					The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




                                  Chemical Industry
                                (20110808-20110812)

          Project Name: Xunwu -Jiangxi Fujian border to the whole of the south section of the highway
          project Xunwu to Xinfeng SA Contract Section ................................................................... 4
          Project Name: Xunwu -Jiangxi Fujian border to the whole of the south section of the highway
          project Xunwu to Xinfeng SB Contract Section ................................................................... 5
          Project Name: Xunwu -Jiangxi Fujian border to the whole of the south section of the highway
          project Xunwu to Xinfeng SD Contract Section ................................................................... 7
          Project Name: Xunwu -Jiangxi Fujian border to the whole of the south section of the highway
          project Xunwu to Xinfeng SC Contract Section ................................................................... 8
          Project Name: Ningbo Nanyuan Street West Extension Project............................................ 9
          Project Name: Dehui Yucai Street road and drainage construction .....................................10
          Project Name: Fufeng - Yang Ling - Mei County, a highway project ....................................11
          Project Name: Tonggang Road road works .......................................................................12
          Project Name: Town, Nanan City, Ishii Xianlin Avenue road project ....................................13
          Project Name: Yanqing Badaling Expressway and the key towns and State Road 110 road
          construction tie-line.........................................................................................................14
          Project Name: Dehui Dehui Road, road and drainage construction .....................................15
          Project Name: Port Road into the municipal works ............................................................16
          Project Name: Guangzhou Road through the project .........................................................17
          Project Name: Deer road reconstruction project ................................................................18
          Project Name: Hebei Expressway Project Hirayama to Zanhuang .......................................18
          Project Name: Bayan Xinglong Town, three road upgrading project ...................................19
          Project Name: Zhanjiang Leizhou town east coast road project ..........................................20
          Project Name: Highway 337 to County Line Hui Sin Temple to Kuitan Gaijian Gongcheng
          Project ...........................................................................................................................21
          Project Name: Beverly Road, construction of the western part ...........................................22
          Project Name: Provincial Xingqing Gong Road, State Road 308 Town Line to connect -Xing
          Heng sector of the Conservation Improvement Project ..... Error! Bookmark not defined.25

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :               +86-10-82743720
         E-Mail :            contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                                 http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




          Project Name: Shijiazhuang City, Lee shot North, South Lee shot, Hui Hua Road Project -
          updated..........................................................................................................................24
          Project Name: Sandu county transportation Bay - Tony Long Course State Road G321
          highway reconstruction project ........................................................................................25
          Project Name: Sea Stone Highway and Duliujian left embankment embankment with
          engineering -updated ......................................................................................................26
          Project Name: Economic Development Zone, Hunan Ningxiang Ningxiang Avenue North
          Extension Project -updated ..............................................................................................27
          Project Name: Dawukou Xinghai to 110 national highway connecting the town line road
          works .............................................................................................................................28
          Project Name: Shizuishan Port Authority, transportation and agriculture to benefit Binhe Road
          -North project .................................................................................................................29
          Project Name: Shizuishan Shan Road -Road to Goldwater mountain road project ................30
          Project Name: Greeting Chuk Hang Road, Park View Road -Southern Section Municipal
          Engineering ....................................................................................................................31
          Project Name: Sin Tong Road, Luohu District, and Municipal Engineering Guowei Road
          Extension .......................................................................................................................32
          Project Name: Nanning Yongning Longgang District Phase II network design projects -B
          standard .........................................................................................................................33
          Project Name: Jingzhou Ring Road Project -updated .........................................................34
          Project Name: Qin Zhang horse section of highway east to the expansion project -update ..36
          Project Name: Lawrence City Hall District, south of the road grid project ............................37
          Project Name: Riverside Road, Zunyi City, road works .......................................................37
          Project Name: Hangzhou Bay New Marina Road East Extension -Xingci all the way - Xingci
          Road Municipal Engineering .............................................................................................38
          Project Name: Luhe robes Park - Park Avenue road project ...............................................39
          Project Name: Lushan Road Project .................................................................................40
          Project Name: Huashan Road, a project ...........................................................................41
          Project Name: Lushan Road, a project ..............................................................................42
          Project Name: Zhuhai Road, road projects ........................................................................43
          Project Name: Yellow River Road, road projects ................................................................44
          Project Name: Songshan Road Projects ............................................................................45
          Project Name: Songshan Road North road network improvement project ...........................45

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :               +86-10-82743720
         E-Mail :            contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                                 http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




          Project Name: Riverside Road, a road network improvement project ..................................46
          Project Name: The road network improvement project Rd three ........................................47
          Project Name: Huadian Road four construction projects ....................................................48
          Project Name: Western Express Line Extension Yangzonghai .............................................49
          Project Name: Lake District, Luzhou City, Ryoma Ryoma Boulevard roadway reconstruction
          project ...........................................................................................................................50
          Project Name: Shuangliu Welcome Avenue South, three-stage construction .......................51
          Project Name: Officer Wells West line of the road extension project -update ......................52
          Project Name: Wen Jing Road Project ..............................................................................53
          Project Name: Shen Nong Road, a project ........................................................................54
          Project Name: G104 Pu Si section of highway expansion project in Nanjing ........................55
          Project Name: Hengshan Road, road projects ...................................................................56
          Project Name: Hengshan Road Project .............................................................................57
          Project Name: Yanhua Road, a road network improvement project ....................................57
          Project Name: Zhujiang Road, a road network improvement project ..................................58
          Project Name: Yun Road West Extension, new construction ...............................................59
          Project Name: Lanzhou West Road -moat - Liuzhou Road comprehensive renovation project
          ......................................................................................................................................60
          Project Name: Shudoutaidao eastern -east Bridge - Third Ring Road Road Rehabilitation
          Project .......................................................................... Error! Bookmark not defined.65
          Project Name: G314 lines Wulabo to Xiaocaohu highway reconstruction project ..................62
          Project Name: Shijiazhuang City, South Ring Highway Project KS-4 section of the contract..63
          Project Name: Shijiazhuang City, South Ring Highway project contract section of KS-1 .......64
          Project Name: Outlets Boulevard Construction -updated ....................................................65
          Project Name: Petrochemical seven middle of the road municipal road projects ..................66
          Project Name: Liuzhou Road, Jiaozhou City West -Lanzhou West Road - South Outer Ring
          Road, Wuzhou Road -Lanzhou West Road - Hong Kong Road, Simenshou Road -Hangzhou
          Road - Liuzhou Road, Luzhou Road -Hangzhou Road - Liuzhou road construction ...............67
          Project Name: Wuwei Minqin red sand to Lake Town Gang -White Alkali Lake road
          reconstruction project -update ........................................ Error! Bookmark not defined.73
          Project Name: Shijiazhuang City, South Ring Highway Project KS-3 Contract Section ..........69
          Project Name: Shijiazhuang City, South Ring Highway project contract section of KS-2 .......70
          Project Name: Laibin South Avenue -Iron Road - Pangu Road Project ................................72

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :               +86-10-82743720
         E-Mail :            contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                                 http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: Xunwu -Jiangxi Fujian border to the whole of the south section of the highway project
Xunwu to Xinfeng SA Contract Section


Stages of progress: survey design

Construction period: 2011 -2014

Major equipment: drilling rig, crane, tower crane, erecting machine, hammers, generators, excavators, road
rollers, dump trucks, motor graders, pull up equipment, template, pipe fittings, fasteners, excavators,
bulldozers, cranes , rollers, compactors, stirring hug, paver, fenders, explosion-proof blankets, non-
magnetic probes, inspection wells, EOD tools vest, Police Equipment, bayonet, intelligent transportation,
electronic police, capture systems, radar speed, green facilities, fire facilities, lighting, drainage facilities,
security facilities, high-speed control, high-speed electronics, security facilities. -Reference

Project:
  Project is located in Jiangxi Province, Jiangxi and Fujian in the route from the junction of Xunwu
Rozanne Township, Shan Pui Tsuen grass ridge, then within ten Fang Zhidong Fujian stay the preliminary
design of highway K-line program. Route from east to west through Xunwu Rozanne Township,
Chengjiang Town, water village, the three standard Township, Shan Hu Anyuan County, a small Town,
Small Town, Luigi finally Xinfeng Village, and the big wide highway connecting. The main control points:
Xunwu, Anyuan, Xinfeng three counties ten townships: Xunwu Rozanne Township, Chengjiang Town,
water village, the three standard Township, Shan Gao Yun Anyuan County, Yan Town, Town car, Xinlong
Township, Xinfeng Hu Shan, a small Town.

