									Arkansas State University
Project OneAstate
Project Definition




                      Prepared by: Brian Lewis
                                    Margaret Watson
                           Version: 0.15
                Last Revision Date: 2/14/2012
                       Create Date: 9/14/2004
                       Revised by:
                                                                                              Project Definition


                                            Table of Contents
EXECUTIVE SUMMARY ................................................................................................ 5

1        INTRODUCTION ................................................................................................. 6
         1.1       MISSION .................................................................................................... 6
                   1.1.1 ASU ........................................................................................................... 6
                   1.1.2 SunGard SCT............................................................................................. 6
         1.2       OBJECTIVES .............................................................................................. 7
                   1.2.1 ASU ........................................................................................................... 7
                   1.2.2 SunGard SCT............................................................................................. 7
         1.3       BENEFITS .................................................................................................. 7
         1.4       HISTORY AND/OR BACKGROUND ................................................................. 7
                   1.4.1 Feasibility Recommendations ................................................................... 8
                   1.4.2 Strategic Directions for Arkansas State University – Jonesboro Adopted
                         by the Strategic Planning Council. Board of Trustees Meeting Minutes-
                         Resolutions ................................................................................................ 8
         1.5       RELATED DOCUMENTS ............................................................................... 9
2        PROJECT SCOPE .............................................................................................. 9
                   2.1.1  Project and Engagement Management Services ....................................... 9
                   2.1.2  Business Process Analysis ....................................................................... 12
                   2.1.3  Data Migration Toolkit Services ............................................................. 13
                   2.1.4  Remote Database Administration Services ............................................. 14
                   2.1.5  SunGard SCT fsaATLAS Services ........................................................... 16
                   2.1.6  SunGard SCT Luminis ............................................................................. 17
                   2.1.7  SunGard SCT Luminis Ed Center Training and Materials and Portal
                          Certification ............................................................................................ 19
                   2.1.8 SCT Luminis Premier Discovery Services............................................... 21
                   2.1.9 SCT Luminis Foundation Implementation .............................................. 22
                   2.1.10 LUMINIS PLATFORM III IMPLEMENTATION .................................... 23
                   2.1.11 LUMINIS CONTENT MANAGEMENT SUITE (“Luminis CMS”)
                          STARTER EDITION IMPLEMENTATION ............................................. 31
                   2.1.12 LDI for e-Learning with Blackboard....................................................... 38
                   2.1.13 Reporting Strategies ................................................................................ 42
                   2.1.14 Workflow Services ................................................................................... 42
                   2.1.15 Finance .................................................................................................... 43
                   2.1.16 Student ..................................................................................................... 45
                   2.1.17 Financial Aid ........................................................................................... 47
                   2.1.18 Human Resources.................................................................................... 50
                   2.1.19 Advancement ........................................................................................... 53
         2.2       EXCLUSIONS............................................................................................ 56
         2.3       PLANNED PROCESS IMPROVEMENTS ......................................................... 56


                                                                                                                         v.0.13.1
OneAstate                              SCT- Confidential & Proprietary                                               Page 2 of 80
                                  ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                                      February 14, 2012
                                                                                       Project Definition

3      PROJECT MILESTONES.................................................................................. 56

4      PROJECT BUDGET.......................................................................................... 57

5      ASSUMPTIONS/DEPENDENCIES ................................................................... 57
       5.1       ASSUMPTIONS ......................................................................................... 57
       5.2       DEPENDENCIES ....................................................................................... 58
                 5.2.1 Dependent Projects ................................................................................. 58
                 5.2.2 Dependent Products ................................................................................ 58
                 5.2.3 Dependent Resources .............................................................................. 59
6      PROJECT CONSTRAINTS ............................................................................... 60
       6.1       PROJECT DIMENSION GRID....................................................................... 60
       6.2       CONSTRAINT DETAILS .............................................................................. 60
7      RISKS ............................................................................................................... 61

8      PROJECT ORGANIZATION ............................................................................. 65
       8.1       PROJECT TEAM ....................................................................................... 65
       8.2       ROLES AND RESPONSIBILITIES .................................................................. 66
       8.3       CHANGE CONTROL BOARD ....................................................................... 69
9      PROJECT APPROACH .................................................................................... 69
       9.1       DEFINE.................................................................................................... 69
       9.2       PLAN ....................................................................................................... 70
       9.3       IMPLEMENT.............................................................................................. 70
       9.4       CLOSE-OUT............................................................................................. 71
       9.5       CHANGE MANAGEMENT ............................................................................ 73
       9.6       COMMUNICATION ..................................................................................... 73
       9.7       MEASUREMENT ........................................................................................ 73
       9.8       ORGANIZATIONAL READINESS ................................................................... 73
       9.9       PROJECT ENVIRONMENT .......................................................................... 73
       9.10      QUALITY ASSURANCE............................................................................... 74
       9.11      TRACKING ............................................................................................... 74
       9.12      RISK MANAGEMENT ................................................................................. 75
10     SYSTEM REQUIREMENTS .............................................................................. 75
       10.1      DATABASE SERVER REQUIREMENTS ......................................................... 75
       10.2      PC CLIENT REQUIREMENTS ...................................................................... 75
       10.3      SUNGARD SCT AND 3RD PARTY, AND SHAREWARE/FREEWARE PRODUCT
                 REQUIREMENTS ....................................................................................... 75
       10.4      DEVELOPER REQUIREMENTS .................................................................... 75
       10.5      SOFTWARE COMPATIBILITY....................................................................... 75


                                                                                                                v.0.13.1
OneAstate                            SCT- Confidential & Proprietary                                        Page 3 of 80
                                ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                               February 14, 2012
                                                                                   Project Definition

11     PROJECT DELIVERABLES ............................................................................. 75

12     PROJECT SUCCESS CRITERIA ...................................................................... 76

13     APPROVAL TO PROCEED .............................................................................. 77

14     ACRONYMS...................................................................................................... 79

15     DEFINITIONS .................................................................................................... 79




                                                                                                            v.0.13.1
OneAstate                          SCT- Confidential & Proprietary                                      Page 4 of 80
                              ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                             February 14, 2012
                                                                    Project Definition

Executive Summary

Arkansas State University is committed to “preparing students in challenging and diverse ways to
become more productive global citizens.” To meet the needs and demands of 21st century
students, the University has undertaken an important and significant step to address these
challenges with the commencement of Project OneAstate.

Project OneAstate is the implementation of the SunGard SCT Banner® suite of enterprise
computing products replacing all modules of the current legacy system. This implementation will
enhance the services provided to all University constituents including student access and
recordkeeping, financial functions, human resource processes and institutional development
functions. While the project is massive in scope and complexity, the rewards realized should be
substantial as well. The thirty-six month project timeline was constructed to best synchronize the
implementation phases with the critical business processes of the institution. The planning,
management, implementation and oversight aspects of the project, including the human
components were designed to maximize efficiency and minimize risks to the project success. By
utilizing proven project management methodologies, involving stakeholders in thorough planning
and with consistent and on-going support from the University leadership, Project OneAstate will
result in a robust and responsive enterprise system supporting the mission and goals of Arkansas
State University

SunGard SCT is committed to working with Arkansas State University to realize the rewards
from Project OneAstate. The SunGard SCT Vision is to help Arkansas State University to
implement and meet institutional strategic objectives of a seamless integrated environment
between Banner and Plus Enterprise Resource Planning (ERP) Systems, SCT Luminis Premier,
the Blackboard Learning Management System (LMS), and other core enterprise applications in
order to create their Unified Digital Campus, an environment in which systems, individuals, and
communications interact seamlessly for learning, teaching, administration, and achievement.




                                                                                         v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 5 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                   Project Definition


1 Introduction

1.1   Mission

1.1.1 ASU
       Enterprise computing systems serve as an information backbone of the institution’s core
       business, teaching, and learning processes. In order to compete successfully, provide a
       student-centered environment, and grow and prosper in the new millennium, ASU must
       invest in the upgrade of our current administrative system. Concurrent with this technical
       upgrade, we must review our business practices and policies to insure responsiveness to
       the institutional mission, goals and objectives. Broadly speaking, Project OneAstate will
       result in:
             An environment that supports, encourages, and promotes “Education Anytime,
                Anywhere”.
             An environment that promotes a seamless academic experience for all ASU
                constituents.
             A University that provides increased and improved service and quality levels for
                all constituents.
             An environment that is scalable, in that it has the ability to add new/increased
                services at a minimal cost.
             An IT organization with increased reliability: technically and organizationally.
             An IT service that facilitates increases in recruitment and retention.
             Services that move existing paper processes to electronic services.
             An environment that extends educational and economic services to previously
                un-reached constituents.
             An IT environment that promotes the development of a network of internal and
                external personal relationships that increase the number and influence of
                stakeholders of the University, creating greater sense of ownership among all
                constituents.

1.1.2 SunGard SCT
       The mission of SunGard SCT is to provide Arkansas State University the education and
       consulting services to implement the Banner systems while assisting them with their
       business processes, and implement the SCT Luminis Premier product family including
       SCT Luminis Platform III, Luminis Enterprise Data Integration (LDI) Technology and
       Luminis Content Management System for both data and single sign-on integration with
       the Banner applications and Blackboard Learning Management System, and further
       integration with other applications as defined by the assessment process and the project
       team, including existing web-based applications.



                                                                                        v.0.13.1
OneAstate                     SCT- Confidential & Proprietary                       Page 6 of 80
                         ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                    Project Definition

1.2   Objectives

1.2.1 ASU
       The expectations and demands of the 21st century consumer far exceed the capabilities of
       the legacy ASU administrative computing system. To succeed in the increasingly
       competitive market, ASU must offer our constituents access and institutional processes
       that reflect the convenience and responsiveness of current technologies. Specifically, we
       must:

               Provide 24/7 access to student services such as admission, registration and
                financial aid processes, curriculum information, on-line transcript access, and
                account information.
               Provide reliable human resource and payroll functions with self-service
                availability of personnel functions for University employees.
               Provide a reliable financial system that promotes efficient, electronic methods for
                A/P, procurement, budgeting and general accounting functions.
               Provide advancement services with 24/7 self-service access to constituents and
                efficient, reliable real-time functionality to enhance University Alumni and
                Advancement processes.
               Complete the project with successful outcomes on the above objectives within
                the project timeline and within the project budget.

1.2.2 SunGard SCT
                o   Provide guidance and support to ASU as they implement the infrastructure of
                    their digital campus. We will exceed their expectations through our services
                    and methodologies to achieve total customer satisfaction.

1.3   Benefits
       By achieving the business objectives of this project the service levels of today will be
       surpassed by working smarter not harder.

1.4   History and/or Background
       Arkansas State University enrolls 16,000 students in credit and non-credit courses in 25
       locations across Arkansas, and numerous on-line courses offered by the internet. The
       university offers a wide range of services throughout the state and region, including
       educational programs ranging from technical certificates through doctoral degrees.
       Arkansas State University has pioneered distance learning delivery throughout the state,
       using compressed video and internet-based technologies. Bachelor’s and Master’s
       degrees are extended from Jonesboro to other system campuses using these capabilities,
       and are often awarded to students through participation in their home communities. The
       Jonesboro campus is a component of the Arkansas Biosciences Research Institute,
       created through funding of the Master Tobacco Settlement. Activity is focused on health-

                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                        Page 7 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                    Project Definition

       related benefits of agri-medical and bio-technology research. Arkansas State University
       has been recognized by the Kaplan Newsweek College Catalog as having nationally and
       regionally recognized programs in financial aid, career guidance and placement,
       individualized faculty attention, and was rated as having extraordinary value for cost. The
       national Kaplan survey of high school guidance counselors identified Arkansas State
       University as academically competitive, and one of the 34 national “hidden treasure”
       universities. The university was recently recognized by Yahoo magazine as one of the top
       50 technology-focused campuses in America.

       In January of 2004, Dr. Wyatt commissioned a team of 40 individuals from across the
       institution to investigate what options were available to the University to not only address
       the critical need before us in terms of supporting our business processes, but to identify a
       solution which would best position the University for growth and excellence for the long-
       term. This team evolved to include over 80 individuals from across the institution and
       from system campuses, and performed a thorough investigation of all available options
       before arriving at the recommendation of the SunGard SCT Banner solution.

       Contract negotiations were completed in late August, 2004 and Project OneAstate began
       formally with preplanning sessions in mid September. The full implementation process
       to leap from Plus to Banner is expected to span 36 months and will result in the
       replacement of all components of the current administrative system and the addition of a
       single sign on portal environment for web access.


1.4.1 Feasibility Recommendations
       Based on the planning activities and information available at this time, Arkansas State
       University and SunGard SCT believe the scope and approach of Project OneAstate is
       feasible provided that the necessary resources and facilities are made available as needed.
       Where appropriate, factors have been further documented in the Risk Management
       Section of this Document.


1.4.2 Strategic Directions for Arkansas State University – Jonesboro Adopted by
      the Strategic Planning Council. Board of Trustees Meeting Minutes-
      Resolutions

       1. Enhance the university’s reputation, visibility, and influence.
       2. Enhance learning by focusing on the institution’s priorities – teaching, research, and
          service.
       3. Develop a cohesive campus community based on strong shared governance, excellent
          communication, and mutual respect.
       4. Develop a culture of assessment to continually and systematically examine and
          enhance educational and institutional outcomes.


                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                        Page 8 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                      Project Definition

         5. Increase enrollment, retention rate, and graduation rate of both undergraduate and
            graduate students.
         6. Enhance the diversity and inclusiveness of students, faculty, staff, and curriculum.
         7. Increase resources to the university.
         8. Strategically allocate/reallocate resources among divisions and colleges based on
            institutional priorities.
         9. Develop an environment that fosters social and economic development.


1.5     Related Documents
         The project definition may refer to the following documents.
                     Document Name                           Description/Location
           CM Plan                              Configuration Manangement Plan/Project
                                                Website
           OR Plan                              Organizational Readiness Plan/ Project Website
           QA Plan                              Quality Analysis Plan/ Project Website
           Risk Report                          Risk Report Details/ Project Website
           Testing Plan                         Module specific test plans/ Project Website
           Training Plan                        End User training plan/ Project Website
           Luminis Requirements Definition      Luminis Reruirements/ Project Website
           Document
           Prioritized Service Requirements     Project Service Requirements/ Project Website




         “Location” identifies the physical location of the Approved documents (e.g., filename
         within a directory structure on a LAN server, database, or a binder on a bookshelf in an
         office).

2 Project Scope

2.1.1 Project and Engagement Management Services

      SunGard SCT’s Project Management services will be provided over the course of a thirty-six
      (36) month period that commences with project initiation. The project is expected to be
      initiated within a short time following the Effective Date. During this period, a single
      SunGard SCT Engagement Manager, Project Manager and Quality Assurance Analyst will
      provide services to the University in connection with the project.

      The SunGard SCT Engagement Manager will be responsible for the overall administration of
      the project. The SunGard SCT Engagement Manager will support the project at the executive



                                                                                            v.0.13.1
OneAstate                         SCT- Confidential & Proprietary                       Page 9 of 80
                             ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                  Project Definition

   level, and provide the parties’ Project Managers with administrative support designed to help
   them meet their project responsibilities.

   The SunGard SCT Engagement Manager will:

    Facilitate the relationship between SunGard SCT and the University.
    Provide general management and serve as primary liaison with University executives,
     including dispute resolution of contract-related issues.
    Communicate regularly with University executives regarding the project.
    Oversee delivery of SunGard SCT contractual deliverables.
    Elevate production-critical software issues to the appropriate levels within SunGard SCT
     organization.
    Elevate management issues to the appropriate SunGard SCT senior executives.
    Recommend resolutions for issues escalated by the project Steering Committee to the
     executive level.
    Reports to University and SunGard SCT executive management regarding project status.

   SunGard SCT will provide support to Arkansas State University as described below:

    SunGard SCT and Arkansas State University will co-develop project-related documents
     describing Project Definition, Configuration Management, Communication Plan,
     Training Plan, and the Quality Assurance Plan using SunGard SCT-supplied templates
     for these named documents.

    SunGard SCT and designated Licensee representatives will co-develop documents
     referred to as the “Services Requirements” and the “Prioritized Services Requirements”
     which will describe a targeted schedule of tasks to be performed by SunGard SCT and
     the order in which SunGard SCT intends to perform such tasks, as well as the technical
     requirements and the facilities and equipment which are necessary for the project. Once
     the parties are in agreement, each shall mutually approve the documents in writing prior
     to commencing implementation activities. Once established and agreed to, any changes to
     these documents will require written approval of both parties. Neither party shall
     unreasonably withhold or delay any approval required under this provision and each shall
     work together in good faith to attempt to resolve any disagreements in this regard.

    SunGard SCT and Arkansas State University will jointly maintain and update, as
     reasonably necessary, the Project Definition, Project Schedule, Configuration
     Management, Communication Plan, Training Plan, Testing Plan and other relevant
     project-related documents.

    SunGard SCT will develop the Project Schedule and Education Plan using SunGard SCT-
     supplied templates.




                                                                                        v.0.13.1
OneAstate                     SCT- Confidential & Proprietary                      Page 10 of 80
                         ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                   Project Definition

    To the extent each party is in agreement, the parties will mutually accept in writing the
     Project Definition, Organizational Readiness, Configuration Management,
     Communication Plan, Training Plan, Testing Plan, and the Quality Assurance Plan
     documents prior to the implementation of the SunGard SCT Component system(s).
     Neither party shall unreasonably withhold or delay their approval of any document and
     must work together in good faith to attempt to resolve any disagreements in this regard.

