scope of work template
							                                              RP598



World Bank Financed

Yunnan Urban Environmental Project




           RESETTLEMENT ACTION PLAN

                          (SUMMARY REPORT )



                Yunnan Provincial WB-loaned
            Environment Protection Project Office
                        September . 2007
                                        Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                         Contents

1    Project Description .............................................................................................................. 1
     1.1      Project Background .................................................................................................. 1
     1.2      Project Components and Description ....................................................................... 1
     1.3      Resettlement Plan ..................................................................................................... 8
     1.4      Measures to Mitigate Project Impacts ...................................................................... 8
     1.5      Analysis on Linkage Subprojects ............................................................................. 9
     1.6       Implementation of Land Acquisition and House Relocation for Stage I Yunnan
     Environment Project ........................................................................................................ 11
2    Project Impact ................................................................................................................... 12
     2.1      Determination of project impact scope ................................................................... 12
     2.2      Result of project impact investigation .................................................................... 12
3    Analysis of Impact on Nature, Society and Economy within Project Area ...................... 35
     3.1      Natural Conditions in project-affected area ............................................................ 35
     3.2      Social and economic conditions of project-affected area ....................................... 37
     3.3      Distribution of Indigenous Peoples in project areas ............................................... 40
4    Policy Framework for Resettlement .................................................................................. 44
5    Compensation Standard..................................................................................................... 47
     5.1      Compensation standards for land occupation ......................................................... 47
     5.2      Compensation for house and auxiliary facility relocation ...................................... 51
     5.3      Compensation for scattered trees and tombs .......................................................... 52
     5.4      Compensation standards for relocation of enterprises and institutions .................. 52
     5.5      Compensation for relocation of individual business households ........................... 52
6    Resettlement and Recovery Scheme ................................................................................. 54
     6.1      Permanent land occupation resettlement ................................................................ 54
     6.2      Recovery plan for temporary land .......................................................................... 62
     6.3      Restoration plan for vulnerable group .................................................................... 63
     6.4      Restoration plan for ethnic people .......................................................................... 63
     6.5      Rebuilding plan for production and living facilities ............................................... 66
     6.6      Enterprise relocation plan ....................................................................................... 66
     6.7      Individual business households .............................................................................. 66
     6.8      Relocation plan for special items, municipal utilities ............................................. 67
Yunan Province –World Bank                                                                                     Group Huit –SCE
YUEP-fasep706

                                                                   i
                                        Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

     6.9      Resettlement implementation management ............................................................ 67
7    Estimation for Compensation of Land Acquisition and Relocation .................................. 68
     7.1      Compilation basis ................................................................................................... 69
     7.2      Compensation principle .......................................................................................... 69
     7.3      Compensation cost .................................................................................................. 69
     7.4      Fund allocation ....................................................................................................... 74
8    Resettlement Implementation Plan ................................................................................... 76
     8.1      Implementation program ........................................................................................ 76
     8.2      Progress plan ........................................................................................................... 77
9    Institutional Organization .................................................................................................. 79
     9.1      Establishing of Organizations ................................................................................. 79
     9.2      Responsibilities of Organization ............................................................................. 79
     9.3      Staffing.................................................................................................................... 80
10      Public Participation and Appeal..................................................................................... 81
     10.1 Public Participation ................................................................................................. 81
     10.2 Responding to Grievance and Appeal ..................................................................... 82
11      Monitoring and Evaluation ............................................................................................. 85
12      Entitlement Matrix ......................................................................................................... 89
Appendix 1:General Description of The Project ................................................................... 92
Appendix 2:List of Land Acquisition .................................................................................. 123
Appendix 3:Linkage Projects .............................................................................................. 127
Appendix 4:Summary of Resettlement Options for All Prefectures/Cities ......................... 133
Appendix 5:Breakdown of Resettlement Compensation .................................................... 138
Appendix 6:Schedule of Land Acquisition and House Relocation ..................................... 152
Appendix 7:Records of Symposiums .................................................................................. 158




Yunan Province –World Bank                                                                                        Group Huit –SCE
YUEP-fasep706

                                                                    ii
                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                        Summary
     A.Generals
     1. The WB-loaned Urban Environment Project is in two categories, i.e., (1) water
pollution prevention and control of major river basins (the Dianchi Lake and the Erhai Lake)
and (2) urban infrastructure construction of main cities (Lijiang City and Wenshan Prefecture),
and is in the four prefectures (cities) of Kunming (Dianchi Lake), Dali (the Erhai Lake) and
Lijiang as well as Wenshan. It deals with the sectors in drainage (including sewage disposal),
water supply, garbage treatment, integrated river dredging, widespread pollution control,
environmental monitoring & management and cultural heritage conservation. The project is
composed of 27 sub-components distributed in 15 counties (cities and districts) of four
prefectures (cities).
     2. Yunnan Urban Environmental Construction Project Leading Group Office and each
prefecture (city) leading group is the executive organization of the project and each
project-affected city and prefecture office and Project Owner are the implementation
organizations. According to the latest feasibility study results and detail socio-economic
investigation and project impact survey, the World Bank Representative Office in Yunnan
Province has, with the assistance of East China Investigation and Design Institute, the Guope
Huit Co. of France and the World Bank experts, compiled the RAPs respectively for the four
prefectures and cities, and based on which, the Office prepares the RAP herein.
     B. Project impact
     3. In the period of Nov. 2006 ~ Jan. 2007, the Project owner, with the cooperation of
local governments at different levels, administrative villages, village groups and PAPs as well
as the project design unit, had carried out the main inventory in-kind survey item by item,
including the population, houses and attached buildings, land and special facilities, within the
preliminarily defined scope of project land requisition. In April –December 2007, an
inventory in-kind survey for checking was carried out according to the latest F/S design
output. Based on the field survey, the consulting unit had exchanged opinions with the project
design unit and the Project Owner; by which, the potential project impact on the local society
and economy have been considered and taken as key factors in comparative selection of the
schemes. The design unit and the Project Owner has adopted some effective measures to
reduce, where possible, the quantity of land requisition and number of inhabitants to be
resettled; in selection of the scheme and arrangement of associated facilities, efforts have been
made to keep the project away from the resident area, reduce the quantity of cultivated land to
be requisitioned and observe the local planning requirement and the opinions of the local
governments.
     4. The project will affect 28 administrative villages in 22 townships (towns) of 15
counties (cities), and a total of 3121 PAPs of 767 households will be affected, including 1870
persons of 442 households to be affected by land requisition, 971 persons of 263 households
by temporary land occupation, 5 persons of 1 household by land borrowing for the project. In
addition, 23 enterprises (807 person) and 130 individual business households (392 persons)
will be affected. The detail survey into the project impact shows that a total of 3105.12 mu
Yunan Province –World Bank                                                    Group Huit –SCE
YUEP-fasep706

                                               1
                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

lands of various types will be acquired timelessly, including cultivated land 710.9 mu, garden
plots 37.34 mu, fish ponds 32.0 mu, water pools 15 mu, woodland 476.25 mu, reclaimed
waste land 177 muconstruction land 1120.63 mu, and the remaining lands are of unused land.
     5. Beside the land requisition, there are three sub-components of the project which will
involve house relocation. The houses of totally 64084.81 m2 will be affected, including
private houses of 13235.3m2 (9923.1 m2 belonging to 30 rural households with 139 persons),
the urban residence of 3312.2m2 (32 households of 141 persons), collective-owned houses of
50689.51m2. Of the 62 households (280 persons) whose houses are to be relocated, 14
households (66 persons) should be resettled at other places, and 48 households (214 persons)
will be resettled at original places. The project-affected properties include the special facilities
such as for telecommunication and power supply, and the tombs and economic trees.
     C. Policy frames and entitlement
     6. For those inhabitant unavoidably affected by the project, the resettlement policy
target of the project is to avoid, to the possible extent, the negative impact of the project
caused by the land requisition and house relocation according to the “Decision of The State
Council on Deepening the Reform and Tightening Land Management” (No. 28 Document of
2004), “Land Management Regulation of Yunnan Province” and “Instructive Opinions on
Improvement of Compensation System for Land Requisition” (Guotuzifa No. 238 Document
of 2004) as well as “Involuntary Resettlement” OP4.12 and BP4.12 of the World Bank and
the requirements set forth in its annexes. The properties of the PAPs will be compensated at
their replacement cost, and efforts will be made to help the PAPs have sufficient opportunities
to restore their original living standard or even better. The main principles are as follows.
     7. The key principles in the policies: (1) Efforts should be made to adopt measures to
minimize the negative impact to the minimal; (2) The compensation and resettlement schemes
should be such that the living standard of the PAPs can be improved or, at least, restored to
that before resettlement; ⑶ Careful consultation should be carried out with the PAPs, so as to
let them to have chance to participate in the activities from the planning to the implementation
of the resettlement plan; (4) All the affected properties will be compensated on the
replacement cost; (5) the principle of “house building first and house demolishing second”
should be always be followed. Before land requisition and house relocation, the PAPs should
receive the compensations of all the lost properties, i.e., the land requisition should never be
carried out before the land and related properties have been compensated and the new
residence is ready and transition subsidies are paid; (6) The borrower is responsible for raising
the fund for resettlement compensation including the contingency for resettlement; (7)
Confirmation of the qualification of the resettlers. The deadline for confirmation of the
resettlers’ qualification should be on the date of issuance of the notice on land requisition and
house relocation. After the date of the issuance, the PAPs should not be allowed to build new
houses, extend or rebuild old houses; the use of the houses and lands should not be changed;
and leasing of land and leasing and purchasing houses should not be allowed. In addition, the
persons rushing into the defined areas after that date should not be qualified as resettlers; (8)
the house compensation should be based on the replacement cost of the houses.
      D.Compensation standard for land and houses
Yunan Province –World Bank                                                       Group Huit –SCE
YUEP-fasep706

                                                 2
                               Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

     8. According to the “Land Management Regulation of Yunnan Province”, the
compensation for the vegetable plots and paddy fields is 6-8 times the yearly average output
value of the previous three years before the land acquisition (same as below); that for irrigated
fields, garden plots and lotus ponds are 7-9 times; the dry lands are 6-8 times; rotation
cropping lands are 6 times, grassland and fish ponds are 3-5 times. The standards of
resettlement subsidy for land requisition is: (1) for those units whose per capita cultivated
land holding is over 6667 square meters, the total resettlement subsidy is 4 times the yearly
average output value of the previous three years before the land acquisition (same as below);
for those with per capita cultivated land holding is less than 6667 square meters, one time
should be added for each reduced 50 square meters, and the max. resettlement subsidy for
land requisition should not exceed 15 times the yearly average output value of the previous
three years before the land acquisition; (2) the resettlement subsidy for requisition of garden
plots, lotus ponds is 6 times and that for fish ponds is 4 times. According to the policies of the
local counties and cities on compensation of land requisition, the regional comprehensive
prices are adopted at Songming of Kunming City, Ancient Town and Ninglang of Lijiang
City, and other counties and cities adopt the calculation by the times of the yearly average
output value of the previous three years before the land acquisition. Because of the difference
in geographical locations and in the output value of the crops, the land compensation
standards are different from area to area, ranging 12880~88450 Yuan for paddy fields,
10380~29858 Yuan for dry land, 4900~9360 Yuan for woodland.1
     9. The compensation for temporary land occupation of the project will be calculated
with the one-year cultivated land loss, standing crop and land reclamation fee. The project
office will state in the construction contract to be signed with the construction contractor the
way of using temporary occupied land, restoration requirement, compensation criteria for
temporarily used land, etc. The contractor should sign the compensation contracts with
affected villages based on the actual land area to be occupied by the project, and the
contractor should restore the temporarily occupied land or pay additional expenses to the land
owners for land restoration.
     10. In the F/S stage of the project, the design should be such that the quantity of house
relocation should be reduced where possible. For those having to be affected by house
relocation, the strategy is to get the substitutive houses, land, property, basic facilities and
income source. In the 27 sub-components, there are three components which involve house
relocation (Funing County Urban Garbage Clearing & Disposal Project, Waste Wastewater
Management in Lijiang Ancient Town and Urban Drainage System under Dali City
Jurisdiction). For the former (Wastewater Management in Lijiang Ancient Town), there are
two resettlement methods for house relocation: (1) The existing buildings which are not
consistent with the surroundings will be demolished and new buildings consistent with the old
1
 The compensation standard is different for various county (even different for different area in a same
county) because discrepancy in region and geography location as well as crop output. The compensation
standard is lower for Wenshanzhou (the more remote area), and higher for other regions. Whether it is to
have the standard of yearly output or the regional comprehensive price, it will be determined according to
the compensation policy of the land administration department at each area.
Yunan Province –World Bank                                                           Group Huit –SCE
YUEP-fasep706

                                                    3
                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

town style will be built (in the Ancient Town area), and the house replacement cost will be
compensated to the affected households (or collectives), i.e., the building of framed- structure
is 626.98 Yuan per square meter, that of brick-concrete structure 494.71 Yuan per square
meter, that of brick-wood structure 367.9 Yuan per square meter and that of clay-wood
structure 276.81 Yuan per square meter; (2) the compensation (replacement cost of houses
plus land cost ) will be paid at one time to the households that are relocated to new host site,
i.e., 600000 Yuan per mu for house plot. For Urban Drainage System under Dali City
Jurisdiction, only simple houses (totally 100 m2) owned by collectives will be affected, and
the compensation is 100 Yuan per square meter. For Funing County Urban Garbage Clearing
& Disposal Project, only the collective houses of brick-wood structure (totally 60 m2) will be
removed and the compensation of 350 Yuan per square meter will be paid to the Owners for
the house replacement.
      11. the Project Owner of each sub-component should ensure that the entitlement of the
PAPs relating house relocation should be obtained before the land leveling, house
demolishing. The land compensation and house relocation subsidies should be paid to the
affected villages or individuals. The compensation for houses, standing crop and lost
properties should be directly paid to the affected individuals and enterprises. The
compensation for affected power supply and telecommunication facilities and other
infrastructures should be paid to the relevant departments for restoration.
      E.Measure for income and house restoration
      12. All the PAPs will continue farming or the job that they are good at. In the 14
administrative villages affected by requisition of contracted cultivated land, 13 villages are
affected only by less than 5% the total cultivated land of the village (including 7 villages
having affected by less than 1%), thus, the impact in this regard is little and will not impose
serious impact on agricultural economy. After consulting with the affected village
managements and PAPs, the rational restoration plans have been formulated for them and
incorporated into the RAP in detail. According to the RAP, all the PAPs can either receive
compensation directly or get land after land adjustment by the villages, so as to ensure that
they can have land for farming. Those villages adopting land adjustment will use the
compensation to improve the planting conditions, develop economic crops and conduct other
non-planting activities. In the process of project construction, the affected households will
have the priority to get the jobs without requiring special technical skills.
      The implementation of the project will bring about benefits and economic development
chances to most of the public in the area. The effective implementation of the RAP will bring
to some of the villagers affected by land requisition and house relocation the chances for
improving living and production conditions and improving living quality. The project will
play the active role in gearing up the economic development in the project-affected areas and
will provide good environmental and social benefits.
      13. Among the 62 households (280 persons), fourteen households (66 persons) should
be moved. In which, 4 households (22 persons) are of rural residents, they will be
compensated by one-time cash payment, and will be resettled in new houses at the reserved
construction land in (or outside of) the villages; and 10 households (44 persons) are of urban
Yunan Province –World Bank                                                   Group Huit –SCE
YUEP-fasep706

                                               4
                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

residents, they will be resettled by one-time cash compensation and at other places (i.e., on the
west side of the fish pond of CCB on Shangrila Avenue in Ancient Town, where there is a
piece of land totally 60 mu in area belonging to the state-owned land of urban construction).
The house plot size should be 1.2 times the land size of the original house. The resettlement
provides a good chance for the resettlers to improve the housing condition. For the
households who have shops, their resettlement will be given priority in choosing host site for
continuing their business. The houses will be compensated at the replacement cost.
      F.Institutional Organizations
      14. Each prefecture (city) leading group, coordinated by Yunnan Urban Environmental
 Construction Project Leading Group, will entrust the Project Owner to assume the overall
 responsibility for implementation of land acquisition and resettlement work of the project
 strictly according to the RAP. All the four affected prefectures and cities and the affected
 counties and cities will set up leading groups and land requisition and house relocation
 offices.Each sub-project Owner shall assume the main responsibility for consultation,
 implementation, and timely payment and other entitlement of the PAPs, and the relevant
 townships and towns should provide assistance in this regard.
     G.Vulnerable groups
      15. Of the villages affected by land requisition, those in Kunming City are Han’s
villages, those in Dali Prefecture are Bai and Yi minority village, those in Lijiang City are
Naxi, Bai and Yi minority villages, and those in Wenshan Prefecture are Zhuang minority
villages. Of the PAPs, the minority population affected by permenant land requisition and
house relocation accounts 61.7% the total affected population. For esteeming the traditional
habits and maintaining the social relations of the minority people, all the PAPs will be
resettled in their original villages and communities.
      16. For the economically vulnerable people, including old people living alone, widows’
households and households in extreme poverty, the project will provide additional financial
and material support. In implementation, the vulnerable groups, whenever found, will receive
the following additional assistance according to the RAP: (i) assistance free of charge in
building houses and family moving; (ii) special subsidy for them to maintain the living level
during house building period. The actual amount of subsidy should be determined according
to the actual conditions and their needs.
      H.Appeal and discrepancy solving mechanism
      17. The PAPs who loss houses will have the chance to select house plots, the PAPS
who lose farmland will have the chance to select suitable income sources instead. All the
affected villagers have their right to express their opinions on how to use the compensation
fee received by the collectives.
      18. In case of occurrence of discrepancies, the PAPs should first appeal orally or in
writing to the village committees or the township land requisition and house relocation office.
If their appeal cannot be settled in two weeks thereafter, they can request re-check the case at
the county land requisition and house relocation offices in one month; if it can nor solved in
two weeks thereafter, the WB-loaned project coordination leading group will make efforts to
coordinate with the project office of the related project sub-component so as to get a solution.
Yunan Province –World Bank                                                    Group Huit –SCE
YUEP-fasep706

                                               5
                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

If necessary, the discrepancy can be settled finally at the court according to the Civil
Procedure Law of the People’s Republic of China.
      I.Monitoring and Evaluation
      19. The internal and external monitoring and evaluation are detailed in the RAP. The
IBRD-loaned Environment Protection Project Office of Yunnan Province will engage an
independent monitoring organization to implement the external monitoring and evaluation.
This organization should evaluate whether and to what extents the PAPs (1) have received
their entitlement on time; (2) have completely restored their living, production and income
levels. The organization should also conduct a baseline survey before the house relocation,
one survey in half a year during house relocation and a yearly follow-up survey in the two
years after the relocation; the representative samples (affected households/ villages) should be
selected.
      20. The IBRD-loaned Environment Protection Project Office of Yunnan Province is
now establishing a seasonal reporting system. The office will report to the WB on the progress
of land requisition and house relocation by means of Seasonal Project Report. The office will
submit the annual independent monitoring and evaluation report (or twice reports for a year)
during implementation of the resettlement work.
      J.Fund raising and planning
      21. The budgetary resettlement cost is totally 164701300 Yuan (including taxes),
accounting for 7.8% of total, including 15878700 Yuan for Kunming (9.64% of the total),
16478700 Yuan for Dali (10.01%), 112481400 Yuan for Lijiang (68.29%) and 19862600 Yuan
for Wenshan (12.06%); of which 40000100 Yuan is for land (28.1%) and 69632500 Yuan for
house (48.9%). It includes all cost including compensation for house, land and other
properties, transition subsidies, subsidy for vulnerable groups, overhead for implementation,
cost of monitoring and evaluation, etc. Project-affected prefecture and city governments will
ensure the associated fund for the budgetary cost of the resettlement work so as to prevent any
fund shortage in the process of the resettlement.
      22. The resettlement implementation schedule has been formulated according to the
project construction schedule agreed by the World Bank after submitted by the project
executive agency. It is planned to start land requisition by the end of 2007 and completed in
Jan. 2008; and the house relocation is planned to complete from April 2007~ Dec. 2008, and
the land adjustment will be finished in Dec. 2008.




Yunan Province –World Bank                                                   Group Huit –SCE
YUEP-fasep706

                                               6
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                              1 Project Description
1.1     Project Background
     Yunnan Province is located in the southwestern frontier of China, neighboring
Guizhou Province and Guangxi Chuang Autonomous Region on the east, linking Sichuan
Province on the north, leaning against Tibet Autonomous Region on the northwest and
bordering Burma, Laos and Vietnam to the west and south. It has a total land area of
394000 km2, including mountainous areas about 94% of the total, and has a total
population of 44.15 million, in which the minority population accounts for 33.4%. Since
reform and opening-up to the outside, especially during the 10th Five-Year Plan, its
economy keeps in rapid growth. The GDP in 2005 reached 347.2 billion RMB yuan, per
capita GDP 7,833 RMB yuan,annual GDP growth rate 8.9%,and urbanization rate
amounting to 29.5%.
     However, the following two main development problems arose in the course of rapid
urbanization and economic growth.(1)Degradation of urban environment, such as the
decline in water quality of Dianchi Lake;(2)universal shortage of urban infrastructure
supporting urbanization process, especially in small towns. Although pollution control
has been strengthened in recent years, pollution problems of surface water near the cities
in Yunnan and main lakes remain serious. Moreover, urbanization and rapid development
in tourism has exceeded the existing capacity of urban infrastructure and brought large
pressure and challenge to urban living conditions.
      Yunnan has regarded solving of the aforesaid development problems as the priority
to promote urbanization and the precondition to realize the 11th Five-Year Plan as well as
the sustainable development of social and economy. Based on summing up the experience
in execution of WB-loaned first-stage projects and motivated by a desire to seek for
further cooperation with the WB, the province raises the Yunnan WB-loaned Urban
Environment Project. The project covers four parts of two categories, i.e., water pollution
prevention and control of major river basins (the Dianchi Lake and the Erhai Lake) as
well as urban infrastructure construction of main cities ( Lijiang City and Wenshan
Prefecture), deals with the sectors in drainage (including sewage disposal), water supplly,
garbage treatment, integrated river dredging, widespread pollution control, environmental
monitoring & management and cultural heritage conservation in the four prefectures
(cities) of Kunming (Dianchi Lake), Dali (the Erhai Lake) and Lijiang as well as
Wenshan. The Project was approved by the State Council in September 2005 and has
been listed in the WB-loaned candidate project plan of the state in the fiscal year of
2006-2008.
1.2     Project Components and Description
      The WB-loaned Urban Environment Project is composed of 27 sub-components
distributed in 15 counties (cities and districts) of four prefectures (cities). The
sub-components of the project are described in Table 1-1, the land occupation is shown in
Appendix 1 for details, and the locations thereof are shown in Fig. 1-1.




                                            1
                     Yunnan Urban Environment ProjectResettlement Action Plan (RAP)




Fig. 1-1 Location Map of Sub-Components of Yunnan Urban Environment Project




                                     2
                                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                               Yunnan Urban Environmental Project
Table 1-1
No.   Location                Project                                       Project description                               Project owner            Project impact            Schedule
      Kunming
         City
 1    Kunming     Enhancement of                     ① Monitoring system for inflow rivers to Dianchi Lake: 3                  Kunming           State-owned land acquisition   Jan. 2007 ~
      City        water quality                      automatic monitoring stations for the key rivers, 14 water quality     Environmental        of 0.65 mu, without house      Dec. 2009
                  monitoring capacity                monitoring stations for inflow rivers, 2 mobile sample vehicles, 2     Monitoring           relocation.
                                                     mobile sampling cars and 1 set of experimental equipment;              Center/Kunming
                                                     ② Supervisory control and management information system for            Environmental
                                                     water pollution aggregate and supervisory control center               Information Center
 2    Luquan Yi     Solid waste management in          Solid waste treatment plant and supporting facilities and the        Luquan Solid Waste   land acquisition for various   Jul. 2007 ~
      and Miao            Luquan County              county garbage collecting and transportation system;                   Disposal       and   kinds totals 118.5mu, incl.:   Dec. 2008
      Autonomo                                         Solid wastes disposal: 90t/d ;                                       Transportation       43.8mu cultivated land; and
      us County                                        Sanitary landfill capacity: 895000 m3                                Management           6.7mu state-owned land.
                                                                                                                            Company              No house relocation

 3    Songming      Solid waste management in         Sanitary landfill, auxiliary facilities, wastes collection and        Songming Wastes    Land acquisition for various     Jan.   2008
       County            Songming County             transport system and closing of the existing refuse dumps;             Disposal Center    kinds: 115.5mu                   ~Aug. 2009
                                                      Mean disposal: 85t/d,                                                                    including 107.7mu
                                                      Landfill capacity : 427200m3                                                             cultivated land and 6.85mu
                                                                                                                                               state-owned land.
                                                                                                                                                  No house relocation
 4    Xundian     Solid waste management        in     Sanitary landfill, wastes transfer station, other public services,   Refuse Clearing,   State-owned land acquired:       Oct.   2007
      Hui and     Xundian County                     and closing the existing refuse dumps;                                 Transport &        3 mu; reclaimed waste land       ~Mar. 2009
      Yi                                               Mean disposal : 70t/d;                                               Disposal Center of aquired: 177 mu, unused
      Autonomo                                         Landfill capacity: 550000m3                                          Xundian Hui and Yi land 3 mu
      us County                                                                                                             Autonomous County     No. house relocation
         Dali
      Prefectur
          e




                                                                                            3
                                                                                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)



No.   Location              Project                                    Project description                             Project owner             Project impact            Schedule
5     Eryuan                     Integrated     ① Treatment of water and soil loss,②        comprehensive water      Dali         Water   No land acquisition house      Jan. 2008~
      County                 treatment project  environment treatment for riverway (10.5km long) ③ Boluo River       Resources Bureau     relocation                     Dec. 2010
                                  of water      water environment management scheme
                            environment along
                                Boluo River
                             Changshan Shiba ①   Treatment of water and soil loss, ②        comprehensive water      Dali Water ResourcesNo land      acquisition   house Jan. 2008~
                                Creek Water     environment treatment for riverway (gravle-covered riverbed,         Bureau              relocation                       Dec. 2010
                                Environment     eco-protection dyke, eco- protective river bank, ③ environmental
                                  Control       management scheme
                                               ① Sewage treatment system for 14 synthetic purification channels at   Dali             City21 mu cultivated land acquired Jan. 2008~
                  Integrat                                                                                           Environment          for man-made wetland, no       Dec. 2008
                               Yong’an River Xiashankou area;② rebuilding and dredging of existing drainage
                  ed water                                                                                           Protection Bureau, house relocation, location of
                                   Water       ditches;③ man-made wetland ④ dyke, ⑤concentrated methane pool
                  environ-                                                                                           Eryuan      County methane pool, Donghu wetland
                  ment
                                Environment    at Meihe Village; ⑥ polluted river water purification system at
                                  Control                                                                            Environment          and riverside not known.
                  treatme                      Donghu wetland; ⑦ eco-restoration at riverside where the river
                                                                                                                     Protection Bureau,
                  nt    for                    enters the lake
                  main                                                                                                Dali             City42mu land acquired (Dazhuang
                  inflow                                                                                              Environment          Village in Cibihu Town, 32mu
                            Miju River Water ① River eco-restoration and protection, ② Cibi Lake water source
                  rivers to Environment                                                                               Protection Bureau, fish pond and 10 mu garden Jan. 2008~
                                             protection;③  Haixihai water resource protection;④Miju river water
                  Erhai                                                                                               Eryuan        Countyplot), owned by Eryuan county Dec. 2009
                            Control          environmental management scheme
                  Lake                                                                                                Environment          government,       managed     by
                                                                                                                      Protection Bureau, Cibihu Town
                                                                                                                      Dali             City76.5mu land acquired (58.8mu
                                                                                                                      Environment          collective     cultivated   land
                                                                                                                      Protection Bureau, owned         by      Zhangjiadeng
                             Luoshi       River
                                                ① Pollution source control along river;② Xihu lake eco-restoration Eryuan           CountyVillage, 2.7mu by Zhongdeng         Jan..
                             Water
                             Environment        and water purification;③ Riverway treatment and eco-restoration; Environment               Village, 15mu collective water 2008~ Dec.
                             Control            ④ Luoshi River water environmental management scheme                  Protection Bureau, pool owned by Qigshuigong            2009
                                                                                                                                           Village). 7.35mu land occupied
                                                                                                                                           by temporary access roads. No
                                                                                                                                           house relocation
6     Eryuan                                                                                                          Dali             City Collective-owned cultivated
                  Widespread          pollution
      County                                    ① construction of domestic sewage treatment facilities at 1 village;② Environment           land acquisition: 1.2mu;        Jan. 2008
                  control at villages in Erhai
                                                Construction of public toilets and sanitary WC                        Protection Bureau,    No house relocation             Jun 2009
                  Lake Basin
7     Dali City   Urban         Fengyi area    New sewer pipes and rain pipes                                        Dali City Water       Temporary land requisition:
                  Drainage                                                                                           Supply         and    131 mu (including 13.5mu
                                Gucheng                                                                              Drainage Co. Ltd.     cultivated land); no house     Jan. 2008 –
                  System                       ①rebuild rainwater ditches;②new rain-sewage drainage pipe;                                                                  Dec. 2009
                  under Dali    area                                                                                                       relocation
                  City          Xizhou area    ①new sewage network



                                                                                        4
                                                                                                 Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

No.   Location            Project                                    Project description                               Project owner             Project impact             Schedule
                 Jurisdictio
                              Tourist area   ①new sewer pipes and rainwater pipe
                 n
8     Eryuan     Dengchuan Town Sewage       ① one new treatment plant;②   one new sewage pump station;③ new         Eryuan County Water   Garden plots acquisition:
      County                                                                                                         Supply and Sewerage   7.34 mu;                        Jan 2008 –
                 Treatment Plant and sewer   sewer pipes; scale of the plant: 1200m3/d for short term (2010),                                                              Dec. 2009
                 network                     1600m3/d for long term (2025)                                           Co. Ltd.              No house relocation
9     Eryuan                                                                                                         Eryuan       County   Collective land acquisition:
      County     Solid waste management in   Rubbish cleaning and transport system, rubbish transfer station,        Environment           165.5      mu;      including   Jan 2008 –
                 Eryuan County               sanitary landfill, management area and related works; scale: 70 t/d     Sanitation            cultivated land 94.8 mu,        Dec. 2008
                                                                                                                     Management Station    No house relocation
      Lijiang
       City
10    Huaping                                                                                                        Huaping      Water    Land acquisition: 21.6 mu;
      County     Wastewater management in    ①   D=400~900mm, and total length of pipe,42.56km                       Supply         and    temporary land occupation:       Jul. 2008
                 Huaping County              ②   Sewage treatment plant, 12000m 3/d                                  Sewerage Co., Ltd.    180.6mu (lanld of roads)        –Feb. 2010
                                                                                                                                           No house relocation
11    Lijiang                                ① Construction of No. 2 Sewage Disposal Plant with a scale of           Lijiang      Water    Land acquisition: 88 mu;
       City                                  70000m3/d,including construction of sewage disposal facilities and      Supply         and    temporary land occupation
                                             supporting and auxiliary devices.                                       Sewerage Co., Ltd.    100.77mu (lalnd of roads
                 Lijiang City WWTP and                                                                                                     78.92mu and cultivated land     Aug. 2008
                 Sewer Network               ②Associated pipe network: the main pipe network with d400~                                                                    –May 2010
                                             d1800mm in downtown area of Lijiang City, Xintuan District and                                21.85 mu)
                                             Yulong County totals 23125m.                                                                  No house relocation
                                             ③Ingoing and outgoing pipe section is 2913m.
12    Yulong                                                                                                         Yulong                No impact
      County     Yulong County Rainwater     New rainwater collection network: 52km long, including rainwater and                                                          Dec. 2007
                                                                                                                     Construction
                 drainage system             sewage separation system                                                                                                      –Nov. 2011
                                                                                                                     Bureau
13    Lijiang                                Construction of a new sanitary landfill with a mean disposal scale of                        Collective land acquisition:
       City                                  270 t/d;                                                                                     230 mu; including cultivated
                 Solid waste management in   the required storage capacity is 2.00 million m3;                       Lijiang Construction land 35 mu, and state-owned       Jun. 2008
                 Lijiang                     Construction of office building of management agency;                   Bureau               land 3.48mu                      –Aug. 2009
                                             rubbish transfer station, updating of refuse clearing & transport                            No house relocation
                                             equipment, Increase and updating of street refuse collectors.
14    Lijiang                                                                                                                              Collective    house    plot
       City                                                                                                                                acquisition: 1.87 mu; and
                                                                                                                     Ancient        City   state-owned land (road and
                                             Demolishing of the existing incoordinated architectures and
                 Wastewater Management                                                                                                     house plot):311mu; 280          May 2007 –
                                             construction of municipal infrastructure and supporting tourism         Management     CO.
                 in Lijiang Ancient City                                                                                                   people of 62 households         Dec. 2007
                                             facilities, planned area: 31.57 ha.
                                                                                                                     Ltd.                  relocated,     houses    of
                                                                                                                                           63924.81 m2 relocated
                                                                                                                                           no house relocation



                                                                                       5
                                                                                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

No.   Location            Project                                    Project description                                 Project owner             Project impact           Schedule
      Wenshan
      Prefecture
15     Funing                                                                                                                                Land requisition: 210.33 mu
       County    Integrated Management of   ①Rive bank revetment 18.4km;②River inspection road 11.9km;                 Hongxing      Co.,    of state-owned land;          Mar. 2007 –
                 Putting River in Funing                                                                               Ltd. of     Funing    temporary land occupation      Feb. 2011
                 County                     ③River dredging 6000m3;④River landscape                                    County                20mu,
                                                                                                                                             No house relocation
16     Qiubei                               ① sets of sewage treatment systems to be built at 8 key lakeside
                                              14                                                                                             Land requisition: including
       County                               villages;                                                                                        collective-owned land 533
                                                                                                                       Qiubei   Puzhehei
                 Puzhehei Lake in Qiubei    ② Build dry-type toilets for households, eco-purification public toilets                         mu;
                                                                                                                       Tourism               No house relocation           Feb. 2008 –
                                            and separate-type dual-chamber water-logged composts, rubbish pool;
                 County                                                                                                Development Co.,                                     Dec. 2009
                                            solid-waste treatment scale: 120t/d in total                               Ltd.
                                            ③ Treatment of the four inflow rivers, including trash racks, macadam
                                            –paved riverbed, riverbed cleaning, riverside greening belts, etc.
17    Wenshan                               ① river improvement: 12.39km long (9.83km from Huituzhai to                                      Permenant land occupation :
      County                                Panshui river and 2.56km from Chengnan Park to Niutouzha)                                        511.32 mu of state-owned
                                                                                                                       Wenshan
                                            ② Treatment for upstream water and soil loss: the slope of 17 streams                            land; temporary land
                 Panlong River in Wenshan                                                                              Development    and                                  Dec. 2007 –
                                            in Dehuo, Hongdian, Binglie towns at upstream of Panlong river is                                occupation: 340 mu of
                 County Town Area                                                                                      Investment                                           Dec. 2009
                                            reformed into terrace; water and soil reserved woods, the economic                               state-owned land;
                                                                                                                       Company
                                            fruit woods and grass are planted; soil reserved cultivation is                                  No house relocation
                                            adopted, with the total treatment area of 122.9775km2
18    Guangnan                                                                                                                              Collective land requisition:
       County                               ① the sewage disposal plant with a capacity of 8000t/d for near future                          1.4 mu; and state-owned
                                                                                                                       Guangnan      Water
                 Wastewater management in   (2010), and 16000t/d for long term (2020);                                                      land occupation: 33.6mu.       Apr. 2007 -
                                                                                                                       Supply          and
                 Guangnan                   ② supporting pipe network is 14.892km, pipe diameter D=300~                Sewerage Company
                                                                                                                                            temporary occupation of        -June 2008
                                            900mm.                                                                                          road land 44.67mu
                                                                                                                                            No house relocation
19     Malipo                               ① a project within the sewage disposal plant with a capacity of                                 Land requisition: 16.35 mu;
                                                                                                                       Environment
       County    Wastewater management in   5000m3/d;                                                                                       temporary occupation of        Apr. 2007 -
                                                                                                                       Protection Bureau of
                 Malipo County              ② constructing 13.193km long sewage intercept pipes along Chouyang                              road land 40.11mu               Jun. 2008
                                                                                                                       Malipo County
                                            River                                                                                           No house relocation
20     Qiubei                                                                                                                               Collective land requisition:
                                            ① constructing a sewage disposal plant with sewage disposal capacity
       County                                                                                                          Qiubei        Water 22.45 mu; and temporary
                 Wastewater management in   of 6000 m3/d;                                                                                                                  Oct. 2007 -
                                                                                                                       Supply          and occupation of road land
                 Qiubei County              ② building 29.4km long sewage pipe network in the range of 5.0km2                                                              -Aug. 2009
                                                                                                                       Sewerage Company 31.89 mu
                                            in Qiubei county town.
                                                                                                                                            No house relocation
21     Qiubei                               ① Build a new water plant with scale of 6000m3/d (short term) and                               Water plant acquires
       County                               16000 m3/d (long term), technolological improvement for Qiubei             Qiubei        Water 18.05mu woodland of
                 Water Supply in Qiubei                                                                                                                                    Nov. 2007 -
                                            County No. 2 Water Plant;                                                  Supply          and MatouVillage, water pipe
                 County                                                                                                                                                    -Mar. 2009
                                            ② Construct a gravity-flow water pipe (2.2km, DN600) and a                 Sewerage Company system temporarily acquires
                                            pressure-flow water pipe (1.5km, DN400), and water supply pipes                                 38.85mu dry land of Matou



                                                                                        6
                                                                                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

No.   Location              Project                                       Project description                                   Project owner             Project impact              Schedule
                                                (totally 19.902km long, DN100~ DN300) of the water distribution                                     Village and the state- owned
                                                system in the county town;                                                                          land 60mu. The water
                                                ③ structures with relation to water supply system, including intake                                 supply system uses without
                                                heading, lifting pump station and inspection chamber, etc.                                          payment the reserved
                                                ④ Protection of water source site;                                                                  state-owned land 0.22mu.
                                                ⑤ Pump station at source water site                                                                 Not land acquisition for the
                                                                                                                                                    protection of water source
                                                                                                                                                    site and pump station at
                                                                                                                                                    source water site.
                                                                                                                                                    No house relocation
22    Wenshan                                                                                                                 Wenshan     Water     Temporarily occupying land
      County       Wastewater management in     Pipe system DN400 – rainwater/sewage pipe DN1500 (86.9 km long),              Supply       and      57 mu for temporary              Jan. 2008 -
                   Wenshan County               service area 19km2                                                            Sewerage              accesses,                        -Aug. 2008
                                                                                                                              Corporation           No house relocation
23    Yanshan                                                                                                                                       Temporarily occupying road
      County                                                                                                                                        land 62.55 mu (restored after
                                                                                                                              Yanshan      Water
                   Urban drainage system in     Construct D300 – D1200 rainwater/sewage pipes (10.77km long),                                       construction). No house          Apr. 2008 ~
                                                                                                                              Supply         and
                   Yanshan County               build 1.1km-long open channel for drainage                                                          relocation. Open channel for     Sept. 2008
                                                                                                                              Sewerage Co., Ltd.
                                                                                                                                                    improving natural ditches,
                                                                                                                                                    without land acquisition
24    Funing       Solid waste management in    The domestic rubbish collecting and transfer facilities and a sanitary        Hongxing              Land requisition : 127.5 mu,     Apr. 2007 ~
      County       Funing County                landfill : capacity 70t/d                                                     Company of Funing     including cultivated land        May 2008
                                                                                                                              County                97.5 mu; and brick-wood
                                                                                                                                                    structure      house      (for
                                                                                                                                                    management of fruit garden)
                                                                                                                                                    relocation: 60m2
25     Maguan                                   Sanitation landfill, transfer station, other public facilities and closure                          Land allocation: 150.21 mu;
       County      Solid waste management in    of existing refuse dumps, etc. The landfill is divided into Landfill Area     Maguan       Refuse   No house relocation              Mar. 2007 ~
                   Maguan County                I and II. Area and capacity of Landfill Area I and II are respectively        Disposal Co., Ltd.                                     Aug. 2007
                                                25000m2 and 37000m2; and 170000m3 and 585000m3.
26     Malipo                                                                                                                                       Land requisition: 80 mu,
                                                Sanitary landfill, transfer station, other public facilities and closure of
       County      Solid waste management in                                                                                  Malipo      Refuse    including 65 mu cultivated       Oct. 2007 ~
                                                existing refuse dumps, etc.. The mean disposal capability of refuse
                   Malipo County                                                                                              Disposal Center       land;                            Mar. 2009
                                                landfill is 44t/d and landfill volume 400000m3.
                                                                                                                                                    No house relocation
27    Wenshan      Environmental                                                                                              Environmental         No land requisition and no
      Prefecture   management             and   Environmental monitoring and supervision system capacity build-up             Protection Bureau     house relocation                 Jul. 2007 ~
                   monitoring in      Wenshan   project of Wenshan Prefecture                                                 of         Wenshan                                      Jun. 2008
                   Prefecture                                                                                                 Prefecture




                                                                                              7
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


1.3     Resettlement Plan

     According to domestic capital construction procedures and the WB’s requirements
for safeguard policies, the resettlement action plan of the WB-loaned Yunnan Urban
Environment Project is carried out. The report includes four sub-reports prepared
according to the packaged projects of the four prefectures (cities) and the the report on
resettlement action plan of the provincial packaged project is prepared on the basis of the
four sub-reports.
     During the report preparation, the site work was conducted according to the project
construction site scope defined by the current design output of the project design
organization and the project owner.
1.4    Measures to Mitigate Project Impacts

     Project construction will certainly involve land acquisition, relocation and
resettlement and meantime inevitably have impacts on the original productive and living
conditions of the local residents. In project planning and design stage, impacts of the
project construction on local society and economy should be considered as far as possible
in scheme optimization and selection and it will be regarded as the key factors for scheme
optimization and selection. In designing sanitory landfills, it should be fully demonstrated
whether leakage will occur in the landfill sites which results in pollution for groundwater
and soil. With a view to decreasing land acquisition and resettlement where feasible, the
design institutes and Project Owners have taken some effective measures. In the aspects
of scheme selection and arrangement of other auxiliary facilities, they have avoided
residential areas and occupied less farmland as far as possible and conform to the local
planning and oppoinons of the the local governments.
     ⑴ On the equal conditions, they avoided relocation and impacts on the surrounding
villagers’ living in siting of refuse dumps, pipeline, sewage disposal facilities and
environmental monitoring devices. Take Xundian Urban Refuse Disposal Project as an
example. The refuse landfill of the project has two optional sites, i.e., Xiacun Site
(Option 1) and Qingshuigou Site (Option 2). The site of Option 1 is too close to the city
zone, there are villages within a range of 200m, the refuse dump is less than 100m to the
railway, thus resulting in great pollution on the villages and moreover the storage
capacity is small and far from the requirements set forth in relevant specifications.
Qingshuigou Refuse Landfill in Option 2 is located 7.5km to the north of Xundian county
town, about 5km to the original refuse piling sites and its west is 1km to the railway from
Kunming to Dongchuan and 2.5km to Tianshengqiao Highway and there is no village
within a range of 1km. The design institute at last recommended Optiion 2 as the final
scheme.
     ⑵ Under equal conditions, cropland has been avoided or occupied less where
possible in siting of refuse dumps, pipeline, sewage disposal facilities and environmental
monitoring facilities. Take the drainage system under Dali City Jurisdiction as an
example. Through site investigation and research, the project design institute proposed
that most sewerage pipeline be laid along highways or in wasteland and exposed pipes be
avoided where possible and meantime, it is also considered that the ground surface will
be restored after construction, which can not only satisfy requirements of engineering


                                             8
                                    Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

design but also avoid permanent land occupation of the local villagers’ farmland or
decrease damage to crops. The sanitory landfill is desinged in light of the topograp hic
conditions and valley and wasteland are used as far as possible. The refuse disposal
center is arranged by making use of the existing urban idle land.
      ⑶ Pay attention to environmental protection and avoid such environmentally
sensitive areas as water source, schools, hospitals, cultural relics and historic sites and
scenic spots as far as possible. The sites should not produce pollution on the surrounding
environment or the pollution should not exceed the allowable range set forth in relevant
natioal laws and regulation as well as current standards. During siting, it is considered
that there is a certain safe distance from the lower wind direction place of the dominant
wind direction to the residential area.
      ⑷ Potential inconvenience brought to the local residents’ production and living by
project construction has been fully consided in design. For example, setting pedestrian
passageways in the sections with relatively concentrated residents to facilitate thei r traffic;
damage to infrastructure of channels due to project construction will be restored to ensure
its integrity.
     ⑸ Optimize construction organization planning to shorten construction period and
decrease excavation and filling in large quantity and reasonably arrange the time period
for restoration of special items and construction to reduce impacts of project construction
on local areas. For instance, housing demolishing and reconstruction is generally chosen
in the slack seasons, and land acquisition after harvest of young crops and construction of
bridge and culverts are completed as far as possible before spring ploughing to facilitate
farmland irrigation and drainage and flood prevention.
1.5      Analysis on Linkage Subprojects

     The related project means the other project which has relations with the preparation
and implementation of this project in the respects of function and benefits.
     In project design, the Project Owners pay great attention into the identification of the
related project, and the project office has conducted analysis on related project together
with the design organizations of respective project sub components. The analysis has the
following results as in Table 1-2.
                                    Analysis on Linkage Subprojects
Table 1-2
                                                                                                             Related
  No.                Project name                                      Analysis
                                                                                                          project, if any
         Enhancement of Water          Quality   Set up the monitoring information system, which can
  1                                                                                                            NO
         Monitoring Capacity                     independently provide benefits.
                                                 Set up sanitary landfill and associated works, and
         Solid waste management             in
  2                                              rubbish collecting system, which will provide benefits        NO
         Songming County                         independently after completion
                                                 Set up sanitary landfill and associated works, and
         Solid waste management in Xundian
  3                                              rubbish collecting system, which will provide benefits        NO
         County
                                                 independently after completion
                                                 Set up sanitary landfill and associated works, and
         Solid waste management in Luquan
  4                                              rubbish collecting system, which will provide benefits        NO
         County
                                                 independently after completion
        Integrated water   Boluo River           In Eryuan Dali, independent works                             NO
        environmental      Cangshan Shiba
  5                                              In Eryuan Dali, independent works                             NO
        management of      creek
        Dali River         Yong’an River         In Eryuan Dali , independent works                            NO


                                                          9
                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                                            Related
No.               Project name                                        Analysis
                                                                                                         project, if any
                       Miju River              In Eryuan Dali, independent works                              NO
                       Luoshi River            In Eryuan Dali, independent works                              NO
      Rural non-point pollution control in
6                                              In Eryuan Dali, independent works                              NO
      Lake Erhai Basin
                                               Improve the network facilities, which will                  Yes, refer
      Urban drainage system under Dali City
7
      Jurisdiction
                                               provide benefits together with the existing                   to the
                                               facilities and the planned facilities                       appendix
      Wastewater treatment plant and           Set up the sewer network and sewage treatment plant,
8     associated  sewer    network    of       which will provide benefits independently after                NO
      Dengchuan Town in Eryuan County          completion
                                               Set up sanitary landfill and associated works, and
      Solid waste management in Eryuan
9                                              rubbish collecting system, which will provide benefits         NO
      County
                                               independently after completion
                                               Set up the sewer network and sewage treatment plant,
      Wastewater management in Huaping
10                                             which will provide benefits independently after                NO
      County
                                               completion
                                               Set up the sewer network and sewage treatment plant,
      Lijiang City   WWTP        and   Sewer
11                                             which will provide benefits independently after                NO
      Network
                                               completion
      Yulong County rainwater drainage         Rainwater and sewage diversion system, independent
12                                                                                                            NO
      system                                   works
                                               Set up sanitary landfill and associated works, and
      Solid waste management in Lijiang
13                                             rubbish collecting system, which will provide benefits         NO
      City
                                               independently after completion
                                               The demolishing of existing building and
      Wastewater management in Lijiang
14
      Ancient Town                             construction of Municipal Infrastructure and                   NO
                                               supplemental facility, independent works
                                               Greening and renovation of pipe network and river
      Integrated management of Putting
15                                             dredging, which will provide benefits independently            NO
      River in Funing County
                                               after completion
                                               Set up eco-treatment system for sewage and river
16    Puzhehei Lake in Qiubei County           dredging, which will provide benefits independently            NO
                                               after completion
      Panlong river in Wenshan County          River control and landscape construction, which will         Yes, see
17
      Town Area                                provide benefits independently after completion             Appendix
                                               Set up the sewer network and sewage treatment plant,
      Wastewater management in Guangnan
18                                             which will provide benefits independently after                NO
      County
                                               completion
                                               Set up the sewer network and sewage treatment plant,
      Wastewater management in Malipo
19                                             which will provide benefits independently after                NO
      County
                                               completion
                                               Set up the sewer network and sewage treatment plant,
      Wastewater management in Qiubei
20                                             which will provide benefits independently after                NO
      County WWT
                                               completion
                                               Set up the new water supply pipe network, and purified
      Wastewater management in Qiubei
21                                             water system, which will provide benefits independently        NO
       County WS
                                               after completion
                                               Set up the new drainage pipe network, which will relate     Yes, refer
      Wastewater management in Wenshan
22                                             the sewage treatment plant of Wenshan County, and will        to the
      County
                                               provide benefits right after completion                     appendix
                                               Set up the new drainage pipe network, which will relate     Yes, refer
      Urban drainage system in Yanshan
23                                             the sewage treatment plant of Yanshan County, and will        to the
      County
                                               provide benefits right after completion                     appendix
      Solid waste management in Funing         Set up rubbish collecting, transferring systems and
24                                                                                                            NO
      County                                   landfill, which can independently provide benefits
      Solid waste management in Maguan         Set up a landfill, which can independently provide
25                                                                                                            NO
      County                                   benefits
      Solid waste management in Malipo         Set up rubbish collecting, transferring systems and
26                                                                                                            NO
      County                                   landfill, which can independently provide benefits
      Environmental    management      and     Set up environmental monitoring system which can
27                                                                                                            NO
      monitoring in Wenshan Prefecture           independently provide benefits




                                                       10
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

1.6    Implementation of Land Acquisition and House Relocation for Stage I Yunnan
Environment Project

      The Yunnan Environment Project Office has rich experience in implementing th e
WB-loaned projects accumulated since 1996 when the managemen and implementation of
the WB-loaned Stage I Yunnan Environment Project, which has 20 sub-components
distributed in Kunming, Chenggong, Puning, Gejiu, Shilin, Mengzi, and Xuanwei
countyies and cities, covering sewager treatment, water supply, solid waste disposal,
industrial pollutino control, environmental monitoring and measurement, etc.
     In order to ensure the successful completion of the Stage I project, Yunnan Province
established in Jan. 1996 the “Land Requisition and House Relocation Leading Group for
Yunnan Environment Project” which was headed by the leader of the provincial
government and membered by the leaders of the governmental departments. Under the
group, an office was set, and the land requisitin and house relocation group of the
provincial project office was responsible for planning, implementation, organization and
coordination of the project. The corresponding leading groups were also established at the
project-affected cities and counties. The work involved in the land requisitin and house
relocation is carried out on the principles of observation of the state laws, regulations and
the WB guidelines, and strictly followed the RAP of WB-loaned Stage I Yunnan
Environment Project approved by the World Bank.
     The key conclusions of the external monitoring for the WB-loaned Stage I Yunnan
Environment Project are: (1) the project is implemented on the principles of close
observation of the state laws, regulations and the local regulations; (2) the project is
implemented in comformity with the involuntary resettlement policy of the World Bank;
(3) the land requisition and house relocatin are carried out based on the Yunnan
Provincial Action Plan for Land Requisition and House Relocation; (4) the resettlement
of the PAPs of the project is mainly by means of internal land adjustment and providing a
few of job opportunities. The individual project components and relevant cities and
counties provide corresponding resettlement methods based on the needs and possibilities
and the principles followed are targeting at the wills and interest of the PAPs; (5) the
living standard of the PAPs are improved or at least reach the standard before
resettlement.




