RP598
World Bank Financed
Yunnan Urban Environmental Project
RESETTLEMENT ACTION PLAN
(SUMMARY REPORT )
Yunnan Provincial WB-loaned
Environment Protection Project Office
September . 2007
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Contents
1 Project Description .............................................................................................................. 1
1.1 Project Background .................................................................................................. 1
1.2 Project Components and Description ....................................................................... 1
1.3 Resettlement Plan ..................................................................................................... 8
1.4 Measures to Mitigate Project Impacts ...................................................................... 8
1.5 Analysis on Linkage Subprojects ............................................................................. 9
1.6 Implementation of Land Acquisition and House Relocation for Stage I Yunnan
Environment Project ........................................................................................................ 11
2 Project Impact ................................................................................................................... 12
2.1 Determination of project impact scope ................................................................... 12
2.2 Result of project impact investigation .................................................................... 12
3 Analysis of Impact on Nature, Society and Economy within Project Area ...................... 35
3.1 Natural Conditions in project-affected area ............................................................ 35
3.2 Social and economic conditions of project-affected area ....................................... 37
3.3 Distribution of Indigenous Peoples in project areas ............................................... 40
4 Policy Framework for Resettlement .................................................................................. 44
5 Compensation Standard..................................................................................................... 47
5.1 Compensation standards for land occupation ......................................................... 47
5.2 Compensation for house and auxiliary facility relocation ...................................... 51
5.3 Compensation for scattered trees and tombs .......................................................... 52
5.4 Compensation standards for relocation of enterprises and institutions .................. 52
5.5 Compensation for relocation of individual business households ........................... 52
6 Resettlement and Recovery Scheme ................................................................................. 54
6.1 Permanent land occupation resettlement ................................................................ 54
6.2 Recovery plan for temporary land .......................................................................... 62
6.3 Restoration plan for vulnerable group .................................................................... 63
6.4 Restoration plan for ethnic people .......................................................................... 63
6.5 Rebuilding plan for production and living facilities ............................................... 66
6.6 Enterprise relocation plan ....................................................................................... 66
6.7 Individual business households .............................................................................. 66
6.8 Relocation plan for special items, municipal utilities ............................................. 67
Yunan Province –World Bank Group Huit –SCE
YUEP-fasep706
i
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
6.9 Resettlement implementation management ............................................................ 67
7 Estimation for Compensation of Land Acquisition and Relocation .................................. 68
7.1 Compilation basis ................................................................................................... 69
7.2 Compensation principle .......................................................................................... 69
7.3 Compensation cost .................................................................................................. 69
7.4 Fund allocation ....................................................................................................... 74
8 Resettlement Implementation Plan ................................................................................... 76
8.1 Implementation program ........................................................................................ 76
8.2 Progress plan ........................................................................................................... 77
9 Institutional Organization .................................................................................................. 79
9.1 Establishing of Organizations ................................................................................. 79
9.2 Responsibilities of Organization ............................................................................. 79
9.3 Staffing.................................................................................................................... 80
10 Public Participation and Appeal..................................................................................... 81
10.1 Public Participation ................................................................................................. 81
10.2 Responding to Grievance and Appeal ..................................................................... 82
11 Monitoring and Evaluation ............................................................................................. 85
12 Entitlement Matrix ......................................................................................................... 89
Appendix 1:General Description of The Project ................................................................... 92
Appendix 2:List of Land Acquisition .................................................................................. 123
Appendix 3:Linkage Projects .............................................................................................. 127
Appendix 4:Summary of Resettlement Options for All Prefectures/Cities ......................... 133
Appendix 5:Breakdown of Resettlement Compensation .................................................... 138
Appendix 6:Schedule of Land Acquisition and House Relocation ..................................... 152
Appendix 7:Records of Symposiums .................................................................................. 158
Yunan Province –World Bank Group Huit –SCE
YUEP-fasep706
ii
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Summary
A.Generals
1. The WB-loaned Urban Environment Project is in two categories, i.e., (1) water
pollution prevention and control of major river basins (the Dianchi Lake and the Erhai Lake)
and (2) urban infrastructure construction of main cities (Lijiang City and Wenshan Prefecture),
and is in the four prefectures (cities) of Kunming (Dianchi Lake), Dali (the Erhai Lake) and
Lijiang as well as Wenshan. It deals with the sectors in drainage (including sewage disposal),
water supply, garbage treatment, integrated river dredging, widespread pollution control,
environmental monitoring & management and cultural heritage conservation. The project is
composed of 27 sub-components distributed in 15 counties (cities and districts) of four
prefectures (cities).
2. Yunnan Urban Environmental Construction Project Leading Group Office and each
prefecture (city) leading group is the executive organization of the project and each
project-affected city and prefecture office and Project Owner are the implementation
organizations. According to the latest feasibility study results and detail socio-economic
investigation and project impact survey, the World Bank Representative Office in Yunnan
Province has, with the assistance of East China Investigation and Design Institute, the Guope
Huit Co. of France and the World Bank experts, compiled the RAPs respectively for the four
prefectures and cities, and based on which, the Office prepares the RAP herein.
B. Project impact
3. In the period of Nov. 2006 ~ Jan. 2007, the Project owner, with the cooperation of
local governments at different levels, administrative villages, village groups and PAPs as well
as the project design unit, had carried out the main inventory in-kind survey item by item,
including the population, houses and attached buildings, land and special facilities, within the
preliminarily defined scope of project land requisition. In April –December 2007, an
inventory in-kind survey for checking was carried out according to the latest F/S design
output. Based on the field survey, the consulting unit had exchanged opinions with the project
design unit and the Project Owner; by which, the potential project impact on the local society
and economy have been considered and taken as key factors in comparative selection of the
schemes. The design unit and the Project Owner has adopted some effective measures to
reduce, where possible, the quantity of land requisition and number of inhabitants to be
resettled; in selection of the scheme and arrangement of associated facilities, efforts have been
made to keep the project away from the resident area, reduce the quantity of cultivated land to
be requisitioned and observe the local planning requirement and the opinions of the local
governments.
4. The project will affect 28 administrative villages in 22 townships (towns) of 15
counties (cities), and a total of 3121 PAPs of 767 households will be affected, including 1870
persons of 442 households to be affected by land requisition, 971 persons of 263 households
by temporary land occupation, 5 persons of 1 household by land borrowing for the project. In
addition, 23 enterprises (807 person) and 130 individual business households (392 persons)
will be affected. The detail survey into the project impact shows that a total of 3105.12 mu
Yunan Province –World Bank Group Huit –SCE
YUEP-fasep706
1
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
lands of various types will be acquired timelessly, including cultivated land 710.9 mu, garden
plots 37.34 mu, fish ponds 32.0 mu, water pools 15 mu, woodland 476.25 mu, reclaimed
waste land 177 muconstruction land 1120.63 mu, and the remaining lands are of unused land.
5. Beside the land requisition, there are three sub-components of the project which will
involve house relocation. The houses of totally 64084.81 m2 will be affected, including
private houses of 13235.3m2 (9923.1 m2 belonging to 30 rural households with 139 persons),
the urban residence of 3312.2m2 (32 households of 141 persons), collective-owned houses of
50689.51m2. Of the 62 households (280 persons) whose houses are to be relocated, 14
households (66 persons) should be resettled at other places, and 48 households (214 persons)
will be resettled at original places. The project-affected properties include the special facilities
such as for telecommunication and power supply, and the tombs and economic trees.
C. Policy frames and entitlement
6. For those inhabitant unavoidably affected by the project, the resettlement policy
target of the project is to avoid, to the possible extent, the negative impact of the project
caused by the land requisition and house relocation according to the “Decision of The State
Council on Deepening the Reform and Tightening Land Management” (No. 28 Document of
2004), “Land Management Regulation of Yunnan Province” and “Instructive Opinions on
Improvement of Compensation System for Land Requisition” (Guotuzifa No. 238 Document
of 2004) as well as “Involuntary Resettlement” OP4.12 and BP4.12 of the World Bank and
the requirements set forth in its annexes. The properties of the PAPs will be compensated at
their replacement cost, and efforts will be made to help the PAPs have sufficient opportunities
to restore their original living standard or even better. The main principles are as follows.
7. The key principles in the policies: (1) Efforts should be made to adopt measures to
minimize the negative impact to the minimal; (2) The compensation and resettlement schemes
should be such that the living standard of the PAPs can be improved or, at least, restored to
that before resettlement; ⑶ Careful consultation should be carried out with the PAPs, so as to
let them to have chance to participate in the activities from the planning to the implementation
of the resettlement plan; (4) All the affected properties will be compensated on the
replacement cost; (5) the principle of “house building first and house demolishing second”
should be always be followed. Before land requisition and house relocation, the PAPs should
receive the compensations of all the lost properties, i.e., the land requisition should never be
carried out before the land and related properties have been compensated and the new
residence is ready and transition subsidies are paid; (6) The borrower is responsible for raising
the fund for resettlement compensation including the contingency for resettlement; (7)
Confirmation of the qualification of the resettlers. The deadline for confirmation of the
resettlers’ qualification should be on the date of issuance of the notice on land requisition and
house relocation. After the date of the issuance, the PAPs should not be allowed to build new
houses, extend or rebuild old houses; the use of the houses and lands should not be changed;
and leasing of land and leasing and purchasing houses should not be allowed. In addition, the
persons rushing into the defined areas after that date should not be qualified as resettlers; (8)
the house compensation should be based on the replacement cost of the houses.
D.Compensation standard for land and houses
Yunan Province –World Bank Group Huit –SCE
YUEP-fasep706
2
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
8. According to the “Land Management Regulation of Yunnan Province”, the
compensation for the vegetable plots and paddy fields is 6-8 times the yearly average output
value of the previous three years before the land acquisition (same as below); that for irrigated
fields, garden plots and lotus ponds are 7-9 times; the dry lands are 6-8 times; rotation
cropping lands are 6 times, grassland and fish ponds are 3-5 times. The standards of
resettlement subsidy for land requisition is: (1) for those units whose per capita cultivated
land holding is over 6667 square meters, the total resettlement subsidy is 4 times the yearly
average output value of the previous three years before the land acquisition (same as below);
for those with per capita cultivated land holding is less than 6667 square meters, one time
should be added for each reduced 50 square meters, and the max. resettlement subsidy for
land requisition should not exceed 15 times the yearly average output value of the previous
three years before the land acquisition; (2) the resettlement subsidy for requisition of garden
plots, lotus ponds is 6 times and that for fish ponds is 4 times. According to the policies of the
local counties and cities on compensation of land requisition, the regional comprehensive
prices are adopted at Songming of Kunming City, Ancient Town and Ninglang of Lijiang
City, and other counties and cities adopt the calculation by the times of the yearly average
output value of the previous three years before the land acquisition. Because of the difference
in geographical locations and in the output value of the crops, the land compensation
standards are different from area to area, ranging 12880~88450 Yuan for paddy fields,
10380~29858 Yuan for dry land, 4900~9360 Yuan for woodland.1
9. The compensation for temporary land occupation of the project will be calculated
with the one-year cultivated land loss, standing crop and land reclamation fee. The project
office will state in the construction contract to be signed with the construction contractor the
way of using temporary occupied land, restoration requirement, compensation criteria for
temporarily used land, etc. The contractor should sign the compensation contracts with
affected villages based on the actual land area to be occupied by the project, and the
contractor should restore the temporarily occupied land or pay additional expenses to the land
owners for land restoration.
10. In the F/S stage of the project, the design should be such that the quantity of house
relocation should be reduced where possible. For those having to be affected by house
relocation, the strategy is to get the substitutive houses, land, property, basic facilities and
income source. In the 27 sub-components, there are three components which involve house
relocation (Funing County Urban Garbage Clearing & Disposal Project, Waste Wastewater
Management in Lijiang Ancient Town and Urban Drainage System under Dali City
Jurisdiction). For the former (Wastewater Management in Lijiang Ancient Town), there are
two resettlement methods for house relocation: (1) The existing buildings which are not
consistent with the surroundings will be demolished and new buildings consistent with the old
1
The compensation standard is different for various county (even different for different area in a same
county) because discrepancy in region and geography location as well as crop output. The compensation
standard is lower for Wenshanzhou (the more remote area), and higher for other regions. Whether it is to
have the standard of yearly output or the regional comprehensive price, it will be determined according to
the compensation policy of the land administration department at each area.
Yunan Province –World Bank Group Huit –SCE
YUEP-fasep706
3
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
town style will be built (in the Ancient Town area), and the house replacement cost will be
compensated to the affected households (or collectives), i.e., the building of framed- structure
is 626.98 Yuan per square meter, that of brick-concrete structure 494.71 Yuan per square
meter, that of brick-wood structure 367.9 Yuan per square meter and that of clay-wood
structure 276.81 Yuan per square meter; (2) the compensation (replacement cost of houses
plus land cost ) will be paid at one time to the households that are relocated to new host site,
i.e., 600000 Yuan per mu for house plot. For Urban Drainage System under Dali City
Jurisdiction, only simple houses (totally 100 m2) owned by collectives will be affected, and
the compensation is 100 Yuan per square meter. For Funing County Urban Garbage Clearing
& Disposal Project, only the collective houses of brick-wood structure (totally 60 m2) will be
removed and the compensation of 350 Yuan per square meter will be paid to the Owners for
the house replacement.
11. the Project Owner of each sub-component should ensure that the entitlement of the
PAPs relating house relocation should be obtained before the land leveling, house
demolishing. The land compensation and house relocation subsidies should be paid to the
affected villages or individuals. The compensation for houses, standing crop and lost
properties should be directly paid to the affected individuals and enterprises. The
compensation for affected power supply and telecommunication facilities and other
infrastructures should be paid to the relevant departments for restoration.
E.Measure for income and house restoration
12. All the PAPs will continue farming or the job that they are good at. In the 14
administrative villages affected by requisition of contracted cultivated land, 13 villages are
affected only by less than 5% the total cultivated land of the village (including 7 villages
having affected by less than 1%), thus, the impact in this regard is little and will not impose
serious impact on agricultural economy. After consulting with the affected village
managements and PAPs, the rational restoration plans have been formulated for them and
incorporated into the RAP in detail. According to the RAP, all the PAPs can either receive
compensation directly or get land after land adjustment by the villages, so as to ensure that
they can have land for farming. Those villages adopting land adjustment will use the
compensation to improve the planting conditions, develop economic crops and conduct other
non-planting activities. In the process of project construction, the affected households will
have the priority to get the jobs without requiring special technical skills.
The implementation of the project will bring about benefits and economic development
chances to most of the public in the area. The effective implementation of the RAP will bring
to some of the villagers affected by land requisition and house relocation the chances for
improving living and production conditions and improving living quality. The project will
play the active role in gearing up the economic development in the project-affected areas and
will provide good environmental and social benefits.
13. Among the 62 households (280 persons), fourteen households (66 persons) should
be moved. In which, 4 households (22 persons) are of rural residents, they will be
compensated by one-time cash payment, and will be resettled in new houses at the reserved
construction land in (or outside of) the villages; and 10 households (44 persons) are of urban
Yunan Province –World Bank Group Huit –SCE
YUEP-fasep706
4
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
residents, they will be resettled by one-time cash compensation and at other places (i.e., on the
west side of the fish pond of CCB on Shangrila Avenue in Ancient Town, where there is a
piece of land totally 60 mu in area belonging to the state-owned land of urban construction).
The house plot size should be 1.2 times the land size of the original house. The resettlement
provides a good chance for the resettlers to improve the housing condition. For the
households who have shops, their resettlement will be given priority in choosing host site for
continuing their business. The houses will be compensated at the replacement cost.
F.Institutional Organizations
14. Each prefecture (city) leading group, coordinated by Yunnan Urban Environmental
Construction Project Leading Group, will entrust the Project Owner to assume the overall
responsibility for implementation of land acquisition and resettlement work of the project
strictly according to the RAP. All the four affected prefectures and cities and the affected
counties and cities will set up leading groups and land requisition and house relocation
offices.Each sub-project Owner shall assume the main responsibility for consultation,
implementation, and timely payment and other entitlement of the PAPs, and the relevant
townships and towns should provide assistance in this regard.
G.Vulnerable groups
15. Of the villages affected by land requisition, those in Kunming City are Han’s
villages, those in Dali Prefecture are Bai and Yi minority village, those in Lijiang City are
Naxi, Bai and Yi minority villages, and those in Wenshan Prefecture are Zhuang minority
villages. Of the PAPs, the minority population affected by permenant land requisition and
house relocation accounts 61.7% the total affected population. For esteeming the traditional
habits and maintaining the social relations of the minority people, all the PAPs will be
resettled in their original villages and communities.
16. For the economically vulnerable people, including old people living alone, widows’
households and households in extreme poverty, the project will provide additional financial
and material support. In implementation, the vulnerable groups, whenever found, will receive
the following additional assistance according to the RAP: (i) assistance free of charge in
building houses and family moving; (ii) special subsidy for them to maintain the living level
during house building period. The actual amount of subsidy should be determined according
to the actual conditions and their needs.
H.Appeal and discrepancy solving mechanism
17. The PAPs who loss houses will have the chance to select house plots, the PAPS
who lose farmland will have the chance to select suitable income sources instead. All the
affected villagers have their right to express their opinions on how to use the compensation
fee received by the collectives.
18. In case of occurrence of discrepancies, the PAPs should first appeal orally or in
writing to the village committees or the township land requisition and house relocation office.
If their appeal cannot be settled in two weeks thereafter, they can request re-check the case at
the county land requisition and house relocation offices in one month; if it can nor solved in
two weeks thereafter, the WB-loaned project coordination leading group will make efforts to
coordinate with the project office of the related project sub-component so as to get a solution.
Yunan Province –World Bank Group Huit –SCE
YUEP-fasep706
5
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
If necessary, the discrepancy can be settled finally at the court according to the Civil
Procedure Law of the People’s Republic of China.
I.Monitoring and Evaluation
19. The internal and external monitoring and evaluation are detailed in the RAP. The
IBRD-loaned Environment Protection Project Office of Yunnan Province will engage an
independent monitoring organization to implement the external monitoring and evaluation.
This organization should evaluate whether and to what extents the PAPs (1) have received
their entitlement on time; (2) have completely restored their living, production and income
levels. The organization should also conduct a baseline survey before the house relocation,
one survey in half a year during house relocation and a yearly follow-up survey in the two
years after the relocation; the representative samples (affected households/ villages) should be
selected.
20. The IBRD-loaned Environment Protection Project Office of Yunnan Province is
now establishing a seasonal reporting system. The office will report to the WB on the progress
of land requisition and house relocation by means of Seasonal Project Report. The office will
submit the annual independent monitoring and evaluation report (or twice reports for a year)
during implementation of the resettlement work.
J.Fund raising and planning
21. The budgetary resettlement cost is totally 164701300 Yuan (including taxes),
accounting for 7.8% of total, including 15878700 Yuan for Kunming (9.64% of the total),
16478700 Yuan for Dali (10.01%), 112481400 Yuan for Lijiang (68.29%) and 19862600 Yuan
for Wenshan (12.06%); of which 40000100 Yuan is for land (28.1%) and 69632500 Yuan for
house (48.9%). It includes all cost including compensation for house, land and other
properties, transition subsidies, subsidy for vulnerable groups, overhead for implementation,
cost of monitoring and evaluation, etc. Project-affected prefecture and city governments will
ensure the associated fund for the budgetary cost of the resettlement work so as to prevent any
fund shortage in the process of the resettlement.
22. The resettlement implementation schedule has been formulated according to the
project construction schedule agreed by the World Bank after submitted by the project
executive agency. It is planned to start land requisition by the end of 2007 and completed in
Jan. 2008; and the house relocation is planned to complete from April 2007~ Dec. 2008, and
the land adjustment will be finished in Dec. 2008.
Yunan Province –World Bank Group Huit –SCE
YUEP-fasep706
6
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
1 Project Description
1.1 Project Background
Yunnan Province is located in the southwestern frontier of China, neighboring
Guizhou Province and Guangxi Chuang Autonomous Region on the east, linking Sichuan
Province on the north, leaning against Tibet Autonomous Region on the northwest and
bordering Burma, Laos and Vietnam to the west and south. It has a total land area of
394000 km2, including mountainous areas about 94% of the total, and has a total
population of 44.15 million, in which the minority population accounts for 33.4%. Since
reform and opening-up to the outside, especially during the 10th Five-Year Plan, its
economy keeps in rapid growth. The GDP in 2005 reached 347.2 billion RMB yuan, per
capita GDP 7,833 RMB yuan,annual GDP growth rate 8.9%,and urbanization rate
amounting to 29.5%.
However, the following two main development problems arose in the course of rapid
urbanization and economic growth.(1)Degradation of urban environment, such as the
decline in water quality of Dianchi Lake;(2)universal shortage of urban infrastructure
supporting urbanization process, especially in small towns. Although pollution control
has been strengthened in recent years, pollution problems of surface water near the cities
in Yunnan and main lakes remain serious. Moreover, urbanization and rapid development
in tourism has exceeded the existing capacity of urban infrastructure and brought large
pressure and challenge to urban living conditions.
Yunnan has regarded solving of the aforesaid development problems as the priority
to promote urbanization and the precondition to realize the 11th Five-Year Plan as well as
the sustainable development of social and economy. Based on summing up the experience
in execution of WB-loaned first-stage projects and motivated by a desire to seek for
further cooperation with the WB, the province raises the Yunnan WB-loaned Urban
Environment Project. The project covers four parts of two categories, i.e., water pollution
prevention and control of major river basins (the Dianchi Lake and the Erhai Lake) as
well as urban infrastructure construction of main cities ( Lijiang City and Wenshan
Prefecture), deals with the sectors in drainage (including sewage disposal), water supplly,
garbage treatment, integrated river dredging, widespread pollution control, environmental
monitoring & management and cultural heritage conservation in the four prefectures
(cities) of Kunming (Dianchi Lake), Dali (the Erhai Lake) and Lijiang as well as
Wenshan. The Project was approved by the State Council in September 2005 and has
been listed in the WB-loaned candidate project plan of the state in the fiscal year of
2006-2008.
1.2 Project Components and Description
The WB-loaned Urban Environment Project is composed of 27 sub-components
distributed in 15 counties (cities and districts) of four prefectures (cities). The
sub-components of the project are described in Table 1-1, the land occupation is shown in
Appendix 1 for details, and the locations thereof are shown in Fig. 1-1.
1
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Fig. 1-1 Location Map of Sub-Components of Yunnan Urban Environment Project
2
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Yunnan Urban Environmental Project
Table 1-1
No. Location Project Project description Project owner Project impact Schedule
Kunming
City
1 Kunming Enhancement of ① Monitoring system for inflow rivers to Dianchi Lake: 3 Kunming State-owned land acquisition Jan. 2007 ~
City water quality automatic monitoring stations for the key rivers, 14 water quality Environmental of 0.65 mu, without house Dec. 2009
monitoring capacity monitoring stations for inflow rivers, 2 mobile sample vehicles, 2 Monitoring relocation.
mobile sampling cars and 1 set of experimental equipment; Center/Kunming
② Supervisory control and management information system for Environmental
water pollution aggregate and supervisory control center Information Center
2 Luquan Yi Solid waste management in Solid waste treatment plant and supporting facilities and the Luquan Solid Waste land acquisition for various Jul. 2007 ~
and Miao Luquan County county garbage collecting and transportation system; Disposal and kinds totals 118.5mu, incl.: Dec. 2008
Autonomo Solid wastes disposal: 90t/d ; Transportation 43.8mu cultivated land; and
us County Sanitary landfill capacity: 895000 m3 Management 6.7mu state-owned land.
Company No house relocation
3 Songming Solid waste management in Sanitary landfill, auxiliary facilities, wastes collection and Songming Wastes Land acquisition for various Jan. 2008
County Songming County transport system and closing of the existing refuse dumps; Disposal Center kinds: 115.5mu ~Aug. 2009
Mean disposal: 85t/d, including 107.7mu
Landfill capacity : 427200m3 cultivated land and 6.85mu
state-owned land.
No house relocation
4 Xundian Solid waste management in Sanitary landfill, wastes transfer station, other public services, Refuse Clearing, State-owned land acquired: Oct. 2007
Hui and Xundian County and closing the existing refuse dumps; Transport & 3 mu; reclaimed waste land ~Mar. 2009
Yi Mean disposal : 70t/d; Disposal Center of aquired: 177 mu, unused
Autonomo Landfill capacity: 550000m3 Xundian Hui and Yi land 3 mu
us County Autonomous County No. house relocation
Dali
Prefectur
e
3
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
No. Location Project Project description Project owner Project impact Schedule
5 Eryuan Integrated ① Treatment of water and soil loss,② comprehensive water Dali Water No land acquisition house Jan. 2008~
County treatment project environment treatment for riverway (10.5km long) ③ Boluo River Resources Bureau relocation Dec. 2010
of water water environment management scheme
environment along
Boluo River
Changshan Shiba ① Treatment of water and soil loss, ② comprehensive water Dali Water ResourcesNo land acquisition house Jan. 2008~
Creek Water environment treatment for riverway (gravle-covered riverbed, Bureau relocation Dec. 2010
Environment eco-protection dyke, eco- protective river bank, ③ environmental
Control management scheme
① Sewage treatment system for 14 synthetic purification channels at Dali City21 mu cultivated land acquired Jan. 2008~
Integrat Environment for man-made wetland, no Dec. 2008
Yong’an River Xiashankou area;② rebuilding and dredging of existing drainage
ed water Protection Bureau, house relocation, location of
Water ditches;③ man-made wetland ④ dyke, ⑤concentrated methane pool
environ- Eryuan County methane pool, Donghu wetland
ment
Environment at Meihe Village; ⑥ polluted river water purification system at
Control Environment and riverside not known.
treatme Donghu wetland; ⑦ eco-restoration at riverside where the river
Protection Bureau,
nt for enters the lake
main Dali City42mu land acquired (Dazhuang
inflow Environment Village in Cibihu Town, 32mu
Miju River Water ① River eco-restoration and protection, ② Cibi Lake water source
rivers to Environment Protection Bureau, fish pond and 10 mu garden Jan. 2008~
protection;③ Haixihai water resource protection;④Miju river water
Erhai Eryuan Countyplot), owned by Eryuan county Dec. 2009
Control environmental management scheme
Lake Environment government, managed by
Protection Bureau, Cibihu Town
Dali City76.5mu land acquired (58.8mu
Environment collective cultivated land
Protection Bureau, owned by Zhangjiadeng
Luoshi River
① Pollution source control along river;② Xihu lake eco-restoration Eryuan CountyVillage, 2.7mu by Zhongdeng Jan..
Water
Environment and water purification;③ Riverway treatment and eco-restoration; Environment Village, 15mu collective water 2008~ Dec.
Control ④ Luoshi River water environmental management scheme Protection Bureau, pool owned by Qigshuigong 2009
Village). 7.35mu land occupied
by temporary access roads. No
house relocation
6 Eryuan Dali City Collective-owned cultivated
Widespread pollution
County ① construction of domestic sewage treatment facilities at 1 village;② Environment land acquisition: 1.2mu; Jan. 2008
control at villages in Erhai
Construction of public toilets and sanitary WC Protection Bureau, No house relocation Jun 2009
Lake Basin
7 Dali City Urban Fengyi area New sewer pipes and rain pipes Dali City Water Temporary land requisition:
Drainage Supply and 131 mu (including 13.5mu
Gucheng Drainage Co. Ltd. cultivated land); no house Jan. 2008 –
System ①rebuild rainwater ditches;②new rain-sewage drainage pipe; Dec. 2009
under Dali area relocation
City Xizhou area ①new sewage network
4
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
No. Location Project Project description Project owner Project impact Schedule
Jurisdictio
Tourist area ①new sewer pipes and rainwater pipe
n
8 Eryuan Dengchuan Town Sewage ① one new treatment plant;② one new sewage pump station;③ new Eryuan County Water Garden plots acquisition:
County Supply and Sewerage 7.34 mu; Jan 2008 –
Treatment Plant and sewer sewer pipes; scale of the plant: 1200m3/d for short term (2010), Dec. 2009
network 1600m3/d for long term (2025) Co. Ltd. No house relocation
9 Eryuan Eryuan County Collective land acquisition:
County Solid waste management in Rubbish cleaning and transport system, rubbish transfer station, Environment 165.5 mu; including Jan 2008 –
Eryuan County sanitary landfill, management area and related works; scale: 70 t/d Sanitation cultivated land 94.8 mu, Dec. 2008
Management Station No house relocation
Lijiang
City
10 Huaping Huaping Water Land acquisition: 21.6 mu;
County Wastewater management in ① D=400~900mm, and total length of pipe,42.56km Supply and temporary land occupation: Jul. 2008
Huaping County ② Sewage treatment plant, 12000m 3/d Sewerage Co., Ltd. 180.6mu (lanld of roads) –Feb. 2010
No house relocation
11 Lijiang ① Construction of No. 2 Sewage Disposal Plant with a scale of Lijiang Water Land acquisition: 88 mu;
City 70000m3/d,including construction of sewage disposal facilities and Supply and temporary land occupation
supporting and auxiliary devices. Sewerage Co., Ltd. 100.77mu (lalnd of roads
Lijiang City WWTP and 78.92mu and cultivated land Aug. 2008
Sewer Network ②Associated pipe network: the main pipe network with d400~ –May 2010
d1800mm in downtown area of Lijiang City, Xintuan District and 21.85 mu)
Yulong County totals 23125m. No house relocation
③Ingoing and outgoing pipe section is 2913m.
12 Yulong Yulong No impact
County Yulong County Rainwater New rainwater collection network: 52km long, including rainwater and Dec. 2007
Construction
drainage system sewage separation system –Nov. 2011
Bureau
13 Lijiang Construction of a new sanitary landfill with a mean disposal scale of Collective land acquisition:
City 270 t/d; 230 mu; including cultivated
Solid waste management in the required storage capacity is 2.00 million m3; Lijiang Construction land 35 mu, and state-owned Jun. 2008
Lijiang Construction of office building of management agency; Bureau land 3.48mu –Aug. 2009
rubbish transfer station, updating of refuse clearing & transport No house relocation
equipment, Increase and updating of street refuse collectors.
14 Lijiang Collective house plot
City acquisition: 1.87 mu; and
Ancient City state-owned land (road and
Demolishing of the existing incoordinated architectures and
Wastewater Management house plot):311mu; 280 May 2007 –
construction of municipal infrastructure and supporting tourism Management CO.
in Lijiang Ancient City people of 62 households Dec. 2007
facilities, planned area: 31.57 ha.
Ltd. relocated, houses of
63924.81 m2 relocated
no house relocation
5
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
No. Location Project Project description Project owner Project impact Schedule
Wenshan
Prefecture
15 Funing Land requisition: 210.33 mu
County Integrated Management of ①Rive bank revetment 18.4km;②River inspection road 11.9km; Hongxing Co., of state-owned land; Mar. 2007 –
Putting River in Funing Ltd. of Funing temporary land occupation Feb. 2011
County ③River dredging 6000m3;④River landscape County 20mu,
No house relocation
16 Qiubei ① sets of sewage treatment systems to be built at 8 key lakeside
14 Land requisition: including
County villages; collective-owned land 533
Qiubei Puzhehei
Puzhehei Lake in Qiubei ② Build dry-type toilets for households, eco-purification public toilets mu;
Tourism No house relocation Feb. 2008 –
and separate-type dual-chamber water-logged composts, rubbish pool;
County Development Co., Dec. 2009
solid-waste treatment scale: 120t/d in total Ltd.
③ Treatment of the four inflow rivers, including trash racks, macadam
–paved riverbed, riverbed cleaning, riverside greening belts, etc.
17 Wenshan ① river improvement: 12.39km long (9.83km from Huituzhai to Permenant land occupation :
County Panshui river and 2.56km from Chengnan Park to Niutouzha) 511.32 mu of state-owned
Wenshan
② Treatment for upstream water and soil loss: the slope of 17 streams land; temporary land
Panlong River in Wenshan Development and Dec. 2007 –
in Dehuo, Hongdian, Binglie towns at upstream of Panlong river is occupation: 340 mu of
County Town Area Investment Dec. 2009
reformed into terrace; water and soil reserved woods, the economic state-owned land;
Company
fruit woods and grass are planted; soil reserved cultivation is No house relocation
adopted, with the total treatment area of 122.9775km2
18 Guangnan Collective land requisition:
County ① the sewage disposal plant with a capacity of 8000t/d for near future 1.4 mu; and state-owned
Guangnan Water
Wastewater management in (2010), and 16000t/d for long term (2020); land occupation: 33.6mu. Apr. 2007 -
Supply and
Guangnan ② supporting pipe network is 14.892km, pipe diameter D=300~ Sewerage Company
temporary occupation of -June 2008
900mm. road land 44.67mu
No house relocation
19 Malipo ① a project within the sewage disposal plant with a capacity of Land requisition: 16.35 mu;
Environment
County Wastewater management in 5000m3/d; temporary occupation of Apr. 2007 -
Protection Bureau of
Malipo County ② constructing 13.193km long sewage intercept pipes along Chouyang road land 40.11mu Jun. 2008
Malipo County
River No house relocation
20 Qiubei Collective land requisition:
① constructing a sewage disposal plant with sewage disposal capacity
County Qiubei Water 22.45 mu; and temporary
Wastewater management in of 6000 m3/d; Oct. 2007 -
Supply and occupation of road land
Qiubei County ② building 29.4km long sewage pipe network in the range of 5.0km2 -Aug. 2009
Sewerage Company 31.89 mu
in Qiubei county town.
No house relocation
21 Qiubei ① Build a new water plant with scale of 6000m3/d (short term) and Water plant acquires
County 16000 m3/d (long term), technolological improvement for Qiubei Qiubei Water 18.05mu woodland of
Water Supply in Qiubei Nov. 2007 -
County No. 2 Water Plant; Supply and MatouVillage, water pipe
County -Mar. 2009
② Construct a gravity-flow water pipe (2.2km, DN600) and a Sewerage Company system temporarily acquires
pressure-flow water pipe (1.5km, DN400), and water supply pipes 38.85mu dry land of Matou
6
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
No. Location Project Project description Project owner Project impact Schedule
(totally 19.902km long, DN100~ DN300) of the water distribution Village and the state- owned
system in the county town; land 60mu. The water
③ structures with relation to water supply system, including intake supply system uses without
heading, lifting pump station and inspection chamber, etc. payment the reserved
④ Protection of water source site; state-owned land 0.22mu.
⑤ Pump station at source water site Not land acquisition for the
protection of water source
site and pump station at
source water site.
No house relocation
22 Wenshan Wenshan Water Temporarily occupying land
County Wastewater management in Pipe system DN400 – rainwater/sewage pipe DN1500 (86.9 km long), Supply and 57 mu for temporary Jan. 2008 -
Wenshan County service area 19km2 Sewerage accesses, -Aug. 2008
Corporation No house relocation
23 Yanshan Temporarily occupying road
County land 62.55 mu (restored after
Yanshan Water
Urban drainage system in Construct D300 – D1200 rainwater/sewage pipes (10.77km long), construction). No house Apr. 2008 ~
Supply and
Yanshan County build 1.1km-long open channel for drainage relocation. Open channel for Sept. 2008
Sewerage Co., Ltd.
improving natural ditches,
without land acquisition
24 Funing Solid waste management in The domestic rubbish collecting and transfer facilities and a sanitary Hongxing Land requisition : 127.5 mu, Apr. 2007 ~
County Funing County landfill : capacity 70t/d Company of Funing including cultivated land May 2008
County 97.5 mu; and brick-wood
structure house (for
management of fruit garden)
relocation: 60m2
25 Maguan Sanitation landfill, transfer station, other public facilities and closure Land allocation: 150.21 mu;
County Solid waste management in of existing refuse dumps, etc. The landfill is divided into Landfill Area Maguan Refuse No house relocation Mar. 2007 ~
Maguan County I and II. Area and capacity of Landfill Area I and II are respectively Disposal Co., Ltd. Aug. 2007
25000m2 and 37000m2; and 170000m3 and 585000m3.
26 Malipo Land requisition: 80 mu,
Sanitary landfill, transfer station, other public facilities and closure of
County Solid waste management in Malipo Refuse including 65 mu cultivated Oct. 2007 ~
existing refuse dumps, etc.. The mean disposal capability of refuse
Malipo County Disposal Center land; Mar. 2009
landfill is 44t/d and landfill volume 400000m3.
No house relocation
27 Wenshan Environmental Environmental No land requisition and no
Prefecture management and Environmental monitoring and supervision system capacity build-up Protection Bureau house relocation Jul. 2007 ~
monitoring in Wenshan project of Wenshan Prefecture of Wenshan Jun. 2008
Prefecture Prefecture
7
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
1.3 Resettlement Plan
According to domestic capital construction procedures and the WB’s requirements
for safeguard policies, the resettlement action plan of the WB-loaned Yunnan Urban
Environment Project is carried out. The report includes four sub-reports prepared
according to the packaged projects of the four prefectures (cities) and the the report on
resettlement action plan of the provincial packaged project is prepared on the basis of the
four sub-reports.
During the report preparation, the site work was conducted according to the project
construction site scope defined by the current design output of the project design
organization and the project owner.
1.4 Measures to Mitigate Project Impacts
Project construction will certainly involve land acquisition, relocation and
resettlement and meantime inevitably have impacts on the original productive and living
conditions of the local residents. In project planning and design stage, impacts of the
project construction on local society and economy should be considered as far as possible
in scheme optimization and selection and it will be regarded as the key factors for scheme
optimization and selection. In designing sanitory landfills, it should be fully demonstrated
whether leakage will occur in the landfill sites which results in pollution for groundwater
and soil. With a view to decreasing land acquisition and resettlement where feasible, the
design institutes and Project Owners have taken some effective measures. In the aspects
of scheme selection and arrangement of other auxiliary facilities, they have avoided
residential areas and occupied less farmland as far as possible and conform to the local
planning and oppoinons of the the local governments.
⑴ On the equal conditions, they avoided relocation and impacts on the surrounding
villagers’ living in siting of refuse dumps, pipeline, sewage disposal facilities and
environmental monitoring devices. Take Xundian Urban Refuse Disposal Project as an
example. The refuse landfill of the project has two optional sites, i.e., Xiacun Site
(Option 1) and Qingshuigou Site (Option 2). The site of Option 1 is too close to the city
zone, there are villages within a range of 200m, the refuse dump is less than 100m to the
railway, thus resulting in great pollution on the villages and moreover the storage
capacity is small and far from the requirements set forth in relevant specifications.
Qingshuigou Refuse Landfill in Option 2 is located 7.5km to the north of Xundian county
town, about 5km to the original refuse piling sites and its west is 1km to the railway from
Kunming to Dongchuan and 2.5km to Tianshengqiao Highway and there is no village
within a range of 1km. The design institute at last recommended Optiion 2 as the final
scheme.
⑵ Under equal conditions, cropland has been avoided or occupied less where
possible in siting of refuse dumps, pipeline, sewage disposal facilities and environmental
monitoring facilities. Take the drainage system under Dali City Jurisdiction as an
example. Through site investigation and research, the project design institute proposed
that most sewerage pipeline be laid along highways or in wasteland and exposed pipes be
avoided where possible and meantime, it is also considered that the ground surface will
be restored after construction, which can not only satisfy requirements of engineering
8
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
design but also avoid permanent land occupation of the local villagers’ farmland or
decrease damage to crops. The sanitory landfill is desinged in light of the topograp hic
conditions and valley and wasteland are used as far as possible. The refuse disposal
center is arranged by making use of the existing urban idle land.
⑶ Pay attention to environmental protection and avoid such environmentally
sensitive areas as water source, schools, hospitals, cultural relics and historic sites and
scenic spots as far as possible. The sites should not produce pollution on the surrounding
environment or the pollution should not exceed the allowable range set forth in relevant
natioal laws and regulation as well as current standards. During siting, it is considered
that there is a certain safe distance from the lower wind direction place of the dominant
wind direction to the residential area.
⑷ Potential inconvenience brought to the local residents’ production and living by
project construction has been fully consided in design. For example, setting pedestrian
passageways in the sections with relatively concentrated residents to facilitate thei r traffic;
damage to infrastructure of channels due to project construction will be restored to ensure
its integrity.
⑸ Optimize construction organization planning to shorten construction period and
decrease excavation and filling in large quantity and reasonably arrange the time period
for restoration of special items and construction to reduce impacts of project construction
on local areas. For instance, housing demolishing and reconstruction is generally chosen
in the slack seasons, and land acquisition after harvest of young crops and construction of
bridge and culverts are completed as far as possible before spring ploughing to facilitate
farmland irrigation and drainage and flood prevention.
