					FORM OF TENDER                                               SCHEDULE OF ITEMS AND PRICES                     April 29, 1994
                                                                                                                        FT-4

 Item                                                                                Estimated
                                                    Description               Unit               Unit Price     Total
  No.                                                                                Quantity

PART 1 - WATERMAIN

 1.1             SP         Remove existing asphalt                           m2      1,200.0                           $0.00

 1.2         SP, SW 300 off 600 tapping sleeve and valve and                  ea.       1.0
                                                                                                                        $0.00
                    increaser

 1.3         SP, SW 200 off 400 tapping sleeve and valve                      ea.       1.0                             $0.00

 1.4         SP, SW 200 mm PVC DR18 watermain                                  m        8.0                             $0.00

 1.5         SP, SW 400 mm PVC DR25 watermain                                  m       265.0                            $0.00

 1.6         SP, SW Offset 400 mm watermain over existing
                                                                              L.S.      1.0                             $0.00
                    900 mm watermain (Provisional)

 1.7         SP, SW Swabbing, flushing, pressure, testing,
                                                                              L.S.      1.0                             $0.00
                    chlorination, disinfection

 1.8         SP, SW Pressure reducing valve chamber                           L.S.      1.0                             $0.00

 1.9             SP         Electrical control cabinets
                            a) MCP-01                                         L.S.      1.0                             $0.00
                            b) LCP-01                                         L.S.      1.0                             $0.00

 1.10        SP, SW Actuator on existing 450 mm gate valve                    L.S.      1.0                             $0.00

 1.11            SP         Electrical conduit
                            a) 40 mm diameter                                  m        15.0                            $0.00
                            b) 50 mm diameter                                  m       500.0                            $0.00
                            c) 75 mm diameter                                  m        70.0                            $0.00

 1.12        SP, SW 600 x 600 ditch inlet catchbasin                          ea.       1.0                             $0.00

 1.13        SP, SW 300 mm storm sewer                                         m        9.0                             $0.00

 1.14        SP, SW Connect to existing 450 mm storm sewer                    L.S.      1.0                             $0.00

 1.15        SP, SW 150 mm storm connection
                    a) PRV chamber                                            m         6.0                             $0.00
                    b) existing chamber                                       m        16.0                             $0.00
                    c) flap gate                                              ea.       2.0                             $0.00

 1.16        SP, SR         Granular B subbase                                 t      2000.0                            $0.00

 1.17        SP, SR         Granular A subbase                                 t       600.0                            $0.00


C:\Docstoc\Working\pdf\2d7562c7-911c-4f6b-8ae4-e28dec2aa3e8.xlsx
FORM OF TENDER                                               SCHEDULE OF ITEMS AND PRICES                     April 29, 1994
                                                                                                                        FT-5

 Item                                                                                Estimated
                                                    Description               Unit               Unit Price     Total
  No.                                                                                Quantity

 1.18        SP, SR         HL8 binder asphalt                                 t       350.0                            $0.00

 1.19        SP, SR         Milling                                            m       260.0                            $0.00

 1.20        SP, SR         HL3 surface asphalt (50 mm thk)                    t       175.0                            $0.00

 1.21        SP, SR         Permanent wide pavement marking
                            a) 100 mm wide                                     m       800.0                            $0.00
                            b) turn arrow                                      ea       1.0                             $0.00

 1.22        SP, SR         Topsoil (150 mm thk)                              m2       500.0                            $0.00

 1.23        SP, SR         Hydroseed                                         m2       500.0                            $0.00

 1.24            SP         Electrical work                                   L.S.      1.0                             $0.00

 1.25        SP, SR         Imported Granular C trench backfill
                                                                               t       500.0                            $0.00
                            (Provisional)

SUBTOTAL PART 1 - WATERMAIN                                                                                             $0.00

PART 2 - MISCELLANEOUS

 2.1             SP         Bonds
                            a) Material                                       L.S.      1.0                             $0.00
                            b) Labour                                         L.S.      1.0                             $0.00

 2.2         SP, GS         Engineer's site office                            L.S.      1.0                             $0.00

 2.3         SP, SR         Dust control
                            a) mechanical sweeping                             hr       20.0                            $0.00
                            b) calcium chloride flakes (40 kg bag)             ea      100.0                            $0.00

 2.4             SP         Traffic Control                                   L.S.      1.0                             $0.00

 2.5         SP, GS         Project sign boards
                            a) pick up/install                                 ea       2.0                             $0.00
                            b) remove/dispose                                  ea       2.0                             $0.00

SUBTOTAL PART 2 - MISCELLANOUS                                                                                          $0.00