					  KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




  DETAILED PROJECT REPORT
                             (DPR)
                        (2009-2014)



                                 PIA
                         KGVK
                   RANCHI, JHARKHAND




              MICRO-WATERSHED CODE: 2A2H2d3f

                       NAME : TALATAND
                       BLOCK: PATRATU
                      DISTRICT: RAMGARH



STATE LEVEL NODAL AGENCY- JHARKHAND STATE WATERSHED MISSION
                  Department of Rural Development
    4   th
             Floor, FFP Building, Dhurwa, Ranchi- 834004
             Telephone/ Fax: 91 - 651-2403017, 2401974
                E-mail : rddjharkhand.slna@gmail.com




        DEPARTMENT OF LAND RESOURCES
        MINISTRY OF RURAL DEVELOPMENT
             GOVERNMENT OF INDIA
                  NEW DELHI




                                                                 Page 1 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)


                                            PREFACE




                                                       B. Nijalingappa (IFS)
                                                         CEO JSWM-SLNA
                                   PREFACE

It is our immense pleasure to submit the DPR prepared by the PIA – Krishi Gram Vikas
Kendra, Rukka, Ramgarh, Jharkhand under IWMP 2009-10.
Where, IWMP Patratu having treatable area of 4488.55 Ha with the financial outlay of
Rs.538.63 Lakhs. The team led by Shri K. L. Choudhary from KGVK & its WDT team has
done PNP, PRA, Baseline Survey etc. meticulously as per the Watershed Common
Guidelines 2008 and prepared the Detailed Project Report (DPR) of Patratu block of
Ramgarh district.

We are thankful to Mr. R. S. Poddar IAS, Principal Secretary, DoRD, GoJ & Mr. S.K.
Satpathy the then Secretary, DoRD, GoJ along with the team of DoLR particularly. Mr.
Surendra Kumar DIG Forest, Mr. C.P. Reddy & Mr. V.M. Arora who has guided us a lot
in this regard.

We must remember Dr. A.K. Sikka Technical Expert from NRAA who has given precious
time as a result PIA under the Co-ordination with JSWM-SLNA has prepared and
submitted the existing DPR.

Shri S.K. Choudhary the then Chairman of JSWM – cum Development Commissioner
(GoJ) and present Chief Secretary, GoJ is the source of inspiration and guidance to
undertake the IWMP projects and setting up of JSWM. We are grateful to him.

We wish all the best.




                                                               (B. Nijalingappa) IFS
                                                        CEO JSWM-SLNA, DoRD, GoJ


                                                                               Page 2 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)


                                                                                  la;qDr lfpo
                                                                           Ñf"k xzke fodkl dsUnz
                                                                             ¼dsñthñohñdsñ½
                 dsñ ,yñ                                                   #Ddk] jk¡ph & 835217
                 pkS/kjh                                                         Jt. Secretary
            K. L. CHOUDHARY                                             Krishi Gram Vikas Kendra (KGVK)
                                               FOREWORD                      Rukka, Ranchi-835217

KGVK is the society registered under Society Registration Act 1860 and CSR wing of Usha Martin Group. At KGVK, we are
committed towards integrated rural development through the TVM (Total Village Management) process and on P4 (People-
Public-Private-Partnership) model. We have the experience of more than a decade in the field of watershed including the
prestigious project like ICEF (India Canada Environment Facility) and SRTT (Sir Ratan Tata Trust).

Since KGVK is working on program mode in our command area spread over into more than 350 villages across 5 locations of
Jharkhand.

Under these circumstances, watershed is the most important and integrated project for the socio-economic development of
the region. Here, the DPR (Detailed Project Report) of watershed which is based on Common Guidelines for Watershed
Development Projects, Government of India 2008 which includes the total cost of Rs 99.52 Lakhs to cater the need of 1048
households. During the preparation of this DPR whole team of KGVK and JSWM-SLNA has accepted the challenges and finally
the DPR is lying into your hand within the stipulated time.

Under the process of preparation of such DPR, the support started from the community at grassroot level, KGVK at PIA level,
WCDC at district level, JSWM-SLNA at state level & finally support from DoLR, GOI at national level is of great help to learn,
understand and finally to prepare on the partnership mode.

We would like to thank Mr. B. Nijalingappa CEO JSWM-SLNA, Mr. R.S. Poddar Principal Secretary, DoRD, GoJ, Mr. S.K. Satpathy
the then Principal Secretary, DoRD, GoJ at state level & Mr. Surendra Kumar DIG Forest, Mr. C.P. Reddy DIG Forest, Mr. V.M.
Arora DIG Forest, Ms. Savita Anand Jt. Secretary, DoLR, GOI, Mrs. Anita Choudhary, Secretary DoLR, GOI who has not only
trained us but have also given the opportunity to share the learning at central level.

KGVK is also very much grateful to Dr. A. K. Sikka and Dr. J. Samra of NRAA (National Rainfed Area Authority) who has given
precious time to share the learning of watershed and convergence to other programmes. We are also thankful to Mr. S.K.
Choudhary Chief Secretary GoJ & the then Development Commissioner and chairman of Jharkhand State Watershed Mission
for his frequent support, motivation and presence at every level as & when it was needed.

And finally, we would like to thank the President of KGVK Mr. Basant Kumar Jhawar and Vice-President           Mr. Brij Kishore
Jhawar who has not only given precious time but also given the liberty to the team at PIA level, as a result, we could achieve
within the stipulated time.

We are very much confident about the success of the project by the support of all concern.

                                                                                                                  Thanks!




                                                                                                              K. L. Choudhary
                                                                                                                (Jt. Secretary)




                                                                                                                Page 3 of 99
         KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                                                       Contents
Annexure 1: Five Year Budget Details as approved by CEO SLNA – JSWM and Rural Development Secretary, Jharkhand ................................................... 6

Annexure 2: Convergence of IWMP and MNREGA guideline of DoLR, GoI............................................................................................................................. 9

   Annexure 3: Action Plan as recommended by CEO SLNA-JSWM ...................................................................................................................................... 12

Executive Summary ............................................................................................................................................................................................................... 16

CHAPTER 1 ............................................................................................................................................................................................................................. 19

Introduction and Background................................................................................................................................................................................................ 19

   INTRODUCTION ................................................................................................................................................................................................................. 19

   II). PROFILE OF THE WATERSHED PROJECT: ...................................................................................................................................................................... 19

   Table No.1.1 Project at a Glance ...................................................................................................................................................................................... 19

   Table No. 1.2 Need and Scope for Watershed Development .......................................................................................................................................... 20

   Table no.1.3: Watershed information ............................................................................................................................................................................... 23

   Table No.1.4: Status of other development project in the area ....................................................................................................................................... 23

   Table No. 1.5: Status of previous watershed programme- ............................................................................................................................................... 23

CHAPTER 2 ............................................................................................................................................................................................................................. 24

General Description of Project Area...................................................................................................................................................................................... 24

   Table 2.1: Location ............................................................................................................................................................................................................ 24

   Details of the types of areas covered under the project........................................................................................................................................... 27

   Table no: 2.2 Land Details ................................................................................................................................................................................................. 27

                                                                                                                                                                                                                     Page 2 of 99
         KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



   Table No. 2.3: Details of the types of areas covered under the project ........................................................................................................................... 28

   Table No. 2.4: Details of Agro-climatic condition .............................................................................................................................................................. 29

   Table No. 2.5 Details of flood and drought in the project area ........................................................................................................................................ 29

   Table No. 2.6: Details of soil erosion in the project area .................................................................................................................................................. 30

   Table No. 2.7 Details of the Soil pH ................................................................................................................................................................................... 30

   Table No.2.7.1 Climatic Condition ..................................................................................................................................................................................... 31

   Table No.-2.8 Physiographic Features ............................................................................................................................................................................... 32

   Table No. 2.9 Watershed characteristics........................................................................................................................................................................... 32

CHAPTER – 3 .......................................................................................................................................................................................................................... 40

BASE LINE INFORMATION OF WATERSHED ........................................................................................................................................................................... 40

   Table No. 3.1: Demographic features: .............................................................................................................................................................................. 40

    ........................................................................................................................................................................................................................................... 41

   Table No. 3.2: Livestock details: ........................................................................................................................................................................................ 42

   Table No.3.3:Socio- economic status: ............................................................................................................................................................................... 43

   Table No. 3.4: Migration Details:....................................................................................................................................................................................... 44

   Table No. 3.5: Details of Community Based Organizations existing in the watershed village: ......................................................................................... 45

   Table No. 3.6: Infrastructure Facilities: ............................................................................................................................................................................ 47

   Table No.3.7 Land use pattern (in Hectares) ..................................................................................................................................................................... 49

   Table No. 3.8: Details of Common Property Resources: ................................................................................................................................................... 50

   Table No. 3.9: Agriculture implements:                               Table No. 3.10: Crop Classification............................................................................................................... 51
                                                                                                                                                                                                                            Page 3 of 99
         KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



   Table No. 3.12: Land capability Classification .................................................................................................................................................................. 54

   Table No.3.13: Irrigation facilities: ................................................................................................................................................................................... 55

   Table No. 3.14: Status of water table: ............................................................................................................................................................................... 55

   Table No. 3.15: Assessment of drinking water facility*: ................................................................................................................................................... 56

   Table No. 3.16: Surface water resources.......................................................................................................................................................................... 57

   Table No. 3.17 Ground Water Structures to be repaired. ................................................................................................................................................. 58

   Table No. 3.18: Existing Water Saving Practices: .............................................................................................................................................................. 58

   Table No. 3.19: Details of existing livelihoods ................................................................................................................................................................... 59

   Table No. 3.20: Existing functional assets (Works already completed under different schemes including works undertaken by farmers
   independently) .................................................................................................................................................................................................................. 59

CHAPTER – 4 .......................................................................................................................................................................................................................... 62

Institutional Building and Project Management ................................................................................................................................................................... 62

   Table No. 4.1 Details of SHGs & UGs newly formed under IWMP: ................................................................................................................................... 63

   Table No 4.3: WDT Particulars:.......................................................................................................................................................................................... 65

   Table No. 4.4: PIA particulars ........................................................................................................................................................................................... 66

   Table No. 4.5 Bank Account Details................................................................................................................................................................................... 66

   Institutional Mechanisms: (Enclose the following documents) ........................................................................................................................................ 67

   Table No. 4.8 Convergence plan with IWMP:.................................................................................................................................................................... 71

CHAPTER – 5 .......................................................................................................................................................................................................................... 73

Management/Action Plan ..................................................................................................................................................................................................... 73

                                                                                                                                                                                                                    Page 4 of 99
         KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



   Description on methodology of plan adopted .................................................................................................................................................................. 73

   5.2 Details of Natural Resource Management Activities................................................................................................................................................... 75

   Table No. 5.2.1 Soil and Moisture Conservation structures.............................................................................................................................................. 75

   Table No. 5.2.2 Water Harvesting Structures .................................................................................................................................................................... 76

   Table No. 5.2.2 Vegetative Covers .................................................................................................................................................................................... 77

   5.3: Structure or Activity Wise Details of Engineering Structure and Vegetative Measures ............................................................................................ 78

   Table No.5.3.1 : Engineering structures for Soil Conservation Measures (SMC) ............................................................................................................ 78

   5.3.2: Details of engineering structures for Water Harvesting WHS................................................................................................................................. 79

   Table No. 5.3.3: Details of activities connected with vegetative cover in watershed works* .......................................................................................... 80

Chapter 6 ................................................................................................................................................................................................................................ 81

   Table No. 6.1 Details of Capacity Building ......................................................................................................................................................................... 82

Chapter 7 ............................................................................................................................................................................................................................... 85

Phasing of Programme and Budgeting .................................................................................................................................................................................. 85

   Table No. 7.1: Phasing of the action plan ......................................................................................................................................................................... 86

   Table No. 7.2 Estimated Benefit Cost Ratio ...................................................................................................................................................................... 89

Chapter 8 ............................................................................................................................................................................................................................... 90

CHAPTER – 9 .......................................................................................................................................................................................................................... 91

   Table No. 9.2: Summarize in the table given below (Quantifiable indicators).................................................................................................................. 93

   Table No.9.3: Backward and Forward Linkages................................................................................................................................................................ 96

List of Maps to be enclosed along with DPR. ........................................................................................................................................................................ 98
                                                                                                                                                                                                                       Page 5 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



Annexure 1: Five Year Budget Details as approved by CEO SLNA – JSWM and Rural Development Secretary, Jharkhand
                                                     State Level Nodal Agency - Jharkhand State Watershed Mission (SLNA-JSWM)
Name of PIA : KGVK                                                               Code of Micro Watershed : 2A2H2d3f
Name of Micro Watershed : Talatand                                               No of families existing under Micro Watershed : 1048No.
Districts : Ramgarh                                                              No of SHG to be formed : 42 No
Blocks Covered : Patratu                                                         No of UG to be formed : 14 No
Name of Village : Talatand, Ucharinga, Hesla, Gegda, Labga,
                                                                                 No of Training to be Proposed : 5No
Melani,Netuwa, & Barghutuwa.
Total Geog. Area of Micro Watershed (Ha): 917.58Ha                               No of Exposure Visits to be Conducted : 02 No
Total Proposed Area to be Treated (Ha) : 829.33 Ha                               Nos of Persons Days to be Generated : 31531 No.
Total Budget (Rs. In Lakhs) : 99.52 Lakhs                                        Date of Approval from Gram Sabha :
Year Wise Physical and Financial Details for the Talatand Micro-watershed
                                                                                                            2010-     2011-      2012-    2013-      2014-
                                                                                                 Rate in                                                         Grand Total
Sl no Budget Head                     Details of Activities                      Unit    Qty.               2011      2012       2013     2014       2015
                                                                                                 Rs.                                                             (Rs.)
                                                                                                            Fin       Fin        Fin      Fin        Fin
                                      a)Reno of drinking Water                   no          7        0.24      1.65      0.00       0.00     0.00       0.00            1.65
                                      b)Micro drinking water System              no          0        2.40      0.00      0.00       0.00     0.00       0.00            0.00
                                      c)Ban Mahostav by School Children          no          1        0.18      0.18      0.00       0.00     0.00       0.00            0.18
                                      d)Nutritional Garden                       family     27        0.01      0.27      0.00       0.00     0.00       0.00            0.27
                                      e)Revoving fund for Agricultural
                                                                                 …       …            0.80      0.80      0.00       0.00     0.00       0.00            0.80
                                      Activities
                                      f)Bio Gas                                  no          1        0.20      0.20      0.00       0.00     0.00       0.00            0.20
          Entry Point Activities(EPA)
     1                                g)Solar Lamp Demonstration                 no          5       0.015      0.08      0.00       0.00     0.00       0.00            0.08
                                      h)Smokeless Chullah                        no          5       0.004      0.02      0.00       0.00     0.00       0.00            0.02
                                      i)Soil testing                             plot       20       0.001      0.02      0.00       0.00     0.00       0.00            0.02
                                      j)Training cum Exposer                     …       …            0.14      0.14      0.00       0.00     0.00       0.00            0.14
                                      k) Vegetable green shade net               No.         1       0.500      0.50      0.00       0.00     0.00       0.00            0.50
                                      l) fruit plant garden                      No.         2       0.050      0.10      0.00       0.00     0.00       0.00            0.10
                                      m)Animal Health Camp                       no          1        0.03      0.03      0.00       0.00     0.00       0.00            0.03
                                                                                          Total                 3.98      0.00       0.00     0.00       0.00            3.98
                                      a)Farm Pond                                No          8        1.23      0.00      2.46       3.69     2.46       1.23            9.84
                                      b)Pond Reno                                No          3        0.73      0.00      0.73       0.73     0.73       0.00            2.19
                                      c)Dova                                     No          1        0.61      0.00      0.00       0.00     0.61       0.00            0.61
          a.Water Coservation         d)Spring development                       No          1          0.7     0.00      0.00       0.00     0.70       0.00            0.70
     2
                                      f)Drinking well Renovation                 No         10        0.26      0.00      0.92       0.92     0.46       0.00            2.30
                                      h) Irrigation channel                      RMT     1000        0.013      0.00      0.00       1.30     3.90       7.80           13.00
                                                                                          Total                 0.00      4.11       6.64     8.86       9.03           28.64




                                                                                                                                                                Page 6 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                          a)Contour Trenching                                                        Ha                    16    0.26   0.00   1.56   1.56   1.04   0.00    4.16
                          b)Field Bunding                                                            Ha                    25    0.17   0.00   0.85   1.70   1.70   0.00    4.25
    b.Soil and
                          c)Gully Plugging                                                           No                    32    0.05   0.00   0.50   0.75   0.25   0.10    1.60
    Moisture
                          d)Boulder Checks                                                           No                    18    0.13   0.00   0.65   1.43   0.26   0.00    2.34
    Conservation
                          e)Field Out lets                                                           No                   256   0.005   0.00   0.21   0.61   0.46   0.00    1.28
                                                                                                                  Total                 0.00   3.77   6.05   3.71   0.10   13.63

