Embed
Email

Established Avg

Document Sample
Established Avg
Shared by: HC120207134923
Categories
Tags
Stats
views:
18
posted:
2/7/2012
language:
pages:
33
Warner Robins Air Logistics Center

F2AST

(Future Flexible Acquisition and

Sustainment Tool)

and

SbAST

(Small Business Acquisition and

Sustainment Tool)







Maj William Kerr

WR-ALC/PKXE

Enterprise Acquisition Branch



People First…Mission Always

WR-ALC

Vision & Focus

Warner Robins Air Logistics Center





Vision:

A “World-Class” Center of

Acquisition & Sustainment Excellence



Focus:

• Exceed Warfighter & Customer Expectations

• Lead DoD in Cost Management

• Re-energize & Sustain Continuous Process

Improvement



People First…Mission Always 2

Overview

Warner Robins Air Logistics Center



Organizational Structure

Contract Basics

Prime Contractors

Scope

Performance Measures

How to Use F2AST/SbAST

Protests

Examples of Systems supported via F2AST

F2AST/SbAST Factsheet





People First…Mission Always 3

What’s in it for You?

Warner Robins Air Logistics Center



WR-ALC/PKXE Augments Your Requirements Team!!

Provides:



• Acquisition Guidance and Contract Award Function

• Dedicated Contracting Officers and Buyer thru Award

• Dedicated Pricing Analyst Support

• Requirements Document Support (PWS, Serv Summ, FOE, MR)

• Assistance with Building and Compiling Requirements Packages

• Experienced Program Management Support

• Engineering Expertise

• DD 2579 Completion/Assistance





People First…Mission Always 4

What’s in it for You?

Warner Robins Air Logistics Center



WR-ALC/PKXE Has Working Relationships and Assists With:



• Small Business Office (WR-ALC/SB)

• Competition Advocate Office (WR-ALC/PKC)

• Acquisition Center of Excellence (ACE)

• Market Research Subject Matter Expert (WR-ALC/XPQ)

• Legal Office (WR-ALC/JA)

• Prime Contractors & OEM’s



NTE Labor Rates Already Established

Avg. F2AST award 32 days $5M = 116 business days reduction of 69 days



Sole Source • Use FAR 16 vs. FAR 15



• $5M = 149 business days





People First…Mission Always 7

F2AST/SbAST Basics

Warner Robins Air Logistics Center







F2AST SbAST

12 Prime Contractors 6 Prime Contractors

• Approx. 396 Subs • Approx. 40 Subs

–Additional subs may be –Additional subs may be

added as necessary added as necessary



$6.9B ceiling $402M ceiling

No Surcharge No Surcharge





As of Apr 2011



People First…Mission Always 8

F2AST Primes

Warner Robins Air Logistics Center







ARINC

Boeing

DRS Technical Services

L-3 Communications TCS

Lockheed Martin Integrated Systems

MacAulay-Brown

MTC (BAE SSTI)

Northrop Grumman Technical Services

Raytheon Tech. Serv. Cust. Eng. and Depot Supt (CEDS)

Science Applications International Corporation (SAIC)

Scientific Research Corporation (SRC)

Support Systems Associates, Inc (SSAI)





As of Mar 2011 People First…Mission Always 9

SbAST - Primes

Warner Robins Air Logistics Center









AAEC (Advanced Aerospace Engineering)

AAII (Alabama Aircraft Industries Inc)

AMS (Advanced Modification Solutions)

ES3 (Engineering and Software Solutions)

SRC (Scientific Research Corporation)

SSAI (Support Systems Associates)









People First…Mission Always 10

F2AST/SbAST –

Pricing ArrangementsAir Logistics Center

Warner Robins





Fixed Price (FP)

• Profit negotiated at D/TO

Labor Hour (LH)

• Profit negotiated at D/TO

• Profit capped at 10%

Time and Material (T&M)

• Profit included in rates (10% max)

Cost Reimbursable (CR)

• Fee negotiated at D/TO

Incentive Types

• Award Fee and Incentive Fee Available





People First…Mission Always 11

F2AST /SbAST –

Customers Robins Air Logistics Center

Warner





Who Can Issue Orders?

