No%20Longer%20Restricted
Document Sample


UNIVERSITY OF WASHINGTON
ENVIRONMENTAL HEALTH AND SAFETY
NO LONGER RESTRICTED ACCESS REPORT
**(BUILDING NAME) = REVISED SINCE LAST REPORT
This report lists restricted asbestos access areas which have been abated and are NO LONGER RESTRICTED. See comment section for additional
NO LONGER RESTRICTED ACCESS REPORT
BUILDIN LOCATIO DESCRIPTIO COMMENT
3018 Western Avenue Crawl spaces Asbestos debris on soil. Demolished. Was 55. This was a space in
the old bagley annex building.
Art Building Attic Deteriorated asbestos elbows on pipe. Deteriorated elbows abated November
Benson Hall Above ceiling, NW corner of Debris containing asbestos may be on This area was cleaned in August, 1991.
basement top surface of ceiling tiles.
CHDD School First floor hallways; spaces Damaged hard mudded fittings exist in Abatement project completed October
above suspended ceilings some areas of these spaces.
Commodore Duchess Attic mechanical spaces Deteriorated asbestos insulation on Access is through roof hatches,insulation
pipes. is air cell 50% chrysotile. Future project
currently being planned as a leasor
development. Abated in lease development
remodel, contractor was TLH.
REPORT 09-Sep-02
PAGE 1 OF 6
NO LONGER RESTRICTED ACCESS REPORT
BUILDIN LOCATIO DESCRIPTIO COMMENT
Communications Attic-East End Deteriorated asbestos containing tape Abated in August 1990.
on exterior of ventilation ductwork.
Cyclotron Building Mezzanine storage area Asbestos-containing spray-on Abatement project completed March 1992.
insulation exists on the ceiling of this
space.
Denny Hall Univents Deteriorated asbestos material inside Abatement completed October 1990.
univents.
Gerberding Hall First floor, area above ceiling in Deteriorated pipe elbow insulation. Abated July, 1992.
main entrance lobby
Guthrie Annex 1 Dirt crawl space Poly over dirt and pipe insulated with Area abated during previous project.
fiberglass. EH&S checked December 1990
Guthrie Annex 1 Dirt crawl space Deteriorated asbestos insulation in dirt Abatement project completed May 1991.
crawl space.
Guthrie Annex 2 Dirt crawl space Dirt crawl space with asbestos piping Abatement project completed May 1991.
in poor condition.
REPORT 09-Sep-02
PAGE 2 OF 6
NO LONGER RESTRICTED ACCESS REPORT
BUILDIN LOCATIO DESCRIPTIO COMMENT
Johnson Hall North/South attic space above Most deteriorated asbestos Abated fall of 1995. New fiberglass
4th floor encapsulated, but some surfaces are insulation installed.
considered contaminated.
Johnson Hall East/West attic space above 3rd Asbestos containing pipe insulation in Asbestos abatement was completed in
floor southeast corner of attic is damaged. December 1993.
Johnson Hall Air plenum under building Asbestos insulated pipes were The asbestos containing material in this
encapsulated in 1985. space was repaired/encapsulated in
Kincaid Hall Basement mechanical room Asbestos - containing spray-on material Project completed April 1992.
on ceiling (up to 40% chrysotile
asbestos).
Lander/Terry Hall Unabated pipe chases Damaged pipe insulation in chases. Pipe chases #01, 02, 03, and 04 were
surrounding lavatory core abated in June 1998. In chase #4 there is
still a vertical steam line which is asbestos
insulated. This line is in good condition,
and has been encapsulated and jacketed for
additional protection.
Magnuson Health J-wing mechanical rooms J-003 Spray-on material on ceiling. 15-20% Spray-on material was abated fall of 1995.
& J-007 chrysotile. Reinsulating product is non asbestos and
has a blue tint.
Magnuson Health T-276 Mechanical space behind Silicate pipe and autoclave insulation. Area has been abated but debris still seen
autoclaves on surfaces. 1 of 3 wipe samples contained
asbestos. work order submitted for clean up
on 11/1/90.