                                             11
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                   2 Project Impact
2.1     Determination of project impact scope
2.1.1 Permanent land acquisition for project

     The permanent land to be acquired by the project is mainly for construction of the
landfill, rubish transition station, sanitation center, rubish storage, access road, sewage
treatment plant, soil purification trough, automatic monitoring station for river flow to the
lake, automatic river flow monitoring station, river harnissing works, man-made wetland,
afforestation along the river. The areas which are within the scope of the permenant land
acquisition and where the living and production of the local inhabitants will be seriously
affected by the project construction and can not be restored afterward, shall be
determined as the project impact scope for the project land acquisition and house
relocation. Based on the project proposal or the feasibility study reported completed by
various design institutes in April ~August 2006 for the sub-projects of the City
Environmental Construction Project of Yunnan Province, the scope for the land
acquisition and house relocation for each sub-project was respectively determined during
that time, and was adjusted according to the revised F/S reports completed in April –
December 2007.
2.1.2 Temporary land use for project construction

     The land to be temporarily used for the project inlcude that for spoil area,
construction camps, construction plant, temporary accesses, water diverting and sewage
interceptor network, and temporary slurry store, etc.
2.2     Result of project impact investigation

     From the end of Nov. 2006 to mid Jnuary 2007, with the participation and
cooperation by the local government, administrative villages, village groups and the
PAPs, the Project owner, with the assistance of the project design units, conducted the
investigation, item by item, into the main inventory in kinds within the preliminarily
determined project impact scope of land acquisition and house relocation, covering status
and number of the PAPs, houses and attached building, lands, and special facilities, etc.,
which lasted 45 days. In April ~Dec. 2007, based on the revised F/S study result, the
investigation team conducted check on the inventory in kinds.
     The project impact scope for the project land acquisition and house relocation will
affect 28 administrative villages of 22 towns (townships) in 15 counties (districts). A
total of 3121 inhabitants in 767 households will be affected, including 1870 of 442
households affected by permenant land acquisition and 971 of 263 householde. In
addition, 392 inhabitants of 130 individual bussiness households will be affected and 807
inhabitants of 23 enterprises will also be affected. A total of 3105.12 mu land will be
requisitioned, and 1123.79 mu land will be temporarily occupied. The project will also
affect some scattered fruit trees, part of living and production facilities as well as some
telecommunication, broadcasting, Unicom and Mobilecom facilities and cables will be
affected. The land acquisitin will affect 1326 minority people, and 424 mu cultivated land
belonging to the minority people will be permantly acquired. The project will affect


                                             12
                          Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

houses of 13295.3m2.The main inventory in kinds affected by the project is indicated in
Table 2-1.




                                          13
                                                                                              Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                            Summary of Itemized inventory in kinds affected by the project
  Table 2-1
                                                                                                              Area of
                                                                                                                       Collective   Incl.    State-owned Temporary
                                                               County PAPs to            be Incl. PAPs to be houses to
No.                       Project Item                                                                                 land to be Cultivated     land
                                                              (District) affected              relocated         be                           occupation land use
                                                                                                                        acquired    land
                                                                                                             relocated
                                                                         House-        House-
                                                                                person        person           m2        mu         mu         mu          mu
                                                                          hold          hold
 1 Enhancement of water quality monitoring capacity           Kunming                                                                          0.65
 2 Solid waste management in Songming County                  Songming     48       193                                 115.5      107.7       6.85
 3 Solid waste management in Luquan County                     Luquan      34       138                                 118.5      43.8        6.7
 4 Solid waste management in Xundian County                   Xundian      1         5                                   180                    3
                             Total in Kunming                              83       336                                  414       151.5       17.2
 5 Integrated water environmental management for Miju
   River                                                                   1         5                                                         42
      Integrated water environmental management for
      Yong’an River                                            Eryuan      12       64                                   21         21
      Integrated water environmental management for
      Luoshi River                                                        103       350                                  76.5      61.5                    7.35


      Integrated water environmental management
      Cangshan Shiba Creek                                      Dali
 6                                                              Dali,
      Rural non-point pollution control in Lake Erhai Basin    Eryuan      4        21                                   1.2        1.2
 7                                                              Dali,
      Urban drainage systems under Dali City Jurisdiction      Eryuan     172       688                        100                                         131
 8 Wastewater treatment plant and associated sewer             Eryuan      16       70                                   7.34



                                                                                14
                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                                       Area of
                                                                                                                Collective   Incl.    State-owned Temporary
                                                       County PAPs to             be Incl. PAPs to be houses to
No.                      Project Item                                                                           land to be Cultivated     land
                                                      (District) affected               relocated         be                           occupation land use
                                                                                                                 acquired    land
                                                                                                      relocated
      network of Dengchuan Town in Eryuan County
 9 Solid waste management in Eryuan County             Eryuan     19         83                                  165.5      94.8                     9
                              Total in Dali                       327    1281                           100      271.54     178.5                  147.35
10 Wastewater management in Huaping County            Huaping     20         91                                   21.6      21.6                   180.6
11                                                    Old Town
      Lijiang City WWTP and sewer network              district   62        324                                  88.00      88.00                  100.77
12 Yulong County rainwater drainage system             Yulong
13                                                    Old Town
      Solid waste management in Lijiang City           district   16         86                                   230       35.00       3.48
14                                                    Old Town
      Wastewater management in Lijiang Ancient Town    district   62        280        62     280     63924.81    1.87                  311
                             Total in Lijiang                     160       781        60     280     63924.81   341.47     144.6      314.48      281.37
15 Integrated management of Putting River in Funing
   County                                              Funing      7    26                                                             210.33       20.0
16 Puzhehei Lake in Qiubei County                      Qiubei                                                     533
17 Panlong River in Wenshan County town Area          Wenshan                                                                          511.32       340
18 Wastewater management in Guangnan County           Guangnan     2         8                                    1.4        1.4        33.6       44.67
19 Wastewater management in Malipo County              Malipo     30        128                                  16.35      16.35                  40.11
20 Wastewater management in Qiubei County WWT          Qiubei     20         92                                  22.45      22.45                  31.89
21 Wastewater management in Qiubei County WS           Qiubei     80        240                                  18.05                  0.22        60
22 Wastewater management in Wenshan County            Wenshan                                                                                       57
23 Urban drainage system in Yanshan County            Yanshan                                                                                      62.55
24 Solid waste management in Funing County             Funing     24         87                         60       127.5      97.5



                                                                        15
                                                                                                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                                                            Area of
                                                                                                                                     Collective   Incl.    State-owned Temporary
                                                                         County PAPs to                be Incl. PAPs to be houses to
No.                           Project Item                                                                                           land to be Cultivated     land
                                                                        (District) affected                  relocated         be                           occupation land use
                                                                                                                                      acquired    land
                                                                                                                           relocated
 25 Solid waste management in Maguan County                             Maguan                                                                                              150.21
 26 Solid waste management in Malipo County                              Malipo          34        142                                          80.00          65
                                Total in Wenshan
                                                                                         197
                                                                                                   723                              60           798          202.7         905.68         695.07
                                      Grand Total                                       767        3121      60        280       64084.81       1825.76       677.3          1279.36        1123.79
   Notes: Including 971 inhabitants of 263 households affected by the temporary land acquisition, (688 inhabitants of 172 households in Eryuan County, 26 of 7 households in Funing County,
227 of 67 households in Qiubei County and 17 of 4 households in Lijiang Old town District).
   In this table, the 392 persons of the individual business households and 807 persons of the affected enterprises and public institutions (totally 1199 persons) are not included. Refer to Table 2-2
for the total affecter persons.




                                                                                                 16
                           Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


2.2.1 PAPs

     The PAPs of this project include those affedted by permenant and temporary land
requisition, house relocation, and those working with individual bussiiness households
and staff of enterprises. A total of 4320 inhabitants will be affected by the project,
including 3121 of 442 households are affected by land requisition and house relocation
(including 1870 of 442 households affected only by land requisition, 280 of 62
households affected only by house relocation (urban residents); 971 persons of 263
households are effected by temporary land occupation), 807 persons of 23 households are
affected by relocation of enterprises they work with; and 392 of 130 individu al bussiness
households will be affected, which are excluded in the residents.




                                           17
                                                                                                      Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                  Summary of Itemized inventory in kinds affected by the project
     Table 2-2
                                                                                                  PAPS affected by   Urban PAPs to PAPs affected
                                                                                Total PAPs to be collective land      be relocated by temporary    Enterprises    Individual business
                             Project item                          County
                                                                                PAPs reset- tled acquired without     without land      land        affected      house holds affected
No.                                                                                               house relocation    acquisition   acquisition
                                                                  (district)
                                                                                                                     House          House                No. of
                                                                                 No.      No.    Household    No.             No.           No.    No.             No. No. of PAPs
                                                                                                                      hold          hold                  PAPs
1     Enhancement of water quality monitoring capacity            Kunming
2     Solid waste management in Songming County                  Song- ming      193      110        48       193
3     Solid waste management in Luquan County                      Luquan        138       66        34       138
4     Solid waste management in Xundian County                    Xundian         5                  1         5
                         Total in Kunming                                        336      176        83       336
5     Integrated water environment treatment for Miju River                       5                  1         5
      Integrated water environment treatment for Yong’an River                   64        34        12       64
                                                                   Eryuan
      Integrated water environment treatment for Luoshi River                    350      133       103       350
      Integrated water environment treatment for Boluo River
      Integrated water environment treatment for Cangshan
      Shiba Creek                                                   Dali
6     Rural non-point pollution control in Lake Er’hai Basin     Dali, Eryuan    21        2         4        21
7     Urban drainage system under Dali City Jurisdiction         Dali, Eryuan    688                                                 172    688
8     Wastewater treatment plant and associated sewer network
      of Dengchuan Town in Eryuan County                           Eryuan        70                  16       70                                           70
9     Solid waste management in Eryuan County                      Eryuan        83       116        19       83
                            Total in Dali                                       1281      285       155       593                    172    688
10 Wastewater management in Huaping County                        Huaping        91        16        20       91
11                                                                Old Town
      Lijiang City WWTP and sewer network                          district      324       24        58       307                     4     17
12 Yulong County rainwater drainage system                         Yulong


                                                                                            18
                                                                                                 Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                             PAPS affected by   Urban PAPs to PAPs affected
                                                                           Total PAPs to be collective land      be relocated by temporary    Enterprises    Individual business
                            Project item                       County
                                                                           PAPs reset- tled acquired without     without land      land        affected      house holds affected
No.                                                                                          house relocation    acquisition   acquisition
                                                              (district)
                                                                                                                House          House                No. of
                                                                            No.      No.    Household    No.             No.           No.    No.             No. No. of PAPs
                                                                                                                 hold          hold                  PAPs
13                                                           Old Town
      Solid waste management in Lijiang City                   district     86        60        16       86
14                                                           Old Town
                                                                           1479                                  62     280
      Wastewater management in Lijiang Ancient Town            district                                                                       23      807     130        392
                          Total in Lijiang                                 1980      100        94       484     62     280      4     17     23      807     130        392
15 Integrated management of Putting River in Funing County    Funing        26                                                   7     26
16 Puzhehei Lake in Qiubei County                              Qiubei
17 Panlong River in Wenshan County Town Area                  Wenshan
18 Wastewater Management in Guangnan                         Guang- nan      8        6         2         8
19 Wastewater management in Malipo County                     Malipo        128       12        30       128
20 Wastewater management in Qiubei County                      Qiubei       92        32        20       92
21 Wastewater management in Qiubei WS                          Qiubei       240                                                 80     240
22 Wastewater management in Wenshan County                    Wenshan
23 Urban drainage system in Yanshan County                    Yanshan
24 Solid waste management in Funing                           Funing        87        84        24       87
25 Solid waste management in Maguan County                    Maguan
26 Solid waste management in Malipo County                    Malipo        142       77        34       142
                         Total in Wenshan                                   723      211       110       457                    87     266
                           Grand Total                                     4320      772       442      1870     62     280     263    971    23      807     130        392




                                                                                       19
                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


2.2.2 Land to be permanent acquired

     The project will permenantly acquired land of 3105.12 mu for its 24 sub-
components, in which, the land acquired by 19 sub-components includes
collective-owned land and that by 13 sub-components includes state-owned land. Of all
the acquired land, the cultivated land is 710.9 mu (22.9% of the total), garden plot 37.34
mu (1.2%), fish pond 32 mu (1%), water pool 15 mu (0.5%), woodland 476.25 mu
(15.3%), reclaimed waste land 177mu (5.7%), unused land 536 mu (17.3%) and
construction land 1120.63 mu (36.1%). The details are shown in Table 2-3 and 2-4.
                               Statistics of collective-owned land to be acquired
  Table 2-3
                                                                          Collective land to be acquired (mu)
                                                                 Farmland                         Reclai
                                                                                                                   Construc
                                                Grand                               Grade Water med        Wood               Unuse
No.                Project item                                   Paddy Dry                                         - tion
                                                Total    total                      n plot pool waste      land               d land
                                                                   field     land                                    land
                                                                                                   land
                                                 mu       mu       mu        mu      mu     mu     mu       mu
      Enhancement       of    water   quality
 1
      monitoring capacity
      Solid    waste     management        in
 2                                               180                                               177                          3
      Xundian County
      Solid    waste     management        in
 3                                              115.5    107.7              107.7                           7.8
      Songming County
      Solid    waste     management        in
 4                                              118.50   43.80               43.8                          74.70
      Luquan County
               Total in Kunming                  414     151.5              151.5                  177     82.5                 3
      Integrated     water      environment
                                                21.00    21.00      21
      treatment for Yong’an River
      Integrated     water      environment
 5                                                                                          15
      treatment for Miju River
      Integrated     water      environment
                                                                                            15
      treatment for Luoshi River                76.50    61.50 61.50
      Rural non-point pollution control
 6
      in Lake Er’hai Basin                       1.20    1.20      1.20
      Wastewater treatment plant and
      associated     sewer     network    of
 7                                               7.34                               7.34
      Dengchuan        Town     in    Eryuan
      County
      Solid waste management in Eryuan
 8                                              165.5    94.80               94.8                          70.7
      County
                   Total in Dali                271.54 178.50 83.70 94.80 7.34              15             70.7
      Wastewater        management         in
 9                                              21.6     21.6      21.6
      Huaping County




                                                                   20
                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                       Collective land to be acquired (mu)
                                                              Farmland                          Reclai
                                                                                                                       Construc
No.                Project item              Grand                               Grade Water med            Wood                  Unuse
                                                               Paddy Dry                                                - tion
                                              Total   total                      n plot pool waste             land               d land
                                                                field     land                                           land
                                                                                                  land
      Wastewater management in Lijiang
10                                            1.87                                                                       1.87
      Ancient Town
      Lijiang City WWTP and sewer
11                                            88.00   88.00 88.00
      network
      Solid     waste    management     in
12                                           230.00    35        35                                        195.00
      Lijiang City
                 Total in Lijiang            341.47 144.60 144.60                                              197       1.87
      Integrated management of Putting
13
      River in Funing County
14 Puzhehei Lake in Qiubei County             533                                                                                  533
      Panlong River in Wenshan County
15
      Town Area
      Wastewater        Management      in
16                                            1.40    1.40      1.40
      Guangnan
      Wastewater management in Malipo
17                                            16.35   16.35 16.35
      County
      Wastewater management in Qiubei                 22.45 22.45
18                                            22.45
      County
      Wastewater management in Qiubei
19                                            18.05                                                         18.05
      WS
20 Solid waste management in Funing           127.5   97.5 16.30 81.20            20                           10
      Solid     waste    management     in
21
      Maguan County
      Solid waste management in Malipo
22                                            80.00   65.00                                                 15.00
      County                                                   13.00 52.00
                Total in Wenshan             798.75 202.70 69.50 133.20           20                        43.05                  533
                   Grand total               1825.76 677.30 297.80 379.50 27.34           15      177      391.25        1.87      533


                        Statistics of State-owned Land Affected by The Project
 Table 2-4
                                                                              Acquisition for value                   Unpaid allocation
No.                     Project item                  Total          Paddy       Garden    Fish          Constr.      Constr.     Wood
                                                                      field       plot     pond           land         land       land
                                                       mu              mu         mu       mu             mu            mu         mu
      Enhancement of water quality monitoring
 1
      capacity                                         0.65                                                            0.65
 2    Solid waste management in Luquan County          3.00                                                3
 3    Solid waste management in Songming               6.85                                               6.7          0.15


                                                                21
                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                           Acquisition for value             Unpaid allocation
No.                     Project item                Total          Paddy    Garden      Fish       Constr.   Constr.   Wood
                                                                   field      plot     pond         land      land      land
                                                        mu          mu        mu        mu          mu         mu       mu
      County
      Solid waste management in Xundian
4
      County                                        6.70                                             6         0.7
                     Total in Kunming               17.2                                            15.7       1.5
      Integrated water environment treatment for
      Yong’an River
5     Integrated water environment treatment for
      Miju River                                   42                          10       32
      Integrated water environment treatment for
      Luoshi River
6     Rural non-point pollution control in Lake
      Er’hai Basin
      Wastewater treatment plant and associated
7     sewer network of Dengchuan Town in
      Eryuan County
8     Solid waste management in Eryuan County
                       Total in Dali                    42                     10       32
      Wastewater management in Huaping
9
      County
      Municipal Infrastructure Construction in
10
      Nu’erguo Town of Ninglang County
      Wastewater management in Lijiang Ancient
11
      Town                                              311                                         311
12 Lijiang City WWTP and sewer network
13    Solid waste management in Lijiang City        3.48                                            3.48
                      Total in Lijiang             314.48                                          314.48
      Integrated management of Putting River in
14
      Funing County                                210.33                                                    210.33
15 Puzhehei Lake in Qiubei County
      Panlong River in Wenshan County Town
16
      Area                                         511.32                                                    511.32
      Wastewater Management in Guangnan
17
      County                                        33.60          33.6
18 Wastewater management in Malipo County
19 Wastewater management in Qiubei County
20 Wastewater management in Qiubei WS               0.22                                                      0.22
21 Solid waste management in Funing
22 Solid waste management in Maguan County 150.21                                                             65.21      85



                                                              22
                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                     Acquisition for value             Unpaid allocation
 No.               Project item                Total         Paddy    Garden      Fish       Constr.   Constr.   Wood
                                                             field      plot     pond         land      land      land
                                                mu            mu        mu        mu          mu         mu       mu
 23 Solid waste management in Malipo County
                Total in Wenshan              905.68         33.60                             1       787.08    85.00
                   Grand total                1279.36        33.6        10       32         330.48    788.58    85.00



2.2.3 Temporary land acquired for project construction

      The land to be temporarily acquired means the land to be temporarily borrowed
during the porject construction period, for arranging the temporary construction plants or
facilities such as spoil areas, construction camps and plants, water diversion and
interception stockpiling of slurry. Among the 27 sub- components, 14 components will
have the construction activities within the acquired land and will not temporarily borrow
land, the remaining 13 components will temporarily occupy a total of 1123.79 mu land at
this project stage. The Project Office will define in the contract to be signed with the
construction contractor the way of using the temporarily acquired land and the
requirement of land restoration after the construction, etc.




                                                        23
                                                                                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                         Statistics of Ownerships of Land to Be Temporarily Acquire (on village base)
Table 2-5
                                                                                                                                                    State-owned
                                                                                                                           Cultivated land
                 Project item                      County          Town            Admin. village         Total                                     constr. land
                                                                                                                   Total    Paddy field Dry land
                                                    Dali                                                  131.00   13.50       11.92         1.58     117.50
                                                                  Xizhou          State-owned land         28                                           28
                                                                   Fengyi                                  30      13.5        11.92         1.58      16.5
                                                                                      Fengming             2.80    2.80         1.22         1.58
Urban drainage system under Dali City
                                                                                      Shilong             10.70    10.70       10.70
Jurisdiction
                                                                                  State-owned land         16.5                                        16.5
                                                                Dali Old city     State-owned land         33                                           33
                                                                                   Provincial-level
                                                                                                           40                                           40
                                                                                Recreation area in Dali
Solid waste management in Eryuan County            Eryuan          Cibihu         State-owned land          9                                            9
Integrated water environment treatment for
                                                   Eryuan         Yousuo        Collective-owned land      7.35                                        7.35
Luoshi River
                                                    Total                                                 147.35   13.50       11.92         1.58     133.85
Wastewater management in Huaping County           Huaping        Zhongxin                                 180.6                                        180.6
Lijiang City WWTP and sewer network             Ancient Town      Jinshan              Jinshan            100.77   21.85       21.85                   78.92
                                                    Total                                                 281.37   21.85       21.85                  259.52
                                                               Communication
                                                  Wenshan                                                  57                                           57
Wastewater management in Wenshan County                            bureau
Wastewater management in Panlong River
                                                  Wenshan                                                  340                                          340
(Wenshan County urban section)
Integrated management of Putting River in
                                                   Funing         Xinhua         Wenhua Community          20       20                       20
Funing



                                                                                 24
                                                                                    Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                                                                            State-owned
                                                                                                                  Cultivated land
                Project item                  County        Town         Admin. village         Total                                       constr. land
                                                                                                          Total    Paddy field Dry land
                                                        Communication
                                             Guangnan                                           44.67                                          44.67
Wastewater Management in Guangnan                          bureau
                                                        Communication
                                              Malipo                                            40.11                                          40.11
Sewage treatment and sewage main                           bureau
                                                        Communication
                                              Yanshan                                           62.55                                          62.55
Urban drainage system in Yanshan County                    bureau
Wastewater management in Qiubei County WWT    Qiubei       Jingping     Donghu Community        31.89                                          31.89
                                                        Communication
                                              Qiubei                                             60                                             60
Wastewater management in Qiubei WS                         bureau
                                                           Jingping          Matou village      38.85     38.85                     38.85
                 Grand total                   Total                                            695.07    58.85                     58.85     636.22
                           Grand total                                                         1123.79    94.20       33.77         60.43     1029.59




                                                                        25
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


2.2.4 Houses and attached buildings to be relocated

     In this project, only the Wastewater management in Lijiang Ancient Towm
component,       the Urban drainage system under Dali County Jurisdiction, and Solid
Waste Management in Funing County require the house relocation, totally 64084.81m2
(only 100 m 2 collective-owned simple houses effectd by the Urban drainage system in
Dali and 60m 2 collective management house effected by Solid Waste Management in
Funing County ), including private-owned houses of 13235.3m2 (which is divided into
rural houses and urban houses according to the land property). Of the houses, 9923.08
m2 are of rural residence (139 persons of 30 households), 3312.22m2 of urban residence
(141 persons of 32 households) and 50849.51m2 of collective-owned houses. No
illegally-built houses are found so far. The details for the urban residence to be relocated
are detailed in Table 2-6, and the rural residence to be relocated is indicated in Table 2-7.




                                             26
                                                                                                     Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                          Urban residence to be relocated
Table 2-6
                                             Villager  No. of                                 Private-owned houses (m2)                    Residence house (m2)         Shops (m2)
     Project      Type of                    commi- household              No. of                Brick-                             Sub total     Brick-
                             Township (town)                                                             Brick-wood Clay- wood                              Brick-wood Clay- wood
   component      impact                       ttee   affected             PAPs     Sub total concrete                                           concrete
                                                                                                           structure    structure                             structure  structure
                                                                                               structure                                         structure
                             Xi’an Subdistrict
                                               Zhengyi         13           54      1108.07     1094.76                  13.31      1094.76     1094.76                      13.31
                 New house        Office
                 at original Dayan Subdistrict
   Wastewater                                  Xinhua          9            43      379.78      379.78                              379.78       379.78
                    place         Office
 management in
                                               Subtotal        22           97      1487.85     1474.54                  13.31      1474.54     1474.54                      13.31
 Lijiang Ancient
      Town       New house
                             Dayan Subdistrict
                  at other                     Xinhua          10           44      1824.37     441.99     1382.38                  1824.37      441.99       1382.38
                                  office
                    place
                  Subtotal                                     32           141     3312.22     1916.53    1382.38       13.31      3298.91     1916.53       1382.38        13.31


                                                                          Rural residence to be relocated
Table 2-7
                                                                         Private-owned houses (m2)            Residence house (m2)                           Shops (m2)
                                                      No. of
                                            Villager                                   Brick-   Clay-                      Brick- Clay-
  Project                                            househol No. of          Brick-                              Brick-                                   Brick- Brick-wo Clay-
              Type of     Township (town) commi-                                       wood     wood                       wood wood
component                                               ds    PAPs Sub total concrete                  Sub total concrete                Sub total        concrete od struc- wood
               impact                         ttee                                     struc-   struc-                     struc- struc-
                                                     affected                structure                           structure                                structure ture struc- ture
                                                                                        ture     ture                       ture   ture
           New house at Xi’an Subdistrict
                                            Zhengyi     26     117 5067.73 4807.35 154.12 106.26 4060.4 4060.42                           1007.3          746.93    154.12   106.26
           original place      Office
Wastewater
manageme                  Xi’an Subdistrict
                                            Zhengyi      2      11 2935.43 2883.38 52.05                690.81 690.81                    2244.62          2192.57   52.05
   nt in                       Office
           New house at       Xianghe
  Lijiang                                    Yihe        2      11 1919.91 1566.71 15.81        337.4   353.21             15.81 337.40 1566.71           1566.71
            other place Subdistrict Office
 Ancient
   Town                           Sub total              5      22 4855.34 4450.09 67.86        337.4 1044.02 690.81 15.81 337.4 3811.33                  3759.28   52.05
               Total                                      30        139   9923.08 9257.44 221.98     443.66 5104.41 4751.2 15.81       337.4   4818.64 4506.2       206.2     106.3




                                                                                           27
                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


         Houses of the collectives, organs and enterprises to be relocated for the
    project are detailed in Table 2-8.
                  Houses of the collectives, organs and enterprises to be relocated
    Table 2-8
                                                                                  Collective-owned houses (m2)
                                                 Villager
                               County Town- ship                                     Brick- Brick-wo Clay- Simple
        Project item                             commi-                   Framed-ho
                                (city)  (town)                 Total                concrete od struc- wood structur
                                                   ttee                      use
                                                                                    structure  ture struc- ture e
Synthetic urban sewage                            Fengmin
                                Dali     Fengyi                   100                                                     100
networks in Dali                                     g
Stage I environmental
                                 Old Enter-
harnessing project for Shizi                                 50689.51       9294.36      31232.48 6499.45 3663.22
                                Town prises
Hill at Ancient Town
                                                   Tuanjie
Solid waste management in        Xinhua
                          Funing                  communi         60                                  60
Funing County                    town
                                                     ty
                                Total                        50849.51       9294.36      31232.48 6559.45 3663.22         100


    2.2.5 Individual business households

         This project will affect 130 individual business households by the sub-
    component --- Wastewter management in Lijiang Ancient Town, who will be
    relocated. They all live on Minzhu Road. The effected shop area is 9632.39 m2, of
    which is 4800.44 m 2 for organ and enterprises and 4831.95 m 2 for individuals.
    The effected house area for individuals is included in project effected houses. The
    details are in Table 2-9.
                                 Statistics of individual business households
    Table 2-9
                                Total                       Private-owned house                    House of enterprises
 Sub district
                                            2                                       2
                No.            House area (m )      No.           House area (m )            No.        House area (m2)
   Minzhu       130               9632.39           37                  4831.95               93            4800.44


    2.2.6 Organs and Enterprises affected

          The sub-component --- Wastewter management in Lijiang Ancient Town,
    will cause relocation of enterprises. According to the investigation at this stage of
    the project, a total of 23 enterprises will be relocated (15 enterprises and 8 public
    institutions). The affected enterprises will be compensated and the employees will
    not loss their job, therefore, the employees will not be affected much. The detail
    of the enterprises to be affected is shown in Table 2-10. The effected houses of
    enterprises are included in the project effected houses.




                                                             28
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                            Enterprises to be affected by the project
Table 2-10

                                                                Architectural area(m2)
                                                                                                        Impact     No. of
No. Name of units                      Kind
                                                                Framed Brick-       Brick-    Clay-      level      staff
                                                      Total
                                                               structure concrete   wood      wood
   Dayan Credit Union of Gucheng Enterprise
 1 District      Rural     Credit                    825.13    672.82     44.92     107.39            Demolished
   Cooperative, Lijiang                                                                                              43
   Local Products Sales Co. Ltd. Enterprise
 2                                                   3141.65 2017.85 1113.67        10.13             Demolished
   Of Gucheng District                                                                                               44
   Traffic Management Station of Enterprise
 3                                                   1493.88            1337.48     156.4             Demolished
   Gucheng District                                                                                                  19
 4 Lijiang Farming Tool Company Enterprise           6759.29            2335.23 2730.38 1693.68 Demolished           43
     Workers’ Cultural Palace of Enterprise
 5                                                   3279.1             2920.67 358.43                Demolished
     Gucheng District                                                                                                 6
     Barbers’ Cooperative Union of Enterprise                                                           Partial
 6                                                   474.19              474.19
     Gucheng District                                                                                 demolished     13
     Tire Repairing Plant (Yunzhinan Enterprise
 7                                                   2906.68            1421.46 387.26       1097.96 Demolished
     Hotel)                                                                                                          60
     State Tax Bureau branch at
 8                                   Organs          4113.05 2928.05      1185                        Demolished
      Gucheng District                                                                                               89
 9   Gucheng Hardware Factory        Enterprise      7376.91            5188.71 1492.81 695.39 Demolished            80
   China     Construction   Bank Enterprise
10                                                   2631.8               2121      481.4     29.4    Demolished
   Lijiang Branch                                                                                                    65
   Yunyan Hotel of Yunnan Enterprise
11                                                   5695.66            5695.66                       Demolished
   Boyuan Industry Co. Ltd.                                                                                          53
                                 Enterprise                                                             Parly
12 Shizishan Commercial Co.
                                                                                                      Demolished     123
     Lijiang Broadcasting and TV Enterprise
13                                                   4412.43 1534.11 2687.01 191.31                   Demolished
     Station                                                                                                         115
     Agricultural Material Co. of Enterprise
14                                                   835.68              620.08     215.6             Demolished
     Gucheng District                                                                                                 0
     Gucheng No. 6 Construction Enterprise
15                                                   1238.94             723.81     368.34   146.79 Demolished
     Co.                                                                                                             54
     Lijiang Animal Husbandry and Enterprise
16                                                   762.12              762.12                       Demolished
     Veterinary Station
17   Conference Hall of Lijiang City Enterprise      2141.53 2141.53                                  Demolished
                                       Enterprise                                                       Partly
18 Senlong Group Co.                                 192.22              192.22
                                                                                                      Demolished
    County goods and material Enterprise
19-
    company, trade company, pork
21
    products mill of Yulong County
                                       Enterprise                                                       Partly
     Clinic department of the county                  1708                1708
22                                                                                                    Demolished
     hospital,

23 Traffic Police Station              Organs

Total                                               50689.51 9294.36 31232.48 6499.45 3663.22                        807
Notes: the partial structures of Agricultural Material Co. of Gucheng District, Clinic department of Yulong county hospital,
county goods and material company, trade company, traffic police station, pork products mill, Barbers’ Cooperative Union
of Gucheng District are affected, but the staff will not be affected.
2.2.7 Scattered trees and tombs

     Four components of the project have impact on the scattered trees, which
include the fruit trees planted in front of and behined the houses and on the
farmland and any other kinds of trees standing on the land to be requisitioned,

                                                       29
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


which are to be felled due to project construction. For this project, a total of
17619 trees will be cut, including 16119 fruit trees and 1500 general trees. The
details are as in Table 2-11.

                    Statistics of scattered trees in the project affected area
Table 2-11
                                                       Luquan     Xundian    Eryuan     Malipo
                    Trees               Unit   Total    County    County     County     County
I    Fruit tree                         ea.    16119    10365      3000          2754
1    Fruited                            ea.    7715      6703       400          323
     Not fruited (trunk about 10cm in
                                               8906      3662      2600          2431
2    diameter)                          ea.
II   General tree                       ea.    1500       1        1440                   59
1    Young tree                         ea.    1500       1        1440                   59
2    Matured tree                       ea.
     Grand Total                        ea.    17619    10366      4440          2754     59



   The project will affect 8 tombs, 3 in Songming County and 5 in Malipo
County. Before project construction these tombs will be relocated.
2.2.8 Special facilities

    The project (four components only) will affect the cables of
telecommunication, broadcasting, Unicom and Mobilecom facilities, and 35kV
power cables. In the project construction, they will be protected and restored after
construction. The detail is shown in Table 2-12。




                                                30
                                     Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                   Statistics of Project Affected Special Facilities
      Table 2-12
 No.                 Description              unit           total        Songming      Luquan       Dali      Maguan
  1     Optical fiber cable                  pole/km         5.26            0.01         1          2.8           1.45

                                             pole/km         5.25                         1
 1.1 Overhead-erected cable                                                                          2.8           1.45
 1.2 Embedded optical fiber cable            pole/km         0.01            0.01
  2     Broadcasting optical fiber cable     pole/km          1                           1
  3     Unicom optical fiber cable           pole/km          3                           3
  4     Mobilecom optical fibre cable          km             1                           1
  5     35KV power cable                     pole/km          2.5                                                  2.5
  6     Power line                             km            1.79                                    1.79
        Total                                                14.55           0.01         6          4.59          3.95
Note: The Unicom and Mobilecom optical fibre cables are erected on the same poles.


      2.2.9 Project-affected living and production facilities

            Two components of the project will affect local living and production
      facilities, including water tanks, transformers, and pump stations.
                     Statistics of project-affected living and production facilities
      Table 2-13
  No.                Project item            City (county)              Facilities            Unit          Quantity
                                                                                                 3
   1       Solid waste management in            Luquan                 Water tanks            m               256
   2       Luquan County                                               Water pipes            kg              430
   3                                             Dali                  Transformer            ea.              2
   4                                             Dali                 Pump station            ea.              3
   5                                             Dali                   Culverts              ea.              4
   6                                             Dali                  Water sluice           ea.              3
           Urban drainage system
   7                                             Dali                  Water pipe              m             2500
           under Dali City Jurisdiction
                                                                     Trench for water
   8                                             Dali                                          m              90
                                                                  pumping (concrete)
                                                                     Trench for water
   9                                             Dali                                          m             1790
                                                                  pumping (masonry)



      2.2.10 Affected Ethnic People

          The project affected 1326ethnic people (accounting to 61.7% of the total
      peop affected by permanent land acquisition). 434 mu cultivated land of the ethnic
      people will be permanently acquired and 13295.3m 2 houses will be affected. See
      Table 2-14.




                                                              31
                                                                                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                                      Impact on the Ethnic People
Table 2-14
                                                                                                                                                         Land acquisition
                                                                                                     Composition of ethinic people
                                                                                   Ethnic                                                                   (mu)            House
                                                        House relocation   PAPs                                                             Proporti                         to be
No.   Project description        Land acquisition               2                  people                                                                             Fish relocate
                                                             (m )        (person)                                                              on    Cultivate Garden
                                                                                  affected    Yi    Bai   Naxi Hui Miao      Lisu    Zhuang                           pon d (m2)
                                                                                                                                                      d land plot
                                                                                                                                                                       d
   Solid          waste Acquiring and using land
 1 management        in 122.35mu,           including                       193      6                           6                            3.11%     3.16
   Songming County      cultivated land 107.7mu
   Solid          waste Acquiring and using land
 2 management in Luquan 125.2mu,            including                       138      36       25                       11                     26.09%    13.19
   County               cultivated land 43.8mu
   Solid             waste Using construction land
 3 management           in 3mu, reclaimed land 177mu                        5        1        1                                                20%
   Xundian County
   Integrated        water Acquiring land 139.5mu,
   environmental           including cultivated land
 4
   management of Dali 82.5mu
                                                                            419     355             355                                      84.73%     61.5      10    32
   River
   Rural         non-point Acquiring cultivated land 1.2
 5 pollution control in mu                                                  21       21             21                                        100%       1.2
   Lake Erhai Basin
   Urban drainage system No land acquisition, but
                                                         Collective-owned           Not
   under      Dali    City temporarily        occupying
 6 Jurisdiction            cultivated land land 131mu         simple        688   identifie
                           including cultivated land
                                                           house100m2                d
                           13.5mu
   Wastewater treatment Acquiring garden plot 7.34
   plant and associated mu
 7 sewer     network    of                                                  70      No
   Dengchuan Town in
   Eryuan County
   Solid             waste Acquiring     land      165.5
 8 management in Eryuan muincluding cultivated land                         83       83       83                                              100%       95
   County                    94.8 mu
   Wastewater              Acquiring cultivated land
 9 management           in 21.6      mu,      temporary                     91       38       36                              2              41.76%     15.6
   Huaping County          occupying construction land


                                                                                         32
                                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                                                                                             Land acquisition
                                                                                                         Composition of ethinic people
                                                                                      Ethnic                                                                    (mu)            House
                                                           House relocation   PAPs                                                              Proporti                         to be
No.   Project description        Land acquisition                  2                  people                                                                              Fish relocate
                                                                (m )        (person)                                                               on    Cultivate Garden
                                                                                     affected    Yi     Bai   Naxi Hui Miao      Lisu    Zhuang                           pon d (m2)
                                                                                                                                                          d land plot
                                                                                                                                                                           d
                            180.6mu

   Lijiang City WWTP Acquiring cultivated land 88
10 and Sewer Network mu                                                       324      307                    307                                94.75%      88

   Solid          waste Acquiring      (using)    land
11 management in Lijiang 233.48mu,           including                         86       86              86                                        100%       35
   City                  cultivated land 35 mu
   Wastewater            using construction land 311
12 management in Lijiang mu, acquiring 1.87mu                63924.81m2       280      236               5    231                                 84.29%                        13235.3
   Ancient Town
   Wastewater           Acquiring cultivated land 35                                                                                              100.00
13 management        in mu                                                     8        8                                                  8                 1.4
   Guangnan County                                                                                                                                  %
   Wastewater           Acquiring cultivated land
14 management in Malipo 16.35mu                                               128       39                                 2               37    30.47%       6
   County
   Wastewater           Acquiring cultivated land
15 management in Qiubei 22.45mu                                                92       9         4                                        5      9.78%       2
   County WWT
   Wastewater           Acquiring woodland land                                        Not
   management in Qiubei 18.05 mu, temporary using
16 County WS            land 98.85mu                                          240    identifie
                                                                                        d
   Solid          waste Acquiring land 127.5         mu, Collective-owned
17 management in Funing including cultivated        land                       87       87                                                 87     100%      97.5      20          60
   County               97.5 mu                           house 60.0m2
   Solid          waste Acquiring land 80            mu,
18 management in Malipo including cultivated        land                      142       14        7                                        7      9.86%     4.45
   County               65.0 mu
          Total                                               64084.81        3121     1326      156    467   538    6     13     2       144                424      10    32 13295.3




                                                                                            33
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


2.2.11 Vulnerable groups

     In the project impact investigation, the nationality, age, education level and
employment status of the household members affected by land acquisition and house
relocation of the project were investigated household by household and village by village.
By the comparison and analysis on the data of the family structure and the information
obtained from the local civil departments and poverty-relief offices of the governments,
the number of vulnerable groups was determined. The investigation data indicates that the
project would affect 1326 minority people and the per capita net income of the affected
was over 1000 RMB Yuan which was far above the income of the local people in poverty
(924 RMB Yuan). Therefore, they are not defined as people in poverty, and their income
is similar to the local Han people.
     Of the project-affected households, the household who is comparatively in
vulnerable condition will receive special assistance in resettlement. Only one is in
Xundian Hui Autonomous County (Hu Guangcun’s family), who has contracted 350 mu
waste hillside land and invested much without output last year, his son is serving in army,
thus, the economic condition of the family was rather poor in 2006, the special support
should be given to the household.




                                            34
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

3 Analysis of Impact on Nature, Society and Economy within Project Area
3.1    Natural Conditions in project-affected area

      A. Yunnan Province
     Yunnan Province is located in the southwest border of China where the tropic of
cancer runs through the southern area of the province. The total teritory of the province is
394,000 square meters, accounting for 4.1% of the country’s total. It links Guangxi
Zhuang Autonomous Region and Guizhou Province on the east, faces Sichuan Province
on the north across the Jinsha River, borders Tibet Autonomous Region on the northwest.
The province neighbors Burma and Vietnam respectively on the south and southeast,
having border line totally 4060km long. The province is topographically tilling from the
north to south, with big difference in elevation and 1500~2200m on the south and
3000~4000m on the north.
    Yunnan Province has rich natural resources, and enjoys the reputation as “Kindom
of Plants”, “Kindom of Animals”, “Kindom of non-ferrous metal” and “Country of
Herbs”.
     The mineral resources is very rich in Yunnan, and a total of 150-odd kinds of
mineral reserves have been discovered so far, accounting to 93% the minerals discovered
nationwide. The reserves of zinc, tin, lead, cadmium, indium, thalium and blue abestos
rank the first in the country.
      There is plenty of water resources and rich precipitation in Yunnan. Rivers and lakes
lie everywhere, with a total flow of 200 billion cubic meters, which is triple of the Yellow
River.
     Yunnan has plenty of tourist resources, pleasant climate, picturesque natural scene,
and diversified customes, which present a beautiful and attractive picture scroll.
      B. Kunming City
   Kunming City is locatedin the middle of the province at east longitude 102°10′~
103°40′ and north latitude 41°11′~42°22;, and has total teritory of 15561 square meters,
140km wide from east to west and 220km long from north to south.
     The city is featured with typical plateau topography, gradually decending from the
north to the south in terrace. The area is mainly of lake basin feature with karst formation,
where basins (locally called “Bazi”) and highlands lie alternatively, mostly at El. 1500 ~
2800m with the toppest at Mazong Peak (El. 4247m) in Luquan County and the lowest at
the confluence of the Pudu River and Jinsha River (El. 746m). There are two main
maintain systems, i.e., the Gongwang Mountain System of the Lunan Mountain Range
originating from the western Sichuan Province and heading southward across the Jinsha
River, which covers Luquan, Fuming, Xishan and Anning counties (districts), and the
Liangwang Mountain System connecting the Wumeng Mountain Range originating from
the northeastern Yunnan Province, covering Songming, Guandu, Chenggong counties and
districs. There are about 20 rivers of various lengths zigzaging within the teritory. The
teritory of Kunming is within the divides areas of the Jinsha River, Nanpan River and
Yuan River, thus, the rivers in the area belong to these three big river systems, such
phenomenon is rare in China.

                                             35
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

     The mountainous monsoon on plateau at low-latitude prevails the area. As located at
low latitude and high elevation, with the natural barrier of Wumeng Mountain Range on
the north that obstruct the cool wind from the north and the lower terrains on the south
that let southwest warm and wet current flow in, and with the temperature regulating
function of the Dianchi Lanke and Yangzonghai Lake, Kunming has a pleasant weather
all the year round. Because of the mild temperature and humidity, long sunshine hours,
short frosting period, good visibility, the plants are easily growing. The flowers bloom
throughout the year and plants are green all the year long, thus, Kunming City is praised
as “Spring City”.
     C. Dali Bai Autonomous Prefecture
      Dali Bai Autonomous Prefectureis located in the mid-west of Yunna Province,
spanning the east longtitude 98°52′~101°03′ and north latitude 24°41′~26°42′。 It
neighbors Chuxiong, Simao and Linchag on the east, links Baoshan and Nujiang on the
west and borders Lijiang on the north. The prefecture government office is located at
Xiaguan of Dali City, which is 338km from Kunming. The prefecture administerd one
city and 11 counties within a teritory of 29459 square meters, 320km wide in the E-W
direction in maximum and 270km in the S-N direction in maximum. In the prefecture, the
mountainous area accounts for 83.7% and mountainous basin area for 16.3% of the
total teritory.
      The prefecture is located at the juncture connecting the Yunna-Guizhou Plateau and
Hengduan Moutains, where the terrain is high on the northwest and low on the southeast,
and is complicated. The area west of the Dianchangshan Mountain is of alpine valleys
and the area east of the Mountain and west of Xiangyun is of moderately high mountains
with steep slope. The mouontains in the prefecture belong to the Yunling Mountain
Range and the Nushan Mountain Range. The Xueban Mountain on the north of the
prefecture, located between Jianchuan and Lanping (Lijiang Prefecture) has the highest
peak (El.4295m) in the prefecture. The lowest point is at Hongqiba (El.730m) on the side
of the Nujiang River. There are many lakes in the teritory, among which there are 18
lakes having water surfaces over 1.5 square meters, the total lake surface is 1871.49
square meters (accounting for 6.6% of the total teritory). The basins are mostly in belt
shape and there are six basin belts lying from west to east. There are 160-odd rivers
distributed in feather pattern in the prefecture, which belong to the Jinsha River,
Lanchang River, Nujiang Tiver and Honghe (Yuanjiang) River systems. There are eight
lakes in the prefecture, i.e., Erhai, Tianchi, Cibihu, Xihu, Donghu, Jianhu, Haixihai and
Qinghai lake.
      The position of the prefecture on plateau at low-latitude forms the mountainous
monsoon pertaining to plateau at low latitude, where the temperature difference is small
all the year round as a whole but varies much at different elevation, rainy and dry seasons
are clearly divided. There occur many climate disasters
     D. Lijiang City
     The city is located at the juncture between the northwest part of the
Yunnan-Guizhou Plateau and Qinghai-Tibet Plateau, with Diqing Zang Autonomous
Prefecture on the north, Dali Bai Autonomous Prefecture on the south, Nujiang Lisu
Autonomous Prefecture on the west, and Liangshan Yi Autonomous Prefecture and

                                            36
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Panzhihua City (Sichuan Province) on the east. It spans the east longtitude
99°23′-101°31′ and north latitude 25°59′-27°56′, and is 213.5 km long from the south to
the north.
      The teritory of the city is high on the northwest and low on the southeast. The
mountain peaks spread all over with gulches and valleys in between. In the m ountains,
many mountainous basins (locally called “Bazi) are distributed. The Yulong Peak in the
city teritory is the highest point (El. 5596m) and the lowest location is at Jinshan River
Valley (El. 1015m), and the average elevation of the city area is at El. 2400m. The city
has a total area of 20603 km 2, 2.6% of which are basin area and 97.4% are mountainous
area; the landform is much undulant and the mountains, basins and valleys alternates.
     Lijiang is within the western monsoon climate zone of China, where the seasonal
climates are clear in a year. The weather in the city varies much with the north subtropic,
mild temperate and plateau climate, obviously featured by the vertical climate of “There
are four seasons from the foot to the top of a mountain and different weather occur within
10km length of a road”. As Lijiang is at high elevation, the air is clear and sunshine last
long in a day. The annual average temperature is 12.6℃~19.9℃, the annual average
precipitation is 910mm~1040mm, the frost period in a year is 191~310d and yearly
duration of sunshine is 2321~2554h.
      E. Wenshan Prefecture
     Wenshan Prefecture is located in the eastern Yunnan Province, linking Baise
Prefecture of GuangxiZhuang Autonomous Region on the east, bordering Vietnam on the
south, neighboring Honghe Hani and Yi Autonomous Prefacture on the southwest and
northwest and connecting Qujing Prefecture on the north and northwest. It is within the
east longtitude 103°35′~106°12′ and north latitude 22°40′~24°28′, and is 255km wide in
E-W direction and 190km long in S-N direction. The total area of the prefecture is
31456km2, 94.6% being mountainous and semi-mountainous area and 5.4% being
mountainous basin area. The area is featured by typical karst formation, and is high on
the northwest and low on the southeast. The Bozhu Peak (El.2991.2m) in Wenshan
County is the highest place in the prefecture, Chuantou (El.107m) in Malipo County is
the lowest place, and the average elevation of the prefecture is at 1000m~1800m.
      The low-latitude plateau monsoon climate prevails over Wenshan Prefecture, and
most part of the area has no severe cold in winter and sweltering heat in summer. The
temperature and humidity there are mild, sunshine lasts long in a day, frost period is short
and the visibility is good, which are favorable for plant growing. The soil in the area can
be classified into 10 types, i.e., dark brown soil, brown soil, yellowish-brown soil, yellow
soil, red soil, deep red soil, brick-red soil, lime soil, purple soil and paddy soil, the red
soil is most widely spreaded, accounting for 75% the total and 60% the farmland of the
prefecture.
     The main grain crops of the prefecture include rice, maize, wheat and potato, an d the
economic crops include peanut, flue-cured tobacco, hot peper, Panax pseudo-ginseng,
fibrous crop, cotton and Rhododendron avatum, etc.
3.2    Social and economic conditions of project-affected area

      A. Yunnan Province

                                             37
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

      The total population of the province was 44.504 million by the end of 2005, increaed
by 352000 persons as compared with that by the end of the previous year. Of the
population, the urban population was 13.129 million and rural population was 31.375
million. The natural population growth of 2005 was 7.97‰, 1.03‰ less than the previous
year.
     Yunnan Province is the province with largest number of different minorities in
China, having 25 minorities out of the 56 minorities of China. The minority population
accounts 38% of the provincial total, and there are over 20 minorities with population
over 8000, including Yi, Bai, Hani, Zhuang, Dai, Miao, Li, Hui, Lagu, Wa, Naxi, Yao,
Zang, Jingpo, Bulang, Pumi, Nu, Achang, Jinuo, Mongolia, Dulong, Man, Shui and Buyi
monirities.
      The preliminary statistics shows that the provincial GDP of the year 2005 is 347.234
billion Yuan, 9.0% over the previous year on the comparable price base; the added value
of the primary industry was 65.618 billion Yuan (increased by 6.3%), that of the
secondary industry 144.971 billion Yuan (increased by 8.5%) and that of the tertiary
industry 136.645 billion Yuan (increased by 10.8%). The reform of industrial structure
has been progressing, in which the percent of added values of the three industries has
been adjusted from 19.3∶ 41.6∶ 39.1 to 18.9:41.7:39.4. The per capita net income of
farmers reached 2041.79 Yuan, increased by 6.5%.
     The mainstay industries of the province are: tobacco, bio-products, minerals and
tourism.
     B. Kunming
      Kunming is the capital city of Yunnan Province, having jurisdiction over five
districts (Wuhua, Panlong, Xishan, Guandu and Dongchuan), one city (Anning) and eight
counties (Chenggong, Jinning, Fuming, Shilin, Yiliang, Songming, Xundian and Luquan).
BY the end of 2005, there are 46 townships, 7 minotity townships, 53 towns and 30
subdistricts.
     BY the end of 2005, the city had a population of 5.0847 million and 1.5319 million
households, respectively increased by 2.98% and 1.10% as compared with the previous
year; the natural population growth was 6.23‰. The minority population of the city was
743868, which accounted for 14.6% of the total city population.
      The GDP of the city was 106.155 billion Yuan in 2005, 11.1% over the previous
year. The added value of the primary industry was 416 million Yuan (increased by 5.7%),
that of the secondary industry 5.256 billion Yuan (increased by 12.4%%) and that of the
tertiary industry 5.869 billion Yuan (increased by 13.1%). The total output value of
agricultue, forestry, animal husbandry and fishery was 11.723 billion Yuan. The
cultivated land was 175035 ha., and grain output reached 1133595 tons. The per capita
net income of peasants was 3258 Yuan.
     C. Dali
    Dali Prefecture has jurisdiction over one city, eleven counties, i.e., Dali City, Yangbi
Yi Autonomous County, Xiangyun, Bingchuan, Midu, Nanjian Yi Autonomous County,
Weishan Yi and Hui Autonomous County, Yongping, Yunlong, Eryuan, Jianchuan and
Heqing.