1.5 Analysis on Linkage Subprojects
The related project means the other project which has relations with the preparation
and implementation of this project in the respects of function and benefits.
In project design, the Project Owners pay great attention into the identification of the
related project, and the project office has conducted analysis on related project together
with the design organizations of respective project sub components. The analysis has the
following results as in Table 1-2.
Analysis on Linkage Subprojects
Table 1-2
Related
No. Project name Analysis
project, if any
Enhancement of Water Quality Set up the monitoring information system, which can
1 NO
Monitoring Capacity independently provide benefits.
Set up sanitary landfill and associated works, and
Solid waste management in
2 rubbish collecting system, which will provide benefits NO
Songming County independently after completion
Set up sanitary landfill and associated works, and
Solid waste management in Xundian
3 rubbish collecting system, which will provide benefits NO
County
independently after completion
Set up sanitary landfill and associated works, and
Solid waste management in Luquan
4 rubbish collecting system, which will provide benefits NO
County
independently after completion
Integrated water Boluo River In Eryuan Dali, independent works NO
environmental Cangshan Shiba
5 In Eryuan Dali, independent works NO
management of creek
Dali River Yong’an River In Eryuan Dali , independent works NO
9
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Related
No. Project name Analysis
project, if any
Miju River In Eryuan Dali, independent works NO
Luoshi River In Eryuan Dali, independent works NO
Rural non-point pollution control in
6 In Eryuan Dali, independent works NO
Lake Erhai Basin
Improve the network facilities, which will Yes, refer
Urban drainage system under Dali City
7
Jurisdiction
provide benefits together with the existing to the
facilities and the planned facilities appendix
Wastewater treatment plant and Set up the sewer network and sewage treatment plant,
8 associated sewer network of which will provide benefits independently after NO
Dengchuan Town in Eryuan County completion
Set up sanitary landfill and associated works, and
Solid waste management in Eryuan
9 rubbish collecting system, which will provide benefits NO
County
independently after completion
Set up the sewer network and sewage treatment plant,
Wastewater management in Huaping
10 which will provide benefits independently after NO
County
completion
Set up the sewer network and sewage treatment plant,
Lijiang City WWTP and Sewer
11 which will provide benefits independently after NO
Network
completion
Yulong County rainwater drainage Rainwater and sewage diversion system, independent
12 NO
system works
Set up sanitary landfill and associated works, and
Solid waste management in Lijiang
13 rubbish collecting system, which will provide benefits NO
City
independently after completion
The demolishing of existing building and
Wastewater management in Lijiang
14
Ancient Town construction of Municipal Infrastructure and NO
supplemental facility, independent works
Greening and renovation of pipe network and river
Integrated management of Putting
15 dredging, which will provide benefits independently NO
River in Funing County
after completion
Set up eco-treatment system for sewage and river
16 Puzhehei Lake in Qiubei County dredging, which will provide benefits independently NO
after completion
Panlong river in Wenshan County River control and landscape construction, which will Yes, see
17
Town Area provide benefits independently after completion Appendix
Set up the sewer network and sewage treatment plant,
Wastewater management in Guangnan
18 which will provide benefits independently after NO
County
completion
Set up the sewer network and sewage treatment plant,
Wastewater management in Malipo
19 which will provide benefits independently after NO
County
completion
Set up the sewer network and sewage treatment plant,
Wastewater management in Qiubei
20 which will provide benefits independently after NO
County WWT
completion
Set up the new water supply pipe network, and purified
Wastewater management in Qiubei
21 water system, which will provide benefits independently NO
County WS
after completion
Set up the new drainage pipe network, which will relate Yes, refer
Wastewater management in Wenshan
22 the sewage treatment plant of Wenshan County, and will to the
County
provide benefits right after completion appendix
Set up the new drainage pipe network, which will relate Yes, refer
Urban drainage system in Yanshan
23 the sewage treatment plant of Yanshan County, and will to the
County
provide benefits right after completion appendix
Solid waste management in Funing Set up rubbish collecting, transferring systems and
24 NO
County landfill, which can independently provide benefits
Solid waste management in Maguan Set up a landfill, which can independently provide
25 NO
County benefits
Solid waste management in Malipo Set up rubbish collecting, transferring systems and
26 NO
County landfill, which can independently provide benefits
Environmental management and Set up environmental monitoring system which can
27 NO
monitoring in Wenshan Prefecture independently provide benefits
10
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
1.6 Implementation of Land Acquisition and House Relocation for Stage I Yunnan
Environment Project
The Yunnan Environment Project Office has rich experience in implementing th e
WB-loaned projects accumulated since 1996 when the managemen and implementation of
the WB-loaned Stage I Yunnan Environment Project, which has 20 sub-components
distributed in Kunming, Chenggong, Puning, Gejiu, Shilin, Mengzi, and Xuanwei
countyies and cities, covering sewager treatment, water supply, solid waste disposal,
industrial pollutino control, environmental monitoring and measurement, etc.
In order to ensure the successful completion of the Stage I project, Yunnan Province
established in Jan. 1996 the “Land Requisition and House Relocation Leading Group for
Yunnan Environment Project” which was headed by the leader of the provincial
government and membered by the leaders of the governmental departments. Under the
group, an office was set, and the land requisitin and house relocation group of the
provincial project office was responsible for planning, implementation, organization and
coordination of the project. The corresponding leading groups were also established at the
project-affected cities and counties. The work involved in the land requisitin and house
relocation is carried out on the principles of observation of the state laws, regulations and
the WB guidelines, and strictly followed the RAP of WB-loaned Stage I Yunnan
Environment Project approved by the World Bank.
The key conclusions of the external monitoring for the WB-loaned Stage I Yunnan
Environment Project are: (1) the project is implemented on the principles of close
observation of the state laws, regulations and the local regulations; (2) the project is
implemented in comformity with the involuntary resettlement policy of the World Bank;
(3) the land requisition and house relocatin are carried out based on the Yunnan
Provincial Action Plan for Land Requisition and House Relocation; (4) the resettlement
of the PAPs of the project is mainly by means of internal land adjustment and providing a
few of job opportunities. The individual project components and relevant cities and
counties provide corresponding resettlement methods based on the needs and possibilities
and the principles followed are targeting at the wills and interest of the PAPs; (5) the
living standard of the PAPs are improved or at least reach the standard before
resettlement.
11
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
2 Project Impact
2.1 Determination of project impact scope
2.1.1 Permanent land acquisition for project
The permanent land to be acquired by the project is mainly for construction of the
landfill, rubish transition station, sanitation center, rubish storage, access road, sewage
treatment plant, soil purification trough, automatic monitoring station for river flow to the
lake, automatic river flow monitoring station, river harnissing works, man-made wetland,
afforestation along the river. The areas which are within the scope of the permenant land
acquisition and where the living and production of the local inhabitants will be seriously
affected by the project construction and can not be restored afterward, shall be
determined as the project impact scope for the project land acquisition and house
relocation. Based on the project proposal or the feasibility study reported completed by
various design institutes in April ~August 2006 for the sub-projects of the City
Environmental Construction Project of Yunnan Province, the scope for the land
acquisition and house relocation for each sub-project was respectively determined during
that time, and was adjusted according to the revised F/S reports completed in April –
December 2007.
2.1.2 Temporary land use for project construction
The land to be temporarily used for the project inlcude that for spoil area,
construction camps, construction plant, temporary accesses, water diverting and sewage
interceptor network, and temporary slurry store, etc.
2.2 Result of project impact investigation
From the end of Nov. 2006 to mid Jnuary 2007, with the participation and
cooperation by the local government, administrative villages, village groups and the
PAPs, the Project owner, with the assistance of the project design units, conducted the
investigation, item by item, into the main inventory in kinds within the preliminarily
determined project impact scope of land acquisition and house relocation, covering status
and number of the PAPs, houses and attached building, lands, and special facilities, etc.,
which lasted 45 days. In April ~Dec. 2007, based on the revised F/S study result, the
investigation team conducted check on the inventory in kinds.
The project impact scope for the project land acquisition and house relocation will
affect 28 administrative villages of 22 towns (townships) in 15 counties (districts). A
total of 3121 inhabitants in 767 households will be affected, including 1870 of 442
households affected by permenant land acquisition and 971 of 263 householde. In
addition, 392 inhabitants of 130 individual bussiness households will be affected and 807
inhabitants of 23 enterprises will also be affected. A total of 3105.12 mu land will be
requisitioned, and 1123.79 mu land will be temporarily occupied. The project will also
affect some scattered fruit trees, part of living and production facilities as well as some
telecommunication, broadcasting, Unicom and Mobilecom facilities and cables will be
affected. The land acquisitin will affect 1326 minority people, and 424 mu cultivated land
belonging to the minority people will be permantly acquired. The project will affect
12
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
houses of 13295.3m2.The main inventory in kinds affected by the project is indicated in
Table 2-1.
13
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Summary of Itemized inventory in kinds affected by the project
Table 2-1
Area of
Collective Incl. State-owned Temporary
County PAPs to be Incl. PAPs to be houses to
No. Project Item land to be Cultivated land
(District) affected relocated be occupation land use
acquired land
relocated
House- House-
person person m2 mu mu mu mu
hold hold
1 Enhancement of water quality monitoring capacity Kunming 0.65
2 Solid waste management in Songming County Songming 48 193 115.5 107.7 6.85
3 Solid waste management in Luquan County Luquan 34 138 118.5 43.8 6.7
4 Solid waste management in Xundian County Xundian 1 5 180 3
Total in Kunming 83 336 414 151.5 17.2
5 Integrated water environmental management for Miju
River 1 5 42
Integrated water environmental management for
Yong’an River Eryuan 12 64 21 21
Integrated water environmental management for
Luoshi River 103 350 76.5 61.5 7.35
Integrated water environmental management
Cangshan Shiba Creek Dali
6 Dali,
Rural non-point pollution control in Lake Erhai Basin Eryuan 4 21 1.2 1.2
7 Dali,
Urban drainage systems under Dali City Jurisdiction Eryuan 172 688 100 131
8 Wastewater treatment plant and associated sewer Eryuan 16 70 7.34
14
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Area of
Collective Incl. State-owned Temporary
County PAPs to be Incl. PAPs to be houses to
No. Project Item land to be Cultivated land
(District) affected relocated be occupation land use
acquired land
relocated
network of Dengchuan Town in Eryuan County
9 Solid waste management in Eryuan County Eryuan 19 83 165.5 94.8 9
Total in Dali 327 1281 100 271.54 178.5 147.35
10 Wastewater management in Huaping County Huaping 20 91 21.6 21.6 180.6
11 Old Town
Lijiang City WWTP and sewer network district 62 324 88.00 88.00 100.77
12 Yulong County rainwater drainage system Yulong
13 Old Town
Solid waste management in Lijiang City district 16 86 230 35.00 3.48
14 Old Town
Wastewater management in Lijiang Ancient Town district 62 280 62 280 63924.81 1.87 311
Total in Lijiang 160 781 60 280 63924.81 341.47 144.6 314.48 281.37
15 Integrated management of Putting River in Funing
County Funing 7 26 210.33 20.0
16 Puzhehei Lake in Qiubei County Qiubei 533
17 Panlong River in Wenshan County town Area Wenshan 511.32 340
18 Wastewater management in Guangnan County Guangnan 2 8 1.4 1.4 33.6 44.67
19 Wastewater management in Malipo County Malipo 30 128 16.35 16.35 40.11
20 Wastewater management in Qiubei County WWT Qiubei 20 92 22.45 22.45 31.89
21 Wastewater management in Qiubei County WS Qiubei 80 240 18.05 0.22 60
22 Wastewater management in Wenshan County Wenshan 57
23 Urban drainage system in Yanshan County Yanshan 62.55
24 Solid waste management in Funing County Funing 24 87 60 127.5 97.5
15
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Area of
Collective Incl. State-owned Temporary
County PAPs to be Incl. PAPs to be houses to
No. Project Item land to be Cultivated land
(District) affected relocated be occupation land use
acquired land
relocated
25 Solid waste management in Maguan County Maguan 150.21
26 Solid waste management in Malipo County Malipo 34 142 80.00 65
Total in Wenshan
197
723 60 798 202.7 905.68 695.07
Grand Total 767 3121 60 280 64084.81 1825.76 677.3 1279.36 1123.79
Notes: Including 971 inhabitants of 263 households affected by the temporary land acquisition, (688 inhabitants of 172 households in Eryuan County, 26 of 7 households in Funing County,
227 of 67 households in Qiubei County and 17 of 4 households in Lijiang Old town District).
In this table, the 392 persons of the individual business households and 807 persons of the affected enterprises and public institutions (totally 1199 persons) are not included. Refer to Table 2-2
for the total affecter persons.
16
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
2.2.1 PAPs
The PAPs of this project include those affedted by permenant and temporary land
requisition, house relocation, and those working with individual bussiiness households
and staff of enterprises. A total of 4320 inhabitants will be affected by the project,
including 3121 of 442 households are affected by land requisition and house relocation
(including 1870 of 442 households affected only by land requisition, 280 of 62
households affected only by house relocation (urban residents); 971 persons of 263
households are effected by temporary land occupation), 807 persons of 23 households are
affected by relocation of enterprises they work with; and 392 of 130 individu al bussiness
households will be affected, which are excluded in the residents.
17
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Summary of Itemized inventory in kinds affected by the project
Table 2-2
PAPS affected by Urban PAPs to PAPs affected
Total PAPs to be collective land be relocated by temporary Enterprises Individual business
Project item County
PAPs reset- tled acquired without without land land affected house holds affected
No. house relocation acquisition acquisition
(district)
House House No. of
No. No. Household No. No. No. No. No. No. of PAPs
hold hold PAPs
1 Enhancement of water quality monitoring capacity Kunming
2 Solid waste management in Songming County Song- ming 193 110 48 193
3 Solid waste management in Luquan County Luquan 138 66 34 138
4 Solid waste management in Xundian County Xundian 5 1 5
Total in Kunming 336 176 83 336
5 Integrated water environment treatment for Miju River 5 1 5
Integrated water environment treatment for Yong’an River 64 34 12 64
Eryuan
Integrated water environment treatment for Luoshi River 350 133 103 350
Integrated water environment treatment for Boluo River
Integrated water environment treatment for Cangshan
Shiba Creek Dali
6 Rural non-point pollution control in Lake Er’hai Basin Dali, Eryuan 21 2 4 21
7 Urban drainage system under Dali City Jurisdiction Dali, Eryuan 688 172 688
8 Wastewater treatment plant and associated sewer network
of Dengchuan Town in Eryuan County Eryuan 70 16 70 70
9 Solid waste management in Eryuan County Eryuan 83 116 19 83
Total in Dali 1281 285 155 593 172 688
10 Wastewater management in Huaping County Huaping 91 16 20 91
11 Old Town
Lijiang City WWTP and sewer network district 324 24 58 307 4 17
12 Yulong County rainwater drainage system Yulong
18
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
PAPS affected by Urban PAPs to PAPs affected
Total PAPs to be collective land be relocated by temporary Enterprises Individual business
Project item County
PAPs reset- tled acquired without without land land affected house holds affected
No. house relocation acquisition acquisition
(district)
House House No. of
No. No. Household No. No. No. No. No. No. of PAPs
hold hold PAPs
13 Old Town
Solid waste management in Lijiang City district 86 60 16 86
14 Old Town
1479 62 280
Wastewater management in Lijiang Ancient Town district 23 807 130 392
Total in Lijiang 1980 100 94 484 62 280 4 17 23 807 130 392
15 Integrated management of Putting River in Funing County Funing 26 7 26
16 Puzhehei Lake in Qiubei County Qiubei
17 Panlong River in Wenshan County Town Area Wenshan
18 Wastewater Management in Guangnan Guang- nan 8 6 2 8
19 Wastewater management in Malipo County Malipo 128 12 30 128
20 Wastewater management in Qiubei County Qiubei 92 32 20 92
21 Wastewater management in Qiubei WS Qiubei 240 80 240
22 Wastewater management in Wenshan County Wenshan
23 Urban drainage system in Yanshan County Yanshan
24 Solid waste management in Funing Funing 87 84 24 87
25 Solid waste management in Maguan County Maguan
26 Solid waste management in Malipo County Malipo 142 77 34 142
Total in Wenshan 723 211 110 457 87 266
Grand Total 4320 772 442 1870 62 280 263 971 23 807 130 392
19
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
2.2.2 Land to be permanent acquired
The project will permenantly acquired land of 3105.12 mu for its 24 sub-
components, in which, the land acquired by 19 sub-components includes
collective-owned land and that by 13 sub-components includes state-owned land. Of all
the acquired land, the cultivated land is 710.9 mu (22.9% of the total), garden plot 37.34
mu (1.2%), fish pond 32 mu (1%), water pool 15 mu (0.5%), woodland 476.25 mu
(15.3%), reclaimed waste land 177mu (5.7%), unused land 536 mu (17.3%) and
construction land 1120.63 mu (36.1%). The details are shown in Table 2-3 and 2-4.
Statistics of collective-owned land to be acquired
Table 2-3
Collective land to be acquired (mu)
Farmland Reclai
Construc
Grand Grade Water med Wood Unuse
No. Project item Paddy Dry - tion
Total total n plot pool waste land d land
field land land
land
mu mu mu mu mu mu mu mu
Enhancement of water quality
1
monitoring capacity
Solid waste management in
2 180 177 3
Xundian County
Solid waste management in
3 115.5 107.7 107.7 7.8
Songming County
Solid waste management in
4 118.50 43.80 43.8 74.70
Luquan County
Total in Kunming 414 151.5 151.5 177 82.5 3
Integrated water environment
21.00 21.00 21
treatment for Yong’an River
Integrated water environment
5 15
treatment for Miju River
Integrated water environment
15
treatment for Luoshi River 76.50 61.50 61.50
Rural non-point pollution control
6
in Lake Er’hai Basin 1.20 1.20 1.20
Wastewater treatment plant and
associated sewer network of
7 7.34 7.34
Dengchuan Town in Eryuan
County
Solid waste management in Eryuan
8 165.5 94.80 94.8 70.7
County
Total in Dali 271.54 178.50 83.70 94.80 7.34 15 70.7
Wastewater management in
9 21.6 21.6 21.6
Huaping County
20
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Collective land to be acquired (mu)
Farmland Reclai
Construc
No. Project item Grand Grade Water med Wood Unuse
Paddy Dry - tion
Total total n plot pool waste land d land
field land land
land
Wastewater management in Lijiang
10 1.87 1.87
Ancient Town
Lijiang City WWTP and sewer
11 88.00 88.00 88.00
network
Solid waste management in
12 230.00 35 35 195.00
Lijiang City
Total in Lijiang 341.47 144.60 144.60 197 1.87
Integrated management of Putting
13
River in Funing County
14 Puzhehei Lake in Qiubei County 533 533
Panlong River in Wenshan County
15
Town Area
Wastewater Management in
16 1.40 1.40 1.40
Guangnan
Wastewater management in Malipo
17 16.35 16.35 16.35
County
Wastewater management in Qiubei 22.45 22.45
18 22.45
County
Wastewater management in Qiubei
19 18.05 18.05
WS
20 Solid waste management in Funing 127.5 97.5 16.30 81.20 20 10
Solid waste management in
21
Maguan County
Solid waste management in Malipo
22 80.00 65.00 15.00
County 13.00 52.00
Total in Wenshan 798.75 202.70 69.50 133.20 20 43.05 533
Grand total 1825.76 677.30 297.80 379.50 27.34 15 177 391.25 1.87 533
Statistics of State-owned Land Affected by The Project
Table 2-4
Acquisition for value Unpaid allocation
No. Project item Total Paddy Garden Fish Constr. Constr. Wood
field plot pond land land land
mu mu mu mu mu mu mu
Enhancement of water quality monitoring
1
capacity 0.65 0.65
2 Solid waste management in Luquan County 3.00 3
3 Solid waste management in Songming 6.85 6.7 0.15
21
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Acquisition for value Unpaid allocation
No. Project item Total Paddy Garden Fish Constr. Constr. Wood
field plot pond land land land
mu mu mu mu mu mu mu
County
Solid waste management in Xundian
4
County 6.70 6 0.7
Total in Kunming 17.2 15.7 1.5
Integrated water environment treatment for
Yong’an River
5 Integrated water environment treatment for
Miju River 42 10 32
Integrated water environment treatment for
Luoshi River
6 Rural non-point pollution control in Lake
Er’hai Basin
Wastewater treatment plant and associated
7 sewer network of Dengchuan Town in
Eryuan County
8 Solid waste management in Eryuan County
Total in Dali 42 10 32
Wastewater management in Huaping
9
County
Municipal Infrastructure Construction in
10
Nu’erguo Town of Ninglang County
Wastewater management in Lijiang Ancient
11
Town 311 311
12 Lijiang City WWTP and sewer network
13 Solid waste management in Lijiang City 3.48 3.48
Total in Lijiang 314.48 314.48
Integrated management of Putting River in
14
Funing County 210.33 210.33
15 Puzhehei Lake in Qiubei County
Panlong River in Wenshan County Town
16
Area 511.32 511.32
Wastewater Management in Guangnan
17
County 33.60 33.6
18 Wastewater management in Malipo County
19 Wastewater management in Qiubei County
20 Wastewater management in Qiubei WS 0.22 0.22
21 Solid waste management in Funing
22 Solid waste management in Maguan County 150.21 65.21 85
22
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Acquisition for value Unpaid allocation
No. Project item Total Paddy Garden Fish Constr. Constr. Wood
field plot pond land land land
mu mu mu mu mu mu mu
23 Solid waste management in Malipo County
Total in Wenshan 905.68 33.60 1 787.08 85.00
Grand total 1279.36 33.6 10 32 330.48 788.58 85.00
2.2.3 Temporary land acquired for project construction
The land to be temporarily acquired means the land to be temporarily borrowed
during the porject construction period, for arranging the temporary construction plants or
facilities such as spoil areas, construction camps and plants, water diversion and
interception stockpiling of slurry. Among the 27 sub- components, 14 components will
have the construction activities within the acquired land and will not temporarily borrow
land, the remaining 13 components will temporarily occupy a total of 1123.79 mu land at
this project stage. The Project Office will define in the contract to be signed with the
construction contractor the way of using the temporarily acquired land and the
requirement of land restoration after the construction, etc.
23
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Statistics of Ownerships of Land to Be Temporarily Acquire (on village base)
Table 2-5
State-owned
Cultivated land
Project item County Town Admin. village Total constr. land
Total Paddy field Dry land
Dali 131.00 13.50 11.92 1.58 117.50
Xizhou State-owned land 28 28
Fengyi 30 13.5 11.92 1.58 16.5
Fengming 2.80 2.80 1.22 1.58
Urban drainage system under Dali City
Shilong 10.70 10.70 10.70
Jurisdiction
State-owned land 16.5 16.5
Dali Old city State-owned land 33 33
Provincial-level
40 40
Recreation area in Dali
Solid waste management in Eryuan County Eryuan Cibihu State-owned land 9 9
Integrated water environment treatment for
Eryuan Yousuo Collective-owned land 7.35 7.35
Luoshi River
Total 147.35 13.50 11.92 1.58 133.85
Wastewater management in Huaping County Huaping Zhongxin 180.6 180.6
Lijiang City WWTP and sewer network Ancient Town Jinshan Jinshan 100.77 21.85 21.85 78.92
Total 281.37 21.85 21.85 259.52
Communication
Wenshan 57 57
Wastewater management in Wenshan County bureau
Wastewater management in Panlong River
Wenshan 340 340
(Wenshan County urban section)
Integrated management of Putting River in
Funing Xinhua Wenhua Community 20 20 20
Funing
24
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
State-owned
Cultivated land
Project item County Town Admin. village Total constr. land
Total Paddy field Dry land
Communication
Guangnan 44.67 44.67
Wastewater Management in Guangnan bureau
Communication
Malipo 40.11 40.11
Sewage treatment and sewage main bureau
Communication
Yanshan 62.55 62.55
Urban drainage system in Yanshan County bureau
Wastewater management in Qiubei County WWT Qiubei Jingping Donghu Community 31.89 31.89
Communication
Qiubei 60 60
Wastewater management in Qiubei WS bureau
Jingping Matou village 38.85 38.85 38.85
Grand total Total 695.07 58.85 58.85 636.22
Grand total 1123.79 94.20 33.77 60.43 1029.59
25
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
2.2.4 Houses and attached buildings to be relocated
In this project, only the Wastewater management in Lijiang Ancient Towm
component, the Urban drainage system under Dali County Jurisdiction, and Solid
Waste Management in Funing County require the house relocation, totally 64084.81m2
(only 100 m 2 collective-owned simple houses effectd by the Urban drainage system in
Dali and 60m 2 collective management house effected by Solid Waste Management in
Funing County ), including private-owned houses of 13235.3m2 (which is divided into
rural houses and urban houses according to the land property). Of the houses, 9923.08
m2 are of rural residence (139 persons of 30 households), 3312.22m2 of urban residence
(141 persons of 32 households) and 50849.51m2 of collective-owned houses. No
illegally-built houses are found so far. The details for the urban residence to be relocated
are detailed in Table 2-6, and the rural residence to be relocated is indicated in Table 2-7.
26
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Urban residence to be relocated
Table 2-6
Villager No. of Private-owned houses (m2) Residence house (m2) Shops (m2)
Project Type of commi- household No. of Brick- Sub total Brick-
Township (town) Brick-wood Clay- wood Brick-wood Clay- wood
component impact ttee affected PAPs Sub total concrete concrete
structure structure structure structure
structure structure
Xi’an Subdistrict
Zhengyi 13 54 1108.07 1094.76 13.31 1094.76 1094.76 13.31
New house Office
at original Dayan Subdistrict
Wastewater Xinhua 9 43 379.78 379.78 379.78 379.78
place Office
management in
Subtotal 22 97 1487.85 1474.54 13.31 1474.54 1474.54 13.31
Lijiang Ancient
Town New house
Dayan Subdistrict
at other Xinhua 10 44 1824.37 441.99 1382.38 1824.37 441.99 1382.38
office
place
Subtotal 32 141 3312.22 1916.53 1382.38 13.31 3298.91 1916.53 1382.38 13.31
Rural residence to be relocated
Table 2-7
Private-owned houses (m2) Residence house (m2) Shops (m2)
No. of
Villager Brick- Clay- Brick- Clay-
Project househol No. of Brick- Brick- Brick- Brick-wo Clay-
Type of Township (town) commi- wood wood wood wood
component ds PAPs Sub total concrete Sub total concrete Sub total concrete od struc- wood
impact ttee struc- struc- struc- struc-
affected structure structure structure ture struc- ture
ture ture ture ture
New house at Xi’an Subdistrict
Zhengyi 26 117 5067.73 4807.35 154.12 106.26 4060.4 4060.42 1007.3 746.93 154.12 106.26
original place Office
Wastewater
manageme Xi’an Subdistrict
Zhengyi 2 11 2935.43 2883.38 52.05 690.81 690.81 2244.62 2192.57 52.05
nt in Office
New house at Xianghe
Lijiang Yihe 2 11 1919.91 1566.71 15.81 337.4 353.21 15.81 337.40 1566.71 1566.71
other place Subdistrict Office
Ancient
Town Sub total 5 22 4855.34 4450.09 67.86 337.4 1044.02 690.81 15.81 337.4 3811.33 3759.28 52.05
Total 30 139 9923.08 9257.44 221.98 443.66 5104.41 4751.2 15.81 337.4 4818.64 4506.2 206.2 106.3
27
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Houses of the collectives, organs and enterprises to be relocated for the
project are detailed in Table 2-8.
Houses of the collectives, organs and enterprises to be relocated
Table 2-8
Collective-owned houses (m2)
Villager
County Town- ship Brick- Brick-wo Clay- Simple
Project item commi- Framed-ho
(city) (town) Total concrete od struc- wood structur
ttee use
structure ture struc- ture e
Synthetic urban sewage Fengmin
Dali Fengyi 100 100
networks in Dali g
Stage I environmental
Old Enter-
harnessing project for Shizi 50689.51 9294.36 31232.48 6499.45 3663.22
Town prises
Hill at Ancient Town
Tuanjie
Solid waste management in Xinhua
Funing communi 60 60
Funing County town
ty
Total 50849.51 9294.36 31232.48 6559.45 3663.22 100
2.2.5 Individual business households
This project will affect 130 individual business households by the sub-
component --- Wastewter management in Lijiang Ancient Town, who will be
relocated. They all live on Minzhu Road. The effected shop area is 9632.39 m2, of
which is 4800.44 m 2 for organ and enterprises and 4831.95 m 2 for individuals.
The effected house area for individuals is included in project effected houses. The
details are in Table 2-9.
Statistics of individual business households
Table 2-9
Total Private-owned house House of enterprises
Sub district
2 2
No. House area (m ) No. House area (m ) No. House area (m2)
Minzhu 130 9632.39 37 4831.95 93 4800.44
2.2.6 Organs and Enterprises affected
The sub-component --- Wastewter management in Lijiang Ancient Town,
will cause relocation of enterprises. According to the investigation at this stage of
the project, a total of 23 enterprises will be relocated (15 enterprises and 8 public
institutions). The affected enterprises will be compensated and the employees will
not loss their job, therefore, the employees will not be affected much. The detail
of the enterprises to be affected is shown in Table 2-10. The effected houses of
enterprises are included in the project effected houses.
28
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Enterprises to be affected by the project
Table 2-10
Architectural area(m2)
Impact No. of
No. Name of units Kind
Framed Brick- Brick- Clay- level staff
Total
structure concrete wood wood
Dayan Credit Union of Gucheng Enterprise
1 District Rural Credit 825.13 672.82 44.92 107.39 Demolished
Cooperative, Lijiang 43
Local Products Sales Co. Ltd. Enterprise
2 3141.65 2017.85 1113.67 10.13 Demolished
Of Gucheng District 44
Traffic Management Station of Enterprise
3 1493.88 1337.48 156.4 Demolished
Gucheng District 19
4 Lijiang Farming Tool Company Enterprise 6759.29 2335.23 2730.38 1693.68 Demolished 43
Workers’ Cultural Palace of Enterprise
5 3279.1 2920.67 358.43 Demolished
Gucheng District 6
Barbers’ Cooperative Union of Enterprise Partial
6 474.19 474.19
Gucheng District demolished 13
Tire Repairing Plant (Yunzhinan Enterprise
7 2906.68 1421.46 387.26 1097.96 Demolished
Hotel) 60
State Tax Bureau branch at
8 Organs 4113.05 2928.05 1185 Demolished
Gucheng District 89
9 Gucheng Hardware Factory Enterprise 7376.91 5188.71 1492.81 695.39 Demolished 80
China Construction Bank Enterprise
10 2631.8 2121 481.4 29.4 Demolished
Lijiang Branch 65
Yunyan Hotel of Yunnan Enterprise
11 5695.66 5695.66 Demolished
Boyuan Industry Co. Ltd. 53
Enterprise Parly
12 Shizishan Commercial Co.
Demolished 123
Lijiang Broadcasting and TV Enterprise
13 4412.43 1534.11 2687.01 191.31 Demolished
Station 115
Agricultural Material Co. of Enterprise
14 835.68 620.08 215.6 Demolished
Gucheng District 0
Gucheng No. 6 Construction Enterprise
15 1238.94 723.81 368.34 146.79 Demolished
Co. 54
Lijiang Animal Husbandry and Enterprise
16 762.12 762.12 Demolished
Veterinary Station
17 Conference Hall of Lijiang City Enterprise 2141.53 2141.53 Demolished
Enterprise Partly
18 Senlong Group Co. 192.22 192.22
Demolished
County goods and material Enterprise
19-
company, trade company, pork
21
products mill of Yulong County
Enterprise Partly
Clinic department of the county 1708 1708
22 Demolished
hospital,
23 Traffic Police Station Organs
Total 50689.51 9294.36 31232.48 6499.45 3663.22 807
Notes: the partial structures of Agricultural Material Co. of Gucheng District, Clinic department of Yulong county hospital,
county goods and material company, trade company, traffic police station, pork products mill, Barbers’ Cooperative Union
of Gucheng District are affected, but the staff will not be affected.
2.2.7 Scattered trees and tombs
Four components of the project have impact on the scattered trees, which
include the fruit trees planted in front of and behined the houses and on the
farmland and any other kinds of trees standing on the land to be requisitioned,
29
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
which are to be felled due to project construction. For this project, a total of
17619 trees will be cut, including 16119 fruit trees and 1500 general trees. The
details are as in Table 2-11.
Statistics of scattered trees in the project affected area
Table 2-11
Luquan Xundian Eryuan Malipo
Trees Unit Total County County County County
I Fruit tree ea. 16119 10365 3000 2754
1 Fruited ea. 7715 6703 400 323
Not fruited (trunk about 10cm in
8906 3662 2600 2431
2 diameter) ea.
II General tree ea. 1500 1 1440 59
1 Young tree ea. 1500 1 1440 59
2 Matured tree ea.
Grand Total ea. 17619 10366 4440 2754 59
The project will affect 8 tombs, 3 in Songming County and 5 in Malipo
County. Before project construction these tombs will be relocated.
2.2.8 Special facilities
The project (four components only) will affect the cables of
telecommunication, broadcasting, Unicom and Mobilecom facilities, and 35kV
power cables. In the project construction, they will be protected and restored after
construction. The detail is shown in Table 2-12。
30
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Statistics of Project Affected Special Facilities
Table 2-12
No. Description unit total Songming Luquan Dali Maguan
1 Optical fiber cable pole/km 5.26 0.01 1 2.8 1.45
pole/km 5.25 1
1.1 Overhead-erected cable 2.8 1.45
1.2 Embedded optical fiber cable pole/km 0.01 0.01
2 Broadcasting optical fiber cable pole/km 1 1
3 Unicom optical fiber cable pole/km 3 3
4 Mobilecom optical fibre cable km 1 1
5 35KV power cable pole/km 2.5 2.5
6 Power line km 1.79 1.79
Total 14.55 0.01 6 4.59 3.95
Note: The Unicom and Mobilecom optical fibre cables are erected on the same poles.
2.2.9 Project-affected living and production facilities
Two components of the project will affect local living and production
facilities, including water tanks, transformers, and pump stations.
Statistics of project-affected living and production facilities
Table 2-13
No. Project item City (county) Facilities Unit Quantity
3
1 Solid waste management in Luquan Water tanks m 256
2 Luquan County Water pipes kg 430
3 Dali Transformer ea. 2
4 Dali Pump station ea. 3
5 Dali Culverts ea. 4
6 Dali Water sluice ea. 3
Urban drainage system
7 Dali Water pipe m 2500
under Dali City Jurisdiction
Trench for water
8 Dali m 90
pumping (concrete)
Trench for water
9 Dali m 1790
pumping (masonry)
2.2.10 Affected Ethnic People
The project affected 1326ethnic people (accounting to 61.7% of the total
peop affected by permanent land acquisition). 434 mu cultivated land of the ethnic
people will be permanently acquired and 13295.3m 2 houses will be affected. See
Table 2-14.
31
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Impact on the Ethnic People
Table 2-14
Land acquisition
Composition of ethinic people
Ethnic (mu) House
House relocation PAPs Proporti to be
No. Project description Land acquisition 2 people Fish relocate
(m ) (person) on Cultivate Garden
affected Yi Bai Naxi Hui Miao Lisu Zhuang pon d (m2)
d land plot
d
Solid waste Acquiring and using land
1 management in 122.35mu, including 193 6 6 3.11% 3.16
Songming County cultivated land 107.7mu
Solid waste Acquiring and using land
2 management in Luquan 125.2mu, including 138 36 25 11 26.09% 13.19
County cultivated land 43.8mu
Solid waste Using construction land
3 management in 3mu, reclaimed land 177mu 5 1 1 20%
Xundian County
Integrated water Acquiring land 139.5mu,
environmental including cultivated land
4
management of Dali 82.5mu
419 355 355 84.73% 61.5 10 32
River
Rural non-point Acquiring cultivated land 1.2
5 pollution control in mu 21 21 21 100% 1.2
Lake Erhai Basin
Urban drainage system No land acquisition, but
Collective-owned Not
under Dali City temporarily occupying
6 Jurisdiction cultivated land land 131mu simple 688 identifie
including cultivated land
house100m2 d
13.5mu
Wastewater treatment Acquiring garden plot 7.34
plant and associated mu
7 sewer network of 70 No
Dengchuan Town in
Eryuan County
Solid waste Acquiring land 165.5
8 management in Eryuan muincluding cultivated land 83 83 83 100% 95
County 94.8 mu
Wastewater Acquiring cultivated land
9 management in 21.6 mu, temporary 91 38 36 2 41.76% 15.6
Huaping County occupying construction land
32
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Land acquisition
Composition of ethinic people
Ethnic (mu) House
House relocation PAPs Proporti to be
No. Project description Land acquisition 2 people Fish relocate
(m ) (person) on Cultivate Garden
affected Yi Bai Naxi Hui Miao Lisu Zhuang pon d (m2)
d land plot
d
180.6mu
Lijiang City WWTP Acquiring cultivated land 88
10 and Sewer Network mu 324 307 307 94.75% 88
Solid waste Acquiring (using) land
11 management in Lijiang 233.48mu, including 86 86 86 100% 35
City cultivated land 35 mu
Wastewater using construction land 311
12 management in Lijiang mu, acquiring 1.87mu 63924.81m2 280 236 5 231 84.29% 13235.3
Ancient Town
Wastewater Acquiring cultivated land 35 100.00
13 management in mu 8 8 8 1.4
Guangnan County %
Wastewater Acquiring cultivated land
14 management in Malipo 16.35mu 128 39 2 37 30.47% 6
County
Wastewater Acquiring cultivated land
15 management in Qiubei 22.45mu 92 9 4 5 9.78% 2
County WWT
Wastewater Acquiring woodland land Not
management in Qiubei 18.05 mu, temporary using
16 County WS land 98.85mu 240 identifie
d
Solid waste Acquiring land 127.5 mu, Collective-owned
17 management in Funing including cultivated land 87 87 87 100% 97.5 20 60
County 97.5 mu house 60.0m2
Solid waste Acquiring land 80 mu,
18 management in Malipo including cultivated land 142 14 7 7 9.86% 4.45
County 65.0 mu
Total 64084.81 3121 1326 156 467 538 6 13 2 144 424 10 32 13295.3
33
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
2.2.11 Vulnerable groups
In the project impact investigation, the nationality, age, education level and
employment status of the household members affected by land acquisition and house
relocation of the project were investigated household by household and village by village.
By the comparison and analysis on the data of the family structure and the information
obtained from the local civil departments and poverty-relief offices of the governments,
the number of vulnerable groups was determined. The investigation data indicates that the
project would affect 1326 minority people and the per capita net income of the affected
was over 1000 RMB Yuan which was far above the income of the local people in poverty
(924 RMB Yuan). Therefore, they are not defined as people in poverty, and their income
is similar to the local Han people.
Of the project-affected households, the household who is comparatively in
vulnerable condition will receive special assistance in resettlement. Only one is in
Xundian Hui Autonomous County (Hu Guangcun’s family), who has contracted 350 mu
waste hillside land and invested much without output last year, his son is serving in army,
thus, the economic condition of the family was rather poor in 2006, the special support
should be given to the household.
34
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
3 Analysis of Impact on Nature, Society and Economy within Project Area
3.1 Natural Conditions in project-affected area
A. Yunnan Province
Yunnan Province is located in the southwest border of China where the tropic of
cancer runs through the southern area of the province. The total teritory of the province is
394,000 square meters, accounting for 4.1% of the country’s total. It links Guangxi
Zhuang Autonomous Region and Guizhou Province on the east, faces Sichuan Province
on the north across the Jinsha River, borders Tibet Autonomous Region on the northwest.
The province neighbors Burma and Vietnam respectively on the south and southeast,
having border line totally 4060km long. The province is topographically tilling from the
north to south, with big difference in elevation and 1500~2200m on the south and
3000~4000m on the north.
Yunnan Province has rich natural resources, and enjoys the reputation as “Kindom
of Plants”, “Kindom of Animals”, “Kindom of non-ferrous metal” and “Country of
Herbs”.
The mineral resources is very rich in Yunnan, and a total of 150-odd kinds of
mineral reserves have been discovered so far, accounting to 93% the minerals discovered
nationwide. The reserves of zinc, tin, lead, cadmium, indium, thalium and blue abestos
rank the first in the country.
There is plenty of water resources and rich precipitation in Yunnan. Rivers and lakes
lie everywhere, with a total flow of 200 billion cubic meters, which is triple of the Yellow
River.
Yunnan has plenty of tourist resources, pleasant climate, picturesque natural scene,
and diversified customes, which present a beautiful and attractive picture scroll.
