Pertinent purpose of SRS document is to introduce and illustrate regarding the
new Energy Management Information System designed for Brandix Lanka Pvt. Ltd,
which is a leading apparel exporter in Sri Lanka. This document extends it s vicinity on
functional and non-functional requirements of the Energy Management Information
System (EMIS) version 1.0.
This system will replace the existing Management Information System on
energy consumption within the group factories of Brandix; the proposed system will
have the capability of analyzing energy consumption details of the group factories and
up to date database with effective data handling. This information system would be
implemented as the sole information system on monitoring energy consumption of
group factories with a link to established network of Brandix i.e. Brandnet.
All the requirements stated in this document are proposed for implementation in
EMIS version 1.0.
1.2. Document conventions
We have used a number of conventions throughout the document in order to expand the
readability of the document.
Major titles are indicated with Times New Roman, 16, Bold.
Major Subtopics are indicated with Times New Roman, 14, Bold, Italic.
Sub topics are indicated with Times New Roman, 13,
Further descriptions were documented with Times New Roman, 11.
Headings and subheadings carry a sequential numbering system.
Major functionalities of the system are represented in diagrams and the explanations are
provided where necessary.
Whole document was prepared in papers with 1.5’ margins from each side.
Terms with special value and when highlighting was needed Italic letters were used.
1
SLIIT
1.3. Intended audience
Intended audience for this document would be developers, testers, management authorities of Brandix
and user documentation writers.
Developers : - Refer to this document in order to understand the user requirements for them to develop the
software.
Testers : - Need this document to understand the functionality of the system and each of its features so
that they can test the software and assure that the system is executing properly.
Management authorities : - Use this document to assess the features implemented will meet their needs
and to plan strategies to fulfill the lacking.
User documentation writers : - Use this document for the basis of writing the user manual.
1.4. Project Contact information
This project is designed to fulfill the requirement of a user friendly Energy Management Information
system for Brandix Lanka Pvt. Ltd. which ensure the accuracy of data analysis of energy consumption and
will exceed the performance of the current system.
EMIS would make a communication base for factory engineers and administrators to get feed back on
factory energy consumption from the Brandnet users.
Goals
01. To analyze energy consumption details of Brandix group effectively
Multiple equipments in Brandix group of factories utilize fuel and electricity during their production
process. Details of those equipments will included in the information system with its quantity of monthly
energy consumption; their by the productivity of each energy consumption source will be analyzed monthly.
02. Give communication for the group engineers
Analyzed through EMIS would make a base for engineers of each factory discuss regarding the
productivity of energy consumption in each factory; their by motivate the for effective energy management.
03. Up-to-date details of group factories
Since existing information system does not allow modification in data entries, new system deign to
improve the necessity.
2
SLIIT
2. Description
2.1. Business perspective
Brandix Lanka Private Limited is a leading apparel exporter in Sri Lanka. The Brandix
group consists of 26 factories around the country. As the apex holding company of the group,
Brandix Lanka functions as the corporate headquarters from which centralized services are
provided. These include Finance, Corporate Finance, Investment and Project Management,
Treasury Management, Legal and Secretarial Services, Tax Planning, Compliance, BOI Relations
and Engineering. It is also responsible for Human Resource Management, Corporate
Communications, the Group’s Management Information System and Communication
Infrastructure. Forging the strategic direction of the group, Brandix Lanka is responsible for the
creation of brand equity, as well as establishing and monitoring Group-Wide adherence to the
principles of corporate governance and corporate social responsibility.
The proposed system is used by the Engineering department of Brandix. One of the
responsibilities of the engineering department is to monitor group-wide energy consumption. As
the Brandix group consists of more than 26 Factories Island wide, it is more reliable to centrally
monitor the energy consumption. The engineering department of the Brandix Lanka Pvt. Ltd.
already has a web based energy Management Information system which has some drawbacks.
The current system only contains the details of the factories which were entered during the
implementation of the system. It does not facilitate updating the current details or adding new
details to the system.