  Project route length of approximately 111.766km, new Interchange 5; separate interchange 40; Channel
93; Bridge 1049 m / 1, Bridge 22,561 m / 55, 1230/18 in Tower Bridge; culverts 180 , proposed by two-
way four-lane expressway standard construction, the design speed of 80 km / h; each lane widths to 3.75
meters, the total carriageway width of 2 × -2 × 3.75 m; the middle width of 3 meters, which the median
width of 2 meters, both sides of the curb width of 0.5 meters.



                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




   The total investment is about 8.843 billion yuan, the project owner self 25%, 75% of domestic bank
loans.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Design:*******
Postal Code:*******
Project Leader: Bin
Tel :*******




Project Name: Xunwu -Jiangxi Fujian border to the whole of the south section of the highway project
Xunwu to Xinfeng SB Contract Section


Stages of progress: survey design

Construction period: 2011 -2014

Major equipment: drilling rig, crane, tower crane, erecting machine, hammers, generators, excavators, road
rollers, dump trucks, motor graders, pull up equipment, template, pipe fittings, fasteners, excavators,
bulldozers, cranes , rollers, compactors, stirring hug, paver, fenders, explosion-proof blankets, non-
magnetic probes, inspection wells, EOD tools vest, Police Equipment, bayonet, intelligent transportation,
electronic police, capture systems, radar speed, green facilities, fire facilities, lighting, drainage facilities,
security facilities, high-speed control, high-speed electronics, security facilities. -Reference

Project:
  Project is located in Jiangxi Province, Jiangxi and Fujian in the route from the junction of Xunwu
Rozanne Township, Shan Pui Tsuen grass ridge, then within ten Fang Zhidong Fujian stay the preliminary

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




design of highway K-line program. Route from east to west through Xunwu Rozanne Township,
Chengjiang Town, water village, the three standard Township, Shan Hu Anyuan County, a small Town,
Small Town, Luigi finally Xinfeng Village, and the big wide highway connecting. The main control points:
Xunwu, Anyuan, Xinfeng three counties ten townships: Xunwu Rozanne Township, Chengjiang Town,
water village, the three standard Township, Shan Gao Yun Anyuan County, Yan Town, Town car, Xinlong
Township, Xinfeng Hu Shan, a small Town.

  Project route length of approximately 111.766km, new Interchange 5; separate interchange 40; Channel
93; Bridge 1049 m / 1, Bridge 22,561 m / 55, 1230/18 in Tower Bridge; culverts 180 , proposed by two-
way four-lane expressway standard construction, the design speed of 80 km / h; each lane widths to 3.75
meters, the total carriageway width of 2 × -2 × 3.75 m; the middle width of 3 meters, which the median
width of 2 meters, both sides of the curb width of 0.5 meters.

   The total investment is about 8.843 billion yuan, the project owner self 25%, 75% of domestic bank
loans.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal address:*******
Post Code:*******
Project Leader: Zhao Wei Chu
Tel :*******
Fax :*******




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: Xunwu -Jiangxi Fujian border to the whole of the south section of the highway project
Xunwu to Xinfeng SD Contract Section


Stages of progress: survey design

Construction period: 2011 -2014

Major equipment: drilling rig, crane, tower crane, erecting machine, hammers, generators, excavators, road
rollers, dump trucks, motor graders, pull up equipment, template, pipe fittings, fasteners, excavators,
bulldozers, cranes , rollers, compactors, stirring hug, paver, fenders, explosion-proof blankets, non-
magnetic probes, inspection wells, EOD tools vest, Police Equipment, bayonet, intelligent transportation,
electronic police, capture systems, radar speed, green facilities, fire facilities, lighting, drainage facilities,
security facilities, high-speed control, high-speed electronics, security facilities. -Reference

Project:
  Project is located in Jiangxi Province, Jiangxi and Fujian in the route from the junction of Xunwu
Rozanne Township, Shan Pui Tsuen grass ridge, then within ten Fang Zhidong Fujian stay the preliminary
design of highway K-line program. Route from east to west through Xunwu Rozanne Township,
Chengjiang Town, water village, the three standard Township, Shan Hu Anyuan County, a small Town,
Small Town, Luigi finally Xinfeng Village, and the big wide highway connecting. The main control points:
Xunwu, Anyuan, Xinfeng three counties ten townships: Xunwu Rozanne Township, Chengjiang Town,
water village, the three standard Township, Shan Gao Yun Anyuan County, Yan Town, Town car, Xinlong
Township, Xinfeng Hu Shan, a small Town.

  Project route length of approximately 111.766km, new Interchange 5; separate interchange 40; Channel
93; Bridge 1049 m / 1, Bridge 22,561 m / 55, 1230/18 in Tower Bridge; culverts 180 , proposed by two-
way four-lane expressway standard construction, the design speed of 80 km / h; each lane widths to 3.75
meters, the total carriageway width of 2 × -2 × 3.75 m; the middle width of 3 meters, which the median
width of 2 meters, both sides of the curb width of 0.5 meters.

   The total investment is about 8.843 billion yuan, the project owner self 25%, 75% of domestic bank
loans.


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Design Unit: Second Highway Survey and Design Institute Co., Ltd.
Postal Address:*******
Tel :*******
Fax :*******




Project Name: Xunwu -Jiangxi Fujian border to the whole of the south section of the highway project
Xunwu to Xinfeng SC Contract Section


Stages of progress: survey design

Construction period: 2011 -2014

Major equipment: drilling rig, crane, tower crane, erecting machine, hammers, generators, excavators, road
rollers, dump trucks, motor graders, pull up equipment, template, pipe fittings, fasteners, excavators,
bulldozers, cranes , rollers, compactors, stirring hug, paver, fenders, explosion-proof blankets, non-
magnetic probes, inspection wells, EOD tools vest, Police Equipment, bayonet, intelligent transportation,
electronic police, capture systems, radar speed, green facilities, fire facilities, lighting, drainage facilities,
security facilities, high-speed control, high-speed electronics, security facilities. -Reference

Project:
  Project is located in Jiangxi Province, Jiangxi and Fujian in the route from the junction of Xunwu
Rozanne Township, Shan Pui Tsuen grass ridge, then within ten Fang Zhidong Fujian stay the preliminary
design of highway K-line program. Route from east to west through Xunwu Rozanne Township,
Chengjiang Town, water village, the three standard Township, Shan Hu Anyuan County, a small Town,
Small Town, Luigi finally Xinfeng Village, and the big wide highway connecting. The main control points:

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Xunwu, Anyuan, Xinfeng three counties ten townships: Xunwu Rozanne Township, Chengjiang Town,
water village, the three standard Township, Shan Gao Yun Anyuan County, Yan Town, Town car, Xinlong
Township, Xinfeng Hu Shan, a small Town.

  Project route length of approximately 111.766km, new Interchange 5; separate interchange 40; Channel
93; Bridge 1049 m / 1, Bridge 22,561 m / 55, 1230/18 in Tower Bridge; culverts 180 , proposed by two-
way four-lane expressway standard construction, the design speed of 80 km / h; each lane widths to 3.75
meters, the total carriageway width of 2 × -2 × 3.75 m; the middle width of 3 meters, which the median
width of 2 meters, both sides of the curb width of 0.5 meters.