B. Kunming City
Kunming City is locatedin the middle of the province at east longitude 102°10′~
103°40′ and north latitude 41°11′~42°22;, and has total teritory of 15561 square meters,
140km wide from east to west and 220km long from north to south.
The city is featured with typical plateau topography, gradually decending from the
north to the south in terrace. The area is mainly of lake basin feature with karst formation,
where basins (locally called “Bazi”) and highlands lie alternatively, mostly at El. 1500 ~
2800m with the toppest at Mazong Peak (El. 4247m) in Luquan County and the lowest at
the confluence of the Pudu River and Jinsha River (El. 746m). There are two main
maintain systems, i.e., the Gongwang Mountain System of the Lunan Mountain Range
originating from the western Sichuan Province and heading southward across the Jinsha
River, which covers Luquan, Fuming, Xishan and Anning counties (districts), and the
Liangwang Mountain System connecting the Wumeng Mountain Range originating from
the northeastern Yunnan Province, covering Songming, Guandu, Chenggong counties and
districs. There are about 20 rivers of various lengths zigzaging within the teritory. The
teritory of Kunming is within the divides areas of the Jinsha River, Nanpan River and
Yuan River, thus, the rivers in the area belong to these three big river systems, such
phenomenon is rare in China.
35
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
The mountainous monsoon on plateau at low-latitude prevails the area. As located at
low latitude and high elevation, with the natural barrier of Wumeng Mountain Range on
the north that obstruct the cool wind from the north and the lower terrains on the south
that let southwest warm and wet current flow in, and with the temperature regulating
function of the Dianchi Lanke and Yangzonghai Lake, Kunming has a pleasant weather
all the year round. Because of the mild temperature and humidity, long sunshine hours,
short frosting period, good visibility, the plants are easily growing. The flowers bloom
throughout the year and plants are green all the year long, thus, Kunming City is praised
as “Spring City”.
C. Dali Bai Autonomous Prefecture
Dali Bai Autonomous Prefectureis located in the mid-west of Yunna Province,
spanning the east longtitude 98°52′~101°03′ and north latitude 24°41′~26°42′。 It
neighbors Chuxiong, Simao and Linchag on the east, links Baoshan and Nujiang on the
west and borders Lijiang on the north. The prefecture government office is located at
Xiaguan of Dali City, which is 338km from Kunming. The prefecture administerd one
city and 11 counties within a teritory of 29459 square meters, 320km wide in the E-W
direction in maximum and 270km in the S-N direction in maximum. In the prefecture, the
mountainous area accounts for 83.7% and mountainous basin area for 16.3% of the
total teritory.
The prefecture is located at the juncture connecting the Yunna-Guizhou Plateau and
Hengduan Moutains, where the terrain is high on the northwest and low on the southeast,
and is complicated. The area west of the Dianchangshan Mountain is of alpine valleys
and the area east of the Mountain and west of Xiangyun is of moderately high mountains
with steep slope. The mouontains in the prefecture belong to the Yunling Mountain
Range and the Nushan Mountain Range. The Xueban Mountain on the north of the
prefecture, located between Jianchuan and Lanping (Lijiang Prefecture) has the highest
peak (El.4295m) in the prefecture. The lowest point is at Hongqiba (El.730m) on the side
of the Nujiang River. There are many lakes in the teritory, among which there are 18
lakes having water surfaces over 1.5 square meters, the total lake surface is 1871.49
square meters (accounting for 6.6% of the total teritory). The basins are mostly in belt
shape and there are six basin belts lying from west to east. There are 160-odd rivers
distributed in feather pattern in the prefecture, which belong to the Jinsha River,
Lanchang River, Nujiang Tiver and Honghe (Yuanjiang) River systems. There are eight
lakes in the prefecture, i.e., Erhai, Tianchi, Cibihu, Xihu, Donghu, Jianhu, Haixihai and
Qinghai lake.
The position of the prefecture on plateau at low-latitude forms the mountainous
monsoon pertaining to plateau at low latitude, where the temperature difference is small
all the year round as a whole but varies much at different elevation, rainy and dry seasons
are clearly divided. There occur many climate disasters
D. Lijiang City
The city is located at the juncture between the northwest part of the
Yunnan-Guizhou Plateau and Qinghai-Tibet Plateau, with Diqing Zang Autonomous
Prefecture on the north, Dali Bai Autonomous Prefecture on the south, Nujiang Lisu
Autonomous Prefecture on the west, and Liangshan Yi Autonomous Prefecture and
36
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Panzhihua City (Sichuan Province) on the east. It spans the east longtitude
99°23′-101°31′ and north latitude 25°59′-27°56′, and is 213.5 km long from the south to
the north.
The teritory of the city is high on the northwest and low on the southeast. The
mountain peaks spread all over with gulches and valleys in between. In the m ountains,
many mountainous basins (locally called “Bazi) are distributed. The Yulong Peak in the
city teritory is the highest point (El. 5596m) and the lowest location is at Jinshan River
Valley (El. 1015m), and the average elevation of the city area is at El. 2400m. The city
has a total area of 20603 km 2, 2.6% of which are basin area and 97.4% are mountainous
area; the landform is much undulant and the mountains, basins and valleys alternates.
Lijiang is within the western monsoon climate zone of China, where the seasonal
climates are clear in a year. The weather in the city varies much with the north subtropic,
mild temperate and plateau climate, obviously featured by the vertical climate of “There
are four seasons from the foot to the top of a mountain and different weather occur within
10km length of a road”. As Lijiang is at high elevation, the air is clear and sunshine last
long in a day. The annual average temperature is 12.6℃~19.9℃, the annual average
precipitation is 910mm~1040mm, the frost period in a year is 191~310d and yearly
duration of sunshine is 2321~2554h.
E. Wenshan Prefecture
Wenshan Prefecture is located in the eastern Yunnan Province, linking Baise
Prefecture of GuangxiZhuang Autonomous Region on the east, bordering Vietnam on the
south, neighboring Honghe Hani and Yi Autonomous Prefacture on the southwest and
northwest and connecting Qujing Prefecture on the north and northwest. It is within the
east longtitude 103°35′~106°12′ and north latitude 22°40′~24°28′, and is 255km wide in
E-W direction and 190km long in S-N direction. The total area of the prefecture is
31456km2, 94.6% being mountainous and semi-mountainous area and 5.4% being
mountainous basin area. The area is featured by typical karst formation, and is high on
the northwest and low on the southeast. The Bozhu Peak (El.2991.2m) in Wenshan
County is the highest place in the prefecture, Chuantou (El.107m) in Malipo County is
the lowest place, and the average elevation of the prefecture is at 1000m~1800m.
The low-latitude plateau monsoon climate prevails over Wenshan Prefecture, and
most part of the area has no severe cold in winter and sweltering heat in summer. The
temperature and humidity there are mild, sunshine lasts long in a day, frost period is short
and the visibility is good, which are favorable for plant growing. The soil in the area can
be classified into 10 types, i.e., dark brown soil, brown soil, yellowish-brown soil, yellow
soil, red soil, deep red soil, brick-red soil, lime soil, purple soil and paddy soil, the red
soil is most widely spreaded, accounting for 75% the total and 60% the farmland of the
prefecture.
The main grain crops of the prefecture include rice, maize, wheat and potato, an d the
economic crops include peanut, flue-cured tobacco, hot peper, Panax pseudo-ginseng,
fibrous crop, cotton and Rhododendron avatum, etc.
3.2 Social and economic conditions of project-affected area
A. Yunnan Province
37
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
The total population of the province was 44.504 million by the end of 2005, increaed
by 352000 persons as compared with that by the end of the previous year. Of the
population, the urban population was 13.129 million and rural population was 31.375
million. The natural population growth of 2005 was 7.97‰, 1.03‰ less than the previous
year.
Yunnan Province is the province with largest number of different minorities in
China, having 25 minorities out of the 56 minorities of China. The minority population
accounts 38% of the provincial total, and there are over 20 minorities with population
over 8000, including Yi, Bai, Hani, Zhuang, Dai, Miao, Li, Hui, Lagu, Wa, Naxi, Yao,
Zang, Jingpo, Bulang, Pumi, Nu, Achang, Jinuo, Mongolia, Dulong, Man, Shui and Buyi
monirities.
The preliminary statistics shows that the provincial GDP of the year 2005 is 347.234
billion Yuan, 9.0% over the previous year on the comparable price base; the added value
of the primary industry was 65.618 billion Yuan (increased by 6.3%), that of the
secondary industry 144.971 billion Yuan (increased by 8.5%) and that of the tertiary
industry 136.645 billion Yuan (increased by 10.8%). The reform of industrial structure
has been progressing, in which the percent of added values of the three industries has
been adjusted from 19.3∶ 41.6∶ 39.1 to 18.9:41.7:39.4. The per capita net income of
farmers reached 2041.79 Yuan, increased by 6.5%.
The mainstay industries of the province are: tobacco, bio-products, minerals and
tourism.
B. Kunming
Kunming is the capital city of Yunnan Province, having jurisdiction over five
districts (Wuhua, Panlong, Xishan, Guandu and Dongchuan), one city (Anning) and eight
counties (Chenggong, Jinning, Fuming, Shilin, Yiliang, Songming, Xundian and Luquan).
BY the end of 2005, there are 46 townships, 7 minotity townships, 53 towns and 30
subdistricts.
BY the end of 2005, the city had a population of 5.0847 million and 1.5319 million
households, respectively increased by 2.98% and 1.10% as compared with the previous
year; the natural population growth was 6.23‰. The minority population of the city was
743868, which accounted for 14.6% of the total city population.
The GDP of the city was 106.155 billion Yuan in 2005, 11.1% over the previous
year. The added value of the primary industry was 416 million Yuan (increased by 5.7%),
that of the secondary industry 5.256 billion Yuan (increased by 12.4%%) and that of the
tertiary industry 5.869 billion Yuan (increased by 13.1%). The total output value of
agricultue, forestry, animal husbandry and fishery was 11.723 billion Yuan. The
cultivated land was 175035 ha., and grain output reached 1133595 tons. The per capita
net income of peasants was 3258 Yuan.
C. Dali
Dali Prefecture has jurisdiction over one city, eleven counties, i.e., Dali City, Yangbi
Yi Autonomous County, Xiangyun, Bingchuan, Midu, Nanjian Yi Autonomous County,
Weishan Yi and Hui Autonomous County, Yongping, Yunlong, Eryuan, Jianchuan and
Heqing.
38
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
By the end of 2005, there were 34.296 million permenant residents and 0.9394
million households in the prefecture. The the population was 1.35% over the previous
year. The minority population was 17.010 million, accounting to 49.6% of the prefecture
total.
The GDP of the prefecture was 23.51799 billion Yuan in 2005, 15% over the
previous year. The added value of the primary industry was 6.72591 billion Yuan
(increased by 7.5%), that of the secondary industry 7.83016 billion Yuan (increased by
23.8%) and that of the tertiary industry 8.96192 billion Yuan (increased by 13.9%). The
total output value of agricultue, forestry, animal husbandry and fishery was 10.64633
billion Yuan. The cultivated land was 187672 ha., and grain output reached 1213763 tons.
The per capita net income of peasants was 2251 Yuan.
D. Lijiang
Lijiang has a total land area of 20600 km 2, and has jurisdiction over the Gucheng
(Old Town) District, Yulong Naxi Autonomous County, Yongsheng County and
Ninglang County, under which, there are 69 towns (townships) and 446 administrative
villages.
By the end of 2005, the total population of Lijiang was 1.1376 million, including
minority population of 0.6609 million (accounting to 58.1% the total). The minorities
having a comparatively large population includes Naxi, Yi, Lishi, Bai and Pumi.
The GDP of the whole city was 6.033 billion Yuan in 2005, 10.8% over the previous
year. The added value of the primary industry was 1.43819 billion Yuan (increased by
5.0%), that of the secondary industry 1.68137 billion Yuan (increased by 16.5%) and that
of the tertiary industry 2.91372 billion Yuan (increased by 10.8%). The percentages of
the three industries in the total GDP were respectively 23.8%, 27.9% and 48.3%. The
grain output reached 401377 tons (15021 tons or 3.9% more than that of the previous
tear). The per capita net income of peasants was 1459 Yuan.
E. Wenshan
Wenshan Prefecture is located on the southeast of the province, having jurisdiction
over eight counties, i.e., Wenshan, Nianshan, Xichou, Malipi, Maguan, Qiubei, Guangnan
and Funing. By the end of 2005, there were 114 towns (townships), including 17 minority
towns (townships)
By the end of 2005, the total population of Wenshan was 3372278, with a population
growth rate of 8.47‰. There were 1906844 minority people, accounting to 56.5% of the
prefecture’s total population.
The GDP of the whole prefecture was 15.024 billion Yuan in 2005, 13.1% over the
previous year. The added value of the primary industry was 4.753 billion Yuan (increased
by 5.0%, and accounting to 31.64% of the total GDP), that of the secondary industry
4.715 billion Yuan (increased by 27% and accounting to 31.38% of the total GDP) and
that of the tertiary industry 5.556 billion Yuan (increased by 10.6% and accounting
to36.98%). The total industrial and agricultural output value was 15.40403 billion Yuan,
including the agricultural output value 6.56409 billion Yuan and industrial output value
of 8.84044 billion Yuan. The grain planting area of the prefecture was 5.6408 million mu,
39
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
economic crop planting area 2.24 million mu, and the total grain output reached 1074070
tons. The per capita net income of peasants was 1365 Yuan.
3.3 Distribution of Indigenous Peoples in project areas
The project areas involve 12 resident IPs, which are Hui, Yi, Miao, Bai, Lisu, Naxi,
Dai, Zhuang, Tibetan, Pumi, Yao and Bouyei, an IPs population of 822.800, accounting
for 39.59% of the total affected population. Specifically, the IPs in the Kunming project
areas are mainly Hui, Yi, Miao etc, with an IPs population of 100,000, accounting for
39.59% of the total affected population; the IPs in the Dali project areas are mainly Bai,
Yi, Hui etc, with an IPs population of 387,100, accounting for 63.59% of the total
affected population; the IPs in the Lijiang project areas are mainly Naxi, Yi, Bai etc, with
an IPs population of 101300, accounting for 56.25% of the total affected population; the
IPs in the Wenshan project areas are mainly Zhuang, Miao, Yi, Yao, etc, with an IPs
population of 196,000, accounting for 44.72% of the total affected population.
40
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 3-1 Composition of Indigenous Peoples in Project Areas (>100 people)
Affected Percent to
Categor 2
Zhuan Bou Othe
No. Subproject IPs benefited Bai Naxi Pumi Hui Miao Yi Yao Tibetan Dai Lisu
y g yei r
population population %
Total Water Pollutant Monitoring, Management
1 and Support System in Dianchi Catchment 82402 13.73 5329 9836 378 879 18537 15907 15328 863 631 8898 3384 567 1865
Area
Municipal Solid Waste Collection and
2 9840 20.5 132 895 6894 324 679 562
Kunming Disposal Project in Luquan County
City Municipal Solid Waste Collection and Disposal
3 4154 7.7 427 368 1015 860 679 306 499
Project in Songming County
Municipal Solid Waste Collection and Disposl
4 3471 6.68 313 1320 167 940 167 564
Project in Xundian County
Total of Kunming City 99867 13.25
Integrated Water Environment Management of 25737
5 286965 63.77 1508 485 13414 450 10752 485 706 1793
Major River Courses into Erhai Lake 2
Rural Runoff Pollution Control in Lake Erhai
6 18276 67.44 12634 361 2440 2356 485
Basin
Dali Dali City Urban Integrated Drainage Pipe
7 44836 59.37 35486 437 4351 132 3395 170 387 478
Prefectur Network Project
e Wastewater Treatment Plant and Associated
8 4055 55.71 2607 755 548 145
Sewer Network in Dengchuan County
Municipal Solid Waste Collection and Disposal
9 33016 67.51 30916 307 453 998 143 199
Project in Eryuan County
Total of Dali Prefecture 387148 63.59
2
Including the Mosuo population.
41
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Affected Percent to
Categor 2
Zhuan Bou Othe
No. Subproject IPs benefited Bai Naxi Pumi Hui Miao Yi Yao Tibetan Dai Lisu
y g yei r
population population %
Sewage Treatment Plant and Associated
10 3531 8.95 496 353 286 923 689 784
Sewers in Huaping County Town
Second Municipal Wastewater Treatment Plant
11
and Associated Sewer Network in Lijiang City
Lijiang 12 Urban Drainage Pipe System in Yulong County 94311 69.5 29299 60095 845 604 1818 755 895
City Municipal Solid Waste Collection and Disposal
13
Project in Lijiang City
Lijiang Lion Mountain Environment Renovation
14 3482 69.64 3128 238 116
Project
Total of Lijiang City 101324 56.25
Integrated Environment Management in
15 29477 84.22 23077 795 1037 4472 96
Putting River Basin of Funing County
Municipal Wastewater Treatment Plant and
16
Associated Sewer Network Funing County
29211 83.46 24869 1155 249 2843 95
Municipal Solid Waste Collection and Disposal
17
Wensha Project in Funing County
n Integrated Water Environment Management in
18
Prefectur Puzhehei River Basin of Qiubei County
e Municipal Wastewater Treatment Plant and 40249 70.44 392 19120 1030 9792 9154 717 44
19
Associated Sewer Network in Qiubei County
20 Water Supply System of Qiubei County
Integrated Environment Management Project
21 of Panlonghe River (Urban Section) in 15212 8.22 7706 182 3829 2677 693 125
Wenshan County
42
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Affected Percent to
Categor 2
Zhuan Bou Othe
No. Subproject IPs benefited Bai Naxi Pumi Hui Miao Yi Yao Tibetan Dai Lisu
y g yei r
population population %
Municipal Wastewater Collection Network in
22
Wenshan County
Municipal Wastewater Treatment Plant and
23 38870 80.98 26650 120 7445 3189 1248 218
Associated Sewers in Guangnan County
Municipal Wastewater Treatment Plant and
24
Associated Sewer Network of Malipo County
11715 54.49 954 7056 672 2709 212 112
Municipal Solid Waste Collection and Disposal
25
Project in Malipo County
Municipal Wastewater Collection Network of
26 5154 11.08 1068 395 760 981 647 598 386 319
Yanshan County
Municipal Solid Waste Collection and Disposal
27 26101 57.87 16637 4415 3428 947 283 391
Project in Maguan County
Total of Wenshan Prefecture 195989 42.72
Total 822848 39.59
43
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
4 Policy Framework for Resettlement
The preparation of this RAP was strictly carried out according to the laws and
policies of People’s Republic of China and Yunnan Province as well as relevant
requirements of OP/BP4.12 Operation Policy of World Bank. The implementation of
resettlement willl strictly carry out according to compensation standards and relevant
requirements in RAP, any change during implementation should not be carried out before
the approval of the World Bank upon the special report submitted by the Construction
Unit.
The main laws and policies adopted are as follows.
Table 4-1
Policy document Effective date
(1) Nationality Regional Autonomy Laws of the People's Republic of China
(2) Relative Provisions in Land Administration Law of the People's Republic of amended on
China Aug. 28, 2004
(3) Temporary Regulations of Tax for Farmland Occupation of the People's Issued on
Republic of China (No. (1987)27 Notification of the State Council of the People's Apr.1, 1987
Republic of China)
(4) Notification of Ministry of Finance and State Land Resource and China
People's Bank on Adjusting Compensation Fee for Land Used for Construction Jan. 1, 2007
(Caizong No. [2006 ] 48)
(5) Ministry of Finance and National Forestry Bureau (Wencaizong No.[2002] 73:
State
Notification of Ministry of Finance and National Forestry Bureau on “Levy and
Usage Management Provisional Method for Forest Vegetation Recovery Cost”
(6) Implementation Regulations of Forest Laws of the People's Republic of China
Jan. 29, 2000
(Decree No. 278 of the State Council of the People's Republic of China)
(7) “Stipulations for Specific Policy of Land Occupy Tax” (Cainongzi No. [1987] Issued on Apr.
206 ) 25, 1987
(8) Decision of The State Council on Deepening Reform of Land Management
Oct. 21, 2004
(Guo Fa [2004] No.28)
(9) Notice on Issue of Instructive Comments on Improvement of Land
Nov. 3, 2004
Compensation System (Guo Tu Zi Fa [2004] No. 238
(10) Land Management Regulations in Yunnan Province Sept. 24, 1999
Yunnan
Province (
(11) Land Management Regulations in Yunnan Province Decree No. 43 of Yunnan
March 26, 1997
Province People’s Government)
(12) Approval of Kunming City People's Government on Adjusting Land
1999
Compensation Price in Kunming City (Kunzhengfu No. [1999] 25)
(13) Notification of Dali City People's Government to Issue Implementation of
Prefectur
Dali City on Land Administration Laws of the People's Republic of China 2000
e City
(Dashizhengfa No. [2000] 27)
(14) Autonomy Regulations of Wenshan Zhuang/Miao Nationality Autonomy
Mar. 25, 2005
Region in Yunnan Province
44
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Policy document Effective date
(15) Notification of Xundian Hui/Yi Nationality Autonomy County on
“Compensation Method of Land Acquisition and Relocation for Urban
2003
Construction in Xundian Hui/Yi Nationality Autonomy County (Xunzhengfa No.
[2003] 25)
(16) Announcement of Malipo County People's Government on Compensation and
Resettlement Scheme for Land Acquisition in Kuilong Nalianglaixi Village 2006
(Mazhengtong No. [2006] 16)
City,
county
(17) Approval of Funing County People's Government on Land Used for
and 2006
Construction in Qixing District (Fuzhengfu No. [2006] 121)
district
(18) Notice issued by Qiubei County People's Government on "Compensation
Standards for Land Acquisitioned by State Construction in Qiubei County 2005
(Qiuzhengfa No. [2005] 38)
(19) Notice issued by Qiubei County People's Government on Compensation
Standards for Land Acquisitioned and Ground Attachment in County Planning 2004
Area (Qiuzhengtong No. [2004] 32)
(20)Operational Policy OP.4.12, "Involuntary Resettlement" - World Bank and its
Jan. 1 2002
attachment
World
Bank
(21) Operational procedures OP.4.12, "Involuntary Resettlement" - World Bank
Jan.1, 2002
and its attachment
The objective of project resettlement policy is to minimize the adverse affects brought
by land acquisition and demolishment. Displaced persons 3 will be provided
compensation at full replacement cost 4for losses of assets and assisted to restore even
surpass former living standards. Mean policies as follows:
When possible, resettlement plans should be conceived as development
opportunities, so that those affected may benefit from project activities.
3
“Displaced persons” refers to all the people who, on account of the activities listed above, would have their (1)
standard of living adversely affected ; or (2)right, title, interest in any house, land (including premises,
agricultural and grazing land) or any other fixed or movable asset acquired or possessed temporarily or
permanently; (3) access to productive assets adversely affected, temporarily or permanently; or (4)business,
occupation, work or place of residence or habitat adversely affected; and “displaced person” means any of the
displaced persons.
4 "Replacement cost" is defined as follows: For agricultural land, it is the pre-project or pre-displacement, whichever is
higher, market value of land of equal productive potential or use located in the vicinity of the affected land, plus the cost of
preparing the land to levels similar to those of the affected land, plus the cost of any registration and transfer taxes. For land
in urban areas, it is the pre-displacement market value of land of equal size and use, with similar or improved public
infrastructure facilities and services and located in the vicinity of the affected land, plus the cost of any registration and
transfer taxes. For houses and other structures, it is the market cost of the materials to build a replacement structure with an
area and quality similar to or better than those of the affected structure, or to repair a partially affected structure, plus the cost
of transporting building materials to the construction site, plus the cost of any labor and contractors' fees, plus the cost of any
registration and transfer taxes. In determining the replacement cost, depreciation of the asset and the value of salvage
materials are not taken into account, nor is the value of benefits to be derived from the project deducted from the valuation of
an affected asset. Where domestic law does not meet the standard of compensation at full replacement cost, compensation
under domestic law is supplemented by additional measures so as to meet the replacement cost standard. Such additional
assistance is distinct from resettlement measures to be provided under other clauses in OP 4.12, para. 6.
45
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Lack of legal rights does not bar displaced persons in peaceful possession from
compensation or alternative forms of assistance.
Compensation rates refer to amounts to be paid in full to the individual or
collective owner of the lost asset, without deduction for any purpose. Also
Individual owners receive compensation for affected structures and other fixed
assets, and villages or DPs receive compensation for acquired land in rural areas.
When cultivated land is acquired, it often is preferable to arrange for
land-for-land replacement through collective land redistribution. In some cases,
as when only small proportions of income are earned through agriculture,
alternative measures such as payment of cash or provision of employment are
acceptable if preferred by the persons losing agricultural land.
Replacement houseplots, sites for relocating businesses, or redistributed
agricultural land should be of equivalent use value to the land that was lost.
Transition periods should be minimized. Compensation should be paid prior to
the time of impact, so that new houses can be constructed, fixed assets can be
removed or replaced, and other necessary measures can be undertaken before
displacement begins.
Displaced persons are consulted during the planning process, so their preferences
regarding resettlement arrangements are considered; resettlement plans are
disclosed in a publicly accessible manner.
The previous level of community infrastructure and services and access to
resources will be maintained or improved after resettlement.
The borrower is responsible for meeting costs associated with land acquisition
and resettlement, including contingencies.
Resettlement plans include adequate institutional arrangements to ensure
effective implementation of resettlement measures.
Resettlement plans include arrangements for internal and external monitoring of
resettlement implementation.
Resettlement plans include procedures by which displaced persons can pursue
grievances.
46
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
5 Compensation Standard
Based on the above-mentioned laws and relative rules and combined with the actual
condition at the affected city and counties, the compensation standards are w orked out.5
The deadline for comfirmation of the resettlers’ qualification should be the date of
issuance of the notice on land requisition and house relocation. After the date of the
issuance, the resettlers should not allowed to build new houses, extend or rebuild old
houses; the use of the houses and lands should not be changed; and leasing of land and
leasing and purchasing houses should not be allowed. In addition, the persons rushing
into the defined areas after that date should not be qualified for compensation as
resettlers.
5.1 Compensation standards for land occupation
5.1.1 Compensation standards for collective land acquisition
According to the “Land Administration Law of the People's Republic of China”,
“Land Management Regulation of Yunnan Province” and “Instructive Opinions on
Improvement of Compensation System for Land Requisition”, as well as the relevant
policies and regulations of the affected cities, the compensation of land requisition covers
the compensation for the land and standing crops and resettlement susidies, which are
either calculated by the multiples of the officially-defined yarely output or determined by
the regional comprehensive prices. According to the actual situations of each affected
counties, those counties (cities) that have had the regional comprehensive prices worked
out by them and already approved by the governmental authorities will adopt such prices
in the project; and those counties/cities without such prices will adopt the uniformed
multiples of the officially-defined yearly output for calculation. The regional
comprehensive prices for land acquisition are the comprehensive compensation criteria
worked out by the county governements on a uniform way and specific for certain
areas/regions of the county on the basis of incorporating the opinions of people of all
fields (particularly the peasants) to a possible extent, so as to meet the needs of acquiring
rural collective-owned land for urban construction. The division of areas / regions and the
land prices are determined by many local factors, such as the location of the land to be
acquired, usage of the land, productive capacity of the land, local cultivated land holding
per capita and economic development level, etc. Therefore the land prices in different
areas / regions are different from each other.
The land compenstion standards are indicated in Table 5-1.
5
The house compensation will be conducted according to the house evaluation price, or according to that
in RAR if the house evaluation price is lower than that in RAP.
47
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Compensation Standards for Rural Land to Be Acquired
Table 5-1 Unit: Yuan/mu
Times of land compensation
Compensation and subsidy standard(Yuan/mu)
and subsidy
Yearly output
Land type Times of
County value/ storing up Times of land Land Resettleme Young Ground Remark
resettlement Total Woods
quantity value compensation compensation nt subsidy crops attachment
subsidy
Reclaimed
Xundian
cultivated land 2000 483
Compensation for ground
Reclaimed garden
attachments and trees listed in the
plot, wood land
2000 “scattered trees”
Unused land
200
Luquan Cultivated land 2000 6 10 33000 12000 20000 1000 Yearly output value
Yearly output value /storing up
Forest land 120/2400 3 2 9360 7200 240 1920
quantity value
Songming Paddy field 20600 20000 600 Regional comprehensive price
Dry land 12400 12000 400 Regional comprehensive price
Yearly output value/storing up
Forest land 90/1800 3 2 7020 5400 1440
quantity value
Dali Paddy field 2156 10 11 46276 21560 23716 1000 Yearly output value
Dry land 1478 8 10 27404 11824 14780 800 Yearly output value
Pool 2156 7 6 28028 15092 12936 Yearly output value
Er’yuan County Paddy field 2164 10 11 46526 21640 23804 1082 Yearly output value
Dry land 1327 10 12 29858 13270 15924 664 Yearly output value
Garden plot 1500 7 6 21000 10500 9000 1500 Yearly output value
Pool 2164 7 6 28132 15148 12984 Yearly output value
Fish pond 2400 5 4 23600 12000 9600 2000 Yearly output value
Yearly output value /Storing up
Forest land 4900 3360 440 1100
quantity
Paddy field
Gucheng district 2164 8 4 88450 87250 1200 Regional comprehensive price
(landfill)
Paddy field
(sewage 41200 40000 1200 Regional comprehensive price
treatment plant)
Forest land 735 4 2 4998 2940 1470 588 Yearly output value /Storing up
48
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Times of land compensation
Compensation and subsidy standard(Yuan/mu)
and subsidy
Yearly output
Land type Times of
County value/ storing up Times of land Land Resettleme Young Ground Remark
resettlement Total Woods
quantity value compensation compensation nt subsidy crops attachment
subsidy
quantity value
Huaping County Paddy field 2196 8 4 27450 17568 8784 1098 Yearly output value
Malipo Paddy field 2200 10 7 38300 22000 15400 900 Yearly output value
Dry land 960 8 7 15300 7680 6720 900 Yearly output value
Yearly output value /Storing up
Forest land 8820 7200 180 1440
quantity value
Funing County Paddy field 2000 10 14 48600 20000 28000 600 Yearly output value
Garden plot 2000 10 14 49500 20000 28000 1500 Yearly output value
Guangnan
Paddy field 1586 8 8 26176 12688 12688 800 Yearly output value
County
Paddy field
Qiubei 1440 8 5 19120 11520 7200 400 Yearly output value
(Jinping town)
Paddy field
(Shuanglongyin 960 8 5 12880 7680 4800 400 Yearly output value
g township)
Dry land
(Shuanlongying 840 6 6 10380 5040 5040 300 Yearly output value
township)
Scattered wood
5040 Comprehensive price in the region
land
Notes
1. The different output value for crops is because of the discrepancy in geography location and region, so that the compensation standards for each
county is different.
2. The compensation standards are also different for different regions in a county.
3. Whether it is to adopt the yearly output value or the regional comprehensive price, it shall be determined according to the c ompensation policy of each
land administration department.
4. The compensation cost for per mu forest land = storing up quantity value per mu woods × multiple; resettlement subsidy cost i s 2 times of yearly
average output value in pervious 3 years, and the compensation cost per mu wood s = storing up quantity value per mu woods × 80%.
49
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
5.1.2 Compensation standard for using state-owned land
The land compensation and resettlement subsidy is 48000 Yuan/mu, and
compensation for the young crops of the paddy field and ground attachments is 600
Yuan/mu. After negotiating between Owner and local people's government, the
compensation for land acquisitioned from County Tanner Plant is 48600 Yuan/mu.
According to the regulations and the actual situation of the relevant counties and
cities, the land compensation standard for acquistion of the state-owned land for the
project is as in Table 5-2 after negotiation between the Project Owner and the local
people’s governemnts.
Compensation Standard for Acquistion of the State-owned Land
Table 5-2 Unit:Yuan/mu
Compensation standards for state-owned land
Land
Xundian Songming Luquan Gucheng district Malipo Guangnan Funing
Land reserved for construction 50325 150000 150000 45000 18000
State-owned land (Paddy field) 90000 48600
5.1.3 Temporary land occupation compensation
All output or income from this land shall be compensated to the land owner
according to its annual output and occupation time. The compensation for the temporary
land occupation includes the compensation for output loss of the cultivated land,
compensation for young crops and compensation for re-cultivation. The rural labor that
manages this land can take part in project construction or other labor service during
construction; and the temporary use land shall be reclaimed after completion of service
by the construction unit.
At this stage, 4 components in Yunnan Urban Environment Project are involved in
the temporary land occupation, i.e., Urban drainage system under Dali City Jurisdictio n,
Wastewater management in Huaping County, Integrated management of Putting River in
Funing County and Wastewater management in Qiubei County (WS).
According to the characteristics of using the land in terms of the time for
construction, it is estimated that the time duration for temporary land occupation is one
year for each of the 4 sub-components. See Table 5-3.
Compensation Standards for Temporary Land Occupation
Table 5-3
Compensation standard(Yuan/mu)
City and
Project Land Compensation for Compensation for Re-cultivation
county Sub-total
young crops cultivated land loss cost
Urban drainage system under Paddy field 5156 1000 2156 2000
Dali
Dali City Jurisdiction Dry land 4278 800 1478 2000
Lijiang City WWTP and Gucheng
Paddy field 5364 1200 2164 2000
Sewer Network District
Puting River Treatment Funing Cultivated land 1860 600 760 500
50
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Compensation standard(Yuan/mu)
City and
Project Land Compensation for Compensation for Re-cultivation
county Sub-total
young crops cultivated land loss cost
Project county
Wastewater management in Qiubei
1200 400 300 500
Qiubei County (WS) county Cultivated land
5.2 Compensation for house and auxiliary facility relocation
The components --- Wastewater management in Lijinag Ancient Town and Urban
drainage systems under Dali city as well as Solid waste management in Funing will cause
house relocation, which includes the private houses and houses of enterprise, ogan s and
collective. According to land nature, the private houses are divided into rural house and
urban houses. The replacement price of the houses to be relocated will be evaluated by
the legally qualified real estate evaluation agent. According to the house compensation
policies of the affected cities, the replacement price (inclusive of land price) of the houses
of different structures and at defferent locations will be estimated, the estimated vaule for
urban houses is calculated according to house replacement price and the compensation for
house plot is 600000 Yuan/mu, and the rural houses will be estimated with the
replacement price ( the house pliot is allotted by the village).
Compensation Standards for House and Auxiliary Facility Relocation
Table 5-4 Unit:Yuan/m2
House structure
City House property Frame Remark
Brick-concrete Brick-wood Earth-wood Simple
structure
Dali Rural 100 Collective house
Lijiang Urban and rural 626.98 494.71 367.9 276.81 Replacement price
Wenshan Rural 350 Collective house
Compensation for Infrastructure at Host Area and Subsidy for Removal
Table 5-5
Compensation standard
No. Compensation Unit Remark
Lijiang
I Infrastructure construction on host area Yuan/household 3300
1 Ground leveling Yuan/household 2500
2 Water and power supply Yuan/household 800
II Subsidy for resettlers’ relocation Yuan/household
1 Transportation fee Yuan/household 300
2 Material damage Yuan/household 300
3 Subsidy for losing of working time Yuan/household 1000
4 Living subsidy for transitional period Yuan/household 1800
5 Loss in renting house Yuan/ea. 600
2
6 Compensation for house rebuilt in original area Yuan/m 18.3
51
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
5.3 Compensation for scattered trees and tombs
Cutting scattered trees due to construction of the project is needed only in Luquan
and Xundian of Kunming City, Eryuan of Dali Prefecture and Malipo of Wenshan
Prefecture; moving tombs needed in Songming of Kunming and Malipo of Wenshan. The
compensation for trees and tombs will be at the unit prices as indicated in Taable 5 -6,
after consulting between the Project Owner and the local county governments.
List of Compensation
Table 5-6 Unit:Yuan/ea.
Compensation standard Remark
No. Description
Luquan Xundian Songming Dali Malipo
I Tree
1 Fruit tree 75
1.1 Diameter less than 3cm 30 30 10
1.2 10cm or full-fruit tree 100 120
2 Economic tree
1.1 Diameter less than 3cm 30
1.2 10cm or full-fruit tree 100
3 Timber 35
3.1 Diameter less than 3cm 5 5
3.2 Mature woods
II Tomb 400 500
5.4 Compensation standards for relocation of enterprises and institutions
The component of the Wastewater management in Lijiang Ancient Town will
involve the relocation of part of structures of the local enterpirse and public institutions.
The compensation for the relocation of enterpirse and institute covers the compensation
for house relocation and other compensation. For the compensation standard adopted for
house relocation, the replacement price by taking account of the comprehensive price of
the land is adopted, i.e. 1120Yuan/m 2 for houses of frame structure, 988 Yuan/m 2 for
brick-concrete structure, 861 Yuan/m 2 for brick-wood structure, and 770 Yuan/m 2 for
earth-wood structure. Other compensations include the compensation for the transition
subsidy and loss for stopping business, etc. and is 50000 Yuan/household by budget at
this stage temporarily. The Project owner has made prelimminary negotiation with three
affected enterprises and public institutions on the compensation for moving, and the
preliminary price negotiated with these 3 enterprises has been listed into the cost
estimation. The compensation to the other units which are required to move will be
solved jointly by the Project Owner and those units through negotiation. The
compensation will be decided after negotiating between the Project Owner and enterprise
or institute, and actual compensation amount shall be according to the agreement signed
by both sides.
5.5 Compensation for relocation of individual business households
The houses of individual bussiness households are of residential houses and
commercial buildings of the enterprises and public institutions, so that the compensation
standard for such houses is same as that of residential houses, 800 Yuan/household for
52
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
moval, 600 Yuan/household for stopping bussiness (200 Yuan/household X three months),
and 200 Yuan/ household for transition subsidy.
53
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
6 Resettlement and Recovery Scheme
The resettlement working group is formed by Provincial Project Office, Kunming
World Bank Project Office, Wenshan World Bank Project Office,Dali World Bank
Project Office, Lijiang World Bank Project Office, the owner of each sub-project, the
different levels people's government and East China Investigation and Design Institute,
the resettlement acting plant of Yunnan urban environment construction project is
prepared based on the resettlement plant of each county(city), twonship and village,
current policies, legal regulations and the requirement fromt the World Bank.
The goal of resettlement is to ensure the resettlers to get the compensation of their
all losses, reasonable resettlement, good recovery, to share the benefit of proje ct, to give
subsidy for temporary difficulty, raise their income level and living standard, production
and profit ability of enterprises at a higher level or at least resume to original level before
the resettlement or before the start of project construction.
6.1 Permanent land occupation resettlement
The project will occupy 1825.76mu collective land, affecting 442 households with
1870 persons.
6.1.1 Land acquisition impact analysis
The contracted land to be acquired by this project will impact on 24 villagers groups
of 14 administrative villages of 11 townships in 10 counties (city, district). In order to
understand the impact on local villagers, the project office organized relative people to
make deep survey on existing land resources of each township (town), administrative
village and villagers group and make detail analysis on the impact based on actual
inventory index of each group. See Table 6-1 for details.