2.2. Business Product/Service functions
The main objective of the new system is to develop an Energy Management Information
System for the company in more efficiently and effective manner. The administrators will add
new plants to the system and the factory equipment details as well. The factory engineers in each
factory will add the monthly energy consumption details of their relevant factory to the database
through internet. The added data will be used to analyze the energy consumption for a user
required period of time.
The proposed system is required to give a graphical representation of the energy
consumption details of each factory separately. It must support viewing details in different chart
types such as bar charts, line charts, PI charts etc. Factory engineers will add the monthly energy
consumption details to the system. Those entered details will be used to generate reports and
charts for the group engineers to get an analytical idea about the energy consumption of group
factories and it will help them to take managerial decisions.
3
SLIIT
The main functions of the proposed system is described in Fig 2.2.1
View Report
Brandnet User
Add Monthly Consumption
Add Plant Details
Factory Engineer
Remove Plant Details
Modify Plant Details
Group Engineer
Add Tariff charges
Add Target KPI
Figure 2.2.1
(Main use case)
4
SLIIT
2.3. User classes and characteristics
Most of the users of the proposed system are non technical personals; therefore user
friendliness is an important characteristic of the system.
Actor Name : Brandnet Users
Description : Brandnet users are the most generalized actor in Energy Management Information
System. Brandnet users can view the reports and they can post comment on those
reports to the administrator.
Skill level : Low Skill Level
Actor Name : Factory Engineers
Description : Factory Engineers are interacting with the system with all the activities which
Brandnet users can do. In addition to that, Factory engineer is capable of adding
pertaining factory information for a particular factory.
Skill level : Low Skill Level
Actor Name : Administrator
Description : The main actor of the proposed system is the group engineer, who is the
administrator of the system. The administrator is capable of adding new factories
to the system and the new equipments that are going to be installed in those
factories. Removing factories and their details from the system is also done by the
administrator if needed. The administrator will be informed about new factory
details by the factory engineers in each plant.
Skill level : High Skill Level
Figure 2.3.1
(User Interaction Diagram)
5
SLIIT
2.4. Operating environment
The following requirements are the minimum system requirements for the proposed web
based system to run.
Web Server
IIS 6.0 or above (To deploy the web site)
Database Server
Hardware
Pentium 4 or higher, 512 MB RAM or more
Software
SQL Server 2005, Windows NT 4.0/Windows 2000 Server or later
Client machine
Hardware
Network Client-Pentium 3 or higher, 256 MB RAM
Software
Windows XP, Vista or later with a web browser installed (Internet
Explorer, Fire Fox, etc.).
2.5. User environment
As the proposed system is a web based system the user manuals are provided to the users as
an online help. Apart from that a training session will be conducted by the development team for
the Group engineers (Administrators) and Factory engineers after deploying the final product in
the client’s web server.
2.6. Design/implementation constraints
The proposed system will be implemented based on Microsoft .NET Framework 3.5 and
using the C# Language as required by the client’s IT department. The database is implemented on
Microsoft® SQL Server 2005. The look and feel of the web site is decided by the Internal
Communication and is out of developer’s control.
2.7. Assumptions
Not Applicable at this stage of the document.
2.8. Dependencies
Not Applicable at this stage of the document.
6
SLIIT
3. External Interface Requirements
3.1. User interfaces
Figure 3.1.1
(Home Page of EMIS)
This is the Home page of the Energy Management Information System.
In this page user can see the latest news about the company.
This page will navigate user to many fields.
7
SLIIT
Figure 3.1.2
(Login Page)
Users who have administrative privileges will have to visit this page in order to.
8
SLIIT
Figure 3.1.3
(Login Error page)
This page will appear when the user submits wrong username or password.
9
SLIIT
Figure 3.1.4
(Plant Details Page)
This interface provide ability to insert data for the validated system users
10
SLIIT
Figure 3.1.5
(Validating Plant Details)
This page will appear when the validating user inputs that entered in incorrect manner
11
SLIIT
Figure 3.1.6
(View Plant Details)
Figure 3.1.6 shows how the entered details will be represented.
12
SLIIT
Figure 3.1.7
(View Graphs)
This page will show the graphical comparison of entered data.
