CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION









TENDER DOCUMENTS









OFFICE OF THE

XEN/CON/TENDER/BBS









TENDER NOTICE NO: CE/CON/HQ/BBS/T/30/2011 Dtd: 11-10-2011









Name of work:- Bhubaneswar: Multi-purpose

Indoor Stadium: Execution of Stadium

Building, internal finishing and other allied

works.









PRICE: Rs. 10,000/-









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

-1-

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION









CONTENTS

OF

TENDER DOCUMENTS









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

-2-

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION





C O N T E N T S OF TENDER DOCUMENTS

Chapter. Contents

No.

1 Top Sheet

2 Tender Notice

3. Instructions to the tenderer(s)

4. Eligibility Criteria and Qualifying Criteria

5. General Conditions of contract

6. Special Conditions of Contract.

7. Technical Conditions of contract

(Additional Special Conditions of Contract)

Section – A : Specification of Civil works and concrete Mix Design.

Section – B : Conditions for supply of Cement & steel by contractor.

Section – C : Code of practice and Specifications

Section – D : Taxes and duties, royalties, price variation and completion

period etc.

Section – E : SAFETY RULES

Section – F : Felling of trees, safe working methods, provision of level

crossing and procurement of machineries by contractor.

Section – G : Price variation clause

Section – H : Drafting of vehicles, working hours, acceptance criteria of

concrete.

Section– I : Special Conditions of quality control.

Section– J : Special Conditions of Fabrication ,assembly and erection of

steel work.

Section– K : Special Conditions of planning & Execution of work

Section– L : Rate quoted/accepted

8. Scope of the work in brief.

9. Summary of works in Tender Schedules.

10. Details of works in Tender Schedule A to F.

11. Specimen format of Bank Guarantee Bond.

12. Specimen format of letter of Acceptance.

13. Questionnaires.

14. Certificate of Familiarization.

15. Declaration of Tender(s)

16. Offered Rate Sheet (Very Important)

17. Annexure – A to M.

END OF THE TENDER DOCUMENT.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

-3-

CE/Con/HQ/BBS/T/30/2011







CHAPTER-01









EAST COAST RAILWAY CONSTRUCTION ORGANISATION









TOP SHEET









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

-4-

CE/Con/HQ/BBS/T/30/2011

CHAPTER-01







EAST COAST RAILWAY CONSTRUCTION ORGANISATION





TOP SHEET



Office of the

Chief Engineer (Con)-HQ

Bhubaneswar-23





TENDER DOCUMENTS FOR



Name of work: Bhubaneswar: Multi-purpose

Indoor Stadium: Execution of Stadium

Building, internal finishing and other allied

works.

• Tender Notice No: CE/CON/HQ/BBS/T/30/2011 Dtd: 11-10-2011



• Date of closing of the Tender : 18-11-2011 at 12.00Hrs.

(Sealing of tender Box)



• Date of opening of the Tender: 18-11-2011 at 12.30Hrs.



• Place of opening of Tender: Offices of XEN/C/Tender/EcoRly/BBS,

DY.CE/Con/EcoRly/SBP & DY.CE/Con/EcoRly/VSKP.



• Tender documents issued to ________________________________



• Address:________________________________________________



________________________________________________



• Tender document cost - Rs.10000/- (Rs. Ten Thousand only)



Money Receipt No.____________________Dt.______



Deposited with: ________________________________









Chief Engineer (Con) -HQ

E. Co. Rly.,Bhubaneswar









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

-5-

CE/Con/HQ/BBS/T/30/2011





CHAPTER-02







EAST COAST RAILWAY CONSTRUCTION ORGANISATION







TENDER NOTICE









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

-6-

CE/Con/HQ/BBS/T/30/2011

CHAPTER-02

EAST COAST RAILWAY

(CONSTRUCTION ORGANISATION)

TENDER NOTICE

Office of the

Chief Engineer/Con/HQ

Bhubaneswar-23

1. Tender Notice No: CE/CON/HQ/BBS/T/30/2011 Dtd. 11-10-2011

2. Sealed tenders in the prescribed form are invited by CE/CON/HQ/ECORly/CSPur/BBS on behalf

of the President of India for execution of the following works from the tenderers fulfilling the

requisite eligibility criteria:-

Ite Name of work Approxim Earnest Date of Date of Cost of

m ate Value Money closing of opening of Tender

No. (Rs.) Deposit Tender(Seal tender docum

(Rs) ing of ent

tender box) (Rs)

1 Bhubaneswar: Multi-

purpose Indoor Stadium:

6,39,780 18-11-11 18-11-11

Execution of Stadium 979.57

At At 10000

Building, internal Lakhs 12.30 Hrs.

12.00 Hrs.

finishing and other allied

works.



3. Eligibility criteria for participation in the Tender :- Tenderer(s) must fulfil/satisfy the

following eligibility criteria for participating in this tender and consideration of their offers.



3.1 The tenderer(s) should have physically completed within qualifying period i.e. three

previous financial years and current financial year (even though the work might have

commenced before the qualifying period) at least one similar single work for a minimum

value of 35% of advertised tender value in Railways or any other Govt/Semi-Govt

Organisation in one single contract agreement.



Similar nature of work means: - “Construction of multistoried buildings of RCC

Frame structure”.



3.1.1 The total value of similar nature of work completed during the qualifying period and not

the payments received within qualifying period alone, shall be considered.

In case, the final bill of similar nature of work has not been passed and final

measurements have not been recorded, the paid amount including statutory deduction

shall be considered. If final measurements have been recorded and work has been

completed with negative variation, then also the paid amount including statutory deduction

shall be considered.

However, if final measurements have been recorded and work has been completed with

positive variation but variation has not been sanctioned, original agreement value or last

sanctioned agreement value whichever is lower shall be considered for judging eligibility.



3.1.2 In case of composite works involving combination of different works, even separate

completed works of required value shall be considered while evaluating the eligibility

criteria. For example, in a tender for bridge works where similar nature of work has been

defined as bridge works with pile foundation and PSC superstructure, a tenderer, who has

completed one bridge work with pile foundation of value at least equal to 35% of tender

value and also has completed one bridge work with PSC superstructure of value at least

equal to 35% of the tender value, shall be considered as having fulfilled the eligibility

criterion of having completed single similar nature of work.



3.2The total contractual payments received by the tenderer(s) during three previous financial

years and the current financial year should be minimum 150% of advertised tender value.

In support of this the tenderer(s) should submit audited balance sheet duly certified by the

Chartered Accountant.



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

-7-

CE/Con/HQ/BBS/T/30/2011









NB :

(A) Current financial year means, the financial year in which the tender is opened.

Financial year means on and from 1 st April to 31st March.

(B)The “tenderer(s)” mentioned in para 3.1 and 3.2 above means – In the “name

and style”, the tenderer(s) who are submitting their offers in the capacity of

individual/proprietary/partnership firms etc.

© Normally, the credentials (technical and financial) should be in the “name and

style” of the tenderer(s) who are submitting their offer as a tenderer(s).

(D)The tenderer(s) who have acquired necessary credentials (technical and

financial) as a constituent in the partnership/Joint Venture firm, such

apportioned credentials (technical and financial) will also be considered.

(Documents shall be furnished).

(E)The credentials (technical and financial) with regard to execution and physical

completion of single similar work and contractual receipts should pertain to the

qualifying period i.e. within the current financial year and three previous financial

years.

(F) Joint Ventures will not be allowed to participate in this tender.

(G) Authentic copy of documents should be furnished by the tenderer(s) along with

their offer to fulfill the eligibility criteria otherwise their offers will not be

considered and summarily rejected.



4. The tenderer should also submit the following documents along with their offer.



4.1 List of personnel, organization available on hand and proposed to be engaged for

the subject work.



4.2 List of Plant & Machinery available on hand (own) and proposed to be inducted (own

and hired to be given separately) for the subject work.



4.3 List of works physically completed in the last 03(three) financial years under

Govt./Semi Govt. organizations giving description of work, organization for whom

executed, approximate value of contract at the time of award, date of award and date

of scheduled completion of work. Date of actual start, actual completion and final

value of contract should also be given.



4.4 List of works on hand indicating description of work, contract value, approximate value

of balance work yet to be done and date of award.



NOTE :In case of items 4.3 & 4.4 above, supportive documents/certificates from the

organizations with whom they worked/are working should be furnished.

Certificates from private individuals for whom such works are executed/being

executed shall not be accepted.



5.0 The credential certificates as per para 3.1 above to be furnished by the tenderers

should contain the basic information such as (i) Contract Agreement No., (ii) Detailed

nature of work executed, (iii) Date of physical completion of work, (iv) Total amount

received, (v) Name & Style in whose favour the credential certificate is issued.



6.0Tenderers must comply the “Mandatory Requirements” as per Para 12, Chapter-3

(Instructions to tenderers).



7.0.The contract period of the works for completion is 20(Twenty) months from the

date of issue of the Acceptance Letter .



8.0.The Tenderers who fulfill the above eligibility criteria are requested to collect the

tender document in person or through their authorized representative on production

of required amount of money receipt as mentioned above per set in support of the

deposit towards the cost of tender document (Non-refundable) made either with

Divl.Cashier/Con/E.Co.Rly/ CSPur/ Bhubaneswar-23 or any Station

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

-8-

CE/Con/HQ/BBS/T/30/2011

Master/Superintendent of E.Co.Railway against Est No.CAO/C/BBS/11-12/Estt/EN-

BBS/52/104/OR,Allocation No: 52/DF-II.

9.0. Tender documents are obtainable from the offices of the XEN/Con/ Tender/E.Co.Rly/

Bhubaneswar, Dy.Chief Engineer/Con/E.Co.Rly/Visakhapatnam & Dy.Chief

Engineer/Con/E.Co.Rly/ Sambalpur on any working day during office working hours

from 27-10-2011 to 17-11-2011. Tender documents are also available on website

www.eastcoastrail.indianrailways.gov.in & http://tenders.gov.in and the

same can be down loaded and used as tender document for submitting the offer. This

facility is available free of cost. However, the cost of tender document as indicated

above will have to be deposited by the Tenderer in the form of a bank draft payable

in favour of FA & CAO/Con/E.Co.Railway/Bhubaneswar along with the tender

document. This should be paid separately and not clubbed with the Earnest Money

deposit. Tenders received without the cost of tender document will be summarily

rejected. In case of any discrepancy between the tender documents down loaded

from internet and the master copy available in the office, the latter shall prevail and

will be binding on the Tenderer(s). No claim on this account will be entertained.



10.0 The tender form is not transferable.



11.0 The earnest money required may be deposited in any acceptable form as mentioned in

the tender document except EMD in the shape of Bank Guarantee which is not

acceptable.



12.0 The tender box will be closed at 12.00 Hrs. of tender opening day and the tenders will

be opened in presence of the tenderers at 12.30 Hrs. on the same day in the offices of

Executive Engineer(Con) / Tender /E.Co.Railway/Bhubaneswar-23, Dy.Chief

Engineer(Con)/E.Co.Railway/ Sambalpur, and Dy.Chief Engineer/Con/VSKP.If the date

of opening happens to be a BANDH or Holiday, the tender will be opened at the

same time on the following working day. No tender documents will be sent by post,

but Tenders received by posts will be accepted, however Tenderers are advised to post

the tenders well in advance so as to reach in time at either of the following addresses:-

(1)Executive Engineer(Con)/Tender /E.Co.Rly/C-67/F, Rail Vihar, Chandrasekharpur,

Bhubaneswar – 23

(2)Dy.Chief Engineer(Con) E.Co. Rly., DRM office Complex, Dondaparthy, Visakhapatnam

– 530 016.



NOTE:- Railway shall not be responsible for any delay whatsoever with regards to postal

tender. Tenderers are also advised to clearly mention the name of the work & Tender

Notice No. and date of opening at the top of the envelope and it should be enclosed in

another envelope to avoid opening inadvertently. Name of work, tender Notice No. &

date of opening should be mentioned on both the envelopes and the tenders will be

opened at 12.30 hrs. on the same day at all the above places.



13.0 The Railway reserves the right to cancel the tender or reject any or all tenders without

assigning any reasons thereof.



14.0 The prospective tenderers are advised to visit the website one week before the date of

opening of tender to note any changes/corrigenda issued for this tender. Website:

www.eastcoastrail.indianrailways.gov.in OR http://tenders.gov.in









XEN/C/Tender/BBS

For Chief Engineer/C/HQ/Bhubaneswar

For & on behalf of President of India.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

-9-

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION





CHAPTER-03









INSTRUCTIONS TO TENDERERS









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 10 -

CE/Con/HQ/BBS/T/30/2011

CHAPTER-03



EAST COAST RAILWAY CONSTRUCTION ORGANISATION

INSTRUCTIONS TO TENDERERS

1. Name of work: - Bhubaneswar: Multi-purpose Indoor Stadium: Execution of

Stadium Building, internal finishing and other allied works.



2. Approximate value of Tender : Rs. 9,79,56,835/-



3. (a) Date of closing of Tender | As mentioned in the Top Sheet

(b) Date of opening of Tender | (Chapter-1) and tender notice

(c) Place of opening of Tender | (Chapter-2)



4. Availability of Tender documents: Tender documents are obtainable from the offices of

the Executive Engineer(Con)/ Tender /E.Co.Rly/Chandrasekharpur/ Bhubaneswar – 23 or

Dy. Chief Engineer/Con/E.Co.Railway, Sambalpur or Dy.Chief Engineer/Con/E.Co.

Railway/Visakhapatnam on any working day during office working hours from 27-10-2011

to 17-11-2011 on production of money receipt in support of Rs.10,000/- (Rs. Ten

Thousand only) non-refundable deposited with Divl.

Cashier/Con/EcoRly/C.S.Pur/Bhubaneswar – 23 or any Station Master /station

superintendent of E.Co. Railway against Est No.CAO/C/BBS/11-12/Estt/EN-

BBS/52/104/OR,Allocation No: 52/DF-II.



4.1. Tender documents are also available on website www.eastcoastrailway.gov.in &

http://tenders.gov.in. and the same can be down loaded and used as tender document for

submitting the offer. This facility is available free of cost. However, the cost of tender

document as indicated above in para 4 will have to be deposited by the tenderer in the form

of a bank draft payable in favour of FA & CAO/Con/E.Co.Rly/BBS along with the tender

document. This should be paid separately and not clubbed with the Earnest Money deposit.

Tenders received without the cost of tender document will be summarily rejected.



4.2 Tender documents must be submitted duly completed in all respect in a sealed envelope

duly super-scribing the Tender Notice No. and the name of work in the tender boxes

provided in the offices of Executive Engineer(Con)/Tender /E.Co.Rly /Chandrasekharpur/

Bhubaneswar – 23 or Dy. Chief Engineer/Con/E.Co.Railway, Sambalpur or Dy.Chief

Engineer/ Con/E.Co. Railway/Visakhapatnam within 12.00 hrs. of tender opening day.

No tender document will be sent by post but Tenders received by posts will be accepted,

however Tenderers are advised to post the tenders well in advance so as to reach in time at

either of the following addresses (i) Executive Engineer(Con)/ Tender /E.Co.Rly, C-67/F, Rail

Vihar, Chandrasekharpur, Bhubaneswar-751023 & (ii) Dy.Chief Engineer(Con) E.Co. Rly.,

DRM office complex, Dondaparthy, Visakhapatnam – 530016.



NOTE:- Railway shall not be responsible for any delay in whatsoever with regards to postal

tender. Tenderers are also advised to clearly mention the name of the work & Tender Notice

No. and date of opening at the top of the envelope and it should be enclosed in another

envelope to avoid opening inadvertently. Name of work, tender Notice No. & date of

opening should be mentioned on both the envelopes and the tenders will be opened at

12.30 hrs. on the same day at all the above places.



4.3 Tenderer(s) are free to down load the tender document from the web site at their risk

and cost for the purpose of perusal and to use the same as Tender Document, if so desire,

for submitting their offer, if the offer of any tenderer who has submitted the tender

document down loaded from the web site is accepted, the Contract agreement will be

prepared based on the master copy of the document and will be binding on the contractor.

No claim on this account will be entertained.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 11 -

CE/Con/HQ/BBS/T/30/2011

4.4 The prospective tenderers are advised to visit the website one week before the date of

opening of tender to note any changes/corrigenda issued for this tender.Website:

www.eastcoastrail.indianrailways.gov.in OR http://tenders.gov.in

4.5 Tenderer(s) may note that if any change/ addition/deletion/alterations are found to

have been made by them in the tender documents which may be detected/ noticed at any

stage even after award of the contract, administrative action including banning of business

would be taken against such tenderers. In addition, the tenderer(s)/ bidders will be liable

to be prosecuted under law



5.0 If the required information asked for in the specified proforma attached in the tender

document are not furnished, the tender will be otherwise treated incomplete and hence will

not be considered.



6.0 Tender which are received after the date and/ or time specified may not be considered.



7.0 Tenderer(s) shall sign every page of the tender documents along with enclosures

serially numbered.



8.0 If the documents viz. partnership deed is not submitted along with the tender, the

tender will be treated as having been submitted by individual signing the tender documents.



9.0 The tenderer(s) whether sole proprietor, a limited company or a partnership firm, if

they want to act through agent or individual partner(s) should submit along with the tender

or at a later stage, a power of attorney duly stamped and authenticated by a Notary Public

or by Magistrate in favour of the specific person.



10.0 Tender should furnish an attested BARCHART, activity-wise detailed programme to

complete the work.



11.0 The tender should be accompanied by duly filled in mandate form for EFT as per

proforma given an Annexure-M.



12.0 The tenderer(s) must fullfil/satisfy the following mandatory requirements

failing which their offers shall be summarily rejected.



MANDATORY REQUIREMENTS :



(i) Earnest Money in the acceptable form.

(ii) Cost of the Tender document in the form of Bank Draft in case the

tender document is down-loaded from web site.

(iii) The complete set of Tender Document duly filled in and duly signed by

the tenderer(s).

(iv) Authentic copies of documents in support of formation/registration of

the company/firm/legal authorization of the person to deal with the

tender/ notarized/registered copies of the documents wherever

required as per tender conditions.

(v) Supportive documents/certificates from competent officials to be

submitted regarding technical and financial eligibility criteria as per

paras 3.1 and 3.2 respectively of tender notice (Chapter-2).









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 12 -

CE/Con/HQ/BBS/T/30/2011

CHAPTER-04





EAST COAST RAILWAY CONSTRUCTION ORGANISATION





ELIGIBILITY CRITERIA









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 13 -

CE/Con/HQ/BBS/T/30/2011

CHAPTER-04



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



ELIGIBILITY CRITERIA



1.0 Contractors who have adequate experience and resources to adhere to the

specifications and completion schedule should participate in this tender.



2.0 The earnest money required can be deposited in any acceptable form as

mentioned in the tender document but EMD in the shape of Bank Guarantee is

not acceptable.



2.1. Tender documents are obtainable from the offices as indicated in the tender

notice. Tender documents are also available on website

www.eastcoastrail.indianrailways.gov.in & http://tenders.gov.in and the

same can be down loaded and used as tender document for submitting the offer.

This facility is available free of cost. However, the cost of tender document as

indicated above will have to be deposited by the Tenderer in the form of a bank

draft payable in favour of FA & CAO/Con/E.Co.Railway/Bhubaneswar along with

the tender document. This should be paid separately and not clubbed with the

Earnest Money deposit.



3.0. Eligibility Criteria:-Eligibility criteria for participation in this Tender are indicated

below;-Tenderer(s) should fulfil the following eligibility criteria prescribed for

participating in the tender.



3.1 The tenderer(s) should have physically completed within qualifying period i.e.

three previous financial years and current financial year (even though the work

might have commenced before the qualifying period) at least one similar single

work for a minimum value of 35% of advertised tender value in Railways or any

other Govt/Semi-Govt Organisation in one single contract agreement.



Similar nature of work means:- “Construction of multistoried buildings

of RCC Frame structure”.



3.1.1 The total value of similar nature of work completed during the qualifying period

and not the payments received within qualifying period alone, shall be

considered.

In case, the final bill of similar nature of work has not been passed and

final measurements have not been recorded, the paid amount including statutory

deduction shall be considered. If final measurements have been recorded and

work has been completed with negative variation, then also the paid amount

including statutory deduction shall be considered.

However, if final measurements have been recorded and work has been

completed with positive variation but variation has not been sanctioned, original

agreement value or last sanctioned agreement value whichever is lower shall be

considered for judging eligibility.



3.1.2 In case of composite works involving combination of different works, even

separate completed works of required value shall be considered while evaluating

the eligibility criteria. For example, in a tender for bridge works where similar

nature of work has been defined as bridge works with pile foundation and PSC

superstructure, a tenderer, who has completed one bridge work with pile

foundation of value at least equal to 35% of tender value and also has completed

one bridge work with PSC superstructure of value at least equal to 35% of the

tender value, shall be considered as having fulfilled the eligibility criterion of

having completed single similar nature of work.



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 14 -

CE/Con/HQ/BBS/T/30/2011

3.2 The total contract amount received by the tenderer(s) during three previous

financial years and the current financial year should be minimum 150% of

advertised tender value. In support of this the tenderer(s) should submit audited

balance sheet duly certified by the Chartered Accountant.



NB :



(A) Current financial year means, the financial year in which the tender is opened. Financial

year means on and from 1st April to 31st March.

(B)The “tenderer(s)” mentioned in para 3.1 and 3.2 above means – In the “name and style”,

the tenderer(s) who are submitting their offers in the capacity of

individual/proprietary/partnership firms etc.

© Normally, the credentials (technical and financial) should be in the “name and style” of the

tenderer(s) who are submitting their offer as a tenderer(s).

(D)The tenderer(s) who have acquired necessary credentials (technical and financial) as a

constituent in the partnership/Joint Venture firm, such apportioned credentials (technical

and financial) will also be considered. (Documents shall be furnished).

(E)The credentials (technical and financial) with regard to execution and physical completion

of single similar work and contractual receipts should pertain to the qualifying period i.e.

within the current financial year and three previous financial years.

(F) Joint Ventures will not be allowed to participate in this tender.

(G) Authentic copy of documents should be furnished by the tenderer(s) along with their offer

to fulfill the eligibility criteria otherwise their offers will not be considered and summarily

rejected.



4.0. The tenderer should also submit the following documents along with the tender.

4.1 List of personnel, organization available on hand and proposed to be engaged for

the subject work.

4.2 List of Plant & Machinery available on hand (own) and proposed to be inducted

(own and hired to be given separately) for the subject work.

4.3 List of works physically completed in the last 03(three) financial years under

Govt./Semi Govt. organizations giving description of work, organization for whom

executed, approximate value of contract at the time of award, date of award and

date of scheduled completion of work. Date of actual start, actual completion and

final value of contract should also be given.

4.4 List of works on hand indicating description of work, contract value, approximate

value of balance work yet to be done and date of award.



NOTE :In case of items 4.3 & 4.4 above, supportive documents/certificates from the

organizations with whom they worked/are working should be furnished.

Certificates from private individuals for whom such works are executed/being

executed shall not be accepted.



5.0 The credential certificates as per para 3.1 above to be furnished by the tenderers

should contain the basic information such as (i) Contract Agreement No., (ii)

Detailed nature of work executed, (iii) Date of physical completion of work, (iv)

Total amount received, (v) Name & Style in whose favour the credential

certificate is issued.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 15 -

CE/Con/HQ/BBS/T/30/2011







CHAPTER-05









EAST COAST RAILWAY CONSTRUCTION ORGANISATION





GENERAL CONDITIONS OF CONTRACT









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 16 -

CE/Con/HQ/BBS/T/30/2011

CHAPTER-05



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



GENERAL CONDITIONS OF CONTRACT

1. GENERAL

1.1 The tenderer(s) should not put any unusal condition from their side contradicting

terms and conditions in the tender documents. Such unusal/contradictory

conditions may not be considered.

1.2 PROGRAMME IN THE FORM OF BAR CHART FOR COMPLETION OF WORK,

MACHINERY DEPLOYMENT FOR ACHIEVING THE PROGRAMMED PROGRESS MUST

BE SUBMITTED ALONG WITH THE TENDER.

1.3 PLEASE FILL IN REQUIRED INFORMATION ASKED FOR IN THE SPECIFIED

PROFORMA ATTACHED IN THE TENDER DOCUMENT. TENDER WILL BE OTHER

WISE TREATED INCOMPLETE AND HENCE WILL BE LIABLE FOR REJECTION.

1.4 THE QUANTITY SHOWN IN THE SCHEDULES ARE APPROXIMATE AND ARE LIKELY

TO VARY ON EITHER SIDE (+/-) AS PER CLAUSE-2 OF SPECIAL CONDITIONS OF

CONTRACT (CHAPTER-06).

1.5 THE TENDERER(S) SHALL QUOTE UNIFORM PERCENTAGE (WITHOUT FRACTION /

DECIMAL) ABOVE OR BELOW OVER THE SCHEDULE OF ITEMS GIVEN IN THE

SCHEDULES INDICATING ABOVE OR BELOW CLEARLY IN THE RATE SHEET ONLY.

1.6 NO MOBILISATION, MACHINERY OR ANY OTHER ADVANCES WILL BE ALLOWED

FOR THIS WORK UNLESS OTHERWISE SPECIFIED.

2. TENDER DOCUMENT

2.1 Tenderers are required to submit their offer on the Railway Administration’s

prescribed tender form and the tenderer/ tenderers shall quote his/their rates

therein as required

2.2 Tender must be enclosed in sealed cover super-scribing thereon the name of the

work and the Tender Notice No. and must be deposited in the Tender box in any

one of the office within the prescribed time as mentioned in the Tender Notice.

Tenderer(s) are requested to be present at the time of opening of tender.

Tenders which are received after the date and/or time specified may not be

considered.

2.3 Tenders containing over writing, additions, alterations, erasures, obliterations and

other discrepancies may be considered only if corrections made by the

Tenderer(s) are properly attested by the Tenderer(s) with his/their signature.

2.4 The Tenderer(s) shall sign every page of the tender documents alongwith

enclosures serially numbered and submit all of them with the tender.

2.5 The tenderer(s) should quote rates both in figures and in words. Wherever there

is a difference between the rates quoted in figures and in words, the rate quoted

in words will be considered as correct.

2.6 COMPANY PROFILE

2.6.1 Tenderer(s) should specifically and fully disclose in his/their respective tender,

their respective constitutions and submit along with each tender attested copies

of documents like partnership deed, Articles and Memorandum of Association,

Certificate of Incorporation etc., if any, in support of such disclosures. If

Tenderer(s) is/are a firm i.e. partnership business, it should be stated whether

the same is Registered under the Indian Partnership Act, and the name and

address of all the partners of the firm should be fully disclosed. The Railway

Administration shall always have the liberty to demand production of the original

partnership deed of the said documents and also to make such further and other



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 17 -

CE/Con/HQ/BBS/T/30/2011

inquiries regarding the constitution of the Tenderer(s) as may be considered

necessary.

2.6.2 The tenderer shall clearly specify whether the tender is submitted on his own or

on behalf of a partnership concern. If the tender is submitted on behalf of a

partnership concern, he should submit the certified copy of partnership deed

along with the tender and authorisation to sign the tender documents on behalf of

partnership firm. If these documents are not enclosed along with tender

documents, the tender will be treated as having been submitted by individual

signing the tender documents. The Railway will not be bound by any power of

attorney granted by the tenderer or by changes in the composition of the firm

made subsequent to the execution of the contract. It may, however recognise

such power of attorney and changes after obtaining proper legal advice, the cost

of which will be chargeable to the contractor.

2.6.3 The tenderer whether sole proprietor, a limited company or a partnership firm if

they want to act through agent or individual partner(s) should submit alongwith

the tender or at a later stage, a power of attorney duly stamped and

authenticated by a Notary Public or by Magistrate in favour of the specific person

whether he/they be partner(s) of the firm or any other person specifically

authorising him/them to submit the tender, sign the agreement, receive money,

witness measurements, sign measurement books, compromise, settle, relinquish

any claim(s) preferred by the firm and sign “No Claim Certificate” and refer all or

any disputes to arbitration.

2.7 PROGRAMME OF COMPLETION OF WORK

2.7.1 The Tenderer(s) shall give a comprehensive list of plant and machinery which

he/they propose(s) to use in the execution of work.

2.7.2 Tenderer(s) shall submit along with tender an attested BARCHART, Activity wise

detailed programme of how he/they plan to complete the work in the time frame

stipulated in the tender along with details of machinery proposed to be deployed

to achieve the same. It may please be noted that tender not accompanied by

this programme are liable to be rejected.

2.8 REFERENCE TO RULE BOOK AND DRAWINGS

2.8.1 The drawings for the works as available can be seen in the office of the concerned

Chief Engineer/Con/E.Co.Railway, Chandrasekharpur, Bhubaneswar or in the

office of the concerned Dy.Chief Engineer/Con as the case may be at any time

during office hours.