Land acquisition impact analysis for sub-components
Table 6-1
Total Mean farmland Mean farmland Land reduction
Agricultura Land
Township(t Administrat Villagers l population farmlan acquisition before land after land before and after
County d area acquisition acquisition land acquisition
own) ive village group
(person) area(mu)
(mu) (mu/person) (mu/person) (%)
Lianwachon
1961 1129.5 43.8 0.58 0.55 3.88
g
Luquan Jinlongtan 153 113 5.78 0.74 0.70 5.12
Pingshan
County
Shangshi-I 104 60 13.54 0.58 0.45 22.57
Shangshi-II 86 60 24.48 0.70 0.41 40.80
Songmi Shijiao 6263 6081 107.7 0.97 0.95 1.77
Songyang
ng Luojing 1293 1274 107.7 0.99 0.90 8.45
Xiaguan Dazhuang 4969 2892 1.2 0.582 0.582 0.04
Dali
Group-6 316 257.20 1.2 0.814 0.810 0.47
Eryuan Cibihu Songhe 3045 2305 94.8 0.757 0.726 4.11
Dasongdian 1612 1328.00 94.8 0.824 0.765 7.14
Eryuan
Yousuo Meihe 6747 4820 21 0.71 0.71 0.44
54
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Total Mean farmland Mean farmland Land reduction
Agricultura Land
Township(t Administrat Villagers l population farmlan acquisition before land after land before and after
County
own) ive village group d area acquisition acquisition land acquisition
(person) area(mu)
(mu) (mu/person) (mu/person) (%)
Dahuayuan 446 278.00 21 0.623 0.576 7.55
Xihu 4090 1929 61.5 0.472 0.457 3.19
Zhangjiadu
n
1678 786.8 58.8 0.469 0.434 7.47
Zhongdeng 648 287 2.7 0.443 0.439 0.94
Huapin
Rongjiang Rongjiang 6098 6523 21.6 1.07 1.066 0.33
g
11 640 823 21.6 1.29 1.25 2.62
Jinshan Yangxi 3517 9125 88 2.59 2.57 0.96
Minru 465 1653 88 3.55 3.37 5.32
Guchen
g Jinshan 4278 5647 35 1.32 1.31 0.62
Shangshipi
316 182 35 0.58 0.47 19.23
ng
Mali Laodifang 3473 5993 2.62 1.73 1.72 0.04
Shimengua
172 270 2.62 1.57 1.55 0.97
n
Congtou 2545 2277 78.73 0.89 0.86 3.46
Luotizai 109 141 4.33 1.29 1.25 3.07
Milipo
Shima 171 159 51.4 0.93 0.63 32.33
Hebian 108 88 3 0.81 0.79 3.41
Yangse 127 127 9 1.00 0.93 7.09
Baba-ao 162 136 11 0.84 0.77 8.09
Tuanjie
1145 612 36.3 0.53 0.50 5.93
Funing Xinhua community
Toutang 309 133 36.3 0.43 0.31 27.29
Guangn Duanfeng 2317 868 1.4 0.37 0.37 0.16
Liancheng
an Tuguozai 1029 254 1.4 0.25 0.25 0.55
Donghu 1475 1056 24.4 0.72 0.7 2.31
No.4 123 133 2.2 1.08 1.06 1.65
Jingping
Qiubai No.6 111 101 7.8 0.91 0.84 7.72
No.7 184 169 4.7 0.92 0.89 2.78
No.8 145 84 7.75 0.58 0.53 9.23
Note: The reclaimed wasteland of 61.2 mu from Toutang village group of Tuanjie community in Xinhua town is
acquisitioned, which is not included in the annual report.
The urban environment construction project is to offer river course treatment,
sewage handlingtreatment or rubbish filling arealandfill. The river course treatment
projects is generally along the river, which has the impact in comparatively samll
area.with small impact. The sewage handling plant sewage treatment plant or rubbish
filling arealandfill is at a concentrated zone, but their sites are usually at wasteland in
valley wasteland, therefore the construction has no big impact on agricultural production
55
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
of local villagers. Based on the analysis of each village group, among the 24 villager
groups affected by acquisition of contracted cultivated land, the 19 groups have less than
10% land to be acquired, so the land acquisition impact on agricultural production of
these groups is not big of 45 groups; however, the remaining five groups will have more
than 10% land to be acquired, (including 4 groups have their land above 20% to be
acquired), and the heaviest impact is on Shangshi’er Group of Yanwachong Village of
Pingshan town in Luquan County (40.8% of the total will be acquired). See Table 6 – 2
for the groups whose land will be acquired by over 10% tha total. By analysis, it shows
that the impaact on most of the village groups is rather small. But by reasonable
resettlement scheme, the effect will be minimized.
Analysis on Land Requisition for Village Groups with
Over 10% Land to be Acquired
Table 6-2
Farmland Farmland Land Income
Agricultur Total Land holding holding reduction impact by
Admini-
Town- ship Villagers al popula- farm- acq- before after before and land
County strative land uired
(town) group tion acquisi- acquisition after land ac-quisitio
village
(pers.) (mu) (mu) tion (mu/ (mu/ acquisition n (10000
person) person) (%) Yuan)
Luquan Ping shan Lanwancun Shangshi -I 104 60 13.54 0.58 0.45 22.57 2.71
Shangshi -II 86 60 24.48 0.70 0.41 40.80 4.9
Old city Shangshi 6.44
Jinshan Jinshan 316 182 35 0.58 0.47 19.23
district ping
Malipo Mali Chong tou Shima 171 159 51.4 0.93 0.63 32.33 6.45
Tuanjie
Funing Xinhua Toutang 309 133 36.3 0.43 0.31 27.29 7.26
community
6.1.2 Resettlement scheme and guarantee measures
During the survey and resettlement planning period, the resettlement working group
hold the symposia to discuss the resettlement scheme in relative township(town) and
villages participated by village cadre, resettlers and partial villagers representatives. All
resettlement plans are agreed by local government and the resettlement households. After
the analysis of environmental capacity afte the land acquisition of each village, it is
determined to settle down all resettlers in the same community in order to keep its
original production and living mode and original social relation without impact.
The resettlement working group worked out feasible production and living recovery
scheme with local government, by both cash compensation and other production
measures, acoording to the survey of geography location of each village, land resource
possession and income condition of local people, the opinion of most representatives and
resettlement households. According to the rules of Article 29 in “Yunnan Land
Management Regulations”, the compensation fee for land acquisition and resettlement
subsidy (except that for personnel belongings, yong crop on the land and subsidy for
self-employed people) shall be owned by the collective and solely used for production
development, employment of surplus labors, living subsidy for disabled people,
construction for road, channel and other collective welfacre facilities,. Since the
resettlement plan is determined by the most resettlers, if individual resettler disagrees the
resettlement plan and like to have other ways, the project office shall try to help and
56
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
coordinate it. If individual villager in the village by the cash compensation mode wishes
to have land for agricultural production, the project office in each County will distribute
collective land or help to replace land from other households that dislike to farm.
Contrarily, if the resettler wishes to have cash compensation for trade business, and if he
has business ability, he can get corresponding cash compensation.
6.1.2.1 Production scheme
The analysis is made for heavier impact 5 villagers groups in 4 administrative
villages (impacted by land acquisition over 10%, mean farmland per capita less than
0.5mu after land acquisition or relying on land greatly), and the resettlement scheme is as
the following:
I. Kunming City
The impact by land acquisition of each village is different, and the resettlement plan
based on quantity for land acquisition and house relocation, number of resettlers and
decision of local government for each village is also different. After full consulting with
each village according the survey, the project office decides to use land adjustment within
same group or by cash compensation for the less reduction of land per capita after the
land acquisition, the land compensation fee will be paid directly by the payment channel
to each villager group and they have right to use it.
For the 2 villager groups of 1 village with heavier impact by land acquisition, the
project office made special consulting and the resettlement plan is as the following. See
the Appendix 4 for the production resettlement plan for heavily affected villages.
(I)Luquan County
A. Pingshan Town
Pingshan town is the county town, two heavy impacted groups are Shangshi-I and
Shangshi-II group of Lanwachong village.
(1) Yanwachong Village
Yanwachong village has 11 villagers groups, total population 480 households with
1961 persons by the end of 2005, farmland 1129.5mu, in which paddy field 439.5mu and
dry land 690mu,mean land per capita 0.58mu, with labor force 1152 persons accounting
for 58.7% of total, the rural economic income is mainly from traditional planting
stockbreeding, the percentage of platning and stockbreeding is 43.7% and 27.7% of total.
By the statistics, the out-working labor force is 137 persons accounting for 11.9%. The
net income per capita by the end of 2005 is 1851 Yuan.
Two heavily affected groups are Shangshi-I and Shangshi-II, the mean land per
capita is 0.58mu and 0.70mu, and over 0.41mu after the land acquisition so that the land
acquisition has no big impact on basic living condiiton. After soliciting the opinion of the
most households, it is decided by two villager commissions to use cash compensation
mode and land adjustment modes. The land compensation and subsidy will be paid fully
to group for leveling of collective land, infrastructure construction and water conservancy
facilities. The young crop compensation fee will be paid directly to affected households.
57
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
By the survey, the project area is at mountainous area, with poor irrigation facility,
general land quality, but the resource of forest land is rich, farmers are mainly using
desolate forest land to plant chestnut and fruit tree, at the same time, the breeding is
developing step by step,and farmer’s income is relying on forest, fruit and animal
husbandry gradually. This village can use land compensation fee to rebuild the irrigation
facility and raise land output. Besides, the village can use partial land compensation fee
to build the existing road, which is a 2km long earth road, incapable of passing in raining
day and is very inconvenient. It is estimated that the investment is 200000 Yuan. The
living and production level of resettlers will be not reduced by the land acquisition.
II. Dali Prefecture
The resettlement working group of each village made analysis of geography location,
possess quantity of land resource and income composition of local residents, the project
affected area is at Erhai basin with better economic condition, belonging to relatively
developed area of Dali prefecture. The economic income source of rural family presents
the tendency of diversity, the income proportion of traditional agricultural as planting
especially is decreased year by year, rely on land reduced also year by year. In fact, the
actual land acquisition is few comparatively, and land acquisition scope scattered
relatively, so that the influence of agricultural production by land acquisition for each
group (natural village) is less. Based on the opinion from resettlement households,
villager representatives and local government, and the option of most are respected. The
cash compensation mode is used mainly for production recovery plan, however, if
individual resettlers disagree the resettlement plan and like to have other ways, the
project office shall try to help and coordinate it. If individual villager wishes to have land
for agricultural production, the project office in each county will distribute collective
land or help to replace land from other households that dislike to farm. The resettlement
plan of Xihu village of Yousuo town in Eryuan County is as follows. See the appendix 4
for resettlement plan and guarantee measures for impacted villages in Dali Prefecture.
(II)Eryuan County
(A) Yousuo Town
(1) Xihu Village
Yousuo town locates in the southeast of Eryuan County, and Yousuo street is the
largest rural market, 18km away to the county town, governing 14 villager committees.
The animal husbandry is the traditional pillar trade in this town,with rich water surface
resource, pond-fishing, seaweed-plant is also relatively developed. Major project
regarded in this town is Luoshi River environment treatment project, the heavily
impacted group (land acquisition being 7.47% of the total) is Zhangjiadun group of Xihu
village.
The project will acquire 61.5 mu land from this village, affecting Zhangjiaden and
Zhongdun villages (103 households with 350 persons). 58.8 mu land in Zhangjiaden
group will be acquired. By the inquiry on-the-spot, the land affected in Zhangjiaden is of
collective wasteland, belonging to none-contract land, which is now distributed to all
villagers, 0.5mu per household, accounting for about 20% of their contracted -land, the
mean contracted-land area per capita after the land acquisition is not reduced, which can
58
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
still satisfy the production and living need. Because this village is near Xihu tourism
scenery district and Yousuo town, the main economic income of local peasant is from
breeding, planting, the secondary and the tertiary industry and migrant work, the planting
income proportion drops down year by year, and peasant relying on land production is
also reduced year by year. Therefore, based on consulting of most resetters and discussed
by village commission and town government, it is decided to use cash compensation
mode, the resettlement subsidy and compensation of young crops will be paid directly to
villager, and the land compensation fee shall be discussed by the villagers meeting to
decide how to use.
In addition, the project office and township(town) government plan to increase the
support intensity for agricultural protection technology to encourageand guide the
development of family breeding (as dairy cattle) and aquatic economic plant ( as edible
seaweed) to rise peasant’s breeding technology, increases product output and quality and
to raise the income of peasant steadily.
III. Lijiang City
After the land acquisition, the land will be re-adjusted in whole group, the cash
compensation mode is used for individual belongings and young crops, the rest fee is
used for collective development of agricultural production; for the households with the
secondary and tertiary industry ability, the cash compensation mode can be used to them
by their will. Only one village group in Jinshan Village of Old City District is heavily
impacted (over 10% land acquired). See the Appendix 4 for resettlement plan and
guarantee measures for heavy impacted villages.
(III) Lijiang Ancient Town
A. Jinshan Township
(1) Jinshan village
Lijiang City WWTP and Sewer Network will impact on Jinshan village and
Wenhuan village in ancient area of Lijiang city, partial collective woodlands of Wenhua
village be occupied without impact on the population, 35mu land in Jinshan v illage be
occupied. By the end of 2005, Jinshan village has total population of 4278 persons,
5647mu farmland, mean land per capita 1.32mu, with labor force 2291 persons
accounting for 54% of total, engaged mainly in traditional agricultural production as well
as the second industrial production, few people engaged in traffic and transportation
service as well as other services, the net income per capita 2526 Yuan. The proportion for
land acquisition by the project is accounting for 0.62%,with small impact on production
and living of local peasants.
According to the survey accomplishment to each household, and based on the
opinion of most peasant household, the town people's government and villagers
commission decided to use following distribution ways: The land compensation will be
distributed in average among whole village, for the peasant lost land, their land will be
re-adjusted in same group.
IV. Wenshan Prefecture
Wenshan prefecture has 2 groups in 2 administrative villages that the land
acquisition is over 10%, among them the mean land per capita in 1 groups is above
59
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
0.5mu, with less impact on protection and living. One heavily impacted group (over 10%,
less than 0.5mu per person after land acquisition) is Toutang in Tuanjie community. The
project office made specific consultation and the resettlement plan as the following. See
the Appendix 4 for resettlement plan and guarantee measures for heavily impacted
villages.
(V)Funing County
A. Xinhua Town
(1) Tuanjie Wenhua Community
Tuanjie community neighberhood commission is at the county town, about 3.5 km2,
governing 11 resident teams under 5 villagers groups, with 1412 households with 5086
of
persons by the end of 2005, which agricultural population is 354 households with 1436
persons;land area 532 mu (of which the paddy field 437mu and dry land 95mu), mean
land per capita 0.37 mu, labor force 2814 persons ( accounting for 55.3% of total). The
main income is from 2nd and 3rd industry except tranditional planting and stockbreeding,
the percentage of planting and stockbreeding in this village 32.6% and 14.7, and the
percentage of 2nd and 3rd industry 18.8% and 14.5%. By the statistics, there are 150
persons to go out for migranting work and the laber service income is 27.9%. Relying on
favourable district advantage, the non-agricultural is well developed, 341 persons
engaged in non-agricultural production, accounting for 47.8%, and net income per capita
by the end of 2005 is 1456 Yuan.
This project will occupy 97.5 mu farmland (of which 61.3mu reclaimed land is
excludeded in the yearly report), regarding to 72 households with 309 persons in Toutang
group. The group has farmland 133 mu (of which, the paddy field 110 mu and dry land
23mu), mean land per capita 0.43 mu. The land acquisition for the projet is accounting for
27.29% of the total farmland. By the survey, the land acquisition of affected households
in Tuanjie community is over 30%, basically with larger impact. Because the most land
has been occupied by the construction of city, the land is less and less, therefore, the
group is relying on district advantage to develop the vegetable base (with yearly income
over 1000 Yuan) in recent years and more persons engage in business and outgoing labor,
so that the farm households have less and less relying on the land. After soliciting the
opinion of the most households, it is decided by two villager commissions to use cash
compensation mode and pay the resettlement subsidy and young crop compensation fee
directly to affected households. Under the same condition, the resettlers have preferable
recruiting opportudities.
6.1.2.2 Income recovery measures
In order to resume the protection and living level of resettlers, the following
measures will be taken:
⑴ The labor service will be arranged in priority to resettlers during the construction
period; And firstly use local building material and living materials. After completion of
the project, the resettlers have preferable recruiting opportudities under the s ame
condition;
⑵ The labor service will be arranged in priority to resettlers if there is labor output
project in the county area;
60
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
⑶ Through land re-adjust within the group, guarantee that all residents share
farmland quantity not less thant the standard and other land;
⑷ Strengthen technical training and invite regularly relevant people from
agricultural technic station or the peasant who has technical specialty to conduct some
relevant agricultural planting technologies and breeding technical lectures in the
resettlement area and teach breeds, prevention of eqpidemic disease, shed -vegetable
planting as well as weave technical knowledge to woman with the language that resettlers
can understand. It is planned to raise the quality and output of agricultural product, raise
domestic animals slaughter rate and breeding output to increase the economic income of
resettlers.
6.1.3 Relocation scheme
Shizhishan environment treatmen project-I will relocate 62 households, in which 14
households are moved to other place and 48 households rebult in original place. The new
house plot with area of 1:1.2 is allotted, and most of project affected residents are from
Naxi nationality so that the new houses built are with Nai national characteristics.
(1) Rural residents
This project will relocate 4 rural households with 22 persons, in which 1 household
in Longtan village had been removed, 2 households in Jinjia village and 1 households in
Longtan village will be removed by the same way. By the survey in this stage, it is
decided to use cash compensation way by the district people’s government, street agent
and neithberhood commission for the 3 households to rebuild their housing in the
construction land (outside the project area) reserved in the same group. The house
replacement price is paid to households, the compensation for the house plot is paid to the
village collective, and house plot will be alloted by village. Those with the main income
before resettlement from collective bonus and house rent will still enjoys the colle ctive
bonus after resettled in original village and have the income from rent room at original
level.
(2) Urban residents
This project will relocate 10 urban households with 44 persons. By the survey in this
stage, it is decided to use cash compensation way by the district people’s government,
street agent and neithberhood commission for 10 households to rebuild their housing in
other places. The housing plot is alotted by government, at the west of fish pond near the
construction bank in Xianggeli street in ancient city area (land area about 60mu, all for
state-owned construction land), the compensation is paid according to the replacement
price, the house plot distribution area is by original plot area and new plot area 1 : and
1.2,
houses are built by households. If immigrant is not willing to have central resettlement,
but select to buy houses or other resettlement way, the compensation for housing plot
will be paid according to standard of 600000 Yuan/mu, with house replacement price,
immigrant can purchase the merchandise house with same area in same region completely.
The house of the most of residents belong to houses with unit raise funds and their major
economic income is from wages so that their economic income will not be affected after
relocation.
(3) Partial housing dismounting
61
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
For 48 households with inconsistent building style by the plan, the portion
inconsistent with building style shall be demolished, at the same time, promise to build
new house on original place by replacement price for compensation.
(4) Rental lodger
The project deals with about 399 rental lodgers, most of them are migranting
workers. For the lodgers renting house in the project construction area, it will be notified
by 3 month in advance, at the same time, offer them house lease information and let them
have enough time to find new housing and reduce the impact on their living.
6.1.3.1 House plot selection and standard
Shizhishan environment treatment project-I will relocate 14 households, and the new
house plot ratio is 1:1.2.
6.1.3.2 Infrastructure plan in host area
For Shizhishan environment treatment project-I, the host area is within original
community where has complete infrastructure facilities. For partial facilities that need for
improvement, the project owner will entrust the municipla utility department to perfect it
and its cost is not put into the compensation cost in this stage.
6.1.3.3 Social service facilities in host area
The construction of project does not relocate school and medical facilities, the
resettlers can use original school, medical room and commercial network, so that it is
necessary to rebuild it; the distance from host area to original social service facility is
identical basically.
6.1.3.4 Community management and housing construction
The host area for this project is inside the original community, therefore, the
community management after resettlement is same as original community management
system, do not need any adjustment.
By the survey of each family, the most opinion is by self-dismount and self-built for
the housing construction. Therefore, the self-dismount and self-built mode is adopted in
this stage.
6.1.4 Allocation of state-owned land
This project concerns with 1279.36 mu state-owned land, in which 405.78mu is
compensated land and 873.58 mu withou compensation. Because the state-owned land
does not regard to relacation, the cash compensation will be used for the compensated
land.
6.2 Recovery plan for temporary land
The temporary land use means the land occupied temporarily during the construction
period including borrow area and spoil area, operation and living area as well as
temporary road etc. The project office will clarify the use mode of temporary land,
resuming requirement and compensation standard in the contract with the construction
62
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
contractor, this buget covers temporarily only land loss compensation, young crops
compensation for one year and land resuming cost.
In order to decrease the environment impact and residents for borrow area, the
design unit has fully consideration for location selection of temporary land, construction
way and resuming mode after completion of project.
6.3 Restoration plan for vulnerable group
Hu Guangcun’s family in Xundian County belong to poor household. The
resettlement plan will give special help to his family. The poverty-reduction group led by
township and village cadre will be set in each township and vilalge to offer timely
assistance to vulnerable group.
This budget is listed with 1% of rural compensation cost as support cost for
vulnerable group, totaling 507200 Yuan. If there is more vulnerable groups during the
implemention of the resettlement plan, the corresponding support and care shall be given
such as proper preference and care for housing construction and resource distribution.
6.4 Restoration plan for ethnic people
According to the analysis on the project impact on the ethnic groups, it can be see
that the ethnic characteristics in the affected area is not obvious, their living style and
production method are not different from that of the Han people, and their living standard
is generally ssimilar to that of the Han people. The resettlement measures for the ethnic
people affected is shown in Table 6-3.
63
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Restoration Measures for ethnic people
Table 6-3
% of affected
Ethnic people House % of ethnic Land acquired (mu) % of income
PAP cultivated land
No. Project description affected relocated peopled in loss of ethnic Resettlement Measures
(person) of ethnic
(person) (m2) total people Cultivated Garden Fish people
land plot pond peopled
Solid waste One Hui household will be affected, the village
management in 193 6 3.11% 3.16 8.45% 0.33% group adjusts land in a planned way, the
1 Songming County compensation will be equally distributed
The Yi and Miao households will be affected, the
Solid waste
village group adjusts land in a planned way, 70%
management in Luquan 138 36 26.09% 13.19 18.80% 8.21%
the compensation will be distributed to the affected
County
2 people.
One household (having both Han and Yi people)
will be affected, with little ethnic characteristics.
Solid waste
Their contracted land will not be affected, but 20mu
management in 5 1 20.00%
reclaimed wasteland will be affected (accounting to
Xundian County
5.7% the total reclaimed wasteland, thus, the impact
3 is little, cash compensation will be paid.
Mainly of Bai people, impact is in little scale,
compensation will be paid. According to the needs
Integrated water
of the PAPs, some reserved collective-owned land
environmental
419 355 84.73% 82.5 10 32 2.86% 1.14% will be allocated to those who want to continue
management of Dali
farmwork, or the land can be obtaind from those
River
who do not want continue farmwork by
4 replacement.
All are Bai people, impact is in little scale,
compensation will be paid. According to the needs
Rural non-point of the PAPs, some reserved collective-owned land
pollution control in 21 21 100.00% 1.2 0.47% 0.18% will be allocated to those who want to continue
Lake Erhai Basin farmwork, or the land can be obtaind from those
who do not want continue farmwork by
5 replacement.
All are Yi people, impact is in little scale,
compensation will be paid. According to the needs
Solid waste of the PAPs, some reserved collective-owned land
management in Eryuan 83 83 100% 95 7.14% 2.83% will be allocated to those who want to continue
County farmwork, or the land can be obtaind from those
who do not want continue farmwork by
6 replacement.
64
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
% of affected
Ethnic people House % of ethnic Land acquired (mu) % of income
PAP cultivated land
No. Project description affected relocated peopled in loss of ethnic Resettlement Measures
(person) of ethnic
(person) (m2) total people Cultivated Garden Fish people
land plot pond peopled
Mainly Yi people, compensation will be paid.
According to the needs of the PAPs, some reserved
Wastewater
collective-owned land will be allocated to those
management in 91 38 41.76% 15.6 2.62% 2.06%
who want to continue farmwork, or the land can be
Huaping County
obtaind from those who do not want continue
7 farmwork by replacement.
Lijiang City WWTP Mainly Naxi people, land adjusted within village
324 307 94.75% 88 5.32% 0.86%
8 and Sewer Network group, compensation equally distributed.
Solid waste
management in Lijiang 86 86 100% 35 19.23% 3.12% Mainly Naxi people, land adjusted within village
9 City group, compensation equally distributed.
Among the 62 households (280 persons), fourteen
households (66 persons) should be moved.
Forty-eight households (214 persons) should build
Wastewater
house at original place. Mainly Naxi people, only
management in Lijiang 280 236 13235.3 84.62%
affect house (relocation), build new house and the
Ancient Town
house plot size will be allocated by 1:1.2. THe new
house is to build in original style, the living style
10 and income source will not be changed.
Wastewater
management in 8 8 100.00% 1.4 0.55% 0.20% All are Zhuang people, little impact, cash
11 Guangnan County compensation
Wastewater
management in Malipo 128 39 30.47% 6 2.87% 1.02%
12 County Few Zhuang People, cash compensation
WWTP and Sewer
Network in Qiubei 92 9 9.78% 2 4.61% 0.87% Four Yi people, five Zhuang people, little impact,
13 county cash compensation
Solid waste Totally 97.5 cultivated land, including reclaimed
management in Funing 87 87 60 100% 36.2 20 27.22% 8.87% wasteland 61.3mu, which is not involved in
14 County analysis. All are Zhuang people, cash compensation
Few Zhuang people, cash compensation. According
to the needs of the PAPs, some reserved
Solid waste
collective-owned land will be allocated to those
15 management in Malipo 142 14 9.86% 4.45 12.75% 4.54%
who want to continue farmwork, or the land can be
County
obtaind from those who do not want continue
farmwork by replacement.
65
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
6.5 Rebuilding plan for production and living facilities
The production and living facility affected by the project construction are mainly:
canal, water cellar, detour bridge, culvert and pavement, etc.. Relevant department made
a lot of surveys for project impact on production and living of local people during the
project design stage, soliciting the opinion of different levels of local people's
government, relevant department, social organization and local resident through meetings,
and these opinions are indicated mostly in the project design.
The temporary facility will be used for water cellars, transformers, pump stations,
culverts, pavement, etc. which will be resumed after the completion of project. The cost
is listed in the total budget of project, so this report does not list it additionally.
6.6 Enterprise relocation plan
Shizhishan project is concerned with 23 enterprise and institutions(15 enterprises, 8
institutions). In which Shizhishan Shanglu Company is kept in original place just do
“appearance modification” without relocation; For Agricultural Material Company,
Barbers’ Cooperative Union of Gucheng District, Senlong Group, Dayan Real Estate,
Yulong County hospital Outpatient Service, County Materials Company, Trading
Company, Traffic Police Brigade and Meat Processing Mill, they have only some shops
and partial offices in the project area, and their main offices are outside the project area,
therefore, after negotiating with 9 units above, one time cash compensation will be made
without relocation.
Through the study by the district people's government, the project owner and
affected institutions and enterprises, All units will be paid by cash, for these need to
rebuild will be arranged by the district government at Xianghelicheng (Lijiang Husbandry
Veterinary Station at the east, original Lijiang tile and brick mill). Xianghel icheng has
2900mu construction land with full capacity for relation of affected units.
Now, the project owner has initial contact with Lijiang Husbandry Veterinary
Station, National Tax Bureau, Broadcasting and Television Bureau by one -time cash
compensation to relocate to Xianghelicheng.
For other 11 units, it is also by one time cash compensation to move them into
Xianghelicheng.
6.7 Individual business households
The housing of individual buseness households is of mixing type and the quanlity is
included in the housing area of residents and enterprises. The compensation will be paid
on the replacement price and estimated price according to different property. The project
is concerned with 130 individual buseness households (128 for rental, 2 self-use), and the
relocation plan is informed 3 months in advance to keep their right not be violated. Based
on the “Yunan urban housing relocation management”, it is paid with operation stop loss
fee for 3 months, 200 Yuan/household per month and recloction subsidy 200
Yuan/household. Among 130 individual households, 128 households rent house for
business. By the survey, several business streets in central area of Lijiang city developed
by several real estate companies, such as Qixing pedestrian street, Yumihe shopping
street, Changluohe shopping street and Guodahuama shopping street, the rental cost is
66
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
same as the original place, specially for Guodahuama shopping street has many idle shops,
which can be used firstly for the individual households and the shops in Xiangh elicheng
can also be used; For employed people by the individual households, if the shop is moved,
they can be employed again, and after consulting with Lijiang talent market, when there
is employment change by some units, the proper people can be recruited first.
6.8 Relocation plan for special items, municipal utilities
The project impacts on 1 pole/km telecommunications cable line (at Luquan),
embedded cable 0.01 km (Songming), broadcasting optical cable 1 pole/km (Luquan),
optical cable of united mobile 3 pole/km (Luquan), mobile cable 1 pole/km (Luquan),
Dali power line 1.79 pole/km, communication line 2.8 pole/km and the partial municipal
facilities. Maguan rubbish disposal and shipping project impacts on 35 kV power line 2.5
pole/km and communicate optical cable 1.45 pole/km.
The affected telecommunications, mobile, united communication, broadcasting and
television and municipal facility etc.will jointly considered in the project design and be
protected and resumed in the construction.
For 0.01km embedded telecommunications optical cable in Songming County, it will
avoid the rubish filling area and rebuild it about 0.4km long after negotiating with the
responsible department above; For affected telecommunications, mobile, united
communication, broadcasting and television line in Luquan County, use 3 towers to set
all lines to avoid rubish filling area and link with original line. For 35kV power line and
telecommunications optical cable in Maguan County, local reloation will be adopted to
avoid the rubish filling area and rebuild about3.1 pole/km power line and 2.0 pole/km
telecomminication line. For the recovery of special items, the plan will be worked out by
relative department and responsible for the construction also by them.
6.9 Resettlement implementation management
The implementation of resettlement shall be led by the project resettlement leading
group. Each county set a project resettlement office formed by relative departments to
work out resettlement policy, transfers relevant department people to set up project
immigrant settle office, work out immigrant to settle policy, responsible for propaganda,
mobilizatio and organization for relocation and resettlement. At the same time, the
resettlement office is main channel to reflect problems in the res ettlement. The
resettlement office shall timely and fully listen to opinion and problem from resettlers,
and report timely to above or responsible department, at the same time feedback in time
the handling opinion to resettlers.
67
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
7 Estimation for Compensation of Land Acquisition and Relocation
The total estimation for resettlement compensation of Yunnan urban environment
construction project is 16470.13 x 10000 Yuan (including tax) , in which : rural
resettlement compensation is 4565.24 x 10000 Yuan, accounting for 32.1% of total;urban
resettlement compensation is 505.76 x 10000 Yuan,accounting for 3.6%;relocation
compensation for enterprise and institutions is 6367.2 x 10000 Yuan,accounting for
44.8%;compensation for special items is 124.66 x 10000 Yuan,accounting for 0.9%,
other cost is 1369.74 x 10000 Yuan,accounting for 9.6%. See Table 7-1 for details of
estimation of resettlement compensation.
Summary of cost estimation for resettlement
Table 7-1
Amount (x 10000 Yuan)
No. Description Total Percentage
Kunming Dali Lijiang Wenshan
Compensation for rural
I resettlement 687.17 885.89 1837.65 1154.53 4565.24 32.1%
(I) Land compensation 597.20 866.34 1218.89 1151.98 3834.41 27.0%
1 Permanent land use 597.20 859.51 1094.97 1143.59 3695.27 26.0%
2 Temporary land use 6.83 11.72 8.38 26.93 0.2%
3 Compensation for house plot 112.20 112.20 0.8%
Compensation for housing and
(II) attachments 1.00 591.42 2.10 594.52 4.2%
Compensation for
(III) infrastructure on host area 1.32 1.32 0.0%
(IV) Compensation for relocation 26.01 26.01 0.2%
(V) Other compensation 89.97 18.55 0.46 108.98 0.8%
1 Scattered trees 89.85 18.55 0.21 108.61 0.8%
2 Tomb 0.12 0.25 0.37 0.0%
Compensation for urban
II resettlement 505.76 505.76 1.8%
House plot acquisition
(I) compensation 165.60 165.60 0.6%
Compensation for housing and
(II) attachments 313.64 313.64 1.1%
Compensation for infrastructure
(III) in hoist area 3.30 3.30 0.0%
(IV) Relocation compensation 12.82 12.82 0.0%
Compensation for individual
(V) business households 10.40 10.40 0.0%
Relocation compensation of
III enterprises 6367.20 6367.20 44.8%
Compensation fee for units
(I) signed agreement 2312.87 2312.87 16.3%
Compensation fee for units
(II) un-signed agreement 4054.32 4054.32 28.5%
Compensation for houses and
1 attachments 3994.32 3994.32 28.1%
2 Other compensation 60.00 60.00 0.4%
IV Compensation for special items 23.20 25.64 75.82 124.66 0.9%
V Other costs 92.06 117.81 1002.03 157.84 1369.74 9.6%
68
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Amount (x 10000 Yuan)
No. Description Total Percentage
Kunming Dali Lijiang Wenshan
VI Contingency fee 80.24 102.93 971.26 138.82 1293.26 9.1%
Static investment ( excluding
tax) 882.67 1132.27 10683.9 1527.02 14225.85 100.0%
Relative tax 705.20 515.6 564.24 459.24 2244.28
Static investment ( including
tax) 1587.87 1647.87 11248.14 1986.26 16470.13
7.1 Compilation basis
⑴ Land Management Law of People’s Republic of China (effected on Jan. 1 st,
1999);
⑵ Rules for Farmland Occupation Tax ((87) CNZ-NO.206);
⑶ Land Management Rules in Yunan Province;
⑷ Woodland Management Method in Yunan Province (Yunnan Provincial People’s
Government, No.43 Decree);
⑸ Notice on Adjustment of Compensation of Newly Increase Construction Land by
the Ministry of Finance, Ministry of National Territory Resource, Bank of China (CZ
[ 2006 ] No. 48);
⑹ Notice on Provisional Method for Management of Forest Vegetation Resuming
Cost by the Ministry of Finance, National Forestry Bureau (CZ [ 2002 ] No.73);
⑺ Notice on Compensation Method for Land Acquisition and Relocation for Coutny
Town Construction in Xundian County by Xundian County People’s Government (XZF
[ 2003 ] No.25);
⑻ Inventory index for land acquisition and relocation
7.2 Compensation principle
The compensation standard is determined with relative legal regulations and actual
condition.
⑴ The land compensation, resettlement subsidy and compensation of young crops is
based on the “Land Management Rules in Yunan Province” and corresponding documents
in relative county (city, district);
⑵ The compensation cost of special facility is based on “3 original” (original
scale, original standard and original function) principle for estimation;
⑶ The compensation for scattered trees is based on corresponding documents in
relative county (city, district) and actual practice.
7.3 Compensation cost
The compensation estimation includes rural resettlement compensation, special
items compensation, other cost, physical contingency fee and relative tax, in which the
rurabl resettlement compensation includes mainly land acquisition compensation, f ruit
tree cutting compensation, etc. Based on relative resettlement policy and other relative
rules, the cost above is computed as the following:
69
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
7.3.1 Rural resettlement compensation
The rural resettlement compensation is totally 4565.24 x 10000 Yuan,in which land
compensation is 3834.41 x 10000 Yuan,housing compensation is 594.52x 10000 Yuan,
fruit tree cutting and tomb compensation is 108.61 x 10000 Yuan.
7.3.1.1 Land acquisition compensation
⑴ Permanent land use compensation
The permanent land use compensation includes mainly land compensation,
resettlement subsidy, young crops compensation or woods compensation. Based on the
compensation standard of different type of land in Chapter 5,the permanent land use
compensation is 3695.27 x 10000 Yuan.
⑵ Temporary land use compensation
Based on the compensation standard of different type of land in Chapter 5 ,the
temporary land use compensation is 26.93 x 10000 Yuan.
(3) Compensation for house plot
Shizhishan environment treatment project will occupy the rural house plot area of
1.87mu, according to compensation standard of 60000 Yuan/mu for the land used for
construction in Gucheng district, the compensation for rural house plot is 1122000 Yuan.
7.3.1.2 Housing compensation
Based on the compensation standard in Chapter 5,the housing compensation is
5945200 Yuan.
7.3.1.3 Compensation for resettlers’ relocation
Compensation for resettlers’ relocation is consisted of transportation fee, subsidy for
working loss and transitional period, fee for loss in house rent, and removing. Based on
the
the compensation standard in Chapter 5, compensation for relocation is 260100 Yuan.
7.3.1.4 Other compensations
(1) Scattered tree compensation
Based on the compensation standard in Chapter 5,the scattered compensation
is108.61 x 10000 Yuan.
(2) Tomb relocation compensation
This project impacts on 8 tombs, based on the compensation standard in Chapter 5 ,
the tomb relocation compensation is 0.37 x 10000 Yuan.
7.3.2 Urban resettlement compensation
7.3.2.1 House plot compensation
Shizhishan environment treatment project will occupy the urban house plot area of
2.76 mu, according to compensation standard of 60000 Yuan/mu for the land used for
construction in Gucheng district, the compensation for urban house plot is 1656000
Yuan .
70
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
7.3.2.2 Housing compensation
Based on the compensation standard in Chapter 5, the housing compensation is
313.64 x 10000 Yuan.
7.3.2.3 Construction fee of infrastructure in hoist area
The construction fee of infrastructure in hoist area includes ground leveling,
compensation for water and power supply faccilities, based on the compensation standard
in Chapter 5,the construction fee of infrastructure in hoist area is 3.3 x 10000 Yuan.
7.3.2.4 Relocation compensation
The relocaton compensation includes transportation fee, and subsidy for work delay.
Based on the compensation standard in Chapter 5,the relocation compensation is 12.82 x
10000 Yuan.
7.3.3 Individual business households relocation compensation
The individual business households relocation compensation includes relocation
compensation and business stop loss fee, in which the business stop loss fee is 200 per
month for 3 months and relocation subsidy is 200 Yuan per household, so the relocation
compensation is 10.4 x 10000 Yuan, of which the business stop loss fee is 7.8 x 10000
Yuan, and relocation subsidey is 2.6 x 10000 Yuan.
7.3.4 Enterprise relocation compensation
By the estimation, the enterprise relocation compensation is 6367.2 x 10000 Yuan.
Now, the project owner signed the relocation agreement with n contact with
National Tax Bureau, Lijiang Husbandry Veterinary Station, Broadcasting and Television
Bureau, one-time compensation for National Tax Bureau 542.80 x 10000 Yuan;housing
compensation at Xinhua road for Husbandry Veterinary Station 15.97x 10000 Yuan,
housing compensation at Mimzhu road will be paid by one time compensation after
negotiation with this unit, and Gucheng management company ltd will give new house
plot with ratio of 1:1.2;The housing and equipment compensation for Broadcasting and
Television Bureau is 1502 x 10000 Yuan, the project owner will offer 6mu land in
Xianghe Resident Zone based on the municipal plan. As a whole, the compensation for
three units is 2312.87 x 10000 Yuan. (By the estimation, the compensation for new house
plot is 252.1 x 10000 Yuan) .
One-time compensation for other units is 4283.32 x 10000 Yuan, in which the
housing compensation is 3994.32 x 10000 Yuan, and relocation compensation is 60 x
10000 Yuan.
7.3.5 Special items compensation
Based on the plan of special item of each county, the spcial items compensation is
124.66 x 10000 Yuan.
71
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
7.3.6 Other cost
Other cost includes construction unit management fee, implementation fee, technical
training fee, supervision fee, monitoring assessment fee, plan and design fee and design
document reviewing fee, etc.
⑴ Construction unit management fee
It is used mainly for all management cost during the implementation, computed by
0.5% in Clause 7.3.1~7.3.5,totally 57.82 x 10000 Yuan;
⑵ Implementation fee
It is used mainly for all costs during the implementation, computed by 0.3% in
Clause 7.3.1~7.3.5,totally 346.89 x 10000 Yuan;
⑶ Technical training fee
It is used mainly for all costs for technical training and skill training, computed by
0.5% in Clause 7.3.1~7.3.3,totally 25.36 x 10000 Yuan;
⑷ Supervision fee
It is used mainly for progress, quality and fund control of supervision unit, computed
by 1.0% in Clause 7.3.1~7.3.5,totally 115.63 x 10000 Yuan;
⑸ Monitoring assessment fee
It is used mainly for monitoring and assessment for external supervision unit,
Kunming, Dili and Wenshan computed by 1.5% in Clause 7.3.1~7.3.5,Lijiang computed
by 1.0% in Clause 7.3.1~7.3.5, totally 129.89 x 10000 Yuan.
⑹ Plan and design fee
The plan and design fee is mainly used for the design, survey and acting plan
compilation by the design unit, survey unit and local government, computed by 2.5% in
Clause 7.3.1~7.3.5, totally 289.08 x 10000 Yuan;
⑺ Design document reviewing fee
It is used mainly for design result consulting or reviewing of consulting unit and
responsible department, computed by 0.3% in Clause 7.3.1~7.3.5, totally 34.69 x 10000
Yuan.
⑻ Relocation management fee
It is computed by 2.8% of land acquisition fee for the management of land
management sector.
⑼ Vulnerable group support fee
It is computed by 1% in Clause 7.3.1~7.3.2 for support of vulnerable group during
the resettlement.
7.3.7 Physical contingency fee
The physical contingency fee is computed by 10% in Clause 7.3.1~7.3.6 for all
contingency accidents.
72
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
7.3.8 Relative tax
⑴ Farmland occupation tax
Based on the rules of “Provisional regulation on farmland occupation tax of People’s
Republic of China” and “Notice on specific policy of farmland occupation tax”, the
farmland occupation tax in Yunnan province is 4 Yuan/m 2,it is totally 250.74 x 10000
Yuan.