                                             38
                           Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

      By the end of 2005, there were 34.296 million permenant residents and 0.9394
million households in the prefecture. The the population was 1.35% over the previous
year. The minority population was 17.010 million, accounting to 49.6% of the prefecture
total.
      The GDP of the prefecture was 23.51799 billion Yuan in 2005, 15% over the
previous year. The added value of the primary industry was 6.72591 billion Yuan
(increased by 7.5%), that of the secondary industry 7.83016 billion Yuan (increased by
23.8%) and that of the tertiary industry 8.96192 billion Yuan (increased by 13.9%). The
total output value of agricultue, forestry, animal husbandry and fishery was 10.64633
billion Yuan. The cultivated land was 187672 ha., and grain output reached 1213763 tons.
The per capita net income of peasants was 2251 Yuan.
    D. Lijiang
     Lijiang has a total land area of 20600 km 2, and has jurisdiction over the Gucheng
(Old Town) District, Yulong Naxi Autonomous County, Yongsheng County and
Ninglang County, under which, there are 69 towns (townships) and 446 administrative
villages.
     By the end of 2005, the total population of Lijiang was 1.1376 million, including
minority population of 0.6609 million (accounting to 58.1% the total). The minorities
having a comparatively large population includes Naxi, Yi, Lishi, Bai and Pumi.
      The GDP of the whole city was 6.033 billion Yuan in 2005, 10.8% over the previous
year. The added value of the primary industry was 1.43819 billion Yuan (increased by
5.0%), that of the secondary industry 1.68137 billion Yuan (increased by 16.5%) and that
of the tertiary industry 2.91372 billion Yuan (increased by 10.8%). The percentages of
the three industries in the total GDP were respectively 23.8%, 27.9% and 48.3%. The
grain output reached 401377 tons (15021 tons or 3.9% more than that of the previous
tear). The per capita net income of peasants was 1459 Yuan.
    E. Wenshan
     Wenshan Prefecture is located on the southeast of the province, having jurisdiction
over eight counties, i.e., Wenshan, Nianshan, Xichou, Malipi, Maguan, Qiubei, Guangnan
and Funing. By the end of 2005, there were 114 towns (townships), including 17 minority
towns (townships)
     By the end of 2005, the total population of Wenshan was 3372278, with a population
growth rate of 8.47‰. There were 1906844 minority people, accounting to 56.5% of the
prefecture’s total population.
     The GDP of the whole prefecture was 15.024 billion Yuan in 2005, 13.1% over the
previous year. The added value of the primary industry was 4.753 billion Yuan (increased
by 5.0%, and accounting to 31.64% of the total GDP), that of the secondary industry
4.715 billion Yuan (increased by 27% and accounting to 31.38% of the total GDP) and
that of the tertiary industry 5.556 billion Yuan (increased by 10.6% and accounting
to36.98%). The total industrial and agricultural output value was 15.40403 billion Yuan,
including the agricultural output value 6.56409 billion Yuan and industrial output value
of 8.84044 billion Yuan. The grain planting area of the prefecture was 5.6408 million mu,



                                           39
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

economic crop planting area 2.24 million mu, and the total grain output reached 1074070
tons. The per capita net income of peasants was 1365 Yuan.
3.3    Distribution of Indigenous Peoples in project areas
     The project areas involve 12 resident IPs, which are Hui, Yi, Miao, Bai, Lisu, Naxi,
Dai, Zhuang, Tibetan, Pumi, Yao and Bouyei, an IPs population of 822.800, accounting
for 39.59% of the total affected population. Specifically, the IPs in the Kunming project
areas are mainly Hui, Yi, Miao etc, with an IPs population of 100,000, accounting for
39.59% of the total affected population; the IPs in the Dali project areas are mainly Bai,
Yi, Hui etc, with an IPs population of 387,100, accounting for 63.59% of the total
affected population; the IPs in the Lijiang project areas are mainly Naxi, Yi, Bai etc, with
an IPs population of 101300, accounting for 56.25% of the total affected population; the
IPs in the Wenshan project areas are mainly Zhuang, Miao, Yi, Yao, etc, with an IPs
population of 196,000, accounting for 44.72% of the total affected population.




                                            40
                                                                                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                           Table 3-1        Composition of Indigenous Peoples in Project Areas (>100 people)
                                                                      Affected    Percent to
    Categor                                                                                                 2
                                                                                                                     Zhuan                                                 Bou Othe
            No.                       Subproject                         IPs      benefited       Bai    Naxi Pumi            Hui   Miao    Yi    Yao Tibetan Dai   Lisu
       y                                                                                                              g                                                    yei    r
                                                                      population population %
                  Total Water Pollutant Monitoring, Management
              1 and Support System in Dianchi Catchment                82402        13.73        5329 9836 378        879    18537 15907 15328 863     631   8898 3384 567 1865
                  Area
                   Municipal   Solid    Waste      Collection   and
              2                                                         9840        20.5                                      132   895 6894                 324    679          562
Kunming           Disposal Project in Luquan County
  City            Municipal Solid Waste Collection and Disposal
              3                                                         4154         7.7          427    368                 1015   860    679         306                       499
                  Project in Songming County
                  Municipal Solid Waste Collection and Disposl
              4                                                         3471        6.68          313                        1320   167    940               167                 564
                  Project in Xundian County
                           Total of Kunming City                        99867       13.25
                  Integrated Water Environment Management of                                     25737
              5                                                        286965       63.77                1508         485    13414 450 10752                 485    706          1793
                  Major River Courses into Erhai Lake                                             2
                  Rural Runoff Pollution Control in Lake Erhai
              6                                                        18276        67.44        12634 361                   2440          2356                                  485
                  Basin
  Dali      Dali City Urban Integrated Drainage Pipe
          7                                                            44836        59.37        35486 437                   4351   132 3395                 170           387 478
Prefectur   Network Project
    e       Wastewater Treatment Plant and Associated
              8                                                         4055        55.71        2607                         755          548                                   145
                  Sewer Network in Dengchuan County
                  Municipal Solid Waste Collection and Disposal
              9                                                        33016        67.51        30916 307                    453          998         143                       199
                  Project in Eryuan County
                           Total of Dali Prefecture                    387148       63.59




2
    Including the Mosuo population.


                                                                                            41
                                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                     Affected    Percent to
Categor                                                                                                   2
                                                                                                                   Zhuan                                                Bou Othe
        No.                         Subproject                          IPs      benefited       Bai   Naxi Pumi           Hui   Miao    Yi    Yao Tibetan Dai   Lisu
   y                                                                                                                g                                                   yei    r
                                                                     population population %
                Sewage Treatment Plant and Associated
           10                                                          3531        8.95          496   353                 286          923               689    784
                Sewers in Huaping County Town
                Second Municipal Wastewater Treatment Plant
           11
                and Associated Sewer Network in Lijiang City
 Lijiang   12 Urban Drainage Pipe System in Yulong County             94311        69.5         29299 60095 845            604          1818        755                       895
  City          Municipal Solid Waste Collection and Disposal
           13
                Project in Lijiang City
                Lijiang Lion Mountain Environment Renovation
           14                                                          3482        69.64               3128                                         238                       116
                Project
                             Total of Lijiang City                    101324       56.25
                Integrated    Environment        Management     in
           15                                                         29477        84.22                           23077         795 1037 4472                                96
                Putting River Basin of Funing County
                Municipal Wastewater Treatment Plant and
           16
                Associated Sewer Network Funing County
                                                                      29211        83.46                           24869         1155   249 2843                              95
                Municipal Solid Waste Collection and Disposal
           17
Wensha       Project in Funing County
    n        Integrated Water Environment Management in
          18
Prefectur    Puzhehei River Basin of Qiubei County
    e        Municipal Wastewater Treatment Plant and                 40249        70.44         392               19120 1030 9792 9154 717                                   44
           19
                Associated Sewer Network in Qiubei County
           20 Water Supply System of Qiubei County
                Integrated Environment Management Project
           21 of    Panlonghe      River    (Urban   Section)   in    15212        8.22                            7706    182   3829 2677                693                 125
                Wenshan County




                                                                                           42
                                                                                               Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                              Affected    Percent to
Categor                                                                                           2
                                                                                                           Zhuan                                              Bou Othe
        No.                       Subproject                     IPs      benefited      Bai   Naxi Pumi           Hui   Miao   Yi   Yao Tibetan Dai   Lisu
   y                                                                                                        g                                                 yei    r
                                                              population population %
              Municipal Wastewater Collection Network in
        22
              Wenshan County
              Municipal Wastewater Treatment Plant and
        23                                                     38870        80.98                          26650   120   7445 3189 1248                             218
              Associated Sewers in Guangnan County
              Municipal Wastewater Treatment Plant and
        24
              Associated Sewer Network of Malipo County
                                                               11715        54.49                           954          7056 672 2709          212                 112
              Municipal Solid Waste Collection and Disposal
        25
              Project in Malipo County
              Municipal Wastewater Collection Network of
        26                                                      5154        11.08                          1068    395   760    981 647         598           386 319
              Yanshan County
              Municipal Solid Waste Collection and Disposal
        27                                                     26101        57.87                          16637         4415 3428              947           283 391
              Project in Maguan County
                    Total of Wenshan Prefecture                195989       42.72
                          Total                                822848       39.59




                                                                                    43
                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                           4 Policy Framework for Resettlement
     The preparation of this RAP was strictly carried out according to the laws and
policies of People’s Republic of China and Yunnan Province as well as relevant
requirements of OP/BP4.12 Operation Policy of World Bank. The implementation of
resettlement willl strictly carry out according to compensation standards and relevant
requirements in RAP, any change during implementation should not be carried out before
the approval of the World Bank upon the special report submitted by the Construction
Unit.
                         The main laws and policies adopted are as follows.
     Table 4-1
                                             Policy document                                      Effective date

             (1) Nationality Regional Autonomy Laws of the People's Republic of China

             (2) Relative Provisions in Land Administration Law of the People's Republic of      amended      on
             China                                                                               Aug. 28, 2004

             (3) Temporary Regulations of Tax for Farmland Occupation of the People's            Issued      on
             Republic of China (No. (1987)27 Notification of the State Council of the People's   Apr.1, 1987
             Republic of China)

             (4) Notification of Ministry of Finance and State Land Resource and China
             People's Bank on Adjusting Compensation Fee for Land Used for Construction          Jan. 1, 2007
             (Caizong No. [2006 ] 48)

             (5) Ministry of Finance and National Forestry Bureau (Wencaizong No.[2002] 73:
   State
             Notification of Ministry of Finance and National Forestry Bureau on “Levy and
             Usage Management Provisional Method for Forest Vegetation Recovery Cost”

             (6) Implementation Regulations of Forest Laws of the People's Republic of China
                                                                                                 Jan. 29, 2000
             (Decree No. 278 of the State Council of the People's Republic of China)

             (7) “Stipulations for Specific Policy of Land Occupy Tax” (Cainongzi No. [1987]     Issued on Apr.
             206 )                                                                               25, 1987

             (8) Decision of The State Council on Deepening Reform of Land Management
                                                                                                 Oct. 21, 2004
             (Guo Fa [2004] No.28)

             (9) Notice on Issue of Instructive Comments on Improvement of Land
                                                                                                 Nov. 3, 2004
             Compensation System (Guo Tu Zi Fa [2004] No. 238



             (10) Land Management Regulations in Yunnan Province                                 Sept. 24, 1999
 Yunnan
 Province                                                      (
             (11) Land Management Regulations in Yunnan Province Decree No. 43 of Yunnan
                                                                                                 March 26, 1997
             Province People’s Government)



             (12) Approval of Kunming City People's Government on Adjusting Land
                                                                                                 1999
             Compensation Price in Kunming City (Kunzhengfu No. [1999] 25)

             (13) Notification of Dali City People's Government to Issue Implementation of
 Prefectur
             Dali City on Land Administration Laws of the People's Republic of China             2000
 e City
             (Dashizhengfa No. [2000] 27)

             (14) Autonomy Regulations of Wenshan Zhuang/Miao Nationality Autonomy
                                                                                                 Mar. 25, 2005
             Region in Yunnan Province



                                                       44
                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                      Policy document                                              Effective date



                 (15) Notification of Xundian Hui/Yi Nationality Autonomy County on
                 “Compensation Method of Land Acquisition and Relocation for Urban
                                                                                                                  2003
                 Construction in Xundian Hui/Yi Nationality Autonomy County (Xunzhengfa No.
                 [2003] 25)

                 (16) Announcement of Malipo County People's Government on Compensation and
                 Resettlement Scheme for Land Acquisition in Kuilong Nalianglaixi Village                         2006
                 (Mazhengtong No. [2006] 16)
    City,
    county
                 (17) Approval of Funing County People's Government on Land Used for
    and                                                                                                           2006
                 Construction in Qixing District (Fuzhengfu No. [2006] 121)
    district
                 (18) Notice issued by Qiubei County People's Government on "Compensation
                 Standards for Land Acquisitioned by State Construction in Qiubei County                          2005
                 (Qiuzhengfa No. [2005] 38)

                 (19) Notice issued by Qiubei County People's Government on Compensation
                 Standards for Land Acquisitioned and Ground Attachment in County Planning                        2004
                 Area (Qiuzhengtong No. [2004] 32)



                 (20)Operational Policy OP.4.12, "Involuntary Resettlement" - World Bank and its
                                                                                                                  Jan. 1 2002
                 attachment
    World
    Bank
                 (21) Operational procedures OP.4.12, "Involuntary Resettlement" - World Bank
                                                                                                                  Jan.1, 2002
                 and its attachment



    The objective of project resettlement policy is to minimize the adverse affects brought
by land acquisition and demolishment. Displaced persons 3 will be provided
compensation at full replacement cost 4for losses of assets and assisted to restore even
surpass former living standards. Mean policies as follows:
              When possible, resettlement plans should be conceived as development
               opportunities, so that those affected may benefit from project activities.

3
  “Displaced persons” refers to all the people who, on account of the activities listed above, would have their (1)
standard of living adversely affected ; or (2)right, title, interest in any house, land (including premises,
agricultural and grazing land) or any other fixed or movable asset acquired or possessed temporarily or
permanently; (3) access to productive assets adversely affected, temporarily or permanently; or (4)business,
occupation, work or place of residence or habitat adversely affected; and “displaced person” means any of the
displaced persons.
4 "Replacement cost" is defined as follows: For agricultural land, it is the pre-project or pre-displacement, whichever is
higher, market value of land of equal productive potential or use located in the vicinity of the affected land, plus the cost of
preparing the land to levels similar to those of the affected land, plus the cost of any registration and transfer taxes. For land
in urban areas, it is the pre-displacement market value of land of equal size and use, with similar or improved public
infrastructure facilities and services and located in the vicinity of the affected land, plus the cost of any registration and
transfer taxes. For houses and other structures, it is the market cost of the materials to build a replacement structure with an
area and quality similar to or better than those of the affected structure, or to repair a partially affected structure, plus the cost
of transporting building materials to the construction site, plus the cost of any labor and contractors' fees, plus the cost of any
registration and transfer taxes. In determining the replacement cost, depreciation of the asset and the value of salvage
materials are not taken into account, nor is the value of benefits to be derived from the project deducted from the valuation of
an affected asset. Where domestic law does not meet the standard of compensation at full replacement cost, compensation
under domestic law is supplemented by additional measures so as to meet the replacement cost standard. Such additional
assistance is distinct from resettlement measures to be provided under other clauses in OP 4.12, para. 6.




                                                                 45
                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

   Lack of legal rights does not bar displaced persons in peaceful possession from
    compensation or alternative forms of assistance.
   Compensation rates refer to amounts to be paid in full to the individual or
    collective owner of the lost asset, without deduction for any purpose. Also
    Individual owners receive compensation for affected structures and other fixed
    assets, and villages or DPs receive compensation for acquired land in rural areas.
   When cultivated land is acquired, it often is preferable to arrange for
    land-for-land replacement through collective land redistribution. In some cases,
    as when only small proportions of income are earned through agriculture,
    alternative measures such as payment of cash or provision of employment are
    acceptable if preferred by the persons losing agricultural land.
   Replacement houseplots, sites for relocating businesses, or redistributed
    agricultural land should be of equivalent use value to the land that was lost.
   Transition periods should be minimized. Compensation should be paid prior to
    the time of impact, so that new houses can be constructed, fixed assets can be
    removed or replaced, and other necessary measures can be undertaken before
    displacement begins.
   Displaced persons are consulted during the planning process, so their preferences
    regarding resettlement arrangements are considered; resettlement plans are
    disclosed in a publicly accessible manner.
   The previous level of community infrastructure and services and access to
    resources will be maintained or improved after resettlement.
   The borrower is responsible for meeting costs associated with land acquisition
    and resettlement, including contingencies.
   Resettlement plans include adequate institutional arrangements to ensure
    effective implementation of resettlement measures.
   Resettlement plans include arrangements for internal and external monitoring of
    resettlement implementation.
   Resettlement plans include procedures by which displaced persons can pursue
    grievances.




                                        46
                               Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                 5 Compensation Standard

     Based on the above-mentioned laws and relative rules and combined with the actual
condition at the affected city and counties, the compensation standards are w orked out.5
The deadline for comfirmation of the resettlers’ qualification should be the date of
issuance of the notice on land requisition and house relocation. After the date of the
issuance, the resettlers should not allowed to build new houses, extend or rebuild old
houses; the use of the houses and lands should not be changed; and leasing of land and
leasing and purchasing houses should not be allowed. In addition, the persons rushing
into the defined areas after that date should not be qualified for compensation as
resettlers.
5.1     Compensation standards for land occupation
5.1.1 Compensation standards for collective land acquisition

     According to the “Land Administration Law of the People's Republic of China”,
“Land Management Regulation of Yunnan Province” and “Instructive Opinions on
Improvement of Compensation System for Land Requisition”, as well as the relevant
policies and regulations of the affected cities, the compensation of land requisition covers
the compensation for the land and standing crops and resettlement susidies, which are
either calculated by the multiples of the officially-defined yarely output or determined by
the regional comprehensive prices. According to the actual situations of each affected
counties, those counties (cities) that have had the regional comprehensive prices worked
out by them and already approved by the governmental authorities will adopt such prices
in the project; and those counties/cities without such prices will adopt the uniformed
multiples of the officially-defined yearly output for calculation. The regional
comprehensive prices for land acquisition are the comprehensive compensation criteria
worked out by the county governements on a uniform way and specific for certain
areas/regions of the county on the basis of incorporating the opinions of people of all
fields (particularly the peasants) to a possible extent, so as to meet the needs of acquiring
rural collective-owned land for urban construction. The division of areas / regions and the
land prices are determined by many local factors, such as the location of the land to be
acquired, usage of the land, productive capacity of the land, local cultivated land holding
per capita and economic development level, etc. Therefore the land prices in different
areas / regions are different from each other.
      The land compenstion standards are indicated in Table 5-1.




5
  The house compensation will be conducted according to the house evaluation price, or according to that
in RAR if the house evaluation price is lower than that in RAP.


                                                  47
                                                                                                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                          Compensation Standards for Rural Land to Be Acquired
  Table 5-1                                                                                                                                                         Unit: Yuan/mu
                                                        Times of land compensation
                                                                                              Compensation and subsidy standard(Yuan/mu)
                                                               and subsidy
                                       Yearly output
                      Land type                                          Times of
    County                            value/ storing up Times of land                            Land              Resettleme Young             Ground                  Remark
                                                                       resettlement   Total                                           Woods
                                      quantity value compensation                             compensation         nt subsidy crops           attachment
                                                                         subsidy
                      Reclaimed
   Xundian
                    cultivated land                                                                 2000                      483
                                                                                                                                                               Compensation for ground
                   Reclaimed garden
                                                                                                                                                           attachments and trees listed in the
                    plot, wood land
                                                                                                    2000                                                           “scattered trees”
                     Unused land
                                                                                                  200
    Luquan          Cultivated land        2000              6             10         33000      12000              20000     1000                               Yearly output value
                                                                                                                                                            Yearly output value /storing up
                      Forest land        120/2400            3             2          9360          7200             240              1920
                                                                                                                                                                    quantity value
   Songming          Paddy field                                                      20600                20000              600                           Regional comprehensive price
                      Dry land                                                        12400                12000              400                           Regional comprehensive price
                                                                                                                                                            Yearly output value/storing up
                      Forest land         90/1800            3             2          7020          5400                              1440
                                                                                                                                                                    quantity value
     Dali            Paddy field           2156             10             11         46276      21560              23716     1000                               Yearly output value
                      Dry land             1478             8              10         27404      11824              14780     800                                Yearly output value
                         Pool              2156             7               6         28028      15092              12936                                        Yearly output value
Er’yuan County       Paddy field           2164             10             11         46526      21640              23804     1082                               Yearly output value
                      Dry land             1327             10             12         29858      13270              15924     664                                Yearly output value
                     Garden plot           1500             7               6         21000      10500               9000                       1500             Yearly output value
                         Pool              2164             7               6         28132      15148              12984                                        Yearly output value
                      Fish pond            2400             5               4         23600      12000               9600                       2000             Yearly output value
                                                                                                                                                            Yearly output value /Storing up
                      Forest land                                                     4900          3360             440              1100
                                                                                                                                                                       quantity
                      Paddy field
Gucheng district                           2164              8             4          88450                87250              1200                          Regional comprehensive price
                      (landfill)
                      Paddy field
                       (sewage                                                        41200                40000              1200                          Regional comprehensive price
                   treatment plant)
                       Forest land          735              4             2          4998          2940             1470              588                  Yearly output value /Storing up



                                                                                               48
                                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                    Times of land compensation
                                                                                          Compensation and subsidy standard(Yuan/mu)
                                                           and subsidy
                                   Yearly output
                    Land type                                        Times of
      County                      value/ storing up Times of land                            Land        Resettleme Young             Ground                 Remark
                                                                   resettlement   Total                                     Woods
                                  quantity value compensation                             compensation   nt subsidy crops           attachment
                                                                     subsidy
                                                                                                                                                          quantity value
Huaping County     Paddy field         2196             8              4          27450      17568          8784    1098                               Yearly output value
   Malipo          Paddy field         2200             10             7          38300      22000         15400    900                                Yearly output value
                    Dry land            960             8              7          15300       7680          6720    900                                Yearly output value
                                                                                                                                                  Yearly output value /Storing up
                   Forest land                                                    8820          7200        180     1440
                                                                                                                                                          quantity value
Funing County      Paddy field         2000             10             14         48600      20000         28000     600                               Yearly output value
                   Garden plot         2000             10             14         49500      20000         28000                       1500            Yearly output value
     Guangnan
                   Paddy field         1586              8             8          26176      12688         12688     800                                Yearly output value
      County
                   Paddy field
      Qiubei                           1440              8             5          19120      11520         7200      400                                Yearly output value
                 (Jinping town)
                   Paddy field
                 (Shuanglongyin         960              8             5          12880         7680       4800      400                                Yearly output value
                  g township)
                     Dry land
                 (Shuanlongying         840              6             6          10380         5040     5040      300                                  Yearly output value
                   township)
                 Scattered wood
                                                                                  5040                                                           Comprehensive price in the region
                       land
Notes

1.       The different output value for crops is because of the discrepancy in geography location and region, so that the compensation standards for each
         county is different.

2.       The compensation standards are also different for different regions in a county.

3.       Whether it is to adopt the yearly output value or the regional comprehensive price, it shall be determined according to the c ompensation policy of each
         land administration department.

4.       The compensation cost for per mu forest land = storing up quantity value per mu woods × multiple; resettlement subsidy cost i s 2 times of yearly
         average output value in pervious 3 years, and the compensation cost per mu wood s = storing up quantity value per mu woods × 80%.


                                                                                           49
                                          Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


5.1.2 Compensation standard for using state-owned land

    The land compensation and resettlement subsidy is 48000 Yuan/mu, and
compensation for the young crops of the paddy field and ground attachments is 600
Yuan/mu. After negotiating between Owner and local people's government, the
compensation for land acquisitioned from County Tanner Plant is 48600 Yuan/mu.
      According to the regulations and the actual situation of the relevant counties and
cities, the land compensation standard for acquistion of the state-owned land for the
project is as in Table 5-2 after negotiation between the Project Owner and the local
people’s governemnts.
                     Compensation Standard for Acquistion of the State-owned Land
   Table 5-2                                                                                             Unit:Yuan/mu
                                                          Compensation standards for state-owned land
              Land
                                    Xundian      Songming      Luquan Gucheng district      Malipo       Guangnan     Funing
Land reserved for construction       50325         150000       150000         45000         18000
State-owned land (Paddy field)                                                                            90000       48600

5.1.3 Temporary land occupation compensation

      All output or income from this land shall be compensated to the land owner
according to its annual output and occupation time. The compensation for the temporary
land occupation includes the compensation for output loss of the cultivated land,
compensation for young crops and compensation for re-cultivation. The rural labor that
manages this land can take part in project construction or other labor service during
construction; and the temporary use land shall be reclaimed after completion of service
by the construction unit.
     At this stage, 4 components in Yunnan Urban Environment Project are involved in
the temporary land occupation, i.e., Urban drainage system under Dali City Jurisdictio n,
Wastewater management in Huaping County, Integrated management of Putting River in
Funing County and Wastewater management in Qiubei County (WS).
     According to the characteristics of using the land in terms of the time for
construction, it is estimated that the time duration for temporary land occupation is one
year for each of the 4 sub-components. See Table 5-3.
                     Compensation Standards for Temporary Land Occupation
Table 5-3
                                                                          Compensation standard(Yuan/mu)
                              City and
           Project                             Land                     Compensation for   Compensation for       Re-cultivation
                                 county                     Sub-total
                                                                          young crops      cultivated land loss        cost
Urban drainage system under                 Paddy field       5156           1000                 2156                2000
                                  Dali
Dali City Jurisdiction                       Dry land         4278            800                 1478                2000
Lijiang City WWTP and         Gucheng
                                            Paddy field       5364           1200                 2164                2000
Sewer Network                 District
Puting River Treatment           Funing Cultivated land       1860            600                  760                 500


                                                              50
                                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                    Compensation standard(Yuan/mu)
                                   City and
             Project                              Land                        Compensation for        Compensation for      Re-cultivation
                                   county                        Sub-total
                                                                                    young crops      cultivated land loss        cost
Project                            county
Wastewater management in           Qiubei
                                                                   1200                 400                  300                 500
Qiubei County (WS)                 county Cultivated land


5.2         Compensation for house and auxiliary facility relocation

     The components --- Wastewater management in Lijinag Ancient Town and Urban
drainage systems under Dali city as well as Solid waste management in Funing will cause
house relocation, which includes the private houses and houses of enterprise, ogan s and
collective. According to land nature, the private houses are divided into rural house and
urban houses. The replacement price of the houses to be relocated will be evaluated by
the legally qualified real estate evaluation agent. According to the house compensation
policies of the affected cities, the replacement price (inclusive of land price) of the houses
of different structures and at defferent locations will be estimated, the estimated vaule for
urban houses is calculated according to house replacement price and the compensation for
house plot is 600000 Yuan/mu, and the rural houses will be estimated with the
replacement price ( the house pliot is allotted by the village).
                Compensation Standards for House and Auxiliary Facility Relocation
Table 5-4                                                                                                          Unit:Yuan/m2
                                                                 House structure
    City       House property        Frame                                                                                  Remark
                                                 Brick-concrete     Brick-wood          Earth-wood      Simple
                                    structure
    Dali            Rural                                                                                 100        Collective house
 Lijiang Urban and rural             626.98             494.71          367.9             276.81                    Replacement price
 Wenshan     Rural                                                       350                                         Collective house


               Compensation for Infrastructure at Host Area and Subsidy for Removal
Table 5-5
                                                                                                  Compensation standard
  No.                       Compensation                                     Unit                                              Remark
                                                                                                         Lijiang
   I      Infrastructure construction on host area                  Yuan/household                        3300
   1      Ground leveling                                           Yuan/household                        2500
   2      Water and power supply                                    Yuan/household                        800
   II     Subsidy for resettlers’ relocation                        Yuan/household
   1      Transportation fee                                        Yuan/household                        300
   2      Material damage                                           Yuan/household                        300
   3      Subsidy for losing of working time                        Yuan/household                        1000
   4      Living subsidy for      transitional period               Yuan/household                        1800
   5      Loss in renting house                                           Yuan/ea.                        600
                                                                                    2
   6      Compensation for house rebuilt in original area                 Yuan/m                          18.3


                                                                   51
                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

5.3     Compensation for scattered trees and tombs

      Cutting scattered trees due to construction of the project is needed only in Luquan
and Xundian of Kunming City, Eryuan of Dali Prefecture and Malipo of Wenshan
Prefecture; moving tombs needed in Songming of Kunming and Malipo of Wenshan. The
compensation for trees and tombs will be at the unit prices as indicated in Taable 5 -6,
after consulting between the Project Owner and the local county governments.
                                        List of Compensation
Table 5-6                                                                         Unit:Yuan/ea.
                                                   Compensation standard                     Remark
  No.          Description
                                       Luquan      Xundian    Songming     Dali     Malipo
   I    Tree
   1    Fruit tree                                                         75
  1.1   Diameter less than 3cm           30             30                 10
  1.2   10cm or full-fruit tree         100            120
   2    Economic tree
  1.1   Diameter less than 3cm           30
  1.2   10cm or full-fruit tree         100
   3    Timber                                                                        35
  3.1   Diameter less than 3cm           5             5
  3.2   Mature woods
   II   Tomb                                                     400                 500

5.4     Compensation standards for relocation of enterprises and institutions

      The component of the Wastewater management in Lijiang Ancient Town will
involve the relocation of part of structures of the local enterpirse and public institutions.
The compensation for the relocation of enterpirse and institute covers the compensation
for house relocation and other compensation. For the compensation standard adopted for
house relocation, the replacement price by taking account of the comprehensive price of
the land is adopted, i.e. 1120Yuan/m 2 for houses of frame structure, 988 Yuan/m 2 for
brick-concrete structure, 861 Yuan/m 2 for brick-wood structure, and 770 Yuan/m 2 for
earth-wood structure. Other compensations include the compensation for the transition
subsidy and loss for stopping business, etc. and is 50000 Yuan/household by budget at
this stage temporarily. The Project owner has made prelimminary negotiation with three
affected enterprises and public institutions on the compensation for moving, and the
preliminary price negotiated with these 3 enterprises has been listed into the cost
estimation. The compensation to the other units which are required to move will be
solved jointly by the Project Owner and those units through negotiation. The
compensation will be decided after negotiating between the Project Owner and enterprise
or institute, and actual compensation amount shall be according to the agreement signed
by both sides.
5.5     Compensation for relocation of individual business households

     The houses of individual bussiness households are of residential houses and
commercial buildings of the enterprises and public institutions, so that the compensation
standard for such houses is same as that of residential houses, 800 Yuan/household for



                                                  52
                          Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

moval, 600 Yuan/household for stopping bussiness (200 Yuan/household X three months),
and 200 Yuan/ household for transition subsidy.




                                          53
                                    Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                              6 Resettlement and Recovery Scheme
     The resettlement working group is formed by Provincial Project Office, Kunming
World Bank Project Office, Wenshan World Bank Project Office,Dali World Bank
Project Office, Lijiang World Bank Project Office, the owner of each sub-project, the
different levels people's government and East China Investigation and Design Institute,
the resettlement acting plant of Yunnan urban environment construction project is
prepared based on the resettlement plant of each county(city), twonship and village,
current policies, legal regulations and the requirement fromt the World Bank.
      The goal of resettlement is to ensure the resettlers to get the compensation of their
all losses, reasonable resettlement, good recovery, to share the benefit of proje ct, to give
subsidy for temporary difficulty, raise their income level and living standard, production
and profit ability of enterprises at a higher level or at least resume to original level before
the resettlement or before the start of project construction.
6.1      Permanent land occupation resettlement

    The project will occupy 1825.76mu collective land, affecting 442 households with
1870 persons.
6.1.1 Land acquisition impact analysis

     The contracted land to be acquired by this project will impact on 24 villagers groups
of 14 administrative villages of 11 townships in 10 counties (city, district). In order to
understand the impact on local villagers, the project office organized relative people to
make deep survey on existing land resources of each township (town), administrative
village and villagers group and make detail analysis on the impact based on actual
inventory index of each group. See Table 6-1 for details.
                     Land acquisition impact analysis for sub-components
Table 6-1

                                                      Total             Mean farmland Mean farmland Land reduction
                                        Agricultura             Land
       Township(t Administrat Villagers l population farmlan acquisition before land    after land before and after
County                                                d area             acquisition   acquisition land acquisition
         own)     ive village  group
                                        (person)             area(mu)
                                                     (mu)               (mu/person) (mu/person)          (%)

                  Lianwachon
                                             1961   1129.5     43.8         0.58          0.55           3.88
                       g
Luquan                         Jinlongtan     153     113      5.78         0.74          0.70            5.12
       Pingshan
County
                               Shangshi-I     104     60      13.54         0.58          0.45           22.57
                               Shangshi-II     86     60      24.48         0.70          0.41           40.80
Songmi              Shijiao                  6263    6081     107.7         0.97          0.95            1.77
       Songyang
  ng                            Luojing      1293    1274     107.7         0.99          0.90            8.45

         Xiaguan Dazhuang                    4969    2892       1.2        0.582          0.582          0.04
 Dali
                                Group-6      316    257.20      1.2        0.814          0.810          0.47
Eryuan   Cibihu     Songhe                   3045    2305      94.8        0.757          0.726          4.11
                               Dasongdian    1612   1328.00    94.8        0.824          0.765          7.14
Eryuan
         Yousuo     Meihe                    6747    4820       21          0.71          0.71           0.44




                                                       54
                                     Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                      Total             Mean farmland Mean farmland Land reduction
                                        Agricultura             Land
       Township(t Administrat Villagers l population farmlan acquisition before land    after land before and after
County
         own)     ive village  group                  d area             acquisition   acquisition land acquisition
                                        (person)             area(mu)
                                                     (mu)               (mu/person) (mu/person)          (%)

                                Dahuayuan    446    278.00      21         0.623          0.576          7.55
                      Xihu                   4090    1929      61.5        0.472          0.457          3.19
                                Zhangjiadu
                                    n
                                             1678    786.8     58.8        0.469          0.434          7.47
                                Zhongdeng    648      287       2.7        0.443          0.439          0.94
Huapin
       Rongjiang Rongjiang                   6098    6523      21.6         1.07          1.066          0.33
  g
                                   11        640      823      21.6         1.29          1.25           2.62
         Jinshan     Yangxi                  3517    9125       88          2.59          2.57           0.96
                                  Minru      465     1653       88          3.55          3.37           5.32
Guchen
  g                  Jinshan                 4278    5647       35          1.32          1.31           0.62
                                Shangshipi
                                             316      182       35          0.58          0.47           19.23
                                   ng
          Mali      Laodifang                3473    5993      2.62         1.73          1.72           0.04
                                Shimengua
                                             172      270      2.62         1.57          1.55           0.97
                                    n
                     Congtou                 2545    2277     78.73         0.89          0.86           3.46
                                 Luotizai    109      141      4.33         1.29          1.25           3.07
Milipo
                                  Shima      171      159      51.4         0.93          0.63           32.33
                                 Hebian      108      88        3           0.81          0.79           3.41
                                 Yangse      127      127       9           1.00          0.93           7.09
                                 Baba-ao     162      136       11          0.84          0.77           8.09
                      Tuanjie
                                             1145     612      36.3         0.53          0.50           5.93
Funing   Xinhua     community
                                 Toutang     309      133      36.3         0.43          0.31           27.29

Guangn           Duanfeng                    2317     868       1.4         0.37          0.37           0.16
       Liancheng
  an                            Tuguozai     1029     254       1.4         0.25          0.25           0.55
                     Donghu                  1475    1056      24.4         0.72           0.7           2.31
                                  No.4       123      133       2.2         1.08          1.06           1.65
         Jingping
Qiubai                            No.6       111      101       7.8         0.91          0.84           7.72
                                  No.7       184      169       4.7         0.92          0.89           2.78
                                  No.8       145      84       7.75         0.58          0.53           9.23
Note: The reclaimed wasteland of 61.2 mu from Toutang village group of Tuanjie community in Xinhua town is
acquisitioned, which is not included in the annual report.



      The urban environment construction project is to offer river course treatment,
sewage handlingtreatment or rubbish filling arealandfill. The river course treatment
projects is generally along the river, which has the impact in comparatively samll
area.with small impact. The sewage handling plant sewage treatment plant or rubbish
filling arealandfill is at a concentrated zone, but their sites are usually at wasteland in
valley wasteland, therefore the construction has no big impact on agricultural production


                                                       55
                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

of local villagers. Based on the analysis of each village group, among the 24 villager
groups affected by acquisition of contracted cultivated land, the 19 groups have less than
10% land to be acquired, so the land acquisition impact on agricultural production of
these groups is not big of 45 groups; however, the remaining five groups will have more
than 10% land to be acquired, (including 4 groups have their land above 20% to be
acquired), and the heaviest impact is on Shangshi’er Group of Yanwachong Village of
Pingshan town in Luquan County (40.8% of the total will be acquired). See Table 6 – 2
for the groups whose land will be acquired by over 10% tha total. By analysis, it shows
that the impaact on most of the village groups is rather small. But by reasonable
resettlement scheme, the effect will be minimized.
                      Analysis on Land Requisition for Village Groups with
                                    Over 10% Land to be Acquired
Table 6-2
                                                                 Farmland Farmland         Land       Income
                                           Agricultur Total Land holding holding         reduction    impact by
                      Admini-
         Town- ship              Villagers al popula- farm- acq- before    after        before and    land
County                strative                         land uired
           (town)                 group tion                     acquisi- acquisition    after land   ac-quisitio
                      village
                                           (pers.)   (mu) (mu)   tion (mu/ (mu/         acquisition   n (10000
                                                                 person) person)            (%)       Yuan)
Luquan Ping shan Lanwancun Shangshi -I      104      60    13.54     0.58      0.45        22.57         2.71
                           Shangshi -II      86      60    24.48     0.70      0.41        40.80          4.9
Old city                    Shangshi                                                                     6.44
         Jinshan   Jinshan                  316     182     35      0.58      0.47        19.23
district                       ping
Malipo     Mali  Chong tou    Shima         171     159    51.4     0.93      0.63        32.33          6.45
                   Tuanjie
Funing Xinhua                Toutang        309     133    36.3     0.43      0.31        27.29          7.26
                 community


6.1.2 Resettlement scheme and guarantee measures

     During the survey and resettlement planning period, the resettlement working group
hold the symposia to discuss the resettlement scheme in relative township(town) and
villages participated by village cadre, resettlers and partial villagers representatives. All
resettlement plans are agreed by local government and the resettlement households. After
the analysis of environmental capacity afte the land acquisition of each village, it is
determined to settle down all resettlers in the same community in order to keep its
original production and living mode and original social relation without impact.
     The resettlement working group worked out feasible production and living recovery
scheme with local government, by both cash compensation and other production
measures, acoording to the survey of geography location of each village, land resource
possession and income condition of local people, the opinion of most representatives and
resettlement households. According to the rules of Article 29 in “Yunnan Land
Management Regulations”, the compensation fee for land acquisition and resettlement
subsidy (except that for personnel belongings, yong crop on the land and subsidy for
self-employed people) shall be owned by the collective and solely used for production
development, employment of surplus labors, living subsidy for disabled people,
construction for road, channel and other collective welfacre facilities,. Since the
resettlement plan is determined by the most resettlers, if individual resettler disagrees the
resettlement plan and like to have other ways, the project office shall try to help and


                                                     56
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

coordinate it. If individual villager in the village by the cash compensation mode wishes
to have land for agricultural production, the project office in each County will distribute
collective land or help to replace land from other households that dislike to farm.
Contrarily, if the resettler wishes to have cash compensation for trade business, and if he
has business ability, he can get corresponding cash compensation.
6.1.2.1   Production scheme

     The analysis is made for heavier impact 5 villagers groups in 4 administrative
villages (impacted by land acquisition over 10%, mean farmland per capita less than
0.5mu after land acquisition or relying on land greatly), and the resettlement scheme is as
the following:
I. Kunming City
     The impact by land acquisition of each village is different, and the resettlement plan
based on quantity for land acquisition and house relocation, number of resettlers and
decision of local government for each village is also different. After full consulting with
each village according the survey, the project office decides to use land adjustment within
same group or by cash compensation for the less reduction of land per capita after the
land acquisition, the land compensation fee will be paid directly by the payment channel
to each villager group and they have right to use it.
     For the 2 villager groups of 1 village with heavier impact by land acquisition, the
project office made special consulting and the resettlement plan is as the following. See
the Appendix 4 for the production resettlement plan for heavily affected villages.
(I)Luquan County
A. Pingshan Town

    Pingshan town is the county town, two heavy impacted groups are Shangshi-I and
Shangshi-II group of Lanwachong village.
(1) Yanwachong Village

     Yanwachong village has 11 villagers groups, total population 480 households with
1961 persons by the end of 2005, farmland 1129.5mu, in which paddy field 439.5mu and
dry land 690mu,mean land per capita 0.58mu, with labor force 1152 persons accounting
for 58.7% of total, the rural economic income is mainly from traditional planting
stockbreeding, the percentage of platning and stockbreeding is 43.7% and 27.7% of total.
By the statistics, the out-working labor force is 137 persons accounting for 11.9%. The
net income per capita by the end of 2005 is 1851 Yuan.
      Two heavily affected groups are Shangshi-I and Shangshi-II, the mean land per
capita is 0.58mu and 0.70mu, and over 0.41mu after the land acquisition so that the land
acquisition has no big impact on basic living condiiton. After soliciting the opinion of the
most households, it is decided by two villager commissions to use cash compensation
mode and land adjustment modes. The land compensation and subsidy will be paid fully
to group for leveling of collective land, infrastructure construction and water conservancy
facilities. The young crop compensation fee will be paid directly to affected households.



