INTEVA PRODUCTS - SUPPLIER PRE-AWARD MEETING

C2C Program #: SCOPE: Supplier Name: -

Date: Supplier Manufacturing Location:

Part Number, Revision Level & Date: DUN's



# of Special

Part Description: Characteristics



PRE-AWARD MEETING LOCATION:



Inteva Products Representatives & Contact Information: Supplier Representatives & Contact Information:

Name Position Phone email address Name Position Phone email address

1 Buyer 1



2 Program Manager 2



3 Product Engineer 3



4 Plant SQA 4



5 APQP 5



6 SD 6



7 * Transfer Manager 7



8 8



9 9



10 10



Inteva Products Program Manager: Coordinate Inteva Products activities and primary supplier interface



Supplier Program Manager: Primary supplier contact - responsible for follow-up



PPAP Submission Date: Supplier & Inteva Products Launch Team Commitment



Inteva Products Post Meeting Decision: Based on input from multidisciplinary Inteva Products members at meeting



if decision is "Proceed - Issue PO" - all open items must be closed prior to full approval

if decision is "Hold" - requirements to move forward must be defined below

if decision is "Do Not Proceed" - reason for cancellation will be communicated to supplier and another option will be pursued



COMMENTS:









* PDF copy to be stored in the Amsterdam Hard Drive "Z:\Procurement Public\Customer Projects\...."



* Notes:

PAM to be filled as well for transfers / relocation

APQP Team to be informed and part of the PAM







Printed or not in server copies are uncontrolled





a3dd6152-153c-4e20-9f61-3efa89a4173a.xls Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist









Supplier: - Date:

RISK ASSESSMENT & SA8000/REACH/RoHS Compliance Yes No N/A Comments / Follow-up Actions, Responsible Person & Due Date STATUS

Was the Risk Assessment performed and supplier identified as ready to

0

develop?

Green Yellow red



0.1 Is supplier compliant to SA8000? Obtain evidence from supplier

Is supplier compliant to REACH (regulation of chemicals in the European

0.2 Union)? Obtain evidence from supplier (NOTE: applies only to suppliers 0 0 0

delivering to Europe)

Is supplier compliant to RoHS regulation? Obtain evidence from supplier

0.3

(NOTE: applies only to suppliers delivering to Europe)

Other Review Items: 100%

0.4





0.5

90%

0.6





DESIGN & PRINT CONSIDERATIONS Yes No N/A Comments / Follow-up Actions, Responsible Person & Due Date STATUS

1.1 A Technical Review meeting was held and a copy of the meeting 80%

minutes are attached.

1.2 The supplier has all required drawings and they are to the correct rev level

1.3 Is this a new design?

70%

1.4 Does supplier have any issues with drawing specifications?

1.5 Is drawing ownership clearly defined?

1.6 Are prototype samples required?

1.7 Are prototype requirements - quantity, quality and delivery understood?

60%

1.8 Does the supplier understand how the part functions? How it is handled in

manufacturing and assembly operations? Mating part considerations?

1.9 All Special characteristics identified? 50%

1.10 Supplier confirmed feasibility study

1.11 Has supplier been given the change request template and Inteva Products

contact?

Identification, traceability & Inteva Products logo requirements on component

1.12 (location, size, etc) defined? Interface with Inteva Products systems (clear orbit,

40%

etc) considered?

1.13 Any issues regarding datums or application of GD&T?



Specifications: Does the supplier understand all OEM/National/International 30%

1.14 Standards/References mentioned on the drawing? Does supplier have access to

these databases and a system in place to regularly update these requirements?



1.15 Any co-development required? If so, has a contract been finalized? 20%

1.16

1.17









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 2 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist





Supplier: - Date:

MATERIAL & PROCESS SPECIFICATION REVIEW Yes No N/A Comments / Follow-up Actions, Responsible Person & Due Date STATUS

2.1 The following material and process specifications apply:

10%



This should be filled out by Inteva Products prior to the meeting

0% 0

2.2 Does the supplier have a copy of all specifications with no exceptions?

1

2.3 Hardness: full understanding of: area to be checked, hardness scale

and any special fixture(s) required.

