PBS_Metrics_20120115_Jan2012WGM

Document Sample
PBS_Metrics_20120115_Jan2012WGM Powered By Docstoc
					Tab Name
Report Card




Summary Report




Recirculation


Unpublished CMETs




Unpublished Ballots



Project Insight Metrics
Description
Provides a count of the number of infractions by Work Group
Green Items: No action needed
Red Items: View the Summary Report to find out more detail about what actions are needed.
For Project Insight red items, see info below in this Legend tab on what actions are needed.

A list of infractions sorted by Work Group. The source of the report are the other tabs to the right of the Summary
Report tab.
Use this report to help address Red Items for:
Recirculation
Unpublished CMETs
Unpublished Ballots

Lists items that Have passed Normative ballot but have outstanding negatives that will require a recirculation
Refer to Notes/Action Items cell for more information on what action needs to be taken.

Lists CMETs items that are Finished (passed by numbers and Recon is complete) but Unpublished (waiting for
For informational purposes be completd by Andy to be taken at Dave Hamill)
the CMET clean-up work to only. No action needs Stechison and this time (waiting for the CMET clean-up work to
be completed by Andy Stechison and Dave Hamill)

Lists items that Are Finished (passed by numbers and Recon is complete) but Unpublished (not in Normative
Edition or on HL7 Standards page)
Refer to Notes/Action Items cell for more information on what action needs to be taken.

Project statistics (by Work Group); source is Project Insight. Use the Searchable Project Database on
www.HL7.org to view your Work Group's project:
http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?ref=common
Send your corrections to Red items to pmo@HL7.org.
Take the following action if you have Red item:
Next Milestone Date Behind > 120 Days: Review project list and determine the next deliverable and Next Milestone Date (you c
Pjt Insight Items Status=Blank: Determine what the correct status is for those projects. Valid values are:Active Project (Resou
Nbr Of 3YP Items in Pjt Insight: If zero, create 3YP Items for your Work Group and email them to pmo@HL7.org
             Owner




             Lynn Laakso


             Lynn Laakso




             Lynn Laakso



             David Hamill




 ext Milestone Date (you can email this info to pmo@HL7.org)
are:Active Project (Resources assigned to pjt) 3-Year Plan Item On Hold (No resources assigned to pjt)Comment Only - Preparing Ballot C
omment Only - Preparing Ballot Comment Only - Balloting   Comment Only - Considering Comments   Informative - Preparing for Ballot
Informative - Preparing for Ballot   Informative - Balloting   Informative - Reconcile   Informative - Request Publication   DSTU - P
e - Request Publication   DSTU - Preparing Ballot   DSTU - Balloting   DSTU - Expired Test Period   DSTU - Reconcile   DSTU - R
DSTU - Reconcile   DSTU - Request Publication   DSTU - Test Period/Accepting Comments   ISO/JIC - Balloting   ISO/JIC - R
ISO/JIC - Balloting   ISO/JIC - Reconcile   Normative - Preparing Ballot   Normative - Balloting   Normative - Reconcile   Normative -
Normative - Reconcile   Normative - Notify   Normative - ANSI Approved   Archived
                                                                                          Pjt Insight
                                                                                                                               % of PI Items
                                                                                             Items       Nbr Of                  with Nxt
                                                                         Pjt Insight Nxt Status=Blank      3YP       Total       Milestone
                                                                           Milestone       (w/ NMD      Items in   Items in   Behind>120 vs.
                                    Steering          Unpub.    Unpub.    Behind >120 Behind<120            Pjt       Pjt      Total PI Items
Work Group                          Division  Recirc. Ballots   CMETs          Days          Days)       Insight    Insight   (Col. G / Col. J)
Anatomic Pathology Work Group DESD              0        0        0              1              0            0         1           100%
Architectural Review Work Group None            0        0        0              1              0            0         2            50%
Arden Syntax Work Group             SSD SD      0        0        0              2              0            0         3            67%
Attachments Work Group              DESD        0        3        0              6              0            0         7            86%
Board of Directors Work Group       None        0        0        0              3              0            0         7            43%
                                    Work Group 0
Clinical Context Object Workgroup SSD SD                 0        0              1              0            1         2            50%
Child Health Work Group             DESD        0        0        0              3              0            2         3           100%
Clinical Decision Support Work Group SD
                                    SSD         0        2        0              3              0            0         6            50%
Clinical Genomics Work Group        SSD SD      0        1        0              6              0            2        11            55%
Clinical Interoperability Council Work Group
                                    DESD        0        0        0              5              0            0         9            56%
Clinical Statement Work Group       SSD SD      0        0        0              0              0            0         1            0%
Community Based Collaborative Care Work Group 0
                                    DESD                 0        0              3              0            1         6            50%
Conformance & Guidance for Implementation/Testing Work Group
                                    FTSD        0        0        0              3              0            1         3           100%
Education Work Group                T3SD        0        0        0              5              0            5         9            56%
Electronic Health Records Work Group SD
                                    SSD         1        0        0             15              0            0        18            83%
Electronic Services Work Group      T3SD        0        0        0              4              0            4         7            57%
Emergency Care Work Group           DESD        0        0        0              3              0            1         4            75%
Financial Management Work Group     SSD SD      0        0        0              4              0            1         6            67%
Generation of Anesthesia Standards Work Group 0
                                    DESD                 0        0              2              0            1         3            67%
Government Projects Work Group DESD             0        0        0              1              0            0         1           100%
Health Care Devices Work Group DESD             0        0        0              1              0            1         1           100%
Imaging Integration Work Group DESD             0        0        1              3              0            3         5            60%
Implementable Technology Specifications Work Group
                                    FTSD        1        2        0              4              0            3        12            33%
Infrastructure and Messaging WorkFTSDGroup      0        1        0              2              0            0         2           100%
International Mentoring Committee Work Group 0
                                    T3SD                 0        0              0              0            0         0          #DIV/0!
Marketing Work Group                None        0        0        0              3              0            0         3           100%
Modeling and Methodology Work FTSD  Group       1        0        2              6              0            1        10            60%
Orders and Observations Work Group SD
                                    SSD         1        1        0              8              0            8        27           30%
Patient Administration Work GroupSSD SD         0        2        1              6              0            3         9            67%
Patient Care Work Group             DESD        0        4        0             12              0            4        17            71%
Patient Safety Work Group           DESD        0        0        0              1              0            1         5           20%
Pharmacy Work Group                 DESD        0        0        2              4              0            3        17           24%
Public Health and Emergency Response Work Group
                                    DESD        0        0        0              3              0            0        10           30%
Process Improvement Work Group T3SD            0          0     0         2         0    4     6      33%
Project Services Work Group       T3SD         0          0     0        10         0    9    13      77%
Publishing Work Group             T3SD         0          0     0         6         0    6     8      75%
Regulated Clinical Research Information Management Work Group
                                  DESD         0          3     0         6         0    6    15      40%
RIM Based Application Architecture Work Group 0
                                  FTSD                    0     0         1         0    0     1     100%
Security Work Group               FTSD         0          1     0         3         0    0     4      75%
Services Oriented Architecture Work Group
                                  FTSD         1          1     0         2         0    0     5      40%
Structured Documents Work Group   SSD SD       0          2     0         6         0    0    19     32%
Technical Steering Committee      None         0          0     0         4         0    1     9      44%
Templates Work Group              FTSD         0          0     0         2         0    0     3      67%
Tooling Work Group                T3SD         0          0     0         2         0    0     8     25%
Vocabulary Work Group             FTSD         0          0     0         8         0    2    13      62%

Total                                         5         23      6        176        0    74   331

Legend                                        =0        =0      =0   Per Column K   =0   =0           >66%
                                              >0        >0      >0   Per Column K   >0   >0         33%-66%
                                                                     Per Column K                     <33%

2011 Sept WGM Totals                          7         24      6        155         2   81   320
2011 May WGM Totals                           6         29      8        156        15   74   303
Infraction   Work Group
Pjt Insight Next Milestone Behind>120 Days   Arden Syntax Work Group


Pjt Insight Next Milestone Behind>120 Days   Arden Syntax Work Group




Pjt Insight Next Milestone Behind>120 Days   Child Health Work Group




Pjt Insight Next Milestone Behind>120 Days   Clinical Genomics Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Genomics Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Clinical Genomics Work
                                             Group




Pjt Insight Next Milestone Behind>120 Days   Clinical Interoperability
                                             Council Work Group


Pjt Insight Next Milestone Behind>120 Days   Community Based
                                             Collaborative Care Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Education Work Group

Pjt Insight Next Milestone Behind>120 Days   Education Work Group




Pjt Insight Next Milestone Behind>120 Days   Education Work Group




Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group

Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group

Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group


Pjt Insight Next Milestone Behind>120 Days   Electronic Services Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Services Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Financial Management Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Financial Management Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Government Projects Work
                                             Group




Pjt Insight Next Milestone Behind>120 Days   Health Care Devices Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Imaging Integration Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Emergency Care Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Financial Management Work
                                             Group


Pjt Insight Next Milestone Behind>120 Days   Imaging Integration Work
                                             Group




Pjt Insight Next Milestone Behind>120 Days   Patient Administration Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Patient Administration Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Patient Administration Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Infrastructure and Messaging
                                             Work Group




Pjt Insight Next Milestone Behind>120 Days   Patient Administration Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group
Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group




Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group


Pjt Insight Next Milestone Behind>120 Days   Modeling and Methodology
                                             Work Group




Pjt Insight Next Milestone Behind>120 Days   Project Services Work Group




Pjt Insight Next Milestone Behind>120 Days   Project Services Work Group




Pjt Insight Next Milestone Behind>120 Days   Process Improvement Work
                                             Group




Pjt Insight Next Milestone Behind>120 Days   Project Services Work Group

Pjt Insight Next Milestone Behind>120 Days   Project Services Work Group

Pjt Insight Next Milestone Behind>120 Days   Project Services Work Group
Pjt Insight Next Milestone Behind>120 Days   Project Services Work Group

Pjt Insight Next Milestone Behind>120 Days   Project Services Work Group


Pjt Insight Next Milestone Behind>120 Days   Project Services Work Group




Pjt Insight Next Milestone Behind>120 Days   Publishing Work Group

Pjt Insight Next Milestone Behind>120 Days   Publishing Work Group




Pjt Insight Next Milestone Behind>120 Days   Patient Administration Work
                                             Group



Pjt Insight Next Milestone Behind>120 Days   Security Work Group




Pjt Insight Next Milestone Behind>120 Days   Templates Work Group
Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group
Pjt Insight Next Milestone Behind>120 Days   Project Services Work Group




Pjt Insight Next Milestone Behind>120 Days   RIM Based Application
                                             Architecture Work Group
Pjt Insight Next Milestone Behind>120 Days   Anatomic Pathology Work
                                             Group
Pjt Insight Status=Blank                     Anatomic Pathology Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Architectural Review Work
                                             Group
Pjt Insight Status=Blank                     Arden Syntax Work Group
Pjt Insight Status=Blank                     Attachments Work Group




Pjt Insight Status=Blank                     Attachments Work Group



Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Status=Blank                     Attachments Work Group



Pjt Insight Status=Blank                     Attachments Work Group



Pjt Insight Status=Blank                     Attachments Work Group




Unpublished Ballot                           Attachments Work Group

Unpublished Ballot                           Attachments Work Group


Unpublished Ballot                           Attachments Work Group


Pjt Insight Next Milestone Behind>120 Days   Board of Directors Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Board of Directors Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Board of Directors Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Child Health Work Group

Pjt Insight Next Milestone Behind>120 Days   Child Health Work Group

Pjt Insight Next Milestone Behind>120 Days   Clinical Context Object
                                             Workgroup Work Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Decision Support
                                             Work Group
Pjt Insight Status=Blank                     Clinical Decision Support
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Decision Support
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Decision Support
                                             Work Group
Unpublished Ballot                           Clinical Decision Support
                                             Work Group

Pjt Insight Next Milestone Behind>120 Days   Clinical Genomics Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Genomics Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Genomics Work
                                             Group
Unpublished Ballot                           Clinical Genomics Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Clinical Interoperability
                                             Council Work Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Interoperability
                                             Council Work Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Interoperability
                                             Council Work Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Interoperability
                                             Council Work Group
Pjt Insight Next Milestone Behind>120 Days   Community Based
                                             Collaborative Care Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Community Based
                                             Collaborative Care Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Conformance & Guidance for
                                             Implementation/Testing
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Conformance & Guidance for
                                             Implementation/Testing
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Conformance & Guidance for
                                             Implementation/Testing
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Education Work Group
Pjt Insight Next Milestone Behind>120 Days   Education Work Group

Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group

Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Recirculation                                Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Services Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Services Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Emergency Care Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Emergency Care Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Financial Management Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Generation of Anesthesia
                                             Standards Work Group
Pjt Insight Next Milestone Behind>120 Days   Generation of Anesthesia
                                             Standards Work Group
Pjt Insight Next Milestone Behind>120 Days   Imaging Integration Work
                                             Group
Unpub CMET                                   Imaging Integration Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Implementable Technology
                                             Specifications Work Group
Pjt Insight Next Milestone Behind>120 Days   Implementable Technology
                                             Specifications Work Group
Pjt Insight Next Milestone Behind>120 Days   Implementable Technology
                                             Specifications Work Group
Pjt Insight Next Milestone Behind>120 Days   Implementable Technology
                                             Specifications Work Group
Recirculation                                Implementable Technology
                                             Specifications Work Group


Unpublished Ballot                           Implementable Technology
                                             Specifications Work Group

Pjt Insight Next Milestone Behind>120 Days   Infrastructure and Messaging
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Marketing Work Group

Pjt Insight Next Milestone Behind>120 Days   Marketing Work Group

Pjt Insight Next Milestone Behind>120 Days   Marketing Work Group

Pjt Insight Status=Blank                     Modeling and Methodology
                                             Work Group
Pjt Insight Status=Blank                     Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Modeling and Methodology
                                             Work Group
Recirculation                                Modeling and Methodology
                                             Work Group
Unpub CMET                                   Modeling and Methodology
                                             Work Group
Unpub CMET                                   Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Recirculation                                Orders and Observations
                                             Work Group
Unpublished Ballot                           Orders and Observations
                                             Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Administration Work
                                             Group
Unpub CMET                                   Patient Administration Work
                                             Group



Unpublished Ballot                           Patient Administration Work
                                             Group

Unpublished Ballot                           Patient Administration Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Unpublished Ballot                           Patient Care Work Group




Pjt Insight Next Milestone Behind>120 Days   Patient Safety Work Group

Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Unpub CMET                                   Pharmacy Work Group



Unpub CMET                                   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Process Improvement Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Project Services Work Group
Pjt Insight Next Milestone Behind>120 Days   Public Health and
                                             Emergency Response Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Public Health and
                                             Emergency Response Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Public Health and
                                             Emergency Response Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Publishing Work Group

Pjt Insight Next Milestone Behind>120 Days   Publishing Work Group

Pjt Insight Next Milestone Behind>120 Days   Publishing Work Group

Pjt Insight Next Milestone Behind>120 Days   Publishing Work Group

Pjt Insight Next Milestone Behind>120 Days   Regulated Clinical Research
                                             Information Management
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Regulated Clinical Research
                                             Information Management
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Regulated Clinical Research
                                             Information Management
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Regulated Clinical Research
                                             Information Management
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Regulated Clinical Research
                                             Information Management
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Regulated Clinical Research
                                             Information Management
                                             Work Group
Unpublished Ballot                           Regulated Clinical Research
                                             Information Management
                                             Work Group
Unpublished Ballot                           Regulated Clinical Research
                                             Information Management
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Security Work Group

Pjt Insight Next Milestone Behind>120 Days   Security Work Group

Pjt Insight Next Milestone Behind>120 Days   Services Oriented
                                             Architecture Work Group
Pjt Insight Next Milestone Behind>120 Days   Services Oriented
                                             Architecture Work Group
Recirculation                                Services Oriented
                                             Architecture Work Group


Unpublished Ballot                           Services Oriented
                                             Architecture Work Group


Unpublished Ballot                           Services Oriented
                                             Architecture Work Group


Pjt Insight Status=Blank                     Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Structured Documents Work
                                             Group
Unpublished Ballot                           Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Structured Documents Work
                                             Group
Unpublished Ballot                           Structured Documents Work
                                             Group
Unpublished Ballot                           Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Technical Steering
                                             Committee
Pjt Insight Next Milestone Behind>120 Days   Technical Steering
                                             Committee
Pjt Insight Next Milestone Behind>120 Days   Technical Steering
                                             Committee
Pjt Insight Next Milestone Behind>120 Days   Technical Steering
                                             Committee
Pjt Insight Next Milestone Behind>120 Days   Templates Work Group

Pjt Insight Next Milestone Behind>120 Days   Tooling Work Group

Pjt Insight Next Milestone Behind>120 Days   Tooling Work Group

Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group


Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group
Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group

Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group

Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group

Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group

Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group
Standard/Document Name   Pjt ID
Arden Syntax for Medical Logic Systems, Version 3.0                771


Arden Syntax v2.8                                                  733




HL7 Child Health Neonatology Profile for EHR Systems, v 1.0        770




HL7 CG-omics Domain Analysis Model                                 705

Clinical Genomics - Genetic Variation (CMET)                       693


Health Informatics: Clinical Genomics Pedigree Topic (ISO Ballot   479
Project)




Emergency Medical Services Domain Analysis Model                   512



Semantic Health Information Performance and Privacy Standard       724
(SHIPPS)
UPDATE OF CERTIFICATION TESTING TO HL7 V2.7                     755

HL7 Enterprise-Wide Education Strategic Plan                    708




Education Tutorial Offering Database                            546




EHR System Computationally-Independent Information-Model        688
(EHR-S CI-IM)
Public Health Functional Profile (PHFP) Project                 704


Pharmacy/Pharmacist Provider Functional Profile based on the    698
EHR-S Functional Model

EHR System Functional Model Release 2.0 (ISO Project)           551

EHR Vital Records Functional Profile (Roadmap Project #4 (one   223
of many))


HL7 Website Enhancements - Release 8 (Sept 2011)                598

HL7 Website Enhancements - Release 9 (Jan 2012)                 673


Financial Management Claims and Reimbursement Reaffirmation     776
Ballot
Create a three-workgroup DAM for claims attachments             775

Healthcare SOA Reference Architecture (H-SOA-RA) V 2.0 and      444
EHR System Design Reference Model (EHR-SD RM)




Implementation Guidance for the use of HL7 messaging related    595
to Healthcare Device communications
HL7 V2.x / DICOM Implementation Guide for Pathology             788
Specimen Identifiers and Labels

EDIS - Emergency Department Information System Functional       694
Profile Version 2.0
Financial Management Account and Billing                         777



HL7 V2.x / DICOM Implementation Guide for Pathology Order        789
Messages and Use of DICOM Image References




Service Delivery Location                                        650


Scheduling Release 2                                             292

Person Registry Enhancement                                      576


Clinical Event Domain - R1                                       256

InM Wrappers requirements determination                          772




V3 Organization Registries, Release 2 topic within Personnel     360
Management domain
Domain Analysis Model and Detailed Clinical Models for Medical   661
Devices
Care Plan Topic; continuation of work                            651
Detailed Clinical Models Release 1                             320




Pressure Ulcer Prevention Domain Analysis Model                745

Care Provision Domain: Care Structures Topic (including        668
Concern List, Vital Signs, and Statement Collector Topics)
Care Provision: Health Concern Topic                           666

Care Provision: Assessment Scales Topic                        664


Core Principles and Properties of HL7 Version 3 Models         219




Develop Project Dashboard / Project Health Metrics             536




Respond to needs of the Working Group as requested by the      535
TSC (ongoing)




Resource Directory Wiki                                        791




Work with Vocab re: process to publish vocab changes 3x/year   748

Create Education for Project Services Related Topics           747

Harmonization Process Work by Project Services WG              741
SWOT Work for Project Services Work Group                   740

SAIF and Sound - Fast Track to Standard Development         676


Annual Maintainance of Project Life Cycle and GOM Updates   533




HL7 Version 2.8 Messaging Standard                          723

Annual maintenance of Facilitators guide                    637




V3 Provider Registries, Release 2 topic within Personnel    359
Management domain



Security and Privacy Ontology                               646




Updated Template Interchange Format DSTU                    272
Guidance for the use of Terminology Post-Coordinated   743
Expressions in HL7
Mentoring Project Facilitators            534




Creation of a set of RIMBAA whitepapers   550
Anatomic Pathology CDA Project   176

Anatomic Pathology CDA Project   176
HL7 Harmonization Framework and Exchange Architecture            687
(HF&EA)
Arden Syntax for Medical Logic Systems, Version 3.0              771
Additional Information Specifications 0011: Periodontal          314
Attachment



Additional Information Specification 0010: Pharmacy Prior        281
Authorization Attachment (CDAR1AIS0010R010)


Additional Information Specifications 0011: Periodontal          314
Attachment
Children's Preventive Health Services Additional Information     286
Specification (CDAR1AIS0007R010)
Additional Information Specification 0008: Home Health           282
Attachment (CDAR1AIS0008R010)
Additional Information Specification 0010: Pharmacy Prior        281
Authorization Attachment (CDAR1AIS0010R010)
Patient Information Unspecified Attachment                       218

Additional Information Specification Documents Conversion from   135
CDA R1.0 to CDA R2.0
Children's Preventive Health Services Additional Information     286
Specification (CDAR1AIS0007R010)


Patient Information Unspecified Attachment                       218



Additional Information Specification Documents Conversion from   135
CDA R1.0 to CDA R2.0



Additional Information Specifications 0000, 0001, 0003, 0004,    135
0005, 0006: Update to CDA Release 2
Additional Information Specifications 0011: Periodontal          314
Attachment

AIS 0009: Patient Information Unspecific Content (PUIC)          218
Attachment, Release 2

HL7 EHR FM R2                                                    837

HL7 Business Plan contract                                       766

Gap Analysis of HL7 Standards Portfolio                          180
Update EHR Child Health Functional Profile for Release 2            691

Annual Updates to Child Health 3-Year Plan                          572

Consider extending CCOW to handle Authorizations                    624

HL7 GELLO v.2 Syntax Re-Ballot                                      229

Order Set Publication Standard                                      259

Order Set Publication Standard                                      259

Infobutton URL-based implementation guide                           130

HL7 Version 3 Standard: Order Set Publication, Release 1            259


Connection with Decision Support                                    564

Specimen Handling CMET                                              565

Gene Expression                                                     333

HL7 Version 3 Domain Analysis Model: Clinical Genomics; Gene        333
Expression, Release 1

Trauma Data Exchange Domain Analysis Model                          774

Tuberculosis Domain Analysis Model, Release 2                       371

Clinical Content Development, Harmonization and Definition          329
(Roadmap Pjt #5,6,10)
Emergency Medical Services Domain Analysis Model, V2                678

Privacy Policy Reference Catalogue                                  656


Update V3 Privacy Message                                           577


Develop and publish Principles & guidelines to specify the syntax   630
for vocabulary binding in implementation guides

V2.8 Proposals - Improve conformance for better testing             629


DSTU Testing toolkit/project (Guidance of what is involved in       198
DSTU testing)

UPDATE OF RIM TESTING TO HL7 RIM 2.34                               754
Academia Engagement Project                                       753

HL7 White Paper: 'Balancing the Integrity and Value of Personal   610
Health Records with...'
Electronic Nutrition Care Process Record System (ENCPRS)          706
Functional Profile.
Diabetes Data Strategy                                            509

EPrescribing Functional Profile based on the EHR-S Functional     697
Model
Dental Health Functional Profile                                  654

EHR Interoperability Model - EHR/IM                               261

CDAr2 Reference Profile for EHR Interoperability                  202

Electronic Health Record Lifecycle Model                          201

HL7 Personal Health Record System Functional Model - Promote      660
from DSTU to Normative and Promote to ISO TC215 under
ISO/HL7 Pilot Agreement
Ambulatory Oncology EHR-S Functional Profile                      609

Joint ISO Ballot – HL7 EHR System Functional Model, Release       480
1.1
Workgroup Scratchpad Webspace                                     794

New HL7 Web Site - (Roadmap Pjt #3, 37)                           150

Emergency Care (EC) Domain Analyses Model, Release 1              368

Emergency Care DAM Version 2                                      573

Consumer Information Account                                      370

Implementation Guide for CDA Release 3 - Anesthetic Record        513

Develop Implementation Guide (IG) for the use of HL7 messaging    543
within Anaesthesiology
CMET: A_DicomCompositeObjectReference minimal                     474
(COCT_RM830120UV05) R2
HL7 Version 3 Standard: Imaging Integration CMETs, Release 9      474


Health informatics - Harmonized data types for information        484
interchange (ISO Ballot Project)
XML ITS R1.1                                                      335

V3 RIM Implementation Technology Specification for XML;           627
Release 1
XML ITS R2                                                        316
HL7 Version 3 Standard: XML Implementation Technology        316
Specification - V3 Structures, Release 2


HL7 Version 3 Standard: XML Implementation Technology        627
Specification for RIM Serializations, Release 1

HL7 Transmission Wrappers R1.1 Batch Messaging               619

Ambassador webinar program                                   599

CDA Product and Services Guide - Phase 3                     433

University Outreach - Phase 1 (Pilot)                        596

HDF Phase III                                                299

Common Message Element Types (COCT) Release 8                221

HDF Phase III                                                299

Data Types R3                                                750

Reaffirmation of Previous Normative CMET Ballots             710

Common Message Element Types (COCT) Release 8                221

Complete Balloting of V3 Abstract Data Types R2              455

HL7 Version 3 Standard: XML Implementation Technology        484
Specification R2; ISO-Harmonized Data Types, Release 1
HL7 Version 3 Standard: Common Message Element Types
(Committee), Release 7
HL7 Version 3 Standard: Common Message Element Types
(Normative), Release 7
Observation Request Template - Release 1                     111

Laboratory Related CMETs                                     349

Blood, Tissue, and Organ - Release 1                         312

General Lab Order IG - R1                                    213

Order Domain - Order Pattern - Release 1                     110

Harmonize Medication Order with Composite Order              585

HL7 Version 3 Standard: Laboratory, Release 1 Result Topic   113

HL7 Version 3 Standard: Common Clinical Product Model,       625
Release 1
HL7 Version 3 Standard: Blood, Tissue, Organ; Donation,      312
Release 1

Personnel Management CMETs                                   574

HL7 Version 3 Standard: Scheduling CMETs, Release 10         459




HL7 Version 3 Standard: Personnel Management; Provider       359
Registry, Release 2

HL7 Version 3 Standard: Personnel Management; Organization   360
Registry, Release 2

Care Provision: Adverse Reaction topic                       675

Patient Care V2 revisions to Chapter 11 and 12               670

Care Provision: Care Statement                               669

Care Provision DSTU - Topic Care Composition                 106

Care Provision DSTU - Topic Professional Services            103

HL7 Version 3 Standard: Care Provision, Health Concern,      666
Release 1



Public Health Reporting Domain Analysis Model (PORR DAM)     494

Medication CMETs Release 2                                   557

HL7 V3 Std: Pharmacy, Release 1: Pharmacy CMETs              249

Administration Event                                         555

HL7 V3 Std: Pharmacy, Release 1: Dosage Instruction          240

HL7 Version 3 Standard: Pharmacy CMETs, Release 10           501



HL7 Version 3 Standard: Common Product Model; Medication     249
CMETs, Release 11
First Time Attendee Process Improvement Project.             643

Project Health Metrics                                       765
Version 2.5.1 Implementation Guide for Immunization Messaging        458


PHER WG Process and Outcomes: Continuous Improvement                 450


1-Complete PHER project list                                         454


Recurring maintenance of glossary and maintain ballot site and its   639
xhtml conformance
Annual maintenance of V3 Guide & Backbone                            638

Annual Establishment of Publishing calendar(s)                       636

Annual Normative Editions                                            635

Subject Data Validation Service Functional Model                     719


Medical Product Information (includes Drugs, Devices, Biologics,     325
Veterinary Products) (SPLr5)

Clinical Trial Registration and Results (CTR&R) (JIC Project)        372


aECG r2 (Annotated ECG, Release 2)                                   721


Clinical Study Functional Profiles                                   718


BRIDG (Biomedical Research Integrated Domain) Domain                 538
Analysis Model (DAM) (ISO/JIC Project)

HL7 Version 3 Domain Analysis Model: Regulated Studies;              205
CDISC Content to Message - Study Participation, Release 1

HL7 Version 3 Domain Analysis Model: Regulated Studies;              205
CDISC Content to Message - Study Participation, Release 1

Risk Assessment Framework Cookbook                                   226

Privacy and Authorization Terminology                                224

Healthcare SOA Ontology Project                                      628

Privacy, Access and Security Services (PASS) Alpha Project           200
HL7 Version 3 Standard: Identification Service (IS), Release 1     264



HL7 Version 3 Standard: Privacy, Access and Security Services -    200
Access Control, Release 1


HL7 Version 3 Standard: Privacy, Access and Security Services -    200
Access Control, Release 1


CDA Modeling with UML                                              487

Publish CDA IGs from Tooling                                       752

Structured Documents Architecture                                  172

CDA Modeling with UML                                              487

CDA R3                                                             477

CDA Implementation Guide for Patient Assessments                   381

HL7 Implementation Guide for CDA Release 2: Genetic Testing        460
Reports, Release 1
Self-Displaying CDA Documents                                      711

HL7 Implementation Guide for CDA Release 2: Genetic Testing        460
Reports, Release 1
HL7 Implementation Guide for CDA Release 2: Self-Displaying        711
CDA, Release 1
TSC Work Group Visbility Maintenance                               631

HL7 SAIF Implementation Guide                                      763

HL7 Product Quality Plan                                           647

TSC Retrospective Self-Assessment Based on T3F                     749
Recommendations
Template Registry Pilot                                            611

HL7 Static Model Designer Enhancement 1                            690

MIF-based Publishing Project - Phase II                            665

HL7 Evaluation of the International Health Terminology Standards   644
Development Organisation (IHTSDO) Workbench Tool

Draft a policy for endorsement by the HL7 Technical Steering       634
Committee on submitting HL7 proposed content change requests
for SNOMED-CT to IHTSDO
Guide for Best Practices for Implementation of Vocabulary       500

Harmonize the V2 & V3 vocabulary                                497

International SDO Glossary (was Health Informatics Harmonised   495
Glossary) (originally a JIC project)
TermInfo - USING SNOMED CT in HL7 v3                            468

Vocabulary Conceptual Model                                     308
Notes/Action to be Taken
Next Milestone Date Is: 2011 Sept WGM/Ballot


Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot


Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot



Next Milestone Date Is: 2011 Sept WGM/Ballot
Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot


Next Milestone Date Is: 2011 Sept WGM/Ballot


Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot



Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot


Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot


Next Milestone Date Is: 2011 Sept WGM/Ballot
Next Milestone Date Is: 2011 Sept WGM/Ballot



Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot


Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot


Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot
Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot


Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot
Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot


Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot
Next Milestone Date Is: 2011 Sept WGM/Ballot
Next Milestone Date Is: 2011 Sept WGM/Ballot




Next Milestone Date Is: 2011 Sept WGM/Ballot
Next Milestone Date Is: - Select One -

Sept. 2010 David Booker: This is likely no longer an active
project although a similar project is underway. I will discuss with
the group in Cambridge and let you know.
Next Milestone Date Is: 2010 Sept WGM/Ballot


5/13/08: This passed unanimously on the first ballot but we are
currently (and actively) working on getting it to final publish state
- but - we have early indication that a substantive change may
occur, and if so, it will be re-balloted.

5/13/2008: Update: we no longer expect this to be published as
a CDA R1 document; it is on-hold except for applying existing
ballot comments in preparation for potential future movement to
CDA R2.




Next Milestone Date Is: - Select One -




5/13/2008: Update: slow progress in converting to use CDA R2
and re-ballot, as of 5/7/2008 we have a champion to organize
the work (June Rosploch). We no longer plan to publish as a
CDA R1 document.
5/13/2008: Update: This project replaced project 285.
This CDA R2-based document passed unanimously on first
ballot in May 2008; mike cassidy currently applying ballot
comments for final publish, probably by July 2008.
5/13/2008: Update: These are the specifications needed for
HIPAA rulemaking, mike cassidy currently finalizing the
documents with much help from the ASIG in Phoenix.
 Promised the HIPAA rulemakers this would be done by end of
June 2008.
On WGM agenda 2012Jan Mon Q1. needs Informative
document publication request;
 on WGM agenda 2012Jan Mon Q1 emailed cochairs 2011:
8/19, 11/22, 12/12. needs Informative document publication
request
 on WGM agenda 2012Jan Mon Q1 emailed cochairs 2011:
8/19, 11/22, 12/12. needs Informative document publication
request;
Next Milestone Date Is: - Select One -

Next Milestone Date Is: - Select One -

Next Milestone Date Is: - Select One -
Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

5/14/08 Update: James Campbell submitted a PSS to replace
the one that was orginially submitted in May, 2006.


Next Milestone Date Is: 2010 Jan WGM/Ballot

planned readiness to publish in January 2012 per Guilherme
applying ballot reconciliation. Passed by numbers, 14 negs
remain, pkg posted; not on DSTU site;
Next Milestone Date Is: 2010 September WGM

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Per NE Review List wiki page, This Informative document will
be re-balloted in the future. This item will not be included in the
NE 2011. Last emailed cochairs 8/22/2011
Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot


Next Milestone Date Is: 2011 Jan WGM/Ballot


Next Milestone Date Is: 2010 Sept WGM/Ballot


Next Milestone Date Is: 2011 Jan WGM/Ballot


Next Milestone Date Is: 2010 May WGM/Ballot


Next Milestone Date Is: 2011 May WGM/Ballot
Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2010 May WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2010 May WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2009 May WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot


Next Milestone Date Is: 2010 Sept WGM/Ballot

R1 is on the standards site as EHR-FM not EHR-S FM; Pat
VanDyke working on R1.1. incomplete recon package
Next Milestone Date Is: 2011 Sept WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: - Select One -

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: - Select One -

This Normative ballot passes by the numbers, but the WG will
incorporate additional changes so this material will not be in the
NE2010 (per NE Review List wiki page)
Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot
This Normative ballot has passed by the numbers and has
completed reconciliation, but there are still several outstanding
negatives. This item was not included in the NE 2011

This DSTU has passed by the numbers although reconciliation
has not been completed. This item will not be included in the
NE 2011 per the NE Review List wiki page
Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: - Select One -

Next Milestone Date Is: 2011 Jan WGM/Ballot




Next Milestone Date Is: 2009 Sept WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot



Next Milestone Date Is: 2010 Jan WGM/Ballot

This has passed by the numbers but 2 negatives remain

Has recon pkg, and 0 negatives but NE10 has CMET R2-2009
revision of R1-2005
How to tell if a certain version is published?NE10 has CMET
R2-2009 revision of R1-2005
Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Outstanding negs; passed by numbers and recon package
posted. Not in NE2010
last emailed cochairs 11/8/2011. Per an update from the O&O
co-chairs, this item will not be included in the NE 2011, Per NE
Review List wiki page;
Next Milestone Date Is: 2010 Sept WGM/Ballot

This DSTU ballot has passed and reconciliation is complete, but
there is still one negative vote and the WG has not submitted
this for publication. This item may or may not be included in the
NE 2011 (per NE Review List Wiki page)

While this DSTU ballot passed the WG determined there were
still technical issues that needed to be addressed and,
therefore, this material will not appear in NE 2010
While this DSTU ballot passed the WG determined there were
still technical issues that needed to be addressed and,
therefore, this material will not appear in NE 2010
Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

This DSTU has passed by the numbers and the WG has
indicated it should be included, but reconciliation has not been
completed. No paperwork has been submitted to request the
DSTU be published. (per NE Review List wiki page)

Next Milestone Date Is: - Select One -

Next Milestone Date Is: 2010 May WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2010 January WGM

Next Milestone Date Is: - Select One -

Listed as HL7 Version 3 Standard: Orders; Substances CMETs
R10? This DSTU has not passed and has not completed
reconciliation. This item is not expected to be in the NE 2011
Per NE Review List wiki page
just passed last cycle; negative voters not yet contacted.

Next Milestone Date Is: 2010 May WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot
Next Milestone Date Is: 2010 May WGM/Ballot


Next Milestone Date Is: 2011 May WGM/Ballot


Next Milestone Date Is: - Select One -


Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot


Next Milestone Date Is: 2011 May WGM/Ballot


Next Milestone Date Is: 2011 May WGM/Ballot


Next Milestone Date Is: 2011 May WGM/Ballot


Next Milestone Date Is: 2011 May WGM/Ballot


Next Milestone Date Is: 2011 May WGM/Ballot


passed by numbers, 0 negs; needs Informative document
publication request;

passed by numbers, 0 negs; needs Informative document
publication request;

Next Milestone Date Is: 2010 Jan WGM/Ballot

Next Milestone Date Is: 2010 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot
This Normative ballot has passed by the numbers, but it would
require a reballot or recirculation ballot to move forward and so
will not be in the NE 2010; DSTU EIS R1 expired Dec 2008

This DSTU ballot has passed by the numbers, but reconciliation
is not quite complete and it has not yet been submitted for
publication. This item may or may not be included in the NE
2011 (per NE Review List Wiki page)
This DSTU ballot has passed by the numbers, but reconciliation
is not quite complete and it has not yet been submitted for
publication. This item may or may not be included in the NE
2011 (per NE Review List Wiki page)
2010July: updated project repository URLs

Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: - Select One -

Next Milestone Date Is: 2009 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

Needs DSTU publication request

Next Milestone Date Is: 2011 May WGM/Ballot

Needs DSTU publication request



Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 May WGM/Ballot

Next Milestone Date Is: 2010 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot


Next Milestone Date Is: 2011 May WGM/Ballot
Next Milestone Date Is: 2010 May WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2009 May WGM/Ballot

Next Milestone Date Is: - Select One -
Infraction    Work Group                                    Name                              Pjt ID Type

            Electronic Health   Joint ISO Ballot – HL7 EHR System Functional Model, Release
Recirculation
            Records Work        1.1                                                             480   N
            Implementable       HL7 Version 3 Standard: XML Implementation Technology
Recirculation
            Technology          Specification - V3 Structures, Release 2                        316   N
            Orders and          HL7 Version 3 Standard: Common Clinical Product Model,
Recirculation
            Observations        Release 1                                                       625   N
            Services Oriented
            Architecture Work
Recirculation                HL7 Version 3 Standard: Identification Service (IS), Release 1     264   N
                             HL7 Version 3 Standard: XML Implementation Technology
                             Specification Group
            Modeling and Methodology Work R2; ISO-Harmonized Data Types, Release 1
Recirculation                                                                                   484   N
                    Notes                        Ballot Cycle Pkg. Lvl.Neg.    Q.    A.

R1 is on the standards site as EHR-FM not                          N1     8   75.23% 57
EHR-S FM; Pat VanDyke working on R1.1.          2009May      not complete
This Normative ballot has passed by the                            N2 13      85.86% 55
numbers and has completed reconciliation, but   2010May      Y
Outstanding negs; passed by numbers and                            N1 11      92.00% 38
recon package posted. Not in NE2010             2009Jan      Y
This Normative ballot has passed by the                            N1 14      93.62% 51
numbers, but it would require a reballot or     2009Sept     Y
This has passed by the numbers but 2
negatives remain                                2009 Sept    Y     N1    2    92.16% 71
Infraction     Work Group                                   Name                               Pjt ID

Unpub        Imaging
CMET         Integration Work   HL7 Version 3 Standard: Imaging Integration CMETs, Release 9        474
Unpub        Modeling and       HL7 Version 3 Standard: Common Message Element Types
CMET         Methodology        (Committee), Release 7                                         ??
Unpub        Modeling and       HL7 Version 3 Standard: Common Message Element Types
CMET         Methodology        (Normative), Release 7                                         ??
Unpub        Patient
CMET         Administration     HL7 Version 3 Standard: Scheduling CMETs, Release 10                459
Unpub        Pharmacy Work
CMET         Group              HL7 Version 3 Standard: Pharmacy CMETs, Release 10                  501
Unpub        Pharmacy Work      HL7 Version 3 Standard: Common Product Model; Medication
CMET         Group              CMETs, Release 11                                                   249
                     Notes                          Ballot Cycle Pkg. Lvl.Neg.    Q.    A.