    The SunGard SCT Project Manager will perform up to an aggregate of eight on-site visits
     per Project Year (each “Project Year” commencing upon project initiation or the
     anniversary thereof over three Project Years). In connection with such visits, SunGard
     SCT will:

           Participate in the co development of project related documents
           Assess the status of the project and assess and identify significant risks to its
            completion;
           Identify and report issues which may potentially impact the project;
           Review all planning documents which are SunGard SCT’s responsibilities as outlined
            above
           Write a project status report after each visit.

    The SunGard SCT Project Manager will be available to work remotely with Arkansas
     State University’s Project Manager in the tracking, management and control of project
     activities for up to 18 hours per month during each Project Year.

    As part of SunGard SCT Project Management Services, the assigned SunGard SCT
     Quality Assurance Analyst will conduct up to an aggregate of two (2) remote Quality
     Assurance Assessment sessions per year, to be conducted at approximately six (6)
     months and eleven (11) months after the initiation of the project, and at the 6 and 11
     month marks of the second and third Project Years, to assess compliance to the project
     processes defined and agreed as part of the Project Definition. With these sessions,
     SunGard SCT will:

           Assist in the development of the Quality Assurance Plan.
           Provide a written Quality Assurance Status report.

    At or near the end of the third Project Year, SunGard SCT will conduct a Project
     Certification Process to determine and document the extent to which (a) the project’s
     agreed-upon objectives have been met; (b) material issues (i.e., issues which result in a
     significant delay in the project or a significant impact on Licensee’s operations) identified
     during the course of the project have been satisfactorily addressed and closed out in a
     reasonable manner by the party responsible for the issue; and (c) Licensee accepts the
     project as complete, which Licensee shall be obligated to do to the extent that SunGard
     SCT has performed its obligations as identified in the above-referenced project
     documents.

                                                                                         v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                      Page 11 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                    Project Definition

2.1.2 Business Process Analysis
   SunGard SCT will provide the following Business Process Analysis services to Arkansas
   State University to document, define, and evaluate Arkansas State University’s current
   procedures and use of certain SunGard SCT Component Systems.

    SunGard SCT will conduct a Business Process Analysis Workshop.

    SunGard SCT will assign a Business Process Analyst and a functional Consultant to
     conduct information-gathering sessions for twelve (12) functional processes to be
     assessed and modeled for the Student functional area and for six (6) functional processes
     to be assessed and modeled for each of the Financial Aid, Finance, and Human Resources
     functional areas, as agreed upon by SunGard SCT and Arkansas State University.

    The assigned SunGard SCT staff will conduct information-gathering sessions with
     representatives of the Student, Financial Aid, Finance, Human Resources, and
     Advancement functional areas as well as other appropriate Arkansas State University
     staff, to gain an understanding of the Arkansas State University’s operational use of the
     SunGard SCT Banner Student, Financial Aid, Finance, and Human Resources
     Component Systems related to the identified processes.

    SunGard SCT will review the identified processes used within the functional areas of the
     above-described Component Systems to:

           Assess procedural documentation

           Assess each activity owner’s process knowledge to recommend appropriate
            additional training needs, if any

           SunGard SCT will develop and provide a Current State Document and an SunGard
            SCT Recommended Practices Document that:

               Describes the results of the interviews and information-gathering activities

               Documents Arkansas State University’s internal business processes to provide an
                analysis of the alignment between the current business processes and the
                SunGard SCT Component System(s).

               Provides representation (graphical or textual) of the agreed-upon current
                processes

               Provides general recommendations for process improvements, which may
                include recommended documentation needs and additional training requirements,
                as appropriate


                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 12 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                   Project Definition



2.1.3 Data Migration Toolkit Services
   SunGard SCT will provide the SunGard SCT Banner Data Migration Toolkit and associated
   services to Licensee in accordance with the following description of services. These services
   include on-site training in the use of the SunGard SCT Converter Tool, documentation/user
   manual for the Converter Tool, and remote support. A SunGard SCT manager will be
   responsible for coordinating the resources and schedules for the services.

    Migration Organization and Planning - SunGard SCT will present a sample overall
     migration plan which overviews of each of the migration steps, anticipated timelines, and
     the roles and responsibilities of all individuals, such as the project management
     responsibilities, decision-making roles, roles in cleansing the legacy system before data
     extraction, and creation of necessary crosswalk files. SunGard SCT, in conjunction with
     Licensee’s Project Manager, will develop a Migration Plan with project requirements,
     resources and anticipated timeframes identified and documented. Specifically, SunGard
     SCT will interview key Licensee personnel to develop timelines for each component of
     the relevant Banner applications, detailing each phase of the migration effort (initial load,
     pre-production load, production load) for all applicable Banner modules. The resultant
     conversion plan identifies each key milestone, documents resource responsibilities and
     outlines completion dates and milestone duration. At the conclusion of this session, the
     institution will have a working plan for migration of legacy data into the SunGard SCT
     Banner application.

    Migration Toolkit Installation and Toolkit Training – After delivery and installation of
     Oracle, PL/SQL and Banner General Technical Training as part of the SunGard SCT
     Banner Component system implementation, SunGard SCT will install the SunGard SCT
     Banner Data Migration Toolkit software and prepare the data conversion schema.
     SunGard SCT will provide training in the functional and technical use of the SunGard
     SCT Banner Data Migration Toolkit software.

    SunGard SCT Banner Application Data Migration Training - SunGard SCT will provide
     SunGard SCT Banner Component system-specific Application Data Migration training
     after the specific SunGard SCT Banner application system Technical Training has been
     conducted, providing training in the specific sequences, data interdependencies, sizing
     strategies and technological approaches necessary to migrate appropriate legacy
     information to the SunGard SCT Banner Component system. In addition, SunGard SCT
     will provide recommendations on the departmental user involvement and appropriate
     validation and testing procedures. For each application module being converted to a
     licensed SunGard SCT Banner Component system, SunGard SCT will provide table- and
     column-level training pertaining to format, content and data validation.




                                                                                         v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                      Page 13 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                   Project Definition

    Migration Toolkit Currency and Phone Support - SUNGARD SCT will provide twenty-
     four (24) months of remote telephone / Web support for the SunGard SCT Data
     Migration Toolkit.

    The Data Migration Toolkit, including:

            o  SunGard SCT Banner Baseline Data Mapping Definitions, providing the baseline
               descriptions of the SunGard SCT Banner column values.
           o COBOL Data Extraction Tools - These tools, tailored to the data mapping
               definitions, extract SunGard SCT Plus data into flat files that structurally mirror
               the SunGard SCT Banner table structures.
           o Customized SQL Scripts, used to create Oracle-based conversion tables.
           o Customized SQL*Loader Control File, to be used for the loading of data into
               conversion tables in the Licensee Oracle environment.
           o Data Translation Tools (Crosswalk Structures), providing the capability to equate
               legacy code values to new SunGard SCT Banner values that may be needed.
           o PL/SQL Conversion Scripts
Training and Documentation – SunGard SCT provides one (1) on-site training visit in the use of
the SunGard SCT Converter Tools, documentation/user manual for the Converter Tool, one (1)
week of remote toolkit support for the SunGard SCT Converter Tools, and two (2) weeks of
phone support. Additional support from SunGard SCT’s migration specialists is additional.

2.1.4 Remote Database Administration Services
   SCT will provide the following services to Arkansas State University during the initial
   Project Year.

    During the initial Project Year, SunGard SCT will provide an aggregate of 660 service
     hours of Remote Database Administration Services and on-going support for the
     SunGard SCT Banner Baseline Component System(s).

       During the initial Project Year, SunGard SCT will provide the following services to
       Arkansas State University until the service hours specified above have been exhausted:

    SunGard SCT will speak with, via telephone, representatives of the Arkansas State
     University to review and document the existing computing environment and discuss the
     goals and direction of the institution. SunGard SCT will periodically connect into the
     Arkansas State University computer system to review and monitor the Oracle
     environment and operating characteristics of the SunGard SCT Banner Baseline
     Component Systems, and propose needed changes, upgrades, and tuning adjustments as
     necessary.

    SunGard SCT staff will coordinate with data processing and administrative staff to assist
     in or implement the needed changes.


                                                                                         v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                      Page 14 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                    Project Definition

    SunGard SCT will conduct an initial on-site visit, if necessary, to review and document
     the existing environment and meet with the Computer Services administration to discuss
     the goals and direction of the institution. During the initial visit, SunGard SCT will assist
     in developing the policies and procedures regarding the administration of the SunGard
     SCT Banner Baseline Component System(s) and work towards devising a mutually
     agreeable plan for performing database maintenance that is designed to minimize impact
     to production systems such as payroll processing, system(s) backups, etc. to the extent
     reasonably practicable.

    To the extent that Baseline upgrades to SunGard SCT Banner Baseline Component
     System are delivered by SunGard SCT during the initial Project Year, SunGard SCT will
     upgrade the SunGard SCT Banner Baseline Component System(s) by installing such
     SunGard SCT Banner Baseline upgrades. Upgrades are typically performed in a test
     environment, and then placed into the production environment after end users approve
     changes. Upgrades are scheduled in coordination with data center staff. For the avoidance
     of doubt, the development by SunGard SCT of modifications to the SunGard SCT Banner
     Baseline Systems is outside the scope of SunGard SCT’s responsibilities under this
     Agreement. To the extent Arkansas State University requests that SunGard SCT develop
     any such modifications, Arkansas State University must notify SunGard SCT of this
     request in writing and SunGard SCT will provide a quote for the additional fees to be
     charged for rendering such services and the estimated effect of such services on the then-
     current project timeline. If the parties agree on such fees and related terms, the parties
     will execute a separate addendum to this Agreement (a “Work Order”) that specifies the
     fees and the services to be provided in this regard. In no event will SunGard SCT be
     responsible for integrating or retrofitting any modifications into a Baseline upgrade of an
     SunGard SCT Banner Component System. To the extent any modifications have been
     made to the SunGard SCT Banner Component System (by SunGard SCT or Arkansas
     State University), and Arkansas State University desires to have such modifications be
     integrated into, or retrofitted to work with, an upgrade to the Baseline Component System
     at issue, Arkansas State University shall notify SunGard SCT of this request in writing
     and SunGard SCT will provide a quote for the additional fees to be charged for rendering
     such services. If the parties agree on such fees and scope, the parties will execute a
     separate Work Order, which specifies the fees and the services to be provided in this
     regard.

       Additionally, during the initial Project Year, and in any event, subject to the aggregate
       660 person-hours limitation specified above, SunGard SCT will:

    Periodically dial-in to monitor database activities, tune the database and work with the
     system and network manager(s) in an effort to identify actions which could improve
     overall performance.
    Develop and implement security plans and backup/recovery plans.
    Create new accounts and grant and revoke database privileges as directed by Arkansas
     State University.

                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 15 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                   Project Definition

    Identify and seek to resolve data and application-oriented problems. Help system and
     network managers identify problems in their areas.
    Support application implementation, including assisting Arkansas State University with
     data conversion.
     Propose changes, upgrades, or tuning adjustments as necessary. Coordinate with the
     computer services staff to assist in implementing recommended changes, including on-
     site visits as necessary.


2.1.5 SunGard SCT fsaATLAS Services
   SunGard SCT will provide baseline SCT fsaATLAS Component system implementation
   services to Arkansas State University (Arkansas State University) in accordance with the
   following scope of services. These services shall include hardware configuration, installation
   of the SCT fsaATLAS software, and training in the use of the SCT fsaATLAS system. An
   SCT manager will be responsible for coordinating the resources and schedules for the
   services.

   SCT will provide:

    Installation of the SCT fsaATLAS software in SCT facilities onto the server machine
   provided by the Arkansas State University, testing, and operational validation (a
   “Deliverable”) of the SCT fsaATLAS software.
              Installation of necessary operating environment components, including SQL
       Server and IIS Configuration
              Installation and configuration of required third-party component applications
              Installation of the SCT fsaATLAS component system
              Initial configuration of the SCT fsaATLAS component system with the Server
       Configuration Utility
              Configuration of background functions on the server (such as SEVIS Transfer
       Service, Event Viewer, etc.)

    Return Shipment of the server machine to Arkansas State University.

    On-site technical and functional SCT fsaATLAS operational training.
            Enterprise Manager
            Record Navigator
            Task and Appointment Manager
            Report Writer
            SEVIS Management
            eScholar
            Campus DataLink

   Arkansas State University obligations regarding fsaAtlas:

                                                                                         v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                      Page 16 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                  Project Definition


 Arkansas State University will provide accessibility to all necessary hardware and software
  per noted requirements indicated in the scope of services above. Primary contact will work
  directly with the SCT personnel to assist and coordinate the access to the Arkansas State
  University’s system for installation, configuration and any necessary support.

 Arkansas State University will acquire and provide to SCT an Intel™-based server that meets
  or exceeds the following standards, and the as-specified software, Certificates, School
  Code(s), and IDs/passwords required in relation to the performance of SCT’s services, as
  follows:

      Verisign Class 1 Digital ID (Certificate)
      SEVIS School Code(s) and/or School Program Number(s)
      PDSO/DSO & RO/ARO Test and Production SEVIS IDs and Passwords
      Server Hardware Requirements
      Pentium III CPU, running at 1GHz or higher
      At least 512 MB of RAM
      A 30 GB or larger hard drive, preferably with a SCSI interface
      10/100 Ethernet card


2.1.6 SunGard SCT Luminis
       The following are the major implementation objectives that will serve as a guideline for
       the deployment of the Luminis Foundation Product Family at Arkansas State University:

       Portal and Infrastructure Objectives:
        Transform OneAstate services to all constituents
               o Provide a desktop portal, a centralized customizable self-service
                   environment.
               o Support the portal’s deployment with 24 x 7 accesses to integrated OneAstate
                   applications.
               o Enhanced communication through the use of unified email, calendar, and
                   targeted messaging.
        Improve student and faculty attraction and retention
               o Arkansas State University current students and faculty members.
               o Increase enrollment.
               o Support the extended site student learning experience.
        Provide for a single point of access for students, faculty, and staff for commonly used
          web based services, with one password to gain secure access to disparate web
          applications.
               o Authentication to the portal via the desktop
               o Provide a common identity management system
                        standardize faculty, staff, and student identifiers


                                                                                       v.0.13.1
OneAstate                     SCT- Confidential & Proprietary                     Page 17 of 80
                         ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc             February 14, 2012
                                                                    Project Definition

                          unified credential management
                o Access to Blackboard, calendar, email, and targeted messaging
                o Leverage and provide authentication with existing Active Directory.
           Foster the adoption and acceptance of OneAstate project.
                o By offering key features as identified by the assessment process.
                o Provide unique Portal user interface look and feel in accordance with
                    OneAstate design standards and brand
                o Document the value of the portal through identification of efficiency,
                    productivity, and responsiveness benefits. Examples may include:
                    leveraging and providing a transition from existing email servers and clients
                    where appropriate
           Train the Luminis team.
                o Train web developer team in uPortal development
                o Train campus-wide portal Content Administrators in customizations and
                    preferences
                o Train technical staff in Luminis Systems administration
                o Train technical staff in Campus Pipeline Integration Protocol (CPIP)
                    integration for single sign-on candidate systems
                o Train Designated staff in Content Administration
                o Deliver Content Planning Workshop for content to be submitted via the
                    uPortal framework and Luminis portal content tools
                o Train assigned staff in Luminis CMS Starter Edition System Edition
                    Administration and Template Developer training
                o Deliver Luminis CMS Content Provider training for content to be submitted
                    via the Luminis Content Management Suite.
                o Deliver Luminis CMS Web Developer training for web developers who will
                    be developing templates and workflows via the Luminis Content
                    Management Suite
                o Deliver Content Administrator training for content to be submitted via the
                    uPortal framework and Luminis portal content tools
           Maintain a reliable and up to date portal.
                o Manage the various environments including the migration of critical data
                    between Test, Quality Assurance, and Production
                o Upgrade, testing, application lifecycle procedures
           Form an enterprise-wide development methodology that includes the SCT Luminis
            Software Development Kit (SDK) as a core development tool.

       Integration Objectives:
           Adopt and adhere to the emerging Open Enterprise Application Integration (EAI)
                   standard for data exchange between enterprise applications.
           Provide seamless integration between Banner ERP System, the SCT Luminis portal
                   and Blackboard Enterprise LMS.



                                                                                         v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                      Page 18 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                     Project Definition

            Integrate student, faculty, course, and enrollment data from Banner SIS to
                    Blackboard LMS, and subsequent data synchronization of student mid-term
                    and final grades from Blackboard LMS to Banner SIS.
            Provide for knowledge transfer and training for Luminis Message Broker (LMB)
                    and data integration capabilities where appropriate.
            Provide knowledge transfer to development staff for LDI data integration leveraging
                    the technology standards established by way of implementing the LDI for e-
                    Learning solution.

       Web Content Management Objectives:
        Ease of access/delivery for all constituents
        Consistent look and feel of content provided at both the public ASU websites and the
           new portal intranet for OneAstate
        Maintain astate.edu branding
        Reusable content shared between both the public ASU websites and the new portal
           intranet for OneAstate, including single point of content entry from the portal
        Provide for distributed content authors across the stakeholder groups
        Delivery of targeted content including attribute based messaging and role-based
           content
        Provide content from astate.edu public website for public entities
        Provide content from astate.edu public website for internal audiences
                o Repurpose and create an inventory of critical services and information from
                    new astate.edu site based on role
       Establish processes and participant teams for content workflows

2.1.7 SunGard SCT Luminis Ed Center Training and Materials and Portal
      Certification

       SCT will provide training to the Arkansas State University-assigned staff at SCT’s Salt
       Lake City, Utah, training facility for up to two (2) Arkansas State University staff in the
       following courses:

           Luminis System Administration – Provides training in the basic architecture and
            information flow among the SCT Luminis system components, and an overview of the SCT
            Luminis integration options. Training will include instruction in managing the SCT
            Luminis system and components, including users and groups, e-mail, calendar, group
            portal, course portal, site customization and content administration.