                          a)Agro Forestry                                                            Ha                    8     0.31   0.00   0.62   0.62   0.62   0.62    2.48
    c.Forest and
                          b)Mango Orchards through intercropping                                     Ha                    5     0.59   0.00   1.18   0.59   0.59   0.59    2.95
    Horticulture
                                                                                                                  Total                 0.00   1.80   1.21   1.21   1.21    5.43

    d.Renewable           a) Smoke less chulhas                                                      No                   50    0.005   0.00   0.00   0.25   0.00 0.00      0.25
    Energy                b)Biogass                                                                  No                   10     0.18   0.00   0.00   0.90   0.90 0.00      1.80
                                                                                                                  Total                 0.00   0.00   1.15   0.90 0.00      2.05
                                                                                                                                                               Total-02    49.75
                          a)Orientation Training to SHG members for 01 Day at village level
                                                                                                     Batch/Training
                          @Rs150.00/Person/Day/Batch @ 50 persons in each batch & total 200                               10    0.075   0.45   0.23   0.08   0.00   0.00    0.75
                                                                                                     no.
                          persons will be trained in 4 batches
                          b)Orientation Training to UG members for 02 Day at Village
                                                                                                     Batch/Training
                          Level@Rs.150.00/Person/Day@ 29 persons/ batch where 58 persons will be                           8    0.087   0.35   0.26   0.09   0.00   0.00    0.70
                                                                                                     no.
                          trained two times, 2nd training will be refresher
                          c)Skill Development training to SHG members for 02 Days
                                                                                                     Batch/Training
                          @Rs200.00/Person/Day@ 30 persons in each batch in 05 Batch fo 150                               10     0.12   0.60   0.48   0.12   0.00   0.00    1.20
                                                                                                     no.
                          persons in 5 batches
                          d)Skill Development training to Watershed Committee members as well as
                                                                                                     Batch/Training
                          Volunteers for 03 Days @ Rs.200.00/person/Day in 01 Batch @ 25                                   1     0.15   0.15   0.00   0.00   0.00   0.00    0.15
    a.Capacity Building                                                                              no.
3                         persons/batch
                          e)Water Management Training to User's Group for 02 Days
                                                                                                     Batch/Training
                          @Rs.200.00/Person/Day @ 35 persons in each batch & total 70 persons will                         3     0.14   0.28   0.00   0.14   0.00   0.00    0.42
                                                                                                     no.
                          be trained
                          f)Exposer to Watershed Committee to Outside State for 7 Days @Rs           Batch/Training
                                                                                                                           1     0.28   0.28   0.00   0.00   0.00   0.00    0.28
                          500.00/Person/Day for 8 persons/batch                                      no.
                          g)Exposer to WDT to Outside State for 2 Days@Rs 600.00/Person/Day for 5    Batch/Training
                                                                                                                           2     0.06   0.00   0.12   0.00   0.00   0.00    0.12
                          persons                                                                    no.
                          h)Documentary Picture of Success Story                                     No                    1            0.10   0.00   0.00   0.00   0.00   0.10
                          i)Agricultural Literature For Farmers as IEC Materials                     ….                 LS              0.07   0.00      0   0.00   0.00   0.07
                          j)Capacity Building training by SLNA &DWDU                                 ….                 LS              0.71   0.36   0.12   0.00   0.00   1.19
                                                                                                                  Total                 2.99   1.45   0.54   0.00   0.00   4.98




                                                                                                                                                                Page 7 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                         a) Goatry Unit of 07 members of JLG under SHG                   No    2      0.68   0.00   0.68   0.68   0.00   0.00   1.36
                                         b)Polutry unit of 250 nos Bird size with 05 members of SHG      No    3      0.62   0.00   0.62   0.62   0.62   0.00   1.86
                                         c) Pigery Unit of 07 members of JLG under SHG                   No    2       0.7   0.00   0.70   0.70   0.00   0.00   1.40
4   Livelihood for Assetless             d)Mushroom Unit 25 bags for SHG member                          No   10      0.18   0.00   0.90   0.54   0.36   0.00   1.80
                                         e) Stitching Unit of 07 members of JLG under SHG in Revolving
                                                                                                         No   2        1.1   0.00   1.10   0.00   1.10   0.00   2.20
                                         mode
                                         f)Vermin compost production model with small Farmers            No   10 0.135       0.00   0.41   0.54   0.41   0.00   1.35
                                                                                                              Total          0.00   4.41   3.08   2.49   0.00   9.97
                                         a)SRI Extension in traditional as well as improved variety      Ha   20      0.23   0.00   1.61   1.61   1.38   0.00    4.60
                                         b)Bottle guard Demonstration with poly mulching                 Ha    2      0.63   0.00   0.63   0.32   0.32   0.00    1.26
                                         c)Hyv Tomatoes Demonstration as Vegetable                       Ha    8      0.47   0.00   1.41   1.41   0.94   0.00    3.76
                                         d)Improved Green Pea Demonstration as Vegetable                 Ha    4      0.25   0.00   0.50   0.25   0.25   0.00    1.00
    Productivity Enhancement and micro   e)Hyv Pigeon pea Demonstration as Pulses                        Ha    7      0.11   0.00   0.33   0.22   0.22   0.00    0.77
5
    Enterprises                          f)Hyv Pearl millet Demonstration as Cereal crop                 Ha    2       0.1   0.00   0.10   0.10   0.00   0.00    0.20
                                         g)Hyv Nizer Demonstration as dry land Oil seed                  Ha    2      0.07   0.00   0.04   0.07   0.04   0.00    0.14
                                         h)Hyv Sorgum Demonstration as dry land Cereals                  Ha    5       0.1   0.00   0.20   0.20   0.10   0.00    0.50
                                         i)Sun Flower Demonstration as Perennial Oil seed                Ha    5      0.14   0.00   0.28   0.21   0.21   0.00    0.70
                                                                                                              Total          0.00   5.10   4.39   3.45   0.00   12.93




                                                                                                                                                     Page 8 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




Annexure 2: Convergence of IWMP and MNREGA guideline of DoLR, GoI
 Convergence Plan for Talatand Micro Watershed
                                                                                               Convergence Under Different Schemes                                          Special
                                                                                                                                                                            Programme
                                                                                               I.W.M.P           MNREGA        NHM           NRLM           Banks
Sl                                                                           Rate     Amt in                                                                                will Design
     Line Activities                                      Qty       Unit
no                                                                           Rs.      Lakhs              Amt.          Amt.          Amt.           Amt.            Amt.           Amt.
                                                                                               Qty       in      Qty   in      Qty   in      Qty    in      Qty     in      Qty in
                                                                                                         Lakhs         Lakhs         Lakhs          Lakhs           Lakhs          Lakhs
1    Water Conservation
     a)Farm Pond                                            10       No        1.23    12.30      8       9.84    2     2.46    0     0.00     0     0.00    0       0.00     0       0
     b)Pond Reno                                             3       No        0.73     2.19      3       2.19    0     0.00    0     0.00     0     0.00    0       0.00     0       0
     c)Dova                                                  1       No        0.61     0.61      1       0.61    0     0.00    0     0.00     0     0.00    0       0.00     0       0
     d)Spring development                                    1       No         0.7     0.70      1       0.70    0     0.00    0     0.00     0     0.00    0       0.00     0       0
     e)Irrigation well in Valley line                       10       No        1.12    11.20      0       0.00   10    11.20    0     0.00     0     0.00    0       0.00     0       0
     f)Drinking well Renovation                             10       No        0.23     2.30     10       2.30    0     0.00    0     0.00     0     0.00    0       0.00     0       0
     g)Micro Lift Irrigation                                 2       No        4.25     8.50      0       0.00    0     0.00    0     0.00     0     0.00    0       0.00     2     8.5
     h) Irrigation channel                                1000       No      0.013     13.00   1000      13.00    0     0.00    0     0.00     0     0.00    0       0.00     0       0
     i)Check Dam Const.                                      1       No      10.08     10.08      0       0.00    0     0.00    0     0.00     0     0.00    0       0.00     1   10.08
                                                                           Total-01    60.88             28.64         13.66          0.00           0.00            0.00         18.58
2    Soil and Moisture Conservation
     a)Contour Trenching                                    12       Ha        0.26     3.12     12       3.12    0     0.00    0     0.00     0     0.00    0       0.00     0    0.00
     b)Field Bunding                                        25       Ha        0.17     4.25     25       4.25    0     0.00    0     0.00     0     0.00    0       0.00     0    0.00
     c)Gully Plugging                                       30       No        0.05     1.50     30       1.50    0     0.00    0     0.00     0     0.00    0       0.00     0    0.00
     d)Boulder Checks                                       18       No        0.13     2.34     18       2.34    0     0.00    0     0.00     0     0.00    0       0.00     0    0.00
     e)Field Out lets                                      256       No      0.005      1.28    256       1.28    0     0.00    0     0.00     0     0.00    0       0.00     0    0.00
     f)Border trenching                                      1       Ha        0.35     0.35      0       0.00    1     0.35    0     0.00     0     0.00    0       0.00     0    0.00
     g)Land levelling                                        2       Ha        0.30     0.60      0       0.00    2     0.60    0     0.00     0     0.00    0       0.00     0    0.00
                                                                           Total-02    13.44             12.49          0.95          0.00           0.00            0.00          0.00
3    Forest and Horticulture
     a)Commercial Timber Plantation of Teak and
                                                                8    Ha       0.31      2.48         8    2.48    0     0.00    0     0.00     0     0.00    0       0.00     0       0
     Gambhar
     b)Mango Orchards through intercropping                     2    Ha    0.59         1.18         2    1.18    0     0.00    0        0     0     0.00    0       0.00     0    0.00
                                                                       Total -03        3.66              3.66          0.00          0.00           0.00            0.00          0.00
4    Agriculture
     a)SRI Extension in traditional as well as improved
                                                            10       Ha       0.23      2.30     10       2.30    0     0.00    0     0.00     0     0.00    0       0.00     0    0.00
     variety
     b)Bottle guard Demostration with poly mulching          0       Ha       0.63      0.00      0       0.00    0     0.00    0     0.00     0     0.00    0       0.00     0    0.00
     c)Hyv Tomatoes Demostration as vegitable              0.5       Ha       0.47      0.24    0.5       0.24    0     0.00    0     0.00     0     0.00    0       0.00     0    0.00
     d)Improved Green Pea Demostration as Vegitable        0.5       Ha       0.25      0.13    0.5       0.13    0     0.00    0     0.00     0     0.00    0       0.00     0    0.00
     e)Hyv Pigeon pea Demostration as Pulses               0.5       Ha       0.11      0.06    0.5       0.06    0     0.00    0     0.00     0     0.00    0       0.00     0    0.00

                                                                                                                                                                     Page 9 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



    f)Hyv Pearl millet Demostration as Cereal crop           0.5   Ha      0.1     0.05   0.5   0.05   0   0.00   0   0.00   0   0.00   0   0.00    0   0.00
    g)Hyv Nizer Demostration as dry land Oil seed            0.5   Ha    0.07      0.04   0.5   0.04   0   0.00   0   0.00   0   0.00   0   0.00    0   0.00
    h)Hyv Sorgum Demostration as dry land Cereals            0.5   Ha      0.1     0.05   0.5   0.05   0   0.00   0   0.00   0   0.00   0   0.00    0   0.00
    i)Sun Flower Demostration as Perrenial Oil seed          0.5   Ha    0.14      0.07   0.5   0.07   0   0.00   0   0.00   0   0.00   0   0.00    0   0.00
                                                                     Total -04     2.92    ….   2.92       0.00       0.00       0.00       0.00        0.00
5   Innovative Activities
    a)Smokeless chulha                                       50    no     0.005    0.25   50    0.25   0   0.00   0   0.00   0   0.00   0   0.00    0   0.00
    b) Biogass                                               10    no       0.18   1.80   10    1.80   0   0.00   0   0.00   0   0.00   0   0.00    0   0.00
                                                                        Total-05   2.05         2.05       0.00       0.00       0.00       0.00        0.00
6   Capacity Building
    a)Orientation Training to SHG members for 01 Day at
                                                             10    No     0.075    0.75   10    0.75   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    village level @Rs150.00/Person/Day in 10 Batch
    b)Orientation Training to UG members for 01 Day at
                                                              8    No     0.087    0.70    8    0.70   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    Village Level@Rs.150.00/Person/Day in 08 batch
    c)Skill Devlopment training to SHG members for 10
                                                             10    No      0.12    1.20   10    1.20   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    Days @Rs200.00/Person/Day in 05 Batch
    d)Skill Devlopment training to Watershed
    Committee members as well as Volunteers for 03            1    No      0.15    0.15    1    0.15   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    Days @ Rs.200.00/person/Day for 3 Days in 01 Batch
    e)Water Management Training to User's Group for
    02 Days @Rs.200.00/Person/Day for 02 Days in 03           3    No      0.14    0.42    3    0.42   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    Batches
    f)Exposer to Watershed Committee to Outside State
                                                              1    No      0.28    0.28    1    0.28   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    for 07 Days@Rs 400.00/Person/Day for 07 Days
    g)Exposer to WDT to Outside State for 10 Days@Rs
                                                              2    No      0.06    0.12    2    0.12   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    600.00/Person/Day
    h)Documentary Picture of Success Story                    1    No        0.1   0.10    1    0.10   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    i)Agricultural Literature For Farmers as IEC Materials                    LS   0.07         0.07   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    j)Capacity Building training by SLNA &DWDU                                     1.19         1.19
                                                                        Total-06   4.98         4.98       0.00       0.00       0.00       0.00        0.00
    Livelihood and Micro Enterprises for production
7
    System
    a)Goatry Unit of 07 members of JLG under SHG in
                                                              6    No      0.68    4.08    6    4.08   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    Revolving mode
    b)Polutry unit of 250 nos Bird size with 05 members
                                                              6    No      0.62    3.72    6    3.72   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    of SHG in revolving mode
    c)Pigery Unit of 07 members of JLG under SHG in
                                                              8    No        0.7   5.60    8    5.60   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    Revolving mode
    d)Mushroom Unit 25 bags for SHG member in
                                                             20    No      0.18    3.60   20    3.60   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    revolving mode
    e)Stiching Unit of 07 members of JLG under SHG in
                                                              3    No        1.1   3.30    3    3.30   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    Revolving mode
    f)Vermi compost production model with small
                                                             19    No     0.135    2.57   19    2.57   0   0.00   0   0.00   0   0.00   0    0.00   0   0.00
    Farmers in revolving mode
                                                                                                                                            Page 10 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



                                                                   Total-07    22.87        22.87        0.00       0.00       0.00       0.00         0.00
8    Consolidation Phases Activities
     a)Market Linkages of SHG Product and it's
                                                         10   No        0.3     3.00   10    3.00   0    0.00   0   0.00   0   0.00   0    0.00   0    0.00
     Diversification
     b)Institutional linkages with Watershed Committee   1    No        0.3     0.30    1    0.30   0    0.00   0   0.00   0   0.00   0   0.00    0    0.00
     c)Experience sharing workshop at District Level     2    No       0.38     0.76    2    0.76   0    0.00   0   0.00   0   0.00   0   0.00    0    0.00
     d)Contigency fund to Watershed Committee            1    No       0.93     0.93    1    0.93   0    0.00   0   0.00   0   0.00   0   0.00    0    0.00
                                                                   Total-08     4.99   ….    4.99        0.00       0.00       0.00       0.00         0.00
     Project Admin and Office Running 90% of Budg.
9                                                                               9.95         9.95
     Year Mark
10   Monitoring 50% of Budg year Mark                                              1            1
11   Evaluation 50% of Budg year Mark                                              1            1
12   Entry Point Activities 100% of Budg. Year mark                             3.98         3.98
13   DPR Preparation 100% of Budg. Yr Mark                                         1            1
                                     G. Total                                 132.71        99.52       14.61       0.00       0.00       0.00        18.58