⑵ Farmland reclamation fee
Based on the rules of “Yunnan province land management regulations”, the land
reclamation fee for farmland and garden field is 3-8 times of annual output for previous 3
years, this project takes lower limit of 3 times, by Kunming National Land Bureau
estimation, the annual output of paddy field for previous 3 years is 2400 Yuan/mu ,dry
field 2100 Yuan/mu,i.e. the reclamation fee for paddy field is 7200 Yuan/mu and the
reclamation fee for dry field is 6300 Yuan/mu. By the estimation, Kunming city needs to
pay reclamation fee 199.40 x 10000 Yuan.
Based on estimation of Chapter 5, the annual output of paddy field for previous 3
years in Dali city is 2156 Yuan/mu,dry field 1478 Yuan/mu; the annual output of paddy
field for previous 3 years in Eryuan County is 2164 Yuan/mu,dry field 1327 Yuan/mu;
i.e. the reclamation fee for paddy field in Dali city is 6468 Yuan/mu and the reclamation
fee for dry field is 4434 Yuan/mu; the reclamation fee for paddy field in Eryuan County
is 6492 Yuan/mu and the reclamation fee for dry field is 3981 Yuan/mu. By the
estimation, Dali prefecture needs to pay reclamation fee 98.83 x 10000 Yuan.
Based on estimation in this stage, the annual output of farmland for previous 3 years
in Lijiang city (county, district) is: paddy field in Huaping County is 2196 Yuan/mu;
paddy field in Gucheng district 2164 Yuan/mu. Its reclamation fee is: paddy field in
Huaping County 6588 Yuan/mu; paddy field in Gucheng district 6492 Yuan/mu. By the
estimation, Lijiang city needs to pay reclamation fee 94.08 x 10000 Yuan.
Based on the estimation of Wenshan State Land Management Bureau, the annual
output of farmland for previous 3 years is 1354 Yuan/mu, the reclamation fee is 4062
Yuan/mu. By the estimation, Wenshan prefecture needs to pay reclamation fee 95.99 x
10000 Yuan.
⑶ Forest vegetation resuming fee
Based on the relative rules of file CZ[2002] No.73 from the Ministry of Finance and
State Forest Bureau, the forest vegetation resuming fee for this project is 4000 Yuan/mu,
totally 188.08 x 10000 Yuan.
⑷ Land use fee for increase of construction land
Based on relative rules of “Notice on Adjustment of Compensation of Newly
Increase Construction Land” by the Ministry of Finance, Ministry of National Territory
Resource, Bank of China (CZ[2006] No.48), it needs to pay for transferring agricultural
land and unused land into construction land. The levy standard in each county is: Luquan
County, Songming County, Xundian County, Grade-XIV, 14 Yuan/m 2; Dali city,
Grade-XII (20 Yuan/m 2); Eryuan County, Grade-XIV (14 Yuan/m 2); Gucheng district,
Grade-XIII, 16 Yuan/m 2; Huaping County and Ninglang County, Grade-XV, 10 Yuan/m 2;
73
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
7 counties in Wenshan prefecture except Wenshan County, Grade-XV, 10 Yuan/m 2;
Wenshan County, Grade-XIV, 14 Yuan/m 2. By the estimation, it will be totally 13.1717
mil. Yuan.
7.4 Fund allocation
7.4.1 Fund source and allocation principle
⑴ All costs for land acquisition and relocation is covered by the total budget of
project, the land acquisition and relocaton compensation as well as other costs will be
paid to relative unit and person by county(district) project office(county(district) p roject
resettlement office, land management department);
⑵ The house compensation cost will be paid by stages to resetterls before their
house construction;
⑶ The land and other facility compensation cost shall be paid one month before
levying;
⑷ In order to guarantee the smooth implementation of RAP, the resettlement
department at different level shall set financial and supervisor organization to guarantee
all capitals to be paid on time.
7.4.2 Financial responsible department
⑴ The financial responsible department for land acquisition compensation is
prefecture(city) project office, each sub-project owner, county(district) project
office(county(district) resettlement office), land management department, townshp and
town, and village;
⑵ The financial responsible department for housing relocation compensation is
prefecture(city) project office, each sub-project owner, county(district) resettlement
office;
⑶ The fund allocation is from upper to lower level, each level shall conduct strictly
the financial settlement and audit system, inspect and report regularly the capital use
condition, take remedy measure for unexpected condition to guarantee the capital use
under the schedule.
7.4.3 Cash flow
⑴ Based on the compensation policy and compensation standard in the RAP, each
sub-project owner shall sign a general agreement for land acquisition and relocation
compensation with relative county(district) land department or each county(district)
resettlement office, and the county(district) land department shall sign “Land acquisition
and relocation compensation agreement” with each township and town(in Dali prefecture,
each sub-project owner will sign sign “Land acquisition and relocation compensation
agreement” with relative township and town).
⑵ The county(district) land department, county(district) resettlement office, or
township(town) shall sign “Land acquisition compensation agreement” with villagers
commission.
74
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
⑶ The county(district) land department, county(district) resettlement office, o r
township(town) shall sign “House relocation compensation agreement” with resettlement
household.
⑷ Each sub-project owner will pay the compensation through bank to
county(district) resettlement office or township(town) based on the content, quantity and
time specified in the agreement, and them the county(district) resettlement office or
township(town) will pay the housing relocation compensation by stage to resettlers and
land compensation to the villagers commission.
75
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
8 Resettlement Implementation Plan
8.1 Implementation program
A. Land acquisition and compensation
The land acquisition and compensation will be performed by relative department and
the specific process is as follows:
a. The design unit will offer detail land acquisition scope drawing, which will be
verified jointly by the prefecture(city) WB project office, the project owner, different
levels government and the land management department to finalize the scope and quantity
for land acquisition and relocation;
b. Each project owner makes application for land acquisition to relevant land
management department;
c. Approval of land acquisition application;
d. Each project owner negotiates land acquisition compensation, sign compensation
agreement and go through land use procedures to relevant land management department;
e. City, county land management bureau go to relevant township(town) to finalize
the land acquisition scope and quantity;
f. City, county land management bureau signs the “land acquisition agreement” with
relevant township(town);
g. Pay compensation;
h. Handling legal procedure;
i. Taking-over acquisitioned land.
Additionally, use of land compensation fee (compensation and resettlement subsidy):
for the village by cash compensation, the resettlement subsidy will distributed d irectly to
each household impacted by land acquisition, if partial land compensation is distributed
to household, it shall be pass by villager conference, the rest shall be used for collective
production and infrastructure construction in village. For the village with land-adjusting
mode, the land compensation and resettlement subsidy shall be kept in the village,
managed and controlled legally. Usually, except the land development and infrastructure
construction in village, the land compensation fee is mainly for collective welfare
construction that the most villages can enjoy it. If some villagers need a loan to open
small enterprise(shop) from land compensation fee, it shall be approved through
villager’s representative meeting, otherwise the villagers must ask for loan from local
bank.
B. Production recovery
The production arrangement and recovery shall be carried out by the villager
commission and the working program is as follows:
a. Convoke villagers representative meeting in the village with resettlement task to
study and prepare the overall scheme for land adjustment, compensation distribution and
production recovery;
76
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
b. Announce the land adjustment and distribution scheme to solicit the opinion of all
villagers;
c. Adjust and distribute land;
d. Farming
C. Housing relocation and rebuilding
The housing relocation and rebuilding procedure is as follows:
a. The project design unit supplys the scope and quantity for house relocation;
b. Each sub-project owner will verify the house number and quality jointly with different
levels government, the land management department and affected unit (person);
c. Each sub-project owner will negotiate the relocation compensation, sign the
compensation agreement and handle land use procedures with land management
department; each level land management department will discuss the compensation
standard for housing and attachment, and sign house relocation compensation agreement
with relative township(town) and villages;
d. City, county(district), township(town) will sign house relocation compensation
agreement with relative villages;
e. Township(town) working group opens house number, compensation standard and
relocation time of each household and consults their opinions;
f. Township(town) working group, village will sign house relocation agreement with
resettlement household;
g. Township(town) and village will offer house plot;
h. Get compensation fee;
i. Start of house building;
j. Demolish old house.
D. Special item rebuilding
a. The project design unit will offer the impact scope of special items;
b. Each project office and responsible department will survey the quantity and class
of special items impacted;
c. Each project office will entrust each responsible department of special items to
prepare rebuilding plan;
d. Each project office will consult with each responsible department of special items
and sign “Special items rebuilding compensation agreement”;
e. Each responsible department will start the the construction of special items;
f. Put into operation of each special item.
8.2 Progress plan
The progress of land acquisition and relocation will follow the progress of project
construction and specific plan shall follow the principles below:
77
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
⑴ The relocation of housing and attachment will be completed by stages, but it shall
be ended before the start of project construction at this area;
⑵ The notice for house relocation shall be informed by at least 2 month in advance;
⑶ The land acquisition shall be ended before the start of construction for that
section;
⑷ The land adjustment and distribution shall be completed as far as possible
between crops season gaps;
⑸ Labor force arrangement shall be completed before the land acquisition;
⑹ The rebuilding of special items shall be ended before start of construction of each
project.
Based on overall progress planned, the land acquisition and relocatiom schedule is
decided, see Appendix 6.
78
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
9 Institutional Organization
9.1 Establishing of Organizations
In order to ensure smooth construction of Yunnan Urban Environment Project, the
necessary resettlement organizations are established by the People’s Government at
different level and Sub-Project Construction Unit, which will plan, coordinate and
monitor the resettlement activities. The following institutions are set up for resettlement
of the Project:
(1) Leading Group of WB-Loaned Yunnan Urban Environmental Construction
Project
(2) Project Office
(3) Prefecture (City) Project Leading Group
(4) Prefecture (City) Project Office
(5) Owners of each Sub-Project
(6) County (City or district) Project Leading Group
(7) County (City or district) Project Office
(8) Town (ship) Working Group
(9) Village committee and villagers’ group
(10) External Independent Monitoring and Evaluation Organization
9.2 Responsibilities of Organization
In order to ensure successful resettlement, the Project Resettlement Leading Group
was composed of the responsible leaders from Yunnan Province Environment Bureau,
Province Development and Reforming Committee, Province Finance Office, and
Province Construction Office. Its main responsibility is to strengthen the leadership of the
project, take charge of resettlement policy-making and coordination among all
resettlement organizations at different levels. The office in charge of daily routine is set
in the office under Yunnan Province Environment Protection Bureau.
The sub-project leading groups, set at each prefecture(city) People’s Government,
are consisting of the leaders from prefecture(city) People’s Government, Environment
Protection Bureau, Develop and Reform Committee, Finance Bureau, Construction
Bureau, State Land Resource Bureau, Forest Bureau, Water Conservancy Bureau, Urban
Management Bureau, and Plan Bureau. Their responsibilities are to organize the project
construction, decide the general layout of project, and coordinate and set down the
relevant major issues. The Office in charge of daily routine (under leading group) is set in
the office of Prefecture Environment Protection Bureau and has responsible for the
integrated management for the project, organization and coordination, external liaison,
monitoring and checking.
The Owners of sub-project have responsibilities of the resettlement capital
preparation and allotment, and participate each resettlement activity.
The Leading Group of different counties and districts, headed by the responsible
leaders of the relevant counties and districts, is composed of the leaders from County
79
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
State Land Bureau, Plan Bureau, Environment Protection Bureau, Finance Bureau, Urban
Construction Bureau, Development and Reforming Bureau, and effected Town(ship)
People’s Government. The main responsibilities for the Leading Group is to strengthen
the leadership over the resettlement processes carried out under their jurisdiction,
coordinate the resettlement work among different government departments concerned and
relationship between the state, the collective and individual so as to ensure smooth
construction of main works, land acquisition and resettlement. The Office under the
Leading Group, composed of specially assigned cadres from departments of environment
protection, state land resource and urban construction, is set to carry out the
implementation, management of resettlement cost, supervise the capital allotment and
usage, go through the relevant procedure for the land acquisition and relocation, train
staff from town(ship)s and village resettlement group, and guide and supervise the
resettlement work in town (ship)s and villages.
Town (ship) working group, led by responsible leaders of the town(ship)s, is
composed of the cadres from land administration and environment protection section as
well as main cadres of effected villages. The main responsibility covers: implementation,
inspection, monitoring and recording all resettlement activities in the town(ship)s. The
working group is composed of cadres from village committee and villagers’ group, and
participates in and implements each resettlement activity.
The independent external monitoring and evaluation for this project is carried out by
independent external monitoring and evaluation organization chosen by Province Project
Office. The independent external monitoring and evaluation organization will, through
the Project Office, offer technology help, carry out the survey on resettlement and the
living level of affected persons according to stipulations, and implement all monitoring
and evaluation work.
9.3 Staffing
In order to ensure the execution of resettlement as well as the project constru ction to
be carried out smoothly, the province project owner, prefecture(city) project owner, each
sub-project owner, people’s governments at different level, relative departments and
effected county (city or district) people’s governments invests a large quantity of capital,
sets up the resettlement organizations and assigned a number of staff (totaling 241
persons). The staff of PRO in each county and their names are shown in each prefecture
(city) report for details.
80
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
10 Public Participation and Appeal
10.1 Public Participation
According to resettlement policies and regulations of state, province and each city
and the construction and reforming characteristics of project, the relevant policies and
detailed enforcement is established and efforts are made for well preparation of
resettlement plan, implementation and organization work so as to meet the goal of
resettling properly for keeping the legal rights and interests of removed units and
resettlers and decreasing the unsatisfactory and dispute. During the preparation of
resettlement policies and RAP as well as implementation, the project resettlement office
widely solicited the opinions from resettlers and paid a great attention on the public
participation in the resettlement and consultation.
During compiling RAP, each sub-project responsible department and enforcement
organization as well as design department, through various channel, adopted different
form to announce the project resettlement policies. From Dec. 2006 to Jan. 2007,
totaling 58 working meetings were held in Kunming city, Dali region, Lijiang City,
Wenshan Prefecture, effected counties (city or district) and town(ship)s and villages,
participated with over 680 persons. The major subject of meetings is on the implementing
the land acquisition and resettlement plan, propagating the resettlement policies,
soliciting the opinion from local masses and resettlers on the project construction and
preliminary resettlement scheme, see Appendix 7 for details.
To issue relevant land acquisition and relocation announcement through local
newspaper or broadcasting television before enforcement of resettlement; Put up bulletin
to propagate resettlement policy, compensation standard and complaint channel in the
scope of towns and villages affected using easy language that easily understood by
resettlers according to local resident national composition condition; The resettlement
action plan report is put in local library or the project office for the resettlers to read. The
schedule for public project information is shown in Table 10-1.
Schedule for Public Project Information
Table 10-1
Public data
Sub-project Public way Language
RAP Bulletin
Supervisory control and management system of water
pollutant aggregate in Dianchi lake basin
Solid waste management project in Songming County Kunming
Solid waste management project in Luquan Yi and Miao daily Chinese Aug.31, 2007 Aug.31, 2007
Autonomous County
News
Solid waste management project in Xundian Hui and Yi
Autonomous County
Integrated water environmental management of main
riverways to the Erhai Lake (including integrated water Dali daily
Chinese
environment management of Yong’an, Miju, Luoshi, Boluo rivers Sep. 3, 2007 Sep. 3, 2007
and Shiba Creek in Changshan Mountain) News
81
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Public data
Sub-project Public way Language
RAP Bulletin
Rural non-point pollution control project in the Erhai river
basin in Eryuan County
Integral urban network project of Dali City (including Fengyi,
the Ancient town, Xizhou and tourism and vacation districts)
Wastewater treatment plant and sewer network project in
Dengchuan Town of Eryuan County
Solid waste management project of Eryuan County
Wastewater treatment plant and associated pipe network
project in Huaping County
No. 2 Urban Wastewater Treatment Plant and associated
sewer network project in the Ancient town zone, Lijiang
Urban drainage pipe network project of Yulong County Lijian daily Chinese
Sep. 12, 2007 Sep. 12, 2007
News
Solid waste management project in the ancient town zone,
Lijiang
Environmental improvement project of Shizi Mountain in the
ancient town
Integrated water environmental management of Puting river
basin in Funing County
Integrated water environmental management of Puzhehei
Lake in Qiubei County
Integrated Improvement project of Panlong River (the urban
section in Wenshan County)
Wastewater treatment plant and sewer main project of
Guangnan County
Wastewater treatment plant and associated sewer main project
of Malipo County
Wastewater treatment plant and associated sewer network
Wenshan Chinese
project of Qiubei County Aug. 29, 2007 Aug. 29, 2007
daily News
Qiubei water supply project
Urban drainage pipe network project of Wenshan County
Urban drainage pipe network project of Yanshan County
Solid waste management project of Funing County
Solid waste management project of Maguan County
Solid waste management project of Malipo County
Environmental management and monitoring system of
Wenshan Prefecture
10.2 Responding to Grievance and Appeal
In the process of preparing and implementing the Resettlement Action Plan, it is
always to encourage the public participation, but there will still be some problems
occurring. In order to solve problems effectively and ensure the project construction and
82
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
land acquisition to be carried out successfully, except the existing appeal ways set in the
local governments at all levels, a transparent and effective appeal way has been set up as
follows:
Stage 1:
If the resettlers are not satisfied for the resettlement plan, they can appeal to the
village committee and the local town resettlement working group in oral or in written
form. If the appeal in oral form, the village will make decision and record in written.
Village committee or town resettlement working group will resol ve the reasonable
requirement and suggestion in two weeks.
Stage 2:
If the resettlers are dissatisfied for the decision of stage 1, they can appeal to the
county (city or district) leading group office after receiving the decision; the county (city
or district) leading group office will make decision within two weeks.
Stage 3:
If the resettlers are dissatisfied for the decision of stage 2, they can appeal to
(prefecture or city) project leading group office after receiving the decision; the
(prefecture or city) WB loaded project leading group office will make decision within two
weeks.
Stage 4:
If the resettlers are still dissatisfied for the decision of the prefecture or city project
office, they can appeal to a people’s court according to the civil procedu ral law after
receiving the decision of the office.
The resettlers can appeal on any respect of the resettlement, including compensation
criteria, etc.
The resettlers will know their right of lodging appeal during participation in the
public meetings and by other ways. At the same time, the appeal processes will be
publicized among the PAPs through media. The relative authorities will sort out the
opinions and proposals of the PAPs and the resettlement offices at all levels will process
the information in a timely and effective manner.
The organizations accept the appeals and grievance of the PAPs free of charge, and
the project leading group office will pay the expenses incurred from project contingency
fund.
List of Contactors and Their Telephone Numbers
Table 10-2
Province, city and county
Item Connector Tel.
project office
Province project office Guo Ping 0871-4166316
Kunming Project office Xi Ying 0871-4100022
Solid waste management project in Luquan Yi and Luquan Yi and Miao
Duan Xingcong 0871-8918766
Miao Autonomous County Autonomous County
Solid waste management project in Songming County Songming County Shen Ping 0871-7911933
Solid waste management project in Xundian Hui Xundian Hui and Yi
Lu Jianchang 0871-2662295
and Yi Autonomous County Autonomous County
83
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Province, city and county
Item Connector Tel.
project office
Dali prefecture project office Zhao Jidong 0872-2316712
Integrated water environmental management of
Boluo river Dali city Bi Fajiang 0872-2124408
Integrated water environmental management of Shiba
Creek in Changshan Mountain Dali city Bi Fajiang 0872-2124408
Integrated water environmental management of
Yong’an river Eryuan county Ji Kaifeng 0872-5122204
Integrated water environmental management of Miju
river Eryuan county Ji Kaifeng 0872-5122204
Integrated water environmental management of
Eryuan county Ji Kaifeng 0872-5122204
Luoshi river
Rural non-point pollution control project in the Erhai Dali city Yang Ya 0872-2136800
river basin Eryuan county Ji Kaifeng 0872-5122204
Integral urban network project of Dali City Dali city Yang Meng 0872-2184909
Wastewater treatment plant and sewage pipe network
Eryuan county Ji Kaifeng 0872-5122204
project in Dengchuan Town of Eryuan County
Lijiang city project office Li Yan 0888-5158967
Wastewater treatment plant and associated sewer Ran
network project in Huaping County Huaping County 0888-6124982
Guangxiang
No. 2 Wastewater treatment Plant and associated
sewer network project in the ancient town zone, Lijiang Ancient town zone He Genli 0888-5176506
Urban drainage pipe network project of Yulong
County Yulong County Yang Yuequan 0888-5179202
Solid waste management project in Lijiang Ancient town zone He Liwei 0888-5181624
Environmental improvement project of Shizi
Mountain in the ancient town zone Ancient town zone Dong Ying 0888-5101010
Wenshan prefecture project
Chen Wen 08762191967
office
Environmental management and system of
Wenshan county Wang Dexing 08762188217
Wenshan Prefecture
Urban drainage pipe network project of Yanshan
Yanshan County He Maohuai 08763122650
County
Wastewater treatment plant and associated sewer
network project of Qiubei County
Qiubei County Zhou Weihua 08765159959
Qiubei water supply project
Wastewater treatment plant and sewer main project
Guangnan County Huang Jianping 08765159959
of Guangnan County
Wastewater solid waste disposal project of Funing Wei
Funing County 08766123566
County Zhongming
Wastewater treatment plant and sewer main project
of Malipo County Malipo County Li Jinlong 08766629691
Solid waste management project of Malipo County
Sun
Solid waste management project of Maguan County Maguan County 08767126968
Zhongxiang
84
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
11 Monitoring and Evaluation
In order to guarantee that the RAP can be smoothly implemented and the
resettlement target suitably realized, the follow-on fact finding and monitoring will be
carried out in the land acquisition and relocation as well as resettlement active according
to World Bank Operation Policy OP 4.12 (Involuntary Resettlement) and requirements of
"Monitoring and Evaluation Operation Guidance of World Bank’s Loaned China Project".
Monitoring on the resettlement will be divided into two parts, i.e., internal monitoring (by
the resettlement offices) and the external independent monitoring, which starts in June
2007 and ends in Dec. 2010. According to each sub-project construction and resettlement
progress, the internal monitoring and the external monitoring report shall be submitted to
WB for each half-year or one year regularly.
It is Yunnan Province WB-loaned Environmental Protection Project Office to take
the overall responsibility for the internal monitoring, and is each prefecture project
leading group and office, prefecture land administration department as well as house
relocation management office to carry out coordination so as to ensure the enforcement
unit to carry out the land acquisition and resettlement according to principles and time
schedule in RAP. The purpose of internal monitoring is that the resettlement organization
will play a good function during implementation.
The external independent monitoring and evaluation means that the independent
monitoring organization carries out the regular independent monitoring and evaluation on
the land acquisition and resettlement activities. The contents of external independent
monitoring cover: the function of resettlement network; implementing progress of land
acquisition and resettlement as well as compensation; resettlement and restoration of
relocated households and shops as well as enterprises; and the analysis of resettlers’
production and living level. It is the unit independent from the project resettlement
organization to carry out the independent monitoring and overall evaluation on the land
acquisition, relocation and resettlement by a long-term viewpoint, and evaluate whether
the resettlement follows the relevant laws of state on land acquisition and resettlement
and accords with Operation Policy of World Bank OP 4.12 (Involuntary Resettlement) ,
and whether the production and living level is raised or restored at the original level at
least. The monitoring organization shall propose suggestion to relevant unit for problem
discovered in monitoring so as to solute problems appeared in implementing in time.
See Table 11-1 Schedule of Monitoring and Evaluation and Report Submitted
85
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Schedule of Monitoring and Evaluation and Report Submitted
Table 11-1
Internal monitoring External monitoring
City or
No. Sub-project
county Monitoring report Post evaluation
Year Report submitted Year
submitted report
Enhancement of water quality monitoring Kunming
1
capacity in Dianchi Lake basin city
Solid waste management project in Luquan Yi Luquan
2 and Miao Autonomous County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Solid waste management project in Songming Songming
3 County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Solid waste management project in Xundian Hui Xundian
4 and Yi Autonomous County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Integrated water environmental management of
main riverways to the Erhai Lake (including Eryuan
5 Integrated water environmental management of County, 2008~Dec.2010 End of each half year 2008~2010 End of each year
Yong’an, Miju, Luoshi, Boluo rivers and Shiba Creek Dali city
in Changshan Mountain)
Rural non-point pollution control project in the Eryuan
6 Erhai river basin in Eryuan County 2008~Dec.2010 End of each half year 2008~2010 End of each year
County
Integral urban network project of Dali City
7 (including Fengyi, the ancient town zone, Xizhou and Dali city 2008~Dec.2010 End of each half year 2008~2010 End of each year
tourism and vacation districts )
Wastewater treatment plant and associated sewer Eryuan
8 network project in Dengchuan Town of Eryuan County 2008~Dec.2010 End of each half year 2008~2010 End of each year
County
Solid waste management project of Eryuan Eryuan
9 County 2008~Dec.2010 End of each half year 2008~2010 End of each year
County
Wastewater treatment plant and sewer main Huaping
10 project in Huaping County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
No. 2 wastewater treatment plant and associated Ancient
11 Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
sewer network project in the ancient town zone, town zone
86
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Internal monitoring External monitoring
City or
No. Sub-project
county Monitoring report Post evaluation
Year Report submitted Year
submitted report
Lijiang
Urban drainage pipe network project of Yulong Yulong
12 County County
Solid waste management project in the ancitent Ancient
13 city zone, Lijiang Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
town zone
Each half year
during
Environmental improvement project of Shizi Ancient implementation and
14 Mountain in the ancient town Aug.2007~Dec.2010 End of each half year 2008~2010
town zone end of each year
after project
completed
Integrated water environmental management of Funing
15 Puting river basin in Funing County 2008~Dec.2010 End of each half year 2008~2010 End of each year
County
Integrated water environmental management of Qiubei
16 Puzhehei Lake in Qiubei County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Integrated water environmental management of Wenshan
17 Panlong River (the urban section in Wenshan County) 2008~Dec.2010 End of each half year 2008~2010 End of each year
County
Wastewater treatment plant and sewer main Guangnan
18 project of Guangnan County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Wastewater treatment plant and sewer main Malipo
19 project of Malipo County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Wastewater treatment plant and associated sewer Qiubei
20 network project of Qiubei County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Qiubei water supply project Qiubei
21 Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
87
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Internal monitoring External monitoring
City or
No. Sub-project
county Monitoring report Post evaluation
Year Report submitted Year
submitted report
Urban drainage system project of Wenshan Wenshan
22 Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County County
Urban drainage system project of Yanshan Yanshan
23 County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Solid waste management project of Funing Funing
24 County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Solid waste management project of Maguan Maguan
25 County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Solid waste management project of Malipo Malipo
26 County Aug.2007~Dec.2010 End of each half year 2008~2010 End of each year
County
Environmental management and monitoring Wenshan
27 system in Wenshan Prefecture Prefecture
88
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
12 Entitlement Matrix
The entitlement of effected units and persons is shown in Table 12-1.
Entitlement Matrix for Yunnan Province Urban Environment Project
Table 12-1
Compensation Standards
Impac Entitled Number of entitled County with
Resettlement Policy
ts Persons units and persons project Rate
located
Land Owner 1.The project construction will involve the land acquisition. Xundian Reclaimed wasteland 2000 Yuan/mu, unused land 200
acquis The land compensation and resettlement subsidy will be paid county Yuan/mu, young crops 483 yuan/mu
ition to the villagers’ groups involved in the land acquisition, and
land compensation for young crops and ground attachment will be Songming
Paddy field:20600Yuan/mu,Dry land:12400 Yuan/mu
paid to households involved in the land acquisition. In the county
cast of that if villagers’ group has the land adjustment or land Luquan
Cultivated land:33000 Yuan/mu
development and the effected household is allotted with land county
1870 persons of 442 or other production information again, the land compensation Paddy field: 46526 Yuan/mu,dry land 29858 Yuan/mu,
households, in 33 and resettlement subsidy will be managed and used by the Eryuan garden plot: 21000Yuan/mu,pool: 28132 Yuan/mu,fish
village groups of 20 collective. Otherwise, if villagers’ group has no land county pond: 23600 Yuan/mu, forest land
and (sparse forest land):
villages adjustment or land development and the effected household is 4900Yuan/mu
not allotted with land or other production information, the
dry
Paddy field: 46276Yuan/mu, land; 27404 Yuan/mu, and
resettlement subsidy will be paid to effected households, but Dali city
fish pond: 28028Yuan/mu
the land compensation will be managed by village collectives
and allotted or used through villagers’ representative Paddy field : 88450 Yuan/mu (urban garbage disposal
meeting. Ancient project),paddy field:41200Yuan/mu(No. 2 wastewater
2. The compensation for the land acquisition in project town zone treatment plant) Timber 4998 Yuan/mu;and construction
construction and resettlement subsidy is mainly used for the used land: 45000Yuan/mu
restoration of resettlers’ production and living level, such as Huaping
Paddy field:27450Yuan/mu
the construction of farmland water conservancy facility, County
reforming of rural basic facility and adjustment of Malipo Paddy field:38300 Yuan/mu,dry land:15300Yuan/mu,
agricultural structure. County and forest land:8820Yuan/mu。
3. According to actual condition at each county and the Funing Paddy field:48600Yuan/mu,garden plot:49500Yuan/mu,
cultivated land output value and output times as well as County and forest land:7457Yuan/mu。
different comprehensive price in each county, the Guangnan
compensation standard for each county is shown in right side County Paddy field:26176 Yuan/mu。
of this table.
Yanshan
Dry land:34916 Yuan/mu
County
89
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Compensation Standards
Impac Entitled Number of entitled County with
Resettlement Policy
ts Persons units and persons project Rate
located
Qiubei Paddy field: dry
19120 Yuan/mu and 12880 Yuan/mu, land:
County 10380 Yuan/mu,and natural pool: 1000 Yuan/mu.
Temp Contracti 263 households with The compensation for temporary used land includes the Dili city Paddy field: 5156Yuan/mu,and Dry land: 4278 Yuan/mu
orary ng 971 person from 6 compensation for young crops, land loss and land reclaiming.Ancient
used househol villages The time of temporary used land is 1 year. The construction Paddy field:5364Yuan/mu
town zone
land ds unit shall take the responsibility or entrust the related unit for
Funing
the land reclaiming. 1860 Yuan/mu
County
Qiubei
1200 Yuan/mu
County
Fruit Owner 5 villages The tree owners will get compensation or transplanted cost Songming
1440 Yuan/mu
trees county
for all fruit trees fell or transplanted for the project Fruit tress: 30 Yuan/ea. for tree below 3cm and 120
Xundian
construction. county Yuan/ea. for tree of 10cm; and timber: 5 Yuan/ea. for tree
below 3cm.
5 Yuan/ea. for seeding, 30 Yuan/ea. for tree with fruits, and
Luquan
100 Yuan/ea. for tree with full fruits.
75 Yuan/ea. for tree with fruits, and 10 Yuan/ea. for fruit
Eryuan
tree without fruits
Masupo
35 Yuan/ea.
county
The collective house
The compensation will be paid according to replacement Compensation standard
of 100m2 in Dali city is
price for all houses and auxiliary facility, without
effected by the pipe Item Unit
Dali Lijiang city
Loss of depreciation, the usable material dismantled from old houses We
House network construction; pref Including Replac
relocat nsh
Owner belongs to resettling households. The new house plot will be ectu house plot ement
ed the collective an
of units, re price price
houses allotted for resettlers and resettlement subsidy will be paid to
collectiv management house 60
and Frame
es and relocation persons. The compensate standard is shown in Yuan/m2 1120 626.98
other m2 in Funing county;62
individu structure
attach- right of the table:
als households with 280 Brick-co
ments Yuan/m2 988 494.71
persons and 23 House ncrete
Brick-wo
enterprisers are Yuan/m2 350 861 367.9
od
effected, and relocation Earth-wo
Yuan/m2 770 276.81
od
90
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Compensation Standards
Impac Entitled Number of entitled County with
Resettlement Policy
ts Persons units and persons project Rate
located
area is of 64084.81 m2 Simple Yuan/m2 100
All
involved The relocated private-owned business households will be
Or loss persons: priority in renting shop in commercial street such as
in
busines Employer Guodahuama street, etc.. The compensation for stopping
s and business and transportation subsidy will be paid.
employee
Living Housing Three months before land acquisition and relocation, the
conditi leaser
on Project Owner shall inform the housing leaser in the effected
Ancient town zone
area about the land acquisition and relocation plan so that
housing leasers will have enough time to rent other housing.
Speci Owner Units of All special facilities affect by project will be moved and
al telecommunications,
reconstructed according to the actual condition and its
facilit Chinaunicom, China
y Mobile, and broadcast original function will be restored. The Project Office will
and television, etc.
consult with special facility Management Department on
compensation cost according to investment of recovery plan.
Produ Owner The production and living facility affected by construction
ction of
facility unit during construction should be maintained or restored so
and
living as to guarantee the normal usage of the facility during
facilit
y construction.
91
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Appendix 1:General Description of The Project
Yunnan Urban Environment Project (Kunming City)
Table 1
No Locatio Remarks
Project Project description Project impact Project owner Schedule
. n
① river monitoring system to Dianchi Kunming
Lake: 3 automatic monitoring stations
Land acquisition of 50m2 respectively for 3 automatic monitoring RAP
for the key inflowing rivers, 14 water Kunming
Enhanc stations for key inflowing rivers, total land acquisition of 0.65
quality monitoring stations for Environmental
ement mu for 14 river water monitoring stations (in which, land
inflowing rivers, 2 mobile monitoring Monitoring
of water acquisition of 20m2 respectively for 11 stations), which is used Jan. 2007
Kunmin stations, 2 mobile sampling vehicles Center/Kunmin
1 quality without payment, and there is no relocation.
g City and a set of experimental equipment; g ~Dec. 2009
monitor
Environmental
ing
② Supervisory control and management Information
capacity
information system for water pollution Center
No land acquisition (rebuilding of existing buildings)
aggregate and supervisory control
center
Land acquisition totals 125.2mu, including:
106.5mu in reservoir area, in which 31.8mu is farmland and
Luquan Solid waste plant and supporting
Solid facilities and the county solid waste 74.7mu is woodland; Luquan Waste
Yi and
waste 9mu farmland is requisitioned for access road; Disposal and Jul. 2007 ~
Miao management system;
2 manage 3m farmland for management zone; Transportation
Autono Solid waste disposal is 90t/d in scale Dec. 2008
ment in 6mu land for the environmental hygiene center, which is the Management
mous and total landfill site capacity is 895000
Luquan state reserved construction land; 0.7mu for transfer station, which Company
County m3
is state-owned construction land and used without payment.
Relocation is not involved.
Land acquisition totals 122.35mu for the project, in which:
Land acquisition in reservoir area is 105mu, including 97.2 mu
Solid
Sanitary landfill, auxiliary facilities, farmland and 7.8mu woodland;
waste
solid waste management system and 6mu farmland is requisitioned for access road; 4.5m farmland
manage Songmi Songming Jan. 2008
the existing refuse dumps; for management zone; 6 mu state-owned reserve construction
3 ment in ng Garbage
Mean disposal scale is 85t/d,and the land for the environmental health center; 0.7mu state-owned ~Aug. 2009
Songmi County Disposal Center
total storage capacity of landfill is reserve construction land for the transfer station.
ng
County 427200m3 3 refuse houses occupy 0.15mu land, which is the state-owned
construction land and used without charge.
Housing relocation isn’t involved.
92
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
No Locatio Remarks
Project Project description Project impact Project owner Schedule
. n
Urban Land acquisition totals 183mu, including 158mu in reservoir Refuse
solid Xundian area for sanitary landfill, 19.5mu for roads, 2.5m for the Clearing &
Sanitary landfill, garbage transfer
waste Hui and management zone, the above land is all of wasteland; and 3m Transport and
station, other public services and the Oct. 2007
manage Yi state-owned reserve construction land for 2 transfer stations. Disposal Center
4 existing refuse dumps;
ment In Autono Relocation is not involved. of Xundian Hui ~Mar. 2009
Mean disposal scale is 70t/d and the
Xundia mous and Yi
total landfill capacity is 550000m3
n County Autonomous
County County
93
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Yunnan Urban Environment Project (Dali Prefecture)
Table 2
Project covering
Proj Sc
Loc area (mu) Land
ect he
No. Project atio Project description Collec acquis Effect analysis Remark
State-ow own dul
n tive ition
ned land er e
land (mu)
It is to renovate the ground runoff drainage
system on the waste mountains and waste
mountain slopes, using water conservance land,
Comp meanwhile, build the anti-erosion protection
inception ditches,
rehen works for the river channel, build the valley
Mountain vertical grooves,
sive protection to incept the rolling rocks and mud.
Int slop protection for According
treat The land property and ownership won’t change
Int egr protection groove top end,
ment so that it has no unfavorable effect on the to
egr ate valley protection
of production and living of involved village
ate d primary
ecolo groups and villagers. Their income will be
d wa
gical increased after reconstruction as that the evaluatio
wat ter
envir farmland quality will be improved.
er en Treat m report
onme It is to restore vegitation on the waste Wat
env vir ment Jan
nt of mountains and waste mountain slopes, the er for
iro on of .
such Protection forest works is arranged on the gullies and use Reso
nm me Dal water 8513.1 20 feasibilit
small on mountain slope, conservation land for the work. The land urce
ent nta i and Eco-treat 08
I river tree and grass property and ownership won’t change so that it s y study,
al l Cit soil ment ~D
basins protection in river has no unfavorable effect on the production and Bure
ma ma y loss ec. it is
as valley living of periphery village groups and villagers. au of
nag na 20
Baita The vegetation coverage will be increased and Dali covered
em ge 10
qing, the quality will be improved. City
ent me in Dali
Fengl
of nt
eqing It is to treat the land in waste mountains and RAP.
Dal of
and slopes to reduce the risk of water and soil loss.
i Bo
Jingc Agro_tech The land property and ownership won’t change
Riv luo
er Ri
hangq nical Contour croping so that it has no unfavorable effect on the
ing. measures production and living of involved village groups
ver
and villagers. It will be favorable for water and
soil conservation.
Gravel protection Laying gravel on
154.35 The works is all in the existing Boluojiang
for 10.5 km long the riverbed to
94
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project covering
Proj Sc
Loc area (mu) Land
ect he
No. Project atio Project description Collec acquis Effect analysis Remark
State-ow own dul
n tive ition
ned land er e
land (mu)
river channel increase the
hydropilicity of the river channel. The exiting water conservation
river land will be used. The land property and
ownership won’t change so that it has no
unfavorable effect on the production and living
of involved village groups and villagers.
The works are arranged in existing Boluojiang
Eco-oriented banks
Restore the river channel and river banks, using the existing
(at the downstream
collapsed river water conservancy land. The land property and
collapsed river 45.42
sectios in existing ownership won’t change so that it has no
section (totally 10.5
river channel unfavorable effect on the production and living
km long)
of involved village groups and villagers.
Eco-oriented The works is to plant trees on the existing river
Green belt built on
riverbank works, bank. it has no unfavorable effect on the
bothbanks of the 94.5
(10km long in production and living of involved village
river
total) groups and villagers.
Envir
onme
Schemes of environmental management,
ntal All are managerial measures, without concerning land acquisition and
water quality monitoring and ecological
mana resettlement.
observation
geme
nt
95
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project covering
Loc area (mu) Land Sch
No Projec
Project atio Project description State-o acquisit Effect analysis t edul Rema
. Collecti owner
n wned ion e rk
ve land
land (mu)
Inception
It is to renovate the ground runoff drainage system on the Acco
ditches,protect
waste mountains and waste mountain slopes, using the
ion works for rdin
Eco water conservation land to build the anti-erosion
vertical
-en protection works for the river channel, build the valley g to
Mountain grooves,
vir protection to incept the rolling rocks and mud. The land
slope protection prim
on property and ownership won’t change so that it has no
protection works at
me unfavorable effect on the production and living of ary
groove upper
ntal involved village groups and villagers. Their income will
ends, valley eval
Wa rest be increased after reconstruction as that the farmland
protection
ter orat quality will be improved. uati
works
an ion
It is to restore vegitation on the waste mountains and Water om
d wor Protection
waste mountain slopes, the works is arranged on the
so ks forest on Resou in
gullies and use the waste mountains and slopes and water Jan.
il for Eco-treat mountain
conservation land for the work. The land property and rces 200 feasi
co Wa ment slopes,
ownership won’t change so that it has no unfavorable 8
1 ns nhu mesures protection 5079.9 Burea bilit
effect on the production and living of periphery village ~Dec.
er axi, trees / grass
groups and villagers. The vegetation coverage will be u of y
va Bai along the river 2010
increased and the quality will be improved.
tio hex Dali stud
n i
City y, it
w and
or Zh is
It is to rectify the lands in waste mountains and slopes to
ks ong
Agro-tec reduce the risk of water and soil loss. The land property cove
hex Contour and ownership won’t change so that it has no unfavorable
i hnical red
croping effect on the production and living of periphery village
sm treatmen groups and villagers, but it is good for water and soil in
all t conservance.
bas Dali
ins
RAP
.