   The total investment is about 8.843 billion yuan, the project owner self 25%, 75% of domestic bank
loans.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal Address:*******
Project Leader: Children Gansheng
Tel :*******
Fax :*******




Project Name: Ningbo Nanyuan Street West Extension Project


Progress stage: construction started in

Construction period: 2011 2012


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Ring Road project is located in the east, west road accessibility, size of the project: road length 115O
meters, the cross section width of 24 meters, the bridge 1.

  The total investment 1914.6570 million.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax 574 -87131742

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******


Project Name: Dehui Yucai Street road and drainage construction


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:


                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :          +86-10-82743720
           E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




   Project is located in Dehui Yucai Street north from the Peace Road intersection from 295.5m to
Dongfeng Road, extending up. Yucai Street, the main project for the project road and sidewalk construction
vehicles, ancillary works including storm sewage works and ancillary works. The project Yucai Street road
construction as part of road length 295.5m, width 13m, of which motor vehicle lane wide 13m, no
sidewalks on both sides of the road a total area of 5610m2.

  The total investment is unknown.

Construction units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Designer:*******
Postal Address:*******
Contact:*******
Tel:*******


Project Name: Fufeng - Yang Ling - Mei County, a highway project


Stages of progress: environmental impact assessment

Construction period: 2011 - 2013

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, Police Equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, safety, speed monitoring, high-speed electronics, security facilities. -Reference

Project:
  Project is located in Shaanxi Province, starting in Fufeng Zhaogongzhen and S107 -off the ring phase,
southwards through the village called light, Wu, Guo, and S104 at Kyorin plane intersects the town, the

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




south by the Maoling village, five Springs to hoe Zhang, cross the Longhai railway, Westwood midline,
Westwood high speed, continue to the south, the village was built by Jiang Yuan Bridge across the Weihe
River, the intersection plane Jinjiazhuang with G310, and then southwards through the bend, Ning Chuang
later, in Mei County, Green Township, Baoji City of God on the horse Teramura access S107 -off the ring.
Project length of 32.546 km.

  The total investment 8.6953 billion.

Construction Unit:*******
Postal Address:*******
Contact Person:*******
Tel :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******


Project Name: Tonggang Road road works


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Quanzhou, Fujian Nanan City, then start planning Xianlin Avenue K1 +802.506,
inter-provincial road S201 line along the field between the villages of East Village and Xianjing open flat
areas along the coast route to the sea then a major thoroughfare, road length About 2654.573m, road red
line width of 50m. 398.4 acres of land in this way, the total investment 252,224,300 yuan.

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The total investment 252,224,300 yuan.

Construction units:*******
Postal Address:*******
Contact:*******
Tel:*******

Design units: Fujian Fujian Branch of Environmental Technology Development Co., Ltd. -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******



Project Name: Town, Nanan City, Ishii Xianlin Avenue road project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Nanan City, Quanzhou, Fujian Province, starting in the ancient stone village south
highway connecting cable access road parallel to Highway S20 route, the road through the ancient village
after village, Kam Tong Village, Ling-pocket Village, River Village, JU Village, the former Sakamura, to
the end of the road in the planning of water, Liu line, road length 9417.737m, road red line width of 50m.

  The total investment 979,021,600 yuan.



                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction units:*******
Postal Address:*******
Contact:*******
Tel:*******

Design units: Fujian Fujian Branch of Environmental Technology Development Co., Ltd. -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******


Project Name: Yanqing Badaling Expressway and the key towns and State Road 110 road construction tie-
line


Stages of progress: environmental impact assessment

Construction period: 2012 - 2013

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Yanqing County, Nanshan north route is divided into two parts: the first section of
the design starting in the Sport Town Xisangyuancun, route east -south through the West Red Teramura,
Guojiabaocun, Badaling Town Hu Tuo village, connecting with paragraph 2, line length 7.085 km;
paragraph 2 of the design starting in the town with Badaling Badaling town planning road connecting the
north side of road in Shan, Henan, along the white trunk to the northeast, passing through Badaling Town, a
small village call lump, a small town Nihe large elm village, south Red Gate Village, Well Town, West
Red Hill, Willow Village, two Division, Ishikawa, three Division Yongning town east through the West
Grey Ridge, Peng Yao, East Ash Ridge, on the south side of the white trunk and finally the current
situation in Henan Chang Chi Road, 28.8 km long route; the total length of 35.9 km project route.

  The total investment 1,297,698,000 yuan.

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction units:*******
Postal Address:*******
Tel :*******

Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******


Project Name: Dehui Dehui Road, road and drainage construction


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Dehui Dehui Road from New Street junction to the northwest from 1983m to extend
high-speed rail up to Harbin. Project main project for the roads and sidewalks Dehui road construction
vehicles, ancillary works including the greening project, rain, sewage works. This project is part of the road
Dehui road, road length 1983m, width 19m, of which motor vehicle lane wide 13m, the width of sidewalks
on both sides of 3m, the total road area 42535m2.

  The total investment 18,921,000 yuan.

Construction units:*******
Postal address:*******
Post Code:*******

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Contact:*******
Tel:*******

Designer:*******
Postal Address:*******
Contact:*******
Tel:*******


Project Name: Port Road into the municipal works


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Huizhou, Guangdong Daya Bay Economic and Technological Development Zone,
Daya Bay center group and port to connect groups, the starting point for the safety and benefit road design,
the design end of Port Road, the road length of 3.54 km. The main construction content of road works, set
the level-light controlled junction 7, the road along the line improved water supply, sewage, water,
electricity and lighting, telecommunications, gas and other municipal pipelines, and supporting transport
facilities and traffic control systems, green landscape and other ancillary facilities. Project covers an area of
159550 m2, green area of 33700 m2.

  The total investment is unknown.

Construction units:*******
Postal Address:*******
Contact:*******


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel :*******

Design Unit: Department of Environmental Protection, Nanjing Institute of Environmental Science -EIA
agencies
Postal Address:*******
Contact:*******
Tel:*******


Project Name: Guangzhou Road through the project


Progress stage: start construction in -EIA at the same time

Construction period: 2011 - 2011

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Guangzhou Road Jiaonan section, the starting point for the section of Guangzhou
Road, north of Jiaonan No.1 Middle School, Changchun Road, extending to the north, a total length of
868.6m. Major road construction project for the hardening of the content, rain and sewage pipe laying,
installation Curb and channel plate, install street lights and fire hydrants, etc., specific economic indicators:
the road length of 868.6m, roadway width 14m, hardened area of 12160m2; rain and sewage pipe laying
3040m; Install Curb 1520m; pavement sidewalk panels 7600m2; install 40 street lights, fire hydrant 6.

  The total investment 9.6545 million yuan.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Design:*******
Postal Address:*******
Tel :*******


Project Name: Deer road reconstruction project


Stages of progress: survey design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Laiwu City, north west show Street, south wen Avenue, total length of 260 meters,
the main building of roadways, storm water ditch, sidewalk bricks, the strength of electrical trench -civil
engineering, construction of bus stop bay , bus shelters, installation of garbage bin and so on. Construction
site has to do leveling.

  The total investment is about 300 million yuan.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******




Project Name: Hebei Expressway Project Hirayama to Zanhuang


Progress stage: engineering design
                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction period: December 2011 December -2014

Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, lighting, ventilation, elevators, medical equipment, electronic display. -Reference

Project:
  Project is located in Shijiazhuang, Hebei Jingxing small village east Zanhuang for regulating the family
Shek Mun Town Village South, the construction of a two-way length of 85.248 km four-lane highway, the
design speed of 80-120 km / h.