                                                                                                                                          Page 11 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




Annexure 3: Action Plan as recommended by CEO SLNA-JSWM
                  State Level Nodal Agency - Jharkhand State Watershed Mission (SLNA-JSWM)
Name of PIA : KGVK                                         Code of Micro Watershed : 2A2H2d3f
Name of Micro Watershed : Talatand                         No of families existing under Micro Watershed : 1048No.
Districts : Ramgarh                                        No of SHG to be formed : 42 No
Blocks Covered : Patratu                                   No of UG to be formed : 14 No
Name of Village : Talatand, Ucharinga, Hesla, Gegda,
                                                           No of Training to be Proposed : 5No
Labga, Melani,Netuwa, & Barghutuwa.
Total Geog. Area of Micro Watershed (Ha): 917.58Ha         No of Exposure Visits to be Conducted : 02 No
Total Proposed Area to be Treated (Ha) : 829.33 Ha         Nos of Persons Days to be Generated : 31531 No.
Total Budget (Rs. In Lakhs) : 99.52 Lakhs                  Date of Approval from Gram Sabha :
 Year Wise Physical and Financial Details for the Talatand Micro-watershed
                                                                                              2010-2011      2011-2012    2012-2013    2013-2014    2014-2015      Grand
Sl                                                                                   Rate
     Budget Head       Details of Activities               Unit             Qty.                                                                                   Total
no                                                                                   in Rs.   Phy     Fin    Phy   Fin    Phy   Fin    Phy   Fin    Phy     Fin
                                                                                                                                                                   (Rs.)
                       a)Reno of drinking Water            no                    7    0.24     7      1.65     0   0.00     0   0.00     0   0.00     0     0.00    1.65
                       b)Micro drinking water System       no                    0    2.40     0      0.00     0   0.00     0   0.00     0   0.00     0     0.00    0.00
                       c)Ban Mahostav by School Children   no                    1    0.18     1      0.18     0   0.00     0   0.00     0   0.00     0     0.00    0.18
                       d)Nutritional Garden                family               27    0.01    27      0.27     0   0.00     0   0.00     0   0.00     0     0.00    0.27
                       e)Revoving fund for Agricultural
                                                           …                …         0.80    …       0.80     0   0.00     0   0.00     0   0.00     0     0.00    0.80
                       Activities
     Entry Point       f)Bio Gas                           no                    1    0.20      1     0.20     0   0.00     0   0.00     0   0.00     0     0.00    0.20
     Activities(EPA)   g)Solar Lamp Demostration           no                    5   0.015      5     0.08     0   0.00     0   0.00     0   0.00     0     0.00    0.08
 1
                       h)Smokeless Chullah                 no                    5   0.004      5     0.02     0   0.00     0   0.00     0   0.00     0     0.00    0.02
                       i)Soil testing                      plot                 20   0.001     20     0.02     0   0.00     0   0.00     0   0.00     0     0.00    0.02
                       j)Training cum Exposer              …                …         0.14    …       0.14     0   0.00     0   0.00     0   0.00     0     0.00    0.14
                       k) Vegetable green shade net        No.                  1    0.500      1     0.50     0   0.00     0   0.00     0   0.00     0     0.00    0.50
                       l) fruit plant garden               No.                  2    0.050      2     0.10     0   0.00     0   0.00     0   0.00     0     0.00    0.10
                       m)Animal Health Camp                no                   1     0.03      1     0.03     0   0.00     0   0.00     0   0.00     0     0.00    0.03
                                                                       Total                          3.98         0.00         0.00         0.00           0.00    3.98
                                                                                                                                                  Total-01          3.98
                       a)Farm Pond                         No                 8       1.23        0   0.00     2   2.46     3   3.69     2   2.46     1 1.23        9.84
                       b)Pond Reno                         No                 3       0.73        0   0.00     1   0.73     1   0.73     1   0.73     0 0.00        2.19
                       c)Dova                              No                 1       0.61        0   0.00     0   0.00     0   0.00     1   0.61     0 0.00        0.61
     a.Water
                       d)Spring development                No                 1        0.7        0   0.00     0   0.00     0   0.00     1   0.70     0 0.00        0.70
 2   Coservation
                       f)Drinking well Renovation          No                10       0.26        0   0.00     4   0.92     4   0.92     2   0.46     0 0.00        2.30
                       h) Irrigation channel               RMT             1000      0.013            0.00     0   0.00   100   1.30   300   3.90 600 7.80         13.00
                                                                       Total                          0.00         4.11         6.64         8.86          9.03    28.64


                                                                                                                                                          Page 12 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



                   a)Contour Trenching                    Ha                   16    0.26   0   0.00    6   1.56     6   1.56    4   1.04       0      0.00    4.16
                   b)Field Bunding                        Ha                   25    0.17   0   0.00    5   0.85    10   1.70   10   1.70       0      0.00    4.25
    b.Soil and
                   c)Gully Plugging                       No                   32    0.05   0   0.00   10   0.50    15   0.75    5   0.25       2      0.10    1.60
    Moisture
    Conservation   d)Boulder Checks                       No                   18    0.13   0   0.00    5   0.65    11   1.43    2   0.26       0      0.00    2.34
                   e)Field Out lets                       No                  256   0.005   0   0.00   42   0.21   122   0.61   92   0.46       0      0.00    1.28
                                                                      Total                     0.00        3.77         6.05        3.71              0.10   13.63

                   a)Agro Forestry                        Ha                    8    0.31   0   0.00   2    0.62     2   0.62   2    0.62       2      0.62    2.48
    c.Forest and   b)Mango Orchards through
                                                          Ha                    5    0.59   0   0.00   2    1.18     1   0.59   1    0.59       1      0.59    2.95
    Horticulture   intercropping
                                                                      Total                     0.00        1.80         1.21        1.21              1.21    5.43

    d.Renewable    a) Smoke less chulhas                  No                   50   0.005   0   0.00   0    0.00    50   0.25   0    0.00       0      0.00    0.25
    Energy         b)Biogass                              No                   10    0.18   0   0.00   0    0.00     5   0.90   5    0.90       0      0.00    1.80
                                                                      Total                     0.00        0.00         1.15        0.90              0.00    2.05
                                                                                                                                            Total-02          49.75
                   a)Orientation Training to SHG
                   members for 01 Day at village level
                                                          Batch/Training
                   @Rs150.00/Person/Day/Batch @ 50                             10   0.075   6   0.45   3    0.23     1   0.08   0    0.00       0      0.00    0.75
                   persons in each batch & total 200
                                                          no.
                   persons will be trained in 4 batches
                   b)Orientation Training to UG
                   members for 02 Day at Village
                   Level@Rs.150.00/Person/Day@ 29         Batch/Training
                                                                                8   0.087   4   0.35   3    0.26     1   0.09   0    0.00       0      0.00    0.70
                   persons/ batch where 58 persons        no.
                   will be trained two times, 2nd
                   training will be refresher
                   c)Skill Development training to SHG
    a.Capacity     members for 02 Days
3                                                         Batch/Training
    Building       @Rs200.00/Person/Day@ 30                                    10    0.12   5   0.60   4    0.48     1   0.12   0    0.00       0      0.00    1.20
                   persons in each batch in 05 Batch fo
                                                          no.
                   150 persons in 5 batches
                   d)Skill Development training to
                   Watershed Committee members as
                                                          Batch/Training
                   well as Volunteers for 03 Days @                             1    0.15   1   0.15   0    0.00     0   0.00   0    0.00       0      0.00    0.15
                   Rs.200.00/person/Day in 01 Batch
                                                          no.
                   @ 25 persons/batch
                   e)Water Management Training to
                   User's Group for 02 Days
                                                          Batch/Training
                   @Rs.200.00/Person/Day @ 35                                   3    0.14   2   0.28   0    0.00     1   0.14   0    0.00       0      0.00    0.42
                   persons in each batch & total 70
                                                          no.
                   persons will be trained

                                                                                                                                                 Page 13 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



                     f)Exposer to Watershed Committee
                     to Outside State for 7 Days @Rs             Batch/Training
                                                                                       1     0.28        1   0.28        0   0.00        0   0.00    0    0.00   0     0.00   0.28
                     500.00/Person/Day for 8                     no.
                     persons/batch
                     g)Exposer to WDT to Outside State
                                                                 Batch/Training
                     for 2 Days@Rs 600.00/Person/Day                                   2     0.06        0   0.00        2   0.12        0   0.00    0    0.00   0     0.00   0.12
                     for 5 persons
                                                                 no.
                     h)Documentary Picture of Success
                                                                 No                    1                 1   0.10        0   0.00        0   0.00    0    0.00   0     0.00   0.10
                     Story
                     i)Agricultural Literature For Farmers
                                                                 ….               LS                LS       0.07   LS       0.00   LS         0     0    0.00   0     0.00   0.07
                     as IEC Materials
                     j)Capacity Building training by SLNA
                                                                 ….               LS                LS       0.71   LS       0.36   LS       0.12    0    0.00   0     0.00   1.19
                     &DWDU
                                                                             Total                           2.99            1.45            0.54         0.00         0.00   4.98
                     a) Goatry Unit of 07 members of JLG
                                                                 No                    2     0.68        0   0.00        1   0.68        1   0.68    0    0.00   0     0.00   1.36
                     under SHG
                     b)Polutry unit of 250 nos Bird size
                                                                 No                    3     0.62        0   0.00        1   0.62        1   0.62    1    0.62   0     0.00   1.86
                     with 05 members of SHG
                     c) Pigery Unit of 07 members of JLG
                                                                 No                    2      0.7        0   0.00        1   0.70        1   0.70    0    0.00   0     0.00   1.40
    Livelihood for   under SHG
4
    Assetless        d)Mushroom Unit 25 bags for SHG
                                                                 No                    10    0.18        0   0.00        5   0.90        3   0.54    2    0.36   0     0.00   1.80
                     member
                     e) Stiching Unit of 07 members of
                                                                 No                    2      1.1        0   0.00        1   1.10        0   0.00    1    1.10   0     0.00   2.20
                     JLG under SHG in Revolving mode
                     f)Vermi compost production model
                                                                 No                    10   0.135        0   0.00        3   0.41        4   0.54    3    0.41   0     0.00   1.35
                     with small Farmers
                                                                             Total                           0.00            4.41            3.08         2.49         0.00   9.97
                     a)SRI Extension in traditional as well as
                                                                 Ha                    20    0.23        0   0.00        7   1.61        7   1.61    6    1.38   0     0.00    4.60
                     improved variety
                     b)Bottle guard Demostration with poly
                                                                 Ha                     2    0.63        0   0.00        1   0.63    0.5     0.32   0.5   0.32   0     0.00    1.26
                     mulching
                     c)Hyv Tomatoes Demostration as
                                                                 Ha                     8    0.47        0   0.00        3   1.41        3   1.41    2    0.94   0     0.00    3.76
                     vegitable
                     d)Improved Green Pea Demostration as
                                                                 Ha                     4    0.25        0   0.00        2   0.50        1   0.25    1    0.25   0     0.00    1.00
                     Vegitable
    Productivity
                     e)Hyv Pigeon pea Demostration as
    Enhancement                                                  Ha                     7    0.11        0   0.00        3   0.33        2   0.22    2    0.22   0     0.00    0.77
5                    Pulses
    and micro
                     f)Hyv Pearl millet Demostration as Cereal
    Enterprises                                                  Ha                     2     0.1        0   0.00        1   0.10        1   0.10    0    0.00   0     0.00    0.20
                     crop
                     g)Hyv Nizer Demostration as dry land Oil
                                                                 Ha                     2    0.07        0   0.00   0.5      0.04        1   0.07   0.5   0.04   0     0.00    0.14
                     seed
                     h)Hyv Sorgum Demostration as dry land
                                                                 Ha                     5     0.1        0   0.00        2   0.20        2   0.20    1    0.10   0     0.00    0.50
                     Cereals
                     i)Sun Flower Demostration as Perrenial
                                                                 Ha                     5    0.14        0   0.00        2   0.28    1.5     0.21   1.5   0.21   0     0.00    0.70
                     Oil seed
                                                                             Total                           0.00            5.10            4.39         3.45         0.00   12.93

                                                                                                                                                                     Page 14 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                          Page 15 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)


                               Executive Summary
                          Talatand micro- watershed.

Present Status and Situation analysis of the Area:
The Talatand micro watershed is located in the patratu Block of Ramgarh district in
Jharkhand .The total geographical area of the watershed is 917.58 Ha. Out of total
area, 829.33 Ha is proposed to be treated under this micro-watershed. The Project is
located at the latitude of 23˚34’17”N and longitude of 80031’34”. The highest and lowest
elevation of the project area is 580 m and 430 m respectively. This project will benefit
1048 house hold in 8 villages of 1 micro watershed boundary through various
activities and intervention. Talatand, uchring ,hislanga, labga, gegda, buarghutuwa
milani. are main villages come under the micro-watershed. In this micro watershed
out of 1048 h.h total population is 5759. Out of that male population is 3109 and
2650 are female. The sex ratio is 917 female over 1000 male. There are 698 BPL
families in micro-watershed area. The literacy rate is 33% percent; male literacy rate
is 46% per cent (of total male population) and female literacy rate is as low as 1% (of
total female population). The major castes in the village are Muslim, Mahoto, Singh ,
Munda, Bedia, Oraon and Sahu.

Topography of micro-watershed is diversified with hilly and undulating surface. The
general slope is towards the north to eastern edge and ranging from o – 8%. The
annual average rain fall varies from 800 mm to 1200 mm with an average of 60 to 65
rainy days. May and June are the hottest months and the temperature goes up to 0˚
to 42˚C. December and January are the coldest months and temperature comes down
from 6˚C to 7˚C.

 About 90 % of population in project area are depending on agriculture and allied
livelihood activities. The erratic rainfall and degradation of forest leads continuously
to a semi- drought situation and detaches the farmers to keep continue remain in
agriculture in a dearth condition. Now present agriculture scenario is unable to
provide either sustenance or employment opportunities round the year due to low
land holding, incapability of farmer community, poor soil Productivity, lack of
irrigation facility and absence of proper Agricultural practices. Altogether these
factors are contributing in multiplication of unemployment situation and eventually it
is creating a problem of migration for exploring other livelihood avenues by
inhabitants.




                                                                            Page 16 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



Vision Statement
       The watershed activities will be achieved within the stipulated time of 5 years.
       About 33% of the Project Area will be covered various intervention by including
        soil and water conservation.
       Khariff Paddy Stabilisation through proper management of Water and SRI
        techniques.
       Increase in 2nd Crop area through proper management of water resources and technical
        intervention.
       Majority of the households under command area will be facilitated access of
        safe and hygienic drinking water.
       Increase in additional income of landless and BPL through various alternatives
        Income Generation Activities (IGA).
       Gender equity will be maintained through involving women SHGs by partnering
        the watershed program and decision making process.

Institutional Arrangements
The PIA ,Krishi Gram Vikas Kendra(KGVK) is an NGO, which is supported and
promoted by Usha martin group of Industries and is the CSR of the Company . It
was set up as an NGO to work at the grass roots level in the State of
Jharkhand . It was registered under society registration act in 1977. The thrust areas
of KGVK includes NRM, education, Health, Livelihood, and Capacity building and
Women empowerment. The organization is emphasizing on inclusive growth of rural
Jharkhand through Partnership mode of development. Organization has established
its credibility with Govt agency, International Voluntary Organizations, Community
level Organization for continuous growth of rural Jharkhand.

In relation to proposed micro-watershed of Talatand, the role of KGVK will be to
facilitate the Community Based Organizations like Watershed Committee (WC), Self
Help Group(SHG), User’s Group(UG) and establish linkages with various line
departments for ensuring convergence action. Watershed Committee will take the
responsibility for proper implementation and execution of works as per proposed
activities and maintaining whole the infrastructures in the micro-watershed area. It
will also ensure community contribution in respect to NRM works. The Secretary of
the Committee will be treated as most responsible member in WC and desired to
perform as per committee decisions. The Watershed Development Team (WDT) will act
as a multi disciplinary functional team to support all the CBOs for its proper
functioning. A total no of 18 SHG and 15 UG are proposed to be linked for different
activities during the project.




                                                                          Page 17 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Salient Project Activities
As per the features of project activities are concerned it will cover various line
components of action plan like EPA, NRM, capacity building, livelihood, productivity
enhancement and micro enterprises. The proposed activities includes drinking well
renovation, micro drinking water system, nutritional Garden, Ban Mahostav through
school children, solar Lamp and bio gas are underEPA activities which covers around
04% budget of the total project cost.
On the same way other focused activities under NRM are field bunding, land leveling,
contour trenching , field outlet, farm pond, pond renovation, construct new Dova,
gully plugs, loose boulder checks, field bunding, Soil Reclamation, commercial timber
plantation, mango orchard by inter-cropping. It will cover around 50% of the
Programme Cost. For the productivity enhancement SRI, Dry land Agriculture, Vermi
Composting and fodder cultivation. Micro- enterprise will spent 13% of the project
cost. For the creation of alternative livelihood like vermin compost, poultry and
Mashroom, cultivation are designed for increase the income of user group. It will
spend around 10% of the programme cost. A comprehensive training and Capacity
building plan have been designed for various CBO like SHG, UG, and Watershed
Committee. The basic aims of these trainings will be skill enhancement of CBO. In the
financial term it will covers around 05% of the project cost. Total project cost is 99.51
lakhs for implementation of IWMP activities.

Convergence with Various Schemes
The aim of the convergence is to saturate the possible activities that are proposed
under micro-watershed of Talatand. NRM activities as per decision taken through
gram sabha will be fulfilled through convergence with various departments as well as
through IWMP Programme. In this Process there is a total amount of 24.87 lakhs will
be converging under various Schemes through MNREGA, NHM, NRLM, DST and
Banks. For some of the intervention like check dam, irrigation channel etc are special
proposal and will be submitted to concerning Department. To fulfill these plans the
SLNA, DWDU and PIA will take a leading role to facilitate the convergence activities
for micro-watershed of Talatand.

Exit Policy
In order to long run sustainability of watershed activities exit policy is considered an
important mechanism to handover the structures created. Sharing of benefit, sharing
mechanism, generating contribution, and maintaining common property etc. will be
taken care by User’s Group. Proper utilization of WDF will be generated after the
Project Period for maintaining of assets for sustainability. The Watershed Committee
will be also responsible for conflict management within User’s Group and SHGs level.
All the records and documents will be handed over to the WC who as of statuary
requirement will respond all the desired compliance of the concerning department and
agency.




                                                                             Page 18 of 99
         KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

                                               CHAPTER 1

                                 Introduction and Background
INTRODUCTION
         Name of the State                    : Jharkhand

         Name of the District                 : Ramgarh

         Names of the Blocks                  : Patratu

         Name of the project                  :IWMP Talatand

         Financial Year of sanction           : 2009 - 2010

         Project duration                     : From 2009 to 2014

         Map of the project area showing village boundaries, contours and drainage.

