                       Project: Hannibal
 I. Mission Statement
   In the year 2001 five students committed themselves to design, build, test, and
   fly their very own cubesat. They promptly set to work at an intense design
   session. From this session came the goals of what they hoped to accomplish.
   These goals were to collect data in the following forms; air pressure, pictures
   (digital of 35 mm), temperature, and a live spider. This data will be collected
   to study the effects of pressure vs. temperature at various altitudes on the
   spider and match images to this data. On April 21, 2000 7:00 AM in Windsor
   Colorado Hannibal will launch and execute these goals. If you want to make
   observations at high altitudes and don’t know who to call. Maybe you should
   call The A-Team.
II. Overview
   Our team has chosen to observe the high altitude effects of temperature vs.
   pressure on a live subject (spider). We have implemented these goals using
   the various surveying equipment and materials. Our primary payload will be
   the data logger and live spider. These payloads will help us understand how
   creatures react to high altitudes and how they react along the
   temperature/pressure curve. Our secondary payload will be our imaging
   device. We will match the images to the data to create a visual reference to
   each point.
   The main impetus behind these observations is to understand the atmosphere
   at the edge of space (100,000ft.). Our payload with travel to 100,000 ft. with
   the help of a balloon provided by the Edge of Space Sciences.

III. Technical Specifications
    Hannibal consists of 4 major systems. Our first system is the frame which
    will carry and protect our payload. This will consist of ¼ inch aluminum that
    will form the skeleton of our frame. The outer walls will consist of Owens
    Corning fiberglass aluminum ducting. Our second system will consist of a
    HOBO Data Logger, a 3x3 cm plexiglass cube that will encase our spider, and
    a camera (either digital or 35mm). Our third system will contain the
    temperature and pressure sensor that report to the HOBO Data Logger. Our
    last system will be the essential power and timing circuitry. This circuit will
    be attached to the altimeter inside the HOBO Data Logger. This altimeter
    will server as the trigger for each of our devices.




                                                                                    2
                         Project: Hannibal
    Hannibal Components
    HOBO Data Logger temp/press/altimeter
    Aluminum Sheeting
    1 camera (digital/35mm)
    Power/Timing Circuit (Battery)
    Fiberglass casing
    Plexiglass casing
    Temp/Press sensors
    2 Teflon grommets

Assembly

   1) Construct frame from aluminum sheeting to specs (100 cm2 each side)
   2) Drill holes centered in top and bottom and attach grommets
   3) Secure sensors internal/external
   4) Secure HOBO Data Logger and hookup to sensor equipment
   5) Secure camera and use mirrors to split frame to capture atmosphere and
      spider in same frame
   6) Secure plexiglass cube with spider and position with mirrors
   7) Mount timing circuit and power source.
   8) Affix external insulation/aluminum walls and seal payload.
Testing

Shock Testing:
This test will be implemented by rolling our finished Hannibal down 2 flights of
stairs with all equipment in operation. We will require four people to run this test.
One person will be positioned at the top of the stairs, one will be positioned at the
bottom of the stairs, one will handle ejecting Hannibal, and the fourth will be our
safety person making sure that not one gets in Hannibal’s way on the voyage
down. After execution we will examine the following payloads; HOBO Data
Logger, power/timing circuit, and the camera. If the data logger/sensors survive
will will accomplish our main goal of recording the atmosphere. If this crucial
systems do not survive our mission will fail, and we will rebuild until the minimal
system elements survive.

Temperature Testing:
We will need the following equipment to test how if our systems run at extreme
temperatures; A cooler, dry ice, soda. We will spend about thirty minutes watch
our favorite show “The A-Team”. When the dry ice is mixed with water it will
                                                                                        3
                        Project: Hannibal
create an extremely cold environment. When this environment is attained we will
put Hannibal in the cooler and start our show. We will check Hannibal halfway
through and drink our soda. Then at the end of the full thirty minutes we will
check Hannibal for operation. As in our previous test we will use the same criteria.
If minimal systems are still functioning we will consider the test a minimal
success. If all systems are working then we will consider this test a success.