  The total investment 12.2 billion yuan.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******

Design Unit: Shijiazhuang Municipal Transportation Bureau
Postal Address:*******
Contact:*******
Tel :*******


Project Name: Bayan Xinglong Town, three road upgrading project


Progress stage: construction started in

Construction period: June 2011 October 2011

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Bayan Xinglong Town, 134,502 square meters -25,149 square meters in which
cultural distance, Renmin Street 59046.00 square meters, the center road 50307.00 square meters.

  The total investment is about 80 million, sources of funding for the self.

Construction units:*******
Postal Address:*******
Contact:*******
Tel:*******

Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******


Project Name: Zhanjiang Leizhou town east coast road project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:

                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :          +86-10-82743720
           E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




   Project is located in the town of the British East Leizhou Tong Jia Bo Village east coast to the sea beach
lots, the project area in which no existing road, to meet the transport requirements, to promote economic
development, the need to build transport routes. The project area is 3.3696 hectares with the sea, road
humps, two-way cross-slope slope, cross slope of 2.0%. Roadbed fill method used, is generally 1:1 fill
slope, local roads is set to 1:1.5.

  The total investment 25,215,300 yuan.

Construction units:*******
Postal Address:*******
Contact:*******
Tel :*******

Design by: South China Sea Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******


Project Name: Highway 337 to County Line Hui Sin Temple to Kuitan Gaijian Gongcheng Project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, Police Equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, safety, speed monitoring, high-speed electronics, security facilities. -Reference

Project:
  Project is located in Jieyang City, Guangdong benefit to the county, provincial 337 lines Huilai Sin
Temple to Kuitan Gaijian Gongcheng length of 66.168 kilometers, is an important export benefit to the
county road, which connects Shantou and Shanwei City, is the benefit to the county road transport artery.

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




The technical standards for the project by a highway planning and construction, the design speed of 80 km /
h, two-way eight-lane, east China Lake to Long sections of rivers, the main highway roadbed width of 37
meters -65 meters wide by supporting the roadbed planning municipal facilities, and the remaining sections
roadbed width of 33 m the main road -50 meters wide by planning embankment supporting municipal
facilities. Stake point K60 +040, after weeks of field, China Lake, Hui City, East Long, Long River, River
West, Nanshan District, overseas, beyond the Kuitanzhen end, and the National Highway 324 connecting
the end Stake for K126 +207.51. The preliminary estimate of total project investment of about
1,889,068,400 yuan.

  The total investment 1,889,068,400 yuan. .

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******



Project Name: Beverly Road, construction of the western part


Stages of progress: survey design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:

                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :          +86-10-82743720
           E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  Project is located in Yangjiang City, Guangdong Province, Jiangcheng, road length 1500m, road width
50m. Include: civil works, roads, green landscape works, drainage works, street works, traffic facilities
project.

  The total investment is about 58 million yuan.

Construction units:*******
Postal Address:*******
Contact:*******
Tel:*******

Design:*******
Post Code:*******
Project Leader: Wang Guang
Tel :*******
Fax :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******

Stages of progress: survey design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
  Project is located in Xingtai City, starting at Qinghe County, State Road 308, and Xing Qinggong road
connecting the existing East to northeast along the lines widened major transformation, to even the Town

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Xing Qinghe County community and the eastern extension of the project value Hengshui segment phase.
Route length of 10.49km. The use of secondary road construction standards, design speed of 60 km / h, the
general roadbed width 12m, road width of 11.4m. Small bridge and roadbed width, the use of highway
bridge design vehicle load - Ⅰ level. Asphalt concrete pavement structures. Other technical indicators by
ministerial Highway Engineering Technical Standards -JTG B01-2003 implementation.

  The total investment is not detailed, owner financing and Hebei Province Department of Transportation
grants.

Construction units:*******
Postal Address:*******
Contact:*******
Tel 0319 -2138108
Fax 0319 -2138108

Design Unit: Road Design Consulting Co., Ltd. Xingtai Hua Tenggong
Postal Address:*******
Tel 0319 -2138426



Project Name: Shijiazhuang City, Lee shot North, South Lee shot, Hui Hua Road Project -updated


Stages of progress: preliminary design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
  Project is located in Shijiazhuang Passenger Station planning area within the building shot Lee Road,
Lee Road shooting, the Department of Chinese road projects.

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The total investment is about about 20 million yuan, urban construction funds.

Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******

Design by: Shanghai Municipal Engineering Design Research Institute -Group Co., Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax 021 -65986480, 51298888




Project Name: Sandu county transportation Bay - Tony Long Course State Road G321 highway
reconstruction project


Stages of progress: survey design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, Police Equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, safety, speed monitoring, high-speed electronics, security facilities, elevator,
boring machine, shield machines, drills, mud recycling cans and other reserves. -Reference

Project:
   Projects are located in three counties, alterations length of 7.02km, by city standards for Class III main
road construction, asphalt concrete pavement, the design speed of 40km / h, which K0 +000 to K2 +300
lane 20m -Vehicle Road 16m, 4m sidewalk , K2 +300 to K7 +019.5 lane 17m -Vehicle Road 16m, shoulder

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




1m, the starting point in the transformation of road traffic Beach G321, G321 seedlings at the end of
Longwan.

  The total investment is not detailed, self-construction funds from the county panel.

Construction units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design unit: Guizhou Provincial Planning Survey and Design Institute Co., Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******




Project Name: Sea Stone Highway and Duliujian left embankment embankment with engineering -updated


Stages of progress: survey design

Construction period: 2011 2012

Major equipment: drilling rig, crane, tower crane, erecting machine, hammers, generators, excavators, road
rollers, dump trucks, motor graders, pull up equipment, template, pipe fittings, fasteners, excavators,
bulldozers, cranes , rollers, compactors, stirring hug, paver, fenders, explosion-proof blankets, non-
magnetic probes, inspection wells, EOD tools vest, Police Equipment, bayonet, intelligent transportation,
electronic police, capture systems, radar speed, green facilities, fire facilities, lighting, drainage facilities,
security facilities, high-speed control, high-speed electronics, security facilities. -Reference

Project:

                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :         +86-10-82743720
           E-Mail :      contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  Project is located in Tianjin, Duliujian located south of Tianjin, is the flood of Daqing line access to the
sea, its left embankment is to protect the safety of the south of Tianjin urban flood defense, protect the right
bank part of Binhai New Area, Mission Park City , Jinghai Park and Dagang Oilfield, Nankang Industrial
Zone and other areas of flood control. Duliujian river is something Qianmiqiao located between the river
channel from east to west 18.6km, north-south width of 5km, for the experimental wetland areas North Port,
Duliujian river is the river channel within the DAZHANGTUO underground injection platform. Cloth
down the river to the beach there are two DN711 Shaanxi-Beijing natural gas pipeline, a total length of 43
km. Wide slot with 57 wells, single-well oil and gas transmission pipeline between 32 and 44.7 km. Tsang
Hong Kong and Hong Kong are northern DN711 DN406 two pipelines, tying up the river 12 km long.

  Bin Shi Binhai New Area Comprehensive highway transportation system is an important part of the
project from the Tianjin-Shantou Expressway west, along the left embankment Duliujian Nankang
Industrial Zone, east of the harbor access road, high-speed two-way six-lane stone shore, full-length
37.6km, red line width of 60m. Embankment with a wide river channel section located within the railway
and petrochemical Diwai area, Hanoi dike to move 70 meters of the original dike as part of the roadbed.

  The total investment is not detailed.

Construction Unit:*******
Postal address:*******
Post Code:*******
Tel :*******

Design Unit: Tianjin Water Conservancy Survey and Design Institute
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: Economic Development Zone, Hunan Ningxiang Ningxiang Avenue North Extension
Project -updated


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Stages of progress: preliminary design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
   Rural Economic Development Project in Nanning, the proposed construction of a road width of 40 m
length 3667.6 m of the road, with a total land area of 260,399.6 square meters.

