert.
Culvert completely washed away by the
rains.                                  Construction of a new Culvert.
Culvert completely washed away by the
rains.                                  Construction of a culvert and raising of embarkment.
Culvert completely washed away by the
rains.                                  Construction of a new Culvert.
                                        Construction of another structure 3m above the
Low bed structure damaged               existing structure.
Culvert completely washed away by the
rains.                                It is proposed that a construction of a new culvert.

Embarkment and under side of culvert    Construction of embarkment,apron and back filling to
completely eaten up.                    suspended rings.
Deck Collapsed.                         Construction of a new Culvert.
Culvert completely washed away by the
rains.                                  Construction of a new Culvert.
Culvert completely washed away by the
rains.                                  Construction of a new Culvert.
Embarkment and under side of culvert    Construction of embarkment,apron and back filling to
completely eaten up.                    suspended rings.
Culvert completely washed away by the
rains.                                  It is proposed that a construction of a new culvert.
Embarkment and under side of culvert    Construction of embarkment,apron and back filling to
completely eaten up.                    suspended rings.
Embarkment and under side of culvert    Construction of embarkment,apron and back filling to
completely eaten up.                    suspended rings.
Culvert completely washed away by the
rains.                                  Construction of a new Culvert.
Culvert completely washed away by the
rains.                                  Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                     Construction of a new Culvert.
Embarkment and under side of culvert    Construction of embarkment,apron and back filling to
completely eaten up.                    suspended rings.
Culvert completely washed away and
there is no bridge.                     Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                     Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                     Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Minor damages onto the culvert.          Needs routine maintenance.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
An improvised temporal bridge set up
after culverts were washed away by the
rains.                                   Construction of a new permanent Bridge.
Embarkment and under side of culvert     Construction of embarkment,apron and back filling to
completely eaten up.                     suspended rings.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Embarkment and under side of culvert     Construction of embarkment,apron and back filling to
completely eaten up.                     suspended rings.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Minor damages onto the culvert.          Cutting of uphill approach to the level of a bridge.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Culvert completely washed away and
there is no bridge.                      Construction of a new Culvert.
Embarkment and under side of culvert     Construction of embarkment,apron and back filling to
completely eaten up.                     suspended rings.
                                                List of Damaged Roads in Lundazi District(Eastern Province)
                                                                    22nd February 2008



                                                                              Distance(Km)
                                Name of river                                 from District
  Name of the Road   District     crossing      Ward/Constituency    Road #      Centre

Chipata-Lundazi      Lundazi    Chindongo             Lumezi                       90
Mwase-Chijemu        Lundazi    Lundazi               Lundazi                      35

Mwase-Nyangwe        Lundazi    Swiswi                Lundazi                      37
Mwase-Mankhaka       Lundazi    Bowe                  Lundazi                      30
Mkomba-Chanyondo     Lundazi    Phalaza               Lundazi                      22
Mwase-Kambaza        Lundazi    Kambaza               Lundazi                      38

Kanyanga-Emusa       Lundazi    Chasefu               Chasefu                      35
Hoya-Boyole          Lundazi    Lundazi               Chasefu                      40
Chamusebe            Lundazi    Susa                  Chasefu                      15


Kanyanga-Emusa       Lundazi    Luwerezi              Chasefu                      36

Chitala-Lundazi      Lundazi    Luamphamba            Lumezi                       40

Chasefu-Chikwa       Lundazi    Luwerezi              Chasefu                      65
in Lundazi District(Eastern Province)




                                               Specifications (m)
                                                                                                         Remarks-proposal works
                       Type of structure                                  Status of Road, Bridges and        to the existing
                        along the Road         Length     Width                     Culverts.                infrastructure.
                                                                                                        It is proposed that a bridge be
                    3 Lines x 900mm culverts         20             15 Culverts have been vandalised.   constructed instead.
                    Ndonda Bridge                    30              7                                  Patching of the Bridge.
                                                                                                        Construction of 4 x 900 culvert
                    Swiswi Bridge                    30              7 Culvert rings washed away        line
                    Mankhaka Bridge                  30              7 Bridge collapsed                 Construction of a drift
                    Kapichila Bridge                 20              7 Bridge washed away               Construction of a Bridge
                    Kambaza Bridge                   40              7 Bridge collapsed                 Construction of a Bridge

                    Kanyanga Bridge                  20              7 Bridge collapsed                 Construction of 2 box culverts
                    Boyole Bridge                    50              7 Bridge collapsed                 Construction of a drift
                    Susa Bridge                      30              5 Culvert broken                   Construction of a drift