II). PROFILE OF THE WATERSHED PROJECT:

Table No.1.1 Project at a Glance

 1       Name of the State                        Jharkhand

 2       Name of the project                      IWMP Talatand

 3       Name of the District                     Ramgarh

 4       Names of the Blocks                      Patratu

 5       Names of Gram Panchayats                                 Talatand, Hesla, & Labga

 6       Names & Census Code of Villages              1. Talatand -635100              4.Labga -636100
         covered                                      2. Ucharinga -635200             5.Gegda -63600
                                                      3. Hesla - 622500                6.

 7       Four major reasons for selection of
         watershed

 8       Name, Address , Phone No and             Krishi Gram Vikas Kendra(KGVK)
         Reg.No.. of the PIA(s)                   TVM Gurukul, Rukka, Neori Vikas, Ranchi, Jharkhand.
                                                  Pin: - 835217
                                                  0651-2276142,0651-3051495,9431109265,9431394893




                                                                                             Page 19 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

                                                    Registered Society established 14th April, 1977.

 9   Date of approval of Watershed                           08-12-2009
     Development Plan by the DPC

10   Area of the Project (ha.)                               917.58 Ha

11   Area proposed to be treated (ha.)                       829.33 Ha

12   Financial Year of sanction                 2009-10

13   Project duration                           From 2009 to 2014

14   Project Cost (Rs. in Lakhs)                99.52 Lakhs

15   Date of Sanction by State authority        25-01-2010

16   Date of Release of 1st Installment of      17 June 2010
     Central Assistance (To be filled by
     DoLR)

17   Any other, please specify                  No



Table No. 1.2 Need and Scope for Watershed Development

A write up elaborating the weightage table for selection of the watershed. (Weightage for
selection of Watershed (as per DoLR’s instructions already issued)


                                                                         Weightage

 Project Name       Project Type           i   ii      Iii    iv    v     vi   vii    ix    x    xi    xii   xiii

                                       7.5     10      5      10   10      5   15     10 5       5     10    15




                                                                                                  Page 20 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



*As per PPR

Slno. Criteria                         Max Score Ranges and Scores

i      Poverty index(%of poor to       10        Above 80% (10)             80 to 50 % (7.5)            50 to 20 % (5)                Below
       population)                                                                                                                    20% (2.5)

ii     % of SC/ST population           10        More than 40% (10)         20 to 40 % (5)              Less than 20% (3)

iii    Actual wages                    5         Actual wages are           Actual wages are equal to
                                                 significantly lower than   or higher than minimum
                                                 minimum wages (5)          wages (0)

iv     % of small and marginal         10        More than 80% (10)         50 to 80% (5)               Less than 50 (3)
       farmers

v      Ground water status             15        Over exploited (15)        Critical (10)               Sub critical (5)              Safe (0)

vi     Moisture index/ DPAP/DDP        10        -66.7 & below (10) DDP     -33.3 to -66.6 (5) DPAP     0 to -33.2 (0) Non
       Block                                     Block                      Block                       DPAP/DDP Block

vii    Area under assured irrigation   15        Less than 10% (15)         10 to 20% (10)              20 to 30% (5)                 Above
                                                                                                                                      30%
                                                                                                                                      (Reject)

viii   Drinking water                  10        No source (10)             Problematic village (7.5)   Partially covered (5)         Fully
                                                                                                                                      covered
                                                                                                                                      (0)

ix     Degraded land                   15        High – above 20% (15)      Medium – 10 to 20 % (10)    Low – less than 10 % of
                                                                                                        TGA (5)




                                                                                                                                  Page 21 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

x      Productivity potential of the    10    Lands with low production    Land with moderate           Lands with high production
       land                                   & where productivity can     production & where           & where productivity can
                                              be significantly enhanced    productivity can be          be marginally enhanced
                                              with reasonable efforts      enhanced with reasonable     with reasonable efforts (0)
                                              (10)                         efforts (5)

xi     Contiguity to another            10    Contiguous to previously     Contiguity with in the       Neither contiguous to
       watershed that has already             treated watershed &          micro watersheds in the      previously treated
       been developed/treated                 contiguity within the        project but non contiguous   watershed nor contiguity
                                              micro watersheds in the      to previously treated        within the micro
                                              project (10)                 watershed (5)                watersheds in the project
                                                                                                        (0)

xii    Cluster approach in the plains   15    Above 6 micro-               4 to 6 micro watersheds in   2 to 4 micro watersheds in
       (more than one contiguous              watersheds in cluster (15)   cluster (10)                 cluster (5)
       micro-watersheds in the
       project)

xiii   Cluster approach in the hills    15    Above 5 micro-               3 to 5 micro watersheds in   2 to 3 micro watersheds in
       (More than one contiguous              watersheds in cluster (15)   cluster (10)                 cluster (5)
       micro- watersheds in the
       project)

       Total                            150   150                          90                           41                            2.5




                                                                                                                                Page 22 of 99
         KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table no.1.3: Watershed information
Sl. no     Name of Project   Watershed Code   Villages to be Treated       Geographical Area(Ha)   Treatable Area(Ha)    Approval Year


           IWMP Talatand       2A2H2d3f                 8                         917.58                829.33               2009 - 2010




Table No.1.4: Status of other development project in the area
Sl. no              Name of the      Sponsoring             Objectives of the Year of     Villages                      Estimated
                    programme/scheme agency                 programme/scheme commencement covered                       number of
                                                                                                                        beneficiaries

1                   NREGA                                    Employment              2008 -09         Talatand          289

2                   IAY                                     Residence                2007 - 08        Talatand          147

3                   RSVY                                    Irrigation facility      2007 -08         Talatand          37

4                   SGSY                                    Self Employment          2008 -09         Talatand          176




Table No. 1.5: Status of previous watershed programme-
S. Project Year    Name     No. Of    Watershed Area      Funding Nodal  PIA Total Expenditure %          % physical
No name    started of       micro     codes     under     source  agency     cost incurred up financial   completion
                   villages watershed           treatment                          to start of completion
                                                                                   IWMP

                                                                   N.A.




                                                                                                                             Page 23 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)


                                 CHAPTER 2

                      General Description of Project Area
Table 2.1: Location
Longitude                               85º28’27’’

Latitude                                23º31’14’’

State                                   Jharkhand

District                                Ramgarh

Subdivision                             Ramgarh

Block                                   Patratu

Panchayat                               Talatand, Hesla, & Labga

Villages                                Talatand, Ucharinga, Hesla, Labga,
                                        Gegda,Melani, Netuwa & Barghutuwa

Approach Road                           Puck




                                                                       Page 24 of 99
  KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

INSERT WATERSHED LOCATION MAP




                                                                            IWMP – Patratu 11 th
                                                                                   Plan



                                                                                       Page 25 of 99
 KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                   IWMP – Talatand Micro Watershed (2A2H2d1f)



Ramgarh District




   IWMP – Patratu

   11TH Plan




                                                     IWMP – Patratu – Talatand 11TH Plan




                                                                                           Page 26 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Details of the types of areas covered under the project


Area under Major Land Uses : Agriculture – 232.39 Ha

(Area in Ha.)

Table no: 2.2 Land Details


S.     Names of      Geographical      Forest     Land under     Rain-   Irrigated   Permanent   Wasteland
No.    villages      Area of the       Area       agricultural   fed     Area        pastures
                     village (ha)      (ha)       use (ha)       area                (ha)        Cultivable   Non-
                                                                 (ha)                            (ha)         cultivable
                                                                                                              (ha)

1      Talatand      193.59            64         22.57          20.97   1.60        2.31        77.84        28.26

2      Ucharinga     108.00            15         25.94          23.86   2.08        0.59        9.71         57.02

3      Hesla         42.00             0          38.89          29.22   9.67        0.00        0.88         2.43

4      Labga         31.00             0          11.12          8.76    2.36        0.00        0.70         19.17

5      Gegda         200.00            26         93.24          85.34   7.90        0.00        9.88         103.43

6      Melani        110.00            14         20.72          17.29   3.43        0.00        12.30        63.74

7      Barghutuwa 83.00                22         10.12          3.52    6.60        0.54        48.90        1.74

8      Netuwa        150.00            21         9.79           8.10    1.69        0.00        .37          61.89




                                                                                                              Page 27 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 2.3: Details of the types of areas covered under the project

      1                2                                                    3
                                                               No. of beneficiaries covered
    S. No.      Name of village
                                        MF          SF         LF                 Landless            Total

1            Talatand, Melani,    542         443         17            46                    1048
             Barghuruwa,
             Ucharinga, Hesla,
             Labga, Gegda,




                                                                                                     Page 28 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

 Table No. 2.4: Details of Agro-climatic condition
1         2                  3                4           5                         6                            7

                             Name of the                                            Major soil types             Major crops
          Name of the        Agro-climatic    Area in     Names of the villages
Sl. No.
          Project            zone covers      ha                                                       b) Area                 b) Area
                             project area                                           a)Type                       a) Name
                                                                                                       in ha                   in ha

          IWMP               Central &        917.58      Talatand,Hesla,                                        Paddy
          Talatand           North Eastern
                                                          Ucharinga,Labga,Gegda     Sandy loam         917.58    Maize         232.39
                             Plateu zone-iv
                                                          Melani,Barghutuwa &                                    Vegetable
                                                          Netuwa


 Table No. 2.5 Details of flood and drought in the project area
          1                       2                              3                                4                             5

                                                                                             Periodicity
      Sl. No.                Particulars                      Villages                              Any other              Not affected
                                                                                  Annual
                                                                                                 (please specify)

          1          Flood                        No. of villages                  No

                                                  Name(s) of villages              No

          2          Drought                      No. of villages                  No

                                                  Name(s) of villages              No




                                                                                                                           Page 29 of 99
        KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 2.6: Details of soil erosion in the project area
                       1                               2                   3                     4                 5

                                                                                            Run off    Average soil loss (Tonnes/
                     Cause                   Type of erosion     Area affected (ha)
                                                                                          (mm/ year)           ha/ year)

Water erosion

                                         a Sheet                         743.49            1250mm      30 – 45 Tonnes /ha/year

                                         b Rill                          116.06

                                         c Gully                         58.03

                             Sub-Total                                 917.58

Wind erosion                                                    No

Total                                                           917.58


Table No. 2.7 Details of the Soil pH
                Name of the Villages                       Sample no                   Soil Ph                Soil Type

Talatand                                           8                              5.31 to 6.76         Acidic in Nature

Ucharinga                                          8                              5.14 to 7.33         Acidic in Nature

Hesla                                              5                              5.43 to 7.14         Acidic in Nature

Labga                                              5                              5.34 to 7.13         Acidic in Nature

Gegda                                              5                              6.41 to 7.20         Acidic in Nature

Melani                                             5                              5.69 to 6.75         Acidic in Nature



                                                                                                                   Page 30 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Barghutuwa                                    5                           6.37 to6.68      Acidic in Nature

Netuwa                                        5                           5.69 to6.19      Acidic in Nature




Table No.2.7.1 Climatic Condition
                                Average       Temp(0
                                                                                                        Average
                                Annual        C)
                                                                     Open pan             Relative      Annual
Sl.    Yea   Average Monthly    rainfall(in              Wind
                                                                     evaporation (mm      Humidity(     run
No     r     Rain fall(in mm)   mm)prece            Mi   Velocity
                                              Max                    per day)             RH)           off(mm/y
                                ding 5              n                                                   ear)
                                years

                                                                     It requires to
            Kharif (June –                                           test locally due
            October) 893                                 5.7 miles   to the high
            Rabi (October –                              per hour    variation in local
1      2010                     1135mm        46    7                                     60%           1250mm
            March) 211.8                                 (district   climate (to be
            Jayad (March-Jun)                            average)    done during
            462.8                                                    implementation
                                                                     period)




                                                                                                       Page 31 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




Table No.-2.8 Physiographic Features

                                                                            Toposequence                            Average
Elevation(MSL) Slope Range(%)                                                                                     annual soil
                                 Order of        Major                       (Soil series)
                                                                                                                   loss(Ton /
                                Watershed       Stream                                                           hectare/year)

                                                          Fine, Mixed, hyperthermic paleustalfs / Loamy Typic
                                                                                                                   30-50
    452             1-3            2ND ORDER NALKARI Rhodustalfs, skeletal, lithic Ustorthents /Loamy ultic
                                                                                                                tonnes/ha/Yr
                                                                             haplustalffs

Sources: JSAC



Table No. 2.9 Watershed characteristics
 Shape index of   Length of main       Drainage density    Average slope      Watershed relief        Perimeter of the
 the watershed       stream                                                                              watershed


                                                              2/(1-8%)               452

Sources: JSAC (Rest data under calculation of JSAC, official records)




                                                                                                                Page 32 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                          Page 33 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                          Page 34 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                          Page 35 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                          Page 36 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                          Page 37 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                          Page 38 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                          Page 39 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)


                                   CHAPTER – 3
                        BASE LINE INFORMATION OF WATERSHED

Table No. 3.1: Demographic features:
1         2                             3             4              5

S.No      Feature                       Male          Female         Total

1         Population                    3052          2707           5759

          SC                            923           861            1584

          ST                            789           641            1230

          BC                            1194          1086           1828

          Others                        146           119            265

2         Children(0-14 years)          449           403            852

3         Sex Ratio                     100           887

4         Literacy                      693           79             772

          Literates                     713           353            1066

          Illiterates                   1646          2275           3921

5         Work Force                    1473          779            2252

          Agriculture                   1054          774            1828

          Industrial/Business           6             0              6

          Service                       13            3              16

6         Birth Rate

7         Death Rate




                                                                     Page 40 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                          Page 41 of 99
        KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 3.2: Livestock details:
    1                              2                                     3

S.No Feature                                                    No./ quantity)

1         Milch Animals

           Cows                                                 113

           Buffaloes                                            6

           Goat, sheep                                          398

2         Draft Animals

           Ox                                                   498

           He Buffalo                                           16

3         Others

           Poultry                                              1556

           Piggery                                              87



4         Total Milk production from milch animals (ltrs/day)   56Lit/day

5         Fodder Availability

          Dry (Abundant/Sufficient/ Scarce)                     Abundant

          Green (Abundant/Sufficient/ Scarce)                   Scarce

6         Fuel wood Availability (Abundant/Sufficient/Scarce) Sufficient




                                                                                  Page 42 of 99
        KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

    Table No.3.3:Socio- economic status:
1                 2              3         4                        5                                        6

S.     Type                 Total    No. of BPL Land Holding (Ha)                            Annual Gross Income (Rs.)
No                          HHs      HHs
                                                Rain fed                Irrigated            SC      ST      Others      Total

                                                SC   ST   Others        SC     ST   Others

1      Marginal             542      403        15   18   13            -      -    -        22500   24000   24000       75000

2      Small Farmers        443      254        38   33   25            6      4    12       28000   27500   29500       84500

3      Big farmers          17       -          -    -    34            -      -    13                       48000       48000

4      Landless             46       41         -    -    -             -      -    -        21000   23000   24000       68000

       Total                1048     698        53   51   72            6      4    25       71500   74500   125500      275500




                                                                                                                 Page 43 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 3.4: Migration Details:
 1                2                   3                      4                              5                        6                  7

       No. of persons migrating   No. of days                                   Distance of destination of
Sl.                                                                                                          Occupation during   Income from such
                                  per year of   Major reason(s) for migrating      migration from the
No.    M    F         Total                                                                                      migration        occupation (Rs.)
                                   migration                                           village (km)
 1
       83   19        102             140                Employment                     60 to 1500              Daily wagged           15000




                                                                                                                                     Page 44 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



Table No. 3.5: Details of Community Based Organizations existing in the watershed village:
1     2                   3                               4                   5                 6              7              8                   9

                                                                                                           No. of                        Bank linkage
                                                                         No. of ST in      No. of SC in                  No. of BPL in
                                                                                                          Others in
                 Total no. of CBOs             No. of members               each              each                           each
                                                                                                            each
                                                                          category          category                      category
                                                                                                          category
S. Type of
           Wit                                                                                                                           No.     Bank Loan
No. Group                                                                                                                                of      Amount
            h      With       Wit
           onl     only        h     Tot                           Tot            Tot               Tot            Tot            Tot    SHG     (Rs.)
                                                      M       F          M   F             M   F          M   F          M    F          s
            y      Wom        bot     al                            al             al                al             al             al
           Me       en         h
            n

                                             (i)
                                           Landle     3       6     9    -   -    -        -   -     -    3   6     9    3    6    9
                                             ss

                                                      2       21                                          1              1   18          29      25000/Gro
                                           (ii) MF                 239   5   86       91   8 91     99        36   49             203
     SHG     6       43        0     49               6        3                                          3              9    4                  ups
 1
                                                      3       28                           1   13         1              2   23
                                           (iii) SF                324   9   93   102               152       57   70             254
                                                      7        7                           5    7         3              1    3

                                           (iv) LF    2       6     8                                     2   6     8

                                                      7       51         1   17            2   22         3   10         4   42
     Total                                                         588            193               251            136            466
                                                      6        7         4    9            3    8         1    5         3    3

                                             (i)
                                           Landle
 2   UGs                             NA      ss

                                           (ii) MF




                                                                                                                                               Page 45 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

                                              (iii) SF

                                              (iv) LF

     Total

3     VSS                         1      13              8    5     13    1    1      2     3    2     5     4    2      6     1    1     2

      FG/
4                                        NA
      FC1

5     WUA                                NA

    F-SHG-
6                                        NA
       C

    F-SHG-
7                                        NA
       B


8      PG                                NA


9      PC                                NA


     Other
    related
1
    Groups                               NA
0
    (Specif
       y)



VSS: Van Suraksha Samiti, FG: Farmer’s Group/ Farmer’s Club, WUA: Water User Association, F-SHG: Federation of SHGs (C: at Cluster, B: at Block), PG: Producer’s
Group, PC: Producer’s Cooperative.