  The total investment is not detailed.

Construction units:*******
Contact:*******
Tel:*******

Design Unit: Planning and Design Institute of Hunan Hua Gang Ltd.
Postal Address:*******
Contact:*******
Tel :*******
Fax 0731 -5219389




Project Name: Dawukou Xinghai to 110 national highway connecting the town line road works


Stages of progress: environmental impact assessment

Construction period: 2011 2012



                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Ningxia Shizuishan Dawukou east of State Road 110, west of Century Avenue. The
total investment 51,317,700 yuan. Road length of 4.102km, planning red line width of 50 meters, 16 meters
wide road motor vehicles which, each 4 meters wide sidewalks on both sides, both sides of the green belt of
13 meters wide. Road grade Ⅱ level urban trunk roads, speed 50km / h, with lights and other transportation
facilities other ancillary works.

  The total investment 51,317,700 yuan.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******


Project Name: Shizuishan Port Authority, transportation and agriculture to benefit Binhe Road -North
project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
   Project is located in Shizuishan, starting in the Huinong stone road K4 +625.5 Department, and was T-
shaped cross-stone road, starting Stake AK0 +000.0, laid from north to south route through the River
Bridge at the crossing after the AK0 +560 The third drain, the route and at the end of the AK3 +300 gate
bias through the central road in the AK4 +290 at Red Road and cross at the AK6 +765 at the crossing after
the benefits of agricultural drainage lines intersect at AK6 +800 G109 , continue south road intersects with
the red gift, cross Stake AK8 +720, after the fifth across the south and AK9 +210 drains from the village
and Jing Jing between the village through the village, at the K11 +610 Drainage across for fourth, followed
by Ping Luo Yang from the east through the industrial base to K15 +400 at and after the proposed project
to the ceremony and a simple spring roads intersect at Yang Ming University farm southeast. Total length
of 15.4 kilometers, according to the standard four-lane highway construction, roadbed width of 24.5m, the
design speed of 80km / h, 2031 the annual average daily traffic 21381pcu / d. Total investment of
226,115,000 yuan, the average cost of 22.84 million yuan per kilometer.

  The total investment 226,115,000 yuan.

Construction units:*******
Postal address:*******
Contact:*******
Tel :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******



Project Name: Shizuishan Shan Road -Road to Goldwater mountain road project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Shizuishan, the starting point K0 +000 in the original landscape Avenue Xinghai toll
station at the lake -toll has been removed, the route from the starting point southwest route, through the toll
office, the southwest parallel to the Baotou-Lanzhou railway route, In the K1 +800 and K5 +275 Xinghai
town across the landscape at the water, into the square in front of the train station Shizuishan in K5 +945
Xinghai town across the landscape at the river and continue south-west route, to end with the upcoming
implementation of the construction of the waterway was T -shaped cross, end Stake K6 +290, route length
of 6.29km.

  The total investment is unknown.

Construction units:*******
Postal address:*******
Contact:*******
Tel :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******



Project Name: Greeting Chuk Hang Road, Park View Road -Southern Section Municipal Engineering


Progress stage: feasibility study being prepared

Construction period: 2011 2012


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
  Project is located in Ping Shan District, construction Greeting Chuk Hang Road, Park View Road -
Southern Section municipal projects.

  The total investment is not detailed.

Construction:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******




Project Name: Sin Tong Road, Luohu District, and Municipal Engineering Guowei Road Extension


Stages of progress: environmental impact assessment

Construction period: January 2012 January 2013

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
  Project Area is located in Luohu District Liantang the northeast mountain road north of the Indus, the
south part of the development of residential quarters, mainly construction Sin Tong Road, Guowei Road
Extension, No. 1 Road and other municipal roads, road length were 782.756m , 217.451m, 130.7m, Sin
Tong Road, Guowei Road Extension planned road red line width of 20 meters, two-way 2-lane, No. 1 Road
planning road red line width of 12 meters, two-way two-lane road all the urban Ⅰ level branch standard
construction, calculation speed 20 km / h, municipal utilities, along the set.

  The total investment 122,582,200 yuan.

Construction units:*******
Postal Address:*******
Contact:*******
Tel:*******

Design unit: Environmental Protection Technology Co., Ltd. Shenzhen Zongxing -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******


Project Name: Nanning Yongning Longgang District Phase II network design projects -B standard


Progress stage: preparation of project proposals

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, Police Equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, security facilities. -Reference

Project:
  Project is located in Nanning Yongning Pu new residential building ten road works.

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The scale of construction investment in the construction budget -million
  2 Harbor Road 1300 × 50 4890
  3 Harbor Road 1110 × 30 2240
  Port 4 1530 × 20 2060
  Port 6-channel 730 × 30 1475
  Harbor Road 5000 × 30 10100 7
  Port 8 1450 × 20 1960
  Port 9 Road 640 × 30 1290
  10 Harbor Road, 400 × 20 540
  11 Harbor Road, 400 × 20 540
  12 Harbor Road 1600 × 20 2160

  The total investment is about 272.55 million yuan.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******

Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******




Project Name: Jingzhou Ring Road Project -updated


Stages of progress: survey design

Construction period: 2011 2012


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
   Project is located in Jingzhou, Jingzhou county in eastern route from the east coast S222 Drainage River
Rock Bay, and the planning and construction of drainage River Bridge connection, S319 intersection, a
new bridge across the drainage Jiangdong Jiang, Zhu dam across the Jiaozuo-Liuzhou railway, in the
county Jingzhou north and high-speed cable Baomao intersection, west of the use of 0.4km, and G209
intersection, respectively, in the western county scenic highway with flying cottage, S222 intersection, and
finally southwest G209 Jingzhou county connection with Jiangdong Bridge Interchange, all length
14.425km -actual construction mileage 14.025km. Major control point for the S222 Rock Bay, Jiangdong
Bridge, Zhujiaba, including Mao high-speed cable Jingzhou, scenic flying cottage door and G209 with
Jiangdong Bridge wiring interchange.

  Secondary road projects across the board with technical standards development, the design speed of
60km / h, roadbed width 12m -of which the new Koto bridge width 18m, vehicle load rating of highway -
Ⅱ level -of which the new Koto bridge load rating of highway - Ⅰ level, other technical indicators used
Highway Engineering Technical Standards -JTGB01-2003 requirements.

  The total investment is about 147,318,700 yuan, Hunan Province, Department of Transportation grant
and local self.

Construction units:*******
Contact:*******
Tel:*******
Fax :*******

Featuring: Hunan Institute of Transportation
Postal Address:*******
Contact:*******
Tel :*******


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project Name: Qin Zhang horse section of highway east to the expansion project -update


Stages of progress: survey design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
   Project is located in Qinshui, starting in the Qinshui Xingyucun North, the Yao are, to Tao River, Hao,
Donggou, Wayaogou, Xujiagou, the Court, well busy ditch, end at Qinshui Zhang Ma Village West, a
length of 15.9Km, according to the standard secondary road construction, the design speed 60Km / h,
roadbed width 12m, lane 3.75m × 2, auto load rating of highway - Ⅰ level standard, asphalt concrete
pavement. Including embankment construction, road construction, bridge construction, cross-project
engineering and railway facilities.

  The total investment is not detailed.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design:*******
Post Code:*******
Project Leader: Ning Qinhai



                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel :*******
Fax :*******



Project Name: Lawrence City Hall District, south of the road grid project


Stages of progress: preliminary design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
  Project is located in Zunyi, South Hall area road grid construction projects.

  The total investment is not detailed.

Construction units:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal address:*******
Post Code:*******
Tel :*******




Project Name: Riverside Road, Zunyi City, road works


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Stages of progress: preliminary design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
  Project is located Honghuagang Chung Town, Riverside Road, road construction projects.