REPORT 09-Sep-02
PAGE 3 OF 6
NO LONGER RESTRICTED ACCESS REPORT
BUILDIN LOCATIO DESCRIPTIO COMMENT
Magnuson Health T-wing utility Utility closet with structural steel Abatement project completed May 1991. If
closets:300C,300Y,400Y insulation debris. debris is found please contact EHS
immediately.
Magnuson Health F-001 mechanical room Spray-on material on ceiling. 97% Spray-on material was abated fall 1995.
amosite.
Magnuson Health RR-155A Autoclave has deteriorated asbestos Clean up completed and inspected January
insulation. 1991.
Magnuson Health RR-wing - basement mechanical Spray-on material on ceiling. Up to 10% Spray-on material was abated fall 1995.
room chrysotile.
Magnuson Health B-wing 4 th floor, area above Temporarily restricted during project. Area above 4th floor suspended ceiling has
suspended ceiling from elevator been abated.
#18 south
Magnuson Health F-001 mechanical room, hatches Asbestos debris in space. Abatement project completed.
below stairs
Magnuson Health T-10 & T-50 mechanical rooms Spray-on material on ceiling. Up to 25% Abatement completed for both mechanical
chrysotile asbestos. rooms.
REPORT 09-Sep-02
PAGE 4 OF 6
NO LONGER RESTRICTED ACCESS REPORT
BUILDIN LOCATIO DESCRIPTIO COMMENT
Magnuson Health BB-17th floor mechanical room Spray-on material on ceiling. Spray-on material was abated fall 1995.
Mary Gates Hall Crawl space Dirt crawl space with piping insulated EHS conducted bulk sampling of the soil
with ACM. in this area and all samples and no asbestos
detected.
Parrington Hall Basement mech room & sprinkler Reported to have deteriorated asbestos Confirmed past abatement action removed
room insulation. hazard.
President's Residence Dirt crawl space under sunporch Dirt crawl space with asbestos debris The area under the sun porch and the
contaminating space. crawlspace accessed via the laundry room
were encapsulated with concrete in August
2000.
Purchasing/Accounting/ Orig. construction (excludes Suspended ceiling tiles contain 3-5% Abatement completed in October, 1991
Parking parking div./acct.payable add.) asbestos.
Student Union Building Room 112J, above suspended Surface above ceiling tiles is Area abated 10/98. Asbestos ceiling
(HUB) ceiling (Foyer to auditorium). contaminated with damaged asbestos material debris and suspect pipe insulation
material from old textured ceiling were all abated.
U of W Medical Center Incinerator - Room CC013A Deteriorated asbestos pipe insulation. Clean-up project previously conducted but
suspicious material remained. EH&S took
4 samples October 1990 and all had no
asbestos detected.
REPORT 09-Sep-02
PAGE 5 OF 6
NO LONGER RESTRICTED ACCESS REPORT
BUILDIN LOCATIO DESCRIPTIO COMMENT
U of W Medical Center Cement crawl space off of old Deteriorated asbestos existed in some Abatement was completed in January 1992.
B-mechanical room pipe chases and the crawlspace floor
below the chases.
U of W Medical Center Mechanical space at bottom of Asbestos debris in space. Abatement project completed May 1991.
BB-1 stair at -1 level
U of W Medical Center BB-306B (medical records) Damaged pipe insulation above ceiling Clean-up of area completed 12/93 after
at east side of room and in some other discovery of damaged asbestos.
locations
Utilities MC-7 past MC-6 Deteriorated asbestos insulation on Area cleaned July 1990 from MC-7 past
pipework and floor. MC-6. MC-7 is not restricted and may be
accessed either through Suzzallo or MC-6.
West of MC-7 to the central parking garage
is still restricted.
Utilities Abandoned MC trunk behind Deteriorated asbestos insulation on Abatement project conducted May 1991.
chiller bay in power plant pipework and floor.
REPORT 09-Sep-02
PAGE 6 OF 6
Related docs