This Normative ballot passes by the numbers,                          N1    3    95.06% 41
but the WG will incorporate additional changes      2009Sept    Y
Has recon pkg, and 0 negatives but NE10 has                           C3    0    89.47% 18
CMET R2-2009 revision of R1-2005                    2008Sept    Y
How to tell if a certain version is                                   N3   11    76.85% 33
published?NE10 has CMET R2-2009 revision            2008Sept    Y
This DSTU ballot has passed and reconciliation                        D1    1    83.12% 20
is complete, but there is still one negative vote   2010Jan     Y
Listed as HL7 Version 3 Standard: Orders;                             N3    2    84.29% 20
Substances CMETs R10? This DSTU has not             2010May     Y
just passed last cycle; negative voters not yet                       N2   10    82.72% 34
contacted.                                          2011Jan     Y
  Infraction     Work Group                                      Name                                 Pjt ID


Unpublished    Attachments Work     Additional Information Specifications 0000, 0001, 0003, 0004,
Ballot         Group                0005, 0006: Update to CDA Release 2                                 135
Unpublished    Attachments Work     Additional Information Specifications 0011: Periodontal
Ballot         Group                Attachment                                                          314
Unpublished    Attachments Work     AIS 0009: Patient Information Unspecific Content (PUIC)
Ballot         Group                Attachment, Release 2                                               218
Unpublished    Clinical Decision
Ballot         Support Work         HL7 Version 3 Standard: Order Set Publication, Release 1            259
Unpublished    Clinical Decision    HL7 Version 2 Implementation Guide: Implementing the Virtual
Ballot         Support Work         Medical Record for Clinical Decision Support (vMR-CDS),             184
Unpublished    Clinical Genomics    HL7 Version 3 Domain Analysis Model: Clinical Genomics; Gene
Ballot         Work Group           Expression, Release 1                                               333
Unpublished    Implementable        HL7 Version 3 Standard: XML Implementation Technology
Ballot         Technology           Specification for RIM Serializations, Release 1                     627
Unpublished    Implementable        V3 XML Implementation Technology Specification for V3 Data
Ballot         Technology           Types 1.1, Release 1                                                316
Unpublished    Infrastructure and
Ballot         Messaging Work       HL7 Version 3 Standard: Transmission Infrastructure, Release 2      619
Unpublished    Orders and           HL7 Version 3 Standard: Blood, Tissue, Organ; Donation,
Ballot         Observations         Release 1                                                           312
Unpublished    Patient              HL7 Version 3 Standard: Personnel Management; Provider
Ballot         Administration       Registry, Release 2                                                 359


               Patient
Unpublished    Administration       HL7 Version 3 Standard: Personnel Management; Organization
Ballot         Work Group           Registry, Release 2                                                 360
Unpublished    Patient Care Work
Ballot         Group                HL7 Version 3 Detailed Clinical Models, Release 1                   320
Unpublished    Patient Care Work    HL7 Version 3 Standard: Care Provision, Health Concern,
Ballot         Group                Release 1                                                           666
Unpublished    Patient Care Work    HL7 Version 3 Standard: Care Provision, Care Composition,
Ballot         Group                Release 1                                                           106
Unpublished    Patient Care Work
Ballot         Group                HL7 Version 3 Standard: Care Provision; Care Plan, Release 1        651
Unpublished    Regulated Clinical   HL7 Version 3 Domain Analysis Model: Biomedical Research
Ballot         Research             Integrated Domain (BRIDG), Release 1                                538
Unpublished    Regulated Clinical
Ballot         Research             HL7 Version 3 Standard: Structured Product Labeling, Release 5      325
Unpublished    Regulated Clinical   HL7 Version 3 Domain Analysis Model: Regulated Studies;
Ballot         Research             CDISC Content to Message - Study Participation, Release 1           205
Unpublished    Security Work
Ballot         Group                HL7 Version 3 Domain Analysis Model: Security, Release 1            529
Unpublished    Services Oriented    HL7 Version 3 Standard: Privacy, Access and Security Services -
Ballot         Architecture Work    Access Control, Release 1                                           200
Unpublished    Structured           HL7 Implementation Guide for CDA Release 2: Genetic Testing
Ballot         Documents Work       Reports, Release 1                                                  460
Unpublished    Structured           HL7 Implementation Guide for CDA Release 2: Self-Displaying
Ballot         Documents Work       CDA, Release 1                                                      711
 Type:                     Notes                       Ballot   Pkg. Lvl.Neg.    Q.    A.
D-DSTU,                                                Cycle
I-Inform
           On WGM agenda 2012Jan Mon Q1.
   I       needs Informative document                 2007May Y      I2    2    90.77% 50
            on WGM agenda 2012Jan Mon Q1
   I       emailed cochairs 2011: 8/19, 11/22,        2007Sep Y      I1    0    88.24% 31
            on WGM agenda 2012Jan Mon Q1
   I       emailed cochairs 2011: 8/19, 11/22,        2008May Y      I2    0    93.59% 57
           planned readiness to publish in                           D1   14    91.46% 36
   D       January 2012 per Guilherme applying        2008Sept Y
           needs Informative document                                I1   22    80.17% 35
   I       publication request (balloted 2010May,     2010May Y
           Per NE Review List wiki page, This                        I2   16    83.04% 28
   I       Informative document will be re-           2010May Y
           This DSTU has passed by the                               D2   12    90.08% 46
   D       numbers although reconciliation has        2010Sept Y
                                                                     I1    0    85.44% 29
   I       Needs Informative publication request 2010Jan        Y
                                                                     D2    0    92.24% 47
   D       Needs DSTU publication request             2010Sept Y
           last emailed cochairs 11/8/2011. Per                      D2   12    85.87% 30
   D       an update from the O&O co-chairs,          2010May Y
           While this DSTU ballot passed the                         D1    4    93.51% 30
   D       WG determined there were still             2009Jan   Y
           While this DSTU ballot passed the                         D1    1    93.24% 23
           WG determined there were still
           technical issues that needed to be
           addressed and, therefore, this material
   D       will not appear in NE 2010                 2009Jan   Y
                                                                     I1   16    91.78% 55
   I       Needs Informative publication request 2010Sept Y
           This DSTU has passed by the                               D2   12    96.63% 35
   D       numbers and the WG has indicated it 2009Sept Y
           This DSTU has passed by the                               D3    1    96.20% 29
   D       numbers and the WG has indicated it 2009Sept Y
                                                                     D1    2    97.73% 29
   D       2 negs; DSTU pub rqst eligible             2007Jan   Y
           23 negs; passed by numbers; eligible                      I1   23    79.86% 42
   I       for publication request                    2010May Y
                                                                     D1   15    81.33% 51
   D       15 negs; eligible for DSTU publication     2010May Y
           passed by numbers, 0 negs; needs
   I       Informative document publication           2009Jan   Y    I1    0    91.23% 32
           Title "Composite Privacy and Security"
   D       DAM issues in progress, human-             2010May Y      D1    2    76.84% 32
           This DSTU ballot has passed by the                        D1    2    86.54% 33
   D       numbers, but reconciliation is not quite   2010Jan   Y
                                                                     D1    6    91.67% 41
   D       Needs DSTU publication request             2010Sept Y

   D
Number Project Name-NEW Pjts in Blue                 Sponsor(s)                  Co-Sponsor(s)        Steering Division

    176 Anatomic Pathology CDA Project               Anatomic Pathology Work                          Domain Expert
                                                     Group
    807 Preparation of SAIF Book for Informative     Architectural Review Work                        None
                                                                                 Technical Steering Committee
        Ballot                                       Group
    687 HL7 Harmonization Framework and              Architectural Review Work                        None
        Exchange Architecture (HF&EA)                Group
    771 Arden Syntax for Medical Logic Systems,      Arden Syntax Work Group                         Structure & Semantic
                                                                                 Arden Syntax Work Group
        Version 3.0                                                                                   Design
    734 Arden Syntax v2.9                            Arden Syntax Work Group     No Selection         Structure & Semantic
                                                                                                      Design
    733 Arden Syntax v2.8                            Arden Syntax Work Group     No Selection         Structure & Semantic
                                                                                                     Design
    805 HL7/Attachments using CDA Templates for Attachments Work Group                                Work Group
                                                                                 Structured DocumentsDomain Expert
        Implementation Guides (based on CCD)
    314 Additional Information Specifications 0011: Attachments Work Group                            Domain Expert
        Periodontal Attachment
    286 Children's Preventive Health Services        Attachments Work Group                           Domain Expert
        Additional Information Specification
    282 Additional Information Specification 0008:   Attachments Work Group                           Domain Expert
        Home Health Attachment
    281 Additional Information Specification 0010:   Attachments Work Group                           Domain Expert
        Pharmacy Prior Authorization Attachment
    218 Patient Information Unspecified              Attachments Work Group                           Domain Expert
        Attachment
    135 Additional Information Specification         Attachments Work Group                           Domain Expert
        Documents Conversion from CDA R1.0 to
    837 HL7 EHR FM R2                                Board of Directors Work     No Selection         None
                                                     Group
    836 2011 Post November Harmonization             Board of Directors Work     No Selection         None
        Repository Update                            Group
    808 2013 HL7 Strategic Initiatives               Board of Directors Work                          None
                                                     Group
    781 OID Registry Support - 2011                  Board of Directors Work                          None
                                                     Group
    780 Update the Beginners' Guide to HL7 Static    Board of Directors Work     No Selection         None
        Model Designer documentation                 Group
    766 HL7 Business Plan contract                   Board of Directors Work     No Selection         None
                                                     Group
    180 Gap Analysis of HL7 Standards Portfolio      Board of Directors Work                          None
                                                     Group
    770 HL7 Child Health Neonatology Profile for     Child Health Work Group                           Domain Expert
                                                                                 Electronic Health Records Work Group
        EHR Systems, v 1.0
    691 Update EHR Child Health Functional Profile Child Health Work Group                            Domain Expert
        for Release 2
    572 Annual Updates to Child Health 3-Year Plan Child Health Work Group                            Domain Expert

    782 Lightweight CCOW                             Clinical Context Object                          Structure & Semantic
                                                     Workgroup Work Group                             Design
    624 Consider extending CCOW to handle            Clinical Context Object                          Structure & Semantic
        Authorizations                               Workgroup Work Group                              Design
    757 Decision Support Service (DSS) Project       Clinical Decision Support                         Structure & Semantic
                                                                                 Services Oriented Architecture Work Group
                                                     Work Group                                       Design
    507 Context Aware Information Retrieval          Clinical Decision Support                        Structure & Semantic
        (Infobutton) SOA Implementation Guide.       Work Group                                       Design
    259 Order Set Publication Standard               Clinical Decision Support                        Structure & Semantic
                                                     Work Group                                       Design
    229 HL7 GELLO v.2 Syntax Re-Ballot               Clinical Decision Support                        Structure & Semantic
                                                     Work Group                                       Design
    184 Virtual Medical Record (vMR) for Clinical    Clinical Decision Support                        Structure & Semantic
                                                                                 Public Health and Emergency Response Work Group
        Decision Support                             Work Group                                       Design
    130 Infobutton URL-based implementation          Clinical Decision Support                        Structure & Semantic
        guide                                        Work Group                                       Design
    841 Clinical Sequencing                          Clinical Genomics Work                           Structure & Semantic
                                                     Group                                            Design
    729 Canonical Pedigree (Family History)          Clinical Genomics Work      No Selection         Structure & Semantic
        Interoperability Implementation Guide        Group                                            Design
    705 HL7 CG-omics Domain Analysis Model           Clinical Genomics Work                           Structure & Semantic
                                                     Group                                            Design
693 Clinical Genomics - Genetic Variation       Clinical Genomics Work                            Structure & Semantic
    (CMET)                                       Group                                            Design
692 Clinical Genomics - Genetic Variation (Fully Clinical Genomics Work                           Structure & Semantic
                                                                             Orders and Observations Work Group
    LOINC-Qualified Genetic Variation Model)    Group                                             Design
663 Cytogenetic Lab Results                     Clinical Genomics Work                            Structure & Semantic
                                                Group                                             Design
565 Specimen Handling CMET                      Clinical Genomics Work                            Structure & Semantic
                                                Group                                             Design
564 Connection with Decision Support            Clinical Genomics Work                            Structure & Semantic
                                                Group                                             Design
479 Health Informatics: Clinical Genomics       Clinical Genomics Work                            Structure & Semantic
    Pedigree Topic (ISO Ballot Project)         Group                                             Design
460 CDA Implementation Guide for Genetic        Clinical Genomics Work                            Structure & Semantic
    Testing Reports                             Group                                             Design
333 Gene Expression                             Clinical Genomics Work                            Structure & Semantic
                                                Group                                              Design
840 Schizophrenia Domain Analysis Model         Clinical Interoperability                          Domain Expert
                                                                             Regulated Clinical Research Information Management Work Group
                                             Council Work Group
815 Cardiology Domain Analysis Model Release Clinical Interoperability       No Selection         Domain Expert
    3                                           Council Work Group
774 Trauma Data Exchange Domain Analysis        Clinical Interoperability                        Group, Expert
                                                                             Emergency Care Work DomainPatient Care Work Group
    Model                                    Council Work Group
726 Cardiology Domain Analysis Model Release Clinical Interoperability       No Selection         Domain Expert
    2                                           Council Work Group
678 Emergency Medical Services Domain           Clinical Interoperability                        Group, Expert
                                                                             Emergency Care Work DomainPatient Care Work Group, Public Health and
    Analysis Model, V2                          Council Work Group
677 Emergency Medical Services Constrained      Clinical Interoperability                        Group, Expert
                                                                             Emergency Care Work DomainPatient Care Work Group, Public Health and
    Information Model & Interoperability        Council Work Group
512 Emergency Medical Services Domain           Clinical Interoperability                         Domain Expert
    Analysis Model                              Council Work Group
371 Tuberculosis Domain Analysis Model,         Clinical Interoperability                         Domain Expert
    Release 2                                   Council Work Group
329 Clinical Content Development,               Clinical Interoperability                         Domain Expert
    Harmonization and Definition (Roadmap Pjt Council Work Group
266 Clinical Statement Pattern                Clinical Statement Work                             Structure & Semantic
                                                                             Orders and Observations Work Group, Patient Care Work Group, Pharmac
                                                Group                                             Design
798 Refactor HL7 Confidentiality Concept        Community Based                                   Domain Expert
                                                                             Security Work Group, Vocabulary Work Group
    Domain, code system & value sets            Collaborative Care Work
724 Semantic Health Information Performance     Community Based                                    Domain Expert
                                                                             Electronic Health Records Work Group, Structured Documents Work Grou
    and Privacy Standard (SHIPPS)               Collaborative Care Work
656 Privacy Policy Reference Catalogue          Community Based                                   Domain Expert
                                                                             Security Work Group, Services Oriented Architecture Work Group
                                                Collaborative Care Work
577 Update V3 Privacy Message                   Community Based                                   Domain Expert
                                                Collaborative Care Work
553 Consent Directive CDA Implementation        Community Based                                   Domain Expert
    Guide.                                      Collaborative Care Work
373 Composite Privacy Consent Directive R2      Community Based                                   Domain Expert
                                                Collaborative Care Work
630 Develop and publish Principles &            Conformance & Guidance                           Foundation &
                                                                             Vocabulary Work Group
    guidelines to specify the syntax for        for Implementation/Testing                        Technology
629 V2.8 Proposals - Improve conformance for    Conformance & Guidance                            Foundation &
    better testing                              for Implementation/Testing                        Technology
198 DSTU Testing toolkit/project (Guidance of   Conformance & Guidance                            Foundation &
    what is involved in DSTU testing)           for Implementation/Testing                        Technology
755 UPDATE OF CERTIFICATION TESTING TO          Education Work Group       No Selection           Technical & Support
    HL7 V2.7                                                                                      Services
754 UPDATE OF RIM TESTING TO HL7 RIM 2.34 Education Work Group               No Selection         Technical & Support
                                                                                                Services
753 Academia Engagement Project                 Education Work Group                            Technical & Support
                                                                             Marketing Work Group
                                                                                                  Services
708 HL7 Enterprise-Wide Education Strategic     Education Work Group                              Technical & Support
    Plan                                                                                          Services
559 Electronic outlets                          Education Work Group                              Technical & Support
                                                                                                  Services
548 Strengthen HL7 Education                    Education Work Group                              Technical & Support
                                                                                                  Services
547 Collaborative Education                     Education Work Group                              Technical & Support
                                                                                                  Services
546 Education Tutorial Offering Database        Education Work Group                              Technical & Support
                                                                                                  Services
545 Education Curriculum Development            Education Work Group                              Technical & Support
    (Ongoing effort)                                                                              Services
830 Electronic Submission of Medical            Electronic Health Records   No Selection          Structure & Semantic
    Documentation(ESMD)-RMES Profile            Work Group                                      Design
819 EHR-S Functional Profile for Health         Electronic Health Records                       Structure Care Work
                                                                            Community Based Collaborative & SemanticGroup, Security Work Group, S
    Information Exchange Metadata               Work Group                                      Design
739 HL7 EHR FM Records Management and           Electronic Health Records                        Work Group
                                                                            Structured DocumentsStructure & Semantic
    Evidentiary Support Functional Profile      Work Group                                        Design
706 Electronic Nutrition Care Process Record    Electronic Health Records                         Structure & Semantic
    System (ENCPRS) Functional Profile.         Work Group                                       Design
704 Public Health Functional Profile (PHFP)     Electronic Health Records                        Structure & Semantic
                                                                            Public Health and Emergency Response Work Group
    Project                                     Work Group                                        Design
698 Pharmacy/Pharmacist Provider Functional     Electronic Health Records                         Structure & Semantic
    Profile based on the EHR-S Functional       Work Group                                        Design
697 EPrescribing Functional Profile based on    Electronic Health Records                         Structure & Semantic
    the EHR-S Functional Model             Work Group                                             Design
688 EHR System Computationally-Independent Electronic Health Records                              Structure & Semantic
                                                                            Architectural Review Work Group, Clinical Decision Support Work Group, C
    Information-Model (EHR-S CI-IM)             Work Group                                        Design
660 HL7 Personal Health Record System           Electronic Health Records                         Structure & Semantic
    Functional Model - Promote from DSTU to Work Group                                            Design
654 Dental Health Functional Profile        Electronic Health Records                             Structure & Semantic
                                                Work Group                                        Design
610 HL7 White Paper: 'Balancing the Integrity   Electronic Health Records                         Structure & Semantic
    and Value of Personal Health Records        Work Group                                        Design
609 Ambulatory Oncology EHR-S Functional        Electronic Health Records                         Structure & Semantic
    Profile                                     Work Group                                        Design
551 EHR System Functional Model Release 2.0     Electronic Health Records                         Structure & Semantic
    (ISO Project)                               Work Group                                          Design
509 Diabetes Data Strategy                      Electronic Health Records                           Structure & Semantic
                                                                            Clinical Interoperability Council Work Group, Patient Care Work Group, Re
                                                Work Group                                        Design
261 EHR Interoperability Model - EHR/IM         Electronic Health Records                         Structure & Semantic
                                                Work Group                                       Design
223 EHR Vital Records Functional Profile        Electronic Health Records                        Structure & Semantic
                                                                            Public Health and Emergency Response Work Group
    (Roadmap Project #4 (one of many))          Work Group                                        Design
202 CDAr2 Reference Profile for EHR             Electronic Health Records                         Structure & Semantic
    Interoperability                            Work Group                                        Design
201 Electronic Health Record Lifecycle Model    Electronic Health Records                         Structure & Semantic
                                                Work Group                                     Design
794 Workgroup Scratchpad Webspace               Electronic Services Work                       Technical & Work Group
                                                                            Pharmacy Work Group, Publishing Support
                                                Group                                             Services
786 HL7 Website Enhancments - Release 12        Electronic Services Work                          Technical & Support
    (Jan 2013)                                  Group                                             Services
785 HL7 Website Enhancments - Release 11        Electronic Services Work                          Technical & Support
    (Sept 2012)                                 Group                                             Services
674 HL7 Website Enhancments - Release 10        Electronic Services Work                          Technical & Support
    (May 2012)                                  Group                                             Services
673 HL7 Website Enhancements - Release 9        Electronic Services Work                          Technical & Support
    (Jan 2012)                                  Group                                             Services
598 HL7 Website Enhancements - Release 8        Electronic Services Work                          Technical & Support
    (Sept 2011)                                 Group                                             Services
150 New HL7 Web Site - (Roadmap Pjt #3, 37)     Electronic Services Work                          Technical & Support
                                                Group                                             Services
820 Data Elements for Emergency Department      Emergency Care Work                               Domain Expert
    Systems (DEEDS) update and revision     Group
694 EDIS - Emergency Department Information Emergency Care Work                                   Domain Expert
                                                                            Electronic Health Records Work Group
    System Functional Profile Version 2.0       Group
573 Emergency Care DAM Version 2                Emergency Care Work                               Domain Expert
                                                Group
368 Emergency Care (EC) Domain Analyses         Emergency Care Work                               Domain Expert
    Model, Release 1                            Group
800 Behavior Health Domain Analysis Model,      Financial Management                            Structure Care Work
                                                                            Community Based Collaborative & SemanticGroup, Structured Documents
    Messages, and CDA Profiles (aka Behavioral Work Group                                         Design
777 Financial Management Account and Billing Financial Management           No Selection          Structure & Semantic
                                                Work Group                                        Design
776 Financial Management Claims and             Financial Management                              Structure & Semantic
    Reimbursement Reaffirmation Ballot          Work Group                                      Design
775 Create a three-workgroup DAM for claims     Financial Management                            Structure & Semantic
                                                                            Attachments Work Group, Structured Documents Work Group
    attachments                                 Work Group                                        Design
370 Consumer Information Account                Financial Management                              Structure & Semantic
                                                Work Group                                        Design
362 Account and Billing CMETs                   Financial Management                             Structure & Semantic
                                                Work Group                                       Design
731 Preoperative Anesthesiology Domain          Generation of Anesthesia                         Domain Expert
                                                                            Child Health Work Group, Clinical Interoperability Council Work Group
    Analysis Model, Release 1                 Standards Work Group
543 Develop Implementation Guide (IG) for the Generation of Anesthesia                           Domain Expert
    use of HL7 messaging within              Standards Work Group
513 Implementation Guide for CDA Release 3 - Generation of Anesthesia                            Domain Expert
                                                                            Health Care Devices Work Group, Structured Documents Work Group
    Anesthetic Record                         Standards Work Group
                                                                                            Domain Expert
444 Healthcare SOA Reference Architecture (H- Government Projects Work Public Health and Emergency Response Work Group
    SOA-RA) V 2.0 and EHR System Design         Group
595 Implementation Guidance for the use of      Health Care Devices Work                         Domain Expert
    HL7 messaging related to Healthcare         Group
821 Radiology/Surgery/Pathology Orders          Imaging Integration Work                        Domain Expert
                                                                            Anatomic Pathology Work Group, Orders and Observations Work Group
    Workflow                                    Group
789 HL7 V2.x / DICOM Implementation Guide       Imaging Integration Work                         Domain Expert
    for Pathology Order Messages and Use of     Group
788 HL7 V2.x / DICOM Implementation Guide       Imaging Integration Work                         Domain Expert
    for Pathology Specimen Identifiers and      Group
787 SopInstance Reference minimal Update        Imaging Integration Work                         Domain Expert
                                          Group
474 CMET: A_DicomCompositeObjectReference Imaging Integration Work                               Domain Expert
    minimal (COCT_RM830120UV05) R2              Group
826 Datatypes and Structures Release 1          Implementable Technology                         Foundation &
    reaffirmation                               Specifications Work Group                   Technology
825 V2 XML Encoding Rules release 2                                                         Foundation &
                                                Implementable Technology Conformance & Guidance for Implementation/Testing Work Group
                                                Specifications Work Group                        Technology
824 HTML 5 ITS                                  Implementable Technology                         Foundation &
                                                Specifications Work Group                        Technology
823 FHIR                                        Implementable Technology                         Foundation &
                                                Specifications Work Group                        Technology
760 Backwards compatible ITS (R2B)              Implementable Technology No Selection            Foundation &
                                                Specifications Work Group                        Technology
759 HL7 Version 3 Standard: Transport           Implementable Technology No Selection            Foundation &
    Specification - ebXML using ebMS 2.0,       Specifications Work Group                   Technology
680 Neutral Mapping Notation                                                                Foundation &
                                                Implementable Technology Conformance & Guidance for Implementation/Testing Work Group
                                                Specifications Work Group                        Technology
627 V3 RIM Implementation Technology            Implementable Technology                         Foundation &
    Specification for XML; Release 1           Specifications Work Group                         Technology
484 Health informatics - Harmonized data types Implementable Technology                          Foundation &
    for information interchange (ISO Ballot     Specifications Work Group                        Technology
335 XML ITS R1.1                                Implementable Technology                         Foundation &
                                                Specifications Work Group                        Technology
316 XML ITS R2                                  Implementable Technology                         Foundation &
                                                Specifications Work Group                        Technology
301 HL7 Web Services Profiles, Release 3        Implementable Technology                         Foundation &
                                            Specifications Work Group                             Technology
772 InM Wrappers requirements determination Infrastructure and                                    Foundation &
                                                                            Services Oriented Architecture Work Group
                                                Messaging Work Group                             Technology
619 HL7 Transmission Wrappers R1.1 Batch        Infrastructure and                               Foundation &
    Messaging                                   Messaging Work Group                             Technology
599 Ambassador webinar program                  Marketing Work Group                             None

596 University Outreach - Phase 1 (Pilot)       Marketing Work Group                             None

433 CDA Product and Services Guide - Phase 3    Marketing Work Group                             None

809 Interoperability Resources for Healthcare                                               Foundation &
                                                Modeling and Methodology Implementable Technology Specifications Work Group, RIM Based Applica
    (IR4H) Methodology Design                   Work Group                                   Technology
761 Information Model Metadata                                                               Foundation &
                                                Modeling and Methodology Vocabulary Work Group
    Documentation                               Work Group                                       Technology
750 Data Types R3                               Modeling and Methodology                         Foundation &
                                             Work Group                                          Technology
710 Reaffirmation of Previous Normative CMET Modeling and Methodology                            Foundation &
    Ballots                                     Work Group                                   Technology
578 HL7 Model Interchange Format (MIF)                                                       Foundation &
                                                Modeling and Methodology Publishing Work Group, Tooling Work Group, Vocabulary Work Group
    Informative Ballot                          Work Group                                       Technology
455 Complete Balloting of V3 Abstract Data      Modeling and Methodology                         Foundation &
    Types R2                                    Work Group                                       Technology
363 Annual Balloting of HL7 Reference           Modeling and Methodology                         Foundation &
    Information Model                           Work Group                                       Technology
299 HDF Phase III                                Modeling and Methodology                        Foundation &
                                                 Work Group                                      Technology
221 Common Message Element Types (COCT)          Modeling and Methodology                        Foundation &
    Release 8                                    Work Group                                      Technology
219 Core Principles and Properties of HL7        Modeling and Methodology                        Foundation &
    Version 3 Models                             Work Group                                      Technology
827 V 2.5.1 Implementation Guide: Orders &       Orders and Observations                         Structure & Semantic
    Observations; EHR-Laboratory                 Work Group                                       Design
797 Behavioral Framework                         Orders and Observations                          Structure & Semantic
                                                                            Architectural Review Work Group, Modeling and Methodology Work Grou
                                                 Work Group                                    Design
793 V2.7.1                                       Orders and Observations                       Structure & Semantic
                                                                            Conformance & Guidance for Implementation/Testing Work Group, Publis
                                                 Work Group                                      Design
792 Ambulatory Laboratory Results Reporting      Orders and Observations                         Structure & Semantic
    Implementation Guide for LRI, Release 1   Work Group                                         Design
738 Diet and Nutrition Orders Domain Analysis Orders and Observations                            Structure & Semantic
                                                                            Patient Care Work Group, Pharmacy Work Group
    Model                                        Work Group                                      Design
682 Specimen CMET Second Release                 Orders and Observations    No Selection         Structure & Semantic
                                                 Work Group                                    Design
626 Substances Model                             Orders and Observations    Pharmacy Work GroupStructure & Semantic
                                                 Work Group                                      Design
625 CPM DSTU R2 (Common Product Model)           Orders and Observations                         Structure & Semantic
                                                                            Health Care Devices Work Group, Patient Safety Work Group, Pharmacy W
                                                 Work Group                                      Design
618 O&O Domain Maintenance                       Orders and Observations                         Structure & Semantic
                                                 Work Group                                      Design
617 Laboratory Related CMETs - R2                Orders and Observations                         Structure & Semantic
                                                 Work Group                                      Design
587 Lab Order - Template                         Orders and Observations    No Selection         Structure & Semantic
                                                 Work Group                                      Design
586 Microbiology Antibiotic Sensitivity Result   Orders and Observations                         Structure & Semantic
    Template                                     Work Group                                      Design
585 Harmonize Medication Order with              Orders and Observations                         Structure & Semantic
    Composite Order                              Work Group                                      Design
584 Specialzed clinical event models - may       Orders and Observations                         Structure & Semantic
    overlap with detailed clinical model.        Work Group                                      Design
583 Specialized order models - new or            Orders and Observations                         Structure & Semantic
    harmonization with other work groups.        Work Group                                      Design
582 Lab Result - R2                              Orders and Observations                         Structure & Semantic
                                            Work Group                                           Design
521 Blood Center System to System Messaging Orders and Observations                              Structure & Semantic
                                           Work Group                                            Design
434 Common Observation Event Template - R1 Orders and Observations                               Structure & Semantic
                                                 Work Group                                      Design
349 Laboratory Related CMETs                     Orders and Observations                         Domain Expert
                                                 Work Group
312 Blood, Tissue, and Organ - Release 1         Orders and Observations                         Structure & Semantic
                                                 Work Group                                      Design
256 Clinical Event Domain - R1                   Orders and Observations                         Structure & Semantic
                                                 Work Group                                      Design
213 General Lab Order IG - R1                    Orders and Observations                         Structure & Semantic
                                                 Work Group                                      Design
113 HL7 Version 3 Standard: Laboratory,          Orders and Observations                         Domain Expert
    Release 1 Result Topic                       Work Group
111 Observation Request Template - Release 1     Orders and Observations                         Structure & Semantic
                                                 Work Group                                      Design
110 Order Domain - Order Pattern - Release 1     Orders and Observations                         Structure & Semantic
                                                                            Imaging Integration Work Group, Pharmacy Work Group
                                                 Work Group                                      Design
109 General Observation Related CMETs -          Orders and Observations                         Structure & Semantic
    Phase I                                      Work Group                                      Design
 38 Composite Order                              Orders and Observations                         Structure & Semantic
                                                 Work Group                                      Design
736 Patient Encounter Messaging                  Patient Administration     No Selection         Structure & Semantic
                                                 Work Group                                       Design
725 Interdependent Registries                    Patient Administration                           Structure & Semantic
                                                                            Services Oriented Architecture Work Group
                                                 Work Group                                      Design
650 Service Delivery Location                    Patient Administration                          Structure & Semantic
                                                 Work Group                                      Design
576 Person Registry Enhancement                  Patient Administration                          Structure & Semantic
                                                 Work Group                                      Design
574 Personnel Management CMETs                   Patient Administration                          Structure & Semantic
                                                 Work Group                                      Design
459 Scheduling CMETs                              Patient Administration                            Structure & Semantic
                                                Work Group                                          Design
360 V3 Organization Registries, Release 2 topic Patient Administration                              Structure & Semantic
    within Personnel Management domain            Work Group                                        Design
359 V3 Provider Registries, Release 2 topic       Patient Administration                            Structure & Semantic
    within Personnel Management domain            Work Group                                        Design
292 Scheduling Release 2                          Patient Administration                            Structure & Semantic
                                                  Work Group                                     Design
813 Care Provision D-MIM to normative ballot      Patient Care Work Group                        Domain Expert,
                                                                              Templates Work Group
                                                                                                 Foundation &
812 Care Provision Care Transfer Topic to         Patient Care Work Group                        Foundation &
                                                                              Templates Work Group
    normative ballot                                                                             Technology
811 Care Provision Care Record Query Topic to Patient Care Work Group                            Foundation &
                                                                              Templates Work Group
    normative ballot                                                                             Technology
810 Care Provision Care Record Topic to           Patient Care Work Group                        Foundation &
                                                                              Templates Work Group
    normative ballot                                                                                Technology
745 Pressure Ulcer Prevention Domain Analysis Patient Care Work Group                               Domain Expert
    Model
675 Care Provision: Adverse Reaction topic        Patient Care Work Group                          Domain Expert
                                                                              Patient Safety Work Group, Pharmacy Work Group

670 Patient Care V2 revisions to Chapter 11 and Patient Care Work Group                           Domain Expert
                                                                              Community Based Collaborative Care Work Group
    12
669 Care Provision: Care Statement                Patient Care Work Group                           Domain Expert

668 Care Provision Domain: Care Structures        Patient Care Work Group                           Domain Expert
    Topic (including Concern List, Vital Signs,
666 Care Provision: Health Concern Topic          Patient Care Work Group                           Domain Expert

664 Care Provision: Assessment Scales Topic       Patient Care Work Group                           Domain Expert

661 Domain Analysis Model and Detailed            Patient Care Work Group                          Domain Expert
                                                                              Health Care Devices Work Group, Patient Safety Work Group
    Clinical Models for Medical Devices
651 Care Plan Topic; continuation of work         Patient Care Work Group                          Work Group
                                                                              Structured DocumentsDomain Expert

320 Detailed Clinical Models Release 1            Patient Care Work Group                          Domain Expert
                                                                              Child Health Work Group, Clinical Decision Support Work Group, Clinical In

174 Care Provision DSTU - Topic Allergy &         Patient Care Work Group                          Domain Expert
                                                                              Patient Safety Work Group, Pharmacy Work Group
    Intolerances
106 Care Provision DSTU - Topic Care              Patient Care Work Group                           Domain Expert
    Composition
103 Care Provision DSTU - Topic Professional      Patient Care Work Group                           Domain Expert
    Services
714 Periodic Safety Report                        Patient Safety Work Group                         Domain Expert

713 Risk Management Plans                         Patient Safety Work Group                         Domain Expert

620 PSO Common Format CDA Project                 Patient Safety Work Group                         Domain Expert

494 Public Health Reporting Domain Analysis       Patient Safety Work Group                        Domain Expert
                                                                              Public Health and Emergency Response Work Group
    Model (PORR DAM)
227 HL7 Individual Case Safety Report Release 3 Patient Safety Work Group                           Domain Expert
    (JIC Ballot Project)
834 CLINICAL STATEMENT - COMPARISON               Pharmacy Work Group                              Domain
                                                                              Clinical Statement Work GroupExpert

817 MEDICATION DISPENSE AND SUPPLY                Pharmacy Work Group                              Domain Group
                                                                              Orders and Observations WorkExpert
    EVENT RELEASE 2
814 Guidance on Implementation of Pharmacy        Pharmacy Work Group                               Domain Expert
    Domain Messages
558 MEDICATION ORDER EVENT RELEASE 2              Pharmacy Work Group                              Domain Group
                                                                              Orders and Observations WorkExpert

557 Medication CMETs Release 2                    Pharmacy Work Group                               Domain Expert

556 Institutional Material                        Pharmacy Work Group                              Domain Group
                                                                              Orders and Observations WorkExpert

555 Administration Event                          Pharmacy Work Group                               Domain Expert

501 IDMP Terminologies Project (JIC Project)      Pharmacy Work Group                               Domain Expert

249 HL7 V3 Std: Pharmacy, Release 1: Pharmacy Pharmacy Work Group                                   Domain Expert
    CMETs
245 HL7 V3 Std: Pharmacy, Release 1: Patient    Pharmacy Work Group                            Domain Expert
    Medication Contraindication Query
244 HL7 V3 Std: Pharmacy, Release 1:            Pharmacy Work Group                            Domain Expert
    Medication Statement and Administration
242 HL7 V3 Std: Release 1: Medication Dispense Pharmacy Work Group                             Domain Expert
    and Supply Event
241 HL7 V3 Std: Pharmacy, Release 1: Generic    Pharmacy Work Group                            Domain Expert
    Patient-Related Pharmacy Query
240 HL7 V3 Std: Pharmacy, Release 1: Dosage     Pharmacy Work Group                            Domain Expert
    Instruction
236 HL7 V3 Std: Pharmacy, Release 1: Common Pharmacy Work Group                                Domain Expert
    Order
235 HL7 V3 Std: Pharmacy, Release 1: Common Pharmacy Work Group                                Domain Expert
    Dispense and Supply Event
189 HL7 V3 Std: Medication, Release 1: Drug     Pharmacy Work Group                            Domain Expert
    Knowledge-Base Query
791 Resource Directory Wiki                     Process Improvement Work                       Technical & Support
                                                Group                                          Services
643 First Time Attendee Process Improvement     Process Improvement Work                       Technical & Support
    Project.                                    Group                                          Services
593 PIC Annual Maintenance: Communication       Process Improvement Work                       Technical & Support
    Strategy (Jan WGM)                          Group                                          Services
592 PIC Bi-Annual Maintenance: Decision         Process Improvement Work                       Technical & Support
    Making Practices (DMP) Template (May        Group                                          Services
591 PIC Annual Maintenance: Best Practices      Process Improvement Work                       Technical & Support
    (January WGM)                               Group                                          Services
590 PIC Bi-Annual Maintenance: Co-Chair         Process Improvement Work                       Technical & Support
    Handbook (September WGM)                    Group                                          Services
835 2012 Annual Updates to the Project Scope    Project Services Work                          Technical & Support
    Statement Template and Project Approval     Group                                           Services
818 Introducing New Processes to HL7            Project Services Work                           Technical
                                                                           Technical Steering Committee & Support
                                                Group                                           Services
765 Project Health Metrics                      Project Services Work                           Technical
                                                                           Technical Steering Committee & Support
                                                Group                                          Services
748 Work with Vocab re: process to publish      Project Services Work                          Technical & Support
    vocab changes 3x/year                       Group                                          Services
747 Create Education for Project Services       Project Services Work                          Technical & Support
    Related Topics                              Group                                          Services
741 Harmonization Process Work by Project       Project Services Work                          Technical & Support
    Services WG                                 Group                                          Services
740 SWOT Work for Project Services Work         Project Services Work                          Technical & Support
    Group                                       Group                                          Services
676 SAIF and Sound - Fast Track to Standard     Project Services Work                          Technical & Support
    Development                                Group                                           Services
536 Develop Project Dashboard / Project Health Project Services Work                           Technical & Support
    Metrics                                  Group                                             Services
535 Respond to needs of the Working Group as Project Services Work                             Technical & Support
    requested by the TSC (ongoing)              Group                                          Services
534 Mentoring Project Facilitators              Project Services Work                          Technical & Support
                                                Group                                          Services
533 Annual Maintainance of Project Life Cycle   Project Services Work                          Technical & Support
    and GOM Updates                             Group                                          Services
531 Annual Updates to the Project Scope         Project Services Work                          Technical & Support
    Statement Template and Project Approval     Group                                           Services
816 HL7 Version 2.5.1 Implementation Guide:     Public Health and                               Domain Group,
                                                                           Orders and Observations WorkExpert Patient Administration Work Group
    Vital Records Birth and Fetal Death         Emergency Response Work
784 Adding Public Health Reporting              Public Health and                            Work Group
                                                                        Structured DocumentsDomain Expert
    Requirements to HQMF                        Emergency Response Work
737 HL7 Version 2.5.1 Implementation Guide:     Public Health and                            Domain Group
                                                                        Orders and Observations WorkExpert
    Electronic Laboratory Reporting to Public   Emergency Response Work
735 HL7 Version 2.5.1 Implementation Guide:     Public Health and                            Domain Group
                                                                        Orders and Observations WorkExpert
    Vital Records Death Reporting, Release 1    Emergency Response Work
458 Version 2.5.1 Implementation Guide for      Public Health and                              Domain Expert
    Immunization Messaging                      Emergency Response Work
454 1-Complete PHER project list                Public Health and                              Domain Expert
                                                Emergency Response Work
450 PHER WG Process and Outcomes:               Public Health and                              Domain Expert
    Continuous Improvement                      Emergency Response Work
350 Public Health Related CMETs                 Public Health and                              Domain Expert
                                                Emergency Response Work
310 Immunization Domain Analysis Model           Public Health and                                 Domain Expert
                                                 Emergency Response Work
309 Immunization Administration                  Public Health and                                 Domain Expert
                                                 Emergency Response Work
773 HL7 Version 2.9 Messaging Standard           Publishing Work Group                        Work Group, Health
                                                                         Financial ManagementTechnical & Support Care Devices Work Group, Infr
                                                                                                   Services
723 HL7 Version 2.8 Messaging Standard           Publishing Work Group                              Work Group, Health
                                                                               Financial ManagementTechnical & Support Care Devices Work Group, Infr
                                                                                                   Services
639 Recurring maintenance of glossary and        Publishing Work Group                             Technical & Support
    maintain ballot site and its xhtml                                                             Services
638 Annual maintenance of V3 Guide &             Publishing Work Group                             Technical & Support
    Backbone                                                                                       Services
637 Annual maintenance of Facilitators guide     Publishing Work Group                             Technical & Support
                                                                                                   Services
636 Annual Establishment of Publishing           Publishing Work Group                             Technical & Support
    calendar(s)                                                                                    Services
635 Annual Normative Editions                    Publishing Work Group                             Technical & Support
                                                                                                   Services
295 Version 3 Publishing Facilitator's Guide     Publishing Work Group                             Technical & Support
                                                                                                   Services
833 Regulated Product Submission Release 2       Regulated Clinical Research No Selection          Domain Expert
    Draft 2 (RPS R2D2)                           Information Management
822 CDA Implementation Guide for the                                                              Work Group
                                                 Regulated Clinical Research Structured DocumentsDomain Expert
    Exchange of Clinical Trial Subject Data:     Information Management
721 aECG r2 (Annotated ECG, Release 2)           Regulated Clinical Research                       Domain Expert
                                                 Information Management
720 Regulatory Activity Submission Hierarchy     Regulated Clinical Research                       Domain Expert
    (RASH)                                       Information Management
719 Subject Data Validation Service Functional   Regulated Clinical Research                       Domain Expert
    Model                                        Information Management
718 Clinical Study Functional Profiles           Regulated Clinical Research                       Domain Expert
                                                 Information Management
717 Notification to Physicians for marketed      Regulated Clinical Research                       Domain Expert
    product information                          Information Management
716 Clinical Trial Registration and Reporting R2 Regulated Clinical Research                       Domain Expert
    (CTR&R-R2)                                   Information Management
541 Clinical Research Filltered Query Service    Regulated Clinical Research                       Domain Expert
    Funtion Model (CRFQ SFM)                     Information Management
539 Regulated Product Submission Release 3       Regulated Clinical Research                       Domain Expert
    (RPS R3)                                     Information Management
538 BRIDG (Biomedical Research Integrated        Regulated Clinical Research                       Domain Expert
    Domain) Domain Analysis Model (DAM)          Information Management
372 Clinical Trial Registration and Results      Regulated Clinical Research                       Domain Expert
    (CTR&R) (JIC Project)                        Information Management
325 Medical Product Information (includes        Regulated Clinical Research                       Domain Expert
    Drugs, Devices, Biologics, Veterinary        Information Management
217 Regulated Product Submission Release 2       Regulated Clinical Research                       Domain Expert
                                                 Information Management
205 CDISC Content to Message                     Regulated Clinical Research                       Domain Expert
                                                 Information Management
550 Creation of a set of RIMBAA whitepapers      RIM Based Application                             Foundation &
                                                 Architecture Work Group                           Technology
646 Security and Privacy Ontology                Security Work Group                               Foundation &
                                                                                                   Technology
529 Security Domain Analysis Model (DAM)         Security Work Group                               Domain Expert
                                                                               Community Based Collaborative Care Work Group

226 Risk Assessment Framework Cookbook           Security Work Group                               Foundation &
                                                                                                   Technology
224 Privacy and Authorization Terminology        Security Work Group                               Foundation &
                                                                                                  Technology
838 Pharmacy Service Profile                     Services Oriented             Pharmacy Work GroupFoundation &
                                                 Architecture Work Group                          Technology
783 HL7 hData Record Format                      Services Oriented                                Foundation &
                                                                               Implementable Technology Specifications Work Group
                                                 Architecture Work Group                           Technology
628 Healthcare SOA Ontology Project              Services Oriented                                 Foundation &
                                                 Architecture Work Group                           Technology
268 Infrastructure: Resource Location and        Services Oriented                                 Foundation &
    Updating Service Functional Model            Architecture Work Group                             Technology
200 Privacy, Access and Security Services (PASS) Services Oriented                                   Foundation &
                                                                               Architectural Review Work Group, Community Based Collaborative Care W
    Alpha Project                                Architecture Work Group                           Technology
796 Patient Education Summary CDA               Structured Documents                        Structure & Semantic
                                                                       Patient Care Work Group
    Documents                                   Work Group                                   Design
756 Health Quality Measure Format (HQMF)        Structured Documents                         Structure & Semantic
                                                                       Clinical Decision Support Work Group
    Implementation Guide                        Work Group                                  Design
752 Publish CDA IGs from Tooling                Structured Documents                        Structure & Semantic
                                                                       Clinical Genomics Work Group, Publishing Work Group, Tooling Work Gro
                                                Work Group                                 Design
728 HL7/IHE Health Story Implementation         Structured Documents                       Structure & Integration Work Group, Patient Care W
                                                                       Attachments Work Group, ImagingSemantic
    Guide Consolidation                         Work Group                                  Design
711 Self-Displaying CDA Documents               Structured Documents                        Structure & Semantic
                                                Work Group                                  Design
679 Implementation Guide for CDA Release 2:     Structured Documents                        Structure & Semantic
    Progress Note                               Work Group                                  Design
569 Implementation Guide for CDA Release 2,     Structured Documents                        Structure & Semantic
    Unstructured Documents                      Work Group                                  Design
568 Implementation Guide for CDA Release 2:     Structured Documents                        Structure & Semantic
    Procedure Note                           Work Group                                     Design
567 Implementation Guide for CDA Release 2 - Structured Documents                           Structure & Semantic
                                                                       Child Health Work Group
    Level 3, Neonatal Care Report             Work Group                                    Design
510 Care Record Summary, Release 2: Discharge Structured Documents                          Structure & Semantic
    Summary                                     Work Group                                  Design
508 Electronic Quality Measure Specification,   Structured Documents                        Structure & Semantic
    Release 1                                   Work Group                                  Design
487 CDA Modeling with UML                       Structured Documents                        Structure & Semantic
                                                Work Group                                  Design
477 CDA R3                                      Structured Documents                        Structure & Semantic
                                                Work Group                                  Design
381 CDA Implementation Guide for Patient        Structured Documents                        Structure & Semantic
                                                                       Patient Care Work Group
    Assessments                              Work Group                                     Design
319 Implementation Guide for CDA Release 2 - Structured Documents                           Structure & Semantic
    Level 3 Healthcare Associated Infection     Work Group                                  Design
210 Quality Reporting Document Architecture     Structured Documents                        Structure & Semantic
                                                                       Child Health Work Group
    (Roadmap Project #4?? (one of many))        Work Group                                  Design
209 IG for CDA R2 - Lvl 3 Personal Healthcare   Structured Documents                        Structure & Semantic
    Monitoring Reports, R1                      Work Group                                  Design
172 Structured Documents Architecture           Structured Documents                        Structure & Semantic
                                                Work Group                                  Design
134 CDA Implementation Guides for Common        Structured Documents                        Structure & Semantic
    Clinical Documents                          Work Group                                  Design
828 Risk Assessment and Governance for SAIF     Technical Steering                          None
    Architecture Program                        Committee
799 HL7 Strategic Initiatives Dashboard Project Technical Steering                          None
                                                                       Board of Directors Work Group, Electronic Services Work Group
                                                Committee
764 SAIF Pilot Coordination                     Technical Steering                           None
                                                                       Architectural Review Work Group, Project Services Work Group
                                                Committee
763 HL7 SAIF Implementation Guide               Technical Steering                           None
                                                                       Architectural Review Work Group, Conformance & Guidance for Implemen
                                                Committee
751 SAIF Architecture Program                   Technical Steering                           None
                                                                       Architectural Review Work Group
                                                Committee
749 TSC Retrospective Self-Assessment Based     Technical Steering                          Domain Expert,
                                                                       Domain Experts Steering Division, Foundation and Technology Steering D
    on T3F Recommendations                      Committee                                   Foundation &
647 HL7 Product Quality Plan                    Technical Steering                          None
                                                Committee
631 TSC Work Group Visbility Maintenance        Technical Steering                          Domain Expert,
                                                Committee                                   Foundation &
478 TSC Product Visibility Project              Technical Steering                          None
                                                Committee
829 HL7 Templates Registry Business Process     Templates Work Group                        Work Group,
                                                                       Structured DocumentsFoundation & Tooling Work Group
    Requirements Analysis                                                                   Technology
611 Template Registry Pilot                     Templates Work Group                        Foundation &
                                                                       Patient Care Work Group, Structured Documents Work Group, Tooling Wo
                                                                                            Technology
272 Updated Template Interchange Format         Templates Work Group                        Foundation &
                                                                       Patient Care Work Group, Structured Documents Work Group
    DSTU                                                                                     Technology
831 EHR-S FM Profiling tool                     Tooling Work Group                           Technical & Support
                                                                       Electronic Health Records Work Group
                                                                                            Services
804 GForge alternative assessment               Tooling Work Group                          Technical & Support
                                                                                             Services
803 HL7 Tooling DashBoard Project               Tooling Work Group                           Technical Publishing
                                                                       Electronic Services Work Group, & Support Work Group
                                                                                             Services
802 HL7 Tooling Communication Plan and          Tooling Work Group                           Technical Marketing
                                                                       Electronic Services Work Group, & Support Work Group, Publishing Work
    Execution Project                                                                       Services
801 HL7 Tooling Strategy and Process Revision Tooling Work Group                               Technical Publishing
                                                                         Electronic Services Work Group, & Support Work Group
                                                                                                 Services
742 Model Automated Exchange (MAX) for           Tooling Work Group                              Technical & Support
                                                                         Clinical Interoperability Council Work Group
    UML Models                                                                                 Services
690 HL7 Static Model Designer Enhancement 1 Tooling Work Group                                 Technical & Support
                                                                                             Services
665 MIF-based Publishing Project - Phase II      Tooling Work Group                          Technical & Support
                                                                         Publishing Work Group
                                                                                               Services
839 HL7 Common Terminology Services Release Vocabulary Work Group                              Foundation &
    2 (CTS2) Implementation Guide                                                           Technology
806 Development of policies and procedures of Vocabulary Work Group      Tooling Work Group Foundation &
    an HL7 terminology authority                                                               Technology
743 Guidance for the use of Terminology Post- Vocabulary Work Group                            Foundation &
    Coordinated Expressions in HL7                                                             Technology
644 HL7 Evaluation of the International Health   Vocabulary Work Group                         Foundation &
    Terminology Standards Development                                                          Technology
634 Draft a policy for endorsement by the HL7    Vocabulary Work Group                         Foundation &
    Technical Steering Committee on                                                            Technology
615 Develop vocabulary maintenance process       Vocabulary Work Group                         Foundation &
    and tooling                                                                                Technology
500 Guide for Best Practices for Implementation Vocabulary Work Group                          Foundation &
    of Vocabulary                                                                              Technology
499 Develop and publish Principles &             Vocabulary Work Group   No Selection          Foundation &
    guidelines of Terminology Maintenance                                                      Technology
497 Harmonize the V2 & V3 vocabulary             Vocabulary Work Group                         Foundation &
                                                                                              Technology
495 International SDO Glossary (was Health       Vocabulary Work Group                        Foundation &
                                                                         Patient Care Work Group, Publishing Work Group
    Informatics Harmonised Glossary)                                                           Technology
468 TermInfo - USING SNOMED CT in HL7 v3         Vocabulary Work Group                         Foundation &
                                                                                               Technology
324 Common Terminology Services 2 (CTS2)         Vocabulary Work Group                         Foundation &
                                                                                               Technology
308 Vocabulary Conceptual Model                  Vocabulary Work Group                         Foundation &
                                                                                               Technology
Description                                                          Project Facilitator     Status                      SD Approval Date