           Content Management Suite System Administration – Prepares system administrators
            to manage Luminis™ Content Management Suite Starter Edition components.
            (Content Management is included only with SCT Luminis Foundation or Premier,
            not with SCT Luminis Basic.)



                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 19 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                     Project Definition

           Introduction to Luminis Software Development Kits SDK - Provides detailed
            understanding of the value that CPIP provides to end users; apply the steps that CPIP
            follows to communicate between Luminis Platform III.x and external Web
            applications; learn the basics of how to design and begin writing a CPIP Connector;
            learn the value of using the Security SDK; evaluate the types of systems that can be
            integrated with Luminis Platform III.x; identify the multiple channel types available
            within Luminis Platform III.x; understand how to develop and publish existing
            Luminis channels; obtain the fundamentals for developing custom channels, and how
            to package/deploy custom channels within Luminis Platform III.x; understand how
            the Communication (Targeted Announcements) SDK can empower other enterprise
            applications in realizing the Unified Digital Campus; understand the basics of
            designing applications using Communications (TA) SDK to target announcements to
            constituents; understand the basics of installation components, programming aspects
            and deployment of the programming modules to publish targeted announcements.

           Luminis CMS Starter Edition Template Developer Training – Provides understanding
            on how Luminis CMS Starter Edition uses templates for the creation of Web pages;
            create sites, templates, layouts, components and Web pages; convert html pages into
            jsp templates; work with the built-in navigation and in-context editing capabilities of
            the Luminis CMS Starter Edition; work with configuration files to customize default
            parameters used in templates to manage controls in the GUI editor.

           Luminis CMS Starter Edition System Administration Training – Prepares attendees
            to manage their Luminis CMS Starter Edition servers and system components,
            including setup, configuration, routine maintenance, and user management tasks;
            troubleshoot system problems; know when and how to report issues to the SunGard
            SCT’s ActionLine.

           Luminis CMS Starter Edition Product Certification - Provide institutional trainers
            with the knowledge needed to develop and deliver training to all site managers,
            content managers, and content contributors on campus. It also provides schools
            access to SunGard SCT’s training materials and protocols that will quickly and
            effectively prepare attendees to deliver training to the appropriate constituent groups:
            know how the Site Studio application is used to create and manage content for sites
            Understand the types of users who will interact with Site Studio and the
            responsibilities they will have within the system for generating and maintaining
            content; know how to create sites and sub-sites and define the elements that can be
            used within them, such as templates and shared components; know how to manage
            users associated with sites; know how to generate and manage workflows that
            automate the process of creating, approving, and posting content; know how to use
            workflows to create or update content; create a training plan that meets the needs of
            all focus area Luminis CMS Starter Edition users and may be adapted for or extended
            to other Luminis CMS Starter Edition users in later phases; define the Luminis CMS
            Starter Edition training classes to be delivered to users and create a detailed plan that

                                                                                           v.0.13.1
OneAstate                       SCT- Confidential & Proprietary                       Page 20 of 80
                           ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                       Project Definition

               includes learning objectives, a course outline, training methods, and outcomes for
               each class.

              SCT will provide each participant in the SCT training sessions with reference copies
               of the SCT-provided training course workbooks and training materials.

2.1.8     SCT Luminis Premier Discovery Services

          SCT will conduct a Discovery Visit to assess and plan for the eventual implementation of
          the Luminis Premier Enterprise Solution. The objectives of this service are to:

           Provide education and awareness of products and services that are necessary for
            implementation.
           Gather data necessary to more accurately recommend a solution using the SCT
            Luminis Platform and SCT Luminis Content Management Suite Enterprise Edition
            configured for client’s processes.
           Identify and prioritize organizational, business, academic and technical project
            requirements from cross-institutional constituents.
           Determine preliminary project resources and skill requirements.
           Establish the project management controls and processes that will guide the
            implementation.

          SunGard SCT Services will collaborate with the institution’s project manager and teams
          to establish a high-level view of the entire project and to create the Project Definition for
          the SCT Luminis Platform and the SCT Luminis Content Management Suite Enterprise
          Edition, which will serve as the roadmap for the implementation.

          Deliverables:
                 Project resources and skill requirements identification.
                 Project definition document and schedule.
                 Project control processes.

          Requirements Gathering:
          During the Requirements Gathering activity, SunGard SCT consultants interview
          executives, faculty, staff, and students from campus departments to gather project
          requirements and identify the institution’s drivers for success. Once these factors are
          identified, SunGard SCT consultants will work with the institution’s project team to
          prioritize and plan for the Luminis implementation, while aligning with the institution’s
          strategic vision and mission. SunGard SCT consultants will assist the institution in
          raising awareness of the project and understanding of the product, help obtain cross-
          functional stakeholder input, and assist in the prioritization of project requirements.

          Deliverables:


                                                                                             v.0.13.1
   OneAstate                      SCT- Confidential & Proprietary                       Page 21 of 80
                             ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                    Project Definition

              Requirements Definition Document.


2.1.9 SCT Luminis Foundation Implementation

       SunGard will provide implementation services for each of the three components of the
       SCT Luminis Foundation Solution to Arkansas State University.

             SCT Luminis Platform III
             SCT Luminis Data Integration Starter Edition
             SCT Luminis Content Management Starter Edition.


       The SCT Luminis™ Foundation Services package is designed for institutions deploying
       the SCT LuminisTM Platform, SCT LuminisTM Content Management Suite Starter Edition
       for management of internal (not public) web content, and Luminis Data Integration
       Technology. The Luminis Foundation Services package provides the technical and
       organizational consulting, training, and support that will maximize effective use of the
       Luminis Platform for an enterprise implementation and Luminis Content Management
       Suite (“CMS”) Starter Edition for one focus area at the institution.

       Understanding the administrative process, academic environment, portal and internal
       Web content management needs, information access and integration priorities of the
       institution is imperative to the successful implementation of Luminis Platform and
       Luminis CMS Starter Edition. SCT Services utilize a highly effective approach to
       identifying and prioritizing the critical needs and desires of campus constituents.
       Aligning the institution’s people, processes, and technology with these critical needs and
       wants—as well as the institution’s overall strategy and vision—gives the institution’s
       project owners a roadmap to realizing the greatest benefits from the Luminis Platform
       and Luminis CMS Starter Edition. These practices also help to ensure project
       preparedness, cross-institutional representation, collaboration, campus-wide buy-in and
       effective planning and support for the implementation.

       The SCT Luminis services team’s highly skilled project managers, consultants, trainers
       and technical engineers work with institutions to help them configure and maximize the
       utility of the Luminis technologies. Made up of subject matter specialists in the areas of
       Web and portal content management, enterprise integration, uPortal channel
       development, security, change management, training, business assessment, and
       organizational strategies, the team is equipped to complement an institution’s strengths
       and facilitate the achievement of its Luminis Platform and Luminis CMS Starter Edition
       objectives.




                                                                                         v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                      Page 22 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                     Project Definition

       Dedicated to the success of partner institutions, SCT consultants provide the expertise
       and experience necessary for the successful implementation of the Luminis Platform and
       Luminis CMS Starter Edition by:
            Aligning the digital campus initiatives with the institution’s strategic vision and
              business priorities
            Identifying project requirements, impacts and opportunities
            Developing detailed project plans and comprehensive timelines
            Facilitating institutional change with the adoption of Luminis Foundation
            Educating and training the institution’s stakeholders and key campus constituents
            Leveraging a proven methodology to minimize risks and optimize success
            Capitalizing on supporting six generations of enterprise Web technology focused
              exclusively on the goals and requirements of higher education

       SCT’s Services methodology is a compilation of deliverables-based, best-practice
       consulting and training services designed to facilitate the four critical phases essential to
       implementing Luminis product family or Foundation technologies. These phases, called
       Assess, Plan, Implement, and Re-Assess, provide an effective approach to 1) identifying
       business, organizational, academic and technical requirements; 2) planning for
       implementation; 3) installation and validation of the software in a test and production
       environment and training on the Luminis Platform and Luminis CMS Starter Edition; and
       4) assessment of project strengths, weaknesses and lessons learned in order to prepare for
       subsequent phases. This approach supports the lifecycle of any implementation and helps
       to keep it aligned with institutional priorities and strategies.

       Most institutions choose to implement the Luminis Platform and Luminis CMS Starter
       Edition in two different phases. The services supporting those phases are therefore
       separated into Luminis Platform and Luminis CMS Starter Edition sections as follows:

2.1.10 LUMINIS PLATFORM III IMPLEMENTATION

       ASSESS PHASE

       Objectives:
           Establish a solid foundation for the Luminis Platform implementation at all levels
               of the institution
           Align project vision with institutional mission
           Provide education and awareness of the Luminis Platform product and services
               that are necessary for a successful implementation
           Gather data necessary to identify a recommended solution using the SCT
               Luminis Platform configured for the institution’s processes
           Identify and prioritize organizational, business, academic and technical project
               requirements



                                                                                           v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                        Page 23 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                February 14, 2012
                                                                     Project Definition

               Identify project resources and skill requirements to support all phases of the
                project
               Establish a project schedule and milestones
               Establish the project management controls and processes that will guide the
                implementation

       Luminis Platform Activities (Assess Phase)

       Luminis Platform Project Kick-Off

                   Strategic Session
                    SunGard SCT consultants will demonstrate the Luminis Platform features
                    and functionality, and provide a high-level overview of the implementation
                    approach and methodology for the institution’s executive stakeholders in
                    order to align the project with the institutional goals and objectives to ensure
                    executive support. The initial strategic session will also validate
                    recommended institutional project team resources to support the Luminis
                    Platform implementation throughout each phase.

                   Project Team Session
                    The outcomes of the discussion in the strategic session will be incorporated
                    into a session with the institution’s identified project team, where the
                    consultants will review the Luminis Platform activities and identify project
                    risks and constraints. The project team session will include a discussion on
                    the planned implementation approach and methodology, as well as the need
                    to support an extended project team from both a technical and functional
                    perspective to participate in the Luminis Platform activities and decision-
                    making process.

                   Luminis Platform System Education
                    Institutional stakeholders participate in the Luminis Platform System
                    Education session in order to gain a more complete understanding of the
                    system and the necessary coordination required across the institution to
                    support the system technology, usage policies and processes, portal
                    layout/content planning, site management, rollout and utilization. The
                    System Education session gives participants both a wider perspective and a
                    more detailed conceptual understanding they need in order to be involved in
                    project team support and other implementation activities throughout each
                    phase.

                   Project Team Wrap-Up
                    SunGard SCT consultants will meet with the institution’s project
                    management team to review the outcomes from the Luminis Platform System
                    Education session, and discuss any additional modifications that are needed

                                                                                           v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                        Page 24 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                February 14, 2012
                                                                   Project Definition

                  for project support personnel, project organizational support, issues,
                  milestones, timelines and preparation for implementation activities.

                  Deliverables:

                          Luminis Platform Project Definition Document
                          Luminis Platform Project Schedule


       Luminis Platform Organizational Information Gathering

                 Project Team Session
                  SunGard SCT consultants will meet with the project team to review project
                  status and action items from the Luminis Platform kick-off, and identify and
                  address any outstanding issues in order to proceed with the Organizational
                  Information Gathering activity A review of the objectives, purpose and
                  outcomes of the Organizational Information Gathering session will be
                  conducted. After the completion of the activity, the Summary of Findings
                  and Recommendations Document will be reviewed with the project team and
                  next steps will be discussed.

                 Organizational Information Gathering Activity
                  Working against the backdrop of the institution’s vision for the Luminis
                  Platform, SunGard SCT consultants will conduct information-gathering
                  sessions that include interviewing executives, and holding focus groups with
                  faculty, staff, and students from a good cross-constituency of campus
                  departments to gather project requirements and identify the institution’s
                  drivers for success. During the Organizational Information Gathering
                  activity, SunGard SCT consultants will assist the institution in raising
                  awareness of the project and understanding of the product through product
                  demos and Q&A sessions that will help obtain cross-functional stakeholder
                  input, and assist in the prioritization of project requirements.

                  Deliverables:

                          Summary of Findings and Recommendations Document


       Luminis Platform Technical Workshop

                 The Technology Planning activity is designed to frame the prioritized
                  technical architecture requirements and plans against existing IT systems,
                  technical goals and priorities. Through analysis of user requirements,
                  existing and future technology requirements, and integration options offered

                                                                                        v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                     Page 25 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc             February 14, 2012
                                                                     Project Definition

                     by Luminis Platform, the technical stakeholders are better able to reach
                     consensus on phased functionality and identify viable options for fulfilling
                     their requirements. This information can then be used by institution IT
                     leaders to build a framework for planning the implementation. The data
                     gathered in this workshop will be analyzed by SunGard SCT consultants to
                     define viable implementation options, high-level scope and estimated cost
                     that will be detailed and delivered to the campus project leaders.

                     Deliverables:

                                Technical Approach Document


       PLAN PHASE

       Objectives:

               Identify enterprise-wide impacts of the Luminis Platform on the institution and
                develop a project plan for the implementation
               Validate activities, resources and estimated timeframes associated with the
                delivery of project phases
               Create portal content, communication and training plans to help prepare for and
                support the launch of the Luminis Platform
               Provide a framework for identifying potential risks and barriers


            Luminis Platform Activities (PLAN PHASE):

                Luminis Platform Content Planning

                Project Team Session
                   SunGard SCT consultants will meet with the project team to review project
                   status and action items from the Organizational Information Gathering, and
                   identify and address any outstanding issues in order to proceed with the
                   Content Planning activities, which will be reviewed to outline the purpose
                   and expected outcome. After the completion of the activity, the Content
                   Matrix and Content Action Plan will be reviewed with the project team and
                   next steps discussed.

                Content Planning Activities
                   The Luminis Platform Content Planning activity inventories portal content
                   and requirements identified in the Organizational Information Gathering
                   activity and current intranet content to build a content plan for the Luminis
                   Platform. This activity identifies critical policies and processes, portal

                                                                                          v.0.13.1
OneAstate                       SCT- Confidential & Proprietary                      Page 26 of 80
                           ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                    Project Definition

                  content publisher roles and resources, and encompasses the design
                  development necessary to customize the site. SunGard SCT consultants help
                  the institution create, validate and prioritize the content layout plan that will
                  serve as their roadmap for content customization and publication. This
                  activity is key to the ultimate utilization of the institution’s Luminis
                  Platform, through constituent participation in planning compelling content
                  that will provide end users with enhanced access to information and an
                  online community where they can collaborate and communicate with the
                  institution. This planning activity specifically applies to the content
                  generated, maintained, and customized for the institution’s intranet or portal,
                  not public website and does not include the use of the web content
                  management system for planning.

       Deliverables:

                 Luminis Platform Content Matrix
                 Luminis Platform Content Action Plan


       Luminis Platform Organizational Planning

              Project Team Session
                 SunGard SCT consultants will meet with the project team to review project
                 status and action items, review relevant data from the Organizational
                 Information Gathering sessions, and identify and address any outstanding
                 issues in order to proceed with the Organizational Planning activities, which
                 will be reviewed to outline the purpose and expected outcome. After the
                 completion of the activity, the Organizational Readiness Plan will be
                 reviewed with the project team and next steps discussed.

              Develop Organizational Change Management Strategies
                 During this activity, SunGard SCT consultants will collaborate with the
                 project planning team to identify how the Luminis Platform technology will
                 impact the institution, and determine what changes in process, policy and
                 communication are needed to support the implementation. The team structure
                 and roles will be defined, key stakeholders interviewed, and an analysis
                 conducted to identify barriers, issues, risks, etc. Key strategies will be
                 discussed to ensure the participants understand and apply proven change
                 management methodologies and processes to succeed in addressing change
                 and delivering desired outcomes.

              Manage Communications
                SunGard SCT consultants will collaborate with the project planning team to
                determine how project status and other information will be communicated for

                                                                                          v.0.13.1
OneAstate                    SCT- Confidential & Proprietary                         Page 27 of 80
                        ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                 February 14, 2012
                                                                     Project Definition

                     which audience, identifying the who/what/how/when. SunGard SCT
                     consultants and the institution will establish a Communication Plan for the
                     project that will address the unique, ongoing communication needs and
                     methods for all key stakeholder groups as well as the project team. The
                     Communication Plan includes end user marketing strategies and materials,
                     project communication processes, web strategies, and ongoing feedback
                     mechanisms. The Communication Plan also serves as a guide for addressing
                     issues and provides a tool for raising awareness of policy and process issues.
                     Estimated timelines and ownership will be assigned.

              Manage Training
                SunGard SCT consultants will collaborate with the project planning team to
                identify the various groups that need to be trained. SunGard SCT consultants
                and the institution will establish create a Training Plan that establishes the
                segments of the user population that will need to be trained. The Training
                Plan identifies timelines, opportunities, type of training, dependencies,
                objectives, and materials for each user group. The Training Plan is a
                comprehensive tool that starts in Organizational Planning and is built upon in
                Product Certification.

              Document Lessons Learned
                 SunGard SCT consultants will discuss and create a plan to evaluate the
                 institution’s level of success in adoption to and absorbing of changes
                 experienced with the transition to the Luminis Platform environment.
                 Review the initial project critical success factors and objectives for
                 utilization.