2.4 Soundness: full understanding of high vs. low soundness areas and % coding status

standards required

2.5 Heat Treat: distortion after HT: will not be an issue?

2.6 Surface Finish: understand paint approval requirements Yellow, 0, 0%

2.7 Surface Finish: understand surface finish requirements for

red, 0, 0%

Green, 0, 0%

machined and "as-produced" surfaces as well as measurement methods

2.8 Plating: understand requirements and measurement method.

2.9 Rubber & Plastic - understand material specification including :

approved sources, Max allowed % re-grind, required temperature and humidity controls



Is supplier (and sub-supplier) CQI-9, 11 or 12 compliant? Get copy of full audit

2.10

results



2.11 Are coating requirements understood, including measurement method?

Other Material and Process Specification Items:

2.11 Regrind per drawing : if not specifically defined regrind allowed = 0

Plating, coating: need to inform Inteva Products about process, layers and

2.12

chemical supplier used, use GTS00100



Traceability/Part history: Does the supplier have a traceability system in place to

record all product and process changes in a part history that will be available

2.13 upon request with the respective Inteva Products personnel? Is the part history

in accordance to the Inteva Products part history requirements of the receiving

plant?



2.14

2.15









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 3 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist





Supplier: - Date:

TOOLING & CAPACITY CONSIDERATIONS Yes No N/A Comments / Follow-up Actions, Responsible Person & Due Date STATUS

Tooling

3.1 Has the supplier received, and agreed to, the Inteva Products Tooling Manual ?

3.2 Is the Tool Cost Breakdown completed ?

3.3 Are Tools designed and constructed in-house or at external supplier ?

Is tooling supplier known to Inteva Products (previous experience)? What is

3.4

name and location of tooling supplier?

Is an audit of the toolmaker required (to be performed by Inteva Products

3.5

Regional Tooling Specialist)?

Tool designer / manufacturer has no issues with tolerances or material specified

3.6

?



3.7

For the specific part, has a mould flow or blank/strip analysis been completed?

Has the mould flow or blank/strip analysis been reviewed by the Inteva Products

3.8

Regional Tooling Specialist?

If no analysis has been completed, has the gate position or blank/strip layout

3.9

been agreed to with the Inteva Products Regional Tooling Specialist?

3.10 Has material shrinkage been considered in the tool design?

3.11 Is the feed position and / or material grain direction acceptable to Inteva

Products ?

Has the supplier submitted tool concept showing feed, parting lines, miss-match

3.12

and flatness meet print and process specification ?



Has tooling design been approved by Inteva Products Regional Tooling

3.13

Specialist? NOTE: approval is mandatory before supplier can cut steel.



3.14 Any secondary operations (burr removal, coining, etc) required ?



3.15 Tooling replacement and maintenance responsibilities understood and agreed?



No issues regarding tool ownership/asset identification (Inteva Products asset

3.16

tag)?

Tooling storage : Is the tooling properly stored with no risk in case of fire or

3.17

flooding ?

3.18 Full Tooling Description:







This should be filled out by Supplier prior to the meeting

Please refer to the specific excel spreadsheet "Tooling Requirements"





3.19 Minimum tooling life warranty (# pcs) = Define if tooling refurbishment in part / price, substituting tool in part / price?

Capacity Considerations - Full process work station to work station

3.20 Constraint Operation =

3.21 Cycle Time =

3.22 Parts / hour =

3.23 Parts / shift =

3.24 # shifts available =

3.25 Daily theoretical capacity =

3.26 Daily nominal capacity =

3.27 Nominal capacity meets Inteva Products requirements

3.28 How will capacity be verified? (PSO = on-site review or Run @ Rate

reported on PSW)

3.29 If equipment and tooling is not dedicated, what impact does this have on available vs.

required capacity?

Has the supplier reviewed and optimized its' process parameters? Does

3.30

supplier need to perform Inteva's Injection Process Audit?

Other Tooling and Capacity Items:

3.31

3.32









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 4 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist





Supplier: - Date:

PROCUREMENT & MATERIALS CONSIDERATIONS Yes No N/A Comments / Follow-up Actions, Responsible Person & Due Date STATUS

Procurement

4.1 The supplier has reviewed the Inteva Products Terms & Conditions and has no

issues

4.2 The supplier agrees and understands payment term (tools and parts)

The supplier understands and agrees the INCO terms, see appendix logistics

4.3

table

4.4 Supplier has responded to RFQ on Inteva Products form with no exceptions

Supplier has provided a detailed Part & Tooling cost breakdown in Inteva

4.5

Products template

4.6 Is steel re-bill part of this program?

4.7 Does supplier understand surcharge reporting method required?

4.8 Timing agreed for registration to Inteva Products Supplier Performance

Website?

Web-based ECN system - describe system and get contact information (EDI,

4.9

Electronic scheduling, electronic invoicing, etc.)



Supplier understands and agrees with Inteva Products cost reduction

4.10

requirements (productivity)



Can supplier provide a preliminary program timing plan to match Inteva Products

4.11

needs?