Anatomic Pathology Reports are complex clinical documents that John Gilbertson                                                    5/22/2007
relate a patient's condition, one or more specimens and
A complete version of the SAIF Book, i.e. the canonical definition   Charlie Mead            DSTU - Balloting                     2/14/2011
of the Behaviour, Information, Conformance and Compliance, and
This HL7 HF&EA Informative-Reference will be an HDF & ECCF     Charlie Mead, Steve           Active Project (Resources
implementation-guide, which is intended to address the reuse or      Hufnagel. Nancy         assigned to pjt)
Arden Syntax for Medical Logic Systems, Version 3.0 - Adoption       Arden Syntax Work
of RIM-based data interchange (fix curly-braces problem) -            Group Co-Chairs
Arden Syntax v2.9 is a revision of v2.8 developed in part in parallel Robert A Jenders       Active Project (Resources            2/21/2011
with it to incorporate fuzzy logic formalisms and to expand the                              assigned to pjt)
Arden Syntax v2.8 is a revision of v2.7 to incorporate a number of Robert Jenders            Normative - Reconcile                2/21/2011
new operators pertinent to flow of control (an iteration break
This project will take a series of existing Additional Information   Durwin Day, Jim         Active Project (Resources            9/23/2011
Specifications and associated CDA implementation guide for           McKinley, Craig         assigned to pjt)
This project is to complete the necessary materials for the          Mike Cassidy                                                 5/28/2007
Periodontal Attachment as an HL7 Additional Information
To define the standard content for an electronic Children's          Penny Sanchez                                                5/23/2005
Preventive Health Services attachment that meets the needs of
The scope of the Home Health Attachment AIS project is to: -         Penny Sanchez           On Hold                              9/26/2005
Define the data content necessary for the exchange of Home
The scope of the Pharmacy Prior Authorization Attachment AIS         Penny Sanchez                                                9/26/2005
project is to: - Define the data content necessary for the exchange
This project upgrades a previously balloted implementation guide Mike Cassidy                                                     2/29/2008
from using CDA R1 to CDA R2, for HL7 informative ballot. The
The current attachment specifications were developed using CDA Penny Sanchez                                                      9/25/2006
R 1.0 as the base standard. As a result of numerous federal NPRM
Contractors to convert the EHR-S FM list worksheet from the      Karen Van                   Active Project (Resources           10/31/2011
existing format into the 7 chapters for Release 2                    Hentenryck              assigned to pjt)
Contractors will analyze and apply the November 2011                 Karen Van               Active Project (Resources            11/1/2011
harmonization approved vocabulary content to the latest Version Hentenryck                   assigned to pjt)
Submit the 2012 HL7 Strategic Initiatives (SI) Document for     Chuck Jaffe, Don             Comment Only - Balloting             9/13/2011
'Comment Only' ballot. The SI document represents HL7's              Mon
Wilfred Bonney to support the OID registry in 2011                   Karen                   Active Project (Resources
                                                                     VanHentenryck;          assigned to pjt)
Wilfred Bonney to update current documentation to reflect            Karen Van               Active Project (Resources
release 1.1.0 of the SMD tool                                        Hentenryck; Wilfred     assigned to pjt)
Contractor to develop a business plan as described in HL7's          Virginia Riehl; Karen   Active Project (Resources
request for proposal dated September 8, 2010. The contractor is      Van Hentenryck          assigned to pjt)
The scope of this project is to: Align Electronic Health Record      Freida Hall             On Hold                              10/1/2007
(EHR) functional requirements with HL7 technical interoperability
The Child Health Neonatology Profile for Electronic Health Record Joy Kuhl, Andy             Active Project (Resources            3/28/2011
Systems v 1.0 (Neonatology Profile) is a project of the HL7 Child Spooner             assigned to pjt)
update to the HL7 Child Health Functional Profile for EHR Systems Child Health WG co- 3-Year Plan Item
following an update to the EHR Functional Model                      chairs
work on our three-year plan when we get together in person in        Joy Kuhl                3-Year Plan Item
January.
Develop a new reference model for browser-based applications         David Fusari            Active Project (Resources
that is integrated into the CCOW context leveraging                                          assigned to pjt)
Consider extending CCOW to handle Authorizations. Will consider CCOW WG                      3-Year Plan Item
again at the Sept. 2010 WGM
A decision support service (DSS) receives patient data as the input Kensaku Kawamoto, Ready for Normative                         8/19/2011
and returns patient-specific conclusions as the output. As such, it MD, PhD                  Edition Publication
The SOA Implementation Guide for context-aware information          Guilherme Del Fiol,      DSTU - Test                          6/15/2009
retrieval ('Infobutton') leverages the HL7 Decision Support         MD, PhD                  Period/Accepting
In this project, Clinical decision Support Workgroup will develop a James R. Campbell                                              6/2/2008
standard and associated implementation guidelines for the       MD
GELLO is a guideline expression language developed to query HL7 Robert Dunlop                Active Project (Resources             3/6/2008
RIM v.3 compliant data. The language was developed by the HL7                                assigned to pjt)
A Virtual Medical Record (vMR) for Clinical Decision Support         Robert Dunlop;          DSTU - Reconcile                      3/1/2010
(CDS) is a data model for representing clinical information inputs   Kensaku Kawamoto
The goal of this infobutton implementation guide is to               Craig Parker            Active Project (Resources            9/25/2006
recommend a URL-based implementation of the context-aware                                    assigned to pjt)
Clinical Sequencing use cases, storyboards, and sample data will     Daryl Thomas            Active Project (Resources
be used to understand the requirements and develop the                                       assigned to pjt)
The Canonical Pedigree Project (CPP) was proposed and approved Scott Bolte                   On Hold                             12/22/2010
at the HL7 Phoenix meeting of the Clinical Genomics work group
This is the -OMICS Domain Analysis Model project. This model will Joyce Hernandez;           Active Project (Resources             2/4/2011
be used to develop our informational requirements for CMETs          Philip M. Pochon        assigned to pjt)
The proposed project is intended to be a new Normative Topic         Rick Haddorff          Active Project (Resources       7/9/2010
under the Clinical Genomics (CG) Domain of the HL7 V3 Ballot                                assigned to pjt)
To foster early utilization of genomic data in HL7 v2 messaging      Rick Haddorff          Informative - Balloting         7/9/2010
and meet clinical needs in this emerging field, the CG group will
The study of chromosomes and their abnormalities is known as         Yan Heras              Informative - Balloting       12/19/2011
cytogenetics. Chromosome analysis, or karyotype, refers to the
Specimen Handling CMET                                               Clinical Genomics      3-Year Plan Item
                                                                     WG Cochairs
Definition of Decision Support Service                               Clinical Genomics      3-Year Plan Item
                                                                     WG Cochairs
This document contains the specifications for the representation     Ed Hammond; Jill       Active Project (Resources      3/30/2009
and exchange of structured family health history.                    Kaufman; Amnon         assigned to pjt)
In this project, the Clinical Genomics and Structured Documents      Amnon Shabo            DSTU - Reconcile               2/24/2009
Work Groups will jointly develop a CDA Implementation Guide
In this project, the Clinical Genomics Work Group will focus on the Joyce Hernandez         Informative - Reconcile        1/27/2009
development of a static data structure (e.g. CMET) for
The scope of this project is to identify and harmonize data          Meredith Nahm          Informative - Preparing for   12/20/2011
elements necessary for regulatory decision making (marketing                                Ballot
The scope of this project is to update and extend the second         Dana Pinchotti         Active Project (Resources     10/10/2011
release of the Cardiology Domain Analysis Model (DAM)                                       assigned to pjt)
This project will create a domain analysis model (DAM) for the       Jay Lyle               Active Project (Resources      5/31/2011
exchange of trauma registry information. The primary use case is                            assigned to pjt)
This Project Scope Statement is a revision to                        Brian McCourt          Informative - Balloting       12/30/2010
PSS_CD_ACSDAM_R2_I1_revised10_10_08.doc approved by the
The intent of this project is to update the domain analysis model    Jay Lyle, Sarah Ryan   Informative - Reconcile         7/6/2010
for the Emergency Medical Services domain. For the purpose of
The goal of the project is to develop a DIM specific to emergency Jay Lyle, Sarah Ryan      Multiple Ballot Levels-See      7/6/2010
medical service in the pre-hospital setting based on the DAM                                Ballot Cycle Info
The goal of the project is to develop a Domain Analysis Model        Jay Lyle, Sarah Ryan   Informative - Request          6/15/2009
(DAM) specific to emergency medical service in the pre-hospital                             Publication
The scope of this project is to extend the initial release of this   Anita Walden           Active Project (Resources     10/16/2008
Domain Analyses Model (DAM) (V3_RR_TBDAM_R1_I2_2008SEP)                                     assigned to pjt)
The scope of this project is to serve the clinical community with    Ed Hammond,            Active Project (Resources       6/6/2008
education, processes and forum for collaboration in the              Crystal Kallem,        assigned to pjt)
The Clinical Statement Pattern project intends to provide a          Hans Buitendijk        DSTU - Expired Test Period     1/30/2006
pattern that can be used by various domains to propagate
1. Current State analysis The project will provide a thorough        Serafina Versaggi;     Active Project (Resources      9/12/2011
analysis of the current confidentiality concept domains, coding      Kathleen Connor        assigned to pjt)
The SHIPPS project will identify the metadata and the minimum        Mary Ann Juurlink      Active Project (Resources      2/14/2011
data quality requirements* required to enable: (1) data                                     assigned to pjt)
To develop representative privacy policy sets applicable in various Richard Thoreson        On Hold                         4/7/2010
healthcare information exchange scenarios in a structured natural
CBBC balloted a V3 Privacy message a couple of years ago that     CBCC WG Cochairs          3-Year Plan Item
resulted in a normative standard; they may update this in the
The project is intended to produce a structured document             Ioana Singureanu       DSTU - Test                   10/21/2009
specification to exchange signed Consent Directives. This                                   Period/Accepting
In addition to the analysis of new requirements, this project will   Ioana Singureanu       DSTU - Test                   10/16/2008
correct any problems detected in the current 'Data Consent R1'                              Period/Accepting
Develop and publish Principles & guidelines to specify the syntax Ted Klein; Frank          Active Project (Resources       2/2/2010
for vocabulary binding in implementation guides. The intent of       Oemig                  assigned to pjt)
                                                                     ICWG                   3-Year Plan Item

The HL7 development framework (HDF) provides guidance on             Jason Rock             Active Project (Resources       4/2/2007
how to develop a standard. However, the HDF does not provide                                assigned to pjt)
Update the existing chapter 02 certification tests to cover HL7      Ted Klein              Active Project (Resources
v2.7 specific topics in Chapter 2/2A                                                        assigned to pjt)
Update the existing RIM certification tests to cover RIM v2.34       Virginia Lorenzi       On Hold
specific topics.
Develop plan to engage with academia, create mechanisms for          AbdulMalik Shakir;     Active Project (Resources       3/6/2011
increased visibility of and membership recruitment into HL7, and     Mollie Ullman-         assigned to pjt)
This project will produce a strategic plan for education related     AbdulMalik Shakir      Active Project (Resources      11/8/2010
activities throughout the entire world-wide HL7 International                               assigned to pjt)
Identification of these outlets (Elearning, Webinars, Podcast,       Gora Datta,            3-Year Plan Item
Social networking) is one of the tasks of the E-Learning Project,    Education WG
Strengthen faculty (skills, backup speakers, recruiting by topic),   Abdul-Malik Shakir,    3-Year Plan Item
leadership (interaction frequency, evaluate need for additional      Mike Henderson,
Develop policy by which affiliates are encouraged to advertise       Abdul-Malik Shakir     3-Year Plan Item
HL7-wide educational offerings such as e-learning, as well as
We have done some preliminary work on a tutorial database. If        Mike Henderson         3-Year Plan Item
work continues on a volunteer basis, populating the database
This is an ongoing process embracing tutorial offerings at WGMs Virginia Lorenzi          3-Year Plan Item
and Educational Summits as well as the evolving E-Learning
The United States Department of Health and Human Services'          Reed D. Gelzer,       Active Project (Resources    12/19/2011
Centers for Medicare and Medicaid Services (CMS) is developing a Michelle Dougherty, assigned to pjt)
The scope of this project is to create a US Realm EHR Functional EHR                 Active Project (Resources         10/24/2011
Profile describing the functions for an EHR system to support                             assigned to pjt)
The following summarizes the scope. The Project Scope               Ioana Singureanu      Comment Only -                2/21/2011
Statement document contains all the scope detail. This project is                         Considering Comments
This project will create an Electronic Nutrition Care Process       Esther Myers          DSTU - Reconcile             11/18/2010
Record System (ENCPRS) Functional Profile based on the
The project will develop an HL7 EHR-S Public Health Functional      Hetty Khan; Michelle Active Project (Resources     11/10/2010
Profile (PHFP) to identify functional requirements and              Williamson; Dr. Anna assigned to pjt)
The Pharmacist/Pharmacy Provider Functional Profile will facilitate Rachelle F. Spiro;   Normative - Reconcile           7/9/2010
EHR systems capture of medication and clinical related data at the Miranda Rochol
Prescribers and pharmacies (pharmacists) for several years have    Rachelle F. Spiro;     Informative - Reconcile        7/9/2010
been communicating electronic prescription information using        Miranda Rochol
We propose developing an EHR-System Computationally-                Steve Hufnagel        Active Project (Resources
Independent Information-Model (EHR-S CI-IM) as a logical model                            assigned to pjt)
This standard will address the functional needs of Personal Health John Ritter, Don       Active Project (Resources     3/30/2010
Record system developers and users. PHR information is expected Mon, Gary Dickinson assigned to pjt)
This project will create an HL7 Functional Profile for the Electronic Pat Van Dyke, Mark Active Project (Resources      3/31/2010
Dental Record System (EDRS) based on the Electronic Health          Diehl                 assigned to pjt)
HL7 White Paper full title: 'Balancing the Integrity and Value of   John Ritter           Active Project (Resources    12/22/2009
Personal Health Records with Consumer Adoption, Current Health                            assigned to pjt)
Delivery of a Functional Profile for an ambulatory oncology    Paul Boyes                 DSTU - Reconcile             12/22/2009
setting based on, and conformant to, the ANSI approved June
a. Enhancing the current joint ISO/HL7 EHR-S FM Release 1.1 into Pat Van Dyke; Don        Comment Only -
Release 2.0 incorporating input from functional profiles, CCHIT     Mon; John Ritter;     Considering Comments
The scope for this project is to focus on the minimum data set      Don Mon               Active Project (Resources     6/12/2009
and data standards in EHR systems for diabetes assessment in                              assigned to pjt)
This project will produce a draft standard specifying, as           Gary Dickinson        DSTU - Expired Test Period    5/22/2006
requirements, the interoperability characteristics of electronic
The goal of the Electronic Health Record System Vital Records       Hetty Khan, Michelle Informative - Reconcile         2/4/2008
(VR) Functional Profile Project is to create an HL7 EHR-S           Williamson
The Profile shows how HL7's Clinical Document Architecture          Gary Dickinson        DSTU - Expired Test Period   11/12/2007
Release 2 (CDAr2) fulfills requirements of the Common EHR
The EHR Lifecycle Model (EHR/LM) is a supplement to the HL7         Gary Dickinson        DSTU - Expired Test Period     1/4/2008
EHR Interoperability Model DSTU (EHR/IM, published February
Provide a means for HL7 workgroups and projects to deploy web Jean-Henri Duteau           Active Project (Resources     7/18/2011
content in a way that allows appropriate access while respecting                          assigned to pjt)
Work to begin in Sept 2012. All to be completed by Jan 2013.        Electronic Services   3-Year Plan Item
Internal (HQ) Facing - None identified External (Web) Facing: -     Work Group Co-
Work to begin in May 2012. All to be completed by Sept 2012 .       Electronic Services   3-Year Plan Item
Internal (HQ) Facing: - Enhance Work Group Collaboration            Work Group Co-
Work to begin in Jan 2012. All to be completed by 2012 May          Electronic Services   3-Year Plan Item
Internal (HQ) Facing: - Add automated unit testing to the           Work Group Co-
Work to begin in Oct, 2011. All to be completed by 2012 Jan         Electronic Services   3-Year Plan Item
Internal (HQ) Facing: - Add automated unit testing to the          Work Group Co-
All to be completed by 2011 Sept. Internal (HQ) Facing: - Security Electronic Services    Active Project (Resources
Update - Encrypt the username and password stored in the            Work Group Co-        assigned to pjt)
Develop a new hl7.org website. Release 1 was the Creative Look      Dave Hamill           Active Project (Resources     4/24/2007
and Feel. Release 2 - Q Commerce - WGM Registration and HL7                               assigned to pjt)
Development and publication of specifications for ED patient        Peter Park            Active Project (Resources    10/24/2011
records systems, Data Elements for Emergency Department                                   assigned to pjt)
Create a functional profile for the Emergency Department            Peter Park            Active Project (Resources
Information System based on the EHR Functional Model Release 2                            assigned to pjt)
Emergency Care DAM Version 2                                   EC WG Cochairs             3-Year Plan Item

The scope of this project is to create a Domain Analyses Model      Jim McClay            Active Project (Resources    10/28/2008
(DAM) for Emergency Care. The initial scope include in-hospital                           assigned to pjt)
Project Scope The Behavioral Health CCD project is intended to      Kathleen Connor       Comment Only - Balloting      8/12/2011
evaluate the currency and comprehensiveness of HL7 Behavioral
Reaffirm ANSI/HL7 V3 AB, R2-2008 HL7 Version 3 Standard:            Kathleen Connor       Active Project (Resources      7/6/2011
Accounting and Billing, Release 2                                                         assigned to pjt)
Reaffirm HL7 Version 3 Standard: Claims and Reimbursement,          Kathleen Connor       Active Project (Resources      7/6/2011
Release 4.                                                                                assigned to pjt)
The plan is to create a three-workgroup DAM for claims              Financial             3-Year Plan Item
attachments with the premise that it would map LOINC into CDA Management Co-
This project will tie HL7 models to information needed by     Craig Parker,               On Hold                      10/13/2008
consumers' views of healthcare data. The models can then be         Kathleen Connor
Development of a universal realm set of CMETs needed for             Kathleen Connor       Ready for CMET Publication   10/13/2008
pricing, including A_ValuedItem, A_Benefit, and
The goal of the Preoperative Anesthesiology Domain Analysis          Mead Walker ; Anita Informative - Reconcile         1/10/2011
Model Project is to support the exchange and understanding of        Walden
                                                                     Martin Hurrell:       3-Year Plan Item

This project will develop an implementation guide constraining       Gunther Schadow       Active Project (Resources     6/29/2009
CDA Release 3. The implementation guide will support an                                    assigned to pjt)
This project will mature the April 2008 Healthcare Services          Steve Hufnagel;       Active Project (Resources     1/16/2009
Oriented Reference Architecture (H-SOA-RA) version 1.0 into H-       Nancy Orvis           assigned to pjt)
Maintain and develop Implementation Guidance for the use of          Melvin Reynolds       3-Year Plan Item
HL7 messaging related to Healthcare Device communications -
Develop an implementation guide for anatomic pathology orders Harry Solomon                Active Project (Resources    10/13/2011
that better captures data from the surgical or interventional                              assigned to pjt)
HL7 V2.x / DICOM Implementation Guide for Pathology Order            Imaging Integration   3-Year Plan Item
Messages and Use of DICOM Image References                   Work Group Co-
HL7 V2.x / DICOM Implementation Guide for Pathology Specimen Imaging Integration           3-Year Plan Item
Identifiers and Labels (in cooperation with AP WG, OO WG, GS1)       Work Group Co-
SopInstance Reference minimal Update (Prerequisite: Release of       Imaging Integration   3-Year Plan Item
HL7 Datatypes R2)                                               Work Group Co-
The project will produce an updated version of the DICOM object Helmut Koenig              On Hold                       3/11/2009
reference CMET A_DicomCompositeObjectReference minimal
Datatypes and Structures Release 1 reaffirmation                     ITS Co-Chairs         3-Year Plan Item

This standard describes the rules for the encoding of HL7 v2.x       Frank Oemig           Normative - Balloting        10/31/2011
messages in XML for transmission.
HTML 5 ITS                                                           ITS Co-Chairs         3-Year Plan Item

FHIR                                                                 ITS Co-Chairs         3-Year Plan Item

This project will develop ITS specifications for HL7 v3 messages     Dale Nelson           Informative - Reconcile        3/8/2011
and documents, that are wire-backwards-compatible to existing
To ballot the now expired ebXML DSTU unaltered as a normative Paul Knapp                   Normative - Reconcile          3/8/2011
standard.
The aim of the project is to define requirements for a neutral,      Robert Worden         On Hold                        7/6/2010
open notation for expressing semantic mappings; to produce
This project will produce a normative specification that describes   Grahame Grieve        DSTU - Reconcile               2/9/2010
a serialization of RIM graphs implemented as XML instances. The
To provide a globally harmonized (ISO/CEN/HL7) set of                Grahame Grieve        Normative - Reconcile         3/30/2009
representations for data used in the presentation and
This project will deliver an update to the XML ITS to include an     Dale Nelson           Normative - Reconcile         5/14/2007
improved informal extension mechanism similar to the one used
This HL7 V3 ITS seeks to achieve: 1. Model-based serialization that Lloyd McKenzie         Normative - Reconcile         1/29/2007
produces i. XML Schema that are automatically always consistent
The purpose of the Web Services Profiles is to provide          Vassil Peytchev            On Hold                       6/21/2005
implementation guidelines to promote interoperability between
This project is to define the requirements for wrappers so that a    Anthony Julian        Active Project (Resources     6/14/2011
new version of wrappers may be defined.                                                    assigned to pjt)
Create the needed transmission artefacts to support batch            Rene Spronk           DSTU - Request Publication    2/23/2010
messaging for V3 messages, using the existing draft content as a
Provide HL7 HQ with the topics and speakers. HQ will facilitate      Jill Kaufmann;        Active Project (Resources
the webinars. Goal is to launch the first webinar by May, 2010       Catherine Chronaki    assigned to pjt)
A) Increase the number of Universities/faculty teaching HL7          Jill Kaufmann         Active Project (Resources
Standards content as part of Healthcare Informatics programs,                              assigned to pjt)
1. Incorporate feedback received from the pilot 2. Products Guide: Jill Kaufman            On Hold
a. Specify which Implementation Guide used (list one or more).
Document and exercise a new HL7 artifact development                 Grahame Grieve        Active Project (Resources     10/4/2011
methodology using the RFH proposal developed by Grahame                                    assigned to pjt)
Will result in a supplement to Core Principles that defines, in      Lloyd McKenzie        Active Project (Resources
detail, the components of HL7 information models, particularly                             assigned to pjt)
Add project for Data Types R3 now, to collect comments, but will MnM Cochairs              3-Year Plan Item
not bring forward until adequate requirements are collected. As of
This project seeks to affirm the previous approval of 62 Common Woody Beeler               Active Project (Resources     11/2/2010
Model Element Type (CMET) specifications that had previously                               assigned to pjt)
HL7 has developed and maintained a set of schemas called the         Lloyd McKenzie        Ready for Normative          10/20/2009
Model Interchange Format (MIF) since 2002. This set of schemas                             Edition Publication
Release 2 of Abstract Data Types was originally proposed in 2005 Grahame Grieve            Normative - Reconcile         1/27/2009
by InM with project ID# 200500060 (Project Insight ID #116). The
This project seeks to maintain the currency of the primary Version G. Woody Beeler         Active Project (Resources     9/30/2008
3 foundation artifact - the Reference Information Model (RIM) - as                         assigned to pjt)
The scope of the Health Level Seven Development Framework             Ioana Singureanu                                    1/25/2005
project includes: - Document and publish the HDF metamodel;
Creation of the HL7 Version 3 Common Message Element Type             Dale Nelson                                         2/14/2008
Release 8 normative standard.
This project seeks to develop an infrastructure standard that will    Woody Beeler          Normative - Reconcile         1/29/2008
supplement the RIM, Data Types and Vocabulary documents.
The EHR-Laboratory Interoperability and Connectivity                  Glen Moy and Walter Active Project (Resources      10/20/2011
Specification (ELINCS) Orders Implementation Guide is an HL7          Sujansky, MD PhD      assigned to pjt)
This project is intended to interface closely with the SAIF           Patrick Loyd          Active Project (Resources     8/19/2011
Architecture Coordination Program on the deployment of the                                  assigned to pjt)
The scope of the project is to include new fields into one or more Hans Buitendijk          Normative - Reconcile          7/1/2011
segments used in the ORU message, address corresponding
The scope of the project is to ballot the Ambulatory Laboratory       Hans Buitendijk       Normative - Reconcile          7/1/2011
Results Reporting Implementations Guide for LRI Release 1 that is
The goal of the project is to create a Domain Analysis Model      Margaret Dittloff,        Informative - Reconcile       2/21/2011
(DAM) for diet and nutrition orders which will describe medical       Jean Duteau
Develop and ballot the second release of the specimen related         OO Work Group Co- Active Project (Resources
CMETs. This may include the following: - New specimen CMETs           Chairs                assigned to pjt)
This project will develop data elements, structures and               Gunther Schadow       Active Project (Resources      2/9/2010
relationships between the data elements required to uniquely          (O&O - modelling);    assigned to pjt)
The objective of the CPM DSTU R2 project is to establish a new        Ed Tripp, Myron       DSTU - Request Publication     2/9/2010
DSTU release addressing the following topics: - Incorporate           Finseth
The objective of this project is to address general maintenance       Hans Buitendijk       Active Project (Resources
efforts to ensure, e.g., that existing materials not within                                 assigned to pjt)
The objective is to create the next release of the necessary CMETs Austin Kreisler          3-Year Plan Item
to support the Lab models.
This topic covers exchanges of information between systems via        Patrick Loyd          Active Project (Resources     8/19/2011
messages and/or services related to requesting laboratory                                   assigned to pjt)
The creation of a Microbiology Antibiotic Sensitivity Result          Patrick Loyd          On Hold                       8/19/2010
Template which is a derivation of the existing Normative
(sync with Lab Template/CMET)                                         OO WG cochair         3-Year Plan Item

May have Clinical Statement, Clinical Event, and specialized model OO WG cochairs           3-Year Plan Item
component.
May have a Composite Order adjustment and specialized model           OO WG cochairs        3-Year Plan Item
component.
                                                                      OO WG cochairs        3-Year Plan Item

Blood center and transfusion services software is considered a        Patti Larson;         Informative - Request         8/17/2009
Class II medical device by the U.S. Food and Drug Administration Jonathan Harber;           Publication
The Common Observation Event Template project focuses on the Patrick Loyd, Rob              3-Year Plan Item             12/15/2008
creation of a common observation event template, patterned            Hausam, Austin
Continue balloting the Laboratory related CMETs which are:            Ken McCaslin          Active Project (Resources     9/15/2008
R_Specimen universal R_Specimen minimal R_Specimen lite                                     assigned to pjt)
To develop V3 messaging specifications for the communication of Diana Perez, Patrick        Active Project (Resources     1/24/2007
information regarding blood donation services. This will provide      E. Loyd               assigned to pjt)
In this project, the Orders & Observations Work Group will focus      Patrick Loyd, Hans    On Hold                      12/15/2008
on development of a message model to create a Composite               Buitendijk, Gunther
General Lab Order IG for Laboratory Orders to Laboratory (U.S.        Ken McCaslin          3-Year Plan Item             11/12/2007
Realm only) Message Implementation Guide (IG) (Lab Order IG)
This is the Laboratory Result Topic. In release 1 this topic will have Austin Kreisler      Active Project (Resources     9/25/2006
RMIM(s), HMD(s), messages, storyboards, trigger events,                                     assigned to pjt)
In this project, the Orders & Observations Work Group will focus      Hans Buitendijk,      On Hold                      12/15/2008
on the development of an Observation Request Template to              Patrick Loyd, Gunther
In this project, the Orders & Observations Work Group will focus      Hans Buitendijk,      Active Project (Resources    12/15/2008
on development of a message model to: - establish a common            Patrick Loyd, Gunther assigned to pjt)
In this project, the Orders & Observations Work Group will focus      Hans Buitendijk,      3-Year Plan Item              9/25/2006
on development of CMETs in support of various domains to              Patrick Loyd, Gunther
This topic covers exchanges of information between systems via        Patrick Loyd          Active Project (Resources     8/19/2011
messages and/or services related to requesting single or                                    assigned to pjt)
The Patient Administration work group began work on the V3            Gregg Seppala         Normative - Balloting         2/21/2011
Patient Encounter messaging standard nearly ten years ago. The
- Collect a comprehensive set of use cases (requirements) - Define Gregg Seppala            DSTU - Balloting             12/22/2010
a Domain Analysis Model (static and dynamic) for interdependent
the context will be to combine Provider Registry, Organization  Patient                     3-Year Plan Item
Registry and Service Delivery Location to better reflect the real     Administration co-
This is a follow on to Project 490 (Registry Enhancements for         PA WG Cochairs        DSTU - Request Publication     2/9/2010
Social Services) that was completed in January 2010. This project
Personnel Management CMETs                                            PA WG Cochairs        3-Year Plan Item
In this project the Patient Administration work group will focus on Gregg Seppala          Ready for Normative           2/24/2009
making the Appointment CMETs more robust. The Release 1                                    Edition Publication
Personnel Management Release 1, consisting of the Provider and Gregg Seppala               Active Project (Resources    10/13/2008
Organization topics, became a normative standard on October 25,                            assigned to pjt)
Personnel Management Release 1, consisting of the Provider and Gregg Seppala               Active Project (Resources    10/13/2008
Organization topics, became a normative standard on October 25,                            assigned to pjt)
The Scheduling project defines HL7 Version 3 messages for the   A. Benson                  3-Year Plan Item              5/23/2005
purpose of communicating and supporting the various processes
The existing Patient Care D-MIM needs to be revised to reflect the William Goossen         Active Project (Resources     9/12/2011
lessons learned from current implementations, as summarized in                             assigned to pjt)
The existing Patient Care D-MIM needs to be revised to reflect the William Goossen         Active Project (Resources     9/12/2011
lessons learned from current implementations, as summarized in                             assigned to pjt)
The existing Patient Care D-MIM needs to be revised to reflect the William Goossen         Active Project (Resources     9/12/2011
lessons learned from current implementations, as summarized in                             assigned to pjt)
The existing Patient Care D-MIM needs to be revised to reflect the William Goossen         Active Project (Resources     9/12/2011
lessons learned from current implementations, as summarized in                             assigned to pjt)
This project will create a domain analysis model (DAM) for            Jay Lyle             Informative - Reconcile       2/22/2011
capturing and managing pressure ulcer prevention information,
This topic covers all interactions related to clinically recorded     Stephen Chu          3-Year Plan Item
adverse reactions, including: - Recording adverse reactions -
V2 Patient Care Provision Chapter 11 for 2.5.1./ 2.6 / 2.7 / 2.8      Patient Care Work    3-Year Plan Item
Chapter 12 for 2.5.1./ 2.6 / 2.7 / 2.8 This extension of the CH. 11 & Group
Care Statement is the Clinical Statement component of Care            Patient Care WG      3-Year Plan Item
Provision domain. It is adapted to fit the specific needs.
The Care Provision Domain addresses the information that is           dr. William TF       3-Year Plan Item
needed for the ongoing care of individuals, populations, and          Goossen
This topic was balloted as DSTU in 2009 September. It is being        William Goossen      On Hold
split from the original Care Structures Topic. The topic covers all
The aim of this release is to provide a generic template based on     dr. William TF       DSTU - Request Publication    1/18/2010
the clinical statement pattern for use with almost all scores         Goossen
The intent of this project is to create and maintain one generic      PC: Anneke Goossen- Active Project (Resources      7/14/2010
Detailed Clinical Model that defines the main concepts of using       Baremans: ; DEV:     assigned to pjt)
The Care Plan Topic is one of the roll outs of the Care Provision     Rosemary Kennedy     Active Project (Resources      4/5/2010
Domain Message Information Model (D-MIM). The Care Plan is a                               assigned to pjt)
The DCM series of projects are as such a follow up of the DCM         Dr. William Goossen: Active Project (Resources     1/18/2010
meeting in Boca Raton, led by Craig Parker and the DCM Brisbane                            assigned to pjt)
Allergy and Intolerance observations are some of the most       Stephen Chu, Susan         DSTU - Test                   5/22/2007
commonly recorded, reviewed and transmitted information in the Matney                      Period/Accepting
This topic includes all interactions intended to record and update William Goossen         DSTU - Request Publication    9/25/2006
encounters, episodes of care and care events e.g. gynaecological
Professional services deals with the capturing of information         William Goossen      DSTU - Expired Test Period    9/25/2006
about specific activities done "to" a patient such as training,
To develop an electronic standard for periodic reporting of safety Nick Halsey             Active Project (Resources     11/8/2010
updates in relation to medicinal products in pre- and post                                 assigned to pjt)
This project is to develop a standardized specification of the data Nick Halsey            Active Project (Resources     11/8/2010
elements and exchange format for the transmission of                                       assigned to pjt)
This will be developed as a standard for exchanging PSO               Patient Safety       3-Year Plan Item
Common Format data provided by AHRQ (version 1.1). The initial
The scope of the project is to create a Domain Analysis Model  Lise Stevens; Peter         On Hold                        5/6/2009
(DAM) to facilitate harmonization of new and existing messaging Goldschmidt
The project scope is to finalize the existing HL7 V3 Individual Case Lise Stevens, ISO Co- Normative - Notify           10/23/2008
Safety Report (ICSR) Release 2 Draft Standard for Trial Use (DSTU) Chair: TBD
This project will examine the Pharmacy models and compare it       MELVA PETERS            Active Project (Resources     12/6/2011
against the Clinical Statement Model. The goal is to assess                                assigned to pjt)
The purpose of this project is to establish a new normative release Melva Peters           Active Project (Resources    10/13/2011
addressing the following topics: -Incorporate support for                                  assigned to pjt)
This project will create guidance for the implementation of HL7       Melva Peters         Active Project (Resources     9/12/2011
V3 Pharmacy messages. The implementation guide will support                                assigned to pjt)
The purpose of this project is to establish a new normative release Pharmacy WG            Active Project (Resources    10/13/2011
addressing the following topics: - Incorporate support for            Cochairs             assigned to pjt)
The scope is no different from that for the existing CMETs. The       Hugh Glover          Active Project (Resources      2/1/2010
existing scope is to provide CMETs that represent medication for                           assigned to pjt)
This project will define uses cases and requirements for orders,      Melva Peters         Active Project (Resources
dispense and supply events in institutions. These use cases and                            assigned to pjt)
Administration Event                                                  Pharmacy Cochairs    3-Year Plan Item

To support an initial HL7 informative ballot as well as all           Garry Cruickshank,   DSTU - Balloting              6/29/2009
anticipated future work efforts, including future ballots that may Julie James
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy' Robert Hallowell          Normative - Reconcile         9/25/2006
(PORX) as Normative Standard. This standard will include support
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy' Robert Hallowell             3-Year Plan Item
(PORX) as Normative Standard. This standard will include support
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy' Robert Hallowell             Normative - Reconcile         9/25/2006
(PORX) as Normative Standard. This standard will include support
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy' Robert Hallowell             Normative - Reconcile         9/25/2006
(PORX) as Normative Standard. This standard will include support
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy' Robert Hallowell             3-Year Plan Item
(PORX) as Normative Standard. This standard will include support
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy' Robert Hallowell             Active Project (Resources     9/25/2006
(PORX) as Normative Standard. This standard will include support                              assigned to pjt)
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy' Robert Hallowell             Normative - Reconcile         9/25/2006
(PORX) as Normative Standard. This standard will include support
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy' Robert Hallowell             Normative - Reconcile         9/25/2006
(PORX) as Normative Standard. This standard will include support
The creation of Release 1 of the HL7 version 3 domain            Robert Hallowell             Normative - Balloting         1/29/2007
'Medication' (POME) as Normative Standard. This standard will
This project will establish a wiki site as a 'Resource Directory' for   Helen Stevens,        Active Project (Resources    10/24/2011
HL7 volunteer resources and available volunteer opportunities.' It Margie Kennedy             assigned to pjt)
Update First Time Attendee programs - Develop objectives for the Ken McCaslin                 Active Project (Resources      3/5/2010
First Time Attendees that can be used to evaluate all other                                   assigned to pjt)
PIC Annual Maintenance: Communication Strategy, evaluation              Process               3-Year Plan Item
and refine for Jan WGM                                                  Improvement
PIC Annual Maintenance: Decision Making Practices (DMP)                 Process               3-Year Plan Item
Template (May WGM)                                                      Improvement
The intent is to collect/triage innovative best practices and           Process               3-Year Plan Item
publish for benefit of other groups who might want to adopt; PIC Improvement
Bi-annual maintenance of the co-chair handbook, review for each PIC Workgroup                 3-Year Plan Item
September WGM
This project will address the annual updates to both the HL7            David Hamill          Active Project (Resources    11/21/2011
Project Approval Process and the HL7 Project Scope Statement                                  assigned to pjt)
HL7 has a well defined methodology for producing standards, but Freida Hall/Project           Comment Only - Balloting      9/26/2011
the method to introduce new processes and move them to                  Services
The HL7 PMO will work with the Technical Steering Committee             David Hamill          Active Project (Resources     3/21/2011
(TSC) and Project Services Work Group to create a Project Health                              assigned to pjt)
Work with Vocab re: process to publish vocab changes 3x/year            Project Services      3-Year Plan Item
[GForge #1588]                                                          Cochairs
Develop education re: RIM version project requirements [GForge          PS Cochairs, Dave     3-Year Plan Item
#1589] Create FAQ or Tip Sheet on how to easily update                  Hamill
Finalize and Approve revised Harmonization Process (Tracker             Project Services      3-Year Plan Item
1587) Improve communications of harmonization processes and             Work Group Cochairs
SWOT Weakness Item - Deployment of Non-Balloted Products                Project Services    3-Year Plan Item
(Tracker 1591) SWOT Weakness Mit. Strtgy Item-Deployment of             Cochairs
In the past two years HL7 has shown that it can initiate and track      Rick Haddorff; Ioana Active Project (Resources       8/2/2010
projects using a well-defined process - the Project Life Cycle for Singureanu                 assigned to pjt)
Develop method to evaluate target date vs. actual date in Project Dave Hamill, Freida         3-Year Plan Item
Insight (2011May) (Tracker 683) - DONE Investigate developing           Hall
TSC delegated work (Tracker 1107)                                       Work Group            3-Year Plan Item
                                                                        CoChairs
Define Work for the SD PF's (Tracker 733) - DONE Develop                Dave Hamill, Freida   3-Year Plan Item
outreach to recruit project facilitators (Tracker 725) Verify        Hall
Annual Edits to Project Life Cycle (Tracker 711) Review Project Life Dave Hamill, Freida      3-Year Plan Item
Cycle for GOM reference updates (thrice per year) (Tracker 1052)        Hall
Work will begin in August of each year. New template will be            Dave Hamill, Project 3-Year Plan Item
rolled out at Jan WGMs Suggestions to be made for the 2012              Services Work Group
Create release 1 of the V2.5.1 Vital Records Birth and Fetal Death      Michelle Williamson DSTU - Balloting                9/21/2011
Reporting Implementation Guide.
This joint PHER/SD project is intended to extend and generalize         Anna Orlova; Lori     Active Project (Resources      6/6/2011
the HQMF standard to include support for specifying                     Reed-Fourquet         assigned to pjt)
Create release 2 of the v2.5.1 Electronic Laboratory Reporting to       Rita Altamore (WA     Normative - Reconcile         2/18/2011
Public Health implementation guide.                                     State DOH)
Create release 1 of the v2.5.1 Vital Records Death Reporting            Michelle Williamson   DSTU - Test                   2/17/2011
Implementation Guide. The U.S. vital registration systems have                                Period/Accepting
This project seeks to ballot an Implementation Guide for                Rob Savage            Comment Only -                1/23/2009
immunization messages, using version 2.5.1 of the HL7 standard.                               Considering Comments
Create PI links to projects in which PHER is a co-                      Rita Altamore;        Active Project (Resources
sponsor/interested party                                                                      assigned to pjt)
Ongoing work to improve how PHER functions as a work group              Rita Altamore;        Active Project (Resources
and to improve its effectiveness in supporting the development of                             assigned to pjt)
Continue balloting the Public Health related CMETs which are:     Austin Kreisler             Ready for CMET Publication   10/17/2008
R_ExposureAgentCarrier universal R_ExposureAgentFomite
This project will develop a Domain Analysis Model that represents Rob Savage              Informative - Balloting       3/14/2011
the structural and behavioral requirements of HL7 sponsored
In this project, the Public Health and Emergency Response SIG will Joginder Madra         Normative - Reconcile         3/23/2009
focus on development of messages for communicating messages
                                                                     Jane Daus            3-Year Plan Item