• F2AST

− Centralized ordering at WR-ALC (by PKXE)

− Decentralized ordering at WR-ALC, OO-ALC, OC-ALC,

and ASC on a case-by-case basis



• SbAST

− Centralized ordering at WR-ALC (by PKXE)

− Decentralized ordering at WR-ALC on a case-by-case

basis





People First…Mission Always 12

F2AST - PoP

Warner Robins Air Logistics Center



Ordering 3 yr 2 yr 2 yr

Basic Opt Opt

Period (Jul08-Jul11) (Jul11-Jul13) (Jul13-Jul15)







PoP 7 yrs 3 yrs







3 yr basic 2 yr 3 yr PoP

Pricing + 2 yr opt opt







Ten- year total period of performance: 23 Jul 2008 – 22 Jul 2018







People First…Mission Always 13

SbAST - PoP

Warner Robins Air Logistics Center





Ordering 3 yr 2 yr

Period basic opt





PoP 5 yrs 2 yrs







Pricing 5 yrs 2 yrs







7 year total period of performance: 22 Oct 2010 – 21Oct 2017







People First…Mission Always 14

F2AST/SbAST Scope

Warner Robins Air Logistics Center



 Scope Includes:

• Sustainment support of Air Force operated weapon

systems, support systems, subsystems, components,

and related services

• Development*, Modification, Maintenance

• Repairs, Spares, and Services

• Foreign Military Sales

• Partnerships

• Direct Sales Partnership Agreements

• Workshare Partnership Agreements



* SbAST does NOT include development







People First…Mission Always 15

F2AST Scope – Development

SbAST does NOT include development

Warner Robins Air Logistics Center







Modify current weapon systems

and/or their subsystems

• Design, engineering, development, and test

• New parts, software, or systems shall be designed

and produced to integrate with existing system

components and software if applicable









People First…Mission Always 16

F2AST/SbAST

Scope - Modifications Air Logistics Center

Warner Robins







Modify current weapon systems

and/or their subsystems

• Enhancements

• Reliability

• Serviceability

• Maintainability

• Performance







People First…Mission Always 17

F2AST/SbAST

Scope - Maintenance Air Logistics Center

Warner Robins







May include

• Programmed Depot Maintenance (PDM)

• Unprogrammed Depot Level

Maintenance(UDLM)

• Inspections

• Unpredictable Repair Maintenance

Requirements







People First…Mission Always 18

F2AST/SbAST

Scope - Services

Warner Robins Air Logistics Center







Not reasonably severable from:

• Development

• Modification

• Maintenance efforts



Engineering Services under F2AST

shall be sole source efforts to a prime

contractor





People First…Mission Always 19

F2AST/SbAST

Scope - Spares

Warner Robins Air Logistics Center







Standard and Non-Standard Spares

• Development and/or modifications

Contingency Spares

• Non-responsive source

Limited Spares

• Low fielded population

• Low demand rate

Critical Spares





People First…Mission Always 20

F2AST/SbAST

Scope - RepairsRobins Air Logistics Center

Warner







Standard and Non-Standard Repairs

• Development and/or modifications

Contingency Repair

• Normally organic source that cannot meet the time

frame required by the government

Limited Repair

• Low fielded population

• Low demand rate

Critical Repair



People First…Mission Always 21

F2AST/SbAST Scope

Warner Robins Air Logistics Center







Scope Does Not Include:

• Commercial items/services (FAR Part 12)

• Small Business Modifications under F2AST

• Severable Engineering Services

• Severable Advisory and Assistance Services

(A&AS)

• New weapon system development

• Military Construction (MILCON)

• Base operating support (BOS)







People First…Mission Always 22

F2AST/SbAST

Performance Measures Logistics Center

Warner Robins Air







Performance Based IAW AFI 63-124

• Performance-Based Work Statement (PWS)

• Service Summary

• Contracting Officer Representative (COR)