13
SLIIT
3.2. Hardware interfaces
Not Applicable at this stage of the document.
3.3. Software interfaces
The proposed Energy Management Information System will be connected with the SQL
Server in the clients IT department.
The details which are entered by the factory engineers is stored in the SQL Server and
calculations will be done as a monthly server schedule using the parameters stored in the database
and they will be stored in a separate table in the database. When client request a report or a chart
from the web site, data will be retrieved from the database.
.
3.4. Communication protocols and interfaces
The system needs a web browser to act as an interface between system and client. FTP,
SMTP, TCP/IP will be used. SMTP protocol used to send email messages. FTP protocol is used
to upload and download the resources and specifications (In .pdf file format).
As this is a web based system HTTP 1.1 protocol is used.
14
SLIIT
4. System Features
4.1. System features
The functionalities that are provided by the proposed system are described in the following
tables and figures.
4.1.1. Identifier
Package ID Use Case ID Use Case
P1.1 View report
P1 P1.2 Add a comment
P1.3 Send an email
P2.1 Login
P2 P2.2 Add monthly consumption
P2.3 Edit details of the recent month
P3.1 Upload resources and specification
P3. 2 Remove resources and specification
P3.3 Add news
P3.4 Add plant details
P3.5 Remove plant details
P3 P3.6 Modify plant details
P3.7 Add tariff charges
P3.8 Add target KPI
P3.9 Add new user
P3.10 Remove user
P3.11 Modify user
P3.12 Add new supplier
P3.13 Remove supplier
P3.14 Modify supplier
15
SLIIT
4.1.2. Description and priority
ID Use case name Description Priority
(High/Medium/Low)
P1.1 View Reports This use case is used when a Medium
client request a report for a
particular month or a year. The
user has to select a location of a
plant.
P1.2 Add a comment This use case is used when a Low
client want to comment on
some report to the
administrator.
P1.3 Send an e-mail This use case is used when a Low
client try to send an e-mail
through the system
P2.1 Login This use case is used when a High
user tries to log to the system
for administrative or data entry
work.
P2.2 Add monthly consumption This use case is used when the High
factory manager tries to enter
monthly energy consumption
details to the system.
P2.3 Edit details of the recent This use case is used when the Low
month factory manager try to edit the
data which were added in the
recent month.
P3.1 Upload resources & This use case is used when the Low
specification administrator tries to upload a
resource (a pdf file) to the
system.
P3.2 Remove Resources & This use case is used when the Low
specification administrator tries to remove a
previously added resource from
the system.
P3.3 Add news This use case is used when the Low
administrator wants to enter
news regarding an upcoming
events or ongoing project.
P3.4 Add plant details This use case is used when the High
administrator tries to add a new
plant and its’ details to the
system.
ID Use case name Description Priority
(High/Medium/Low)
16
SLIIT
P3.5 Remove plant details This use case is used when the Low
administrator tries to remove an
existing plant detail from the
system.
P3.6 Modify plant details This use case is used when the Low
administrator tries to modify an
existing detail relevant to a
particular plant.
P3.7 Add tariff chargers This use case is used when the High
administrator wants to add new
tariff charges to the system.
P3.8 Add target KPI This use case is used when the High
administrator wants to add the
target KPI value to the system.
P3.9 Add new user This use case is used when the Medium
administrator wants to add a
new user to the system.
P3.10 Remove User This use case is used when the Medium
administrator wants to remove
an existing user from the
system.
P3.11 Modify User This use case is used when the Medium
administrator wants to modify a
user detail in the database, such
as change of password etc.
P3.12 Add supplier This use case is used when the Low
administrator wants to add a
new supplier to the system
P3.13 Remove supplier This use case is used to remove Low
an existing supplier from the
system.
P3.14 Modify supplier This use case is used when the Low
administrator needs to modify
the details regarding a
particular supplier.
17
SLIIT
4.1.3. Action/result
The priority for the use cases was assigned by considering the importance of them to perform the
main functionality of the system. For the most important task priority is assigned as High, the
tasks which will not effect the main functionality of the system is assigned as Medium and
priority for other tasks are assigned as Low.