4.12 Have key Inteva Products milestones been communicated to the supplier?

4.13 Agree upon Exchange rate base?

4.14 Agree upon raw material base?

Materials, Logistics & Packaging

4.13 Are the Logistics requirements based on appendix Logistics agreed

4.14 Is supplier EDI capable?

4.15 Can supplier send ASN's?

4.16 Does supplier understand Inteva Products release system and forms?

4.17 Raw, fab and firm allowance defined?

4.18 What is the delivery frequency?

4.19 Are safety stock requirements agreed (minimum, maximum, consignment)?

4.20 Are raw material and sub-supplier lead times understood?

Complete Description of Proposed Supply Chain:

4.21

This should be filled out by Supplier prior to the meeting





4.22 Shipping label meets AIAG, Odette, Galia, VDA or other required format?



Are packaging requirements understood (container type, size, quantities, etc.)

4.23

and does packaging minimize risk of damage to parts?

4.24 Is packaging is included in piece price

Supplier has provided a detailed Packaging and Transportation cost break

4.25

down using Inteva Products Template

4.26 Rust prevention requirements understood?

Other Procurement and Materials, Logistics and Packaging Items:

4.27

4.28









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 5 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist





Supplier: - Date:

PPAP Yes No N/A Comments / Follow-up Actions, Responsible Person & Due Date STATUS

5.1 PPAP Submission default level required by Inteva Products = Level 3

5.2 Supplier PPAP contact = supplier to complete ___________________________ Inteva Products PPAP contact =

____________________________________________________

PPAP Checklist

5.3

Intent is for Inteva Products PPAP contact person to fill out check list prior to

and review line by line with supplier during meeting. Attached checklist is

provided for reference only. If site has a different checklist then it can be

used instead.



Each PPAP can be sent by e-mail but a paper copy must be



A complete understanding of PPAP submission requirements must be

achieved!!



For the Special Characteristics provided, is the supplier aware of which print

dimension corresponds to each characteristic? Which is the capability

5.4

requirement for PPAP presentation for each special characteristics? Which is

the functional risk assessment for each ?





Does the supplier understand how each special characteristics list item must be

5.5 measured?

Capability study: Ppk: 30 measurements/Cpk: 125 measurements Per cavity





Are specially designed gages needed? Will Inteva Products gages be

5.6 duplicated? Will supplier gages be duplicated? Does Inteva Products need to

provide prints of special gages ? CMM programs?



5.7 Are the number of samples required for engineering test identified?

Summary of Engineering tests to be conducted:

5.8

This should be filled out by Inteva Products prior to the meeting





5.9 Total of samples to be submitted for line trial per cavity: identify in measurement

report with the appropriate CC/SC symbol



PPAP samples, for both dimensional and initial capability study, must be

5.10

individually tagged and numbered by cavity



IMDS/MSDS information understood and required (must be sent to ID 13110 for

5.11

Inteva)



Is a launch containment required at supplier sight? If yes, please provide control

5.12

inspection sheet, flow organization, launch organization…



Is an Annual revalidation (re-PPAP) required ? If yes define Inteva Products

location to receive



- A complete dimensional report on each cavity

5.13 - A capability study on all Special Characteristic

- A certificate of conformity of material

- Test results described on the drawing (corrosion, endurance, …)

- If suppliers have a Heat Treatment and deliver parts for Ford/Volvo ask to see

evidence for compliance to CQI-9



5.14 Did supplier submit list of metrology equipment to Inteva Products Quality Dept?



Does supplier agree to submit the CQI-9, 11 or 12 front page job audit with

5.15

annual PPAP submission?



Does supplier understand the PPAP Resubmission Criteria requirements

5.16

per the latest edition of the AIAG PPAP manual?

PRIOR to implementing a change, it is the supplier's responsibility to contact the Inteva

Products plant quality contact and agree to PPAP level submission required



Other PPAP Items:

5.17









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 6 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist





Supplier: - Date:

QUALITY Yes No N/A Comments / Follow-up Actions, Responsible Person & Due Date STATUS

SQSR Manual understood and agreed? SQSR Concurrence Template is signed

6.1 (with copies to Inteva Products Buyer and Plant Quality Dept) and is attached to

Pre-Award meeting?



6.2 Are warranty obligations understood ?



6.3 Does the supplier agree to Inteva's 0 PPM requirement?



Does supplier meet Inteva's mandatory quality system certification requirement

(at a minimum, certified to latest edition of ISO9001 with plan in place to

6.4 To be sent to Inteva Products quality department and Buyer

become compliant to latest edition of ISO/TS 16949?) Obtain evidence from

supplier



6.5 Is supplier certified to ISO 14001? Obtain evidence from supplier To be sent to Inteva Products quality department and Buyer.