2.8.2 The terms “Correction Slip” as referred to in this tender document includes the

following terms also.

Addendum Slip

corrigendum slip

Addendum slip and corrigendum slip which are issued in consecutive serials.

2.9 S.E. Railways General Conditions of Contract 2001 with upto date correction slips

and USSOR 2010 with “Indian Railways Unified Standard Specifications” (Vol-I &

II)2010 can be seen at the offices from where tender documents are made

available. Copies of the same can be obtained on payment of an amount

specified for copy of each Volume on any working day during office hours from

the office of General Manager,E.Co.Railway, C.S.Pur, Bhubaneswar –23 subject to

availability.

3. EARNEST MONEY DEPOSIT (EMD)

3.1 The Tender must be accompanied by a sum equivalent to the following which

shall be rounded to the nearest Rs. 10/-.

Value of the work EMD

(Tender Value)



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 18 -

CE/Con/HQ/BBS/T/30/2011

For works estimated to 2% of the estimated cost of the work.

cost upto Rs.1 crore.

For works estimated to Rs. 2 lakhs plus ½% (half percent) of the excess of

cost more than Rs.1 estimated cost of work beyond Rs.1 crore subject to

crore. a maximum of Rs.1 crore.

(i) The Earnest Money should be in cash or in the form of deposit receipts, pay

orders or demand drafts executed by State Bank of India or any of the

Nationalized Banks or by a Scheduled Bank.

(ii) These forms of earnest money are to be endorsed in the name of FA &

CAO(Con)/ E.Co.Railway/Bhubaneswar. Earnest Money in shape of Bank

Guarantee bond will not be accepted.

3.2 The sum mentioned as Earnest Money for each Tender, if desired by Tenderer(s)

can be deposited in Cash with the FA & CAO(C), E.Co Railway, C.S.Pur,

Bhubaneswar –23 and the receipt for the deposit should accompany the Tender.

In making such deposit, the name of the work for which the money is deposited

must be clearly stated in writing in the receipt.

3.3 Earnest Money should be submitted in acceptable form. In case the Earnest

Money is not deposited in the acceptable form as stated above along with Tender,

the Tender will be rejected.

3.4 Tender without Earnest Money Deposit will not be considered and the tender will

be rejected.

3.5 The Tenderer(s) shall hold the offer open for a period 90 days from the date of

opening of Tender. It is understood that the Tender Documents have been

sold/issued to the Tenderer(s) and the Tenderer(s) is/are being permitted to

tender in consideration of stipulation on his/their part that after submitting

his/their tender, he/they will not resile from his/their offer or modify the terms

and conditions thereof in a manner not acceptable to the Chief Administrative

Officer(C)/Chief Engineer(C)/Dy.CE/Con of the E.Co. Railway. Should the

Tenderer(s) fails to observe or comply with the foregoing stipulations, the amount

deposited as Earnest Money for the due performance of the above stipulation

shall be forfeited by the railway. If the Tender is accepted, the amount of

Earnest Money will be retained towards part of Security Deposit for the due and

faithful fulfillment of the contract.

3.6 The Earnest Money of the Unsuccessful Tenderer(s) as here in before provided

will be returned to the Unsuccessful Tenderer(s) but the Railway shall not be

responsible for any loss or depreciation that may happen to the Earnest Money

for the due performance of the stipulation to keep the offer open for the period

specified in the Tender documents or to the Earnest Money while in their

possession, nor be liable to pay interest thereof.

3.7 The Earnest Money deposited by the successful Tenderer(s) will be retained

towards the part of Security Deposit for the due and faithful fulfilment of the

Contract but shall be forfeited if the Contractor(s) fails to execute the Agreement

Bond within 15 (fifteen) days after issue of letter of acceptance to that effect or

commence the work within 15 (fifteen) days from issue of letter of acceptance.

3.8 It is the responsibility of the contractor while submitting FDR along with

the tender as EMD/SD/BG to ensure that FDRs obtained from the issuing

bank are with automatic renewal facility so that when the FDRs become

due forrenewal there will be no need to part with those FDR lodged for

safe custody. Railway administration will not be responsible for loss of

interest to the contractor if he fails to-comply this while submitting FDRs

along with tender.

4 DOCUMENTS AND OTHER CONDITIONS

4.1 The submission of a tender by a tenderer(s) shall be deemed to imply and taken

as indicating that he has read, understood and abided by the conditions stated

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 19 -

CE/Con/HQ/BBS/T/30/2011

therein General Condition of Contract 2001 Volume – 2 including correction slips

and USSOR 2010 with “Indian Railways Unified Standard Specifications” (Vol-I &

II)2010 issued up to the date of opening of tender.

4.2 A certificate may be attached along with the Tender papers that the Tenderer(s)

has/have purchased and General Condition of Contract of 2001 with correction

Slips for P.Way items and USSOR 2010 with “Indian Railways Unified Standard

Specifications” (Vol-I & II) 2010 up to the date of opening of the tender and gone

through all the conditions of contract and rates, specifications, etc. embodied

therein.

4.3 Certificates of completion of work and work under progress in support of the

execution of similar type of work mentioned in the tender must be submitted

along with the tender issued by the concerned authority of any Government /

Semi Government organisation under whom the work executed. The certificate

should contain name of work, agreement/work order No, value of the work, date

of award, date of completion , total amount paid.

4.4 When work is tendered for by a firm or company of contractors, the tender shall

be signed by the individual legally authorised to enter into commitments on their

behalf.

4.5 If the Tenderer(s) expires after the submission of his/their Tender or after the

acceptance of his/their Tender, the Railway shall deem such Tender cancelled. If

a partner of a Firm expires after submission of their Tender or after the

acceptance of their tender, the Railway shall deem such Tender as cancelled

unless the Firm retains its character legally acceptable.

4.6 If the Tenderer(s) deliberately gives/give wrong information in his/their Tender or

creates/create circumstances for the acceptance of his/their Tender, Railway

reserve the right to reject such tender at any stage.

4.7 The following documents should be submitted along with the tender.

(a) List of personnel, organisation available on hand and proposed to be

engaged for the subject work.

(b) List of Plant & Machinery available on hand (own) and proposed to be

inducted (own and hired to be given separately) for the subject work.

4.8 The authority for the acceptance of the Tender will rest with the Railway. It shall

not be obligatory on the said authority to accept the lowest tender or any other

tender and no tenderer(s) shall demand any explanation for the cause of rejection

of his/their tender not the Railway undertake to assign reasons for declining to

consider or reject any particular tender or tenders. The Railways reserve the right

to accept the Tender either for the full quantity of work or part thereof or divide

the works amongst more than one Tender without assigning any reasons for any

such actions.

4.9 Should a Tenderer(s) find discrepancies in or omission from the drawings or any

of the Tender Forms, or should be in doubt as to their meanings, he/they should

at once, notify the authority inviting the Tender who may send a written

instructions to all Tenderer(s). It should be understood that every endeavour has

been made to avoid any error which can naturally effect the basis of the Tender

and the successful Tenderer(s) shall take upon himself/themselves and provide

for the risk of any error which may subsequently be discovered and shall make no

subsequent claim on account thereof.

4.10 Tender documents in which Tender is submitted by Tenderer(s) shall become the

property of the Railway and the Railway shall have no obligation to return the

same to the Tenderer(s).

(a) Before submitting a Tender, the Tenderer(s) will be deemed to have satisfied

himself/themselves by actual inspection of the site and locality of the work

that all conditions liable to be encountered during the execution of the works

are taken into account and that the rates he/they enters/enter in the Tender

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 20 -

CE/Con/HQ/BBS/T/30/2011

Forms are adequate and all inclusive, to accord with the provisions in Clause –

37 of the General Conditions of Contract as amended and corrected from time

to time for the completion of works to the entire satisfaction of the Engineer-

in-charge.

(b) When work is tendered for by a firm or company of contractors, the tender

shall be signed by the individual legally authorised to enter into commitments

on their behalf.

(c) The Railway will not be bound by any power of attorney granted by the

tenderer or by changes in the composition of the firm made subsequent to the

execution of the contract. It may, however, recognise such power of attorney

and changes after obtaining proper legal advice, the cost of which will be

chargeable to the contractor.

4.11 The successful Tenderer(s) shall be required to execute an Agreement with the

President of India acting through the East Coast Railway for carrying out the work

according to General Conditions of Contract, Special Conditions/Specifications

annexed to the tender and specifications for work and materials as laid down in

general conditions of contract and specifications, Part IV of South Eastern

Railway as amended/corrected upto the date of opening of tender.

4.12 The Tenderer(s) whose tender is accepted shall appear at the office of the

General Manager/Chief Administrative Officer(Con)/Chief Engineer(Con)/Dy.Chief

Engineer (Con),.E.Co..Railway, as the case may be in person or in case of a Firm

or Corporation, a duly authorized representative thereof shall so appear to

execute the Contract documents within 15 (fifteen) days after issue of letter of

acceptance. Failure to do so shall constitute breach of the Agreement effected by

the acceptance of the Tender in which case the earnest money accompaning the

tender shall be forfeited by the Railway without prejudice to any other rights or

remedies.

4.13 In the event of any tenderer whose tender is accepted shall refuse to execute /

does not execute the contract documents as here in before provided, the Railway

may determine that such tenderer(s) has/have abandoned the contract and there

upon his/their tender and acceptance letter thereof shall be treated as cancelled

and the Railway shall be entitled to forfeit the full amount of earnest money and

to recover the damages for such default as per Clause No. 62 of General

Conditions of Contract and Standard Specifications-2001, Vol-2 corrected upto

the date of opening of tenders.

4.14 In case of non acceptance of a tender by the Railway Administration for any

reason whatsoever, the Tenderer(s) cannot claim for any expenses incurred by

him/them in submitting the Tender for the work or for any other account.

4.15 Where there is any conflict between the instructions to Tenderers, Special

Conditions with stipulation and condition in these tender particulars in one hand,

and E.Co.Railway Engineering Department’s Unified Standard Schedule of Rates

2010, S.E.Railways General Condition of Contract 2001 & Indian Railways Unified

Standard Specifications (Vol-I & II)2010 with corrections slips issued up to the

date of opening of tender on the other hand, the former shall prevail.

4.16 All the works included in the tender/contract shall be completed in all respect

within the time specified in tender document.

4.17 Unusal terms and conditions in offers are liable to be ignored.

4.18 These instructions to the Tenderer(s) shall be deemed to form a part of the

tender document.

For On Behalf Of The PRESIDENT OF INDIA

The above conditions are under stood and accepted by me/us.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 21 -

CE/Con/HQ/BBS/T/30/2011









CHAPTER-06







EAST COAST RAILWAY CONSTRUCTION ORGANISATION









SPECIAL CONDITIONS OF CONTRACT









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 22 -

CE/Con/HQ/BBS/T/30/2011

CHAPTER-06



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



SPECIAL CONDITIONS of Contract

1 GENERAL:

1.1 Principal items of works to be carried out by the tenderer/contractor are as noted

in the schedule of works viz. Schedules annexed with the Tender /Agreement.

1.2 The quantities of works to be carried out by the tenderer / contractor will be as

mentioned in the work order/ Agreement.

1.3 The approximate value of the work is specified in the Tender Notice /Agreement.

1.4 Plans for the works as may be available, may be inspected in the Office of the

concerned Chief Engineer(Con)/E. Co. Railway/Chandrasekharpur/Bhubaneswar

or in the office of the concerned Dy.Chief Engineer(C).

1.5 (i) The successful tenderer/contractor will have to maintain all works excepting

earth work, supply of ballast and turfing for a period of 06(six) Calendar months

unless otherwise specified from the certified date of completion without any extra

cost to the Railway.

(ii) In case of P.Way works , the contractor shall maintain the same at free of

cost till six months from completion of the work or till allowing regular train

services on the track which ever is earlier.

1.6 No Mobilisation, Machinery or any other advances will be allowed for this work

unless otherwise specified.

1.7 All the works included in the tender/contract shall be completed within the time

specified in the tender /agreement.

1.8 The additional special conditions dealt in the document, Instructions to

Tenderer(s) and the stipulations made in the Schedules of items of works shall

govern the works under this contract, in addition to and/or in part supersession of

the General Conditions of Contract Vol.2 of 2001 and USSOR 2010 with “Indian

Railways Unified Standard Specifications” (Vol-I & II) 2010 corrected up to date

of opening of tender.

1.9 Where there is any conflict between the instructions to Tenderers, Special

Conditions with stipulation and condition in these tender particulars in one hand,

and E.Co.Railway Engineering Department’s Unified Standard Schedule of Rates

2010, S.E.Railways General Condition of Contract 2001 & Indian Railways Unified

Standard Specifications (Vol-I & II) 2010 with corrections slips issued up to the

date of opening of tender on the other hand, the former shall prevail.

1.10 Any notes appearing in the Schedule of Quantities and Rates will take precedence

over Additional Special Conditions of Contract and also S.E. Railway’s GENERAL

CONDITIONS OF CONTRACT & SPECIFICATIONS. The Railway will take for

granted that Tenderer(s) has/have acquainted himself/themselves with all terms

and words used in the tender documents before submitting the tender.

1.11 Any specifications/conditions stated by the Tenderer(s) in the covering letter

submitted by him/them along with the tender shall be deemed to be a part of the

contract only to such an extent as has been expressly accepted by the Railway.

1.12 All measurements, methods of measurements, meaning and item of specifications

and interpretation of Special Conditions of Contract given and made by the

Railway or by the Engineer on behalf of the Railway shall be final and binding and

shall be considered as “excepted matters” in terms of condition No. 63 and as

modified in the GENERAL CONDITIONS OF CONTRACT.







SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 23 -

CE/Con/HQ/BBS/T/30/2011

1.13 Any change in the address of the contractor shall be forthwith intimated in writing

to the Railways. The Railway will not be responsible for any loss or inconvenience

suffered by the contractor on account of his failure to comply with this.

1.14 The Railway Administration reserves the right to alter the detailed plans and

sections and to carry out minor alternations in the plans resulting in the

corresponding increase/decrease in the quantity of work without being liable to

pay enhanced rates for the work and to allow extra time for completion of the

work.

2. VARIATION IN CONTRACT QUANTITIES:

The procedure detailed below shall be adopted for dealing with variations in

quantities during execution of works contracts:-

2.1) Individual NS items in contracts shall be operated with variation of plus or minus

25% and payment would be made as per the agreement rate. For this no finance

concurrence would be required.

2.2) In case of increase in quantity of an individual item by more than 25% of the

agreement quantity is considered unavoidable, the same shall be got executed by

floating a fresh tender. If floating a fresh tender for operating that item is

considered not practicable, quantity of that item may be operated in excess of

125% of the agreement quantity subject to the following conditions.

(a). Operation of an item by more than 125% of the agreement quantity needs the

approval of an officer of the rank not less than S.A.Grade.

(i). Quantities operated in excess of 125% but upto 140% of the agreement quantrity

of the concerned item, shall be paid at 98% of the rate awarded for that item in

that particular tender.

(ii). Quantities operated in excess of 140% but upto 150% of the agreement quantity

of the concerned item shall be paid at 96% of the rate awareded for that item in

that particular tender.

(iii). Variation in quantities of individual items beyond 150% will be prohibited and

would be permitted only in exceptional unavoidable circumstances with the

concurrence of associate finance and shall be paid at 96% of the rate awarded for

that item in that particular tender.

(b). The variation in quantities as per the above formula will apply only to the

individual items of the contract and not on the overall contract value.

(c ). Execution of quantities beyond 150% of the overall agreemental value should not

be permitted and, if found necessary should be only through fresh tenders or by

negotiating with existing contractor, with prior personal concurrence of

FA&CAO/FA&CAO(C ) and approval of General Manager.

3. In cases where decrease is involved during execution of contract:

(a). The contract signing authority can decrease the items upto 25% of individual item

without finance concurrence.

(b). For decrease beyond 25% for individual items or 25% of contract agreement

value, the approval of an officer not less than rank of S.A.Grade may be taken,

after obtaining ‘No Claim Certificate’ from the contractor and with finance

concurrence giving detailed reasons for each such decrease in the quantities.

(c ). It should be certified that the work proposed to be reduced will not be required in

the same work.

4. The limit for varying quantities for minor value items shall be 100% (as against

25% prescribed for other items). A minor value item for this purpose is defined as

an item whose original agreement value is less than 1% of the total original

agreement value.

5. No such quantity variation limit shall apply for foundation items.



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 24 -

CE/Con/HQ/BBS/T/30/2011

6. As far as SOR items are concerned, the limit of 25% would apply to the value of

SOR schedule as a whole and not on individual SOR items. However, in case of

NS items, the limit of 25% would apply on the individual items irrespective of the

manner of quoting the rates (single percentage rate or individual item rate).

7. For the tenders accepted at Zonal Railways level, variations in the quantities will

be approved by the authority in whose powers revised value of the agreement

lies.

8. For tenders accepted by General Manager, variation upto 125% of the original

agreement value may be accepted by General Manager.

9. For tenders accepted by Board Memabers and Railway Ministers variations upto

110% of the original agreement value may be accedpted by General Manager.

10. The aspect of vitiation of tender with respect to variation in quantities should be

checked and avoided. In case of vitiation of the tender (both for increase as well

as decrease of value of contract agreement), sanction of the competent authority

as per single tender should be obtained.

3. AGREEMENT:

3.1. All expenses in drawing up the agreement and the cost of stamp duty, if any,

shall be borne by the Railway Administration.

3.2. Should the successful Tenderer/Contractor on the list of approved contractor have

a relative or relatives or in the case of firm or company or contractors one or

more of its shareholders or a relatives of the shareholder(s) employed in the

gazetted capacity in the Engineering Department of the East Coast Railway, the

authority executing the contract shall be informed of the fact at the time of

execution of the contract, failing which the contractor may be dis-qualified, or

such facts subsequently comes to light, the contract may be rescinded in

accordance with the provisions in Clause-62 of the General Conditions of

Contract.

3.3. Should the successful Tenderer/Contractor find that his relative has/have

obtained an employment in gazetted capacity in the Engineering Department of

the East Coast Railway, subsequent to the execution of the agreement or in the

case of a firm or company of contractors, one or more of its shareholders or

relative or relatives of the shareholder(s) got employed in the gazetted capacity

in the Engineering Department of the East Coast Railway, subsequent to the

execution of the agreement, the successful tenderer/contractor shall inform the

authority executing the contract of this fact, failing which the successful

tenderer/contractor may be dis-qualified or if such fact subsequently come to

light, the contract may be rescinded in accordance with the provision in Clause-

62 of the General Conditions of Contract.

3.4 (a) Should a Tenderer/Contractor be a retired Engineer of the Gazetted Rank or

any other Gazetted Officer working before his retirement, whether in the

executive or administrative capacity, or whether holding a pensionable post or

not, in the Engineering Department of any of the Railways owned and

administrated by the President of India for the time being, or should a

tenderer/contractor being partnership firm have as one of its partners retired

Engineer or retired Gazetted Officer as aforesaid, or should a tenderer/contractor

being an incorporated company have any such retired Engineer or retired Officer

as one of its Directors, or should a tenderer/contractor have in his employment

any retired Engineer or retired Gazetted Officer as aforesaid, the full information

as to the date of retirement of such Engineer or Gazetted Officer from the said

service and in case where such Engineer or officer had not retired from

Government service at least 2years prior to the date of submission of the tender

as to whether permission for taking such contract, or if the contractor be a

partnership firm or an incorporated company, to become a partner or Director as

the case may be, or to take the employment under the contractor, has been

obtained by the tenderer or the Engineer or Officer, as the case may be from the



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 25 -

CE/Con/HQ/BBS/T/30/2011

President of India or any officer, duly authorised by him in this behalf, shall be

clearly stated in writing at the time of submitting the tender. Tenders without the

information above referred to or a statement to the effect that no such retired

Engineer or retired Gazetted Officer is so associated with the tenderer, as the

case may be, shall be rejected.

(b) Should a tenderer or contractor being an individual on the list of approved

Contractors, have a relative(s) or in the case of partnership firm or company of

contractors one or more of his shareholder(s) or a relative(s) of the

shareholder(s) employed in gazetted capacity in the Engineering department of

the East Coast Railway, the authority inviting tenders shall be informed of the fact

at the time of submission of tender, failing which the tender may be

disqualified/rejected or if such fact subsequently comes to light, the contract may

be rescinded in accordance with the provision in clause 62 of the General

Conditions of Contract.

3.5. If it is detected at any stage during the currency of contract/Agreement that any

document produced by the contractor during submission of his/ their tender

related to finalisation of his/their tender and/or during execution of work is/are

found wrong/false, the contract will be terminated with forfeiture of Earnest

Money deposit/Security deposit (as the case may be) without any further

correspondence with the contractor(s).

4. PASSES

4.1. No free Railway passes shall be issued by the Rly. to the contractor or any of his

employee/worker.

5 Partnership deeds, Power of Attorney Etc:

5.1 The tenderer shall clearly specify whether the tender is submitted on his own or

on behalf of a partnership concern. If the tender is submitted on behalf of a

partnership concern, he should submit the certified copy of partnership deed

along with the tender and authorisation to sign the tender documents on behalf of

partnership firm. If these documents are not enclosed alongwith tender

documents, the tender will be treated as having been submitted by individual

signing the tender documents. The Railway will not be bound by any power of

attorney granted by the tenderer or by changes in the composition of the firm

made subsequent to the execution of the contract. It may, however recognise

such power of attorney and changes after obtaining proper legal advice, the cost

of which will be chargeable to the contractor.

5.2 The tenderer whether sole proprietor, a limited company or a partnership firm if

they want to act through agent or individual partner(s) should submit along with

the tender or at a later stage, a power of attorney duly stamped and

authenticated by a Notary Public or by Magistrate in favour of the specific person

whether he/they be partner(s) of the firm or any other person specifically

authorizing him/them to submit the tender, sign the agreement, receive money,

witness measurements, sign measurement books, compromise, settle, relinquish

any claim(s) preferred by the firm and sign “No Claim Certificate” and refer all or

any disputes to arbitration.

6. DISSOLUTION OF CONTRACTOR’S FIRM:

6.1 If the contractor’s firm is dissolved due to death or retirement of any partner or

for any reasons whatsoever before fully completing the whole work or any part of

it undertaken by the Principal agreement, the partners shall remain jointly,

severally and personally liable to complete the whole work to the satisfaction of

the Railway and to pay compensation for loss sustained, if any, by the Railway

due to such dissolution. The amount of such compensation shall be decided by

the General Manager of the Railway and his decision in the matter shall be final

and binding on the contractor(s).

7. DEPLOYMENT OF PLANT AND MACHINERY:



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 26 -

CE/Con/HQ/BBS/T/30/2011

7.1 The deployment of plant and machinery including moving machines shall be such

as not to infringe or cause damage to Railway track or any other Government or

private properties. Operation of such equipment involving infringement to

moving dimensions prescribed in the Hand book of the Schedule of Dimensions of

the Railway shall not be undertaken without the prior approval of the Engineer-in-

charge. For any loss or damage resulting from violation of this clause the

contractor(s) shall be wholly responsible.

7.2 It should clearly be understood that it is entirely the successful

tenderer(s)/contractor(s) responsibility and liability to find, procure and use all

machinery, tools and plants and their spare parts that are required for efficient

and methodical execution of the work. Delay in procurement of such items due

to their non-availability or import difficulties or any other cause whatsoever, will

not be taken as an excuse for slow progress or non-performance of the work.

8 HIRING OF RAILWAYS PLANT & MACHINARY:

8.1 The Railway Administration may have at their disposals for hire to successful

tenderers/contractors a certain number of such plant as concrete mixtures,

compressors and portable engines for use during execution of the work, but it

does not guarantee hiring of any such machines or will any claim or compensation

be entertained due to Railway Administration’s inability to supply the machinery

and plant or the conditions of the machinery and/or plant supplied by the

Railway Administration shall not be taken as an excuse for slow progress or for

non-performance of the work.

8.2 The Railway Administration shall charge the successful tenderer/contractor for

hire of machinery and plant supplied to him/them. The rate of hire charges for

the plant and machinery given by the Railway will be calculated on the following

basis:-

(a)The cost of plant and machinery for the purpose of calculating the hire charges

shall be its present day market value as on 1st April of the financial year in which

the plant is given on hire plus 5% freight and 2% incidental charges to which

supervision charges at 12.1/2 % on the total cost will be added.

(b) The hire charge per annum will be calculated at the following rates on the cost

of the plant and machinery as per (a) above:

I) Interest at the ruling rate of dividend payable by the Railway to the Central

Government.

II) Ordinary repairs and maintenance charges @ 5%.

III) Special repairs and maintenance charges @ 10%.

IV)Depreciation charges at the rates mentioned in para 3505 of the I.R.W. & W.

Manual (i.e. 16% for light, 10% for heavy and 6% for special type plant and

machinery as classified in para 3502 of I.R.W.W.M.

V)An additional 10% on the total of (I) to (IV) above to meet the contingencies.

(c) The hire charges per day shall be arrived at by dividing the annual hire

charges vide (b) above by 250. These hire charges will be payable from the day

the plant is handed over to the hirer, to the day, it is returned by him to the

Railway’s representative. If the plant remains out of order for reasons, beyond

the control of the hirer or is sent for periodical overhaul such periods will not be

counted for levy of hire charges, provided a certificate to the effect is given by

the Engineer.

The plant will be delivered from the Railway’s godown/stores depot and the

contractor is to make his own arrangement for transporting the same at work site

free of charges and will return at the same Railway’s godown/stores depot at his

expenses.

(d) In case the contract is spread over a period of more than one year, the hire

charges of the plant and machinery as arrived at on the above basis shall be

operative during the currency of the contract.



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 27 -

CE/Con/HQ/BBS/T/30/2011

8.3 The Railway shall reserve to itself the right to recall any plant/machinery without

assigning any reasons by giving or at any time without notice in the event of

its being required by the Railway for an unforeseen emergency. In either case,

the Railway shall not be liable to pay any compensation to hirer for the loss that

may be caused by the withdrawal of the plant.

8.4 While the machine(s) is/are in the possession of the contractor(s), he/they shall

be responsible for seeing that any inspection certificate of license required under

any Government Act is obtained in due time. The contractor shall also be

responsible for seeing that all required precautions are observed in using the

plants as well, and he shall be responsible for any accident which may occur from

the use of the plant.

8.5 In case of lifting heavy consignments by cranes in connection with the work,

charges for Railway cranes used will be levied against the successful

Tenderer/Contractor as per the extant rules of the Railways.

8.6 The materials of the successful Tenderer/Contractor required for the execution of

the work will have to be carried at the public rate of Railway freight and no

concessional rate of Railway freight will be applicable. If called upon to do so the

successful Tenderer/Contractor will be bound to state the source of supply of the

materials to be used by him on the works. No. R.M.C. Notes or priority certificates

will be issued for the carriage of tools, plant or any other materials belonging to

the successful Tenderer/Contractor.

9. ISSUE OF MATERIALS:

9.1 If materials outside the contract are supplied for use on a work on the application

of a contractor, the Engineer-in-charge of the work should specify in each case

the rate to be charged, which should be the market rate prevailing at the time of

supply or the issue rate whichever is higher,. Plus departmental charges which

shall be computed as below:-Market rate or issue rate which ever is higher, plus

freight 5%, incidental charges 2% and 12.1/2 % departmental charges to cover

the cost of Supervision, Storage, interest on outlay.

9.2 (I): In case, cement and/or steel and/or other materials stipulated as per

agreement are issued to the contractor(s) either free of cost or on cost to be

recovered for use on the work, the supply thereof shall be made in stages limited

to the quantity/ qualities computed by the Railway according to the prescribed

specifications and approved drawing as per the agreement. The cement and/or

Steel and/or other materials issued in excess of the requirement(s) as above,

shall be returned in perfectly good condition by the contractor to the Railway

immediately after completion or determination of the contract. If the contractor

fails to return the said stores, then the cost of cement and/or steel and/or other

materials issued in excess of the requirement as computed by the Railway

according to the specifications and approved drawings, will be recovered from the

contractor(s) at twice the prevailing procurement cost at the time of last issued,

viz. 2X (purchase price + 5% freight only).

If it is discovered that the quantity of cement and/or Steel and/or other materials

used is less than the quantity ascertained as herein before provided, the cost of

the cement and/or Steel and/or other materials not so used shall be recovered

from the contractor(s) on the basis of the above stipulated formula.

The contractor shall not be entitled to cartage and incidental charges for returning

the surplus materials issued as per contract or outside the contract on

application, from and to the Stores where from they are issued. No lead will be

paid for returning the empty cement bags.