96
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project covering
Loc area (mu) Land Sch
No Projec
Project atio Project description State-o acquisit Effect analysis t edul Rema
. Collecti owner
n wned ion e rk
ve land
land (mu)
Inception
It is to renovate the ground runoff drainage system on the
ditches,protect
waste mountains and waste mountain slopes, using water
Riv ion works for
conservance land build the anti-erosion protection works
ers vertical
for the river channel, build the valley protection to incept
hor Mountain grooves,
the rolling rocks and mud. The land property and
e slope protection
ownership won’t change so that it has no unfavorable
of protection works at
effect on the production and living of involved village
Xia groove upper
groups and villagers. Their income will be increased after
oga ends, valley
reconstruction as that the farmland quality will be
n protection
improved.
rive works 908.4
r, It is to restore vegitation on the waste mountains and
Protection
and waste mountain slopes, the works is arranged on the
forest on
, gullies and use the waste mountains and slopes and water
Eco-treat mountain
Ma conservation land for the work. The land property and
ment slopes,
ngy ownership won’t change so that it has no unfavorable
mesures protection
ong effect on the production and living of periphery village
trees / grass
rive groups and villagers. The vegetation coverage will be
along the river
r increased and the quality will be improved.
Contour It is mainly to reform the wasteland in mountains and st
Agro-tech
has no unfavorable effect on the production and living of
nical croping effected village groups and villagers And good for water
treatment
and soil conservation
97
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project covering
Loc area (mu) Land Sc Remark
No Project
Project atio Project description State- acquisi Effect analysis hed
. Collective owner
n owned tion ule
land
land (mu)
The works is all in the existing
Laying gravel Shibaxi river channel. The exiting
Layin Gravel on the water conservation land will be
g protection for riverbed to used. The land property and
256.59
gravel 31550m long increase the ownership won’t change so that it
works river channel hydropilicity has no unfavorable effect on the
of the river production and living of involved
village groups and villagers.
Integ
Integrat River Eco-oriented The works is all in the existing
rated Rehabilitation
ed water water Eco-o river bank Shibaxi river channel and river Jan.
wate will be made Water
environ enviro riente protection banks. The exiting water
r for the 200
mental nment d (at the conservation land will be used. The Resour
envir existing
manage treatm river downstream 169.64 land property and ownership won’t 8~ It is covered
onm damaged and ces
ment of Dali ent bank collapsed river change so that it has no unfavorable
ental collapsed Dec in Dali
1 Shiba City works protec section (totally effect on the production and living Bureau
mana dikes of
Creek in tion 23600mm of involved village groups and . RAP
geme Shiba Creek. of Dali
Changs long)) villagers.
nt of 201
han Eco-o The works is to plant trees on the City
Dali
Mountai riente Green belts existing river banks of Shibaxi 0
Rive Eco-oriented
n d arranged on River. It has no unfavorable effect
r river bank, 365.21
river the two rivr on the production and living of
81157m long
bank banks periphery village groups, villagers
works and recreation center.
Enviro
nment
Schemes of environmental management All are of managerial measures, not concerning land acquisition and
al
and environmental monitoring resettlement.
manag
ement
98
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project covering
Loc area (mu) Land Sc Remark
No Project
Project atio Project description State- acquisi Effect analysis hed
. Collective owner
n owned tion ule
land
land (mu)
For main drain, it is mainly to
Waste Rectangular main drain with a
Integrat water
Recons
dimension of 700×700, about
reconstruct the existing soil drain on
ed water Eryu tructio both sides of National Highway 214.
treatm 600m long, arranged on both
environ an n, and Hardening reconstruction will be
ent sides of National Highway
mental Cou dredgi conducted for sub-drains by making
schem 214; the sub-drain from the
manage nty ng of 0.87 use of existing residential drain and
e for households with a size of
ment and the channels. The land property and
Xiasha 400×400 is about 400m long,
of Dali existin ownership will not change so that it
nkou arranged between the
Yong’a City
Distric
g
households far away from
has no unfavorable effect on the
n River drains production and living of periphery
t wetland and main drain.
village groups and villagers.
99
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project covering area
Loc (mu) Land Sc
No Project Remark
Project atio Project description State-o acquisi Effect analysis hed
. Collective owner
n wned tion ule
land (mu)
land
It is planned to be on the idle land
Interga (belonging to house plots) within
Waste ted villagers’ yards in Xiashankou
water purific Village. The land property and
Intergated purification slots 1.3
treatm ation ownership will not change and it
(totally 14 sets)
ent slot will be used by the villagers so that
Enviro
Integr schem works it has no unfavorable effect on the
nmenta
ated Integrat e for production and living of households.
l
water ed water Eryu Xiasha Wetland area: 10050m2
It is necessary to requisition 21mu Protect
enviro environ an nkou Artifici Management house area: Jan.
ion
nment mental Cou farmland of Meihe Village in 2008
Distric al 40m2 Bureau
1 al manage nty 21 Youshuo Town. 64 persons from 12 ~
t wetlan Plant disposal zone: 280m2 of
mana ment and households will be involved in land Dec.
d Road and reserved land: Eryuan
geme of Dali acquisition and resettlement. 2008
3490m2 County
nt of Yong’a City
and
Dali n River Constructing natural bank
It is arranged at river bed and dike Dali
River revetment of primary form,
land for water conservancy. The City
dike Dike arranged from the new
land property and ownership won’t
constru constru Dengbei Highway on
Yong’an River to 1950m 3 change so that it has no unfavorable
ction ction
effect on the production and living
project project downstream
of periphery village groups and
-Planting grass above the
villagers.
mean water level
100
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project covering
Land
area (mu)
Locatio acqui Project Schedu
No. Project Project description State-o Colle Effect analysis Remark
n sition owner le
wned ctive
(mu)
land land
Natural-type bank
revetment
(arranged from
Qingsuo check It is arranged at river bed
and dike land for water
gate to 380m
conservancy. The land
downstream the
property and ownership
Schemes river ) -
Integr 3 won’t change so that it
for river cement-rubble
ated has no unfavorable effect Environ
environme foundation will be
Integrat water ntal built on both sides
on the production and mental
ed water enviro living of periphery village Protecti
Eryuan protection of riverbed and
environ nment Dike groups and villagers. on
County and grass will be Jan. 2008
1 mental al construction Bureau
and dredging planted above the ~ Dec.
manage mana project of
Dali and sludge flood level 2008
ment of geme Eryuan
City resources 1000m artificial
Dali nt of County
and dike and natural shore It is arranged at river bed
River Yong’ constructi
and Dali
protection of many and dike land for water City
an on project kinds (arranged conservancy. The land
River
1000m upstream property and ownership
Jiangwei Bridge in 6 won’t change so that it
Dali Highway) has no unfavorable effect
-cement-rubble on the production and
foundation and living of periphery village
revetment will be groups and villagers.
built in riverbed.
101
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project covering
Land
area (mu)
Locatio acqui Project Schedu
No. Project Project description State-o Colle Effect analysis Remark
n sition owner le
wned ctive
(mu)
land land
It is arranged at river bed
The section from and dike land for water
Dali Highway to conservancy. The land
the estuary will property and ownership
13.5
not be cleaned up won’t change so that it
but the 1.5km long has no unfavorable effect
dike will be on the production and
heightened. living of periphery village
groups and villagers.
Water
environme Environmental management scheme
All are providing management measures, and no land
ntal and water quality monitoring
acquisition and resettlemtn is required.
manageme scheme, etc.
nt scheme
Meihe Build steel-casing solar-heated
Village methane tanks. The size is 200m3,
concentrat with daily manure treatment
In Policy
ed capacity of 3.46 tons, daily methane Location is not decided yet.
Framworks
methane production of 100m3, liquid organic
tank fertilizer 10 tons and fine organic
works fertilizer 0.2 tons
102
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project covering
Land
area (mu)
Locatio acqui Project Schedu
No. Project Project description State-o Colle Effect analysis Remark
n sition owner le
wned ctive
(mu)
land land
Intensed
Purificatio
treatment for
n system
man-made Works covers the
for
wetland and three linked
polluted
purification watlands at
river water Location is not decided yet
for Dongdeng,
from
less-poluted Geguanying and
Donghu
water from Liuguanying
Lake
natural
wetland
wetland
Eco-restor
Restore the plants at lakeside,
ation
improve the eco-environment at
works at
lakeside, strengthen the eco-system
lakeside Location is not decided yet
at the place where the river enters
where the
the lake, diversify the plant species,
river enter
to provide a good environment.
the lake
103
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project covering
area (mu) Land
Project Schedu
Project Project description Collec acquis Effect analysis Remark
State- owner le
tive ition
owned
land (mu)
Revetment with
Revetmen cement-rubble (15.253km
t project on one side), and it needs
The project is planned
to occupy land of 46mu.
River to arrange within
There are 76 places where
ecolo riverway and dikes on
the levee toe is suspended
No Loca gical Levee toe Miju River, all is
in the upper and middle
. tion restor Ecological repair riverway land for water
reaches (0+000~14+600).
ation dike project conservancy. The land
It needs to occupy land of
and construction 510 property and ownership
13mu.
conse project on won’t change and it has
The whole river sections,
rvatio Miju River Dredging no unfavorable effect
it needs to occupy about
n project on the production and
400mu land.
proje living of periphery
Mainly distributed 6.8km
ct village groups and
Dike upstream the Qingsuo
villagers.
extension flood-diversion sluice, and
project it is necessary to occupy
about 51mu land
104
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project covering
area (mu) Land Projec Sch
Loca Rema
No. Project Project description Collec acquis Effect analysis t edul
tion State- rk
tive ition owner e
owned
land (mu)
It is arranged on Xizha riverway,
and all is river land for water
Flood Check gate from Miju
Flood conservancy. The land property and
diversion River to Xizha River ,
control 33 ownership won’t change and it will
works on (with a treatment length
project have no unfavorable effect on
Xizha River of 5.543km)
Int Int production and living of periphery
egr egr groups and villagers.
ate ate Rehabilitation of dike It is to green the dyke at two sides of
Environ
d d Ecological vegetation(replanting the river and it will have no
mental
wat wat rehabilitation drought-enduring trees 50 unfavorable effect on production
protectio
er er project on dike of the whole and living of periphery groups and
River n project
env env river section) villagers.
ecologi
iro iro Eryu Arrangement of sand Enviro
cal Basis
n n an beaches along lakeside, nment
rehabili restoration
me me Cou with a total land al
1 tation project
ntal ntal n ty occupation of 262mu Protec Jan.
and
ma ma and Ecological rehabilitation tion 200
conser The project is planned and arranged
nag nag Dali Ecologic Ecological at the estuary along Burea 8 ~
vation on the sand beaches of the Erhai
em em City al rehabilitation lakeside of Miju River u of Dec
project Lake around the exit of Miju River,
ent ent rehabilita project with a total land Eryua .
of of and all is flood land. The land n 200
tion and occupation of 5.34mu
Dal Mij 271.8 property and ownership won’t Count 9
protectio Trash rack Setting up trash rack at
i u change, and it will have no y and
n project construction the estuary of Miju
Riv Riv unfavorable effect on production Dali
of the project River
er er and living of periphery groups and City
estuary Arranging ecological villagers.
Ecological stops on the sand
stop beaches to the north of
construction entrance of Miju River,
project with land occupation of
4.46mu
105
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project covering
area (mu) Land Projec Sch
Loca Rema
No. Project Project description Collec acquis Effect analysis t edul
tion State- rk
tive ition owner e
owned
land (mu)
Water All project-used land is flood
Pollution
Water source The desilting basin is 5 land in southeast part of Zibihu
control
source conservat mu and compound Reservoir. The land property and
project of
conserv ion intensified disposal 180 ownership won’t change and it will
water of Mici
ation project zone of hydrobios is have no unfavorable effect on
River into the
project of Zibi 175mu production and living of periphery
lake
Lake groups and villagers.
106
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project covering
area (mu) Land Proje
No Locati Sche
Project Project description State- acquisition Effect analysis ct Remark
. on Collectiv dule
owne (mu) owner
e land
d
After pretreatment 42mu land is required to be
Advance in desilting basin requisitioned in Handeng of
pool project Dazhuang Village, Zibihu
(6.0 mu), the water
on west Town, including 32mu fish
goes into the
side of Zibi anaerobic pool (6.0 ponds and 10mu garden
Lake (42mu mu), then goes into plots. It is owned by Eryuan
42
Inte idle land on County Government and
the facultative basin
grat the west managed by Zibuhu Town
(10.0mu) , and
ed side of Government. Now, it is
finally flows into Envir
wat Water Fengyu leased to farmers (5 persons
Integrate Wat
sourc River)
the aerobic basin
of 1 household) for breed onme
er er (20.0 mu) ntal
d water e aquatics.
envi Eryuan sour Prote Jan.
environm conse Ecological The project is planned to be
ron County ce ction 2008
ental rvatio rehabilitatio on reservoir water surface
1 men and cons Burea ~
managem n n project of and the occupied land is land
tal Dali ervat u of Dec.
ent of projec outer lake of Reservoir. The land
man City ion Eryua 2009
Miju t of of Zibihu Submerged plant property and ownership
age proj 1100 n and
River Zibi Lake (the rehabilitation won’t change and it will not
men ect Dali
t of Lake outlet at have unfavorable effect on
City
Dali southeast irrigation, and production
Riv end of and living of periphery
er Zibihu) groups and villagers.
All are managerial measures without concerning land use and
Tourism pollution control project
resettlement.
Scheme for operation and
management and ecological All are managerial measures, without concerning land use and
environmental monitoring of Zibi resettlement.
Lake
107
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project covering
area (mu) Land Proje
No Locati Sche
Project Project description State- acquisition Effect analysis ct Remark
. on Collectiv dule
owne (mu) owner
e land
d
560mu land in the advance
reservoir area of Haixihai
Advance
Reservoir will be occupied.
purification
The land property and
reservoir Reconstructing the
ownership won’t change and
project for existing advance
560 it will not have unfavorable
water from reservoir with an
effect on irrigation,
diversion area of 560mu
aquatic product, and
culvert into
production and living of
reservoir
periphery groups and
villagers.
It is to reform the deserted
hills, and forest land after
Water
Reconstructing reformed will belong to the
sourc
Ecological ecological original villages, it won’t
e
reconstructi vegetation for the concern land acquisition and
conse
on project lime kiln and resettlement and will not
rvatio
of the deserted land of have unfavorable effect on
n 560
deserted mine on the south production and living of
projec
land of side of the periphery groups and
t of
mine (lime 34-opening bridge, villagers. Their income will
Haixi
kiln) with an area of be increased as long as
hai
58000 m2 increasing of land usage
percentage and forest land
quantity.
The land in Haixihai
Ecological Reservoir will be occupied.
rehabilitatio Rehabilitation for The land property and
n project totally 3000m long ownership won’t change and
for collapsed reservoir it will not have unfavorable
279
collapsed banks on both banks effect on irrigation,
reservoir and 270mu beach aquatic product, and
bank and land on north bank production and living of
beach land periphery groups and
villagers.
108
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project
covering area
Land
Loc (mu) Projec
No acqui Sche
Project atio Project description Coll Effect analysis t Remark
. State- sition dule
n ectiv owner
owne (mu)
e
d
land
Silt project of biological The purpose of the project is to
fence increase the forest coverage
Gully treatment project, around the reservoir, improve
Ecologi establishing managerial woodland quality and decrease
cal measures and check dam water and soil loss. The project is
system Combined system implemented on land with
Inte Water
protecti thinning woodland and
grat Water source project of artificial grass
on and forest (converting shrubbery. Forest zone has no
ed Integ source conservati
project 8250 herds (in this area, domestic Envir
wat rated conservatio on project the land for forestry)
of Reconstruction project animals are raised in shed onme
er water n project of
Ery woodlan of inefficient forests mainly). ntal
envi envir Haixihai
uan d and The land property and ownership Protec Jan.
ron onme Cou semiarid won’t change and the green zone tion 2008
1 men ntal nty land will not have restriction so that it Burea ~
tal mana Protective measures for
and land ecological system has no effect on the production u of Dec.
man geme Dali and living of periphery groups Eryua 2009
age nt of City and villagers. n and
men Miju Dali
Water
t of River City
resources
Dali
regulation
Riv
and control
er Hydrometric system construction of water quality
and All are managerial measures without concerning land
of Miju River and management scheme of
ecological acquisition and resettlement
industrial waste disposal and standardized effluent
environmen
tal
manageme
nt
109
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project
covering area
Land
Loc (mu) Projec
No acqui Sche
Project atio Project description Coll Effect analysis t Remark
. State- sition dule
n ectiv owner
owne (mu)
e
d
land
The hardening alteration will be
conducted mainly for the
Pollution
channels in river. All used land is
Pollution control
land of irrigation and drainage
source project
Reconstructing 3 existing irrigation facilities. Its property and
control of
channels into ecological cement ownership won’t change so that it
project ditches 9
Integ irrigation channels, with a has no unfavorable effect on the
along and Envir
rated reconstruction length of 13km production and living of
Luoshi channels onme
water periphery village groups and
Erh River into the ntal
envir villagers. The income of farmers
ai river Protec Jan.
onme will be increased after farmland
Cou irrigation condition improved. tion 2008
ntal nty Burea ~
1 mana and Ecological protection scheme for u of Dec.
geme Dali Eryua 2009
wetland in western Xihu (1.036 It is planned to plant various
nt of Ecological
City million m2) water plants by taking use of the n and
Luos rehabilitati Ecologic Dali
Project scheme for intensified existing Xihu water surface. Its
hi on and al
rehabilitation area of the villages property and ownership won’t City
River water protectio
(449000 m2) change so that it has no
quality n and 4230
Project scheme for wetland ecological unfavorable effect on the
purification control
reconstruction area of Xihu (1.282 irrigation function of reservoir as
project of project
million m2) well as production and living of
Xihu in of Xihu
Project scheme for ecological periphery village groups and
Eryuan
rehabilitation area of wetland in villagers.
eastern Xihu area (53000 m2)
110
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project covering area Proje
Land
No Locati (mu) ct Sche
Project Project description acquisiti Effect analysis Remark
. on State-owne Collecti owne dule
on (mu)
d ve land r
It is required to requisition 55m
land, all belongs to collective
farmland of Xihu and
Purification Zhangjiadeng villages of
Purificat project of runoff Youshuo Town and now it is
ion 55
into the lake from distributed to the villagers for
system Yuejing River cultivation, belonging to
Polluti of non-contracted land. 302
Inte on wetland persons from 91 households are
grat control at the affected by land acquisition.
Ecolog
ed project estuary It is necessary to requisition Envi
Integra ical
of the (of Purification ronm
wat rehabil 15 mu land, and all are ponds
ted rivers Yuejing project for runoff ental
er itation belonging to the collective land
water into River, from Qingshuigou 15 Prote
envi Eryuan and of Qingshuigou in Xihu Jan.
enviro the Qingshu Channel into the ction
ron County water Village, without concerning 2008
nmenta lake igou lake Bure
1 men and quality resettlement. ~De
l and Channel au of
tal Dali purific It is planned to take use of reed c.
manag channe and Eryu
man City ation land ( planted with various 2009
ement ls Gaojiayi an
age project
of Purification in
water plan) the range of Xihu
men ng and
Luoshi of project for runoff land. The land property and
t of Channel Dali
River Xihu, from Gaojiaying 24 ownership will not change and
Dali ) City
Eryuan Channel into the it has no unfavorable effect on
Riv
lake the production and living of
er
periphery village groups and
villagers.
Water It is necessary to occupy
exchan Culvert Zhangjiadeng temporarily 7.28mu road land
ge and arrange Road, Dongdeng and it will be restored after
7.28
improv ment Road and construction completion,
ement project Nandeng Road without concerning land
project acquisition and resettlement.
111
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project covering area Proje
Land
No Locati (mu) ct Sche
Project Project description acquisiti Effect analysis Remark
. on State-owne Collecti owne dule
on (mu)
d ve land r
of It is on deserted dykes of fish
Xihu pond (due to converting pond
into lake in 2003) and it belongs
Pond
to Xihu land scope. The land
ridge Dongdeng Village
property and ownership will not
demolis and Nandeng 1.42
change and it has no
hing Village
unfavorable effect on the
project
production and living of
periphery village groups and
villagers.
Culvert
arrangement (in
the connecting Temporary land occupation of
0.07mu is required, all is road
roads between
land and will be restored after
Qingshuitang and 0.07
Dongdeng as well construction completion
Water as between without concerning land
exchang acquisition and resettlement.
Zhongdeng and
e
Dongdeng)
capacity
build-up Riverway 6.5mu farmland is required to
project broadening and be requisitioned, including
of excavation 3.8mu of Zhangjiadeng Village
village (riverway and 2.7mu of Zhongdeng
areas widening in Village in Xihu Village,
Zhangjiadeng and 6.5 Youshuo Town. All is
Dongdeng and cropland formed by farmers’
riverway filling the lake, belonging to
excavation in non-contracted land. 48 persons
Zhongdeng and from 12 households are affected
Nandeng) by land acquisition.
112
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project covering Land Pro
N Loca area (mu) acquisi ject Sche Remark
Project Project description Effect analysis
o. tion State-o Collecti tion ow dule
wned ve land (mu) ner
It is planned to reconstruct the
bank slope at west side of Xihu.
The 2.0km long place The land property and ownership
Implem easy to collapse in will not change and it has no
6
entation Linshan on the west unfavorable effect on the
of dike side of Xihu production and living of
periphery village groups and En
rehabilit
Int Int ation villagers. vir
egr 2.5km in Dengchuan on
egr Integrated Dredging project
ate Town and downstream 7.5 me
ate dredging Project of in
d The project is entirely executed in nta
d and Luoshijiang 18.29k river section
wat riverway and dyke, which is of l
wat ecologica River m long 2.5km in the section
er riverway land for water Pro
er l riverwa upstream entrance of
env 7.5 conservancy. The land property tect
env rehabitati y of Luoshi River and
iro Eryu and ownership will not change ion
iro on project Luoshiji Erhai
nm an and it has no unfavorable effect Bu Jan.
nm of ang 1.0km upstream and
ent Cou on the production and living of rea 2008
ent Luoshijia River downstream the
1 al nty periphery village groups and u ~
al ng River confluence of 3
ma and villagers. of Dec.
ma Longwangjian and
nag Dali Ery 2009
nag Luoshijiang rivers
em City uan
em Water Co
ent
ent quality Ecologi Revetment adopts unt
of
of protection cal cement- rubble Land use has been listed in that of y
Lu
Dal of revetme +monolayerporous river improvement project. and
osh
i Luoshijiang nt concrete ball. Dal
i
Riv River i
Riv
er Water Capacity build-up project of water environmental Cit
er
environm protection of Luoshijiang Project y
ental
managem Water environmental and ecological monitoring All are of managerial measures, without concerning land
ent scheme of Luoshijiang River acquisition and resettlement.
project
Environmental management measures for
and
Luoshijiang River
measures
113
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 2 (Continued)
Project covering
Loc area (mu) Land Sche Remark
No Project
Project atio Project description State- acquisition Effect analysis
. Collectiv owner dule
n owne (mu)
e land
d
Constructing domestic wastewater Land acquisition of 1.2mu is required and 21
treatment facilities in one natural 1.2 persons from 4 households will be affected by
villages resettlement.
The project is a public facility and it is planned to
Rural construct on idle land (unused land) of all natural
Environm
non-poi Ery villages, without concerning land acquisition. The Jan.
ental
nt uan land ownership won’t change, it will be
Building 51 public toilets 4 Protectio 2008
pollutio Cou provided to villages and groups without charge,
n Bureau
2 n nty and it has no unfavorable effect on the production ~
of Eryuan
control and and living of periphery village groups and
County June
in Dali villagers.
and Dali
Erhai City It is planned to build in the idle yards of all 2009
City
Basin households (partial house plot). The land property
and ownership won’t change, it will be provided
2545 sanitary toilets 3.82
to the villagers without payment, and it has no
unfavorable effect on the production and living of
villagers.
It is necessary to temporarily occupy road land of
Urban
28mu and will be restored after construction Eryuan Jan.
Draina
completion. In addition, the pipe network of the County
ge 2008
town will be constructed by section and time, Water
System Dali Xizhou
3 Sewer network 28 temporary construction sidewalk will be made and Supply ~De
under City district
the road surface will be restored timely. Therefore, and
Dali c.
project construction results in no impacts on 130 Drainage
Jurisdic
households of privately-owned business along Co.Ltd 2008
tion
Caiyun Street and Shihu Street.
114
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project covering
Loc area (mu) Land Sche Remark
No Project
Project atio Project description State- acquisition Effect analysis
. Collectiv owner dule
n owne (mu)
e land
d
The project needs to occupy 33mu road land and it
will be restored after construction completion. In
addition, the pipe network of the district is mainly
laid on the vehicle lanes of peripheral roads of the
ancient town, not on the main commercial streets
Ancient
Sewer network and and with relatively little pedestrian flow, and the
Dali Town 33
rainwater pipe network road is spacious. It is construction by section and
district
time period, temporary access road will be set and
the road surface will be restored timely, therefore,
there will be no impact on 398 privately-owned
business households along Bo’ai Road and
Pingdeng Road.
Dali
It is necessary to temporarily occupy road land of
tourism and Sewer network and
40 40mu and will be restored after construction
vacation rainwater pipe network
completion.
zone
It is necessary to temporarily occupy 30mu land,
Fengyi Sewer network and
30 including road land 16.5mu and farmland 13.5mu,
District rainwater pipe network
and will be restored after construction completion.
Waste The project needs to requisition 7.34mu collective
water Wastewater treatment plant,1200T/d garden plots in Lianghe natural village of Zhonghe
7.34
treatme for short term,1600T/d for long-term Village of Dengchuan Town and the affected
nt plant resettlers are 70 persons from 16 households.
and
Eryuan Jan.
associa
County
ted Ery 2008
Water
sewer uan
4 Supply ~
networ Cou
and
k of nty Dec.
Associated sewer network Drainage
Denchu
Co.Ltd 2009
an
Town
in
Eryuan
County
115
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Project covering
Loc area (mu) Land Sche Remark
No Project
Project atio Project description State- acquisition Effect analysis
. Collectiv owner dule
n owne (mu)
e land
d
Sanitary landfill (91.5 mu);
management facility zone
(4.5 mu); internal road and
The project needs to requisition 165.5mu land,
Sanita drain (3mu); temporary
including 94.8 mu farmland of Songhe Village and
ry storage section of Jan.
165.5 Dasongdian natural village, and 70.7 mu sparse Eryuan
Solid landfil overburden soil (15mu); site
Ery woodland. The affected resettlers are 83 persons County 2008
waste l afforestation (15 mu); newly
uan from 19 households. Environm
5 manage constructed access road (11 ~De
Cou ent and
ment in mu) and reserve 25.5 mu
nty Sanitary c.20
Eryuan land for long=term use
Station
Piping The project needs to temporarily occupy 08
for
Pipe dia. 100mm,12km in road land for 9 mu, which will be restored
seepag 9
e
length after construction completion. It doesn’t
liquid concern land acquisition and resettlement.
116
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Yunnan Urban Environment Project (Lijiang City)
Table 3
Project
No. Project Location Project description Land use condition Schedule Remark
owner
21.6 mu collective land will be RAP for
①Sewage intercept pipe D400~900mm, total pipe length Huaping
requisitioned for the wastewater sub-projects
Wastewater 42.56m Water
Huaping treatment plant and temporary use Jul. 2008 of LIjiang
1 management in ② wastewater treatment plant project with total construction Supply and
County land for the pipe network is 180.6 ~Feb. 2010 City
Huaping County scale of 12000m3/d, 6000 m3/d for the near future and mu, which is all of construction land,
Sewerage
6000m3/d for a long term.. without concerning relocation.
Co., Ltd.
① Construction of No. 2 Wastewater treatment Plant with a The land acquisition for No.2 RAP for
3
scale of 70000m3/d (20000 m /d for the near future and wastewater treatment plant is 88mu sub-projects
50000 m3/d for a long team), including construction of and temporary use land for the Lijiang of LIjiang
Lijiang City Ancient wastewater disposal facilities and associated sewer network associated sewer network is 78.92 Water City
Aug. 2008
2 WWTP and Sewer town and auxiliary facilities. mu, which is all of construction land. Supply and
~May 2010
Network zone ②Associated sewer network: the sewer main network with The ingoing and outgoing section Sewerage
d400~d1800mm in downtown area of Lijiang City, Xintuan will occupy temporarily 21.85 mu Co., Ltd.
District and Yulong County totals 23125m. land. The project will not concern
③Ingoing and outgoing pipe section is 2913m. relocation.
The project is within the range of RAP for
planned new Yulong city while the sub-projects
Yulong County Yulong
Yulong The rainwater effluent pipe network to be constructed is 52 planned land for new Yulong city has Dec. 2007 ~ of LIjiang
3 rainwater drainage Construction
County km. been requisitioned, therefore, the Nov. 2011 City
system Bureau
project won’t concern land
acquisition and relocation.
Total land occupation of the project RAP for
Construction of a new sanitary landfill with a mean disposal is 233.48 mu, in which 195 mu sub-projects
scale of 270 t/d is to be built and the required storage capacity woodland is requisitioned for refuse of LIjiang
Solid waste Ancient is 2 million m3; disposal plant, 35m farmland for Lijiang City
Jun. 2008 ~
4 management in town Construction of office building of management agency; business center, and 3.48mu for Construction
Aug. 2009
Lijiang City zone Refuse transfer station, updating of refuse clearing & transfer station (state-owned Bureau
transport equipment, and increase and updating of street reserved land and used with charge).
refuse collector. The project doesn’t concern
relocation.
Lijiang RAP for
Wastewater The planning scope is 31.57ha.
Ancient Demolishing of the existing incompatible architectures and Ancient sub-projects
management in Requisitioning 1.87 mu construction May 2007
5 town construction of municipal infrastructure and supporting Town of LIjiang
Lijiang Ancient land (house plots) and using 311 mu ~Dec. 2007
zone tourism facilities. Management City
Town state-owned construction land.
Co., Ltd.
117
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Yunnan Urban Environment Project (Wenshan Prefecture)
Table 4
No. Project Location Project description Land use condition Project owner Schedule
Construct Harnessing scope: For Land occupation is about 30mu, all is of river land
dry rubble Puting River, 1.2km river for water conservancy. The land property and
Rive bank
bank section from lower reach of ownership won’t change and is acquired without
revetment
revetment Caihong Bridge to the water payment by assignment. It won’t concern land
for 18.4km taking dam of Hydropower acquisition and resettlement.
Constructing Station on Puting River; Land occupation is about 53 mu, all is of river land
River
11.9km river For Hongmeng River, 1.1km for water conservancy and is acquired without
inspection
inspection river section from the old payment by assignment. It won’t concern land
road
road power station to the acquisition and resettlement.
River confluence of Dang’a River; 20mu farmland will be temporarily occupied to
River
dredging of For Dang’a River, 2.0km stock sludge and it will affect 26 persons of 7
dredging 3
river section from the place
6000m households. Hongxing
Integrated Constructing joining Hongmeng River to Land occupation is about 121.03 mu, all is of river State-owned
management of Funing River a landscape Naping Village; land for water conservancy and is acquired without Assets
Mar. 2007
1 landscape zone of For Gepu River, 0.7km river payment by assignment. It won’t concern land ~ Feb.
Puting river in County Business Co.,
80690m2 section from Liushui fishing acquisition and resettlement. 2011
Funing County Ltd. of Funing
base to old bus passenger
County
transport center;
For Limeng River, 3.5km
river section from the north
side of the development
district to the confluence of Land occupation is about 6.3 mu, all is of river land
Bridge on the Building 4 Puting River; for water conservancy and is used without payment
river new bridges For Moshao River, 0.48km by assignment. It won’t concern land acquisition
river section upstream the and resettlement.
place to joining Puting River;
For Yulin River, 0.2km
upstream the confluence
into Puting River
Pollution 82 mu flood land will be occupied by the project.
Puzhehei Tour
Puzhehei Lake control for 14 wastewater treatment systems in 8 The completed project will be used and managed Feb.
Qiubei villages, with a total disposal capacity of Development
2 in Qiubei villages in by local village. The land property and ownership 2008~
County Co.Ltd in
County river basin 3500m3/d; won’t change and no land acquisition and Dec. 2009
Qiubei County
and resettlement is involved.
118
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
No. Project Location Project description Land use condition Project owner Schedule
improvement Building ecological toilets for 105
of the 3 mu land is required to be occupied and it is
households, 7 biological cleaning public
people’s planned on the idle land in the villages or farmers’
toilets, 110 dispersive two-compartment yards. The land property and ownership won’t
living
water-logged compost system, 230 refuse change, without payment and without concerning
environment
collection sumps, and total disposal land acquisition and resettlement.
capacity for solid wastes is 120t/d.
The project is executed entirely in river and needs
Taking engineering measures such as setting
Harnessing of to occupy land of 448 mu, all is collective unused
up trash racks, regulating lock, wetland at
the four rivers land. The land property and ownership won’t
flood plain, and overflow weir for four rivers
flowing into change and is used without charge by assignment,
of Yuezhe, Xinzha, Laojiugou and Bailonghu
the lake without concerning land acquisition and
to establish overflow artificial wetland.
resettlement.
511.32 mu is for permanent occupation and 340.0
The river improvement is consisted of bank
mu for temporary. All is state-owned land and
protection and strengthening and construction
Panlong River will be used in free of charge. Now partial land is
Wenshan River of ecological dike, totaling length of
3 Wenshan County planted by near villagers in free of charge. A
County improvement 12.39km. Of which it is 9.83km from
Town Area season before the project construction, farmers will
Huitugiao to Panshui river and 2.56km from
be informed to stop planting so to reduce the loss of
Chengnan Park to Niutou village.
young crops for farming households.
119
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
No. Project Location Project description Land use condition Project owner Schedule
It is planned to have treatment on 23600.73 hectare
land in Dehou, Gongdian and Binglie towns. The
land property and ownership won’t change. It is
rainy season in May ~ Oct. in Wenshan district,
not rainy season after Oct ~ Apr. in next year.
The slope of 17 creeks in Dehou, Gongdian
The major crop of tobacco is planted by the end of
and Binglie towns at upstream Panlong River
May and harvested by Oct., and the corn is planted
will be terraced for 1726.93 ha.. By methods
in Apr.~May and harvested in Aug.. The
Treatment of of planting the water and soil conservation
construction can be carried out in Nov. ~Apr. , not
water and soil woods and economic and fruit trees (3438
in the rainy season. The slope terraced will not
lost ha.) as well as grass and soil conservation
have influence on agricultural production. The
cultivation and closure (4466 ha.), the
terraced slope has functions of conservation in
treatment with of area 122.9775 km2 is
warm, water, and fertilizer, and increasing output at
implemented.
the same time.
The households are benefited from afforestation
and planting trees.
The closure means to prohibit the disordering fell,
and closure has no influence on households.
It has no resettlement involved.
Wastewater The wastewater treatment plant project will occupy
4 management in ① the wastewater treatment plant with a capacity of 8000t/d 35 mu land, including 1.4mu farmland in Duanfeng
Funing County Village and 33.6mu test fields of the county Guangnan
,
for near future (2010) and 16000t/d for long term (2020); Apr. 2007
Guangnan Water Supply
minority middle school (cash paid for using). Land ~ Jun.
Wastewater County ② associated sewer network is 14.892km , with diameter acquisition will affect 8 persons of 2 households.
and Sewerage
2008
5 management in D=300~900mm. Company
The sewer network project will occupy temporarily
Guangnan
44.67 mu road land.
16.35mu farmland will be requisitioned by the
project, including 13.73mu in Chongtou Village
and 2.62mu in Laodifang Village and 128 persons Environmental
① a project within the wastewater treatment plant with a
Wastewater of 30 households will be affected. Protection Apr. 2008
Malipo capacity of 5000m3/d;
6 management in The pipe network is formed by notch and is used Bureau of ~ Dec.
County ② constructing 13.193km long sewage intercept pipes along
Malipo County along Chouyang River and road. The temporary Malipo 2008
Chouyang River.
land (land used for road) occupation is 40.11mu County
and will be restored after the construction, without
concerning land acquisition and resettlement.
The wastewater treatment plant project needs to
Wastewater ① constructing a wastewater treatment plant with wastewater requisition 22.45mu farmland in Donghu Qiubei Water
treatment capacity of 6000 m3/d; Oct. 2007
management in Qiubei Community and 92 persons of 20 households will Supply and
7 ~ Aug.
Qiubei County County ② building 22.827km long sewage pipe network in the range be affected by land acquisition. Sewerage
2009
(WWT) of 6.76 km2 in Qiubei county town. The pipe network project will temporarily occupy Company
road land for 31.89mu.
120
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
No. Project Location Project description Land use condition Project owner Schedule
The water plant project will occupy 9.7mu
①building a water plant with a capacity of 6000t/d for near scattered forest land in Qiaotou group of
future and 16000t/d for long term; and reforming of Qiubei No. Matoushan village. The length of access to the
2 water plant and increasing a group of activated carbon site is 821.94m, and 8.35 mu land will be
adsorption filter equipment acquisitioned, which is the scattered forest land in
②Reconstructing a DN600 gravity water diversion pipe for Qiaotou group. No land acquisition needs for No. 2
2.2km, a DN400 pressure water diversion pipe for 1.5km, and water plant.
a DN100~ DN30 water supply pipe for 19.902km ; The gravity pipe and pressure pipe project will
temporarily occupy 38.85mu land, involve four
③ Structures and elements with relation to water supply
groups of Jiucheng, Matoushan, Xiaoxinzhai and
Wastewater system, including intake heading, lifting pump station and Qiubei Water
Qiaotou in Matou village, and have affect on 80 Nov. 2007
management in Qiubei inspection chamber, etc. Supply and
8 households with 240 persons. The county main ~ Mar.
Qiubei County County ④ Protection of watershed: protection of Longtan pond in water supply system will occupy the land (used for
Sewerage
2009
(WS) Jiucheng and the existing water source, including raising the road) 60 mu, and pass through streets of Puzhehei, Company
dyke height and placing masonry for dyke and the protective Zhongyang, Xizheng, Caiyun and Donghu, etc. .
wall of wire mesh around Qingtan and Longtan; The water supply project will occupy 0.22mu land,
⑤ Lifting pump station of raw water: building a lifting which is state-owned reserved construction land
pump house with scale of 9000 m3/d for the near future and and is used without charge by assignment.
19000 m3/d for a long term at the reserved area. Protection of watershed: no land acquisition and
house relocation.
Lifting pump station of raw water: it is constructed
at the reserved area in the existing lifting pump
station, no land acquisition and house relocation.
1)Reconstructing confluence pipe in the old urban area:
DN400-DN1000, PE pipe for 12km.
2) Constructing sewage branch pipe in the old urban area:
DN400-DN700, PE pipe for 20km.
3)Constructing rainwater pipe in the old urban area: Wenshan
Wastewater Jan. 2008
Wenshan 57mu road land will be temporarily occupies by the Water Supply
9 management in DN400-DN1500,reinforced concrete pipe for 26km. ~ Aug.
County project. and Sewerage
Wenshan County 2008
4) Increasing sewage pipe at two banks of Panlonghe New Corporation
Plan Area: DN400-DN900,PE pipe for 17km.
5) Increasing sewage pipe at two banks of Panlonghe New
Plan Area: PE
DN500-DN1200, pipe for 11.9km (in which, the
2
push bench is 9.8km); the area of project service is 19km .
and
121
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
No. Project Location Project description Land use condition Project owner Schedule
62.55mu road land which will be temporarily Yanshan
Urban Drainage occupied by the project will be restored after Water Supply Apr. 2008
Yanshan Constructing D300~ D1200 rainwater pipe for 10.77km in the
10 system in construction. The waste canal is constructed by and ~ Sept.
County planned area of Yanshan County and waste canal for 1.1km.
Yanshan County taking use of existing nature canal, no land Sewerage Co., 2008
acquisition. Ltd.