                     Deliverables:

                                Organizational Readiness Plan
                                    - Communication Plan
                                    - Change Management Plan
                                    - Training Plan

       IMPLEMENT PHASE

       Objectives:

                    Design, build, test and deploy Luminis Platform within a structured
                     methodology
                    Prepare project team to manage all aspects of the Luminis Platform
                    Provide communication and training to prepare constituents for launch


                                                                                           v.0.13.1
OneAstate                       SCT- Confidential & Proprietary                       Page 28 of 80
                           ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                   Project Definition


       Luminis portal activities (implement phase)

              Luminis Content Administration Training

              The purpose of this training is to prepare content managers and administrators of
              the Luminis Platform to publish content to the portal or intranet. Participants will
              receive hands-on training in authoring content, creating channels, and managing
              workflows in accordance to prescribed roles and standards. This training spans
              two days and includes techniques for publishing and managing content in the
              Luminis Platform and does not include training on web content management or
              using the Luminis Content Management system. Upon completion of this course,
              attendees will be able to:

                     Understand the Luminis Platform’s distributed content management
                      processes
                     Create, send, and manage Targeted Announcements
                     Create and configure role-based content for delivery in Targeted Content
                      channels and system-provided content channels (My Courses and
                      Academic Services)
                     Create and manage content in Targeted Content channels and system-
                      provided content channels
                     Create simple channels leveraging existing Web content (inline frame,
                      image, RSS, Web proxy)
                     Create and publish XML transform channels
                     Understand the criteria for the development of custom channels
                     Understand the choices among content creation techniques
                     Create and edit layouts for groups of users
                     Create and manage color and logo sets for groups of users
                     Create and manage content within Group Studio homepages (optional)

              Luminis Platform Product Certification

              This course offers institutional trainers the opportunity to learn how to use
              Luminis Platform and provides schools access to SunGard SCT expertise, end
              user materials, and training methodologies that will efficiently and effectively
              prepare them to plan and deliver training to all constituent groups across the
              institution. During the course, the attendees will:

                     Use the Luminis Platform in a hands-on training environment
                     Learn how to create a training strategy that will address the needs of all
                      users



                                                                                         v.0.13.1
OneAstate                    SCT- Confidential & Proprietary                        Page 29 of 80
                        ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                February 14, 2012
                                                                     Project Definition

                        Develop learning objectives, define training methods and outcomes, and
                         create custom
                         training materials
                        Build upon the Training Plan developed in Organizational Planning

                Luminis Platform Installation

                Because a Luminis Platform implementation requires a rigorous installation
                process involving a number of complex software components, SunGard SCT
                consultants will perform the test installation, validate its core components and
                certify it for the testing phase. At a later time, the SunGard SCT Technical
                Consultant will install the production system and assist the institution in
                migrating test data into the production system to prepare for launch. For each
                installation, a SunGard SCT Technical Consultant will guide the institution’s
                technical staff through all the critical tasks of the SunGard SCT Luminis
                Platform Installation Plan in preparation for certification of the system.

                Deliverables:

                         o    Installation of the Luminis Platform
                         o    Knowledge transfer during the installation
                         o    Provide tested and operational Luminis Platform environment
                         o    Review final production readiness checklist

       RE-ASSESS PHASE

       Objectives:

               Execute activities to ensure all business objectives have been achieved
               Validate that the Luminis Platform is meeting institution’s needs
               Ensure institution is self-sufficient in managing and maintaining the Luminis
                Platform

       Luminis Platform Activities (Re-ASSESS PHASE)

       Luminis Platform Project Close-Out and Re-Assessment

               SunGard SCT consultants will meet with project team and interview key project
                participants to assess project strengths, weaknesses and lessons learned. An
                analysis will be completed to document results and identify and recommend next
                steps.
               Review current Luminis Platform-supported institutional Web site (or portal)
               Interview key project participants
               Assess strengths, weaknesses, lessons learned

                                                                                          v.0.13.1
OneAstate                         SCT- Confidential & Proprietary                    Page 30 of 80
                             ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc            February 14, 2012
                                                                    Project Definition

               Re-assess education readiness
               Validate completion and execution of transition plans
               Identify and recommend next steps
               Draft a Luminis Platform Re-Assessment Document
               Review document with institution
               Complete Luminis Platform Project Close-Out

       Deliverables:

               Luminis Platform Re-Assessment Document
               Provide post-implementation support
               On-going account management support


2.1.11 LUMINIS CONTENT MANAGEMENT SUITE (“Luminis CMS”) STARTER
       EDITION IMPLEMENTATION
       The Luminis CMS Starter Edition helps an institution create and manage web content on
       an institution’s internal Web sites or intranet. The Luminis CMS Starter edition does not
       include management of the institution’s public or .edu website and the services outlined
       below support the implementation of one focus area at the institution.

       ASSESS PHASE

       Objectives:

               Establish a solid foundation for the Luminis CMS Starter Edition implementation
                at all levels of the institution
               Provide understanding of the Luminis CMS Starter Edition product and services
                necessary for a successful implementation
               Identify the “focus area” for the implementation (A “focus area” is the collection
                of Web content, content management role-players, and processes that will be at
                the center of the Luminis CMS Starter Edition configuration and development
                efforts during this implementation)
               Identify project resources and skill requirements to support all phases of the
                project
               Establish the project schedule and milestones
               Establish the project management controls and processes that will guide the
                implementation
               Gather data necessary to identify a recommended Luminis CMS Starter Edition
                solution configured for the institution’s processes
               Identify and prioritize organizational, business, academic and technical project
                requirements


                                                                                         v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                      Page 31 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                   Project Definition


       Luminis CMS Starter Edition Activities (ASSESS PHASE)

              Luminis CMS Starter Edition Project Launch

                 Strategic Session
                  SunGard SCT consultants will demonstrate the Luminis CMS Starter Edition
                  features and functionality and provide a high-level explanation of the
                  implementation approach and methodology. In order to ensure executive
                  support for the implementation, they will work with the executive team to
                  align the goals of the Luminis CMS Starter Edition project with the
                  institution’s vision or strategic goals. The executive session also provides the
                  opportunity to validate the recommended institutional project team and
                  resources to support all phases of the Luminis CMS Starter Edition
                  implementation.

                 Project Team Session
                  The outcomes of the discussion in the executive session will be incorporated
                  with the institution’s identified project team, where SunGard SCT
                  consultants will demonstrate Luminis CMS Starter Edition features and
                  functionality and review the Luminis CMS Starter Edition implementation
                  approach, methodology, and activities in detail. Project risks and constraints
                  will be identified, and recommended institutional resources will be identified
                  and validated.

       Luminis CMS Starter Edition Fundamentals

              SunGard SCT consultants will provide project stakeholders—armed with a high-
              level understanding of the Luminis CMS Starter Edition features and
              implementation process—with a more in-depth appreciation of the system and
              the associated policies, procedures, and decisions involved in a successful
              Luminis CMS Starter Edition implementation. Making use of presentations by
              the SunGard SCT trainer/consultant, hands-on activities, and discussion, the
              course covers Luminis CMS Starter Edition components and concepts, user and
              administrative tools, and scenario-based Luminis CMS Starter Edition user tasks.

       Luminis CMS Starter Edition Project Scoping

              SunGard SCT consultants will meet with the project team to review the
              information that was identified and shared during the Project Launch and
              Luminis CMS Starter Edition Fundamentals activities as they define the
              parameters of the Luminis CMS Starter Edition project to be implemented.
              SunGard SCT consultants will work with the institution to identify /confirm the
              “focus area” for the Luminis CMS Starter Edition implementation, participants in

                                                                                         v.0.13.1
OneAstate                    SCT- Confidential & Proprietary                        Page 32 of 80
                        ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                February 14, 2012
                                                                    Project Definition

              all remaining implementation activities, and metrics for post-implementation
              assessment. The Project Scoping activity concludes with collaborative drafting of
              the Luminis CMS Starter Edition Project Definition Document (PDD), which
              specifies the project timeline, personnel, resources, risks, milestones, and
              responsibilities of the SunGard SCT and institutional project teams.

              Deliverables:

                        Luminis CMS Starter Edition Project Definition Document
                        Luminis CMS Starter Edition Project Schedule

       Luminis CMS Starter Edition Content Process Analysis

              SunGard SCT consultants will meet with the Luminis CMS Starter Edition
              project team and stakeholders from the identified focus area to document web
              content and processes used to manage it. During these meetings, SunGard SCT
              consultants will assist in fostering an understanding of the Luminis CMS Starter
              Edition system and its implementation and prioritizing project requirements so
              that the Luminis CMS Starter Edition can later be deployed beyond the focus
              area to the entire institution. Analysis of the information gathered in this activity
              will be reported in the Summary of Findings and Recommendations document,
              which will also identify alignment with baseline Luminis CMS Starter Edition
              functionality and gaps that suggest system customizations (either by the
              institution’s staff or by SunGard SCT technical consultants). This document,
              which is drafted by the SunGard SCT organizational and technical consultants,
              will then be reviewed with the institutional project team and validated so that it
              may be used as input for the Luminis CMS Starter Edition project Plan Phase.

              Deliverables:

                        Summary of Findings and Recommendations Document

       Luminis CMS Starter Edition Technical Validation of Assess Phase

              SunGard SCT organizational and technical consultants will review the outcomes
              of all Assess Phase activities. SunGard SCT technical consultants will participate
              in Q&A as needed throughout the Assess Phase.

       PLAN PHASE

       Objectives:




                                                                                          v.0.13.1
OneAstate                       SCT- Confidential & Proprietary                      Page 33 of 80
                           ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                   Project Definition

               Utilize outcomes of Luminis CMS Starter Edition Assess Phase to create
                definitive plans for designing, building, and deploying the Luminis CMS Starter
                Edition for the focus area
               Plan for organizational readiness to roll out the Luminis CMS Starter Edition

            Luminis CMS Starter Edition Activities (plan phase)

                Luminis CMS Starter Edition Site Planning

                SunGard SCT consultants will work with the Luminis CMS Starter Edition
                project team and institutional stakeholders to create a plan for creating and
                maintaining their Web content using Luminis CMS Starter Edition. After
                reviewing the outcomes from the Assess Phase (especially the PDD and
                Summary of Findings and Recommendations document), the team will
                collaborate on developing the plan for the Luminis CMS Starter Edition as
                deployed in a specific focus area content and for subsequent extension of the
                Luminis CMS Starter Edition enterprise-wide. This session includes Luminis
                CMS Starter Edition site structure and configuration, navigation, templates,
                layouts, and components for development, workflows and Luminis CMS Starter
                Edition role players, procedures, and standards. Content identified for
                management within the Luminis CMS Starter Edition system will be mapped to
                this structure, and an action plan for migrating existing content and developing
                new content will be developed.

                After the completion of the activity, the Site Plan and Site Development Action
                Plan will be reviewed with the project team and next steps discussed.

                Deliverables:

                            Luminis CMS Starter Edition Site Plan
                            Luminis CMS Starter Edition Site Development Action Plan

                Luminis CMS Starter Edition Organizational Change Management
                Planning

                SunGard SCT consultants will facilitate this workshop to prepare individual
                stakeholders and organizational entities in the institution’s focus area to
                successfully manage content on the institution’s internal Web sites, or intranet,
                with the Luminis CMS Starter Edition. Specific objectives include identifying
                organizational changes associated with use of Luminis CMS Starter Edition,
                developing strategies for managing these changes, developing training strategies,
                developing an awareness/communication plan for the Luminis CMS Starter
                Edition rollout, and drafting an Organizational Readiness Plan.


                                                                                         v.0.13.1
OneAstate                        SCT- Confidential & Proprietary                    Page 34 of 80
                            ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc            February 14, 2012
                                                                 Project Definition


                Develop Organizational Change Management Plan
                SunGard SCT consultants will collaborate with the project team to identify
                how the Luminis CMS Starter Edition implementation will impact the
                institution and determine what changes in process, policy and
                communication are needed to support the implementation. Key strategies will
                be discussed to ensure the participants understand and apply proven change
                management methodologies and processes to succeed in addressing change
                and delivering desired outcomes.

                Manage Communications
                SunGard SCT consultants will collaborate with the project team to establish a
                Communication Plan for the project that will address communication needs
                and methods for all key stakeholder groups as well as the project team. The
                Communication Plan includes end user marketing strategies and materials,
                project communication processes, Web strategies, and ongoing feedback
                mechanisms. The Communication Plan also serves as a guide for addressing
                issues and provides a tool for raising awareness of policy and process. The
                Organizational Readiness Plan will be reviewed with the project team and
                next steps discussed.

                Manage Training
                SunGard SCT consultants will collaborate with the project planning team to
                identify the various groups that need to be trained. SunGard SCT consultants
                and the institution will create a Training Plan that establishes the segments of
                the user population that will need to be trained for the identified focus area.
                The Training Plan identifies timelines, opportunities, type of training,
                dependencies, objectives, and materials for the focus area. The Training Plan
                is a comprehensive tool that is first implemented in Luminis CMS Starter
                Edition Organizational Planning and is built upon in Luminis CMS Starter
                Edition Product Certification.

                Deliverables:

                           Organizational Readiness Plan
                            - Change Management Plan
                            - Communication Plan
                            - Training Plan

            Technical Validation of Plan Phase

            SunGard SCT organizational and technical consultants will review the outcomes
            of all Plan Phase activities. SunGard SCT technical consultants will participate in
            Q&A as needed throughout the Plan Phase.

                                                                                      v.0.13.1
OneAstate                  SCT- Confidential & Proprietary                       Page 35 of 80
                      ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                    Project Definition


       IMPLEMENT PHASE

       Objectives:

                    Install, test, and certify Luminis CMS Starter Edition
                    Prepare project team to manage all aspects of the Luminis CMS Starter
                     Edition
                    Provide training to prepare Luminis CMS Starter Edition role-players for
                     launch

       Luminis CMS Starter Edition Activities (implement phase)

                Luminis CMS Starter Edition Installation

                SunGard SCT technical consultants will perform a test installation, validate its
                core components and certify it for the testing phase. At a later time, SunGard
                SCT technical consultants will perform a second (production) installation or
                install a second docBase on the same hardware used for the test installation. The
                SunGard SCT technical consultants will guide the institution’s technical staff
                through all the critical tasks of the Luminis CMS Starter Edition Installation Plan
                in preparation for certification of the system.

                Deliverables:

                             Installation of the Luminis CMS Starter Edition
                             Knowledge transfer during the installation
                             Provide tested and operational Luminis CMS Starter Edition
                              environment
                             Installation completion report

       RE-ASSESS PHASE

       Objectives:

               Ensure all project business objectives have been achieved
               Validate that the Luminis CMS Starter Edition solution is meeting institution’s
                needs
               Ensure institution is self-sufficient in managing the Luminis CMS Starter Edition
               Assist institution in planning subsequent extension of the Luminis CMS Starter
                Edition to areas outside the initial focus area

            Luminis CMS Starter Edition Activities (re-assess phase)


                                                                                          v.0.13.1
OneAstate                         SCT- Confidential & Proprietary                    Page 36 of 80
                             ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc            February 14, 2012
                                                                    Project Definition


                Luminis CMS Starter Edition Project Re-Assessment

                SunGard SCT consultants will meet with the project team and interview key
                project participants to assess project strengths, weaknesses and lessons learned.
                An analysis will be completed to document results and identify and recommend
                next steps, including development of a plan for phased rollout of Luminis CMS
                Starter Edition to additional focus areas.

                Deliverables:

                    o   Luminis CMS Starter Edition Re-Assessment Document

       At the conclusion of the implementation, the client will have received all Luminis
       Platform and Luminis CMS Starter Edition services required to complete a successful
       implementation

       Client Obligations

               Identify and assign project resources to support Luminis Platform Project Team
                participation. This must include a Project Manager, Technical Lead and
                Functional Lead to support the coordination and requirements for the Luminis
                Platform implementation.
               Identify and assign project resources to support the Luminis CMS Starter Edition
                Project Team participation. This must include a Project Manager and Focus Area
                Lead(s) to support the coordination and requirements for the Luminis CMS
                Starter Edition implementation.
               Identify and provide the physical facilities where onsite SunGard SCT services
                will be delivered. This is to include laptop overhead projection capabilities,
                whiteboard or flipchart support for facilitation and discussion as needed,
                dedicated workstations for training workshop participants for SunGard SCT
                instruction, Internet access, and other facilitation and/or training amenities as
                defined with each service engagement.
               Provide project personnel to attend knowledge transfer and consulting sessions.
               Review existing policies and procedures and begin developing new policies and
                procedures to support the Luminis Platform and Luminis CMS Starter Edition
                utilization.
               Review the information contained in the Luminis Platform and Luminis Content
                Management Starter Edition documentation provided to ensure that each member
                of the implementation team understands the functionality being presented.
               Meet with the SunGard SCT consultants after each services delivery to identify
                any issues and concerns prior to going into next phase.



                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 37 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                   Project Definition

               Complete installation of hardware environment and operating system to support
                Luminis Platform and Luminis CMS Starter Edition installation.
               Review installation completion reports, and validate successful installation.
               Validate converted data from other systems integrated into the Luminis Platform.
               Create any test scenarios for identified implementations. Complete scenario
                testing.
               Test the production system to certify an end-user ready system.
               Create a Deployment Plan for rollout to users.
               Conduct end-user training.
               Manage and deliver implementation communications.
               Identify all concerns/issues with the SunGard SCT Project Manager as they
                surface.

2.1.12 LDI for e-Learning with Blackboard

       SunGard SCT’s LDI for e-Learning Implementation Services will delivered in four
       required and one optional phase:

            o   Phase I – Organizational & Environmental Readiness Review; Project Planning
            o   Phase II – Installation of Messaging Components, Technical Training &
                Installation Support
            o   Phase III – Project Planning Review, e-learning Knowledge Transfer, System
                Verification and Debugging Skills
            o   Phase IV – Production System Verification & Validation

       Phase I – Organizational & Environmental Readiness Review; Project Planning

            During this phase, SunGard SCT will conduct interviews with institutional personnel
            (both technical and functional) to determine the state of the current environment,
            implementation and deployment plans and academic and policy goals and constraints.
            A number of documents; including a Project Definition, initial Milestone Plan and
            Implementation Blueprint will be prepared and reviewed with the client. These
            documents will guide the e-Learning implementation. In this Phase, the SunGard
            SCT resource will:

            o   Interview appropriate academic, administrative, data center and other IT support
                personnel to determine the academic, administrative, and architectural plans for
                e-Learning implementation and deployment.
            o   Determine/ensure the appropriate dependent software is installed.
            o   Determine/ensure that appropriate hardware is available.
            o   Review hardware and network configuration.




