					TTC Calculator Project


Ebrahim Vaahedi

Feb 4, 2011
                   Background
                   Project Objective Motivation
                   TTC Calculation
                      ● Near Real-time
                      ● Pre-Scheduling
                   Transmission Reliability Margin
                   Project Plan
How Do We Interconnect?

Path 1 (AESO intertie) consists
of 5L94, 1L274 & 1L275

Path 3 (BPAT intertie) consists
of 5L51/52, 2L112 and Teck-
Cominco 71L

There are quite a few paths for
which ATC is posted but the
Path to the US and Alberta are
the most important (e.g. BCH-
FBC, BCH LM to BPA)
TTC Calculation Processes
1. Hour Ahead TTC (for 12 hours updated hourly)
2. Hourly Calculations (for 168 hours updated
   daily)
3. Daily Calculations (for 30 days updated daily)
4. Weekly Calculations (for 52 weeks updated
   weekly)
5. TRM Calculation
TTC Calculator Program
Establishing and Setting TTC Limits With BPA& AESO




       BPA TRM    50 MW (both directions)
       AESO TRM 65 MW (both directions)
Project Objective & Motivation
Objective
  • Define, design and develop a more accurate TTC
    Calculator
  • Involves Technology, Process and People

Benefits
  •   Increased Benefit
  •   Reduced Risk
  •   Increased Efficiency
  •   Improved Sustainment and sustainability
   TTC Calculation Old Method Vs. New Method

                              TRM using
  2 Million Off-line                                               TRM using
                              Historic       One Online Voltage
  Voltage Stability Studies                                        Probabilistic
                              Interchange    Stability Study Per   Methodology
                              Errors                 TTC

 Pattern Matching Program
 Voltage Stability Results
                                                  TSAPM
                                            to be Superseded by
                                                Online TSA
       TSAPM



                                            Combine VSA &TSA
Combine VSA &TSA
       Online TTC Project
– Phase 1: Definition (Completed, March 2009)
    • Define the requirements
    • Design the technology solution
    • Conduct a revised assessment for cost & schdule


–    Phase 2: Implementation (Started April 2010)
    • To develop and implement the solution in real-time
      and pre-scheduling
    • To conduct user’s training and sustainment transition.
                                                              Project Schedule
          • Completion Date: Sep 2010
          • Detailed Design: February 2011
          • Contract Negotiation March 2011




                             Apr- May- Jun-        Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun-        Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun-        Aug- Sep-
Tasks                         10    10   10 Jul-10   10   10  10    10   10   11   11  11   11    11   11 Jul-11   11   11 11     11   11   12   12  12   12    12   12 Jul-12   12   12
Project Management
Detailed Functional Design
Architecture Design
Hardware Implementation
Implementation, Basecase
Developer
Implementation, TTC
Implementation, TRM
System Integration
Testing
Software Changes
Testing
Software changes
Real-time Implementation
Final Testing
Training
Transition to Maintenance
Documentation
Achievements So Far- Procurement Strategy
• Instead of dealing with a number
  of parties try to have one outfit do
  the project

• Since the solution was to use
  Areva’s EMS environment, it was
  decided to have Areva provide a
  budgetary estimate with no
  obligations

• Areva did provide a budgetary
  estimate



  Areva is now called
  Alstom T&D
Achievements So Far- Alstom’s Budgetary Estimate
• Budgetary estimate was high considering that it did not include a
  number of items

• Met with Alstom on August 31 to discuss, Proposal, Price, Base-
  lining and Governance

• Discussion Summary
   – BC Hydro should manage both Alstom and Powertech
   – BC Hydro to perform use case studies to come up with a more
     detailed requirement document for sharper estimates
   – Alstom is prepared to baseline the solution except for the TRM
   – TRM development expensive

• BC Hydro has been developing the detailed requirements

• Alternative design with TRM calculations outside the tool
Wrap-up
•   A new TTC is under development
•   A number of Processes have been streamlined
•   Detailed Requirement under development
•   A study is being conducted to revise the TRM values
•   Contract negotiation to start in March

				