Total land occupation is 127.5mu, including 90 mu
A new sanitary landfill will be built in the place 3km to the (in which 60.0 mu is farmland, 20.0mu garden land
north of Funing County and the project design scale is defined and 10.0mu farmland) for landfill, 3 mu (farmland)
Solid waste as 70t/d and storage capacity 670000m3 , including the for access road, 4.45mu (farmland) for management Hongxing Apr. 2007
Funing
11 management in following: living and management area, sanitary landfill area, houses, 15.0mu (farmland) for area greening, and Company of ~ May
County
Funing County internal road, working road, flood intercept ditch, illumination, 15.0 mu (farmland) for overburden soil storage. The Funing County 2008
water supply, sewerage, greening, environmental quality project construction will involve the relocation of
monitoring system. The total construction area is about 900 m2. management houses (brick-wood structure) of 60m2
and effect 87 persons of 24 households.
The project consists of sanitary landfill, transfer station, other Total land occupation is 150.21mu, including Maguan
public facilities and the existing refuse dumps, etc.. The 145.74 mu for sanitary landfill, 2.0mu for roads, Refuse
Solid waste Mar. 2007
Maguan sanitary landfill is divided into Landfill Area I and II. Area and 0.97 mu for management area, 1.5mu for transfer Clearing &
12 management in ~ Aug.
County station, which is all of state-owned reserved Transport and
Maguan County capacity of Landfill Area I and II are 25000m2 and 37000m2; 2007
construction land (used without charge), without Disposal Co.,
and 170000m3 and 585000m3 respectively. Ltd.
concerning relocation.
Total land occupation of the project is 80mu,
including 60 mu (56mu farmland and 4 mu
Solid waste The project consists of sanitary landfill, other public facilities woodland) for sanitary landfill, 11mu woodland Malipo Refuse Oct. 2007
Malipo and the existing refuse dumps, etc.. The mean disposal scale of
13 management in for roads, and 5mu and 4m farmland respectively Disposal ~ Mar.
County
Maguan County sanitary landfill is 44t/d and landfill capacity 400000m3. for management area and sewage regulating pool. Center 2009
142 persons of 34 households will be affected by
land acquisition.
Environmental Environmental
management and All are managerial measures and procurement of Protection Jul. 2007
Wenshan Environmental management and monitoring project of
14 monitoring in equipment and instruments, without concerning Bureau of ~ Jun.
Prefecture Wenshan Prefecture
Wenshan land acquisition and resettlement. Wenshan 2008
Prefecture Prefecture
122
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Appendix 2:List of Land Acquisition
List of Land Acquisition
Unit:mu
Farmland State-owned
Garden Reclaimed Unused
County Town(ship) Village Total Paddy field Dry land Fish pond Pool Forest land construction
Total plot land land
used land
Xundian 183 177 3 3
County 110
planning
bureau 110
Rende town 3 3
Xiaguan 47
Rende town Village 50 3
Jinshuo 20
Township Haizi Village 20
Songming 122.35 107.7 107.7 7.8 6.85
County-owned
construction
land 6.79 6.79
Songyang Sijiao 115.5 107.7 107.7 7.8
Yanglin 0.03 0.03
Xiaojie 0.03 0.03
Luquan 125.2 43.8 43.8 74.7 6.7
County-owned
construction
land 6.7 6.7
Pingshan 118.5 43.8 43.8 74.7
123
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Farmland State-owned
Garden Reclaimed Unused
County Town(ship) Village Total Paddy field Dry land Fish pond Pool Forest land construction
Total plot land land
used land
Yanwachong 118.5 43.8 43.8 74.7
Kunming
city 0.65 0.65
Sub-total 431.2 151.5 151.5 82.5 177 17.2 3
Dali city 1.2 1.2 1.2
Xiaguan 1.2 1.2 1.2
Dazhuang 1.20 1.2 1.2
Eryuan 312.34 177.3 177.3 17.34 32 15 70.7
Zibihu 165.5 94.8 94.8 70.6
Songhe 94.80 94.8 94.8
Fengyuan 70.6 70.6
Yousuo 97.5 82.5 82.5 15
Xihu 76.5 61.5 61.5 15
Meihe 21.00 21 21
Dengchuan Zhonghe 7.34 7.34
State-owned 42.00 10.00 32
Sub-total 313.54 178.5 178.5 17.34 32 10 70.6
Huaping Rongjiang Rongjiang 21.6 21.6
Ancient 123
town zone 634.35 123 195 316.35
Jinshan 321.48 123 123 195 3.48
Yangxi 88.00 88 88
Wenhua 195.00 195
Jinshan 35.00 35 35
Xi’an street Yizheng 207.33 207.33
124
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Farmland State-owned
Garden Reclaimed Unused
County Town(ship) Village Total Paddy field Dry land Fish pond Pool Forest land construction
Total plot land land
used land
resident
committee
Xinhua
resident
Dayan office committee 98.98 98.98
Yihe resident
Xianghe office committee 6.56 6.56
Sub-total 655.95 144.6 144.6 195 316.35
County
State-Land
Resource
Wenshan Bureau 511.32 511.32
Malipo Mali Laodifang 2.62 2.62
Mali Chongtou 93.73 78.73 26.73 52 15
Total 97.35 81.35 26.73 52 15 1
Tuanjie 16.3 81.2
Funing Xinhua community 127.5 97.5 20 10
Water
Conservancy
Bureau 210.33 210.33
Total 337.83 97.5 16.3 81.2 20 10 210.33
Guangnan Liancheng Duanfeng 1.4 1.4 1.4
Minority
Middle School 33.6 33.6 33.6
Sub-total 35 35 35
125
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Farmland State-owned
Garden Reclaimed Unused
County Town(ship) Village Total Paddy field Dry land Fish pond Pool Forest land construction
Total plot land land
used land
Donghu 22.45
Qiubei Jinping community 22. 45 22.45
Matou 18.05 18.05
Shuanglongyin
g Puzhehei 533 533
Running Water
Plant 0.22 0.22
Total 573.72 22.45 22.45 18.05 0.22 533
Maguan
environment
sanitation
Maguan station 150.21 85 65.21
Sub-total 1704.43 236.3 103.1 133.2 20 128.05 787.08 533
Total 3105.12 710.9 426.2 284.7 37.34 32 15 476.25 177 1120.63 536.00
126
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Appendix 3:Linkage Projects
Associated Project 1
Dali Sewage Treatment Plant Project
1. Project description
1) Project contents
Dali Sewage Treatment Plant is located at Dayutian downstream the Xi’er River in
Xiaguan District, Dali City with a land occupation of 2.7 ha. and disposal capacity of
54000 m3/d.
2) Project owner
The project owner is Dali Water Supply and Sewerage Co., Ltd.
3) Funds
Total construction investment is 96 million yuan.
4) Construction time
The project construction was commenced in January 2001 and was put into
operation after test-run was completed in early 2005.
5) Relationship
Dali Sewage Treatment Plant mainly undertakes the urban house wastewater
disposal in the two urban districts of Xiaguan and Dali. The Urban Drainage Systems
under Dali City Jurisdiction collects the sewage from the recreation district, the ancient
Dali town and Fengyi district and convey the sewage to Dali Sewage Treatment Plant for
disposal. Therefore, it is the associated project to Urban Drainage Systems under Dali
City Jurisdiction and can jointly give full play to efficiency.
2. Impacts of land acquisition and relocation for the project
1) Land acquisition:
It is necessary to requisition 26 mu land in total ( including farmland 16mu) and
transfer land use for 16 mu, without concerning relocation.
2) Procedure of land acquisition:
The land acquisition unit, land administration departments and the
land-requisitioned unit jointly negotiate compensation standard and resettlement options
for land acquisition and then implement after reporting to the land administration
departments at all levels.
3. Compensation policies and standard
Cash compensation is adopted for resettlement for land acquisition of the project. In
spite of land categories, the land is economically compensated averagely based on 37980
Yuan/mu and the use option for land compensation is raised by the villagers’ groups and
implemented after reported to the city and township governments for approval.
4. Resettlement effects
127
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
During construction of the project, compensation for land acquisition was paid to
land-requisitioned units in time and the resettlement effects are favorable.
128
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Associated Project 2
Xizhou Sewage Treatment Plant and Associated Sewer Network
1. Project Description
1) Project contents
The Xizhou Twon Sewage Treatment Plant is now in the planning stage. The plant is
planned with 2000 m 3/d for short term and 4000m 3/d for long term. The plant will occupy
about 30 mu land.
2) Project owner
Dali Recreation Resort Management Committee (a provincial- level organization)
3) Relationship
According to plan, Xizhou wastewater disposal plant undertakes the sanitary
wastewater of Xizhou town. Therefore, it is the associated project to Urban Drainage
Systems under Dali City Jurisdiction and can jointly give full play to efficiency.
4) Others
The project owner promises that the plant will be constructed at the same time with
the Urban Drainage Systems under Dali City Jurisdiction, and that the land requisition
and house relocation for the Plant will be implemented strictly following the laws and
regulations of the state government and the Yunnan Provincial government as well as the
Operational Policy OP4.12 of the World Bank.
2. Impacts of land acquisition and relocation for the project
1) Land acquisition:
According to plan, totaling 29.37 mu land (all paddy land) will be acquisitioned,
without concerning relocation.
2. Procedure of land acquisition:
The land acquisition unit, land administration departments and the
land-requisitioned unit jointly negotiate compensation standard and resettlement options
for land acquisition and then be implemented after reporting to the land administration
departments at all levels.
3. Compensation policy and standard
Cash compensation is adopted for resettlement for land acquisition of the project. The
land is economically compensated averagely based on 48000 Yuan/mu and the use option for
land compensation is raised by the villagers’ groups and implemented after reported to the
city and township governments for approval.
129
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Associated Project 3
The Project Related to Wastewater Management in Wenshan County
The Project Related to Wastewater Management in Wenshan County
1. Project description
1) Project contents
Wenshan Sewage Treatment Plant: design disposal capacity 50000 ton/d,
constructed in two stages, disposal capacity for the first stage is 25000 ton/d.
2) Project owner
The project owner is Wenshan Water Supply and Sewerage Company.
3) Funds
Total construction investment for first-stage project is 57.99 million yuan.
4) Construction time
The first stage project was completed in June 2004.
5) Relationship
In order to cooperate with the urban construction in Wenshan County, Wenshan
Sewage Treatment Plant was built in 2004. However, no perfect and independent sewer
network system is available to divert the wastewater into the plant, so that the plant
cannot operate normally and is almost out of operation. Therefore, it is necessary to
construct the Wastewater management in Wenshan County to support Wenshan Sewage
Treatment Plant so as to effectively treat the house sewage and industrial wastewater in
Wenshan County. After the project is completed, it will be used in cooperation with the
plant and play a significant role in realizing standard effluent of wastewater and
improving the environment of Wenshan town.
2. Compensation standard for land acquisition and impacts of relocation
Procedure of land acquisition:
⑴ Planning and siting conducted by the urban construction department ;
⑵ Boundary survey carried out by the land administration department ;
⑶ Price negotiation of land acquisition held by Wenshan Land and Resources
Bureau and the project owner with the land –requisitioned villagers’ groups;
⑷ Signing of land acquisition agreement by Wenshan Land and Resources Bureau
with the land-requisitioned villagers’ groups;
⑸ Disbursement of land acquisition funds: The project owner pays to Wenshan Land
and Resources Bureau and Wenshan Land and Resources Bureau pays to the affected
villagers’ groups.
3. Resettlement effects
Land acquisition and compensation for ground attachment for Wenshan Sewage
Treatment Plant was completed in 1999. The requisitioned farmland is 52 mu and the
compensation standard is 30000 yuan/mu. All compensation funds have been paid directly to
the resettlers and most resettlers are satisfied at the compensation standard.
130
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Associated Project 4
The Project Related to Wastewater Management in Yanshan County
1. Project description
1) Project contents
Yanshan Sewage Treatment Plant: design disposal capacity is 5000 ton/d.
2) Project owner
The project owner is Yanshan Water Supply and Sewerage Company.
3) Funds
Total construction investment is 12.609 million yuan.
4) Construction time
The project was completed in January 2003.
5) Relationship
In order to cooperate with the urban construction in Yanshan County, Yanshan
Sewage Treatment Plant was built in 2003. However, no perfect and independent sewe r
network system makes the pollutant concentration in the wastewater into the plant not
high so that the plant cannot work normally and is almost out of operation. Therefore, it
is necessary to construct the Urban Drainage System in Yanshan County to support
Yanshan Sewage Treatment Plant so as to effectively treat the house sewage and
industrial waste water in Yanshan County. After the project was completed, it has been
used in cooperation with the plant and played a significant role in realizing standard
effluent of wastewater and improving the environment of Yanshan city town.
2. Compensation standard for land acquisition and impacts of relocation
Procedure of land acquisition:
⑴ Planning and siting conducted by the urban construction departments ;
⑵ Boundary survey carried out by the land administration departments;
⑶ Price negotiation of land acquisition held by Yanshan Land and Resources Bureau
and the project owner with the land–requisitioned villagers’ groups;
⑷ Signing of land acquisition agreement by Yanshan Land and Resources Bureau
with the land-requisitioned villagers’ groups;
⑸ Disbursement of land acquisition funds: The project owner pays to Yanshan Land
and Resources Bureau and Yanshan Land and Resources Bureau pays to the affected
villagers’ groups.
3. Resettlement effects
Land acquisition and compensation for ground attachment for Yanshan Sewage
Treatment Plant was completed in 2002. The requisitioned farmland is 11.39 mu and the
compensation standard is 10000 yuan/mu. All compensation funds have been paid directly to
the resettlers and most resettlers are satisfied at the compensation standard.
131
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Associated Project 5
The Project Related to Integrated management of Panlong River (Wenshan urban
section)
1. Project description
1) Project contents
Integrated management of Panlong River (Wenshan urban section) is consisted of:
intergated management of 21.0km long river section from Hutuzhai in Wenshan County
to Niutouzhai and treatment for water and soil loss in 17 creeks in Dehou, Gongdian and
Binglie towns.
2) Project owner
The project owner is Wenshan Development and Investment Company.
3) Funds
Total construction investment is 256.6273 million yuan.
4) Construction time
It is planned to start construction Nov. 2007.
5) Relationship
In order to cooperate with the urban construction in Wenshan County and based on
General Wenshan Plan, Wenshan County completed the land acquisition within scope of
70m at two banks of Panlong River beyond Wenshan old urban in planning area before
end of 2005. In 2005, the land acquisition is 359.2 mu, including the land acquisition
262.9 mu for Panlong River North sectin (10.02km) from Huituzhai to Panshuiqiao (43
households involved), and land acquisition 96.3 mu for south section (2.56km) from
Chengnan park to Niutouzhai (33 households involved). The land construction area for
Panlong river (Wenshan county section) is 511.32 mu. Of which, 66.3 mu land is
acquisitioned in 2005 and 445.02mu land was acquisitioned before 2005.
2. Compensation standard for land acquisition and impacts of relocation
Procedure of land acquisition:
⑴ Planning and siting conducted by the urban construction departments ;
⑵ Boundary survey carried out by the land administration departments ;
⑶ Price negotiation of land acquisition held by Wenshan Land and Resources
Bureau and the project owner with the land–requisitioned villagers’ groups;
⑷ Signing of land acquisition agreement by Wenshan Land and Resources Bureau
with the land-requisitioned villagers’ groups;
⑸ Disbursement of land acquisition funds: The project owner pays to Wenshan Land
and Resources Bureau and Wenshan Land and Resources Bureau pays to the affected
villagers’ groups.
3. Resettlement effects
Land acquisition within scope of 70m at two banks of Panlong River was completed in
2005, the land compensation is 55000 yuan/mu and subsidy for public facilities paid to village
collectives is 1000 yuan/mu. All compensation funds have been paid directly to the resettlers
and most resettlers are satisfied at the compensation standard.
132
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Appendix 4:Summary of Resettlement Options for All Prefectures/Cities
Summary of Resettlement Options for Kunming City
Table 1
Rural Farmland Produc-tion Impacts on Compensati
Admini- Total Compensa-
Cou Town( Village popula-ti requisition and Propor-ti resettle-ment income on /annual Measures for income
strative farmland tion Resettlement option
nty ship) group on occupation on popula-tion (104 yuan/ loss for land restoration
village (mu) (104 yuan)
(person) (mu) (person) year) acquisition
One household and the reclaimed
Xun Jinshu
Haizi 3009 3730 wasteland of the village and group
dian o
collective is affected by wasteland
requisition in Xundian; young crop
Qingshuigo fee for affected household is paid
364 473
u to PAPs; 70% land compensation
paid to households and 30% left in
Rende Beiguan 3506 2685.2 village and group collective; and
compensation for the affected
Group 4 of collective property all left in
429 170
Xia Village village and group collective.
Luq Pingsh Yanwach Combination of cash compensation
an 1961 1129.5 43.8 3.88% 66 8.76 144.54 17 and land adjustment and the young
uan Town ong
crop fee is paid to the resettled
Strengthening labor
Qinglongta households. It is decided
153 113 5.78 5.12% 8 1.16 19.07 17 training and developing
n tentatively that 30% land
forest and fruit trade
Shangshi-I 104 60 13.54 23 2.71 44.68 compensation and resettlement
22.57% 17 and animal husbandry.
subsidy is left in the village
Shangshi-II 86 60 24.48 40.80% 35 4.90 80.78 17 collective and 70% distributed
averagely in the group.
Son Songy Enhancing labor
gmi ang Sijiao 6263 6081 107.7 0.75% 109 19.74 133.55 7 training to go in for the
ng Town Cash compensation and land secondary and tertiary
adjustment. Land compensation industries; industrial
and resettlement subsidy are paid restruc- turing to
to all villagers and young crop fee develop vegetable
Loujin 1293 1274 107.7 8.45% 109 19.74 133.55 7 to the resettled households. planting and the
Chinese milk vetch is
sold to Guangdong.
133
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Summary of Resettlement Options of Dali Prefecture
Table 2
Rural Requisiti Proportion Annual loss Compens Compensation
City Villagers Gross Resettled
Town(shi Villagers’ populatio oned in gross for land ation /annual loss Resettleme Supporting measures for
(Count committe farmland laborer acquisition Remarks
p) group n farmland farmland (104 for land nt method restoration
y) e (mu) (person) (104 yuan)
(person) (mu) (%) yuan) acquisition
(1) For those who don’t agree
with the resettlement option of the
Dali Xiaguan Dazhuan
4969 2892 1.2 0.04% 2 0.26 5.55 21 village, according to their wishes,
City Town g it is to coordinate and help the
individual households that need
land for continuous farming to
replace land from the collective
Group 6 316 257.2 1.20 0.47% 2 0.26 5.55 21
Cash reserve land or those who are not
compensati willing to go in for farming;
Eryuan Zibihu on, young
Songhe 3045 2305 94.8 4.11% 116 12.58 283.05 22
County Town crop (2) enhancing the relevant
compensati technical training, guiding and
Dasongdian 1612 1328 94.8 7.14% 116 12.58 283.05 22 on and encouraging the resettlers to
resettlement expand planting area of the cash
compensati crops and increase the breeding
Yousuo
Meihe 6747 4820 21 0.44% 34 4.54 97.70 21 on are paid scale of milk cows by using of
Town to resettlers, the compensation, improving
40% land agricultural production conditions
Dahuayuan 446 278 21 7.55% 34 4.54 97.70 21 compensati to raise the resettlers’ income;
on is left in
the village (3) During project construction, Reclaimed
collective giving priority to considering wasteland
Xihu 4090 1929 63.5 3.29% 133 13.3 286.13 21 and 60% employment of resettled labors excluded in
paid to and utilization of the local inventory
Zhangjiade resettlers. construction and living materials.
1678 786.8 58.8 7.47% 126 12.72 273.57 21 After completion, the resettlers are
ng given priority to employment
under equal conditions;
(4) Once there are projects
Zhongdeng 648 287 2.7 0.94% 7 0.58 12.56 21 concerning export of labor service
in the county (city), the priority is
given to resettlers.
134
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Summary of Resettlement Options of Lijiang City
Table 3
Annual Compensa
Rural
Admin Requisi- loss for Compen - tion
popula Farmlan Resettle
County Town i- Villager tioned d land -sation /annual
- tion d laborer (104 Resettlement method Supporting measures for restoration
(District) (ship) strative s’ group farmlan acquisitio loss for
(perso (mu) (person) yuan)
village d (mu) n (104 land
n)
yuan) acquisition
Rong- Cash compensation;
Huaping Rong- resettlement subsidy and (1) According to the resettlers’ whishes, coordinating and helping
jiang 6098 6523 27.2 25 5.97 98.56 17 young crop fee are paid to land replacement for those needing land for continuous farming
County jiang
Town resettlers; 65% land
compensation is paid to from the collective reserve land or those who don’t want to go in
resettlers and the rest 35% is
11 640 823 21.6 16 4.74 59.29 13 for farming;
left in villagers’ groups and
local land adjustment (2)According to resettlers’ wishes, those giving up farming for
trade, as long as they have trade base and capability, will acquire
Jinsha cash compensation and be helped in handling relevant certificates;
Ancient n (3) Enhancing relevant technical training, guiding and
Yangxi 3517 9125 88 33 19.04 362.56 19
town Towns Cash compensation; encouraging resettlers to expand vegetable planting area by use of
distributed averagely in the
hip groups; 65% land the land compensation, improving agricultural production
Minru 465 1653 88 24 19.04 362.56 19 compensation and conditions to raise resettlers’ income;
resettlement subsidy is
Jinsha distributed in the groups; (4) During project construction, giving priority to considering
4278 5647 35 26 7.57 309.58 41
and land adjustment in employment of resettlers and utilization of the local construction
n
groups.
Shangs and living materials. After completion, the resettlers are given
316 182 35 60 7.57 309.58 41
hiping employment preference under equal conditions.
135
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Summary of Resettlement Options of Wenshan Prefecture
Table 4
Proportion of
Rural Total per capita Annual loss Compensation
Admini- Villagers’ Requisitioned Supporting
popula- farmland Resettled for land Compensation /annual loss Resettlement
County Town(ship) strative tion farmland farmland measures for
group reduction laborer(person) acquisition (104 yuan) for land method
village (mu) restoration
(person) (mu) before and after (104 yuan) acquisition
land requisition
Laodifang 3473 5993 2.62 0.04% 24 0.58 10.03 17
Malipo Mali Town Shiguanmen 172 270 2.62 0.97% 2 0.58 10.03 17 Cash
compensation,
Chongtou 2545 2277 78.73 3.46% 12 10.87 181.94 17
fully paid to
Loutizhai 109 141 4.33 3.07% 4 0.60 10.01 17 resettlers
Cash Enhancing
compensation, labor training,
fully paid to going in for the
resettlers, and secondary and
Shima 171 159 51.4 32.33% 56 7.10 118.78 17 the villages’ tertiary
committee industries,
assists villagers industrial
to make local restructuring
land adjustment and developing
vegetable
Hebian 108 88 3 3.41% 4 0.41 6.93 17 Cash planting
compensation,
Yangse 127 127 9 7.09% 9 1.24 20.80 17
fully paid to
Baba’ao 162 136 11 8.09% 14 1.52 25.42 17 resettlers
Tuanjie Going in for
Funing Xinhua Town 1145 612 36.3 5.93% 84 7.26 176.42 24
community trade as well as
the secondary
Cash and tertiary
Toutang 309 133 36.3 27.29% 84 7.26 176.42 24 compensation, industries; and
fully paid to employment
resettlers preference.
Liancheng
Guangnan Duanfeng 2317 868 1.4 0.16% 6 0.22 3.66 17
Town
Tuguozhai 1029 254 1.4 0.55% 6 0.22 3.66 17
Donghu Providing skill
Jinping Town
Community
1475 1056 22.45 2. 13% 32 2.63 43.03 16
Qiubei training for the
Group 4 123 133 2.2 1.65% 3 0.26 4.21 16 Cash land-lost
136
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Proportion of
Rural Total per capita Annual loss Compensation
Admini- Villagers’ popula- Requisitioned Supporting
farmland Resettled for land Compensation /annual loss Resettlement
County Town(ship) strative farmland farmland 4 measures for
group tion reduction laborer(person) acquisition (10 yuan) for land method
village (mu) restoration
(person) (mu) before and after (104 yuan) acquisition
land requisition
Group 6 111 101 7.8 7.72% 9 0.91 14.91 16 compensation, farmers;
fully paid to industrial
Group 7 184 169 4.7 2.78% 6 0.55 8.99 16 resettlers restructuring to
develop
Cash vegetable and
compensation, pseudo-ginseng
fully paid to planting
resettlers, and
Group 8 145 84 7.75 9.23% 14 0.9 14.92 16 the villages’
committee
assists villagers
to make local
land adjustment
137
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Appendix 5:Breakdown of Resettlement Compensation
Estimation of Resettlement Compensation for the Project Package in Kunming City
Table 1
Solid waste management Solid waste management in Solid waste management in
Total
in Luquan County Xundian County Songming County
Serial
Item Unit Unit Amount Unit Amoun Unit Amount
No. Amount (104
Qty Qty price (104 Qty price (104 Qty price (104
yuan) (yuan) yuan) (yuan) (yuan) yuan)
yuan)
Compensation
I for rural 687.17 361.19 86.33 239.64
resettlement
Compensation
for land
(1) mu 429.70 597.20 124.50 304.46 183 53.21 122.20 239.52
acquisition and
occupation
Project
1 permanent land mu 429.70 597.20 124.50 304.46 183.00 53.21 122.20 239.52
occupation
1.1 Dry land mu 151.50 278.09 43.8 33000 144.54 107.7 12400 133.55
1.2 Garden plots mu 25.00 228.00
1.3 Woodland mu 82.50 75.39 74.7 9360 69.92 7.8 7020 5.48
Construction
1.4 mu 15.00 195.10 6 150000 90.00 3.00 50325 15.10 6.7 150000 100.5
land
Reclaimed
1.4 mu 55.00 13.66 55.00 2483 13.66
farmland
Reclaimed
1.5 mu 110.00 22.00 110.00 2000 22.00
garden plots
Reclaimed
1.6 mu 12.00 2.40 12.00 2000 2.40
woodland
1.7 Unused land mu 3.00 0.06 3.00 200 0.06
Temporary
construction mu 928.25 447.88
2 land
Dry land mu 928.25 447.88
Other
(2) 14806.00 89.97 10366 56.73 4440 33.12 0.12
compensation
Compensation
1 for scattered 14806.00 89.85 10366 56.73 4440 33.12
trees
Compensation
1.1 for scattered 13365.00 89.13 10365 56.73 3000 32.40
cash fruit trees
1.1.1 Less than 3cm 7103.00 21.31 6703 30 20.11 400 30 1.20
10cm or with
1.1.2 6262 67.82 3662 100 36.62 2600 120 31.20
bumper fruit
1.2 Timber 1441 0.72 1 0.00 1440 0.72
Less than 3cm 1441 0.72 1 5 0.00 1440 5 0.72
2 Grave 3 0.12 3 400 0.12
Compensation
II for restoration 6.40 23.20 6 22 0.4 1.2
of special items
Compensation
for
1 Pole/km 6.40 23.20 6 22 0.4 30000 1.20
communication
facilities
Compensation
2 for power
facilities
III Other expenses 92.06 49.25 11.31 31.50
Overhead of
1 construction 3.55 1.92 0.43 1.20
unit
138
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Solid waste management Solid waste management in Solid waste management in
Total
in Luquan County Xundian County Songming County
Serial
Item Unit Unit Amount Unit Amoun Unit Amount
No. Amount (104
Qty Qty price (104 Qty price (104 Qty price (104
yuan)
(yuan) yuan) (yuan) yuan) (yuan) yuan)
Technical
2 3.44 1.81 0.43 1.20
training fee
Plan & design
3 17.76 9.58 2.16 6.02
fee
Overhead for
4 21.31 11.50 2.59 7.23
implementa-tion
Resettle- ment
5 7.10 3.83 0.86 2.41
supervision fee
Monitoring and
6 10.66 5.75 1.30 3.61
evaluation fee
Examination fee
7 for design 2.13 1.15 0.26 0.72
documenta- tion
Overhead of
8 land acquisition 19.24 2.42 6.71
and relocation 10.11
Supporting fee
9 for vulnerable 6.87 3.61 0.86 2.40
groups
IV Contingency 80.24 43.24 9.76 27.23
Basic
1 80.24 43.24 9.76 27.23
contingency
Contingency for
2
price difference
Static
investment 882.67 475.68 107.41 299.58
(excluding tax)
V. Related tax 519 705.20 179.75 519 317.95 207.49
Farmland
1 316.5 199.40 43.80 27.59 165 103.95 107.7 67.85
reclamation fee
Paddy fields 7200 7200
Dry land and
316.5 199.40 43.8 6300 27.59 165 6300 103.95 107.7 6300 67.85
garden plots
Tax for
2 farmland 316.5 84.40 43.8 2666.7 11.68 165 2667 44.00 107.7 2666.7 28.72
occupation
Forest
3 vegetation 94.5 37.80 74.7 4000 29.88 12 4000 4.80 7.8 4000 3.12
restoration fee
Use fee with
compensation
of the newly
4 411 383.60 118.5 9333 110.60 177 9333 165.20 115.5 9333 107.8
added
construction
land
Static investment
1587.87 655.44 425.36 507.07
(including tax)
139
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Estimation of Resettlement Compensation for the Project Package in Dali Prefecture
Table 2
Wastewater
Urban drainage treatment plant Integrated water Integrated water Integrated water
Solid waste
Rural non-point pollution control in Lake systems under and associated environmental environmental environment
Unit price(yuan) Total management in
Er’hai Basin Daili City sewer network of management of management of management of
Eryuan County
Serial jurisdiction Dengchuan Town Luoshi River Miju River Yongan River
Item Unit
No. in Eryuan County
Eryuan County Dali City Dali City Eryuan County Eryuan County Dali City Eryuan County Eryuan County
Eryuan Eryuan
Dali City Subtotal Dali City Subtotal
County County
Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount
Compensa-
tionon for
I 885.89 872.51 13.38 5.55 5.55 7.81 15.41 336.24 326.64 96.52 97.70
rural
resettlement
Compensa-
tion for land
(1) acquisition 866.34 853.96 12.38 5.55 5.55 6.81 15.41 317.69 326.64 96.52 97.70
and
occupation
1 Project 859.51 853.96 5.55 5.55 5.55 15.41 317.69 326.64 96.52 97.70
1.1 permanent
Farmland 670.90 665.35 5.55 5.55 5.55 283.05 284.60 97.70
land
Paddy fields mu 46526 46276 387.85 382.30 5.55 5.55 1.2 5.55 61.5 284.60 21 97.70
acquisition
Dry land mu 29858 27404 283.05 283.05 94.8 283.05
1.2 Garden mu 21000 21000 36.41 36.41 7.34 15.41 10 21.00
1.3 plots
Pond mu 28132 28028 42.04 42.04 15 42.04
1.4 Fish pond mu 23600 75.52 75.52 32 75.52
1.5 Woodland mu 4900 34.64 34.64 70.7 34.64
Temporary
( sparse
2 construction 6.83 6.83 6.81
land
woodland)
1.1 Paddy fields mu/y 5156 6.15 6.15 11.88 6.13
1.2 r
Dry land mu/y 4278 0.68 0.68 1.58 0.68
Compensa- r
(2) tion for m2 100 1.00 1.00 100 1.00
houses
140
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Wastewater
Urban drainage treatment plant Integrated water Integrated water Integrated water
Solid waste
Rural non-point pollution control in Lake systems under and associated environmental environmental environment
Unit price(yuan) Total management in
Er’hai Basin Daili City sewer network of management of management of management of
Eryuan County
Serial jurisdiction Dengchuan Town Luoshi River Miju River Yongan River
Item Unit
No. in Eryuan County
Eryuan County Dali City Dali City Eryuan County Eryuan County Dali City Eryuan County Eryuan County
Eryuan Eryuan
Dali City Subtotal Dali City Subtotal
County County
Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount
Compensati
on for
(3) 18.55 18.55 18.55
scattered
fruit trees
1 Trees with piece 75 75 18.23 18.23 2431 18.23
2 fruit
Trees piece 10 10 0.32 0.32 323 0.32
Compensati
without fruit
on for
II restoration 25.64 25.64 25.64
of special
items
Electric pole/
1 65000 11.64 11.64 1.79 11.64
power line km
Telecommu
pole/
2 nication 50000 14.00 14.00 2.8 14.00
km
cable
Other
III 117.81 113.81 4.00 0.75 0.75 3.25 2.02 43.53 42.80 12.65 12.81
expenses
Overhead of
1 construction I+II 0.50% 0.50% 4.56 4.36 0.20 0.03 0.03 0.17 0.08 1.68 1.63 0.48 0.49
unit
Technical
2 I 0.50% 0.50% 4.43 4.36 0.07 0.03 0.03 0.04 0.08 1.68 1.63 0.48 0.49
training fee
Plan &
3 I+II 2.50% 2.50% 22.80 21.82 0.98 0.14 0.14 0.84 0.39 8.41 8.17 2.41 2.44
design fee
Overhead
4 for I+II 3.00% 3.00% 27.35 26.18 1.17 0.17 0.17 1.00 0.46 10.09 9.80 2.90 2.93
implementa-
tion
Resettle-
ment
5 I+II 1.00% 1.00% 9.12 8.73 0.39 0.06 0.06 0.33 0.15 3.36 3.27 0.97 0.98
supervision
fee
141
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Wastewater
Urban drainage treatment plant Integrated water Integrated water Integrated water
Solid waste
Rural non-point pollution control in Lake systems under and associated environmental environmental environment
Unit price(yuan) Total management in
Er’hai Basin Daili City sewer network of management of management of management of
Eryuan County
Serial jurisdiction Dengchuan Town Luoshi River Miju River Yongan River
Item Unit
No. in Eryuan County
Eryuan County Dali City Dali City Eryuan County Eryuan County Dali City Eryuan County Eryuan County
Eryuan Eryuan
Dali City Subtotal Dali City Subtotal
County County
Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount
Monitoring
and
6 I+II 1.50% 1.50% 13.67 13.09 0.58 0.08 0.08 0.50 0.23 5.04 4.90 1.45 1.47
evaluation
fee
Examination
fee for
7 design I+II 0.30% 0.30% 2.74 2.62 0.12 0.02 0.02 0.10 0.05 1.01 0.98 0.29 0.29
documenta-
tion
Overhead of
land
8 acquisition (1) 2.80% 2.80% 24.27 23.92 0.35 0.16 0.16 0.43 8.90 9.15 2.70
and
relocation 0.22 2.74
Supporting
fee for
9 I 1.00% 1.00% 8.87 8.73 0.14 0.06 0.06 0.08 0.15 3.36 3.27 0.97 0.98
vulnerable
groups
IV Contingency 102.93 98.63 4.30 0.63 0.63 3.67 1.74 37.98 36.94 10.92 11.05
1 Basic I+II+ 10% 10% 102.93 98.63 4.30 0.63 0.63 3.67 1.74 37.98 36.94 10.92 11.05
2 contingency III
Contingency
for
Static price 1132.27 1084.95 47.32 6.93 6.93 40.4 19.17 417.75 406.38 120.09 121.56
difference
investment
V Related tax 515.60 512.90 2.70 2.70 2.70 11.73 245.77 162.19 54.38 38.83
(excluding
Farmland
1 tax) 98.83 98.05 0.78 0.78 0.78 2.92 37.74 39.78 3.98 13.63
reclamation
fee
Paddy fields mu 6492 6468 54.19 53.41 0.78 0.78 1.2 0.78 61.5 39.78 21 13.63
Dry land mu 3981 4434 44.64 44.64 7.34 2.92 94.8 37.74 10 3.98
and
Tax gardenfor
2 farmland mu 2666.8 2666.8 64.76 64.44 0.32 0.32 1.2 0.32 7.34 1.96 94.8 25.28 76.5 20.40 42 11.20 21 5.60
plots
occupation
142
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Wastewater
Urban drainage treatment plant Integrated water Integrated water Integrated water
Solid waste
Rural non-point pollution control in Lake systems under and associated environmental environmental environment
Unit price(yuan) Total management in
Er’hai Basin Daili City sewer network of management of management of management of
Eryuan County
Serial jurisdiction Dengchuan Town Luoshi River Miju River Yongan River
Item Unit
No. in Eryuan County
Eryuan County Dali City Dali City Eryuan County Eryuan County Dali City Eryuan County Eryuan County
Eryuan Eryuan
Dali City Subtotal Dali City Subtotal
County County
Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount
Restoration
3 fee of forest mu 4000.2 4000.2 28.28 28.28 70.7 28.28
vegetation
Use fee with
compensatio
n of the
4 mu 9333.8 13334 323.73 322.13 1.60 1.60 1.2 1.60 7.34 6.85 165.5 154.47 76.5 102.01 42 39.20 21 19.60
newly added
construction
land
Total investment
1647.87 1597.85 50.02 9.63 9.63 40.4 30.9 663.52 568.57 174.47 160.39
(including tax)
143
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Estimation of Resettlement Compensation for the Project Package in Lijian City
Table 3
Wastewater management in Wasterwater management in Lijiang Lijiang City WWTP and sewer
Serial Total investment Solid waste management in Lijiang City
Huaping County Ancient City network
Item Unit
No. (104 yuan)
Unit price Investment Unit price Investment (104 Unit price Investment Unit price
Qty Qty Qty Qty Investment (104 yuan)
(yuan) (104 yuan) (yuan) yuan) (yuan) (104 yuan) (yuan)
I Compensation for rural resettlement 1837.65 59.29 730.96 790.08 257.32
Compensation for land acquisition and
(I) 1106.69 59.29 790.08 257.32
occupation
1 Project permanent land acquisition 1094.97 59.29 778.36 257.32
1.1 Farmland 981.85 59.29 778.36 144.20
Paddy fields mu 981.85 21.6 27450 59.29 88 88450 778.36 35 41200 144.2
Dry land mu
1.2 Woodland mu 97.46 195 4998.00 97.46
1.3 Construction land mu 15.66 3.48 45000 15.66
2 Temporary construction land 11.72 11.72
2.1 Farmland 11.72 11.72
Paddy fields mu 11.72 21.85 5364 11.72
Compensation for houses and auxiliary
(II) 703.62 703.62
structures
2
1 Houses m 590.62 590.62
2
Frame structure m 626.98
2
Brick-concrete house m 457.97 9257.44 494.71 457.97
2
Brick-wood house m 8.17 221.98 367.90 8.17
2
Earth-wood house m 12.28 443.66 276.81 12.28
2 House plot mu 112.20 1.87 600000.00 112.20
3 Auxiliary structures 0.8 4 2000.00 0.8
Compensation for infrastructure in
(III) 1.32 1.32
resettlement sites
1 Ground leveling fee household 1.00 4 2500.00 1.00
2 Compensation for water and power supply household 0.32 4 800.00 0.32
144
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Wastewater management in Wasterwater management in Lijiang Lijiang City WWTP and sewer
Serial Total investment Solid waste management in Lijiang City
Huaping County Ancient City network
Item Unit
No. (104 yuan)
Unit price Investment Unit price Investment (104 Unit price Investment Unit price
Qty 4 Qty Qty 4 Qty Investment (104 yuan)
(yuan) (10 yuan) (yuan) yuan) (yuan) (10 yuan) (yuan)
(IV) Removal compensation 26.01 26.01
1 Transportation fee household 0.12 4 300.00 0.12
2 Subsidy for loss of working time household 3.00 30.00 1000.00 3.00
3 Living subsidy for transition period household 0.72 4 1800.00 0.72
4 Business loss fee for the leasing houses piece 12.90 215.00 600.00 12.90
2
5 Relocation compensation m 9.27 5067.73 18.30 9.27
II Compensation for urban resettlement 505.76 505.76
Compensation for houses and auxiliary
structures 479.24 479.24
1 Houses 311.64 311.64
2
Brick-concrete house m 94.81 1916.53 494.71 94.81
2
Brick-wood house m 50.86 1382.38 367.90 50.86
2
Earth-wood house m 0.37 13.31 276.81 0.37
2 House plot mu 165 2.76 600000.00 165.60
3 Auxiliary structures household 2.00 10 2000 2.00
Compensation for infrastructure in
(III) 3.30 3.30
resettlement sites
1 Ground leveling fee household 2.50 10.00 2500.00 2.50
2 Compensation for water and power supply household 0.80 10.00 800.00 0.80
(IV) Removal compensation 12.82 12.82
1 Transportation fee household 0.30 10.00 300.00 0.30
2 Subsidy for loss of working time household 3.20 32.00 1000.00 3.20
3 Living subsidy for transition period household 1.80 10.00 1800.00 1.80
4 Business loss fee for the leasing houses piece 4.80 80.00 600.00 4.80
5 Relocation compensation m2 2.72 1487.85 18.30 2.72
Removal compensation of privately-owned
(V) household 10.40 130 800 10.40
business households
145
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Wastewater management in Wasterwater management in Lijiang Lijiang City WWTP and sewer
Serial Total investment Solid waste management in Lijiang City
Huaping County Ancient City network
Item Unit
No. (104 yuan)
Unit price Investment Unit price Investment (104 Unit price Investment Unit price
Qty 4 Qty Qty 4 Qty Investment (104 yuan)
(yuan) (10 yuan) (yuan) yuan) (yuan) (10 yuan) (yuan)
Removal compensation of enterprises and
III
public institutions 6367.20 6367.20
Compensation of units that have signed
(I) 2312.87 2312.87
agreements
1 Land acquisition fee for new site 252.1 252.10
2 State Taxation Bureau of the ancient town 542.80 542.80
3 Lijiang Technics and Veterinary Station 15.97 15.97
Lijiang Municipal Bureau of Radio and
4 1502.00 1502.00
Television
Compensation of units that have not signed
(II)
agreements 4054.32 4054.32
Compensation for houses and auxiliary
1 3994.32 3994.32
structures
1.1 Houses 3994.32 3994.32
2
Frame house(including land price) m 541.21 4832.2 1120 541.21
2
Brick-concrete house (including land price) m 2627.92 26598.35 988.00 2627.92
Brick-wood house (including land price) m2 543.13 6308.14 861.00 543.13
Earth-wood house (including land price) m2 282.07 3663.22 770.00 282.07
2 Other compensation 60 12 50000 60
IV Other expenses 1002.03 7.47 862.59 99.55 32.42
1 Overhead of construction unit 43.55 0.30 38.02 3.95 1.29
2 Technical training fee 11.72 0.30 6.18 3.95 1.29
3 Plan & design fee 217.77 1.48 190.10 19.75 6.43
4 Overhead for implementation 261.32 1.78 228.12 23.70 7.72
5 Resettlement supervision fee 87.11 0.59 76.04 7.90 2.57
6 Monitoring and evaluation fee 87.11 0.59 76.04 7.90 2.57
7 Examination fee for design documentation 26.13 0.18 22.81 2.37 0.77
8 Overhead of land acquisition and relocation 243.90 1.66 212.91 22.12 7.20
9 Supporting fee for vulnerable groups 23.43 0.59 12.37 7.90 2.57
146
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Wastewater management in Wasterwater management in Lijiang Lijiang City WWTP and sewer
Serial Total investment Solid waste management in Lijiang City
Huaping County Ancient City network
Item Unit
No. (104 yuan)
Unit price Investment Unit price Investment (104 Unit price Investment Unit price
Qty 4 Qty Qty 4 Qty Investment (104 yuan)
(yuan) (10 yuan) (yuan) yuan) (yuan) (10 yuan) (yuan)
V Contingency 971.26 6.68 846.65 88.96 28.97
1 Basic contingency 971.26 6.68 846.65 88.96 28.97
2 Contingency for price difference 0.00
Static investment (excluding tax) 10683.9 73.44 9313.15 978.59 318.72
VI Related tax 564.24 34.39 0.00 174.46 355.39
1 Farmland reclamation fee 94.08 14.23 0.00 57.13 22.72
Paddy fields mu 94.08 21.6 6588 14.23 0.00 88 6492 57.13 35 6492 22.72
Dry land mu 0.00 0.00 0.00 0.00
2 Tax for farmland occupation mu 38.56 21.60 2666.68 5.76 0.00 58667.0 4 23.47 35 2666.68 9.33
3 Restoration fee of forest vegetation mu 78.00 0.00 0.00 0.00 195.0 4000.02 78.00
Use fee with compensation of the newly added
4 mu 353.60 21.60 6666.70 14.40 0.00 58667.0 16 93.87 230.0 10666.72 245.33
construction land
Total investment (including tax) 11248.14 107.83 9313.15 1153.06 674.11
147
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Estimation of Resettlement Compensation for the Project Package in Wenshan Prefecture
Table 4
Solid waste management in Wastewater management in Solid waste management in Funing Integrated management of Puting
Total
Serial Malipo County Malipo County County River in Funing County
Item Unit
No. Amount (104 Unit price Amount (104 Unit price Amount Unit price Amount Unit price Amount
Qty Qty Qty Qty Qty
yuan) (yuan) yuan) (yuan) (104 yuan) (yuan) (104 yuan) (yuan) (104 yuan)
Compensation for rural
I 1154.53 143.04 62.62 3.72
resettlement 582.41
Compensation for land
(1) acquisition and 1151.98 142.58 62.62 3.72
occupation 580.31
Project permanent land
1 mu 299.40 1143.59 80.00 142.58 16.35 62.62 127.5 0.00
occupation 580.31
1.1 Paddy fields mu 69.55 238.22 13.00 38300 49.79 16.35 38300 62.62 16.3 48600 79.22
1.2 Dry land mu 133.20 474.19 52.00 15300 79.56 81.2 48600 394.63
1.2 Test fields mu 33.60 302.40
1.3 Garden plots mu 20 99.00 20 49500 99
1.4 Woodland mu 43.05 29.78 15.00 8820 13.23 10 7457 7.46
Temporary
2 mu 58.85 8.38 0 0 0 20 3.72
construction land
Farmland mu 58.85 8.38 20 1860 3.72
2
(2) House compensation m 60 350 2.10
Brick-wood m2 60 350 2.10
(3) Other compensation 0.46 0.46 0 0 0
Scattered trees piece 59 0.21 59 35 0.21
Grave piece 5 0.25 5 500 0.25
Compensation for
II restoration of special 75.82 0 0 0 0
items
Compensation for
Pole/
1 communication 3.10 70.24
km
facilities
Compensation for Pole/
2 2.00 5.58
electric power facilities km
III Other expenses 157.84 18.72 8.20 76.24 0.49
Overhead of
1 6.15 0.72 0.31 2.91 0.02
construction unit
148
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Solid waste management in Wastewater management in Solid waste management in Funing Integrated management of Puting
Total
Serial Malipo County Malipo County County River in Funing County
Item Unit
No. Amount (104 Unit price Amount (104 Unit price Amount Unit price Amount Unit price Amount
Qty Qty Qty Qty Qty
yuan) (yuan) yuan) (yuan) (104 yuan) (yuan) (104 yuan) (yuan) (104 yuan)
2 Technical training fee 5.77 0.72 0.31 2.91 0.02
Planning and design
3 30.76 3.58 1.57 14.56 0.09
fee
Overhead for
4 36.91 4.29 1.88 17.47 0.11
implementation
Resettlement
5 12.30 1.43 0.63 5.82 0.04
supervision fee
Monitoring and
6 18.46 2.15 0.94 8.74 0.06
evaluation fee
Examination fee for
7 3.69 0.43 0.19 1.75 0.01
design documentation
Overhead of land
8 acquisition and 3.99 1.75 0.10
relocation 32.26 16.25
Supporting fee for
9 11.55 1.43 0.63 5.82 0.04
vulnerable groups
IV Contingency 138.82 16.18 7.08 65.86 0.42
1 Basic contingency 138.82 16.18 7.08 65.86 0.42
Contingency for price
2 0.00 0 0 0 0
difference
Static investment
1527.02 177.94 77.91 724.51 4.63
(excluding tax)
V Related tax 459.24 103.07 21.90 154.61 0.00
Farmland reclamation
1 95.99 65.00 4062 26.40 16.35 4062 6.64 97.5 4062 39.60
fee
Tax for farmland
2 63.02 65.00 2667 17.33 16.35 2667 4.36 97.5 2667 26.00
occupation
Restoration fee of
3 44.00 15.00 4000 6.00 10 4000 4.00
forest vegetation
Newly added
4 256.24 80.00 6667 53.33 16.35 6667 10.90 127.5 6667 85.00
construction land
Static investment (including
1986.26 281.01 99.81 879.12 4.63
tax)
149
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Estimation of Resettlement Compensation for the Project Package in Wenshan Prefecture
Table 4 (continued)
Integrated water environmental
Wastewater management in Wastewater management in Water supply project in Qiubei Solid waste management in
management of Puzhehei Lake
Serial Guangnan County Qiubei County County Maguan County
Item Unit in Qiubei County
No.