                                                                                        v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                     Page 38 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc             February 14, 2012
                                                                   Project Definition

            o   Provide an Implementation Blueprint template to the client and review the
                completed Implementation Blueprint with the client to determine that all
                prerequisites for a successful installation have been met.
            o   Verify remote connections so that the remote install can be completed
                successfully and on time.

       Phase II – Installation of Messaging Components, Technical Training & Installation
       Support

            A SunGard SCT technical consultant will install the e-learning messaging
            components in a test environment and will configure the messaging components with
            the e-learning partner system(s). This phase is conducted remotely. SunGard SCT
            will also provide training on the installation and administration of the Luminis
            Message Broker and Learning Management Gateway and other system
            administration functions. In this Phase, the SunGard SCT resource will:

            o   Review installation and upgrade requirements.
            o   Install the e-learning messaging components in a test environment.
            o   Configure the e-learning messaging components to communicate with the
                appropriate Blackboard learning management system(s).
            o   Review e-learning messaging set-up and message registration.
            o   Review e-learning messaging debug procedures.
            o   Perform data extract from the enterprise system and populate the learning
                management system(s), if desired by the client.
            o   Verify successful delivery of event data from the enterprise system to the
                learning management system(s).
            o   Verify successful transmission of grades from the learning management system
                to the enterprise system and verify return of correct grade success/failure
                message to the learning management system, if grade exchange is supported by
                the learning management system.
            o   Deliver Technical/System Administration Training which includes:
            o   On-going system maintenance and other system administration requirements.
            o   System maintenance requirements.
            o   Review the steps required to install the e-learning messaging components in
                additional Pre-Prod or Production environments.
            o   Procedures for periodic required upgrades of the e-learning messaging
                components.
            o   Prepare and provide to the client a Checklist that details the installation and
                configuration.

   Phase III – E-learning Knowledge Transfer, System Verification and Debugging Skills

            In the Knowledge Transfer component, SunGard SCT will provide in-depth training
            and knowledge transfer for enterprise system processing as it impacts the e-learning

                                                                                         v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                      Page 39 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                     Project Definition

            solution. Material covered will include data set-up requirements, routine processing
            which drives data synchronization, academic policies and procedures that affect the
            deployment of e-learning and best practices in use of the e-learning solution. During
            the System Verification component, extract/import processing, data synchronization
            via message processing and grade exchange will be verified and/or debugged as
            required. In this Phase, the SunGard SCT resource will:

            o   Discuss academic policies and procedures that affect e-learning delivery at the
                institution.
            o   Discuss administrative policies and procedures that affect e-learning delivery at
                the institution.
            o   Update the Project Definition and Milestone Plan.
            o   Provide training sessions on enterprise system set-up to reflect academic and
                administrative policies.
            o   Discuss best practices in e-learning solutions implementation.
            o   Provide a road map for on-going maintenance of the e-learning solution.
            o   Review client’s implementation and deployment plans to confirm expected
                results.
            o   Review system set-up requirements based upon expected results.
            o   Review parameters used in extract processing and discuss best practices in
                extract processing.
            o   Set up initial system users and courses in the learning management test system(s)
                utilizing extract/import processing.
            o   Verify event set-up.
            o   Verify each data synchronization event, discussing the event trigger actions and
                requirement, and tracing the event data through the components until it
                successfully displays in the learning management system(s).
            o   Verify Grade Exchange processing, discussing each required step, and tracing the
                event data through the components until exported grades display correctly in the
                Enterprise system and the results of grade exchange processing display correctly
                in the learning management system(s). (If Grade Exchange processing is
                supported by the learning management system.)
            o   Using data synchronization and grade exchange processing, discuss debugging
                steps if message transactions are not successful.
            o   Debug all unsuccessful message transactions, leaving the client with a fully
                functional test system.
            o   Document the results of System Verification.

       Phase IV – Production System Verification & Validation

            During this phase, SunGard SCT will provide resources to verify the client’s
            readiness to deploy the e-learning solution in the institution’s Production system.
            S/he will review extract files taken from the Production system based upon
            production deployment plans, and will discuss adjustments required to meet


                                                                                          v.0.13.1
OneAstate                       SCT- Confidential & Proprietary                      Page 40 of 80
                           ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                      Project Definition

            production targets. This phase is conducted remotely, although the client can be
            ‘present’ via appropriate collaboration tools, or the activity can be scheduled to be
            conducted on-site if the client is willing to incur additional travel expenses. In this
            Phase, the SunGard SCT resource will:

            o   Review client’s implementation and deployment plans to confirm expected
                results.
            o   Review system set-up requirements based upon expected results.
            o   Verify the validity of data extracted from the Production system for initial
                population of the learning management system(s).
            o   Provide guidance in obtaining correct results from extract processing, if required.
            o   Assist in the setup of initial system users and courses in the Production enterprise
                system.
            o   Review, in detail, all steps required for taking the e-learning solution into
                production.
            o   Provide a Pre-Production Checklist and provide the completed Checklist to the
                client.
            o   Obtain Sign-Off from the client on the entire project.

            Throughout the delivery of LDI for e-Learning Solution Services, the SunGard SCT
            technical resource will:

            o   Document outstanding issues and ownership of the issues.
            o   Document meetings/conversations with the client.
            o   Provide clear and consistent SunGard SCT recommendations.
            o   Obtain Sign-Off from the client at the end of each phase, before moving on to the
                next phase and obtain client sign-off at the completion of the project. They can
                put students

       The following message sets will be delivered, configured and tested as part of this
       implementation. Not all messages will be used at every installation or with every
       learning management system.

   LDI Processing                                Message(s) supported
   LDITERM Event                                 Term description and dates; term active or not
                                                 Add, change, delete
   LDICOLLEGE Event                              College description
                                                 Add, change, delete
   LDIDEPT Event                                 Department description
                                                 Add, change, delete
   LDICOURSE Event                               Course (catalog) attributes, title, active status, e-
                                                 learning enabled
                                                 Add, change, delete
   LDISECTION Event                              Section (schedule/timetable) attributes, title,
                                                 active status, start/end dates, meeting data, e-

                                                                                             v.0.13.1
OneAstate                       SCT- Confidential & Proprietary                         Page 41 of 80
                           ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                 February 14, 2012
                                                                Project Definition

                                             learning enabled
                                             Add, change, delete
   LDIXLGRP Event                            Section cross-list group identifier
                                             Add, delete
   LDIXLMEM Event                            Section cross-list section membership (sections
                                             in a cross-list)
                                             Add, change, delete
   LDIPERSON Event                           Person ID, name, demographics, address,
                                             telephone, e-mail address, role(s), major(s)-
                                             students, title-faculty
                                             (Data for Students, Faculty, Staff, Alumni,
                                             Prospective Students, Friends, Development
                                             Officers, Finance at the option of the client)
                                             Add, change
   LDIENROLL Event                           Student enrollment adds/drops
                                             Add, change, delete
   LDIASSIGN Event                           Faculty teaching assignments, primary or
                                             subordinate teaching status
                                             Add, change, delete
   LDIFMEM Event                             Faculty department membership(s)
                                             Add, change, delete
   Extract Program(s)                        XML file produced for mass-population of e-
                                             learning system(s)
                                                               - Consolidated (single) extract
                                                                    for Banner
                                                               - Product-specific extracts for
                                                                    Plus
   On Demand Synchronization                 Send data on demand, rather than through event
                                             trigger
                                                               - Job submission for Banner
                                                               - Online screen for Plus

2.1.13 Reporting Strategies
   SunGard SCT will provide consulting sessions with ASU technical and functional teams to
   discuss the different options available for reporting from the Banner® systems.

2.1.14 Workflow Services
   SunGard SCT will provide the following SunGard SCT Workflow implementation and
   support services to the Arkansas State University. A SunGard SCT manager will be
   responsible for coordinating the resources and schedules for the services.

   SunGard SCT will provide:
    On site installation of the SunGard SCT Workflow product, to include installation and
      primary operational configuration of SunGard SCT Workflow Server and software
      components.


                                                                                      v.0.13.1
OneAstate                    SCT- Confidential & Proprietary                     Page 42 of 80
                        ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc             February 14, 2012
                                                                    Project Definition

    On site Workflow Technical training, providing training in the technical administration of
     SunGard SCT Workflow Server and SunGard SCT Workflow software components. This
     session is typically provided during the same visit as the SunGard SCT Workflow
     Installation, although it may be facilitated during a timeframe separate from the
     installation activity.
    On site Workflow Tools functional training, providing training in the use of the
     Workflow Tool/Modeler and the techniques for implementing Workflow in Arkansas
     State University’s business environment.
    On site Workflow Process Analysis training in SunGard SCT’s methodology for
     gathering information needed to model workflow-related business processes and in the
     techniques for identifying specific required data elements for workflow development.
     This trip is generally combined with the Tools functional training or a Workflow
     consulting visit.

    On site Workflow Consulting visit to provide training in the implementation
     requirements of an Arkansas State University-selected workflow. This visit will include
     the initiation of the implementation of one (1) Workflow.

2.1.15 Finance
      SunGard SCT will provide system education training and process consulting support on
       the features, functions, processing rules, operating cycles, and set-up requirements of the
       baseline SunGard SCT Banner Finance System, anticipated to include training and
       process consulting support in the following areas. The specific areas of training and
       process consulting support to be provided to Licensee will be determined as part of the
       preliminary Project Planning activities.

            o   Chart of Accounts
                     Train on the User-Defined Chart of Accounts
                     Consult on best practice of designing the Institutional accounting system.
                     User-Specified Budget NSF Checking Methods
                     Training in the General Ledger and Operating Ledger Queries
                     Training in the baseline reporting capabilities.
                     Bank Reconciliation
                     Spread Sheet Uploads to Journal Vouchers
            o   Finance Rules, Security and Approvals
                     Transaction Editing for Accounting Elements
                     Balancing methods for Budget Transfers
                     Transactions approved to specific users.
                     Creating Transaction security for specific users
                     Assigning Department Security
                     Assigning Funding Security
                     Identifying Institution electronic approval lists of users by function.


                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 43 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                   Project Definition

                      Creating unique electronic routing of transactions such as purchase
                       orders, purchase requisitions, Invoices, and Journal Vouchers.
                     Retaining electronic signature history of all approvers of electronic
                       documents.
            o   Purchasing/Receiving
                     Online decentralized input
                     Electronic document approval
                     Online fund availability checking
                     Unlimited items and accounting distributions
                     Additional text at the line item level
                     Automatic assignment of requisitions
                     Capability to consolidate requisitions
                     Commodity/vendor products capability
                     Calculate multiple taxes
                     Bid creation
                     Assign prospective bidders
                     Comparison of bid responses
                     Bid award
                     Alpha search for prior bid activity
                     Automatic retrieval of PO data
                     Record items received/rejected
                     Automated interface to Fixed Assets
                     Track internal delivery of items received
            o   Accounts Payable
                     Automated retrieval of PO data
                     Automated payment scheduling
                     Calculation of multiple taxes
                     Online checks for emergencies
                     Invoice selection reporting
                     Online submission for batch check runs
                     Multiple banks supported
                     Online check cancellation
                     Check and deposit bank reconciliation
                     Online adjustments for discrepancies
            o   Accounts Receivable
                     Multiple customer types
                     Invoice and statement generation
                     Flexible application of payments to charges
                     User-defined charge and payment codes
                     Online account status
                     Cashiering and checkout process
            o   Budget Development

                                                                                        v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                     Page 44 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc             February 14, 2012
                                                                    Project Definition

                     Future year scenarios
                     User-defined phases for each scenario
                     Various options for specifying base budgets
                     Automated transfer of approved budget
                     Online input of budget requests
                     Dollar and/or unit budgeting
                     User-specified budget periods
                     Budget distribution parameters
                     Dynamic budget query
                     Current year budget maintenance
                     Downloading Budget data into Spreadsheets
                     Manipulating spreadsheets and verifying Account elements.
                     Up loading Spread sheets budgets into the Finance Ledgers
            o   Fixed Assets
                     Online creation of asset master
                     Temporary tag number from Purchasing/AP
                     Conversion to permanent tag number
                     Asset component capability
                     Unlimited accounting distributions
                     Maintain non-capitalized assets
                     Track transfers
                     Table-defined depreciation methods
                     Optional posting to ledgers
            o   Finance Self-Service
                     Validation and rule tables for Web-based functionality
                     Training in the components and navigation of the SunGard SCT Banner
                       Finance Self Service
                     Advising in SunGard SCT Banner Finance Self Service Module Site
                       Preference Definition
                     Consulting support in processing transactions to the common database
                       utilizing security and document approval definitions
                     Web General/ Web Tailor for enabled modules

2.1.16 Student
      SunGard SCT will provide system education training and process consulting support on
       the features, functions, processing rules, operating cycles, and set-up requirements of the
       baseline SunGard SCT Banner Student System, anticipated to include training and
       process consulting support in the following areas. The specific areas of training and
       process consulting support to be provided to Licensee will be determined as part of the
       preliminary Project Planning activities.

            o   Course Catalog


                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 45 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                 Project Definition

                    Validation tables
                    Planning and guidance for manual or electronic catalog conversion
            o   Schedule
                    Rules and Validation tables for building sections of courses for
                        registration, including room and faculty assignments
                    Planning and guidance for manual or electronic schedule conversion
            o   General Person
                    Validation tables for biographic and demographic information
                    Name search, ID generation and address maintenance (may be shared
                        with HR, Alumni, Financial Aid and Finance areas)
                    Planning and guidance for manual or electronic person data record
                        conversion
            o   Recruitment
                    Curriculum rules tables
                    Overview of Curriculum Advising and Program Planning
                    Validation tables for recruitment record management
                    High School, prior college, and test score information
                    Tape Load processes (SAT, GMAT, etc.)
                    Letter Generation and Communication Plans processes
                    Planning and guidance for manual or electronic recruiting record
                        conversion
            o   Admissions
                    Rules and Validation tables for applicant record management, including
                        curriculum rules
                    Detail Codes for application fees
                    Tape Load processes (SAT, GMAT, etc.)
                    Letter Generation and Communication Plans processes
                    Planning and guidance for manual or electronic admission record
                        conversion
            o   General Student
                    Rules and Validation tables for defining and classifying students and
                        holds
                    Planning and guidance for manual or electronic general student record
                        conversion
            o   Registration
                    Rules and Validation tables for registration (pre-requisites, enrollment
                        verification, fee assessment, holds) and grade collection
                    Detail Codes for Fee Assessment
                    Academic History
                    Rules and Validation tables for Academic History, including Transfer
                        Articulation (repeats, academic standing, transcript holds etc.)
                    Grade mailer, transcript, grade change and graduation processes
                    Planning and guidance for manual or electronic academic history record
                        conversion

                                                                                      v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                   Page 46 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc           February 14, 2012
                                                                    Project Definition

            o   Accounts Receivable
                     Rule and Validation tables for A/R Administration
                     Charge and Payment Detail Codes and Accounting Distributions
                     Deposit Administration
                     Student Refund Processing
                     Contract and Exemption Processing
                     Planning and guidance for account balance establishment or conversion
                        of available legacy data
            o   Location Management
                     Validation tables and definitions for Building and Rooms
                     Room, Meal, Phone Assignments
                     Rate codes and rules for Rooms, Meals, Phone
                     Housing Term Control Form
                     Planning and guidance for manual or electronic building and room data
                        conversion
            o   Curriculum, Advising and Program Planning
                     CAPP overview and Fact Gathering
                     CAPP Requirements
                     Compliance Information
                     Curriculum Rules and Controls
                     CAPP Student Adjustments
                     Building of CAPP Requirements for up to 10 programs
            o   Student Self-Service
                     Validation and rule tables for Web-based Registration and student record
                        management
                     Validation and rule tables for Web-based Admissions
                     Validation and rule tables for Web-based Prospects
                     Web-based Course Catalogs
                     Web-based Class Schedules
                     Web Tailor for enabled Student modules
            o   Faculty and Advisors Self-Service
                     Validation and rule tables for enabling Faculty data, including permit
                        overrides and transcripts
                     WebCAPP setup and security
                     Web-based Grade Entry, including Grade Book set up and security
                     Web Tailor for Faculty Module

2.1.17 Financial Aid
      SunGard SCT will provide system education training and process consulting support on
       the features, functions, processing rules, operating cycles, and set-up requirements of the
       baseline SunGard SCT Banner Financial Aid System, anticipated to include training and
       process consulting support in the following areas. The specific areas of training and
       process consulting support to be provided to Licensee will be determined as part of the
       preliminary Project Planning activities.