This project is to create the Version 2.8 standard from Version 2.7, Jane Daus            Active Project (Resources      5/2/2011
applying those proposals 1. Accepted by the end of the May 2011                           assigned to pjt)
Recurring maintenance of glossary and maintain ballot site and its Publishing WG co-      3-Year Plan Item
xhtml conformance. This work occurs every WGM cycle.         chairs
Annual maintenance of V3 Guide & Backbone. Work occurs every Publishing WG co-            3-Year Plan Item
other WGM.                                                           chairs
Annual maintenance of Facilitators guide. Work occurs every          Publishing WG co-    3-Year Plan Item
other WGM.                                                           chairs
This annual work occurs in September of each year.                   Publishing WG co-    3-Year Plan Item
                                                                     chairs
The annual work for this occurs from Sept WGM to Jan WGM.            Publishing WG co-    3-Year Plan Item
                                                                  chairs
The HL7 Version 3 Standards are a collection of related standards Pete Gilbert            Active Project (Resources     5/23/2005
built upon a common Reference Information Model. Due to the                               assigned to pjt)
The RPS R2D2 project scopes builds on the scope defined in RPS       Patty Garvey         Active Project (Resources    11/28/2011
R1 and RPS R2's first draft. RPS R2 incorporated medical device                          assigned to pjt)
The project will reference the withdrawn Subject Data DSTU V3        Armando Oliva/Patty DSTU - Balloting              10/24/2011
message (project 205) as a starting point to limit the scope of the Garvey
                                                                    RCRIM WG              3-Year Plan Item

                                                                     RCRIM WG             3-Year Plan Item

                                                                     RCRIM WG             3-Year Plan Item

Clinical Study Functional Profiles                                   RCRIM WG             3-Year Plan Item

Notification to Physicians for marketed product information          RCRIM WG             3-Year Plan Item

Further development of the Clinical Trial Registration and           RCRIM WG             3-Year Plan Item
Reporting for enhancements after initial normative ballot.
The CRFQ defines a single service with two service profiles: i) EHR Charlie Mead          DSTU - Test                   6/28/2010
service provider: service client provides CRFQ instance with                              Period/Accepting
The RPS R3 project scopes builds on the scope defined in RPS R1 Geoff Williams            DSTU - Balloting              4/22/2011
and RPS R2. RPS R2 incorporated medical device and                  (EFPIA)
The scope of this project is to ballot the static components of the Julie Evans; Edward   Informative - Reconcile       9/11/2009
BRIDG DAM. The scope of the BRIDG model is Protocol-driven      Tripp
This project will be focused on the development and maintenance Ed Helton; Tracy          DSTU - Request Publication    12/8/2008
of an HL7 V3 message in support of the global data exchange        Beck; Scott Getzin
The original SPL project developed a standardized specification of Myron Finseth          Informative - Request         2/22/2010
the data elements and exchange format for the transmission of                             Publication
The project scope is to extend the existing HL7 V3 Regulated         Ed Tripp             DSTU - Test                   3/28/2008
Product Submission message with new requirements. The project                             Period/Accepting
The project scope is to create HL7 V3 messages from existing  Jason Rock                  DSTU - Test                  11/30/2007
content within the CDISC standard. This project will specifically                         Period/Accepting
The scope of the set of whitepapers is limited to those that         Rene Spronk          Active Project (Resources    10/18/2010
answer the following question: 'If one wishes to create a RIM                             assigned to pjt)
This project will develop a domain ontology encompassing the         Mike Davis           DSTU - Reconcile               3/1/2010
healthcare IT security and privacy domains providing a single,
This project is intended to create and ballot a single HL7 Domain    Suzanne Gonzales-    DSTU - Request Publication    10/6/2009
Analysis Model (DAM) integrating both security access control        Webb
The scope of this project is to create a unified method and          WG Cochairs          Active Project (Resources     2/14/2008
process to identify issues, categorize them using a standard and                          assigned to pjt)
The scope of this project includes incorporation of additional       Suzanne Gonzales-    Normative - Reconcile         1/29/2008
RBAC permission vocabulary (e.g., Healthcare Financial            Webb
This project will create an implementation guide for a medication Gerald Beuchelt         Active Project (Resources
statement service. It will define the actual content (precise data                        assigned to pjt)
The hData Record Format describes how clinical data of arbitrary     Gerald Beuchelt      DSTU - Request Publication    6/21/2011
media type can be organized in a hierarchical abstract format, and
The scope of this project is to develop a Health Interoperability  James Buckner          Active Project (Resources     3/24/2010
Service Ontology encompassing the description and classification                          assigned to pjt)
The Resource Location and Updating Service is a Service Oriented Stefano Lotti            Normative - Balloting         1/30/2006
Architecture sub-project that attempts to elaborate the business
The Privacy, Access and Security Services (PASS) project             Don Jorgenson        DSTU - Reconcile              8/20/2009
specifications define a set of encapsulated, loosely-coupled and
This project will create a CDA implementation guide to provide         Shawn Myers            Active Project (Resources     8/19/2011
for a standard, structured representation of the delivery of patient                          assigned to pjt)
This project is intended to create a domain analysis model to        Bob Dolin; Floyd         Active Project (Resources     3/28/2011
describe the content required within EHRs to measure quality and Eisenberg                    assigned to pjt)
The scope of this project is to expand the CDA Template Tooling Pete Gilbert                  Active Project (Resources    12/22/2010
Project to facilitate the easy production of quality CDA                                     assigned to pjt)
This project will take a series of existing CDA implementation         Liora Alschuler, Dave DSTU - Test                   12/22/2010
guides for various types of clinical documents and consolidate         Carlson                Period/Accepting
This project will create a CSS stylesheet that enables CDA             Keith W. Boone         DSTU - Reconcile             11/10/2010
documents to be displayed in a web browser without
This project will design a Progress Note in XML as a constraint on Liora Alschuler            DSTU - Test                    7/9/2010
HL7 v3 CDA r2. A Progress Note documents patient's clinical                                   Period/Accepting
This project will provide guidance for sending/receiving               Liora Alschuler        DSTU - Test                  10/29/2009
unstructured clinical documents including images, scanned                                   Period/Accepting
This project is to design a basic procedure note in XML as a           Liora Alschuler; Tom DSTU - Test                     9/21/2009
constraint on HL7 v3 CDA r2. The note will be basic enough to be Carr                         Period/Accepting
With cooperation from the Child Health Corporation of America Liora Alschuler; Bob            DSTU - Test                   9/21/2009
(CHCA) and the Children's Hospitals Neonatal Consortium                Dolin:                 Period/Accepting
The Care Record Summary, issued in June 23, 2006, was the first        Liora Alschuler        DSTU - Expired Test Period    6/15/2009
balloted Implementation Guide for CDA R2. CRS covered CDA
The purpose of this project is to create a standard to                 Bob Dolin              DSTU - Test                   6/15/2009
unambiguously represent quality measure specifications,                                       Period/Accepting
- Provide a UML platform for modeling CDA implementation               Rich Rogers                                           4/2/2009
guide specifications. - Create documentation on how to author
The project will produce the Release 3 of the Clinical Document        Robert Dolin           Active Project (Resources     3/13/2009
Architecture (CDA R3). It will correct known deficiencies and                                 assigned to pjt)
There is growing awareness that high quality and safe health and Jennie Harvell               DSTU - Test                   11/6/2008
long-term care can only be delivered when the right patient                                   Period/Accepting
With cooperation from CDC and Healthcare Associated Infections Dan Pollock                    DSTU - Test                    7/6/2011
(HAI) software vendors, this project will develop an                                          Period/Accepting
Health care institutions routinely collect and report performance      Liora Alschuler, Joy   DSTU - Test                    2/4/2008
measure data to improve the quality of care provided to patients. Kuhl, (Roadmap              Period/Accepting
With cooperation from Continua Health Alliance member             Igor Gejdos                 DSTU - Test                    2/4/2008
companies and Electronic Medical Records software vendors, this                               Period/Accepting
In this project the Structured Documents committee will focus on Keith Boone                  Normative - Reconcile         5/22/2007
the development of a document architecture used in reporting
1.This project will develop and bring to ballot one or more (tbd)      Liora Alschuler        DSTU - Test                   9/25/2006
implementation guides that constrain CDA for common type of                                   Period/Accepting
Risk assessment for the SAIF Architecture Program resulting in a       Jane Curry             Active Project (Resources
Risk Profile and Mitigation Strategies. This effort is to be an                               assigned to pjt)
The scope of this project to implement a dashboard showing the         TBD                    Active Project (Resources     8/15/2011
TSC progress on implementing the HL7 Strategic Initiatives that                               assigned to pjt)
Orders and Observations is undertaking a project to create a           Project Services       Active Project (Resources     3/21/2011
Composite Order. This presents an opportunity to implement             Work Group: Rick       assigned to pjt)
The project is divided into 3 phases: Phase A: To formally define      Lloyd McKenzie         Active Project (Resources     3/21/2011
all of the artifact types that will be developed, maintained and                              assigned to pjt)
The purpose of the SAIF Architecture Program is to coordinate all Austin Kreisler             Active Project (Resources     2/21/2011
the activities necessary to 'stand-up' HL7's Enterprise Architecture                          assigned to pjt)
The Technical Steering Committee (TSC) will undertake a              G W Beeler, Jr.          Active Project (Resources     2/28/2011
retrospective review of itself (after three full years of operation)                          assigned to pjt)
The scope of this project is aimed at providing a clear HL7            Austin Kreisler        Active Project (Resources
Product Quality Plan and a strategy for implementing that plan.                               assigned to pjt)
Maintenance project to obtain and update Work Groups' Mission Lynn Laakso                     3-Year Plan Item
and Charter statements, Decision Making Practices (DMPs), and
Create and evaluate visibility of HL7 PRODUCTS                         John Quinn, Lynn       Active Project (Resources
                                                                       Laakso                 assigned to pjt)
Business Requirements Analysis sufficient to ensure template           Mark Shafarman,        Comment Only - Balloting     10/31/2011
artifacts can be successfully registered and maintained               Corinne Gower
In this project we will create a pilot template registry based on the Keith W. Boone/Mark Active Project (Resources        12/15/2009
business requirements established by the Template Workgroup            Shafarman              assigned to pjt)
The existing Templates DSTU needs to be revised to reflect the         John Roberts, Mark     Active Project (Resources     8/23/2011
lessons learned from current approaches to defining and                Shafarman              assigned to pjt)
This project will produce a (web-based and/or desktop) tool to         Corey Spears, John     Active Project (Resources    11/28/2011
create EHR-S FM profiles (starting with the EHR-S FM R2), with         Ritter                 assigned to pjt)
Evaluate alternatives to the current Gforge service (including         Andy Stechishin        Active Project (Resources     9/26/2011
status quo) for the tracking, development and distribution of HL7                             assigned to pjt)
Revise existing Tooling Work Group Processes to include           Jane Curry                  Active Project (Resources     9/26/2011
coordination and specify criteria for tooling project selection and                           assigned to pjt)
Develop and execute a communications plan to highlight tooling Jane Curry                     Active Project (Resources     9/26/2011
available both within and outside HL7 community and to revise                                 assigned to pjt)
Revise existing Tooling Work Group Processes to include            Jane Curry             Active Project (Resources     9/26/2011
coordination with other Work Groups and to specify criteria for                           assigned to pjt)
Develop a tool to facilitate the exchange of model data between    Stacy Berger           Active Project (Resources      2/4/2011
UML modeling tools used to develop DAMs and DCMs such as                                  assigned to pjt)
Enhance the HL7 Static Model Designer (SMD) tool to support        Jane Curry             Active Project (Resources
Universal conventions and enable complete Model Interchange                               assigned to pjt)
The project will complete the implementation of a fully MIF-based Andy Stechishin         Active Project (Resources     5/25/2010
publishing process. Initial stages of the project were accomplished                     assigned to pjt)
The goal of the implementation guide is to: - Specify how the HL7 Kevin Peterson, Craig Active Project (Resources      12/13/2011
MIF syntax and semantics map to the CTS 2 Model, optionally        Stancl                 assigned to pjt)
The initial scope of this project is to develop the policies and   Jim Case               Active Project (Resources     10/4/2011
procedures for the establishment and ongoing operation of an                              assigned to pjt)
This project will create and document a set of policies and        Ted Klein, Jim Case,   Active Project (Resources     2/14/2011
recommended procedures for the HL7 community relative to post- Beverly Knight             assigned to pjt)
Evaluate and map (technical alignment) between the IHTSDO      Russ Hamm                  On Hold                       3/23/2010
workbench information model and the HL7 vocabulary model, as
This project will be a jointly developed policy between HL7 and Russell Hamm              Active Project (Resources      4/6/2010
the IHTSDO to develop a policy and process whereby HL7                                    assigned to pjt)
Determine a formal process for vocabulary maintenance that         Vocabulary WG          3-Year Plan Item
includes timelines, allows for interdependencies, and leverages
This work builds upon the core principles document which           Beverly Knight;        3-Year Plan Item
identifies the principles of vocabulary when developing HL7        Heather Grain; Stan
Coordinate with a work item at ISO TC 215 - Principles &           Beverly Knight         Active Project (Resources     4/19/2011
guidelines of Terminology Maintenance The focus of this                                   assigned to pjt)
Harmonize the V2 & V3 vocabulary                                   Dave Shaver            On Hold

The intent of this document is to contribute actively to the       Heather Grain          Active Project (Resources    10/19/2010
development, and inclusion of HL7 glossary material to the                                assigned to pjt)
The provision of implementation guidance to support the            Ian Townend; Ed        DSTU - Expired Test Period    1/15/2005
communication of SNOMED CT terminology content in HL7              Cheetham
Terminology services represent functions necessary to manage,      Russell Hamm, Craig DSTU - Expired Test Period       6/16/2008
search, and access terminology content. Terminology services       Stancl
The goal of this project is to enhance support for this key        Beverly Knight         On Hold                        4/8/2008
document to support HL7 v3 terminology implementations.
TSC Approval Date Type                     Objectives/Deliverables                                              Next Milestone Date

        5/22/2007 Ballot - DSTU            As part of this project, the Anatomic Pathology SIG will:            - Select One -

        2/14/2011 Ballot - DSTU            Complete SAIF Book for Informational Ballot submission - Target: 2012 Jan WGM/Ballot
                                               May 2011 - DONE
                    Ballot - Informative   1) Identification of key HL7 Terms, products and Processes.          2010 Sept WGM/Ballot
                                           Target: Oct 2010 (Year 1 task-1)
                                           Arden Syntax for Medical Logic Systems, Version 3.0                  2011 Sept WGM/Ballot
                                           - Adoption of RIM-based data interchange (fix curly-braces
        2/28/2011 Ballot - Normative       Finalization of the Arden Syntax v2.9 document - Target: 2011        2012 Jan WGM/Ballot
                                           September Ballot
        2/28/2011 Ballot - Normative       Finalization of the Arden Syntax v2.8 document - Target: 2011        2011 Sept WGM/Ballot
                                           May Ballot
        9/28/2011 Ballot - Informative     1st Ballot attachments - Target: Jan, 2012                           2012 Jan WGM/Ballot
                                           2nd Ballot for attachments, if necessary - Target: May, 2012
        5/28/2007                          Create and ballot an HL7 Informative document using the ADA
                                           specification for a periodontal attachment, in a manner consistent
        5/23/2005                          - Create an Additional Information Specification for Children's
                                           Preventive Health Services in both Human Decision Variants and a
        9/26/2005                          The objectives of this project are to:                           - Select One -
                                           - Adequately define an attachment for the home health
        9/26/2005                          The objectives of this project are to:
                                           - Adequately define an attachment for the Pharmacy Prior
         3/3/2008                          Upgrade narrative and content of existing CDA R1-based
                                           specification document to incorporate CDA R2-based concepts
        9/25/2006                          - Create a new version of the HL7 Additional Information
                                           Specification Implementation Guide to incorporate CDA R2
       10/31/2011 Vendor Contract          A. Convert the EHR-S FM function list worksheet from the             - Select One -
                                           existing format into the 7 chapters for Release 2.0 including
        11/1/2011 Vendor Contract          Dec 2 - Contracters deliver updated repository                       2012 Jan WGM/Ballot

        9/13/2011 - Other -                For comments ballot - Target: Jan 2012 ballot cycle                  2012 Jan WGM/Ballot
                                           Strategic Initiative committee will review comments from ballot
                    Vendor Contract        Wilfred Bonney to support the OID registry in 2011                   2012 Jan WGM/Ballot

                    Vendor Contract        September 30, 2011 - list of areas in existing documents that        2012 Jan WGM/Ballot
                                           need to be updated delivered to tooling committee
                                           --HL7 business plan: The plan should contain standard business       - Select One -
                                           plan components, such as:
        10/1/2007 - Other -                Using the HL7 EHRS Functional Model, map existing HL7 products - Select One -
                                           to the EHR-S functions. HL7 'Products' to include clinical story
        4/11/2011 Ballot - DSTU            Project team identified - Target: January 2011                       2011 Sept WGM/Ballot
                                           Child Health approval of project scope statement - Target:
                    Ballot - Normative     update to the HL7 Child Health Functional Profile for EHR Systems 2011 Jan WGM/Ballot
                                           following an update to the EHR Functional Model
                                           Complete Child Health 3-Year Plan                                    2011 Jan WGM/Ballot

                    Ballot - Normative     Updated CCOW standard - Target: 2012 Sept WGM                        2012 Sept WGM/Ballot
                                           Project End Date - Target: 2012 Sept WGM
                                           Consider extending CCOW to handle Authorizations.                    2010 Sept WGM/Ballot

        8/29/2011 Ballot - Normative       Ballot release 1 of normative HL7 DSS standard - Target: May         2012 Sept WGM/Ballot
                                           2011 - DONE
        6/22/2009 Ballot - DSTU            Initial ballotable draft of Infobutton SOA Implentation Guide (for   2013 May WGM/Ballot
                                           comment)
         7/6/2008 Ballot - DSTU            refinement of the use case requirements within the domain
                                           analysis model - Target: May 2006 (Done)
        12/8/2008 Ballot - DSTU            To deliver the following set of project deliverables in the order    2011 May WGM/Ballot
                                           presented:
         3/8/2010 Ballot - Normative       To deliver the following set of project deliverables in the order    2012 May WGM/Ballot
                                           presented:
        9/25/2006 Ballot - Informative     Rules to convert an XML context-aware information retrieval          2010 Jan WGM/Ballot
                                           ('infobutton') message into a URL
                    Ballot - DSTU          Initial work products: V2, V3, DIM, DAM ballot for comment only - 2012 Jan WGM/Ballot
                                           Target: 12/2012
         1/8/2011 Ballot - Informative     First draft of IG balloted for comment only - Target: 2011 Sep       2012 Sept WGM/Ballot
                                           WGM
        2/14/2011 Ballot - Informative     Project Initiation - Target: Jan, 2011                               2011 Sept WGM/Ballot
  8/2/2010 Ballot - Normative       Reconcile negative comments on the Genetic Variation CMET              2011 Sept WGM/Ballot
                                    (which passed normative ballot) preferably using SMD - Target:
  8/2/2010 Ballot - Informative     Complete modeling and review - Target: August 2010 COMPLETE 2012 Jan WGM/Ballot
                                    Complete first draft of release 2 implementation guide for ballot
             Ballot - Informative   Extension of the Clinical Genomics Domain Information Model            2012 Jan WGM/Ballot
                                    and consequently of the Genetic Variation Model to support
                                    Specimen Handling CMET                                                 2010 Sept WGM/Ballot

                                    Joint with Decision Support group Ken K. - CG responsible for          2010 September WGM
                                    CMET and extensions plus a output WSDL
 3/30/2009 ISO JIC Ballot Project   The purpose of this standard is to specify a universal format for      2011 Sept WGM/Ballot
                                    expressing an individual's family history. This standard
  6/1/2009 Ballot - DSTU            - Perform detailed requirements analysis by collecting                 2012 May WGM/Ballot
                                    requirements from all stakeholders.
  2/9/2009 Ballot - Normative       - Domain Analysis Model for CMET (DSTU) September 2009                 2010 Sept WGM/Ballot
                                    - New message specification CMET (DSTU) January 2010
             Ballot - Informative   Ballot DAM (Including Data Elements) - Target: May 2012                2012 May WGM/Ballot
                                    Mapping to CDISC SDTM - Target: July 2012
10/10/2011 Ballot - Informative     Develop a set of DAM artifacts defined by HDF requirements -           2013 Jan WGM/Ballot
                                    Target: September 2011-November 2012
 6/13/2011 Ballot - Informative     Submit DAM to ballot - Target: November 2011                           2011 Jan WGM/Ballot
                                    Resolve DAM comments - Target:      January 2012
  2/7/2011 Ballot - Informative     Develop set of DAM artefacts defined in HDF Requirements               2012 Jan WGM/Ballot
                                    Publish the UML with data elements via the National Cancer
 7/26/2010 Ballot - Informative     1. Define project and obtain project sponsor approval - June 2010 2011 Jan WGM/Ballot
                                    2. Obtain SD and TSC approval - June 2010
 11/1/2010 Ballot - DSTU            1. Define project and obtain project sponsor approval - June 2010 2012 Jan WGM/Ballot
                                    - COMPLETED
 6/29/2009 Ballot - Informative     This project is the first in a series of planned activities intended to 2011 Sept WGM/Ballot
                                    transform the uniform pre-hospital emergency medical services
10/24/2008 Ballot - Informative     Develop set of DAM artifacts defined in HDF Requirements. In           2010 Sept WGM/Ballot
                                    addition, publish the UML with data elements via the National
 6/16/2008 Ballot - Informative     1. Identify and create reference list of clinical content definition   2010 Jan WGM/Ballot
                                    efforts being developed.
 1/30/2006 Ballot - DSTU            - Provide a Clinical Statement Pattern and select CMETs that can       2012 Jan WGM/Ballot
                                    be used by other domains to establish a common and consistent
 9/28/2011 Ballot - Comment Only    Draft Use Cases available for HL7 WGs Peer Review - Target: Aug        2012 Jan WGM/Ballot
                                    2011
 3/14/2011 Ballot - DSTU            Analyze Quality Measurement Data Reporting requirements (e.g.          2011 Sept WGM/Ballot
                                    HEDIS, GPRA, NOMS, NQF) - Target: January 15th, 2011
 4/19/2010 Ballot - DSTU            DSTU Catalogue of reference privacy policies - Target: 2010 Sept       2010 Sept WGM/Ballot
                                    WGM
                                    Update V3 Privacy Message                                              2011 Jan WGM/Ballot

 11/9/2009 Ballot - DSTU            The project will produce templates and a standard structured           2012 Sept WGM/Ballot
                                    document structure to represent the patient consent directive for
10/28/2008 Ballot - DSTU            Domain Analysis for consumer consent and policies                 2012 May WGM/Ballot
                                    Target: Jan 2009
 7/26/2010 Ballot - Informative     Currently, implementation guides have to provide some kind of          2010 Sept WGM/Ballot
                                    binding of the static model to the used vocabulary. As there is no
                                    V2.8 Proposals - Improve conformance for better testing            2011 Jan WGM/Ballot

  4/2/2007                          -   Provide guidance and documentation to prove that a HL7 V3 2010 May WGM/Ballot
                                    standard fit for purpose and stable enough for implementers
             - Other -              Original target dates:                                                 2011 Sept WGM/Ballot
                                    First draft of the new HL7 V2.7 CH02 cert. test - Target: 03/01/11
                                    First draft of the new RIM 2.34 cert. test - Target: 03/01/11          2011 May WGM/Ballot
                                    Update of the RIM slides for precert - Target: 05/01/11
 3/21/2011 - Other -                Project Initiation - Target: March 2011                                2011 May WGM/Ballot
                                    Analysis of Common Mechanisms for Scholarly Recognition -
11/15/2010 - Other -                Current state analysis and strategic vision specification - Target:    2011 Sept WGM/Ballot
                                    November 2010 -DONE
                                    - E-learning (Mature pilots into repeatable and manageable             2012 Jan WGM/Ballot
                                    content and process) (DK)
             - Other -              1) Strengthen faculty (AMS)                                            2012 Jan WGM/Ballot

             - Other -              Collaborative education                                                2012 Jan WGM/Ballot
                                    - Affiliates
             - Other -              We have done some preliminary work on a tutorial database.             2011 Sept WGM/Ballot
                                    Intent is populating the database with baseline and historical
             - Other -                - Curriculum Development                                              2012 Jan WGM/Ballot
                                         - Catalog - Begin in 2009; target end: 2010JanWMG
             - Other -                1. Complete the Use Cases construction, the Standards                 2012 Jan WGM/Ballot
                                      environmental scan and inventory, and the Use Case to Standards
10/31/2011 Ballot - Informative       Project Scope Statement Approved - Target: October 1, 2011      2012 Jan WGM/Ballot
                                      First Draft of the functional profile - Target: November 1, 2011
 2/28/2011 Ballot - Informative       RM-ES concepts and Environmental Scan/summary of relevant        2012 Jan WGM/Ballot
                                      Work Groups and Projects - Target: May 2011 WGM
11/22/2010 Ballot - DSTU              DSTU Level Ballot - Target: January 2011 ballot                       2011 May WGM/Ballot
                                      Normative Level Ballot - Target: January 2013 ballot
11/29/2010 Ballot - Informative       The objective for the Electronic Health Record System Public          2011 Sept WGM/Ballot
                                      Health Functional Profile Project is to develop an HL7 Electronic
 8/16/2010 Ballot - Informative       Informative Ballot - August 2010 - COMPLETED                          2011 Sept WGM/Ballot
                                      Normative Ballot - August 2011
 8/16/2010 Ballot - Informative       Informative Ballot - August 2010                                      2011 Jan WGM/Ballot
                                      Normative Ballot - August 2011
             Ballot - Informative     May 2011 - Informal Peer Review Prototype using Diabetes              2011 Sept WGM/Ballot
                                      Project [STATUS: completed]
 4/19/2010 ISO JIC Ballot Project     PHR System Functional Model ballot (Target: September 2010)           2011 Jan WGM/Ballot
                                      Reconciliation of PHR-S FM ballots and publishing of the
 4/12/2010 Ballot - Normative         1. Development of Profile for Informative Level Ballot - Target:      2010 Sept WGM/Ballot
                                      8/2010
  1/4/2010 Ballot - Comment Only      The PHR Work Group will:                                              2010 May WGM/Ballot
                                      - Initially create a U.S. Realm-oriented White Paper that will list
  1/4/2010 Ballot - Normative         Delivery of Functional Profile document and criteria draft for        2010 Sept WGM/Ballot
                                      comment (Target: January 2010)
             ISO JIC Ballot Project   HL7 Normative Ballot - Target: April, 2011 Ballot                     2011 Sept WGM/Ballot
                                      Joint HL7/ISO ballot - Target: September 2011 Ballot
 6/22/2009 - Other -                  1. Review the DAMs from USF and The Netherlands. Select a             2010 May WGM/Ballot
                                      common set of T1D diabetes assessment data elements to be
 5/22/2006 Ballot - DSTU              Target: July 2006 DSTU ballot; July 2008 Membership ballot            2009 May WGM/Ballot
                                      - Establish a common reference for EHR Record Interoperability
 2/11/2008 Ballot - Informative       The objective for the Electronic Health Record System Vital           2011 Sept WGM/Ballot
                                      Records (VR) Functional Profile Project is to develop an HL7
10/28/2008 Ballot - DSTU              - To develop a Profile showing how attributes of HL7 CDAr2            2010 Sept WGM/Ballot
                                      fulfill Common EHR Record Unit requirements, per the HL7 EHR
11/12/2007 Ballot - DSTU              - To specify the events occurring in an EHR record lifecycle,         2010 Sept WGM/Ballot
                                      focused on the lifecycle of the Common EHR Record Unit that are
 7/25/2011 - Other -                  One workgroup can post material. - Target: July 2011            2011 Sept WGM/Ballot
                                      Project announced to all workgroups/projects - Target: Sept 2011
                                      Work to begin in Sept 2012. All to be completed by Jan 2013.     2012 Sept WGM/Ballot
                                      Internal (HQ) Facing
                                      Work to begin in May 2012. All to be completed by Sept 2012 .         2012 May WGM/Ballot
                                      Internal (HQ) Facing:
             - Other -                Work to begin in Jan 2012. All to be completed by 2012 May            2012 Jan WGM/Ballot
                                      Internal (HQ) Facing:
             - Other -                Work to begin in Oct, 2011. All to be completed by 2012 Jan           2011 Sept WGM/Ballot
                                      Internal (HQ) Facing:
             - Other -                All to be completed by 2011 Sept.                                     2011 May WGM/Ballot
                                      Internal (HQ) Facing:
 4/24/2007 Vendor Contract            Implment remaining non-showstopper requirements by Jan 2011. 2011 May WGM/Ballot
                                      Implement External (web facing) Membership by July 2010 -
 11/7/2011 Ballot - Comment Only      Update and revision of DEEDS 1.0 - Target: 2011 Sept WGM              2012 Jan WGM/Ballot
                                      Project Approval - Target: 2011 Oct 1
             Ballot - Normative       Balloted EDIS FP version 2 document - Target: 2011 Sept WGM           2011 Sept WGM/Ballot
                                      Reconciliation of Ballot comments - Target:       2012 Jan WGM
                                      Emergency Care DAM Version 2                                          - Select One -

 11/3/2008 Ballot - Informative       Develop set of DAM artifacts defined in HDF Requirements.             2010 Sept WGM/Ballot
                                      Targeting 2010 Sept. Ballot Cycle
 9/28/2011 Ballot - DSTU              Draft Assessment Domain Analysis Model submitted for January          2012 Jan WGM/Ballot
                                      2012 Ballot November 2011
 7/18/2011 Ballot - Normative         Update front matter, add reaffirmation notes to reader, check         2011 Sept WGM/Ballot
                                      links, and make any technical corrections required - Target:
 7/18/2011 Ballot - Normative         Update front matter, add reaffirmation notes to reader, check         2011 Sept WGM/Ballot
                                      links, and make any technical corrections require - Target: August
                                      The plan is to create a three-workgroup DAM for claims             2011 Sept WGM/Ballot
                                      attachments with the premise that it would map LOINC into CDA
10/28/2008                            Consumer Information Account DAM (informative track)          2010 Sept WGM/Ballot
                                      Target: January 2010
10/28/2008 Ballot - Normative       A_ValuedItem universal, basic, informational, definitional and      2012 Jan WGM/Ballot
                                    identified variants, A_Benefit universal and basic and A_Provider
 1/31/2011 Ballot - Informative     We will create a Domain Analysis Model which will include the       2012 Jan WGM/Ballot
                                    following:
                                    Develop Implementation Guide (IG) for the use of HL7 messaging 2010 Sept WGM/Ballot
                                    within Anaesthesiology
  7/6/2009 Ballot - Informative     This project will develop:                                          2010 Sept WGM/Ballot
                                    - Prose implementation guide
 2/19/2009 Ballot - Comment Only    As of Jan 2010, this project will deliver:                          2011 Sept WGM/Ballot

                                    Maintain and develop Implementation Guidance for the use of         2011 Sept WGM/Ballot
                                    HL7 messaging related to Healthcare Device communications -
10/25/2011 Ballot - Informative     Implementation Guide draft: Target - May 2012 WGM                   2012 May WGM/Ballot
                                    Ballot: Target - Sept 2012 Ballot
                                    HL7 V2.x / DICOM Implementation Guide for Pathology Order           2011 Sept WGM/Ballot
                                    Messages and Use of DICOM Image References
                                    HL7 V2.x / DICOM Implementation Guide for Pathology Specimen 2011 Sept WGM/Ballot
                                    Identifiers and Labels (in cooperation with AP WG, OO WG, GS1)
                                    SopInstance Reference minimal Update                                2012 Jan WGM/Ballot

 3/16/2009 Ballot - Normative       Update COCT_RM830120UV05 to synchronize it with the changes - Select One -
                                    in the successfully balloted CDA Diagnostic Imaging Report
            Ballot - Normative      Datatypes and Structures Release 1 reaffirmation                    2012 May WGM/Ballot

 11/7/2011 Ballot - Normative       Draft available for review - Target: Sept 2011 WGM                  2012 Jan WGM/Ballot
                                    Document approved for ballot - Target: Nov 2011
                                    HTML 5 ITS                                                          2012 Jan WGM/Ballot

                                    FHIR                                                                2012 Jan WGM/Ballot

 3/21/2011 Ballot - Normative       normative standard ITS R2B structures - Target: Ballot 1, May 2011 2012 Jan WGM/Ballot
                                    normative standard ITS R2B data types - Target: Ballot 1, May
 3/14/2011 Ballot - Normative       normative standard - Target: Ballot 1, May 2011                     2012 Jan WGM/Ballot

            Ballot - DSTU           Write set of requirements for the notation - May 2010               2012 Jan WGM/Ballot
                                    Receive feedback on requirements and refine them as necessary -
 2/22/2010 Ballot - Normative       Initial normative ballot : May 2010                             2011 Jan WGM/Ballot
                                    Project End Date (all objectives have been met): Jan 2011
 3/30/2009 ISO JIC Ballot Project   The market for and the supply of healthcare software systems is     2011 Jan WGM/Ballot
                                    global. There is an increasing demand to be able to communicate
 5/14/2007 Ballot - Normative       - Revised XML ITS Structures document                           2011 May WGM/Ballot
                                    - Section for XML ITS Guide covering rationale for the new
 1/29/2007 Ballot - Normative       This project will produce the following work products:              2010 Sept WGM/Ballot
                                    1. The ITS specification (including rationale), including:
 6/21/2005 Ballot - Normative       The work product of the project is:                                 2012 Jan WGM/Ballot
                                    - A normative DSTU that details the requirements of web
 7/11/2011 - Other -                Project Scope approved by InM - Target: May, 2011                   2011 Sept WGM/Ballot
                                    Project Scope approved by FTSD & TSC - Target: June 2011
  3/8/2010 Ballot - DSTU            Initial Ballot - 2010 May WGM                                       2011 May WGM/Ballot
                                    Complete DSTU balloting of the material - 2010 Sept WGM
            - Other -               First topic:- the Ambassador presentations                          2010 Sept WGM/Ballot

            - Other -               Next Step: Determine additions to the lecture slides; complete      2011 Jan WGM/Ballot
                                    additional material for Sept. 2010. Continue to sign up additional
            - Other -               The following are the project deliverables to be provided to HL7 - Select One -
                                    HQ for review and approval:
10/17/2011 Ballot - DSTU            Initial draft of methodology for WG review - Target: 2012-01        2012 Jan WGM/Ballot
                                    WGM
            Ballot - Informative    Draft of document for review - Target: Nov. 1, 2011                 2012 Jan WGM/Ballot
                                    Consideration of feedback on draft, and an CP ballot comments -
            Ballot - Normative      Add project for Data Types R3 now, to collect comments, but will 2011 May WGM/Ballot
                                    not bring forward until adequate requirements are collected.
 11/8/2010 Ballot - Normative       First Ballot open - Target: November 2010                           2011 May WGM/Ballot
                                    Project End Date (all objectives have been met) - Target: June
 11/2/2009 Ballot - Informative     Publishable version of the MIF and requirements. Target: Nov.       2012 Sept WGM/Ballot
                                    30, 2009
 2/23/2009 Ballot - Normative       Complete balloting of 'HL7 Version 3 Standard: Data Types -         2010 Jan WGM/Ballot
                                    Abstract Specification, Release 2 (V3_DT_R2_N2_2008MAY)'
10/28/2008 Ballot - Normative       Provide a fully Normative Reference Information Model at the end 2012 Sept WGM/Ballot
                                    of each calendar year to be the anchor of the following year's
 1/25/2005                        HDF Maintenance - Integrate the HDF into the ballot package            2009 Sept WGM/Ballot
                                  HDF Maintenance - Update the artifacts developed by HL7
             Ballot - Normative   Publish COCT Release 8 as a Membership level ballot, for inclusion
                                  in Normative Edition 2009. General work products are R-MIMs
 3/20/2008 Ballot - Normative     Create a Normative Standard from existing work documented in:          2011 Sept WGM/Ballot
                                  - Message Development Framework (1999)
10/31/2011 Ballot - DSTU          DSTU Ballot - Target: January, 2012                                    2012 May WGM/Ballot
                                  DSTU Update Ballot (if needed) - Target: May, 2012
 8/29/2011 Ballot - Normative     Requirements documentation - Target: Jan 2012                          2012 May WGM/Ballot
                                  DSTU Ballot - Target:    May 2012
 7/11/2011 Ballot - Normative     Definition of proposed fields and conformance usage indicator -        2012 May WGM/Ballot
                                  Target: June 30, 2011
 7/11/2011                        Receipt draft IG for balloting - Target: July 31                       2012 May WGM/Ballot
                                  First Ballot (out-of-cycle) - Target: August 1 2011
 2/28/2011 Ballot - Informative   Define project and obtain project approval (SD and TSC) - Target: 2012 Jan WGM/Ballot
                                  Jan 2011 - COMPLETE
             Ballot - Normative   Dispose of Change Requests - June 24, 2010                             2014 Jan WGM/Ballot
                                  First normative ballot - October 2010 Ballot
 2/22/2010 Ballot - DSTU          Develop a CMET and schema for exchange of information on               2012 Jan WGM/Ballot
                                  substances and specified substances. Target: May 2010
 2/22/2010 Ballot - DSTU          First ballot - target May 2010                                         2012 Jan WGM/Ballot
                                  Second ballot (if needed) - target September 2010
             - Other -            To be completed.                                                       2012 Jan WGM/Ballot

             Ballot - DSTU        To be provided later.                                                  2013 Jan WGM/Ballot

 8/29/2011 Ballot - Normative     Development of Ballot Materials - Target: Jan 2012                     2012 May WGM/Ballot
                                  Development of Technical Artifacts - Target: Jan 2012
 9/20/2010 Ballot - DSTU          Preliminary Gap Analysis between two existing templates. - Prior       2012 Jan WGM/Ballot
                                  to Oct 2010 WGM
                                  Harmonize Medication Order with Composite Order (sync with             2010 Sept WGM/Ballot
                                  Lab Template/CMET)
                                  Specialzed clinical event models - may overlap with detailed           2013 Jan WGM/Ballot
                                  clinical model.
                                  Specialized order models - new or harmonization with other work 2013 Jan WGM/Ballot
                                  groups.
                                  Lab Result Release 2                                                   2014 Jan WGM/Ballot

 8/24/2009 Ballot - Informative   The objectives for the initial scope of the project include the        2012 Jan WGM/Ballot
                                  following:
             Ballot - DSTU        The objective of the project is to create a common observation         2012 Sept WGM/Ballot
                                  event template.
 10/6/2008 Ballot - Normative     Normative CMETs:                                                       2010 Sept WGM/Ballot
                                  R_Specimen universal
 1/24/2007 Ballot - Normative     - Incorporate Blood Order Template into the Composite Order            2010 Sept WGM/Ballot
                                  model to include information necessary for blood product orders,
 5/22/2006 Ballot - DSTU          Create the composite model to enable specific templates to be    2011 Sept WGM/Ballot
                                  plugged into rather then multiple different approaches.
  1/4/2008                        - This IG is for the purpose of defining the clinical lab order data   2011 Jan WGM/Ballot
                                  message.
 9/25/2006                        The Result Topic will provide:                                         2010 Sept WGM/Ballot
                                  - Model and artifacts specific to the creation of messages
 9/25/2006 Ballot - DSTU          The following is a list of the work products expected to be            2011 Jan WGM/Ballot
                                  produced by this project:
 9/25/2006 Ballot - DSTU          The following is a list of the work products expected to be            2011 Jan WGM/Ballot
                                  produced by this project:
 9/25/2006 Ballot - DSTU          The following is a list of the work products expected to be            2012 Jan WGM/Ballot
                                  produced by this project:
 8/29/2011 Ballot - Normative     Development of Ballot Materials - Target: Jan 2012                     2012 May WGM/Ballot
                                  Development of Technical Artifacts - Target: Jan 2012
 2/28/2011 Ballot - DSTU          Approve project scope statement - Target: 2011 Jan WGM                 2012 Jan WGM/Ballot
                                  Complete simplification analysis - Target: 2011 Jan WGM
  1/8/2011 Ballot - DSTU          Ballot DAM and requirements for comment: Target - 2011 May             2012 Jan WGM/Ballot
                                  Ballot
             Ballot - DSTU        the context will be to combine Provider Registry, Organization         2011 Sept WGM/Ballot
                                  Registry and Service Delivery Location to better reflect the real
 2/22/2010 Ballot - DSTU          Begin work at 2010 Jan WGM - COMPLETED                                 2011 Sept WGM/Ballot
                                  Complete DSTU Ballot in the 2010 May ballot cycle - COMPLETED
                                  Personnel Management CMETs                                    2010 Sept WGM/Ballot
                                  Begin work at Sept 2010 WGM
  3/2/2009 Ballot - DSTU             New information model and documentation for A_Appointment             2013 Sept WGM/Ballot
                                     [universal], A_Appoointment [identified confirmable] CMETs.
10/28/2008 Ballot - DSTU             - Finalize requirements for changes and additions to the              2011 Sept WGM/Ballot
                                     Organization Registry topic within the Personnel Management
10/28/2008 Ballot - DSTU             Finalize requirements for changes and additions to the Provider       2011 Sept WGM/Ballot
                                     Registry topic within the Personnel Management domain
 5/23/2005 Ballot - Normative        Due to resource constraints, Scheduling is being developed in a       2011 Sept WGM/Ballot
                                     series of releases. Each new release will build upon the last and
10/10/2011 Ballot - Normative        First revised draft Ballot Plan, following DSTU extension - Target:   2012 Jan WGM/Ballot
                                         May 2009
10/10/2011 Ballot - Normative        First revised draft Ballot Plan, following DSTU extension - Target:   2012 Sept WGM/Ballot
                                     May 2009
10/10/2011 Ballot - Normative        First revised draft Ballot Plan, following DSTU extension - Target:   2012 Jan WGM/Ballot
                                     May 2009
10/10/2011 Ballot - Normative        First revised draft Ballot Plan, following DSTU extension - Target: 2012 Jan WGM/Ballot
                                       May 2009
 2/28/2011 Ballot - Informative      Submit DAM to ballot      - Target: March 2011                        2011 Sept WGM/Ballot
                                     Resolve DAM comments - Target: June 2011
             Ballot - Normative      The new scope statement will include objectives to request            2010 Sept WGM/Ballot
                                     extension as DSTU of the Adverse Reaction topic for two more
             Ballot - Normative      Patient Care V2 revisions to Chapter 11 and 12                        2010 Sept WGM/Ballot

             Ballot - Normative      Update with concern class                                             2011 Jan WGM/Ballot
                                     Keep consistent with CS pattern
             Ballot - Normative      The Care Structures 'super topic' will act as an umbrella project     2011 Sept WGM/Ballot
                                     Starting 2011 Sep, over three Care Provision Topics:
             Ballot - Normative      This topic covers all interactions related to health concerns,        2011 Sept WGM/Ballot
                                     including:
  2/8/2010 Ballot - DSTU             This project is a sub-project of # 320, Detailed Clinical Models.     2011 Sept WGM/Ballot
                                     - Topic definitions  2009SepWGM
 7/26/2010 Ballot - Informative      Target August 2010 for the following:                                 2011 Sept WGM/Ballot
                                     Create draft Domain Analysis Model to support a Medical Devices
 4/19/2010 Ballot - DSTU             Target: End of 2010:                                            2011 Sept WGM/Ballot
                                     1. Domain analysis Model with the following deliverables
  2/8/2010 Ballot - DSTU             DCM Release 1 will support the following goals:                       2011 Sept WGM/Ballot
                                     - Develop methods and tools requirements for binding of clinical
 5/22/2007 Ballot - DSTU             Produce ANSI-approved v3 standards for capturing, maintaining 2012 Sept WGM/Ballot
                                     and retrieving allergy & intolerance information, about a patient.
 9/25/2006 Ballot - Normative        Produce ANSI-approved v3 standards in order to record and             2011 May WGM/Ballot
                                     update encounters, episodes of care.
 9/25/2006 Ballot - DSTU             Produce ANSI-approved v3 standards for capturing, maintaining         2011 May WGM/Ballot
                                     and retrieving information about the professional services
11/15/2010 Ballot - DSTU             DSTU ballot submission - Target: January 2013 (orig Jan 2012)         2013 Jan WGM/Ballot
                                     Normative ballot submission - Target: September 2013 (orig Sept
11/15/2010 Ballot - DSTU             DSTU ballot submission - Target: January 2013 (orig September   2013 Jan WGM/Ballot
                                     2011)
                                     This will be developed as a standard for exchanging PSO               2013 Jan WGM/Ballot
                                     Common Format data provided by AHRQ (version 1.1). The initial
  6/1/2009 Ballot - Informative      - The DAM will assist developers with the creation and         - Select One -
                                     reconciliation of HL7 V3 content in the PORR and POPH domains
10/28/2008 ISO JIC Ballot Project    The ICSR Release 3 Normative Standard will support the following 2012 May WGM/Ballot
                                     goals:
12/19/2011 - Other -                 Review Pharmacy DMIM and Clinical Statement Model - Target:           2012 Jan WGM/Ballot
                                     October 31, 2011
10/24/2011 Ballot - Normative        First Ballot - Target: January 2012                                   2012 Jan WGM/Ballot
                                     Second Ballot (if needed) - Target: May 2012
 9/28/2011 Ballot - Informative      This project will develop and integrate existing material on the      2012 Jan WGM/Ballot
                                     Pharmacy WIKI:
10/24/2011                           First Ballot - Target: January 2012                                   2012 Jan WGM/Ballot
                                     Second Ballot (if needed) - Target: May 2012
  2/8/2010 Ballot - Normative        Medication CMETs - Target: May 2010 Ballot                            2010 May WGM/Ballot