• CPAR and COR provided by requiring activity at D/TO









People First…Mission Always 23

F2AST/SbAST Process

Warner Robins Air Logistics Center

If F2AST or SbAST is being considered:



Call or email WR-ALC/PKXE

• Advise of your potential requirement

• Provide PWS and Market Research if available



Meet with WR-ALC/PKXE

• Via e-mail, phone, or face-to-face

• Not limited to one meeting

• Review requirements documents

• Prepare the F2AST/SbAST checklist

• Early coordination with the Small Business Office

is recommended

People First…Mission Always 24

F2AST/SbAST Process

(cont.)

Warner Robins Air Logistics Center







Develop the PR Package

• PR, PWS, Performance Plan, RAD, F2AST/SbAST

checklist etc.



CO Issues Request for Order Proposal (RFOP)

• F2AST PCO will issue for centralized orders

• All applicable clauses are included

• The official RFOP will not be released until a complete

package is received in R2M

–A control number must be assigned by WR-ALC/PKXE



People First…Mission Always 25

F2AST/SbAST Process

(cont.) Warner Robins Air Logistics Center

Evaluation of Offerors

• Tech evaluation conducted by requiring activity

• Cost/Price evaluation conducted by WR-ALC/PKXE for

centralized orders



Delivery/Task Order (D/TO) Award

• WR-ALC/PKXE PCO in conjunction with requiring

activity’s team makes a best value decision



Administration

• Performed by Requirements PCO for D/TO(s)





People First…Mission Always 26

F2AST/SbAST Protests

Warner Robins Air Logistics Center







Protest of Orders

• Contractors can protest D/TOs based on:

− Order increases scope, period of performance, or

maximum value of the order

− Orders over $10M (FAR 16.505(a)(9)(i))

• WR-ALC/PKXE PCO will respond to protests resulting

from award process disputes

• Requiring activity PCO will respond to protests resulting

from scope, performance, or acquisition strategy







People First…Mission Always 27

Systems Supported By F2AST

Warner Robins Air Logistics Center







 C-130

- AC-130 Gunship Sustainment Support









 C-5

- C-5 Enhanced Surveillance (EHS)









People First…Mission Always 28

Systems Supported By F2AST

Warner Robins Air Logistics Center







 C-17

-C-17 Interactive Electronic Technical Manuals

(IETMS)









 F-15

- F-15 Auto Flight Control System Test Set









People First…Mission Always 29

Systems Supported By F2AST

Warner Robins Air Logistics Center







 F-16

-F-16 Block 25/30/32 Plug and Play Operational

Flight Program









 A-10

-A-10 Helmet Mounted Information Targeting

and Queuing System (HMIT)









People First…Mission Always 30

Systems Supported By F2AST

Warner Robins Air Logistics Center







 B-1

-Investigate B-1 30” Bomb Release Units (BRU)

ejector racks reliability









 Global Hawk

-Global Hawk Pilot Stand Alone Trainer (PSAT)









People First…Mission Always 31

F2AST/SbAST

Fact Sheet Robins Air Logistics Center

Warner







Website for F2AST/SbAST information:

• http://www.robins.af.mil/library/factsheets/factsheet.asp?id=11544



Or



• http://www.robins.af.mil

–Units

• WR-ALC Staff Agencies

• Under “WR-ALC Staff Agencies” heading select

Enterprise Acquisition Branch









People First…Mission Always 32

Discussion/Questions

Warner Robins Air Logistics Center









People First…Mission Always 33


Related docs
Other docs by HC120207134923
Sydney Anglican Cursillo
Views: 0  |  Downloads: 0
Administrative Law Exam 2006
Views: 0  |  Downloads: 0
Chapter 8 PowerPoint AP
Views: 0  |  Downloads: 0
Mongol Empire
Views: 0  |  Downloads: 0
Navigating the MR Waiver:
Views: 1  |  Downloads: 0
EL TRIBUNAL CONSTITUCIONAL
Views: 1  |  Downloads: 0
Division 2 meeting notes
Views: 1  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!