                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 47 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                Project Definition


            o   Record Creation and EDE Processing
                 Creating records with multiple names and ID numbers
                 Upload/download data to Dept. of Education
                 Rules and Validation tables for EDE processing
            o   Applicant Processing
                 INAS Record processing
                 Tracking records
                 Rule and validation tables for document/requirement tracking
            o   Budgeting, Needs Analysis
                 Rule and validation tables for automated budget assignment
                 Creating budget components, component amounts, budget groups, and
                    budget types
                 Define aid periods
                 Establishing valid budget types by budget groups
                 Establishing valid budget components by budget groups, budget type, and aid
                    period combinations
                 Defining budget group assignment rules for each budget established
                 Placing a student in a budget group
                 Changing a student’s budget group to reflect mixed enrollment
                 Determining whether components were system generated, manually
                    assigned, or generated as a result of mixed
            o   Funds Management
                 Relate a fund to the Accounts Receivable detail code, and allow
                    disbursement of the fund to the student’s account
                 Build fund-specific awarding and disbursement rules
                 Establish a standard awarding and disbursement schedule for each aid period
                 Define packaging and disbursement options for a fund
                 Associate tracking requirements and messages to a fund
                 Limit the amount awarded from a fund to a single budget component or
                    group of budget components
                 Limit the amount disbursed from a fund to a single detail code or group of
                    detail codes
                 Create a customized fund-specific disbursement schedule
                 Establish an award and disbursement schedule for a specific fund that
                    overrides the default parameters previously built
            o   Student Employment
                 Rules and validation tables for Student Employment Authorization and how
                    the client will maintain these values
                 A placement codes, organization codes, and position codes as appropriate
                 Create student employee authorizations
                 Update student wages manually or by using the payroll interface, as needed.


                                                                                     v.0.13.1
OneAstate                     SCT- Confidential & Proprietary                   Page 48 of 80
                         ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc           February 14, 2012
                                                                 Project Definition

            o   Packaging and Disbursement
                 Rules and Validation tables for manual and/or automatic awarding
                   (automatic awarding subject to Banner FA system baseline
                   capabilities)
                 Award disbursement to Student Accounts Receivable
                 Define packaging group codes and rules
                 Define packaging options to determining when awards to students will be
                   made
                 Enter and maintain resource information and create exemptions and third-
                   party contract rules
                 Assign a student to a packaging group either automatically online, manually,
                   or in batch
                 Award a student’s funds based on rules either in batch or automatically
                   online
                 Manually award additional funds after automatic packaging to meet any
                   remaining ASU need
                 Send award letters
                 Award, accept, and decline/cancel funds manually and through mass entry
                 Define when and how specific funds can be awarded to students using funds-
                   management rules, and gap, equity and self-help packaging rules
            o   Loans
                 Rules and Validation tables for Loan processing: CommonLine,
                   Direct Loans, or Manual Loans
                 Perform electronic loan application creation activities
                 Maintain electronic loan application changes and processing
                 Process Guarantor Response files
                 Execution of EFT processes
                 General setup steps to activate the Direct Loan module
                 State the data elements and data definitions within Direct Loan
                 Discuss the data processing steps for the Direct Loan processing flow
                 Process applications and monitor disbursement of checks
                 Generate standard reports and run processes
                 Establish processing options for the Loan module to process manual (paper)
                   loan applications
                 Define a loan period for loan processing
                 Process manual (paper) loan applications
                 Post and disburse loan proceeds
            o   Award History
                 Viewing student award history
                 Obtain the financial aid history of transfer students
            o   Common Functions
                 Rules and Validation tables for:


                                                                                      v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                   Page 49 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc           February 14, 2012
                                                                    Project Definition

                         o Batch Posting processes
                         o Financial Aid Holds, Messages, User-Defined Fields
                         o Satisfactory Academic Progress
                         o FISAP Reporting
            o   Letter Generation, Population Selection and Job Submission
                 Discussion and overview of the standard reports and processes
                 Submission of reports and processes using Job Submission
                 Definition of population selections and a discussion of the various
                    ways population selections can be used
                 Creation of population selections, manually or via rules for specific
                    Financial Aid needs
                 Tracking and budgeting
                 ISIR
                 Overview of the letter generation process
                 Training on the creation of letters, including basic components of a
                    letter such as variables, objects and paragraphs
                 Extraction of information and merging that information into a word
                    processing document.
                 Discussion of Letter Generation for Award Notification and
                    Applicant Tracking needs
                 Rules and Validation tables required for FISAP reports
                 Generating the FISAP reports using job submission
            o   Go-Live Support

2.1.18 Human Resources
      SunGard SCT will provide system education training and process consulting support on
       the features, functions, processing rules, operating cycles, and set-up requirements of the
       baseline SunGard SCT Banner Human Resources System, anticipated to include training
       and process consulting support in the following areas. The specific areas of training and
       process consulting support to be provided to Licensee will be determined as part of the
       preliminary Project Planning activities.

            o   Biographic and Demographic Information
                 Validation tables for biographic and demographic information
                 Store comments, including interview results and offer stipulations
                 Educational background, including institutions attended and degrees received
                 Employment experience
                 Veteran status
                 Publications record
                 Certification information
                 Skill descriptions

            o   Employee Compensation Administration

                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 50 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                    Project Definition

                   Rule and validation tables for employee
                   Identify an employee’s status, class, hire dates, leave and benefit categories,
                    and reporting organization
                   Collect direct deposit information
                   Maintain leave records, including type, year-to-date accrued hours, year-to-
                    date used hours, prior year balances
                   Create and maintain an internal employee history
                   Define an employee’s assigned job, including description, class, salary grade
                    and step, contract type, shift, and status
                   Create and maintain a job history to track changes in an employee’s
                    movement through the salary scale
                   Maintain year-to-date totals of employee hours and earnings

            o   Benefits/Deductions Administration
                 Rules and validation tables for benefits and deductions
                 Multiple calculation methods and payroll deduction frequencies
                 Employee option of using pre- or post-tax dollars
                 Ability to enter data with future effective dates
                 Ability to define preclusion rules to prevent employees from selecting
                   competing benefits
                 Ability to designate and calculate imputed income for taxable fringe benefits
                 Unlimited number of benefit plans
                 Grand fathered benefit plan structures
                 Premium and census reports
                 Capture biographic and demographic information on dependents and
                   beneficiaries
                 Associate dependents and beneficiaries with specific deductions and
                   coverage
                 Unlimited number of flexible spending accounts
                 Automatic under/over-utilization calculations
                 Automatic notification of qualifying events occurring in other modules of the
                   Human Resource System
                 Automatic notification and length-of-coverage date calculations
                 Automatic correspondence generation
                 Billing and payment administration process

            o   Time Entry and Payroll Processing
                 Rules and validation tables for time entry and payroll
                 Collection of time sheet data, including positive and exception hours
                 Accrue to and take from leave balances
                 Validate earnings codes, hours, and special rates to insure eligibility of
                   earnings type by employee group


                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 51 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                     Project Definition

                   Obtain time sheet summary totals by department to support time entry
                    balancing procedures
                   Define an unlimited number of premium rates and special payment methods
                   Calculate taxable gross income, including or excluding any user-specified
                    earnings and deduction amounts
                   Automatically calculate and generate overtime pay as determined by FLSA
                    requirements
                   Automatically calculate federal, state, and local taxes via user-defined tables
                   Calculate and apply deductions, including user-authorized payments and
                    deposits, tax levies, garnishments, and savings bond purchases

            o   Electronic Approvals
                 Rules and validation tables
                 Approval signature process for centralized and decentralized HR operations

            o   Employee Relations
                 Rules and validation tables
                 Bargaining unit membership
                 Multiple bargaining unit relationships
                 Seniority tracking
                 Grievance tracking

            o   Health and Safety
                 Rules and validation tables
                 Supports the entering and reporting of employee health information
                 Satisfaction of Occupational Safety and Health Act requirements

            o   Position Management and Budgeting
                 Rule and validation tables for Position Control
                 Establish position definitions, including classification, salary, grade,
                    occupation code, EEO Primary Activity code and labor distribution
                 Preparing budgets for personnel services, fringe benefits, and premium
                    earnings
                 Compare position expenditures with budgeted amounts to ensure compliance
                    with budget requirements
                 Exchanging data with the SunGard SCT Banner Finance System, if present
                 Position authorization and monitoring
                 Position budgeting and expenditure control
                 Personnel services budgeting
                 Position history
                 Reporting
            o   Go-Live Support


                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 52 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                    Project Definition

            o   Employee Self-Service
                 Validation and rule tables for Web-based functionality
                 Validation and rule tables for Web Time Entry capabilities
                 Submission of time transactions directly from the Web to SunGard SCT
                   Banner Human Resources Component system
                 Web General/ Web Tailor for enabled Employee modules

2.1.19 Advancement
      SunGard SCT will provide system education training and process consulting support on
       the features, functions, processing rules, operating cycles, and set-up requirements of the
       baseline SunGard SCT Banner Advancement System, anticipated to include training and
       process consulting support in the following areas. The specific areas of training and
       process consulting support to be provided to Licensee will be determined as part of the
       preliminary Project Planning activities.

            o   Constituent and Organization Modules
                 Discussion and demonstration of the interface between Banner
                   Student and Banner Advancement/Development
                 Creating records with multiple names and ID numbers
                 Maintenance of biographic and demographic information for
                   constituents, including:
                        o Addresses, phone numbers and general biographic
                            information
                        o Academic history
                        o Relationship data
                        o Employment information
                        o Activities, and mailing, exclusion and other special codes
                        o Comments
                 Maintenance of biographic and demographic information for
                   organizations, including:
                        o Addresses, phone numbers and general business information
                        o Contacts
                        o Matching gift rules
                        o Activities and mailing, exclusion and other special codes

            o   Campaign and Designation Modules
                    Discussion of various campaign structures and methods for tracking
                      campaign information in Banner
                    Creation and maintenance of campaigns
                    Association of designations and solicitation data with campaigns
                    Definition of Banner designations
                    Creation and maintenance of designations


                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 53 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                    Project Definition

                       Link of Banner Advancement Development Designations to Banner
                        Advancement Funds – providing stewardship information
                       Designation Accounting Distribution and link to Banner Finance

            o   Gift, Payment and Pledge Processing
                     Entry and maintenance of pledge information, including:
                        o Conditional pledges and FASB compliance
                        o Associating pledges with appropriate campaigns and
                           designations
                        o Pledges made by third parties
                        o Tracking solicitation information for pledges
                        o Tracking payroll deduction pledges via the interface with
                           SunGard SCT Banner Human Resources
                        o Feeding pledge information to SunGard SCT Banner
                           Finance
                        o Adjustment of pledge information

                       Entry and maintenance of gift and payment information, including:
                        o Associating gifts and payments with appropriate campaigns
                            and designations
                        o Payments made by third parties
                        o Tracking solicitation information for gifts and payments
                        o Associating payments with appropriate pledges
                        o Tracking payroll deduction payments via the interface with
                            SunGard SCT Banner Human Resources
                        o Feeding gift and payment information to SunGard SCT
                            Banner Finance
                        o Adjustment of gift and payment information

                       Entry and maintenance of matching gift, including:
                        o Establishing matching gift companies and linking employees
                            to these companies
                        o Establishing institutional matching gift rules
                        o Maintenance of corporate matching gift rules
                        o Running the Banner matching gift reports and processes
                        o Manually creating anticipated and expected matching gifts
                        o Entering matching gifts received from companies
                        o Entering matching gifts as third party payments

            o   Gift Societies and Acknowledgments
                     Discussion of institutional policies regarding gift societies and
                        recognition clubs
                     Banner qualifying rules for gift societies
                     Maintenance of society names for donors

                                                                                         v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                      Page 54 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                   Project Definition

                       Discussion of institutional policies regarding acknowledgments and
                        receipts for donors
                       Creation and maintenance of SunGard SCT Banner qualifying rules for
                        gift and pledge acknowledgments and receipts
                       Establishment of appropriate letters using the SunGard SCT Banner
                        Letter Generation module

            o   Solicitor Organizations (staff and volunteer organizations)
                     Discussion of institutional procedures for tracking solicitor and volunteer
                        organizations
                     Discussion and demonstration of various methods for tracking solicitor
                        information in Banner
                     Creation and maintenance of solicitor organization structures
                     Application of solicitor organizations to campaigns, gifts, payments and
                        pledges

            o   Prospect Management
                     Discussion of institutional policies and procedures for tracking prospects
                       and prospect information
                     Creation and maintenance of prospect information, including
                       o General prospect information
                       o Research data
                       o Proposals and projects
                       o Contacts, call reports
                       o Strategic plans

            o   Membership
                   Discussion of institutional policies and procedures for tracking
                      memberships and membership programs
                   Creation and maintenance of membership programs and interests
                   Creation and maintenance of membership qualifying rules
                   Entry and adjustment of membership dues

            o   Events Management
                    Creation and maintenance of events and functions
                    Scheduling functions and rooms
                    Tracking invitees, attendees and participants
                    Recording task assignments for an event or function

            o   Population Selection, Letter Generation, Job Submission
                    Discussion and overview of the standard reports and processes that are
                        part of SunGard SCT Banner Advancement Development


                                                                                        v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                     Page 55 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc             February 14, 2012
                                                                    Project Definition

                      Submission of reports and processes using SunGard SCT Banner Job
                       Submission
                      Definition of Banner population selections and a discussion of the
                       various ways population selections can be used
                      Creation of population selections, manually or via rules
                      Overview of the SunGard SCT Banner letter generation process
                      Creation of letters, including all components of a letter such as variables,
                       objects and paragraphs
                      Extraction of information from SunGard SCT Banner and merging that
                       information into a word processing document.

            o   Assistance in Data Mapping for conversion purposes
            o   Assistance in Data Conversion strategy and Planning
            o   Go-Live Support
            o   Advancement Self-Service
                    Validation and rule tables for Web-based self-service functionality
                    Training in the components and navigation of the SunGard SCT Banner
                        Advancement Self Service system
                    Navigation and functionality contained in the SunGard SCT Banner
                        Advancement Self Service system available for view and update by
                        constituent users
                    Navigation and functionality contained in the SunGard SCT Banner
                        Advancement Self Service system available for view and update by
                        Licensee staff users
                    Web General/ Web Tailor for enabled Advancement and Development
                        modules

2.2   Exclusions
       The following will not be considered part of the SCT Luminis Implementation project
       •       Installation and configuration of the Relational Database Management System

2.3   Planned Process Improvements
       Through the use of the SunGard SCT Project Management methodology (CSM) we will
       be able to achieve the level of success that is expected.

3 Project Milestones

                                      Milestone                                   Date
        Project Started                                                     09/01/2004
        Project Definition Approved                                         12/17/2004
        Project Schedule Complete                                           12/17/2004
        Finance Go-Live                                                     01/01/2006

                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 56 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                    Project Definition

                                        Milestone                                 Date
           Financial Aid Go-Live                                            02/15/2006
           Student – Recruiting                                             Summer 2005
           Student – Admissions                                             Summer 2005
           Student – Registration                                           03/30/2006
           HR                                                               01/01/2007
           Advancement                                                      06/29/2007
           Luminis Portal                                                   05/31/2005
           Luminis Content Management System                                TBD
           LDI- for e-Learning with Blackboard                              TBD
           Project Ended                                                    08/31/2007



4 Project Budget
       The project budgets please refer to the contract between Arkansas State University and
       SunGard SCT.

5 Assumptions/Dependencies
       Assumptions and Dependencies are items that are being presumed and are potentially out
       of our control.

5.1   Assumptions
            Have executive level support throughout the Project.
            Project OneAstate remains an ASU priority.
            Will receive adequate funding to implement.
            Training requirements are communicated effectively (how, who, when, funding,
             where, branches).
            No changes to the baseline Banner® Systems.
            Project Teams receive the training needed to do job from SunGard SCT.
            Departments & offices receive resources to support on-going training.
            Upgrades to networks and infrastructure enable connections to meet service level
             agreements.
            Provide adequate human resources to implement the system.
            PLUS will be retired.
            Executive level support for the moratorium on changes to the legacy systems.
            Executive Committee supports the cultural, policy and organizational changes
             necessary to successfully implement Banner® systems.
            Campus community wants this Project to succeed.
            SunGard SCT and other vendors deliver the products and services as contracted.
            Adequate release time will be granted to allow employees to participate in required
             training.


                                                                                          v.0.13.1
OneAstate                         SCT- Confidential & Proprietary                    Page 57 of 80
                             ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc            February 14, 2012
                                                                    Project Definition

           Executives acknowledge that resources will be stretched during implementation,
            affecting existing levels of service.
           Banner® systems meet the core business needs.
           There will be changes to the way we do business.
           There will be some losses and some gains in functionality, but overall the net change
            will be positive.
           Provide the appropriate structure to effectively communicate Project activities.

5.2   Dependencies

5.2.1 Dependent Projects

        Capturing accurate project dependency information is critical to identifying early the
        issues that may prevent ASU from implementing project deliverables because of known
        issues that are jeopardizing the completion of a project upon which this project depends.

        Project Name           Expected Completion Date           Reason for Dependency
Banner 7.x Migration                                      Meet minimum software dependencies.
Banner 7.x Self-Service                                   Meet minimum software dependencies.
Install/upgrade
Banner 7.1 Intcomp                                        Meet minimum software dependencies.
                                                          When performing the Banner 7.x upgrade,
                                                          will also need to upgrade to at last Banner
                                                          Intcomp 7.1
Banner 7.1 Extract                                        Meet minimum software dependencies.
                                                          When performing the Banner 6.x upgrade,
                                                          will also need to upgrade to at last Banner
                                                          Extract 7.1
Luminis Upgrade/Migration                                 Meet minimum software dependencies;
                                                          complete the architecture to support the e-
                                                          Education Infrastructure.
Blackboard Install/Upgrade                                Meet minimum software dependencies.


5.2.2 Dependent Products

        Capturing accurate product dependency information is critical to identifying early the
        issues that may prevent implementation of project deliverables because of known issues
        with products upon which this project depends.