1




                                                                                                                                                    Page 46 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 3.6: Infrastructure Facilities:


1        2                                  3              4                     5

S.No     Infrastructure type                No./Quantity   Distance (km)         Status (description)

1        Educational Institutions

             Anganwadi                      7              Within the village    Running

             Primary School                 3              Within the village    Running

             Secondary school               0              NA                    NA

             Govt. College                  0              NA                    NA

             Vocational Institutions        0              NA                    NA

2        Service Institutions

             Bank                           0              NA                    NA

             Post office                    0              NA                    NA

             Primary Health Care Center     1              1

             Veterinary Center              0              NA                    NA

             Markets/ Village Haat          0              NA                    NA

3        No. of bore wells/pump sets        0              NA                    NA
         (Functional)




                                                                                                 Page 47 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

4      No. of Milk collection centers              0     NA                    NA

       ( Union/ Society/ Pvt.
       Agency/Others)

        Total Quantity of surplus milk             0     NA                    NA

5      Road Connectivity (to main road by          Yes   0.5                   NA
       an all-weather road) (Yes/No)

6      Bus facility (Yes/No)                       Yes   NA                    NA

7      No. of HHs provided electricity             437   NA                    NA

8      No. of HHs with access to drinking          NA    NA                    NA
       water

9      Access to Agro Industries (Yes/No)          No    NA                    NA

10     Any other facilities (specify------------         NA                    NA
       -)




                                                                                    Page 48 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No.3.7 Land use pattern (in Hectares)
1       2           3         4        5            6         7        8             9                   10          11     12    13*
                                                                                Uncultivated                                Ne
                                                                                                 Cultivated area
                                                                                Private land                                  t
                                                                                                                            Are
                                                Land                                                                          a
                                                                     Land                                            Net          Gros
S                           For                under       Perma                                                             so
               Geograp             Commu                             Under                                           So             s
.                           est                 Non         nent                                 Cultiv   Cultiv            wn
    Village      hical              nity                            miscella   Tempo    Perma                        wn           Crop
N                           Are                Agricul     Pastur                                 ated     ated             mo
                Area#               Land                             neous      rary     nent                        Are          ped
o                            a                  ture         es                                  Rainfe   Irrigat            re
                                                                      use      fallow   Fallow                        a           Area
                                                 Use                                               d        ed              tha
                                                                                                                             n
                                                                                                                            on
                                                                                                                             ce
                                                                                                                     33.    0.0
1    Netua                            4.71      77.74       0.00      0.47      0.09     9.23    67.44        0.03                33.81
                  150        21                                                                                      78       3
     Bargh                                                                                                           18.    0.0
                                      5.68      32.36       0.00      0.57      0.05     5.10    37.32        0.02                18.71
2    utua          83        22                                                                                      69      2
                                                                                                                     24.    0.0
3 malani          110        14       3.45      33.96       0.00      0.35      0.07     6.77    49.46        0.02                24.79
                                                                                                                     77      2
                                                                                                                     45.    0.0
4 Gegda           200        26       6.28      86.69       0.00      0.63      0.12    12.30    89.92        0.04                45.08
                                                                                                                     04      4
                                                                                                                     6.9    0.0
5 Labga            31         0       0.97      11.13       0.00      0.10      0.02     1.91    13.94        0.01                6.99
                                                                                                                      8      1
  Talata                                                                                                             43.    0.0
                                      6.06                  0.00      0.61      0.12    11.87    86.77        0.04                43.50
6   nd            193        64                  86.9                                                                46      4
  Uchrin                                                                                                             24.    0.0
                                      7.39                  0.00      0.74      0.06     6.64    48.56        0.02                24.34
7   ga            108        15                 41.27                                                                32      2
                                                                                                                     9.4    0.0
8    Hesla         42         0       1.32      38.69       0.00      0.13      0.03     2.58    18.88        0.01                9.47
                                                                                                                      6      1

#geographical area here is the area covered under the watershed.

* Coloumn 13 is the summation of coloumn 11 & 12.




                                                                                                                           Page 49 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 3.8: Details of Common Property Resources:
   1         2                                 3                                                  4
                                        Total Area (ha)
                                                                              Area available for treatment (ha)
                                 Area owned/ In possession of
                                    Govt.                                               Govt.
            CPR                                                                                                 Any
  S.No                                                         Any other
         Particulars     Pvt.                                                 Pvt.                             other
                                                  PRI         (Community                              PRI
                       persons     (specify                                 persons    (specify                 (Pl.
                                                                 land)
                                    dept.)                                              deptt.)               Specify)

         Wasteland/
         degraded       195.26          348.30         0.00        424.76 o               37.63        0.00        0.00
         land
         Forest              0             154            0             0          0          0           0           0
Total                   195.26          502.30         0.00        424.76       0.00      37.63        0.00        0.00




                                                                                                         Page 50 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



Table No. 3.9: Agriculture implements:               Table No. 3.10: Crop Classification

        1                  2                 3                     1                 2               3

    S. No   Implements                   Nos.                  S. No   Crop classification   Area (HA)

    1       Tractor                      4                     1       Single crop           232.39

    2       Sprayers-manual/ power       0                     2       Double crop           35.34

    3       Cultivators/Harrows          0                     3       Multiple crop         6.35

    4       Seed drill                   0

.




                                                                                             Page 51 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 3.11: Crops & Cropping pattern:
1    2        3       4                                     5                                         6
S
.   Seas    Crop     Rain                                 Irriga                                     Tota
N    on     sown     fed                                   ted                                         l
o
                                                 Cost                                       Cost                                Cost
                            Produc    Product     of                             Product     of             Produc   Product     of
                     Area    tion       ivity   cultiva   Area     Production(     ivity   cultiva   Area    tion      ivity   cultiva
                     (ha)   (Ton/yr   (Kgs/h     tion     (ha)       Ton/yr)     (Kgs/h     tion     (ha)   (Ton/y   (Kgs/h     tion
                               )         a)      (Rs.                               a)      (Rs.              r)        a)      (Rs.
                                                 /ha)                                       /ha)                                /ha)
    Khari            218.   277.1     1240.2    1451.                                                218.   277.1    1240.2     1451.
1           Paddy                                          0.00          0.00      0.00      0.00
      f               00        4          0      04                                                  00        4         0       04
                     14.3                       503.6                                                14.3                       503.6
            Maize           17.10     503.68               0.00          0.00      0.00      0.00           17.10    503.68
                        9                           8                                                   9                           8

            Vegeta                                                               31040.     3104     26.6   168.4    31040.    31040
2   Rabi             0.00     0.00      0.00      0.00    26.66        168.41
            bles                                                                    77      0.77        6       1       77        .77

            Mustar                                                               2083.6    2083.                     2083.6     2083.
                     0.00     0.00      0.00      0.00     8.68          3.41                        8.68    3.41
            d                                                                         2      62                           2       62
    Sum     Vegeta                                                               7393.4    7393.                     7393.4     7393.
3                    0.00     0.00      0.00      0.00     6.35         40.11                        6.35   40.11
    mer     bles                                                                      3       43                          3       43
                     232.                       977.3                                      2025      274.                      21236
    Total                                                 41.69
                      39                            6                                       8.91      08                          .27




                                                                                                                        Page 52 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                                          Page 53 of 99
        KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 3.12: Land capability Classification
                                                                                                                                                                             Lan
                                                                                                                                                                              d
  1        2        3                                      4                                            5                                            6
                                                                                                                                                                             clas
                                                                                                                                                                               s
                  Total     Soil
                                                 Based on Depth (cms)-                                                                          Erosion
                  Area     Textur                                                     Based on Slope (%) (mention area in ha)
                  (ha)       e*                   (mention area in ha)                                                                    (mention area in ha)
 Sl.N    Land
                                       V.               Modera
  o.     type                                 Shallow                Deep     Very.    Nearly     Moderat    Strong     Steep               Water
                                     Shallo             te deep
                                               (7.5-                (45.0-    Deep    Level (0-   e slope   slope (6-   (>15
                                       w                 (22.5-                                                                  Sheet       Rill         Gully      Wind
                                               22.5)                 90.0)   (>90)       2)        (2-6)       15)        )
                                     (0.75)             45.00)
                           Mostly
                            sandt
                           loam &
                            Sandy
         Uplan    550.54   Gravels   275.2    165.164   71.571     38.538             264.263     187.186   66.0657     33.03   440.438    71.5712       38.5383     5.505
  1                                                                                                                                                                           vi
           d        8         in      74         4         2         36                 04          32         6          3        4          4             6         48
                           differe
                              nt
                           patche
                               s
                           Mostly
         Mediu              sandt
           m               loam &
         Uplan    174.34    Sandy             122.038   52.302                                    81.9398   92.4003             139.472    22.6642       12.2038
  2                                                                                                                                                                           iii
          d (3      02     clay in              14         1                                         94        06                 16          26            14
          No.                few
         khet )            patche
                               s
        Mediu
        m Low               Sandy
                  64.230                      41.7498              7.7076                         28.9037   35.3268             51.3844    8.34997       4.49614             iii
  3      land              loam &                       14.773
                     6                           9                   72                              7         3                   8          8             2                / ii
        (2 No.              loamy
        khet )
         Low                Sandy
         land     55.054   loam &                       22.021     16.516    11.010               24.7746   22.0219             44.0438    7.15712       3.85383              ii
  4                                           5.50548                                 8.25822
        (1 No.       8      loamy                          9         44        96                    6         2                   4          4             6                /iii
        khet )               clay




* Soil texture (sandy-clay, clayey, loamy-clay, gravel)




                                                                                                                                                                  Page 54 of 99
           KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No.3.13: Irrigation facilities:
             1                                               2                                                      3                                  4

S.No                      Type of the Source                                                          Nos.                            Command area (in ha)

1                         Ponds                                                                       5                               3.45

2                         Open wells & River                                                          69                              24.65

3                         Bore wells                                                                  0                               0

4                         Canal irrigation                                                            0                               0

5                         Check Dam                                                                   1                               7.24




Table No. 3.14: Status of water table:
     1                2                      3                   4                   5                     6                           7                      8

    S.No         Source (open       Well No of       Name of the Owner*          Date of       Depth of water table           Source located at            Remarks
                   well)**          the source                                  recording       from ground level          (ridge/middle/valley)
                                                                                                     (in mts)

1            Open Well             Tal - 1            Shaturdhan Munda         3/4/11          12                         Ridge                         Nil

2            Open Well             Tal - 2          Ramkishun Munda            3/4/2011        10.30                      Ridge                         Nil

3            Open Well             Tal - 3          Rageshwar Ganghu           3/4/2011        7.62                       Middle                        Nil

4            Open Well             Tal - 4          Shankar Karmali            3/4/2011        8.85                       Middle                        Nil

5            Open Well             Tal - 5            Shivcharan Orawa         3/4/2011        7.40                       Valley                        Nil

6            Open Well             Tal - 6          Rambharosa Ganghu          3/4/2011        6.10                       Valley                        Nil

** Identify at least five representative open wells in the ridge/middle/valley portion. Collect the data at the time of DPR and maintain a register every Quarter




                                                                                                                                                        Page 55 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 3.15: Assessment of drinking water facility*:

     1                                           2                                           3        4            5

    S.No                                      Item                                       Units   Quantity    Source

1                Drinking water requirement                                       Ltrs/day       6          well

2                Present availability of drinking water                           Ltrs/day       5          well

3                No. of drinking water sources available                          Nos.           69         Well &
                                                                                                            Tube well

           a)    Functional                                                       Nos.           50         Well &
                                                                                                            Tube Well

           b)    Need Repairing                                                   Nos.           10         Well

           c)    Defunct                                                          Nos.           9          Well

4                Short fall if any                                                Ltrs/day       1          Well

5                No. of families getting drinking water from out side the Micro   Nos.           NA         NA
                 watershed area

6                Requirement of new drinking water sources (if any)               Nos.           15         Well &
                                                                                                            Tube well   * based on the
                                                                                                                        observation
from the field




                                                                                                                          Page 56 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 3.16: Surface water resources

1            2                            3               4                     5

Sl. No       Type of water resource       Nos.            Area irrigated (Ha)   Storage capacity (Cu.m)

1            Tank                         0               0                     0

2            Pond                         5               3.45                  7200 Cum /pond avrege

3            Lake                         0               0                     0

4            Check dam                    1               7.24                  5500 Cum.

5            Percolation tank             0               0                     0

6            Channel/Canal                0               0                     0

7            Any others (specify Well &   69              24.65                 125 Cum /Well
             River)




                                                                                            Page 57 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)


Table No. 3.17 Ground Water Structures to be repaired.
                                                                                                            No. available
    Sl. No                 Type of structure
                                                                  No. to be                  No. to be                   No. with no
                                                                                                                                                   Total
                                                                  Repaired                 rejuvenated             interventions required

1               Open Well                                    10                      7                            24                        41

                           Total                             10                      7                            24                        41



Table No. 3.18: Existing Water Saving Practices:
Name of the Major Crop                                                           Area (Ha)

                                        Under water          Under water                     Any other                      Total             Current water
                                       saving devices$   conserving agronomic                                                                Saving status as
                                                              practices#                    (Pl. Specify)                                      against flood
                                                                                                                                            irrigation. (Cu.m)

                                                         No practices
                                                         existing


$: Sprinklers, Drip, PVC Pipe, etc.,

#: Vermi compost, organic manuring, check basin, alternate furrow, Ridges and furrow & specific practices




                                                                                                                                                 Page 58 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No. 3.19: Details of existing livelihoods


 1                2                                               3                                           4

                                                       No. of beneficiaries
Sl.                                                                                                   Pre-project average
           Name of activity
No.                               SC          ST           Others             Total        Women     income per HH (Rs.)


 1             Pigery             18          20             14                52              38       5000.00/Year

 2             Goatry             6           15             57                78              78       2500.00/Year




Table No. 3.20: Existing functional assets (Works already completed under different schemes including
works undertaken by farmers independently)
  1                     2                          3                      4                5                  6

Sl. No         Name of the work              Plot No.                  Quantity       Amount spent      Programme
                                                                      (No./RMTs)         (Rs.)




                                                                                                             Page 59 of 99
          KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No.3.21 PROBLEM TYPOLOGY OF THE WATERSHED

    1                             2                                             3                                    4

    Sl.                    Problem area                                Problem analysis               Proposed interventions to
    No                                                                                                   overcome problems

1           Soil Conservation (slope, erosion, soil    Erosion, Low Productivity, Erratic           Nala Bunds, , Field Bunding,Gully
            loss, rainfall, productivity, etc)         rainfall, Acidic Soil,                       plug, Boulder check, CCT,
                                                                                                    Plantation,
                                                                                                    SRI method


2           Water conservation (Water budget,          High runoff, high permeability, low          Farm pond, Dova,& pond
            Ground water norms, productivity)          storage of surface water                     renovation

3           Crop coverage – {80% of w/s area should    High forest cover but lack of                Plantation with Agro forestry.
            be with canopy}                            economically beneficial forest from
                                                       community, moreover under forest
                                                       department

4           Agriculture productivity (crop wise        All crops have low productivity with         Kitchen Garden, SRI paddy
            compare with dist. average)                District and state average.                  cultivation,
                                                                                                    high value Vegetable and Sri
                                                                                                    paddy
                                                                                                    cultivation.

5           Livestock productivity (Milk Yield, Meat   No such products for marketing.
            yield, Eggs, Wool Yield, Kidding etc.)
                                                                                                    Improved practices of Poultryy,
                                                                                                    Goatry.

6           Existing Livelihood activities for Asset   Medication practices of livestock, Goatry,   Improved practices of Goatry,
            less persons                               Piggery, Broiler Poultry.                    Broiler
                                                                                                    Poultry.




                                                                                                                     Page 60 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

7     Community Based Organizations &     There is SHG group for woman but all   Restructuring of Woman SHG
      Social capital base                 had become defunct or is in worse      groups,
                                          condition.                             Capacity building, Livelihood
                                                                                 implementation, Productive
                                                                                 systems
                                                                                 implementation through SHG.

8     Capacity Building (participation,   There is no advanced knowledge for     All training will be done in respect
      training,awareness of watershed     livelihood activity implementation,    to
                                          System dynamics, accounting systems,   each activity to be implemented in
      community
                                          SWC, WHS, and Plantation.              the
                                                                                 project.