(II): The provisions of the fore-going sub-clause shall in addition to cement and

other materials apply in the case of steel reinforcement or structural steel section,

except that the theoretical quantity of steel shall be taken as the quantity

required as per design or as authorised by the Engineer-in-Charge including

authorised laps.



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 28 -

CE/Con/HQ/BBS/T/30/2011

9.3 The materials issued to contractor but remaining unused and in perfectly good

condition at the time of completion or determination of the contract shall be

returned to the Engineer-in-Charge at a place where directed by him.

9.4 In case the contractor fails to return the unused or excess materials supplied

outside the contract as per para 9.1 above, over the requirement as calculated,

the cost as arrived at in para 9.1 above, increased by 100% will be charged and

recovered from the contractor’s dues without prejudice the provision of the

relevant conditions regarding return of materials governing the contract.

10. STORAGE OF RAILWAY MATERIALS:

10.1 The Contractor shall make his own arrangements at the site of work for the safe

storage and custody of Railway material issued to him. Such Railway materials

issued to the Contractor and stored at the site of work shall be opened for

inspection by the Engineer-in-charge or his representative at any time.

10.2 Contractor’s sheds, stores, camp office, yard etc., for stacking Railway materials

shall be located in the Railway premises only at the locations approved by the

Engineer-in-charge. The land available will be given on standard charge fixed by

the Railway for the period of construction only. On completion of work, he shall

leave the site free of all structures, debris etc. non-compliance of same the

Engineer-at-site will decide the amount to be deducted from payment due to the

contractor(s) and this shall be final & binding on the contractor(s).

11. OCCUPATION AND USE OF LAND:

No land belonging to or in the possession of the Railway shall be occupied by the

Contractor without the permission of the Railway. The Contractor shall not use, or

allow to be used, the site for any purposes other than that of executing the

works. Whenever Non-Railway bodies/persons are permitted to use Railway

premises with competent authority’s approval. Conservancy charges as applicable

from time to time may be levied.

12 FORCE MAJEURE CLAUSE:

12.1 Applicable as per Clause 17 of Part.III of SERly GCC Volume-2 - 2001

13. NIGHT WORK:

13.1 No work shall be carried out between sunset and sunrise without previous

permission of Engineer-in-charge.

13.2 If the Engineer-in-charge is satisfied that the work is not likely to be completed in

time except by resorting to night work, he may order the Contractor(s) to carry

out the works even at night without conferring any right on the contractor for

claiming any extra payment for the same. All arrangements in this connection

shall be made by the Contractor at his own cost.

14. SERVICE ROADS:

14.1 No new facilities such as roads, level crossing, etc. other than those already in

existence will be made available to the tenderer(s)/Contractor(s).

14.2 The successful tenderer(s)/Contractor(s) shall make his own arrangements at his

own cost for the construction of service roads within the Railway land for the

transport of materials. No separate payment shall be admissible to the

Successful Tenderer(s)/Contractor(s) for the construction of such road or its

repairs and maintenance. The Successful Tenderer(s)/Contractor(s) shall make

his own arrangement at his own cost for the construction of any Service Roads

outside the Railway land or for the use of any of the existing roads outside the

Railway land, required for the transport of materials for the construction of such

roads, its repair or maintenance and the successful tenderer(s)/Contractor(s)

shall be responsible for payment of road taxes, toll charges, octroi duty, etc. if

any. The Railway will have right to use the service roads at all times without any

payment to the successful Tenderer(s)/Contractor(s).



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 29 -

CE/Con/HQ/BBS/T/30/2011

14.3 Existing roads or water courses shall not be blocked, cut through, altered,

diverted or obstructed in any way by the Contractor, except with the permission

of the Engineer, All compensations claimed for any unauthorised closure, cutting

through, alteration, diversion or obstruction to such roads or water courses by the

Contractor or his agent or his staff shall be recoverable from the Contractor by

deduction from any sums which may become due to him in terms of contract, or

otherwise according to law.

15 WATER SUPPLY:

15.1 Water required for all the works shall be arranged by the contractor at his own

cost. No arrangements will be made by the Railway Administration for supplying

water to the Contractor either for drinking purpose or execution of work free of

cost. Rate quoted shall include the cost of arranging water supply and no

separate payment will be made to the contractor on account of water charges.

15.2 The Railway may supply if any surplus water available from its own sources to the

Contractor part or whole of the quantity of the water required for the execution of

works from the Railway’s existing water supply system at or near the site of

works on specified terms and conditions and at such charges as shall be

determined by the Railway and payable by the Contractor, provided that the

Contractor shall arrange, at his own expense, to effect the connections and lay

additional pipe lines and accessories on the site and that the Contractor shall not

be entitled to any compensation for interruption or failure of the water supply.

16 ELECTRICITY:

16.1 Any electric supply required at site for whatsoever purpose shall be arranged by

the Contractor/s. The contractor/s shall be responsible for the arrangements for

obtaining electric supply at his/their own cost and rates quoted shall include the

cost of providing electric supply arrangements required for the work.

16.2 The Railway may supply to the Contractor part or whole of the electric power

wherever available and possible, required for execution of works from the

Railway’s existing electric supply systems at or near the site of works on specified

terms and conditions and such charges as shall be determined by the Railway and

payable by the Contractor provided the cost of arranging necessary connections

to the Railway’s Electric Supply systems, and laying of underground/overhead

conductor, circuit protection, electric power meters, transmission structure, shall

be borne by the Contractor and that the Contractor shall not be entitled to any

compensation for interruption or failure of the Electric supply system.

16.3 If required by Contractor/s, the Railway administration may give required

assistance in recommending to State Electricity Board for giving necessary

electric connection to the Contractor for execution of works.

17 LOSS OF WORK ORDERS:

17.1 If the original work order issued to the contractor is lost by him for any reason

whatsoever and the Contractor demands for supply of a duplicate of the same, a

penal levy of Rs. 10/- (ten only) for each work order shall be imposed on him for

the issue of a duplicate copy.

18 ROYALITY FOR MATERIALS COLLECTED FROM UNDER RAILWAY LAND :

18.1 If and when the contractor quarries and/or collects materials from or from under

Railway land for the purpose of supply of materials and or of work under an

agreement based on special rates obtained for various items of work or supplies,

he shall be liable to pay to the Railway a royalty at the flat rates hereinafter set

out. Such royalty shall be recovered by deduction from the contractor’s bill for the

supply of materials and or work done under this agreement or from any other

sums due to him from the Railway, at the rate prescribed by the State

Government authorities and in force during the period the contract is current.

18.2 In case of contracts entered into at specified percentage on Unified Standard of

Rates-2010, the royalty rate as fixed in the proceeding para for materials

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 30 -

CE/Con/HQ/BBS/T/30/2011

extracted from Railway land will be subjected to tender increase or decrease and

will be calculated as under:

Gross value payable as per USSOR-2010 : X

Royalty leviable as per above : Y

Tender premium : Z

Net payment : (X-Y) + (X-Y) Z

18.3 Stores and other materials obtained from the dismantling of any structures within

the Railway land and used as building stone pitching or breaking into ballast and

stone chips etc., may be used by the successful Tenderer/Contractor on payment

of appropriate rate as per Schedule of Rates increased/decreased by the Tender

percentage accepted for miscellaneous works, treating the materials as belonging

to the Railway.

19 Employment of Graduate Engineers/Diploma Holders by Contractor:

19.1 The contractor shall be responsible to ensure compliance with the provision of the

Apprentices Act, 1961 and the Rules and Orders issued from time to time in

respect of Apprentices directly or through petty Contractors or Sub-Contractors

employed by him for the purpose of carrying out the Contract. If the Contractor

directly or through Petty Contractors or Sub-Contractors fails to do so, his failure

will be a breach of the Contract and the Railway may in its discretion, rescind the

contract. The Contractor shall also be liable for any pecuniary liability arising on

account of any violation of the provision of the Act.

NOTE: The Contractors are required to engage apprentices when the work(s)

is/are undertaken by them last for a period of one year or more and/or the cost

of work is Rs. One lakh or more.

19.2 Employment under Civil Engineering Works Contractor: - Railway Contractors are

to employ un-employed Civil Engineering Graduates/Diploma holders under them.

Fresh Civil Engineering Graduates without any experience of any kind will have to

be taken under training on stipend basis at the rate of not less than Rs.4500/-

per month for a period of 06 months.

19.3 The contractors will be required to employ such un-employed Civil Engineering

Graduates/Diploma holders at the rate specified above and the duration for such

an employment will be as under:-

Contract Value. No. Of Eng./Diploma Monthly Salary. Duration.

Holders and Degree

holders.

For works of value Diploma holder - 1 Engg. Diploma During

more than 5 lakhs Degree holder – nil holder not Less Currency Of

but less than Rs. 15 than Rs. 4000/-. Contract

lakhs.

Works of value Rs. Degree holder – 1 Engg. Degree Do.

15 lakhs and above Holder not less

than Rs. 6000/-

Contractors have to give a declaration along with his Tender to the effect that

Graduate Engineers/Diploma Holders employed by him under the particular work

for which Tender is submitted are in accordance with the rates and duration as

specified above and none of them is related to him(Contractor’s failing which the

Tender may be disqualified). In case of wrong information having been given by

the Contractors which comes to light subsequently, the Contract may be

rescinded and action taken in accordance with Clause 62 of the General

Conditions of Contract.

19.4 Technical staff should be available at the site wherever required by the Engineer-

in-charge to take instructions. In case, the contractor fails to employ the

technical staff as aforesaid, he shall be liable to pay reasonable amount not

exceeding a sum of Rs.6,000/-(Rupees six thousand only) for each month of

default, in case of Graduate Engineer, Rs.4,000/-(Rupees four thousand only) for

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 31 -

CE/Con/HQ/BBS/T/30/2011

each month of default in case of Diploma Holder(Overseer) to be deducted from

his ongoing on A/C bills. The decision of the Engineer-in-charge as to the period

for which the required technical staff was not employed by the Contractor and as

to the reasonableness of the amount to be deducted on this account shall be final

and binding to the contractor.

20 EMPLOYMENT OF RAILWAY’S SURPLUS LABOUR BY CONTRACTOR:

20.1 The contractor may be required to engage surplus / retrenched casual labour of

the E. Co.Rly if found suitable up to the extent of twenty persons for each lakh or

part of the value of the contract during the currency of contract. The terms of the

employment between such labour and the contractor may be on mutual agreed

forms, subject to the statutory provisions contained in the labour regulations and

enactments. The contractor shall indemnity the Railway against any claims arising

out of employment of such labour and the Railway shall not be a party to any

disputes etc., arising out of the employment of such labour by the contractor.

20.2 The contractor shall engage local labour for unskilled work as far as possible and

practicable.The Bonded Labour System (Abolition) ordinance 1975 and

modifications there in from time to time apply to the present contract. The

contractor shall duly observe the provision there of.

21 COMPLIANCE TO THE PROVISIONS OF DIFFERENT ACTS:

The contractor shall comply with the provision of

(i)Minimum wages Act 1948.

(ii)Apprentices Act 1961.

(iii)Payment and wages Act 1936.

(iv)Contract Labour (Regulation and Abolition) Act 1970.

(v) Contract Labour (Regulation and Abolition) Central Rules 1971.

(vi) Workmen’s compensation Act.

(vii)Mines Act.

And the rules and orders issued from time to time for all the above acts.

22 PRICE VARIATION CLAUSE (PVC)

Price Variation Clause is applicable for this contract.

23 DAMAGES BY ACCIDENTS/FLOODS/RAINS/CYCLONES, ETC.

23.1 The Contractor(s) shall take all precautions against damages from accidents,

floods or tides etc. No compensation shall be allowed to the contractor for his

tools, plants, materials, machines and other equipments lost or damaged by any

cause whatsoever. The Contractor(s) shall make good the damages to any

structure, plant or materials of every description belonging to the Railway

Administration, lost or damaged by any cause during the course of construction

work.

23.2 The Railway Administration will not be liable to pay the contractor any charges for

rectification or repairs which may have occurred from any cause whatsoever, to

any part of the new structures during currency of contract.

24 SETTING OUT OF WORKS:

24.1 The contractor shall be responsible for the correct setting out of all works in

relation to original points, lines and levels of reference at his cost. The Contractor

shall execute the work true to alignment, grade, levels and dimensions as shown

in the drawing and as directed by the Engineer’s representative and shall check

these at frequent intervals. The Contractor shall provide all facilities like labour

and instruments and shall cooperate with the Engineer’s representative to check

all alignments, grades, levels and dimensions. If, at any time, during the progress

of the works any error shall appear or arise in any part of the work, the

Contractor, on being required so to do by the Engineer’s representative shall, at

his own cost rectify such errors, to the satisfaction of the Engineer’s

representative. Such checking shall not absolve the Contractor of his own

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 32 -

CE/Con/HQ/BBS/T/30/2011

responsibility of maintaining accuracy in the work. The Contractor shall carefully

protect and preserve all bench marks, sight rails, pegs and other things used in

setting out the work.

25 MAINTENANCE PERIOD:

25.1 The maintenance period in terms of Clause 47 & 48 of the South Eastern Railway

GENERAL CONDITIONS OF CONTRACT 2001 Volume – 2 shall be six months from

the date of issue of completion certificate for all works except earth work and

supply of ballast.

26 ANTILARVAL WORK:

26.1 During execution of the works against this contract the Contractor(s) shall be

responsible for antilarval work at his/their own cost.

27 NON-ITEMIZED WORKS:

27.1 Where item not covered by the schedules are to be executed, the rates for such

non-itemised works shall be negotiated before commencement of such work or to

be got executed through any other agency by the Railway at the discretion of the

Railway Administration.

28 TIME IS THE ESSENCE OF CONTRACT:

28.1 Time is the essence of contract. All the works are required to be completed in all

respects as stipulated by the Railway within the completion date. Progress shall

be maintained strictly in accordance with the programme given by the Contractor

and accepted by the Engineer-in-charge from time to time as per the programme

chart as per (BAR/CE/PERT chart) as will be finalised.

28.2 Failure on the part of the contractor to complete the works in the date stipulated

in the Agreement for completion of respective works will entitle the Railway

Administration to impose penalty on the contractor in terms of S.E.Railway,

General Conditions of Contract, & Standard Specifications, Vol-2, 2001 as given in

Part-II, III & IV together with its correction slips issued up to the date of opening

of tender.

28.3 If the work is terminated during execution of the work, in accordance with the

prescribed conditions of Clause-61 and/or 62 of General Conditions and any other

relevant Clause appearing in the General Conditions of Contract of the

S.E.Railway General Conditions of Contract & Standard Specifications, 2001-Vol-2

as given in Part-II, III & IV together with the correction slips issued upto the date

of opening of tender, the Railway Administration reserves the right to invite fresh

tenders for the whole or any portion of the work.

29. INCENTIVE BONUS PAYMENT CLAUSE FOR WORKS RELATING TO

THROUGHPUT ENHANCEMENT WORKS COMING UNDER PLAN HEADS

“DOUBLING” and “TRAFFIC FACILITIES”.

(i) The incentive bonus payable shall not be more than 1% of the initial contract

value or revised contract value whichever is less for every one month of early

completion ahead of the original completion period or revised completion period

whichever is less.

(ii) The maximum incentive payable shall not be more than 6% of the original

contract value or revised contract value whichever is less.

(iii) This incentive scheme shall not apply if extension to the original completion

period is given irrespective of on whose account (Railway’s account or

contractor’s account).

(iv) Period less than a month will not be reckoned for the incentive bonus

calculation.

30 LEAD & LIFT ON CONTRACTOR’S MATERIALS:







SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 33 -

CE/Con/HQ/BBS/T/30/2011

30.1 No lead and lift for the contractors materials is payable for the works executed

under this contract or for the materials issued by the Railway mainly cement,

steel, hume pipes, E.W. pipes, etc. unless otherwise specified.

31 ISSUE OF RAILWAY MATERIALS:

31.1 Only cement, steel or any other materials which if the Railway Administration is

under obligation to supply for the specific items as considered necessary by the

Railway Administration for the execution of works will be supplied by the Railway

Administration free of cost. This material will be delivered from the nearest

Railway store depot at CUTTACK/Other location as directed by the

engineer-in-charge and the contractor is required to make his own

arrangements at his own cost for the carriage of the same to the site of work.

This is, however, not applicable to works being carried out under the South

Eastern Railway schedule of rates. Cement will normally be supplied in bags of

nominal weight of 50 kg the volume of which shall be taken as 1.23 cft for all

calculation purposes.

31.2 In case of free supply of cement in bags by the Railway, the Contractor(s) is/are

required to carry from Railway Depots as stated in Clause-31.1 above at his/their

own cost. The cost of the empty cement bags will be recovered at the rates fixed

by Railway from time to time. Railway reserves the right to take back empty

cement bags if will be required for use.

31.3 For the works carried out under the South Eastern Railway schedule of labour and

material rates, the cost of the transportation and handling of Railway’s materials

will be paid to the contractor in accordance with the actual leads from the

Railway’s godown at which the materials are supplied to the site of work at the

appropriate rate of the schedule of rates increased or decreased by the

percentage quoted by the contractor as per terms of SOR.

31.4 The materials referred to above shall be issued to the contractor as per actual

requirements. The contractor/s has/have to return excess materials if any issued,

to the Railway’s store depot in perfectly good condition to the railway at his/their

own cost failing which the cost thereof shall be recovered from him/them at issue

rates plus Railway’s freight, handling, loading, supervision and other incidental

charges at rates fixed by the Railways. To this will have to be added on increase

of 100%.

31.5 If during the course of execution of the work, the District engineer/Dy.Chief

Engineer, in charge of the works consider it necessary to issue Railway materials

in the interest of the Railway work i.e. to supply certain unforeseen materials not

readily available in the market, the contractor will be paid at labour and materials

rate and the cost of such materials will be recovered from the contractor at the

market rate or Railway’s issue rate which ever is higher plus 30.37%.

31.6 The contractor shall arrange binding wire for all reinforcement work at his own

cost and the rate quoted by him shall be inclusive of this.

32 CUTTING/UPROOTING OF TREES.

32.1 No extra rate shall be paid for cutting or uprooting tress, grubbing root of trees or

jungle clearance involved in any work under this contract.

32.2 The trees cut by contractor shall be property of the Railway.

32.3 If the section passes through forest land, the contractor or his labour is prohibited

to cut the trees for the purpose of fire wood or for any other purpose. Cutting of

trees as required under the items of works indicated in the tender schedules may

be carried out strictly as directed by the Engineer-in-Charge of the work.

Unauthorised cutting of trees will result in prosecution and imprisonment. It is the

contractor’s responsibility to cause no damage to the forest growth and any fuel

required by the Contractor for his own use or for the use by his labourers, or for

the work shall be arranged by the Contractor at his own cost. The Contractor shall

take this aspect into consideration while quoting the rates against the tender.



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 34 -

CE/Con/HQ/BBS/T/30/2011

33 BLASTING.

33.1 The contractor has to make his own arrangements to get the necessary

license/permits for storing and use of explosive. The contractor has to make his

own arrangements for procurement of explosive and detonators required for the

work. Wherever a cutting passes through or near OHE Transmission Line or near

the villages, only controlled blasting is to be resorted to as per schedule. The

guidelines for blasting as provided in S.E.Railway General Conditions of Contract-

2001-Vol-2 to be followed.

34 SECURITY DEPOSIT:

34.1 The Earnest Money deposited by the successful tenderer/contractor to be retained

towards security deposit for the due fulfilment of the contract in terms of Clause-

16 of the General Conditions of Contract but shall be forfeited, if the contractor

fail to execute the agreement within 15 (fifteen) days after issue of Acceptance

letter to that effect or commence the work within 15(fifteen) days from the issue

of the Acceptance Letter.

34.2 In the event of any tenderer whose tender is accepted shall refuse to

execute/dose not execute the contract documents as here in before provided, the

Railway may determine that such tenderer has abandoned the contract and there

upon his tender and the acceptance there of shall be treated as cancelled and the

Railway shall be entitled to forfeit the full amount of the earnest money and to

recover the damages for such default (as per Clause No. 62 of General Conditions

of Contract and Standard Specifications-2001, Vol-2) corrected upto the date of

opening of tender.

34.3 Unless otherwise specified in the Special Conditions, if any, the amount of

Security Deposit, rate of recovery, mode of recovery shall be as under.

(a) Security Deposit shall be 5% of the contract value. The Contractor may

deposit the amount in cash with the FA & CAO (Con), E. Co. Railway,

Chandrasekharpur, Bhubaneswar or recovery @ 10% may be made from running

bills of the contract.

(b) The rate of recovery shall be at the rate of 10% of the bill amount till the full

security deposit is recovered.

(c) Security Deposits will be recovered only from the running bills of the contract

and no other mode of collecting SD such as SD in the form of instruments like

BG, FD etc. shall be accepted towards Security Deposit.

(d) In case of contracts of value Rs. 50 crore and above, irrevocable Bank

Guarantee shall also be accepted as a mode of obtaining security deposit.

34.4 (i) Security Deposit shall be returned to the contractor after the physical

completion of the work as certified by the Competent Authority. The certificate,

interalia, should mention that the work has been completed in all respects and

that all the contractual obligations have been fulfilled by the contractor(s) and

that there is no due from the contractor to Railways against the contract

concerned. Before releasing the Security Deposit, an unconditional and an

unequivocal No Claim Certificate from the contractor concerned should be

obtained.

(ii) After the work is physically completed, security deposit recovered from the

running bills of a contractor shall be returned to him if he so desires, in lieu of

FDR/irrevocable Bank Guarantee for equivalent amount to be submitted by him.

34.5 No interest will be paid on the said Earnest Money and the Security Deposit or

amounts payable to the contractor under the contract.

35 RENEWAL OF DEPOSITS BY CONTRACTORS:

35.1 In the case of tenderer(s)/Contractor(s) depositing Earnest Money in the shape of

deposit receipt, it shall be the responsibility of the Tenderer(s)/contractor(s) for

renewal and revalidation of the currency period of the deposit receipt as required

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 35 -

CE/Con/HQ/BBS/T/30/2011

before the expiry of the currency periods. If the Tenderer(s)/Contractor(s) fails

to do so, the loss of interest on the deposit receipt, if any, shall be solely on the

Tenderer(s)/Contractor’s account and the Railway shall not in any way be liable

and responsible for the loss of interest suffered by the Tenderer(s)/Contractor(s).

36. Performance Gurantee

The procedure for obtaining Performance Guarantee is outlined below:-

a). The successful bidder shall have to submit a Performance Guarantee (PG) within

30 (thirty) days from the date of issue of Letter of Acceptance (LOA). Extension

of time for submission of PG beyond 30 (thirty) days and upto 60 days from the

date of issue of LOA maybe given by the Authority who is competent to sign the

contract agreement. However, a penal interest of 15% per annum shall be

charged for the delay beyond 30 (thirty) days, i.e. from 31st day after the date of

issue of LOA. In case the contractor fails to submit the requisite PG even after 60

days from the date of issue of LOA, the contract shall be terminated duly

forfeiting EMD and other dues, if any payable against that contract. The failed

contractor shall be debarred from participating in re-tender for that work.

b). The successful bidder shall submit the Performance Guarantee (PG) in any of the

following forms, amounting to 5% of the contract value.

(i) A deposit of Cash,

(ii) Irrevocable Bank Guarantee,

(iii) Government Securities including State Loan Bonds at 5 % below the market value,

(iv) Deposit Receipts, Pay Orders, Demand Drafts and Guarantee Bonds. These forms of

Performance Guarantee could be either of the State Bank of India or any of the

Nationalised Banks;

(v) Guarantee Bonds executed or Deposits Receipts tendered by all Scheduled Banks;

(vi) A Deposit in the Post Office Saving Bank;

(vii) A Deposit in the National Savings Certificates;

(viii) Twelve years National Defence Certificates;

(ix) Ten years Defence Deposits;

(x) National Defence Bonds; and

(xi) Unit Trust Certificates at 5 % below market value or at the face value whichever is

less.

Also FDR in favour of FA&CAO(Con), East Coast Railway, Bhubaneswar, (free from

any encumbrance) may be accepted.

Note : The instruments as listed above will also be acceptable for Guarantees in case of

Mobilization Advance.

(c) The Performance Guarantee shall be submitted by the successful bidder after the

Letter Of Acceptance has been issued, but before signing of the contract

agreement. This P.G. shall be initially valid upto the stipulated date of completion

plus 60 days beyond that. In case, the time for completion of work gets

extended, the contractor shall get the validity of P.G. extended to cover such

extended time for completion of work plus 60 days.

(d) The value of PG to be submitted by the contractor will not change for variation

upto 25% (either increase or decrease). In case during thecourse of execution,

value of the contract increases by more than 25% of the original contract value,

an additional Performance Guarantee amounting to 5% (five percent) for the

excess value over the original contract value shall be deposited by the contractor.

(e) The Performance Guarantee (PG) shall be released after the physical completion of

the work based on the ‘Completion Certificate’ issued by the competent authority

stating that the contractor has completed the work in all respects satisfactorily.

The Security Deposit shall, however, be released only after expiry of the

maintenance period and after passing the final bill based on ‘No Claim Certificate’

from the contractor.

(f) Wherever the contract is rescinded, the Security Deposit shall be forfeited and the

Performance Guarantee shall be encashed. The balance work shall be got done

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 36 -

CE/Con/HQ/BBS/T/30/2011

independently without risk and cost of the failed contractor. The failed contractor

shall be debarred from participating in the tender for executing the balance work.

If the failed contractor is a JV or a partnership firm, then every member/partner

of such a firm shall be debarred from participating in the tender for the balance

work in his/her individual capacity or as a partner of any other JV/partnership

firm.

(g) The engineer shall not make a claim under the Performance Guarantee except for

amounts to which the President of India is entitled under the contract (not

withstanding and/or without prejudice to any other provisions in the contract

agreement) in the event of:

(i) Failure by the contractor to extend the validity of the Performance Guarantee as

described herein above, in which event the Engineer may claim the full amount of

the Performance Guarantee.

(ii) Failure by the contractor to pay President of India any amount due, either as

agreed by the contractor or determined under any of the Clauses/Conditions of

the agreement, within 30 days of the service of notice to this effect by Engineer.

(iii) The contract being determined or rescinded under provision of the GCC the

Performance Guarantee shall be forfeited in full and shall be absolutely at the

disposal of the President of India.

(h) Specimen copy of standard BG format is given in chapter .

(i) “Bank Guarantee (BGs) to be submitted by suppliers/contractors should

be sent directly to the concerned authorities by the issuing bank under

Registered post AD.

37. UTILIZATION OF RAILWAY STONES:

37.1 Notwithstanding the inclusion of some of the rates in the schedules with

contractor’s stones/aggregate, the Contractor(s) shall utilize the Railway’s

useable surplus stones, if available for use as such or by converting them into

aggregate of sizes required. The cost of boulder shall be recovered for one cubic

metre net of such stones as per the prevailing rate of the area or @ Rs. 100/-

per cum or as may be decided by the Railway (after deducting 25% for voids).

The Contractor(s) shall collect the boulders from locations within the limit of

contract section wherever they are offered to him within the section limits. The

rate per cubic metre net includes royalty, collection as required. The rate also

includes loading, transportation of cut spoils which has to be done by the

Contractors at his/their own risk and cost and the rate is towards the cost of cut

stone available on “as is and where is basis”. The boulder issued to the

Contractor(s) for the above purpose will be used only for the works of the

agreement and shall neither be disposed off nor be used for any other

agreement.

38. SALES TAX, ROYALTY OR ANY OTHER TAXES:

38.1 The Contractor shall bear in full all taxes, royalties and/ or other taxes / duties

levied by the State Government and/or Central Government from time to time.

This would be entirely a matter between the contractor and State Government/or

Central Government. Railway will recover the taxes and royalties through running

account bills, if the contractor fails to produce document for proof of payment of

taxes and royalties to the Government in the standard format as in practice by

the State Government/ Central Government.

39. ASSESSMENT OF ROCK REQUIRING BLASTING:

39.1 Assessment of quantities of rock requiring blasting shall be based on cross

sectional measurements. Where such measurement is found to be difficult, as in

the case of isolated boulder, payment shall be based on stack measurement of

blasted rocks/boulders subject to deduction of 25% volume towards voids. The

classification of soil and certification thereto only to be done by Dy.Chief Engineer

or higher Engineering officials in charge of the work.

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 37 -

CE/Con/HQ/BBS/T/30/2011

40. APPROVAL OF SAMPLES OF MATERIALS

All materials to be used in the work by the contractor shall be subject to the prior

approval of the Engineer-in-charge of the work. Before using in the works, the

contractor(s) shall submit samples of materials and arrange for the supplies, for

the work only, if the same are approved.