      Product Name               Release         Release             Reason for Dependency
                                 Number       Dependency is
                                                 Higher


                                                                                           v.0.13.1
OneAstate                         SCT- Confidential & Proprietary                     Page 58 of 80
                             ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc             February 14, 2012
                                                                     Project Definition

      Product Name                  Release        Release            Reason for Dependency
                                    Number      Dependency is
                                                   Higher
Banner® Finance               7.0                               New Install
Banner® Student               7.0                               New Install
Banner® Financial Aid         7.0                               New Install
Banner® HR                    7.0                               New Install
Banner® Advancement           7.0                               New Install
Banner® Finance Self-         7.0                               New Install
Service
Banner® Student Self-         7.0                               New Install
Service
Banner® Faculty & Advisor     7.0                               New Install
Workflow                                                        New Install
fsaAtlas                                                        New Install
Touchnet Payment Gateway                                        Upgrade
Touchnet Webcheck/remote                                        New Install
Blackboard Enterprise                 6.1                       Accepts user, course and
                                                                enrollment data from Banner using
                                                                the IMS specifications standard
Banner Intcomp                5.3 or 6.1.1                      Minimum level to support LDI data
                                                                processing.
Banner LDI Extract            5.3 or 6.1.1                      Minimum level to support LDI data
                                                                processing.
Blackboard                    6.1 with LDI                      Minimum level to support LDI data
                              Integration                       processing.
                              Agent
Luminis                       LPIII.2                           Minimum level to support LDI data
                                                                processing.
Luminis Data Integration      Starter Edition                   Minimum level to support LDI data
Suite (LMB and LMG)           (SE)                              processing.
SCT IC                        Latest                            Minimum level to support LDI data
                                                                processing.


5.2.3 Dependent Resources
             Full time positions identified in section 8, Project Organization, and SCT consultants
              are critical to the success of this Project. Turnover in these key positions could
              adversely impact the timeline, scope and quality of the implementation.
             Contingency funds for contract/consultant staff are necessary if Project deadlines are
              jeopardized by an inability to hire regular staff.




                                                                                           v.0.13.1
OneAstate                        SCT- Confidential & Proprietary                      Page 59 of 80
                            ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                     Project Definition

6 Project Constraints
       Project Constraints are aspects about the project that cannot be changed and are limiting
       in nature. Constraints generally surround four major areas: Scope, Cost, Schedule (Time),
       and Quality. Either through direction given by the Project Sponsor(s) of the project, or by
       working through the issues, the constraining factors of the project must be identified.

6.1   Project Dimension Grid
       The grid below prioritizes the critical project dimensions and is used to negotiate changes
       during the course of the project. First step is to specify the constraining dimension. Is the
       critical project driver scope, cost, quality, or time? The second step is to specify the
       accept dimension. If change is required, in which area are the key stakeholders most
       willing to accept change–scope, cost, schedule, or quality? Change must be accepted in at
       least one dimension. This is specified in the Vary column below. Remaining dimensions
       are then minimized or maximized. These dimensions will be utilized for all aspects of the
       project, unless explicitly stated in a sub-project definition.

       Specify the project dimensions below. Constrain at least one dimension and vary at least
       one dimension.

Project Dimension      Minimize/Maximize               Constrain                     Vary
Scope                                                    Yes
Cost                                                     Yes
Schedule                     Maximize                                                 Yes
Quality                      Maximize

6.2   Constraint Details
       ASU constraints include:
                   Cost – Project is to be completed within budget.
                   Schedule – Project is to be completed within the schedule timeframe.
                    Critical milestones are identified and need to be met.
                   Scope/Quality – scope and quality are not to be compromised.

       If an event or case is encountered which will impact one of the Project dimensions, the
       first response will be to review the priorities noted above; however, each case will be
       reviewed and evaluated on an individual basis and the decision made will consider the
       overall needs of the Project. Known exceptions to the Project dimension grid include:
                 Blackout dates identified by departments will be followed as much as
                    possible.
                 Budget and technical resources are constraints that determine the need to
                    install a “vanilla” system.
                 Availability of human resources.


                                                                                          v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                       Page 60 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                           Project Definition



     7 Risks
               Approaches to responding to risks include Deflection (transferring the risk to another
               party), Control (minimize the effect), Retention (accept the consequences), and
               Avoidance (reject the risk; do nothing).



        Risk             Probability   Estimated   Weight     Issue or    Mitigation         Contingency
                             of         Project    B+(A-1)   Jeopardy     Strategy
                         Occurrence     Impact                Control
                            (A)           (B)                   No.
Policy changes will          2             3         4                   Deflect       Escalate to the Steering
not be made and                                                                        Committee for action and
approved in a                                                                          reschedule work till
timely manner                                                                          policy is changed.
resulting in inability
to meet timeline
milestones.

Users do not attend          2            2          3                   Deflect       Intervention by VP,
necessary training                                                                     Dean, Director level.
resulting in their                                                                     Publish the Steering
inability to use the                                                                   Committees support and
system and process                                                                     communication
transactions                                                                           establishing mandatory
                                                                                       training. Reschedule
                                                                                       training classes and
                                                                                       Publish the Multiple
                                                                                       methods of training, e.g.,
                                                                                       web, written, meetings.
                                                                                       Publish training dates in
                                                                                       advance; multiple
                                                                                       offerings of training
                                                                                       classes; flexible times for
                                                                                       training sessions
                                                                                       (including evening or
                                                                                       weekend). Users will not
                                                                                       be granted access without
                                                                                       training.

Employee burnout             2            2          3                   Control       Identify alternate
of (a) project staff                                                                   resources to lessen the
and/or (b) current                                                                     workload on affected
operational staff                                                                      individuals and/or


                                                                                                v.0.13.1
     OneAstate                          SCT- Confidential & Proprietary                    Page 61 of 80
                                   ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc            February 14, 2012
                                                                        Project Definition

        Risk           Probability   Estimated   Weight     Issue or   Mitigation         Contingency
                           of         Project    B+(A-1)   Jeopardy    Strategy
                       Occurrence     Impact                Control
                          (A)           (B)                   No.
results in adverse                                                                  workgroups.
impact on
implementation
timeline or scope

Lack of buy-in and         1            3          3                   Control      Escalate issues to
resistance to change                                                                appropriate executive
undermines the                                                                      level for timely
objectives of the                                                                   resolution. Provide
project                                                                             change management
                                                                                    support activities.
                                                                                    Publicize executive level
                                                                                    support of project.
                                                                                    Establish communication
                                                                                    team to ensure timely and
                                                                                    accurate information is
                                                                                    provided to university
                                                                                    community. Include
                                                                                    stakeholders in analysis,
                                                                                    design and
                                                                                    implementation
                                                                                    processes. Immediately
                                                                                    address issues as they
                                                                                    occur.

Executive level            1            1          1                   Control      Empower the project
turnover results in                                                                 committee to continue
loss of project                                                                     with additional approval
sponsorship.                                                                        authority.

Pressure to make           1            2          2                   Control      Explain to requestor why
changes to Banner                                                                   the change can not be
baseline product                                                                    accommodated and
results in increased                                                                maybe help them fill out
long term costs,                                                                    a RPE.
inability to meet
timeline, inability
to implement future
releases of the
product.

Other high priority        2            2          3                   Deflect      Intervention by VP level
ASU projects or                                                                     to reset priority level and
changes in policy                                                                   direct staffing as


                                                                                             v.0.13.1
     OneAstate                        SCT- Confidential & Proprietary                   Page 62 of 80
                                 ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc           February 14, 2012
                                                                          Project Definition

        Risk             Probability   Estimated   Weight     Issue or   Mitigation         Contingency
                             of         Project    B+(A-1)   Jeopardy    Strategy
                         Occurrence     Impact                Control
                            (A)           (B)                   No.
compete for critical                                                                  required.
project resources
resulting in
inadequate staffing
and inability to
meet timeline
milestones.

Training                     1            2          2                   Control      Publish the Multiple
incomplete by go                                                                      methods of training, e.g.,
live date resulting                                                                   web, written, meetings.
in users' inability to                                                                Publish training dates in
utilize system.                                                                       advance; multiple
                                                                                      offerings of training
                                                                                      classes; flexible times for
                                                                                      training sessions
                                                                                      (including evening or
                                                                                      weekend). Users will not
                                                                                      be granted access without
                                                                                      training.

Delays in hardware           1            2          2                   Control      Reschedule installation
and software                                                                          and may have to have a
procurement result                                                                    Remote only installation.
in inability to meet
project milestones.

Unforeseen major             1            2          2                   Control
disaster (e.g.
weather disaster,
terrorism, long term
electrical outage)
results in inability
to meet timeline
milestones.

Implementation               1            1          1                   Control      Convert a training session
Team does not have                                                                    in to a consulting visit to
sufficient time to do                                                                 give expert help to build
SunGard SCT                                                                           system.
assigned
"homework"
between training
sessions. Therefore


                                                                                               v.0.13.1
      OneAstate                         SCT- Confidential & Proprietary                   Page 63 of 80
                                   ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc           February 14, 2012
                                                                          Project Definition

        Risk             Probability   Estimated   Weight     Issue or   Mitigation         Contingency
                             of         Project    B+(A-1)   Jeopardy    Strategy
                         Occurrence     Impact                Control
                            (A)           (B)                   No.
they do not learn
the system.

Turnover of Key              1            2          2                   Control      Replace with a qualified
ASU Project                                                                           candidate so that the
Personnel                                                                             implementation schedule
                                                                                      is not impacted.

Turnover of Key              2            1          2                   Control      Replace with a qualified
SunGard SCT                                                                           candidate so that the
Project Personnel                                                                     implementation schedule
                                                                                      is not impacted.

Critical project staff       1            2          2                   Control      Agree to the baselined
not available                                                                         schedule and use
                                                                                      contingency funds to
                                                                                      hire additional staff.
                                                                                      Adjust delivery date, or
                                                                                      reduce other
                                                                                      functionality

Implementing too             1            1          1
many interfaces at
the same time.

Significant                  1            1          1                   Control      Inquire about getting an
regulatory changes                                                                    extension for the
(federal/state)                                                                       regulation due to new
                                                                                      system implementation.

Legacy data not              1            2          2                   Control      Bring on SunGard SCT
converted to Banner                                                                   consultants to help with
as scheduled                                                                          the conversion.

Over scheduling of           2            1          2                   Control
ASU staff

ASU is unable to             2            2          3                   Control      Execute numerous
agree on a common                                                                     sessions with content
design of the portal                                                                  managers and the Pilot
front end.                                                                            Group
Lack of                      2            1          2
representation from
departmental

                                                                                               v.0.13.1
     OneAstate                          SCT- Confidential & Proprietary                   Page 64 of 80
                                   ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc           February 14, 2012
                                                                            Project Definition

       Risk            Probability   Estimated    Weight      Issue or    Mitigation          Contingency
                           of         Project     B+(A-1)    Jeopardy     Strategy
                       Occurrence     Impact                  Control
                          (A)           (B)                     No.
stakeholders around
the institution


              Probability of Occurrence, Estimated Project Impact, and Weight (described below) are
              the method used to classify risks. Probability guidelines:

                 Very Likely          70-100%            A=3
                 Probable             40-70%             A=2
                 Unlikely             0-40%              A=1

              Impact guidelines for scope, cost, schedule, or quality

                 Catastrophic         B=3
                 Critical             B=2
                 Marginal             B=1

     8 Project Organization

     8.1   Project Team
              This is a high-level listing of the personnel involved that will be assigned to this project.
              Each resource on the project should be listed here or in the Project Schedule. The
              Resource type should describe the responsibilities - project manager, etc. There should be
              a resource type for every role defined in the Roles and Responsibilities section below.
              Examples of key roles are listed.




              Resource Type                      Name           Person Hours or       Date Range When
                                                                  Days Needed        Resource is Needed
     Project Manager                   Brian Lewis              As required by      09/04 – 08/07
                                                                contract
     Account Management                Jo Ann Puissgeur         As needed           09/04 – 08/07
     QA Analyst                        Deb Keener               As required by      09/04 – 08/07
                                                                contract


                                                                                                 v.0.13.1
     OneAstate                        SCT- Confidential & Proprietary                       Page 65 of 80
                                 ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                            Project Definition

         Resource Type                      Name               Person Hours or       Date Range When
                                                                Days Needed          Resource is Needed
Blackboard Project Manager         TBD
SCT Luminis Technical Consultant   Carlos Pena
SCT Luminis CMS Consultant
SCT Organizational Trainer         Mark Sonntag
SCT Luminis Organizational
                                   Mark Sonntag
Consultant
                                   Brian Lewis
SCT Luminis Project Manager
ASU Public Web Coordinator**
ASU Blackboard Coordinator**
ASU Luminis Trainer**
ASU Portal Implementation
Team**
ASU Luminis Administrator          Todd Reed                         100%           11/04 – 08/07
ASU Database Administrator**       Sara Moser                        100%           11/04 – 08/07
** These titles may not reflect the positions/committee when actually established
      * Hours are estimated averages over the duration of the Project.

8.2     Roles and Responsibilities
Individuals,            Roles, Responsibilities and Authorities
Groups
Executive               The Executive Committee shall:
Committee                     Provide broad institutional and political support throughout the Project.
                              Provide adequate and timely financial support throughout the Project.
                              Resolve escalated issues in a timely manner.
                              Make final decisions on all requests for modification of baseline software
                                 or use of third-party software in lieu of available Banner® functionality.
                              Ensure that the new systems and processes are designed and implemented
                                 in accordance with the Project’s Guiding Principles.
Executive Sponsor       Executive Sponsor.
                              Ultimately responsible for successful implementation and use of all
                                 Banner® modules.
                              Removes obstacles to a successful implementation Project.
                              Makes timely decisions on issues escalated to them by their Project
                                 Manager or the Implementation Team.
                              Facilitates timely decisions on issues escalated to the Executive
                                 Committee.
                              Ensures that the new systems and processes are designed and implemented
                                 in accordance with the Project’s Guiding Principles.
OneAstate Process       In accordance with the approved description of the OneAstate Process Team, this
Team                    group:
                              Ensures that the business solutions that are implemented under the
                                 auspices of Project OneAstate exemplify the Project’s Guiding Principles.
                              Provides a forum within which each Project Lead can gain a broader


                                                                                                 v.0.13.1
OneAstate                           SCT- Confidential & Proprietary                         Page 66 of 80
                               ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                 February 14, 2012
                                                                        Project Definition

Individuals,           Roles, Responsibilities and Authorities
Groups
                                understanding of key initiatives within their respective areas.
                       Areas in which the OPT is empowered to review and make final decisions include:
                             Issues of Integration
                             Cross-functionality
                             Communication
                             Change Requests
OneAstate Project      In accordance with the approved ASU job description:
Manager                      Provides the day-to-day oversight and coordination of Project OneAstate
                                implementations.
                             Single point of contact for the overall administrative responsibility and
                                accountability for the Banner® Implementation Team interacting with the
                                SunGard SCT Project Manager, ASU Project Leads and Executive
                                Committee.
                             Monitors relationship between ASU and SunGard SCT to ensure contract
                                compliance.
                             Provides full-time functional and technical direction in planning and
                                implementing a major system.
                             Identifies requests and schedules necessary resources for Project activity
                                as appropriate to meet implementation requirements.
                             Ensures Project is moving forward, meeting targets and expectations, and
                                maintaining focus.
                             Communicates with appropriate levels of the organization and Project
                                teams at critical points.
                             Advises stakeholder groups representing the campuses regarding needs for
                                cross-functional considerations, workflow integration, task overlaps,
                                teamwork, and optimization of best practices.
                             Prepares monthly Project Status Reports for the OneAstateTeam.
                             Manages Project’s budget.
                             Maintains regular contact with Executive Sponsor by providing regular
                                updates on the Project i.e. progress, risks, issues, etc.
                             Reviews, prioritizes and manages Change Requests.
Functional/Technical   These functional and technical experts are assigned full time to the Project to
Team Leads             provide direction to one or more Project work groups performing the detailed tasks
                       associated with the Banner® implementation.
                             Lead and manage one or more work groups in the planning and
                                performance of the detailed tasks associated with implementing a major
                                module or component of a Banner® module. (Note: the Team Leads,
                                along with the Project Manager comprise the Project Management Team.)
                             Submit weekly status reports to Project Manager, highlighting progress,
                                risks, and new developments.
                             Attend relevant SCT training.
                             Review and recommend Change Requests.
Work Groups            A small group of people comprised of functional and/or technical members who
                       perform detailed implementation tasks as required. Work groups are formed and
                       dissolved as required by evolving team tasks.