Unit price Amount Unit price Amount Unit price Amount Unit price Amount Unit price Amount
Qty Qty Qty Qty Qty
(yuan) (104 yuan) 4
(yuan) (10 yuan) (yuan) (104 yuan) (yuan) (104 yuan) (yuan) (104 yuan)
Compensation for rural 13.76
I 306.06 0.00
resettlement 42.92
Compensation for land 13.76
(1) acquisition and 306.06 0.00
occupation 42.92
Project permanent land 18.05 9.10
1 mu 35.00 306.06 0.00
occupation 22.45 42.92
1.1 Paddy fields mu 1.4 26176 3.66 22.45 19120 42.92
1.2 Dry land mu
1.2 Test fields mu 33.6 90000 302.4
1.3 Garden plots mu
1.4 Pond mu
1.5 Woodland mu 18.05 5040 9.10
1.7 Construction land mu
Temporary construction 38.85 4.66
2 mu 0 0 0
land
Farmland mu 38.85 1200 4.66
(2) Other compensation 0 0 0 0
Scattered trees piece
Grave piece
Compensation for
II restoration of special 0 0 0 75.82
items
Compensation for pole/
1 3.1 226357 70.24
communication facilities km
Compensation for pole/
2 2.0 27903 5.58
electric power facilities km
III Other expenses 40.09 5.62 1.80 6.67
Overhead of construction
1 1.53 0.38
unit 0.21 0.07
2 Technical training fee 1.53 0.21 0.07 0.00
3 Planning and design fee 7.65 1.07 0.34 1.90
Overhead for
4 9.18 2.27
implementation 1.29 0.41
150
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Integrated water environmental
Wastewater management in Wastewater management in Water supply project in Qiubei Solid waste management in
management of Puzhehei Lake
Serial Guangnan County Qiubei County County Maguan County
Item Unit in Qiubei County
No.
Unit price Amount Unit price Amount Unit price Amount Unit price Amount Unit price Amount
Qty Qty Qty Qty Qty
(yuan) (104 yuan) 4
(yuan) (10 yuan) (yuan) (104 yuan) (yuan) (104 yuan) (yuan) (104 yuan)
Resettlement supervision
5 3.06 0.76
fee 0.43 0.14
Monitoring and
6 4.59 1.14
evaluation fee 0.64 0.21
Examination fee for
7 0.92 0.23
design documentation 0.13 0.04
Overhead of land
8 acquisition and 8.57 0.00
relocation 1.20 0.39
Supporting fee for
9 3.06 0.00
vulnerable groups 0.43 0.14
IV Contingency 34.62 4.85 1.56 8.25
1 Basic contingency 34.62 4.85 1.56 8.25
Contingency for price
2 0 0 0
difference
Static investment
380.78 53.40 17.12 90.74
(excluding tax)
V Related tax 46.88 30.07 12.03 90.67
Farmland reclamation
1 35.00 4062 14.22 4062
fee 22.45 9.12
Tax for farmland
2 35.00 2667 9.33 2667
occupation 22.45 5.99
Restoration fee of forest
3 85.00 4000 34.00
vegetation
Newly added
4 35.00 6667 23.33 6667 85.00 6667 56.67
construction land 22.45 14.97 12.03
Static investment
427.66 83.48 29.15 181.41
(including tax)
151
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Appendix 6:Schedule of Land Acquisition and House Relocation
Schedule of Land Acquisition and House Relocation for the Package Project in Kunming City
Table 1
Solid waste management in Solid waste management in Solid waste management Enhancement of Water
Item
Xundian County Songming County in Luquan County Quality Monitoring Capacity
I. Land acquisition
1.Confirmation of the affected persons by land acquisition 2006.11 2007.4
2. Preparation for inventory survey of land acquisition and
2006.12~2007.1 2007.4
investigation
3. Consultation and determination of compensation standard for
2007.1~2007.9 2007.6~2007.8 2007.1~2007.4
land acquisition
4. Disbursement of compensation for land acquisition 2007.6~2007.10 2007.6~2007.12 2007.4~2007.5
5. Going through formalities of land acquisition 2007.7~2007.10 2007.7~2007.12 2007.4~2007.6
II. Production restoration
1. Construction of water conservancy project 2007.4~2007.12
2. Altering land or restructuring agricultural planting (such as
2007.6~2007.12 2007.6~2007.12 2007.4~2007.12
selection of crop variety)
3. Consultation of land adjustment and distribution option 2007.6~2007.8 2007.5~2007.7
4. Land adjustment and distribution 2007.9~2007.12 2007.7~2007.12
5. Resettlement of labor force Before Feb. 2007 Before Feb. 2007
IV. Restoration and reconstruction of special items Before Feb. 2008 Before Feb. 2008
152
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Schedule of Land Acquisition and House Relocation for the Package Project in Dali Prefecture
Table 2
Wastewater Integrated
Rural non-point pollution Urban drainage treatment plant and Integrated water Integrated water water
Solid waste
Serial systems under associated sewer environmental environmental environmental
Item control in Lake Er’hai management in
No. Daili City network of management of management of management
Eryuan County
Basin jurisdiction Dengchuan Town in Miju River Yongan River of Luoshi
Eryuan County River
I Land acquisition
Confirmation and check of land acquisition
1 scope 2006.12~2007.4
Survey and check of inventory of land
2 acquisition 2006.12~2006.5
Consultation and determination of compensation
3 standard for land acquisition 2007.10~2007.11
Disclosure of compensation resettlement options
4 for land acquisition 2007.11
Disbursement of compensation for land
5 acquisition 2007.12
6 Handling land use formalities 2007.12
II Relocation and construction of special items
Determination and Disclosure of production
1 restoration and compensation distribution
scheme 2007.11
2 Payment of compensation fee 2007.12
2007.9~
Ⅲ Relocation of special items 2007.12
IV Commencement of project construction 2008.1
153
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Schedule of Land Acquisition and House Relocation for the Package Project in Lijiang
Table 3
Serial Wastewater management in Wastewater management in Lijiang Ancient Lijiang City WWTP and sewer Solid waste management
Item
No. Huaping County Town network in Lijiang City
I Land acquisition 2006.11
1 Determination of land requisition scope 2006.11
Survey and check of land requisition
2 2006.12~2007.1
inventory
Consultation and determination of
3 2007.2~2007.3
compensation standard for land acquisition
Disclosure of compensation resettlement
4 2007.3~2007.9
options for land acquisition
Disbursement of compensation for land
5 2007.4~2007.12
acquisition
6 Handling land acquisition formalities 2007.5~2007.12
II Production restoration
Determination of production restoration
1 2007.6~2007.7 2007.6~2007.7 2007.5~2007.7
option
Land adjustment in villagers’ groups or cash
2 2007.7~2007.12 2007.7~2007.12 2007.7~2007.12
payment
III House relocation and construction
1 Determination of relocation scope 2006.12~2007.1
2 Survey and check of relocation inventory 2007.1~2007.2
Consultation and determination of
3 2007.2~2007.3
compensation standard for house relocation
154
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Serial Wastewater management in Wastewater management in Lijiang Ancient Lijiang City WWTP and sewer Solid waste management
Item
No. Huaping County Town network in Lijiang City
Disclosure of resettlement option for house
4 2007.3~2007.9
relocation
Disbursement of compensation for land
5 2007.4~2007.12
acquisition and relocation (the first stage)
6 Distribution of house plots 2007.4~2007.12
7 Resettlers’ constructing new houses 2007.4~2007.12
8 Disbursement of compensation balance 2008.2
9 Resettlers’ moving into new houses 2008.2
10 Demolition of old houses Before Dec. 2007
Relocation of enterprises and public
IV 2006.12~2007.12
institutions
V Commencement of project construction 2008.7 2007.5 2008.8 2008.6
155
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Schedule of Land Acquisition and House Relocation for the Package Project in Wenshan Prefecture
Table 4
Wenshan County Malipo County Funing County
Item Panlong River in Wastewater Solid waste Wastewater Solid waste Integrated management
Wenshan County management in management in management in Malipo management in of Puting River in
Town Area Wenshan County Malipo County County Funing County Funing County
I. Land acquisition
1.Confirmation of the affected persons by
2006.11
land acquisition
2.Preparation of inventory survey for land
2006.12~2007.1
acquisition and investigation
3.Consultation and determination of
2007.1~2007.9 2007.6~2007.8 2007.1~2007.4 2007.1~2007.4 2007.1~2007.2 2007.1~2007.2
compensation standard for land acquisition
4. Disbursement of compensation for land
2007.6~2007.10 2007.6~2007.12 2007.4~2007.7 2007.7~2007.10 2007.2~2007.3 2007.2~2007.2
acquisition
5. Handling land acquisition formalities 2007.7~2007.10 2007.7~2007.11 2007.5~2007.7 2007.8~2007.12 2007.2~2007.3 2007.2~2007.2
II. Production restoration
1. Construction of water conservancy
2007.7~2007.12 2007.9~2007.10 2007.7~2007.12
projects
2. Land reclamation and alteration or
restructuring of agricultural planting (such 2007.7~2007.12 2007.9~2007.10 2007.7~2007.12
as selection of crop variety)
3. Consultation of land adjustment and
2007.7~2007.12 2007.9~2007.10 2007.7~2007.12
distribution option
4. Land adjustment and distribution 2007.7~2007.12 2007.9~2007.10 2007.7~2007.12
Before Dec.
5. Resettlement of labor force Before Dec. 2007 Before Dec. 2007
2007
156
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Table 4 (continued)
Guangnan County Qiubei County Yanshan County Maguan County
Wastewater Wastewater Wastewater
Solid waste
Item Puzhehei Lake in management in management in Urban drainage system
management in Qiubei County Qiubei County Qiubei County in Yanshan County
management in
Maguan County
Guangnan County (WWT) (WS)
I. Land acquisition
1. Confirmation of the affected persons by land
2006.11
acquisition
2.Preparation of inventory survey for land
2006.12~2007.1
acquisition and investigation
3.Consultation and determination of
2007.1~2007.1 2007.6~2007.8 2007.1~2007.4 2007.1~2007.4 2007.1~2007.4
compensation standard for land acquisition
4. Disbursement of compensation for land
2007.2~2007.3 2007.6~2007.12 2007.4~2007.7 2007.4~2007.6 2007.4~2007.8
acquisition
5. Handling land acquisition formalities 2007.2~2007.3 2007.7~2007.12 2007.5~2007.7 2007.5~2007.8 2007.6~2007.12
II. Production restoration
1. Construction of water conservancy projects 2007.7~2007.12 2007.8~2007.10 2007.8~2007.10
2. Land reclamation and alteration or
restructuring of agricultural planting (such as 2007.7~2007.12 2007.8~2007.10 2007.8~2007.10
selection of crop variety)
3. Consultation of land adjustment and
2007.7~2007.12 2007.8~2007.10 2007.8~2007.10
distribution option
4. Land adjustment and distribution 2007.7~2007.12 2007.8~2007.10 2007.8~2007.10
5. Resettlement of labor force Before Dec. 2007 Before Dec. 2007 Before Dec. 2007
III. Restoration and reconstruction of special
2007.2~2007.3
items
157
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Appendix 7:Records of Symposiums
Summary of Symposium Records
Time Place Participant Main topic for discussion Conclusion
Mobilization meeting of The project owners are requested to cooperate with ECIDI, the consulting unit,
Environmental
land acquisition and organize the local governments and resettlers’ representatives to participate and
Morning Protection 19 persons from the county project
relocation as well as provide data as required and inventory of land acquisition and relocation in
of Dec. 4 Bureau of office and all project owners
resettlement planning project-affected areas.
Kunming City
work for the project
The adopted method in existing refuse landfill is bare dumping and there are great
12 persons from the city project
Understanding the impacts on the surrounding environment and cannot satisfy urban development.
office, Xundian County Party
Afternoon Xundian County necessity of project Therefore, construction of the project is in absolute demand. The project has obvious
Committee, the county government,
of Dec. 4 Party Committee construction and impacts advantages that the occupied land is the collective woodland and contracted
urban construction bureau and state
of land acquisition wasteland and land acquisition only affects one rural household and wasteland of the
land administration bureau
village collective with few impacts.
Refuse landfill is adopted for the project. It is to lease 20 mu reclaimed wasteland
12 persons from the county urban
contracted by Mr. Hu Guangchun of the village and it has impacts on his production
Haizi Villagers construction bureau, township Comprehending project
and business to certain extent but his livelihood will not be affected after given
Morning Committee of government, state land impacts and implementing
proper compensation.
of Dec. 5 Jinsuo Township, administration office, forestry production resettlement
The rent will be directly paid to the owner with land use right and the use right will
Xundian County station and villagers’ committee as measures
be returned after completion of leasing and reclamation, so there are no impacts on
well as the villagers’ representatives.
his production and living.
The existing dump site is within the village and there are great impacts on the
surrounding villagers. It only needs to lease the collective land of the village for
9 persons from the county urban
construction of the project and there will be small influence on villagers’ production
Beiguan Villagers construction bureau, town Comprehending project
and living. Therefore, it is thought that construction of the project is very necessary
Afternoon Committee of government, planning station, impacts and implementing
and they all express their active support to it. As for rent use, they think it should be
of Dec.5 Rende Town, forestry station, and villagers’ production resettlement
used for collective non-profit undertakings.
Xundian County committee as well as the villagers’ measures
The method of one-year compensation for one-year occupation is adopted and the
representatives
rent is directly paid to the collective of villagers’ groups and the use right will be
returned after reclamation at leasing expiration.
158
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Time Place Participant Main topic for discussion Conclusion
All the participants express their support to the project. They think the project will
16 persons from the city project
facilitate social development and improvement of the people’s life. The existing
office, the county government, Understanding the
Songming Hotel dump site is of bare dumping and is situated in the supply area of Longtan water,
Morning environmental protection bureau, necessity of project
in Songming resulting in great pollution for the downstream water resources. Therefore,
of Dec. 8 land administration bureau, forestry construction and impacts
County construction of new refuse landfill is imperative. However, it will occupy some
bureau, construction bureau and of land acquisition
farmland, resulting in certain impacts on the resettlers’ production and living. It is
agriculture bureau.
necessary to formulate feasible resettlement options.
During project construction, some land of the village will be used. Most resettlers
hope to adopt leasing method, thus they will have proceeds every year and it is
usually higher than planting income. However, some resettlers doubt whether the
13 persons from the county Comprehending project
newly constructed refuse landfill will affect their life and health just like the existing
Afternoon Sijiao Village of environmental protection bureau and impacts and implementing
dumping sites. Through explanation, they know that the project will adopt enclosed
of Dec.8 Songyang Town villagers committee as well as production resettlement
landfill and will not influence the ambient environment and villagers’ production and
villagers’ representatives measures
living. They all agree with the project construction.
Land acquisition will have certain impacts on the resettlers’ production, but the
impacts can be mitigated by such resettlement option as cash compensation.
The project is very favorable for the town. At present, along with rapid development
Understanding the of the county town, the existing dumping sites and refuse cleaning and transport
necessity of project facilities cannot satisfy the demands and there are also impacts on further
Afternoon Songyang Town 4 persons from Songyang Town
construction and improvement of the residents’ living standard. In formulating the resettlement
of Dec.8 Government government and villagers committee
implementing production options, the resettlers’ opinions should be listened to. The compensation should be
resettlement measures paid to the villagers committee and some will be used for the collective non-profit
undertakings and the other paid to villagers’ groups and the contracting households.
There is no refuse treatment site in conformity with the national sanitation standard
19 persons from the city project up to now in Luquan County and meantime the refuse collecting system is not
Understanding the
Construction office, the county government, perfect. The existing dumping site is 200m to the water source of the county town,
Morning necessity of project
Bureau of construction bureau, state land Changjiu River and causes dangers to safety of water quality. The new refuse landfill
of Dec. 21 construction and impacts
Luquan County administration bureau, water can not only improve the current situation and accommodate to demands of urban
of land acquisition
resources bureau and forestry bureau development but also protect the ecological environment of the Three Gorges
reservoir area.
159
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Time Place Participant Main topic for discussion Conclusion
Some land will be occupied by the project and most villagers express their support,
Over 20 persons from the county but others express their worry and raise that the project may affect the current
construction bureau, environmental domestic water and the close linear distance form the refuse landfill to the residential
Comprehending project
Yanwachong sanitation station, Pingshan Town area is likely to affect their living environment, therefore, they request the
Afternoon impacts and implementing
Village in government, villagers committee as government to solve the issue of domestic water and take certain measure to ensure
of Dec. 21 production resettlement
Pingshan Town well as the resettlers’ the ambient environment will not be impacted. They also hope the government can
measures
representatives, Mr. Yang Qingbiao invest in road construction to improve traffic.
and Mr. Zhang Daode Such resettlement option as combining cash compensation with land regulation can
mitigate impacts of land acquisition.
Over 20 persons from the county
Environmental The project owners are requested to actively cooperate with the consulting unit,
Dec. 8, environmental protection bureau, Project mobilization
Protection ECIDI, in relevant work, organize the local governments and resettlers’
planning and construction bureau,
2006 Bureau of Eryuan meeting representatives to participate and provide timely the necessary data and land
state land administration bureau and
County acquisition inventory in project-affected areas.
forestry bureau
Environmental Over 30 persons from the members The project owners are requested to actively cooperate with the consulting unit,
Dec. 9, Protection of the project leading group of the Project mobilization ECIDI, in relevant work, organize the local governments and resettlers’
2006 Bureau of Dali city environmental protection meeting representatives to participate and provide timely the necessary data and land
City bureau, and water resources bureau acquisition inventory in project-affected areas.
15 persons from the county The capacity of the existing refuse disposal plant cannot satisfy the demand of urban
environmental protection bureau, development and construction of the project is urgent. The villagers all express their
Interview to resettlers and
Dec. 12, Songhe Village of planning and construction bureau, support to the project and they think the project construction will improve the local
Zibihu Town in forestry bureau and Zibihu Town resettlement discussion outgoing traffic. The occupied land is of collective woodland and contracted
2006 Eryuan County government as well as the cadres wasteland (dry slope land) and the income of the villagers also comes from gathering
meeting
from villagers’ groups and villagers’ pine pubescent, therefore, there are few impacts on villagers’ income. Cash
representatives compensation will be taken through consultation with villagers’ groups and the town.
For the integrated non-point pollution control and water environmental management
10 persons from the county projects, the villagers all express their support and they think construction of these
Interview to resettlers and
Dec. 12, Jiutai Community environmental protection bureau, non-profit projects will facilitate improving the ambient natural and living
of Zibihu Town Zibihu Town government and cadres resettlement discussion environment, promoting development of the areas surrounding the county town as
2006 in Eryuan County of villagers groups and villagers’ well as tourism in Zibihu Scenic Spots and they will benefit from these projects. The
meeting
representatives requisitioned land has few impacts on villagers’ income and cash resettlement will be
taken by negotiation with the village, group and the town.
160
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Time Place Participant Main topic for discussion Conclusion
For the integrated non-point pollution control and water environmental management
11 persons from the county projects, the villagers all express their support and they think construction of these
environmental protection bureau, non-profit projects will facilitate improving the ambient natural and living
Dec. 14, Interview to resettlers and
Yousuo Town in Yousuo Town government and environment, promoting development of the areas surrounding the county town as
resettlement discussion
2006 Eryuan County cadres of villagers’ groups well as tourism in Xihu Scenic Spots and the river harnessing will also improve the
meeting
concerned and villages’ local irrigation conditions to make the villagers benefit. The requisitioned land (most
representative of reclaimed wasteland) has few impacts on villagers’ income and cash resettlement
will be taken by negotiation with the village, group and the town.
8 persons from the county For Dengchuan Wastewater Treatment Plant project, villagers all express they will
Zhonghe Village environmental protection bureau, support but they think it should be planned in a reasonable way and they hope the
Dec. 15, Interview to resettlers and
of Dengchuan Dengchuan Town government and plant site should have certain distance to the village. The requisitioned garden plots
resettlement discussion
2006 Town in Eryuan cadres from villagers groups are owned by the collective, not contracting land, so there are few impacts on the
meeting
County concerned and villagers’ villagers’ income. After consultation with the village, group and the town, cash
representatives compensation will be taken.
7 persons for the city environmental
For the sewer network project in Fengyi Town, the villagers all express they will
protection bureau, project owner
Dec. 21, Fengming Village Interview to resettlers and support to project construction and they think these non-profit projects will facilitate
units, Fengyi Town government and
of Fengming resettlement discussion improving the ambient living and sanitation environment and they will benefit from
2006 cadres from the villagers groups
Town in Dali City meeting them. For the farmland to be temporarily occupied, they hope to get reasonable
concerned and villagers’
economic compensation.
representatives
6 persons from the city
For non-point pollution control projects, the villagers all express they will support the
environmental protection bureau,
Dec. 22, Taihe Village of Interview to resettlers and project construction and they think construction of these non-profit projects will
Xiaguan Town government and
Xiaguan Town in resettlement discussion facilitate improving the ambient living and sanitation environment and they will
2006 cadres from villagers groups
Dali City meeting benefit from them. For the requisitioned farmland in small quantity, they hope to get
concerned and the villagers’
reasonable economic compensation.
representative
5 persons from the city
For non-point pollution control projects and sewer network projects, the villagers all
Preservation environmental protection bureau,
Dec. 25, Interview to resettlers and express they will support the project construction and they think construction of these
Zone of ancient project owner unit, Dali Town
resettlement discussion non-profit projects will facilitate improving the ambient living and sanitation
2006 Dali Town in government and cadres of villagers
meeting environment and they will benefit from them. For the requisitioned farmland in small
Dali City groups concerned and villagers’
quantity, they hope to get reasonable economic compensation.
representative
161
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Time Place Participant Main topic for discussion Conclusion
5 persons from the city
For non-point pollution control projects, the villagers all express they will support the
environmental protection bureau, Understanding project
Dec. 26, Majiuyi Village project construction and they think construction of these non-profit projects will
Yinqiao Town government and impact, interview to
of Yinqiao Town facilitate improving the ambient living and sanitation environment and they will
2006 cadres of the villagers groups resettlers and resettlement
in Dali City benefit from them. For the requisitioned farmland in small quantity, they hope to get
concerned as well as villagers’ discussion meeting
reasonable economic compensation.
representative
5 persons from the city
For non-point pollution control projects, the villagers all express they will support the
Xiangyangxi environmental protection bureau, Understanding project
Dec. 27, project construction and they think construction of these non-profit projects will
Village of Wanqiao Town government and impact, interview to
facilitate improving the ambient living and sanitation environment and they will
2006 Wanqiao Town in cadres of the villagers groups resettlers and resettlement
benefit from them. For the requisitioned farmland in small quantity, they hope to get
Dali City concerned as well as villagers’ discussion meeting
reasonable economic compensation.
representative
6 persons from the city
For non-point pollution control projects, the villagers all express they will support the
Haichaohe environmental protection bureau, Understanding project
Dec. 28, project construction and they think construction of these non-profit projects will
Village of Shanggua Town government and impact, interview to
facilitate improving the ambient living and sanitation environment and they will
2006 Shangguan Town cadres of the villagers groups resettlers and resettlement
benefit from them. For the requisitioned farmland in small quantity, they hope to get
in Dali City concerned as well as villagers’ discussion meeting
reasonable economic compensation.
representative
6 persons from the city
For non-point pollution control projects and sewer network projects in Xizhou, the
environmental protection bureau, Understanding project
Dec. 29, Shacun Village of villagers all express they will support the project construction and they think
project owner unit, Xizhou Town impact, interview to
Xizhou Town in construction of these non-profit projects will facilitate improving the ambient living
2006 government and cadres of the resettlers and resettlement
Dali City and sanitation environment and they will benefit from them. For the requisitioned
villagers groups concerned as well discussion meeting
farmland in small quantity, they hope to get reasonable economic compensation.
as villagers’ representative
Environmental All project owners are requested to actively cooperate with ECIDI, the consulting
16 persons from the city project
Protection Project mobilization unit, organize the local government and resettlers’ representatives to participate and
Dec. 1 office, subproject owners and
Bureau of Lijiang meeting timely provide required data and land acquisition inventory in the project affected
project consulting unit
City areas.
25 persons from the county
The people’s Mobilization meeting for
government, project owner and The cadres of the county government point out the necessity of construction of the
Dec. 3 government of subprojects in Huaping
relevant design department and project and request the departments concerned to actively cooperate.
Huaping County County
consulting unit
Home of Mr.
He Zikun in 6 representatives of the The villagers express their support to project construction and some farmers hope to
Dec. 5 Interview in households
Rongjiang project-affected rural households get cash compensation for land acquisition.
Village
162
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Time Place Participant Main topic for discussion Conclusion
Administration
8 persons from the city project
commission of Discussion meeting for The Shizishan project concerns house relocation and suggestions are provided on
Dec. 19 office, project owner unit and
the ancient town project survey how to make inventory survey and the work plan is scheduled.
consulting unit
in Lijiang City
8 persons from the city project
Construction office, project owner unit,
Discussion meeting for The project owner is urged to site the management center as soon as possible so as to
Dec. 21 Bureau of Lijiang environmental sanitation bureau of
project survey arrange the next work.
City the ancient town area and consulting
unit
30 persons from the city project
office, project owner unit, the
Administration
people’s government of the ancient Exchange are carried out on the resettlement option for the residents and enterprises
commission of Discussion meeting for
Dec. 22 town area, office and residential and public undertakings involved in Shizishan project and the inventory survey will
the ancient town resettlement options
committee concerned, and be completed in earnest.
in Lijiang City
consulting unit as well as resettlers’
representative
Villagers
10 persons from the city project
committee of
office, project owner unit, The refuse landfill is located near Yonghong Group of Wenhua Village and the
Wenhua Village
Dec. 22 consulting unit and villagers Interview in households villagers hope construction of the project will not pollute the local environment and
of Jinshan
committee as well as villagers’ on this basis they support the project.
Township in
representative
ancient town area
Lijiang Water
5 persons from the city project
Supply and Discussion meeting for Construction of the project can decrease pollution, improve urban environment and
Dec. 25 office, project owner unit and
Sewerage project survey had significant meaning for Lijiang City. The project owner has arranged work plan.
consulting unit
Company
8 persons from the city project
Office of Minru
office, project owner unit, villagers The villagers support construction of the project and hope the land can be adjusted
Dec. 27 Group of Yangxi Interview in households
committee, and consulting unit as after requisition.
Village
well as resettlers’ representative
Environmental
Reporting meeting for The whole work course is reported to the leaders of the project office of Lijiang City
Protection 5 persons from the city project
Dec. 28 and the problems left over are made clear and the project owners are urged by the
Bureau of Lijiang office and consulting unit project survey results project office to solve them as soon as possible.
City
163
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Time Place Participant Main topic for discussion Conclusion
Environmental
Mobilization meeting for All county project offices (project owners) are requested to actively cooperate with
Protection
Dec. 4, Leaders of the project office and 8 social and economic ECIDI, the consulting unit, organize the local government and resettlers’
Bureau of
2006 county project offices survey work in representatives to participate and timely provide the required data and land
Wenshan
project-affected areas acquisition inventory in project-affected areas.
Prefecture
Understanding basic The two projects in the county will directly affect two administrative villages and
Environmental
Morning 10 persons from the prefecture conditions of project five persons from the county environmental protection bureau headed by Mr. Wu
Protection
of Dec. 5, project office and the county construction and its Zhengrong are requested to cooperate in survey in an all-round way, collect the data
Bureau of Malipo
2006 environmental protection bureau impacts and scheduling required by the consulting unit and define the land acquisition scope for the two
County
survey work projects.
Understanding project
impacts, discussing with
2.62mu farmland will be requisitioned by the project but there are no great impacts.
Afternoon Laodifang 12 persons from the project office of village cadres and
According to discussion with the village cadres, if reasonable compensation is given
of Dec. 5, Village in Malipo the prefecture and county, villagers’ resettlers’ representatives,
to the land-lost households, their production will not be affected greatly. The
2006 Town cadres and resettlers’ representative and carrying out
resettlers express their support for the project.
production resettlement
measures
Understanding project
impacts, discussing with The requisitioned farmland is not in large quantity, resulting in only small impacts on
16 persons from the county project
Morning village cadres and each households involved in land acquisition. According to discussion with the
Chongtou Village office and villagers’ cadre and
of Dec. 6, resettlers’ representatives, village cadres, if reasonable compensation is given to the land-lost households, their
in Malipo Town resettled households for land
2006 and carrying out production will not be affected greatly. The resettlers express their support for the
acquisition
production resettlement project.
measures
Comprehending
Environmental
Morning 9 persons from the prefecture conditions of project Land acquisition has been accomplished preliminarily and the land required by the
Protection
of Dec. 8, project office and the county construction and land project belongs to Xichou Environmental Sanitation Station and the land requisition
Bureau of Xichou
2006 environmental protection bureau acquisition and scheduling agreement for the project construction is shown to the staff of the consulting unit.
County
survey work
Comprehending The county is involved in two projects. After construction, the local environment will
Environmental
Morning 9 persons from the prefecture conditions of project be greatly improved. The land acquisition scope of the project is determined. After
Protection
of Dec. 9, project office and the county construction and land the project is put into operation, if there is need to recruit workers, the project owner
Bureau of Funing
2006 environmental protection bureau acquisition and scheduling will be consulted to give hiring preference to the land-lost farmers under equal
County
survey work conditions.
164
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Time Place Participant Main topic for discussion Conclusion
Understanding project
Group of Weishe impacts, discussing with
12 persons from the county project
Afternoon Village in village cadres and For the village has little land (much land has been requisitioned for construction in
office, and cadres of villagers
of Dec. 9, Wenhua resettlers’ representatives, recent years), it is hoped to get reasonable compensation after land is requisitioned
groups and resettlers’
2006 Community of and carrying out by the project and the compensation will be used as capital for other industries.
representatives
Xinhua Town production resettlement
measures
Environmental Comprehending
The county minority middle school and two households are involved in land
Morning Protection 8 persons from the prefecture conditions of project
acquisition of the project and land acquisition results in small impacts. After
of Dec. Bureau of project office and the county construction and land
construction, the local environment will be greatly improved and the residents’ living
12, 2006 Guangnan environmental protection bureau acquisition and scheduling
quality will be heightened.
County survey work
Understanding project
impacts, discussing with
8 persons from the project office of Some farmland of the village will be requisitioned but in small quantity and so there
Afternoon Duanfeng Village village cadres and
the prefecture and county and the are no great impacts on resettlers’ production. It is hoped to compensate according to
of Dec. in Liancheng resettlers’ representatives,
cadres from villagers groups and relevant state policies. The resettlers express their support to the project and they
12, 2006 Town and carrying out
resettlers think construction of the project will improve the local environment.
production resettlement
measures
Puzhehei Lake is the local famous scenic spot, but in recent years the environmental
pollution becomes serious increasingly due to fishing in the upper reaches and
Comprehending
Environmental continuously increasing tourists. Construction of the project will improve the
Morning 8 person from the prefecture project conditions of project
Protection environment of the scenic spot. The land used by the project is distributed along both
of Dec. office and the county environmental construction and land
Bureau of Qiubei banks of Puzheheai Lake and production and living of the residents along both banks
16, 2006 protection bureau acquisition and scheduling
County will be affected in a period of time. On the whole, formulating a proper resettlement
survey work
option can not only restore their production and living but also improve the local
environment and heighten their living quality.
Understanding project
impacts, discussing with
Puzhehei Village Environmental pollution has become serious in recent years and has started to affect
Morning 13 persons from the county project village cadres and
in the local tourism income. Therefore, the local residents express that they favorably
of Dec. office and cadres from the villagers resettlers’ representatives,
Shuanglongying receive project construction as long as compensation is conducted according to the
18, 2006 groups and resettlers and carrying out
Town national policies.
production resettlement
measures
165
Yunnan Urban Environment ProjectResettlement Action Plan (RAP)
Time Place Participant Main topic for discussion Conclusion
Bare dumping is adopted in the existing refuse landfill, as a result, there are great
Environmental
Understanding necessity impacts on the peripheral environment and the urban development demands cannot
Dec. 24, Protection 7 persons from the project office of
of project construction and be satisfied. Therefore, implementation of the project is very necessary. The whole
2006 Bureau of the prefecture and the county
land acquisition conditions project has obvious advantages and the occupied land belongs to the environmental
Maguan County
sanitation station of Guangnan County.
Implementation of the project looks especially necessary for accommodation to
Environmental Qiubei development and control and protection of Puzhehei Lake. The land
Consulting resettlement
Dec. 27, Protection 4 persons from the county project requisitioned by integrated water environmental management project of Puzhehei
options in light of land
2006 Bureau of Qiubei office and the county government Lake is in large quantity and totally 533 mu land of all kinds is concerned. During
acquisition of the project
County compensation for land acquisition, the compensation standard concerned refers to the
documentation of Qiuzhengtong [2004] No. 32.