                                                                                                        Construction of reinforced
                    Luwerezi Bridge                  50              7 Concrete box culvert collapsed   concrete box culverts
                                                                                                        Constructinon of reinforced box
                    Concrete box culvert             25              7 Bridge washed away               culverts
                                                                                                        Constructinon of reinforced box
                    Culvert Bridge                   20              7 Culverts washed away.            culverts
                                                    List of Damaged Roads in Nyimba District(Eastern Province)
                                                                               22nd February 2008


                                                                                         Distance(Km)
                                    Name of river                                        from District
  Name of the Road   District         crossing        Ward/Constituency         Road #      Centre



Ndake-Msima Road     Nyimba     Nyimba                       Chiweza              T4          15



Hofmeyr              Nyimba     Musunguzi Stream             Chiweza              T4           8



Matonje              Nyimba     Nga'ndu stream                Ngozi               T4           1



Kapakasa             Nyimba     Mtilizi stream              Vizimumba             T4           4



ZNS-Mtilizi Loop     Nyimba     Kesadi stream               Vizimumba             T4          34


Nyalugwe             Nyimba     Several stream        Chamilala and Nyalugwe      T4          23
istrict(Eastern Province)




                                  Specifications (m)
              Type of structure                          Status of Road, Bridges and      Remarks-proposal works to
               along the Road     Length     Width                 Culverts.              the existing infrastructure.


                                                                                         Replace washed away culvert as the
                 Ring Culvert       30         5.5     Culvert completely washed away.   road has been rendered impassable.
                                                                                         Replace washed awa culvert and
                                                       Culvert washed away. Erosion of   embarkment needs masonry works.
                 Ring Culvert       10         4.5     embarkment.                       Road is impassable.

                                                                                         Replace and install washed away
                 Ring Culvert       25          5      Culvert washed away               structure. Road is impassable.

                                                                                         Replace and install washed away
                 Ring Culvert       20         5.5     Culvert washed away               structure. Road is impassable.

                                                                                         Replace and install washed away
                 Ring Culvert       5           5      Culvert washed away               structure. Road is impassable.

                                                                                         Replace and install washed away
                 Ring Culverts                         Culverts washed away.             structure. Road is impassable.
                                   List of damaged Roads in Chama North and South Districts(Eastern Province)
                                                                       22nd February 2008



                                                                                Distance(Km)
                                   Name of river                                from District
  Name of the Road    District       crossing      Ward/Constituency   Road #      Centre

Chama-Tembwe         Chama South      Bazimu            Mabinga                      24

Tembwe-Chikwa        Chama South      Chizizi           Mabinga                      42

Tembwe-Chikwa        Chama South      Lumezi             Lumezi                      64



Chama-Kambombo       Chama North    Kamphemba         Kamphemba                       1

Chama-Kambombo       Chama North       Kaozi          Kamphemba                       4
Chama-Kambombo       Chama North      Vitukute        Mphalausenga                    7

Chama-Kambombo       Chama North      Pendwe          Mphalausenga                   10

Chama-Kambombo       Chama North      Mbwala          Mphalausenga                   15

Kalinkhu-Nthonkho    Chama North     Chaubwa            Kalinkhu                     23


Hospital             Chama North      Kanjiki         Kamphemba
South Districts(Eastern Province)




                                    Specifications (m)
                                                                                                  Remarks-proposal works
              Type of structure                            Status of Road, Bridges and                to the existing
               along the Road       Length     Width                 Culverts.                        infrastructure.

           Drift                      10         5.5     Eroded hand wall and damaged back       Rehabilitation of head wall.
                                                                                                 Replacement of wooden deck
           Box Culvert                6           5      Washed away wooden deck                 with concrete deck.
                                                                                                 Replacement of wooden deck
           Box Culvert                10          5      Washed away wooden deck                 with concrete deck.
                                                                                                 Extension of the
                                                         The river changed course and eroded     drift/Construction of a bridge on
           Drift                      20         5.5     the drift aside.                        another point.
                                                         Crack on the deck eroded apron and      Replacement of deck apron and
           Box Culvert                5           5      broken wing walls                       wing walls
           Box Culvert                4           5      Cracks on the deck.                     Replacement of the deck.
                                                         Culverts are silted.Discharge drains    Openin drainage and culverts.
           Culvert                    8           4      low. Affected embarkement               Raising embarkment.
                                                         Water crossing the road 6m before the   Construction of a catch water
           Culvert                    10          5      culvert.                                drain.
                                                                                                 Replacement of washed away
           Box Culvert                10         5.5     Box culvert completely washed away.     box culvert.


           Box Culvert                7          5.5     No wing walls                           Construction of wing walls.

								
To top