                                            57
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

      By the survey, the project area is at mountainous area, with poor irrigation facility,
general land quality, but the resource of forest land is rich, farmers are mainly using
desolate forest land to plant chestnut and fruit tree, at the same time, the breeding is
developing step by step,and farmer’s income is relying on forest, fruit and animal
husbandry gradually. This village can use land compensation fee to rebuild the irrigation
facility and raise land output. Besides, the village can use partial land compensation fee
to build the existing road, which is a 2km long earth road, incapable of passing in raining
day and is very inconvenient. It is estimated that the investment is 200000 Yuan. The
living and production level of resettlers will be not reduced by the land acquisition.
     II. Dali Prefecture
      The resettlement working group of each village made analysis of geography location,
possess quantity of land resource and income composition of local residents, the project
affected area is at Erhai basin with better economic condition, belonging to relatively
developed area of Dali prefecture. The economic income source of rural family presents
the tendency of diversity, the income proportion of traditional agricultural as planting
especially is decreased year by year, rely on land reduced also year by year. In fact, the
actual land acquisition is few comparatively, and land acquisition scope scattered
relatively, so that the influence of agricultural production by land acquisition for each
group (natural village) is less. Based on the opinion from resettlement households,
villager representatives and local government, and the option of most are respected. The
cash compensation mode is used mainly for production recovery plan, however, if
individual resettlers disagree the resettlement plan and like to have other ways, the
project office shall try to help and coordinate it. If individual villager wishes to have land
for agricultural production, the project office in each county will distribute collective
land or help to replace land from other households that dislike to farm. The resettlement
plan of Xihu village of Yousuo town in Eryuan County is as follows. See the appendix 4
for resettlement plan and guarantee measures for impacted villages in Dali Prefecture.
(II)Eryuan County
     (A) Yousuo Town
     (1) Xihu Village

     Yousuo town locates in the southeast of Eryuan County, and Yousuo street is the
largest rural market, 18km away to the county town, governing 14 villager committees.
The animal husbandry is the traditional pillar trade in this town,with rich water surface
resource, pond-fishing, seaweed-plant is also relatively developed. Major project
regarded in this town is Luoshi River environment treatment project, the heavily
impacted group (land acquisition being 7.47% of the total) is Zhangjiadun group of Xihu
village.
     The project will acquire 61.5 mu land from this village, affecting Zhangjiaden and
Zhongdun villages (103 households with 350 persons). 58.8 mu land in Zhangjiaden
group will be acquired. By the inquiry on-the-spot, the land affected in Zhangjiaden is of
collective wasteland, belonging to none-contract land, which is now distributed to all
villagers, 0.5mu per household, accounting for about 20% of their contracted -land, the
mean contracted-land area per capita after the land acquisition is not reduced, which can


                                             58
                           Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

still satisfy the production and living need. Because this village is near Xihu tourism
scenery district and Yousuo town, the main economic income of local peasant is from
breeding, planting, the secondary and the tertiary industry and migrant work, the planting
income proportion drops down year by year, and peasant relying on land production is
also reduced year by year. Therefore, based on consulting of most resetters and discussed
by village commission and town government, it is decided to use cash compensation
mode, the resettlement subsidy and compensation of young crops will be paid directly to
villager, and the land compensation fee shall be discussed by the villagers meeting to
decide how to use.
      In addition, the project office and township(town) government plan to increase the
support intensity for agricultural protection technology to encourageand guide the
development of family breeding (as dairy cattle) and aquatic economic plant ( as edible
seaweed) to rise peasant’s breeding technology, increases product output and quality and
to raise the income of peasant steadily.
     III. Lijiang City
     After the land acquisition, the land will be re-adjusted in whole group, the cash
compensation mode is used for individual belongings and young crops, the rest fee is
used for collective development of agricultural production; for the households with the
secondary and tertiary industry ability, the cash compensation mode can be used to them
by their will. Only one village group in Jinshan Village of Old City District is heavily
impacted (over 10% land acquired). See the Appendix 4 for resettlement plan and
guarantee measures for heavy impacted villages.
    (III) Lijiang Ancient Town
A. Jinshan Township
(1) Jinshan village

     Lijiang City WWTP and Sewer Network will impact on Jinshan village and
Wenhuan village in ancient area of Lijiang city, partial collective woodlands of Wenhua
village be occupied without impact on the population, 35mu land in Jinshan v illage be
occupied. By the end of 2005, Jinshan village has total population of 4278 persons,
5647mu farmland, mean land per capita 1.32mu, with labor force 2291 persons
accounting for 54% of total, engaged mainly in traditional agricultural production as well
as the second industrial production, few people engaged in traffic and transportation
service as well as other services, the net income per capita 2526 Yuan. The proportion for
land acquisition by the project is accounting for 0.62%,with small impact on production
and living of local peasants.
      According to the survey accomplishment to each household, and based on the
opinion of most peasant household, the town people's government and villagers
commission decided to use following distribution ways: The land compensation will be
distributed in average among whole village, for the peasant lost land, their land will be
re-adjusted in same group.
     IV. Wenshan Prefecture
    Wenshan prefecture has 2 groups in 2 administrative villages that the land
acquisition is over 10%, among them the mean land per capita in 1 groups is above

                                            59
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

0.5mu, with less impact on protection and living. One heavily impacted group (over 10%,
less than 0.5mu per person after land acquisition) is Toutang in Tuanjie community. The
project office made specific consultation and the resettlement plan as the following. See
the Appendix 4 for resettlement plan and guarantee measures for heavily impacted
villages.
(V)Funing County
A. Xinhua Town

     (1) Tuanjie Wenhua Community
     Tuanjie community neighberhood commission is at the county town, about 3.5 km2,
governing 11 resident teams under 5 villagers groups, with 1412 households with 5086
                            of
persons by the end of 2005, which agricultural population is 354 households with 1436
persons;land area 532 mu (of which the paddy field 437mu and dry land 95mu), mean
land per capita 0.37 mu, labor force 2814 persons ( accounting for 55.3% of total). The
main income is from 2nd and 3rd industry except tranditional planting and stockbreeding,
the percentage of planting and stockbreeding in this village 32.6% and 14.7, and the
percentage of 2nd and 3rd industry 18.8% and 14.5%. By the statistics, there are 150
persons to go out for migranting work and the laber service income is 27.9%. Relying on
favourable district advantage, the non-agricultural is well developed, 341 persons
engaged in non-agricultural production, accounting for 47.8%, and net income per capita
by the end of 2005 is 1456 Yuan.
     This project will occupy 97.5 mu farmland (of which 61.3mu reclaimed land is
excludeded in the yearly report), regarding to 72 households with 309 persons in Toutang
group. The group has farmland 133 mu (of which, the paddy field 110 mu and dry land
23mu), mean land per capita 0.43 mu. The land acquisition for the projet is accounting for
27.29% of the total farmland. By the survey, the land acquisition of affected households
in Tuanjie community is over 30%, basically with larger impact. Because the most land
has been occupied by the construction of city, the land is less and less, therefore, the
group is relying on district advantage to develop the vegetable base (with yearly income
over 1000 Yuan) in recent years and more persons engage in business and outgoing labor,
so that the farm households have less and less relying on the land. After soliciting the
opinion of the most households, it is decided by two villager commissions to use cash
compensation mode and pay the resettlement subsidy and young crop compensation fee
directly to affected households. Under the same condition, the resettlers have preferable
recruiting opportudities.
6.1.2.2    Income recovery measures

    In order to resume the protection and living level of resettlers, the following
measures will be taken:
     ⑴ The labor service will be arranged in priority to resettlers during the construction
period; And firstly use local building material and living materials. After completion of
the project, the resettlers have preferable recruiting opportudities under the s ame
condition;
      ⑵ The labor service will be arranged in priority to resettlers if there is labor output
project in the county area;

                                             60
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

    ⑶ Through land re-adjust within the group, guarantee that all residents share
farmland quantity not less thant the standard and other land;
     ⑷ Strengthen technical training and invite regularly relevant people from
agricultural technic station or the peasant who has technical specialty to conduct some
relevant agricultural planting technologies and breeding technical lectures in the
resettlement area and teach breeds, prevention of eqpidemic disease, shed -vegetable
planting as well as weave technical knowledge to woman with the language that resettlers
can understand. It is planned to raise the quality and output of agricultural product, raise
domestic animals slaughter rate and breeding output to increase the economic income of
resettlers.
6.1.3 Relocation scheme

    Shizhishan environment treatmen project-I will relocate 62 households, in which 14
households are moved to other place and 48 households rebult in original place. The new
house plot with area of 1:1.2 is allotted, and most of project affected residents are from
Naxi nationality so that the new houses built are with Nai national characteristics.
     (1) Rural residents
     This project will relocate 4 rural households with 22 persons, in which 1 household
in Longtan village had been removed, 2 households in Jinjia village and 1 households in
Longtan village will be removed by the same way. By the survey in this stage, it is
decided to use cash compensation way by the district people’s government, street agent
and neithberhood commission for the 3 households to rebuild their housing in the
construction land (outside the project area) reserved in the same group. The house
replacement price is paid to households, the compensation for the house plot is paid to the
village collective, and house plot will be alloted by village. Those with the main income
before resettlement from collective bonus and house rent will still enjoys the colle ctive
bonus after resettled in original village and have the income from rent room at original
level.
     (2) Urban residents
     This project will relocate 10 urban households with 44 persons. By the survey in this
stage, it is decided to use cash compensation way by the district people’s government,
street agent and neithberhood commission for 10 households to rebuild their housing in
other places. The housing plot is alotted by government, at the west of fish pond near the
construction bank in Xianggeli street in ancient city area (land area about 60mu, all for
state-owned construction land), the compensation is paid according to the replacement
price, the house plot distribution area is by original plot area and new plot area 1 : and
                                                                                      1.2,
houses are built by households. If immigrant is not willing to have central resettlement,
but select to buy houses or other resettlement way, the compensation for housing plot
will be paid according to standard of 600000 Yuan/mu, with house replacement price,
immigrant can purchase the merchandise house with same area in same region completely.
The house of the most of residents belong to houses with unit raise funds and their major
economic income is from wages so that their economic income will not be affected after
relocation.
  (3) Partial housing dismounting


                                            61
                                Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

     For 48 households with inconsistent building style by the plan, the portion
inconsistent with building style shall be demolished, at the same time, promise to build
new house on original place by replacement price for compensation.
  (4) Rental lodger
     The project deals with about 399 rental lodgers, most of them are migranting
workers. For the lodgers renting house in the project construction area, it will be notified
by 3 month in advance, at the same time, offer them house lease information and let them
have enough time to find new housing and reduce the impact on their living.
6.1.3.1      House plot selection and standard

    Shizhishan environment treatment project-I will relocate 14 households, and the new
house plot ratio is 1:1.2.
6.1.3.2      Infrastructure plan in host area

     For Shizhishan environment treatment project-I, the host area is within original
community where has complete infrastructure facilities. For partial facilities that need for
improvement, the project owner will entrust the municipla utility department to perfect it
and its cost is not put into the compensation cost in this stage.
6.1.3.3      Social service facilities in host area

     The construction of project does not relocate school and medical facilities, the
resettlers can use original school, medical room and commercial network, so that it is
necessary to rebuild it; the distance from host area to original social service facility is
identical basically.
6.1.3.4      Community management and housing construction

     The host area for this project is inside the original community, therefore, the
community management after resettlement is same as original community management
system, do not need any adjustment.
      By the survey of each family, the most opinion is by self-dismount and self-built for
the housing construction. Therefore, the self-dismount and self-built mode is adopted in
this stage.
6.1.4      Allocation of state-owned land

      This project concerns with 1279.36 mu state-owned land, in which 405.78mu is
compensated land and 873.58 mu withou compensation. Because the state-owned land
does not regard to relacation, the cash compensation will be used for the compensated
land.
6.2       Recovery plan for temporary land

     The temporary land use means the land occupied temporarily during the construction
period including borrow area and spoil area, operation and living area as well as
temporary road etc. The project office will clarify the use mode of temporary land,
resuming requirement and compensation standard in the contract with the construction


                                                  62
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

contractor, this buget covers temporarily only land loss compensation, young crops
compensation for one year and land resuming cost.
     In order to decrease the environment impact and residents for borrow area, the
design unit has fully consideration for location selection of temporary land, construction
way and resuming mode after completion of project.
6.3    Restoration plan for vulnerable group

     Hu Guangcun’s family in Xundian County belong to poor household. The
resettlement plan will give special help to his family. The poverty-reduction group led by
township and village cadre will be set in each township and vilalge to offer timely
assistance to vulnerable group.
     This budget is listed with 1% of rural compensation cost as support cost for
vulnerable group, totaling 507200 Yuan. If there is more vulnerable groups during the
implemention of the resettlement plan, the corresponding support and care shall be given
such as proper preference and care for housing construction and resource distribution.
6.4    Restoration plan for ethnic people

     According to the analysis on the project impact on the ethnic groups, it can be see
that the ethnic characteristics in the affected area is not obvious, their living style and
production method are not different from that of the Han people, and their living standard
is generally ssimilar to that of the Han people. The resettlement measures for the ethnic
people affected is shown in Table 6-3.




                                            63
                                                                                                      Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                                     Restoration Measures for ethnic people
Table 6-3
                                                                                                         % of affected
                                          Ethnic people   House % of ethnic       Land acquired (mu)                    % of income
                                 PAP                                                                    cultivated land
No.     Project description                  affected   relocated peopled in                                            loss of ethnic                 Resettlement Measures
                               (person)                                                                    of ethnic
                                            (person)       (m2)   total people Cultivated Garden Fish                      people
                                                                                 land      plot  pond       peopled
   Solid           waste                                                                                                                 One Hui household will be affected, the village
   management         in         193           6                     3.11%      3.16                        8.45%          0.33%           group adjusts land in a planned way, the
 1 Songming County                                                                                                                         compensation will be equally distributed
                                                                                                                                         The Yi and Miao households will be affected, the
      Solid          waste
                                                                                                                                         village group adjusts land in a planned way, 70%
      management in Luquan       138           36                   26.09%      13.19                      18.80%          8.21%
                                                                                                                                         the compensation will be distributed to the affected
      County
 2                                                                                                                                       people.
                                                                                                                                         One household (having both Han and Yi people)
                                                                                                                                         will be affected, with little ethnic characteristics.
      Solid          waste
                                                                                                                                         Their contracted land will not be affected, but 20mu
      management        in        5            1                    20.00%
                                                                                                                                         reclaimed wasteland will be affected (accounting to
      Xundian County
                                                                                                                                         5.7% the total reclaimed wasteland, thus, the impact
 3                                                                                                                                       is little, cash compensation will be paid.
                                                                                                                                         Mainly of Bai people, impact is in little scale,
                                                                                                                                         compensation will be paid. According to the needs
      Integrated    water
                                                                                                                                         of the PAPs, some reserved collective-owned land
      environmental
                                 419          355                   84.73%      82.5     10      32         2.86%          1.14%         will be allocated to those who want to continue
      management of Dali
                                                                                                                                         farmwork, or the land can be obtaind from those
      River
                                                                                                                                         who do not want continue farmwork by
 4                                                                                                                                       replacement.
                                                                                                                                         All are Bai people, impact is in little scale,
                                                                                                                                         compensation will be paid. According to the needs
      Rural        non-point                                                                                                             of the PAPs, some reserved collective-owned land
      pollution control in       21            21                  100.00%       1.2                        0.47%          0.18%         will be allocated to those who want to continue
      Lake Erhai Basin                                                                                                                   farmwork, or the land can be obtaind from those
                                                                                                                                         who do not want continue farmwork by
 5                                                                                                                                       replacement.
                                                                                                                                         All are Yi people, impact is in little scale,
                                                                                                                                         compensation will be paid. According to the needs
      Solid          waste                                                                                                               of the PAPs, some reserved collective-owned land
      management in Eryuan       83            83                    100%        95                         7.14%          2.83%         will be allocated to those who want to continue
      County                                                                                                                             farmwork, or the land can be obtaind from those
                                                                                                                                         who do not want continue farmwork by
 6                                                                                                                                       replacement.



                                                                                          64
                                                                                                        Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                                             % of affected
                                              Ethnic people   House % of ethnic       Land acquired (mu)                    % of income
                                     PAP                                                                    cultivated land
No.     Project description                      affected   relocated peopled in                                            loss of ethnic                 Resettlement Measures
                                   (person)                                                                    of ethnic
                                                (person)       (m2)   total people Cultivated Garden Fish                      people
                                                                                     land      plot  pond       peopled
                                                                                                                                             Mainly Yi people, compensation will be paid.
                                                                                                                                             According to the needs of the PAPs, some reserved
      Wastewater
                                                                                                                                             collective-owned land will be allocated to those
      management              in     91            38                   41.76%      15.6                        2.62%          2.06%
                                                                                                                                             who want to continue farmwork, or the land can be
      Huaping County
                                                                                                                                             obtaind from those who do not want continue
7                                                                                                                                            farmwork by replacement.
  Lijiang City WWTP                                                                                                                          Mainly Naxi people, land adjusted within village
                                     324          307                   94.75%       88                         5.32%          0.86%
8 and Sewer Network                                                                                                                          group, compensation equally distributed.
  Solid           waste
  management in Lijiang              86            86                    100%        35                        19.23%          3.12%         Mainly Naxi people, land adjusted within village
9 City                                                                                                                                       group, compensation equally distributed.
                                                                                                                                             Among the 62 households (280 persons), fourteen
                                                                                                                                             households (66 persons) should be moved.
                                                                                                                                             Forty-eight households (214 persons) should build
      Wastewater
                                                                                                                                             house at original place. Mainly Naxi people, only
      management in Lijiang          280          236        13235.3    84.62%
                                                                                                                                             affect house (relocation), build new house and the
      Ancient Town
                                                                                                                                             house plot size will be allocated by 1:1.2. THe new
                                                                                                                                             house is to build in original style, the living style
10                                                                                                                                           and income source will not be changed.
      Wastewater
      management         in           8            8                   100.00%       1.4                        0.55%          0.20%         All are Zhuang people,         little impact,   cash
11    Guangnan County                                                                                                                        compensation
      Wastewater
      management in Malipo           128           39                   30.47%       6                          2.87%          1.02%
12    County                                                                                                                                 Few Zhuang People, cash compensation
      WWTP and Sewer
      Network in Qiubei              92            9                     9.78%       2                          4.61%          0.87%         Four Yi people, five Zhuang people, little impact,
13    county                                                                                                                                 cash compensation
      Solid           waste                                                                                                                  Totally 97.5 cultivated land, including reclaimed
      management in Funing           87            87          60        100%       36.2     20                27.22%          8.87%         wasteland 61.3mu, which is not involved in
14    County                                                                                                                                 analysis. All are Zhuang people, cash compensation
                                                                                                                                             Few Zhuang people, cash compensation. According
                                                                                                                                             to the needs of the PAPs, some reserved
   Solid          waste
                                                                                                                                             collective-owned land will be allocated to those
15 management in Malipo              142           14                    9.86%      4.45                       12.75%          4.54%
                                                                                                                                             who want to continue farmwork, or the land can be
   County
                                                                                                                                             obtaind from those who do not want continue
                                                                                                                                             farmwork by replacement.



                                                                                              65
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


6.5    Rebuilding plan for production and living facilities

     The production and living facility affected by the project construction are mainly:
canal, water cellar, detour bridge, culvert and pavement, etc.. Relevant department made
a lot of surveys for project impact on production and living of local people during the
project design stage, soliciting the opinion of different levels of local people's
government, relevant department, social organization and local resident through meetings,
and these opinions are indicated mostly in the project design.
      The temporary facility will be used for water cellars, transformers, pump stations,
culverts, pavement, etc. which will be resumed after the completion of project. The cost
is listed in the total budget of project, so this report does not list it additionally.
6.6    Enterprise relocation plan

      Shizhishan project is concerned with 23 enterprise and institutions(15 enterprises, 8
institutions). In which Shizhishan Shanglu Company is kept in original place just do
“appearance modification” without relocation; For Agricultural Material Company,
Barbers’ Cooperative Union of Gucheng District, Senlong Group, Dayan Real Estate,
Yulong County hospital Outpatient Service, County Materials Company, Trading
Company, Traffic Police Brigade and Meat Processing Mill, they have only some shops
and partial offices in the project area, and their main offices are outside the project area,
therefore, after negotiating with 9 units above, one time cash compensation will be made
without relocation.
     Through the study by the district people's government, the project owner and
affected institutions and enterprises, All units will be paid by cash, for these need to
rebuild will be arranged by the district government at Xianghelicheng (Lijiang Husbandry
Veterinary Station at the east, original Lijiang tile and brick mill). Xianghel icheng has
2900mu construction land with full capacity for relation of affected units.
     Now, the project owner has initial contact with Lijiang Husbandry Veterinary
Station, National Tax Bureau, Broadcasting and Television Bureau by one -time cash
compensation to relocate to Xianghelicheng.
    For other 11 units, it is also by one time cash compensation to move them into
Xianghelicheng.
6.7    Individual business households

     The housing of individual buseness households is of mixing type and the quanlity is
included in the housing area of residents and enterprises. The compensation will be paid
on the replacement price and estimated price according to different property. The project
is concerned with 130 individual buseness households (128 for rental, 2 self-use), and the
relocation plan is informed 3 months in advance to keep their right not be violated. Based
on the “Yunan urban housing relocation management”, it is paid with operation stop loss
fee for 3 months, 200 Yuan/household per month and recloction subsidy 200
Yuan/household. Among 130 individual households, 128 households rent house for
business. By the survey, several business streets in central area of Lijiang city developed
by several real estate companies, such as Qixing pedestrian street, Yumihe shopping
street, Changluohe shopping street and Guodahuama shopping street, the rental cost is


                                             66
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

same as the original place, specially for Guodahuama shopping street has many idle shops,
which can be used firstly for the individual households and the shops in Xiangh elicheng
can also be used; For employed people by the individual households, if the shop is moved,
they can be employed again, and after consulting with Lijiang talent market, when there
is employment change by some units, the proper people can be recruited first.
6.8    Relocation plan for special items, municipal utilities

      The project impacts on 1 pole/km telecommunications cable line (at Luquan),
embedded cable 0.01 km (Songming), broadcasting optical cable 1 pole/km (Luquan),
optical cable of united mobile 3 pole/km (Luquan), mobile cable 1 pole/km (Luquan),
Dali power line 1.79 pole/km, communication line 2.8 pole/km and the partial municipal
facilities. Maguan rubbish disposal and shipping project impacts on 35 kV power line 2.5
pole/km and communicate optical cable 1.45 pole/km.
       The affected telecommunications, mobile, united communication, broadcasting and
television and municipal facility etc.will jointly considered in the project design and be
protected and resumed in the construction.
      For 0.01km embedded telecommunications optical cable in Songming County, it will
avoid the rubish filling area and rebuild it about 0.4km long after negotiating with the
responsible department above; For affected telecommunications, mobile, united
communication, broadcasting and television line in Luquan County, use 3 towers to set
all lines to avoid rubish filling area and link with original line. For 35kV power line and
telecommunications optical cable in Maguan County, local reloation will be adopted to
avoid the rubish filling area and rebuild about3.1 pole/km power line and 2.0 pole/km
telecomminication line. For the recovery of special items, the plan will be worked out by
relative department and responsible for the construction also by them.
6.9    Resettlement implementation management

     The implementation of resettlement shall be led by the project resettlement leading
group. Each county set a project resettlement office formed by relative departments to
work out resettlement policy, transfers relevant department people to set up project
immigrant settle office, work out immigrant to settle policy, responsible for propaganda,
mobilizatio and organization for relocation and resettlement. At the same time, the
resettlement office is main channel to reflect problems in the res ettlement. The
resettlement office shall timely and fully listen to opinion and problem from resettlers,
and report timely to above or responsible department, at the same time feedback in time
the handling opinion to resettlers.




                                            67
                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

       7 Estimation for Compensation of Land Acquisition and Relocation
     The total estimation for resettlement compensation of Yunnan urban environment
construction project is 16470.13 x 10000 Yuan (including tax) , in which : rural
resettlement compensation is 4565.24 x 10000 Yuan, accounting for 32.1% of total;urban
resettlement compensation is 505.76 x 10000 Yuan,accounting for 3.6%;relocation
compensation for enterprise and institutions is 6367.2 x 10000 Yuan,accounting for
44.8%;compensation for special items is 124.66 x 10000 Yuan,accounting for 0.9%,
other cost is 1369.74 x 10000 Yuan,accounting for 9.6%. See Table 7-1 for details of
estimation of resettlement compensation.
                                 Summary of cost estimation for resettlement
Table 7-1
                                                       Amount (x 10000 Yuan)
 No.               Description                                                            Total    Percentage
                                             Kunming      Dali      Lijiang    Wenshan
        Compensation         for     rural
  I      resettlement                        687.17      885.89     1837.65    1154.53   4565.24     32.1%

(I) Land compensation                        597.20      866.34     1218.89    1151.98   3834.41     27.0%

  1     Permanent land use                   597.20    859.51       1094.97    1143.59   3695.27     26.0%


  2     Temporary land use                                6.83    11.72         8.38      26.93      0.2%

  3  Compensation for house plot                                    112.20               112.20      0.8%
      Compensation for housing and
(II) attachments                                          1.00      591.42      2.10     594.52      4.2%
      Compensation                for
(III) infrastructure on host area                                    1.32                 1.32       0.0%

 (IV)    Compensation for relocation                                 26.01                26.01      0.2%

 (V)    Other compensation                    89.97       18.55                 0.46     108.98      0.8%

  1     Scattered trees                       89.85       18.55                 0.21     108.61      0.8%

  2  Tomb                                     0.12                              0.25      0.37       0.0%
     Compensation      for     urban
 II  resettlement                                                   505.76               505.76      1.8%
     House        plot    acquisition
(I) compensation                                                    165.60               165.60      0.6%
     Compensation for housing and
(II) attachments                                                    313.64               313.64      1.1%
      Compensation for infrastructure
(III) in hoist area                                                  3.30                 3.30       0.0%

(IV) Relocation compensation                                         12.82                12.82      0.0%
     Compensation for individual
(V) business households                                              10.40                10.40      0.0%
     Relocation compensation of
 III  enterprises                                                   6367.20              6367.20     44.8%
     Compensation fee for units
(I) signed agreement                                                2312.87              2312.87     16.3%
     Compensation fee for units
(II) un-signed agreement                                            4054.32              4054.32     28.5%
     Compensation for houses and
  1   attachments                                                   3994.32              3994.32     28.1%

  2     Other compensation                                           60.00                60.00      0.4%

  IV    Compensation for special items        23.20       25.64                 75.82    124.66      0.9%
   V    Other costs                           92.06      117.81     1002.03    157.84    1369.74     9.6%


                                                            68
                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                  Amount (x 10000 Yuan)
 No.             Description                                                         Total     Percentage
                                        Kunming      Dali     Lijiang     Wenshan
  VI    Contingency fee                  80.24      102.93    971.26       138.82   1293.26      9.1%
        Static investment ( excluding
        tax)                            882.67      1132.27   10683.9     1527.02   14225.85    100.0%
        Relative tax                   705.20        515.6     564.24     459.24    2244.28
        Static investment ( including
        tax)                          1587.87       1647.87   11248.14    1986.26   16470.13



7.1      Compilation basis

    ⑴ Land Management Law of People’s Republic of China (effected on Jan. 1 st,
1999);
       ⑵ Rules for Farmland Occupation Tax ((87) CNZ-NO.206);
       ⑶ Land Management Rules in Yunan Province;
    ⑷ Woodland Management Method in Yunan Province (Yunnan Provincial People’s
Government, No.43 Decree);
     ⑸ Notice on Adjustment of Compensation of Newly Increase Construction Land by
the Ministry of Finance, Ministry of National Territory Resource, Bank of China (CZ
[ 2006 ] No. 48);
     ⑹ Notice on Provisional Method for Management of Forest Vegetation Resuming
Cost by the Ministry of Finance, National Forestry Bureau (CZ [ 2002 ] No.73);
     ⑺ Notice on Compensation Method for Land Acquisition and Relocation for Coutny
Town Construction in Xundian County by Xundian County People’s Government (XZF
[ 2003 ] No.25);
       ⑻ Inventory index for land acquisition and relocation
7.2      Compensation principle

    The compensation standard is determined with relative legal regulations and actual
condition.
      ⑴ The land compensation, resettlement subsidy and compensation of young crops is
based on the “Land Management Rules in Yunan Province” and corresponding documents
in relative county (city, district);
        ⑵ The compensation cost of special facility is based on “3 original” (original
scale, original standard and original function) principle for estimation;
        ⑶ The compensation for scattered trees is based on corresponding documents in
relative county (city, district) and actual practice.
7.3      Compensation cost

     The compensation estimation includes rural resettlement compensation, special
items compensation, other cost, physical contingency fee and relative tax, in which the
rurabl resettlement compensation includes mainly land acquisition compensation, f ruit
tree cutting compensation, etc. Based on relative resettlement policy and other relative
rules, the cost above is computed as the following:

                                                       69
                                 Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

7.3.1 Rural resettlement compensation

      The rural resettlement compensation is totally 4565.24 x 10000 Yuan,in which land
compensation is 3834.41 x 10000 Yuan,housing compensation is 594.52x 10000 Yuan,
fruit tree cutting and tomb compensation is 108.61 x 10000 Yuan.
7.3.1.1         Land acquisition compensation

        ⑴ Permanent land use compensation
     The permanent land use compensation includes mainly land compensation,
resettlement subsidy, young crops compensation or woods compensation. Based on the
compensation standard of different type of land in Chapter 5,the permanent land use
compensation is 3695.27 x 10000 Yuan.
        ⑵ Temporary land use compensation
    Based on the compensation standard of different type of land in Chapter 5 ,the
temporary land use compensation is 26.93 x 10000 Yuan.
        (3)      Compensation for house plot
     Shizhishan environment treatment project will occupy the rural house plot area of
1.87mu, according to compensation standard of 60000 Yuan/mu for the land used for
construction in Gucheng district, the compensation for rural house plot is 1122000 Yuan.
7.3.1.2         Housing compensation

    Based on the compensation standard in Chapter 5,the housing compensation is
5945200 Yuan.
7.3.1.3         Compensation for resettlers’ relocation

     Compensation for resettlers’ relocation is consisted of transportation fee, subsidy for
working loss and transitional period, fee for loss in house rent, and removing. Based on
                                          the
the compensation standard in Chapter 5, compensation for relocation is 260100 Yuan.
7.3.1.4         Other compensations

        (1) Scattered tree compensation
     Based on the compensation standard in Chapter 5,the scattered compensation
is108.61 x 10000 Yuan.
        (2) Tomb relocation compensation
     This project impacts on 8 tombs, based on the compensation standard in Chapter 5 ,
the tomb relocation compensation is 0.37 x 10000 Yuan.
7.3.2         Urban resettlement compensation
7.3.2.1         House plot compensation

     Shizhishan environment treatment project will occupy the urban house plot area of
2.76 mu, according to compensation standard of 60000 Yuan/mu for the land used for
construction in Gucheng district, the compensation for urban house plot is 1656000
Yuan .


                                                  70
                               Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

7.3.2.2      Housing compensation

    Based on the compensation standard in Chapter 5, the housing compensation is
313.64 x 10000 Yuan.
7.3.2.3      Construction fee of infrastructure in hoist area

     The construction fee of infrastructure in hoist area includes ground leveling,
compensation for water and power supply faccilities, based on the compensation standard
in Chapter 5,the construction fee of infrastructure in hoist area is 3.3 x 10000 Yuan.
7.3.2.4      Relocation compensation

    The relocaton compensation includes transportation fee, and subsidy for work delay.
Based on the compensation standard in Chapter 5,the relocation compensation is 12.82 x
10000 Yuan.
7.3.3      Individual business households relocation compensation

    The individual business households relocation compensation includes relocation
 compensation and business stop loss fee, in which the business stop loss fee is 200 per
 month for 3 months and relocation subsidy is 200 Yuan per household, so the relocation
 compensation is 10.4 x 10000 Yuan, of which the business stop loss fee is 7.8 x 10000
 Yuan, and relocation subsidey is 2.6 x 10000 Yuan.
7.3.4      Enterprise relocation compensation

        By the estimation, the enterprise relocation compensation is 6367.2 x 10000 Yuan.
        Now, the project owner signed the relocation agreement with n contact with
National Tax Bureau, Lijiang Husbandry Veterinary Station, Broadcasting and Television
Bureau, one-time compensation for National Tax Bureau 542.80 x 10000 Yuan;housing
compensation at Xinhua road for Husbandry Veterinary Station 15.97x 10000 Yuan,
housing compensation at Mimzhu road will be paid by one time compensation after
negotiation with this unit, and Gucheng management company ltd will give new house
plot with ratio of 1:1.2;The housing and equipment compensation for Broadcasting and
Television Bureau is 1502 x 10000 Yuan, the project owner will offer 6mu land in
Xianghe Resident Zone based on the municipal plan. As a whole, the compensation for
three units is 2312.87 x 10000 Yuan. (By the estimation, the compensation for new house
plot is 252.1 x 10000 Yuan) .
    One-time compensation for other units is 4283.32 x 10000 Yuan, in which the
housing compensation is 3994.32 x 10000 Yuan, and relocation compensation is 60 x
10000 Yuan.
7.3.5 Special items compensation

    Based on the plan of special item of each county, the spcial items compensation is
 124.66 x 10000 Yuan.




                                                 71
                                Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

7.3.6 Other cost

      Other cost includes construction unit management fee, implementation fee, technical
training fee, supervision fee, monitoring assessment fee, plan and design fee and design
document reviewing fee, etc.
        ⑴ Construction unit management fee
    It is used mainly for all management cost during the implementation, computed by
0.5% in Clause 7.3.1~7.3.5,totally 57.82 x 10000 Yuan;
        ⑵ Implementation fee
    It is used mainly for all costs during the implementation, computed by 0.3% in
Clause 7.3.1~7.3.5,totally 346.89 x 10000 Yuan;
        ⑶ Technical training fee
    It is used mainly for all costs for technical training and skill training, computed by
0.5% in Clause 7.3.1~7.3.3,totally 25.36 x 10000 Yuan;
        ⑷ Supervision fee
     It is used mainly for progress, quality and fund control of supervision unit, computed
by 1.0% in Clause 7.3.1~7.3.5,totally 115.63 x 10000 Yuan;
        ⑸ Monitoring assessment fee
     It is used mainly for monitoring and assessment for external supervision unit,
Kunming, Dili and Wenshan computed by 1.5% in Clause 7.3.1~7.3.5,Lijiang computed
by 1.0% in Clause 7.3.1~7.3.5, totally 129.89 x 10000 Yuan.
        ⑹ Plan and design fee
    The plan and design fee is mainly used for the design, survey and acting plan
compilation by the design unit, survey unit and local government, computed by 2.5% in
Clause 7.3.1~7.3.5, totally 289.08 x 10000 Yuan;
     ⑺ Design document reviewing fee
     It is used mainly for design result consulting or reviewing of consulting unit and
responsible department, computed by 0.3% in Clause 7.3.1~7.3.5, totally 34.69 x 10000
Yuan.
        ⑻ Relocation management fee
    It is computed by 2.8% of land acquisition fee for the management of land
management sector.
        ⑼ Vulnerable group support fee
     It is computed by 1% in Clause 7.3.1~7.3.2 for support of vulnerable group during
the resettlement.
7.3.7      Physical contingency fee

     The physical contingency fee is computed by 10% in Clause 7.3.1~7.3.6 for all
contingency accidents.




                                                72
                           Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

7.3.8 Relative tax

    ⑴ Farmland occupation tax
    Based on the rules of “Provisional regulation on farmland occupation tax of People’s
Republic of China” and “Notice on specific policy of farmland occupation tax”, the
farmland occupation tax in Yunnan province is 4 Yuan/m 2,it is totally 250.74 x 10000
Yuan.
    ⑵ Farmland reclamation fee
     Based on the rules of “Yunnan province land management regulations”, the land
reclamation fee for farmland and garden field is 3-8 times of annual output for previous 3
years, this project takes lower limit of 3 times, by Kunming National Land Bureau
estimation, the annual output of paddy field for previous 3 years is 2400 Yuan/mu ,dry
field 2100 Yuan/mu,i.e. the reclamation fee for paddy field is 7200 Yuan/mu and the
reclamation fee for dry field is 6300 Yuan/mu. By the estimation, Kunming city needs to
pay reclamation fee 199.40 x 10000 Yuan.
      Based on estimation of Chapter 5, the annual output of paddy field for previous 3
years in Dali city is 2156 Yuan/mu,dry field 1478 Yuan/mu; the annual output of paddy
field for previous 3 years in Eryuan County is 2164 Yuan/mu,dry field 1327 Yuan/mu;
i.e. the reclamation fee for paddy field in Dali city is 6468 Yuan/mu and the reclamation
fee for dry field is 4434 Yuan/mu; the reclamation fee for paddy field in Eryuan County
is 6492 Yuan/mu and the reclamation fee for dry field is 3981 Yuan/mu. By the
estimation, Dali prefecture needs to pay reclamation fee 98.83 x 10000 Yuan.
     Based on estimation in this stage, the annual output of farmland for previous 3 years
in Lijiang city (county, district) is: paddy field in Huaping County is 2196 Yuan/mu;
paddy field in Gucheng district 2164 Yuan/mu. Its reclamation fee is: paddy field in
Huaping County 6588 Yuan/mu; paddy field in Gucheng district 6492 Yuan/mu. By the
estimation, Lijiang city needs to pay reclamation fee 94.08 x 10000 Yuan.
    Based on the estimation of Wenshan State Land Management Bureau, the annual
output of farmland for previous 3 years is 1354 Yuan/mu, the reclamation fee is 4062
Yuan/mu. By the estimation, Wenshan prefecture needs to pay reclamation fee 95.99 x
10000 Yuan.
    ⑶ Forest vegetation resuming fee
      Based on the relative rules of file CZ[2002] No.73 from the Ministry of Finance and
State Forest Bureau, the forest vegetation resuming fee for this project is 4000 Yuan/mu,
totally 188.08 x 10000 Yuan.
    ⑷ Land use fee for increase of construction land
     Based on relative rules of “Notice on Adjustment of Compensation of Newly
Increase Construction Land” by the Ministry of Finance, Ministry of National Territory
Resource, Bank of China (CZ[2006] No.48), it needs to pay for transferring agricultural
land and unused land into construction land. The levy standard in each county is: Luquan
County, Songming County, Xundian County, Grade-XIV, 14 Yuan/m 2; Dali city,
Grade-XII (20 Yuan/m 2); Eryuan County, Grade-XIV (14 Yuan/m 2); Gucheng district,
Grade-XIII, 16 Yuan/m 2; Huaping County and Ninglang County, Grade-XV, 10 Yuan/m 2;


                                            73
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

7 counties in Wenshan prefecture except Wenshan County, Grade-XV, 10 Yuan/m 2;
Wenshan County, Grade-XIV, 14 Yuan/m 2. By the estimation, it will be totally 13.1717
mil. Yuan.
7.4     Fund allocation
7.4.1    Fund source and allocation principle

     ⑴ All costs for land acquisition and relocation is covered by the total budget of
project, the land acquisition and relocaton compensation as well as other costs will be
paid to relative unit and person by county(district) project office(county(district) p roject
resettlement office, land management department);
    ⑵ The house compensation cost will be paid by stages to resetterls before their
house construction;
     ⑶ The land and other facility compensation cost shall be paid one month before
levying;
      ⑷ In order to guarantee the smooth implementation of RAP, the resettlement
department at different level shall set financial and supervisor organization to guarantee
all capitals to be paid on time.
7.4.2    Financial responsible department

     ⑴ The financial responsible department for land acquisition compensation is
prefecture(city) project office, each sub-project owner, county(district) project
office(county(district) resettlement office), land management department, townshp and
town, and village;
     ⑵ The financial responsible department for housing relocation compensation is
prefecture(city) project office, each sub-project owner, county(district) resettlement
office;
     ⑶ The fund allocation is from upper to lower level, each level shall conduct strictly
the financial settlement and audit system, inspect and report regularly the capital use
condition, take remedy measure for unexpected condition to guarantee the capital use
under the schedule.
7.4.3 Cash flow

     ⑴ Based on the compensation policy and compensation standard in the RAP, each
sub-project owner shall sign a general agreement for land acquisition and relocation
compensation with relative county(district) land department or each county(district)
resettlement office, and the county(district) land department shall sign “Land acquisition
and relocation compensation agreement” with each township and town(in Dali prefecture,
each sub-project owner will sign sign “Land acquisition and relocation compensation
agreement” with relative township and town).
    ⑵ The county(district) land department, county(district) resettlement office, or
township(town) shall sign “Land acquisition compensation agreement” with villagers
commission.




                                             74
                           Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

    ⑶ The county(district) land department, county(district) resettlement office, o r
township(town) shall sign “House relocation compensation agreement” with resettlement
household.
     ⑷ Each sub-project owner will pay the compensation through bank to
county(district) resettlement office or township(town) based on the content, quantity and
time specified in the agreement, and them the county(district) resettlement office or
township(town) will pay the housing relocation compensation by stage to resettlers and
land compensation to the villagers commission.




                                           75
                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                     8 Resettlement Implementation Plan
8.1     Implementation program

      A. Land acquisition and compensation
     The land acquisition and compensation will be performed by relative department and
the specific process is as follows:
      a. The design unit will offer detail land acquisition scope drawing, which will be
verified jointly by the prefecture(city) WB project office, the project owner, different
levels government and the land management department to finalize the scope and quantity
for land acquisition and relocation;
    b. Each project owner makes application for land acquisition to relevant land
management department;
      c. Approval of land acquisition application;
     d. Each project owner negotiates land acquisition compensation, sign compensation
agreement and go through land use procedures to relevant land management department;
      e. City, county land management bureau go to relevant township(town) to finalize
the land acquisition scope and quantity;
     f. City, county land management bureau signs the “land acquisition agreement” with
relevant township(town);
      g. Pay compensation;
      h. Handling legal procedure;
      i. Taking-over acquisitioned land.
      Additionally, use of land compensation fee (compensation and resettlement subsidy):
for the village by cash compensation, the resettlement subsidy will distributed d irectly to
each household impacted by land acquisition, if partial land compensation is distributed
to household, it shall be pass by villager conference, the rest shall be used for collective
production and infrastructure construction in village. For the village with land-adjusting
mode, the land compensation and resettlement subsidy shall be kept in the village,
managed and controlled legally. Usually, except the land development and infrastructure
construction in village, the land compensation fee is mainly for collective welfare
construction that the most villages can enjoy it. If some villagers need a loan to open
small enterprise(shop) from land compensation fee, it shall be approved through
villager’s representative meeting, otherwise the villagers must ask for loan from local
bank.
      B. Production recovery
   The production arrangement and recovery shall be carried out by the villager
commission and the working program is as follows:
     a. Convoke villagers representative meeting in the village with resettlement task to
study and prepare the overall scheme for land adjustment, compensation distribution and
production recovery;



                                             76
                               Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

     b. Announce the land adjustment and distribution scheme to solicit the opinion of all
villagers;
      c. Adjust and distribute land;
      d. Farming
      C. Housing relocation and rebuilding
      The housing relocation and rebuilding procedure is as follows:
      a. The project design unit supplys the scope and quantity for house relocation;
   b. Each sub-project owner will verify the house number and quality jointly with different
levels government, the land management department and affected unit (person);
     c. Each sub-project owner will negotiate the relocation compensation, sign the
compensation agreement and handle land use procedures with land management
department; each level land management department will discuss the compensation
standard for housing and attachment, and sign house relocation compensation agreement
with relative township(town) and villages;
     d. City, county(district), township(town) will sign house relocation compensation
agreement with relative villages;
     e. Township(town) working group opens house number, compensation standard and
relocation time of each household and consults their opinions;
     f. Township(town) working group, village will sign house relocation agreement with
resettlement household;
      g. Township(town) and village will offer house plot;
      h. Get compensation fee;
      i. Start of house building;
      j. Demolish old house.
      D. Special item rebuilding
      a. The project design unit will offer the impact scope of special items;
     b. Each project office and responsible department will survey the quantity and class
of special items impacted;
    c. Each project office will entrust each responsible department of special items to
prepare rebuilding plan;
     d. Each project office will consult with each responsible department of special items
and sign “Special items rebuilding compensation agreement”;
      e. Each responsible department will start the the construction of special items;
      f. Put into operation of each special item.
8.2     Progress plan

     The progress of land acquisition and relocation will follow the progress of project
construction and specific plan shall follow the principles below:




                                               77
                           Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

     ⑴ The relocation of housing and attachment will be completed by stages, but it shall
be ended before the start of project construction at this area;
    ⑵ The notice for house relocation shall be informed by at least 2 month in advance;
     ⑶ The land acquisition shall be ended before the start of construction for that
section;
    ⑷ The land adjustment and distribution shall be completed as far as possible
between crops season gaps;
    ⑸ Labor force arrangement shall be completed before the land acquisition;
     ⑹ The rebuilding of special items shall be ended before start of construction of each
project.
     Based on overall progress planned, the land acquisition and relocatiom schedule is
decided, see Appendix 6.




                                            78
                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                             9 Institutional Organization
9.1     Establishing of Organizations

     In order to ensure smooth construction of Yunnan Urban Environment Project, the
necessary resettlement organizations are established by the People’s Government at
different level and Sub-Project Construction Unit, which will plan, coordinate and
monitor the resettlement activities. The following institutions are set up for resettlement
of the Project:
     (1) Leading Group of WB-Loaned Yunnan Urban Environmental Construction
Project
      (2) Project Office
      (3) Prefecture (City) Project Leading Group
      (4) Prefecture (City) Project Office
      (5) Owners of each Sub-Project
      (6) County (City or district) Project Leading Group
      (7) County (City or district) Project Office
      (8) Town (ship) Working Group
      (9) Village committee and villagers’ group
      (10)   External Independent Monitoring and Evaluation Organization
9.2     Responsibilities of Organization

     In order to ensure successful resettlement, the Project Resettlement Leading Group
was composed of the responsible leaders from Yunnan Province Environment Bureau,
Province Development and Reforming Committee, Province Finance Office, and
Province Construction Office. Its main responsibility is to strengthen the leadership of the
project, take charge of resettlement policy-making and coordination among all
resettlement organizations at different levels. The office in charge of daily routine is set
in the office under Yunnan Province Environment Protection Bureau.
     The sub-project leading groups, set at each prefecture(city) People’s Government,
are consisting of the leaders from prefecture(city) People’s Government, Environment
Protection Bureau, Develop and Reform Committee, Finance Bureau, Construction
Bureau, State Land Resource Bureau, Forest Bureau, Water Conservancy Bureau, Urban
Management Bureau, and Plan Bureau. Their responsibilities are to organize the project
construction, decide the general layout of project, and coordinate and set down the
relevant major issues. The Office in charge of daily routine (under leading group) is set in
the office of Prefecture Environment Protection Bureau and has responsible for the
integrated management for the project, organization and coordination, external liaison,
monitoring and checking.
    The Owners of sub-project have responsibilities of the resettlement capital
preparation and allotment, and participate each resettlement activity.
     The Leading Group of different counties and districts, headed by the responsible
leaders of the relevant counties and districts, is composed of the leaders from County

                                              79
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

State Land Bureau, Plan Bureau, Environment Protection Bureau, Finance Bureau, Urban
Construction Bureau, Development and Reforming Bureau, and effected Town(ship)
People’s Government. The main responsibilities for the Leading Group is to strengthen
the leadership over the resettlement processes carried out under their jurisdiction,
coordinate the resettlement work among different government departments concerned and
relationship between the state, the collective and individual so as to ensure smooth
construction of main works, land acquisition and resettlement. The Office under the
Leading Group, composed of specially assigned cadres from departments of environment
protection, state land resource and urban construction, is set to carry out the
implementation, management of resettlement cost, supervise the capital allotment and
usage, go through the relevant procedure for the land acquisition and relocation, train
staff from town(ship)s and village resettlement group, and guide and supervise the
resettlement work in town (ship)s and villages.
     Town (ship) working group, led by responsible leaders of the town(ship)s, is
composed of the cadres from land administration and environment protection section as
well as main cadres of effected villages. The main responsibility covers: implementation,
inspection, monitoring and recording all resettlement activities in the town(ship)s. The
working group is composed of cadres from village committee and villagers’ group, and
participates in and implements each resettlement activity.
     The independent external monitoring and evaluation for this project is carried out by
independent external monitoring and evaluation organization chosen by Province Project
Office. The independent external monitoring and evaluation organization will, through
the Project Office, offer technology help, carry out the survey on resettlement and the
living level of affected persons according to stipulations, and implement all monitoring
and evaluation work.
9.3    Staffing

     In order to ensure the execution of resettlement as well as the project constru ction to
be carried out smoothly, the province project owner, prefecture(city) project owner, each
sub-project owner, people’s governments at different level, relative departments and
effected county (city or district) people’s governments invests a large quantity of capital,
sets up the resettlement organizations and assigned a number of staff (totaling 241
persons). The staff of PRO in each county and their names are shown in each prefecture
(city) report for details.




