Unit Load Hours Available

Unit Load Typical Unit

Shopping No. Of (hrs per

Medical (hrs Load (50%Sh

(hrs per Professionals professional per

per contract) 50%Med) hrs

contract) day)



Paralegal 4 6 4 6 5



Tax

1 3 3 8 2

lawyer

Senior

1 1 2 4 1

partner









Unit Load Hours Available

Unit Load

Shopping No. Of (hrs per Capacity Sh

Medical (hrs

(hrs per Professionals professional per Case / day

per contract)

contract) day)

Paralegal 4 6 4+1 6 7.5

Tax

1 3 3 8 24

lawyer

Senior

1 1 2 4 8

partner

Capacity of Capacity of Capacity Capacity of

No. Of

one one of the the

Professionals

Resource Resource Resource Resource

Required

Unit / hr Unit / day Pool /day Pool /mon



0.2 1.2 4.8 96 6.25



0.5 4 12 240 1.875



1 4 8 160 1.875









Capacity

Med Case /

day

5

8



8





2.4

Resource Unit Load Theoretical

Pool (min./claim): capacity of a

Tp Resource Unit:

1/T p claims/min



Mailroom 0.6 1.67

clerk

Data-entry 4.2 0.24

clerk

Claims 6.6 0.15

processor

Claims 2.2 0.45

supervisor

Number of the Theoretical capacity of

Resouce Units in Resource Pool:

the Resource R p =c p /T p

Pool: c p Claims/min



1 1.67



8 1.90



12 1.82



5 2.27

Resource Scheduled Unit Load

Pool availability (min./claim):

(min/day) Tp





Mailroom 450 0.6

clerk

Data-entry 450 4.2

clerk

Claims 360 6.6

processor

Claims 240 2.2

supervisor

Theoretical capacity Number of the Theoretical capacity of

of a Resource Unit: Resouce Units in Resource Pool:

(1/T p )(min/day) the Resource R p =(c p /T p )(min/day)

claims/day Pool: c p Claims/min



750.0 1 750.0



107.1 8 857.1



54.5 12 654.5



109.1 5 545.5

Plumbing Window Cleaning Gutter Guards Landscaping

Production 90 70 80 60

Revenue/job 130 170 200 270

Material cost 30 10 70 75



total Revenue 55800

Material Cost 13500

Direct labor 10000

Administrative OH 18000

Non-administrative OH 9000

Net Profit 5300

Plumbing Window Cleaning Gutter Guards Landscaping

Production 90 70 80 60

Labor Hours/job 2 4 3 5

Revenue/job 130 170 200 270

Material cost 30 10 70 75

Labor Cost 20 40 30 50

Resource pool (p) PhyClim HosClaim Needed Available

Mailroom clerk 0.6 1 327.3 <= 450

Data-entry clerk 4.2 5.2 2290.9 <= 3600

Claims processor 6.6 7.5 3600.0 <= 4320

Claims supervisor 2.2 3.2 1200.0 <= 1200

1 1 545.4545

545.45 0

Microsoft Excel 12.0 Sensitivity Report

Worksheet: [Capacity.xlsx]LPFormulation

Report Created: 11/14/2010 11:43:28 AM





Adjustable Cells

Final Reduced Objective Allowable

Cell Name Value Cost Coefficient Increase

$B$8 PhyClim 545.4545455 0 1 1E+30

$C$8 HosClaim 0 -0.454545455 1 0.454545455



Constraints

Final Shadow Constraint Allowable

Cell Name Value Price R.H. Side Increase

$D$3 Mailroom clerk Needed 327.2727273 0 450 1E+30

$D$4 Data-entry clerk Needed 2290.909091 0 3600 1E+30

$D$5 Claims processor Needed 3600 0 4320 1E+30

$D$6 Claims supervisor Needed 1200 0.454545455 1200 240

Allowable

Decrease

0.3125

1E+30







Allowable

Decrease

122.7272727

1309.090909

720

1200

Resource Pool No. Units in Load (Total) Unit Scheduled Loss Net

Resource Batch Load avilability Factor Availability

Pool (minutes ) hours /day (Minutes)