4.1.4. Functional requirements
Report
Generator
Brandnet User
Add Monthly
Consumption
Factory Engineer
Administration
Function
Group Engineer
Figure 4.1.4.1
(Packages)
18
SLIIT
>
>
Send email
Add a comment
View Report
Brandnet User
Figure 4.1.4.2
(Package 01 (P1))
Login
>
Factory Engineer
Edit details of the recent month
Add monthly Consumption
Figure 4.1.4.3
(Package 02 (P2))
19
SLIIT
Add tariff changes Update resources and
specification
Remove resources and
specification
Add plant details
Remove plant details
Group Engineer
Modify plant details
Add user
Add Target KPI Remove user
Add news
Remove supplier Modify user
Modify supplier
Add supplier
Figure 4.1.4.4
(Package 03(P3))
20
SLIIT
The use cases in the figures Figure 4.1.4.2, Figure 4.1.4.3, Figure 4.1.4.4 above are described package
wisely in the use case scenarios below.
Package 01
Use Case Number P1.1
Name View report
Actors Brandnet User
Pre condition
Scenario 1. Use case begins with when user selects the report which
needs to view.
2. System access the database.
3. System generates the report.
4. Use case ends with displaying the report.
Extensions 4.a If user wants he can add a comment. [P1.2]
4.b System stores the comment in the database
4.c An email notification sends to the administrator.
[P1.3]
Post Condition
Use Case Number P1.2
Name Add a comment
Actors Brandnet User
Pre condition User must view reports
Scenario 1. Use case begins with when user add a comment.
2. System stores the comment in the database.
3. Use case ends when an email notification sends to the
administrator. [P1.3]
Extensions 1.a If user didn’t enter his name display “Please enter your
name” error message.
1.b Prompt the user to enter his name
Post Condition Stored the comment and sent an email.
Use Case Number P1.3
Name Send an email
Actors Brandnet User
Pre condition User must add a comment
Scenario 1. Use case begins when user add a comment.
2. System access the database.
3. Get the destination email addresses.
4. Use case end with when send an email.
Extensions
Post Condition An email sent to the administrator.
21
SLIIT
Package 02
Use Case Number P2.1
Name Login
Actors Factory Engineer, Group Engineer
Pre condition
Scenario 1. Use case begins when user enter the username and
password.
2. Validate the user
3. Use case end when user login to the system.
Extensions 2.a If username and password are not correct display
“Invalid username or password re-enter the password” error
message.
2.b Prompt the user to login screen.
Post Condition User login to the system.
Use Case Number P2.2
Name Add monthly consumption
Actors Factory Engineer.
Pre condition User must login to the system
Scenario 1. Use case begins when user select the year and month.
2. Then user add monthly energy consumption details
3. Use case end when store new data in the database
Extensions 2.a If user wants he can edit details of the recent month.
[P2.3]
2.b Edited data store in the database
Post Condition New data stored in the database.
Use Case Number P2.3
Name Edit details of the recent month
Actors Factory Engineer.
Pre condition User must login to the system.
User must select the year and month.
Scenario 1. Use case begins when user press edit button.
2. Then user edit the energy consumption details
3. Use case end when store new data in the database
Extensions
Post Condition New data stored in the database.
22
SLIIT
Package 03
Use Case Number P3.1
Name Upload resources and specification
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user upload a file.
2. Use case ends when store the file in the separate folder.
Extensions
Post Condition File stored in the separate folder.
Use Case Number P3.2
Name Remove resources and specification
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user select the file wants to
remove.
2. System displays the confirmation message.
3. Use case ends when file removed from the folder
Extensions 2.a If user select cancel button discard the operation.
2.b Prompt the user to remove resources and specification
screen.
Post Condition File removed from the separate folder.
Use Case Number P3.3
Name Add news
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user add a new news description.
2. Use case ends when store new news in the database.
Extensions
Post Condition Store new news in the database and update the database.
Use Case Number P3.4
Name Add plant details
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when add a new plant details
2. Use case ends when store new plant details in the
database.
Extensions
Post Condition Store new plant details in the database and update the
database.