             Ballot - Comment Only   Completion of Use Cases and Requirements - Target: January            2012 Jan WGM/Ballot
                                     2012
                                     Administration Event                                                  2010 January WGM

  7/6/2009 ISO JIC Ballot Project    Informative Ballot comments. Target Date: September WGM               2012 Jan WGM/Ballot
                                     2009
 9/25/2006 Ballot - Normative        Publish Release 1 of the Pharmacy v3 Domain for Committee             2011 May WGM/Ballot
                                     Ballot, including storyboards, interactions, message models and
             Ballot - Normative   Publish Release 1 of the Pharmacy v3 Domain for Committee          2012 May WGM
                                  Ballot, including storyboards, interactions, message models and
 9/25/2006 Ballot - Normative     Publish Release 1 of the Pharmacy v3 Domain for Committee          2012 Jan WGM/Ballot
                                  Ballot, including storyboards, interactions, message models and
 9/25/2006 Ballot - Normative     The creation of Release 1 of the HL7 version 3 domain 'Pharmacy' 2012 Jan WGM/Ballot
                                  (PORX) as Normative Standard. This standard will include
             Ballot - Normative   Publish Release 1 of the Pharmacy v3 Domain for Committee          2012 May WGM/Ballot
                                  Ballot, including storyboards, interactions, message models and
 9/25/2006 Ballot - Normative     Publish Release 1 of the Pharmacy v3 Domain for Committee          - Select One -
                                  Ballot, including storyboards, interactions, message models and
 9/25/2006 Ballot - Normative     Publish Release 1 of the Pharmacy v3 Domain for Committee          2012 Jan WGM/Ballot
                                  Ballot, including storyboards, interactions, message models and
 9/25/2006 Ballot - Normative     Publish Release 1 of the Pharmacy v3 Domain for Committee          2012 Jan WGM/Ballot
                                  Ballot, including storyboards, interactions, message models and
 1/29/2007 Ballot - Normative     Publish Release 1 of the Medication v3 Domain for Committee        2012 Jan WGM/Ballot
                                  Ballot, including storyboards, interactions, message models and
10/31/2011                        Develop wiki pages - Target: August 2011                           2011 Sept WGM/Ballot
                                  Establish procedures and policies for use of the wiki - Target:
 3/22/2010 - Other -              Target: May 2010 WGM:                                              2010 May WGM/Ballot
                                  Define the objectives for the First Time Attendee process
             - Other -            PIC Annual Maintenance: Develop, evaluate, enhance and             2012 Jan WGM/Ballot
                                  maintain PIC Communication Strategy for each Jan WGM
             - Other -            PIC Annual Maintenance: Decision Making Practices (DMP)            2013 May WGM/Ballot
                                  Template (May WGM)
             - Other -            PIC Yearly Maintenance: Best Practices, for release at January     2012 Jan WGM/Ballot
                                  WGM)
             - Other -            Bi-annual maintenance of the co-chair handbook, review for each 2012 Sept WGM/Ballot
                                  September WGM; reconcile comments during September WGM;
 12/5/2011 - Other -              PS WG approves this PSS - Target: October 27, 2011                 2012 Jan WGM/Ballot
                                  T3SD approves this PSS - Target: November 07, 2011
 10/3/2011 - Other -              Comment-Only ballot - Target: 2012Jan                              2012 Jan WGM/Ballot
                                  Comment-Only ballot - second ballot if needed - Target:
 3/28/2011 - Other -              Project Metrics accompany the Excel report generated from          2011 May WGM/Ballot
                                  Project Insight - Target: Oct 2010 thru Sept 2011 WGM
                                  Work with Vocab re: process to publish vocab changes 3x/year       2011 Sept WGM/Ballot
                                  (2011May) [GForge #1588]
             - Other -            Develop education re: RIM version project requirements [GForge     2011 Sept WGM/Ballot
                                  #1589]
                                  Finalize and Approve revised Harmonization Process (Tracker        2011 Sept WGM/Ballot
                                  1587)
                                  SWOT Weakness Item - Deployment of Non-Balloted Products           2011 Sept WGM/Ballot
                                  (Tracker 1591)
 9/27/2010 - Other -              Initial draft proposal presentation - Target:   2010May            2011 Sept WGM/Ballot
                                  Identify changes to PLCPD - Target: 2011 Jan
             - Other -            Develop method to evaluate target date vs. actual date in Project 2011 Sept WGM/Ballot
                                  Insight (Tracker 683) - DONE
             - Other -            TSC delegated work (Tracker 1107)                                  2011 Sept WGM/Ballot

             - Other -            Define Work for the SD PF's (Tracker 733) - DONE                   2011 Sept WGM/Ballot
                                  Develop outreach to recruit project facilitators (Tracker 725)
             - Other -            Annual Edits to Project Life Cycle (Tracker 711)                   2011 Sept WGM/Ballot
                                  Review Project Life Cycle for GOM reference updates (Tracker
             - Other -            Work will begin in August of each year. New template will be       2012 Jan WGM/Ballot
                                  rolled out at Jan WGMs
 10/3/2011 Ballot - DSTU          Draft created for WG review - Target: October 15, 2011             2012 Jan WGM/Ballot
                                  Initial ballot content submitted - Target: November 6, 2011
 6/13/2011 Ballot - DSTU          DSTU initial ballot - Target: January 2012                         2012 Jan WGM/Ballot
                                  DSTU Ballot Reconciliation - Target: March 2012
             Ballot - DSTU        Draft created for WG review - Target: February 28, 2011            2012 Jan WGM/Ballot
                                  Ballotable IG R2 to HL7 HQ - Target: March 27, 2011
 3/14/2011 Ballot - DSTU          Draft created for WG review - Target: March 15, 2011               2012 Jan WGM/Ballot
                                  Ballotable IG R1 to HL7 HQ - Target: March 27, 2011
 2/27/2009 Ballot - Informative   The project deliverable is an implementation guide for             2010 May WGM/Ballot
                                  immunization messages. This Implementation Guide will address
             - Other -            Bring PI list for PHER up to date by creating links to co-sponsored - Select One -
                                  projects
             - Other -            See task list                                                      2011 May WGM/Ballot

10/28/2008 Ballot - Normative     Normative CMETs:                                                   2012 Jan WGM/Ballot
                                  R_ExposureAgentCarrier universal
 3/28/2011 Ballot - Informative     Complete draft of DAM - Target: 3/20/11 - COMPLETED                  2012 Jan WGM/Ballot
                                    Submit for comment only ballot - Target: 3/27/11 - COMPLETED
 3/23/2009 Ballot - DSTU            The following is a list of the work products expected to be          2012 Jan WGM/Ballot
                                    produced by this project:
            Ballot - Normative      Based on v2.9 submitted proposals, the objectives of this project    2013 May WGM/Ballot
                                    are to:
  5/9/2011 Ballot - Normative       All proposals have been gathered and discussed - Target: 2011        2011 Sept WGM/Ballot
                                    May WGM - COMPLETE
            - Other -               Recurring maintenance of glossary and maintain ballot site and its 2011 Jan WGM/Ballot
                                    xhtml conformance.
                                    Work occurs every other WGM.                                         2010 Sept WGM/Ballot
                                    Targeting Sept. 2010 and May 2011
                                    Work occurs every other WGM.                                         2011 Sept WGM/Ballot
                                    Targeting May 2010, Jan 2011 and Sept 2011
                                    Annual Establishment of Publishing calendar(s)                       2010 Sept WGM/Ballot

                                    Annual Normative Editions. The annual work for this occurs from 2010 Sept WGM/Ballot
                                    Sept WGM to Jan WGM.
 5/23/2005 Ballot - Informative     Document Publishing Process                                          2012 Jan WGM/Ballot

 12/5/2011 Ballot - DSTU            The project will deliver:                                            2012 Jan WGM/Ballot
                                    The RPS R2D2 normative standard
10/31/2011 Ballot - DSTU            Complete balloting of implementation guide - Target: May 2012        2012 Jan WGM/Ballot
                                    Successful use of the guide to produce valid FDA test files -
            Ballot - DSTU           aECG r2 (Annotated ECG, Release 2)                                   2011 May WGM/Ballot

            Ballot - DSTU           Regulatory Activity Submission Hierarchy (RASH)                      2012 Jan WGM/Ballot

            Ballot - DSTU           Subject Data Validation Service Functional Model                     2011 May WGM/Ballot

            Ballot - DSTU           Clinical Study Functional Profiles                                   2011 May WGM/Ballot

            Ballot - DSTU           Notification to Physicians for marketed product information          2012 Sept WGM/Ballot

            Ballot - DSTU           Update CTR&R                                                         2012 May WGM/Ballot

 7/14/2010 Ballot - DSTU            Calendar 2011 - implementation of CRFQ within NCI and IMI            2012 May WGM/Ballot
                                    projects
  5/2/2011 Ballot - DSTU            The RPS R3 normative standard - Target: June 2012                    2012 Jan WGM/Ballot
                                    An implementation guide for the normative standard - Target:
 9/22/2009 ISO JIC Ballot Project   This ballot will include the set of static components of DAM         2011 May WGM/Ballot
                                    artifacts as defined in HDF Requirements.
12/15/2008 ISO JIC Ballot Project   1. Utilize the RCRIM BRIDG model in the analysis process and         2011 May WGM/Ballot
                                    extend, as needed, to meet trial registry and result database
  3/1/2010 Ballot - Informative     DSTU - Target: 2010 May Ballot                                       2011 May WGM/Ballot
                                    Normative Ballot - Target: 2011 May Ballot
 4/21/2008 Ballot - Normative       RPS Release 2 will support the following goals:                      2012 Sept WGM/Ballot
                                    - Extend the capability of the secure electronic single point of
11/30/2007 Ballot - DSTU            At the end of this project four work streams, V3 messages, will      2013 Sept WGM/Ballot
                                    support FDA requirements to receive and store clinical study and
 11/8/2010 - Other -                At a high level the deliverable consists of a series of harmonized   2011 Sept WGM/Ballot
                                    whitepapers. These whitepapers will each have a target date; the
 3/29/2010 Ballot - DSTU            Target Jan 2011:                                                     2011 Sept WGM/Ballot
                                    Identify and analyze vocabularies and ontologies associated with
10/26/2009 Ballot - Informative     Analyze ASTM, PMAC, ANSI 359-2004 RBAC, OASIS SAML Profile           2012 Jan WGM/Ballot
                                    and HL7 RBAC Engineering concepts - Target: May 2009
 2/25/2008 - Other -                Goal 1 - Security Awareness and Security Consistency                 2010 Jan WGM/Ballot
                                    Objective A - Submit draft of Security Cookbook Documentation
 2/11/2008 Ballot - Normative       To produce and submit a final Permission Catalog vocabulary          2010 Jan WGM/Ballot
                                    update to ballot. The update will execute Neumann-Strembeck
            Ballot - DSTU           This project will deliver an IG for REST and SOAP medication         2012 Jan WGM/Ballot
                                    statement services.
 7/11/2011 Ballot - DSTU            Joint session SOA/ITS - Target: May 2011 - COMPLETE                  2012 Jan WGM/Ballot
                                    Document ready for committee review - Target: Early June 2011 -
 4/19/2010 Ballot - Informative     Collect candidate use-cases to scope the usage of the Healthcare 2011 Jan WGM/Ballot
                                    SOA Ontology effort - Target: 15-MAY-2010
 1/30/2006 Ballot - Normative       The RLUS project will deliver the RLUS Service Functional Model.     2012 Jan WGM/Ballot
                                    A Service Functional Model is a textual document enumerating
 8/24/2009 Ballot - DSTU            Key objectives targeted by this project in being designated and      2011 Jan WGM/Ballot
                                    operating as a SAEAF / EA Alpha initiative:
 8/29/2011 Ballot - Informative     Detailed project plan - Target: July 2011                           2012 Jan WGM/Ballot
                                    Ballot Informative Implementation Guide - Target: Jan 2012
 3/28/2011 Ballot - DSTU            Domain Analysis Model / Implementation Guide for HQMF -             2012 Jan WGM/Ballot
                                    Target: 2011 May Ballot
  1/8/2011 - Other -                Better tooling to support the publishing of CDA IGs - Target: May 2011 May WGM/Ballot
                                    2011 WGM
  1/8/2011 Ballot - DSTU            Ballot for DSTU - Target: May, 2011                                 2014 Jan WGM/Ballot
                                    Publish DSTU - Target: July, 2011
11/15/2010 Ballot - DSTU            Target Date for all of the following is 2010 Jan Ballot             2011 May WGM/Ballot
                                    Implementation Guide
  8/9/2010 Ballot - DSTU            Review developing design with HL7 Structured Documents Work         2013 May WGM/Ballot
                                    Group (SDWG) - June 2010 - August 2010
 11/9/2009 Ballot - DSTU            Implementation Guide for CDA Release 2, Unstructured                2012 Sept WGM/Ballot
                                    Documents.
10/26/2009 Ballot - DSTU            - Sample endoscopy note in XML as a constraint on HL7 v3 CDA        2012 Sept WGM/Ballot
                                    r2.
10/26/2009 Ballot - DSTU            This project will develop:                                          2012 Sept WGM/Ballot
                                    - A prose implementation guide:
 6/22/2009 Ballot - DSTU            CRS Release 2.0: Discharge Summary                                  2012 Jan WGM/Ballot
                                    Development June, 2009; draft review July, 2009; ballot, August,
 6/22/2009 Ballot - DSTU            Electronic Quality Measure Specification, release 1                 2012 May WGM/Ballot
                                    Target: September, 2009
 4/13/2009                          - Provide a UML based formalization approach for constraining       2009 Sept WGM/Ballot
                                    CDA.
 3/30/2009 Ballot - Normative       Delivery of a new updated release of the CDA standard: Clinical     2010 Sept WGM/Ballot
                                    Document Architecture, Release 3 (CDA R3), including updated
11/10/2008 Ballot - DSTU            - Perform detailed requirements analysis. Be consistent with work 2011 May WGM/Ballot
                                    of Patient Care and Detailed Clinical Models. Coordinate with IHE
 7/18/2011 Ballot - DSTU            This project will develop:                                        2013 May WGM/Ballot
                                     - Prose implementation guide
  3/3/2008 Ballot - DSTU            The goal of the project will be to develop HL7 Version 3            2012 May WGM/Ballot
                                    structured document specifications for quality measurement.
 2/11/2008 Ballot - DSTU            This project will develop:                                          2013 Jan WGM/Ballot
                                    - Prose implementation guide
 5/22/2007 Ballot - Normative       - Develop Requirements for Reporting with inputs from               - Select One -
                                    o Pediatric SIG Project
 9/25/2006 Ballot - DSTU            This project will develop:                                          2012 Jan WGM/Ballot
                                    - Prose implementation guide
11/21/2011 - Other -                Description of risk profile - Target: January 2012 WGM              2012 Jan WGM/Ballot
                                    Description of types of decisions needing governance - Target:
 8/22/2011 - Other -                Initial Project planning including budget and securing EC approval 2012 Jan WGM/Ballot
                                    of a budget - Target: September, 2011
 3/28/2011 - Other -                Initial report to TSC and ArB prior to May WGM - Target: Before     2012 Jan WGM/Ballot
                                    2011 May
             Ballot - Informative   Complete 'alpha' artifact definitions - Target: WGM May 2011        2011 May WGM/Ballot
                                    Complete 'alpha' methodology defined - Target: WGM Sep 2011
 2/28/2011 - Other -                Goal: Canonical SAIF Book                                           2012 Jan WGM/Ballot
                                    Goal: Draft HL7 SAIF IG for use with pilot projects
             - Other -              Establish review criteria (based on T3F report) 3/15/11             2011 May WGM/Ballot
                                    Conduct initial assessment polls    End May 11 WGM
  8/2/2010 - Other -                HL7 Product Quality Plan - Target: January 2011 WGM                 2011 Jan WGM/Ballot
                                    Project End Date (all objectives have been met) - Target: May
             - Other -              Work Group Visibility Maintenance:                                  2011 May WGM/Ballot
                                    Maintenance project to obtain and update Work Groups' Mission
  8/3/2009 - Other -                1) Create workable definitions of HL7 PRODUCTS                2012 May WGM/Ballot
                                    - Develop Product matrix for TSC review
 11/7/2011 Ballot - Comment Only    Use Case diagrams with Role definitions 2012-01               2012 Jan WGM/Ballot
                                    Activity Diagram depicting the types of interactions between a
  1/4/2010 - Other -                Technical Requirements (Target: Jan 2010)                           2010 Jan WGM/Ballot
                                    - User Interface Requirements and Design
 8/29/2011 Ballot - DSTU            First revised draft ballot (for comment) - Target: September 2011   2011 Sept WGM/Ballot
                                    First revised draft ballot - Target: Jan 2012
 12/5/2011 - Other -                High level Functional Specifications Complete - Target: Jan 2012    2012 Jan WGM/Ballot
                                    Roadmap for iterative release defined - Target: February 2012
 10/3/2011 - Other -                The Gforge hosting service has not being providing appropriate      2012 Jan WGM/Ballot
                                    customer service. The Tooling Work group is recommending that
 10/3/2011 - Other -                Tooling WG to create a visual summary in the form of a 'dash  2012 Jan WGM/Ballot
                                    board' that provides a snapshot of what tools are available and
 10/3/2011 - Other -                Tooling WG will review current communications, create a             2012 Jan WGM/Ballot
                                    communication plan to ensure interested parties can be fully
 10/3/2011 - Other -                Tooling will work with Electronic Services to align the               2012 Jan WGM/Ballot
                                    requirements gathering and tool selection processes to ensure
             - Other -              Obtain Project approval - Target: January 2011 WGM                    2012 Jan WGM/Ballot
                                    Complete project initiation (Charter, Project team,WBS) - Target:
             - Other -              Release package for use by HL7 - Target: 2010 October WG              2010 Sept WGM/Ballot
                                    Meeting
  6/7/2010 - Other -                Produce the Sept (Oct) 2010 Ballot package using MIF publishing. 2011 Jan WGM/Ballot
                                    Target: 2010 Oct Ballot
             Ballot - DSTU          Project Team Inception - Target:     2011 December                    2012 May WGM/Ballot
                                    Complete Draft Implementation Guide - Target: 2012 March
10/17/2011 - Other -                Terminology Authority makeup and terms of reference (i.e.             2012 Jan WGM/Ballot
                                    operating procedures) - Target: January 2012
 2/28/2011 Ballot - Informative     Draft for Workgroup Review - Target: September 2011 WGM               2011 Sept WGM/Ballot
                                    Initial ballot document - Target: January 2012 cycle
 4/12/2010 Ballot - Informative     Assess new and enhanced functionality of the latest Workbench         2011 Jan WGM/Ballot
                                    release - Target: May 2010
 4/19/2010 - Other -                Draft Policy Document - Target: April 30, 2010                        2011 May WGM/Ballot
                                    Review and approval and acceptance of policy by Vocabulary -
             - Other -              Determine a formal process for vocabulary maintenance that            2012 Jan WGM/Ballot
                                    includes timelines, allows for interdependencies, and leverages
             Ballot - Informative   The project is intended to produce a guideline.                       2010 May WGM/Ballot
                                    Target: 18 months after successful ballot of core principles
  6/6/2011                          The objective of this project is to review the ISO technical report   2012 Jan WGM/Ballot
                                    and provide input for the purposes of ensuring alignment and
             Ballot - Informative   V2 and V3 vocabulary are maintained separately. To improve and 2011 Jan WGM/Ballot
                                    provide consistent support for both V2 & V3 implementers, and
 11/1/2010 - Other -                Write set of processes and issues for consideration of the HL7        2010 Sept WGM/Ballot
                                    community. Target: August 2010
 1/15/2005 Ballot - DSTU            Implementation guide.                                                 2009 May WGM/Ballot

 6/30/2008                          The goal of the Common Terminology Services 2 (CTS 2)                 2012 Jan WGM/Ballot
                                    Specification is to expand on the original functionality developed
  4/8/2008                          - Aggregate existing documentation regarding code systems,         - Select One -
                                    concept domains, value sets, and binding syntax
Project End Date   Project Intent                   Project Need

- Select One -     Create New Standard

2012 January WGM   Create New Standard              The balloting of the SAIF Book establishes
                                                    HL7's commitment to separating the
2011 May WGM                                        HL7 documents are targeted to HL7
                                                    members, stakeholders and users, which
2012 September WGMRevise Current Standard

2012 January WGM   Revise Current Standard          Fuzzy logic will allow direct representation
                                                    of reasoning that is common in clinical
2011 September WGMRevise Current Standard           The proposed new operators will preserve
                                                    backward compatibility while offering new
2013 January WGM   Create New Standard, Revise      The project will provide standards in
                   Current Standard,                compliance with the ACA provisions for
- Select One -     Supplement to a Current
                   Standard
- Select One -

- Select One -     Create New Standard

- Select One -     Create New Standard

- Select One -

- Select One -

- Select One -     Revise Current Standard          Need to update so HL7 can ballot EHR-S
                                                     FM Release 2
2012 January WGM   N/A (Project not directly related Update to V3 repoitory following Nov 2011
                   to an HL7 Standard)               harmonization
2013 January WGM   N/A (Project not directly related The HL7 Board of Directors approved the
                   to an HL7 Standard)              Strategic Initiatives in Sept 2011. The intent
2012 January WGM

2012 January WGM   N/A (Project not directly related The existing document needs to be
                   to an HL7 Standard)               updated to reflect version of SMD tool
- Select One -     N/A (Project not directly related Board approved development of new
                   to an HL7 Standard)              business model
- Select One -

2011 September WGMCreate New Standard               The HL7 functional standards for EHR
                                                    systems do not currently provide guidance
2013 January WGM   Revise Current Standard

2014 January WGM

2012 September WGMRevise Current Standard           The current reference model is no longer
                                                    desirable because it leverages the use of
2010 September WGM

2013 September WGMRevise Current Standard           One of the most promising strategies
                                                    available for improving care quality and
2013 May WGM       Supplement to a Current
                   Standard
- Select One -     Create New Standard

2011 September WGM

2014 January WGM   Create New Standard,             Within the clinical decision support (CDS)
                   Supplement to a Current          community, it has been recognized for
2010 May WGM

2014 January WGM   Supplement to a Current          DNA sequencing is quickly dropping in cost
                   Standard, Implementation Guide and increasing in throughput, causing the
2013 January WGM   Supplement to a Current        The adoption of the HL7 Pedigree standard
                   Standard, Implementation Guide message is inhibited by a lack of
2012 January WGM   Supplement to a Current        Our initial DAM was part of the Gene
                   Standard                         Expression CMET project. During our initial
2012 May WGM         Revise Current Standard           Clinical genomics is a rapidly emerging field
                                                       with increasing use in patient care and
2012 May WGM         Supplement to a Current           Clinical genomics is a rapidly emerging field
                     Standard, Implementation Guide with increasing use in patient care and
2012 January WGM     Create New Standard,           The 'Genetic Variation' implementation
                  Implementation Guide                 guide covers genetic mutations (i.e. variants
2010 September WGM

2011 January WGM

2012 January WGM

2012 May WGM         Create New Standard,
                     Implementation Guide
2011 May WGM         Create New Standard

2012 September WGMCreate New Standard                  Despite considerable amount of common
                                                       assessment data for the diagnosis of
2013 May WGM         Revise Current Standard           Despite considerable progress, additional
                                                       effort is necessary to achieve semantic and
2012 May WGM         Create New Standard               Traumatic injury is the leading cause of
                                                       death in the first four decades of life,
2012 January WGM     Create New Standard               While significant progress has been made
                                                       in data exchange there is not yet adequate
2011 January WGM     Revise Current Standard           The US Sponsor desires to bring EMS
                                                       communication into line with HITSP and
2014 May WGM         Create New Standard               The US Sponsor desires to bring EMS
                                                       communication into line with HITSP and
2011 September WGM

2011 January WGM

2011 January WGM

2012 January WGM     Create New Standard

2012 September WGMRevise Current Standard,             Changes to the current vocabulary are
                  Supplement to a Current              required. This project will use a specific
2011 September WGMRevise Current Standard,             The HITECH Act of 2009 adds new
                     Supplement to a Current           requirements concerning privacy and
2013 January WGM     Create New Standard               A catalogue of reference privacy policies is
                                                       required to support the CDA R2 Consent
2011 January WGM

2012 September WGMCreate New Standard,
                     Implementation Guide
2012 May WGM         Create New Standard, Revise
                     Current Standard,
2011 May WGM         N/A (Project not directly related The intent of this work is to provide rules
                     to an HL7 Standard)               for associating value sets (implementable
2011 January WGM     Supplement to a Current
                     Standard
2010 May WGM

2012 January WGM     N/A (Project not directly related After releasing a new version of the HL7
                  to an HL7 Standard)               v2.x family of standards, HL7 needs to
2011 September WGMN/A (Project not directly related After releasing a new version of the HL7 V3
                     to an HL7 Standard)               family of standards, HL7 needs to update
2012 January WGM     N/A (Project not directly related HL7 has interest in more richly engaging
                     to an HL7 Standard)               with and participating in the academic
2012 January WGM     N/A (Project not directly related The need for this project is in response to
                     to an HL7 Standard)               ever increasing interest in HL7 Education as
2013 January WGM

2013 January WGM

2013 January WGM

2012 September WGM
2013 January WGM

2012 May WGM        Reaffirmation of a standard         The project is needed to make certain that
                                                        Standards exist and are sufficient to meet
2012 May WGM        Create New Standard                 The US Federal Government has begun
                                                        rulemaking processes around metadata for
2012 January WGM    Supplement to a Current             There is the need for EHR System Vendors
                    Standard                            and Implementers to readily understand
2013 January WGM    Create New Standard                 Approval of the Nutrition Functional Profile
                                                        will ensure capability for inclusion of
2011 September WGMCreate New Standard                   Public health can benefit from defined
                                                        functional requirements and criteria to
2012 September WGMCreate New Standard                   According to information provided by the
                                                        Pharmacist Service Technical Advisory
2012 September WGMCreate New Standard                   The project was initially started to meet the
                                                        needs of CCHIT. On September 25, 2008
2014 January WGM    Create New Standard                 Using EHR-S Function Profiles and Data
                                                        Profiles within the HL7 Service Aware
2011 January WGM    Revise Current Standard             Semantic interoperability and health
                                                        information reuse is enhanced when
2011 September WGMCreate New Standard                   Development of a Dental Health Functional
                                                        Profile based on the EHR-S FM.
2010 September WGM

2011 January WGM    Create New Standard

2012 May WGM        Revise Current Standard             Many ISO member national bodies/HL7
                                                        realms have already begun using the HL7
2010 May WGM

2009 May WGM        Create New Standard

2011 September WGMCreate New Standard

2010 September WGMCreate New Standard

2010 September WGM

2012 January WGM    N/A (Project not directly related For some workgroups and projects, there is
                    to an HL7 Standard)                 the need to pre-publish material to allow
2013 January WGM

2012 September WGM

2012 May WGM        N/A (Project not directly related
                    to an HL7 Standard)
2012 January WGM    N/A (Project not directly related
                  to an HL7 Standard)
2011 September WGM

2012 January WGM

2012 January WGM    Revise Current Standard             Emergency medicine and nursing are on
                                                        the frontline of care in the United States. As
2012 January WGM    Revise Current Standard             Certification of EDIS module, requirements
                                                        for vendors of EDIS modules, inform
- Select One -

2011 January WGM

2012 September WGMSupplement to a Current               HL7 has several standards that support the
                  Standard, Implementation Guide interoperability requirements of the
2011 September WGMReaffirmation of a standard    Conduct reaffirmation ballot timely.

2011 September WGMReaffirmation of a standard           Conduct reaffirmation ballot timely.

2012 September WGM

2011 September WGMCreate New Standard,
                    Implementation Guide
2012 January WGM   - OTHER -

2012 January WGM   Create New Standard            In addition to clinicians, this standardization
                                                  will also be beneficial to such groups as
2011 September WGMSupplement to a Current
                   Standard
2011 January WGM   Supplement to a Current
                  Standard
2011 September WGMCreate New Standard,
                  Supplement to a Current
2012 September WGMImplementation Guide

2013 January WGM   Supplement to a Current        This project is an outgrowth of the CAPRIT
                   Standard, Implementation Guide pathology/radiology expert panel
2013 January WGM

2013 January WGM

2013 January WGM

- Select One -     Revise Current Standard

2014 January WGM

2012 September WGMSupplement to a Current         The rules for the successful encoding and
                   Standard                       decoding of messages are necessary to
2013 January WGM

2014 January WGM

2012 September WGMRevise Current Standard         The need for this project has been raised by
                                                  existing HL7 v3 implementers including
2012 January WGM   Revise Current Standard        The standard is in use and continues to be
                                                  relevant to the implementers who operate
2012 September WGMCreate New Standard             To encourage takeup of HL7 standards,
                                                  there need to be simple, easily
2011 January WGM   Create New Standard            A RIM graph serialisation is suitable for use
                                                  where ever RIM based data is transferred.
2011 January WGM

2011 May WGM       Revise Current Standard

2011 May WGM       Create New Standard, Revise
                  Current Standard
2012 September WGMImplementation Guide

2011 September WGMRevise Current Standard         Many HL7 members have commented on
                                                  the inadequacies of the current wrappers,
2013 January WGM   Create New Standard            Support those parties who are interested in
                                                  providing a batch capability for V3
2012 January WGM

2011 September WGM

- Select One -     - OTHER -

2013 January WGM   Create New Standard            There are a number of issues with existing
                                                  v3 methodology that have resulted in low
2013 January WGM   Supplement to a Current        Core Principles defines HL7 artifacts at a
                   Standard                       high level, but does not provide guidance
2013 January WGM   Revise Current Standard

2012 January WGM   Reaffirmation of a standard    The previously approved CMETs were
                                                  balloted under the auspices of Modeling
2012 September WGM

2010 January WGM   Revise Current Standard

2015 September WGMRevise Current Standard
2009 September WGMCreate New Standard

- Select One -

2011 September WGMCreate New Standard

2013 May WGM       Implementation Guide,            The goal of ELINCS Orders is to provide an
                   Externally developed IG is to be applicable messaging specification that,
2013 May WGM       Create New Standard              The old dynamic model methodology is
                                                    insufficient to describe and define sufficient
2012 May WGM       Revise Current Standard          The project is initiated to support the US
                                                    S&I Framework Laboratory Results Initiative
2012 May WGM       Supplement to a Current          The project is initiated to support the US
                   Standard, Implementation Guide S&I Framework Laboratory Results Initiative
2012 January WGM   Create New Standard            Computerized Nutrition Services/Diet
                                                    Office Systems used by dietetics and
2015 January WGM   Create New Standard, Revise      The first release of the Specimen CMETs
                  Current Standard                  focused on requirements for general
2013 September WGMCreate New Standard               The purpose of this project is to provide
                                                    more specific definition to substances in
2013 September WGMRevise Current Standard           To further satisfy regulatory requirements
                                                    and practical experience based on use of
2012 January WGM   - OTHER -

2014 January WGM   Revise Current Standard

2013 September WGMCreate New Standard               We need to have a way to order lab tests
                                                    using V3 to support various stakeholder
2014 January WGM   Supplement to a Current          Although both existing realm-localized
                   Standard                         templates are a derivation of the existing
2011 January WGM

2014 January WGM

2014 January WGM

2014 September WGM

2012 January WGM   Revise Current Standard

2012 September WGMCreate New Standard

2010 September WGMCreate New Standard

2012 January WGM   Create New Standard

2012 January WGM   Create New Standard

2012 January WGM   Implementation Guide

2010 September WGM

2011 January WGM   Create New Standard

2011 January WGM   Create New Standard

2012 January WGM   Create New Standard

2013 September WGMCreate New Standard               For efficiency, many times protocols or
                                                    order sets are developed by providers by
2012 September WGM                                  A core part of HL7 V2, Chapter 3 - Patient
                                                    Administration, defines messages for
2012 September WGMRevise Current Standard           Industry experience found that real world
                                                    applications require different types of
2013 September WGM

2011 September WGMRevise Current Standard           The HL7 Patient Administration work group
                                                    received an extensive use case on behalf of
2012 May WGM
2013 September WGMRevise Current Standard

2012 January WGM   Revise Current Standard

2012 January WGM   Revise Current Standard

2012 September WGM

2012 September WGMRevise Current Standard        Several Care Provision materials have been
                                                 implemented based on the DSTU R1
2012 September WGMRevise Current Standard        Several Care Provision materials have been
                                                 implemented based on the DSTU R1
2012 September WGMRevise Current Standard        Several Care Provision materials have been
                                                 implemented based on the DSTU R1
2012 September WGMRevise Current Standard        Several Care Provision materials have been
                                                 implemented based on the DSTU R1
2012 January WGM   Create New Standard           Pressure ulcers are one of the most
                                                 common 'never events' identified by the
2013 January WGM   Revise Current Standard

2011 September WGMRevise Current Standard        Australian input and from other users

2011 May WGM       Revise Current Standard

2014 May WGM       Create New Standard, Revise   Need to redefine the new scope of each
                  Current Standard,              topic as it would significantly change the
2012 September WGMRevise Current Standard

2013 September WGMRevise Current Standard        Need to redefine the new scope of each
                                                 topic as it would significantly change the
2011 September WGMCreate New Standard,           There is an increase use of Health Care
                   Supplement to a Current       Devices across healthcare settings from the
2014 January WGM   Supplement to a Current       Items about Care Planning to be discussed
                  Standard                       towards a future round of DSTU include:
2011 September WGMCreate New Standard,           - To create and maintain in a repository a
                  Supplement to a Current        set of detailed clinical models that can be
2012 September WGMCreate New Standard

2013 January WGM   Create New Standard

2011 May WGM

2014 January WGM   Create New Standard           Legislative requirements to provide
                                                 electronic format and transmission of
2014 May WGM       Create New Standard           The EMA has implemented risk
                                                 management plans for all Centrally
2014 January WGM   Supplement to a Current
                   Standard
- Select One -     Create New Standard

2012 May WGM       Revise Current Standard

2012 January WGM   Supplement to a Current       Clinical Statement Model needs to be
                  Standard                       updated to support pharmacy
2012 September WGMRevise Current Standard        To further satisfy institutional requirements
                                                 for dispense and supply.
2013 May WGM                                     Current implementers find it difficult to find
                                                 information to support implementation of
2012 September WGMRevise Current Standard        To further satisfy institutional requirements
                                                 for medication orders.
2010 May WGM       Revise Current Standard       This makes the representation of
                                                 medication within the Pharmacy domain
2012 May WGM       Supplement to a Current       Institutional use cases are currently not all
                   Standard                      supported in HL7 Version 3 Pharmacy
2011 January WGM

2012 January WGM   Supplement to a Current
                  Standard
2011 September WGMCreate New Standard
2014 September WGMCreate New Standard

2012 January WGM     Create New Standard

2012 January WGM     Create New Standard

2013 May WGM         Create New Standard

- Select One -       Create New Standard

2012 January WGM     Create New Standard

2012 January WGM     Create New Standard

2012 January WGM     Create New Standard

2012 May WGM         N/A (Project not directly related Many Workgroups are looking to attract
                  to an HL7 Standard)               volunteer resources to support projects or
2010 September WGMN/A (Project not directly related There have been limited changes to the
                     to an HL7 Standard)              First Time Attendee programs and recently
2015 January WGM     - OTHER -

2015 May WGM

2015 January WGM

2014 September WGM

2012 January WGM     N/A (Project not directly related Incorporate suggestions to the template to
                  to an HL7 Standard)               make it more usable and informative for
2012 September WGMN/A (Project not directly related The (TSC) requested Project Services to
                  to an HL7 Standard)               evaluate the definition/adoption of new
2011 September WGMN/A (Project not directly related Identifies projects and standards that are at
                     to an HL7 Standard)              risk or stagnant.
2015 May WGM

2012 January WGM

2011 September WGM

2012 January WGM

2012 May WGM         N/A (Project not directly related 1) HL7 members are interested in
                  to an HL7 Standard)                 understanding how the introduction of
2011 September WGM

2015 September WGM

2012 September WGM

2015 May WGM

2015 January WGM

2012 September WGMImplementation Guide                The U.S. vital registration systems for birth
                                                      and fetal death reporting have not kept
2012 September WGM                                    Public health requires both routine and
                                                    selected reporting by healthcare providers
2012 January WGM     Supplement to a Current        Developers and PH agencies are currently
                     Standard, Implementation Guide building to release 1 of the IG. As
2012 January WGM     Supplement to a Current        Specified in project scope.
                     Standard, Implementation Guide
2010 May WGM         Supplement to a Current
                     Standard, Implementation Guide
- Select One -

2015 May WGM

2012 January WGM     Create New Standard
2012 January WGM     Supplement to a Current             Immunization is an important part of
                     Standard                            preventive health care that is captured in a
2012 January WGM     Create New Standard

2014 September WGMRevise Current Standard

2012 September WGMRevise Current Standard                New version of the standard required to
                                                         incorporate changes required by work
2014 September WGM

2011 September WGM

2012 May WGM

2014 September WGMN/A (Project not directly related
                     to an HL7 Standard)
2011 January WGM

2012 May WGM

2013 May WGM         Revise Current Standard             The RPS R2D2 project will build on the
                                                         work done in RPS R2's first draft. For the
2014 September WGMImplementation Guide                   This project builds upon the work begun a
                                                         few years ago to harmonize CDISC and HL7
2013 September WGMRevise Current Standard

2014 September WGMCreate New Standard

2013 January WGM     Create New Standard

2014 May WGM         Supplement to a Current
                  Standard
2014 September WGMCreate New Standard

2013 May WGM         Revise Current Standard

2013 January WGM     Reaffirmation of a standard         By virtue of its ability to efficiently and
                                                         effectively pair subject- or protocol-based
2013 May WGM         Revise Current Standard,            Several healthcare regulatory agencies are
                  Supplement to a Current                seeking a single electronic message
2014 September WGM

2012 May WGM         Create New Standard

2013 May WGM         Revise Current Standard,            The FDA has implemented Structured
                     Implementation Guide                Product Labeling for Pharmaceutical
2013 January WGM

2013 September WGMCreate New Standard

2013 January WGM     N/A (Project not directly related
                  to an HL7 Standard)
2011 September WGMCreate New Standard                    Providing security and protecting the
                                                         privacy of electronic health records is a
2012 January WGM     Revise Current Standard

2010 January WGM     Create New Standard

2010 May WGM

2012 September WGMImplementation Guide                   The Pharmacy Service profile project is
                                                         needed to provide a working standards-
2012 January WGM     Create New Standard                 This specification creates a simple
                                                         packaging model, with support for meta
2011 September WGMSupplement to a Current                In order to effectively manage business
                     Standard                            transactions and to search the service
2012 January WGM     Create New Standard

2011 January WGM     Create New Standard
2012 May WGM         Supplement to a Current           Consumers will soon regularly receive
                     Standard, Implementation Guide 'Patient Specific Education Resources' via
2012 January WGM     Implementation Guide           Quality and performance measurement of
                                                       healthcare has been complex. Much of the
2011 May WGM         N/A (Project not directly related The current CDA IGs are published
                     to an HL7 Standard)               manually as Word Documents. The project
2014 January WGM     Implementation Guide              The consolidation of the guides will resolve
                                                       ballot comments made on individual
2011 September WGMSupplement to a Current              Consumers will soon have access to large
                     Standard, Implementation Guide volumes of CDA documents as a result of
2013 May WGM         Implementation Guide           No CDA guidance is currently available for
                                                       sending a Progress Note.
2012 September WGMCreate New Standard,
                  Implementation Guide
2012 September WGMCreate New Standard,
                  Implementation Guide
2012 September WGMImplementation Guide

2012 January WGM     Revise Current Standard

2012 May WGM         Create New Standard

2009 September WGM

2011 January WGM     Revise Current Standard

2011 May WGM         Create New Standard,
                     Implementation Guide
2013 May WGM         Implementation Guide              22 states require that Healthcare
                                                       Associated Infection data be submitted
2012 May WGM

2013 January WGM     Create New Standard

- Select One -       Create New Standard

2012 January WGM

2012 May WGM         N/A (Project not directly related Decisions on what needs to be governed
                     to an HL7 Standard)               should be guided by what are the nature of
2012 May WGM         N/A (Project not directly related
                  to an HL7 Standard)
2012 September WGMN/A (Project not directly related The TSC and ArB are interested in moving
                     to an HL7 Standard)               SAIF from the conceptual phase to the
2013 January WGM                                       Creation of the HL7 SAIF Implementation
                                                       Guide is the next major step in SAIF
2013 January WGM     N/A (Project not directly related Implementing a SAIF based architecture for
                     to an HL7 Standard)               HL7 is going to involve a number of
2012 January WGM     N/A (Project not directly related Every good organization should undertake
                     to an HL7 Standard)               a retrospective self-assessment in order to
2011 May WGM         N/A (Project not directly related Current known issues with HL7 product
                  to an HL7 Standard)               quality include:
2015 September WGMN/A (Project not directly related
                     to an HL7 Standard)
2012 May WGM

2012 May WGM         N/A (Project not directly related Validation of requirements broadly to
                  to an HL7 Standard)                  provide input to Templates Registry tooling
2010 September WGM

2012 May WGM                                           Part of the V3 vision has included the idea
                                                       of being able to register static model
2013 January WGM     N/A (Project not directly related The current method of creating EHR-S FM
                  to an HL7 Standard)               profiles, using unstructured tools
2012 September WGMN/A (Project not directly related The current GForge service provider has
                     to an HL7 Standard)               indicated that HL7 is close to using all of its
2012 May WGM                                           The HL7 Technical Steering Committee and
                                                       Board would like a consistent visual that
2012 May WGM         N/A (Project not directly related Increased emphasis on tooling in HL7
                     to an HL7 Standard)               requires more visible and consistent
2012 September WGMN/A (Project not directly related The HL7 Board has emphasized that the
                    to an HL7 Standard)               Tooling Work Group needs to focus on
2012 January WGM    N/A (Project not directly related Many HL7 Work Groups use a UML
                    to an HL7 Standard)               modeling tool to produce Domain Analysis
2011 January WGM    N/A (Project not directly related The HL7 SMD as sponsored by the NHS
                    to an HL7 Standard)               does not include some design and
2011 January WGM    N/A (Project not directly related The project is necessary to complete the
                  to an HL7 Standard)                 conversion to utilizing a single common file
2012 September WGMImplementation Guide                As part of the CTS 2 development effort in
                                                      the OMG community, it is necessary to
2012 May WGM        N/A (Project not directly related HL7 has a Vocabulary workgroup that can
                  to an HL7 Standard)                 weigh in on all of the questions identified
2012 September WGMImplementation Guide                Increasingly the HL7 community is asking
                                                      for guidance for post-coordination,
2011 January WGM    N/A (Project not directly related It will allow us to gain understanding of
                    to an HL7 Standard)               how to represent the HL7 vocabulary assets
2011 May WGM        N/A (Project not directly related Currently, change requests for SNOMED-CT
                    to an HL7 Standard)               content changes are coordinated and
2013 January WGM    - OTHER -