41. IS CODES/IRS’s SPECIFICATIONS.

41.1 (i)Whenever any reference to Code, Specification, Act, etc. is made in the

documents, it shall be taken as a reference to the latest version thereof, including

all amendments and corrections thereto or otherwise specified.

41.2 (ii)The Contractor shall not be entitled to any extra payment on any account for

compliance with the various provision of I.S. Specifications and Additional Special

Conditions. The rate indicated in the Schedule shall be deemed to include all

works required to be done in compliance with the specifications.

42. PRE-CAUTION TO BE TAKEN WHILE PLYING OF VEHICLES ADJACENT TO

RUNNING LINES TO PREVENT ACCIDENT TO TRAINS.

42.1 Vulnerable locations where construction work adjacent to running line can cause

accident should be protected by suitable strong barrier which should be included

as a paid item in contract schedule. These locations should be decided by

Executive Incharge of the work at the beginning of construction and intimated to

contractor in writing.

42.2 The barrier should be painted by retro-reflective paint at suitable interval to give

warning at night.

42.3 No work adjacent to running track should be carried out at night without express

written authority from the Executive Engineer Incharge of the work. In fact, no

contractor should do any kind of night working unless the Executive Engineer

Incharge of the work gives the specified spots according to priority of work where

night working has to be done. These spots should be well lit at night. In addition,

the work should always; be done under supervision of Railway supervisors in

addition to Contr’s supervisors. Suitable Railway personnel should be posted at

site with safety equipment’s like banner flags, hand signal flags, hand signal

lamps and detonators to arrange protection of trains. The Railway supervisors in

charge of such work should also give suitable message to adjacent stations as

well as through control for issuing caution orders to the trains approaching the

work site. For this purpose, he should be equipped with field telephone/walkie

talkie set.

42.4 The Contractor shall not allow any road vehicle belonging to him or his suppliers

etc., to ply in railway land next to the running line. If for execution of certain

works viz, earthwork for parallel Railway Line and supply of ballast for new or

existing rail line gauge conversion etc., road vehicles are necessary to be used in

Railway land next to the railway line, the Contractor shall apply to the Engineer-in

–Charge for permission giving the type & No. of individual vehicles, names and

License particulars of the drivers, location, duration & timings for such

work/movement. The Engineer in Charge or his authorised representative will

personally counsel, examine & certify, the road vehicle drivers, Contractor’s

flagmen & supervisor and will give written permission giving names of road

vehicle drivers, Contractor’s flagmen and supervisor to be deployed on the work,

location, period and timing of the work. This permission will be subject to the

following obligatory conditions.

( i ) The road vehicles will ply only between sunrise & sunset.

( ii ) Nominated vehicles & drivers will be utilised for work in the presence of at

least one flagman & one supervisor certified for such work.

(iii) The vehicles shall ply 6m clear of track. Any movement/work at less than

6m and up to minimum 3.5m clear of track centre, shall be done only in the

presence of railway employee authorised by the Engineer-in-Charge. No part

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 38 -

CE/Con/HQ/BBS/T/30/2011

of the road vehicle will be allowed at less than 3.5m from track centre. Cost

of such railway employee shall be borne by the Railway.

(iv) The Contractor shall remain fully responsible for ensuring safety & in case of

any accident, shall bear cost of all damages to this equipment and new and

also damages to railway & its passengers.

(v) The Contractor shall also be bound by the provisions of this agreement to

ply the road Vehicle only with adequate margin of safety, well clear of the

fixed structure profile of infringement, as stipulated in the rules made under

the Indian Railway’s Act and to seek and be guided by the Signals and other

directions of any look-out men or other personnel retained for the purpose

of ensuring safety, and to ensure extra care and vigilance while turning,

reversing or moving the road Vehicles in any other manner at an inclination

to the running Railway Track or the siding as the case may be. The

Contractor shall employ necessary look-out; men also at his own cost,

irrespective of any other arrangement that Railway may make in this regard.

(vi) Any breach of these conditions by the Contractor and/or his agents affecting

the safety of movement of Trains, Engines, or other rolling stock of the

Railway shall constitute a breach of Contract by the Contractor entailing

liability with termination of contract for default on the part of the Contractor.





For & on behalf of President of India









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 39 -

CE/Con/HQ/BBS/T/30/2011

CHAPTER-7





EAST COAST RAILWAY CONSTRUCTION ORGANISATION









ADDITIONAL SPECIAL CONDITIONS OF

CONTRACT





(TECHNICAL CONDITIONS)



Section – A: Specification of Civil works and concrete Mix Design.

Section – B: Conditions for supply of Cement & steel by contractor.

Section – C: Code of practice and Specifications .

Section – D: Taxes and duties, royalties, price variation and completion period etc.

Section – E: SAFETY RULES .

Section – F : Felling of trees, safe working methods, provision of level crossing and

procurement of machineries by contractor.

Section – G : Price variation clause

Section – H : Drafting of vehicles, working hours, acceptance criteria of concrete.

Section– I : Special Conditions of quality control.

Section– J : Special Conditions of Fabrication ,assembly and erection of steel work.

Section– K : Special Conditions of planning & Execution of work

Section– L : Rate quoted/accepted









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 40 -

CE/Con/HQ/BBS/T/30/2011









EAST COAST RAILWAY CONSTRUCTION ORGANISATION









Section-A



SPECIFICATION OF CIVIL WORKS AND CONCRETE MIX

DESIGN









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 41 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Section-A

SPECIFICATION OF CIVIL WORKS AND CONCRETE MIX

DESIGN



Design Mix Cement Concrete :



Concrete for all the works to be executed under this contract, shall be machine mix only.

Hand mixing shall not be permitted.



Concrete should mechanically compacted by using different varieties of vibrators

available to suit to situation of work. Neddle vibrators, surface vibrators(plate vibrators)

etc are to be procured by the contractor for vibrating the concrete mechanically.



All cement works shall be cured for 21 days by the contractor at his own cost.



All materials to be used in the work by the tenderer/contractor shall be subject to the

prior approval of the Engineer in charge of the work. Before using in the work,

tenderer/contractor shall submit sample of materials and arrange for the supplies, only if

the same are approved.



Tenderer/Contractor has to borne all the charges for testing the

cement/reinforcement/aggregate/water etc at his own cost including transportation of

materials to be tested from site of work to laboratories.



Testing of materials are to be done as and when ordered by Engineer in charge in an

approved laboratory.



Compressive strength of concrete indicated in different item of the concrete works are

characteristic compressive strength of concrete at the end of 28 days.



Initially concrete mix will be designed for target average compressive strength which will

depend upon standard deviation. Generally target means strength=characteristic

compressive strength at end of 28 days (+) 1.65 x standard deviation. Standard

deviation again depends upon different degree of control. Refer Table-1 of 10262-1982

for suggested values of standard deviation. Degree of control “fair” shall be adopted for

the mix design for this work.



After mix design, three sets of cubes shall be cast under laboratory condition as per the

finalized mix design to check the 7 days and 28 days strength. Average compressive

strength of the cubes should satisfy the acceptability criteria as stipulated in IS:456-

2000.

Any time there is change in the aggregate, source of receipt of cement, change

in grade of cement, type of cement and also if the age of the cement increases

considerably, the above tests for the design mix concrete shall be repeated

before the aggregates or cement are used in the work.



Aggregate :

Coarse and fine aggregate likely to be used in the work shall confirm to IS:383:1970.

Coarse aggregate shall invariably be of hard granite/black trap/ballast of machine

crushed well graded aggregate are acceptable. Flaky and Lime stone, quarry stone are

not acceptable.



Shuttering :

Contractor should arrange good steel shuttering/ply wood shuttering without containing

any depressions. The line, level and surface of the finished work should be absolutely

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 42 -

CE/Con/HQ/BBS/T/30/2011

neat and pleasing. The rates are inclusive of shuttering and no extra payment will be

made for the shuttering, cutting, bending and binding of the reinforcement. Rubber flats

of required sizes should be placed between the shutters for proper joining to arrest

leakage of cement water during concreting and compaction. Before laying the concrete

all the gap of shutters are to be packed with jute/cotton waste and should be applied

with grease and cement slurry to arrest leakage of cement water through joints/other

holes.



Cover Blocks:

Cover blocks of specified thickness to match the required grade of concrete should be

cast in advance for ensuring specified cover to all concrete works wherever required for

which separate payment will not be made. The rates are inclusive of this element.



Water :

Only clean potable water free from impurities shall only be permitted for concreting,

curing and grouting works.



The following testing equipments should be kept at site for monitoring the quality of the

works to be executed.



1) Set of IS sieves for coarse and fine aggregates conform to IS-383-1970.

2) Cube moulds(15x15x15cm) Minimum 6 Nos or as per the quantity of concrete

executed as per IS:456-2000.

3) Slump cone.

4) Measuring jars

5) Rapid moisture machine with calcium carbide chemical

6) Weighing equipment 10Kg capacity upto 1gm accuracy for conducting sieve

analysis

7) Weighing equipment 100Kg capacity to know unit weights of fine and coarse

aggregates in connection with design mix(Mobile type)

8) Compression testing machine for cube testing(Calibration of compression testing

machine should be done at specified intervals by the Engineering Incharge in an

approved laboratory/IIT/any University).

Note: Alternatively the cubes can be sent for testing in an approved laboratory as

per the direction of Engineer in charge if the cube testing machine is not installed

in the field laboratory.



The contractor should quote the rate considering the cost of above equipment

and cost of calibration charges and no separate will be made.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 43 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION









Section –B

CONDITIONS FOR SUPPLY OF CEMENT &

STEEL BY CONTRACTOR









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 44 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Section-B

CONDITIONS FOR SUPPLY OF CEMENT & STEEL BY

CONTRACTOR .

1.1 Cement and reinforcement steel for the entire work will be supplied by the

Contractor as per Schedule – B & Schedule-C.

1.2 Cement

1.2.1. Cement to be used in this work shall be conforming to IS 8112/IS 12269 :Puzzolona

Portland Cement.

1.2.2. Cement produced by reputed firms only shall be used for construction.

1.2.3. Decision of Engineer regarding reputed firms shall be final and binding on the

contractor.

1.2.4. Cement within 3 (Three) months from the date of manufacture will only be

used in the work covered under various schedules of the agreement.

1.2.5. Cost of the cement procured by the contractor should be paid only after

consumption towards the different item of works of schedules.

1.3 Steel

1.3.1. Steel used for work shall be High strength deformed bars of Grade Fe500

conforming to specification IS: 1786-1985 .

1.3.2. Steel produced by following manufacturers only shall be supplied by the

Contractor and used for construction.

• SAIL

• TISCO

• RINL

1.4 General

1.4.1. The Contractor shall arrange testing of cement and steel under directions of

Railway representative. All the charges for testing of all materials shall be

borne by the contractor. Steel shall be tested for tensile strength, elongation

etc. Testing of these materials shall be done at approved

laboratories/recognised laboratories as is being done by other Government

Organisations such as CPWD.

1.4.2. Steel used for work will be paid as per relevant items in Schedule of

quantities and rates. The rate for supply of Reinforcement steel as per

Schedule-C also include all items namely transporting, loading, unloading,

handling, re-handling, cutting, binding and placing and any other item what

so ever. The rate for supply of Cement as per Schedule-B is also inclusive of

transportation, loading, unloading, re-handling, storing with all lead, lift, all

taxes and incidental charges etc.

1.4.3. Railway reserves the right to inspect contractor’s godowns and documents

pertaining to this work.

1.4.4. The contractor shall use these materials in the work as per specifications

contained in this document approved drawings and shall not use less

quantities than what is stipulated in the relevant specifications/approved

drawings.

1.4.5. No allowance wastage on any of the materials supplied by the contractor

including Cement and Steel is payable by the Railway.



1.4.6 Contractor will make his own arrangements for storing cement, steel and

other materials.

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 45 -

CE/Con/HQ/BBS/T/30/2011





1.4.7 Reinforcement steel should be paid only after utilization in RCC work. Payment

should not be made for bars projected beyond the casting level until the same

is concreted in next stage.



1.4.8 Standard weights as per relevant IS code will be followed for arranging

payment for steel.



1.4.9 The contractor should disclose the sources from where supply of steel & cement

received by him and shall maintain detailed records of receipt of steel & cement

from different locations and shall keep the challans, R.R.No, Lorry No etc and

shall enter the receipts, issues and balance in the register and produce the

same to the Engineer in charge or his representative as demanded.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 46 -

CE/Con/HQ/BBS/T/30/2011









EAST COAST RAILWAY CONSTRUCTION ORGANISATION







Section – C



Code of practice and specifications









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 47 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Section – C

Code of practice and specifications

1. General:



The specification shall apply to all such works as are required to be executed under the

contract or other wise, directed by the Engineer. In every case the work shall be carried

out to the satisfaction of the Engineer and shall confirm to grades and cross sections

shown on the drawings or as indicated by the Engineer, the succeeding sections. Where the

drawings and specifications describe of portion of the work in only general terms and not

in complete details, it shall be understood that only the best general practice is to prevail.

Materials and workmanship of the best quality are to be explored and that the instructions

of the engineer are to be fully complied with and shall be binding on the Contractor. The

contractor shall be fully responsible to ensure that the finished works are free from any

defects, weakness, crack etc.



Code of practice and Specifications:



The abbreviations mentioned else where for standard specifications and code of

practice shall be considered to have the following meaning:



IS : Indian Standard of the Indian Standards Institution.

IRS : Indian Railway Standard Specifications and code of practice.

GCC 1994 : South Eastern Railway General Conditions of Contract-2001(Revised edition) and

Unified Standard Specifications 2010.

IRC : Indian Road Congress.

RDSO : Research, Design and Standard Organisation (Ministry of Railways), Lucknow.

MORT& H : Ministry of Road Transport & Highways.



Wherever the term “an Engineer comes in above specifications, it shall be read as defined in

Standard General Conditions of Contract for use in connection with Engineering works,

definition and interpretation Part-III of GCC item-1(e).

Wherever a reference is made to any of the standard specifications and code of practices,

it shall be taken as a reference to the latest version/ revision of the same and shall

include all the errata / corrections made in the same from time to time.

In case of any contradiction between provisions in the Special Specifications laid down

hereunder and in the specifications and codes which have been referred to the former

shall prevail and that in all cases, the decision of the engineer shall be final and binding

on the contractor.

All measurements shall be made in the metric system. Different items of the works shall

be measured in accordance with the procedures set forth in the relevant sections read

with conjunction with GCC and Special Conditions of Contract.

All measurements and computations, unless otherwise indicated shall be carried nearest the

following limits:

i) Length and breadth

ii) Height and depth or thickness of earth work, CC work,

Structural members etc. 5 mm

iii) Area 0.01 sqm

iv) Cubic contents: 0.01cum.

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 48 -

CE/Con/HQ/BBS/T/30/2011

Site clearance wherever involved shall be undertaken and the same shall be considered

incidental to the earth work items and the contract unit rates for the same shall be

deemed to be inclusive of clearing and grubbing operations.

All matters and specifications not provided for or specified in the tender documents for

this work shall be in accordance with South Eastern Railway General Conditions of

Contract-2001(Revised edition) and Unified Standard Specifications 2010 edition

corrected up to date and the contractor shall be bound by them for the performance of

the contract.



2.0 Miscellaneous:



2.1 When the earth for making formation is borrowed from adjacent private land,

contractor must ensure that minimum distance of borrow pit in private land from the

toe of new bank is at least equal to the height of the bank plus 3.0 mtr.

2.1.1 Under no circumstances incomplete work will be taken over by the department.

Contractor shall notify sufficiently in advance his intention of handing over a particular

stretch of completed finished work so as to enable recording.

2.3 The contractor should make his own arrangement at his cost of employ qualified

Engineers who will always be present at site during the progress of work with required

instrument like Theodolite, Leveling instruments, Steel Tapes, Leveling stages and other

equipments and labour etc. as required to control the day to day work and also to take

measurements of work done to assess the quantity for payment.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 49 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION







Section – D



TAXES AND DUTIES, ROYALTIES,

PRICE VARIATION AND COMPLETION PERIOD ETC.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 50 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION





Section – D

TAXES AND DUTIES, ROYALTIES,

PRICE VARIATION AND COMPLETION PERIOD ETC.



Name of Work: Bhubaneswar: Multi-purpose Indoor Stadium: Execution of Stadium

Building, internal finishing and other allied works.



1. Principal items of works: Multi-purpose Indoor Stadium: Execution of Stadium

Building, internal finishing and other allied works.

.

2. Completion Period:

All works under this contract are required to be completed within 20(Twenty)

months from the date of issue of acceptance letter.



3. The Price Variation Clause is applicable for this contract as per tender conditions.



4. Orissa Sales Tax/VAT is recoverable from the bills of the contractor @ 4% or at the

rates as specified/proposed by the govt. of Orissa from time to time.



5. Income Tax @2.3% is deductible from all the bills of the contractor.



6. Any other taxes/duties like Entry Tax/Octroi/Royalty etc. shall be on contractors

accounts.

7. The present rates of the recovery of the royalty charges are as under :

Srl. Name of minor minerals Rate of royalty per

No Cubic Metre

1 Ordinary Sand Rs.14/-

2 Ordinary clay, silt, rehtti, brick-earth, ordinary earth, Rs.14/-

moorum

3 Sandstone, late rite and slate in shape of slabs and tiles Rs.70/-

4 Ordinary boulders used for road and civil constructions Rs.50.40 ps

5 Road metals including ballast and chips Rs.50.40 ps

6 Bajri and crusher fines Rs.14/-



The revised rates if any will be recovered as per the directions of the State

Govt. of Orissa from time to time.



8. The works are required to be executed in the district KHURDA of Odisha State.



9. The execution of this work is to be completed on top priority basis.



10. Contractors who have adequate experience and resources to adhere to the

specification and completion schedule should participate in this tender.



11. Any diversion required for execution of work shall be paid under the respective

items of the schedules.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 51 -

CE/Con/HQ/BBS/T/30/2011









EAST COAST RAILWAY CONSTRUCTION ORGANISATION







Section – E



(SAFETY RULES)









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 52 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Section – E

(SAFETY RULES)

(SAFETY RULES)



1.1 Suitable scaffolds should be provided for workmen for all works that cannot be safely

done from the ground or from solid construction except for such short periods work as

can be done safely from ladders. When a ladder is used an extra labour shall be engaged

for holding the ladder and if the ladder is used for carrying materials as well, suitable

foot holds and hand holds shall be given an inclination not steeper than 1 to 4 (1

Horizontal to 4 Vertical).



1.2 Scaffolding or staging more than 3.5 metres above the ground or floor, swung or

suspended from an overhead support or erected with stationery support shall have a

guard rail properly attached, bolted, bracketed and otherwise secured at least 1 metre

high above the floor or platform of such scaffolding or staging and extending along the

entire length thereof with only such opening as may be necessary for the delivery of

materials. Such scaffolding or staging shall be fastened as to prevent it from swaying

from the building or structure.



1.3 Working platform gangways and stairways should be so constructed that they should not

sway unduly or unequally and where the height of the platform or the gangway or the

stairway is more than 3.5 metres above ground level or floor level they should be closely

boarded, should have adequate width and should be suitably fastened as described in

the para above.



1.4 Safe means of access shall be provided to all working platform and other working places.

Every ladder shall be securely fixed. No portable single ladder shall be over 10 metres

in length while the width between side rails in swung ladder shall in no case be less than

300 mm. for ladder upto and including 3.5 metres in length.



1.4.1 For longer ladders this width should be increased by at least 20 mm. each additional

metre of length. Uniform steps spacing shall not exceed 300 mm. Adequate

precautions shall be taken to prevent danger from electrical equipment. No materials on

any of the sites of work shall be so stacked or placed so as to cause danger or

inconvenience to any persons or the public. The Contractor shall provide all necessary

fencing and lights to protect the public from accident and shall be bound to bear the

expenses of defences of every suit, action or other proceedings at law that may be

brought by any persons for injury sustained owing to neglect of the above precautions

and to pay any damages and cost which may be awarded in any such suit, action or

proceedings to any such person shall be paid by the Contractor to compromise any claim

by any such person. In case the Contractor fails to settle such problems, the Railway

Administration will make payments arising on account of the conditions given above to

the concerned parties and recover the same from Contractor’s dues without any delay.

Contractor will not have any claim on this account at any stage.



1.5 Demolition : Before any demolition work is commenced and also during the process of work.

a) All roads and open area adjacent to the work site shall either be closed or suitably

protected.

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 53 -

CE/Con/HQ/BBS/T/30/2011

b) No electric cable or apparatus which is liable to be a source of danger over a cable or

apparatus used by the operator shall remain electrically charged.

c) All practical steps shall be taken to prevent danger to persons employed from risk of fire

or explosives or flooding. No floor, roof or other part of the building shall be so over

loaded with debris or materials as to render it unsafe.



1.6 All necessary personal safety equipment as considered adequate by the Engineer-in-

charge should be kept available for the use of the persons employed in the site and

maintained in a condition suitable for immediate use and the contractor should take

adequate steps to ensure proper use of equipment by these concerned.

a) Workers employed on mixing asphaltic materials cement and mortar shall be provided

with protective goggles.

b) Those engaged in white washing and mixing or stacking of cement bags or any materials

which is injurious to the eye shall be provided with protective goggles.

c) Those engaged in welding works shall be provided with welder’s protective eye sight lids.

d) Stone breakers shall be provided with protective goggles and protective clothing and

seated at sufficiently safe intervals.



1.7 When the work is done near any place where there is risk of drowning, all necessary

equipment should be provided and kept ready for use and all necessary steps taken for

prompt rescue of any persons in danger and adequate provision should be made for

prompt first all aid treatment of all injuries like to be sustained during the course of

the work.



1.8 Use of hoisting machines and tackles including their attachment anchorage and

supports shall confirm to the following standards of condition.



(a)(i) These shall be of good mechanical construction, sound materials and adequate strength

and free from patent defects and shall be kept in good repair and in good working

order.



(ii) Every rope used in hoisting or lowering materials or as a means of suspension shall be of

durable quality and adequate strength and free from patent defects.



b) Every crane driver or hoisting appliances operator shall be properly qualified and no

person under the age of 21 years should be in-charge of any hoisting machine including

any scaffolding.

c) In case of every hoisting machine and every cable ring, hook, shackle, swivel and pulley

block used in hoisting or as means of suspension safe working load shall be ascertained by

adequate means. Every hoisting machine and all gear referred to above shall be plainly marked

with the safe working load. In case of hoisting machine having a variable safe working load of

the conditions under which it is applicable shall be clearly indicated. No part of any machinery

or any gear referred to above in this paragraph shall be loaded beyond the safe working load

except for the purpose of testing.

d) In case of departmental machine, the safe working load shall be notified by the

Technological Engineer-in-Charge. As regards Contractor’s machines, the contractors shall

notify the safe working load of machine to the Engineer-in-charge whenever he brings any

machinery to site of work, get it verified by the Engineer concerned.



1.9 Motors, gearing, transmission, electric wiring and other dangerous parts of hoisting

appliances should be provided with efficient safe guards. Hoisting appliances should be

provided with such means as will reduce to the minimum the risk of accidental decent of the

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 54 -

CE/Con/HQ/BBS/T/30/2011

load; adequate precautions should be taken to reduce the minimum the risk of any part of a

suspended load becoming accidentally displaced. When workers are employed on Electrical

installations which are already energized, insulating mats wearing apparel, such as gloves,

sleeves and both as may be necessary should be provided. The workers should not wear any

rings, watches and carry keys or other materials which are good conductors of electricity.



1.10 All scaffolds, ladders and other safety devices mentioned or described herein shall be

maintained in safe condition and no scaffold, ladder or equipment shall be altered or removed

while it is in use. Adequate warning facilities should be provided at or near places of work.



1.11 These safety provisions should be brought to the notice of all concerned by display on

a notice board, at a prominent place at the work spot. The persons responsible for compliance of

the safety code shall be named therein by the Contractor.



1.12 To ensure effective endorsement of the rules and regulations relating to safety

precautions, the arrangements made by the contractor shall be open to inspection by the Labour

Officer, Engineer-in-charge of the Department or their representative.



1.13 Not withstanding the above clause from 6.1 to 6.12, there is nothing in these to

exempt the contractor from the operations of any other act or rule in force in the Republic of

India.



1.14 PRECAUTION TO BE TAKEN WHILE PLYING OF VEHICLES ADJACENT TO

BUILDING LINES TO PREVENT ACCIDENT TO TRAINS

Whenever a Lorry or any other Form of Road transport is required to ply along or in the

vicinity of a running line or any other Rly. track where Rly. Engines or Trains are liable to move,

the Contractor shall inform the Engineer in writing, of such requirement specify in the locations

and duration of time over which such specified Road Vehicles have to operate in the area (for

loading, leading or unloading of earth, ballast or any other materials, or plants or equipments)

without any obstruction or dislocation to the running Trains.



The Contractor shall also furnish the particulars of Vehicles and the names and

Photographs of Driver and attendant retained for each Vehicle to enable the Engineer to issue

necessary permits allowing the holder to operate the Vehicles, with such restrictions regarding

duration and /or location as are considered necessary. Such permit shall be returned to the

Engineer as soon as the work for which it is issued is over.



1.14.2 The Engineer-In-Charge or his Authorized Representative will personally counsel, examine

and certify the road Vehicle Drivers, Contractor’s Flag Man and Supervisor and will give written

permission giving names of Road Vehicle Drivers, Contractor’s Flag Man and Supervisor to be

deployed on the work , location, period and timing of the work. This permission will be subject to the

following obligatory conditions :



(a) The Road Vehicles will ply only between sunrise and sunset.



(b) Nominated Vehicles and Drivers will be utilized for the work in presence of at least one Flag Man

and on Supervisor certified for such work.



(c) The Vehicle shall ply 6 mtr. Clear of track. Any movement / work at less than 6 mtr. and up to

minimum 3.5 mtrs. clear of track centre, shall be done only in presence of Rly. Employee authorized

by the Engineer-In-Charge. No part of the Road Vehicle will be allowed at less than 3.5 mtrs. from

track centre. Cost of such Rly. Employee shall be the Rly.





SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 55 -

CE/Con/HQ/BBS/T/30/2011

(d) The Contractor shall remain fully responsible for ensuring safety and in case of any accident shall

bear the cost of all damages to this equipment and crew and also damages to Rly. and its Passengers.

Engineer-In-Charge may impose any other condition necessary for a particular work of site. Such

permit shall be returned to the Engineer, as soon as the work for which it is issued is over.



1.14.3 The Contractor shall execute a Bond undertaking to ply the Road Vehicles in a safe and

satisfactory manner and strictly in accordance with the stipulation and other conditions specified by

the Engineer and to engage and retain only the permit Holder to be the Contractor’s Agent In-

Charge of the Vehicle and the attendance shall at all time, be vigilant and on the look out for signals

from the Look Out Man, Flag Man or other personnel available at Site with a view to stop or late the

road movement so as to ensure adequate margin of safety for the timely passage of an approaching

Train or a Rly. Engine, without any delay or detention.



1.14.4 The Contractor shall also be bound by the provisions of this Agreement to ply the Road

Vehicles only with adequate margin of safety, well clear of the fixed structure profile of

infringement, as stipulated in the rules laid under the Indian Rly.’s Act and to seek and be guided by

the signals and other directions of any Look Out Man or other personnel retained for the purpose of

ensuring safety, and to ensure extra care and vigilance while turning, reversing or moving the Road

Vehicles in any other manner at an inclination to the running Rly. track or the siding as the case may

be. The Contractor shall employ necessary Look Out Man also at his own cost, irrespective of any

other arrangements that Rly. may make in this regard.



1.14.5 The Contractor also undertakes to make good at his cost, any inconvenience, loss, damage or

other expenses, cause incurred by the Rly. Administration and to pay such amount as are determined

by the Engineer to be recoverable from Contractor as penalty or damages from any omission ,

negligence, carelessness, over sight or accident on the part of any Contractor’s Agent, Drivers or

Attendant or any other person to whom the services of the Holder of the permit (issued by the

Engineer) has been lent or otherwise made accessible available.



1.14.6 Any breach of these conditions by the Contractor and his Agents affecting the safety of

movement of Trains, Engines, or other rolling stock of the Rly., shall constitute a breach of contract

by the Contractor entitling liability termination of contract for the fault on the part of the contract.



1.14.7 In exceptionally vulnerable locations, physical barrier in the form of barricades a height of

1.5 mtr. of trenches on ground shall be provided by the Contractor at his own cost so as to indicate

the limit up to which the Vehicle can be approached the running line. The locations or circumstances

under which such barriers have to be put will be decided personally by the Engineer-In-Charge.