9     Others (specify)                    NA                                     NA




                                                                                                  Page 61 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                        CHAPTER – 4
Institutional Building and Project Management




                                                              Page 62 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

 Table No. 4.1 Details of SHGs & UGs newly formed under IWMP:
 1    2                      3                                  4                         5                6                 7                 8          9

                                                                                                      No. of SC in     No. of Others                      Bank linkage
                                                                                  No. of ST in                                            No. of BPL in
                     Total no. of CBOs                 No. of members                                    each             in each
                                                                                 each category                                           each category
                                                                                                       category          category
Sl. Type of
No. Group                                                                                                                                               No.      Amoun
              With    With
                                 With                                                                                                              Tota of       t (Rs)
              only    only               Total              M       F    Total   M    F       Total   M    F   Total   M    F    Total   M    F
                                 both                                                                                                                l  SHG
              Men    Women
                                                                                                                                                        s

                                                    (i)
                                                                    8     8           8        8                                              6     6
                                                 Landless

                                                 (ii) MF            12    12          5        5           3    3           5     5           8     8
     SHG                 3                3
 1
                                                 (iii) SF           13    13                               3    3           10    10          6     6

                                                 (iv) LF

     Total                                                          33    33          13       13          6    6           15    15          20    20

                                                    (i)
                                                            9             9      9             9                                         9          9
                                                 Landless

                                                 (ii) MF    23            23     4             4      12        12     7          7      12         12
 2   UGs       7                          7
                                                 (iii) SF   29            29     3             3      5         5      21         21     9          9

                                                 (iv) LF    2             2                                            2          2

     Total                                                  63            63     16            16     17        17     30         30     30         30

 *Account no. of Watershed Committee, PIA.




                                                                                                                                                          Page 63 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

4.2: Details of Watershed Committees (WC)

                                                                                                       Type of                        Member of     Function/
SL.N                              Name of the         Father / Husband      Designatio   M/     Cast   Farmer     Landles   BPL       the           s
.                                 member              Name                  n            F      e      SF/MF/L    s         No.       UG/SHG/An     assigned
                                                                                                       F                              y other       #
                                  Shatrrudhan
1                                                     Late Balak Munda      Persident    M      ST     SF                             VDC/UG
                                  Munda
2                                 Perdeep Mahto       Madho Mahto           Secretry     M      OBC    SF                   5345      UG
                                                                                                                  Landles
3                                 Rekha Devi          Persuram Chaudhary    Cashier      F      OBC                                   SHG
                                                                                                                  s
4                                 Bilso Devi          Bharat Karmali        Member       F      ST     SF                             SHG
                                                                                                                  Landles
5                                 Nuresha Khatun      Nurul Haqe            Member       F      OBC                                   SHG
                                                                                                                  s
                                                                                                                  Landles
6                                 Jabira Khatun       Harun Rasid           Member       F      OBC                                   SHG
                                                                                                                  s
7      Talatan    Under           Laxmi Devi          Rajesh Kr. Saw        Member       F      OBC    SF                             SHG
8      d          process         Dewanti Devi        Laxman Singh          Member       F      GEN    SF                             SHG
9                                 Sahnaj Khatun       Jalil Ansari          Member       F      OBC    SF                             SHG
                                                                                                                  Landles
10                                Allaudin Ansari     Noor Mohabat          Member       M      OBC                                   LAN
                                                                                                                  s
11                                Anul Ansari         Late Maksud Ansari    Member       M      OBC    SF                             UG
12                                Bijay Kr. Munda     Balmukund Munda       Member       M      ST     SF                             UG
13                                Anita Kumari        Ramdhani Munda        Member       F      ST     SF                             UG
                                                                                                                  Landles
14                                Ashok Karmali       Jaleshwar Karmali     Member       M      ST                                    UG/VEC
                                                                                                                  s
                                                                                                                  Landles
15                                Satish Kr. Munda    Mani Munda            Member       M      ST                                    UG
                                                                                                                  s


(NOTE- Member wise details of SHGs, UGs & Watershed Committee has to be enclosed as annexures. The details includes the Name, Husband name and Caste)

In column 18 only the letter assigned, as below, needs to be typed, except for `J’, where the type may be specifically mentioned.

                 A.         PNP and PRA                                             B.        Planning
                 C.         Maintenance of Accounts                                 D.        Signing of cheques and making payments
                 E.         Supervision of construction activities                  F.        Cost Estimation
                 G.         Verification & Measurement                              H.        Record of labour employed
                 I.         Social Audit                                            J.        Any other (please specify).




                                                                                                                                              Page 64 of 99
          KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)

Table No 4.3: WDT Particulars:
    1            2                3             4                   5                              6                           7


           Names of WDT                                       Qualification /            Description of
    Sl.                          M/F#           Age                                                                      Role/ Function*
             members                                           Experience             professional training
    No

1           Soman Mahto      M             28           Diploma in civil Eng.        Watershed                 A,B,D,M,F,E,G,I,
                                                                                     Development, Net
                                                                                     planning, Social Audit

2          Kishun Mahto      M             52           B.A. (Agriculture)           SHG Promotion &           A,B,E,G,I
                                                                                     Poverty elevation

3          Kartik Kumar      M             43           B.A. (Sociology )            PRA, Social Audit,        A,B,I,H
                                                                                     Maintenance of Muster
                                                                                     Roll

4          Balmukund Lal     M             26           B.A. Diploma in Para-        A.I. ,BIRVA               A,G,I,B
                                                        vetnerian, A.I


*In column 7 only the letter assigned, as below, needs to be typed, except for `J’, where the type may be
specifically mentioned.
                A.        PNP and PRA                                           B.     Planning

                C.        Maintenance of Accounts                               D.     Signing of cheques and making payments

                E.        Supervision of construction activities                F.     Cost Estimation

                G.        Verification & Measurement                            H.     Record of labour employed

                I.        Social Audit                                          J.     Any other (please specify).




                                                                                                                                   Page 65 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




Table No. 4.4: PIA particulars
               1                      2                                                      3

             S.No               Particulars                                          Details of PIA

                   1. Type of organization#                G

                   2. Name of organization                 Krishi Gram Vikash Kendra (KGVK )

                   3. Designation & Address                Krishi Gram Vikas Kendra(KGVK)
                                                           TVM Gurukul, Rukka, Neori Vikas,                          Ranchi,
                                                           Jharkhand.
                                                            Pin: - 835217
                   4. Telephone                            0651-2276142,0651-
                                                           3051495,9431109265,9431394893

                   5. Fax                                    0651-2276142,

                   6. E-mail                               kvikas@ushamartin.co.in


            # In column no. 8.1.6 (1), only the letter assigned to each type, as given below, needs to be typed.
            A Line Dept.                                  B       Autonomous organization
            C Govt. Institute                             D       Research Bodies
            E Zila Parishad                               F       Intermediate Panchayat
            G Voluntary Organisations                     H       Any other (please specify).

Table No. 4.5 Bank Account Details
Name of WC/PIA                    Name of the               Account No.                   Name of the Signatory    Address
                                  Bank/Place
Krishi Gram Vikash Kendra (       Indian Overseas Bank      8946                          Ranjit Bajaj,            TVM Gurukul, Rukka, Neori Vikas, Ranchi,
PIA )                                                                                     Jayanta Mitra            Jharkhand. Pin: - 835217
WC Talatand                       SBI Patratu               31343062615                   Shatrudhan Munda         Vill + Post – Talatand,Patratu,
                                                                                          Pardeep Mahto            Ramgarh,Jharkhand
                                                                                          Soman Mahto




                                                                                                                                          Page 66 of 99
   KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




Institutional Mechanisms: (Enclose the following documents)

  4.6.1 Flow Chart of Institutional Arrangement from District to watershed level




                                                                                   Page 67 of 99
 KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



4.6.2 Fund Flow mechanisms – flow chart,



                    DoLR, GOI                  DoRD, GoJ
                      (90%)                      (10%)




                                JSWM (SLNA)
                                   (100%)




                            Project Implementation
                                  Agency (PIA)
                              (Training & Capacity
                             Building, Admin Cost)




                            Watershed Committee
                             (Programme Fund)




                                                                           Page 68 of 99
 KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



4.6.3 List of Watershed Records to be maintained

a) At Watershed committee level                                   b) At PIA Level
    Registration certificate
    Bylaws                                                                  Cash book
    DPR                                                                     Computerized
    AAP                                                                     accounting system

    Cash Book                                                               Vouchers

    Project fund pass book
    WDF pass book
    Ledger Book
    Asset Register
    Vouchers
    Family wise planning detail
    Plot no wise planning detail
    Land survey
    Measurement book
    Muster roll
    MPR
    QPR
    PRA exercise chart
    Audit report/Social audit report
    Photo documents
    Project completion report
    Common guidelines in Hindi
    MoU between WC and PIA / WC and SLNA / WC and UGs,    Revenue records



                                                                                         Page 69 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




Documents of Agreements:

4.7.1) Watershed Committee Registration certificate

The Registration is in the process and will be done shortly.

4.7.2 MoU – PIA – DWDU, PIA – WC

The MOU is also in process and will be done shortly.

4.7.3 Resolution of Gram Sabha , Aam Sabha, WC approving action plan#

The resolution passed by Gram sabha, Watershed committee is attached as annexure.




                                                                                    Page 70 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



4.8 Project Implementation

Table No. 4.8 Convergence plan with IWMP:


  1                2                              3                    4                 5                 6                7

                                  Name of activity/task/structure
                                   proposed under convergence                                           Estimated        Level of
                                (a) Structures                      Period of                             Fund        decision taken
         Names of Departments                                                    Reference no. of
                                                                    Support                             Proposed            for
S. No.       with Schemes                                                         activity/ task/
                                (b) livelihoods                                                           Under        convergence
         converging with IWMP                                       (Years)      structure in DPR
                                                                                                      Convergence
                                (c) Capacity Building                                                 (in Rs.Lakhs)   Block/district

                                (d) Any other (pl. specify)

  1            MNREGA                             A                    2            Farm pond             1.23            Block

  2            MNREGA                             A                    2            Farm pond             1.23            Block

              Soil & Water                        A
  3           conservation                                             2        Check Dan with lift      15.33           District
              Dept

  4            MNREGA                             A                    2        Irrigation well-10       11.20            Block

  5            MNREGA                             A                    2        Border trench 1 ha        0.35            Block

  6            MNREGA                             A                    2        Land Leveling 2 ha        0.60            Block

                 Total                                                                                   33.19




                                                                                                                      Page 71 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                    CHAPTER – 5

                            Management/Action Plan
Description on methodology of plan adopted

  a. Awareness generation interventions
The KGVK started working in the area in april 2009. We initiated with formation and
reviving the SHG’s. Till date 49 SHG’s are formed/ revived. We also involved with 18
farmers in agriculture in SRI, Kharif tomato, arhar, kulthi etc to create a base in the
area. Other than that we also conducted exposure visits of SHG members to see good
quality SHG’s, SHG norms and accounting system of SHG. Exposures were also
conducted with the watershed committee members to see one of the model watersheds
in Jharkhand implemented by KGVK in Patratu block of Ramgarh district called ICEF
Watershed to understand the different aspect of watershed programme. We also invited
people from Pali and Armadag watershed to share their experiences, their journey and
their understandings.

 b. Initial Orientation program
We initiated the orientation programme with the help of secretary of ICEF Watershed,
sharing his experiences at hamlet level. We arranged whole day discussion meetings in
every hamlet along with micro watershed committee representative from that
hamlet/Village. We shared the
concept of watershed, how it is going to bring a change in the village scenario followed
by sharing of experience by the ICEF watershed secretary. There was question answer
session in
the end where the people, those who went to exposure in ICEF watershed answered
different
queries of the people along with the secretary of ICEF watershed.

  c. Formation process UGs & Watershed Committee
The watershed committee was formed through micro watershed level meeting. We
arranged the meeting in the micro watershed through notice in the local paper,
circulated in the area. We also informed the villagers directly by visiting each and every
hamlet and distributed pamphlet for the meeting. The meeting initiated with the
criteria required for selection as directed by SLNA. It was followed by hamlet level sub
group discussion, in which they selected their representative. In the main group they
proposed the name of their representatives and the total people participating in the
meeting gave their view. Finally the selected members are finalized by minutes of the
meeting signed by all the participating members. A meeting was again called by giving
notice in the local daily of the watershed committee to select the secretary, president,
treasurer and community mobiliser as per the norms.




                                                                              Page 73 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



 d. DPR preparation process:

i. Data Collection –The data is primarily collected through household base line
survey. The secondary data was collected from block office, district administration,
forest department, and Soil and water conservation department. Along with that
transect, PRA exercises was also done in each and every hamlet followed by net
planning along with families and focused discussion with SHG members.

ii. Planning Process – The planning process was done at the hamlet level through
different steps like transect, patch wise demarcation of the hamlet, option generation
at the patch , verification of the site and finally by approval through gram sabha and
watershed committee.

iii. Mapping – During the planning process maps were made at the village level and
finally consolidated at the watershed level through a three days training programme.
Eight maps were made through this process namely drainage map, resource map, land
utilization map, patch wise map and proposed activity map. The maps are attached at
the end.

iv. Hydro-geological Survey- The hydro geological data are basically collected from
secondary sources but the drainage, erosion and land capability data are also collected
from villages.

v. Public-Private partnership- The DPR was prepared through amalgamating
thoughts and views at different level. The DPR was prepared with the help of
community, SHG, watershed committee. Further it was reviewed, helped and corrected
through timely feedbacks from consortium, KGVK and SLNA.

vi. Consolidation & preparation of DPR document- The data collected from village
was consolidated at the watershed committee level and with the help of KGVK the
activities are distributed year wise and budgets, estimates are prepared.

vii. Approval by Aam Sabha/Gram Sabha- After the DPR preparation the final draft is
shared at the village level and approval was taken by passing resolution. Further the
overall plan of the micro watershed is also approved from watershed committee by
passing resolution. The resolution at the village level and watershed committee level is
attached.




                                                                            Page 74 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



5.2 Details of Natural Resource Management Activities

Table No. 5.2.1 Soil and Moisture Conservation structures
  1                      2              3            4               5             6   7               8           9       10                    11
                                            Plot                          Area (in
                                            Numbers                      Ha)/                                       Total
                             Name of                                                   Unit    Total
    Name of the                             (                            Dimension                                  Grant  Year of
Sl.                          the                       Name of                         Cost    Cost
    Activities                              including                    ( in M/ Sq.                   Contribution Amount Implementation
No.                          Hamlet /                  Beneficiaries                   in      (in Rs.
    (Structures)                            Name of                      M / CuM)                                   (in Rs (1st/2nd/3rd/4th/5th)
                             Village                                                   lakhs   Lakhs)
                                            the local                    of                                         Lakhs)
                                            Patch)                       Structure

                              Talatand
 1                                                                                              4.16       0.416       3.744     2nd,3rd & 4th
                             ,Ucharinga
      Contour Trenching                                                    16 Ha       0.26


                              Talatand
 2                                                                                              4.25       0.425       3.825     2nd,3rd & 4th
                             ,Ucharinga

        Field Bunding                                                      25 Ha       0.17

                              Talatand
 3                                                                                              1.6        0.16        1.44      2nd,3rd & 4th
                             ,Ucharinga
       Gully Plugging                                                      32 No       0.05

                              Talatand
 4                                                                                              2.34       0.234       2.106     2nd,3rd & 4th
                             ,Ucharinga
       Boulder Checks                                                      18 No       0.13

                              Talatand
 5                                                                                              1.28       0.128       1.152     2nd,3rd & 4th
                             ,Ucharinga
        Field Out lets                                                    256 No       0.005




                                                                                                                                   Page 75 of 99
     KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



Table No. 5.2.2 Water Harvesting Structures
 1           2              3                 4                       5           6   7       8         9      10                  11
                                                                           Area (in
                                                                          Ha)/
    Name of                                                               Dimensi         Tot              Total
                 Name of        Plot Noumbers                                         Uni                           Year of
Sl. the                                                                   on ( in         al               Grant
                 the            ( including                                           t         Contributi          Implementation
No Activities                                     Name of Beneficiaries   M/ Sq.          Cos              Amou
                 Hamlet /       Name of the                                           Co        on                  (1st/2nd/3rd/4th
.   (Structur                                                             M/              t (in            nt (in
                 Village        local Patch)                                          st                            /5th)
    es)                                                                   CuM) of         Rs.)             Rs)
                                                                          Structur
                                                                          e
                                                  Sanjay Munda
                                 256,246,64,91,   Chandru Munda
                 Talatand
   Farm                         153,155,1412,3    Pancham Ganghu          (30x30x3    1.2
 1               Ucharinga,                                                                 9.84     0.984   8.856 2nd, 3rd &4th
   pond                         32,253            Rameshwar Pahan            )M         3
                 Hesla
                                                  Rahim Ansari
                                                  Abas Ansari
                                                  Dhaneshwar Munda
                                                  Balchand Munda
       Pond       Talatand
                                                  Indra Nath Saw          (30X35X     0.7
2    Renovatio   Ucharinga,       76,91,120                                                 2.19     0.219   1.971 2nd, 3rd &4th
                                                                          2)M          3
        n          Hesla




                                                  Manna Mahto             (18X18X     0.6
3    Dova        Talatand       9,8                                                         0.61     0.061   0.549 2nd, 3rd &4th
                                                                              3)M       1




                                                                                                                     Page 76 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




Table No. 5.2.2 Vegetative Covers
  1             2              3    4                 5            6 7            8             9       10                   11
                            Plot                           Area (in
                            Noumbers                      Ha)/
    Name of                                                                                        Total
                 Name of    (                             Dimension          Total                         Year of
Sl. the                               Name of                         Unit                         Grant
                 the Hamlet including                     ( in M/ Sq.        Cost     Contribution         Implementation
No. Activities                        Beneficiaries                   Cost                         Amount
                 / Village  Name of                       M / CuM)           (in Rs.)                      (1st/2nd/3rd/4th/5th)
    (Structures)                                                                                   (in Rs)
                            the local                     of
                            Patch)                        Structure