2012 January WGM    - OTHER - , Create New
                    Standard
2012 January WGM    N/A (Project not directly related There is little documentation that exists on
                    to an HL7 Standard)               this topic
2011 January WGM

2012 January WGM    N/A (Project not directly related National and International efforts to write
                    to an HL7 Standard)               and use clear standards to support the
2009 May WGM        Create New Standard,
                    Implementation Guide
2012 January WGM    Revise Current Standard

- Select One -      Supplement to a Current
                    Standard
Success Criteria                               Dependancies           Collaboration Efforts

                                               HL-7 Specimen          Members of the AP SIG working on this
                                          Model (being                project include members of College of
Complete SAIF Book for information ballot None                        NCI, DoD, NeHTA, CHI
submission
                                               HL7 SAIF and HDF       Federal Health Architecture (FHA) - FHA
                                                                      members are participating on project team

Incorporation of fuzzy logic operators and     None
revision of the XML representation into the
Incorporation of new control, string, list and None                   None
temporal operators into the Arden Syntax
Standard and Operating Rules are adopted - Facilitators and           CMS / OESS for regulatory guidance.
in Regulations for use in the US.   Finalize   consulting support
                                               - Successful ballot    American Dental Association Standards
                                               of the Additional      Committee on Dental Informatics (ADA-
                                               HL7 Additional
                                               Information
                                               None

                                               None                   NCPDP
                                                                      X12
                                               None - Project is      ASC X12
                                               managed within         MOU Signed, renewed 2005
                                               None                   Structured Documents Technical
                                                                      Committee

                                               None

Gather feedback on the SI document             None




                                               Project is dependent N/A
                                           on funding from HL7
Set of neonatology functional requirements While there are no  The Child Health Work Group and this
for EHR systems and related conformance        dependencies for this project receive strong support from the
                                               EHR-S FM R2 (551)



The completion of an updated reference         Security review.       http://gforge.hl7.org/gf/project/ccow/docma
model that improves adoption of browser-                              n/?subdir=264


Success criteria for this project              None                   Object Management Group (OMG). This
are(i)adoption of a normative HL7 DSS                                 project is collaborating with OMG as a part
IG which describes both a technically          Infobutton Standard
correct and clinically usable                  (Project 265)
                                               Structured             Work with the Patient Care, Structured
                                               Document              Documents, and Orders and Observations
                                               - Project timing will Since the 1st ballot of HL7 GELLO was
                                               be dependent on        based on the Object Constraint Language
The following will be the primary project      The HL vMR project     Project work will be coordinated with other
success criteria:                              will be dependent on HL7 work groups, including:
                                               This
                                               recommendation is
Pilot of the new standard in across two        Project will move in   Life Technologies, Illumina, Complete
participating institutions. Positive review    parallel with external Genomics, DFCI, Intermountain Healthcare,
There are ongoing family history                                      Family history stakeholders who have
implementation projects in various                                  expressed interest include Hughes Risk
-omics Domain Analysis Model as                Enter name and ID of Oxford University (New Collaborator) -
Informative standard.                          project(s) that this   Modeling
Normative Genetic Variation Topic and/or
additional CMETs defined by the domain (a
Release 2 of the HL7 Version 2
Implementation Guide: Clinical Genomics;
Successful balloting of the HL7 2.5.1          Successful extension ARUP Laboratories, Salt Lake City, Utah
Implementation Guide: Clinical Genomics;       of the Clinical




Pass ISO ballot.                                                       ISO Work Group 2 : Data Interchange;

Completion of deliverables                     As a CDA IG it          Structured Docs, Orders and Observation
                                               obviously depends
Completion of deliverables                     In order to perform     Collaborating with:
                                               DSTU testing within     RCRIM - Reviewer
Balloting the Domain Analysis Model                                    This project represents a broad
                                                                       collaboration among stakeholders in the
Success will be measured by producing a                                This project represents a broad
single set of consensus based work                                     collaboration among stakeholders in the
Success will consist in the affirmative        None                    This project is based on work by the
balloting of the domain analysis model.                                American College of Surgeons Committee
Success will be determined by producing a                              Continued contribution from resources
single set of consensus based work                                     involved with Release 1 is expected.
The project will have succeeded when the       None                    The National EMS Information System
revised DAM is approved.                                               office at the University of Utah is providing
The project will have succeeded when a         Continued funding       The National EMS Information System
DIM is approved, specifications are            from NEMSIS (no         office at the University of Utah is providing
Successful balloting of an informative                                 A major contributor to this effort is the
domain analysis model for the emergency                                United States Department of
                                               None                    Clinical Data Interchange Standards
                                                                       Consortium (CDISC)
                                               Medical                 Medical professional societies
                                               Specialty/Professiona
                                               - Dependent on
                                               other Domain Work
This project will have succeeded if it         529 - Security          Possible collaboration includes:
establishes consistent sets of required        Domain Analysis         SNOMED/IHTSDO, ISO
1. The pre-requisites/properties for data      None
segmentation (i.e., minimum data quality
A Normative Catalogue of Reference             Privacy view of the
Privacy Policies                               unified Security &

Successful ballot in Jan, 2010.                                        Security, Structured Documents, Child Care
                                                                       HITSP Consumer Preferences. Don/Tom
                                               Privacy and
                                               Authorization
Develop and publish Principles & Rules to                              NHS LRA project -Nicholas Oughtbridge
specify the syntax for vocabulary binding in

                                               We need other           N/A
                                               projects to evaluate
Having an HL7 V2.7 cert. test ready for
Sept.2011 WGM
Having an HL7 RIM cert updated to RIM
2.34 for Sept.2011 WGM
Develop common mechanisms for                  None
improving support of academia, increasing
A critical measure of success for this project None                    Co-sponosor: Marketing Committee;
is publication of an actionable education                              International Council
                                               Project 708 (HL7
                                               Enterprise-Wide
                                               Project 708 (HL7
                                               Enterprise-Wide
                                               Project 708 (HL7
                                               Enterprise-Wide
                                              Project 708 (HL7
                                              Enterprise-Wide
1. Identification of RMES requirements        None
pertinent to ESMD
An EHR-S Functional Profile successfully      This project may pre- The intent of this project is to define an
passes ballot in January.                     adopt functional        EHR-S functional profile for metadata
- The RM-ES concepts are validated,           EHR-S Functional
illustrative examples and key words are       Model (Archived
The project deliverables must be specific     N/A                     American Dietetic Association (ADA,
enough to accurately reflect the Nutrition                            International Confederation of Dietetic
The project deliverables will be successful   Project 223: EHR-S      Centers for Disease Control and
when at least two public health domains       Vital Records           Prevention/National Center for Health
                                              This project is not     EHR WG Team members, Members of
                                              dependent upon any Pharmacist Services Technical Advisory
                                              This project is not EHR WG Team members, Members of
                                              dependent upon any Pharmacist Services Technical Advisory
                                              HL7 SAIF, RIM, EHR-S Federal Health Architecture (FHA) - FHA
                                              FM                      members are participating on project team
Creation of a functional model that           Subject-matter          ISO TC/215 Working Group 8
includes a list of PHR functions, a           expertise on Personal
                                                                      American Dental Associateion - MOU
                                                                      Additional interested parties include:
Publication of the White Paper.

Approval of Ambulatory Oncology
Functional Profile through HL7 balloting
This project will be successful when the EHR-
S FM Release 2.0 has completed normative
Demonstrate how clinical content can be                               Clinical Interoperability Council, Patient
defined in the EHR in a collect once,                                 Care WG, RCRIM, Interoperability WG
                                              HL7 EHR System          ISO TC215 WGs1,2,8
                                              Functional Model
                                              None                    Centers for Disease Control and
                                                                      Prevention/National Center for Health
                                              HL7 Clinical            - HL7 EHR Technical Committee
                                              Document              (developers of the EHR Interoperability
                                              HL7 Electronic Health N/A
                                              Record System
When each workgroup or project has the        N/A                     N/A
means to request web space and can post




                                              None                    GoMembers, ISite, Ascentium software and
                                                                      vendor contractors.
Broad review and feedback on the updated None                         Military Health Care System
data elements in DEEDS as input for the                      American College of Emergency Physicians
Adoption of the EDIS FP V2 by vendors and 1) EHR WG progress Department of Defense Directorate Of
regulators.                                   on EHR FM R2            Clinical Informatics

                                              Detailed clinical
                                              models
This project will have succeeded if it        Availability of
completes development and balloting of        resources and
Conduct reaffirmation ballot timely.

Conduct reaffirmation ballot timely.          N/A



                                              None
Package 1 of the project has been               None                     - Anesthesia Patient Safety Foundation
successfully balloted                                                    (APSF)
                                                Note to TSC: Reason
                                                for non-availablity of
                                                None

                                                                         EHR, HSSP, Service Oriented Architecture
                                                                         (SOA), Structured Documents, InM,

Implementation Guide approval                   None                     IHE Anatomic Pathology
                                                                         IHE Radiology




                                                Prerequisite: Release
                                                of HL7 Datatypes R2
Pass ballot                                     CDA Diagnostic      DICOM WG20 (Agreement Status: Joint
                                                Imaging Report (DIR) Work Group based on MoU between HL7

The document passes ballot.                     None                     None




- normative standard ITS R2B structures         The following            FDA, SPL Working Group, possibly NCPDP,
- normative standard ITS R2B data types         projects are sources. possibly US DHHS ONC to make CDA R2
normative standard passes ballot

- A set of requirements for a neutral           Projects (Green CDA, The NHS Logical Record Architecture (LRA)
mapping notation is agreed (balloted?)          Micro-ITS, etc) to       project has defined a semantic model of
Normative specification of a RIM based          RIM, Data types R2       RIMBAA, Structured Documents, MnM,
XML ITS.                                                                 SOA
Pass ISO ballot.                                                         ISO Work Group ???
                                                                         Relationship of project to activities of other
                                                None                     INM Work Group.

                                                This project depends OMG, ISO, CEN
                                                on
                                                XML ITS                  Control Query TC
                                                Abstract Transport
Sufficient requirements produced to             Dependent on the         There is no external collaboration
describe the scope of the new Wrappers          SAIF implementation anticipated.
The project will be successful if HL7 is able
to provide a standard way of doing batch

                                                                         - Columbia University- Virginia
                                                                         - Northwestern University- Harry
                                                Completion of the
                                                CDA Product and
IR4H methodology passes DSTU and                Dependent on SAIF        This project will be conducted with
begins to be adopted by HL7 WGs (and            (Canonical               involvement and coordination from
HL7 modelers follow the identified              This will be
guidelines when constructing models.            influenced by the

Conformation of a set of CMETs that had         None
previously completed Normative balloting
Pass Informative ballot                         N/A

Final Normative Status for said document.       Relinquishment of
                                                'ITS and Data Types
                                                RIM Harmonization
                                                and Maintenance
                                            None                    HL7 ArB

                                            This project has        None
                                            dependencies on
                                            I&M Data Types          supported by Vocabulary and Infrastructure
                                            Specifications, RIM     & Messaging Technical Committees
-Successful DSTU ballot (60% of the         No known                California HealthCare Foundation (CHCF)
combined affirmative and negative votes     dependencies            already has an arrangement with HL7 from
Normative Standards                         This project is
                                            intended to interface
Successful balloting of the proposed        External              This project is closely tied to the US S&I
changes.                                   dependencies             Framework Laboratory Reporting initiative.
Successful balloting of the implementation External                 This project is generated by the US based
guide as Informative to be used by the S&I dependencies             S&I Framework Laboratory Results Interface
Success will be a DAM that informs others The EHR Work              This project will be a joint project between
about diet and nutrition orders such that it Group's Electronic     HL7 and the American Dietetic Association
Inclusion of the second release of specimen Participation by        None
CMETS as normative artifacts in a           resources from
Forms that allow the interchange of         Common product
defining elements for substances and       model (project 456?)
A standard that is ready to be implemented Substances Project to SPL (Structured Product Labeling) Work
by medical product oversight agencies to   provide CMET(s) to Group, external to HL7, at http://spl-work-




Normative Ballot                            We need to align
                                            with the template
Ability to harmonize the Canadian and UK    None                    Canada Health Infoway, NHS (To be
realm-localized templates.                                          confirmed)




The success of the project would be the     None                    Clinical Interoperability Council (CIC) Work
acceptance of both the informative and                              Group
                                            Advanced level of       OO will work with Lab, Pharmacy,
                                            completeness of the Integrated Imaging, and Patient Care to

                                            Composite Order         Laboratory Work Group
                                            topic must be           Patient Safety Work Group
                                            Clinical Statement      Clinical Statement, Patient Care, Laboratory,
                                            Pattern from Clinical Pharmacy, Image Integration, Clinical
                                            None                  HL7 Orders/Observations is the Sponsoring
                                                                    Committee
                                            The Result Topic is a
                                            constraint on the
                                            The General             Laboratory, Image Integration, and Patient
                                            Observation Domain Care
                                            The Composite Order The work will be performed in collaboration
                                            model is dependent      with key Work Groups, in particular:
                                            The orders CMETs
                                            are used in many
The successful balloting of Composite       The composite order
Order as a Normative Standard.              project is the pilot
Pass DSTU ballot in the May 2011 ballot     Close project 489 -     None
cycle                                       Patient Encounters
Resulting standards will:                   An indirect             1. Need to coordinate with Integrating the
- Address industry use cases                dependency is the       Healthcare Enterprise IT Infrastructure

Complete DSTU Ballot in the 2010 May
ballot cycle.
                                                                    August 2010: G. Seppala: I believe we will
                                                                    bring the project proposal forward for work
                                                                       Orders and Observations

                                              ITS and Data Types
                                              R2 - Project ID 316
                                              ITS and Data Types
                                              R2 - Project ID 316
                                              Scheduling has no
                                              unique dependencies
The project will be successful when there     HL7 SAIF            HL7 Netherlands will provide most of the
is a consensus on:                            Implementation           work on the models, walkthrough and
The project will be successful when there     HL7 SAIF                 HL7 Netherlands will provide most of the
is a consensus on:                            Implementation           work on the models, walkthrough and
The project will be successful when there     HL7 SAIF                 HL7 Netherlands will provide most of the
is a consensus on:                            Implementation           work on the models, walkthrough and
The project will be successful when there     HL7 SAIF                 HL7 Netherlands will provide most of the
is a consensus on:                            Implementation           work on the models, walkthrough and
Success will consist in the affirmative       None                     This project is based on work by the
balloting of the domain analysis model.                                Veteran's Health Administration in concert
                                              Previously part of
                                              Care Provision




                                              Clinical Statement
                                              interaction on

This document tries to address two kinds of CMET's from Patient
requirements. First, it should define which   Administration WG
- In addition to creating the Domain          Depence on project       Collaborating with / Agreement Status /
Analysis Model, this project will produce     320 DCM.             Comments
Clear definitions of Care Plan and            Project #105 was the Structured Docs WG; IMIA-NI; IHE.
components, harmonized with CEN Contsys original Care Plan             Under the MOU with CEN, there have been
                                        - Semantic                     CEN, ISO,. OpenEHR
                                              interoperability
                                              determined at            N/A
                                              2010May WGM, A&I
                                              None

                                              None

Becomes a Normative HL7 standard              Common Product           EMA, EFPIA
                                              Model - #625
Becomes a Normative HL7 standard              Common Product           EMA, EFPIA
                                              Model - #625

Concurrence and/or adoption of DAM as         HL7 Individual Case      Federal Health Architecture (TBD)
modeling artefact by groups specified in      Safety Report (ICSR) NPSA/NHS (TBD)
                                              This project will strive ISO TC 215.
                                              to maintain              Work is being managed under the SDO
Comparison of Pharmacy models (via            Availability of
DMIMs, RMIMs and other artifacts) will        Resources
A standard that is ready to implement by      Institutional Material
stakeholders that will support the exchange (ID 556)
Implementers of the V3 messages will be     Availability of
able to implement faster and with less        resources
A standard that is ready to implement by      Institutional Project
stakeholders that will support the exchange (Id 556)
CMETs are revised and pass ballot.          456 - Common
                                              Product Model
A set of use cases, requirements that are     Medication Dispense
sufficiently comprehensive to enable model and Supply Event

Successful completion of the ISO Standards None in HL7;                ISO TC215 WG6
development process, with full HL7            coordinate with ISO      JIC project
                                              None
                                             None

                                             None

                                             None

                                             None

                                             None

                                             None

                                             None

                                             None                 OO TC

The following will help define if this project Bandwidth of
has completed the efforts intended:            participants
The following will help define if this project Bandwidth of
has completed the efforts intended:          participants




New template released to the membership None
at Jan 2011 WGM.
-New processes will follow the proposed
process
A project Report Card is created; the        None
Project Approval process is incorporates




-Input from key Work Groups (ARB, MnM,       Input from key Work Other interested parties: ArB, SAIF Alpha
Vocabulary)                                  Groups (ARB, MnM,    Projects (Marc Koehn)




Successful completion of a DSTU ballot by    None                 Centers for Disease Control and
June 2012.                                                        Prevention/National Center for Health
This project should result in the availability None               IHE Quality, Research and Public Health
of a standardized expression of public                            Committee (IHE QRPH). IHE and HL7 have
Successful completion of a DSTU ballot in    None                 Collaborating with CDC, CSTE and other PH
May 2011.                                                         stakeholders. Members of the CSTE-CDC
Successful completion of a DSTU ballot in    Consistency in       Collaborating with CDC, the National
May 2011 for Vital Records Death             following the        Association for Public Health Statistics and
                                             This project is
                                             dependent on the




                                             None
This effort will develop a Immunization      None
Domain Analysis Model. Success will be
                                             At this time there are
                                             no known

Successful ballot of the standard            None




                                             HDF, V3
                                             Substantivity
In general, the project will have been       Regulated Product        ICH (ICH is made up of six parties
deemed to have been successful if the        Submission (RPS R2) representing the human pharmaceuticals
The implementation guide will be used to     CDA Release 2       US FDA
conduct FDA pilot testing with regulated     (already completed)




                                             CTR&R, Project ID
                                          372
Successful deployment of the CRFQ service Specifically excluded
assumes the following:                       from - but, in many
In general, the project will have been       #217 - Regulated         ICH (ICH is made up of six parties
deemed to have been successful if the        Product Submission       representing the human pharmaceuticals
Successfully completed informative ballot.   - ISO JIC Ballot of      CDISC
                                             BRIDG: The BRIDG
                                             Partnership with ISO National Cancer Institute (John Speakman /
                                             for global alignment Ed Helton) - Agreed to participate.
SPLr5 is intended to have backward           Project #625,        The project team will collaborate with FDA,
compatibility with SPLr4                     Common Product           the SPL Work Group and will attempt to
                                             - Semantic               This will be a collaborative effort sponsored
                                             interoperability with    by FDA and co-sponsored by PhRMA. It is
                                             This long term           CDISC / FDA are cosponsoring this project.
                                             success of this          bio-pharmaceutics industry, bio-
The objective will be reached if a) the
whitepapers are known to be read and b) if
This project will be considered successful This project is            Development of the domain ontology will
after 1) The DSTU has been accepted by       associated with the      be coordinated with any similar ISO
1. The domain research incorporates SME      Project 373
expert input from the sponsoring project     Composite Privacy
                                             ISO Risk Framework - TBD
                                             Not yet delivered
                                             HL7 RBAC Role            Community Based Collaborative Care
                                             Engineering Process,
Completion of a DSTU for a Pharmacy          (Technically, this   N/A
hData Content Profile and a SOAP Service     depends on hData -
This project will be successful, when the    This project realizes
current HL7 hData Record Format draft       the RLUS SFM, and is
Establish terminology capable of describing Healthcare SOA       Indeterminant at this time. May involve
healthcare SOA services.                     Ontology work will       collaboration with OMG Ontology SIG
                                             None

1.4.   Project Completion Statement          1.5.   Project           HL7 ArB, Security, CBCC, SOA
To accomplish Phase 1 objectives, PASS-      Constraints
The project will demonstrate the ability to   Request and
comprehensively describe patient               approval of LOINC
This project should result in the availability                        US Health Information Technology
of an Implementation Guide that can                                   Standards Committee Quality Workgroup.
A number of criteria will be evaluated to                             Open Health Tools, Connecting for Health.
determine the format of published CDA IGs:
Publication as DSTU in time for recognition                           Health Story (Associate Charter Agreement)
under the next stage of Meaningful Use                                Integrating the Healthcare Enterprise (IHE)
The project will demonstrate the viability of None
the technique in several web browsers, and
Successful development and reconciliation None                        Health Story
of a Progress Note implementation guide
Timely development of a balloted                                      Health Story Project - Associate Charter (as
implementation guide.                                                 CDA4CDT)
Production of the deliverables with                                   Patient Care (invited); Clinical Interoperabily
successful completion of the balloting                                Council (invited)
Adoption of Clinical Document Architecture None                       CHCA and the CHNC are sponsoring this
(CDA) for Neonatal Data Reporting by                                  project and have recruited neonatology
Timely development of a balloted                                      Health Story Project Associate Charter (as
implementation guide.                                                 CDA4CDT)
Timely development of a balloted              None                    National Quality Forum
specification.                                                        Clinical Decision Support
Implementer organizations, Structured                                 Structured Documents - Sponsor and
Documents work group, and others have                                 collaborator
                                              HL7 V3 Datatypes,       PHER; Clinical Statement
                                              Release 2               OO; ArB (SAEAF)
                                              None                    - Center for Aging Services Technologies
                                                                      (CAST)
Successful balloting and publication of one None                      QRDA (Quality Reporting Document
or more releases of the HAI                                           Architecture), CMS (Center for Medicare
                                              None                    Child Health Work Group (formerly named
                                                                      Pediatric Data Standards Special Interest
                                              None                    Continua Health Alliance
                                                                      The Continua Health Alliance has decided
                                              N/A                     Government Projects SIG, Pediatric Data
                                                                      Standards SIG
                                              None

The criteria for identifying risks and        Project Coordination
managing risks through appropriate            Project - 764
 - Dashboard for Strategic Initiatives has    Dependent on the
been set up and is visible to the general     BOD delivery of
- Successful completion of the Composite      - Ongoing working
Order project                                 relationship with the
An HL7 SAIF Implementation Guide that         A related project
has been endorsed by the membership and under the TSC is
Remaining to be addressed are definitions - Do we keep track of
of success criteria by which progress will be projects which are
Complete the report and have it formally
adopted by the TSC and endorsed by the
Delivery of the HL7 Product Quality Plan      SAIF Governance
and Implementation Plan
                                              combined 3-year
                                              planning project #
Target audiences are defined                  Document the            Marketing Council
Target audiences are able to obtain the       various HL7
Consensus reached from the broader            None. However this Open Health Tools repository project.
community on what constitutes a               replaces former
We will have demonstrated the                 Templates Registry      IHE PCC and QRPH       Agreement Status:
effectiveness of a template registry by      Business                 Signed
The project will be successful when there is SAIF:
a consensus on:                               SAIF Pilot
- Capable of producing fully conformant       Publication of HER-S Interested parties: MAX Project ID 742
EHR-S FM profiles, which may be balloted.     FM R2 (Project #551)
A document is produced that contains
recommendations.
A Tooling Dashboard is available and
accepted
A Tooling Communication Plan is               None
developed and executed.
Tooling users are satisfied that the         None                   Open Health Tools
processes are transparent and that their
The tool is developed and adopted by HL7 None
working groups for their use in importing
A successfully completed testing cycle and A parallel HL7           This project is being conducted in
release package including source code is     Generator              collaboration with the NHS.
Successful production of an HL7 ballot
package and its resulting products using
Successful completion and publishing of      This project will be
HL7 Common Terminology Services -            dependent on the
Appointment of Terminology Authority         With the               HL7 currently has an agreement with
Members and the development of the           establishment of an    IHTSDO for use of both tooling and
Approval and publication of the guidance     None                   The US Centers for Disease Control and
as an informative HL7 document.                                     Prevention wish to collaborate on this, as
The potential outcomes from this effort are: This project is        There will be collaboration with the IHTSDO
a) the workbench has an appropriate home dependent on the           and affiliates who have related Workbench
A clear policy and process outlining how                            This artefact will be a jointly developed
HL7 members can develop, vet, package                               policy between HL7 and the IHTSDO. This
                                             We acknowledge the
                                             requirement for
Best Practice Guide available                Core Principles        IHTSDO
                                             Document must
1. Completion of the review.                 None                   IHTSDO, Regenstrief, & ISO TC 215
2. Identify further projects that would
                                                                    InM WG

- Process document developed                 None - though this     Cosponsors: Joint Initiative Council
- Trial undertaken                           project does relate to ISO Joint Initiative Council approved
                                             Some dependencies SNOMED International
                                             on projects external IHTSDO (International Health Terminology
                                             CTS 2 itself will make SOA Work Group
                                             use of the Security
                                             None                   Per B. Knight 2010-01-13 a scope
                                                                    statement from MnM underway that may
Ballot Cycle Info.                                                 Misc. Notes

                                                                   Sept. 2010 David Booker: This is likely no longer an active project
                                                                   although a similar project is underway. I will discuss with the
2012 Jan Ballot Cycle Info: DSTU                                   May 2011: CMead: SAIF Canonical guide - The plan is to add
Ballot results:                                                    Performance Statements to the Informative balloted guide and
Leave blank until NIB is submitted

Leave blank until NIB is submitted

2012 Jan Ballot Cycle Info: NORMATIVE
Ballot results: POSTPONED
2011 May Ballot Cycle Info: NORMATIVE
Ballot results: Met basic vote requirements. 7 Negatives to
Leave blank until NIB is submitted                                 The deliverable will be a PUBLIC DOCUMENT. Hence, the PSS
                                                                   needs to go to the EC after TSC approval.
                                                                   5/13/08: This passed unanimously on the first ballot but we are
                                                                   currently (and actively) working on getting it to final publish state -
                                                                   5/13/2008: Update: slow progress in converting to use CDA R2
                                                                   and re-ballot, as of 5/7/2008 we have a champion to organize the
                                                                   5/13/2008: Update: On-hold until we have a champion for the
                                                                   domain content, need to update to use CDA R2, and at that time I
                                                                   5/13/2008: Update: we no longer expect this to be published as a
                                                                   CDA R1 document; it is on-hold except for applying existing ballot
                                                                   5/13/2008: Update: This project replaced project 285.
                                                                   This CDA R2-based document passed unanimously on first ballot
                                                                   5/13/2008: Update: These are the specifications needed for HIPAA
                                                                   rulemaking, mike cassidy currently finalizing the documents with
Leave blank until NIB is submitted

Leave blank until NIB is submitted

2012 Jan Ballot Cycle Info: COMMENT ONLY
Ballot results:
Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted                                 Dec. 2011: Per Karen, don't include in the monthly contract report
                                                                   to the Board yet.
                                                                   Dec. 2009 Frieda Hall: This project is currently on hold. A portion
                                                                   of this project is being worked on via project 444 led by the
Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

                                                                   Other Stakeholders: Stakeholders providing, using, or
                                                                   implementing CCOW compliant clinical technology.
Leave blank until NIB is submitted

2011 May Ballot Cycle Info: NORMATIVE                              August 2011: Received ANSI Notification of approval for HL7 V3
Ballot results: Met basic vote requirements. 0 Negatives to        DSS, R1-2011. PMO changed to Ready for NE as it will be
2011 Jan Ballot Cycle Info: DSTU                                   DSTU-Accepting Comments thru Mar 24, 2013 via HL7 Version 3
Ballot results: Met basic vote requirements. 1 Negative votes to   Implementation Guide: Context-Aware Knowledge Retrieval
                                                                   5/14/08 Update: James Campbell submitted a PSS to replace the
                                                                   one that was orginially submitted in May, 2006.
                                                                   Oct 2010: Robert Dunlop reactivated this project. Per Robert,
                                                                   "we had to suspend the GELLO v2 because of problems with the
2012 Jan Ballot Cycle Info: DSTU                                   Oct 2010: Robert Dunlop reactivated the GELLO project, which is
Ballot results: POSTPONED                                          closely related to this project.
11/29/2010: TSC approved the publication request for the
following Informative Document:
                                                                   We intend to ballot for Comment Only within the first year to get
                                                                   feedback from the HL7 community and will submit an informative
Leave blank until NIB is submitted                                 Sept 2011: M. Ullman-Cullere: We would like to suspend the
                                                                   following project. We have received feedback from ISO on the
Leave blank until NIB is submitted
Leave blank until NIB is submitted                                  Created by splitting Project #196 into two projects for better
                                                                    tracking of deliverables.
2012 Jan Ballot Cycle Info: INFORMATIVE                             Created by splitting Project #196 into two projects for better
Ballot results:                                                     tracking of deliverables..
2012 Jan Ballot Cycle Info: INFORMATIVE                             2011-08-08 TSC Call: Cytogenetics in current ballot without scope
Ballot results:                                                     statement having been approved by Steering Division and TSC?
Leave blank until NIB is submitted                                  August 2010: From Mukesh Sharma: We are working on the
                                                                    project requirements in order to fill out the scope statement. We
Leave blank until NIB is submitted

                                                                    May 2011 - ISO ballot needs to be reconciled and accepted
                                                                    changes introduced into the documentation and model. Strategy
2012 Jan Ballot Cycle Info: COMMENT ONLY                            Sept. 2009: Updated per project review.
Ballot results: POSTPONED
2010 May Ballot Cycle Info: INFORMATIVE                             2010July: updated project repository URL
Ballot results: Ballot results: Met basic vote requirements for     Sept 2009: There are multiple deliverables within this project
Leave blank until NIB is submitted                                  6.b. Synchronization with other SDOs/Profilers: CDISC - The data
                                                                    elements produced in this DAM project are expected to be
Leave blank until NIB is submitted                                  Other Stakeholders: All individuals and healthcare oriented
                                                                    organizations within the cardiology domain are considered
Leave blank until NIB is submitted

2012 Jan Ballot Cycle Info: INFORMATIVE                             Sept 2011: After Sept 2011 Ballot Results, will need to find out
Ballot results:                                                     what the next step for this project is given project #815 has been
2010 Sept Ballot Cycle Info: INFORMATIVE                            June 2010: Per Anita Walden, EMS DAM R2 will expand on the
Ballot results: Met basic vote requirements. 3 Negative votes to    R1 DAM and will implement substantive changes that were
2011 Sept Ballot Cycle Info: DSTU                                   Oct 2010: Anita Walden reactivated this project. PMO moved the
Ballot results: Met basic vote requirements. 10 Negatives to        project from the Archived status and folder into the CIC folder.
2011 May Ballot Cycle Info: INFORMATIVE                             Sep 2010: updated project repository URL
Ballot results: Met basic vote requirements. 0 Negatives to         July 2010: Per Anita Walden, the EMS project team does not want
                                                                    PHER Workgroup voted to submit this to CIC.
                                                                    Jan2010 not balloting until September 2010
                                                                    Dec. 2009: Set project status to 'Active' per Crystal Kallem.
                                                                     Crystal updated the project schedule. Crystal's update: I updated
2011 Sept Ballot Cycle Info: DSTU                                   Jan 2011: DSTU-Accepting Comments thru Dec. 7, 2011 for HL7
Ballot results: Met basic vote requirements. 12 Negatives to        Version 3 Standard: Clinical Statement Pattern, Release 1
Leave blank until NIB is submitted                                  Oct 2011: SVersaggi: The Security DAM which passed DSTU back
                                                                    in May 2010 (#529) just never got published. Kathleen has been
2011 May Ballot Cycle Info: DSTU                                    The conclusion regarding discussion about why this project is
Ballot results: Did not meet basic vote requirements for approval   marked Universal' and not Realm Specific:
                                                                    2010July: updated project respository URLs

Leave blank until NIB is submitted                                  LL per Ioana update April 2010, waiting for tooling issues to be
                                                                    resolved. Updated for Jan 2011 completion date
2010 May Ballot Cycle Info: DSTU                                    Feb 2011: The TSC approved the following DSTU for publication:
Ballot results: Met basic vote requirements for approval. 18        Consent Directive CDA Implementation Guide: for the Community
2009 Sept Ballot Cycle Info: DSTU                                   DSTU - Accepting comments thru Feb 04, 2012 for HL7 Version 3
Ballot results: Met basic vote requirements for approval. 19        Domain Analysis Model: Medical Records; Composite Privacy
Leave blank until NIB is submitted                                  Sep 2010: updated project repository URL

Leave blank until NIB is submitted

                                                                    See project page at
                                                                    http://wiki.hl7.org/index.php?title=HL7_DSTU_testing_toolkit
                                                                    June 2011: Per Ted Klein: The exam materials will be ready for
                                                                    review by Sept 2011 WGM.
                                                                    June 2011: Per Educ WG Call: Education will add an agenda item
                                                                    to discuss certification testing. This discussion may adjust the
                                                                    June 2011: Education WG will review dates at an upcoming Educ.
                                                                    Meeting
Leave blank until NIB is submitted                                  June 2011: Changed target dates to reflect Sept. 2011 and Jan
                                                                    2012 dates.
N/A                                                                 June 2011: Project 708 (HL7 Enterprise-Wide Education Strategic
                                                                    Plan) will determine Education's 3YP. Changed NMD to be Jan
Leave blank until NIB is submitted                                  June 2011: June 2011: Project 708 (HL7 Enterprise-Wide Education
                                                                    Strategic Plan) will determine Education's 3YP. Changed NMD to
Leave blank until NIB is submitted                                  June 2011: June 2011: Project 708 (HL7 Enterprise-Wide Education
                                                                    Strategic Plan) will determine Education's 3YP. Changed NMD to
Leave blank until NIB is submitted                                  June 2011: Education WG does want to do this; they are seeking
                                                                    resources; will reach out to Electronic Services for resources as
N/A                                                                 June 2011: Project 708 (HL7 Enterprise-Wide Education Strategic
                                                                    Plan) will determine Education's 3YP. Changed NMD to be Jan
                                                                    Note: The overarching task is to provide ESMD with guidance on
                                                                    achieving technical specifications that provide RMES functional
2012 Jan Ballot Cycle Info: INFORMATIVE                             Other Stakeholder: ONC
Ballot results: POSTPONED                                           Other Vendor: HIE
2011 Sept Ballot Cycle Info: COMMENT ONLY                           Other Stakeholder: Professional associations: AHIMA
Ballot results: Met basic vote requirements. 1 Negatives to
2011 Jan Ballot Cycle Info: DSTU                                    Backwards Compatibility notes: The Nutritional Functional Profile
Ballot results: Met basic vote requirements. 12 Negative votes to   could identify revisions to the HL7 artefacts in the functionality to
2011 Sept Ballot Cycle Info: INFORMATIVE                            NOTE TO THE TSC: The project deliverable will be a publically
Ballot results: Postponed                                           available document. When a deliverable is specified as a Public
2011 May Ballot Cycle Info: NORMATIVE
Ballot results: Met basic vote requirements. 2 Negatives to
2010 Sept Ballot Cycle Info: INFORMATIVE
Ballot results: Met basic vote requirements. 3 Negative votes to
Ballot strategy:                                                    2011 Sept Ballot Cycle Info: COMMENT ONLY
- first ballot as comment only white paper in order to socialize the Ballot results: Postponed
Leave blank until NIB is submitted                                   Dec 10, 2010 DSTU Expired for: HL7 Personal Health Record
                                                                    System Functional Model, Release 1
Leave blank until NIB is submitted

Leave blank until NIB is submitted                                  Jan 2009: TSC approved; refer to TSC Tracker #1376 for
                                                                    discussion regarding approval.
2010 May Ballot Cycle Info: DSTU                                    July2010: updated project repository URL
Ballot results: Met basic vote requirements for approval. 16        March 2010 JRitter: The EHR WG voted on (and approved) a NIB
2011 May Ballot Cycle Info: COMMENT ONLY                            2/21/2011: DESD Approval contingent upon EHR FM R1.1
Ballot results: Met basic vote requirements. 27 Negatives to        completing normative ballot reconciliation.
                                                                    Oct. 2009 P. VanDyke: Changed target dates to Feb. 2010
                                                                    Aug 2009: Don Mon provided status updates; see
                                                                    Oct. 2009 P. VanDyke: We are planning to fold this model into
                                                                    the Joint Intiative HER-S FM R2. PMO changed project status to
2011 May Ballot Cycle Info: INFORMATIVE                             Roadmap Project #4 (one of many)
Ballot results: Met basic vote requirements. 1 Negatives to         Oct 2009: received word from John Ritter that PHER WG was
                                                                    Sep 30, 2010: DSTU Expired for: HL7 Implementation Guide for
                                                                    CDA Release 2: Reference Profile for EHR Interoperability, Release
                                                                    Sep 30, 2010: DSTU Expired for: HL7 EHR Lifecycle Model
                                                                    (EHR/LM), Release 1
Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

                                                                    Aug 2010: Moving some items from this project to #580 Online
                                                                    Presence Project.
Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

                                                                    2010July: updated project repository URL

2012 Jan Ballot Cycle Info: COMMENT ONLY
Ballot results:




Leave blank until NIB is submitted

                                                                    May 2011: K. Conner: still on hold waiting for resources as well as
                                                                    the go-ahead from constituents
                                                                    June 2011: PMO unarchived this project and set the status to
                                                                    "Ready for CMET Publication". No further work is needed by the
2011 Sept Ballot Cycle Info: INFORMATIVE
Ballot results: Met basic vote requirements. 8 Negatives to
Leave blank until NIB is submitted                                  August 2010 Martin Hurrell: At the 2010 Oct WGM in Cambridge,
                                                                    the WG will discuss whether projects #513 and #543 should be
                                                                    August 2010 Martin Hurrell: At the 2010 Oct WGM in Cambridge,
                                                                    the WG will discuss whether projects #513 and #543 should be
                                                                    April 2011: PHER Update : Draft May 2010. Ongoing
                                                                    coordination.

Leave blank until NIB is submitted                                  Backwards Compatibility Notes: Intended to be fully compatible
                                                                    with HL7 V2.5.1 while it may pre-adopt from and later versions (in
Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

Sept 2010 HKoenig: This project is an update to an existing CMET
A_DicomCompositeObjectReference minimal R1. The updated
Leave blank until NIB is submitted

2012 Jan Ballot Cycle Info: NORMATIVE                               Oct 31, 2011: AStechison: this item has been on the agenda at
Ballot results:                                                     FTSD for the previous meeting and next meeting.
Leave blank until NIB is submitted

Leave blank until NIB is submitted

2011 May Ballot Cycle Info: INFORMATIVE                             Oct 2011: PMO Updated dates based on 3YP that ITS submitted.
Ballot results: Ballot results: Met basic vote requirements. 1      Other Stakeholders: All HL7 v3 implementers.
2011 May Ballot Cycle Info: NORMATIVE                               Oct 2011: PMO Updated dates based on 3YP that ITS submitted.
Ballot results: Met basic vote requirements. 12 Negatives to        Other Stakeholders: All HL7 v2 and v3 implementers.
Leave blank until NIB is submitted                                  Oct 2011: PMO Updated dates based on 3YP that ITS submitted.
                                                                    Product Type: V3 Foundation - Implementable Technology
2010 Sept Ballot Cycle Info: DSTU                                   2010July: updated project repository URLs
Ballot results: Met basic vote requirements. 27 Negative votes to   New Product Definition: V3 Implementation Technology
2009 Sept Ballot Cycle Info: NORMATIVE                              Dec 2011: Per L. Laakso The project is an ISO/JIC project; it has
Ballot results: Met basic vote requirements for approval. 3         been published by ISO but not yet by HL7. PMO changed it to be
2009 Sept Ballot Cycle Info: NORMATIVE                              Sep2010: updated project repository URL
Ballot Postponed                                                   August 2010: Per Charlie McCay: I do not think that there is any
2010 May Ballot Cycle Info: NORMATIVE                              Jun2010: Based on May 2010 ballot results, moved out Milestone
Ballot results: Did not meet basic vote requirements for approval. and Pjt End dates one cycle.
2010 Jan Ballot Cycle Info: NORMATIVE                              Oct 2011: PMO Updated dates based on 3YP that ITS submitted.
Ballot results: Postponed                                           Sept 2011: Andy Stechishin: from Sept 2011 minutes: looking for
Leave blank until NIB is submitted                                  Synchronization with other SDOs: There may be interaction with
                                                                    OMG, to be determined by the SOA WG.
2010 Sept Ballot Cycle Info: DSTU                                   Feb 2011: TSC approved the following DSTU for publication: HL7
Ballot results: Ballot results: Met basic vote requirements. 14     Version 3 Standard: Transmission Infrastructure, Release 2 at TSC
Leave blank until NIB is submitted                                  Sept 2010: Ambassador Webinars held to date:
                                                                    June 8, 2010 conducted: HL7 Ambassador Series: The HL7
Leave blank until NIB is submitted                                  Sept. 2010 JKaufman: For the rest of 2010, we are now focused on
                                                                    getting more universities to use this material. In 2011, plan to
                                                                    Jan 2009:
                                                                    Dec. 2009: JKaufman: The Product and Services guide is on hold
Leave blank until NIB is submitted                                  2a Ballot Type: Candidate for JIC in a later stage.