23
SLIIT
Use Case Number P3.5
Name Remove plant details
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when select the plant details wants to
remove.
2. System displays the confirmation message.
3. Use case ends when remove plant details from the
database.
Extensions 2.a If user select cancel button discard the operation.
2.b Prompt the user to remove plant details screen.
Post Condition Remove plant details from the database and update the
database.
Use Case Number P3.6
Name Modify plant details
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when select the plant details wants to
modify.
2. Use case ends when store new plant details in the
database.
Extensions
Post Condition Store new plant details in the database and update the
database.
Use Case Number P3.7
Name Add tariff charges
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user add new tariff charges.
2. Use case ends when store new tariff charges in the
database.
Extensions
Post Condition Store new tariff charges in the database and update the
database.
Use Case Number P3.8
Name Add target KPI
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user add new target KPIs.
2. Use case ends when store new target KPIs in the
database.
Extensions
Post Condition Store new target KPIs in the database and update the
database.
24
SLIIT
Use Case Number P3.9
Name Add new user
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user add new user details.
2. Use case ends when store new user details in the
database.
Extensions
Post Condition Store new user details in the database and update the
database.
Use Case Number P3.10
Name Remove user
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user select user need to remove.
2. System displays the confirmation message.
3. Use case ends when remove user details from the
database.
Extensions 2.a If user select cancel button discard the operation.
2.b Prompt the user to remove user screen.
Post Condition Remove user details from the database and update the
database.
Use Case Number P3.11
Name Modify user
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user select user need to modify.
2. Use case ends when store new user details in the
database.
Extensions
Post Condition Store new user details in the database and update the
database.
Use Case Number P3.12
Name Add supplier
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user add a new supplier.
2. Use case ends when store new user details in the
database.
Extensions
Post Condition Store new supplier details in the database and update the
database.
25
SLIIT
Use Case Number P3.13
Name Remove supplier
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user select supplier need to
remove.
2. System displays the confirmation message.
3. Use case ends when remove supplier details from the
database.
Extensions 2.a If user select cancel button discard the operation.
2.b Prompt the user to remove supplier screen.
Post Condition Remove supplier details from the database and update the
database.
Use Case Number P3.14
Name Modify supplier
Actors Group Engineer.
Pre condition User must login to the system.
Scenario 1. Use case begins when user select supplier need to
modify.
2. Use case ends when store new user details in the
database.
Extensions
Post Condition Store new supplier details in the database and update the
database.
26
SLIIT
The diagrams below are the activity diagrams for the use case scenarios above.
Select Report
Access
Database
Generate
Report
Display Report
Add Comment
Add Comment
[ valid Comment ] [Invalid Comment]
Display Error
Store Comment Send Email
Figure 4.1.4.5
(View Report)
27
SLIIT
Enter Username
& Password
[Valid] [Invalid]
Select Location Dispaly Error
Year & Month Message
Add Monthly Re-enter
Consumptions Password
Store Data
Figure 4.1.4.6
(Add Monthly Consumption)
28
SLIIT
Enter Username
& Password
[Invalid] [Valid]
Display Error Add Palnt
Message Details
Store Data
Figure 4.1.4.7
(Add Plant Detail)
Enter Username
& Password
[Invalid] [Valid]
Display Error Add Tariff
Message Charges
Store Data
Figure 4.1.4.8
(Add Tariff Changes)
29
SLIIT
Enter Username
& Password
[Valid] [Invalid]
Select Plant Details
Display Error
to Remove
Message
Confirmation
Message
[Cancel] [Remove]
Remove Item From
The Database
Figure 4.1.4.9
(Remove Plant Details)
30
SLIIT
The diagram below is the class diagram for the system.
Figure 4.1.4.10
(Class diagram)
31
SLIIT
5. Nonfunctional Requirements
5.1. Performance requirements
The following requirements associated with the speed with which the
EMIS shall function.
5.1.1 Capacity
The following requirements concern the minimum number of objects that
the system can support.
1) The EMIS shall support a maximum of 50 users.
.
5.1.2 Latency
The maximum time that is permitted for the system to execute a specific
task (i.e. system operations) is 10 sec.