  The total investment 500 million yuan, more channels to raise.

Construction units:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal address:*******
Post Code:*******
Tel :*******



Project Name: Hangzhou Bay New Marina Road East Extension -Xingci all the way - Xingci Road
Municipal Engineering


Stages of progress: preliminary design

Construction period: 2011 2012




                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
   Project is located in Hangzhou Bay New Area, the road is about 770m, width 26m, mainly for roads,
bridges, drainage, electrical, traffic signs and markings and other projects.

  The total investment is about 14 million raised.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Post Code:*******
Contact:*******
Tel :*******



Project Name: Luhe robes Park - Park Avenue road project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:

                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :          +86-10-82743720
           E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  Project is located in Luhe robes Park, north Chuhe levee, south along the road, a total length of 6483
meters, planning of the road width of 60 meters, is planned north-south Metro robes main road to the city.

  The total investment is unknown.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Lushan Road Project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Nanjing, Lushan Road -Yan Heng Road - Mountain Road, planning red line width of
22m, total length of 1.396km, designed for the city branch. Road construction projects including road
construction, bridge construction, drainage and overall pipeline project, greening works and ancillary works.

  The total investment is unknown.


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: Huashan Road, a project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Nanjing, Huashan Road, one -Lushan Road ~ Yan Heng Road, planning red line
width of 22m, total length of 1.794km, designed for the city branch. Road construction projects including
road construction, bridge construction, drainage and overall pipeline project, greening works and ancillary
works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: Lushan Road, a project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Nanjing, Lushan Road, a -~ Yan Heng Road, Huashan Road, planning red line width
of 35m, total length of 1.571km, designed for the urban sub-trunk level. Road construction projects
including road construction, bridge construction, drainage and overall pipeline project, greening works and
ancillary works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Zhuhai Road, road projects


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Nanjing, and Yan Zhu Hai Luxi Road from the east by Rd, length 1352.975m, road
red line width of 24m, designed for the city branch. Road construction projects including road works,
bridge works, drainage works, street works and road ancillary works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Yellow River Road, road projects


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Nanjing, the Yellow River Road and Martin Road, west road, east by Rd, length
1477.708m, road red line width of 24m, designed for the city branch. Road construction projects including
road works, bridge works, drainage works, street works and road ancillary works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Fax :*******


Project Name: Songshan Road Projects


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Nanjing, Songshan Road north from the Shen Nong Road, south Weiyi, road length
1012.336m, planning red line width of 35m, level of urban sub-distributors. Road construction projects
including road works, bridge works, drainage works, street works and road ancillary works.

The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Songshan Road North road network improvement project


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Nanjing, Songshan Road North -New Road - Riverside Road, too, total length
1066m, planning red line width of 35m, designed for the urban sub-distributors. Road construction projects
including road works, bridge works, drainage works, street works and road ancillary works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Riverside Road, a road network improvement project


Stages of progress: environmental impact assessment

Construction period: 2011 2012


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Nanjing, Riverside Road, one west and Martin Road, east by five sections, total
length of 943.041 meters, road red line width of 28m, designed for the urban sub-distributors. Road
construction projects including road works, bridge works, drainage works, street works and road ancillary
works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: The road network improvement project Rd three


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
   Project is located in Nanjing, Riverside Road, north of planning, the status quo too new road south, road
length 1089.669m, planning red line width of 45m, level of Class I main road for the city. Road
construction projects including road works, bridge works, drainage works, street works and road ancillary
works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Huadian Road four construction projects


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:


                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :          +86-10-82743720
           E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  Project is located in Qixia District, for the urban sub-trunk roads, the route was to the west, starting at the
end of Huadian Road, three designed by Yin Chun Road East, finally Huadian Road, two design starting
point, length 1270 m, road width of 35 meters, asphalt concrete pavement forms.

  The total investment is unknown.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******


Project Name: Western Express Line Extension Yangzonghai


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project route starting point K0 +000 = Yangzonghai Western Express Highway Matsushige - Qi Dian
segment K1 +356.55, Yangzonghai scenic spots in the ditch near the sun, and the Western Express
Highway Yangzonghai Matsushige ~ seven segment K1 +356.55 plane Austin cross, the sun along the
ditch line to show the direction of wild JIAZHUQING line, K0 +520 intensive nearby village, and local
road level crossing, K3 +180 plane with the cross-roads into the wild Takemura, K3 +350 and Road horse
Yang Road -XA89 plane cross, the end of K3 +878.06, Takemura east of Yunnan wild beyond the College

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




of Land Resources Yangzonghai new campus. Route length 3.87806km. Project uses two standards for
road construction, calculation speed using 40km / h, roadbed width 10m. Road with two bridges along the
total of 220m, culverts 9. Major junctions across the board were set four planes cross. Pavement with
asphalt concrete pavement. Along the line of signs, markings, fencing, diversion blocks, metal crash barrier,
safety net and other traffic safety facilities.

  The total investment is unknown.

Construction units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Lake District, Luzhou City, Ryoma Ryoma Boulevard roadway reconstruction project


Stages of progress: survey design

Construction period: November 2011 December 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
   Project area is located in Luzhou Longmatan Ryoma Avenue, is about 5 km, 60 m two-way
transformation of rubber cement concrete pavement asphalt pavement.

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The total investment is about 80 million, fiscal urban construction funds.

Construction units:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Design:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******




Project Name: Shuangliu Welcome Avenue South, three-stage construction


Stages of progress: survey design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
  Project is located in Shuangliu, Welcome Avenue South, three sections of road length 2400 meters.

  The total investment is not detailed.



                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax:*******

Designer:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******




Project Name: Officer Wells West line of the road extension project -update


Stages of progress: preliminary design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
  Project is located in Zunyi, officials from the wells in the West and the intersection of the tunnel well
beyond the official Yangzhou Road, road length of 1705 meters.

  The total investment 115 million yuan.



                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction units:*******
Post Code:*******
Contact:*******
Tel :*******

Designer:*******
Postal address:*******
Post Code:*******
Tel :*******




Project Name: Wen Jing Road Project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Nanjing, Wen Jing Road -Tucheng head ~ Mountain Road, planning red line width
of 16m, total length of 1.132km, designed for the city branch. Road construction projects including road
construction, bridge construction, drainage and overall pipeline project, greening works and ancillary works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: Shen Nong Road, a project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Nanjing, Shen Nong Road, one -after Rd - Mountain Road, planning red line width
of 35m, total length of 1.561km, designed for the urban sub-trunk level. Road construction projects
including road construction, bridge construction, drainage and overall pipeline project, greening works and
ancillary works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: G104 Pu Si section of highway expansion project in Nanjing


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, Police Equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, safety, speed monitoring, high-speed electronics, security facilities. -Reference

Project:
   Project is located in Nanjing, in Jiangsu and Anhui from the junction of the braided river, the status quo
along the route Ninghuai beneath the high-speed G104, Nanjing-Qidong railway, go to the town of
Citigroup Yongning camp, along the old road to the east, beneath the Yangtze Petrochemical lanes, cross-
Chu rivers into the Nanjing High-tech Zone, the route finally G328 intersection, the route mileage of about
12.339km. Chahe to rather high even roadbed width 26.0m, two-way four-lane, high-speed connection to
the G328 rather roadbed width of 43.0m, two-way six lanes.