Launch:
       Launch Day operations-- Saturday April 21, Hannibal will arrive at the
Windsor Colorado Launch Site no later then 5:30 am. Members of “The A-Team”
shall arrive at the Windsor Colorado Launch site no later than 6 am. All members
will begin setting up Hannibal at 6:15 am. Hannibal will undergo a diagnosis upon
reaching the launch site. This diagnosis shall entail, but not be limited to:
    An inspection of the frame for cracks, dings, dents, soft spots, or any other
       mark or mar that might cause it to fail during the ascent.
    A function test of the HOBO data logger. (Internal Software)
    Check the camera for damage, monitor and note camera power levels.
    Check timing circuit for functionality (Might require multi-meter)
    Check timing circuit power supply. Replace power supply if needed.
    Check insulation for damage.
    Check to make sure spider is alive and well


After performing a pre-flight inspection, the craft shall be assembled and inspected
once more. The next step is mounting Hannibal onto the EOSS balloon line.
Mounting Hannibal is a two-step process. First The A-Team threads the line
through the grommets in Hannibal, then they tie a knot into the line creating a knot
of greater diameter than the grommet. The last task performed at the launch site is
holding Hannibal off the ground during balloon release.

     After balloon release, all members of The A-Team are released from further
mandatory activities that day.


Safety:
      Safety is a primary concern of The A-Team. In order to fully maintain a
high safety standard, The A-Team shall undertake the following precautions:
           Machining work will be done by qualified group members.

                                                                                   4
                         Project: Hannibal
          All operations shall be planned and analyzed in advance to any
           undertaking of action.
          All actions pertaining to Hannibal will be performed in groups of no
           less than two people.
IV. Management and Cost Analysis
The A-Team has determined that time will be a large concern in this effort. The
largest time concern will arise if Hannibal should fail a test. In order to give the
greatest amount of time to correct planning and construction, testing is late in the
schedule. A smaller concern deals with shipping issues. If any part is placed on
backorder, the chances that Hannibal achieves its mission with a full science
payload are bleak. To prevent these two time issues, The A-Team shall begin
ordering and construction as soon as our presentation is given.

Schedule:
 Task                                     Completion Date
 Team presentation                        March 12, 2001
  Have Equipment Purchased/Donated        March 15, 2001
 Complete aluminum skeleton               March 20, 2001
 Finish camera timing circuit             March 21, 2001
 Integrate components                     March 22, 2001
 Complete testing phase 1                 March 23, 2001
 MRR                                      March 23, 2001
 Modify structure/components              April 15, 2001
 Complete Testing phase 2                 April 20, 2001
 Launch                                   April 21, 2001 @ 7:00 AM MST


Team Member roles:
 Name            Function                             Email
 Genny Dice      Testing                              geniveve@colorado.edu
 Shannon Atencio Management                           Shannon.Atencio@colorado.edu
 Peter Isakander Procurements                         Peter_polo@hotmail.com
 Fligg/Gadda     Structural design/SolidWorks         Fligg@colorado.edu
 Dong Bo         Testing                              wangdb@colorado.edu
 Fligg/Gadda/Bo Circuitry/Assembly                    gadda@colorado.edu
 J.R.            Assembly                             jafit@colorado.edu

                                                                                       5
                       Project: Hannibal
Budget Issues:
Our main issue with Hannibal is going to be the cost of the camera equipment.
Depending on whether we go digital or analog with make a huge difference. If we
go digital our weight decreases tremendously, but our costs go up. If we go analog
our weight increases but our costs go down. We are talking with Brian Egas of the
imaging division of Space Grant to see if he can donate a camera for our unit. We
are also asking Ren Su to use some of the money from the Engineering Excellence
fund to donate towards our research. Secondly, the HOBO Data Logger with be
the other primary cost. Our materials for the structure and frame will be donated
by L&L Insulation and Supply Company.

Budget:
                                      Money               Mass Budget
                                      Budget
Limitations                             $300                  500g
Construction Materials
   Aluminum casing                     Donation               90g
   Welding, fastening supplies         Donation               20g
   Bushings for rope attachment        Donation               20g
   Miscellaneous - duct tape etc…       $20.00                100g

Science
   HOBO Data Logger                     $75.99               28.35g
       Shipping and Handling             $7.00                 0
   Board for timing                     $10.00                50g
   Wiring                                $5.00                10g
   Power Source                          $2.00                10g
   Camera                              $100.00                100g
   Miscellaneous                       $150.00                152g



                                        By
                                Shannon Atencio
                                    Dong Bo
                                  Genny Dice
                                   Ryan Fligg
                                  Matt Gadda
                                 Peter Isakander

                                                                                 6