                    Talatand
    Mango
  1                 Ucharinga,                                  5Ha 0..59       2.95         1.00      1.95 2nd, 3rd &4th
    Orchard
                    Hesla




                     Talatand
       Timber
 2                  Ucharinga,                               4Ha      0.31      1.24         .576    0.664 2nd, 3rd &4th
       plants
                      Hesla




      Timber
 3                  Talatand                                    4Ha   0.31      1.24        0.567    0.664 2nd, 3rd &4th
      plants




                                                                                                                   Page 77 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



5.3: Structure or Activity Wise Details of Engineering Structure and Vegetative Measures

Table No.5.3.1 : Engineering structures for Soil Conservation Measures (SMC)
  1                    2                                                       3                                               4
                                                                                   Proposed plan
                                                                                                                    Farmers        Grant
                                                                     UNIT
S.                     Area                      Total units (No./                                                  contribution   Portion
    Name of structures               Farmers                         COST           Estimated cost* (Rs. in lakh)
No.                    (Ha)                      cu.m./ rmt)                                                        (Rs. in        (Rs. in
                                                                     (Rs.Lakhs)
                                                                                                                    lakh)          lakh)
                                                                                   M     W          O       T
A     PRIVATE LAND
      Contour Trenching     16 Ha        57               16            0.26        0     3.744     0.416    4.16      0.416       3.744
      Field Bunding         25 Ha       102               25            0.17        0     3.825     0.425    4.25      0.425       3.825
      Gully Plugging        32 No       35                32            0.05        0      1.44      0.16     1.6       0.16        1.44
      Boulder Checks        18 No        12               18            0.13        0     2.106     0.234    2.34      0.234       2.106
      Field Out lets        256No       102               256          0.005        0     1.152     0.128    1.28      0.128       1.152
      Others (Specify----
      -----------)
      COMMON
B
      LAND
      Contour Trenching
      Field Bunding
      Gully Plugging
      Boulder Checks
      Field Out lets
      Others (Specify----
      -----------)
      Sub total (B)
      Grand total (A+B)                 308               347          0.615        0     12.267    1.363 13.63        1.363       12.267

        (M – Materials, W- wages, O- others, T – Total)


                                                                                                                           Page 78 of 99
           KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



5.3.2: Details of engineering structures for Water Harvesting WHS
M – Materials, W- wages, O- others, T – Total
       1                                  2                            3                                                                                      4
                                                                           Proposed plan
S.                                            Total units                  Estimated cost* (Rs. In Lakh)                                            Farmers
            Name of structures                               UNIT COST
No.                                           (No./ cu.m./                                                                                        contribution
                                                                (Rs.)      M                               W              O       T
                                              rmt)                                                                                                   (Rs.)
A           PRIVATE LAND
A1          Individual structures
i.          a)Farm Pond                             8           1.23                    0                      8.856      0.984       9.84           0.984
ii.         b)Pond Reno                             3           0.73                    0                      1.971      0.219       2.19           0.219
iii.        c)Dova                                  1           0.61                    0                      0.549      0.061       0.61           0.061
iv.         d)Spring development                    1           0.7                   0.42                     0.28       0.07         0.7           0.028
v.          f)Drinking well Renovation             10           0.26                  1.56                     1.04       0.26         2.6           0.104
vi.         h) Irrigation channel                 1000         0.013                   7.8                      5.2        1.3         13            0.52
xvi.        Any other (specify------------)
xviii.
            Subtotal (A)                                                              9.78                     17.896     2.894       28.94          1.916
B           COMMON LAND
i.          a)Farm Pond                                                                        N.A.
ii.         b)Pond Reno                                                                        N.A.
iii.        c)Dova                                                                             N.A.
iv.         d)Spring development                                                               N.A.
v.          f)Drinking well Renovation            N.A.
vi.         h) Irrigation channel                 N.A.
vii.        Any other (specify-------)            N.A.
            Sub total (B)                                                                           0                 0       0            0             0
            Grand total (A+B)                                                                    9.78            17.896   2.894        28.94         1.916




                                                                                                                                              Page 79 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




Table No. 5.3.3: Details of activities connected with vegetative cover in watershed works*
   1                           2                         3                                                          4

                                                                              Proposed plan
S.      Name of structure/                                                   Estimated     Farmer
No.          work                                                                                      Grant (Rs.
                                   Area (ha) No. of plants Unit Cost (Rs)   cost (Rs. in Contribution
                                                                                                        in lakh)
                                                                               lakh)     (Rs. in lakh)

       a)Agro Forestry                8          2216           0.31           2.48        1.152        1.328

       b)Mango Orchards
                                      5          1385           0.59           2.95           1          1.95
       through intercropping

               Total                                                           5.43        2.152        3.278




                                                                                                      Page 80 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                           Chapter 6
                  Capacity Building Plan




                                                              Page 81 of 99
         KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



   Table No. 6.1 Details of Capacity Building
  1               2         3      4          5         6           7             8          9                   10               11
    Name of
    the
                                                                        Total Cost
    Training &                         Total
                                                                        required       Total
    Exposure ( Number Number of Number Total                 Cost per                          Year of
Sl.                                                                     for the        Grant                         Monitoring
    Knowledge, of         Participants of days Traineedays Traineeday                          Implementation
No.                                                                     programme      Amount                        Indicators
    Skill, etc. at events in an event per      (= 3 x 4 x 5) (in Rs)                           (1st/2nd/3rd/4th/5th)
                                                                        (= 6 x7 ; in   (in Rs)
    both Being                         event
                                                                        Rs.)
    and Doing
    level)
SHG/ UG / WC / PI related
     Concept
                                       One
  1 training of             5    250                  250         150         37500      37500 2nd, 3rd &4th
                                       days                                                                           Groups linked
     SHG
                                                                                                                      with cluster,
     Book
                                                                                                                      Having Cash
     Keeping                           One
  2                         2    100                  100         150         15000      15000 2nd, 3rd &4th          book, pass
     Training of                       days
                                                                                                                      book and
     SHG
                                                                                                                      Linked with
     Concept
                                       One                                                                            bank & KGVK
  3 training of             4    200                  200         150         30000      30000 2nd, 3rd &4th
                                       days                                                                           VRC
     UG
Subtotal                                                                      82500      82500

                                                                                                                       Technical
                                                                                                                      Knowledge of
                                                                                                                      Watershed
                                                                                                                      Structures,
    Watershed                                                                                                         Understanding
    Concept                                                                                                           of group
  1                         4    200 3 Days           600         400         80000      80000 2nd, 3rd &4th
    training Of                                                                                                       dynamics,
    UG                                                                                                                Knowledge of
                                                                                                                      skill
                                                                                                                      enhancement
                                                                                                                      of
                                                                                                                      conservation


                                                                                                                Page 82 of 99
         KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



                                                                                                       methods
     Watershed
     Concept
  2                        1     15 5Days         75       600       9000    9000 2nd, 3rd &4th
     training Of
     WC
Subtotal                                                            89000   89000
Production Enhancement related
     Uger group                                                                                        Use to with
     Training of                                                                                       scientific
  1                        2     200 2Days       400       200      40000   40000 2nd, 3rd &4th
     agriculture                                                                                       method &
     Activity                                                                                          adoption
     Uger group                                                                                        SRI method
     Training of                                                                                       adoption &
  2                        1     50 3 Days       150       400      20000   20000 2nd, 3rd &4th
     agriculture                                                                                       extension in
     SRI.                                                                                              farming area
     Uger group                                                                                        Use to with
     Training of                                                                                       scientific
  3                        1     50 3 Days       150       400      20000   20000 2nd, 3rd &4th
     agriculture                                                                                       method &
     Vegetable.                                                                                        adoption
Subtotal                                                            80000   80000

      SHG
      Member
  1                       1      50 3 Days       150       400      20000   20000 2nd, 3rd &4th
      Goatry
      Training
      Training of
      SHGs                                                                                             To be trained
  2                       1      50 3 Days       150       400      20000   20000 2nd, 3rd &4th
      member in                                                                                        for rearing &
      Piggery                                                                                          skill to be
      Training of                                                                                      developed for
      SHGs                                                                                             livelihood
  3                       1      50 3 Days       150       400      20000   20000 2nd, 3rd &4th
      member in                                                                                        generation.
      Stitching
      SHG
      Member
  4                       1      50 3 Days       150       400      20000   20000 2nd, 3rd &4th
      Poultry
      Training


                                                                                                  Page 83 of 99
           KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



Subtotal                                                              80000    80000
Convergence / Rights & entitlement / Wel Being related
     Rights                                                                                               Clear
  1 concept of               1            50 1DAY        50    150     7500     7500 2nd, 3rd &4th        understanding
     UG.                                                                                                  of Role &
                                                                                                          Responsibility
                                                                                                          &
Subtotal                                                               7500     7500                      sustainability
                                                                                                          with Users
                                                                                                          contribution
For PIA / WDT staffs level
      SLNA &
  1                                                                  119000   119000
      WDDU
      Exposure of                                                                                         Understanding
  2                          1             4 28Days      28   1000    28000    28000
      WC Member                                                                                           of Watershed
      Exposure of                                                                                         different
  3 WDT                      1             2 20 Days     20    600    12000    12000 2nd, 3rd &4th        dynamics &
      Member                                                                                              learning of
                                                                                                          better &
                                                                                                          sustainable
Subtotal                                                             159000   159000
                                                                                                          methods of
                                                                                                          activities.
GRAND TOTAL                                                          498000   498000




                                                                                                     Page 84 of 99
KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                         Chapter 7
  Phasing of Programme and Budgeting




                                                              Page 85 of 99
        KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



Table No. 7.1: Phasing of the action plan
                                                                      Year Wise Physical and Financial Details for the Talatand Micro-watershed
Sl.                                                                                       Rate in        2010-2011        2011-2012        2012-2013      2013-2014        2014-2015        Grand
      Budget Head                       Details of Activities            Unit    Qty.                                                                                                                   Remarks
no                                                                                       Rs.(Lakhs)    Phy       Fin     Phy      Fin    Phy       Fin   Phy      Fin   Phy        Fin     Total(Rs.)
                        a)Reno of drinking Water                          no      7         0.24        7       1.65      0      0.00     0       0.00    0      0.00    0        0.00       1.65
                        b)Micro drinking water System                     no      0         2.40        0       0.00      0      0.00     0       0.00    0      0.00    0        0.00       0.00
                        c)Ban Mahostav by School Children                 no      1         0.18        1       0.18      0      0.00     0       0.00    0      0.00    0        0.00       0.18
                        d)Nutritional Garden                            family    27        0.01        27      0.27      0      0.00     0       0.00    0      0.00    0        0.00       0.27
                        e)Revoving fund for Agricultural Activities       …       …         0.80        …       0.80      0      0.00     0       0.00    0      0.00    0        0.00       0.80       Separate
                        f)Bio Gas                                         no      1         0.20        1       0.20      0      0.00     0       0.00    0      0.00    0        0.00       0.20        Plan had
       Entry Point                                                                                                                                                                                        already
                        g)Solar Lamp Demonstration                        no      5        0.015        5       0.08      0      0.00     0       0.00    0      0.00    0        0.00       0.08
      Activities(EPA)                                                                                                                                                                                      been
                        h)Smokeless Chullah                               no      5        0.004        5       0.02      0      0.00     0       0.00    0      0.00    0        0.00       0.02       Submitted
1
                        i)Soil testing                                   plot     20       0.001        20      0.02      0      0.00     0       0.00    0      0.00    0        0.00       0.02        at JSWM
                        j)Training cum Exposer                            …       …         0.14        …       0.14      0      0.00     0       0.00    0      0.00    0        0.00       0.14
                        k) Vegetable green shade net                     No.      1        0.500        1       0.50      0      0.00     0       0.00    0      0.00    0        0.00       0.50
                        l) fruit plant garden                            No.      2        0.050        2       0.10      0      0.00     0       0.00    0      0.00    0        0.00       0.10
                        m)Animal Health Camp                              no      1         0.03        1       0.03      0      0.00     0       0.00    0      0.00    0        0.00       0.03
                                                                                                                          0                       0.00                                       3.98
                                                                                                                                                                                Total-
                                                                                                                                                                                             3.98
                                                                                                                                                                                01
                        a)Farm Pond                                       No       8        1.23        0      0.00      2      2.46      3       3.69    2      2.46    1        1.23        9.84         A
                        b)Pond Reno                                       No       3        0.73        0      0.00      1      0.73      1       0.73    1      0.73    0        0.00        2.19         B
                        c)Dova                                            No       1        0.61        0      0.00      0      0.00      0       0.00    1      0.61    0        0.00        0.61         C
      a.Water
                        d)Spring development                              No       1         0.7        0      0.00      0      0.00      0       0.00    1      0.70    0        0.00        0.70         D
      Coservation
                        f)Drinking well Renovation                        No      10        0.26        0      0.00      4      0.92      4       0.92    2      0.46    0        0.00        2.30         E
                        h) Irrigation channel                            RMT     1000      0.013               0.00      0      0.00     100      1.30   300     3.90   600       7.80       13.00         G
                                                                                                                                                                                Total-02     28.64

                        a)Contour Trenching                               Ha       16       0.26        0      0.00      6      1.56      6       1.56   4       1.04    0        0.00        4.16         H
                        b)Field Bunding                                   Ha       25       0.17        0      0.00      5      0.85      10      1.70   10      1.70    0        0.00        4.25         I
      b.Soil and
                        c)Gully Plugging                                  No       32       0.05        0      0.00      10     0.50      15      0.75   5       0.25    2        0.10        1.60         J
      Moisture
2                       d)Boulder Checks                                  No       18       0.13        0      0.00      5      0.65      11      1.43   2       0.26    0        0.00        2.34         K
      Conservation
                        e)Field Out lets                                  No      256      0.005        0      0.00      42     0.21     122      0.61   92      0.46    0        0.00        1.28         L
                                                                                                                                                                                Total-03     13.63

                        a)Agro Forestry                                   Ha       8        0.31        0      0.00      2      0.62      2       0.62    2      0.62    2        0.62       2.48          M
       c.Forest and
                        b)Mango Orchards through intercropping            Ha       5        0.59        0      0.00      2      1.18      1       0.59    1      0.59    1        0.59       2.95          N
       Horticulture
                                                                                                                                                                                Total-04     5.43

      d.Renewable       a) Smoke less chulhas                             No      50       0.005        0      0.00      0      0.00      50      0.25    0      0.00    0        0.00        0.25          X
         Energy         b)Biogass                                         No      10        0.18        0      0.00      0      0.00      5       0.90    5      0.90    0        0.00        1.80          Y
                                                                                                                                                                                Total-05      2.05
                                                                                                                                                                                Total-01     49.75