  The total investment is unknown.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Hengshan Road, road projects


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Nanjing, value from the Shen Nong Road, Shandong Road, south to the Yellow
River Road, a total length of 697.693m, road red line width of 16m, designed for the city branch. Road
construction projects including road works, bridge works, drainage works, street works and road ancillary
works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Fax :*******


Project Name: Hengshan Road Project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
   Project is located in Nanjing, Weiyi Road Hengshan Road south from the north to the Shen Nong Road,
length of 931.909m, road red line width of 24m, designed for the city branch. Road construction projects
including road works, bridge works, drainage works, street works and road ancillary works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Yanhua Road, a road network improvement project


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Nanjing, Yanhua Road one -Huangshan Road ~ by Rd, total length of about 730m,
planning red line width of 22m, designed for the city branch. Road construction projects including road
works, bridge works, drainage works, street works and road ancillary works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Zhujiang Road, a road network improvement project


Stages of progress: environmental impact assessment

Construction period: 2011 2012


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Nanjing, Zhujiang one -and Martin Road ~ by Rd, total length of about 934m,
planning red line width of 35m, designed for the urban sub-distributors. Road construction projects
including road works, bridge works, drainage works, street works and road ancillary works.

  The total investment is unknown.

Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******

Design by: Nanjing Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Yun Road West Extension, new construction


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference


                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Project:
   After opening the project area is located in Kunming, Kwong Fuk Road, north from the south were
transported Fortune Avenue and Avenue intersection. Road length 4567.864m, Kwong Fuk Road to the
south of which line the road to connect the red line width 50m, length 2716.586m; was transported to the
Southern Connector Road section of the road red line width 60m, length 1851.278m. Works within the
scope of works includes: roads, bridges, drainage, lighting, green landscape, pipeline and other transport
facilities and comprehensive content.

  The total investment is unknown.

Construction units:*******
Postal Address:*******
Contact:*******
Tel :*******

Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******


Project Name: Lanzhou West Road -moat - Liuzhou Road comprehensive renovation project


Stages of progress: environmental impact assessment

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:


                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :          +86-10-82743720
           E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




   Project is located in Jiaozhou Lanzhou West Road, east moat, Liuzhou Road west. Transformation of the
specific content of the construction roads, drainage, landscaping, lighting and other projects. Length of road
reconstruction projects 2545m, the road width 40m. Rehabilitate asphalt concrete pavement 40720m2,
asphalt concrete overlay 40720m2, removal of road transport and dug earth 43976m3, installation of curbs
5090m, sidewalks and parking area of 34370m2, installation boundary stone, tree, pond stone 6800m,
landscaping area 11460m2. Engineering the laying of water main pipe -DN800 length 2545m, trunk sewers
-DN1000 length 2545m, installation of street lights 170. Year construction period.

  The total investment as unknown.

Construction Unit:*******
Post Code:*******
Contact Person:*******
Tel:*******

Featuring: First Institute of Oceanography, State Oceanic Administration -EIA agencies
Postal Address:*******
Contact:*******
Tel:*******

Progress stage: the record

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities -for reference

Project:
  Project is located on both sides of green and red road Shudoutaidao range, starting at the east bridge,
overpass beyond the Third Ring Road Chengdu, Shudoutaidao eastern -east Bridge - Third Ring Road
Road Rehabilitation Project, the total road reconstruction length of 5175 meters, the road red line width of
50-55 meters. The main construction contents include road reconstruction, interchange reconstruction


                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Shuangqiao son, SG Road viaduct reconstruction, River Bridge bridge construction projects and municipal
facilities

  The total investment 283,587,700 yuan.

Construction units:*******
Contact:*******
Tel:*******
Fax :*******



Project Name: G314 lines Wulabo to Xiaocaohu highway reconstruction project


Progress stage: the record

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, Police Equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, security facilities, drilling rigs, cranes, tower cranes, bridge machines, hammers,
generators, excavators, road rollers, dump truck, motor graders, pull up equipment, template, pipe fittings,
fasteners -for reference

Project:
   Wulabo project management station is located in Urumqi, G314 line Wulabo to Xiaocaohu highway
reconstruction project, the project G312, G314 lines overlap segment, length of 112km, the proposed
technical standards for the secondary road highway, plain design speed : 80km / h. Baiyang mountainous
terrain design speed: 40km / h. A total of Bridge 1 across the board, the bridge 1, bridge 7, a total of nine
bridges. Separated Interchange are using the old bridge, along the set toll 2 -Xinhua plant new one, the old
Grass Lake left a toll station, a new maintenance management, traffic observation stations 1.

  The total investment is unknown.

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******



Project Name: Shijiazhuang City, South Ring Highway Project KS-4 section of the contract


Stages of progress: survey design

Construction period: December 2011 December -2014

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, Police Equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, security facilities. -Reference

Project:
   Project is located in Shijiazhuang City, the starting point for the Shi-Tai high-speed Jingxing exchange -
G5K307 west of the 1.6 km cable at Jingxing, after high-speed eastward across the stone is too well
balanced basic cable laid along the line position in the tomb of beans into the tunnel, in the Piedmont
Luquan Avenue west of the tunnel, Hospital Road and east across the South after the installation, and
Qingdao-Yinchuan Expressway intersection, continue east to use stone ring ring road south, then east until
the new Beijing-Hong Kong and Macao motorway project end. The main line for about 53.360 km, starting
from Green Bank High-speed two-way four-lane highway section of technical standards for construction,
Qingdao-Yinchuan to Beijing, Hong Kong and Macau high-speed high-speed two-way six-lane expressway
section of technical standards for construction, design speed with 80 km / hour, across the board New
Interchange 6, Interchange 4 reconstruction, building long tunnel 1, Bridge 2, Bridge 9, Separated
Interchange 10, a service area, a tunnel management, communication, monitoring and control center of a , a
conservation center, a management office. Cable construction length 10.15 km.

  KS-4 tenders: greening projects across the board.

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  The total investment is about 10.906 billion yuan, raised 25%, 75% of domestic bank loans.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Postal address:*******
Post Code:*******
Tel :*******
Fax :*******




Project Name: Shijiazhuang City, South Ring Highway project contract section of KS-1


Stages of progress: survey design

Construction period: December 2011 December -2014

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, Police Equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, security facilities. -Reference

Project:
  Project is located in Shijiazhuang City, the starting point for the Shi-Tai high-speed Jingxing exchange -
G5K307 west of the 1.6 km cable at Jingxing, after high-speed eastward across the stone is too well
balanced basic cable laid along the line position in the tomb of beans into the tunnel, in the Piedmont
Luquan Avenue west of the tunnel, Hospital Road and east across the South after the installation, and

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Qingdao-Yinchuan Expressway intersection, continue east to use stone ring ring road south, then east until
the new Beijing-Hong Kong and Macao motorway project end. The main line for about 53.360 km, starting
from Green Bank High-speed two-way four-lane highway section of technical standards for construction,
Qingdao-Yinchuan to Beijing, Hong Kong and Macau high-speed high-speed two-way six-lane expressway
section of technical standards for construction, design speed with 80 km / hour, across the board New
Interchange 6, Interchange 4 reconstruction, building long tunnel 1, Bridge 2, Bridge 9, Separated
Interchange 10, a service area, a tunnel management, communication, monitoring and control center of a , a
conservation center, a management office. Cable construction length 10.15 km.

   KS-1 tenders: main K0 +000- K20 +000 and Jingxing cable -including housing construction, road works
-including road, roadbed, road, bridge, tunnel, cross and other projects, etc..

  The total investment is about 10.906 billion yuan, raised 25%, 75% of domestic bank loans.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Design by: Smile in cross traffic Technology Group Limited
Postal Address:*******
Contact:*******
Tel :*******



Project Name: Outlets Boulevard Construction -updated


Stages of progress: preliminary design

Construction period: 2011 2012



                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities. -Reference

Project:
  Cape Town, Longhai City project is located in the United States, major road construction projects for the
Outlet.