                                             80
                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                             10 Public Participation and Appeal
10.1    Public Participation

     According to resettlement policies and regulations of state, province and each city
and the construction and reforming characteristics of project, the relevant policies and
detailed enforcement is established and efforts are made for well preparation of
resettlement plan, implementation and organization work so as to meet the goal of
resettling properly for keeping the legal rights and interests of removed units and
resettlers and decreasing the unsatisfactory and dispute. During the preparation of
resettlement policies and RAP as well as implementation, the project resettlement office
widely solicited the opinions from resettlers and paid a great attention on the public
participation in the resettlement and consultation.
      During compiling RAP, each sub-project responsible department and enforcement
organization as well as design department, through various channel, adopted different
form to announce the project resettlement policies. From Dec. 2006 to Jan. 2007,
totaling 58 working meetings were held in Kunming city, Dali region, Lijiang City,
Wenshan Prefecture, effected counties (city or district) and town(ship)s and villages,
participated with over 680 persons. The major subject of meetings is on the implementing
the land acquisition and resettlement plan, propagating the resettlement policies,
soliciting the opinion from local masses and resettlers on the project construction and
preliminary resettlement scheme, see Appendix 7 for details.
     To issue relevant land acquisition and relocation announcement through local
newspaper or broadcasting television before enforcement of resettlement; Put up bulletin
to propagate resettlement policy, compensation standard and complaint channel in the
scope of towns and villages affected using easy language that easily understood by
resettlers according to local resident national composition condition; The resettlement
action plan report is put in local library or the project office for the resettlers to read. The
schedule for public project information is shown in Table 10-1.
                                  Schedule for Public Project Information
Table 10-1
                                                                                               Public data
                          Sub-project                        Public way Language
                                                                                         RAP         Bulletin

     Supervisory control and management system of water
pollutant aggregate in Dianchi lake basin

    Solid waste management project in Songming County   Kunming
    Solid waste management project in Luquan Yi and Miao daily Chinese             Aug.31, 2007    Aug.31, 2007
Autonomous County
                                                         News
    Solid waste management project in Xundian Hui and Yi
Autonomous County

     Integrated water environmental management of main
riverways to the Erhai Lake (including integrated water Dali daily
                                                                   Chinese
environment management of Yong’an, Miju, Luoshi, Boluo rivers                      Sep. 3, 2007    Sep. 3, 2007
and Shiba Creek in Changshan Mountain)                        News




                                                        81
                                      Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                                         Public data
                              Sub-project                             Public way Language
                                                                                                   RAP         Bulletin

     Rural non-point pollution control project in the Erhai river
basin in Eryuan County

     Integral urban network project of Dali City (including Fengyi,
the Ancient town, Xizhou and tourism and vacation districts)

    Wastewater treatment plant and sewer network project in
Dengchuan Town of Eryuan County

    Solid waste management project of Eryuan County

     Wastewater treatment plant and associated pipe network
project in Huaping County

    No. 2 Urban Wastewater Treatment Plant and associated
sewer network project in the Ancient town zone, Lijiang

    Urban drainage pipe network project of Yulong County              Lijian daily Chinese
                                                                                             Sep. 12, 2007   Sep. 12, 2007
                                                                         News
     Solid waste management project in the ancient town zone,
Lijiang

     Environmental improvement project of Shizi Mountain in the
ancient town

     Integrated water environmental management of Puting river
basin in Funing County

    Integrated water environmental management of Puzhehei
Lake in Qiubei County

     Integrated Improvement project of Panlong River (the urban
section in Wenshan County)

    Wastewater treatment plant and sewer main project of
Guangnan County

    Wastewater treatment plant and associated sewer main project
of Malipo County

     Wastewater treatment plant and associated sewer network
                                                              Wenshan             Chinese
project of Qiubei County                                                                     Aug. 29, 2007 Aug. 29, 2007
                                                             daily News
     Qiubei water supply project

     Urban drainage pipe network project of Wenshan County
    Urban drainage pipe network project of Yanshan County

    Solid waste management project of Funing County

    Solid waste management project of Maguan County

    Solid waste management project of Malipo County

    Environmental management and monitoring system of
Wenshan Prefecture

10.2     Responding to Grievance and Appeal

    In the process of preparing and implementing the Resettlement Action Plan, it is
always to encourage the public participation, but there will still be some problems
occurring. In order to solve problems effectively and ensure the project construction and

                                                             82
                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

land acquisition to be carried out successfully, except the existing appeal ways set in the
local governments at all levels, a transparent and effective appeal way has been set up as
follows:
     Stage 1:
     If the resettlers are not satisfied for the resettlement plan, they can appeal to the
village committee and the local town resettlement working group in oral or in written
form. If the appeal in oral form, the village will make decision and record in written.
Village committee or town resettlement working group will resol ve the reasonable
requirement and suggestion in two weeks.
     Stage 2:
     If the resettlers are dissatisfied for the decision of stage 1, they can appeal to the
county (city or district) leading group office after receiving the decision; the county (city
or district) leading group office will make decision within two weeks.
     Stage 3:
     If the resettlers are dissatisfied for the decision of stage 2, they can appeal to
(prefecture or city) project leading group office after receiving the decision; the
(prefecture or city) WB loaded project leading group office will make decision within two
weeks.
     Stage 4:
     If the resettlers are still dissatisfied for the decision of the prefecture or city project
office, they can appeal to a people’s court according to the civil procedu ral law after
receiving the decision of the office.
      The resettlers can appeal on any respect of the resettlement, including compensation
criteria, etc.
     The resettlers will know their right of lodging appeal during participation in the
public meetings and by other ways. At the same time, the appeal processes will be
publicized among the PAPs through media. The relative authorities will sort out the
opinions and proposals of the PAPs and the resettlement offices at all levels will process
the information in a timely and effective manner.
     The organizations accept the appeals and grievance of the PAPs free of charge, and
the project leading group office will pay the expenses incurred from project contingency
fund.
                        List of Contactors and Their Telephone Numbers
Table 10-2
                                                        Province, city and county
                        Item                                                          Connector        Tel.
                                                              project office
                                                         Province project office      Guo Ping     0871-4166316
                                                         Kunming Project office        Xi Ying     0871-4100022
    Solid waste management project in Luquan Yi and          Luquan Yi and Miao
                                                                                    Duan Xingcong 0871-8918766
Miao Autonomous County                                       Autonomous County
    Solid waste management project in Songming County         Songming County         Shen Ping    0871-7911933
     Solid waste management project in Xundian Hui           Xundian Hui and Yi
                                                                                    Lu Jianchang   0871-2662295
and Yi Autonomous County                                     Autonomous County



                                                        83
                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                    Province, city and county
                              Item                                                                    Connector        Tel.
                                                                          project office
                                                                   Dali prefecture project office    Zhao Jidong   0872-2316712
    Integrated water environmental management of
Boluo river                                                                  Dali city                Bi Fajiang   0872-2124408

    Integrated water environmental management of Shiba
Creek in Changshan Mountain                                                  Dali city                Bi Fajiang   0872-2124408

    Integrated water environmental management of
Yong’an river                                                             Eryuan county               Ji Kaifeng   0872-5122204

        Integrated water environmental management of Miju
river                                                                     Eryuan county               Ji Kaifeng   0872-5122204

    Integrated water environmental management of
                                                                          Eryuan county               Ji Kaifeng   0872-5122204
Luoshi river
     Rural non-point pollution control project in the Erhai                  Dali city                 Yang Ya     0872-2136800
river basin                                                               Eryuan county               Ji Kaifeng   0872-5122204
        Integral urban network project of Dali City                          Dali city               Yang Meng     0872-2184909
     Wastewater treatment plant and sewage pipe network
                                                                          Eryuan county               Ji Kaifeng   0872-5122204
project in Dengchuan Town of Eryuan County
                                                                    Lijiang city project office        Li Yan      0888-5158967
    Wastewater treatment plant and associated sewer                                                     Ran
network project in Huaping County                                        Huaping County                            0888-6124982
                                                                                                     Guangxiang
    No. 2 Wastewater treatment Plant and associated
sewer network project in the ancient town zone, Lijiang                 Ancient town zone             He Genli     0888-5176506

    Urban drainage pipe network project of Yulong
County                                                                    Yulong County             Yang Yuequan   0888-5179202

        Solid waste management project in Lijiang                       Ancient town zone             He Liwei     0888-5181624
   Environmental improvement             project      of   Shizi
Mountain in the ancient town zone                                       Ancient town zone            Dong Ying     0888-5101010

                                                                   Wenshan prefecture project
                                                                                                      Chen Wen     08762191967
                                                                            office
       Environmental management and system of
                                                                         Wenshan county             Wang Dexing    08762188217
Wenshan Prefecture
       Urban drainage pipe network project of Yanshan
                                                                         Yanshan County              He Maohuai    08763122650
County
       Wastewater treatment plant and associated sewer
network project of Qiubei County
                                                                          Qiubei County             Zhou Weihua    08765159959
          Qiubei water supply project
       Wastewater treatment plant and sewer main project
                                                                        Guangnan County             Huang Jianping 08765159959
of Guangnan County
       Wastewater solid waste disposal project of Funing                                                Wei
                                                                          Funing County                            08766123566
County                                                                                               Zhongming
       Wastewater treatment plant and sewer main project
of Malipo County                                                          Malipo County               Li Jinlong   08766629691
          Solid waste management project of Malipo County
                                                                                                        Sun
        Solid waste management project of Maguan County                  Maguan County                             08767126968
                                                                                                     Zhongxiang




                                                                   84
                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                          11 Monitoring and Evaluation
     In order to guarantee that the RAP can be smoothly implemented and the
resettlement target suitably realized, the follow-on fact finding and monitoring will be
carried out in the land acquisition and relocation as well as resettlement active according
to World Bank Operation Policy OP 4.12 (Involuntary Resettlement) and requirements of
"Monitoring and Evaluation Operation Guidance of World Bank’s Loaned China Project".
Monitoring on the resettlement will be divided into two parts, i.e., internal monitoring (by
the resettlement offices) and the external independent monitoring, which starts in June
2007 and ends in Dec. 2010. According to each sub-project construction and resettlement
progress, the internal monitoring and the external monitoring report shall be submitted to
WB for each half-year or one year regularly.
     It is Yunnan Province WB-loaned Environmental Protection Project Office to take
the overall responsibility for the internal monitoring, and is each prefecture project
leading group and office, prefecture land administration department as well as house
relocation management office to carry out coordination so as to ensure the enforcement
unit to carry out the land acquisition and resettlement according to principles and time
schedule in RAP. The purpose of internal monitoring is that the resettlement organization
will play a good function during implementation.
      The external independent monitoring and evaluation means that the independent
monitoring organization carries out the regular independent monitoring and evaluation on
the land acquisition and resettlement activities. The contents of external independent
monitoring cover: the function of resettlement network; implementing progress of land
acquisition and resettlement as well as compensation; resettlement and restoration of
relocated households and shops as well as enterprises; and the analysis of resettlers’
production and living level. It is the unit independent from the project resettlement
organization to carry out the independent monitoring and overall evaluation on the land
acquisition, relocation and resettlement by a long-term viewpoint, and evaluate whether
the resettlement follows the relevant laws of state on land acquisition and resettlement
and accords with Operation Policy of World Bank OP 4.12 (Involuntary Resettlement) ,
and whether the production and living level is raised or restored at the original level at
least. The monitoring organization shall propose suggestion to relevant unit for problem
discovered in monitoring so as to solute problems appeared in implementing in time.
     See Table 11-1 Schedule of Monitoring and Evaluation and Report Submitted




                                            85
                                                                                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                               Schedule of Monitoring and Evaluation and Report Submitted
Table 11-1
                                                                                            Internal monitoring                         External monitoring
                                                                 City or
  No.                       Sub-project
                                                                 county                                                                 Monitoring report     Post evaluation
                                                                                  Year                  Report submitted     Year
                                                                                                                                           submitted              report
            Enhancement of water quality monitoring             Kunming
  1
        capacity in Dianchi Lake basin                            city
            Solid waste management project in Luquan Yi         Luquan
  2     and Miao Autonomous County                                          Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
                                                                County
            Solid waste management project in Songming         Songming
  3     County                                                              Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
                                                                County
             Solid waste management project in Xundian Hui      Xundian
  4     and Yi Autonomous County                                            Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
                                                                County
             Integrated water environmental management of
        main riverways      to the Erhai Lake (including       Eryuan
  5     Integrated water environmental management of           County,      2008~Dec.2010          End of each half year   2008~2010   End of each year
        Yong’an, Miju, Luoshi, Boluo rivers and Shiba Creek    Dali city
        in Changshan Mountain)

            Rural non-point pollution control project in the     Eryuan
  6     Erhai river basin in Eryuan County                                  2008~Dec.2010          End of each half year   2008~2010   End of each year
                                                                 County
             Integral urban network project of Dali City
  7     (including Fengyi, the ancient town zone, Xizhou and    Dali city   2008~Dec.2010          End of each half year   2008~2010   End of each year
        tourism and vacation districts )

            Wastewater treatment plant and associated sewer      Eryuan
  8     network project in Dengchuan Town of Eryuan County                  2008~Dec.2010          End of each half year   2008~2010   End of each year
                                                                 County
            Solid waste management project of Eryuan             Eryuan
  9     County                                                              2008~Dec.2010          End of each half year   2008~2010   End of each year
                                                                 County
             Wastewater treatment plant and sewer main          Huaping
  10    project in Huaping County                                           Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
                                                                County
            No. 2 wastewater treatment plant and associated     Ancient
  11                                                                        Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
        sewer network project in the ancient town zone,        town zone



                                                                                      86
                                                                                                Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                                                         Internal monitoring                         External monitoring
                                                              City or
No.                       Sub-project
                                                              county                                                                 Monitoring report          Post evaluation
                                                                               Year                  Report submitted     Year
                                                                                                                                            submitted               report
      Lijiang

          Urban drainage pipe network project of Yulong       Yulong
12    County                                                  County
            Solid waste management project in the ancitent    Ancient
13    city zone, Lijiang                                                 Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
                                                             town zone
                                                                                                                                    Each       half     year
                                                                                                                                    during
         Environmental improvement project of Shizi           Ancient                                                               implementation and
14    Mountain in the ancient town                                       Aug.2007~Dec.2010      End of each half year   2008~2010
                                                             town zone                                                              end of each year
                                                                                                                                    after             project
                                                                                                                                    completed
           Integrated water environmental management of       Funing
15    Puting river basin in Funing County                                2008~Dec.2010          End of each half year   2008~2010   End of each year
                                                              County
          Integrated water environmental management of        Qiubei
16    Puzhehei Lake in Qiubei County                                     Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
                                                              County
          Integrated water environmental management of       Wenshan
17    Panlong River (the urban section in Wenshan County)                2008~Dec.2010          End of each half year   2008~2010   End of each year
                                                             County
           Wastewater treatment plant and sewer main         Guangnan
18    project of Guangnan County                                         Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
                                                              County
           Wastewater treatment plant and sewer main          Malipo
19    project of Malipo County                                           Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
                                                              County
          Wastewater treatment plant and associated sewer     Qiubei
20    network project of Qiubei County                                   Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
                                                              County

           Qiubei water supply project                        Qiubei
21                                                                       Aug.2007~Dec.2010      End of each half year   2008~2010   End of each year
                                                              County




                                                                                   87
                                                                                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                                                     Internal monitoring                         External monitoring
                                                          City or
No.                    Sub-project
                                                          county                                                                 Monitoring report     Post evaluation
                                                                            Year                 Report submitted     Year
                                                                                                                                    submitted              report
          Urban drainage system project of Wenshan       Wenshan
22                                                                    Aug.2007~Dec.2010     End of each half year   2008~2010   End of each year
      County                                             County
          Urban drainage system project of Yanshan       Yanshan
23    County                                                          Aug.2007~Dec.2010     End of each half year   2008~2010   End of each year
                                                         County
          Solid waste management project of Funing        Funing
24    County                                                          Aug.2007~Dec.2010     End of each half year   2008~2010   End of each year
                                                          County
          Solid waste management project of Maguan        Maguan
25    County                                                          Aug.2007~Dec.2010     End of each half year   2008~2010   End of each year
                                                          County
          Solid waste management project of Malipo        Malipo
26    County                                                          Aug.2007~Dec.2010     End of each half year   2008~2010   End of each year
                                                          County
           Environmental management   and   monitoring   Wenshan
27    system in Wenshan Prefecture                       Prefecture




                                                                                88
                                                                                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)



                                                                          12 Entitlement Matrix
     The entitlement of effected units and persons is shown in Table 12-1.
                                            Entitlement Matrix for Yunnan Province Urban Environment Project
Table 12-1
                                                                                                                                          Compensation Standards
 Impac    Entitled   Number     of   entitled                                                                      County with
                                                                     Resettlement Policy
   ts     Persons    units and persons                                                                               project                                Rate
                                                                                                                     located
 Land     Owner                                 1.The project construction will involve the land acquisition.      Xundian       Reclaimed wasteland 2000 Yuan/mu, unused land 200
 acquis                                         The land compensation and resettlement subsidy will be paid        county        Yuan/mu, young crops 483 yuan/mu
 ition                                          to the villagers’ groups involved in the land acquisition, and
 land                                           compensation for young crops and ground attachment will be         Songming
                                                                                                                                 Paddy field:20600Yuan/mu,Dry land:12400 Yuan/mu
                                                paid to households involved in the land acquisition. In the        county
                                                cast of that if villagers’ group has the land adjustment or land   Luquan
                                                                                                                                 Cultivated land:33000 Yuan/mu
                                                development and the effected household is allotted with land       county
                     1870 persons of 442        or other production information again, the land compensation                     Paddy field: 46526 Yuan/mu,dry land 29858 Yuan/mu,
                     households,   in  33       and resettlement subsidy will be managed and used by the           Eryuan        garden plot: 21000Yuan/mu,pool: 28132 Yuan/mu,fish
                     village groups of 20       collective. Otherwise, if villagers’ group has no land             county        pond: 23600 Yuan/mu, forest land
                                                                                                                                                       and         (sparse forest land):
                     villages                   adjustment or land development and the effected household is                     4900Yuan/mu
                                                not allotted with land or other production information, the
                                                                                                                                                           dry
                                                                                                                                 Paddy field: 46276Yuan/mu, land; 27404 Yuan/mu, and
                                                resettlement subsidy will be paid to effected households, but      Dali city
                                                                                                                                 fish pond: 28028Yuan/mu
                                                the land compensation will be managed by village collectives
                                                and allotted or used through villagers’ representative                           Paddy field : 88450 Yuan/mu (urban garbage disposal
                                                meeting.                                                           Ancient       project),paddy field:41200Yuan/mu(No. 2 wastewater
                                                2. The compensation for the land acquisition in project            town zone     treatment plant) Timber 4998 Yuan/mu;and construction
                                                construction and resettlement subsidy is mainly used for the                     used land: 45000Yuan/mu
                                                restoration of resettlers’ production and living level, such as    Huaping
                                                                                                                                 Paddy field:27450Yuan/mu
                                                the construction of farmland water conservancy facility,           County
                                                reforming of rural basic facility and adjustment of                Malipo        Paddy field:38300 Yuan/mu,dry land:15300Yuan/mu,
                                                agricultural structure.                                            County        and forest land:8820Yuan/mu。
                                                3. According to actual condition at each county and the            Funing        Paddy field:48600Yuan/mu,garden plot:49500Yuan/mu,
                                                cultivated land output value and output times as well as           County        and forest land:7457Yuan/mu。
                                                different comprehensive price in each county, the                  Guangnan
                                                compensation standard for each county is shown in right side       County        Paddy field:26176 Yuan/mu。
                                                of this table.
                                                                                                                   Yanshan
                                                                                                                                 Dry land:34916 Yuan/mu
                                                                                                                   County



                                                                                             89
                                                                                                               Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                                                                                      Compensation Standards
Impac     Entitled    Number       of    entitled                                                                        County with
                                                                          Resettlement Policy
  ts      Persons     units and persons                                                                                     project                                       Rate
                                                                                                                            located
                                                                                                                         Qiubei           Paddy field:                                dry
                                                                                                                                                      19120 Yuan/mu and 12880 Yuan/mu, land:
                                                                                                                         County           10380 Yuan/mu,and natural pool: 1000 Yuan/mu.
Temp      Contracti   263 households with           The compensation for temporary used land includes the       Dili city                 Paddy field: 5156Yuan/mu,and Dry land: 4278 Yuan/mu
orary     ng          971 person from 6             compensation for young crops, land loss and land reclaiming.Ancient
used      househol    villages                      The time of temporary used land is 1 year. The construction                           Paddy field:5364Yuan/mu
                                                                                                                town zone
land      ds                                        unit shall take the responsibility or entrust the related unit for
                                                                                                                Funing
                                                    the land reclaiming.                                                                  1860 Yuan/mu
                                                                                                                County
                                                                                                                Qiubei
                                                                                                                                          1200 Yuan/mu
                                                                                                                County
Fruit     Owner       5 villages                    The tree owners will get compensation or transplanted cost Songming
                                                                                                                                          1440 Yuan/mu
trees                                                                                                          county
                                                    for all fruit trees fell or transplanted for the project                              Fruit tress: 30 Yuan/ea. for tree below 3cm and 120
                                                                                                                Xundian
                                                    construction.                                               county                    Yuan/ea. for tree of 10cm; and timber: 5 Yuan/ea. for tree
                                                                                                                                          below 3cm.
                                                                                                                                          5 Yuan/ea. for seeding, 30 Yuan/ea. for tree with fruits, and
                                                                                                                         Luquan
                                                                                                                                          100 Yuan/ea. for tree with full fruits.
                                                                                                                                          75 Yuan/ea. for tree with fruits, and 10 Yuan/ea. for fruit
                                                                                                                         Eryuan
                                                                                                                                          tree without fruits
                                                                                                                         Masupo
                                                                                                                                             35 Yuan/ea.
                                                                                                                         county

                      The collective house
                                                    The compensation will be paid according to replacement                                                                 Compensation standard
                      of 100m2 in Dali city is
                                                    price for all houses and auxiliary facility,             without
                      effected by the pipe                                                                                         Item                  Unit
                                                                                                                                                                   Dali           Lijiang city
Loss of                                             depreciation, the usable material dismantled from old houses                                                            We
          House       network construction;                                                                                                                        pref           Including Replac
relocat                                                                                                                                                                     nsh
          Owner                                     belongs to resettling households. The new house plot will be                                                   ectu           house plot   ement
ed                    the collective                                                                                                                                        an
          of units,                                                                                                                                                 re               price      price
houses                                              allotted for resettlers and resettlement subsidy will be paid to
          collectiv   management house 60
and                                                                                                                                       Frame
          es and                                    relocation persons. The compensate standard is shown in                                             Yuan/m2                      1120      626.98
other                 m2 in Funing county;62
          individu                                                                                                                        structure
attach-                                             right of the table:
          als         households with 280                                                                                                 Brick-co
ments                                                                                                                                                   Yuan/m2                      988       494.71
                      persons and 23                                                                                       House            ncrete
                                                                                                                                          Brick-wo
                      enterprisers are                                                                                                                  Yuan/m2             350      861        367.9
                                                                                                                                              od
                      effected, and relocation                                                                                            Earth-wo
                                                                                                                                                        Yuan/m2                      770       276.81
                                                                                                                                              od


                                                                                                   90
                                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                                                                       Compensation Standards
Impac     Entitled   Number     of   entitled                                                                   County with
                                                                     Resettlement Policy
  ts      Persons    units and persons                                                                            project                                 Rate
                                                                                                                  located
                     area is of 64084.81 m2                                                                                   Simple     Yuan/m2    100
          All
        involved                                The relocated private-owned business households will be
Or loss persons:                                priority in renting shop in commercial street such as
in
busines Employer                                Guodahuama street, etc.. The compensation for stopping
s       and                                     business and transportation subsidy will be paid.
          employee

Living    Housing                               Three months before land acquisition and relocation, the
conditi   leaser
on                                              Project Owner shall inform the housing leaser in the effected
                                                                                                                Ancient town zone
                                                area about the land acquisition and relocation plan so that
                                                housing leasers will have enough time to rent other housing.
Speci     Owner      Units of                   All special facilities affect by project will be moved and
al                   telecommunications,
                                                reconstructed according to the actual condition and its
facilit              Chinaunicom, China
y                    Mobile, and broadcast      original function will be restored. The Project Office will
                     and television, etc.
                                                consult with special facility Management Department on
                                                compensation cost according to investment of recovery plan.


Produ     Owner                                 The production and living facility affected by construction
ction     of
          facility                              unit during construction should be maintained or restored so
and
living                                          as to guarantee the normal usage of the facility during
facilit
y                                               construction.




                                                                                            91
                                                                                                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


Appendix 1:General Description of The Project

                                                               Yunnan Urban Environment Project (Kunming City)
Table 1
 No                 Locatio                                                                                                                                                       Remarks
          Project                        Project description                                           Project impact                             Project owner      Schedule
  .                   n
                              ① river monitoring system to Dianchi                                                                                                                Kunming
                              Lake: 3 automatic monitoring stations
                                                                            Land acquisition of 50m2 respectively for 3 automatic monitoring                                       RAP
                              for the key inflowing rivers, 14 water                                                                              Kunming
      Enhanc                                                                stations for key inflowing rivers, total land acquisition of 0.65
                              quality    monitoring     stations   for                                                                            Environmental
      ement                                                                 mu for 14 river water monitoring stations (in which, land
                              inflowing rivers, 2 mobile monitoring                                                                               Monitoring
      of water                                                              acquisition of 20m2 respectively for 11 stations), which is used                        Jan. 2007
                    Kunmin    stations, 2 mobile sampling vehicles                                                                                Center/Kunmin
  1   quality                                                               without payment, and there is no relocation.
                     g City   and a set of experimental equipment;                                                                                g                 ~Dec. 2009
      monitor
                                                                                                                                                  Environmental
      ing
                              ② Supervisory control and management                                                                                Information
      capacity
                              information system for water pollution                                                                              Center
                                                                              No land acquisition (rebuilding of existing buildings)
                              aggregate and supervisory control
                              center
                                                                               Land acquisition totals 125.2mu, including:
                                                                               106.5mu in reservoir area, in which 31.8mu is farmland and
                    Luquan       Solid waste plant and supporting
      Solid                   facilities and the county solid waste         74.7mu is woodland;                                                   Luquan Waste
                    Yi and
      waste                                                                    9mu farmland is requisitioned for access road;                     Disposal and      Jul. 2007 ~
                     Miao     management system;
  2   manage                                                                   3m farmland for management zone;                                   Transportation
                    Autono       Solid waste disposal is 90t/d in scale                                                                                             Dec. 2008
      ment in                                                                  6mu land for the environmental hygiene center, which is the        Management
                     mous     and total landfill site capacity is 895000
      Luquan                                                                state reserved construction land; 0.7mu for transfer station, which   Company
                    County    m3
                                                                            is state-owned construction land and used without payment.
                                                                            Relocation is not involved.
                                                                               Land acquisition totals 122.35mu for the project, in which:
                                                                               Land acquisition in reservoir area is 105mu, including 97.2 mu
      Solid
                                 Sanitary landfill, auxiliary facilities,   farmland and 7.8mu woodland;
      waste
                               solid waste management system and               6mu farmland is requisitioned for access road; 4.5m farmland
      manage        Songmi                                                                                                                        Songming          Jan. 2008
                               the existing refuse dumps;                   for management zone; 6 mu state-owned reserve construction
  3   ment in         ng                                                                                                                          Garbage
                                 Mean disposal scale is 85t/d,and the       land for the environmental health center; 0.7mu state-owned                             ~Aug. 2009
      Songmi        County                                                                                                                        Disposal Center
                              total storage capacity of landfill is         reserve construction land for the transfer station.
      ng
      County                  427200m3                                         3 refuse houses occupy 0.15mu land, which is the state-owned
                                                                            construction land and used without charge.
                                                                               Housing relocation isn’t involved.




                                                                                                 92
                                                                                                 Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

No             Locatio                                                                                                                                             Remarks
     Project                       Project description                                      Project impact                          Project owner      Schedule
 .               n
     Urban                                                            Land acquisition totals 183mu, including 158mu in reservoir   Refuse
     solid     Xundian                                             area for sanitary landfill, 19.5mu for roads, 2.5m for the       Clearing     &
                            Sanitary landfill, garbage transfer
     waste     Hui and                                             management zone, the above land is all of wasteland; and 3m      Transport and
                         station, other public services and the                                                                                       Oct. 2007
     manage      Yi                                                state-owned reserve construction land for 2 transfer stations.   Disposal Center
4                        existing refuse dumps;
     ment In   Autono                                                 Relocation is not involved.                                   of Xundian Hui    ~Mar. 2009
                            Mean disposal scale is 70t/d and the
     Xundia     mous                                                                                                                and         Yi
                         total landfill capacity is 550000m3
     n         County                                                                                                               Autonomous
     County                                                                                                                         County




                                                                                      93
                                                                                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                Yunnan Urban Environment Project (Dali Prefecture)
Table 2
                                                                                     Project covering
                                                                                                                                                                      Proj   Sc
                      Loc                                                                area (mu)        Land
                                                                                                                                                                       ect   he
 No.       Project    atio                    Project description                               Collec   acquis                    Effect analysis                                  Remark
                                                                                    State-ow                                                                          own    dul
                       n                                                                         tive     ition
                                                                                    ned land                                                                           er    e
                                                                                                 land     (mu)
                                                                                                                  It is to renovate the ground runoff drainage
                                                                                                                  system on the waste mountains and waste
                                                                                                                  mountain slopes, using water conservance land,
                                     Comp                                                                         meanwhile, build the anti-erosion protection
                                                             inception ditches,
                                     rehen                                                                        works for the river channel, build the valley
                                                Mountain     vertical grooves,
                                     sive                                                                         protection to incept the rolling rocks and mud.
                Int                             slop         protection       for                                                                                                  According
                                     treat                                                                        The land property and ownership won’t change
          Int   egr                             protection   groove top end,
                                     ment                                                                         so that it has no unfavorable effect on the                       to
          egr   ate                                          valley protection
                                     of                                                                           production and living of involved village
          ate    d                                                                                                                                                                  primary
                                     ecolo                                                                        groups and villagers. Their income will be
          d     wa
                                     gical                                                                        increased after reconstruction as that the                        evaluatio
          wat   ter
                                     envir                                                                        farmland quality will be improved.
          er     en          Treat                                                                                                                                                  m report
                                     onme                                                                         It is to restore vegitation on the waste Wat
          env   vir          ment                                                                                                                                            Jan
                                     nt of                                                                        mountains and waste mountain slopes, the           er             for
          iro    on            of                                                                                                                                             .
                                     such                    Protection forest                                    works is arranged on the gullies and use Reso
          nm    me    Dal    water                                                             8513.1                                                                        20     feasibilit
                                     small                   on mountain slope,                                   conservation land for the work. The land urce
          ent   nta    i      and               Eco-treat                                                                                                                    08
  I                                  river                   tree and grass                                       property and ownership won’t change so that it      s             y study,
          al      l   Cit     soil              ment                                                                                                                         ~D
                                     basins                  protection in river                                  has no unfavorable effect on the production and Bure
          ma    ma     y     loss                                                                                                                                            ec.    it is
                                     as                      valley                                               living of periphery village groups and villagers. au of
          nag    na                                                                                                                                                          20
                                     Baita                                                                        The vegetation coverage will be increased and Dali                covered
          em     ge                                                                                                                                                          10
                                     qing,                                                                        the quality will be improved.                     City
          ent   me                                                                                                                                                                  in Dali
                                     Fengl
          of     nt
                                     eqing                                                                        It is to treat the land in waste mountains and                    RAP.
          Dal    of
                                     and                                                                          slopes to reduce the risk of water and soil loss.
          i     Bo
                                     Jingc      Agro_tech                                                         The land property and ownership won’t change
          Riv   luo
          er     Ri
                                     hangq      nical        Contour croping                                      so that it has no unfavorable effect on the
                                     ing.       measures                                                          production and living of involved village groups
                ver
                                                                                                                  and villagers. It will be favorable for water and
                                                                                                                  soil conservation.

                                     Gravel protection       Laying gravel on
                                                                                    154.35                        The works is all in the existing Boluojiang
                                      for 10.5 km long       the riverbed to




                                                                                              94
                                                                                                    Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                Project covering
                                                                                                                                                                 Proj   Sc
                Loc                                                                 area (mu)        Land
                                                                                                                                                                  ect   he
No.   Project   atio                   Project description                                 Collec   acquis                   Effect analysis                                  Remark
                                                                               State-ow                                                                          own    dul
                 n                                                                          tive     ition
                                                                               ned land                                                                           er    e
                                                                                            land     (mu)
                                river channel           increase         the
                                                        hydropilicity of the                                   river channel. The exiting water conservation
                                                        river                                                land will be used. The land property and
                                                                                                             ownership won’t change so that it has no
                                                                                                             unfavorable effect on the production and living
                                                                                                             of involved village groups and villagers.

                                                                                                             The works are arranged in existing Boluojiang
                               Eco-oriented banks
                                                        Restore         the                                  river channel and river banks, using the existing
                               (at the downstream
                                                        collapsed     river                                  water conservancy land. The land property and
                               collapsed        river                          45.42
                                                        sectios in existing                                  ownership won’t change so that it has no
                               section (totally 10.5
                                                        river channel                                        unfavorable effect on the production and living
                               km long)
                                                                                                             of involved village groups and villagers.
                               Eco-oriented                                                                  The works is to plant trees on the existing river
                                                        Green belt built on
                               riverbank works,                                                              bank. it has no unfavorable effect on the
                                                        bothbanks of the       94.5
                               (10km long in                                                                 production and living of involved village
                                                        river
                               total)                                                                        groups and villagers.
                       Envir
                       onme
                               Schemes of environmental management,
                       ntal                                                    All are managerial measures, without concerning land acquisition and
                               water quality monitoring and ecological
                       mana                                                    resettlement.
                               observation
                       geme
                       nt




                                                                                         95
                                                                                                          Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 2 (Continued)
                                                                       Project covering
                Loc                                                          area (mu)          Land                                                                                Sch
No                                                                                                                                                                      Projec
      Project   atio                 Project description              State-o                  acquisit                        Effect analysis                            t         edul    Rema
 .                                                                                 Collecti                                                                             owner
                 n                                                    wned                         ion                                                                              e       rk
                                                                                   ve land
                                                                      land                         (mu)
                                                    Inception
                                                                                                          It is to renovate the ground runoff drainage system on the                        Acco
                                                    ditches,protect
                                                                                                          waste mountains and waste mountain slopes, using the
                                                    ion works for                                                                                                                            rdin
                              Eco                                                                         water conservation land to build the anti-erosion
                                                    vertical
                              -en                                                                         protection works for the river channel, build the valley                           g to
                                       Mountain     grooves,
                              vir                                                                         protection to incept the rolling rocks and mud. The land
                                       slope        protection                                                                                                                               prim
                              on                                                                          property and ownership won’t change so that it has no
                                       protection   works        at
                              me                                                                          unfavorable effect on the production and living of                                 ary
                                                    groove upper
                              ntal                                                                        involved village groups and villagers. Their income will
                                                    ends, valley                                                                                                                             eval
                       Wa     rest                                                                        be increased after reconstruction as that the farmland
                                                    protection
                        ter   orat                                                                        quality will be improved.                                                          uati
                                                    works
                        an    ion
                                                                                                          It is to restore vegitation on the waste mountains and        Water                om
                        d     wor                   Protection
                                                                                                          waste mountain slopes, the works is arranged on the
                        so    ks                    forest       on                                                                                                     Resou                in
                                                                                                          gullies and use the waste mountains and slopes and water                   Jan.
                        il    for      Eco-treat    mountain
                                                                                                          conservation land for the work. The land property and         rces         200     feasi
                        co    Wa       ment         slopes,
                                                                                                          ownership won’t change so that it has no unfavorable                        8
 1                      ns    nhu      mesures      protection                    5079.9                                                                                Burea                bilit
                                                                                                          effect on the production and living of periphery village                  ~Dec.
                        er    axi,                  trees / grass
                                                                                                          groups and villagers. The vegetation coverage will be         u      of            y
                        va    Bai                   along the river                                                                                                                  2010
                                                                                                          increased and the quality will be improved.
                        tio   hex                                                                                                                                       Dali                 stud
                        n     i
                                                                                                                                                                        City                 y, it
                        w     and
                        or    Zh                                                                                                                                                             is
                                                                                                          It is to rectify the lands in waste mountains and slopes to
                        ks    ong
                                       Agro-tec                                                           reduce the risk of water and soil loss. The land property                          cove
                              hex                   Contour                                               and ownership won’t change so that it has no unfavorable
                              i        hnical                                                                                                                                                red
                                                    croping                                               effect on the production and living of periphery village
                              sm       treatmen                                                           groups and villagers, but it is good for water and soil                            in
                              all      t                                                                  conservance.
                              bas                                                                                                                                                            Dali
                              ins
                                                                                                                                                                                             RAP
                                                                                                                                                                                             .




                                                                                              96
                                                                                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                               Project covering
               Loc                                                   area (mu)          Land                                                                              Sch
No                                                                                                                                                               Projec
     Project   atio          Project description              State-o                  acquisit                         Effect analysis                            t      edul   Rema
.                                                                          Collecti                                                                              owner
                n                                             wned                         ion                                                                            e      rk
                                                                           ve land
                                                              land                         (mu)
                                            Inception
                                                                                                  It is to renovate the ground runoff drainage system on the
                                            ditches,protect
                                                                                                  waste mountains and waste mountain slopes, using water
                      Riv                   ion works for
                                                                                                  conservance land build the anti-erosion protection works
                      ers                   vertical
                                                                                                  for the river channel, build the valley protection to incept
                      hor      Mountain     grooves,
                                                                                                  the rolling rocks and mud. The land property and
                      e        slope        protection
                                                                                                  ownership won’t change so that it has no unfavorable
                      of       protection   works        at
                                                                                                  effect on the production and living of involved village
                      Xia                   groove upper
                                                                                                  groups and villagers. Their income will be increased after
                      oga                   ends, valley
                                                                                                  reconstruction as that the farmland quality will be
                      n                     protection
                                                                                                  improved.
                      rive                  works                         908.4
                      r,                                                                          It is to restore vegitation on the waste mountains and
                                            Protection
                      and                                                                         waste mountain slopes, the works is arranged on the
                                            forest       on
                        ,                                                                         gullies and use the waste mountains and slopes and water
                               Eco-treat    mountain
                      Ma                                                                          conservation land for the work. The land property and
                               ment         slopes,
                      ngy                                                                         ownership won’t change so that it has no unfavorable
                               mesures      protection
                      ong                                                                         effect on the production and living of periphery village
                                            trees / grass
                      rive                                                                        groups and villagers. The vegetation coverage will be
                                            along the river
                      r                                                                           increased and the quality will be improved.
                                            Contour                                               It is mainly to reform the wasteland in mountains and st
                               Agro-tech
                                                                                                  has no unfavorable effect on the production and living of
                               nical        croping                                               effected village groups and villagers And good for water
                               treatment
                                                                                                  and soil conservation




                                                                                      97
                                                                                                          Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 2 (Continued)
                                                                                           Project covering
                        Loc                                                                   area (mu)          Land                                                       Sc     Remark
No                                                                                                                                                                Project
         Project        atio                     Project description                      State-                acquisi              Effect analysis                        hed
 .                                                                                                 Collective                                                     owner
                         n                                                                owned                   tion                                                      ule
                                                                                                      land
                                                                                           land                  (mu)
                                                                                                                          The works is all in the existing
                                                                       Laying gravel                                        Shibaxi river channel. The exiting
                                        Layin      Gravel              on           the                                     water conservation land will be
                                        g          protection for      riverbed      to                                     used. The land property and
                                                                                          256.59
                                        gravel     31550m long         increase the                                         ownership won’t change so that it
                                        works      river channel       hydropilicity                                        has no unfavorable effect on the
                                                                       of the river                                         production and living of involved
                                                                                                                            village groups and villagers.
     Integ
             Integrat          River               Eco-oriented                                                           The works is all in the existing
     rated                                                             Rehabilitation
             ed water          water    Eco-o      river      bank                                                        Shibaxi river channel and river                   Jan.
     wate                                                              will be made                                                                               Water
             environ           enviro   riente     protection                                                             banks.      The     exiting     water
     r                                                                 for         the                                                                                      200
             mental            nment    d          (at          the                                                       conservation land will be used. The     Resour
     envir                                                             existing
             manage            treatm   river      downstream                             169.64                          land property and ownership won’t                  8~ It is covered
     onm                                                               damaged and                                                                                 ces
             ment of    Dali   ent      bank       collapsed river                                                        change so that it has no unfavorable
     ental                                                             collapsed                                                                                            Dec     in Dali
 1           Shiba      City   works    protec     section (totally                                                       effect on the production and living     Bureau
     mana                                                              dikes        of
             Creek in                   tion       23600mm                                                                of involved village groups and                      .      RAP
     geme                                                              Shiba Creek.                                                                               of Dali
             Changs                                long))                                                                 villagers.
     nt of                                                                                                                                                                  201
             han                        Eco-o                                                                             The works is to plant trees on the       City
     Dali
             Mountai                    riente                         Green belts                                        existing river banks of Shibaxi                     0
     Rive                                          Eco-oriented
             n                          d                              arranged on                                        River. It has no unfavorable effect
     r                                             river bank,                            365.21
                                        river                          the two rivr                                       on the production and living of
                                                   81157m long
                                        bank                           banks                                              periphery village groups, villagers
                                        works                                                                             and recreation center.
                               Enviro
                               nment
                                        Schemes of environmental management                All are of managerial measures, not concerning land acquisition and
                                 al
                                        and environmental monitoring                                                  resettlement.
                               manag
                               ement




                                                                                             98
                                                                                              Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                               Project covering
                   Loc                                                            area (mu)         Land                                                         Sc    Remark
No                                                                                                                                                     Project
     Project       atio                   Project description                 State-                acquisi              Effect analysis                         hed
.                                                                                      Collective                                                      owner
                    n                                                         owned                  tion                                                        ule
                                                                                         land
                                                                              land                   (mu)
                                                                                                              For main drain, it is mainly to
                          Waste               Rectangular main drain with a
        Integrat           water
                                    Recons
                                              dimension of 700×700, about
                                                                                                              reconstruct the existing soil drain on
        ed water   Eryu             tructio                                                                   both sides of National Highway 214.
                          treatm              600m long, arranged on both
        environ    an               n, and                                                                    Hardening reconstruction will be
                            ent               sides of National Highway
         mental    Cou              dredgi                                                                    conducted for sub-drains by making
                          schem               214; the sub-drain from the
        manage     nty               ng of                                               0.87                 use of existing residential drain and
                           e for              households with a size of
          ment     and                the                                                                     channels. The land property and
                          Xiasha              400×400 is about 400m long,
           of      Dali             existin                                                                   ownership will not change so that it
                           nkou               arranged     between      the
        Yong’a     City
                          Distric
                                       g
                                              households far away from
                                                                                                              has no unfavorable effect on the
        n River                     drains                                                                    production and living of periphery
                             t                wetland and main drain.
                                                                                                              village groups and villagers.




                                                                                 99
                                                                                                      Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 2 (Continued)
                                                                                      Project covering area
                          Loc                                                                 (mu)             Land                                                       Sc
 No                                                                                                                                                             Project          Remark
           Project        atio                  Project description                   State-o                 acquisi              Effect analysis                        hed
  .                                                                                              Collective                                                     owner
                           n                                                           wned                     tion                                                      ule
                                                                                                    land       (mu)
                                                                                       land
                                                                                                                        It is planned to be on the idle land
                                           Interga                                                                      (belonging to house plots) within
                                 Waste     ted                                                                          villagers’ yards in Xiashankou
                                 water     purific                                                                      Village. The land property and
                                                      Intergated purification slots             1.3
                                 treatm    ation                                                                        ownership will not change and it
                                                      (totally 14 sets)
                                 ent       slot                                                                         will be used by the villagers so that
                                                                                                                                                                Enviro
      Integr                     schem     works                                                                        it has no unfavorable effect on the
                                                                                                                                                                nmenta
       ated    Integrat          e for                                                                                  production and living of households.
                                                                                                                                                                l
      water    ed water   Eryu   Xiasha               Wetland area: 10050m2
                                                                                                                        It is necessary to requisition 21mu     Protect
      enviro   environ    an     nkou      Artifici   Management house area:                                                                                              Jan.
                                                                                                                                                                ion
      nment     mental    Cou                                                                                           farmland of Meihe Village in                      2008
                                 Distric   al         40m2                                                                                                      Bureau
  1     al     manage     nty                                                                                 21        Youshuo Town. 64 persons from 12                   ~
                                 t         wetlan     Plant disposal zone: 280m2                                                                                of
      mana       ment     and                                                                                           households will be involved in land               Dec.
                                           d          Road and reserved land:                                                                                   Eryuan
      geme        of      Dali                                                                                          acquisition and resettlement.                     2008
                                                      3490m2                                                                                                    County
       nt of   Yong’a     City
                                                                                                                                                                and
       Dali    n River                                Constructing natural bank
                                                                                                                        It is arranged at river bed and dike    Dali
      River                                           revetment of primary form,
                                                                                                                        land for water conservancy. The         City
                                  dike      Dike      arranged from the new
                                                                                                                        land property and ownership won’t
                                 constru   constru    Dengbei     Highway      on
                                                      Yong’an River to 1950m          3                                 change so that it has no unfavorable
                                  ction     ction
                                                                                                                        effect on the production and living
                                 project   project    downstream
                                                                                                                        of periphery village groups and
                                                      -Planting grass above the
                                                                                                                        villagers.
                                                      mean water level




                                                                                          100
                                                                                                      Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 2 (Continued)
                                                                                            Project covering
                                                                                                               Land
                                                                                               area (mu)
                            Locatio                                                                            acqui                                  Project   Schedu
  No.        Project                                Project description                     State-o Colle                    Effect analysis                               Remark
                              n                                                                                sition                                 owner     le
                                                                                             wned      ctive
                                                                                                               (mu)
                                                                                             land      land
                                                                   Natural-type bank
                                                                   revetment
                                                                   (arranged        from
                                                                   Qingsuo         check                                It is arranged at river bed
                                                                                                                        and dike land for water
                                                                   gate to 380m
                                                                                                                        conservancy. The land
                                                                   downstream         the
                                                                                                                        property and ownership
                                      Schemes                      river       )       -
                   Integr                                                                     3                         won’t change so that it
                                      for river                    cement-rubble
                   ated                                                                                                 has no unfavorable effect     Environ
                                      environme                    foundation will be
        Integrat   water              ntal                         built on both sides
                                                                                                                        on the production and         mental
        ed water   enviro                                                                                               living of periphery village   Protecti
                            Eryuan    protection                   of riverbed and
        environ    nment                           Dike                                                                 groups and villagers.         on
                            County    and                          grass      will     be                                                                      Jan. 2008
   1     mental    al                              construction                                                                                       Bureau
                            and       dredging                     planted above the                                                                            ~ Dec.
        manage     mana                            project                                                                                            of
                            Dali      and sludge                   flood level                                                                                   2008
        ment of    geme                                                                                                                               Eryuan
                            City      resources                    1000m       artificial
          Dali     nt of                                                                                                                              County
                                      and dike                     and natural shore                                    It is arranged at river bed
         River     Yong’              constructi
                                                                                                                                                      and Dali
                                                                   protection of many                                   and dike land for water       City
                   an                 on project                   kinds      (arranged                                 conservancy. The land
                   River
                                                                   1000m upstream                                       property and ownership
                                                                   Jiangwei Bridge in         6                         won’t change so that it
                                                                   Dali       Highway)                                  has no unfavorable effect
                                                                   -cement-rubble                                       on the production and
                                                                   foundation         and                               living of periphery village
                                                                   revetment will be                                    groups and villagers.
                                                                   built in riverbed.




                                                                                            101
                                                                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                              Project covering
                                                                                                  Land
                                                                                 area (mu)
                Locatio                                                                           acqui                                    Project   Schedu
No.   Project                           Project description                   State-o Colle                       Effect analysis                             Remark
                  n                                                                               sition                                   owner     le
                                                                               wned      ctive
                                                                                                  (mu)
                                                                               land      land


                                                                                                             It is arranged at river bed
                                                        The section from                                     and dike land for water
                                                        Dali Highway to                                      conservancy. The land
                                                        the estuary will                                     property and ownership
                                                                               13.5
                                                        not be cleaned up                                    won’t change so that it
                                                        but the 1.5km long                                   has no unfavorable effect
                                                        dike     will   be                                   on the production and
                                                        heightened.                                          living of periphery village
                                                                                                             groups and villagers.




                            Water
                          environme    Environmental management scheme
                                                                              All are providing management measures, and no land
                              ntal     and water quality monitoring
                                                                              acquisition and resettlemtn is required.
                          manageme     scheme, etc.
                          nt scheme




                            Meihe      Build steel-casing solar-heated
                           Village     methane tanks. The size is 200m3,
                          concentrat   with daily manure treatment
                                                                                                                                                              In Policy
                              ed       capacity of 3.46 tons, daily methane   Location is not decided yet.
                                                                                                                                                              Framworks
                           methane     production of 100m3, liquid organic
                             tank      fertilizer 10 tons and fine organic
                            works      fertilizer 0.2 tons




                                                                              102
                                                                                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                 Project covering
                                                                                                     Land
                                                                                    area (mu)
                Locatio                                                                              acqui                       Project   Schedu
No.   Project                             Project description                    State-o Colle                 Effect analysis                      Remark
                  n                                                                                  sition                      owner     le
                                                                                  wned      ctive
                                                                                                     (mu)
                                                                                  land      land

                                        Intensed
                          Purificatio
                                        treatment for
                           n system
                                        man-made          Works covers the
                              for
                                        wetland and       three       linked
                            polluted
                                        purification      watlands        at
                          river water                                            Location is not decided yet
                                        for               Dongdeng,
                             from
                                        less-poluted      Geguanying and
                            Donghu
                                        water     from    Liuguanying
                             Lake
                                        natural
                            wetland
                                        wetland




                          Eco-restor
                                        Restore the plants at lakeside,
                              ation
                                        improve the eco-environment at
                           works at
                                        lakeside, strengthen the eco-system
                           lakeside                                              Location is not decided yet
                                        at the place where the river enters
                          where the
                                        the lake, diversify the plant species,
                          river enter
                                        to provide a good environment.
                            the lake




                                                                                 103
                                                                                                    Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 2 (Continued)
                                                                                                  Project covering
                                                                                                     area (mu)       Land
                                                                                                                                                               Project   Schedu
         Project                                     Project description                                   Collec    acquis        Effect analysis                                Remark
                                                                                                  State-                                                       owner     le
                                                                                                             tive    ition
                                                                                                  owned
                                                                                                            land     (mu)
                                                                    Revetment with
                                                       Revetmen     cement-rubble (15.253km
                                                       t project    on one side), and it needs
                                                                                                                              The project is planned
                                                                    to occupy land of 46mu.
                             River                                                                                            to       arrange      within
                                                                    There are 76 places where
                             ecolo                                                                                            riverway and dikes on
                                                                    the levee toe is suspended
 No                   Loca   gical                     Levee toe                                                              Miju      River,     all    is
                                                                    in the upper and middle
  .                   tion   restor   Ecological       repair                                                                 riverway land for water
                                                                    reaches (0+000~14+600).
                             ation    dike             project                                                                conservancy. The land
                                                                    It needs to occupy land of
                             and      construction                                                510                         property and ownership
                                                                    13mu.
                             conse    project on                                                                              won’t change and it has
                                                                    The whole river sections,
                             rvatio   Miju River       Dredging                                                               no unfavorable effect
                                                                    it needs to occupy about
                             n                         project                                                                on the production and
                                                                    400mu land.
                             proje                                                                                            living     of      periphery
                                                                    Mainly distributed 6.8km
                             ct                                                                                               village      groups        and
                                                       Dike         upstream the Qingsuo
                                                                                                                              villagers.
                                                       extension    flood-diversion sluice, and
                                                       project      it is necessary to occupy
                                                                    about 51mu land




                                                                                         104
                                                                                                        Yunnan Urban Environment ProjectResettlement Action Plan (RAP)



Table 2 (Continued)
                                                                                                Project covering
                                                                                                   area (mu)        Land                                              Projec   Sch
                    Loca                                                                                                                                                              Rema
No.    Project                                     Project description                                    Collec   acquis              Effect analysis                  t      edul
                    tion                                                                        State-                                                                                rk
                                                                                                           tive     ition                                             owner    e
                                                                                                owned
                                                                                                           land     (mu)
                                                                                                                            It is arranged on Xizha riverway,
                                                                                                                            and all is river land for water
                                                       Flood        Check gate from Miju
                                        Flood                                                                               conservancy. The land property and
                                                     diversion      River to Xizha River                           ,
                                       control                                                  33                          ownership won’t change and it will
                                                     works on       (with a treatment length
                                       project                                                                              have no unfavorable effect on
                                                    Xizha River     of 5.543km)
      Int    Int                                                                                                            production and living of periphery
      egr    egr                                                                                                            groups and villagers.
      ate    ate                                                    Rehabilitation of dike                                  It is to green the dyke at two sides of
                                      Environ
       d      d                                     Ecological      vegetation(replanting                                   the river and it will have no
                                       mental
      wat    wat                                   rehabilitation   drought-enduring trees      50                          unfavorable effect on production
                                      protectio
       er     er                                      project       on dike of the whole                                    and living of periphery groups and
                            River     n project
      env    env                                                    river section)                                          villagers.
                           ecologi
      iro    iro    Eryu                                            Arrangement of sand                                                                               Enviro
                              cal                       Basis
       n      n      an                                             beaches along lakeside,                                                                           nment
                           rehabili                  restoration
      me     me     Cou                                             with a total land                                                                                 al
 1                          tation                     project
      ntal   ntal   n ty                                            occupation of 262mu                                                                               Protec   Jan.
                             and
      ma     ma     and                                             Ecological rehabilitation                                                                         tion     200
                            conser                                                                                          The project is planned and arranged
      nag    nag    Dali              Ecologic      Ecological      at the estuary along                                                                              Burea    8 ~
                            vation                                                                                          on the sand beaches of the Erhai
      em     em     City                   al      rehabilitation   lakeside of Miju River                                                                            u of     Dec
                           project                                                                                          Lake around the exit of Miju River,
      ent    ent                      rehabilita      project       with a total land                                                                                 Eryua    .
       of     of                                                                                                            and all is flood land. The land           n        200
                                       tion and                     occupation of 5.34mu
      Dal    Mij                                                                                271.8                       property and ownership won’t              Count    9
                                      protectio      Trash rack     Setting up trash rack at
        i     u                                                                                                             change, and it will have no               y and
                                      n project     construction    the estuary of Miju
      Riv    Riv                                                                                                            unfavorable effect on production          Dali
                                         of the       project       River
       er     er                                                                                                            and living of periphery groups and        City
                                        estuary                     Arranging ecological                                    villagers.
                                                     Ecological     stops on the sand
                                                       stop         beaches to the north of
                                                    construction    entrance of Miju River,
                                                      project       with land occupation of
                                                                    4.46mu




                                                                                            105
                                                                                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                           Project covering
                                                                                              area (mu)        Land                                         Projec   Sch
                Loca                                                                                                                                                        Rema
No.   Project                                Project description                                     Collec   acquis             Effect analysis              t      edul
                tion                                                                       State-                                                                           rk
                                                                                                      tive     ition                                        owner    e
                                                                                           owned
                                                                                                      land     (mu)
                                   Water                                                                               All project-used land is     flood
                                             Pollution
                        Water     source                      The desilting basin is 5                                 land in southeast part of Zibihu
                                             control
                        source   conservat                    mu and compound                                          Reservoir. The land property and
                                             project     of
                       conserv      ion                       intensified disposal         180                         ownership won’t change and it will
                                             water of Mici
                         ation    project                     zone of hydrobios is                                     have no unfavorable effect on
                                             River into the
                       project    of Zibi                     175mu                                                    production and living of periphery
                                             lake
                                   Lake                                                                                groups and villagers.




