Doc. No.:

*ADD CLIENT NAME



*ADD LOGO HERE REV.

*ADD PROJECT NAME HERE Date:

0

METHOD STATEMENT

Page No. : 1 of 6



GENERAL INFORMATION









THIS DOCUMENT IS ENTENDED FOR REFRENCE PURPOSES ONLY. YOU CAN EDIT & MODIFY THE

CONTENT.



Download Link:



http://www.docstoc.com/profile/unfoldsecrets



Official Unfold Secrets Website:



http://www.unfoldsecrets.com



Facebook Page:



https://www.facebook.com/pages/Unfoldsecrets/124593744292924



Youtube Page:



http://www.youtube.com/user/UnfoldTheSecrets?feature=mhee



Unfold Secrets Article Page:



http://airgildaviss.hubpages.com/



Don’t forget to Sign Up:



http://unfoldsecrets.com/login/index.php



Sign Our Guestbook:



http://unfoldsecrets.com/Guest-book.php









DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.docstoc.com/profile/unfoldsecrets

Doc. No.:

*ADD CLIENT NAME



*ADD LOGO HERE REV.

*ADD PROJECT NAME HERE Date:

0

METHOD STATEMENT

Page No. : 2 of 6







METHOD STATEMENT

FOR INSTALLATION OF G.I. BOXES









Project : *ADD PROJECT NAME HERE

Contractor : *ADD CONTRACTOR NAME HERE

Document No. :



Document revision status : 0









0 Issued for Review & Comments



Prepared by Checked by Approved by

Rev. Date Description

*ADD CONTRACTOR NAME HERE









DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.docstoc.com/profile/unfoldsecrets

Doc. No.:

*ADD CLIENT NAME



*ADD LOGO HERE REV.

*ADD PROJECT NAME HERE Date:

0

METHOD STATEMENT

Page No. : 3 of 6







REVISION CONTROL SHEET





REV. NO. DATE PAGE NO. DESCRIPTION









DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.docstoc.com/profile/unfoldsecrets

Doc. No.:

*ADD CLIENT NAME



*ADD LOGO HERE REV.

*ADD PROJECT NAME HERE Date:

0

METHOD STATEMENT

Page No. : 4 of 6







TABLE OF CONTENTS







1 Purpose…………………………………………………………………………….. 5

2 Scope of Work…………………………………………………………………….. 5

3 Responsible Personnel on Site………………………………………………… 5

4 Storage…………………………………………………………….………………. 5

5 Pre-Installation…………………………………………………………………… 4

6 Installation………………………………………………………………………… 5

7 Reference Documents…………………………………………………………. 5

8 Safety……………………………………………………………………………… 5









DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.docstoc.com/profile/unfoldsecrets

Doc. No.:

*ADD CLIENT NAME



*ADD LOGO HERE REV.

*ADD PROJECT NAME HERE Date:

0

METHOD STATEMENT

Page No. : 5 of 6





1. Purpose



This method of statement covers the installation of boxes as defined in the General

Specification.







2. Scope of Works



This procedure will define the method to be used to ensure that boxes installations

and workmanship are correct and acceptable and shall conform to the Contract

Documents and Specification.







3. Responsible Personnel on Site



3.1. Construction Manager

3.2. Electrical Field Engineers

3.3. Safety Officer

3.4. QA/QC Engineer

3.5. Electrical Supervisors







4. Storage



4.1 Boxes shall be properly supported and stacked on a flat surface.

4.2 Boxes shall be protected from sunlight and moisture by covering them with tarpaulin.

4.3 Boxes shall be stacked properly in neat and orderly manner.







5. Pre-Installation



5.1 All materials and documentation relevant to this particular Section of works will be

checked by the Construction Department prior to the commencement of works. Ensure

that all materials to be installed are inspected and accepted by the Consultant.

5.2 Access to start the work will be confirmed that they are in a suitable condition for

permanent works to commence.









DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.docstoc.com/profile/unfoldsecrets

Doc. No.:

*ADD CLIENT NAME



*ADD LOGO HERE REV.

*ADD PROJECT NAME HERE Date:

0

METHOD STATEMENT

Page No. : 6 of 6









6. Installation



6.1 Install electrical boxes and fittings as indicated; in accordance with manufacturer’s

written instructions, applicable requirements of the applicable electrical code and in

accordance with recognized industry practices to fulfill project requirements.

6.2 Obtain exact location of outlets from the drawings of interior details and finishes. Refer

any condition that would place an outlet box in an unsuitable location to the Engineer.

6.3 Mount outlet boxes for similar equipment in the same or similar areas at uniform

heights. Where mounting heights are not indicated, locate outlet as required for the

equipment connected thereto or as directed by the Engineer.

6.4 Provide pull and/or splice boxes where indicated on the drawings or required to

facilitate pulling of wires and cables.

6.5 Support boxes located above hung ceilings independently of the ceiling. Fasten boxes

to the structure by bar hangers or other supports as approved by the Engineer.

6.6 Coordinate installation of electrical boxes and fittings with wire/cable, wiring devices,

and raceway installation work.

6.7 Install electrical boxes in those locations which ensure ready accessibility to enclosed

electrical wiring.

6.8 Avoid installing boxes back-to-back in walls. Provide not less than 6 inches

separation.

6.9 Do not install aluminum products in concrete.

6.10 Position recessed outlet boxes accurately to allow for surface finish thickness.

6.11 Fasten electrical boxes firmly and rigidly to substrates, or structural surfaces to which

attached, or solidly embed electrical boxes in concrete or masonry.

6.12 Raise Request for Inspection of box Installation.



7. Reference Documents



7.1 Approved Electrical Shop Drawings

7.2 Approved Material Submittals for Conduits and Boxes

7.3 Approved Material Inspection Report

7.4 Approved Safety Plan

7.5 Approved QA/QC Inspection Plan.



8. Safety



8.1 All safety precautions shall be followed as per approved safety plan & procedure.

Ensure all involved persons are aware of the same.

8.2 Tradesman shall ensure that before leaving their working places, it must be clean,

tidy and free from rubbish.



------------------------ Procedure End----------------------









DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.docstoc.com/profile/unfoldsecrets



Related docs
Other docs by airgil daviss
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!