Worker S 1 1 10 8 6.25% 450

Punch press R 1 1 22 8 5% 456

Punch press B 1 1 30 8 5% 456

Worker PR 1 1 22 8 5% 456

Worker PB 1 1 30 8 5% 456

Forming machine R 1 1 12 8 10% 432

Forming machine B 1 1 6 8 10% 432

Worker FR 1 1 12 8 6.25% 450

Worker FB 1 1 6 8 6.25% 450

Welding gun 1 1 13 8 10.0% 432

Worker SA 1 1 13 8 6.25% 450

Worker FA 1 1 10 8 6.25% 450

Inspector 2 1 36 8 6.25% 450

Effective Capacity of

the Resource Pool

(flow units/day)

45.00

20.73

15.20

20.73

15.20

36.00

72.00

37.50

75.00

33.23

34.62

45.00

25.00

Product A B C D Minutes Profit Margin Profit/Minute

P 15 15 15 15 60 45 0.75

Q 10 30 5 5 50 60 1.2

Product A B C D Profit Margin Demand

P 15 15 15 15 45 110

Q 10 30 5 5 60 60

Capacity 2400 2400 2400 2400









Product A B C D Profit Margin Demand

P 15 10 15 10 45 110

Q 10 35 5 5 55 60

Capacity 2400 2400 2400 2400

Resource Product P Product Q Needed Available

Resource A 15 10 1800.0 <= 2400

Resource B 15 30 2400.0 <= 2400

Resource C 15 5 1650.0 <= 2400

Resource D 15 5 1650.0 <= 2400

Market P 1 100.0 <= 100

Market Q 1 30.0 <= 50

45 60 300

100.00 30

Microsoft Excel 12.0 Sensitivity Report

Worksheet: [Capacity.xlsx]LPFromTOC

Report Created: 11/14/2010 4:07:52 PM





Adjustable Cells

Final Reduced Objective Allowable Allowable

Cell Name Value Cost Coefficient Increase Decrease

$B$10 Product P 100.00 0.00 45 1E+30 15

$C$10 Product Q 30 0 60 30 60



Constraints

Final Shadow Constraint Allowable Allowable

Cell Name Value Price R.H. Side Increase Decrease

$D$3 Resource A Needed 1800.0 0.0 2400 1E+30 600

$D$4 Resource B Needed 2400.0 2.0 2400 600 900

$D$5 Resource C Needed 1650.0 0.0 2400 1E+30 750

$D$6 Resource D Needed 1650.0 0.0 2400 1E+30 750

$D$7 Market P Needed 100.0 15.0 100 60 40

$D$8 Market Q Needed 30.0 0.0 50 1E+30 20

Resource Product P Product Q Product PJ Product QJ Needed Available

Resource A 15 10 15 10 0 <= 2400

Resource B 15 30 15 30 0 <= 4800

Resource C 15 5 15 5 0 <= 2400

Resource D 15 5 15 5 0 <= 2400

Market P 1 0 <= 100

Market Q 1 0 <= 50

45 60 27 40 -6400

Resource Product P Product Q Product PJ Product QJ Needed Available

Resource A 15 10 15 10 2400 <= 2400

Resource B 15 30 15 30 4800 <= 4800

Resource C 15 5 15 5 1800 <= 2400

Resource D 15 5 15 5 1800 <= 2400

Market P 1 80 <= 100

Market Q 1 50 <= 50

45 60 27 40 3000

80 50 0 70





37.037037 Weeks to pay back

Resource Product P Product Q Needed Available

Resource A 15 10 1900.0 <= 2400

Resource B 10 35 2400.0 <= 2400

Resource C 15 5 1700.0 <= 2400

Resource D 10 5 1200.0 <= 2400

Market P 1 100.0 <= 100

Market Q 1 40.0 <= 50

45 55 700

100.00 40



Other docs by huanghengdong
EOL Share the Care PowerPoint
Views: 1  |  Downloads: 0
Quotes
Views: 0  |  Downloads: 0
IntentionsDatabase-Live
Views: 0  |  Downloads: 0
Team CYC
Views: 5  |  Downloads: 0
CommitteeCharter_1_
Views: 2  |  Downloads: 0
Mak ke a one o off donat tion
Views: 0  |  Downloads: 0
GBCMA_AR_2007_Page36_RCT_Increase_cover
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!