                                                                                         106
                                                                                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 2 (Continued)
                                                                                              Project covering
                                                                                                  area (mu)           Land                                     Proje
 No                        Locati                                                                                                                                      Sche
             Project                                 Project description                     State-                acquisition         Effect analysis           ct           Remark
  .                         on                                                                         Collectiv                                                       dule
                                                                                             owne                     (mu)                                     owner
                                                                                                        e land
                                                                                               d
                                                                     After pretreatment                                        42mu land is required to be
                                                     Advance         in desilting basin                                        requisitioned in Handeng of
                                                     pool project                                                              Dazhuang Village, Zibihu
                                                                     (6.0 mu), the water
                                                     on      west                                                              Town, including 32mu fish
                                                                     goes     into     the
                                                     side of Zibi    anaerobic pool (6.0                                       ponds and 10mu garden
                                                     Lake (42mu      mu), then goes into                                       plots. It is owned by Eryuan
                                                                                                                      42
      Inte                                           idle land on                                                              County Government and
                                                                     the facultative basin
      grat                                           the     west                                                              managed by Zibuhu Town
                                                                     (10.0mu) , and
       ed                                            side      of                                                              Government. Now, it is
                                                                     finally flows into                                                                        Envir
      wat                                   Water    Fengyu                                                                    leased to farmers (5 persons
               Integrate            Wat
                                            sourc    River)
                                                                     the aerobic basin
                                                                                                                               of 1 household) for breed       onme
       er                             er                             (20.0 mu)                                                                                 ntal
                d water                        e                                                                               aquatics.
      envi                 Eryuan   sour                                                                                                                       Prote   Jan.
               environm                     conse    Ecological                                                                The project is planned to be
      ron                  County     ce                                                                                                                       ction   2008
                 ental                      rvatio   rehabilitatio                                                             on reservoir water surface
  1   men                  and      cons                                                                                                                       Burea    ~
               managem                         n     n project of                                                              and the occupied land is land
       tal                 Dali     ervat                                                                                                                      u of    Dec.
                 ent of                     projec   outer lake                                                                of Reservoir. The land
      man                  City      ion                                                                                                                       Eryua   2009
                 Miju                        t of    of Zibihu       Submerged      plant                                      property and ownership
      age                           proj                                                     1100                                                              n and
                 River                       Zibi    Lake (the       rehabilitation                                            won’t change and it will not
      men                            ect                                                                                                                       Dali
      t of                                  Lake     outlet at                                                                 have unfavorable effect on
                                                                                                                                                               City
      Dali                                           southeast                                                                 irrigation,    and production
      Riv                                            end of                                                                    and living of periphery
       er                                            Zibihu)                                                                   groups and villagers.
                                                                                             All are managerial measures without concerning land use and
                                                     Tourism pollution control project
                                                                                             resettlement.
                                                     Scheme    for   operation    and
                                                     management     and     ecological       All are managerial measures, without concerning land use and
                                                     environmental monitoring of Zibi        resettlement.
                                                     Lake




                                                                                             107
                                                                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                        Project covering
                                                                            area (mu)           Land                                          Proje
No             Locati                                                                                                                                 Sche
     Project                     Project description                   State-                acquisition          Effect analysis               ct           Remark
 .              on                                                               Collectiv                                                            dule
                                                                       owne                     (mu)                                          owner
                                                                                  e land
                                                                         d
                                                                                                           560mu land in the advance
                                                                                                           reservoir area of Haixihai
                                 Advance
                                                                                                           Reservoir will be occupied.
                                 purification
                                                                                                           The land property and
                                 reservoir       Reconstructing the
                                                                                                           ownership won’t change and
                                 project for     existing    advance
                                                                       560                                 it will not have unfavorable
                                 water from      reservoir with an
                                                                                                           effect       on      irrigation,
                                 diversion       area of 560mu
                                                                                                           aquatic       product,      and
                                 culvert into
                                                                                                           production and living of
                                 reservoir
                                                                                                           periphery       groups      and
                                                                                                           villagers.
                                                                                                           It is to reform the deserted
                                                                                                           hills, and forest land after
                        Water
                                                 Reconstructing                                            reformed will belong to the
                        sourc
                                 Ecological      ecological                                                original villages, it won’t
                           e
                                 reconstructi    vegetation for the                                        concern land acquisition and
                        conse
                                 on project      lime     kiln  and                                        resettlement and will not
                        rvatio
                                 of the          deserted land of                                          have unfavorable effect on
                           n                                                    560
                                 deserted        mine on the south                                         production and living of
                        projec
                                 land of         side      of    the                                       periphery       groups      and
                         t of
                                 mine (lime      34-opening bridge,                                        villagers. Their income will
                        Haixi
                                 kiln)           with an area of                                           be increased as long as
                         hai
                                                 58000 m2                                                  increasing of land usage
                                                                                                           percentage and forest land
                                                                                                           quantity.
                                                                                                           The        land in Haixihai
                                 Ecological                                                                Reservoir will be occupied.
                                 rehabilitatio   Rehabilitation for                                        The land property and
                                 n project       totally 3000m long                                        ownership won’t change and
                                 for             collapsed reservoir                                       it will not have unfavorable
                                                                       279
                                 collapsed       banks on both banks                                       effect       on      irrigation,
                                 reservoir       and 270mu beach                                           aquatic       product,      and
                                 bank and        land on north bank                                        production and living of
                                 beach land                                                                periphery       groups      and
                                                                                                           villagers.




                                                                       108
                                                                                                        Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 2 (Continued)
                                                                                                     Project
                                                                                                  covering area
                                                                                                                   Land
                      Loc                                                                              (mu)                                                        Projec
 No                                                                                                                acqui                                                    Sche
        Project       atio                         Project description                                      Coll                      Effect analysis                 t            Remark
  .                                                                                               State-           sition                                                   dule
                       n                                                                                   ectiv                                                   owner
                                                                                                  owne             (mu)
                                                                                                              e
                                                                                                    d
                                                                                                            land
                                                                    Silt project of biological                              The purpose of the project is to
                                                                    fence                                                   increase the forest coverage
                                                                    Gully treatment project,                                around the reservoir, improve
                                                        Ecologi     establishing managerial                                 woodland quality and decrease
                                                        cal         measures and check dam                                  water and soil loss. The project is
                                                        system      Combined            system                              implemented on land with
      Inte                                   Water
                                                        protecti                                                            thinning       woodland        and
      grat                     Water         source                 project of artificial grass
                                                        on          and forest (converting                                  shrubbery. Forest zone has no
       ed    Integ             source      conservati
                                                        project                                            8250             herds (in this area, domestic          Envir
      wat    rated           conservatio   on project               the land for forestry)
                                                        of          Reconstruction project                                  animals are raised in shed             onme
       er    water            n project        of
                      Ery                               woodlan     of inefficient forests                                  mainly).                               ntal
      envi   envir                          Haixihai
                      uan                               d    and                                                            The land property and ownership        Protec   Jan.
      ron    onme     Cou                               semiarid                                                            won’t change and the green zone        tion     2008
  1   men     ntal    nty                               land                                                                will not have restriction so that it   Burea     ~
       tal   mana                                                   Protective measures for
                      and                                           land ecological system                                  has no effect on the production        u of     Dec.
      man    geme     Dali                                                                                                  and living of periphery groups         Eryua    2009
      age    nt of    City                                                                                                  and villagers.                         n and
      men    Miju                                                                                                                                                  Dali
                             Water
      t of   River                                                                                                                                                 City
                             resources
      Dali
                             regulation
      Riv
                             and control
       er                                  Hydrometric system construction of water quality
                             and                                                                  All are managerial measures without concerning land
                                           of Miju River and management scheme of
                             ecological                                                           acquisition and resettlement
                                           industrial waste disposal and standardized effluent
                             environmen
                             tal
                             manageme
                             nt




                                                                                            109
                                                                                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                              Project
                                                                                           covering area
                                                                                                            Land
                 Loc                                                                            (mu)                                                       Projec
No                                                                                                          acqui                                                   Sche
     Project     atio                          Project description                                   Coll                     Effect analysis                 t            Remark
 .                                                                                         State-           sition                                                  dule
                  n                                                                                 ectiv                                                  owner
                                                                                           owne             (mu)
                                                                                                       e
                                                                                             d
                                                                                                     land
                                                                                                                     The hardening alteration will be
                                                                                                                     conducted mainly for the
                                       Pollution
                                                                                                                     channels in river. All used land is
                         Pollution      control
                                                                                                                     land of irrigation and drainage
                          source        project
                                                   Reconstructing 3 existing irrigation                              facilities. Its property and
                          control           of
                                                   channels into ecological cement                                   ownership won’t change so that it
                          project       ditches                                                     9
         Integ                                     irrigation    channels,     with   a                              has no unfavorable effect on the
                           along           and                                                                                                             Envir
         rated                                     reconstruction length of 13km                                     production     and     living   of
                          Luoshi       channels                                                                                                            onme
         water                                                                                                       periphery village groups and
                 Erh       River        into the                                                                                                           ntal
         envir                                                                                                       villagers. The income of farmers
                 ai                       river                                                                                                            Protec   Jan.
         onme                                                                                                        will be increased after farmland
                 Cou                                                                                                 irrigation condition improved.        tion     2008
          ntal   nty                                                                                                                                       Burea     ~
1        mana    and                               Ecological protection scheme for                                                                        u of     Dec.
         geme    Dali                                                                                                                                      Eryua    2009
                                                   wetland in western Xihu (1.036                                    It is planned to plant various
         nt of          Ecological
                 City                              million m2)                                                       water plants by taking use of the     n and
         Luos           rehabilitati   Ecologic                                                                                                            Dali
                                                   Project scheme for intensified                                    existing Xihu water surface. Its
           hi             on and          al
                                                   rehabilitation area of the villages                               property and ownership won’t          City
         River             water       protectio
                                                   (449000 m2)                                                       change so that it has no
                          quality       n and                                              4230
                                                   Project scheme for wetland ecological                             unfavorable effect on the
                        purification    control
                                                   reconstruction area of Xihu (1.282                                irrigation function of reservoir as
                         project of     project
                                                   million m2)                                                       well as production and living of
                          Xihu in      of Xihu
                                                   Project scheme for ecological                                     periphery village groups and
                          Eryuan
                                                   rehabilitation area of wetland in                                 villagers.
                                                   eastern Xihu area (53000 m2)




                                                                                     110
                                                                                                    Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 2 (Continued)
                                                                                      Project covering area                                                    Proje
                                                                                                                Land
 No                    Locati                                                                 (mu)                                                              ct     Sche
         Project                               Project description                                            acquisiti            Effect analysis                            Remark
  .                     on                                                           State-owne Collecti                                                       owne    dule
                                                                                                              on (mu)
                                                                                          d         ve land                                                      r
                                                                                                                          It is required to requisition 55m
                                                                                                                          land, all belongs to collective
                                                                                                                          farmland      of     Xihu      and
                                                                Purification                                              Zhangjiadeng        villages    of
                                                    Purificat   project of runoff                                         Youshuo Town and now it is
                                                    ion                                                       55
                                                                into the lake from                                        distributed to the villagers for
                                                    system      Yuejing River                                             cultivation,     belonging      to
                                          Polluti   of                                                                    non-contracted       land.     302
      Inte                                on        wetland                                                               persons from 91 households are
      grat                                control   at    the                                                             affected by land acquisition.
                                Ecolog
       ed                                 project   estuary                                                               It is necessary to requisition       Envi
             Integra              ical
                                          of the    (of         Purification                                                                                   ronm
      wat                       rehabil                                                                                   15 mu land, and all are ponds
               ted                        rivers    Yuejing     project for runoff                                                                             ental
       er                       itation                                                                                   belonging to the collective land
              water                       into      River,      from Qingshuigou                              15                                               Prote
      envi             Eryuan     and                                                                                     of Qingshuigou in Xihu                       Jan.
             enviro                       the       Qingshu     Channel into the                                                                               ction
      ron              County    water                                                                                    Village, without concerning                  2008
             nmenta                       lake      igou        lake                                                                                           Bure
  1   men              and      quality                                                                                   resettlement.                                ~De
                 l                        and       Channel                                                                                                    au of
       tal             Dali     purific                                                                                   It is planned to take use of reed             c.
             manag                        channe    and                                                                                                        Eryu
      man              City      ation                                                                                    land ( planted with various                  2009
              ement                       ls        Gaojiayi                                                                                                   an
      age                       project
                of                                              Purification                                                           in
                                                                                                                          water plan) the range of Xihu
      men                                           ng                                                                                                         and
             Luoshi                of                           project for runoff                                        land. The land property and
      t of                                          Channel                                                                                                    Dali
              River              Xihu,                          from Gaojiaying      24                                   ownership will not change and
      Dali                                          )                                                                                                          City
                                Eryuan                          Channel into the                                          it has no unfavorable effect on
      Riv
                                                                lake                                                      the production and living of
       er
                                                                                                                          periphery village groups and
                                                                                                                          villagers.
                                           Water                                                                          It is necessary to occupy
                                          exchan    Culvert     Zhangjiadeng                                              temporarily 7.28mu road land
                                          ge and    arrange     Road, Dongdeng                                            and it will be restored after
                                                                                                              7.28
                                          improv    ment        Road         and                                          construction           completion,
                                           ement    project     Nandeng Road                                              without      concerning       land
                                          project                                                                         acquisition and resettlement.




                                                                                          111
                                                                               Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                 Project covering area                                                   Proje
                                                                                           Land
No             Locati                                                    (mu)                                                             ct     Sche
     Project               Project description                                           acquisiti           Effect analysis                            Remark
 .              on                                              State-owne Collecti                                                      owne    dule
                                                                                         on (mu)
                                                                     d         ve land                                                     r
                         of                                                                          It is on deserted dykes of fish
                        Xihu                                                                         pond (due to converting pond
                                                                                                     into lake in 2003) and it belongs
                                Pond
                                                                                                     to Xihu land scope. The land
                                ridge      Dongdeng Village
                                                                                                     property and ownership will not
                                demolis     and     Nandeng     1.42
                                                                                                     change and it has no
                                hing        Village
                                                                                                     unfavorable effect on the
                                project
                                                                                                     production and living of
                                                                                                     periphery village groups and
                                                                                                     villagers.
                                           Culvert
                                           arrangement (in
                                           the     connecting                                        Temporary land occupation of
                                                                                                     0.07mu is required, all is road
                                           roads     between
                                                                                                     land and will be restored after
                                           Qingshuitang and                                0.07
                                           Dongdeng as well                                          construction          completion
                               Water       as        between                                         without      concerning     land
                               exchang                                                               acquisition and resettlement.
                                           Zhongdeng     and
                               e
                                           Dongdeng)
                               capacity
                               build-up    Riverway                                                  6.5mu farmland is required to
                               project     broadening    and                                         be requisitioned, including
                               of          excavation                                                3.8mu of Zhangjiadeng Village
                               village     (riverway                                                 and 2.7mu of Zhongdeng
                               areas       widening        in                                        Village in Xihu Village,
                                           Zhangjiadeng and                                6.5       Youshuo Town.           All is
                                           Dongdeng      and                                         cropland formed by farmers’
                                           riverway                                                  filling the lake, belonging to
                                           excavation      in                                        non-contracted land. 48 persons
                                           Zhongdeng     and                                         from 12 households are affected
                                           Nandeng)                                                  by land acquisition.




                                                                   112
                                                                                                     Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 2 (Continued)
                                                                                           Project covering       Land                                           Pro
 N                Loca                                                                         area (mu)         acquisi                                         ject   Sche   Remark
       Project                                Project description                                                                   Effect analysis
 o.               tion                                                                    State-o     Collecti     tion                                          ow     dule
                                                                                           wned       ve land     (mu)                                           ner
                                                                                                                           It is planned to reconstruct the
                                                                                                                           bank slope at west side of Xihu.
                                                                The 2.0km long place                                       The land property and ownership
                                                    Implem      easy to collapse in                                        will not change and it has no
                                                                                             6
                                                    entation    Linshan on the west                                        unfavorable effect on the
                                                    of dike     side of Xihu                                               production    and    living   of
                                                                                                                           periphery village groups and          En
                                                    rehabilit
      Int   Int                                     ation                                                                  villagers.                            vir
            egr                                                 2.5km in Dengchuan                                                                               on
      egr                Integrated   Dredging      project
            ate                                                 Town and downstream         7.5                                                                  me
      ate                 dredging    Project of    in
             d                                                                                                             The project is entirely executed in   nta
       d                    and       Luoshijiang   18.29k      river section
            wat                                                                                                            riverway and dyke, which is of        l
      wat                ecologica    River         m long      2.5km in the section
             er                                                                                                            riverway     land      for   water    Pro
       er                     l                     riverwa     upstream entrance of
            env                                                                             7.5                            conservancy. The land property        tect
      env                rehabitati                 y      of   Luoshi River and
            iro   Eryu                                                                                                     and ownership will not change         ion
      iro                on project                 Luoshiji    Erhai
            nm    an                                                                                                       and it has no unfavorable effect      Bu     Jan.
      nm                     of                     ang         1.0km upstream and
            ent   Cou                                                                                                      on the production and living of       rea    2008
      ent                Luoshijia                  River       downstream          the
 1           al   nty                                                                                                      periphery village groups and          u       ~
       al                 ng River                              confluence           of      3
            ma    and                                                                                                      villagers.                            of     Dec.
      ma                                                        Longwangjian       and
            nag   Dali                                                                                                                                           Ery    2009
      nag                                                       Luoshijiang rivers
            em    City                                                                                                                                           uan
      em                              Water                                                                                                                      Co
            ent
      ent                             quality         Ecologi    Revetment      adopts                                                                           unt
             of
       of                             protection      cal        cement-        rubble                                     Land use has been listed in that of   y
            Lu
      Dal                             of              revetme +monolayerporous                                             river improvement project.            and
            osh
        i                             Luoshijiang nt             concrete ball.                                                                                  Dal
              i
      Riv                             River                                                                                                                      i
            Riv
       er                  Water      Capacity build-up project of water environmental                                                                           Cit
             er
                         environm     protection of Luoshijiang Project                                                                                          y
                           ental
                         managem      Water environmental and ecological monitoring       All are of managerial measures, without concerning land
                            ent       scheme of Luoshijiang River                         acquisition and resettlement.
                          project
                                      Environmental management         measures     for
                            and
                                      Luoshijiang River
                         measures




                                                                                          113
                                                                                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 2 (Continued)
                                                               Project covering
                 Loc                                               area (mu)           Land                                                                           Sche   Remark
 No                                                                                                                                                        Project
      Project    atio              Project description        State-                acquisition                     Effect analysis
  .                                                                     Collectiv                                                                          owner      dule
                  n                                           owne                     (mu)
                                                                         e land
                                                                d
                        Constructing domestic wastewater                                          Land acquisition of 1.2mu is required and 21
                        treatment facilities in one natural                            1.2        persons from 4 households will be affected by
                        villages                                                                  resettlement.
                                                                                                  The project is a public facility and it is planned to
        Rural                                                                                     construct on idle land (unused land) of all natural
                                                                                                                                                          Environm
      non-poi    Ery                                                                              villages, without concerning land acquisition. The                  Jan.
                                                                                                                                                          ental
      nt         uan                                                                              land ownership won’t change, it will be
                        Building 51 public toilets                         4                                                                              Protectio   2008
      pollutio   Cou                                                                              provided to villages and groups without charge,
                                                                                                                                                          n Bureau
  2   n          nty                                                                              and it has no unfavorable effect on the production                   ~
                                                                                                                                                          of Eryuan
      control    and                                                                              and living of periphery village groups and
                                                                                                                                                          County      June
      in         Dali                                                                             villagers.
                                                                                                                                                          and Dali
      Erhai      City                                                                             It is planned to build in the idle yards of all                     2009
                                                                                                                                                          City
      Basin                                                                                       households (partial house plot). The land property
                                                                                                  and ownership won’t change, it will be provided
                        2545 sanitary toilets                             3.82
                                                                                                  to     the villagers without payment, and it has no
                                                                                                  unfavorable effect on the production and living of
                                                                                                  villagers.
                                                                                                  It is necessary to temporarily occupy road land of
       Urban
                                                                                                  28mu and will be restored after construction             Eryuan     Jan.
      Draina
                                                                                                  completion. In addition, the pipe network of the        County
         ge                                                                                                                                                           2008
                                                                                                  town will be constructed by section and time,            Water
      System     Dali   Xizhou
  3                                    Sewer network                                    28        temporary construction sidewalk will be made and         Supply     ~De
       under     City   district
                                                                                                  the road surface will be restored timely. Therefore,      and
        Dali                                                                                                                                                           c.
                                                                                                  project construction results in no impacts on 130       Drainage
      Jurisdic
                                                                                                  households of privately-owned business along             Co.Ltd     2008
        tion
                                                                                                  Caiyun Street and Shihu Street.




                                                                                       114
                                                                                                    Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                Project covering
                Loc                                                 area (mu)           Land                                                                         Sche   Remark
No                                                                                                                                                         Project
     Project    atio              Project description          State-                acquisition                     Effect analysis
 .                                                                       Collectiv                                                                         owner     dule
                 n                                             owne                     (mu)
                                                                          e land
                                                                 d
                                                                                                   The project needs to occupy 33mu road land and it
                                                                                                   will be restored after construction completion. In
                                                                                                   addition, the pipe network of the district is mainly
                                                                                                   laid on the vehicle lanes of peripheral roads of the
                                                                                                   ancient town, not on the main commercial streets
                       Ancient
                                      Sewer network and                                            and with relatively little pedestrian flow, and the
                       Dali Town                                                         33
                                      rainwater pipe network                                       road is spacious. It is construction by section and
                       district
                                                                                                   time period, temporary access road will be set and
                                                                                                   the road surface will be restored timely, therefore,
                                                                                                   there will be no impact on 398 privately-owned
                                                                                                   business households along Bo’ai Road and
                                                                                                   Pingdeng Road.
                       Dali
                                                                                                   It is necessary to temporarily occupy road land of
                       tourism and    Sewer network and
                                                                                         40        40mu and will be restored after construction
                       vacation       rainwater pipe network
                                                                                                   completion.
                       zone
                                                                                                   It is necessary to temporarily occupy 30mu land,
                       Fengyi         Sewer network and
                                                                                         30        including road land 16.5mu and farmland 13.5mu,
                       District       rainwater pipe network
                                                                                                   and will be restored after construction completion.
      Waste                                                                                        The project needs to requisition 7.34mu collective
      water            Wastewater treatment plant,1200T/d                                          garden plots in Lianghe natural village of Zhonghe
                                                                                        7.34
     treatme           for short term,1600T/d for long-term                                        Village of Dengchuan Town and the affected
     nt plant                                                                                      resettlers are 70 persons from 16 households.
       and
                                                                                                                                                          Eryuan     Jan.
     associa
                                                                                                                                                          County
        ted     Ery                                                                                                                                                  2008
                                                                                                                                                          Water
      sewer     uan
4                                                                                                                                                         Supply      ~
     networ     Cou
                                                                                                                                                          and
       k of     nty                                                                                                                                                  Dec.
                       Associated sewer network                                                                                                           Drainage
     Denchu
                                                                                                                                                          Co.Ltd     2009
         an
      Town
         in
     Eryuan
     County




                                                                                        115
                                                                                                    Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                Project covering
               Loc                                                  area (mu)           Land                                                                      Sche   Remark
No                                                                                                                                                     Project
     Project   atio             Project description            State-                acquisition                    Effect analysis
 .                                                                       Collectiv                                                                     owner      dule
                n                                              owne                     (mu)
                                                                          e land
                                                                 d
                                Sanitary landfill (91.5 mu);
                                management facility zone
                                (4.5 mu); internal road and
                                                                                                   The project needs to requisition 165.5mu land,
                      Sanita    drain (3mu); temporary
                                                                                                   including 94.8 mu farmland of Songhe Village and
                        ry      storage section of                                                                                                                Jan.
                                                                                       165.5       Dasongdian natural village, and 70.7 mu sparse      Eryuan
      Solid           landfil   overburden soil (15mu); site
               Ery                                                                                 woodland. The affected resettlers are 83 persons    County     2008
      waste              l      afforestation (15 mu); newly
               uan                                                                                 from 19 households.                                Environm
5    manage                     constructed access road (11                                                                                                       ~De
               Cou                                                                                                                                     ent and
     ment in                    mu) and reserve 25.5 mu
               nty                                                                                                                                     Sanitary   c.20
     Eryuan                     land for long=term use
                                                                                                                                                       Station
                      Piping                                                                       The project needs to temporarily occupy                         08
                        for
                                Pipe dia. 100mm,12km in                                            road land for 9 mu, which will be restored
                      seepag                                                             9
                         e
                                length                                                             after construction completion. It doesn’t
                      liquid                                                                       concern land acquisition and resettlement.




                                                                                        116
                                                                                                          Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                         Yunnan Urban Environment Project (Lijiang City)
Table 3
                                                                                                                                                     Project
No.        Project         Location                         Project description                                    Land use condition                             Schedule      Remark
                                                                                                                                                     owner
                                                                                                          21.6 mu collective land will be                                       RAP      for
                                      ①Sewage intercept pipe D400~900mm, total pipe length                                                         Huaping
                                                                                                          requisitioned for the wastewater                                      sub-projects
      Wastewater                       42.56m                                                                                                      Water
                           Huaping                                                                        treatment plant and temporary use                         Jul. 2008   of LIjiang
 1    management in                   ② wastewater treatment plant project with total construction                                                 Supply and
                           County                                                                         land for the pipe network is 180.6                       ~Feb. 2010   City
      Huaping County                   scale of 12000m3/d, 6000 m3/d for the near future and              mu, which is all of construction land,
                                                                                                                                                   Sewerage
                                       6000m3/d for a long term..                                         without concerning relocation.
                                                                                                                                                   Co., Ltd.
                                      ① Construction of No. 2 Wastewater treatment Plant with a           The land acquisition for No.2                                         RAP      for
                                                                      3
                                      scale of 70000m3/d (20000 m /d for the near future and              wastewater treatment plant is 88mu                                    sub-projects
                                      50000 m3/d for a long team), including construction of              and temporary use land for the           Lijiang                      of LIjiang
      Lijiang City         Ancient    wastewater disposal facilities and associated sewer network         associated sewer network is 78.92        Water                        City
                                                                                                                                                                  Aug. 2008
 2    WWTP and Sewer        town      and auxiliary facilities.                                           mu, which is all of construction land.   Supply and
                                                                                                                                                                  ~May 2010
      Network               zone      ②Associated sewer network: the sewer main network with              The ingoing and outgoing section         Sewerage
                                      d400~d1800mm in downtown area of Lijiang City, Xintuan              will occupy temporarily 21.85 mu         Co., Ltd.
                                      District and Yulong County totals 23125m.                           land. The project will not concern
                                      ③Ingoing and outgoing pipe section is 2913m.                        relocation.
                                                                                                          The project is within the range of                                    RAP      for
                                                                                                          planned new Yulong city while the                                     sub-projects
      Yulong     County                                                                                                                            Yulong
                           Yulong     The rainwater effluent pipe network to be constructed is 52         planned land for new Yulong city has                    Dec. 2007 ~   of LIjiang
 3    rainwater drainage                                                                                                                           Construction
                           County     km.                                                                 been requisitioned, therefore, the                       Nov. 2011    City
      system                                                                                                                                       Bureau
                                                                                                          project     won’t    concern      land
                                                                                                          acquisition and relocation.
                                                                                                          Total land occupation of the project                                  RAP      for
                                      Construction of a new sanitary landfill with a mean disposal        is 233.48 mu, in which 195 mu                                         sub-projects
                                      scale of 270 t/d is to be built and the required storage capacity   woodland is requisitioned for refuse                                  of LIjiang
      Solid waste          Ancient    is 2 million m3;                                                    disposal plant, 35m farmland for         Lijiang                      City
                                                                                                                                                                  Jun. 2008 ~
 4    management in         town      Construction of office building of management agency;               business center, and 3.48mu for          Construction
                                                                                                                                                                   Aug. 2009
      Lijiang City          zone      Refuse transfer station, updating of refuse clearing &              transfer     station     (state-owned    Bureau
                                      transport equipment, and increase and updating of street            reserved land and used with charge).
                                      refuse collector.                                                   The project doesn’t concern
                                                                                                          relocation.
                                                                                                                                                   Lijiang                      RAP      for
      Wastewater                                                                                          The planning scope is 31.57ha.
                           Ancient    Demolishing of the existing incompatible architectures and                                                   Ancient                      sub-projects
      management     in                                                                                   Requisitioning 1.87 mu construction                      May 2007
 5                          town      construction of municipal infrastructure and supporting                                                      Town                         of LIjiang
      Lijiang   Ancient                                                                                   land (house plots) and using 311 mu                     ~Dec. 2007
                            zone      tourism facilities.                                                                                          Management                   City
      Town                                                                                                state-owned construction land.
                                                                                                                                                   Co., Ltd.




                                                                                            117
                                                                                                      Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                 Yunnan Urban Environment Project (Wenshan Prefecture)
Table 4
 No.       Project       Location                         Project description                                           Land use condition                     Project owner    Schedule
                                                     Construct       Harnessing scope: For             Land occupation is about 30mu, all is of river land
                                                     dry rubble Puting River, 1.2km river              for water conservancy. The land property and
                                    Rive    bank
                                                     bank            section from lower reach of       ownership won’t change and is acquired without
                                    revetment
                                                     revetment       Caihong Bridge to the water       payment by assignment. It won’t concern land
                                                     for 18.4km      taking dam of Hydropower          acquisition and resettlement.
                                                     Constructing Station on Puting River;             Land occupation is about 53 mu, all is of river land
                                    River
                                                     11.9km river For Hongmeng River, 1.1km            for water conservancy and is acquired without
                                    inspection
                                                     inspection      river section from the old        payment by assignment. It won’t concern land
                                    road
                                                     road            power station to the              acquisition and resettlement.
                                                     River           confluence of Dang’a River;       20mu farmland will be temporarily occupied to
                                    River
                                                     dredging of For Dang’a River, 2.0km               stock sludge and it will affect 26 persons of 7
                                    dredging               3
                                                                     river section from the place
                                                     6000m                                             households.                                             Hongxing
       Integrated                                    Constructing joining Hongmeng River to            Land occupation is about 121.03 mu, all is of river     State-owned
       management of     Funing     River            a landscape Naping Village;                       land for water conservancy and is acquired without      Assets
                                                                                                                                                                                Mar. 2007
  1                                 landscape        zone       of For Gepu River, 0.7km river         payment by assignment. It won’t concern land                              ~ Feb.
       Puting river in   County                                                                                                                                Business Co.,
                                                     80690m2         section from Liushui fishing      acquisition and resettlement.                                              2011
       Funing County                                                                                                                                           Ltd. of Funing
                                                                     base to old bus passenger
                                                                                                                                                               County
                                                                     transport center;
                                                                     For Limeng River, 3.5km
                                                                     river section from the north
                                                                     side of the development
                                                                     district to the confluence of     Land occupation is about 6.3 mu, all is of river land
                                    Bridge on the    Building 4 Puting River;                          for water conservancy and is used without payment
                                    river            new bridges     For Moshao River, 0.48km          by assignment. It won’t concern land acquisition
                                                                     river section upstream the        and resettlement.
                                                                     place to joining Puting River;
                                                                     For Yulin River, 0.2km
                                                                     upstream the confluence
                                                                     into Puting River
                                    Pollution                                                          82 mu flood land will be occupied by the project.
                                                                                                                                                               Puzhehei Tour
       Puzhehei Lake                control    for   14 wastewater treatment systems in 8              The completed project will be used and managed                             Feb.
                         Qiubei                      villages, with a total disposal capacity of                                                               Development
  2    in      Qiubei               villages    in                                                     by local village. The land property and ownership                         2008~
                         County                                                                                                                                  Co.Ltd in
       County                       river    basin   3500m3/d;                                         won’t change and no land acquisition and                                 Dec. 2009
                                                                                                                                                               Qiubei County
                                    and                                                                resettlement is involved.




                                                                                        118
                                                                                                     Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

No.       Project      Location                         Project description                                           Land use condition                      Project owner   Schedule
                                  improvement       Building ecological toilets for 105
                                  of        the                                                       3 mu land is required to be occupied and it is
                                                    households, 7 biological cleaning public
                                  people’s                                                            planned on the idle land in the villages or farmers’
                                                    toilets, 110 dispersive two-compartment           yards. The land property and ownership won’t
                                  living
                                                    water-logged compost system, 230 refuse           change, without payment and without concerning
                                  environment
                                                    collection sumps,        and total disposal       land acquisition and resettlement.
                                                    capacity for solid wastes is 120t/d.
                                                                                                      The project is executed entirely in river and needs
                                                    Taking engineering measures such as setting
                                  Harnessing of                                                       to occupy land of 448 mu, all is collective unused
                                                    up trash racks, regulating lock, wetland at
                                  the four rivers                                                     land. The land property and ownership won’t
                                                    flood plain, and overflow weir for four rivers
                                  flowing into                                                        change and is used without charge by assignment,
                                                    of Yuezhe, Xinzha, Laojiugou and Bailonghu
                                  the lake                                                            without concerning land acquisition and
                                                    to establish overflow artificial wetland.
                                                                                                      resettlement.



                                                                                                      511.32 mu is for permanent occupation and 340.0
                                                    The river improvement is consisted of bank
                                                                                                      mu for temporary. All is state-owned land and
                                                    protection and strengthening and construction
       Panlong River                                                                                  will be used in free of charge. Now partial land is
                       Wenshan    River             of ecological dike, totaling length of
3     Wenshan County                                                                                  planted by near villagers in free of charge. A
                       County     improvement       12.39km. Of which it is 9.83km from
        Town Area                                                                                     season before the project construction, farmers will
                                                    Huitugiao to Panshui river and 2.56km from
                                                                                                      be informed to stop planting so to reduce the loss of
                                                    Chengnan Park to Niutou village.
                                                                                                      young crops for farming households.




                                                                                       119
                                                                                                 Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

No.      Project      Location                        Project description                                           Land use condition                    Project owner   Schedule
                                                                                                  It is planned to have treatment on 23600.73 hectare
                                                                                                  land in Dehou, Gongdian and Binglie towns. The
                                                                                                  land property and ownership won’t change. It is
                                                                                                  rainy season in May ~ Oct. in Wenshan district,
                                                                                                  not rainy season after Oct ~ Apr. in next year.
                                                  The slope of 17 creeks in Dehou, Gongdian
                                                                                                  The major crop of tobacco is planted by the end of
                                                  and Binglie towns at upstream Panlong River
                                                                                                  May and harvested by Oct., and the corn is planted
                                                  will be terraced for 1726.93 ha.. By methods
                                                                                                  in Apr.~May and harvested in Aug.. The
                                 Treatment of     of planting the water and soil conservation
                                                                                                  construction can be carried out in Nov. ~Apr. , not
                                 water and soil   woods and economic and fruit trees (3438
                                                                                                  in the rainy season. The slope terraced will not
                                 lost             ha.) as well as grass and soil conservation
                                                                                                  have influence on agricultural production. The
                                                  cultivation and closure (4466 ha.), the
                                                                                                  terraced slope has functions of conservation in
                                                  treatment with of area 122.9775 km2 is
                                                                                                  warm, water, and fertilizer, and increasing output at
                                                  implemented.
                                                                                                  the same time.
                                                                                                  The households are benefited from afforestation
                                                                                                  and planting trees.
                                                                                                  The closure means to prohibit the disordering fell,
                                                                                                  and closure has no influence on households.
                                                                                                  It has no resettlement involved.
      Wastewater                                                                                  The wastewater treatment plant project will occupy
4     management in              ① the wastewater treatment plant with a capacity of 8000t/d      35 mu land, including 1.4mu farmland in Duanfeng
      Funing County                                                                               Village and 33.6mu test fields of the county            Guangnan
                                                      ,
                                 for near future (2010) and 16000t/d for long term (2020);                                                                                Apr. 2007
                      Guangnan                                                                                                                            Water Supply
                                                                                                  minority middle school (cash paid for using). Land                       ~ Jun.
      Wastewater       County    ② associated sewer network is 14.892km , with diameter           acquisition will affect 8 persons of 2 households.
                                                                                                                                                          and Sewerage
                                                                                                                                                                            2008
5     management in              D=300~900mm.                                                                                                             Company
                                                                                                  The sewer network project will occupy temporarily
      Guangnan
                                                                                                  44.67 mu road land.
                                                                                                  16.35mu farmland will be requisitioned by the
                                                                                                  project, including 13.73mu in Chongtou Village
                                                                                                  and 2.62mu in Laodifang Village and 128 persons         Environmental
                                 ① a project within the wastewater treatment plant with a
      Wastewater                                                                                  of 30 households will be affected.                      Protection      Apr. 2008
                       Malipo    capacity of 5000m3/d;
6     management in                                                                               The pipe network is formed by notch and is used         Bureau of        ~ Dec.
                       County    ② constructing 13.193km long sewage intercept pipes along
      Malipo County                                                                               along Chouyang River and road. The temporary            Malipo            2008
                                 Chouyang River.
                                                                                                  land (land used for road) occupation is 40.11mu         County
                                                                                                  and will be restored after the construction, without
                                                                                                  concerning land acquisition and resettlement.
                                                                                                  The wastewater treatment plant project needs to
       Wastewater                ① constructing a wastewater treatment plant with wastewater      requisition 22.45mu farmland in Donghu                  Qiubei Water
                                 treatment capacity of 6000 m3/d;                                                                                                         Oct. 2007
      management in    Qiubei                                                                     Community and 92 persons of 20 households will          Supply and
7                                                                                                                                                                          ~ Aug.
      Qiubei County    County    ② building 22.827km long sewage pipe network in the range        be affected by land acquisition.                        Sewerage
                                                                                                                                                                            2009
         (WWT)                   of 6.76 km2 in Qiubei county town.                               The pipe network project will temporarily occupy        Company
                                                                                                  road land for 31.89mu.


                                                                                   120
                                                                                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

No.       Project      Location                        Project description                                           Land use condition                    Project owner   Schedule
                                                                                                    The water plant project will occupy 9.7mu
                                  ①building a water plant with a capacity of 6000t/d for near       scattered forest land in Qiaotou group of
                                  future and 16000t/d for long term; and reforming of Qiubei No.    Matoushan village. The length of access to the
                                  2 water plant and increasing a group of activated carbon          site is 821.94m, and 8.35 mu land will be
                                  adsorption filter equipment                                       acquisitioned, which is the scattered forest land in
                                  ②Reconstructing a DN600 gravity water diversion pipe for          Qiaotou group. No land acquisition needs for No. 2
                                  2.2km, a DN400 pressure water diversion pipe for 1.5km, and       water plant.
                                  a DN100~ DN30 water supply pipe for 19.902km ;                    The gravity pipe and pressure pipe project will
                                                                                                    temporarily occupy 38.85mu land, involve four
                                  ③ Structures and elements with relation to water supply
                                                                                                    groups of Jiucheng, Matoushan, Xiaoxinzhai and
       Wastewater                 system, including intake heading, lifting pump station and                                                               Qiubei Water
                                                                                                    Qiaotou in Matou village, and have affect on 80                        Nov. 2007
      management in    Qiubei     inspection chamber, etc.                                                                                                 Supply and
8                                                                                                   households with 240 persons. The county main                            ~ Mar.
      Qiubei County    County     ④ Protection of watershed: protection of Longtan pond in          water supply system will occupy the land (used for
                                                                                                                                                           Sewerage
                                                                                                                                                                             2009
          (WS)                    Jiucheng and the existing water source, including raising the     road) 60 mu, and pass through streets of Puzhehei,     Company
                                  dyke height and placing masonry for dyke and the protective       Zhongyang, Xizheng, Caiyun and Donghu, etc. .
                                  wall of wire mesh around Qingtan and Longtan;                     The water supply project will occupy 0.22mu land,
                                  ⑤ Lifting pump station of raw water: building a lifting           which is state-owned reserved construction land
                                  pump house with scale of 9000 m3/d for the near future and        and is used without charge by assignment.
                                  19000 m3/d for a long term at the reserved area.                  Protection of watershed: no land acquisition and
                                                                                                    house relocation.
                                                                                                    Lifting pump station of raw water: it is constructed
                                                                                                    at the reserved area in the existing lifting pump
                                                                                                    station, no land acquisition and house relocation.
                                  1)Reconstructing confluence pipe in the old urban area:
                                  DN400-DN1000, PE pipe for 12km.
                                  2) Constructing sewage branch pipe in the old urban area:
                                  DN400-DN700, PE pipe for 20km.
                                  3)Constructing rainwater pipe in the old urban area:                                                                     Wenshan
      Wastewater                                                                                                                                                           Jan. 2008
                       Wenshan                                                                      57mu road land will be temporarily occupies by the     Water Supply
9     management in               DN400-DN1500,reinforced concrete pipe for 26km.                                                                                           ~ Aug.
                       County                                                                       project.                                               and Sewerage
      Wenshan County                                                                                                                                                         2008
                                  4) Increasing sewage pipe at two banks of Panlonghe New                                                                  Corporation
                                  Plan Area: DN400-DN900,PE pipe for 17km.
                                  5) Increasing sewage pipe at two banks of Panlonghe New
                                  Plan Area:                PE
                                             DN500-DN1200, pipe for 11.9km (in which, the
                                                                                           2
                                  push bench is 9.8km); the area of project service is 19km .
                                                       and




                                                                                     121
                                                                                                           Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

No.       Project         Location                           Project description                                            Land use condition                    Project owner   Schedule
                                                                                                            62.55mu road land which will be temporarily           Yanshan
      Urban Drainage                                                                                        occupied by the project will be restored after        Water Supply    Apr. 2008
                          Yanshan     Constructing D300~ D1200 rainwater pipe for 10.77km in the
10       system in                                                                                          construction. The waste canal is constructed by       and              ~ Sept.
                          County      planned area of Yanshan County and waste canal for 1.1km.
      Yanshan County                                                                                        taking use of existing nature canal, no land          Sewerage Co.,     2008
                                                                                                            acquisition.                                          Ltd.
                                                                                                            Total land occupation is 127.5mu, including 90 mu
                                      A new sanitary landfill will be built in the place 3km to the         (in which 60.0 mu is farmland, 20.0mu garden land
                                      north of Funing County and the project design scale is defined        and 10.0mu farmland) for landfill, 3 mu (farmland)
      Solid     waste                 as 70t/d and storage capacity 670000m3 , including the                for access road, 4.45mu (farmland) for management     Hongxing        Apr. 2007
                          Funing
11    management in                   following: living and management area, sanitary landfill area,        houses, 15.0mu (farmland) for area greening, and      Company of      ~    May
                          County
      Funing County                   internal road, working road, flood intercept ditch, illumination,     15.0 mu (farmland) for overburden soil storage. The   Funing County   2008
                                      water supply, sewerage, greening, environmental quality               project construction will involve the relocation of
                                      monitoring system. The total construction area is about 900 m2.       management houses (brick-wood structure) of 60m2
                                                                                                            and effect 87 persons of 24 households.
                                      The project consists of sanitary landfill, transfer station, other    Total land occupation is 150.21mu, including          Maguan
                                      public facilities and the existing refuse dumps, etc.. The            145.74 mu for sanitary landfill, 2.0mu for roads,     Refuse
      Solid    waste                                                                                                                                                              Mar. 2007
                          Maguan      sanitary landfill is divided into Landfill Area I and II. Area and    0.97 mu for management area, 1.5mu for transfer       Clearing   &
12    management in                                                                                                                                                               ~    Aug.
                          County                                                                            station, which is all of state-owned reserved         Transport and
      Maguan County                   capacity of Landfill Area I and II are 25000m2 and 37000m2;                                                                                 2007
                                                                                                            construction land (used without charge), without      Disposal Co.,
                                      and 170000m3 and 585000m3 respectively.                                                                                     Ltd.
                                                                                                            concerning relocation.
                                                                                                            Total land occupation of the project is 80mu,
                                                                                                            including 60 mu (56mu farmland and 4 mu
      Solid    waste                  The project consists of sanitary landfill, other public facilities    woodland) for sanitary landfill, 11mu woodland        Malipo Refuse   Oct. 2007
                          Malipo      and the existing refuse dumps, etc.. The mean disposal scale of
13    management in                                                                                         for roads, and 5mu and 4m farmland respectively       Disposal        ~    Mar.
                          County
      Maguan County                   sanitary landfill is 44t/d and landfill capacity 400000m3.            for management area and sewage regulating pool.       Center          2009
                                                                                                            142 persons of 34 households will be affected by
                                                                                                            land acquisition.
      Environmental                                                                                                                                               Environmental
      management and                                                                                        All are managerial measures and procurement of        Protection      Jul. 2007
                         Wenshan      Environmental management and monitoring project of
14    monitoring    in                                                                                      equipment and instruments, without concerning         Bureau     of    ~ Jun.
                         Prefecture   Wenshan Prefecture
      Wenshan                                                                                               land acquisition and resettlement.                    Wenshan           2008
      Prefecture                                                                                                                                                  Prefecture




                                                                                            122
                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


Appendix 2:List of Land Acquisition
                                                                   List of Land Acquisition
                                                                                                                                                    Unit:mu
                                                              Farmland                                                                   State-owned
                                                                                    Garden                                     Reclaimed                Unused
 County    Town(ship)       Village       Total            Paddy field   Dry land             Fish pond   Pool   Forest land             construction
                                                   Total                             plot                                        land                    land
                                                                                                                                          used land
 Xundian                                   183                                                                                    177         3           3
              County                                                                                                              110
             planning
              bureau                       110
            Rende town                      3                                                                                                 3
                            Xiaguan                                                                                               47
            Rende town      Village        50                                                                                                             3
             Jinshuo                                                                                                              20
             Township     Haizi Village    20
Songming                                  122.35   107.7                  107.7                                     7.8                      6.85
           County-owned
           construction
               land                        6.79                                                                                              6.79
            Songyang         Sijiao       115.5    107.7                  107.7                                     7.8
             Yanglin                       0.03                                                                                              0.03
              Xiaojie                      0.03                                                                                              0.03
 Luquan                                   125.2    43.8                    43.8                                     74.7                      6.7
           County-owned
           construction
               land                        6.7                                                                                                6.7
             Pingshan                     118.5    43.8                    43.8                                     74.7




                                                                              123
                                                                                     Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                            Farmland                                                                  State-owned
                                                                                  Garden                                    Reclaimed                Unused
 County     Town(ship)       Village    Total            Paddy field   Dry land            Fish pond   Pool   Forest land             construction
                                                 Total                             plot                                       land                    land
                                                                                                                                       used land
                           Yanwachong   118.5    43.8                    43.8                                    74.7
Kunming
  city                                   0.65                                                                                             0.65
Sub-total                               431.2    151.5                  151.5                                    82.5          177        17.2         3
Dali city                                1.2      1.2         1.2
             Xiaguan                     1.2      1.2         1.2
                            Dazhuang     1.20     1.2         1.2
 Eryuan                                 312.34   177.3       177.3                17.34       32       15        70.7
              Zibihu                    165.5    94.8                    94.8                                    70.6
                             Songhe     94.80    94.8                    94.8
                            Fengyuan     70.6                                                                    70.6
              Yousuo                     97.5    82.5         82.5                                     15
                              Xihu       76.5    61.5         61.5                                     15
                             Meihe      21.00     21          21
            Dengchuan       Zhonghe      7.34                                      7.34
            State-owned                 42.00                                     10.00       32
Sub-total                               313.54   178.5       178.5                17.34       32       10        70.6
Huaping     Rongjiang      Rongjiang     21.6    21.6
 Ancient                                                      123
town zone                               634.35   123                                                             195                     316.35
              Jinshan                   321.48   123          123                                                195                      3.48
                             Yangxi     88.00     88          88
                            Wenhua      195.00                                                                   195
                             Jinshan    35.00     35          35
            Xi’an street    Yizheng     207.33                                                                                           207.33


                                                                            124
                                                                                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                 Farmland                                                                    State-owned
                                                                                         Garden                                    Reclaimed                Unused
 County      Town(ship)         Village      Total            Paddy field   Dry land              Fish pond   Pool   Forest land             construction
                                                      Total                               plot                                       land                    land
                                                                                                                                              used land
                               resident
                              committee
                               Xinhua
                               resident
            Dayan office      committee      98.98                                                                                               98.98
                             Yihe resident
            Xianghe office    committee       6.56                                                                                               6.56
Sub-total                                    655.95   144.6       144.6                                                 195                  316.35
               County
             State-Land
              Resource
Wenshan        Bureau                        511.32                                                                                            511.32
 Malipo         Mali          Laodifang       2.62    2.62
                Mali          Chongtou       93.73    78.73       26.73       52                                         15
                Total                        97.35    81.35       26.73       52                                         15                       1
                               Tuanjie                             16.3       81.2
 Funing        Xinhua        community       127.5    97.5                                20                             10
                Water
            Conservancy
               Bureau                        210.33                                                                                                210.33
                Total                        337.83   97.5         16.3       81.2        20                             10                     210.33
Guangnan      Liancheng       Duanfeng        1.4      1.4         1.4
              Minority
            Middle School                     33.6    33.6         33.6
              Sub-total                       35       35          35



                                                                                   125
                                                                                      Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                             Farmland                                                                  State-owned
                                                                                   Garden                                    Reclaimed                   Unused
County       Town(ship)      Village     Total            Paddy field   Dry land            Fish pond   Pool   Forest land             construction
                                                  Total                             plot                                       land                       land
                                                                                                                                        used land
                             Donghu                           22.45
 Qiubei        Jinping      community   22. 45    22.45
                             Matou       18.05                                                                   18.05
            Shuanglongyin
                  g         Puzhehei     533                                                                                                              533
            Running Water
                Plant                    0.22                                                                                                     0.22
                Total                   573.72    22.45       22.45                                              18.05                     0.22           533
              Maguan
             environment
              sanitation
Maguan         station                  150.21                                                                     85                         65.21
Sub-total                               1704.43   236.3       103.1      133.2      20                           128.05                   787.08          533
 Total                                  3105.12   710.9       426.2      284.7     37.34       32       15       476.25         177       1120.63        536.00




                                                                             126
                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


Appendix 3:Linkage Projects

                                  Associated Project 1
                           Dali Sewage Treatment Plant Project

    1. Project description
    1) Project contents
    Dali Sewage Treatment Plant is located at Dayutian downstream the Xi’er River in
Xiaguan District, Dali City with a land occupation of 2.7 ha. and disposal capacity of
54000 m3/d.
    2) Project owner
    The project owner is Dali Water Supply and Sewerage Co., Ltd.
    3) Funds
    Total construction investment is 96 million yuan.
    4) Construction time
    The project construction was commenced in January 2001 and was put into
operation after test-run was completed in early 2005.
    5) Relationship
     Dali Sewage Treatment Plant mainly undertakes the urban house wastewater
disposal in the two urban districts of Xiaguan and Dali. The Urban Drainage Systems
under Dali City Jurisdiction collects the sewage from the recreation district, the ancient
Dali town and Fengyi district and convey the sewage to Dali Sewage Treatment Plant for
disposal. Therefore, it is the associated project to Urban Drainage Systems under Dali
City Jurisdiction and can jointly give full play to efficiency.
    2. Impacts of land acquisition and relocation for the project
    1) Land acquisition:
     It is necessary to requisition 26 mu land in total ( including farmland 16mu) and
transfer land use for 16 mu, without concerning relocation.
    2) Procedure of land acquisition:
     The land acquisition unit, land administration departments and the
land-requisitioned unit jointly negotiate compensation standard and resettlement options
for land acquisition and then implement after reporting to the land administration
departments at all levels.
    3. Compensation policies and standard
     Cash compensation is adopted for resettlement for land acquisition of the project. In
spite of land categories, the land is economically compensated averagely based on 37980
Yuan/mu and the use option for land compensation is raised by the villagers’ groups and
implemented after reported to the city and township governments for approval.
    4. Resettlement effects


                                            127
                              Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


     During construction of the project, compensation for land acquisition was paid to
land-requisitioned units in time and the resettlement effects are favorable.