1.14.8 Suitable gates/barriers should be installed across the new embankment, preferably

adjoining the manned/unmanned level crossings. The entry for the vehicles shall be regulated by

an authorized representative of the Engineer- in -charge during the working hours.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 56 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION







Section – F

Felling of trees, safe working methods etc.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 57 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Section –F

(Felling of trees, safe working methods etc.)

1.0 Felling of Forest Trees:

1.1 The section generally passes through forest land. Trees coming on the proposed

formation are only to be cut as directed by the Engineer-in-charge and under no

circumstances trees failing outside the scope of proposed formation should be

cut/up rooted. The Contractor or his labour are prohibited to cut the trees for the

purpose of file wood or for any other purpose. Cutting of trees as required under

the items of works indicated in the tender schedules may be carried out strictly

as directed by the Engineer-in-charge of the work . Unauthorised felling of trees

will result in prosecution and imprisonment. so it is the contractor’s responsibility

to cause no damage to the forest growth and any fuel required by the contractor

for his own use or for the use by his labourers, should be arranged by the

contractor at his own cost. The contractor should take this aspect into

consideration while quoting the rates against the tender.

2.0 Safe Working Methods:

2.1 The Contractor shall, at all times, adopt such safe methods of work as well

ensure safety of structure, equipment and labour. If at any time, the Railway

finds the safety arrangements inadequate or unsafe, the contractor shall take

immediate corrective action as directed by Railway’s representative at site. Any

direction in the matter shall in no way absolve the contractor of his sole

responsibility to adopt safe working methods. It shall be noted by the contractor

that the work involves working in close proximity to the existing track. The

contractor shall ensure that no damage, injury or loss is caused or likely to be

caused to any person or property the rates quoted shall be inclusive of all leads,

lift, re-handling if any due to crossing of track and also shall cover risk to track,

life and property during execution of work. The contractor shall adopt all

precautionary measures to safeguard track, life, property, structure while

execution of work and the rates shall include all measures.

3.0 Provision of level Crossing :

3.1 During the execution of the work, if there is a request from the contractor for the

provision of any level crossing for the use of contractor’s vehicle, the same will be

considered by the Administration. As the provision of level crossing is subject to

various safety regulations and the sanction for the same is to be obtained from

the commissioner for Railway safety the Railway cannot guarantee the provision

of such level crossing at all the places requested by the contractor. the non-

provision of such level crossing by the Administration will not confer any claim on

the part of the contractor to quote for any damages or extra rates. If a level

crossing for vehicle traffic is provided after getting the sanction of competent

authority, the same shall be provided maintained and dismantled when not

required by the Railway Administration and the whole cost should be borne by

the contractor. Location and number of temporary level crossings to be provided

on the existing Railway line to facilitate the construction shall be decided solely

by the Engineer-in-charge and his decision in this regard shall be final and

binding on the contractor.

4.0 Procurement of Machinery By Contractor :

4.1 In case arrangement by hire is proposed through collaboration proper legal

documents to the effect should be furnished in sufficient detail. The Railway shall

not be responsible/liable to pay any dues by the tenderer/contractor in case the

plant & machinery is taken on hire from a third party by the tenderer/contractor.

In other words, it shall mean that the contract is only between the

tenderer/contractor and the President of India acting through Ministry of

Railways.





SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 58 -

CE/Con/HQ/BBS/T/30/2011









EAST COAST RAILWAY CONSTRUCTION ORGANISATION









Section-G



PRICE VARIATION









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 59 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION

Section - G

PRICE VARIATION



1. The rates quoted by Tenderer and accepted by Railway Administration shall hold

good till the completion of the work and no additional individual claim will be

admissible on account of fluctuation in market rates, increases in taxes/any other

levies/tools etc., except that payment/recovery for overall market situation shall

be made as per Price Variation Clause.



No cognizance will be given for any sort of fluctuations in taxes and other market

conditions etc. for any individual item for the purpose of making adjustments in

payments. The Contract shall, however, be governed by the General Price

Variation Clause as under:



(i) Price Variation Clause (PVC) shall be applicable for tenders of

value more than Rs.50 lakh irrespective of the contract completion

period.

(ii) Material supplied free by Railway to the Contractor will fall outside the

purview of the Price Variation Clause.

(iii) Price variation implies both increase as well as decrease in input prices

and therefore, price variation during the currency of the contract may

result in extra payment or recovery as the case may be.

(iv) Price variation is payable /recoverable during the extended period of the

contract also provided the Price Variation clause is part of the original

contract and the extension has been granted on administrative ground i.e

under clause 17-A (i), (ii) and (iii) of GCC.



2. CATEGORIES OF WORKS AND COMPONENTS:



Adjustment for variation in prices of material, labour, fuel explosive, detonators

shall be determined in the manner prescribed below:-

The percentage component of various items in a contract on which variation in

prices admissible shall be as follows:-

A Earthwork Contract

Labour Component 50%

Fuel Component 20%

Other Material Component 15%

Fixed Component **15%

B Ballast and Quarry products Contracts

Labour Component 55%

Fuel Component 15%

Other Material Component 15%

Fixed Component **15%



C Tunneling Contracts

Labour Component 45%

Fuel Component 15%

Explosive Component 15%

Detonators Components 05%

Other Material Component 05%

Fixed Component **15%



D Other Works Contracts

Labour Component 30%

Material Component 25%

Fuel Component 15%

Fixed Component **30%

** Will not be considered for any Price Variation.

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 60 -

CE/Con/HQ/BBS/T/30/2011





Notes for Other Works Contract i.e. Category-D:-



(1) The percentage component of various items in other works contracts shall

be determined on the value arrived after deducting the cost of steel &

cement from the total contract value.

(2) Price Variation on steel & cement shall be calculated separately.



If, in any case, the accepted offer includes some specific payment to be made to

consultants or other items supplied by Railway at fixed price, such payments

should be excluded from the gross value of the work for purpose of

payment/recovery of variations.



3. PVC FORMULAE:

The amount of variation in prices in the several components (Labour, Materials

etc.) shall be worked out by the following formulae.



(I) Formulae applicable for Categories A to D having no provision of steel &

cement:-



i) L= R X (I - Io) X P_ Labour Component

Io 100

ii) M = R X (W - Wo) X Q Material Component

Wo 100

iii) U= R X (F - Fo) X Z Fuel Component

Fo 100

iv) X= R X (E - Eo) X S Explosive Component

Eo 100

v) N= R X (D - Do) X T Detonator Component

Do 100

L = Amount of Price Variation in Labour.

M = Amount of Price Variation in Materials

U = Amount of Price Variation in Fuel

X = Amount of Price Variation in Explosives

N = Amount of Price Variation in Detonators

R =Gross value of work done by the Contractor as per on account bills excluding

cost of materials supplied by Railway at fixed price. This will also exclude

payment made to the Consultants by the Contractors, (such payment will be

indicated in the Contractor’s offer)

Io =Consumer Price Index Number for Industrial Workers - All India - Published in

RBI Bulletin for the base period.

I =Consumer Price Index Number for Industrial Workers –All India - Published in

RBI Bulletin based on the average Price Index of the three months of the quarter.

Wo =Index Number of wholesale Prices - By Groups and Sub-groups - All

commodities - as published in the RBI Bulletin for the base period.

W =Index Number of whole sale prices - By groups and Sub-groups of all

commodities as published in the RBI Bulletin based on the average of the 3

months of the quarter under consideration.

Fo =Index Number of wholesale Prices - By Groups and Sub-groups - for fuel,

power, light and lubricants as published in the RBI Bulletin for the base period.

F =Index Number of whole sale prices - By groups and Sub-groups for fuel, power,

light and lubricants as published in the RBI Bulletin based on the average Price

Index of the 3 months of the quarter under consideration.

Eo =Cost of explosives as fixed by DGS&D in the relevant rate contract of the Firm

from whom purchases of explosives are made by the Contractor for the base

period.

E =Cost of explosives as fixed by DGS&D in the relevant rate contract of the Firm

from whom purchases of explosives are made by the Contractor based on the

average Price Index of the 3 months of the quarter under consideration.



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 61 -

CE/Con/HQ/BBS/T/30/2011

Do =Cost of detonators as fixed by DGS & D in the relevant rate contract of the Firm

from whom purchases of detonators are made by the Contractor for the base

period.

D = Cost of detonators as fixed by DGS & D in the relevant rate contract of the Firm

from whom purchases of detonators are made by the Contractor based on the

average Price Index of the 3 months of the quarter.

P = % of Labour Component

Q = % of Material Component

Z = % of Fuel Component

S = % of Explosives Component

T = % of Detonators Component



II) Formulae for calculation of the amount of variation in price of steel &

cement under other works contracts i.e. Category-D:-



a) The amount of price variation in Steel shall be worked out by the

following formula.



Ms = Q (Bs-Bso)

Where,

Ms = Amount of price variation in steel payable/recoverable.

Q = Weight of steel in tones supplied by the contractor as per the on account

bill for the month under consideration.

Bs = SAIL’s (Steel Authority of India Limited) ex-works price plus Excise Duty

thereof (in rupees per tonne) for the relevant category of steel supplied by

the contractor as prevailing on the first day of the month in which the

steel was purchased by the contractor (or) as prevailing on the first day of

the month in which steel was brought to the site by the contractor

whichever is lower.

Bso = SAIL’s ex-works price plus Excise Duty thereof (in rupees per tonne) for

the relevant category of steel supplied by the contractor as prevailing on

the first day of the month in which the tender was opened.



b) The amount of price variation in cement shall be worked out by the

following formula.



Mc = R X (Wc – Wco)/Wco

Where,

Mc = Amount of Price Variation in material (Cement)

R = Value of Cement supplied by Contractor as per on account bill in the

quarter under consideration.

Wco = Index No. of Wholesale Price of subgroup (of Cement) as published in RBI

Bulletin for the base period.

Wc = Index No. of Wholesale price of subgroup (of Cement) as published in RBI

bulletin for the first month of the quarter under consideration.



Notes for I & II above:-

1. The Index Number for the base period will be the Index Number as obtained for

the month of opening of the Tender and the quarters will commence from the

month following the month of opening of Tender.

2. Where rates are fixed through negotiations, the base month for Price Variation

Clause shall be the month in which negotiations are held.

3. Counter offer shall be treated at par with negotiations & the base month for Price

Variation Clause shall be the month in which the counter offer is issued.

4. The adjustment for variation in Prices if required shall be based on the average

Price Index of the 3 months of the quarter for formula I and 1st month of the

quarter under consideration for formula II(b) in the on account payments. If more

than one on account payment is made to the Contractor in a quarter, the

adjustment, if required, shall be made in each bill.

5. For Item-II(a):

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 62 -

CE/Con/HQ/BBS/T/30/2011

(i) Relevant categories of steel for the purpose of operating the above price

variation formula based on SAIL’s ex-works price plus Excise duty thereof

are as under :-



Sl. Category of steel supplied in Category of steel produced by SAIL whose

No the Railway Work. ex-works price plus Excise Duty thereof

would be adopted to determine price

variation.

01 Reinforcement bars and other TMT 8mm IS 1786 Fe 415/Fe 500

rounds

02 All types and sizes of angles Angle 65 x 65x 6 mm IS 2062 E250A SK

03 All types and sizes of plates PM Plates above 10-20mm IS-2062

E250A SK

04 All types and sizes of Channels 200 x 75 mm IS 2062 E250A SK

channels and joists

05 Any other section of steel not Average of price for the 3 categories

covered in the above covered under sl.no. 1,2,3 above.

categories and excluding HTS



(ii) The prevailing ex-works price of steel per tonne as on 1st of every month

for the above categories of steel as advised by SAIL to Railway Board shall

be considered.









***









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 63 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Section-H

Drafting of Vehicles, Working Hours, acceptance criteria of concrete









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 64 -

CE/Con/HQ/BBS/T/30/2011









EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Section - H

Drafting of Vehicles, Working Hours, acceptance criteria of concrete





1.0 Drafting of vehicles:

1.1 The Railway shall reserve the right to draft any of the vehicles and/or equipments

mobilised by the contractor at the site of the work along with its operator

employed by the contractor to assist in rescue and restoration operation in case

of any accidents/natural calamities involving human lives. The contractor shall be

responsible to arrange mobilisation of his operator/equipment/vehicle so drafted

with shortest possible delay.



1.2 The Railway shall arrange to duly compensate the contractor. Whose

vehicle/equipment/operator or so drafted by the operation of suitable non-

scheduled(N.S) items as per Railway’s existing norms.



1.3 The working hours of labourers in Summer months of April and May will be from

6 Hrs to 11 Hrs and 16.00 Hrs to 19.00 Hrs.



2.0 ACCEPTANCE CREITERIA FOR CONCRETE.



Acceptance criteria for concrete has been stipulated vide clause 6 & 15 of IS-

456/2000(Code of practice for plain & reinforced concrete). Therefore for all concreting

works the acceptance criteria should be followed as per IS-456/2000.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 65 -

CE/Con/HQ/BBS/T/30/2011







EAST COAST RAILWAY CONSTRUCTION ORGANISATION







SECTION-I









SPECIAL CONDITION & SPECIFICATION FOR

Quality control









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 66 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION



SECTION-I

Special Conditions: Quality Control



Design Mix Concrete:

Reinforced cement concrete to be laid for different elements of the proposed work

are design mix concrete.

Concrete mix design shall be done as per SP-33 of IS Hand Book on concrete Mix.

IS-10262-1982 code of practice for design mix.

All the specifications laid down in IS-456 must be followed for the work.

Any time, if there is change in the aggregate, source of receipt of cement, change

in Grade of Cement, type of cement and also if the age of the cement increases

considerably, the tests for the design mix concrete shall be repeated before the

aggregates or cement are used in the work.



Cement :

Only ordinary portland cement 53/43 Grade shall be used for design mix

concrete. Cement 53/43 Grade shall be conforming to IS-12269 and IS-8112

respectively. Cement testing shall be done batch wise for physical properties.



Aggregate :

Coarse and fine aggregate likely to be used in the work shall confirm to IS-383-

1970 Coarse aggregate of size 20 mm and below to be used in Reinforced Cement

concrete (M-25/M-30 or richer mix) shall invariably be of hard granite/black trap/basalt

quantity. Lime stone, quarry stone are not acceptable.

40mm stone aggregate shall be used in the Mass concrete works for mud mat

concrete and temporary staging foundation shall be hard stone confirming to IS-383-

1970.



Reinforcement :

Reinforcement steel to be used in the work shall be of high yield strength

deformed bars cold twisted/hot rolled one re-bars produced from SAIL/TISCO/RINL

recognised manufacturers only. Reinforcement steel should confirm to IS : 1786 Testing

of reinforcement steel shall be done for physical properties batch wise.



Binding wire :

Binding wire to be used in the work should be standard quality. The diameter

shall be 16 SWG.

Shuttering :

Contractor should arrange good steel shuttering/ply good shuttering without

containing any depressions. Shuttering plates should not contain depressions more than

5 mm. sufficient numbers of stiffeners are to be provided to prevent bulging between

end runners. The line, level and surface of the finished work should be absolutely neat

and pleasing. No touching of concrete will be allowed after shuttering is struck.

Joints between the concrete lifts should be chipped off neatly and the joint should

be rubbed with carbondrum stones(rough, medium and smooth) after applying cement

mortar 1:3

The rods left in concrete for the purpose of shuttering should be cut 2.5 cm deep

from the face of structure by gas cutting and the tie rod hole should filled with epoxy at

contractor’s cost.

19 x 5 mm wide rubber flats should be placed between the shutters for proper joining

to arrest leakage of cement water during concreting and compaction. Before laying

the concrete, all the gaps of shutters are to be packed with jute/cotton waste and

should be applied with grease and cement slurry to arrest leakage of cement water

through joints and other holes.



Cover Blocks :

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 67 -

CE/Con/HQ/BBS/T/30/2011

Cover blocks of specified thickness should be cast in advance for ensuring

specified cover to all RCC works for which separate payment will not be made, as the

rates of all RCC works are inclusive of this element.

Frequency of Sampling of concrete & Testing:

Minimum frequency of sampling for testing of concrete work should be as per IS-

456 Clause 15.2.2.

Admixture/Plasticizers :

Cost of Admixtures/Plastizers to be mixed with concrete for the purpose of

acquiring early strength of concrete to bring the structure early into use are to be

procured by the contractor at his own cost inclusive of transportation to works spot.

Generally concrete works to be done under traffic block conditions are to be mixed with

Admixtures/Plasticizers. Specifications of admixtures/plasticizers should be confirmed to

IS specifications.

Design Mix Cement Concrete :

Concrete for all the works to be executed under this contract, shall be machine

mix only. Hand mixing shall not be permitted.

Concrete should mechanically compacted by using different verities of vibrators

available to suit to situation of work. Shutter vibrators, needle vibrators, surface

vibrators(plate vibrators) etc. to be procured by the contractor for vibrating the concrete

mechanically.

All cement works shall be cured by the contractor at his own cost.

All materials to be used in the work by the tenderer/contractor shall be subject to

the prior approval of the Engineer-in-charge of the work. Before using in the work,

tenderer/contractor shall submit sample of materials and arrange for the supplies, only if

the same are approved.

Tenderer/contractor shall to borne all the charges for testing the

cement/reinforcement/aggregate/water etc., at his own cost including transportation of

materials to be tested from site of work to laboratories.

Testing of materials are to be done as and when ordered by Engineer-in-charge in

a approved laboratory.

Testing of Concrete:

The rates for concrete works shall be deemed to include all charges for testing of

aggregates and the concrete as required to be done in accordance with specification,

including the cost of labour, materials, equipment, moulds, transport, curing etc. For this

purpose the contractor shall set up a testing laboratory at his works at the location to be

decided by the Engineer. He/They shall also make adequate arrangements for curing of

test cubes, so prepared as per the direction of the Engineer. The contractor shall prepare

at his both for (1) preliminary test and (2) the works tests. All such tests shall be carried

out by the signed by the contractor or his/their representative and Engineer or his

representative shall be maintained by the contractor as per the direction of the Engineer.

The contractor shall provide without any extra charge all materials, tools, labour

and assistance of every kind which Engineer may demand from his for any test and

examination, other than special or independent test, which he shall require to make on

the contractor’s premises and the contractor shall bear and pay all costs attendants

thereon. If the contractor fails to comply with the conditions as aforesaid, the Engineer

shall his own judgment be entitled to remove for test and examination of any of the

material to any premises other than contractor’s and in all such cases, the contractor

shall bear the cost of transportation and/or carrying out such tests elsewhere. A

certificate in writing of the Engineer that the contractor has failed to provide facilities

and the means for the test and the examination shall be final.

The contractor shall also provide and deliver for tests, free of charge at such

places other than his premises as the Engineer may specify such materials or cubes as

he may require.

The Engineer, at his discretion may decide to perform some of the tests on

aggregate of concrete at his own laboratory or any other agency he may consider

necessary. In all such cases, the contractor shall provide and deliver for tests for such

materials or concrete cubes duly cured, free of charges at the premises as may be

specified by the Engineer. Any further cost incurred for such tests, shall be recovered

from the contractor’s bills.



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 68 -

CE/Con/HQ/BBS/T/30/2011

The contractor shall set up a small field laboratory to carry out tests on

aggregate, design mix concrete and testing of cement concrete as and when ordered by

the Engineer or his representative. The field laboratory should have the following



Equipment’s to conduct the field tests:-

Set of IS sieve for coarse and fine aggregate.

Cube moulds(15 x 15 x 15 cms)Minimum 6 Nos.

Slump cone.

Measuring jars.

Rapid moisture machine with calcium carbide chemical.

Weighing equipment 10 Kg. Capacity up tom 1 Gram accuracy for conducting sieve

analysis.

Weighing equipment 100 Kg. Capacity to know unit weights of fine and coarse aggregate

in connection with design mix(Mobile type).

Compression testing machine for cube testing 100/200 Tonne Capacity Unit.

Caliberation of compression testing machine should be done at specified intervals

by the Engineers in charge in approved laboratory/IIT/any University.

Contractor should quote the rate considering the cost of the above equipment and

cost of calibration charges. The rate for the above testing and equipments have already

been included in the respective items of works for which separate payment will not be

made.

Contractor can choose testing the cubes in approved labs instead of procuring the

compression testing indicated under Items 8 of field laboratory.

Immediately after receiving formal acceptance letter, the tender/contractor

should submit the materials such as aggregate, sand, cement, with details of name of

the quarry for aggregate, cement brand, grade of cement etc. to the approved

laboratory to design the concrete mix for M-25 or richer mix Tests such as specific

gravity of cement, sand, metal and testing of cement for physical properties, sieve

analysis for fine and coarse aggregate, abrasion, impact and crushing strength etc. are

to be done by the laboratory to design the concrete mix. Concrete mix design should be

done as per IS-10262-1982 with further stipulations indicated in previous para stated on

this subject.

Laboratory should submit the result of all the above tests along with design mix

calculation for further verification by Railway and to approve the design mix by the

Engineer-in-charge.

Cost for carrying out design mix in an approved laboratory should be borne by

the contractor at his cost. Percentage of rates for various items quoted by the Tenderer

shall be deemed to include the cost of the above tests.

Tenderer/contractor should procure preferably 53 grade cement for M-25 or

richer design mixes. In case 53 Grade Cement is not available in the local market, 43

Grade Cement can be used.

For 43 Grade Cement, separate design mix is required and should be got it done

in the laboratory/IIT etc. as approved by the Engineer-in-charge.

No extra payment shall be paid to the contractor for the above as the rate quoted

are inclusive of carrying out the above design mix charges in approved laboratory.

If curing is not being done to satisfy the standard, the Engineer-in-charge may

get it done at the contractors cost without any notice to him, as the curing can not wait

for such notice, time etc. The Engineers decision shall be final and binding, as to whether

satisfactory curing is being done or not.

Contractor should arrange for painting of date of casting of different elements on

the structure with paint for monitoring the curing. Cost of the above should be borne by

the contractor at his own cost.

After the work is completed in all respects the contractor shall make available for

Railways for record the following.

Tracing drawings on transparent polythine film of all completed works with all

details like general arrangements drawings, reinforcement details, structural details etc.

are to be made and supplied along with six ammonia copies for record.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 69 -

CE/Con/HQ/BBS/T/30/2011









EAST COAST RAILWAY CONSTRUCTION ORGANISATION









SECTION - J









Fabrication , assembly and erection of steel work









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 70 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION

SECTION-J

Special Conditions Specifications/Conditions for Fabrication, assembly

and erection of steel work



1. All fabrication and erection shall be done in accordance with IS: 800:62. Structural

steel to be procured by the contractor of this work shall confirm to IS:2062 Gr.’A’ and

welding shall confirm to IS:816. Fabrication shall not be taken in hand until the relevant

shop drawings have been approved by the Dy.CE. Shop drawings are to be prepared by

the contractor based on the standard drawings / drawings based on the similar work as

per the direction of Engineer-in-charge or his representative. On completion of

fabrication with all the approved changes, 4 copies of “as made” drawing should be

supplied to the Engineer. Approval of drawings shall not relieve the contractor’s from

his obligations under the contract.



2. The contractor shall afford to the Engineer or his representative all reasonable

facilities as may be necessary for satisfying the Engineer that the structural steel is being

and or has been fabricated in accordance with the specification and drawings.



3. The fabrication of structure shall be as specified in the approved drawings (Ref .1

above)and as per the directions of the Engineer-in-charge of the work.



4. Riveting/welding shall not be started until such time the Engineer has personally

satisfied himself that the alignment of the structure is correct.



5. The welding shall be uniform and shall not contain any slag or blow holes. There

should be no under cutting of parent metal or overlapping. Electrodes used for welding

shall be got approved by Dy.CE, E.Co.Railway, BBS before use.



6. All riveting shall be done by pneumatic or hydraulic rivets.



7. Rivets, when driven, shall fill the holes completely, have full round heads and

concentric with the surface or be counter-sunk when so required.



8. Permanent bolts, anchor bolts, nuts, washers, rivets, welds, rail clips etc., required

for complete fabrication and erection of various structure shall be provided by the

contractor, the cost of which is already included in the basic rates for fabrication and

erection.



9. The contractor shall arrange for service bolts and nuts, drifts, compressed air,

oxyzen and acetylene gases required for the fabrication and erection dismantling and

also trailors/tractors with necessary tackles for loading, handling and transport of

structures to erection site from storages.



10. Where only bolting is specified in the drawing, it should be tightened to the

maximum limit. The bolts used should be long enough to so that at least three threads

protrude when the nut is fully tightened and no gap should be allowed between the

members to be joined. On permanent bolts one washer should be provided for the bolt

head and one for the nut.



11. Particular care should be taken to ensure free expansion and contraction wherever

provided.



12. Wooden rams or mallet shall be used in forcing members into position, in order to

protect the metal from injury or shock.



13. While assembling, the contractor shall arrange to straighten any bends, twists, etc.

if any in the fabricated members. The contractor shall at his own cost rectify any minor

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 71 -

CE/Con/HQ/BBS/T/30/2011

defects in fabrication, and also carryout any minor alterations that may be found

necessary. Such minor works shall include cutting of rivets, drilling of holes, reaming

providing gussets/cleats and jointing structural members by riveting/bolting/welding.

14. Instrumental checking for correctness of setting up of structures as also the final

adjustment of leveling and aligning should be carried out immediately after completion

of assembling of each work, block of building (frame works) in the sequences determined

by the Design, Crane girders and rails requiring higher accuracy while setting them up,

should be adjusted after the completion of basic structures.

15. The erection of steel structures should be carried out in a correct sequence

ensuring the stability of structures at all stages of erection. All structures placed in

position must have strong supports until they are properly joined with the allied

structures, so that they may not fall down or be blown off. The contractor failing to take

such precautionary measures shall make good the damages sustained to those

structures and other properties of the Railway or replace such structures and properties

of the Railway found damaged causing from such incidents, as considered necessary by

the Engineer.

16. The erection of all steel structures should be carried out in accordance with the

specifications, approved drawings and instructions supplied and subject to alteration and

amendment as may be ordered from time to time during the progress of the work. Any

departure from plans, specifications, etc. should be reported to the Engineer-in-charge.

17. Assemblies of structures should be made on ground. The weight upto which a

particular ground assembly may be made will be determined by the Engineer taking into

consideration the height of the structures, capacity of the lifting tackle, and site

conditions such as availability of space etc.

18. Inspection: Fabricated steel work will be inspected at the fabrication site by an

authorised representative of the Railway prior to erection.

19. The contractor shall be responsible for the transportation at his own cost from the

contractor’s works to the site of erection and stacking them if ordered at the site of work

before erection besides being responsible for any damages occurring in transit and while

keeping them stacking till the materials are erected by him and work is finally accepted

by the Dy.Chief Engineer.

20. All materials and workmanship shall be subject to such tests as specified in the

contract documents or as the Engineer may order and all materials excepting those

which must be necessity be tested at the work site before they are actually required to

be used to enable the Engineer to have such tests made as he may consider necessary.

All fabrication work shall be carried out near work site at the place allotted by the

Railway.

21. The contractor shall furnish all information such as weight constituent substances,

dimensions, levels, strength and description of the materials supplied by him and give

the Engineer such other particulars as may be required for using in the work.

22. The contractor shall bear the whole expense of testing or re-testing all structures,

materials and workmanship as the Engineer will direct.

23. The Engineer may order the materials in the works to be cut where he considers it

necessary to test the workmanship and quality and if the work be found satisfactory the

cutting out and replacing of the materials will be paid by the Railway but, if in the

opinion of the Engineer any such work opened up shall have been executed with

unsound, imperfect or unskillful workmanship or with materials of quality not in

accordance with the contract, the contractor shall forthwith at his own costs and to the

entire satisfaction of the Engineer rectify, re-construct or replace the same in whole or in

part as he may be directed by the Engineer whether or not the value of any such work or

materials shall be included in any payment made to the contractor.

24. The contractor shall inform the Engineer in writing any portion of the work is ready

for inspection giving him sufficient notice to enable him to inspect the same, without

retarded complete in accordance with the terms of the tender until the Engineer shall

have certified in writing that it has been inspected and approved by him.

25. The contractor shall design, manufacture, erect and dismantle any false work

staging temporary supports etc., required for the safe and accurate erection of the

structural steel and shall be responsible for the adequacy of the same.





SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 72 -

CE/Con/HQ/BBS/T/30/2011

25.1 The cost of such work shall be deemed to be included in the rates of erection of

the structures for which such false work staging and temporary supports etc. are

required. The contractors may get his drawings and designs of such false work, staging

etc. approved by he Engineer but such approval by the Engineer shall not relieved him of

any responsibility for the safety of such works.



26. Erection of steel structures over concrete structures will start only on receipt of an

authorisation from the Engineer to the effect that all the inserts embedded in concrete

are in correct lines and level as shown in the drawings and that the deviations, if any,

are within the permissible limits.



