					IHOC meeting- 9/28/1010

Attendees- Skyler, John, Curtis, Kegan, Achyut, Drew, Jay

Start- 4:00 Pm



Meeting With Jay

Reviewed email from Chris: he hasn’t forgotten about us, just busy. Close to getting stuff and questions
answered. Probably visit him around the end of October.

Flow Chart for system: used Visio, new image on website, added information and power characteristics.

Things to do: get a schedule, team pictures, system needs (response rates, temp range, etc.)

Team Meeting

Developed preliminary schedule based on goals using sticky notes:

October

         Specs for team snapshot
         Flow sensor
         System converts heat characteristics to a steady temp.
         Flow/heat analysis
         Initial prototype
         Visit Intel

November

         Re-evaluate components (pump, tubes, heater, etc.)
         Controller communicating w/ pump and valves
         Touch screen selected
         Control System Analysis 1
         Controller communicating w/ touch screen, GUI flowchart
         Snapshot

Christmas/December

         Rest

Jan/Feb

         Physical System R2
         Physical Layout/DFM/DFA
       Manual
       Physical Design completed

March

       Completed GUI
       Control System Analysis 2
       Final GUI communicating with Arduino board
       Testing (optimization/safety)/ check components to spec
       Emergency manual

April

       Final Prototype and layout designed
       Finished testing/ Final Adjustments
       Manual/Poster
       EXPO

Took individual photos for website

Action Items for next week

Review snapshot requirements, review chris’ reply, snapshot poster, website, Gantt chart

				