                                               128
                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                 Associated Project 2
                Xizhou Sewage Treatment Plant and Associated Sewer Network

    1. Project Description
    1) Project contents
     The Xizhou Twon Sewage Treatment Plant is now in the planning stage. The plant is
planned with 2000 m 3/d for short term and 4000m 3/d for long term. The plant will occupy
about 30 mu land.
    2) Project owner
    Dali Recreation Resort Management Committee (a provincial- level organization)
    3) Relationship
     According to plan, Xizhou wastewater disposal plant undertakes the sanitary
wastewater of Xizhou town. Therefore, it is the associated project to Urban Drainage
Systems under Dali City Jurisdiction and can jointly give full play to efficiency.
    4) Others
     The project owner promises that the plant will be constructed at the same time with
the Urban Drainage Systems under Dali City Jurisdiction, and that the land requisition
and house relocation for the Plant will be implemented strictly following the laws and
regulations of the state government and the Yunnan Provincial government as well as the
Operational Policy OP4.12 of the World Bank.
    2. Impacts of land acquisition and relocation for the project
    1)   Land acquisition:
    According to plan, totaling 29.37 mu land (all paddy land) will be acquisitioned,
without concerning relocation.
    2. Procedure of land acquisition:
     The land acquisition unit, land administration departments and the
land-requisitioned unit jointly negotiate compensation standard and resettlement options
for land acquisition and then be implemented after reporting to the land administration
departments at all levels.
    3. Compensation policy and standard
    Cash compensation is adopted for resettlement for land acquisition of the project. The
land is economically compensated averagely based on 48000 Yuan/mu and the use option for
land compensation is raised by the villagers’ groups and implemented after reported to the
city and township governments for approval.




                                              129
                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                  Associated Project 3
         The Project Related to Wastewater Management in Wenshan County

    The Project Related to Wastewater Management in Wenshan County
    1. Project description
    1) Project contents
     Wenshan Sewage Treatment Plant: design disposal capacity 50000 ton/d,
constructed in two stages, disposal capacity for the first stage is 25000 ton/d.
    2) Project owner
    The project owner is Wenshan Water Supply and Sewerage Company.
    3) Funds
    Total construction investment for first-stage project is 57.99 million yuan.
    4) Construction time
    The first stage project was completed in June 2004.
    5) Relationship
     In order to cooperate with the urban construction in Wenshan County, Wenshan
Sewage Treatment Plant was built in 2004. However, no perfect and independent sewer
network system is available to divert the wastewater into the plant, so that the plant
cannot operate normally and is almost out of operation. Therefore, it is necessary to
construct the Wastewater management in Wenshan County to support Wenshan Sewage
Treatment Plant so as to effectively treat the house sewage and industrial wastewater in
Wenshan County. After the project is completed, it will be used in cooperation with the
plant and play a significant role in realizing standard effluent of wastewater and
improving the environment of Wenshan town.
    2. Compensation standard for land acquisition and impacts of relocation
    Procedure of land acquisition:
    ⑴ Planning and siting conducted by the urban construction department ;
    ⑵ Boundary survey carried out by the land administration department ;
    ⑶ Price negotiation of land acquisition held by Wenshan Land and Resources
Bureau and the project owner with the land –requisitioned villagers’ groups;
     ⑷ Signing of land acquisition agreement by Wenshan Land and Resources Bureau
with the land-requisitioned villagers’ groups;
     ⑸ Disbursement of land acquisition funds: The project owner pays to Wenshan Land
and Resources Bureau and Wenshan Land and Resources Bureau pays to the affected
villagers’ groups.
    3. Resettlement effects
     Land acquisition and compensation for ground attachment for Wenshan Sewage
Treatment Plant was completed in 1999. The requisitioned farmland is 52 mu and the
compensation standard is 30000 yuan/mu. All compensation funds have been paid directly to
the resettlers and most resettlers are satisfied at the compensation standard.

                                            130
                              Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                    Associated Project 4
           The Project Related to Wastewater Management in Yanshan County

     1. Project description
     1) Project contents
     Yanshan Sewage Treatment Plant: design disposal capacity is 5000 ton/d.
     2) Project owner
     The project owner is Yanshan Water Supply and Sewerage Company.
     3) Funds
     Total construction investment is 12.609 million yuan.
     4) Construction time
     The project was completed in January 2003.
     5) Relationship
     In order to cooperate with the urban construction in Yanshan County, Yanshan
Sewage Treatment Plant was built in 2003. However, no perfect and independent sewe r
network system makes the pollutant concentration in the wastewater into the plant not
high so that the plant cannot work normally and is almost out of operation. Therefore, it
is necessary to construct the Urban Drainage System in Yanshan County to support
Yanshan Sewage Treatment Plant so as to effectively treat the house sewage and
industrial waste water in Yanshan County. After the project was completed, it has been
used in cooperation with the plant and played a significant role in realizing standard
effluent of wastewater and improving the environment of Yanshan city town.
     2. Compensation standard for land acquisition and impacts of relocation
     Procedure of land acquisition:
     ⑴ Planning and siting conducted by the urban construction departments ;
     ⑵ Boundary survey carried out by the land administration departments;
     ⑶ Price negotiation of land acquisition held by Yanshan Land and Resources Bureau
and the project owner with the land–requisitioned villagers’ groups;
     ⑷ Signing of land acquisition agreement by Yanshan Land and Resources Bureau
with the land-requisitioned villagers’ groups;
     ⑸ Disbursement of land acquisition funds: The project owner pays to Yanshan Land
and Resources Bureau and Yanshan Land and Resources Bureau pays to the affected
villagers’ groups.
     3. Resettlement effects
     Land acquisition and compensation for ground attachment for Yanshan Sewage
Treatment Plant was completed in 2002. The requisitioned farmland is 11.39 mu and the
compensation standard is 10000 yuan/mu. All compensation funds have been paid directly to
the resettlers and most resettlers are satisfied at the compensation standard.



                                               131
                              Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                   Associated Project 5
The Project Related to Integrated management of Panlong River (Wenshan urban
section)
     1. Project description
     1) Project contents
     Integrated management of Panlong River (Wenshan urban section) is consisted of:
intergated management of 21.0km long river section from Hutuzhai in Wenshan County
to Niutouzhai and treatment for water and soil loss in 17 creeks in Dehou, Gongdian and
Binglie towns.
     2) Project owner
     The project owner is Wenshan Development and Investment Company.
     3) Funds
     Total construction investment is 256.6273 million yuan.
     4) Construction time
     It is planned to start construction Nov. 2007.
     5) Relationship
     In order to cooperate with the urban construction in Wenshan County and based on
General Wenshan Plan, Wenshan County completed the land acquisition within scope of
70m at two banks of Panlong River beyond Wenshan old urban in planning area before
end of 2005. In 2005, the land acquisition is 359.2 mu, including the land acquisition
262.9 mu for Panlong River North sectin (10.02km) from Huituzhai to Panshuiqiao (43
households involved), and land acquisition 96.3 mu for south section (2.56km) from
Chengnan park to Niutouzhai (33 households involved). The land construction area for
Panlong river (Wenshan county section) is 511.32 mu. Of which, 66.3 mu land is
acquisitioned in 2005 and 445.02mu land was acquisitioned before 2005.
     2. Compensation standard for land acquisition and impacts of relocation
     Procedure of land acquisition:
     ⑴ Planning and siting conducted by the urban construction departments ;
     ⑵ Boundary survey carried out by the land administration departments ;
    ⑶ Price negotiation of land acquisition held by Wenshan Land and Resources
Bureau and the project owner with the land–requisitioned villagers’ groups;
     ⑷ Signing of land acquisition agreement by Wenshan Land and Resources Bureau
with the land-requisitioned villagers’ groups;
     ⑸ Disbursement of land acquisition funds: The project owner pays to Wenshan Land
and Resources Bureau and Wenshan Land and Resources Bureau pays to the affected
villagers’ groups.
     3. Resettlement effects
     Land acquisition within scope of 70m at two banks of Panlong River was completed in
2005, the land compensation is 55000 yuan/mu and subsidy for public facilities paid to village
collectives is 1000 yuan/mu. All compensation funds have been paid directly to the resettlers
and most resettlers are satisfied at the compensation standard.


                                             132
                                                                                                          Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


Appendix 4:Summary of Resettlement Options for All Prefectures/Cities
                                                          Summary of Resettlement Options for Kunming City
Table 1
                                     Rural                Farmland                Produc-tion Impacts on            Compensati
          Admini-                               Total                                                    Compensa-
Cou Town(               Village     popula-ti          requisition and Propor-ti resettle-ment income                on /annual                                           Measures for income
          strative                            farmland                                                      tion                            Resettlement option
nty ship)               group          on                occupation       on      popula-tion (104 yuan/            loss for land                                             restoration
          village                              (mu)                                                      (104 yuan)
                                    (person)                (mu)                   (person)     year)                acquisition
                                                                                                                                    One household and the reclaimed
Xun Jinshu
             Haizi                   3009      3730                                                                                 wasteland of the village and group
dian o
                                                                                                                                    collective is affected by wasteland
                                                                                                                                    requisition in Xundian; young crop
                      Qingshuigo                                                                                                    fee for affected household is paid
                                      364      473
                      u                                                                                                             to PAPs; 70% land compensation
                                                                                                                                    paid to households and 30% left in
    Rende Beiguan                    3506     2685.2                                                                                village and group collective; and
                                                                                                                                    compensation for the affected
                      Group 4 of                                                                                                    collective property all left in
                                      429      170
                      Xia Village                                                                                                   village and group collective.
Luq Pingsh Yanwach                                                                                                                  Combination of cash compensation
      an                             1961     1129.5        43.8        3.88%        66           8.76       144.54      17         and land adjustment and the young
uan Town     ong
                                                                                                                                    crop fee is paid to the resettled
                                                                                                                                                                         Strengthening       labor
                      Qinglongta                                                                                                    households.       It   is    decided
                                      153       113         5.78        5.12%         8           1.16       19.07       17                                              training and developing
                          n                                                                                                         tentatively     that    30%     land
                                                                                                                                                                         forest and fruit trade
                      Shangshi-I      104       60          13.54                    23           2.71       44.68                  compensation and resettlement
                                                                        22.57%                                           17                                              and animal husbandry.
                                                                                                                                    subsidy      is left in the village
                      Shangshi-II      86       60          24.48       40.80%       35           4.90       80.78       17         collective and 70% distributed
                                                                                                                                    averagely in the group.
Son Songy                                                                                                                                                                Enhancing           labor
gmi ang      Sijiao                  6263      6081         107.7       0.75%        109          19.74      133.55       7                                              training to go in for the
 ng Town                                                                                                                            Cash compensation and land secondary and tertiary
                                                                                                                                    adjustment. Land compensation industries;           industrial
                                                                                                                                    and resettlement subsidy are paid restruc-       turing     to
                                                                                                                                    to all villagers and young crop fee develop         vegetable
                        Loujin       1293      1274         107.7       8.45%        109          19.74      133.55       7         to the resettled households.         planting     and      the
                                                                                                                                                                         Chinese milk vetch is
                                                                                                                                                                         sold to Guangdong.




                                                                                            133
                                                                                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                         Summary of Resettlement Options of Dali Prefecture
Table 2
                                         Rural            Requisiti Proportion           Annual loss Compens Compensation
 City           Villagers                          Gross                       Resettled
       Town(shi           Villagers’   populatio            oned     in gross             for land     ation  /annual loss Resettleme        Supporting measures for
(Count          committe                         farmland                       laborer acquisition                                                                              Remarks
          p)              group           n               farmland farmland                            (104     for land   nt method               restoration
  y)                e                              (mu)                        (person) (104 yuan)
                                       (person)             (mu)       (%)                            yuan) acquisition
                                                                                                                                         (1) For those who don’t agree
                                                                                                                                         with the resettlement option of the
 Dali Xiaguan Dazhuan
                                        4969      2892     1.2      0.04%        2         0.26       5.55        21                     village, according to their wishes,
 City     Town      g                                                                                                                    it is to coordinate and help the
                                                                                                                                         individual households that need
                                                                                                                                         land for continuous farming to
                                                                                                                                         replace land from the collective
                            Group 6      316     257.2     1.20     0.47%        2         0.26       5.55        21
                                                                                                                          Cash           reserve land or those who are not
                                                                                                                          compensati willing to go in for farming;
Eryuan Zibihu                                                                                                             on, young
                 Songhe                 3045      2305     94.8     4.11%       116       12.58      283.05       22
County Town                                                                                                               crop           (2) enhancing the relevant
                                                                                                                          compensati technical training, guiding and
                          Dasongdian    1612      1328     94.8     7.14%      116        12.58      283.05       22      on        and encouraging the resettlers to
                                                                                                                          resettlement expand planting area of the cash
                                                                                                                          compensati crops and increase the breeding
        Yousuo
                  Meihe                 6747      4820      21      0.44%       34         4.54      97.70        21      on are paid scale of milk cows by using of
          Town                                                                                                            to resettlers, the compensation, improving
                                                                                                                          40% land agricultural production conditions
                          Dahuayuan      446      278       21      7.55%       34         4.54      97.70        21      compensati to raise the resettlers’ income;
                                                                                                                          on is left in
                                                                                                                          the village (3) During project construction,          Reclaimed
                                                                                                                          collective giving priority to considering              wasteland
                   Xihu                 4090      1929     63.5     3.29%      133         13.3      286.13       21      and      60% employment of resettled labors           excluded in
                                                                                                                          paid        to and utilization of the local            inventory
                          Zhangjiade                                                                                      resettlers. construction and living materials.
                                        1678     786.8     58.8     7.47%      126        12.72      273.57       21                     After completion, the resettlers are
                               ng                                                                                                        given priority to employment
                                                                                                                                         under equal conditions;

                                                                                                                                        (4) Once there are projects
                          Zhongdeng      648      287      2.7      0.94%        7         0.58      12.56        21                    concerning export of labor service
                                                                                                                                        in the county (city), the priority is
                                                                                                                                        given to resettlers.




                                                                                        134
                                                                                                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                  Summary of Resettlement Options of Lijiang City
Table 3
                                                                       Annual            Compensa
                                      Rural
                    Admin                              Requisi-   loss for Compen - tion
                                      popula Farmlan    Resettle
 County Town         i- Villager                 tioned     d       land    -sation /annual
                                     - tion  d           laborer              (104                      Resettlement method                       Supporting measures for restoration
(District) (ship) strative s’ group             farmlan          acquisitio          loss for
                                    (perso (mu)         (person)             yuan)
                  village                        d (mu)            n (104              land
                                       n)
                                                                   yuan)           acquisition
           Rong-                                                                                    Cash            compensation;
Huaping             Rong-                                                                           resettlement subsidy and (1) According to the resettlers’ whishes, coordinating and helping
           jiang                      6098    6523      27.2      25    5.97    98.56       17      young crop fee are paid to land replacement for those needing land for continuous farming
 County             jiang
           Town                                                                                     resettlers;     65%       land
                                                                                                    compensation is paid to from the collective reserve land or those who don’t want to go in
                                                                                                    resettlers and the rest 35% is
                               11      640    823       21.6      16    4.74    59.29       13                                      for farming;
                                                                                                    left in villagers’ groups and
                                                                                                    local land adjustment           (2)According to resettlers’ wishes, those giving up farming for
                                                                                                                                    trade, as long as they have trade base and capability, will acquire
           Jinsha                                                                                                                   cash compensation and be helped in handling relevant certificates;
 Ancient     n                                                                                                                      (3) Enhancing relevant technical training, guiding and
                    Yangxi            3517    9125       88       33   19.04    362.56      19
  town     Towns                                                                                    Cash            compensation; encouraging resettlers to expand vegetable planting area by use of
                                                                                                    distributed averagely in the
            hip                                                                                     groups;        65%        land the land compensation, improving agricultural production
                             Minru     465    1653       88       24   19.04    362.56      19      compensation               and conditions to raise resettlers’ income;
                                                                                                    resettlement     subsidy     is
                    Jinsha                                                                          distributed in the groups; (4) During project construction, giving priority to considering
                                      4278    5647       35       26    7.57    309.58      41
                                                                                                    and land adjustment in employment of resettlers and utilization of the local construction
                      n
                                                                                                    groups.
                             Shangs                                                                                                 and living materials. After completion, the resettlers are given
                                       316    182        35       60    7.57    309.58      41
                             hiping                                                                                               employment preference under equal conditions.




                                                                                                 135
                                                                                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                       Summary of Resettlement Options of Wenshan Prefecture
Table 4
                                                                           Proportion of
                                              Rural   Total                  per capita                Annual loss             Compensation
                         Admini- Villagers’                 Requisitioned                                                                                     Supporting
                                             popula-                         farmland      Resettled     for land  Compensation /annual loss Resettlement
 County    Town(ship)    strative              tion farmland farmland                                                                                         measures for
                                  group                                      reduction laborer(person) acquisition (104 yuan)     for land     method
                         village                               (mu)                                                                                            restoration
                                            (person) (mu)                 before and after             (104 yuan)                acquisition
                                                                          land requisition
                        Laodifang             3473    5993      2.62           0.04%          24           0.58       10.03          17
 Malipo    Mali Town               Shiguanmen   172      270     2.62         0.97%           2           0.58        10.03         17      Cash
                                                                                                                                            compensation,
                        Chongtou                2545    2277     78.73        3.46%          12          10.87        181.94        17
                                                                                                                                            fully paid to
                                    Loutizhai   109      141     4.33         3.07%           4           0.60        10.01         17      resettlers
                                                                                                                                            Cash                 Enhancing
                                                                                                                                            compensation,      labor training,
                                                                                                                                            fully paid to going in for the
                                                                                                                                            resettlers, and secondary and
                                     Shima      171      159     51.4        32.33%          56           7.10        118.78        17      the      villages’     tertiary
                                                                                                                                            committee            industries,
                                                                                                                                            assists villagers industrial
                                                                                                                                            to make local restructuring
                                                                                                                                            land adjustment and developing
                                                                                                                                                                  vegetable
                                     Hebian     108      88        3          3.41%           4           0.41         6.93         17      Cash                   planting
                                                                                                                                            compensation,
                                     Yangse     127      127       9          7.09%           9           1.24        20.80         17
                                                                                                                                            fully paid to
                                    Baba’ao     162      136      11          8.09%          14           1.52        25.42         17      resettlers
                      Tuanjie                                                                                                                               Going in for
 Funing Xinhua Town                             1145     612     36.3         5.93%          84           7.26        176.42        24
                    community                                                                                                                             trade as well as
                                                                                                                                                           the secondary
                                                                                                                                            Cash            and tertiary
                                    Toutang     309      133     36.3        27.29%          84           7.26        176.42        24      compensation, industries; and
                                                                                                                                            fully paid to employment
                                                                                                                                            resettlers       preference.
           Liancheng
Guangnan                Duanfeng                2317     868      1.4         0.16%           6           0.22         3.66         17
             Town
                                   Tuguozhai    1029     254      1.4         0.55%           6           0.22         3.66         17
                      Donghu                                                                                                                                 Providing skill
        Jinping Town
                     Community
                                                1475    1056     22.45   2. 13%              32           2.63        43.03         16
 Qiubei                                                                                                                                                      training for the
                                    Group 4     123      133      2.2    1.65%                3           0.26         4.21         16      Cash                 land-lost


                                                                                  136
                                                                                               Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                           Proportion of
                                              Rural   Total                  per capita                Annual loss             Compensation
                      Admini-    Villagers’ popula-         Requisitioned                                                                                         Supporting
                                                                             farmland      Resettled     for land  Compensation /annual loss Resettlement
County   Town(ship)   strative                      farmland farmland                                                  4                                         measures for
                                  group        tion                          reduction laborer(person) acquisition (10 yuan)      for land        method
                      village                                  (mu)                                                                                               restoration
                                            (person) (mu)                 before and after             (104 yuan)                acquisition
                                                                          land requisition
                                 Group 6       111     101      7.8       7.72%               9            0.91       14.91          16      compensation,          farmers;
                                                                                                                                             fully paid to industrial
                                 Group 7       184     169      4.7       2.78%               6            0.55        8.99          16      resettlers         restructuring to
                                                                                                                                                                    develop
                                                                                                                                             Cash                vegetable and
                                                                                                                                             compensation, pseudo-ginseng
                                                                                                                                             fully paid to          planting
                                                                                                                                             resettlers, and
                                 Group 8       145      84      7.75      9.23%               14           0.9        14.92          16      the      villages’
                                                                                                                                             committee
                                                                                                                                             assists villagers
                                                                                                                                             to make local
                                                                                                                                             land adjustment




                                                                                    137
                                                 Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


Appendix 5:Breakdown of Resettlement Compensation
      Estimation of Resettlement Compensation for the Project Package in Kunming City

Table 1
                                                                 Solid waste management Solid waste management in     Solid waste management in
                                                Total
                                                                    in Luquan County         Xundian County                Songming County
Serial
               Item          Unit                                           Unit Amount               Unit    Amoun              Unit  Amount
 No.                                             Amount (104
                                       Qty                   Qty            price (104      Qty       price    (104    Qty       price  (104
                                                   yuan)                  (yuan) yuan)              (yuan)                     (yuan) yuan)
                                                                                                              yuan)
    Compensation
  I for        rural                                    687.17                    361.19                      86.33                     239.64
    resettlement
    Compensation
    for         land
(1)                          mu     429.70              597.20   124.50           304.46    183               53.21   122.20            239.52
    acquisition and
    occupation
    Project
 1 permanent land            mu       429.70            597.20   124.50           304.46 183.00               53.21   122.20            239.52
    occupation
 1.1     Dry land            mu       151.50            278.09    43.8    33000 144.54                                107.7     12400   133.55

 1.2     Garden plots        mu       25.00         228.00

 1.3     Woodland            mu       82.50             75.39     74.7     9360   69.92                                7.8      7020     5.48
         Construction
 1.4                         mu       15.00         195.10         6      150000 90.00     3.00     50325     15.10    6.7     150000    100.5
         land
         Reclaimed
 1.4                         mu       55.00             13.66                              55.00     2483     13.66
         farmland
         Reclaimed
 1.5                         mu       110.00            22.00                              110.00    2000     22.00
         garden plots
         Reclaimed
 1.6                         mu       12.00              2.40                              12.00     2000      2.40
         woodland
 1.7     Unused land         mu        3.00              0.06                               3.00     200       0.06
         Temporary
         construction        mu       928.25        447.88
  2      land
         Dry land            mu       928.25        447.88
         Other
 (2)                                 14806.00           89.97    10366            56.73    4440               33.12                      0.12
         compensation
         Compensation
  1      for     scattered           14806.00           89.85    10366            56.73    4440               33.12
         trees
         Compensation
 1.1     for     scattered           13365.00           89.13    10365            56.73    3000               32.40
         cash fruit trees
1.1.1 Less than 3cm                  7103.00            21.31     6703      30    20.11     400       30      1.20
      10cm or with
1.1.2                                  6262             67.82     3662     100    36.62    2600      120      31.20
      bumper fruit
 1.2     Timber                        1441             0.72       1               0.00    1440               0.72

         Less than 3cm                 1441             0.72       1        5      0.00    1440       5       0.72

  2      Grave                          3               0.12                                                            3        400     0.12
         Compensation
  II     for restoration               6.40             23.20      6                22                                 0.4                1.2
         of special items
         Compensation
         for
  1                       Pole/km      6.40             23.20      6                22                                 0.4      30000    1.20
         communication
         facilities
         Compensation
  2      for        power
         facilities
 III     Other expenses                                 92.06                     49.25                       11.31                      31.50
         Overhead     of
  1      construction                                    3.55                      1.92                        0.43                       1.20
         unit



                                                                            138
                                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                             Solid waste management Solid waste management in   Solid waste management in
                                            Total
                                                                in Luquan County         Xundian County              Songming County
Serial
               Item          Unit                                      Unit Amount            Unit    Amoun                Unit  Amount
 No.                                         Amount (104
                                    Qty                  Qty           price (104     Qty     price    (104      Qty       price  (104
                                               yuan)
                                                                     (yuan) yuan)           (yuan)    yuan)              (yuan) yuan)
         Technical
  2                                                  3.44                     1.81                     0.43                         1.20
         training fee
         Plan & design
  3                                                 17.76                     9.58                     2.16                         6.02
         fee
         Overhead      for
  4                                                 21.31                    11.50                     2.59                         7.23
         implementa-tion
         Resettle- ment
  5                                                  7.10                     3.83                     0.86                         2.41
         supervision fee
         Monitoring and
  6                                                 10.66                     5.75                     1.30                         3.61
         evaluation fee
         Examination fee
  7      for        design                           2.13                     1.15                     0.26                         0.72
         documenta- tion
         Overhead       of
  8      land acquisition                           19.24                                              2.42                         6.71
         and relocation                                                      10.11
         Supporting fee
  9      for vulnerable                              6.87                     3.61                     0.86                         2.40
         groups
 IV      Contingency                                80.24                    43.24                     9.76                        27.23
         Basic
  1                                                 80.24                    43.24                     9.76                        27.23
         contingency
         Contingency for
  2
         price difference
         Static
         investment                                 882.67                   475.68                   107.41                      299.58
         (excluding tax)
 V.      Related tax                519             705.20                   179.75   519             317.95                      207.49
         Farmland
  1                                 316.5           199.40   43.80           27.59    165             103.95    107.7              67.85
         reclamation fee
         Paddy fields                                                 7200                   7200
       Dry land and
                                    316.5           199.40    43.8    6300   27.59    165    6300     103.95    107.7     6300     67.85
       garden plots
       Tax           for
  2 farmland                        316.5           84.40     43.8 2666.7 11.68       165    2667     44.00     107.7    2666.7    28.72
       occupation
       Forest
  3 vegetation                      94.5            37.80     74.7    4000   29.88    12     4000      4.80      7.8      4000      3.12
       restoration fee
       Use fee with
       compensation
       of the newly
  4                                 411             383.60   118.5    9333 110.60     177    9333     165.20    115.5     9333     107.8
       added
       construction
       land
  Static investment
                                                1587.87                      655.44                   425.36                      507.07
  (including tax)




                                                                       139
                                                                                                                                Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                 Estimation of Resettlement Compensation for the Project Package in Dali Prefecture
Table 2
                                                                                                                                           Wastewater
                                                                                                                         Urban drainage treatment plant                  Integrated water Integrated water   Integrated water
                                                                                                                                                          Solid waste
                                                                             Rural non-point pollution control in Lake   systems under    and associated                  environmental    environmental       environment
                                Unit price(yuan)            Total                                                                                        management in
                                                                                          Er’hai Basin                     Daili City   sewer network of                  management of management of         management of
                                                                                                                                                         Eryuan County
Serial                                                                                                                    jurisdiction  Dengchuan Town                     Luoshi River      Miju River       Yongan River
             Item        Unit
 No.                                                                                                                                    in Eryuan County

                                                                                      Eryuan County       Dali City        Dali City     Eryuan County   Eryuan County      Dali City      Eryuan County     Eryuan County
                                Eryuan                    Eryuan
                                       Dali City Subtotal        Dali City Subtotal
                                County                    County
                                                                                      Qty   Amount      Qty     Amount    Qty    Amount Qty     Amount   Qty    Amount    Qty    Amount     Qty   Amount      Qty    Amount

         Compensa-
         tionon for
  I                                                885.89   872.51   13.38   5.55                                 5.55            7.81          15.41           336.24           326.64             96.52             97.70
         rural
         resettlement
         Compensa-
         tion for land
 (1)     acquisition                               866.34   853.96   12.38   5.55                                 5.55            6.81          15.41           317.69           326.64             96.52             97.70
         and
         occupation

  1      Project                                   859.51   853.96   5.55    5.55                                 5.55                          15.41           317.69           326.64             96.52             97.70

 1.1     permanent
         Farmland                                  670.90   665.35   5.55    5.55                                 5.55                                          283.05           284.60                               97.70
         land
         Paddy fields mu         46526   46276     387.85   382.30   5.55    5.55                       1.2       5.55                                                    61.5   284.60                        21     97.70
         acquisition
           Dry land      mu      29858   27404     283.05   283.05                                                                                       94.8   283.05

 1.2     Garden          mu      21000   21000     36.41    36.41                                                                        7.34   15.41                                       10      21.00

 1.3     plots
         Pond            mu      28132   28028     42.04    42.04                                                                                                          15     42.04

 1.4     Fish pond       mu      23600             75.52    75.52                                                                                                                           32      75.52

 1.5     Woodland        mu      4900              34.64    34.64                                                                                        70.7   34.64
         Temporary
         (     sparse
  2      construction                               6.83             6.83                                                         6.81
         land
         woodland)
 1.1     Paddy fields mu/y               5156       6.15             6.15                                                11.88    6.13

 1.2                 r
           Dry land mu/y                 4278       0.68             0.68                                                1.58     0.68
    Compensa-  r
(2) tion   for m2                         100       1.00             1.00                                                100      1.00
    houses
                                                                                                                 140
                                                                                                                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                                                                                                              Wastewater
                                                                                                                            Urban drainage treatment plant                   Integrated water Integrated water   Integrated water
                                                                                                                                                             Solid waste
                                                                                Rural non-point pollution control in Lake   systems under    and associated                   environmental    environmental       environment
                                   Unit price(yuan)            Total                                                                                        management in
                                                                                             Er’hai Basin                     Daili City   sewer network of                   management of management of         management of
                                                                                                                                                            Eryuan County
Serial                                                                                                                       jurisdiction  Dengchuan Town                      Luoshi River      Miju River       Yongan River
             Item          Unit
 No.                                                                                                                                       in Eryuan County

                                                                                         Eryuan County       Dali City        Dali City      Eryuan County   Eryuan County      Dali City      Eryuan County     Eryuan County
                                   Eryuan                    Eryuan
                                          Dali City Subtotal        Dali City Subtotal
                                   County                    County
                                                                                         Qty   Amount      Qty     Amount    Qty    Amount Qty    Amount     Qty    Amount    Qty    Amount     Qty   Amount      Qty    Amount

         Compensati
         on          for
 (3)                                                  18.55    18.55                                                                                                18.55
         scattered
         fruit trees

  1      Trees    with piece         75      75       18.23    18.23                                                                                         2431   18.23

  2      fruit
         Trees             piece     10      10        0.32     0.32                                                                                         323     0.32
         Compensati
         without fruit
         on        for
  II     restoration                                  25.64             25.64                                                        25.64
         of    special
         items
         Electric      pole/
  1                                         65000     11.64             11.64                                               1.79     11.64
         power line km
         Telecommu
                   pole/
  2      nication                           50000     14.00             14.00                                                2.8     14.00
                    km
         cable
         Other
 III                                                  117.81   113.81   4.00    0.75                                 0.75            3.25           2.02            43.53             42.80             12.65             12.81
         expenses
         Overhead of
  1      construction I+II 0.50%            0.50%      4.56     4.36    0.20    0.03                                 0.03            0.17           0.08             1.68             1.63              0.48               0.49
         unit
         Technical
  2                          I      0.50%   0.50%      4.43     4.36    0.07    0.03                                 0.03            0.04           0.08             1.68             1.63              0.48               0.49
         training fee
         Plan       &
  3                   I+II 2.50%            2.50%     22.80    21.82    0.98    0.14                                 0.14            0.84           0.39             8.41             8.17              2.41               2.44
         design fee
         Overhead
  4      for          I+II 3.00%            3.00%     27.35    26.18    1.17    0.17                                 0.17            1.00           0.46            10.09             9.80              2.90               2.93
         implementa-
         tion
         Resettle-
         ment
  5                   I+II 1.00%            1.00%      9.12     8.73    0.39    0.06                                 0.06            0.33           0.15             3.36             3.27              0.97               0.98
         supervision
         fee



                                                                                                                    141
                                                                                                                                Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                                                                                                           Wastewater
                                                                                                                         Urban drainage treatment plant                  Integrated water Integrated water   Integrated water
                                                                                                                                                          Solid waste
                                                                             Rural non-point pollution control in Lake   systems under    and associated                  environmental    environmental       environment
                                Unit price(yuan)            Total                                                                                        management in
                                                                                          Er’hai Basin                     Daili City   sewer network of                  management of management of         management of
                                                                                                                                                         Eryuan County
Serial                                                                                                                    jurisdiction  Dengchuan Town                     Luoshi River      Miju River       Yongan River
             Item       Unit
 No.                                                                                                                                    in Eryuan County

                                                                                      Eryuan County       Dali City        Dali City     Eryuan County   Eryuan County      Dali City      Eryuan County     Eryuan County
                                Eryuan                    Eryuan
                                       Dali City Subtotal        Dali City Subtotal
                                County                    County
                                                                                      Qty   Amount      Qty     Amount    Qty    Amount Qty     Amount   Qty    Amount    Qty    Amount     Qty   Amount      Qty    Amount
         Monitoring
         and
  6                    I+II 1.50%        1.50%     13.67    13.09    0.58    0.08                                 0.08            0.50           0.23            5.04             4.90              1.45               1.47
         evaluation
         fee
         Examination
         fee       for
  7      design        I+II 0.30%        0.30%      2.74     2.62    0.12    0.02                                 0.02            0.10           0.05            1.01             0.98              0.29               0.29
         documenta-
         tion
         Overhead of
         land
  8      acquisition (1) 2.80%           2.80%     24.27    23.92    0.35    0.16                                 0.16                           0.43            8.90             9.15              2.70
         and
         relocation                                                                                                               0.22                                                                                 2.74
         Supporting
         fee      for
  9                       I      1.00%   1.00%      8.87     8.73    0.14    0.06                                 0.06            0.08           0.15            3.36             3.27              0.97               0.98
         vulnerable
         groups

 IV      Contingency                               102.93   98.63    4.30    0.63                                 0.63            3.67           1.74           37.98             36.94             10.92             11.05

  1      Basic          I+II+    10%     10%       102.93   98.63    4.30    0.63                                 0.63            3.67           1.74           37.98             36.94             10.92             11.05

  2      contingency III
         Contingency

         for
         Static price                             1132.27 1084.95    47.32   6.93                                 6.93            40.4          19.17           417.75           406.38            120.09             121.56
         difference
         investment
  V      Related tax                               515.60   512.90   2.70    2.70                                 2.70                          11.73           245.77           162.19             54.38             38.83
         (excluding
         Farmland
  1      tax)                                      98.83    98.05    0.78    0.78                                 0.78                           2.92           37.74             39.78             3.98              13.63
         reclamation

         fee
         Paddy fields mu         6492    6468      54.19    53.41    0.78    0.78                       1.2       0.78                                                    61.5    39.78                        21     13.63

          Dry land      mu       3981    4434      44.64    44.64                                                                        7.34    2.92    94.8   37.74                       10      3.98
          and
         Tax gardenfor
  2      farmland      mu       2666.8   2666.8    64.76    64.44    0.32    0.32                       1.2       0.32                   7.34    1.96    94.8   25.28     76.5    20.40     42      11.20      21      5.60
             plots
         occupation


                                                                                                                 142
                                                                                                                            Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                                                                                                       Wastewater
                                                                                                                     Urban drainage treatment plant                   Integrated water Integrated water   Integrated water
                                                                                                                                                      Solid waste
                                                                         Rural non-point pollution control in Lake   systems under    and associated                   environmental    environmental       environment
                            Unit price(yuan)            Total                                                                                        management in
                                                                                      Er’hai Basin                     Daili City   sewer network of                   management of management of         management of
                                                                                                                                                     Eryuan County
Serial                                                                                                                jurisdiction  Dengchuan Town                      Luoshi River      Miju River       Yongan River
            Item     Unit
 No.                                                                                                                                in Eryuan County

                                                                                  Eryuan County       Dali City        Dali City     Eryuan County    Eryuan County      Dali City      Eryuan County     Eryuan County
                            Eryuan                    Eryuan
                                   Dali City Subtotal        Dali City Subtotal
                            County                    County
                                                                                  Qty   Amount      Qty     Amount    Qty    Amount Qty     Amount   Qty     Amount    Qty    Amount     Qty   Amount      Qty    Amount

         Restoration
  3      fee of forest mu   4000.2   4000.2    28.28    28.28                                                                                        70.7    28.28
         vegetation

         Use fee with
         compensatio
         n of the
  4                   mu    9333.8   13334     323.73   322.13   1.60    1.60                       1.2       1.60                   7.34    6.85    165.5   154.47    76.5   102.01     42      39.20      21     19.60
         newly added
         construction
         land

Total investment
                                              1647.87 1597.85    50.02   9.63                                 9.63            40.4           30.9            663.52           568.57            174.47             160.39
 (including tax)




                                                                                                             143
                                                                                                                                           Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                     Estimation of Resettlement Compensation for the Project Package in Lijian City
Table 3
                                                                                               Wastewater management in          Wasterwater management in Lijiang       Lijiang City WWTP and sewer
 Serial                                                                     Total investment                                                                                                         Solid waste management in Lijiang City
                                                                                                    Huaping County                         Ancient City                             network
                                  Item                            Unit
  No.                                                                          (104 yuan)
                                                                                                      Unit price Investment                 Unit price Investment (104            Unit price Investment          Unit price
                                                                                               Qty                                 Qty                                     Qty                            Qty               Investment (104 yuan)
                                                                                                      (yuan) (104 yuan)                     (yuan)          yuan)                 (yuan) (104 yuan)              (yuan)
   I      Compensation for rural resettlement                                   1837.65                            59.29                                  730.96                             790.08                               257.32
          Compensation      for    land     acquisition   and
  (I)                                                                           1106.69                            59.29                                                                     790.08                               257.32
          occupation
   1      Project permanent land acquisition                                    1094.97                            59.29                                                                     778.36                               257.32

  1.1     Farmland                                                              981.85                             59.29                                                                     778.36                               144.20

                            Paddy fields                           mu           981.85         21.6    27450       59.29                                                   88      88450     778.36       35      41200            144.2

                              Dry land                             mu

  1.2     Woodland                                                 mu            97.46                                                                                                                    195    4998.00           97.46

  1.3     Construction land                                        mu            15.66                                                                                                                    3.48    45000            15.66

   2      Temporary construction land                                            11.72                                                                                                        11.72

  2.1     Farmland                                                               11.72                                                                                                        11.72

                            Paddy fields                           mu            11.72                                                                                    21.85     5364      11.72
          Compensation      for    houses     and   auxiliary
  (II)                                                                          703.62                                                                    703.62
          structures
                                                                     2
   1      Houses                                                   m            590.62                                                                    590.62
                                                                     2
          Frame structure                                          m                                                                         626.98
                                                                     2
          Brick-concrete house                                     m            457.97                                           9257.44     494.71       457.97
                                                                     2
          Brick-wood house                                         m             8.17                                            221.98      367.90         8.17
                                                                     2
          Earth-wood house                                         m             12.28                                           443.66      276.81        12.28

   2      House plot                                               mu           112.20                                            1.87     600000.00      112.20

   3      Auxiliary structures                                                    0.8                                               4       2000.00         0.8
       Compensation       for            infrastructure    in
 (III)                                                                           1.32                                                                       1.32
       resettlement sites
   1      Ground leveling fee                                   household        1.00                                               4       2500.00         1.00

   2      Compensation for water and power supply               household        0.32                                               4        800.00         0.32


                                                                                                                           144
                                                                                                                                     Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                                                             Wastewater management in      Wasterwater management in Lijiang       Lijiang City WWTP and sewer
Serial                                                                    Total investment                                                                                                     Solid waste management in Lijiang City
                                                                                                  Huaping County                     Ancient City                             network
                                Item                            Unit
 No.                                                                         (104 yuan)
                                                                                                   Unit price Investment              Unit price Investment (104           Unit price Investment         Unit price
                                                                                             Qty                 4           Qty                                     Qty                 4         Qty              Investment (104 yuan)
                                                                                                   (yuan) (10 yuan)                   (yuan)          yuan)                (yuan) (10 yuan)              (yuan)
(IV) Removal compensation                                                      26.01                                                                 26.01

  1      Transportation fee                                   household        0.12                                           4        300.00         0.12

  2      Subsidy for loss of working time                     household        3.00                                         30.00     1000.00         3.00

  3      Living subsidy for transition period                 household        0.72                                           4       1800.00         0.72

  4      Business loss fee for the leasing houses               piece          12.90                                       215.00      600.00        12.90
                                                                   2
  5      Relocation compensation                                 m             9.27                                        5067.73      18.30         9.27

  II     Compensation for urban resettlement                                  505.76                                                                505.76
         Compensation     for    houses     and   auxiliary
         structures                                                           479.24                                                                479.24

  1      Houses                                                               311.64                                                                311.64
                                                                   2
                      Brick-concrete house                       m             94.81                                       1916.53     494.71        94.81
                                                                   2
                       Brick-wood house                          m             50.86                                       1382.38     367.90        50.86
                                                                   2
                        Earth-wood house                         m             0.37                                         13.31      276.81         0.37

  2      House plot                                              mu             165                                         2.76     600000.00      165.60

  3      Auxiliary structures                                 household        2.00                                          10         2000         2.00
      Compensation       for           infrastructure    in
(III)                                                                          3.30                                                                   3.30
      resettlement sites
  1      Ground leveling fee                                  household        2.50                                         10.00     2500.00         2.50

  2      Compensation for water and power supply              household        0.80                                         10.00      800.00         0.80

(IV) Removal compensation                                                      12.82                                                                 12.82

  1      Transportation fee                                   household        0.30                                         10.00      300.00         0.30

  2      Subsidy for loss of working time                     household        3.20                                         32.00     1000.00         3.20

  3      Living subsidy for transition period                 household        1.80                                         10.00     1800.00         1.80

  4      Business loss fee for the leasing houses               piece          4.80                                         80.00      600.00         4.80

  5      Relocation compensation                                 m2            2.72                                        1487.85      18.30         2.72
         Removal compensation of privately-owned
 (V)                                             household                     10.40                                         130         800         10.40
         business households



                                                                                                                     145
                                                                                                                           Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                                                  Wastewater management in        Wasterwater management in Lijiang      Lijiang City WWTP and sewer
Serial                                                         Total investment                                                                                                      Solid waste management in Lijiang City
                                                                                       Huaping County                       Ancient City                            network
                              Item                      Unit
 No.                                                              (104 yuan)
                                                                                        Unit price Investment               Unit price Investment (104           Unit price Investment         Unit price
                                                                                  Qty                 4             Qty                                    Qty                 4         Qty              Investment (104 yuan)
                                                                                        (yuan) (10 yuan)                    (yuan)          yuan)                (yuan) (10 yuan)              (yuan)
    Removal compensation of enterprises and
 III
    public institutions                                           6367.20                                                                 6367.20
    Compensation of units that have signed
(I)                                                               2312.87                                                                 2312.87
    agreements
  1      Land acquisition fee for new site                          252.1                                                                 252.10

  2      State Taxation Bureau of the ancient town                 542.80                                                                 542.80

  3      Lijiang Technics and Veterinary Station                    15.97                                                                  15.97
         Lijiang Municipal Bureau of Radio and
  4                                                               1502.00                                                                 1502.00
         Television
         Compensation of units that have not signed
 (II)
         agreements                                               4054.32                                                                 4054.32
         Compensation for houses and auxiliary
  1                                                               3994.32                                                                 3994.32
         structures
 1.1 Houses                                                       3994.32                                                                 3994.32
                                                          2
             Frame house(including land price)          m          541.21                                         4832.2      1120        541.21
                                                          2
          Brick-concrete house (including land price)   m          2627.92                                      26598.35     988.00       2627.92

            Brick-wood house (including land price)     m2         543.13                                       6308.14      861.00       543.13

            Earth-wood house (including land price)     m2         282.07                                       3663.22      770.00       282.07

  2      Other compensation                                          60                                             12        50000          60

 IV      Other expenses                                           1002.03                            7.47                                 862.59                             99.55                               32.42

  1      Overhead of construction unit                              43.55                            0.30                                  38.02                              3.95                                1.29

  2      Technical training fee                                     11.72                            0.30                                  6.18                               3.95                                1.29

  3      Plan & design fee                                         217.77                            1.48                                 190.10                             19.75                                6.43

  4      Overhead for implementation                               261.32                            1.78                                 228.12                             23.70                                7.72

  5      Resettlement supervision fee                               87.11                            0.59                                  76.04                              7.90                                2.57

  6      Monitoring and evaluation fee                              87.11                            0.59                                  76.04                              7.90                                2.57

  7      Examination fee for design documentation                   26.13                            0.18                                  22.81                              2.37                                0.77

  8      Overhead of land acquisition and relocation               243.90                            1.66                                 212.91                             22.12                                7.20

  9      Supporting fee for vulnerable groups                       23.43                            0.59                                  12.37                              7.90                                2.57