27. The contractor shall provide adequate supervision at all stages of work and

examine in parts for accuracy before erection is commenced. He shall also provide

necessary facilities satisfactory to the Engineer-in-charge for inspection of any parts to

be used in the work at such stages, as he may direct. Irrespective of any inspection and

tests made by the Engineer, the contractor shall be entirely responsible for proper

execution of the contract, not withstanding any approval which may have been given by

the Engineer of the work or of tests carried out either by the Engineer or the contractor.

Any fittings or accessories which may not be specifically mentioned in the specification

but which are usual or necessary for erection are to be provided by the contractor

without extra charges, so that the erected structure may be complete in all details.



28. The contractor should bring his own erection plant and equipment, tools and

tackles, scaffolding, trestles etc. and any other accessories.



29. The contractor shall provide for the convenience of inspection/testing, adequate

temporary access ladders, if required by the Railway Department, gangways, tools,

tackles, instruments and all other facilities required by the engineer for the purpose.



30. The holes of erection joints riveted or bolts (with machined bolts) should be filled

with temporary bolts and plugs after mounting the structures. The number of bolts and

plugs is determined by design, but should not be less than 2/3 of the total number of the

holes. In joints where the number of holes is equal to 5 or less not less than 2 holes

should be filled. The number of plugs should be about 30% of the number of bolts.



31. CALCULATION OF WEIGHT OF FABRICATED STEEL

The weight of materials for which payment has to be made for fabrication and erection

shall be that which is computed on the basis of nominal weight of the steel sections of

the finished product. Gussets will be paid as per the overall rectangular/square

dimensions. In computing the weight of finished steel no deductions will be made for

rivet holes or bolt holes or any other holes, hew nuts, notches. The weight will not

include the weights of rivets, welds, bolts, nuts, washers etc. supplied by the contractor,

at his cost. Unit weights of all structural steel to be used in this work will be paid as

per IS -808-1989.

32. MAINTENANCE PERIOD:

The contractor should maintain the works executed for a period of 6(Six) months

from the date of completion of the entire work and any defects that are found during this

period shall have to be replaced/rectified by him at his own cost.



33. The Railway will, at its discretion and for the duration of contract make available

free of charge land at site for the construction of contractor’s site, Office, storage etc.,

required for execution of the contract. Cleaning and leveling of the ground, construction

of temporary roads, stores, offices etc., as required shall be done by the contractor at

his own cost to the satisfaction of the Engineer. No land for accommodation for his staff

and labour shall be made available by the Railways. In regard to the lands made

available to the contractor for the office, stores, the site shall on completion of work be

restored to reasonably the same conditions as they were originally handed over to the

contractor.





SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 73 -

CE/Con/HQ/BBS/T/30/2011

34. The railway shall also provide land for making the marking and fabrication platform

free of charge. It shall be the responsibility of the contractor to make and maintain the

platform at his own cost.

35. Contractor has to make his own arrangements for obtaining the electric power

supply from CESCO. However if possible, Railways will arrange the supply of electric

energy at a point from any of the existing points near the site. The contractor shall make

his own arrangements for laying and maintaining further distribution lines and wires

necessary for the works. This system shall confirm to Indian Electricity Act. The

contractor shall provide his own energy meter for registering consumption. The meter

shall be got tested by contractor, if necessary from appropriate authority. The contractor

should pay the electrical energy charges for the consumption of power at the rates as

fixed by the Railway from time to time. The contractor will have no claim on the Railways

if the supply becomes intermittent or for break down in system of fluctuation in voltage.



36. The contractor should disclose the source from where supplies of structural steel

required by him and shall maintain a detail record of receipts from different sources.

Photo copies of challans, invoices, gate passes etc. having the details of the rates,

quantity etc. for the structural steel procured by the contractor for the work has to be

supplied to Railway for their record.

Contractor has to submit the manufacturer test certificate for the structural steel

procured for the work. Further contractor has to arrange the testing (physical properties)

of structural steel received lot wise in an approved laboratory by Engineer-in-charge for

the material received on different occasions for the work. Cost of transportation and

handling charges of samples up to the laboratory and testing charges have to be borned

by the contractor.



37. Welding



37.1 General: The welding and the welded work shall generally conform to IS:816

and 823 unless otherwise specified. As much work as possible shall be welded in shops

and the layout and sequence of operations shall be so arranged as to eliminate distortion

and shrinkage stresses.



37.2 Electrodes: All electrodes shall be kept under dry conditions. Any electrodes

damaged by moisture shall not be used unless it is guaranteed by the manufacturer that

when it is properly dried, there will be no detrimental effect. Any electrode which has

part of its flux coating broken away or is otherwise damaged, shall be rejected. Any

electrode older than six (6) months from the date of manufacture shall not be used.

37.3 Preparation of Joints: The edges shall be prepared with an automatically

controlled flame cutting torch correctly to the shape, size and dimensions of the groove,

prescribed in the design and shop drawings. In case of U-groove joint, the edges shall be

prepared with an automatic flame cutting torch in two phases following a bevel out with

a gouging pass or by machining.



The welding surfaces shall be smooth, uniform and free from tins, tears, notches

or any other defect which may adversely affect welding and shall be free of loose scale,

slag, rust, grease, paint moisture or any other foreign material.

37.4 Welding Procedure: The welding procedure to be followed by the contractor

shall be in conformity with the ISI specification to suit the details of the joints indicated

in the drawings and the position at which welding has to be carried out. Welding

procedure shall cover the following:

i) Type and size of electrodes

ii) Current for arc welding and voltage;

iii) Length of run per electrode, for arc welding and speed of travel;

iv) Number and arrangement of runs in multirun welds;

v) Position of welding;

vi) Preparation and set up of components;

vii) Welding sequence;

viii) Pre or post heating;

ix) Any other relevant information;

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 74 -

CE/Con/HQ/BBS/T/30/2011

The welding procedure shall be so arranged that the distortion and shrinkage

stresses are reduced to a minimum and that the welds meet the requirement of quality

specified hereunder.



Any weld found defective shall be cut by using either chipping hammer or gouging

torch in such a manner that adjacent material is not injured in any way.



Painting of the welds involving deformations of the weld surface either during de-

slaging operation or thereafter shall not be allowed.



37.5 Fusion faces and surrounding surfaces: Fusion faces and the surrounding

surfaces within 50mm of welds, shall be free from all mill scale and free from oil, paint or

any substance which might affect the quality of the welds or impede the quality /

progress of welding. They shall be free from irregularities that would interfere with the

deposition of the specified size of weld or be the cause of defects.



All mill scale within 50mm of welds shall be removed prior to welding either by

picking followed by thorough power wire brushing or by other approved methods.



If preparation or cutting of the fusion faces is necessary the same shall be carried

out by shearing, chipping, gas-cutting or flame gouging.



Where hand gas-cuttings or hand-gouging is employed, the blowpipe or gouging

blow pipe shall be properly guided.



37.6 Assembly for welding: Parts to be welded shall be properly assembled and held

firmly in position by means of jigs and clamps prior to and during welding.



37.7 Accuracy of Fit-up: Parts to be fillet welded shall be brought into as close

contract as practicable and the gap due to faulty workmanship or incorrect fit-up shall

not exceed 1.5mm. If greater separation occurs at any position, the size of fillet weld

shall be increased at such positions by the amount of the gap.



37.8 Jigs and Fixtures: Jigs and fixtures shall be used where applicable and shall be

designed to facilitate welding and to ensure that all welded portions are easily accessible

to the operators.



37.9 Ends of Butt welded joints: The ends of butt joint shall be welded so as to

provide full throat thickness. This may be done by the use of extension piece, cross-runs

or other approved means.



37.10 Weld Face and Reinforcement of Butt Welds: The weld face shall at all

places be deposited uniformity on the surface of the parent metal. Where a flush

surface is required the surplus metal shall be dressed off.



37.11 Minimum Leg length and Throat Thickness in Fillet Welds: The minimum

leg length of a fillet weld as deposited shall be not less than the specified size. In no case

shall a concave weld be deposited unless specifically permitted. Where permitted, the leg

length shall be increased above that specified, so that the resultant throat thickness is as

grate as would have been obtained by the deposition of a flat-faced weld of the specified

leg length.



37.12 De-slaging: After making each run of welding all slag shall be thoroughly

removed and the surface cleaned.



37.13 Quality of Welds: The weld metal, as deposited (including track welds if

to be incorporated) shall be free from cracks, slag inclusions, porosity, cavities and other

deposition faults. The weld metal shall be properly faced with the parent metal without

under cutting or overlapping at the toes of the weld. The surface of the weld shall have a

uniform consistent contour and regular appearance.

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 75 -

CE/Con/HQ/BBS/T/30/2011





37.14 Weather Conditions: Welding shall not be done under severe weather

conditions which might adversely affect the efficiency of the welding.



37.15 Qualification and Testing of Welders: The contractor shall satisfy the

Engineer that the welders are suitable for the work for which they will be employed and

shall produce evidence to the effect that welders have satisfactorily completed

appropriate tests as described in IS: 877. The Engineer may at his own discretion order

periodic tests of the welders and / or of the welds produced by them such tests shall be

at the expense of the contractor.



37.16 Supervision: The contractor shall employ a competent welding supervisor to

ensure that the standard of workmanship and the quality of the materials comply with

the requirements laid down in this specification.



38 Erection Marking: Each fabricated member whether assembled prior to

despatch or not so assembled, shall bear an erection mark, which will help to identify the

member and its position in respect of the whole structure, to facilitate re-erection at site.



These erection marks shall be suitably incorporated in the shop detail and erection

drawings.



39. CONTROLS IN THE FABRICATION AND ASSEMBLY OF VARIOUS

STRUCTURES



39.1 The following tests shall be conducted to ensure quality of welding.

The contractor shall conduct tests in accordance with the following norms:

(i) Visual examination – Hundred percent(100%) of the welded joints.

(ii) Ultrasonic testing - 2% of the butt joints or as directed by the Engineer in

charge. The ultrasonic test shall be carried out by authorised agencies

and carried out under the personal supervision of Engineer-in-charge.

(iii) Dye penetration: (as per IS 3658 – 1981 – All butt joints and Important

lap joints shall be tested by dye penetration method:



39.2 Tests:



39.2.1 Visual Examination: The contractor shall conduct visual examination and

measurement of the external dimensions of the weld for all joints. Before examining the

welded joints, areas close to it on both sides of the weld for a width not less than 20mm

shall be cleaned of slag and other impurities. Examination shall be done by magnifying

glass which has a magnification

power of ten (10) and measuring instrument which has an accuracy of +0.1 mm

or by weld gauges. Welded joints shall be examined from both sides. The contractor

shall examine the following during the visual checks.



i) Correctness and shape of the welded joints

ii) Incomplete penetration of weld metal

iii) Influx

iv) Burns

v) Unwelded craters

vi) Under cuts

vii) Cracks in welded spots and heat affected zones

viii) Porosity in welds and spot welds

ix) Compression in welded joints as a result of electrode impact while

carrying out contract welding.

x) Displacement of welded element.



The contractor shall document all data as per sound laboratory practices.





SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 76 -

CE/Con/HQ/BBS/T/30/2011

39.2.2 Ultrasonic test: Ultrasonic test shall be conducted by the contractor to detect

gas inclusion (pores), slag inclusion, shallow welds, cracks, lamination and friability etc.,

prior to starting of ultrasonic test the welded joint shall be thoroughly cleaned of slag

and other material. Surface of the basic metal adjacent to the welded joint on both sides

shall be mechanically cleaned by a grinder or a metal brush to provide the contract of

the whole ultrasonic probe surface with surface of basic metal. The width of the clean

surface shall be as directed by the Engineer. The welded joint then shall be covered with

a thin coat of transformer oil, turbine or machine oil to ensure acoustic contact . The

joints so treated shall be marked and the marks shall be entered into documentation.

Subsequent to this, ultrasonic test shall be carried out as directed by the Engineer.



39.2.3 Dye Penetration test: (As per IS 3658-1989 All butt joints and

important lab joints shall be tested by dye penetration method ; First the joints shall be

thoroughly cleaned with wire brush / by mechanical means then the cleaned joint shall

be sprayed with "Cleaner" to obtain a clean surface, which can receive the “Penetrent”.

Then the “Penetrent” shall be applied on the joint. After gap of 5 to 10 minutes the

“developer” shall be applied to direct the defects of the weld which can be identified by

careful visual examination. The procedure shall be followed as per manufacturers

specification as directed by Engineer in charge.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 77 -

CE/Con/HQ/BBS/T/30/2011









EAST COAST RAILWAY CONSTRUCTION ORGANISATION









SECTION - K









Planning & Execution of work









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 78 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



SECTION-K

SPECIAL CONDITIONS Planning & Execution

A. PLANNING, SPECIFICATIONAND EXECUTION

1. Samples of the materials like brick, sand, aggregate, pipes, fittings including

sanitary fittings proposed to be used by the Contractor shall first be submitted to

the AXEN(Con)/ XEN(Con) in-charge for approval & future comparison. The

materials shall be brought to sites only after being approved by the

AXEN(Con)/XEN(Con), who may decide to get these materials tested before

according his approval and the cost of such testing shall be borne by the

Contractor. If any doubt arises during course of execution of works regarding

acceptability of any of the materials brought to site by the Contractor, the

decision of AXEN(C)/XEN(Con) shall be final & binding on the Contractor except

that if he so wishes, the Contractor can represent to DY.C.E.(Con)/BBS for

reviewing the decision within 7 days, who shall cause the matter to be

examined/tested and the decision so arrived at shall be final & binding on both

the parties. The cost of such examination/testing shall be borne by the

Contractor, if the material is found unacceptable and shall be borne by the

Railway if the material is found acceptable.

2. Any detailing of structure, layout of pipelines/fittings etc. or any other details not

specifically indicated in the drawing shall be brought to the notice of

AXEN(Con)/XEN(Con) by the Contractor at least 15 days in advance who will

furnish the details in writing to the Contractor. It is the sole responsibility of the

Contractor to ask for the complete details at least 15 days in advance so as not to

hold up the work & he shall be squarely responsible for any delay on this count

except that if the Railway do not furnish the details within this period after being

asked by the Contractor in writing, delay after expiry of this period may be

assigned to the Railway. However, such delay shall not entitle the Contractor to

any additional rates or claims except that extension of time for the period of

delay may be granted to him without imposition of penalty.

3. Design and detailing of proposed staging and/or shuttering for concreting

proposed to be used shall be got approved by AXEN(Con)/XEN(Con) before

bringing the same to site. The material and finish of the shuttering shall also

require approval of AXEN(Con)/XEN(Con) before the same is used for concreting.

The individual pieces of shuttering (Plank or plate) shall fulfil the following

dimensional & other criterion :

(i) The surface of the shuttering piece shall be in one plane. From an

imaginary plane passing through 3 corners of shuttering, the fourth corner

or any other point on the surface shall not deviate by more than 3 mm per

67 cm. diagonal length of shuttering.

(ii) Individual edges of a shuttering piece shall not deviate from an imaginary

line joining the two respective corners by more than 2 mm per 60 cm

length/width of shuttering.

(iii) Surface of the shuttering should be smooth & applied with shuttering

release-agent before use, so that concrete does not stick to the shuttering.

The staging material shall be straight ( i.e. having no bends) & shall stand erect

(at 90° from supporting surface) and crooked pieces of ballies or bent pipes shall

not be used.

4. Compaction of concreting shall be done with needle vibrators of approved quality

& specification except for slabs where surface vibrators of approved quality shall

be employed in addition to needle vibrators.

5. Cover pieces made of suitable proportion of sand, cement mortar to give a

strength equal to concrete strength shall be cast sufficiently in advance of

concreting and used as cover blocks for reinforcement. The size of these blocks

shall be c x 2c x 2c where ‘c’ is the specified cover to the reinforcement & these

pieces shall be smooth with sharp edges.

6. Suitable chairs made of HYSD bars shall be provided in RCC slabs to maintain the

required distance between top & bottom reinforcement as per requirement at site

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 79 -

CE/Con/HQ/BBS/T/30/2011

& as per instruction of AXEN(Con)/XEN(Con). The steel for this shall be paid

under relevant schedule or supplied by the Railway, but no extra payment shall

be made for providing these chairs.

7. The Contractor shall take all precautions to ensure that the slab is absolutely damp proof.

For testing this, ponding of water up to a depth of 1 feet shall be kept over the slab for at

least one week and the lower surface of slab should show no sign of dampness at the end

of this period. The testing shall be done after curing for at least 21 days. The payment for

the concreting slabs & beams shall be released only after this test and the cube test as

indicated in ‘Additional special conditions of contract’ give satisfactory results.

If any sign of dampness is observed in the above test, the Contractor is liable to give such

treatment (like epoxy grouting etc.) to the slab as approved by the Railway to make the

slab damp proof. Full cost for such treatment shall be borne by the Contractor. After the

treatment, the slab shall be tested again and the payment for slab & beams shall be

released only after obtaining satisfactory result. If the dampness is not arrested, the full

cost of Railway materials consumed in the slab(i.e. steel & cement) & cost of dismantling

of slab shall be recovered from the Contractor & no payment shall be admissible for the

concreting so executed. Additional cubes if required, may also have to be made as per

instructions of Engineer-in-charge for testing 7 days’ strength so as to decide upon the

time of striking off form work, to determine the duration of curing etc.

(B) PROGRAMME OF THE WORK

(TO BE ESSENTIAL PART OF TIME FRAME FOR COMPLETION OF CONTRACT)

The Contractor immediately after getting the acceptance letter and requisite site

and drawings, make out a detailed programme for completion of work within the

completion period and submit to the Railway along with a list of resources (men and

machineries) proposed to be deployed by him to stick to the programme submitted to the

Railway. This programme shall form an integral part of the agreement. However, if there is

any hindrance to the work due to the reasons beyond the Control of the two parties to the

agreement, such programme shall be reviewed and re-submitted, after and to the extent,

such hindrances have been removed and in this case this revised programme, if accepted

by the Railway will become binding on the Contractor as if it forms part of the original

agreement. This programme of works shall be binding on the Contractor including the

sequence of works indicated in the programme.

It is also to be understood clearly that the Contractor is under obligation to

execute every portion of work at the earliest opportunities and such works which

can be progressed in parallel should be started simultaneously. In case, the

Contractor fails to stick to the desired sequence and programme of work, a

penalty equivalent to 10% of the respective shortfall of progress may be

recovered from his bills. However, if the Contractor is able to make good the

shortfall in subsequent months, the penalty recovered for the earlier duration

shall be reviewed on pro-rata basis. However, if the Contractor fails to make good

the shortfall through out the validity period and ultimately causes delay in

completion of whole of the work, the penalty recovered shall stand forfeited and

form part of the penalty that will be imposed on him due to delay in completion of

work as per Clause No. 17(4) of GCC. The above penalty may be waived at the

time of completion (during the currency of Contract) by the Railway

Administration if the reasons for overall delay in works are beyond the control of

the Contractor and overall delay in works does not result as a direct consequence

of the failure of Contractor in sticking to the agreed sequence and programme of

work during on account stage of the Contract.

(C) CLEARANCE OF SITE

On completion of the work, the Contractor is required to remove all the debris,

surplus materials like metals, aggregates, bricks stones etc. from work site. He is also

required to do dressing and levelling neatly(including cutting/filling up to 6”, filling to be

done with approved quality of good earth/moorum) for the surrounding area (i.e. Area

used for stacking of materials like bricks, stone, sand, metals etc. by the Contractor, area

where excavated earth are dumped & other areas affected in connection with execution of

the work of the executed structure) as per the direction and to the entire satisfaction of

the Engineer-in-charge of the work. Rates for all the items under agreement are inclusive

of 1% expenditure towards this final cleaning up as detailed above. Hence, deduction @

1% from the Contractor’s on a/c bill will be made and which will be released at the time of

final bill if and only after the dressing and levelling is completed to the full satisfaction of

the AXEN(Con)/XEN(Con). In case of failure of Contractor to fulfill this condition, this

amount totalling to 1% of total value of work executed shall not be paid to the

Contractor & retained by the Railway.

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 80 -

CE/Con/HQ/BBS/T/30/2011







EAST COAST RAILWAY CONSTRUCTION ORGANISATION





Section – L

Rates Quoted/Accepted









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 81 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Section – L

Rates Quoted/Accepted

Unless specifically provided for in item, the rates quoted for all items of Schedule shall

include the cost of :-

1. (a) Earth work in cutting.

Minerals of all kinds including iron ore are likely to be met with in and around this

area. The classification of soils referred to in the Schedule cover all these

minerals including iron ore of any content. The contract should take this aspect

into consideration while quoting the rates against the tender. No claim

whatsoever on this account shall be entertained by the Railway.

(b) Rock Requiring Blasting:-

All transport, lead, lift, ascent, descent,crossing tracks, observing traffic

regulations etc. for bringing materials equipments, tools and plants, labour to the

site of work as required to complete the work in all respects,

(c) Rock requiring control blasting:-

(i) The control blasting must be done very carefully taking all the measures to

prevent any untoward incident. The Contractor must keep a competent blasting

Foreman to available as and when required at site.

(ii) Any damage to the overhead electric/telephone wire or property or life due to

blasting operation is the sole responsibility of the Contractor. Any compensation

thereof likely to be paid towards any damage will be borne by the Contractor.

2. All taxes, State, Central or Local.

3. All labour, skilled, unskilled, supervisory, specialised as required.

4. All temporary arrangements like shuttering, scaffolding, staging, supports,

shoring, making templates etc. inclusive of all labour and materials required for

providing, erection use, dismantling of such arrangement after completion of

permanent work and removing from site including submission of detailed

drawings/designs for such temporary arrangements and getting the same

approved by Railway if and as required by the Engineer-in-charge at site.

5. All such equipment, tools, jacks, cranes, drilling equipment, grouting equipments,

plant and machinery etc. as may be required for executing the work in a modern

and workman like manner as per specifications, inclusive of cost of such

equipment, bringing to site, labour and fuel for operation, maintenance etc.

complete.

6. All works being executed as per specification of these tender documents, G.C.C.

relevant IS/IRS Codes MORT & H specifications as applicable to best quality and

finish.

7. Executing the work as per items of schedule, complete in all respect and any

other incidental charges other than those listed in these notes, as may be

necessary. All the works shall be carried out in accordance with the approved

drawings.

8. Carrying out the work at any height/depth, above/below the ground, at any

location at the work site.

9. Taking all safety precautions for keeping the working spaces free from

obstructions without endangering the Railway property and personnel.

10. All jungle clearance, cutting and uprooting of trees, crossing one or more Railway

lines making service dag-bel’s and reference pillars, bailing out water with

contractor’s pumps, removal of slush where encountered, dressing of spoil heaps,

banks and cuttings to final dimensions.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 82 -

CE/Con/HQ/BBS/T/30/2011





CHAPTER-8









EAST COAST RAILWAY CONSTRUCTION ORGANISATION







SCOPE OF WORK IN BRIEF









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 83 -

CE/Con/HQ/BBS/T/30/2011

CHAPTER-8









EAST COAST RAILWAY CONSTRUCTION ORGANISATION





SCOPE OF WORK IN BRIEF





NAME OF WORK:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of

Stadium Building, internal finishing and other allied works.







SCOPE OF THE WORK IN BRIEF:



The above named tender is inclusive of the following schedule wise works.

Schedule ‘A’: Execution of works covered under ECoR USSOR 2010.

Schedule ‘B’: Supply of Cement.

Schedule ‘C’: Supply of steel .

Schedule ‘D’: Wooden & Rubber flooring and acoustic ceiling.

Schedule ‘E’: Fire fighting arrangement.

Schedule ‘F’: Supplying of submersible pump and developing tube well.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 84 -

CE/Con/HQ/BBS/T/30/2011





CHAPTER-9









EAST COAST RAILWAY CONSTRUCTION ORGANISATION









SUMMARY OF WORKS IN

TENDER SCHEDULE









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 85 -

CE/Con/HQ/BBS/T/30/2011

CHAPTER-9



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



SUMMARY OF WORKS IN TENDER SCHEDULE

NAME OF WORK:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of

Stadium Building, internal finishing and other allied works.



RATE SHEET FOR WORKS UNDER SCHEDULE A , B ,C , D , E & F



Sl. Description of work Basic Tender cost of Brief description of work

No. schedules(Rs) under each schedule

1. Execution of works as Execution of works covered

detailed in Schedule-A. under ECoR USSOR 2010

5,17,69,466 excluding items covered

under schedule B, & C of this

tender.

2 Execution of works as

detailed in Schedule-B. For Supply of Cement under

1, 09, 93,885

ECoR USSOR-2010



3. Execution of works as

detailed in Schedule-C. 2, 71, 40,000 For Supply of steel under

ECoR USSOR-2010



4. Execution of works as Non scheduled items for

detailed in Schedule-D. 67, 03,330 Wooden & Rubber flooring

and acoustic ceiling etc.

5. Execution of works as

detailed in Schedule-E. Non scheduled items for Fire

12,59,546

fighting arrangement



6 Execution of works as Non scheduled items for

detailed in Schedule-F. Supplying of submersible

90,608

pump and developing tube

well.

Total Basic Tender

9,79,56,835

Cost





NOTE TO TENDERER



1. The Tenderer(s) should quote only single percentage above/below/at par of

Basic tender value against each schedule in the RATE SHEET only of chapter-

16.

2. In case the rate above/ below is not mentioned clearly, the quoted rate shall be

treated as above rates.

3. The Tenderer(s) should not quote percentage/rate in any annexed schedule, and if

quoted, the tender stands summarily rejected.

4. Conditional tender may liable to be rejected.

5. The contract period for completion of the work is 20 (Twenty) months from the

date of issue of Acceptance letter.

6. PVC Clause is applicable to this tender.

7. The rates quoted by the tenderer(s) & accepted by Railway Administration shall hold

good till the completion of work and no additional individual claims will be

admissible on account of fluctuation in market rates, increase in taxes/any other

levies etc.

8. Details of the items and basic cost of above schedules A to F are shown in the

chapter-10



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 86 -

CE/Con/HQ/BBS/T/30/2011







EAST COAST RAILWAY CONSTRUCTION ORGANISATION

CHAPTER-10









DETAILS OF WORKS IN TENDER

SCHEDULES (Schedule A to F)









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 87 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Name of Work:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of

Stadium Building, internal finishing and other allied works.

USSOR 2010

Schedule-"A"



Sl

Description of work Amount (in Rs.)

No



1 Execution of works covered under East Coast

Railway Unified Standard Schedule Of Rates

2010 (Works & Materials) of Engineering

Department excluding the items covered

under Schedule B, C, D, E & F of this tender.

Approximate basic value as per USSOR 2010

rates 6, 09, 05,254

Railway tender Premium @15% below

USSOR 2010 -91,35,788

Total Basic Tender value of Schedule-"A" 5,17,69,466



Note: -

1. The likely items of USSOR 2010 & quantities to be operated under above

schedule is mentioned in Annexure-“A-1” (item no-1 to 80) for guidance only.

However, during execution items as well as quantities may vary as per site

requirement and instruction of Engineer-in-Charge.

2. No claim on this account will be admissible due to non-operation of the items

mentioned in Annexure-“A-1” and operation of other items of USSOR 2010 as

well as variation of quantities as per site requirement.

3. For all the items included in this schedule the note/ sub-note of USSOR’2010 and

specification contained in “Indian Railway Unified Standard Specification- 10

Vol.I & Vol-II” will be applicable.

4. The basic rates of ECoR USSOR-2010 of above schedule ‘A’ are reduced by

Railway tender premium as above, thereof, tenderers are advised to take note of

the same while quoting rate for this schedule.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 88 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Annexure: “A-1”

List of Probable USSOR 2010 items for SCH-“A”



Item Rate in

no as Figures

Sl Quanti Amount

Description of work per Unit &

No ty (in Rs.)

USSOR Words

2010 in (Rs.)