Leave blank until NIB is submitted                                  Aug 2010: Per L. McKenzie: We'll probably start looking at it more
                                                                    seriously in 6-9 months. At the moment, we're still waiting for
2011 Jan Ballot Cycle Info: NORMATIVE                               Jan 2011: Moved next milestone date and Project End Date out
Ballot results: Postponed                                           one trimester given the ballot was postponed.
2011 Jan Ballot Cycle Info: INFORMATIVE                             August 2011: Per Don, To Go in NE 2012, but now published on
Ballot results: Met basic vote requirements. 1 Negative votes to    Standards page as NE update.
2009 Sept Ballot Cycle Info: NORMATIVE
Ballot results: Did not meet basic vote requirements for approval. Product Type: V3 Foundation - Data Types
2011 May Ballot Cycle Info: NORMATIVE                              Dec 2011: G. W. Beeler: The final release of HL7 RIM release 2.37
Ballot results: Ballot results: Met basic vote requirements. 2      and vocabulary release 1129 have been completed and were
2011 May Ballot Cycle Info: NORMATIVE                             Oct 2010: Based on Sept 2010 ballot results, moved Next
Ballot results: Met basic vote requirements. 11 Negatives to      Milestone and Pjt End Date up one cycle.
2012 Jan Ballot Cycle Info: DSTU                                  Other Stakeholders: American College of Physicians, American
Ballot results: Postponed; will try to ballot in May, 2012        Clinical Laboratory Association, RHIOs (Colorado, Utah), ONC
Leave blank until NIB is submitted                                Oct 2011: Resource shortage; moving all milestones out one
                                                                  trimester; expect to ballot in May 2012.
2012 Jan Ballot Cycle Info: NORMATIVE                             Other SDO/Profilers: United States DHHS ONC S&I Framework
Ballot results: POSTPONED
2012 Jan Ballot Cycle Info: DSTU                                  Other SDO/Profilers: United States DHHS ONC S&I Framework
Ballot results: POSTPONED
2011 Sept Ballot Cycle Info: INFORMATIVE                          Other Stakeholders and Vendors:
Ballot results: Met basic vote requirements. 1 Negative to        The American Dietetic Association
Leave blank until NIB is submitted

2011 Sept Ballot Cycle Info: NORMATIVE
Ballot results: Met basic vote requirements. 0 Negatives to
Copied from #456 - Common Product:                                May 2011: Have requested the TSC to approve DSTU publication
2010 May Ballot Cycle Info: DSTU                                  of HL7 Version 3 Standard: Common Product Model CMETs, DSTU
Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted                                Oct 2011: Resource shortage; moving all milestones out one
                                                                  trimester; expect to ballot in May 2012.
2011 Sept Ballot Cycle Info: DSTU                                 Sept 2011 WGM: Per OO meeting: Re-evaluate in January 2012
Ballot results: Postponed                                         May 2010: Moved from 3-Year Plan item to Active Project.
Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

2011 Sept Ballot Cycle Info: INFORMATIVE                          Dec 2011: HL7 Version 2.6 Implementation Guide: Blood Bank
Ballot results: Met basic vote requirements. 0 Negatives to       Donation Services (US Realm), Release 1 is requested for
                                                                  Oct 2009: Updated per Project Review and Cleanup

                                                                  Sep 2010: updated project repository URL
                                                                  Oct 2009: Updated per Project Review and Cleanup. Active
2010 May Ballot Cycle Info: DSTU                                  Sep 2010: update project repository URL
Ballot results: Did not meet basic vote requirements for approval. Jan 2010: re-open 312, Blood, Tissue, and Organ R1; Since it is
                                                                   Oct 2009: Updated per Project Review and Cleanup. Waiting for
                                                                  resoruces and driver. Need to sync with Detailed Clinical Model
                                                                  Oct 2009: Updated per Project Review and Cleanup. Leave it
                                                                  open until HITSP/IHE clearly identifies what is needed and then
                                                                  Sept. 2010 - Added URL to the Project Document Repository
                                                                  Dec. 2009: From ANSI: RE: Notification on Final Action on:
                                                                  Oct 2009: Updated per Project Review and Cleanup. After Lab
                                                                  Order Template is complete.
                                                                  2010July: updated project repository URL
                                                                  Oct 2009: Updated per Project Review and Cleanup. Changed
                                                                  Oct 2009: Updated per Project Review and Cleanup. After
                                                                  Composite Order or Clinical Event are in play to ensure we know
                                                                  Oct 2011: Resource shortage; moving all milestones out one
                                                                  trimester; expect to ballot in May 2012.
2012 Jan Ballot Cycle Info: NORMATIVE                             Note that this project will replace project #489 of the same name.
Ballot results:                                                   The new project signals a significant departure from that previous
2012 Jan Ballot Cycle Info: DSTU                                  Other Stakeholders: National bodies that foster and accelerate
Ballot results:                                                   the development and adoption of electronic health record (EHR)
Leave blank until NIB is submitted                                Dec. 2010: G. Seppala: #725 may encompass other projects such
                                                                  as 650 (Service Delivery Location), 360 (Organization Registries)
May 2011: Don is working with Gregg Seppala and Alex Henkat       2010July: updated project repository URLs
towards getting this on our DSTU site. PMO to change NMD to       Jan 2010: Changed from a 3YP to Active per the PSS submitted.
Leave blank until NIB is submitted                                2010July: updated project repository URL
2010 Jan Ballot Cycle Info: DSTU                                    August 2011: Did not go into NE 2011; Per Don Lloyd: Did not
Ballot results: Met basic vote requirements for approval. 3         receive final content on these; will follow up with WG.
                                                                    Dec. 2010: G. Seppala: #725 may encompass other projects such
                                                                    as 650 (Service Delivery Location), 360 (Organization Registries)
                                                                    Dec. 2010: G. Seppala: #725 may encompass other projects such
                                                                    as 650 (Service Delivery Location), 360 (Organization Registries)
                                                                    Sept 2009 G. Seppala: From Project Rvw/Cleanup, changed to 3-
                                                                    Year Plan item. Updated Objectives/Deliverables
Leave blank until NIB is submitted                                  This project continues the work from #284 - Care Provision
                                                                    Domain,
Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

2011 May Ballot Cycle Info: INFORMATIVE                             Other Stakeholder/Vendor/Provider: IHE (Integrating the Health
Ballot results: Met basic vote requirements. 15 Negatives to        Enterprise)
Leave blank until NIB is submitted

Leave blank until NIB is submitted                                  Identified 2010MayWGM

Leave blank until NIB is submitted                                  created planning item based on May2010 WGM discussions:
                                                                       Needs a new project scope statement as it needs update with
Leave blank until NIB is submitted

Balloted Sept 2009, awaiting request to publish in time for 2010    May 2011: Placed project 'On Hold' since there are no resources
Sept WGM                                                            available for this work:
January 2009 Ballot Cycle                                           July 2011: TSC approved the request for the publication of a
2009JAN, Dec 03, 2008 - Jan 05, 2009                                DSTU for 24 months at their 2011-07-11 teleconference via TSC
2011 Sept Ballot Cycle Info: INFORMATIVE                            2010July: updated project repository URL
Ballot results: Postponed
                                                                    2010July: Updated URLs for project repository
                                                                    2010May: per discussion at WGM, DSTU considering comments
2010 Sept Ballot Cycle Info: INFORMATIVE                            May 2011: WGoosen: Expect to finish before Sept en ballot 1 of 5
Ballot results: Did not meet basic vote requirements for approval   separately and then each next ballot one example.
DSTU, R2, Sept 2009                                                 DSTU - Accepting Comments thru Jun 09 2012 for HL7 Version 3
                                                                    Standard: Care Provision; Allergy and Intolerance, Release 1
June 2010 The TSC approved the following DSTU for publication:      DSTU - Accepting Comments thru May 23, 2011 HL7 Version 3
 HL7 Version 3 Standard: Care Provision: Care Composition Topic     Standard: Care Provisions, Release 1
Test Period till 2011/2012 depending publication                    DSTU - Accepting Comments thru May 23, 2011 for HL7 Version 3
Releases: HL7 CP CP, R1 July 2009 (DSTU)                            Standard: Care Provisions, Release 1
                                                                    Sept 2011: Mead Walker provided PMO with status updates to
                                                                    Objectives and Target Dates
                                                                    Sept 2011: Mead Walker provided PMO with status updates to
                                                                    Objectives and Target Dates
Leave blank until NIB is submitted                                  Sept 2011: Mead Walker: Remove all Milestones and dates.
                                                                     However, we do not want to cancel the project. 1/21/2010:
                                                                    Sept 2011: Mead Walker: Remove all Milestones and dates. We
                                                                    would like to explore having PHER take on the role of primary
2010 Sept Ballot Cycle Info: NORMATIVE                              Dec 2011: L. Laakso: has been published by ISO but not yet by
Ballot results: Met basic vote requirements. 0 Negative votes to    HL7
Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted                                  Sept 2011: PSS submitted; activated 3-Year Plan item as a project
                                                                    Sept. 2009 R. Hallowell: Medication Order Release 2 doesn't
Existing CMETs will be revised to be constraints on the Common      2010July: updated project repository URL
Product Model
Leave blank until NIB is submitted

Leave blank until NIB is submitted

2012 Jan Ballot Cycle Info: DSTU                                    Feb 2010: Updated the objectives/deliverables based on Hugh
Ballot results:                                                     Glover email.
2011 Jan Ballot Cycle Info: NORMATIVE                               Oct 2010: Based on Sept 2010 ballot results, moved Next
Ballot results: Did not meet basic vote requirements. 13 Negative Milestone and Pjt End Date up one cycle.
                                                                   Sept 2009: Changed to a 3-Year Plan item.

2011 Sept Ballot Cycle Info: NORMATIVE                             Oct 2010: Based on Sept 2010 ballot results, moved Next
Ballot results: Met basic vote requirements. 1 Negative to         Milestone and Pjt End Date up one cycle.
2011 Jan Ballot Cycle Info: NORMATIVE                              Jan 2011: R. Hallowell: Will discuss next steps on one of our next
Ballot results: Met basic vote requirements. 1 Negative votes to   conference calls. My instinct is that we will bring forward, close
                                                                   Sept 2011: Melva Peters: Change this to a 3-Year Plan Item. PMO
                                                                   has followed up asking when the Work Group plans on beginning
                                                                   Sept. 2009 R. Hallowell: Regarding this project, the Pharm WG
                                                                   needs to check as we believe it may have already passed a ballot
2011 Jan Ballot Cycle Info: NORMATIVE                              Sept 2011: Melva Peters: WG reconciling.
Ballot results: Did not meet basic vote requirements. 9 Negative   Oct 2010: Based on Sept 2010 ballot results, moved Next
2011 Jan Ballot Cycle Info: NORMATIVE                              Sept 2011: Melva Peters: WG reconciling.
Ballot results: Did not meet basic vote requirements. 8 Negative   Oct 2010: Based on Sept 2010 ballot results, moved Next
2012 Jan Ballot Cycle Info: NORMATIVE                              Oct 2010: Based on Sept 2010 ballot results, moved Next
Ballot results:                                                    Milestone and Pjt End Date up one cycle.
Leave blank until NIB is submitted                                 Other Stakeholders: HL7 Staff and co-chairs

                                                                   July2010:UPdated project repository URLs
                                                                   Public document will be created.

                                                                   Aug 2010: The TSC approved an updated Decision Making
                                                                   Practices Template, which provides an example for documenting


                                                                   Sept 2010 work is covered under project #686.



Leave blank until NIB is submitted                                 4.b.Project Need footnote: Additional information at TSC tracker:
                                                                   http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemE

Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted

Leave blank until NIB is submitted                                 May 2011: The SAIF AP team agreed that it's best to defer
                                                                   publication of the White Paper defer publication of this until the
N/A                                                                Develop method to predict ballot schedules from Insight
                                                                   (2010Jan) (Tracker 722) - COMPLETED
Leave blank until NIB is submitted                                 Nov 2010: PSWG agreed to close Tracker 1093 - Consider use of
                                                                   RASCI chart for cross Work Group projects, hence removing it
N/A                                                                May 2011: Have uploaded the recorded PMO webinar to
                                                                   www.HL7.org > Resources > Tools and Resources > Project
N/A                                                                Jan 2009: Rick Haddorff waiting on some SAEAF decisions prior
                                                                   to beginning work on this item.
N/A                                                                Update Project Scope Definition in HL7 V3 ballot section 5.4.1
                                                                   (Tracker 1049). - COMPLETED
2012 Jan Ballot Cycle Info: DSTU                                   Other Vendors: Vital Records System vendors and potentially
Ballot results:                                                    other public information systems.
Leave blank until NIB is submitted                                 Work Group approval dates: PHER: 5/19/11; SD: 5/18/11.
                                                                   Other stakeholders and providers: Public Health Information
2011 Sept Ballot Cycle Info: NORMATIVE (Out of Cycle)              March 2011 PHER Update: Indefinite hold of R2. Creating errata
Ballot results: Met basic vote requirements. 49 Negatives to       and clarifications docs. PHER will review and vote on the Errata
2011 May Ballot Cycle Info: DSTU                                   Oct 2011: TSC approved a request for the publication of a DSTU
Ballot results: Met basic vote requirements. 2 Negatives to        at their 2011-10-10 teleconference for approval for: HL7 Version
2010 Jan Ballot Cycle Info: COMMENT                                April 2011: TSC recommends withdrawing the project: the CDC
Ballot results: Met basic vote requirements for approval. 0        decided to not move forward with publishing the IG through HL7.
                                                                   2010Sep: updated project URL

                                                                   Feb 2010: This is ongoing work within PHER.

                                                                   July 2011: PMO set the satus to 'Ready for CMET Publication'.
                                                                   The work from this project should go into the CMET Master list
2012 Jan Ballot Cycle Info: INFORMATIVE                             Feb 2010: Placed project 'on hold'. Will work on ballot
Ballot results:                                                     preperation as soon as Abdul Malik Shakir has bandwith to assist.
2011 Sept Ballot Cycle Info: NORMATIVE                              April 2011: PHER Will consider requesting an extension of the
Ballot results: Did not meet basic vote requirements. 17 Negatives DSTU.
Leave blank until NIB is submitted

2011 Sept Ballot Cycle Info: NORMATIVE
Ballot results: Postponed
Leave blank until NIB is submitted                                  Andy Stechishin will discuss with Publishing WG at the 2010
                                                                    October WGM
Leave blank until NIB is submitted                                  Andy Stechishin will discuss with Publishing WG at the 2010
                                                                    October WGM
Leave blank until NIB is submitted                                  Aug. 2010: Will remain on the list; Andy Stechishin will update
                                                                    dates
Leave blank until NIB is submitted                                  Aug. 2010: Will remain on the list; Andy Stechishin will update
                                                                    dates
Leave blank until NIB is submitted

                                                                    Aug 2010 Andy S: Hope to bring it up at current ballot cycle.
                                                                     Comment only ballot for Jan 2011 ballot cycle.
Leave blank until NIB is submitted                                  This project stems from #539 - Regulated Product Submission
                                                                    Release 3 (RPS R3)
2012 Jan Ballot Cycle Info: DSTU                                    Other SDO/Profiler: CDISC SDTM
Ballot results:
Leave blank until NIB is submitted                                  2010Nov(LL): added per RCRIM Three-year plan

Leave blank until NIB is submitted                                  2010Nov(LL): added per RCRIM THree-year plan.

Leave blank until NIB is submitted                                  2010Nov:(LL):added per RCRIM Three-year plan

Leave blank until NIB is submitted                                  2010Nov(LL): added per RCRIM Three-year plan

Leave blank until NIB is submitted                                  2010Nov(LL): added per RCRIM Three-year plan.

Leave blank until NIB is submitted                                  2010Nov: added per RCRIM three-year plan (LL)

2012 Jan Ballot Cycle Info: DSTU                                    DSTU-Accepting Comments thru May 18, 2012 HL7 Version 3
Ballot results:                                                     Standard: Regulated Studies; Clinical Research Filtered Query
2012 Jan Ballot Cycle Info: DSTU                                    April, 2011: Scope changed and RCRIM sent modified PSS
Ballot results:                                                     through SD and TSC Approval.
2010 May Ballot Cycle Info: INFORMATIVE                             2011Dec: Per L. Laakso The Bridg project at PI 538 is an ISO/JIC
Ballot results: Met basic vote requirements for approval. 24        project (ISO/CD 14199). PMO changed it to be an ISO/JIC project
2010 May Ballot Cycle Info: DSTU                                    Dec 2011: Per L. Laakso The project is a JIC project but can't find a
Ballot results: Met basic vote requirements for approval. 9         reference in ISO. PMO changed it to be an ISO/JIC project type.
2010 Sept Ballot Cycle Info: INFORMATIVE                            May 2, 2011: TSC approved the request for publication of
Ballot results: Ballot results: Met basic vote requirements. 0      Informative Document: HL7 Version 3 Implementation Guide:
2010 Jan Ballot Cycle Info: DSTU                                    DSTU-Accepting Comments thru Aug 25, 2012 for Version 3
Ballot results: Met basic vote requirements for approval. 33        Standard: Regulated Product Submission Release 2, DSTU Release
2011 May Ballot Cycle Info: INFORMATIVE                             October 13, 2011 Discussion with RCRIM regarding this project:
Ballot results: Met basic vote requirements. 7 Negatives to         RCRIM wants to withdraw just the Subject Data 2009 ballot as this
Leave blank until NIB is submitted                                  2010 Oct: Submitting PSS to FTSD for review/approval. Updated
                                                                    project deliverables in Project Insight based on info gathered
2011 May Ballot Cycle Info: DSTU                                    2010 July: updated repository URLs
Ballot results: Met basic vote requirements. 9 Negatives to
2010 May Ballot Cycle Info: DSTU                                    Nov 2011: Security WG submitted a request for the publication of
Ballot results: Met basic vote requirements for approval. 4         a DSTU that will be coming to the TSC at their 2011-11-07
                                                                    2010 July added repository URL
                                                                    Sep 2009 submitted for comment to steering division, plan to
2009 Sept Ballot Cycle Info: NORMATIVE                              2010 July updated repository URLs
Ballot results: Met basic vote requirements for approval. 10        2009 Sept update: balloting this cycle with vocabulary harmonized
Leave blank until NIB is submitted

2011 Sept Ballot Cycle Info: DSTU                                   Dec 2011: a DSTU publication request that will be coming to the
Ballot results: Met basic vote requirements. 14 Negatives to        TSC for approval of HL7 Version 3 Specification: hData Record
Initial plans are to produce the document as HL7 internal, with the 2010Aug (LL per Jim Buckner): planning to ballot the draft
potential to ballot-for-comment depending upon input from           ontology for comment for the 2011Jan cycle, and then ballot
2012 Jan Ballot Cycle Info: NORMATIVE                               2010 July added repository URL
Ballot results:                                                     June 15,2010: Stefano states We expect to go to ballot in the next
2010 Sept Ballot Cycle Info: DSTU                                   July 2010: updated repository URL
Ballot results: Met basic vote requirements. 17 Negative votes to   June 2010: Based on May 2010 ballot results, moved Next
Leave blank until NIB is submitted                                  Other Stakeholder: Healthcare consumers/patients

2012 Jan Ballot Cycle Info: DSTU                                    Other Stakeholders: Quality, Safety and Performance Registries,
Ballot results: Postponed                                           Public Health Information Systems, Health Information Exchanges
                                                                    This was originally project #727.

2011 Sept Ballot Cycle Info: DSTU                                   DSTU Period - Accepting Comments until December 14, 2013
Ballot results: Did not meet basic vote requirements. 35 Negatives Dec 2011: TSC approved the DSTU publication for 24 months
2011 Jan Ballot Cycle Info: DSTU
Ballot results: Met basic vote requirements. 23 Negative votes to
2010 Sept Ballot Cycle Info: DSTU                                   DSTU - Accepting Comments thru Feb 05, 2013 for HL7
Ballot results: Met basic vote requirements. 4 Negative votes to    Implementation Guide for Clinical Document Architecture,
2010 Jan Ballot Cycle Info: DSTU                                    DSTU-Accepting Comments thru Sep. 3, 2012 for HL7 for
Ballot results: Did not meet basic vote requirements for approval. Implementation Guide for Clinical Document Architecture,
July 2010: TSC approved the following DSTUs for publication or     11/23/2009: The TSC approved the alternate ballot date of 12
extension for 24 months via GForge #1595.                           December 2009 for the following: HL7 Implementation Guide for
2010 Jan Ballot Cycle Info: DSTU                                    2010July: Lynn updated the URLs of the documentation
Ballot results: Met basic vote requirements for approval. 10        repositories
Dec 2009: request to publish DSTU (Gforge tracker #1367)            DSTU-Accepting Comments thru Dec. 17, 2011 for HL7
2009 Sept Ballot Cycle Info: DSTU                                   Implementation Guide for CDA Release 2: Care Record Summary,
2012 Jan Ballot Cycle Info: DSTU                                    DSTU-Accepting Comments thru Mar. 10, 2012 for HL7 Version 3
Ballot results: Postponed                                           Standard: Representation of the Health Quality Measures Format
                                                                    2010July: updated project repository URLs



Feb 2011: SD WG has requested a 1 year extension of the
following DSTU: HL7 Implementation Guide for CDA Release 2:
2011 Sept Ballot Cycle Info: DSTU                                   June 2011: SD WG submitted a revised PSS for informative ballot
Ballot results: Met basic vote requirements. 1 Negatives to         work.
2012 Jan Ballot Cycle Info: DSTU                                    May 2011: From Bob Dolin - RE: The DSTU item that was balloted
Ballot results: Postponed                                           in Sept 2008:
2008 Sept Ballot Cycle Info: DSTU                                   DSTU-Accepting Comments thru Oct. 19, 2012 for HL7
Document Name: HL7 Implementation Guide for CDA Release 2 - Implementation Guide for CDA Release 2: Personal Healthcare
2009 May Ballot Cycle Info: Normative                       June 2010: SD WG has not completed reconciliation, hence this
Document Name: HL7 Version 3 Standard: Structured Documents project cannot be closed. They need to post a recon package and
[#1383] For 20100111: Request for publication of DSTU for HL7 DSTU - Accepting comments thru Jan. 2, 2012 via HL7
Implementation Guide for CDA Release 2: History and Physical        Implementation Guide for CDA Release 2: History and Physical
Leave blank until NIB is submitted

Leave blank until NIB is submitted

                                                                    April 2011 Rick H. and Dave H. estimated the initial target dates.
                                                                    These dates will change as the individual projects create their
Leave blank until NIB is submitted                                  Other SDO/Profilers: OMG - An OMG representative will monitor
                                                                    the discussion of artifact and methodology definitions and
Leave blank until NIB is submitted                                  Next Milestone Date will be based on the various schedules for
                                                                    the projects under the SAIF AP umbrella.
Leave blank until NIB is submitted

                                                                    Other Stakeholder/Vendor/Providers: HL7 co-chairs, facilitators
                                                                    (modeling, vocab, project, publishing, etc.), workgroups, HL7
Leave blank until NIB is submitted                                  three-year planning project for TSC, replaces #570 (2009 TSC
                                                                    Work Group Visibility project) and #645 (TSC Communications
                                                                    See also Roadmap Task #48, project #413
                                                                    7 Jan 2010: Product List on HL7 wiki. Web site development for
2012 Jan Ballot Cycle Info: COMMENT ONLY                            Other Stakeholders: Researchers, Academic Institutions, Specialty
Ballot results:                                                     Associations producing guidelines
Leave blank until NIB is submitted                                  2010July: updated project repository URLs

                                                                    August 2011: Templates submitted the updated project scope
                                                                    statement.
Leave blank until NIB is submitted                                  4.g. Backwards Compatibility notes: This project is targeted for the
                                                                    EHR-S FM R2. However if it is determined that there is enough
Leave blank until NIB is submitted                                  4.g. Backwards Compatibility: There are a number of layers of
                                                                    'backward compatibility' that will be considered as part of the
Leave blank until NIB is submitted                                  Other Stakeholders - Tool Users and Tool Contributors

Leave blank until NIB is submitted                                  Other Stakeholders: Tool Users and Tool Contributors
                                                                    Approved by Tooling and Marketing at Sept 2011 WGM
Leave blank until NIB is submitted                           Other Stakeholders: Tool Users and Tool Contributors
                                                             Approved by Tooling and Publishing 2011Sept WGM 9/15/2011.
Leave blank until NIB is submitted                           Other Stakeholders: HL7 Work Groups

                                                             Sept 2010 - updated project repository with URLs

                                                             Backwards Compatibility: The project will allow for the conversion
                                                             of existing Pub XML artefacts to MIF so that the current PubDb
Leave blank until NIB is submitted                           Backwards compatibility note: This implementation guide is
                                                             compatible with MIF version 2.2.
Leave blank until NIB is submitted                           Other SDO/Profilers: IHTSDO, LOINC

Leave blank until NIB is submitted                           Backwards Compatibility Notes: Every attempt will be made to
                                                             ensure that the guidance doesn't conflict with previously balloted
Leave blank until NIB is submitted                           13Aug2010(LL): per vocab concall Aug 12th, putting project on
                                                             hold; can not find volunteers to work on the project and Russ
                                                             April 2011: FTSD approved the document "Use of SNOMED CT
                                                             identifiers and descriptions in Health Level Seven messages and
Leave blank until NIB is submitted

                                                             2010-01-13; not yet started. Setting next milestone date for May
                                                             WGM
                                                             Other SDO/Profilers: IHTSDO, Regenstrief

                                                             2010-01-13 project scope statement was developed but not sent
                                                             to SD for approval; B. Knight sent to Woody today.
                                                             Dec. 2011: Per L. Laakso: My records from last year show that the
                                                             International SDO Glossary at HL7 project insight ID# 495 was
per B. Knight 2010-01-13 coming to ballot updated DSTU May   June 2011: BKnight: there is not going to be any further work on
2010                                                         this so please close. However, prior to closing, the Vocab WG is
                                                             June 2011: When this project goes to Normative ballot, the PMO
                                                             wants the project ID to remain the same as it was during DSTU.
                                                             2010-01-13 on hold pending development of MnM project
Product Type                               Backwards        Stakeholders
                        Project Document Repository Compatibility                  Vendors               Providers



SAIF Program            ArB Wiki:               N/A         Standards              Other (specify in     Healthcare
                        http://wiki.hl7.org/ind             Development            Misc. Notes below)    Institutions
                        http://hssp.wikispace
                        s.com/HF%26EA
Arden Syntax

Arden Syntax            http://wiki.hl7.org/ind Yes         Quality Reporting      EHR, PHR, Health      Healthcare
                        ex.php?title=Arden_                 Agencies               Care IT, Clinical     Institutions
Arden Syntax            http://wiki.hl7.org/ind Yes         Quality Reporting      EHR, PHR, Health      Healthcare
                        ex.php?title=Arden_                 Agencies               Care IT, Clinical     Institutions
V3 Documents-           http://wiki.hl7.org/in N/A          Clinical and Public    Lab, HIS              Clinical and Public
Clinical (e.g. CDA)     dex.php?title=Attach                Health Laboratories,                         Health Laboratories,




V3 Documents-
Clinical (e.g. CDA)
Electronic Health                              N/A          N/A                    N/A                   N/A
Record
- Non Product                                  N/A          Other (specify in      N/A                   N/A
Project -                                                   Misc. Notes below)
- Non Product           http://www.hl7.org/do N/A
Project -               cumentcomments/in


- Non Product                                  N/A          N/A                    N/A                   N/A
Project -
- Non Product                                  N/A          N/A                    N/A                   N/A
Project -
- Non Product
Project -
Electronic Health       Work Group's web       N/A          Standards              Clinical Decision     Healthcare
Record                  page on www.hl7.org                 Development            Support Systems       Institutions
Electronic Health       http://www.hl7.org/S Yes
Record                  pecial/committees/p


CCOW                                           Yes          Other (specify in      Health Care IT        Healthcare
                                                            Misc. Notes below)                           Institutions

V3 Services-Web         http://hssp-        N/A             Immunization           EHR, PHR, Health      Healthcare
Services (OMG)          dss.wikispaces.com/                 Registries, Quality    Care IT, Clinical     Institutions
V3 Messages-Clinical,
V3 Services-Web
V3 Documents-
Knowledge
V3 Rules-GELLO

Domain Analysis       Project                               Clinical and Public    EHR, PHR, Health      Clinical and Public
Model (DAM), V2       documentation will                    Health Laboratories, Care IT, Clinical       Health Laboratories,
                      http://www.hl7.org/ds
                      tucomments/
V2 Messages-Clinical, http://wiki.hl7.org/ind Yes           Clinical and Public    EHR, PHR,             Clinical and Public
V3 Documents-         ex.php?title=CG#Cli                   Health Laboratories, Equipment , Health      Health Laboratories,
V3 Messages-Clinical http://wiki.hl7.org/ind N/A            N/A                  EHR, PHR, Clinical      Healthcare
                      ex.php?title=Canonic                                         Decision Support     Institutions
Domain Analysis       Models will be          N/A           Clinical and Public    Pharmaceutical, EHR, Healthcare
Model (DAM)             located in HL7                      Health Laboratories, PHR, Health Care IT     Institutions
V3 Messages-Clinical http://wiki.hl7.org/ind Yes             Clinical and Public   EHR, PHR, Health      Clinical and Public
                      ex.php?title=CG                        Health Laboratories, Care IT, Lab, HIS      Health Laboratories,
V2 Messages-Clinical http://www.hl7.org/S Yes                Clinical and Public  EHR, PHR, Health       Clinical and Public
                      pecial/committees/cli                  Health Laboratories   Care IT, Lab, HIS     Health Laboratories,
V2 Messages-Clinical, http://wiki.hl7.org/ind                Clinical and Public   EHR, PHR, Clinical    Clinical and Public
V3 Messages-Clinical ex.php?title=CG                         Health Laboratories   Decision Support      Health Laboratories,




- New Product
Definition -
V3 Documents-
Clinical (e.g. CDA)
V3 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=Gene_E
Domain Analysis      http://www.hl7.org/S No                 Regulatory Agency,    Pharmaceutical
Model (DAM)          pecial/committees/ci                    Standards
Domain Analysis      http://wiki.hl7.org/in Yes              Regulatory Agency,    Pharmaceutical        Medical Imaging
Model (DAM)             dex.php?title=CV_DA                  Standards                                   Service, Healthcare
Domain Analysis         Project materials will N/A           Quality Reporting     EHR, PHR, Health      Emergency Services,
Model (DAM)             be kept on the HL7                   Agencies, Regulatory Care IT, Clinical      Local and State
Domain Analysis         HL7 Wiki:              Yes           Regulatory Agency,
Model (DAM)             http://wiki.hl7.org/in               Standards
Domain Analysis         http://wiki.hl7.org/ind N/A          Quality Reporting     EHR, PHR,             Emergency Services,
Model (DAM)             ex.php?title=EMS_D                   Agencies, Other       Equipment , Other     Local and State
V3 Documents-           HL7 Wiki                N/A          Quality Reporting     EHR, PHR,             Emergency Services,
Clinical (e.g. CDA), V3                                      Agencies, Other       Equipment , Other     Local and State
Domain Analysis         http://wiki.hl7.org/ind
Model (DAM)             ex.php?title=EMS_D
Domain Analysis
Model (DAM)
- New Product
Definition -
                        http://wiki.hl7.org/ind
                        ex.php?title=Clinical
V3 Foundation-          HL7 GForge              Don't Know   Clinical and Public   Pharmaceutical, EHR, Clinical and Public
Vocab Domains &         [http://gforge.hl7.org               Health Laboratories, PHR, Equipment ,       Health Laboratories,
Domain Analysis         GForge:                Yes           Clinical and Public  EHR, PHR, Health       Local and State
Model (DAM),            http://gforge.hl7.org/               Health Laboratories, Care IT, Clinical      Departments of
V3 Foundation-          http://gforge.hl7.org/ N/A                                EHR, PHR, Health       Clinical and Public
Vocab Domains &         gf/project/cbcc/scms                                       Care IT               Health Laboratories,

V3 Documents-
Administrative (e.g.
Domain Analysis
Model (DAM), V3
V3 Documents-           http://wiki.hl7.org/ind
Knowledge, V3           ex.php?title=Binding
- Non Product
Project -
- Non Product           http://wiki.hl7.org/ind
Project -               ex.php?title=HL7_D
- Non Product                                     No         N/A                   N/A                   N/A
Project -
- Non Product                                     No         N/A                   N/A                   N/A
Project -
- Non Product           http://wiki.hl7.org/ind N/A          N/A                   N/A                   N/A
Project -               ex.php?title=Educati
- Non Product           HL7 Wiki - Under        N/A          Other (specify in     N/A                   N/A
Project -               Education                            Misc. Notes below)

- Non Product
Project -
- Non Product
Project -
- Non Product
Project -
- Non Product
Project -
Electronic Health      http://wiki.hl7.org/in N/A     Regulatory Agency       N/A                   N/A
Record                 dex.php?title=EHR_R
Electronic Health      http://wiki.hl7.org/ind Yes    Clinical and Public     EHR, PHR, Health      Clinical and Public
Record                 ex.php?title=EHR#Pr            Health Laboratories, Care IT, Lab, Other      Health Laboratories,
Electronic Health      GForge:                 N/A    Quality Reporting    EHR, PHR                 Healthcare
Record                 http://gforge.hl7.org/         Agencies, Regulatory                      Institutions
Electronic Health      http://wiki.hl7.org/ind N/A    Clinical and Public  Pharmaceutical, EHR, Clinical and Public
Record                 ex.php?title=EHR               Health Laboratories, PHR, Equipment ,         Health Laboratories,
Electronic Health      http://wiki.hl7.org/in N/A     N/A                  EHR, PHR, Health         Local and State
Record                 dex.php?title=Main_                                    Care IT, Other       Departments of
Electronic Health      http://wiki.hl7.org/ind N/A    Standards               Pharmaceutical, EHR, Healthcare
Record                 ex.php?title=EHR_N             Development             PHR                  Institutions
Electronic Health      http://wiki.hl7.org/ind N/A    Standards               Pharmaceutical, EHR, Healthcare
Record                 ex.php?title=EHR_N             Development             PHR                   Institutions
Electronic Health                              N/A
Record
Electronic Health      http://wiki.hl7.org/ind Yes    Clinical and Public     Pharmaceutical, EHR, Clinical and Public
Record                 ex.php?title=ehr               Health Laboratories, PHR, Equipment ,         Health Laboratories,
Electronic Health                              N/A
Record
- Non Product
Project -
Electronic Health      http://wiki.hl7.org/ind
Record                 ex.php?title=Oncolog
Electronic Health      www.hl7.org/wiki/ehr/ No       Quality Reporting       EHR, PHR              Local and State
Record, SAIF           ehrR2                          Agencies, Regulatory                          Departments of
Domain Analysis        http://wiki.hl7.org/ind
Model (DAM),           ex.php?title=EHR_Di
Electronic Health
Record
Electronic Health      http://wiki.hl7.org/in
Record                 dex.php?title=PHER_
Electronic Health      http://wiki.hl7.org/in
Record                 dex.php?title=EHR_In
Electronic Health
Record
- Non Product          N/A                      N/A   N/A                     N/A                   N/A
Project -
                                                      N/A                     N/A                   N/A



- Non Product                                   N/A
Project -
- Non Product
Project -
- Non Product                                         N/A                     N/A                   N/A
Project -
- Non Product
Project -
V3 Foundation-         http://wiki.hl7.org/ind N/A    N/A                     N/A                   N/A
Vocab Domains &        ex.php?title=Emerge
Electronic Health      HL7 ECWG wiki           No     ------------------------ EHR, PHR, Health     Emergency Services,
Record                 HL7 ECWG website               ------- Select all that Care IT, Clinical     Healthcare

Domain Analysis        http://www.hl7.org/S
Model (DAM)            pecial/committees/e
Domain Analysis        HL7 GForge           Yes       Clinical and Public     Pharmaceutical, EHR, Clinical and Public
Model (DAM), V3        [http://gforge.hl7.org         Health Laboratories, PHR, Equipment ,         Health Laboratories,
V3 Documents-          http://www.hl7.org/S N/A       N/A                  N/A                      N/A
Administrative (e.g.   pecial/committees/f
V3 Documents-          http://www.hl7.org/S N/A       Payors                  Health Care IT        N/A
Administrative (e.g.   pecial/committees/f


Domain Analysis
Model (DAM), V3
V3 Messages-
Administrative
Domain Analysis       Project Insight, the                   Quality Reporting     EHR, PHR, Clinical    Healthcare
Model (DAM)           GAS WG web page                        Agencies, Payors      Decision Support      Institutions

V3 Documents-
Clinical (e.g. CDA)
Electronic Health     http://hssp.wikispace
Record                s.com/Reference+Ar
V2 Messages-Clinical,
V3 Messages-Clinical
V2 Messages-Clinical http://www.hl7.org/S Yes                Standards             EHR, PHR, Health      Medical Imaging
                     pecial/committees/im                    Development           Care IT               Service, Healthcare




V2 Messages-          Project linked from Don't Know         Other (specify in     Other (specify in     Other (specify in
Infrastructure        Main ITS Wiki page:                    Misc. Notes below)    Misc. Notes below)    Misc. Notes below)




V3 Messages-          http://wiki.hl7.org/ind   Yes          Other (specify in     N/A                   N/A
Infrastructure        ex.php?title=ITS_W                     Misc. Notes below)
V3 Messages-          http://wiki.hl7.org/ind   Yes          Other (specify in     N/A                   N/A
Infrastructure        ex.php?title=ITS_W                     Misc. Notes below)
- New Product         http://wiki.hl7.org/ind   N/A          Standards             Health Care IT        Local and State
Definition -          ex.php?title=Neutral                   Development                                 Departments of
- New Product         http://wiki.hl7.org/ind   N/A          Other (specify in     Other (specify in     Other (specify in
Definition -          ex.php?title=RIM_IT                    Misc. Notes below)    Misc. Notes below)    Misc. Notes below)
- New Product         http://wiki.hl7.org/in
Definition -          dex.php?title=ISO_D
                      http://wiki.hl7.org/ind
                      ex.php?title=XML_IT




SAIF Program, V3      Project formal            Don't Know   Clinical and Public   Pharmaceutical,       Clinical and Public
Messages-             Documents:                             Health Laboratories, Equipment , Health     Health Laboratories,
SAIF Program, V3      http://wiki.hl7.org/ind                Regulatory Agency    Pharmaceutical
Messages-             ex.php?title=MCCI_


- Non Product
Project -
- Non Product
Project -
- New Product         HL7 Wiki:               Don't Know     Clinical and Public   Pharmaceutical, EHR, Clinical and Public
Definition -          http://wiki.hl7.org/ind                Health Laboratories, PHR, Equipment ,       Health Laboratories,
V3 Documents-         MnM Project Wiki:       N/A            N/A                  N/A                    N/A
Knowledge             http://wiki.hl7.org/ind
V3 Foundation-RIM

V3 Messages-          http://wiki.hl7.org/ind Yes            Clinical and Public   Pharmaceutical, Lab, Clinical and Public
Infrastructure        ex.php?title=CMET_                     Health Laboratories, HIS                    Health Laboratories,
- New Product
Definition -
- New Product
Definition -
V3 Foundation-RIM     http://gforge.hl7.org/
                      gf/project/mnm-
V3 Messages-           http://gforge.hl7.org/
Infrastructure       gf/project/mnm-
V2 Messages-Clinical http://elincsorders.pr N/A            Clinical and Public   EHR, PHR, Lab          Clinical and Public
                     ojectspaces.com                       Health Laboratories,                      Health Laboratories,
SAIF Program, V3     http://gforge.hl7.org/ No             Clinical and Public  Pharmaceutical, EHR, Medical Imaging
Messages-            gf/project/orders/scm                 Health Laboratories   PHR, Health Care IT,   Service, Healthcare
V2 Messages-Clinical The document to be Yes                Clinical and Public   EHR, PHR, Health       Clinical and Public
                     balloted will be kept                 Health Laboratories, Care IT, Lab, HIS       Health Laboratories,
V2 Messages-Clinical The document to be N/A                Clinical and Public  EHR, PHR, Health        Clinical and Public
                      balloted will be kept                Health Laboratories, Care IT, Lab, HIS    Health Laboratories,
Domain Analysis       HL7 Wiki or other     N/A            Quality Reporting    Pharmaceutical, EHR, Local and State
Model (DAM)           location per Orders                  Agencies, Regulatory PHR, Clinical           Departments of
V3 Messages-Clinical, HL7 Wiki (Orders and Yes             Clinical and Public  EHR, PHR, Health        Clinical and Public
V3 Messages-           Observations) -                     Health Laboratories, Care IT, Lab, HIS    Health Laboratories,
V3 Documents-          http://gforge.hl7.org/ N/A          Clinical and Public  Pharmaceutical, EHR, Clinical and Public
Administrative (e.g.   gf/project/pharmacys                Health Laboratories, PHR, Equipment ,     Health Laboratories,
V3 Documents-          http://wiki.hl7.org/in Yes          Clinical and Public  Pharmaceutical, EHR, Clinical and Public
Administrative (e.g.   dex.php?title=Comm                  Health Laboratories, PHR, Equipment ,        Health Laboratories,
V3 Documents-
Clinical (e.g. CDA)
V3 Documents-
Clinical (e.g. CDA)
SAIF Program, V3     http://wiki.hl7.org/ind No            Clinical and Public   , Pharmaceutical,      , Clinical and Public
Documents-Clinical ex.php?title=SAIF_Al                    Health Laboratories, EHR, PHR,               Health Laboratories,
V3 Messages-Clinical HL7 Wiki, GForge,                     Clinical and Public  EHR, PHR, Health        Clinical and Public
                       Project Insight, the                Health Laboratories   Care IT, Clinical      Health Laboratories,




V2 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=BTO_v2
V3 Messages-Clinical

V3 Documents-           http://svn.hl7.nscee.
Clinical (e.g. CDA), V3 edu/svn/hl7v3/labsig/
V3 Messages-Clinical http://wiki.hl7.org/ind
                        ex.php?title=BTO
V3 Messages-Clinical

V2 Messages-Clinical

                       http://svn.hl7.nscee.
                       edu/svn/hl7v3/labsig/


V3 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=Orders_


SAIF Program, V3       http://wiki.hl7.org/ind             Clinical and Public   Pharmaceutical, EHR, Clinical and Public
Documents-Clinical     ex.php?title=SAIF_Al                Health Laboratories, PHR, Equipment ,        Health Laboratories,
                       Project documents: Yes              Payors               Health Care IT, HIS     Healthcare
                       http://gforge.hl7.org/                                                           Institutions
Domain Analysis        Discussions:           Don't Know   Standards             EHR, PHR, Health       Healthcare
Model (DAM), V3        http://wiki.hl7.org/in              Development           Care IT, HIS           Institutions

                       http://wiki.hl7.org/in Yes          Other (specify in     Health Care IT         N/A
                       dex.php?title=Propos                Misc. Notes below)
                       http://gforge.hl7.org/
                       gf/project/patient-
V2 Messages-            http://wiki.hl7.org/ind
Administrative          ex.php?title=Appoint
V3 Messages-
Administrative
V3 Messages-
Administrative

V3 Messages-Clinical Patient Care WG on           Don't Know   Immunization          Clinical Decision      Clinical and Public
                     HL7 website                               Registries, Quality   Support Systems        Health Laboratories,
V3 Messages-Clinical Patient Care WG on           Don't Know   Immunization          Clinical Decision      Clinical and Public
                     HL7 website                               Registries, Quality   Support Systems        Health Laboratories,
V3 Messages-Clinical Patient Care WG on           Don't Know   Immunization          Clinical Decision      Clinical and Public
                     HL7 website                               Registries, Quality   Support Systems        Health Laboratories,
V3 Messages-Clinical Patient Care WG on           Don't Know   Immunization          Clinical Decision      Clinical and Public
                     HL7 website                               Registries, Quality   Support Systems        Health Laboratories,
Domain Analysis      Project materials will N/A                Quality Reporting     EHR, PHR, Health       Local and State
Model (DAM)          be kept on the HL7                        Agencies, Regulatory Care IT, Clinical       Departments of
V3 Messages-Clinical                        Yes

V2 Messages-Clinical                                                                                        Healthcare
                                                                                                            Institutions
V3 Messages-Clinical

V3 Documents-        http://wiki.hl7.org/ind Yes                                                            Healthcare
Clinical (e.g. CDA)  ex.php?title=Patient_                                                                  Institutions
V3 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=Health_
V3 Messages-Clinical http://wiki.hl7.org/in Yes                                                             Healthcare
                        dex.php?title=Patient                                                               Institutions
Domain Analysis         http://gforge.hl7.org/ N/A             Standards             EHR, PHR,              Healthcare
Model (DAM)             gf/project/dcmmd/;                     Development           Equipment              Institutions
V3 Documents-           HL7 PC Wiki page for N/A               Quality Reporting     EHR, PHR               Healthcare
Clinical (e.g. CDA), V3 discussion and work                    Agencies, Standards                          Institutions
Domain Analysis         http://wiki.hl7.org/ind
Model (DAM),            ex.php?title=Detailed
                        http://wiki.hl7.org/in
                        dex.php?title=Allergy
                        http://wiki.hl7.org/ind
                        ex.php?title=Care_C
                        http://www.hl7.org/ds
                        tucomments/showde
V3 Documents-           HL7 Wiki                N/A            Regulatory Agency     Pharmaceutical         N/A
Administrative (e.g.
V3 Documents-           HL7 Wiki                  N/A          Regulatory Agency     Pharmaceutical         N/A
Administrative (e.g.
V3 Documents-
Clinical (e.g. CDA)
Domain Analysis         http://gforge.hl7.org/
Model (DAM)             gf/project/pher/scms
V3 Messages-
Administrative
V3 Documents-           HL7 Wiki                  N/A          Standards             Pharmaceutical, EHR, Healthcare
Clinical (e.g. CDA)  HL7 Document                              Development           PHR, Health Care IT, Institutions
V3 Messages-Clinical HL7 SVN Repository, Yes                   Standards             Pharmaceutical, EHR, Healthcare
                        HL7 Wiki                               Development           PHR, Health Care IT, Institutions
                        Pharmacy section of N/A                Standards             Pharmaceutical, EHR, Healthcare
                     HL7 Wiki                                  Development           PHR, Clinical        Institutions
V3 Messages-Clinical HL7 SVN Repository, Yes                   Standards             Pharmaceutical, EHR, Healthcare
                     HL7 Wiki                                  Development           PHR, Health Care IT, Institutions
                     http://gforge.hl7.org/ No                 Standards             Pharmaceutical, EHR, Healthcare
                     gf/project/pharmacys                      Development           PHR                  Institutions
V3 Messages-Clinical HL7 Wiki                                  Standards             Pharmaceutical, EHR, Emergency Services,
                        HL7 Document                           Development           PHR, Health Care IT,   Healthcare

V3 Foundation-
Vocab Domains &
                       http://wiki.hl7.org/in
                       dex.php?title=Docu




- Non Product          All documents             N/A   Other (specify in     N/A                N/A
Project -              should be stored on             Misc. Notes below)
- Non Product          http://www.hl7.org/S N/A        Other (specify in     N/A                N/A
Project -              pecial/committees/pi            Misc. Notes below)
- Non Product
Project -
- Non Product
Project -

- Non Product
Project -
- Non Product          PS WG GForge              N/A   N/A                   N/A                N/A
Project -              Draft Docs page:
- Non Product          Project Services wiki     N/A   Other (specify in
Project -              draft documents                 Misc. Notes below)
- Non Product          Suggestions for           N/A   N/A                   N/A                N/A
Project -              Project Health