5.1.3 Response time
The maximum time that is permitted for the system to respond to requests.
1) All system responses shall occur within 30 seconds.
5.2. Safety requirements
The following requirements are associated with the degree to which the
EMI system does not directly or indirectly cause accidental harm to life or
property.
SA-1 : The system shall not accidentally lose user account information.
SA-2 : The system shall not lose any data in databases.
SA-3 : The system shall warn engineers if a dramatic increase of energy
consumption is detected in each factory.
SA-4 : The system shall keep backups once in every four months. When
this time expires, records will be removed from the database
automatically. These data will be stored in files in read only
format where only the Administrator (Group Engineer) gets
permission to access them.
32
SLIIT
5.3. Security requirements
The security requirements that specify the extent to which the EMIS shall
protect itself and its sensitive data and communications from accidental,
malicious, or unauthorized access, use, modification, destruction, or disclosure.
SE-1 : Identification Requirements
The identification requirements specify up to which extent the EMIS
should identify its externals (e.g., human users and external applications) before
interacting with them.
For this purpose the users of the EMIS will be given different user names
and passwords.
SE-2 : Privacy Requirements
The privacy goal of the EMIS is to ensure the confidentiality of all information
entrusted to it, whether stored or communicated, except for such information that
an operational requirement explicitly makes public. The following privacy
requirements specify the extent to which the EMIS shall support anonymity and
keep its confidential data and communications private from unauthorized
individuals and programs.
1).User Privacy – A minimum of 99% of the time, the EMIS shall
Restrict access as indicated to the following confidential user
Information, whether communicated or stored.
-Password Information (restricted to the Group Engineer)
+Password
+Password Confirmation
SE-3 : System Maintenance Security Requirements
The EMIS should ensure that authorized modifications during maintenance will
not inadvertently allow unauthorized individuals access to the system. The
Brandix IT department will only be authorized to take care of the maintenance
part of the system.
33
SLIIT
5.4. Software quality attributes
5.4.1 Portability
The EMIS should enable users to use the following environments
to interact with the EMIS:
1).User Personal Computer:
Linux
Windows/XP,
3).Platform
Microsoft .Net platform 3.5
4).External software
SQL server 2005 express edition
5.4.2 Reliability
The EMIS support reliability by taking backups of the database
once in every four months. If a system failure occurs, the system will be
up within 24 hours.
5.4.3 Robustness
The following requirements are associated with the degree to which the
system continues to properly function under abnormal circumstances.
1) The EMIS should gracefully handle invalid inputs. For this a validation
will be done before entering data in to the database.
2) The EMIS should gracefully handle hardware failures. If a failure in
database occurred then system will be redirected to another page where
it asks the user to refresh the page after few minutes.
5.4.4 Integrity
Only users who have access privileges shall be able to view energy
consumption histories. The authorized users will be the Factory Engineers,
Group Engineers and the Brandnet users
34
SLIIT
5.5. Project documentation
The template of the Software Requirement Specification was published on
the SLIIT course web. The EMIS SRS will be completed according to that format.
SRS and final document will be delivered in the near future.
5.6. User documentation
EMIS hopes to deliver an online user manual along with the website, so
that every user can refer it through internet for efficient system usage. Help will
also provide when ever needed.
5.7. Other Operational requirements
Not applicable at this stage of the document.
35
SLIIT
6. Other Requirements
Not Applicable at this stage of the document.
36
SLIIT
7. Appendix
7.1. Appendix A: Terminology
KPI -: Key Performance Indicator
EMIS -: Energy Management Information System
7.2. Appendix B: Glossary
SRS -: System Requirement Specification
Activity diagram -: An activity diagram is a variation of a state machine, used to represent a
High-level process rather than a specific object:
– States represent the performance of sub-activities
– Transitions are triggered by the completion of sub activities.
Class Diagram -: are a static view of a system showing the relationships between classes,
interfaces and collaborations
Use case -: A use case describes software requirements in terms of:
– The external entities that interact with the system;
– The flow of events that occur during these interactions.
A UML class structure describes several important properties of a class.
37