1 Earth work in excavation as 011010 0

per …., as per specifications-

in

(a) All Kinds of Soil 011011 650 Cum 92.00 59800

(Rs.Ninet

y-two

only)

(b) Ordinary Rock (Not 011012 650 Cum 269.00 174850

requiring blasting) (Rs.Two

hundred

Sixty-

nine

only)

(c) Hard Rock (blasting 011014 650 Cum 680.00 442000

prohibited) (Rs.Six

hundred

Eighty

only)

2 Extra over items 011010 for 011030 5500 Cum 122.00 671000

spreading ……. (Rs.One

hundred

Twenty-

two only)

3 Extra over item 011010 for 012010 1950 Cum 10.00 19500

…. Note : Dressing …….not (Rs.Ten

partly only)

4 Extra for watering and 012030 5500 Cum 17.00 93500

ramming ………earthwork in (Rs.Seve

filling. nteen

only)

5 Supplying and filling sand 012050 5000 Cum 636.00 3180000

………….. (Rs.Six

hundred

Thirty-

six only)

6 Dressing Surface (average 014010 2500 10 62.00 15500

excavation or filling up to 15 Sqm (Rs.Sixty

cm) …………………………….. -two

only)

7 Providing and laying in 031012 92 Cum 1918.00 176456

position ….. - All works up to (Rs.One

Plinth level : thousand

1:3:6 ……….. Nine

hundred

Eighteen

only)

8 Providing and laying cement 031023 336 Cum 2306.00 774816

concrete. …… shuttering, (Rs.Two

centering:1:2:4 ………. thousand

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 89 -

CE/Con/HQ/BBS/T/30/2011

Three

hundred

Six only)

9 Providing and laying in 031051 200 Cum 2211.00 442200

position ……Engineer in (Rs.Two

charge : All works up to thousand

Plinth level Two

hundred

Eleven

only)

10 Providing and laying in.. …… 041010 0

Engineer in charge

(a)All work up to plinth 041011 550 Cum 2493.00 1371150

level, ……….. (Rs.Two

thousand

Four

hundred

Ninety-

three

only)

(b)All work in buildings 041012 2350 Cum 2718.00 6387300

above plinth level up to floor (Rs.Two

two level. thousand

Seven

hundred

Eighteen

only)

11 Centering and shuttering 042010 0

…………. :

(a)Foundations, footings, 042011 1779 Sqm 140.00 249060

bases ……….., Footings of (Rs.One

FOB etc. hundred

Forty

only)

(b)Suspended floors, roofs, 042013 8260 Sqm 226.00 1866760

landings, ……….. and access (Rs.Two

platform hundred

Twenty-

six only)

(c)Lintels, beams, plinth 042014 6100 Sqm 196.00 1195600

beams, bed blocks, girders, (Rs.One

bressumers and cantilevers hundred

Ninety-

six only)

(d)Columns, pillars, , posts 042015 3470 Sqm 260.00 902200

and struts (Rs.Two

hundred

Sixty

only)

(e)Stairs (excluding 042016 200 Sqm 254.00 50800

landings) except spiral- (Rs.Two

staircases hundred

Fifty-four

only)

12 Brick work with ……… plinth 051018 1170 Cum 3227.00 3775590

in :Cement mortar 1:6 (1 (Rs.Thre

cement : 6 coarse sand) e

thousand

Two



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 90 -

CE/Con/HQ/BBS/T/30/2011

hundred

Twenty-

seven

only)

13 Extra over item 051010 & 051040 720 Cum 155.00 111600

051020 ………..up to floor (Rs.One

two level : hundred

Fifty-five

only)

14 Extra for brick work in 051050 120 Cum 301.00 36120

superstructure ……….. every (Rs.Thre

3m or part thereof : e

hundred

One

only)

15 Half brick masonry ….…… 051182 3400 Sqm 423.00 1438200

foundations and plinth in : (Rs.Four

Cement mortar 1:4 ……… hundred

Twenty-

three

only)

16 Extra for half Brick masonry 051190 3200 Sqm 43.00 137600

in superstructure above (Rs.Forty

plinth level up to floor two -three

level only)

17 Extra for half brick …. For 051200 200 Sqm 16.00 3200

every floor or part thereof. (Rs.Sixte

en only)

18 Laterite Masonry in 063012 300 Cum 2234.00 670200

foundation and plinth with : (Rs.Two

Cement mortar 1:4 thousand

(1cement: 4 fine sand) Two

hundred

Thirty-

four

only)

19 Providing wood work in ……. 071012 1680 Cudm 42.00 70560

position :Sal wood (Rs.Forty

-two

only)

20 Providing wood work … 071021 520 Cudm 37.00 19240

position :Sal wood (Rs.Thirt

y-seven

only)

21 Providing and fixing …… 072031 62 Sqm 761.00 47182

25mm to 40mm thick: (Rs.Seve

Particle board 12mm thick. n

…. hundred

Sixty-

one only)

22 Providing and fixing to IS: 072141 60 Sqm 1867.00 112020

2202 ……… shutters: (Rs.One

35mm thick …….. screws. thousand

Eight

hundred

Sixty-

seven

only)





SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 91 -

CE/Con/HQ/BBS/T/30/2011

23 Providing and fixing in wall 074061 171 Sqm 1171.00 200241

lining flat …….s etc. (Rs.One

complete: thousand

12mm thick. One

hundred

Seventy-

one only)

24 Providing and fixing ……….. 074231 3196 KG 80.00 255680

complete :Fixed to steel (Rs.Eight

windows by welding y only)

25 Providing and fixing 074352 53 Sqm 244.00 12932

decorative ………….complete: (Rs.Two

0.8mm thick. hundred

Forty-

four

only)

26 Providing and fixing factory 078130 85 Metre 451.00 38335

made P.V.C. door frame ….. (Rs.Four

of Engineer-in-Charge. hundred

Fifty-one

only)

27 Providing and fixing …… 078180 43 Sqm 2490.00 107070

0.6mm galvanized M.S. rod (Rs.Two

and fastened with nuts and thousand

washers. Four

hundred

Ninety

only)

28 Structural steel work …….. 081030 0

up to 6m height above GL.

(a)In RSJ, tees, angles and 081031 33500 KG 87.00 2914500

channels. (Rs.Eight

y-seven

only)

(b)In flats, plates, round or 081032 105000 KG 84.00 8820000

square bars. (Rs.Eight

y-four

only)

29 Extra for every …. steel work 081043 214280 KG 9.00 1928520

: (Rs.Nine

Over item no 081032 only)

30 Providing and fixing ….. 081180 83 Sqm 2997.00 248751

applying a priming coat of (Rs.Two

approved steel primer. thousand

Nine

hundred

Ninety-

seven

only)

31 Providing and fixing ........ 081340 40 Each 111.00 4440

bar bent to shape as per (Rs.One

standard drawing. hundred

Eleven

only)

32 Providing and fixing hand 081421 35000 KG 114.00 3990000

rail by welding etc. (Rs.One

……..primer: hundred

M.S. tube (medium) 40mm Fourteen

nominal bore. only)



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 92 -

CE/Con/HQ/BBS/T/30/2011

33 Providing and fixing 082012 1000 KG 362.00 362000

anodised (Rs.Thre

aluminium……...(a)For e

openable /sliding portions…… Hundred

Sixty-

two only)

34 Providing and fixing ……… 082032 300 Sqm 919.00 275700

(i)With float/frosted glass (Rs.Nine

panes of 5.5 mm ……….. Hundred

and

Nineteen

only)

35 Fabricating, supplying & 083050 1000 KG 720.00 720000

installing stainless steel ….. (Rs.Seve

for grade certification. n

hundred

Twenty

only)

36 Providing hand packed …….. 091032 1360 Sqm 199.00 270640

including ramming sub (Rs.One

grade :Flat brick hundred

Ninety-

nine

only)

37 Cement concrete 092010 0

……complete

(a)25mm thick with 12.5mm 092011 938 Sqm 247.00 231686

nominal size stone (Rs.Two

aggregate hundred

Forty-

seven

only)

(b)40mm thick with 20mm 092012 1400 Sqm 341.00 477400

nominal size stone (Rs.Thre

aggregate e

hundred

Forty-

one only)

38 Providing top layer of floor, 093023 938 Sqm 347.00 325486

9mm ….:With white cement (Rs.Thre

with pigment e

hundred

Forty-

seven

only)

39 Marble chips skirting (upto 093033 60 Sqm 598.00 35880

30cm height) … volume : (Rs.Five

18mm thick with …………… hundred

Ninety-

eight

only)

40 Providing and laying ….: 094013 205 Sqm 813.00 166665

With white cement with (Rs.Eight

pigment hundred

Thirteen

only)

41 Providing and fixing Ist 095011 600 Sqm 669.00 401400

quality ………..complete: (Rs.Six

200x200 mm hundred



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 93 -

CE/Con/HQ/BBS/T/30/2011

Sixty-

nine

only)

42 Providing and fixing 095021 300 Sqm 717.00 215100

……………. complete: (Rs.Seve

Of Group B-II Clause 5.1 …… n

hundred

Seventee

n only)

43 Marble stone flooring ……….. 096013 295 Sqm 2121.00 625695

complete with : (Rs.Two

Agaria White thousand

One

hundred

Twenty-

one only)

44 False ceiling: 106100 268 Sqm 704.00 188672

Providing and fixing at all (Rs.Seve

height false ceiling ………….. n

hundred

& Four

only)

45 Providing and fixing ………….. 108162 426 Metre 224.00 95424

expansion.: (Rs.Two

110mm dia. hundred

Twenty-

four

only)

46 Providing and fixing 109200 2846 Sqm 656.00 1866976

permanently............. EPDM (Rs.Six

washer on crests of the hundred

sheet Fifty-six

only)

47 12 mm cement plaster of 111012 14960 Sqm 65.00 972400

mix -1:6 (1cement: 6fine (Rs.Sixty

sand) -five

only)

48 20 mm cement plaster of 111031 2519 Sqm 88.00 221672

mix -1:4 (1cement: 4 fine (Rs.Eight

sand) y-eight

only)

49 Cement plaster to ceiling of 111151 6270 Sqm 56.00 351120

mix -6 mm thick 1:3 (Rs.Fifty-

(1cement: 3 fine sand) six only)

50 Neat cement punning 111180 1446 Sqm 13.00 18798

(Rs.Thirt

een only)

51 Distempering … even shade: 115042 10750 Sqm 61.00 655750

New work (two or more (Rs.Sixty

coats of ……………… -one

only)

52 Wall painting on new work 115090 7517 Sqm 52.00 390884

with two or more coats of (Rs.Fifty-

plastic emulsion paint …….. two

only.)

53 Finishing walls with water 115110 16700 Sqm 37.00 617900

proofing ………. (Rs.Thirt

y-seven

only)



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 94 -

CE/Con/HQ/BBS/T/30/2011

54 Painting Steel …………. 121030 3970 Sqm 61.00 242170

(Sixty-

one only)

55 Providing and fixing 131120 0

Chlorinated …………..

(a)75mm nominal outer dia. 131121 188 Metre 1927.00 362276

Pipes (Rs.One

thousand

Nine

hundred

Twenty-

seven

only)

(b)100mm nominal outer 131122 232 Metre 2600.00 603200

dia. Pipes (Rs.Two

thousand

Six

hundred

only)

56 Providing and fixing ……. 131150 0

(a)40 mm dia. nominal bore 131155 261 Metre 326.00 85086

(Rs.Thre

e

hundred

Twenty-

six only)

(b)50 mm dia. nominal bore 131156 42 Metre 405.00 17010

(Rs.Four

hundred

Five

only)

57 Providing and fixing …………: 132034 3 Each 1111.00 3333

50 mm nominal bore (Rs.One

thousand

One

hundred

Eleven

only)

58 Providing and fixing C.P. 132180 25 Each 326.00 8150

brass bib cock, 15mm (Rs.Thre

nominal bore, of approved e

quality conforming to hundred

IS:8931 Twenty-

six only)

59 Providing and fixing ………….. 132210 78 Each 418.00 32604

conforming to IS:8931 (Rs.Four

hundred

Eighteen

only)

60 Providing and placing 136150 8000 Litre 8.00 64000

…………. support for tank (Eight

only)

61 Providing and fixing water 151011 9 Each 2956.00 26604

closet squatting pan (Indian (Rs.Two

type W….. wherever thousand

required: Nine

White Vitreous China ……… hundred

Fifty-six

only)

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 95 -

CE/Con/HQ/BBS/T/30/2011

62 Providing and fixing white 151022 12 Each 2902.00 34824

vitreous ……………. required: (Rs.Two

W.C. pan with ………… thousand

Nine

hundred

Two

only)

63 Providing ………… required: 151073 25 Each 1902.00 47550

White vitreous china wash (Rs.One

basin size 550x400mm ……… thousand

Nine

hundred

Two

only)

64 Extra for using coloured 151150 1 Each 848.00 848

pedestal type W.C. pan (Rs.Eight

(European type) ……….. hundred

Forty-

eight

only)

65 Providing and fixing white, 151270 28 Each 1436.00 40208

vitrous china squatting plate (Rs.One

urinal with integral thousand

longitudinal flush pipe Four

hundred

Thirty-

six only)

66 Providing and fixing 152110 21 Each 787.00 16527

600x450mm ……. and (Rs.Seve

washers complete n

hundred

Eighty-

seven

only)

67 Providing and fixing …make: 153322 29 Each 421.00 12209

600mm long towel rail ……… (Rs.Four

of 88mm, weighing not less hundred

than 190gms Twenty-

one only)

68 Providing and fixing Soap 153570 25 Each 231.00 5775

dish (C.P. Brass) having (Rs.Two

approx. wt. 220 gm hundred

Thirty-

one only)

69 Providing and fixing 110 mm 154110 28 Each 116.00 3248

PVC bend ………. (Rs.One

hundred

Sixteen

only)

70 Supplying chemical emulsion 171320 330 Litre 360.00 118800

(Chlorpyriphos / Lindane (Rs.Thre

emulsifiable ………… e

hundred

Sixty

only)

71 Diluting ……………: 171331 14000 Metre 8.00 112000

Along external wall ……. (Rs.Eight

only)

72 Drilling of bore …………….. 171520 0



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 96 -

CE/Con/HQ/BBS/T/30/2011

(a)For 200 mm dia 171522 175 Metre 433.00 75775

(Rs.Four

hundred

Thirty-

three

only)

(b)Extra over 75m drilling 171525 100 Metre 87.00 8700

for 200mm dia (Rs.Eight

y-seven

only)

72 Providing ………. etc. 171543 175 Metre 1101.00 192675

complete: (Rs.One

200 mm internal pipe thousand

One

hundred

One

only)

73 Extra for ……………. casing 171553 12 Metre 102.00 1224

pipe:200 mm internal pipe (Rs.One

hundred

Two

only)

74 Providing and laying water 231040 0

…..

(a)Sub-base with stone 231041 425 Cum 1137.00 483225

aggregate 90mm to 45mm (Rs.One

including stone screening thousand

13.2mm size One

hundred

Thirty-

seven

only)

(b)Base course with 63mm 231042 316 Cum 1129.00 356764

to 45mm size including (Rs.One

stone screening 13.2mm thousand

size One

hundred

Twenty-

nine

only)

(c)Base course with 53mm 231043 316 Cum 1303.00 411748

to 22.4mm size including (Rs.One

stone screening 11.2mm thousand

size Three

hundred

Three

only)

75 Providing and laying seal 235010 4250 Sqm 39.00 165750

coat of premixed fine …….. (Rs.Thirt

y-nine

only)

76 Providing and laying. tack 238013 4250 Sqm 371.00 1576750

coat:50 mm average (Rs.Thre

compacted thickness …… e

hundred

Seventy-

one only)

77 Supply of Moorum 252020 2500 Cum 311.00 777500

(Rs.Thre



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 97 -

CE/Con/HQ/BBS/T/30/2011

e

hundred

Eleven

only)

78 Supply of Local sand / pit 252140 3000 Cum 439.00 1317000

sand/yamuna sand for filing (Rs.Four

purposes hundred

Thirty-

nine

only)

79 Soil testing and submission LS 200000

of report under chapter-19

80 Other unforeseen items LS 1000000

covered under USSOR 2010

TOTAL 60905254

Less Railway tender -9135788

Premium @ 15%

Total Basic Tender value 51769466

Note: -

1. Descriptions of items above are for guidance only. However, in case of

discrepancy the description, rates etc. as mentioned in USSOR 2010 will

hold good.

2. The basic rates of ECoR USSOR-2010 are reduced by Railway tender

premium to arrive basic value of the schedule as above, thereof,

tenderers are advised to take note of the same while quoting rate for

schedule ‘A’.

3. The execution of item no-79 (soil testing & submission of report under

chapter-19) should be completed within 3 (three) weeks or as directed by

Engineer-in-charge after issue of acceptance letter. The execution of

stadium building will be started only after submission of soil testing

report.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 98 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Name of Work:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of

Stadium Building, internal finishing and other allied works.



Schedule-"B"



(Supply of Cement)



Sl Description of work USSOR Qty Unit Rate in Amount

No 2010 Figures & (in Rs.)

Words in Rs.

1 Supply of Portland 252060 1951 MT 5635.00 10993885

Pozzolana Cement. (Rs.Five

thousand Six

hundred

Thirty-five

only)







Total Basic Tender value of Schedule- 1, 09, 93,885

"B" (Adopting rates at par USSOR-

2010)



NOTE:

1. The rate includes all loading/unloading stacking in contractor's store go-down as

per IS specification, transportation to site of work with all lead, lift, taxes,

handling, re-handling complete.

2. Cement produced by reputed firms only shall be used for construction.

3. For This item note/ sub-note of USSOR’2010 and specification contained in

“Indian Railway Unified Standard Specification- Vol.I” will be applicable.

4. Decision of Engineer regarding reputed firms shall be final and binding on the

contractor.

5. Cost of the cement procured by the contractor should be paid only after

consumption towards the different item of works of schedules.

6 No wastage of any of the materials supplied and used in the work by the contractor

including cement is payable by the Railway.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 99 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Name of Work:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of

Stadium Building, internal finishing and other allied works.

Schedule-"C"



(Supply of Steel)



Sl Description of work USSOR Qty Unit Rate in Amount

No 2010 Figures & (in Rs.)

Words in Rs.

1 Supplying 045016 460000 KG 59.00 27140000

Reinforcement for (Rs. Fifty-Nine

R.C.C. work including only )

straightening, cutting,

bending, placing in

position and binding all

complete:

Thermo-Mechanically

Treated bars

Total Basic Tender value of Schedule-

"C" (Adopting rates at par USSOR-

2, 71, 40,000

2010)



NOTE:

1. For this item note/sub-note of USSOR 2010 & Specification contained in “Indian

Railway Unified Standard Specifications Vol-I” will be applicable.

2. Steel produced by following manufacturers only shall be supplied by the

Contractor and used for construction.

• SAIL

• TISCO

• RINL

3. No wastage of any of the materials supplied and used in the work by the

contractor including steel is payable by the Railway.

4. Payment towards supply of steel will be made only after its consumption and for

the quantity consumed for the work. Payment should not be made for bars

projected beyond the casting level until the same is concreted in next stage.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 100 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Name of Work:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of

Stadium Building, internal finishing and other allied works.



Schedule-"D"

(Wooden & Rubber flooring and acoustic ceiling)

Sl Description of work Qty Unit Rate in Amount

No Figures & (in Rs.)

Words in

Rs.

1 Providing and fixing in position 864 Sqm 6573.91 5679858.24

wooden flooring of MAPLE HARD (Rs.Six

WOOD FLOOR approved thousand

INTERNATIONALLY MFMA (Mapple Five hundred

flooring manufacturer Association) Seventy-

Detail specification & procedure three and

mentioned below. paise Ninety-

1. Ensure that the existing one only)

concrete floor & masonry walls

are thoroughly treated for

waterproofing & dampness.

2. Place suitable (preferably

0.6mm) polythene on entire

floor as a vapour barrier.

3. Place 38mm X 63.50mm X

1.22mtr sleeper (Fit or pine)

duly & properly stappeled at a

rate 10” center to center with

11mm biopads are double-

trapezoidal EPDM rubber with

reverse cavity (the moisture of

sleeper is 5% to 7% only.)

4. Fix MAPLE WOOD stripes of

size 20mm (thickness) X

57mm (width) and in length of

2’ to 8’ having tongue & groove

on sleepers. The stripes are

DRI-VAC treated which makes

the floor totally anti termite,

anti insects, bugs, borer etc.

5. The floor thus laid shall be

sanded with DRUM SANDER,

EDGER three times using

coarse medium & fine grade

sand paper.

6. Buff the floor using 100 grit

sand paper.

7. Apply three coats of Deep

Penetrating Sealer with finish.

2 Supplying and fixing 15 mm thick 256 Sqm 2537.00 649472.00

MAGNA rubber tiles of similar make of (Rs.Two

required size as decided by the thousand

Engineer-in-charge conforming to Five hundred

following codes. Thirty-seven

1. Hardness- ASTMD: 2240 only)

2. Taber Abrasion (weight loss) -

ASTMD: 3389.

3. Tear Strength- ASTMD: 624.

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 101 -

CE/Con/HQ/BBS/T/30/2011

4. Tensile Strength & Elongation

at break- ASTMD: 412.

5. Abrasion Resistance DIN-

Rotary Drum- ISO: 4649.

6. Compression Set- ASTMD: 395.

7. Flammability (Rate of Burning)

- ASTM: 635.

8. Di-electric Strength- ASTMD:

149.

9. Co-efficient of Friction (Skid

resistance) - ASTM:

E303/C1028.

10. For installation manufacture

specification is to be followed.

11. The above codes should be

made available by the agency

at the work site prior to

commencement of work.

3 ACOUSTICAL CEILING : 400 Sqm 935.00 374000.00

Providing and fixing 15 mm thick Arm (Rs.Nine

strong / Insula ,fine fissured RH-99 hundred

Mineral fibre false ceiling tiles or Thirty-five

equivalent of size 600 mm x 600 mm only)

in true horizontal level suspended on

inter locking metal grid of hot dipped

galvanized steel sections (galvanized

@350 gsm) consisting of main "T"

runner suitably spaced at joints to get

required length and of size 24 x 38

mm made from 0.30 thick (minimum)

sheet spaced at 1200 mm center to

center and cross "T" of size 24 mm x

25 mm made of 0.30 mm thick

(minimum) sheet, 1200 mm long

spaced between main "T" at 600 mm

center to center to form a grid of

1200 mm x 600 mm and secondary

cross "T" of length 600 mm and size

24 mm x 25 mm made of 0.30 mm

thick (minimum) sheet to be

interlocked at middle of the 1200 mm

x 600 mm panel to form grids of 600

mm x 600 mm and laying 15 mm

thick mineral fibre false ceiling tiles of

approved texture in the grid including,

wherever, required, cuttings, fixtures,

smoke detectors etc. Main "T" runners

to be suspended from ceiling using

G.I. slotted cleats fixed to ceiling with

6 mm dia and 50 mm long dash

fasteners, 4 mm G.I. adjustable rods

with galvanized level clips spaced at

1200 m center to center along main T,

bottom exposed with of 24 mm of all

T-sections shall be pre-painted with

polyester paint, all complete at all

heights as per specifications drawings

and as directed by Engineer-in-

charge.



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 102 -

CE/Con/HQ/BBS/T/30/2011

Note:

Only Mineral Fibre false ceiling area

will be measured for the purposed of

payment.



The Mineral Fibre Ceiling shall either

be precast (moulded)or wetted

product and shall have NRC value of

0.5 (minimum) CAC 33-40, light

reflection more than 83% fire rating

class A as per ASTM E-84, Fire

performance - Class 0 / Class 1 (BS

476) suitable for 95% relative

humidity and also having Thermal

Resistance "(R)" = 0.33m² deg. C/W.

Total Basic Tender value of Schedule-

6703330.24

"D"

Say 67, 03,330









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 103 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Name of Work:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of

Stadium Building, internal finishing and other allied works.



Schedule-"E"

(Fire fighting arrangement)



Sl Description of work Qty Unit Rate in Amount

No Figures & (in Rs.)

Words in

Rs.

1 Providing and fixing of Photo- 50 Each 1742.00 87100.00

luminescent signs of size 15 cm x 30 (Rs.One

cm printed with fire safety grade. thousand

Luminous ink and shall have capacity Seven

to absorb light in close of normal hundred

working day and then glow in the Forty-two

dark. The signs shall mark the exit, only)

fire exit, staircase location, fire

extinguisher location, fire alarm call

point, exit route etc. The job is

inclusive of all material, labour, T&P,

royalties, taxes, installation etc. all

complete.

2 Providing and fixing of break glass 4 Each 563.00 2252.00

type manual pull station complete with (Rs.Five

hammer and chain, back box and hundred

accessories and shall be of AGNI / Sixty-three

Equivalent Make. The rate is inclusive only)

of all material, labour, T&P, royalties,

taxes, installation etc. all complete.

3 Providing and fixing of electronic 2 Each 867.00 1734.00

hooter, complete with mounting box (Rs.Eight

and accessories and shall be of AGNI hundred

Make. The rate is inclusive of all Sixty-seven

material, labour, T&P, royalties, taxes, only)

installation etc. all complete.

4 Providing and fixing of 1.5 Sqm 400 RMT 171.00 68400.00

flexible copper cable to be laid in pair (Rs.One

in PVC conduit of suitable size to be hundred

erected concealed with all accessories. Seventy-one

The job shall be inclusive of all only)

material, labour, T&P, royalties, taxes,

installation etc. all complete.

5 Providing and fixing of Ultra sensitive 60 Each 8710.00 522600.00

photo electric wireless smoke (Rs.Eight

detectors capable of sensing smoke thousand

particles in the 0.3 to 10 micron size Seven

with remote sensing technology and hundred Ten

communicate with the central only)

monitoring console. The detector shall

be encased in fiber body cover

operated through 9 volt Alkaline /

Lithium battery with a alarm sound

level of 85 decibel and shall be of

Cease fire (CFR-SA-WL) / Equivalent

Make all complete including all

material, labour, T&P, royalties, taxes,

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 104 -

CE/Con/HQ/BBS/T/30/2011

installation etc. all complete.



6 Providing and fixing of wireless alarm 4 Each 54000.00 216000.00

control panel for 28 wireless detectors (Rs.Fifty-

suitable to function in 230 VAC, 50 four

Hz/9 VAC, 1A with a battery back up thousand

of 12 hours. The panel shall be only)

compatible with wireless detectors and

the rate shall be inclusive of all

material, labour, T&P, royalties, taxes,

installation etc. all complete.

7 Providing and fixing of 12 Biz wireless 12 Each 12194.00 146328.00

repeater to function in 13-20 VDC, 11- (Rs.Twelve

16 VAC suitable for enhancing the thousand

signal of wireless detector to become One hundred

compatible with control panel shall be Ninety-four

of Ceasefire (CFR-RP-WL)/Equivalent only)

Make The rate is inclusive of all

material, labour, T&P, royalties, taxes,

installation, testing etc. all complete.

8 CO2 type Fire Extinguisher 4.5 kg 8 Each 13065.00 104520.00

capacity confirming to IS : 2878 made (Rs.Thirteen

from ISI marked seamless cylinder thousand

confirming to IS : 7285, fitted with ISI Sixty-five

marked controlled valve confirming to only)

IS : 3224, high pressure 1 Mtr.

discharge hose & horn complete with

initial gas charged with carrying

handle and wall mounting bracket.

Make - Ceasefire/Equivalent.

9 ABC stored pressure squeeze type fire 8 Each 4790.00 38320.00

extinguisher, 2 kg capacity, ISI (Rs.Four

marked IS: 13849 filled with ABC thousand

mono Ammonium Phosphate base Seven

powder pressurized with dry Nitrogen hundred

Gas at 15 kg/sq.cm., complete with Ninety only)

discharge hose and wall mounting

bracket. Make - Ceasefire/any

Equivalent.

10 ABC stored pressure squeeze type fire 4 Each 7186.00 28744.00

extinguisher, 5 kg capacity, ISI (Rs.Seven

marked IS: 13849 filled with ABC thousand

mono Ammonium Phosphate base One hundred

powder pressurized with dry Nitrogen Eighty-six

Gas at 15 kg/sq.cm., complete with only)

discharge hose and wall mounting

bracket. Make - Ceasefire/any

Equivalent.

11 ABC stored pressure squeeze type fire 4 Each 10887.00 43548.00

extinguisher, 10 kg capacity, ISI (Rs.Ten

marked IS: 13849 filled with ABC thousand

mono Ammonium Phosphate base Eight

powder pressurized with dry Nitrogen hundred

Gas at 15 kg/sq.cm., complete with Eighty-seven

discharge hose and wall mounting only)

bracket. Make - Ceasefire/any

Equivalent.

Total Basic Tender value of Schedule- 1259546

"E"



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 105 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION



Name of Work:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of

Stadium Building, internal finishing and other allied works.



Schedule-"F"



(Supply of submersible pump & developing tube well)



Sl Description of work Qty Unit Rate in Amount

No Figures & (in Rs.)

Words in

Rs.

1 Supplying, erecting, testing and 1 Each 75200.00 75200.00

commissioning of electrically (Rs.Seventy-

operated submersible water pump five thousand

(Crompton, Kirloskar, K.S.B., Two hundred

Waterman), or similar approved only)

make water lubricating totally

enclosed with bronze or chrome

steel impeller, stainless steel ball

bearing etc. 8000 GPH capacity

1450 RPM 60 meters head, suitable

for 75mm(3") G.I. delivery pipe

complete with squirrel cage water

lubricated A.C. Motor, Horsepower

suitable for 8000 GPH, 3 phase 50

cycle 400volt and starter

earthening of motor and all other

accessories/spares etc. conforming

as per CEE/Con/BBS's specification

including contractor's labour,

materials etc. complete as

annexed.