- Non Product          http://gforge.hl7.org/ N/A                                               Other (specify in
Project -              gf/project/psc/                                                          Misc. Notes below)
- Non Product
Project -
- Non Product
Project -
- Non Product
Project -
- Non Product
Project -
- Non Product
Project -
V2 Messages-           PHER Wiki:                N/A   Regulatory Agency,    EHR, PHR, Health   Local and State
Administrative, V2   http://wiki.hl7.org/in            Standards             Care IT, Other     Departments of
                     HL7 Project Insight Yes           Clinical and Public   EHR, PHR, Health   Clinical and Public
                     and the PHER Work                 Health Laboratories, Care IT, Clinical   Health Laboratories,
V2 Messages-Clinical CR page: HL7 Wiki      Yes        Clinical and Public  EHR, PHR, Lab       Clinical and Public
                     http://wiki.hl7.org/in            Health Laboratories,                     Health Laboratories,
V2 Messages-Clinical http://wiki.hl7.org/in N/A        Other (specify in    EHR, PHR            Local and State
                     dex.php?title=PHER_               Misc. Notes below)                       Departments of
V2 Messages-Clinical http://gforge.hl7.org/
                     gf/project/pher/scms
- Non Product        http://wiki.hl7.org/ind
Project -            ex.php?title=PHER_
- Non Product
Project -
V3 Documents-           http://gforge.hl7.org/
Clinical (e.g. CDA), V3 gf/project/pher/scms
Domain Analysis      http://wiki.hl7.org/ind                  Immunization          EHR, PHR, Health      Local and State
Model (DAM), V3      ex.php?title=Immuni                      Registries            Care IT               Departments of
V3 Messages-Clinical http://wiki.hl7.org/in
                       dex.php?title=Immu
V2 Messages-                                     Don't Know
Administrative, V2
V2 Messages-           Balloted Chapters         Don't Know   Clinical and Public   Pharmaceutical, EHR, Clinical and Public
Administrative, V2     that are in                            Health Laboratories, PHR, Equipment ,       Health Laboratories,




- Non Product
Project -

                       http://wiki.hl7.org/in
                       dex.php?title=Publis
V3 Messages-
Administrative
V3 Documents-          http://wiki.hl7.org/ind N/A            Regulatory Agency     Pharmaceutical,       Healthcare
Clinical (e.g. CDA)    ex.php?title=Study_                                          Equipment             Institutions
V3 Messages-Clinical

- New Product
Definition -
V3 Services-Web
Services (OMG)
Electronic Health
Record
V3 Messages-
Administrative
V3 Messages-Clinical

V3 Services-Web        https://wiki.nci.nih.go                Other (specify in     Other (specify in     Other (specify in
Services (OMG)         v/display/caEHR/caE                    Misc. Notes below)    Misc. Notes below)    Misc. Notes below)
V3 Documents-          HL7 RPS Wiki:       Yes                Regulatory Agency,    Other (specify in
Administrative (e.g. http://wiki.hl7.org/in                   Other (specify in     Misc. Notes below)
Domain Analysis      http://wiki.hl7.org/ind
Model (DAM)          ex.php?title=BRIDG_
V3 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=Clinical
V3 Documents-        http://wiki.hl7.org/in Yes               Regulatory Agency     Pharmaceutical        N/A
Administrative (e.g.   dex.php?title=Medic
                       http://wiki.hl7.org/in
                     dex.php?title=Regula
V3 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=Study_
- New Product        http://wiki.hl7.org/in
Definition -           dex.php?title=Creati
V3 Messages-           http://gforge.hl7.org/ No              Standards             EHR, PHR, Health      Clinical and Public
Infrastructure         gf/project/security/d                  Development           Care IT, Clinical     Health Laboratories,
Domain Analysis        http://gforge.hl7.org/
Model (DAM)            gf/project/security/do
SAIF Program           http://wiki.hl7.org/ind
                       ex.php?title=Cookbo
                       http://gforge.hl7.org/
                       gf/project/security/d
V3 Services-Web        http://hssp.wikispace No               N/A                   N/A                   N/A
Services (OMG)         s.com/Medication+St
V3 Services-Web        http://wiki.hl7.org/ind N/A            N/A                   N/A                   N/A
Services (OMG)         ex.php?title=HData
- Non Product          http://wiki.hl7.org/in                 Clinical and Public   Pharmaceutical,       Clinical and Public
Project -, V3 Services- dex.php?title=Service                 Health Laboratories, Health Care IT         Health Laboratories,
                        The document
                        repository will be in
V2 Messages-            http://hssp-
Infrastructure, V3      security.wikispaces.c
V3 Documents-         HL7 Wiki                   N/A          Quality Reporting      EHR, PHR, Health      Local and State
Clinical (e.g. CDA)                                           Agencies, Standards Care IT, Clinical    Departments of
Domain Analysis       Draft material will be N/A              Quality Reporting   Pharmaceutical, EHR, Local and State
Model (DAM), V3       circulated via list                     Agencies, Regulatory PHR, Health Care IT,    Departments of
- Non Product         Tools and support          N/A          N/A                  N/A                     N/A
Project -             documentation will
V3 Documents-         www.cdatools.org;          Don't Know   Clinical and Public    EHR, PHR, Health      Clinical and Public
Clinical (e.g. CDA)  http://wiki.hl7.org/in                   Health Laboratories, Care IT, Clinical       Health Laboratories,
V3 Messages-Clinical http://wiki.hl7.org/ind N/A              Standards            EHR, PHR, Health        Healthcare
                     ex.php?title=Self_Dis                    Development            Care IT               Institutions
V3 Documents-        http://wiki.hl7.org/ind N/A                                     Other (specify in
Clinical (e.g. CDA)  ex.php?title=Structur                                           Misc. Notes below)
V3 Documents-        http://wiki.hl7.org/ind
Clinical (e.g. CDA)  ex.php?title=Health_
V3 Documents-        http://wiki.hl7.org/ind
Clinical (e.g. CDA)  ex.php?title=Health_
V3 Documents-        http://wiki.hl7.org/in
Clinical (e.g. CDA)   dex.php?title=Neona
V3 Documents-         http://wiki.hl7.org/ind
Clinical (e.g. CDA)   ex.php?title=Health_
V3 Documents-         http://wiki.hl7.org/in
Knowledge             dex.php?title=HQMF;
- Non Product         http://wiki.hl7.org/in
Project -             dex.php?title=Struct
SAIF Program, V3      http://wiki.hl7.org/ind
Documents-Clinical    ex.php?title=Categor
V3 Documents-
Clinical (e.g. CDA)
V3 Documents-         http://wiki.hl7.org/ind Yes             Quality Reporting      Health Care IT        Healthcare
Clinical (e.g. CDA)   ex.php?title=Healthc                    Agencies, Regulatory                         Institutions
                      http://wiki.hl7.org/in
                      dex.php?title=Qualit
V3 Documents-
Clinical (e.g. CDA)
V3 Documents-         http://wiki.hl7.org/ind
Clinical (e.g. CDA)   ex.php?title=Structur
V3 Documents-         http://wiki.hl7.org/ind
Clinical (e.g. CDA)   ex.php?title=CDA_R
- Non Product         http://wiki.hl7.org/ind    N/A          N/A                    N/A                   N/A
Project -             ex.php?title=SAIF_A
- Non Product         http://hl7tsc.org/wiki/i   N/A
Project -             ndex.php?title=Strat
SAIF Program          http://gforge.hl7.org/     N/A          N/A                    N/A                   Other (specify in
                      gf/project/psc/                                                                      Misc. Notes below)
SAIF Program          http://wiki.hl7.org/ind    N/A          Standards              N/A                   N/A
                      ex.php?title=Categor                    Development
SAIF Program          Add link to wiki:          N/A
                      SAIF AP list server:
- Non Product         http://gforge.hl7.org/ N/A              Standards
Project -             gf/project/tsc/                         Development
SAIF Program          http://hl7t3f.org/wiki N/A              Other (specify in      Other (specify in     Other (specify in
                      /index.php?title=Mai                    Misc. Notes below)     Misc. Notes below)    Misc. Notes below)
- Non Product
Project -
- Non Product         http://wiki.hl7.org/ind
Project -             ex.php?title=Product
- New Product         http://wiki.hl7.org/ind N/A             Immunization           Clinical Decision     Local and State
Definition -          ex.php?title=Templat                    Registries, Quality    Support Systems       Departments of
- Non Product         http://gforge.hl7.org/
Project -             gf/project/templatesr
                      gForge                Don't Know

Electronic Health     http://wiki.hl7.org/ind    No           Clinical and Public    Pharmaceutical, EHR, Clinical and Public
Record                ex.php?title-                           Health Laboratories, PHR, Equipment ,        Health Laboratories,
- Non Product         The discussion page        Don't Know   N/A                  N/A                     N/A
Project -             will be:
- Non Product         http://wiki.hl7.org/ind    N/A          Other (specify in                            Healthcare
Project -             ex.php?title=Tooling                    Misc. Notes below)                           Institutions
- Non Product         http://wiki.hl7.org/ind    N/A          Other (specify in                            Healthcare
Project -             ex.php?title=Update                     Misc. Notes below)                           Institutions
- Non Product          http://wiki.hl7.org/ind N/A           Other (specify in                         Healthcare
Project -              ex.php?title=HL7_-                    Misc. Notes below)                        Institutions
- Non Product          TBD, Presence to be N/A               Other (specify in     N/A                 N/A
Project -              specified by tooling                  Misc. Notes below)
- Non Product          HL7 Tooling WG wiki N/A               N/A                   N/A                 N/A
Project -              will be the source of
- Non Product          http://www.hl7.org/v Don't Know       N/A                   N/A                 N/A
Project -              3preview/html/welco
V3 Services-Web        http://wiki.hl7.org/ind No            Clinical and Public   EHR, PHR, Health    Clinical and Public
Services (OMG)         ex.php?title=Commo                    Health Laboratories, Care IT              Health Laboratories,
- Non Product                                  N/A           Clinical and Public  Pharmaceutical, EHR, Clinical and Public
Project -                                                    Health Laboratories, PHR, Equipment ,     Health Laboratories,
V2 Messages-            http://wiki.hl7.org/ind Don't Know   Regulatory Agency, Health Care IT         Local and State
Infrastructure, V3      ex.php?title=Vocabul                 Standards                                 Departments of
- Non Product           http://gforge.hl7.org/ N/A           Standards             N/A                 N/A
Project -               gf/project/ihtsdo-                   Development
V3 Documents-           http://wiki.hl7.org/ind N/A          Standards             N/A                 N/A
Knowledge               ex.php?title=HL7_pr                  Development
- Non Product
Project -
V3 Foundation-
Vocab Domains &
V3 Foundation-          http://wiki.hl7.org/ind              Regulatory Agency,    , Health Care IT    , Local and State
Vocab Domains &         ex.php?title=Vocabul                 Standards                                 Departments of
- Non Product
Project -
- Non Product                                                Regulatory Agency,    Health Care IT      Local and State
Project -                                                    Standards                                 Departments of
V3 Documents-
Clinical (e.g. CDA), V3
V3 Foundation-          http://wiki.hl7.org/in
Vocab Domains &        dex.php?title=CTS2;
SDO/Profilers         Realm                 HL7 Affiliate         Roadmap Reference                             Start Date

                      - Choose One -                                                                                     5/14/2007 8:00

                        Notes below)
Other (specify in Misc. Universal                                 A. Lead the development of global                      2/11/2011 8:00
                                                                  technical and functional health informatics
                      Universal                                                                                          6/23/2010 8:00

                      - Choose One -                                                                                         4/1/2011 8:00

N/A                   Universal                                   C. Facilitate HL7 standards adoption and               1/21/2011 8:00
                                                                  implementation.
                      Universal                                   C. Facilitate HL7 standards adoption and               1/21/2011 8:00
                                                                 implementation.
                                             "U.S."              Affiliate below
                      Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                           9/8/2011 8:00
                                                                  technical and functional health informatics
                      - Choose One -                                                                                     5/29/2007 8:00

                      - Choose One -                                                                                         4/1/2002 8:00

                      - Choose One -                                                                                     1/25/2001 8:00

                      - Choose One -                                                                                         1/3/2005 8:00

                      - Choose One -                                                                                     1/28/2008 8:00

                      - Choose One -                                                                                     9/25/2006 8:00

N/A                   - Choose One -                              G. None of the above                                   11/4/2011 8:00

N/A                   - Choose One -                              G. None of the above                                  11/28/2011 8:00

                      - Choose One -                                                                                     9/21/2011 8:00

                      - Choose One -                                                                                         7/1/2011 8:00

N/A                   Universal                                   G. None of the above                                       9/1/2011 8:00

N/A                   Universal                                                                                          3/14/2011 8:00

                      - Choose One -                                                                                     10/1/2007 8:00

N/A                   Universal                                   A. Lead the development of global                      3/29/2011 8:00
                                                                  technical and functional health informatics
                      - Choose One -                                                                                    11/29/2010 8:00

                      - Choose One -                                                                                    10/16/2009 8:00

N/A                   Universal                                   C. Facilitate HL7 standards adoption and                   6/6/2011 8:00
                                                                  implementation.
                      - Choose One -                                                                                     1/28/2010 8:00

                        Notes below)
Other (specify in Misc. Universal                                 A. Lead the development of global                      2/25/2011 8:00
                                                                  technical and functional health informatics
                      - Choose One -                                                                                     5/18/2009 8:00

                      Universal                                                                                          5/15/2008 8:00

                      - Choose One -                                                                                     9/18/2000 8:00

                      Universal                                   A. Lead the development of global                      5/14/2007 8:00
                                                                  technical and functional health informatics
                      - Choose One -                                                                                     9/25/2006 8:00

N/A                   Universal                                   A. Lead the development of global                     12/23/2011 8:00
                                                                 technical and functional health informatics
N/A                                          "U.S."              Affiliate below
                      Realm Specific - Enter U.S. or name of HL7 C. Facilitate HL7 standards adoption and                10/5/2010 8:00
                                                                  implementation.
                      Universal                                   D. Define an overarching and internally               10/18/2010 8:00
                                                                  consistent interoperability framework., E.
                      Universal             U.S.                   A. Lead the development of global              6/30/2010 8:00
                                                                 technical and functional health informatics
                                             "U.S."              Affiliate below
                      Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                 6/2/2010 6:30
                                                                 technical and functional health informatics
                                             "U.S."              Affiliate below
                      Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                4/27/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                              9/28/2009 8:00

                      - Choose One -                                                                              9/28/2009 8:00

                      - Choose One -                                                                              3/30/2009 8:00

                      - Choose One -                                                                              1/22/2009 8:00

                                             "U.S."
                      Realm Specific - Enter USA or name of HL7 Affiliate below                                    7/1/2008 8:00

                        Notes below)           "U.S."              Affiliate below
Other (specify in Misc. Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global             12/20/2011 8:00
                                                                   technical and functional health informatics
                       Universal
IHE, Other (specify in Misc. Notes below)                          A. Lead the development of global              9/22/2011 8:00
                                                                 technical and functional health informatics
                                             "U.S."              Affiliate below
                      Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                5/27/2011 8:00
                                                                   technical and functional health informatics
                      Universal                                    A. Lead the development of global              12/7/2010 8:00
                                                                   technical and functional health informatics
                                             "U.S." or name of HL7 A. Lead the development of global
                      Realm Specific - Enter US                    Affiliate below                                6/14/2010 8:00
                                                                   technical and functional health informatics
                      Universal                                    A. Lead the development of global              6/14/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                              6/15/2009 8:00

                      Universal                                                                                    9/8/2008 8:00

                      - Choose One -                                                                               8/1/2008 8:00

                      Universal                                                                                   1/30/2004 8:00

ISO, IHE              Universal                                    C. Facilitate HL7 standards adoption and       8/12/2011 8:00
                                                                   implementation., D. Define an overarching
                      Universal                                    A. Lead the development of global             11/15/2010 8:00
                                                                   technical and functional health informatics
                      Universal                                    A. Lead the development of global              3/23/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                             10/16/2009 8:00

                      - Choose One -                                                                              9/25/2009 8:00

                      - Choose One -                                                                               9/8/2008 8:00

                      Universal                                    B. Streamline the HL7 standards                5/15/2010 8:00
                                                                   development process.
                      - Choose One -                                                                              2/10/2010 8:00

                      - Choose One -                                                                               4/2/2007 8:00

N/A                   Universal                                    C. Facilitate HL7 standards adoption and       1/26/2011 8:00
                                                                   implementation.
N/A                   Universal                                    C. Facilitate HL7 standards adoption and       1/26/2011 8:00
                                                                   implementation.
N/A                   - Choose One -                               G. None of the above                           1/26/2011 8:00

                      Universal                                    C. Facilitate HL7 standards adoption and      10/28/2010 8:00
                                                                   implementation.
                      - Choose One -                                                                              9/28/2009 8:00

                      - Choose One -                                                                              9/17/2009 8:00

                      - Choose One -                                                                              9/17/2009 8:00

                      - Choose One -                                                                              9/17/2009 8:00
             - Choose One -                                                                              9/17/2009 8:00

N/A                                 "U.S."              Affiliate below
             Realm Specific - Enter U.S. or name of HL7 C. Facilitate HL7 standards adoption and        10/28/2011 8:00
                                                        implementation., D. Define an overarching
DICOM, IHE                          "U.S."              Affiliate below
             Realm Specific - Enter U.S. or name of HL7 C. Facilitate HL7 standards adoption and         9/27/2011 8:00
                                                          implementation., F. Align HL7's business
             Universal                                    C. Facilitate HL7 standards adoption and        2/3/2011 8:00
                                                          implementation., D. Define an overarching
             Universal                                    C. Facilitate HL7 standards adoption and      10/18/2010 8:00
                                                        implementation.
                                    "U.S."              Affiliate below
             Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global               10/18/2010 8:00
                                                        technical and functional health informatics
                                    "U.S."              Affiliate below
             Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                7/16/2010 8:00
                                                        technical and functional health informatics
                                    "U.S."              Affiliate below
             Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                7/16/2010 8:00
                                                          technical and functional health informatics
             Universal                                                                                   6/23/2010 8:00

             Universal                                    A. Lead the development of global              3/16/2010 8:00
                                                        technical and functional health informatics
                                    "U.S."              Affiliate below
             Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                3/23/2010 8:00
                                                       technical and functional health informatics
                                    "U.S."
             Realm Specific - Enter USA or name of HL7 Affiliate below                                  12/23/2009 8:00

             - Choose One -                                                                             12/22/2009 8:00

             Universal                                    A. Lead the development of global              2/10/2011 8:00
                                                          technical and functional health informatics
                                    "U.S." or Netherlands
             Realm Specific - Enter USA, Thename of HL7 Affiliate below                                   4/1/2009 8:00

             Universal                                                                                   5/22/2006 8:00

                                    "U.S."
             Realm Specific - Enter USA or name of HL7 Affiliate below                                   1/28/2008 8:00

             - Choose One -                                                                              5/14/2007 8:00

             Universal                                                                                   5/14/2007 8:00

N/A          Universal                                    B. Streamline the HL7 standards                6/28/2011 8:00
                                                          development process.
N/A          Universal                                                                                   9/17/2012 8:00

             Universal                                                                                   5/15/2012 8:00

             - Choose One -                               G. None of the above                            6/4/2012 8:00

             Universal                                    G. None of the above                           10/3/2011 8:00

N/A          Universal                                    G. None of the above                            6/1/2011 8:00

             Universal                                    G. None of the above                           9/22/2008 8:00

N/A          - Choose One -                               A. Lead the development of global              9/29/2011 8:00
                                                        technical and functional health informatics
                                    "U.S."              Affiliate below
             Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                 7/1/2010 8:00
                                                          technical and functional health informatics
             - Choose One -                                                                             10/16/2009 8:00

                                    "U.S."
             Realm Specific - Enter USA or name of HL7 Affiliate below                                    9/8/2008 8:00

ISO          Universal                                    C. Facilitate HL7 standards adoption and      8/12/2011 11:00
                                                          implementation., D. Define an overarching
N/A          Universal                                    C. Facilitate HL7 standards adoption and       5/31/2011 8:00
                                                          implementation.
N/A          Universal                                    C. Facilitate HL7 standards adoption and       5/31/2011 8:00
                                                          implementation.
             - Choose One -                                                                              5/27/2011 8:00

             - Choose One -                                                                               9/8/2008 8:00
                      Universal                                                                                  9/8/2008 8:00

N/A                   Universal                                  C. Facilitate HL7 standards adoption and       1/10/2011 8:00
                                                                 implementation.
                      - Choose One -                                                                            9/14/2010 8:00

                      - Choose One -                                                                            6/30/2009 8:00

                                             "U.S."
                      Realm Specific - Enter USA or name of HL7 Affiliate below                                 12/4/2008 8:00

                      - Choose One -                                                                             6/1/2010 8:00

DICOM, IHE            Universal                                  A. Lead the development of global             10/14/2011 8:00
                                                                 technical and functional health informatics
                      - Choose One -                                                                            6/15/2011 8:00

                      - Choose One -                                                                            6/15/2011 8:00

                      - Choose One -                                                                            6/15/2011 8:00

                      - Choose One -                                                                            9/14/2009 8:00

                      - Choose One -                                                                           10/19/2011 8:00

N/A                   Universal                                  A. Lead the development of global             10/28/2011 8:00
                                                                 technical and functional health informatics
                      - Choose One -                                                                           10/19/2011 8:00

                      - Choose One -                                                                           10/19/2011 8:00

N/A                   Universal                                  C. Facilitate HL7 standards adoption and       2/28/2011 8:00
                                                                 implementation.
N/A                   Universal                                  C. Facilitate HL7 standards adoption and       2/28/2011 8:00
                                                                 implementation.
                      Universal                                  C. Facilitate HL7 standards adoption and       6/14/2010 8:00
                                                                 implementation.
                      Universal                                  A. Lead the development of global               2/2/2010 8:00
                                                                 technical and functional health informatics
                      - Choose One -                                                                            3/30/2009 8:00

                      - Choose One -                                                                            5/14/2007 8:00

                      - Choose One -                                                                            1/29/2007 8:00

                      - Choose One -                                                                            5/23/2005 8:00

                        Notes below)
Other (specify in Misc. Universal                                A. Lead the development of global              5/18/2011 8:00
                                                                 technical and functional health informatics
                      Universal                                  A. Lead the development of global              1/20/2010 8:00
                                                                 technical and functional health informatics
                      - Choose One -                                                                           12/11/2009 8:00

                      - Choose One -                                                                             2/2/2009 8:00

                      - Choose One -                                                                            12/8/2009 8:00

N/A                   Universal                                  A. Lead the development of global              9/22/2011 8:00
                                                                 technical and functional health informatics
N/A                   Universal                                  B. Streamline the HL7 standards                 3/4/2011 8:00
                                                                 development process., C. Facilitate HL7
                      - Choose One -                                                                            5/17/2010 8:00

                      Universal                                  B. Streamline the HL7 standards                11/2/2010 8:00
                                                                 development process.
                      - Choose One -                                                                           10/16/2009 8:00

                      Universal                                                                                 1/23/2009 8:00

                      - Choose One -                                                                             9/8/2008 8:00
                      - Choose One -                                                                              1/25/2005 8:00

                      - Choose One -                                                                              1/28/2008 8:00

                      - Choose One -                                                                              1/28/2008 8:00

                                             "U.S."              Affiliate below
                      Realm Specific - Enter U.S. or name of HL7 C. Facilitate HL7 standards adoption and        10/21/2011 8:00
                                                                   implementation.
IHE                   Universal                                    B. Streamline the HL7 standards                 8/9/2011 8:00
                                                                   development process., D. Define an
                        Notes below)
Other (specify in Misc. Universal                                  A. Lead the development of global              6/28/2011 8:00
                                                                   technical and functional health informatics
                        Notes below)           "U.S."              Affiliate below
Other (specify in Misc. Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global              6/28/2011 8:00
                                                                   technical and functional health informatics
                      Universal                                    A. Lead the development of global               2/3/2011 8:00
                                                                   technical and functional health informatics
                      Universal                                    A. Lead the development of global              6/14/2010 8:00
                                                                   technical and functional health informatics
                      Universal                                    A. Lead the development of global              1/18/2010 8:00
                                                                   technical and functional health informatics
                      Universal                                    A. Lead the development of global              1/19/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                              1/18/2010 8:00

                      Universal                                                                                   1/18/2010 8:00

IHE                   Universal                                    A. Lead the development of global               8/9/2011 8:00
                                                                   technical and functional health informatics
                      Universal                                    A. Lead the development of global              5/17/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                              11/2/2009 8:00

                      - Choose One -                                                                              11/2/2009 8:00

                      - Choose One -                                                                              11/2/2009 8:00

                      - Choose One -                                                                              11/2/2009 8:00

                      - Choose One -                                                                              8/19/2009 8:00

                      Universal                                                                                  11/13/2008 8:00

                      - Choose One -                                                                               9/8/2008 9:00

                      - Choose One -                                                                              1/24/2007 8:00

                      Universal                                                                                   5/22/2006 8:00

                                             "U.S."
                      Realm Specific - Enter USA or name of HL7 Affiliate below                                   11/5/2007 8:00

                      - Choose One -                                                                              9/25/2006 8:00

                      Universal                                                                                   9/25/2006 8:00

                      - Choose One -                                                                              9/25/2006 8:00

                      Universal                                                                                   9/25/2006 8:00

IHE                   Universal                                    A. Lead the development of global               8/9/2011 8:00
                                                                   technical and functional health informatics
N/A                   Universal                                    A. Lead the development of global              1/24/2011 8:00
                                                                   technical and functional health informatics
                      Universal                                    D. Define an overarching and internally        12/6/2010 8:00
                                                                   consistent interoperability framework.
                      - Choose One -                                                                              3/22/2010 8:00

                      Universal                                    A. Lead the development of global              1/21/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                             10/16/2009 8:00
      - Choose One -                                                                                1/15/2009 8:00

      - Choose One -                                                                                9/17/2008 8:00

      - Choose One -                                                                                9/28/2008 8:00

      - Choose One -                                                                                5/20/2004 8:00

IHE   Universal                                   A. Lead the development of global                 9/22/2011 8:00
                                                  technical and functional health informatics
IHE   Universal                                   A. Lead the development of global                 9/22/2011 8:00
                                                  technical and functional health informatics
IHE   Universal                                   A. Lead the development of global                 9/22/2011 8:00
                                                  technical and functional health informatics
IHE   Universal                                   A. Lead the development of global                 9/22/2011 8:00
                                                 technical and functional health informatics
                             "U.S."              Affiliate below
      Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                  2/10/2011 8:00
                                                  technical and functional health informatics
      - Choose One -                                                                                 6/8/2010 8:00

      - Choose One -                                                                                 6/3/2010 8:00

      Universal                                   A. Lead the development of global                  6/1/2010 8:00
                                                  technical and functional health informatics
      Universal                                   A. Lead the development of global                  6/1/2010 8:00
                                                  technical and functional health informatics
      - Choose One -                                                                                5/17/2010 8:00

      Universal                                   A. Lead the development of global                 4/30/2010 8:00
                                                  technical and functional health informatics
      Universal                                   G. None of the above                              4/13/2010 8:00

      Universal                                   A. Lead the development of global                 3/23/2010 8:00
                                                technical and functional health informatics
      - Choose One -        HL7 Netherlands and HL7 UK                                              5/20/2008 8:00

      - Choose One -                                                                                5/14/2007 8:00

      Universal                                                                                     9/25/2006 8:00

      - Choose One -                                                                                9/25/2006 8:00

      Universal                                   G. None of the above                             10/10/2010 8:00

      Universal                                   G. None of the above                             10/10/2010 8:00

      - Choose One -                                                                                1/28/2010 8:00

                             "U.S."
      Realm Specific - Enter USA or name of HL7 Affiliate below                                     5/18/2009 8:00

                             "U.S." or name of HL7 Affiliate below                                    9/8/2008 8:00
      Realm Specific - Enter ISO,CEN Normative Standard for Regulatory Reporting of Human Pharmaceuticals

N/A   Universal                                   A. Lead the development of global                11/21/2011 8:00
                                                  technical and functional health informatics
      Universal                                   A. Lead the development of global                 9/23/2011 8:00
                                                  technical and functional health informatics
      Universal                                   C. Facilitate HL7 standards adoption and          9/22/2011 8:00
                                                  implementation.
N/A   Universal                                   A. Lead the development of global                 9/23/2011 8:00
                                                  technical and functional health informatics
      Universal                                   A. Lead the development of global                 1/21/2010 8:00
                                                  technical and functional health informatics
N/A   - Choose One -                              A. Lead the development of global                 9/26/2011 8:00
                                                  technical and functional health informatics
      - Choose One -                                                                                9/28/2009 8:00

      - Choose One -                                                                                5/21/2009 8:00

      - Choose One -                                                                                9/25/2006 8:00
      - Choose One -                                                                             9/25/2006 8:00

      - Choose One -                                                                             9/25/2006 8:00

      - Choose One -                                                                             9/25/2006 8:00

      - Choose One -                                                                             9/25/2006 8:00

      - Choose One -                                                                             9/25/2006 8:00

      - Choose One -                                                                             9/25/2006 8:00

      - Choose One -                                                                             9/25/2006 8:00

      - Choose One -                                                                             5/14/2007 8:00

N/A   Universal                                   A. Lead the development of global              6/28/2011 8:00
                                                  technical and functional health informatics
      Universal                                   C. Facilitate HL7 standards adoption and        3/5/2010 8:00
                                                  implementation.
      - Choose One -                                                                            11/13/2009 8:00

      - Choose One -                                                                            11/13/2009 8:00

      - Choose One -                                                                            11/13/2009 8:00

      - Choose One -                                                                            11/13/2009 8:00

N/A   Universal                                   B. Streamline the HL7 standards               11/28/2011 8:00
                                                  development process.
N/A   Universal                                   E. Ensure broad and encompassing               9/26/2011 8:00
                                                  stakeholder engagement in the standards
N/A   Universal                                   C. Facilitate HL7 standards adoption and       3/11/2011 8:00
                                                  implementation., E. Ensure broad and
      - Choose One -                                                                             2/14/2011 8:00

      - Choose One -                              G. None of the above                           2/14/2011 8:00

      - Choose One -                                                                              2/4/2011 8:00

      - Choose One -                                                                              2/4/2011 8:00

      Universal                                   B. Streamline the HL7 standards                6/11/2010 8:00
                                                  development process.
      - Choose One -                                                                             9/11/2009 8:00

      - Choose One -                                                                             9/11/2009 8:00

      - Choose One -                                                                             9/11/2009 8:00

      - Choose One -                                                                             9/11/2009 8:00

      - Choose One -                                                                             9/11/2009 8:00

IHE                          "U.S."              Affiliate below
      Realm Specific - Enter U.S. or name of HL7 C. Facilitate HL7 standards adoption and        9/22/2011 8:00
                                                  implementation., E. Ensure broad and
IHE   Universal                                   A. Lead the development of global               6/6/2011 8:00
                                                 technical and functional health informatics
                             "U.S."              Affiliate below
      Realm Specific - Enter U.S. or name of HL7 C. Facilitate HL7 standards adoption and        1/25/2011 8:00
                                                 implementation., E. Ensure broad and
                             "U.S."              Affiliate below
      Realm Specific - Enter U.S. or name of HL7 C. Facilitate HL7 standards adoption and        1/21/2011 8:00
                                                  implementation., E. Ensure broad and
      - Choose One -                                                                              1/9/2009 8:00

      - Choose One -                                                                             1/26/2009 8:00

      - Choose One -                                                                             1/23/2009 8:00

      - Choose One -                                                                             9/23/2008 9:00
                      Universal                                    A. Lead the development of global              12/1/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                               9/1/2006 8:00

                      - Choose One -                                                                              5/19/2011 8:00

N/A                   Universal                                    A. Lead the development of global               1/1/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                              2/26/2010 8:00

                      - Choose One -                                                                              2/26/2010 8:00

                      - Choose One -                                                                              2/26/2010 8:00

                      - Choose One -                                                                              2/26/2010 8:00

                      - Choose One -                                                                              2/26/2010 8:00

                      - Choose One -                                                                              10/8/2010 8:00

                      Universal                                                                                  11/18/2011 8:00

                        Notes below)                                 Affiliate below
Other (specify in Misc. Realm Specific - Enter "U.S." or name of HL7 A. Lead the development of global           10/14/2011 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                             11/10/2010 8:00

                      - Choose One -                                                                              10/3/2011 8:00

                      - Choose One -                                                                               2/1/2011 8:00

                      - Choose One -                                                                               2/1/2011 8:00

                      - Choose One -                                                                               8/1/2012 8:00

                      - Choose One -                                                                               2/1/2012 8:00

                      - Choose One -                               A. Lead the development of global              9/11/2009 8:00
                                                                   technical and functional health informatics
N/A                   Universal                                    G. None of the above                           9/11/2009 8:00

                      - Choose One -                                                                              9/11/2009 8:00

                      - Choose One -                                                                               9/8/2008 8:00

                      - Choose One -                               A. Lead the development of global              2/23/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                              1/30/2008 8:00

                      - Choose One -                                                                              9/24/2007 8:00

                      - Choose One -                                                                              9/23/2009 8:00

                      Universal                                    A. Lead the development of global              3/15/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                              9/21/2009 8:00

                      - Choose One -                                                                              1/28/2008 8:00

                      - Choose One -                                                                              1/29/2008 8:00

N/A                   Universal                                    A. Lead the development of global             11/29/2011 8:00
                                                                   technical and functional health informatics
N/A                   Universal                                    A. Lead the development of global               6/6/2011 8:00
                                                                   technical and functional health informatics
                      Universal                                    C. Facilitate HL7 standards adoption and       3/23/2010 8:00
                                                                   implementation.
                      - Choose One -                                                                              5/30/2005 8:00

                      - Choose One -                                                                              5/14/2007 8:00
N/A                   - Choose One -                               A. Lead the development of global              7/22/2011 8:00
                                                                   technical and functional health informatics
                        Notes below)           "U.S."              Affiliate below
Other (specify in Misc. Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global              2/24/2011 8:00
                                                                   technical and functional health informatics
                      Universal                                    B. Streamline the HL7 standards               12/28/2010 8:00
                                                                 development process.
IHE                                          "U.S."              Affiliate below
                      Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global               12/13/2010 8:00
                                                                   technical and functional health informatics
                      Universal                                    C. Facilitate HL7 standards adoption and       11/3/2010 8:00
                                                                 implementation.
                                             "U.S."              Affiliate below
                      Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                6/14/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                              10/1/2009 8:00

                      - Choose One -                                                                              10/1/2009 8:00

                                             "U.S."
                      Realm Specific - Enter USA or name of HL7 Affiliate below                                   10/1/2009 8:00

                                             "U.S."
                      Realm Specific - Enter USA or name of HL7 Affiliate below                                   5/18/2009 8:00

                      - Choose One -                                                                               6/4/2009 8:00

                      - Choose One -                                                                               4/2/2009 8:00

                      - Choose One -                                                                              2/26/2009 8:00

                      Universal                                                                                    9/8/2008 8:00

N/A                                          "U.S."             Affiliate below
                      Realm Specific - Enter USA or name of HL7 C. Facilitate HL7 standards adoption and          5/15/2008 9:00
                                                                   implementation.
                      - Choose One -                                                                              1/28/2008 8:00

                      Universal                                                                                   1/28/2008 8:00

                      - Choose One -                                                                              5/14/2007 8:00

                      - Choose One -                                                                              9/25/2006 8:00

                      - Choose One -                               B. Streamline the HL7 standards               10/21/2011 8:00
                                                                   development process., D. Define an
                      Universal                                    A. Lead the development of global              8/12/2011 8:00
                                                                   technical and functional health informatics
N/A                   Universal                                    B. Streamline the HL7 standards                 3/7/2011 8:00
                                                                   development process.
                        Notes below)
Other (specify in Misc. Universal                                  A. Lead the development of global               3/7/2011 8:00
                                                                   technical and functional health informatics
N/A                   Universal                                    A. Lead the development of global              2/21/2011 8:00
                                                                   technical and functional health informatics
N/A                   Universal                                    A. Lead the development of global              2/14/2011 8:00
                                                                   technical and functional health informatics
                      Universal                                    A. Lead the development of global              7/27/2010 8:00
                                                                   technical and functional health informatics
                      - Choose One -                               G. None of the above                           2/16/2010 8:00

                      - Choose One -                               A. Lead the development of global              3/23/2009 8:00
                                                                   technical and functional health informatics
N/A                   Universal                                    A. Lead the development of global             10/25/2011 8:00
                                                                   technical and functional health informatics
                      - Choose One -                                                                             12/23/2009 8:00

IHE                   Universal                                    B. Streamline the HL7 standards                1/30/2006 8:00
                                                                   development process., C. Facilitate HL7
                      Universal                                    A. Lead the development of global             11/10/2011 9:00
                                                                   technical and functional health informatics
                      Universal                                    B. Streamline the HL7 standards                9/16/2011 8:00
                                                                   development process.
                      Universal                                    A. Lead the development of global              9/16/2011 8:00
                                                                   technical and functional health informatics
                      Universal                                    A. Lead the development of global              9/16/2011 8:00
                                                                   technical and functional health informatics
                      Universal        A. Lead the development of global              9/16/2011 8:00
                                       technical and functional health informatics
                      - Choose One -   B. Streamline the HL7 standards                 2/8/2011 8:00
                                       development process., C. Facilitate HL7
                      Universal        B. Streamline the HL7 standards                6/25/2010 8:00
                                       development process.
                      Universal        A. Lead the development of global               5/7/2010 8:00
                                       technical and functional health informatics
                      Universal        D. Define an overarching and internally       12/13/2011 8:00
                                       consistent interoperability framework.
                        Notes below)
Other (specify in Misc. Universal      B. Streamline the HL7 standards                 9/9/2011 8:00
                                       development process., C. Facilitate HL7
                        Notes below)
Other (specify in Misc. Universal      C. Facilitate HL7 standards adoption and        2/8/2011 8:00
                                       implementation.
                      Universal        A. Lead the development of global              3/12/2010 8:00
                                       technical and functional health informatics
                      Universal        A. Lead the development of global              2/24/2010 8:00
                                       technical and functional health informatics
                      - Choose One -                                                  1/13/2012 8:00

                      Universal                                                       5/18/2009 8:00

                        Notes below)
Other (specify in Misc. Universal      C. Facilitate HL7 standards adoption and       5/11/2009 8:00
                                       implementation.
                      - Choose One -                                                  5/18/2009 8:00

                      Universal        B. Streamline the HL7 standards                5/11/2009 8:00
                                       development process., C. Facilitate HL7
                      - Choose One -                                                  1/15/2005 8:00

                      - Choose One -                                                   6/2/2008 8:00

                      - Choose One -                                                   4/8/2008 8:00
Next Milestone MM/DD/YYYY

        7/29/2007

        1/15/2012

        9/15/2010

        9/15/2011

        1/15/2012

        9/15/2011

        1/15/2012

        4/30/2007

       11/30/2005

       12/31/2005

       12/31/2005

        5/15/2008




        1/15/2012

        1/15/2012

       12/31/2011

       12/15/2011




        9/15/2011

        1/15/2011

        1/15/2011

        9/15/2012

        9/15/2010

        9/15/2012

        3/24/2013

        9/30/2008

        5/15/2011

        5/15/2012

        1/15/2010

        1/15/2012

        9/15/2012

        9/15/2011
9/15/2011

1/15/2012

1/15/2012

9/15/2010

9/15/2010

9/15/2011

5/15/2012

9/15/2010

5/15/2012

1/15/2013

1/15/2011

1/15/2012

1/15/2011

1/15/2012

9/15/2011

9/15/2010

1/15/2010

12/7/2011

1/15/2012

9/15/2011

9/15/2010

1/15/2011

 7/6/2012

 2/4/2012

9/15/2010

1/15/2011

5/15/2010

9/15/2011

5/15/2011

5/15/2011

9/15/2011

1/15/2012

1/15/2012

1/15/2012

9/15/2011
1/15/2012

1/15/2012

1/15/2012

1/15/2012

5/15/2011

9/15/2011

9/15/2011

1/15/2011

9/15/2011

1/15/2011

9/15/2010

5/15/2010

9/15/2010

9/15/2011

5/15/2010

5/15/2009

9/15/2011

9/30/2010

9/15/2010

7/31/2011

9/15/2012

5/15/2012

1/15/2012

9/15/2011

9/15/2011

5/15/2011

1/15/2012

9/15/2011



9/15/2010

1/15/2012

9/15/2011

9/15/2011

9/15/2011

9/15/2010
1/15/2012

1/15/2012

9/15/2010

9/15/2010

9/15/2011

9/15/2011

5/15/2012

9/15/2011

9/15/2011

1/15/2012



5/15/2012

1/15/2012

1/15/2012

1/15/2012

1/15/2012

1/15/2012

1/15/2012

1/15/2011

1/15/2011

5/15/2011

9/15/2010

1/15/2012

9/15/2011

5/15/2011

9/15/2010

1/15/2011



1/15/2012

1/15/2012

5/15/2011

5/15/2011

9/15/2012

1/15/2010

9/15/2012
 9/14/2009

12/31/2008

 9/15/2011

 5/15/2012

 5/15/2012

 5/15/2012

 5/15/2012

 1/15/2012

 9/15/2014

 1/15/2012

 1/15/2012

 1/15/2012

 1/15/2013

 5/15/2012

 1/15/2012

 9/15/2010

 1/15/2013

 1/15/2013

 1/15/2014

 1/15/2012

 9/15/2012

 9/15/2010

 9/15/2010

 9/15/2011

 1/15/2011

 9/15/2010

 1/15/2011

 1/15/2011

 1/15/2012

 5/15/2012

 1/15/2012

 1/15/2012

 9/15/2011

 9/15/2011

 9/15/2010
9/15/2013

9/15/2011

9/15/2011

9/15/2011

1/15/2012

9/15/2012

1/15/2012

1/15/2012

9/15/2011

9/15/2010

9/15/2010

1/15/2011

9/15/2011

9/15/2011

9/15/2011

9/15/2011

9/15/2011

9/15/2011

 6/9/2012

5/23/2011

5/23/2011

1/15/2013

1/15/2013

1/15/2013



2/28/2012

1/15/2012

1/15/2012

1/15/2012

1/15/2012

5/15/2010

1/15/2012

1/15/2010

1/15/2012

5/15/2011
5/15/2012

1/15/2012

1/15/2012

 4/1/2012



1/15/2012

1/15/2012

1/15/2012

8/31/2011

5/15/2010

1/15/2012

5/15/2013

1/15/2012

9/15/2012

1/15/2012

1/15/2012

5/15/2011

9/15/2011

9/15/2011

9/15/2011

9/15/2011

9/15/2011

9/15/2011

9/15/2011

9/15/2011

9/15/2011

1/15/2012

1/15/2012

1/15/2012

1/15/2012

1/15/2012

5/15/2010



5/15/2011

1/15/2012
1/15/2012

1/15/2012

5/15/2013

9/15/2011

1/12/2011

9/15/2010

9/14/2011

9/15/2010

9/15/2010

 1/8/2012

1/15/2012

1/15/2012

5/15/2011

1/15/2012

5/15/2011

5/15/2011

9/15/2012

5/15/2012

5/18/2012

1/15/2012

5/15/2011

5/15/2011

5/15/2011

9/15/2012

 9/9/2013

9/15/2011

9/15/2011

1/15/2012

1/15/2010

1/15/2010

1/15/2012

1/15/2012

1/15/2011

1/15/2012

1/15/2011
 1/15/2012

 1/15/2012

 5/15/2011

12/14/2013

 5/15/2011

  2/5/2013

  9/3/2012

 7/23/2012

 6/22/2012

12/17/2011

 3/10/2012

 9/15/2009

 9/15/2010

  4/2/2011

  3/1/2013

 4/17/2012

10/19/2012



  1/2/2012

 1/15/2012

 1/15/2012

 1/15/2012

 5/15/2011

 1/15/2012

 5/15/2011

 1/15/2011

 5/16/2011

 4/17/2012

 1/15/2012

 1/15/2010

 9/15/2011

 1/15/2012

 1/15/2012

 1/15/2012

 1/15/2012
 1/15/2012

 1/17/2012

 9/15/2010

  1/9/2011

 5/15/2012

 1/15/2012

 9/15/2011

 1/15/2011

 5/15/2011

 1/15/2012

 5/15/2010

 1/15/2012

 1/15/2011

 9/15/2010

 5/14/2009

10/28/2011

 8/30/2008

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:2/13/2012
language:
pages:205