                                                                                                            146
                                                                                                                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


                                                                                  Wastewater management in           Wasterwater management in Lijiang      Lijiang City WWTP and sewer
Serial                                                         Total investment                                                                                                         Solid waste management in Lijiang City
                                                                                       Huaping County                          Ancient City                            network
                              Item                      Unit
 No.                                                              (104 yuan)
                                                                                          Unit price Investment                Unit price Investment (104             Unit price Investment           Unit price
                                                                                  Qty                   4              Qty                                    Qty                   4         Qty                Investment (104 yuan)
                                                                                          (yuan) (10 yuan)                     (yuan)          yuan)                  (yuan) (10 yuan)                (yuan)
  V      Contingency                                               971.26                              6.68                                  846.65                               88.96                                 28.97

  1      Basic contingency                                         971.26                              6.68                                  846.65                               88.96                                 28.97

  2      Contingency for price difference                           0.00

               Static investment (excluding tax)                   10683.9                             73.44                                 9313.15                             978.59                                318.72

 VI                       Related tax                              564.24                              34.39                                  0.00                               174.46                                355.39

  1      Farmland reclamation fee                                   94.08                              14.23                                  0.00                                57.13                                 22.72

                          Paddy fields                  mu          94.08         21.6      6588       14.23                                  0.00            88        6492      57.13        35       6492            22.72

                             Dry land                   mu                                             0.00                                   0.00                                 0.00                                  0.00

  2               Tax for farmland occupation           mu          38.56         21.60   2666.68      5.76                                   0.00          58667.0       4       23.47        35     2666.68            9.33

  3           Restoration fee of forest vegetation      mu          78.00                              0.00                                   0.00                                 0.00       195.0   4000.02           78.00
         Use fee with compensation of the newly added
  4                                                     mu         353.60         21.60   6666.70      14.40                                  0.00          58667.0      16       93.87       230.0   10666.72         245.33
                       construction land
                Total investment (including tax)                  11248.14                            107.83                                 9313.15                             1153.06                               674.11




                                                                                                               147
                                                                                                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                       Estimation of Resettlement Compensation for the Project Package in Wenshan Prefecture
Table 4
                                                                          Solid waste management in        Wastewater management in   Solid waste management in Funing    Integrated management of Puting
                                                        Total
  Serial                                                                        Malipo County                   Malipo County                      County                      River in Funing County
                      Item             Unit
   No.                                                  Amount (104             Unit price Amount (104           Unit price Amount               Unit price   Amount                Unit price    Amount
                                                Qty                     Qty                                Qty                         Qty                                 Qty
                                                          yuan)                 (yuan)        yuan)               (yuan) (104 yuan)              (yuan)      (104 yuan)              (yuan)      (104 yuan)
           Compensation for rural
   I                                                        1154.53                         143.04                          62.62                                                                  3.72
           resettlement                                                                                                                                       582.41
           Compensation for land
 (1)       acquisition and                                  1151.98                         142.58                          62.62                                                                  3.72
           occupation                                                                                                                                         580.31
           Project permanent land
   1                                    mu     299.40       1143.59     80.00               142.58         16.35            62.62     127.5                                                        0.00
           occupation                                                                                                                                         580.31
  1.1      Paddy fields                 mu     69.55        238.22      13.00   38300       49.79          16.35    38300   62.62     16.3       48600        79.22
  1.2      Dry land                     mu     133.20       474.19      52.00   15300       79.56                                     81.2       48600        394.63
  1.2      Test fields                  mu     33.60        302.40

  1.3      Garden plots                 mu      20              99.00                                                                  20        49500          99

  1.4      Woodland                     mu     43.05            29.78   15.00    8820       13.23                                      10         7457         7.46
           Temporary
   2                                    mu     58.85            8.38                          0                               0                                 0         20                       3.72
           construction land
           Farmland                     mu     58.85            8.38                                                                                                      20         1860          3.72
                                          2
  (2)      House compensation           m                                                                                              60         350          2.10
           Brick-wood                   m2                                                                                             60         350          2.10
  (3)      Other compensation                                   0.46                         0.46                             0                                 0                                   0

           Scattered trees             piece    59              0.21     59       35         0.21

           Grave                       piece     5              0.25     5       500         0.25
           Compensation for
   II      restoration of special                               75.82                         0                               0                                 0                                   0
           items
           Compensation for
                                       Pole/
   1       communication                        3.10            70.24
                                        km
           facilities
           Compensation for            Pole/
   2                                            2.00            5.58
           electric power facilities    km
  III      Other expenses                                   157.84                          18.72                           8.20                              76.24                                0.49
           Overhead of
   1                                                            6.15                         0.72                           0.31                               2.91                                0.02
           construction unit



                                                                                                     148
                                                                                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                 Solid waste management in       Wastewater management in   Solid waste management in Funing    Integrated management of Puting
                                               Total
Serial                                                                 Malipo County                  Malipo County                      County                      River in Funing County
                  Item            Unit
 No.                                           Amount (104             Unit price Amount (104          Unit price Amount               Unit price   Amount                Unit price    Amount
                                         Qty                   Qty                               Qty                         Qty                                 Qty
                                                 yuan)                 (yuan)        yuan)              (yuan) (104 yuan)              (yuan)      (104 yuan)              (yuan)      (104 yuan)
 2       Technical training fee                        5.77                         0.72                          0.31                               2.91                                0.02
         Planning and design
 3                                                     30.76                        3.58                          1.57                              14.56                                0.09
         fee
         Overhead for
 4                                                     36.91                        4.29                          1.88                              17.47                                0.11
         implementation
         Resettlement
 5                                                     12.30                        1.43                          0.63                               5.82                                0.04
         supervision fee
         Monitoring and
 6                                                     18.46                        2.15                          0.94                               8.74                                0.06
         evaluation fee
         Examination fee for
 7                                                     3.69                         0.43                          0.19                               1.75                                0.01
         design documentation
         Overhead of land
 8       acquisition and                                                            3.99                          1.75                                                                   0.10
         relocation                                    32.26                                                                                        16.25
         Supporting fee for
 9                                                     11.55                        1.43                          0.63                               5.82                                0.04
         vulnerable groups
IV       Contingency                               138.82                          16.18                          7.08                              65.86                                0.42

 1       Basic contingency                         138.82                          16.18                          7.08                              65.86                                0.42
         Contingency for price
 2                                                     0.00                          0                              0                                 0                                   0
         difference
         Static investment
                                                   1527.02                        177.94                          77.91                             724.51                               4.63
         (excluding tax)
 V       Related tax                               459.24                         103.07                          21.90                             154.61                               0.00
         Farmland reclamation
 1                                                     95.99   65.00   4062        26.40         16.35    4062    6.64      97.5        4062        39.60
         fee
         Tax for farmland
 2                                                     63.02   65.00   2667        17.33         16.35    2667    4.36      97.5        2667        26.00
         occupation
         Restoration fee of
 3                                                     44.00   15.00   4000         6.00                                     10         4000         4.00
         forest vegetation
         Newly added
 4                                                 256.24      80.00   6667        53.33         16.35    6667    10.90     127.5       6667        85.00
         construction land
Static investment (including
                                                   1986.26                        281.01                          99.81                             879.12                               4.63
              tax)




                                                                                           149
                                                                                                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                        Estimation of Resettlement Compensation for the Project Package in Wenshan Prefecture
Table 4 (continued)
                                                                                                                                                Integrated water environmental
                                                  Wastewater management in         Wastewater management in    Water supply project in Qiubei                                    Solid waste management in
                                                                                                                                                management of Puzhehei Lake
 Serial                                              Guangnan County                    Qiubei County                    County                                                        Maguan County
                     Item                Unit                                                                                                          in Qiubei County
  No.
                                                         Unit price    Amount              Unit price Amount            Unit price Amount                 Unit price Amount            Unit price Amount
                                                 Qty                               Qty                         Qty                               Qty                             Qty
                                                         (yuan)       (104 yuan)                       4
                                                                                           (yuan) (10 yuan)             (yuan) (104 yuan)                 (yuan) (104 yuan)            (yuan) (104 yuan)
          Compensation for rural                                                                                                    13.76
   I                                                                   306.06                                                                                                                         0.00
          resettlement                                                                               42.92
          Compensation for land                                                                                                       13.76
  (1)     acquisition        and                                       306.06                                                                                                                         0.00
          occupation                                                                                 42.92
          Project permanent land                                                                               18.05                   9.10
   1                                     mu      35.00                 306.06                                                                                                                         0.00
          occupation                                                               22.45             42.92
  1.1     Paddy fields                   mu       1.4     26176         3.66       22.45    19120    42.92
  1.2     Dry land                       mu

  1.2     Test fields                    mu      33.6     90000        302.4

  1.3     Garden plots                   mu

  1.4     Pond                           mu
  1.5     Woodland                       mu                                                                    18.05      5040         9.10

  1.7     Construction land              mu
          Temporary construction                                                                               38.85                   4.66
   2                                     mu                              0                             0                                                                                               0
          land
          Farmland                       mu                                                                    38.85      1200         4.66

  (2)     Other compensation                                             0                             0                                0                                                              0
          Scattered trees                piece
          Grave                          piece
          Compensation            for
   II     restoration of special                                         0                             0                                0                                                            75.82
          items
          Compensation            for    pole/
   1                                                                                                                                                                             3.1     226357      70.24
          communication facilities        km
          Compensation            for    pole/
   2                                                                                                                                                                             2.0     27903        5.58
          electric power facilities       km
  III     Other expenses                                               40.09                          5.62                             1.80                                                           6.67
          Overhead of construction
   1                                                                    1.53                                                                                                                          0.38
          unit                                                                                        0.21                             0.07
   2      Technical training fee                                        1.53                          0.21                             0.07                                                           0.00
   3      Planning and design fee                                       7.65                          1.07                             0.34                                                           1.90
          Overhead              for
   4                                                                    9.18                                                                                                                          2.27
          implementation                                                                              1.29                             0.41


                                                                                                      150
                                                                                                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                                                                                                                           Integrated water environmental
                                             Wastewater management in         Wastewater management in    Water supply project in Qiubei                                     Solid waste management in
                                                                                                                                           management of Puzhehei Lake
Serial                                          Guangnan County                    Qiubei County                    County                                                         Maguan County
                   Item              Unit                                                                                                         in Qiubei County
 No.
                                                    Unit price    Amount              Unit price Amount            Unit price Amount                 Unit price Amount              Unit price Amount
                                            Qty                               Qty                         Qty                               Qty                             Qty
                                                    (yuan)       (104 yuan)                       4
                                                                                      (yuan) (10 yuan)             (yuan) (104 yuan)                 (yuan) (104 yuan)              (yuan) (104 yuan)
         Resettlement supervision
  5                                                                3.06                                                                                                                           0.76
         fee                                                                                     0.43                             0.14
         Monitoring           and
  6                                                                4.59                                                                                                                           1.14
         evaluation fee                                                                          0.64                             0.21
         Examination fee for
  7                                                                0.92                                                                                                                           0.23
         design documentation                                                                    0.13                             0.04
         Overhead       of   land
  8      acquisition          and                                  8.57                                                                                                                           0.00
         relocation                                                                              1.20                             0.39
         Supporting      fee   for
  9                                                                3.06                                                                                                                           0.00
         vulnerable groups                                                                       0.43                             0.14
 IV      Contingency                                              34.62                          4.85                             1.56                                                            8.25
  1      Basic contingency                                        34.62                          4.85                             1.56                                                            8.25
         Contingency for price
  2                                                                 0                             0                                                                                                0
         difference
         Static        investment
                                                                  380.78                         53.40                           17.12                                                           90.74
         (excluding tax)
  V      Related tax                                              46.88                          30.07                           12.03                                                           90.67
         Farmland      reclamation
  1                                         35.00     4062        14.22                 4062
         fee                                                                  22.45              9.12
         Tax      for     farmland
  2                                         35.00     2667         9.33                 2667
         occupation                                                           22.45              5.99
         Restoration fee of forest
  3                                                                                                                                                                         85.00     4000       34.00
         vegetation
         Newly               added
  4                                         35.00     6667        23.33                 6667                                                                                85.00     6667       56.67
         construction land                                                    22.45              14.97                           12.03
         Static         investment
                                                                 427.66                          83.48                           29.15                                                          181.41
         (including tax)




                                                                                                 151
                                                                                                    Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


Appendix 6:Schedule of Land Acquisition and House Relocation
                              Schedule of Land Acquisition and House Relocation for the Package Project in Kunming City
Table 1
                                                                    Solid waste management in   Solid waste management in   Solid waste management   Enhancement      of    Water
                                  Item
                                                                    Xundian County              Songming County             in Luquan County         Quality Monitoring Capacity
 I. Land acquisition
 1.Confirmation of the affected persons by land acquisition                 2006.11                                                                            2007.4
 2. Preparation for inventory survey of land acquisition and
                                                                         2006.12~2007.1                                                                        2007.4
 investigation
 3. Consultation and determination of compensation standard for
                                                                         2007.1~2007.9               2007.6~2007.8              2007.1~2007.4
 land acquisition
 4. Disbursement of compensation for land acquisition                    2007.6~2007.10              2007.6~2007.12             2007.4~2007.5
 5. Going through formalities of land acquisition                        2007.7~2007.10              2007.7~2007.12             2007.4~2007.6
 II. Production restoration
 1. Construction of water conservancy project                                                                                   2007.4~2007.12
 2. Altering land or restructuring agricultural planting (such as
                                                                         2007.6~2007.12              2007.6~2007.12             2007.4~2007.12
 selection of crop variety)
 3. Consultation of land adjustment and distribution option                                          2007.6~2007.8              2007.5~2007.7
 4. Land adjustment and distribution                                                                 2007.9~2007.12             2007.7~2007.12
 5. Resettlement of labor force                                                                     Before Feb. 2007           Before Feb. 2007
 IV. Restoration and reconstruction of special items                                                Before Feb. 2008           Before Feb. 2008




                                                                                          152
                                                                                                         Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                               Schedule of Land Acquisition and House Relocation for the Package Project in Dali Prefecture
Table 2
                                                                                                         Wastewater                                                            Integrated
                                                            Rural non-point pollution Urban drainage treatment plant and               Integrated water   Integrated water       water
                                                                                                                          Solid waste
 Serial                                                                               systems under associated sewer                    environmental      environmental     environmental
                                Item                         control in Lake Er’hai                                      management in
  No.                                                                                   Daili City        network of                   management of      management of       management
                                                                                                                         Eryuan County
                                                                      Basin            jurisdiction Dengchuan Town in                     Miju River       Yongan River        of Luoshi
                                                                                                       Eryuan County                                                             River
   I      Land acquisition
          Confirmation and check of land acquisition
   1      scope                                                                                                   2006.12~2007.4
          Survey and check of inventory of land
   2      acquisition                                                                                             2006.12~2006.5
          Consultation and determination of compensation
   3      standard for land acquisition                                                                           2007.10~2007.11
          Disclosure of compensation resettlement options
   4      for land acquisition                                                                                         2007.11
          Disbursement of compensation for land
   5      acquisition                                                                                                  2007.12
   6      Handling land use formalities                                                                                2007.12
   II     Relocation and construction of special items
          Determination and Disclosure of production
   1      restoration and compensation distribution
          scheme                                                                                                       2007.11
   2      Payment of compensation fee                                                                                  2007.12
                                                                                       2007.9~
  Ⅲ       Relocation of special items                                                   2007.12
  IV      Commencement of project construction                                                                         2008.1




                                                                                              153
                                                                                                    Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                                          Schedule of Land Acquisition and House Relocation for the Package Project in Lijiang
Table 3

 Serial                                                  Wastewater management in   Wastewater management in Lijiang Ancient Lijiang City WWTP and sewer Solid waste management
                               Item
  No.                                                        Huaping County                         Town                              network                in Lijiang City

   I      Land acquisition                                                                                      2006.11

   1      Determination of land requisition scope                                                               2006.11
          Survey and check of land requisition
   2                                                                                                        2006.12~2007.1
          inventory
          Consultation and determination of
   3                                                                                                        2007.2~2007.3
          compensation standard for land acquisition
          Disclosure of compensation resettlement
   4                                                                                                        2007.3~2007.9
          options for land acquisition
          Disbursement of compensation for land
   5                                                                                                        2007.4~2007.12
          acquisition
   6      Handling land acquisition formalities                                                             2007.5~2007.12

   II     Production restoration
          Determination of production restoration
   1                                                         2007.6~2007.7                                                        2007.6~2007.7             2007.5~2007.7
          option
          Land adjustment in villagers’ groups or cash
   2                                                         2007.7~2007.12                                                       2007.7~2007.12            2007.7~2007.12
          payment
  III     House relocation and construction

   1      Determination of relocation scope                                                    2006.12~2007.1

   2      Survey and check of relocation inventory                                              2007.1~2007.2
          Consultation and determination of
   3                                                                                            2007.2~2007.3
          compensation standard for house relocation



                                                                                         154
                                                                                                   Yunnan Urban Environment ProjectResettlement Action Plan (RAP)


Serial                                                  Wastewater management in   Wastewater management in Lijiang Ancient Lijiang City WWTP and sewer Solid waste management
                              Item
 No.                                                        Huaping County                         Town                              network                in Lijiang City

         Disclosure of resettlement option for house
  4                                                                                            2007.3~2007.9
         relocation
         Disbursement of compensation for land
  5                                                                                           2007.4~2007.12
         acquisition and relocation (the first stage)
  6      Distribution of house plots                                                          2007.4~2007.12

  7      Resettlers’ constructing new houses                                                  2007.4~2007.12

  8      Disbursement of compensation balance                                                      2008.2

  9      Resettlers’ moving into new houses                                                        2008.2

 10      Demolition of old houses                                                             Before Dec. 2007
         Relocation of enterprises and public
 IV                                                                                           2006.12~2007.12
         institutions
  V      Commencement of project construction                    2008.7                            2007.5                            2008.8                     2008.6




                                                                                        155
                                                                                                  Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

                              Schedule of Land Acquisition and House Relocation for the Package Project in Wenshan Prefecture
Table 4
                                                            Wenshan County                               Malipo County                                 Funing County
                       Item                     Panlong River in     Wastewater               Solid waste            Wastewater          Solid waste       Integrated management
                                                Wenshan County      management in            management in       management in Malipo   management in         of Puting River in
                                                  Town Area         Wenshan County           Malipo County             County           Funing County          Funing County
 I. Land acquisition
 1.Confirmation of the affected persons by
                                                                                                             2006.11
 land acquisition
 2.Preparation of inventory survey for land
                                                                                                       2006.12~2007.1
 acquisition and investigation
 3.Consultation and determination of
                                                2007.1~2007.9        2007.6~2007.8           2007.1~2007.4             2007.1~2007.4    2007.1~2007.2          2007.1~2007.2
 compensation standard for land acquisition
 4. Disbursement of compensation for land
                                                2007.6~2007.10       2007.6~2007.12          2007.4~2007.7             2007.7~2007.10   2007.2~2007.3          2007.2~2007.2
 acquisition
 5. Handling land acquisition formalities       2007.7~2007.10       2007.7~2007.11          2007.5~2007.7             2007.8~2007.12   2007.2~2007.3          2007.2~2007.2
 II. Production restoration
 1. Construction of water conservancy
                                                                                            2007.7~2007.12             2007.9~2007.10   2007.7~2007.12
 projects
 2. Land reclamation and alteration or
 restructuring of agricultural planting (such                                               2007.7~2007.12             2007.9~2007.10   2007.7~2007.12
 as selection of crop variety)
 3. Consultation of land adjustment and
                                                                                            2007.7~2007.12             2007.9~2007.10   2007.7~2007.12
 distribution option
 4. Land adjustment and distribution                                                        2007.7~2007.12             2007.9~2007.10   2007.7~2007.12
                                                                                                                                         Before Dec.
 5. Resettlement of labor force                                                             Before Dec. 2007       Before Dec. 2007
                                                                                                                                            2007




                                                                                      156
                                                                                             Yunnan Urban Environment ProjectResettlement Action Plan (RAP)

Table 4 (continued)
                                                     Guangnan County                        Qiubei County                        Yanshan County        Maguan County

                                                   Wastewater                                Wastewater         Wastewater
                                                                                                                                                        Solid waste
                       Item                                             Puzhehei Lake in    management in     management in    Urban drainage system
                                                   management      in     Qiubei County     Qiubei County      Qiubei County    in Yanshan County
                                                                                                                                                       management in
                                                                                                                                                       Maguan County
                                                   Guangnan County                             (WWT)               (WS)
 I. Land acquisition
 1. Confirmation of the affected persons by land
                                                                                              2006.11
 acquisition
 2.Preparation of inventory survey for land
                                                                                           2006.12~2007.1
 acquisition and investigation
 3.Consultation     and      determination    of
                                                      2007.1~2007.1      2007.6~2007.8       2007.1~2007.4    2007.1~2007.4       2007.1~2007.4
 compensation standard for land acquisition
 4. Disbursement of compensation for land
                                                      2007.2~2007.3     2007.6~2007.12       2007.4~2007.7    2007.4~2007.6       2007.4~2007.8
 acquisition
 5. Handling land acquisition formalities             2007.2~2007.3     2007.7~2007.12       2007.5~2007.7    2007.5~2007.8       2007.6~2007.12
 II. Production restoration
 1. Construction of water conservancy projects        2007.7~2007.12    2007.8~2007.10      2007.8~2007.10
 2. Land reclamation and alteration or
 restructuring of agricultural planting (such as      2007.7~2007.12    2007.8~2007.10      2007.8~2007.10
 selection of crop variety)
 3. Consultation of land adjustment and
                                                      2007.7~2007.12    2007.8~2007.10      2007.8~2007.10
 distribution option
 4. Land adjustment and distribution                  2007.7~2007.12    2007.8~2007.10      2007.8~2007.10
 5. Resettlement of labor force                      Before Dec. 2007   Before Dec. 2007   Before Dec. 2007
 III. Restoration and reconstruction of special
                                                                                                                                                       2007.2~2007.3
 items




                                                                                   157
                                                                                                          Yunnan Urban Environment ProjectResettlement Action Plan (RAP)




Appendix 7:Records of Symposiums
                                                                        Summary of Symposium Records

  Time            Place                        Participant                  Main topic for discussion                                           Conclusion

                                                                            Mobilization meeting of       The project owners are requested to cooperate with ECIDI, the consulting unit,
              Environmental
                                                                            land     acquisition    and   organize the local governments and resettlers’ representatives to participate and
 Morning        Protection       19 persons from the county project
                                                                            relocation as well as         provide data as required and inventory of land acquisition and relocation in
 of Dec. 4      Bureau of        office and all project owners
                                                                            resettlement       planning   project-affected areas.
              Kunming City
                                                                            work for the project
                                                                                                          The adopted method in existing refuse landfill is bare dumping and there are great
                                 12 persons from the city project
                                                                            Understanding           the   impacts on the surrounding environment and cannot satisfy urban development.
                                 office, Xundian County Party
Afternoon    Xundian County                                                 necessity    of     project   Therefore, construction of the project is in absolute demand. The project has obvious
                                 Committee, the county government,
of Dec. 4    Party Committee                                                construction and impacts      advantages that the occupied land is the collective woodland and contracted
                                 urban construction bureau and state
                                                                            of land acquisition           wasteland and land acquisition only affects one rural household and wasteland of the
                                 land administration bureau
                                                                                                          village collective with few impacts.
                                                                                                          Refuse landfill is adopted for the project. It is to lease 20 mu reclaimed wasteland
                                 12 persons from the county urban
                                                                                                          contracted by Mr. Hu Guangchun of the village and it has impacts on his production
              Haizi Villagers    construction      bureau,     township     Comprehending       project
                                                                                                          and business to certain extent but his livelihood will not be affected after given
 Morning       Committee of      government,           state         land   impacts and implementing
                                                                                                          proper compensation.
 of Dec. 5   Jinsuo Township,    administration      office,     forestry   production    resettlement
                                                                                                          The rent will be directly paid to the owner with land use right and the use right will
             Xundian County      station and villagers’ committee as        measures
                                                                                                          be returned after completion of leasing and reclamation, so there are no impacts on
                                 well as the villagers’ representatives.
                                                                                                          his production and living.
                                                                                                          The existing dump site is within the village and there are great impacts on the
                                                                                                          surrounding villagers. It only needs to lease the collective land of the village for
                                 9 persons from the county urban
                                                                                                          construction of the project and there will be small influence on villagers’ production
             Beiguan Villagers   construction      bureau,     town         Comprehending       project
                                                                                                          and living. Therefore, it is thought that construction of the project is very necessary
Afternoon     Committee of       government,     planning   station,        impacts and implementing
                                                                                                          and they all express their active support to it. As for rent use, they think it should be
of Dec.5       Rende Town,       forestry station, and villagers’           production    resettlement
                                                                                                          used for collective non-profit undertakings.
             Xundian County      committee as well as the villagers’        measures
                                                                                                          The method of one-year compensation for one-year occupation is adopted and the
                                 representatives
                                                                                                          rent is directly paid to the collective of villagers’ groups and the use right will be
                                                                                                          returned after reclamation at leasing expiration.




                                                                                              158
                                                                                                      Yunnan Urban Environment ProjectResettlement Action Plan (RAP)




  Time            Place                      Participant                Main topic for discussion                                            Conclusion

                                                                                                      All the participants express their support to the project. They think the project will
                                 16 persons from the city project
                                                                                                      facilitate social development and improvement of the people’s life. The existing
                                 office, the county government,         Understanding           the
             Songming Hotel                                                                           dump site is of bare dumping and is situated in the supply area of Longtan water,
Morning                          environmental protection bureau,       necessity    of     project
              in Songming                                                                             resulting in great pollution for the downstream water resources. Therefore,
of Dec. 8                        land administration bureau, forestry   construction and impacts
                 County                                                                               construction of new refuse landfill is imperative. However, it will occupy some
                                 bureau, construction bureau and        of land acquisition
                                                                                                      farmland, resulting in certain impacts on the resettlers’ production and living. It is
                                 agriculture bureau.
                                                                                                      necessary to formulate feasible resettlement options.
                                                                                                      During project construction, some land of the village will be used. Most resettlers
                                                                                                      hope to adopt leasing method, thus they will have proceeds every year and it is
                                                                                                      usually higher than planting income. However, some resettlers doubt whether the
                                 13 persons from the county             Comprehending       project
                                                                                                      newly constructed refuse landfill will affect their life and health just like the existing
Afternoon    Sijiao Village of   environmental protection bureau and    impacts and implementing
                                                                                                      dumping sites. Through explanation, they know that the project will adopt enclosed
of Dec.8     Songyang Town       villagers committee as well as         production    resettlement
                                                                                                      landfill and will not influence the ambient environment and villagers’ production and
                                 villagers’ representatives             measures
                                                                                                      living. They all agree with the project construction.
                                                                                                      Land acquisition will have certain impacts on the resettlers’ production, but the
                                                                                                      impacts can be mitigated by such resettlement option as cash compensation.
                                                                                                      The project is very favorable for the town. At present, along with rapid development
                                                                        Understanding          the    of the county town, the existing dumping sites and refuse cleaning and transport
                                                                        necessity    of    project    facilities cannot satisfy the demands and there are also impacts on further
Afternoon    Songyang Town       4 persons from Songyang Town
                                                                        construction          and     improvement of the residents’ living standard. In formulating the resettlement
of Dec.8      Government         government and villagers committee
                                                                        implementing production       options, the resettlers’ opinions should be listened to. The compensation should be
                                                                        resettlement measures         paid to the villagers committee and some will be used for the collective non-profit
                                                                                                      undertakings and the other paid to villagers’ groups and the contracting households.
                                                                                                      There is no refuse treatment site in conformity with the national sanitation standard
                                 19 persons from the city project                                     up to now in Luquan County and meantime the refuse collecting system is not
                                                                        Understanding           the
              Construction       office, the county government,                                       perfect. The existing dumping site is 200m to the water source of the county town,
 Morning                                                                necessity    of     project
               Bureau of         construction bureau, state land                                      Changjiu River and causes dangers to safety of water quality. The new refuse landfill
of Dec. 21                                                              construction and impacts
             Luquan County       administration    bureau,      water                                 can not only improve the current situation and accommodate to demands of urban
                                                                        of land acquisition
                                 resources bureau and forestry bureau                                 development but also protect the ecological environment of the Three Gorges
                                                                                                      reservoir area.




                                                                                          159
                                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)




  Time            Place                       Participant                Main topic for discussion                                           Conclusion

                                                                                                       Some land will be occupied by the project and most villagers express their support,
                                 Over 20 persons from the county                                       but others express their worry and raise that the project may affect the current
                                 construction bureau, environmental                                    domestic water and the close linear distance form the refuse landfill to the residential
                                                                         Comprehending       project
               Yanwachong        sanitation station, Pingshan Town                                     area is likely to affect their living environment, therefore, they request the
Afternoon                                                                impacts and implementing
                 Village in      government, villagers committee as                                    government to solve the issue of domestic water and take certain measure to ensure
of Dec. 21                                                               production    resettlement
              Pingshan Town      well      as      the     resettlers’                                 the ambient environment will not be impacted. They also hope the government can
                                                                         measures
                                 representatives, Mr. Yang Qingbiao                                    invest in road construction to improve traffic.
                                 and Mr. Zhang Daode                                                   Such resettlement option as combining cash compensation with land regulation can
                                                                                                       mitigate impacts of land acquisition.
                                 Over 20 persons from the county
             Environmental                                                                             The project owners are requested to actively cooperate with the consulting unit,
 Dec. 8,                         environmental protection bureau,        Project        mobilization
             Protection                                                                                ECIDI, in relevant work, organize the local governments and resettlers’
                                 planning and construction bureau,
  2006       Bureau of Eryuan                                            meeting                       representatives to participate and provide timely the necessary data and land
                                 state land administration bureau and
             County                                                                                    acquisition inventory in project-affected areas.
                                 forestry bureau
             Environmental       Over 30 persons from the members                                      The project owners are requested to actively cooperate with the consulting unit,
 Dec. 9,     Protection          of the project leading group of the     Project        mobilization   ECIDI, in relevant work, organize the local governments and resettlers’
  2006       Bureau of Dali      city     environmental     protection   meeting                       representatives to participate and provide timely the necessary data and land
             City                bureau, and water resources bureau                                    acquisition inventory in project-affected areas.
                                 15 persons from the county                                            The capacity of the existing refuse disposal plant cannot satisfy the demand of urban
                                 environmental protection bureau,                                      development and construction of the project is urgent. The villagers all express their
                                                                         Interview to resettlers and
Dec. 12,     Songhe Village of   planning and construction bureau,                                     support to the project and they think the project construction will improve the local
             Zibihu Town in      forestry bureau and Zibihu Town         resettlement     discussion   outgoing traffic. The occupied land is of collective woodland and contracted
  2006       Eryuan County       government as well as the cadres                                      wasteland (dry slope land) and the income of the villagers also comes from gathering
                                                                         meeting
                                 from villagers’ groups and villagers’                                 pine pubescent, therefore, there are few impacts on villagers’ income. Cash
                                 representatives                                                       compensation will be taken through consultation with villagers’ groups and the town.
                                                                                                       For the integrated non-point pollution control and water environmental management
                                 10 persons from the county                                            projects, the villagers all express their support and they think construction of these
                                                                         Interview to resettlers and
Dec. 12,     Jiutai Community    environmental protection bureau,                                      non-profit projects will facilitate improving the ambient natural and living
             of Zibihu Town      Zibihu Town government and cadres       resettlement     discussion   environment, promoting development of the areas surrounding the county town as
  2006       in Eryuan County    of villagers groups and villagers’                                    well as tourism in Zibihu Scenic Spots and they will benefit from these projects. The
                                                                         meeting
                                 representatives                                                       requisitioned land has few impacts on villagers’ income and cash resettlement will be
                                                                                                       taken by negotiation with the village, group and the town.




                                                                                           160
                                                                                                      Yunnan Urban Environment ProjectResettlement Action Plan (RAP)




 Time           Place                       Participant                 Main topic for discussion                                           Conclusion

                                                                                                      For the integrated non-point pollution control and water environmental management
                               11 persons from the county                                             projects, the villagers all express their support and they think construction of these
                               environmental protection bureau,                                       non-profit projects will facilitate improving the ambient natural and living
Dec. 14,                                                                Interview to resettlers and
           Yousuo Town in      Yousuo Town government and                                             environment, promoting development of the areas surrounding the county town as
                                                                        resettlement    discussion
 2006      Eryuan County       cadres    of   villagers’   groups                                     well as tourism in Xihu Scenic Spots and the river harnessing will also improve the
                                                                        meeting
                               concerned       and       villages’                                    local irrigation conditions to make the villagers benefit. The requisitioned land (most
                               representative                                                         of reclaimed wasteland) has few impacts on villagers’ income and cash resettlement
                                                                                                      will be taken by negotiation with the village, group and the town.
                               8 persons from the county                                              For Dengchuan Wastewater Treatment Plant project, villagers all express they will
           Zhonghe Village     environmental protection bureau,                                       support but they think it should be planned in a reasonable way and they hope the
Dec. 15,                                                                Interview to resettlers and
           of   Dengchuan      Dengchuan Town government and                                          plant site should have certain distance to the village. The requisitioned garden plots
                                                                        resettlement    discussion
 2006      Town in Eryuan      cadres from villagers groups                                           are owned by the collective, not contracting land, so there are few impacts on the
                                                                        meeting
           County              concerned        and        villagers’                                 villagers’ income. After consultation with the village, group and the town, cash
                               representatives                                                        compensation will be taken.
                               7 persons for the city environmental
                                                                                                      For the sewer network project in Fengyi Town, the villagers all express they will
                               protection bureau, project owner
Dec. 21,   Fengming Village                                             Interview to resettlers and   support to project construction and they think these non-profit projects will facilitate
                               units, Fengyi Town government and
           of     Fengming                                              resettlement    discussion    improving the ambient living and sanitation environment and they will benefit from
 2006                          cadres from the villagers groups
           Town in Dali City                                            meeting                       them. For the farmland to be temporarily occupied, they hope to get reasonable
                               concerned        and        villagers’
                                                                                                      economic compensation.
                               representatives
                               6     persons    from     the     city
                                                                                                      For non-point pollution control projects, the villagers all express they will support the
                               environmental protection bureau,
Dec. 22,   Taihe Village of                                             Interview to resettlers and   project construction and they think construction of these non-profit projects will
                               Xiaguan Town government and
           Xiaguan Town in                                              resettlement    discussion    facilitate improving the ambient living and sanitation environment and they will
 2006                          cadres from villagers groups
           Dali City                                                    meeting                       benefit from them. For the requisitioned farmland in small quantity, they hope to get
                               concerned and the villagers’
                                                                                                      reasonable economic compensation.
                               representative
                               5     persons    from     the     city
                                                                                                      For non-point pollution control projects and sewer network projects, the villagers all
           Preservation        environmental protection bureau,
Dec. 25,                                                                Interview to resettlers and   express they will support the project construction and they think construction of these
           Zone of ancient     project owner unit, Dali Town
                                                                        resettlement    discussion    non-profit projects will facilitate improving the ambient living and sanitation
 2006      Dali Town    in     government and cadres of villagers
                                                                        meeting                       environment and they will benefit from them. For the requisitioned farmland in small
           Dali City           groups concerned and villagers’
                                                                                                      quantity, they hope to get reasonable economic compensation.
                               representative




                                                                                          161
                                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)




  Time           Place                       Participant                Main topic for discussion                                            Conclusion

                                5     persons     from     the city
                                                                                                       For non-point pollution control projects, the villagers all express they will support the
                                environmental protection bureau,        Understanding        project
 Dec. 26,   Majiuyi Village                                                                            project construction and they think construction of these non-profit projects will
                                Yinqiao Town government and             impact,     interview     to
            of Yinqiao Town                                                                            facilitate improving the ambient living and sanitation environment and they will
  2006                          cadres of the villagers groups          resettlers and resettlement
            in Dali City                                                                               benefit from them. For the requisitioned farmland in small quantity, they hope to get
                                concerned as well as villagers’         discussion meeting
                                                                                                       reasonable economic compensation.
                                representative
                                5     persons     from     the city
                                                                                                       For non-point pollution control projects, the villagers all express they will support the
            Xiangyangxi         environmental protection bureau,        Understanding        project
 Dec. 27,                                                                                              project construction and they think construction of these non-profit projects will
            Village      of     Wanqiao Town government and             impact,     interview     to
                                                                                                       facilitate improving the ambient living and sanitation environment and they will
  2006      Wanqiao Town in     cadres of the villagers groups          resettlers and resettlement
                                                                                                       benefit from them. For the requisitioned farmland in small quantity, they hope to get
            Dali City           concerned as well as villagers’         discussion meeting
                                                                                                       reasonable economic compensation.
                                representative
                                6     persons     from     the city
                                                                                                       For non-point pollution control projects, the villagers all express they will support the
            Haichaohe           environmental protection bureau,        Understanding        project
 Dec. 28,                                                                                              project construction and they think construction of these non-profit projects will
            Village      of     Shanggua Town government and            impact,     interview     to
                                                                                                       facilitate improving the ambient living and sanitation environment and they will
  2006      Shangguan Town      cadres of the villagers groups          resettlers and resettlement
                                                                                                       benefit from them. For the requisitioned farmland in small quantity, they hope to get
            in Dali City        concerned as well as villagers’         discussion meeting
                                                                                                       reasonable economic compensation.
                                representative
                                6     persons     from     the city
                                                                                                       For non-point pollution control projects and sewer network projects in Xizhou, the
                                environmental protection bureau,        Understanding        project
 Dec. 29,   Shacun Village of                                                                          villagers all express they will support the project construction and they think
                                project owner unit, Xizhou Town         impact,     interview     to
            Xizhou Town in                                                                             construction of these non-profit projects will facilitate improving the ambient living
  2006                          government and cadres of the            resettlers and resettlement
            Dali City                                                                                  and sanitation environment and they will benefit from them. For the requisitioned
                                villagers groups concerned as well      discussion meeting
                                                                                                       farmland in small quantity, they hope to get reasonable economic compensation.
                                as villagers’ representative
            Environmental                                                                              All project owners are requested to actively cooperate with ECIDI, the consulting
                                16 persons from the city project
            Protection                                                  Project       mobilization     unit, organize the local government and resettlers’ representatives to participate and
Dec. 1                          office, subproject owners and
            Bureau of Lijiang                                           meeting                        timely provide required data and land acquisition inventory in the project affected
                                project consulting unit
            City                                                                                       areas.
                                25 persons from the county
            The     people’s                                            Mobilization meeting for
                                government, project owner and                                          The cadres of the county government point out the necessity of construction of the
Dec. 3      government    of                                            subprojects in Huaping
                                relevant design department and                                         project and request the departments concerned to actively cooperate.
            Huaping County                                              County
                                consulting unit
            Home     of Mr.
            He Zikun in         6     representatives      of     the                                  The villagers express their support to project construction and some farmers hope to
Dec. 5                                                                  Interview in households
            Rongjiang           project-affected rural households                                      get cash compensation for land acquisition.
            Village




                                                                                          162
                                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)




  Time          Place                       Participant                 Main topic for discussion                                           Conclusion

          Administration
                               8 persons from the city project
          commission      of                                            Discussion meeting       for   The Shizishan project concerns house relocation and suggestions are provided on
Dec. 19                        office, project owner unit and
          the ancient town                                              project survey                 how to make inventory survey and the work plan is scheduled.
                               consulting unit
          in Lijiang City
                               8 persons from the city project
          Construction         office,    project    owner      unit,
                                                                        Discussion meeting       for   The project owner is urged to site the management center as soon as possible so as to
Dec. 21   Bureau of Lijiang    environmental sanitation bureau of
                                                                        project survey                 arrange the next work.
          City                 the ancient town area and consulting
                               unit
                               30 persons from the city project
                               office, project owner unit, the
          Administration
                               people’s government of the ancient                                      Exchange are carried out on the resettlement option for the residents and enterprises
          commission      of                                            Discussion meeting       for
Dec. 22                        town area, office and residential                                       and public undertakings involved in Shizishan project and the inventory survey will
          the ancient town                                              resettlement options
                               committee        concerned,       and                                   be completed in earnest.
          in Lijiang City
                               consulting unit as well as resettlers’
                               representative
          Villagers
                               10 persons from the city project
          committee       of
                               office,    project owner   unit,                                        The refuse landfill is located near Yonghong Group of Wenhua Village and the
          Wenhua Village
Dec. 22                        consulting unit and villagers            Interview in households        villagers hope construction of the project will not pollute the local environment and
          of        Jinshan
                               committee as well as villagers’                                         on this basis they support the project.
          Township        in
                               representative
          ancient town area
          Lijiang  Water
                               5 persons from the city project
          Supply    and                                                 Discussion meeting       for   Construction of the project can decrease pollution, improve urban environment and
Dec. 25                        office, project owner unit and
          Sewerage                                                      project survey                 had significant meaning for Lijiang City. The project owner has arranged work plan.
                               consulting unit
          Company
                               8 persons from the city project
          Office of Minru
                               office, project owner unit, villagers                                   The villagers support construction of the project and hope the land can be adjusted
Dec. 27   Group of Yangxi                                               Interview in households
                               committee, and consulting unit as                                       after requisition.
          Village
                               well as resettlers’ representative
          Environmental
                                                                        Reporting    meeting     for   The whole work course is reported to the leaders of the project office of Lijiang City
          Protection           5 persons from the city project
Dec. 28                                                                                                and the problems left over are made clear and the project owners are urged by the
          Bureau of Lijiang    office and consulting unit               project survey results         project office to solve them as soon as possible.
          City




                                                                                          163
                                                                                                           Yunnan Urban Environment ProjectResettlement Action Plan (RAP)




  Time             Place                       Participant                Main topic for discussion                                              Conclusion

              Environmental
                                                                          Mobilization meeting for         All county project offices (project owners) are requested to actively cooperate with
              Protection
Dec.     4,                       Leaders of the project office and 8     social    and     economic       ECIDI, the consulting unit, organize the local government and resettlers’
              Bureau        of
2006                              county project offices                  survey        work      in       representatives to participate and timely provide the required data and land
              Wenshan
                                                                          project-affected areas           acquisition inventory in project-affected areas.
              Prefecture
                                                                          Understanding           basic    The two projects in the county will directly affect two administrative villages and
              Environmental
Morning                           10 persons from the prefecture          conditions      of project       five persons from the county environmental protection bureau headed by Mr. Wu
              Protection
of Dec. 5,                        project office and the county           construction      and      its   Zhengrong are requested to cooperate in survey in an all-round way, collect the data
              Bureau of Malipo
2006                              environmental protection bureau         impacts and scheduling           required by the consulting unit and define the land acquisition scope for the two
              County
                                                                          survey work                      projects.
                                                                          Understanding         project
                                                                          impacts, discussing with
                                                                                                           2.62mu farmland will be requisitioned by the project but there are no great impacts.
Afternoon     Laodifang           12 persons from the project office of   village      cadres      and
                                                                                                           According to discussion with the village cadres, if reasonable compensation is given
of Dec. 5,    Village in Malipo   the prefecture and county, villagers’   resettlers’ representatives,
                                                                                                           to the land-lost households, their production will not be affected greatly. The
2006          Town                cadres and resettlers’ representative   and        carrying       out
                                                                                                           resettlers express their support for the project.
                                                                          production      resettlement
                                                                          measures
                                                                          Understanding         project
                                                                          impacts, discussing with         The requisitioned farmland is not in large quantity, resulting in only small impacts on
                                  16 persons from the county project
Morning                                                                   village      cadres      and     each households involved in land acquisition. According to discussion with the
              Chongtou Village    office and villagers’ cadre and
of Dec. 6,                                                                resettlers’ representatives,     village cadres, if reasonable compensation is given to the land-lost households, their
              in Malipo Town      resettled households for land
2006                                                                      and        carrying       out    production will not be affected greatly. The resettlers express their support for the
                                  acquisition
                                                                          production      resettlement     project.
                                                                          measures
                                                                          Comprehending
              Environmental
Morning                           9 persons from the prefecture           conditions      of project       Land acquisition has been accomplished preliminarily and the land required by the
              Protection
of Dec. 8,                        project office and the county           construction and land            project belongs to Xichou Environmental Sanitation Station and the land requisition
              Bureau of Xichou
2006                              environmental protection bureau         acquisition and scheduling       agreement for the project construction is shown to the staff of the consulting unit.
              County
                                                                          survey work
                                                                          Comprehending                    The county is involved in two projects. After construction, the local environment will
              Environmental
Morning                           9 persons from the prefecture           conditions      of project       be greatly improved. The land acquisition scope of the project is determined. After
              Protection
of Dec. 9,                        project office and the county           construction and land            the project is put into operation, if there is need to recruit workers, the project owner
              Bureau of Funing
2006                              environmental protection bureau         acquisition and scheduling       will be consulted to give hiring preference to the land-lost farmers under equal
              County
                                                                          survey work                      conditions.




                                                                                              164
                                                                                                       Yunnan Urban Environment ProjectResettlement Action Plan (RAP)




  Time            Place                     Participant                Main topic for discussion                                            Conclusion

                                                                       Understanding         project
             Group of Weishe                                           impacts, discussing with
                                12 persons from the county project
Afternoon    Village      in                                           village      cadres      and    For the village has little land (much land has been requisitioned for construction in
                                office, and cadres of villagers
of Dec. 9,   Wenhua                                                    resettlers’ representatives,    recent years), it is hoped to get reasonable compensation after land is requisitioned
                                groups          and     resettlers’
2006         Community    of                                           and        carrying       out   by the project and the compensation will be used as capital for other industries.
                                representatives
             Xinhua Town                                               production      resettlement
                                                                       measures
             Environmental                                             Comprehending
                                                                                                       The county minority middle school and two households are involved in land
Morning      Protection         8 persons from the prefecture          conditions      of project
                                                                                                       acquisition of the project and land acquisition results in small impacts. After
of    Dec.   Bureau        of   project office and the county          construction and land
                                                                                                       construction, the local environment will be greatly improved and the residents’ living
12, 2006     Guangnan           environmental protection bureau        acquisition and scheduling
                                                                                                       quality will be heightened.
             County                                                    survey work
                                                                       Understanding         project
                                                                       impacts, discussing with
                                8 persons from the project office of                                   Some farmland of the village will be requisitioned but in small quantity and so there
Afternoon    Duanfeng Village                                          village      cadres      and
                                the prefecture and county and the                                      are no great impacts on resettlers’ production. It is hoped to compensate according to
of    Dec.   in    Liancheng                                           resettlers’ representatives,
                                cadres from villagers groups and                                       relevant state policies. The resettlers express their support to the project and they
12, 2006     Town                                                      and        carrying       out
                                resettlers                                                             think construction of the project will improve the local environment.
                                                                       production      resettlement
                                                                       measures
                                                                                                       Puzhehei Lake is the local famous scenic spot, but in recent years the environmental
                                                                                                       pollution becomes serious increasingly due to fishing in the upper reaches and
                                                                       Comprehending
             Environmental                                                                             continuously increasing tourists. Construction of the project will improve the
Morning                         8 person from the prefecture project   conditions    of project
             Protection                                                                                environment of the scenic spot. The land used by the project is distributed along both
of    Dec.                      office and the county environmental    construction and land
             Bureau of Qiubei                                                                          banks of Puzheheai Lake and production and living of the residents along both banks
16, 2006                        protection bureau                      acquisition and scheduling
             County                                                                                    will be affected in a period of time. On the whole, formulating a proper resettlement
                                                                       survey work
                                                                                                       option can not only restore their production and living but also improve the local
                                                                                                       environment and heighten their living quality.
                                                                       Understanding         project
                                                                       impacts, discussing with
             Puzhehei Village                                                                          Environmental pollution has become serious in recent years and has started to affect
Morning                         13 persons from the county project     village      cadres      and
             in                                                                                        the local tourism income. Therefore, the local residents express that they favorably
of    Dec.                      office and cadres from the villagers   resettlers’ representatives,
             Shuanglongying                                                                            receive project construction as long as compensation is conducted according to the
18, 2006                        groups and resettlers                  and        carrying       out
             Town                                                                                      national policies.
                                                                       production      resettlement
                                                                       measures




                                                                                          165
                                                                                                      Yunnan Urban Environment ProjectResettlement Action Plan (RAP)




  Time            Place                     Participant                Main topic for discussion                                          Conclusion

                                                                                                      Bare dumping is adopted in the existing refuse landfill, as a result, there are great
             Environmental
                                                                       Understanding necessity        impacts on the peripheral environment and the urban development demands cannot
Dec.   24,   Protection         7 persons from the project office of
                                                                       of project construction and    be satisfied. Therefore, implementation of the project is very necessary. The whole
2006         Bureau        of   the prefecture and the county
                                                                       land acquisition conditions    project has obvious advantages and the occupied land belongs to the environmental
             Maguan County
                                                                                                      sanitation station of Guangnan County.
                                                                                                      Implementation of the project looks especially necessary for accommodation to
             Environmental                                                                            Qiubei development and control and protection of Puzhehei Lake. The land
                                                                       Consulting      resettlement
Dec.   27,   Protection         4 persons from the county project                                     requisitioned by integrated water environmental management project of Puzhehei
                                                                       options in light of land
2006         Bureau of Qiubei   office and the county government                                      Lake is in large quantity and totally 533 mu land of all kinds is concerned. During
                                                                       acquisition of the project
             County                                                                                   compensation for land acquisition, the compensation standard concerned refers to the
                                                                                                      documentation of Qiuzhengtong [2004] No. 32.




                                                                                         166

						
Related docs
Other docs by yaosaigeng