2 Developing the tube well by air 1 Each 10800.00 10800.00

compressor, till sand/soil free clear (Rs.Ten

water is obtained and testing the thousand

same well for obtaining required Eight

quantity of yield for forty eight hundred

hours with Contractor's only)

arrangements complete.

3 Supplying all materials, labour, toos 8 Cum 576.00 4608.00

and plants & strouting the tube well (Rs.Five

with round singles of 3 mm to 10 hundred

mm size around the tube well as Seventy-six

per the directions of Engineer-in- only)

charge complete as required.

Total Basic Tender value of Schedule- 90608

"F"









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 106 -

CE/Con/HQ/BBS/T/30/2011







Chapter-11



EAST COAST RAILWAY CONSTRUCTION ORGANISATION





SPECIMEN FORMAT OF

BANK GUARANTEE BOND









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 107 -

CE/Con/HQ/BBS/T/30/2011



Chapter-11

EAST COAST RAILWAY CONSTRUCTION ORGANISATION



SPECIMEN FORMAT OF BANK GUARANTEE BOND





In consideration of the President of India (herein after called the Government ) having

agreed to exempt _______________ (hereinafter called the said Contractor(s)” from the

demand, under the terms and conditions of an Agreement dated: _________ made between

____________ and ________ for__________ (hereinafter called “the said Agreement”)¸of

security deposit for the due fulfillment by the said Contractor(s) of the terms and conditions

contained in the said Agreement, on production of a bank Guarantee for Rs. _________

(Rupees____________________________only)

1.we, ________________________________

(indicate the name of the bank)

(hereinafter referred to as “the Bank”) at the request of ______________ (contractor’s ) do

hereby undertake to pay to the Government an amount not exceeding Rs. ___________

against any loss or damage caused to or suffered or would be caused to or suffered by the

Government by reason of any breach by the said Contractor(s) of any of the terms or

conditions contained in the said Agreement.



2. We __________________________________do hereby undertake to pay the amounts (indicate the

name of bank)

due and payable under this guarantee without any demur, merely on a demand from the

Government stating that the amount/claimed is due by way of loss or damage caused to or

would be caused to or suffered by the Government by reason of breach by the said

contractor(s) of any of the terms or conditions contained in the said Agreement or by reason

of the Contractor(s) failure to perform the said Agreement. Any such demand made on the

bank shall be conclusive as regards the amount due and payable by the Bank under this

guarantee. However, our liability under this guarantee shall be restricted to an amount not

exceeding Rs. ___________.





3.We undertake to pay to the Government any money so demanded not withstanding any

dispute or disputes raised by the Contractor(s)/supplier(s) in any suite or proceeding pending

before any court or Tribunal relating thereto our liability under this present being absolute

and unequivocal.

The payment so made by us under this bond shall be a valid discharge of our liability

for payment thereunder and the contractor(s) /supplier(s) shall have no claim against us for

making such payment.

4. We, _________________________ ___________ further agree that the guarantee herein

(indicate the name of bank)

contained shall remain in full force and effect during the period that would be taken for the

performance/of the said Agreement and that it shall continue to be enforceable till all the dues

of the Government under or by virtue of the said Agreement have been fully paid and its

claims satisfied or discharged or till ___________ Office/ Department) Ministry of

________________certifies that the terms and conditions of the said Agreement have been

fully and properly carried out by the said Contractor(s) and accordingly discharges this

guarantee. Unless a demand or claim under this guarantee is made on us in writing on or

before the ____________ we shall be discharged from all liability under this guarantee

thereafter.

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 108 -

CE/Con/HQ/BBS/T/30/2011





5. We, __________________________________ further agree with the government that

the

(indicate the name of Bank)

Government shall have the fullest liberty without our consent and without affecting in any

manner our obligations hereunder to vary any of the terms and conditions of the said

Agreement or to extend time of performance by the said Contractor(s) from time to time or to

postpone for any time or from time to time any of the powers exercisable by the Government

against the said Contractor(s) and forbear or enforce any of the terms and conditions relating

to the said agreement and we shall not be relieved from our liability by reason of any such

variation, or extension being granted to the said Contractor(s) or for any forbearance, act or

omission on the part of the Government or any indulgence by the Government to the said

Contractor(s) or any such matter or thing whatsoever which under the law relating to sureties

would, but for this provision, have effect of so relieving us.



6. This guarantee will not be discharged due to the change in the constitution of the Bank or the

Contractor(s)/Supplier(s).





7. We, ____________________________________ lastly undertake not to revoke this

(indicate the name of Bank)

this guarantee during its currency except with the previous consent of the Government in

writing.





Dated the ______________ day of _________2011

For _____________________________________

(indicate the name of bank)









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 109 -

CE/Con/HQ/BBS/T/30/2011





CHAPTER-12









EAST COAST RAILWAY CONSTRUCTION ORGANISATION









SPECIMEN FORMAT OF

LETTER OF ACCEPTANCE









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 110 -

CE/Con/HQ/BBS/T/30/2011





CHAPTER-12

EAST COAST RAILWAY CONSTRUCTION ORGANISATION

SPECIMEN FORMAT OF LETTER OF ACCEPTANCE

Without Prejudice

By Regd. Post with A.D

By Special Man



EAST COAST RAILWAY

Office of the

Chief Administrative Officer(Con)

Bhubaneswar-23

No: CE/CON/III/BBS/T/ Dtd:



To

---------

---------

Dear Sir(s),

Sub :- (Name of work).



Ref:- a) Your offer submitted on ------

b)Tender Notice No.----------- Dtd: .

********

01. With references to above, your offer has been accepted by the Railway Administration at a

total value of Rs. ------/- (Rupees ----------- only) with Contract Period of -- months from the

date of issue of this Acceptance Letter at the following rates shown against each item under

Schedules-A,B,C--- as enclosed to this letter.



Schedule-‘A ’ :----- % accepted rate in Above/below/at par

Schedule-‘B ’ :------% accepted rate in Above/below/at par

Schedule-‘C ’ :------% accepted rate in Above/below/at par

Schedule-‘D ’ :------% accepted rate in Above/below/at par

Schedule-‘E ’ :------% accepted rate in Above/below/at par

---------- : --------

Other terms and conditions as incorporated in the tender documents issued for the work

will be included in a formal agreement to be executed by you for carrying out the work.



02. An amount of Rs ----/- (Rupees ---- only) is to be deposited towards Security Deposit.



The EMD submitted alongwith tender in the shape of TDR/DR/PO/--- No: ----- for Rs. ----

-/-(Rupees ------- only) issued by the -----bank, ----- Branch in favour of FA &

CAO/C/E.Co.Rly /BBS is adjusted towards Security Deposit. Balance amount of Security

Deposit i.e., Rs. -------/-(Rupees eighty nine thousand seventy only) is to be deposited in

cash with FA & CAO (Con) E. Co. Railway/Bhubaneswar or otherwise if you so desire

amount of balance Security Deposit will be recovered at the rate of 10% from your

running bills of the contract.



03. You are requested to give a performance guarantee in any acceptable form as mentioned in

the tender document, for an amount of Rs -----------/- (Rupees ---------- only) before

signing of the agreement and it should be valid upto expiry of the maintenance period.



SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 111 -

CE/Con/HQ/BBS/T/30/2011

04. Until a formal Agreement is prepared and executed, acceptance of this Tender shall

constitute a binding contract. As such, you are requested to furnish the performance

Guarantee to execute the agreement within 15 (fifteen) days after issue of this

acceptance letter.



05. Please contact Dy. Chief Engineer(Con)E. Co. Rly./------ immediately with your execution

programme for further instructions to start the work on the authority of this Acceptance

Letter.



06. You are also requested to submit the EFT mandate form duly filled with details of bank

account for receiving payment through EFT system.



07. Please acknowledge receipt of this letter of Acceptance and confirm that you are taking

action as stated above.



Encl: Schedules – A,B,C----- alongwith proforma for EFT

system.

Yours faithfully,







Executive Engineer(Con)/Tender,

E. Co. Railway/ Bhubaneswar

For & on behalf of President of India.



No: CE/CON/III/BBS/T/ Dtd.



Copy with copy of enclosures forwarded for information to :-





01. Sr.AFA/C/----- (Expenditure Section) along with TDR/DR/PO/---- No: ---- for Rs. -----/-

(Rupees ------- only) issued by the -----bank, ----- Branch in favour of FA &

CAO/C/E.Co.Rly /BBS for adjustment towards security deposit.

02. Sr.AFA/C/------ (Finance Section).

03. Principal Director of Audit (Con)/E.Co.Rly./Bhubaneswar.

04. Dy.Chief Engineer (Con)/E.Co.Rly/--------. No work order should be issued to the contractor. The

contractor should start the work straightway on the basis of this Acceptance Letter for the

items and specifications covered therein. Before starting the work, the execution programme

should be signed by AXEN/XEN/Dy.CE and Contractor.

05. Regional employment Exchange/BBS/Orissa.

06. Central Industrial Machinery, C/o. Ministry of Labour, 686, Swastik Bhawan, Saheed Nagar,

Bhubaneswar.

07. Dy.Chief Vigilance Officer/E.Co.Rly/BBS.

08. Regional Labour Commissioner(Central), ----------------.

09. Labour Enforcement Officer(Central), --------------.

10. CE/C/I,II,----/BBS.



Encl: Schedules – A, B,C,------





Executive Engineer(Con)/Tender,

E. Co. Railway/ Bhubaneswar









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 112 -

CE/Con/HQ/BBS/T/30/2011





CHAPTER-13





EAST COAST RAILWAY CONSTRUCTION ORGANISATION







QUESTIONNAIRE









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 113 -

CE/Con/HQ/BBS/T/30/2011

CHAPTER-13



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



QUESTIONNAIRE TO BE FILLED IN BY TENDERERS.



Sl. No. Details Yes/No Remarks

1 Whether cost of tender document and Earnest

Money deposited.

2 Whether the certificate of familiarization

submitted as per Chapter-14 of bid document.

3 Whether the declaration by the tenderer(s)

filled in as per Chapter-15 of bid document.

4 Whether rates in figures and words quoted for

each schedule of work in the place provided in

Chapter 16 of Bid Document

5 Whether History sheet of tenderer(s) filled in

as per Annexure ‘A’ of Bid document.

6 Whether details of execution of similar single

work to the extent of 35% of advertised

tender value filled in as per Annexure ‘B’ of Bid

documents.

7 Whether details of Contractual payments

received filled in as per Annexure ‘C’ of Bid

documents.

8 Whether details of Tools and Plants filled in as

per Annexure ‘D’ of Bid documents.

9 Whether details of personnel to be engaged in

the work filled in as per Annexure ‘E’ of Bid

documents.

10 Whether details of work completed in the past

filled in as per Annexure-‘F ’ of Bid document

11 Whether details of works presently on hand

filled in as per Annexure-‘G’ of Bid documents.

12 Whether declaration regarding association of

Railway Officers with tenderer(s) given as per

Annexure-‘H’ of Bid document.

13 Whether list of court cases furnished as per

Annexure ‘I ‘.of Bid document

14 Whether list of arbitration cases furnished as

per Annexure ‘J ‘.of Bid document

15 Whether broad plan of execution of work filled

in as per Annexure ‘K’ of Bid documents.

16 Whether details of other credentials/facilities,

filled in as per Annexure ‘L’ of Bid documents.

17 Whether mandate form of EFT, filled in as per

Annexure ‘M’ of Bid documents.

18 Whether audited balance sheet duly certified by

Chartered Accountant in support of the receipt

of contractual payments received during three

previous financial years and the current year

submitted.



Signature of Tenderer

along with Seal.







SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 114 -

CE/Con/HQ/BBS/T/30/2011

CHAPTER-14









EAST COAST RAILWAY CONSTRUCTION ORGANISATION







CERTIFICATE OF

FAMILARIZATION









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 115 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION

CHAPTER-14



NAME OF WORK:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of Stadium

Building, internal finishing and other allied works.



CONTRACTOR’S FAMILARIZATION



I/We hereby solemnly declare that I/we have visited the site of above work and

have familiarized myself/ourselves of the working conditions there in all respects and in

particular the following:





1. Topography of the area and existing Road net work ( high ways & Village, Pucca

& Kacha) and availability of Service Roads,



2. Soil Conditions at the site of the work.



3. Sources and availability of construction material.



4. Rates for Construction materials.



5. Availability of local labour , both skilled and unskilled and the prevailing labour

rates.



6. Availability of Water and Electricity.



7. Availability of space for putting up labour camps, offices Store Godowns ,

Engineering yards etc.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 116 -

CE/Con/HQ/BBS/T/30/2011







EAST COAST RAILWAY CONSTRUCTION ORGANISATION

CHAPTER-15









DECLARATION

BY THE TENDERER(S)









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 117 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION

CHAPTER-15



DECLARATION BY THE TENDERER(S)



TENDER NOTICE NO:CE/Con/HQ/BBS/T/30/2011



NAME OF WORK:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of Stadium

Building, internal finishing and other allied works.



To

The President of India,

Acting through the Chief Engineer (Con)-HQ

East Coat Railway, Bhubaneswar.



1.0 I,/We,_____________________________________________ have read the

various conditions to tender attached hereto and agree to abide by the said

conditions. I/we also agree to keep this tender open for acceptance for a

period of 90 days from the date fixed for opening the same and in default

thereof. I/we will be liable for forfeiture of my/our Earnest Money. I/We offer

to do the works for East Coast Railway, at the rates quoted in the attached

schedule and thereby bind myself / ourselves to complete the work in all

respects within 20(Twenty) months form the dated of issue of letter of

acceptance of the tender. as detailed below at the rates quoted below:-



2.0. I/We also hereby agree to abide by the General Conditions of Contract

corrected up to printed / advance correction slip no. x dated xxx and to carry

out the works according to the Special conditions of contract and

Specifications of materials and works as laid down by the Railway in the

annexed special conditions / specifications and the South Eastern Railway

General conditions of Contract 2001 corrected up to printed / advanced

correction slip no. x dated xxx .and USSOR 2010 with Indian Railways

Unified Standard Specifications (Vol-I &II)2010 for the present Contract



3.0. A sum of Rs. 6,39,780/- is submitted herewith as Earnest Money. The full

value of the Earnest Money shall stand forfeited without prejudice to any

other right or remedies in case my/ our tender is accepted and if ;

(a) I/We do not execute the contract documents within 15 (fifteen) days after

issue of acceptance letter.

(b) I/We do not commence the work within 15 (fifteen) days from issue

of acceptance letter.



4.0 Until a formal agreement is prepared and executed, acceptance of this tender

shall constitute a binding contract between us, subject to modifications, as

may be mutually agreed to between us and indicated in the letter of

acceptance of my/our offer for this work.



Signature of the Witnesses:

1.

2.

Signature of Tenderer(s)

Date:

Address of Tenderer(s)









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 118 -

CE/Con/HQ/BBS/T/30/2011







CHAPTER-16









EAST COAST RAILWAY CONSTRUCTION ORGANISATION







OFFERED RATE SHEET









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 119 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION

Chapter-16





OFFERED RATE SHEET

NAME OF WORK:- Bhubaneswar: Multi-purpose Indoor Stadium: Execution of

Stadium Building, internal finishing and other allied works.

.

Offered Rate Sheet for works covered under Schedule A to F as detailed in

Chapter 10.

Sl Description of Work Basic Tender Rates(Percentage) to be quoted

and schedules cost of in figures and words as “AT

schedules(Rs) PAR/ABOVE/BELOW the basic

tender cost.

1. Execution of works as

detailed in Schedule-A. 5,17,69,466



2 Execution of works as

1, 09, 93,885

detailed in Schedule-B.

3. Execution of works as 2, 71, 40,000

detailed in Schedule-C.

4. Execution of works as

67, 03,330

detailed in Schedule-D.

5. Execution of works as

12,59,546

detailed in Schedule-E.

6 Execution of works as

90,608

detailed in Schedule-F.

Total Basic Tender

9,79,56,835

Cost



NOTE TO TENDERER



1. The Tenderer(s) should quote only single percentage above/below/at par of Basic

value against each schedule in the RATE SHEET only.

2. In case the rate above/ below is not mentioned clearly, the quoted rate shall be

treated as above rates.

3. The Tenderer(s) should not quote percentage/rate in any annexed schedule, and if

quoted, the tender stands summarily rejected.

4. Conditional tender may liable to be rejected.

5. The contract period of the work is 20 (Twenty) months from the date of issue of

Acceptance letter.

6. PVC Clause is applicable to this tender.

7. The rates quoted by the tenderer(s) & accepted by Railway Administration shall hold

good till the completion of work and no additional individual claims will be

admissible on account of fluctuation in market rates, increase in taxes/any other

levies etc.

8. The tenderer(s) should quote rates both in figures and in words. Wherever there is

a difference between the rates quoted in figures and in words, the rate quoted in

words will be considered as correct.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 120 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION

CHAPTER-17









ANNEXURES –A to M

1. ANNEXURE – A:-HISTORY SHEET OF THE TENDERER.

2. ANNEXURE - B:- Compliance of Eligibility criteria by the tenderer

regarding execution of similar single work

3. ANNEXURE - C:-Compliance of Eligibility criteria by the Tenderer

regarding contractual payments received

4. ANNEXURE - D:- DETAILS OF CONTRUCTION MACHINERIES, TOOLS &

PLANTS, VEHICLES ETC.



5. ANNEXURE –E :-DETAILS OF TECHNICAL AND OTHER PERSONNELS

AVAILABLE ON HAND & PROPOSED TO BE ENGAGED IN

WORK



6. ANNEXURE - F:- DETAILS OF WORKS COMPLETED DURING LAST THREE

FINANCIAL YEARS & CURRENT YEAR BY THE

TENDERER(s).



7. ANNEXURE - G:- DETAILS OF WORKS ON HAND BY THE TENDERER(s)



8. ANNEXURE - H:- DECLARATION REGARDING ASSOCIATION OF RAILWAY

OFFICER(S) WITH TENDERER(S)



9. ANNEXURE - I:- LIST OF COURT CASES DURING LAST 3 YEARS



10.ANNEXURE –J :-LIST OF ARBITRATION CASES DURING LAST 3 YEARS



11.ANNEXURE–K:-BROAD PLAN OF EXECUTION OF THIS WORK WITHIN THE

STIPULATED COMPLETION PERIOD



12.ANNEXURE -L:-DETAILS OF OTHER CREDENTIALS/FACILITIES AVAILABLE WITH

THE FIRM/CONTRACTOR



13. ANNEXURE- M:-MANDATE FORM OF EFT









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 121 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION

CHAPTER-17

ANNEXURE – ‘A’



HISTORY SHEET OF THE TENDERER



i) Name of the Company :









ii) Address of Registered Office :







Phone: Fax:

iii) Constitution of the Company :







a) Ownership particulars whether Private Ltd., :

Public Ltd., or partnership firm or any other type

duly supported by the documents such as

partnership deed and articles of constitution etc.

as applicable.



b) Name and address of collaborator(s) :







c) Nature of participation by collaborator(s) in :

share holding of the Company





d) Extent and nature of proposed participation by :

collaborator(s) in execution of this work



iv) Number of years the firm has been in operation :

in India under its present



v) Any Other information







Signature of tenderer

Along with Seal









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 122 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION





ANNEXURE – ‘B’





Compliance of Eligibility criteria by the tenderer regarding execution of

similar single work to the extent of 35% of advertised tender value as

per para 3.1 of Tender Notice (Chapter-2) & Eligibility Criteria (Chapter-

4)





1. Name and style of the contractor with address (Present tenderer)

2. Name and scope of the work executed



3. Authority who have awarded the contract.

4. Full address of the authority under whom the contract was executed.

5. Whether it is a Govt/Railway/Semi Govt organization.

6. Contractual Agreement No. & date.

7. Value of the contract.

(a) Original value of the contract.

(b) Value of works executed and payment received (should be minimum of 35% of

the advertised tender value)

(c) Last sanctioned agreemental value in Rs……. (should be minimum of 35% of

advertised tender value).

8. (a) Date of award of contract.

(b) Date of actual physical completion of work.

9. Details of copy of documents attached in support of completion of above similar

single work.

(a) Certificate No. and date.

(b) Authority issued.

10. Declaration by the tenderer : I hereby declare that the information given above are

true and the copy of the certificate enclosed is genuine. If any of the information given

above is found to be wrong at any time, my tender will liable to be rejected and such

liability will be compensated by me.









Name & signature of Tenderer

along with Seal.







N.B. (1) Certificates containing the above information will only be considered.

In complete certificates/copy of bills/letter of acceptance will not be

considered.

(2) Current financial year means, the financial year in which the tender is

opened. Financial year means on and from 1st April to 31st March.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 123 -

CE/Con/HQ/BBS/T/30/2011







EAST COAST RAILWAY CONSTRUCTION ORGANISATION



ANNEXURE – ‘C’



Compliance of Eligibility criteria by the Tenderer regarding contractual

payments received during the qualifying period i.e during the current

financial year plus previous three financial years as per para 3.2 of

Tender Notice (Chaper-2) and Eligibility Criteria (Chapter-4).



1. Name and style of the Tenderer with address (present tenderer)

2. Amount of contractual payment received as per the audited balance sheet of

the contractor (Tenderer).

Year Amount of contractual payments received Page Ref of Audited

Balance Sheet



Current financial year Rs. F/……….

3rd Previous financial year Rs. F/……….

2nd Previous financial year Rs. F/……….

1st Previous financial year Rs. F/……….

Total Rs.



3. Name & address of the Chartered Accountant who have audited the balance

sheet.



4. Declaration by the tenderer: I hereby declare that the information given above are

true and copy of the certificate enclosed is also genuine. If any of the information given

above is found to be wrong at any time, my tender will liable to be rejected.



Name & signature of Tenderer

along with Seal.



N.B. :-



1. Copy of Chartered Accountant certificate along with copy of balance

sheet of the contractors should be furnished.

2. The value of total contractual payments received within the current

financial year plus three previous financial years should be minimum

of 150% of the advertised tender value.

3. Contractual payment should not be construed as “Turn Over “ which

includes contractual payments received, works in progress, stock on

hand etc.

4. Current financial year means, the financial year in which the tender is

opened. Financial year means on and from 1st April to 31st March.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 124 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



ANNEXURE – ‘D’



DETAILS OF CONTRUCTION MACHINERIES, TOOLS & PLANTS, VEHICLES

ETC.

AVAILABLE ON HAND AND PROPOSED TO BE UTILIZED IN WORK



Sl. Description Number Date of Date Make How Condition Where the

No. of availabl- purchase of driven of the equipment

equipments e manuf (i. e) equipment can be

(Owned/ -acture Petrol/ inspected

hired) Diesel

/electric

al

1 2 3 4 5 6 7 8 9









Signature of tenderer

Along with Seal









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 125 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION





ANNEXURE – ‘E’



DETAILS OF TECHNICAL AND OTHER PERSONNELS AVAILABLE ON HAND

& PROPOSED TO BE ENGAGED IN WORK





Sl Name Age Technical Position Commenc Total Emolume

qualificatio with the ement of experien nts

n(s) tenderer present ce

employme

nt

1 2 3 4 5 6 7 8









Signature of tenderer

Along with Seal







SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 126 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



ANNEXURE – ‘ F’



DETAILS OF WORKS COMPLETED DURING PREVIOUS THREE FINANCIAL

YEARS & CURRENT YEAR BY THE TENDERER(s).



Sl Name of the Full address Date of Actual Date Final value Documentary

work with of the Award & commence of contract proof of

value of authority Original ment & in Rs. completion of

contract under completion Actual Date work (enclose

whom the period of copies separately

work has completion for each work

been and indicate

executed Annexure No. in

with this column)

Telephone

No. & Fax

No.

1 2 3 4 5 6 7









Signature of Tenderer

Along with Seal









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 127 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION



ANNEXURE – ‘ G’





DETAILS OF WORKS ON HAND OF THE TENDERER(s)



Sl Name Total Month Date of Present Full Documentary proof

of work cost of and year award progress address of (enclose copies of

contact of & the acceptance letter &

value in commen Comple authority proof regarding

Rs/- -cement -tion under present progress

period whom the etc. & indicate

work is Annexure No. in

being this column)

executed

Financi Physi

al cal

1 2 3 4 5 6 7 8 9









Signature of tenderer

Along with seal









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 128 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION





ANNEXURE – ‘ H’





DECLARATION REGARDING ASSOCIATION OF RAILWAY OFFICER(S) WITH

TENDERER(S)



Sl Name Status If working in If retired on the date of tendering

with the Rly on the

tenderer date of

tendering,

designation &

place of

posting

Date of Status at Particulars of

retirement retirement permission taken

for associating

with the tenderer

1 2 3 4 5 6 7









Signature of Tenderer

Along with Seal.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 129 -

CE/Con/HQ/BBS/T/30/2011







EAST COAST RAILWAY CONSTRUCTION ORGANISATION



ANNEXURE – ‘ I’



LIST OF COURT CASES DURING PREVIOUS THREE FINANCIAL YEARS



Sl Name of Value Name of Name of the Date Relief sought Brief Final/

work of Client Court of from Court reaso Presen

work Deptt. institut n of t

ion of disput positio

case e n of

the

case

1 2 3 4 5 6 7 8 9









Signature of tenderer

Along with Seal









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 130 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION



ANNEXURE – ‘J’



LIST OF ARBITRATION CASES DURING PREVIOUS THREE FINANCIAL YEARS.





Sl Name of Value of Name of Client Amount Claim of Brief Final/Prese

work work Deptt. and date Deptt. if reason nt position

of claim any s of of the case

preferred disput

es

1 2 3 4 5 6 7 8









Signature of Tenderer

Alongwith Seal









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 131 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION





ANNEXURE – ‘K’





BROAD PLAN OF EXECUTION OF THIS WORK WITHIN THE STIPULATED

COMPLETION PERIOD







Sl.No Activity Period of completion in months









Signature of Tenderer

Alongwith Seal









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 132 -

CE/Con/HQ/BBS/T/30/2011





EAST COAST RAILWAY CONSTRUCTION ORGANISATION





ANNEXURE – ‘L’



OTHER CREDENTIALS/FACILITIES OF THE FIRM/CONTRACTOR (WHICH ARE

NOT COVERED IN ANNEXURE-A TO ANNEXURE – J)









Signature of Tenderer

Along with Seal.









SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 133 -

CE/Con/HQ/BBS/T/30/2011



EAST COAST RAILWAY CONSTRUCTION ORGANISATION



ANNEXURE – ‘M’



The Contractor/supplier having their bank accounts on any of the city centres where

reserve bank of India’s EFT (Electronic Fund Transfer) facility exists will receive their

payments through EFT scheme in case of being awarded with the work/supply order . For

that they (the agency) will have to furnish the mandate form of EFT(As per proforma

given below)) along with the tender document.



Electronic clearing service (Credit clearing)Model Mandate form

(Invcestor/Custoner’s Option to receive payments through Credit Clearing Mechanism).



Name of the scheme and the periodicity of payment

No.

1) Contractor/supplier’s Name

2) Particulars of their Bank Account

a) Name of Bank:

b) Name of the Branch

Address

Telephone No.

c) 9 Digit Code Number of the bank and branch

Appearing on the MICR cheque issued by the bank.

d) Type of the Account (S.B. Current or cash Credit)

With code (10/11/13)

e) Ledger and ledger folio Number.

f) Account number (as appearing on the cheque book)



(In lieu of the bank certificate to be obtained as under, please attach a bank cancelled

cheque or photocopy of a cheque or front page of your saving bank passbook issued by

your bank for verification of the above particulars)



3) Date of effect



I hereby declare that the particulars given above are correct and complete. If the

transaction is delayed or not effected at all for reasons of incomplete or incorrect

information, I would not hold the user institution responsible. I have read the option

invitation letter and agree to discharge the responsibility expected of me as a

participant under the scheme.



Signature of the Contractor/Supplier.

Date: __________

----------------------------------------------------------------------------------

Certified that the particulars furnished above are correct as per our records.

Bank’s stamp.

Date: ______

Signature of The Authorised Official of the Bank.









END OF TENDER DOCUMENTS

SIGNATURE OF TENDERER/OFFERER DY.CE/C/HQ/BBS

- 134 -


Shared by: jianghongl
Other docs by jianghongl
“Well Seasoned CHEFS”
Views: 18  |  Downloads: 0
“PREZ
Views: 9  |  Downloads: 0
“GENERATION G”
Views: 10  |  Downloads: 0
“Cooking Class Venues”
Views: 17  |  Downloads: 0
“Bundle” of Joy
Views: 13  |  Downloads: 0
Related docs