                                                                                               v.0.13.1
OneAstate                        SCT- Confidential & Proprietary                          Page 67 of 80
                            ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                  February 14, 2012
                                                                        Project Definition

Individuals,         Roles, Responsibilities and Authorities
Groups
                         Participate in all required work-team activities.
                         Meet with other team members and Team Leads as often as necessary, but no
                          less than weekly.
                      Play an active role in research and contribute to the team’s decisions and
                          recommendations.
                      Ensure dissemination of approved Project information back to their respective
                          home departments.
                      Solicit input and concerns from home department staff, and bring those
                          concerns to Team Lead.
Major Stakeholders   Organizational leaders responsible for specific enterprise-wide business processes
                     who are seen as major stakeholders in the success of each implementation Project.
                     Each Project Team Lead will identify his or her own major stakeholders group.
                           Responsible for the long-term management and training of the systems
                               and processes created during the implementation phase of Project
                               OneAstate.
                           Provide guidance with regard to potential changes to such processes or
                               underlying policies as necessitated by the Project.
                           Encourage staff support for business process changes.
                           Ensure staff members participate in demonstrations & training sessions.
                           Collaborate with Project Management Team members to ensure that
                               functional experts can focus on, and are recognized for Project OneAstate-
                               related responsibilities.
                           Participate in regular Project update meetings to help ensure that the new
                               systems and processes are being designed to meet critical business needs.
                           Review and endorse potential Change Requests.
                           Identify and ensure that appropriate functional staff expertise and financial
                               resources are made available to the Project Manager.
Project Management   A small group of organizational leaders for Project OneAstate implementation who
Team                 assist the Project Manager in planning and executing the Banner® implementation
                     by:
                           Monitoring Project scope,
                           Maintaining Project schedule,
                           Reviewing and approving Change Requests,
                           Ensuring comprehensive communication plans,
                           Providing staffing and administrative support.
Organizational       This Project OneAstate team will:
Readiness Team        Compose and disseminate all public information regarding the Project. This
                          includes, but is not limited to a Project website, news releases, articles, and
                          newsletters.
                      Ensure that ASU faculty, staff and students receive sufficient training and on-
                          going support so that they are successful in utilizing the new systems.
                      Ensure that ASU faculty, staff, and students have available resources to assist
                          them in adapting to the new systems.
Technical            This Project OneAstate will:
Architecture Team     Translate complex, immediate business needs into clear, generic implications


                                                                                              v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                           Page 68 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                   February 14, 2012
                                                                       Project Definition

Individuals,         Roles, Responsibilities and Authorities
Groups
                         for the technical architecture of ASU, robust enough to respond to those needs
                         and scalable to the next phases to be implemented.
                        Discern what's 'necessary' technology, what's 'prudent and appropriate’
                         technology in an environment where the Project scope is dynamic, and what
                         technology is purely 'nice to have', and make the best recommendation for
                         ASU.
                        Make technical decisions that can be implemented and maintained to support
                         the business decisions made by ASU leadership.
                        Plan for ASU-wide connectivity
                        Current responsibilities include:
                              o Hardware and software necessary for the Banner® applications
                              o Calendaring and email systems to accommodate Banner®
                              o Database management,
                              o End-user technical support,
                              o Luminis implementation, system security,

8.3   Change Control Board

                      Member Name                          Role or Area of Representation
         Executive Steering Committee                Review and approve escalated request as
                                                     deemed necessary for success of Project
                                                     OneAstate.
         Project Management Team                     Review and approve as deemed necessary
                                                     for success of Project OneAstate.
         SunGard SCT Project Manager                 To process all change requests for Proejct
                                                     OneAstate.
         SunGard SCT Account Manager                 To act as the SunGard SCT management
                                                     approval for change requests.
         SunGard SCT General Manager                 SunGard SCT Executive approval



9 Project Approach
        The project approach section defines the overall method by which the project’s objectives
        will be realized, including methodologies, life cycles, responsibilities, and other
        associated strategies, tactics, practices and procedures.

9.1   Define
        ASU and SunGard SCT will jointly develop the Project Definition Document (this
        document). Through a combination of presentations and dialogue, ASU and SunGard
        SCT identified the scope, organization, constraints, risks and approach to be used in the
        Project.


                                                                                             v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                          Page 69 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                  February 14, 2012
                                                                   Project Definition

9.2   Plan
       The following are the steps that will be used to plan the Project:
        Receive Project Budget approval.
        Create Project Definition Document.
        Develop Project Schedule.
        Develop System Education Plan.
        Develop Communication Plan.
        Obtain ASU and SunGard SCT management acceptance of Project Schedule and
          Project Definition Document.
        Develop Training Plan.
        Develop QA Plan.
        Develop Data Conversion Plan.
        Develop Testing Plan.
        Execute plans.

9.3   Implement
       Following are the steps that will be used to implement the Project:
        Install hardware and software.
        Complete business process analysis.
        Receive system education.
        Develop training materials.
        Develop prototype.
        Verify and validate prototype.
        Deploy prototype.
        Convert legacy data.
        Develop interfaces.
        Train end-users.
        Go live.
       Note that some of these steps occur in parallel:




                                                                                      v.0.13.1
OneAstate                     SCT- Confidential & Proprietary                    Page 70 of 80
                         ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc            February 14, 2012
                                                                               Project Definition


                                                  Project Approach

             Model Business
               Processes                           Validate Prototype                                Create Customer
                                                                                                   Process & Orientation



             Define Current
               Business
              Processes

                                                              Convert System
                                                                                                         Business Solutions
                                                                                                             Deployed


             Install System


                                                                               End Users Trained

                                                 Test Prototype
                                                                                                            Continuous
                                                                                                           Improvements
            Complete System
                                                                                                             Planned
               Education
                                  Prototype
                                   Business
                                  Processes,
                                  Workflows


             Model Business
                                                Refine Workflows
                Process




9.4   Close-Out
       Closing out the Project involves both product verification (was all work completed
       correctly and satisfactorily?) and administrative closure (verifying and documenting
       project results to formalize acceptance of the product of the Project by the sponsor, client,
       or customer, plus collection of Project records, ensuring that they reflect final
       specifications, analysis of Project success and effectiveness, and archiving such
       information for future use).

       The purpose of a Closeout/Post-Implementation Review is to determine if objectives
       were met, to review the procedures established and decisions made during the
       implementation, to identify system functionality and features excluded or intentionally
       deferred during the implementation, and to ensure efficiency and confirm users'
       understanding of the Banner® systems. The output of this process will allow the
       identification of future business practices and continual improved utilization of the
       system and functional processes.

       The Closeout/Post-Implementation Review will take place within one year after
       implementation of the Project.

       The following documents, accessible in the Project directory, may be used during the
       Closeout/Post-Implementation Review:


                                                                                                            v.0.13.1
OneAstate                          SCT- Confidential & Proprietary                                     Page 71 of 80
                              ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                             February 14, 2012
                                                                  Project Definition

                      Project Definition Document
                      Test Plan
                      Current and Future State Analysis Documents
                      System Education Agendas
                      End-User Training Agendas
                      End-User Training Schedules
                      Training Attendees Listings

       The OneAstate Implementation Team will be responsible to:
                  Conduct the Closeout/Post-Implementation Review at the time called for
                      in the Project Schedule.
                  Use the relevant Project documents to determine if all the
                      implementation tasks were completed.
                  Identify the major processes within each administrative department
                      and/or functional area and all the activities within each functional
                      process and to determine if procedures were written for each activity or if
                      activities listed were eliminated or improved as a result of the
                      implementation.
                  Determine if reporting requirements were met and if new input
                      documents were developed or current input documents modified as a
                      result of the implementation.
                  Review the status of New Requirements and Issues identified during the
                      business process analysis.

       ASU will:
                      Review Functional and Operations Procedures Manual to determine if
                       they meet the needs of the functional unit.
                      Use the department staff identified during campus end user training to
                       assess their product knowledge and determine training needs.
                      Verify that the proper security and system access has been granted.
                      Identify resources needed for ongoing support and maintenance of the
                       Financial Aid systems.

       The Closeout/Post-Implementation Review Document must include:
                   An Executive Summary stating if the Project objectives were met.
                   State if the objectives, tasks and deliverables for Project OneAstate
                      Banner® implementation were met. Verify the degree to which Project
                      success metrics were achieved. Include plans and timelines to implement
                      changes or new features. If major components remain to be implemented,
                      identify those responsible for implementation, the necessary timing and
                      supporting budget needs.




                                                                                        v.0.13.1
OneAstate                     SCT- Confidential & Proprietary                      Page 72 of 80
                         ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                   Project Definition

9.5   Change Management
       All change requests must be submitted on a Change Request Form located in the Project
       directory. Please refer to Configuration Management plan for details on the change
       management process.

9.6   Communication
       Refer to the Project OneAstate Communication Plan.

9.7   Measurement
       Go-live – Did the project meet the prescribed and approved Go-Live for each Module?
       This will be documented with a module certification documents.

9.8   Organizational Readiness
       It is a common misperception that the technology involved in large systems
       implementations like this pose the biggest problem. In actuality, the most difficult issues
       we face involve people and changes to their behavior. Preparing departments to perform
       day-to-day business on the new internet-based applications presents many challenges.
       The most serious challenges include:

                  Many business practices are built upon exception-based processing, and to a
                   large extent ASU employees have become dependant on this ability to “cut
                   the pattern to fit the cloth”. These new automated systems with their built-in
                   business rules and logic will not allow ad hoc changes.
                  Post-implementation support is critical (application support, training,
                   communication, change management).
                  Staff turnover and upgrades to Banner® software necessitate ongoing
                   training for staff and dedicated computer lab classrooms.
                  The ITS Helpdesk must support the ASU community with system related
                   issues encompassing a wide spectrum of potential problems from PC
                   configuration through specific business questions.
                  All organizational levels at ASU must make budget allowances to purchase
                   equipment that meets minimal Banner® functional needs.


9.9   Project Environment
       Project Software Environment:
            Calendar
            Email
            Microsoft Office Professional
            Microsoft Project 2002
            Microsoft VISIO Pro 2002

                                                                                         v.0.13.1
OneAstate                     SCT- Confidential & Proprietary                       Page 73 of 80
                         ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc               February 14, 2012
                                                                      Project Definition

               Adobe Acrobat
               Virus Protection Software (up-to-date)
               Windows 2000 Professional or XP Professional (with up-to-date patches applied)

       Project Space:
            Training/workroom for approximately 16 workstations has been proposed to be
           built in the former Grants & Contracts area in the library.

9.10 Quality Assurance
       Refer to the QA Plan.

9.11 Tracking
       Periodic review meetings and scope reassessment events are scheduled as follows:

           Project Management Team meets weekly to review status, issues and progress and to
            make decisions.
           Project Management Team meets, as needed, with key stakeholders in the Major
            Stakeholders Group to review status and request feedback on issues and validate
            Project approach.
           Frequent meetings, at least monthly, are held between the Project Manager and
            Executive Sponsor.
           Quarterly meetings by the Project Manager and SunGard SCT Project Manager are
            held with Executive Committee.

       Action items generated from meetings will be documented in meeting minutes and
       tracked to closure. Issues identified by the teams will be submitted, via the team lead, to
       the Project Manager on the Issues Report form. All Issues will be logged to the Issues
       Database and tracked to closure. Risks that are triggered and become either an Issue or
       Jeopardy will be submitted by the Project Manager or the SunGard SCT Project Manager
       to the Project Management Team, the Project Sponsor, and/or to the Executive
       Committee via an Issue Report Form or Jeopardy Report Form.

       An Issue is a day-to-day Project concern that is brought to the attention of the Project
       Manager. Issues are identified and tracked. If an issue grows and remains unresolved
       this could put the Project in jeopardy. In this case, the issue is turned into a Jeopardy.

       A Jeopardy is any issue that puts the Project at risk of not being able to achieve its scope,
       schedule, cost, or quality objectives. The intent of a Jeopardy is to identify critical issues
       as early as possible in the Project.




                                                                                            v.0.13.1
OneAstate                      SCT- Confidential & Proprietary                         Page 74 of 80
                          ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc                 February 14, 2012
                                                                   Project Definition

9.12 Risk Management
       Risks are identified at the beginning of the project and throughout the project. When a
       Risk is identified, Mitigation Actions and Contingency Plans are developed and recorded
       in the Work Product’s database for all risks ranked 3 or higher. The Project Manager
       manages the Risks by executing Mitigation Actions, which may include how the
       contingency plans will be implemented and how the reserves will be allocated. If a Risk
       materializes, it is escalated to a Project Issue or Jeopardy by executing the Identify and
       Resolve Issues or Identify and Resolve Jeopardies activities. Risk Contingency Plans may
       become the Project Issue or Jeopardy Action Plan.

10 System Requirements
       System Requirements are items that are necessary in order to run any related software
       required for the practices/methodologies at ASU including hardware and software needs.

10.1 Database Server Requirements
       Refer to the SunGard SCT Banner® Documentation.

10.2 PC Client Requirements
       Refer to the SunGard SCT Banner® Documentation.

10.3 SunGard SCT and 3rd Party, and Shareware/Freeware Product
     Requirements
       Indicate PC Client Requirements or refer to the Integration Plan


        Adobe Reader


10.4 Developer Requirements
       Refer to the SunGard SCT Banner® Documentation.


10.5 Software Compatibility
       Refer to the SunGard SCT Banner® Documentation.

11 Project Deliverables
DELIVERABLE                     DUE DATE                         RESPONSIBLE PARTY
Communication Plan              January 15, 2004                 Project Management Team
Configuration Management        January 15, 2005                 Project Management Team

                                                                                        v.0.13.1
OneAstate                     SCT- Confidential & Proprietary                      Page 75 of 80
                         ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc              February 14, 2012
                                                                     Project Definition

Plan
Education Plan                   January 15, 2005                    SCT Project Manager
Prioritized Services             January 15, 2005                    Project Management Team
Requirements Document
Project Definition Document      December 15, 2004                   Project Management Team
Quality Assurance Plan           November 2004                       SCT Project Manager
Risk Management Plan             November 2004                       Project Management Team
Project Schedule                 January 15, 2005                    Project Management Team
Conversion Plan                  January 2005                        Project Management Team
Integration Plan (interfaces)    January 2005                        Project Management Team
Testing Plan                     March 2005                          Implementation Team


12 Project Success Criteria
        Project success criteria provide specific measurement for determining that the objectives
        and deliverables defined for the project have been met. Following are the criteria:


           All issues and action items have been completed and signed off
           All required work products have been produced
           All deficiencies have been logged and signed off
           Verification that the project has met project and Organizational Entity standards
           Validation that the product meets the requirements
           A project termination statement exists, if applicable
           A project cancellation statement exists, if applicable


        The project success criteria have been met when the project has validated that all major
        commitments and deliverables have been closed.




                                                                                         v.0.13.1
OneAstate                       SCT- Confidential & Proprietary                     Page 76 of 80
                           ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc             February 14, 2012
                                                                   Project Definition


13 Approval to Proceed




Jennus Burton                                         Susan Allen
Vice Chancellor, Finance & Administration             Vice Chancellor, Research & Acad. Affairs
Date                                                  Date




Rick Stripling                                        Steve Owens
Vice Chancellor, Student Affairs                      Vice Chancellor, Institutional Advancement
Date                                                  Date




Ed Kremers                                            Mark Hoeting
Assoc. Vice Chancellor, Fin. & Admin.                 CIO & Project Sponsor
Date                                                  Date




Brian Lewis                                           Jo Ann Puisegur
SunGard SCT Project Manager                           SunGard SCT Account Manager
Date                                                  Date




                                                                                         v.0.13.1
OneAstate                        SCT- Confidential & Proprietary                    Page 77 of 80
                            ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc            February 14, 2012
                                                                Project Definition

Document History

Revision Record
  Number       Date and Sections         Author                          Notes
   0.01     9/14/2004              Brian Lewis        Create starting document
   0.02     9/27/2004              Brian Lewis        Scope, Risks, Project Constraints
   0.03     9/29/2004              Margaret Watson    Mission, Goals and Objectives
   0.04     9/29/2004              Brian Lewis        Project Team - ASU
   0.05     10/06/2004             Brian Lewis        Scope
   0.06     10/07/2004             Brian Lewis        Mission, Objectives, Milestones, Budget,
                                                      Assumptions, Constraints, Risks,
                                                      Organizational Readiness, Project
                                                      Approach, Project Deliverables
   0.07     10/13/2004             Brian/JoAnn
   0.08     10/21/2004             Margaret Watson    Executive summary, project team update
   0.09     11/05/2004             Brian Lewis
   0.10     11/08/2004             Carlos Pena        SCT Luminis Foundation Implementation
                                                      LDI for e-Learning with Blackboard
                                                      SCT Luminis Premier Discovery
                                                      SCT Luminis Trainer Certification
   0.11                            Mark Sonntag       Luminis Scope
   0.12     11/10/04               Brian Lewis        All Sections
                                   Margaret Watson
   0.13     11/11/04               Brian Lewis        All Sections
                                   Margaret Watson
   0.13.1   11/12/04               Margaret Watson    Signature Page
    0.14    11/17/04               Brian Lewis        Signature Page
    0.15    11/18/2004             Brian Lewis        Reporting Strategies Project Team




                                                                                      v.0.13.1
OneAstate                     SCT- Confidential & Proprietary                    Page 78 of 80
                         ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc            February 14, 2012
                                                            Project Definition


14 Acronyms
      Acronym                                 Description
CM               Change Management
CR               Change Request
CSM              Common Service Methodology
FRS              Financial Reporting System
HRS              Human Resource System
IR               Institutional Research
IT               Information Technology
LAN              Local Area Network
PC               Personal Computer
PMT              Project Management Team
QA               Quality Assurance
SIS              Student Information System
ST               Student
TBD              To be determined
ASU              Arkansas State University
CSM              Common Services Methodology
LMB              Luminis Message Broker
EAI              Enterprise Application Integration
LMS              Learning Management System
RDBMS            Relational Database Management System
JDK              Java Development Kit
CCB              Change Control Board
ERP              Enterprise Resource Planning
SunONE           Sun Open Network architecture
LDAP             Lightweight Directory Access Protocol
CPIP             Campus Pipeline Integration Protocol
SSO              Single Sign On
LDIS             Luminis Data Integration Suite
CMS              Content Management Suite, Luminis CMS
SDK              Software Development Kit


15 Definitions
        Term                                  Definition
Banner Intcomp   A component of Banner Student that provides the enabling events and
                 extract programs for data integration using LDIS.


                                                                              v.0.13.1
OneAstate              SCT- Confidential & Proprietary                   Page 79 of 80
                  ba4be2ed-ad6e-47a0-b95b-6be9f592134a.doc           February 14, 2012
                                                             Project Definition

LDI Starter Edition   Luminis Data Integration Suite Starter Edition, which includes the
(SE)                  Luminis Message Broker and Learning Management Gateway. These
                      objects may be downloaded from the ActionWeb from the Luminis –
                      Data Integration SE folder.


SCT IC                SCT Integration Components, which includes the Corba Event
                      Dispatcher (used for SmartTM and Notify events) and the SCT
                      Authenticator (used to authenticate to Banner Self-Service)




                                                                                  v.0.13.1
OneAstate                   SCT- Confidential & Proprietary                  Page 80 of 80