  The total investment is not detailed.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel 0596 -6776174, 6796003

Designer:*******
Post Code:*******
Project Leader: Shen Jian-Gang
Tel :*******
Fax :*******



Project Name: Petrochemical seven middle of the road municipal road projects


Progress stage: preparation of project proposals

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:


                                                 Chinabidding
           11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
           China 100044
           Phone :        +86-10-82744588
           Fax :          +86-10-82743720
           E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




  Project Gaolan Port in Zhuhai Economic Zone, formerly the North seven Road, -Flat Bay Road - Flat
Bay Rd L × W: 1987.0m × 18m -2m cars were +14 m +2 m people.

  The total investment is about 30 million.

Construction units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******

Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: Liuzhou Road, Jiaozhou City West -Lanzhou West Road - South Outer Ring Road, Wuzhou
Road -Lanzhou West Road - Hong Kong Road, Simenshou Road -Hangzhou Road - Liuzhou Road, Luzhou
Road -Hangzhou Road - Liuzhou road construction


Stages of progress: environmental impact assessment

Construction period: 2011 - 2013

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank and so on. -Reference

Project:
  Project is located in Jiaozhou city west, respectively: from Lanzhou Liuzhou North Road, south to South
Outer Ring Road; Wuzhou Road from Lanzhou West Road, south to Hong Kong Road; Simenshou Road

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




east Hangzhou Road, west of Liuzhou Road; Luzhou Road, east of Hangzhou Road, Liuzhou Road west.
Building content for the roads, bridges and culverts, drainage, landscaping, lighting and other projects. A
total of four total road length of 16846m, surface area 567344m2; green area 277856m2; bridge 3; install
LED lights 1120. Laying of water pipes -DN400 about 16846m, rainwater pipes -DN600 ~ DN1000 of
about 33292m, sewers -DN1000 about 16846m, laying power lines 16846m. Construction period of two
years.

  The total investment is unknown.

Construction Unit:*******
Post Code:*******
Contact Person:*******
Tel:*******

Featuring: First Institute of Oceanography, State Oceanic Administration -EIA agencies
Postal Address:*******
Contact:*******
Tel:*******

Progress stage: construction design

Construction period: 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
  Project is located in Wuwei Minqin, starting in the red sand Gang, Highway 212 and the connecting line,
means the South Ida, red fruit well, well north of pomegranate, red wells, wells Qiu, West nitrate pool, the
town of White Lake at the base end Lake, a total length of 176.8 km. Technical standards across the board
by four highway design, the design speed of 20km / h, roadbed width 6.5m, road surface width of 6.0m.
Desert road pavement structure to be adopted 20cm cement stabilized gravel base +4 cm asphalt surfacing;

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




fixed, semi-fixed sand dunes, saline soil sections of pavement to be used natural gravel cushion 16cm,
18cm cement stabilized gravel base +4 cm asphalt surfacing. Bridge and roadbed width, design load for the
car - Ⅱ level, the design flood frequency of 1 / 25, the county set the perfect anti-drainage facilities and the
necessary safety equipment.

  The total investment is not detailed.

Construction units:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******

Designer:*******
Tel :*******



Project Name: Shijiazhuang City, South Ring Highway Project KS-3 Contract Section


Stages of progress: survey design

Construction period: December 2011 December -2014

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, Police Equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, security facilities. -Reference

Project:
  Project is located in Shijiazhuang City, the starting point for the Shi-Tai high-speed Jingxing exchange -
G5K307 west of the 1.6 km cable at Jingxing, after high-speed eastward across the stone is too well
balanced basic cable laid along the line position in the tomb of beans into the tunnel, in the Piedmont
Luquan Avenue west of the tunnel, Hospital Road and east across the South after the installation, and

                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Qingdao-Yinchuan Expressway intersection, continue east to use stone ring ring road south, then east until
the new Beijing-Hong Kong and Macao motorway project end. The main line for about 53.360 km, starting
from Green Bank High-speed two-way four-lane highway section of technical standards for construction,
Qingdao-Yinchuan to Beijing, Hong Kong and Macau high-speed high-speed two-way six-lane expressway
section of technical standards for construction, design speed with 80 km / hour, across the board New
Interchange 6, Interchange 4 reconstruction, building long tunnel 1, Bridge 2, Bridge 9, Separated
Interchange 10, a service area, a tunnel management, communication, monitoring and control center of a , a
conservation center, a management office. Cable construction length 10.15 km.

  KS-3 tenders: full range of housing construction.

  The total investment is about 10.906 billion yuan, raised 25%, 75% of domestic bank loans.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******



Project Name: Shijiazhuang City, South Ring Highway project contract section of KS-2


Stages of progress: survey design

Construction period: December 2011 December -2014



                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
explosion-proof blankets, non-magnetic probes, inspection wells, EOD tools vest, Police Equipment,
bayonet, intelligent transportation, electronic police, capture systems, radar, green facilities, fire facilities,
lighting, drainage facilities, security facilities. -Reference

Project:
   Project is located in Shijiazhuang City, the starting point for the Shi-Tai high-speed Jingxing exchange -
G5K307 west of the 1.6 km cable at Jingxing, after high-speed eastward across the stone is too well
balanced basic cable laid along the line position in the tomb of beans into the tunnel, in the Piedmont
Luquan Avenue west of the tunnel, Hospital Road and east across the South after the installation, and
Qingdao-Yinchuan Expressway intersection, continue east to use stone ring ring road south, then east until
the new Beijing-Hong Kong and Macao motorway project end. The main line for about 53.360 km, starting
from Green Bank High-speed two-way four-lane highway section of technical standards for construction,
Qingdao-Yinchuan to Beijing, Hong Kong and Macau high-speed high-speed two-way six-lane expressway
section of technical standards for construction, design speed with 80 km / hour, across the board New
Interchange 6, Interchange 4 reconstruction, building long tunnel 1, Bridge 2, Bridge 9, Separated
Interchange 10, a service area, a tunnel management, communication, monitoring and control center of a , a
conservation center, a management office. Cable construction length 10.15 km.

   KS-2 tenders: main K20 +000- K53 +360 of the survey work -including housing construction, road
works -including road, roadbed, road, bridge, cross and other works; full range of traffic engineering -
safety, monitoring systems, communications systems, charging systems, power supply and distribution
systems, lighting systems, etc..

  The total investment is about 10.906 billion yuan, raised 25%, 75% of domestic bank loans.

Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******




                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :          +86-10-82743720
          E-Mail :       contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******




Project Name: Laibin South Avenue -Iron Road - Pangu Road Project


Progress stage: engineering design

Construction period: September 2011 2012

Main equipment: excavators, bulldozers, cranes, road rollers, compactors, stirring hug, paver, fenders,
green facilities, fire facilities, lighting, drainage facilities, security facilities, elevator, boring machine,
TBM , rig, mud circulation reserve tank, etc. -reference

Project:
  Project is located east of Laibin Seongbuk-gu, Iron Road intersection north of the road, finally Pangu
Road intersection along with Wei Shi Road, Wei 11 Road, Tsui Ping Road, Pan Gu Avenue intersection, at
1KM +522.66 m and to co-rail intersection, line for the north-south length of 1637.997 m, -including a
cross-Gui in the water, length <100 m landscape bridges, road red line width of 40 meters, the road grade to
grade Ⅰ urban sub-distributors, asphalt concrete pavement.

  The total investment 78,863,100 yuan, bank loans, the owners raised.

Construction units:*******
Contact:*******
Tel :*******




                                                Chinabidding
          11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
          China 100044
          Phone :        +86-10-82744588
          Fax :           +86-10-82743720
          E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                              http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Designer:*******
Post Code:*******
Project Manager: Li Zhong
Tel :*******
Fax :*******

Designer:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******

Designer:*******
Post Code:*******
Contact:*******

                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.




Tel :*******
Fax :*******




                                               Chinabidding
         11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
         China 100044
         Phone :        +86-10-82744588
         Fax :           +86-10-82743720
         E-Mail :        contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
                             http://www.chinabidding.com.cn www.chinabidding.org

				