                                                                                                                                                                                             Page 86 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                     a)Orientation Training to SHG members for 01 Day
                                                                                                                                                            0.75
                     at village level @Rs150.00/Person/Day in 04 Batch    No   10   0.075   6    0.45   3     0.23   1     0.08   0     0.00   0   0.00              Z
                     b)Orientation Training to UG members for 01 Day
                                                                                                                                                            0.70
                     at Village Level@Rs.150.00/Person/Day in 07 batch    No   8    0.087   4    0.35   3     0.26   1     0.09   0     0.00   0   0.00             Aa
                     c)Skill Devlopment training to SHG members for 03
                                                                                                                                                            1.20
                     Days @Rs200.00/Person/Day in 04 Batch                No   10   0.12    5    0.60   4     0.48   1     0.12   0     0.00   0   0.00             Ab
                     d)Skill Devlopment training to Watershed
                     Committee members as well as Volunteers for 03
                                                                                                                                                            0.15
                     Days @ Rs.200.00/person/Day for 3 Days in 01
                     Batch                                                No   1    0.15    1    0.15   0     0.00   0     0.00   0     0.00   0   0.00              Ac
    a.Capacity       e)Water Management Training to User's Group for
    Building         02 Days @Rs.200.00/Person/Day for 02 Days in                                                                                           0.42
3
                     02Batches                                            No   3    0.14    2    0.28   0     0.00   1     0.14   0     0.00   0   0.00             Ad
                     f)Exposer to Watershed Committee to Outside
                     State for 07 Days@Rs 400.00/Person/Day for 07                                                                                          0.28
                     Days                                                 No   1    0.28    1    0.28   0     0.00   0     0.00   0     0.00   0   0.00             Ae
                     g)Exposer to WDT to Outside State for 10 Days@Rs
                                                                                                                                                            0.12
                     600.00/Person/Day                                    No   2    0.06    0    0.00   2     0.12   0     0.00   0     0.00   0   0.00              Af
                     h)Documentary Picture of Success Story               No   1            1    0.10   0     0.00   0     0.00   0     0.00   0   0.00     0.10
                     i)Agricultural Literature For Farmers as IEC
                                                                          ….                                                                                0.07
                     Materials                                                 LS           LS   0.07   LS    0.00   LS      0    0     0.00   0    0.00
                     j)Capacity Building training by SLNA &DWDU           ….   LS           LS   0.71   LS    0.36   LS    0.12   0     0.00   0    0.00    1.19
                                                                                                                                                   Total-
                                                                                                                                                            4.98
                                                                                                                                                     06
                     a) Goatry Unit of 07 members of JLG under SHG        No   2    0.68    0    0.00   1     0.68   1     0.68   0     0.00   0    0.00    1.36    Ag
                     b)Polutry unit of 250 nos Bird size with 05
                                                                                                                                                            1.86
                     members of SHG                                       No   3    0.62    0    0.00   1     0.62   1     0.62   1     0.62   0   0.00             Ai
                     c) Pigery Unit of 07 members of JLG under SHG        No   2    0.7     0    0.00   1     0.70   1     0.70   0     0.00   0   0.00     1.40    Ak
    Livelihood for
4                    d)Mushroom Unit 25 bags for SHG member               No   10   0.18    0    0.00   5     0.90   3     0.54   2     0.36   0   0.00     1.80    Aj
    Assetless
                     e) Stiching Unit of 07 members of JLG under SHG in
                                                                                                                                                            2.20
                     Revolving mode                                       No   2     1.1    0    0.00   1     1.10   0     0.00   1     1.10   0   0.00              Al
                     f)Vermi compost production model with small
                                                                                                                                                            1.35
                     Farmers                                              No   10   0.135   0    0.00   3     0.41   4     0.54   3     0.41   0    0.00            Am
                                                                                                                                                   Total-
                                                                                                                                                     07     9.97
                     a)SRI Extension in traditional as well as improved
                                                                                            0    0.00   7     1.61   7     1.61   6     1.38   0   0.00     4.60
                     variety                                              Ha   20   0.23                                                                             O
                     b)Bottle guard Demonstration with poly mulching      Ha   2    0.63    0    0.00    1    0.63   0.5   0.32   0.5   0.32   0    0.00    1.26     P
                     c)Hyv Tomatoes Demonstration as Vegetable            Ha   8    0.47    0    0.00    3    1.41    3    1.41    2    0.94   0    0.00    3.76     Q
    Productivity     d)Improved Green Pea Demonstration as Vegetable      Ha   4    0.25    0    0.00    2    0.50    1    0.25    1    0.25   0    0.00    1.00     R
    Enhancement      e)Hyv Pigeon pea Demonstration as Pulses             Ha   7    0.11    0    0.00    3    0.33    2    0.22    2    0.22   0    0.00    0.77     S
5
    and micro        f)Hyv Pearl millet Demonstration as Cereal crop      Ha   2    0.1     0    0.00    1    0.10    1    0.10    0    0.00   0    0.00    0.20     T
    Enterprises      g)Hyv Nizer Demonstration as dry land Oil seed       Ha   2    0.07    0    0.00   0.5   0.04    1    0.07   0.5   0.04   0    0.00    0.14     U
                     h)Hyv Sorgum Demonstration as dry land Cereals       Ha   5    0.1     0    0.00    2    0.20    2    0.20    1    0.10   0    0.00    0.50     V
                     i)Sun Flower Demonstration as Perennial Oil seed     Ha   5    0.14    0    0.00    2    0.28   1.5   0.21   1.5   0.21   0    0.00    0.70     W
                                                                                                                                                   Total-
                                                                                                              5.10         4.39         3.45         08     12.93




                                                                                                                                                            Page 87 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                     a)Project Completion Report                No    1    1.25   0    0.00   0    0.00   0    0.00   0    0.00   1     1.25    1.25
                     b)Environment Impact assesment Studies.    No    1    0.75   0    0.00   0    0.00   0    0.00   0    0.00   1     0.75    0.75
     Consolidation
                     c) Documentation of Success Stories             L.S   0.60   0    0.00   0    0.00   0    0.00   0    0.00   ..    0.60    0.60
        Phases
                     d)Knowledge disemination events/workshop   No    1    1.25   0    0.00   0    0.00   0    0.00   0    0.00   1     1.25    1.25
6      Activities
                     e) Institutional Linkages                       L.S   0.80   0    0.00   0    0.00   0    0.00   0    0.00   …     0.80    0.80
                     f)Process Documentation                         L.S   0.31   0    0.00   0    0.00   0    0.00   0    0.00   …     0.31    0.31
                                                                                                                                       Total-
                                                                                                                                         09     4.96
     Project
7                                                               ….   ….           ….   1.99   ….   1.99   ….          ….          ….            9.95
     Admin.                                                                9.95                                1.99        1.99         1.99
 8   Monitoring                                                 ….   ….      1    ….   0.2    ….    0.2   ….    0.2   ….    0.2   ….    0.2     1.00
 9   Evaluation                                                 ….   ….      1    ….   0.1    ….   0.20   ….    0.2   ….   0.20   ….    0.3     1.00
10   DPR.                                                       ….   ….      1    ….    1     ….     0    ….   0.00   ….   0.00   ….    0.00    1.00
                                                                                                                                       Total-
                                              Total                                                                                             99.52
                                                                                                                                         10




                                                                                                                                                Page 88 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



Table No. 7.2 Estimated Benefit Cost Ratio
                                                  Total Benefit
S.No.   Name of the activity Total Cost (Rs.)     expected *          BCR                Remarks
                                                  (Rs.)
                                           3.98
        EPA                                                   4.975           1 : 1.25
                                          49.75
        NRM                                                  137.31           1 : 2.76
                                          12.93
        PE                                                  30.7734           1 : 2.38

        Livelihood for Asset               9.97
                                                            17.2481           1 : 1.73
        less
        Institution and                    4.98
                                                             12.201           1 : 2.45
        Capacity building

        Overall                           81.61            202.5075           1 : 2.48



*kindly relate this with table no. 9.2 (expected outcomes)




                                                                                              Page 89 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                                         Chapter 8
                      Consolidation and completion of various works
Table No. 8.1: Consolidation of Action Plan
                                                                                                                     Consolidation/exit
    1                            2 Implementation Phase
                                                                                                                     Phase
                                     1 year              2nd year            3rd year            4th year            5th year
S. No    Component                   Phy        Fin      Phy        Fin      Phy        Fin      Phy        Fin      Phy
                                                                                                                                Fin (Lakh)
                                     (No)       (Lakh)   (No)       (Lakh)   (No)       (Lakh)   (No)       (Lakh)   (No)
         Entry Point Activities
     1                                    70     3.980          0    0.000          0    0.000          0    0.000          0        0.000
         (4%)
         DPR Preparation by
     2                               ….          1.000 ….            0.000 ….             0.000 ….            0.000 ….                0.000
         PIA(1%)
         Institution & Capacity
     3                                    20     2.988       12      1.446          4    0.542          0    0.000          0        0.000
         Building (5%)
         SLNA-0.3%
         DWDU-0.9%
         PIA-3.8%
         Productivity Enhancement
     4                                      0    0.000      21.5     5.095      19       4.385       14.5    3.450          0        0.000
         (13%)
         Livelihoods for Assetless
     5                                      0    0.000       12      4.405      10       3.080          7    2.485          0        0.000
         (10%)
         Natural Resource
     6                                      0    0.000       79      9.680      330 15.050           428 14.680          606        10.340
         Management (50 %)
     7   Monitoring (1%)             ….          0.200 ….            0.200 ….            0.200 ….            0.200 ….                0.200
     8   Evaluation (1 %)            ….          0.100 ….            0.200 ….             0.200 ….            0.200 ….                0.300
     9   Consolidation phase (5%)           0    0.000          0    0.000          0    0.000          0    0.000          3        4.960
    10   Administration (10 %)       ….          1.990 ….            1.990 ….            1.990 ….            1.990 ….                1.990



                                                                                                                            Page 90 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




                                     CHAPTER – 9
                                  EXPECTED OUTCOMES

9.1 Describe in detail the “Expected Outcomes”
A. Employment
Employment has always been a challenge in the village. The principal occupations of the
people are rainfed agriculture, animal husbandry and casual labour work. During Khariff
period most part of the work mass engaged themselves for about 4 months. Lack of
fodder makes animal husbandry very difficult too. So, animal husbandry does not keep
them engaged full time. Thus the people mainly depend upon casual labour, either in the
village itself or outside to it. The project plans for creation of both wage employment and
self employment opportunities. Wage employment would be created by engaging people
in watershed physical works like construction of earthen bunds, farm bunds, village
pond, plantation, etc. Self employment would be created by providing the people with
cash support in the form of direct livelihood activities like agriculture, animal husbandry
(Breed improvement) and enterprise development.



B. Migration
Low rainfall, low productivity of Agriculture land, lack of fodder bound to local people for
migration to the nearest town. On account of agriculture and animal husbandry
providing only part time employment for some part of the year, the people migrate for a
better half of the year for wage labour. During that period people engaged themselves in
the construction Industry, Brick Kiln as well as Road works.

To check the migration from the Locality the Project mandate is to Create Employment
through Proper management of land, water as well as human resource management.


C. Drinking Water
Drinking water is the biggest Challenges in this Area. Most of the people depends upon
well and tube well for drinking water purposes. Most of the well in this micro watershed
are not in proper location of discharging zone. Most of the well has gone dried during
summer. In most of the hamlet of this watershed people collect drinking water from 1-2
km from their residence.


D. Crops, Cropping pattern & Productivity

Paddy is the main crop cultivated in the area followed by Maize while among the Rabi
crops vegetables like Brinjal, Lady’s finger, Chilly, Bitter guard, Cauliflower, Cabbages,



                                                                                Page 91 of 99
    KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



Beans etc are noticed and some of the patches Oilseed like mustard and Pulses like
Pigeon peas are also noticed. The average yield of paddy is around 7 qntl/ha which so is
less than the Jharkhand average. The yield of paddy is reflection of quality of soil and
water available in the watershed areas. Similarly the average yield of vegetables are
around 8 qtl/Ha which is also so less .
Maize is very common crop in this region, particularly in relatively high land area near
the villages since Maize requires light sandy soil with poor water holding capacity. Most
of the Maize are of early maturity type is sown under rain fed condition. After harvesting
the Maize, most of the fields are used for Rabi cultivation like Potatoes cultivation
through well based Irrigation.


E. Horticulture
Though this agro climatic Condition is suitable for various Horticultural Crops, but it so
scarce in this Zone. Only in some of the Pockets in the command villages of this Micro
watershed is Visible. The suitable Categories of fruit Plants for this Zones are
Mangoes, Amrud, Litchi, Aonla, Lemon and Papaya. The strong mandate of Project is
to promote such species in proper time frame of Plantation activities.


F. Vegetative Coverage
The area is sparsely vegetated with Sal, Mahua, Sidha, Bamboo and such type of trees in
the hills, foothills and high wasteland areas. Afforestation practices for soil as well as
water conservation should be taken up mainly in the wasteland part and southern hill
slopes areas with such type of vegetation, which are suitable for this particular land.

G. Live Stock
This watershed has an average strength of livestock. That includes Cows, Buffaloes,
Goats, Pigs, and Birds. Most of the Cows in this watershed are the local cows of poor
yielding in nature. Due to lack of Infrastructure, awareness, Fodder Bank, people are
unable to raise their income from livestock based management system. Most of the tribal
Community in this Area is interested for small animals like Pigs, Goats and Hen. The
basic cause behind this theory is due to low investment, low risk, small
Infrastructure, and availability of market . The Project will focused upon this Concept
and promote livestock management system through Group based activities &
especially with breed improvement of the local animals to convert into the high yielding
species through convergence & under IWMP.




                                                                              Page 92 of 99
           KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



    Table No. 9.2: Summarize in the table given below (Quantifiable indicators)
1      2                                        3             4             5                6

S.                                              Unit of       Pre-project   Expected Post-
       Item                                                                                  Remarks
No.                                             measurement   Status        project Status

1      Status of water table (Depth to Ground   Meters        7 to 9 m      5 to 7 m         The Water level will increase
       water level)                                                                          through the recharging
                                                                                             structure
                                                                                             implemented in the project.

2      Ground water structures repaired/        No.                                          Will be repaired under IWMP
       rejuvenated

3      Quality of drinking water                Description                                  The percolated water pollutes
                                                                                             the well making the water
                                                                                             unsafe
                                                                                             for drinking

4      Availability of drinking water           Description

5      Increase in irrigation potential         Hec.          35.34         74.50            The WHS constructed in
                                                                                             project & increase in irrigation
                                                                                             area.

6      Change in cropping/ land use pattern     Description                                  New improved technology will
                                                                                             be introduced through training,
                                                                                             exposure and followup

7      Area under agricultural crop             Hec.

       I          Area under single crop        Hec.          232.39        245.50           Kharif Paddy / Maize /
                                                                                             Vegetable

       Ii         Area under double crop        Hec.          35.34         75.00            Kharif Paddy / Maize /



                                                                                                              Page 93 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)


                                                                                 Vegetable

     iii       Area under multiple crop         Hec.         6.35     12.70      Kharif Paddy / Maize /
                                                                                 Vegetable

8    Net increase in crop production area       Hec.

9    Increase in area under Vegetation/Forest   Hec.         162.30   173.30

10   Increase in area under horticulture        Hec.         0        5

11   Increase in area under fuel                Hec.

12   Increase in area under Fodder              Hec.         0        15

13   Increase in milk production                Litres/day

14   Environmental Impact                                    0

     Change in Soil Loss

     Perenniality of flow and change in Run-
     off

     Recharge of ground water

14   No. of SHGs Promoted                       No.          49       60

15   Increase in no. of livelihoods             No.          2        10




                                                                                                 Page 94 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




16   Increase in income                Rs.           5000         8500          Overall implementation will
                                                                                increase the crop production;
                                                                                Livelihood activity will increase
                                                                                the per capita income.

17   Status of Migration               No.           102          38            The employment will be

                                                                                generated in the project area

18   SHG Federations formed            No.           0            2             The SHG federation 2 in
                                                                                watershed area.

19   Credit linkage with banks         Rs.           25000        250000        The SHG will be linked through
                                                                                Bank

20   Resource use agreements

21   WDF collection & management       Rs.           0            700000        The WDF fund will be collected
                                                                                through different NRM,
                                                                                Livlihood
                                                                                and productivity enhancement

22   Summary of lessons learnt         Description




                                                                                                 Page 95 of 99
       KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




Table No.9.3: Backward and Forward Linkages


                          5                                      6                                                             7
Type of Marketing             Name of the          Pre-project
                                                                     Expected post project status
Facility                      institution          (no.)
(A)    Backward
linkages
(i)     Seed certification    HARP                 No                To be done with HARP, Palandu
(ii)  Seed supply             Cooperative, KGVK-                     KGVK Will facilitate the services in coordination with
                                                   No
system                        TFC                                    Ugs & HARP
(iii) Fertilizer supply       Cooperative, KGVK-                     Cooperative will be created & will facilitate the services,
                                                   No
system                        TFC                                    KGVK will work as a facilitator.
(iv) Pesticide supply         Cooperative, KGVK-                     Cooperative will be created & will facilitate the services,
                                                   No
system                        TFC                                    KGVK will work as a facilitator.

(v)   Credit                                                         Internal credit to be done by SHG & External to be
                              Local Bank/SHG       SHG
institutions                                                         done by Local Commercial bank

(vi)    Water supply          Users Group          No                To be facilitated by Users group
(vii) Extension                                                      To be facilitated by KGVK-TFC wing & CBO to be
                              KGVK-TFC Wing        No
services                                                             strengthen for the continuation.
                              KGVK-Agriculture                       To be facilitated by KGVK-Agriculture wing & CBO to
(viii) Nurseries                                   No
                              Wing                                   be strengthen for the continuation & Sustainability.
(ix) Tools/machinery
                              …………………              …………………..         ………………………..
suppliers
(x)  Price Support
                              …………………….            ……………………..        …………………………
system
                              Gram
(xi)    Labour                                     No                Will be done by WC/Ugs/G.S.
                              Sabha/WC/Ugs
(xii) Any other (please
                              …………………              …………………..         ………………………..
specify)




                                                                                                                   Page 96 of 99
        KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)




(B)       Forward linkages           …………………             …………………..             ………………………..
                                                                               Quality implements be supplied by
(i) (Harvesting/threshing
                                     KGVK-Usha Agro                            KGVK -Usha Agro wing in low cost to
machinery) / SRI & SWI                                   No
                                     implements                                strengthen & Extension of the SRI &
Weeder, Seed drill
                                                                               SWI
                                     Cooperative/KGVK-
(ii)     Markets / Mandis                                No                    Will be done by Cooperative/KGVK-TFC
                                     TFC
                                                         KGVK presence in
                                     Cooperative/KGVK-                         Will be done by Cooperative/KGVK-TFC
(iii)    Agro and other Industries                       some
                                     TFC & Agri wing                           & Agri wing
                                                         villages/Hamlets
(iv) Milk and other collection                           NDDB Cooperative in
                                     KGVK-TFC (Dairy)                          Will be done by Cooperative/KGVK-TFC
centres                                                  some villages




                                                                                                         Page 97 of 99
      KGVK-TALATAND Micro watershed (UNDER IWMP-PATRATU, RAMGARH, (11TH PLAN)



List of Maps to be enclosed along with DPR.

  1    .Location –District, mandal, village, watershed location map

  2      watershed Map for IWMP Project (Watershed Boundary demarcation in cadastral & Topo Sheet)

  3    Social Map (along with photos & paper drawing)-with Existing Structure

  4    Resource Map (along with photos & paper drawing)and Land Type

              5 Drainage Map (with numbering)

              6 Map showing existing structures

          a. Proposed action plan map

          b. Land use/Land cover map

          c. Slope map

          d. Soil and land capability class maps

          e. GIS maps

          B,c,d will be from the PRA maps done in the village


            should include Latitude and Longitude and the plot no.


            will be provided by JSACS