Site Assessment (Risk Assessment, PAPA, PSO, etc) performed ? List date,

6.6

lead Inteva Products SD person and assessment score.



All actions identified during above site assessment closed ? On track for closure

6.7

? Obtain latest status from designated Inteva Products SD person



Supplier understands that they are completely responsible for sub-supplier

6.8 quality. Specific responsibilities must be agreed upon for any exceptions

(consigned material, etc).



Known Problems

Does the supplier have experience/knowledge of quality issues on similar products? What Lesson learned file to be sent to Inteva Products quality department

was supplier action plan ?

6.9









6.10 Any concerns with current Supplier Performance Rating/MOS data?



Does the supplier agree to on-site support at Inteva, such as a resident

6.11 engineer, to support Inteva Products with respect to timing and quality of the

SOP



6.12

Problem Notification - method of notification (DMN) from Inteva Products

understood by the supplier ? distribute supplier quality chart to Inteva Products



Expected Response to Problem Notification agreed by supplier ?

- 8D report with at minimum Ishikawa or 5 Why

- 24 hours for containment action

- 30 days for complete 8D report except for customer issue the delay is 8 days



How many people are trained at the supplier on the problem solving ?





Remedial Charges

6.13

o Super control and sorting cost done on the components at Inteva

o Scrap product due to the non-conform component

o Sorting done on the complete product at our customer

o Sorting done on the complete product stock at Inteva Products

o Special transport to avoid customer line stoppage

o Rework

o Inteva Products line stoppage

o Customer line stoppage

o Warranty cost

o Customer car park inspection

o 8D not delivered in time

o PPAP not delivered in time or not OK compared to Inteva Products

requirement

o Comex

See SQSR Manual



Record Retention requirements understood (requirement is 10 years after End

6.14

Of Product) ? See SQSR Manual



Does the supplier understand the long term capability (Cpk) requirement (serial

6.15

life and annual revalidation) for Special Characteristic management table



6.16 What is supplier's planned method to gather capability data?





a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 7 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist





Supplier: - Date:

Does the supplier understand that an approved deviation for any out-of-

6.17 specification characteristic must be obtained prior to PPAP submission or serial

delivery ?



Does supplier understand,. and agree to, all OE Customer Specific

6.19

Requirements?

Has supplier been identified as "critical" thereby requiring supplier to

6.20

submit/maintain the APQP Critical Supplier Status Report?

Does supplier follow the requirements of the latest edition of the AIAG reference

6.21

manuals: PPAP, APQP & Control Plan, FMEA, MSA and SPC?



6.22 Does supplier have liability insurance?



Other Quality Items:

After first trial parts and prior to final tool grooming, supplier agrees to send

CMM operator to visit lead Inteva Products plant to agree to measurement

6.23

methodologies. Measurement system instructions to be included in PPAP

package

6.24









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 8 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 9 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist









Green

Yellow



Yellow, 0, 0% red



red, 0, 0%

Green, 0, 0%









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 10 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 11 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 12 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 13 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 14 of 28 Release Date: MM/DD/07, Revised Date: None

ArvinMeritor - Pre-Award Meeting Checklist









a3dd6152-153c-4e20-9f61-3efa89a4173a.xls, 15 of 28 Release Date: MM/DD/07, Revised Date: None

Supplier SQSR Concurrence Summary







SUPPLIER: -



Issue / Comment / Status

Understand

Specific SQSR Section Requirement Accept Reject

2.1 General Quality System Requirements

2.2 APQP Conformance

2.3 Pre-Award Meeting

2.4 Prototype Requirements

2.5 Special Characteristics

2.6 Process Capability and Control Requirements

2.7 Sub-Supplier Control

2.8 Tooling, Gagging and Returnable Containers

2.9 Early Production & Pilot Part Requirements

2.10 PAPA / PSO Concurrence

2.11 PPAP Requirements

2.12 Changes to Approved Product and Processes

2.13 Annual Re-qualification

2.14 Certificates of Conformance

2.15 European ELV Directive and IMDS Requirements

2.16 Verification Reviews of Purchased Product

2.17 Product Identification and Packaging

2.18 Delivery Performance & EDI Requirements

2.19 Contingency Plans

2.20 Continuous Improvement

2.21 Problem Solving and Avoidance

2.22 Supplier Performance ratings

2.23 Supplier 4 Step Incoming Quality Process

2.24 Containment Requirements

2.25 Product or Process Deviations or Concessions

2.26 Warranty and Cost Recovery

2.27 Product Safety and Compliance Requirements

2.28 Charges for Supplier Responsible Non-conformances

2.29 Record Retention Concurrence

2.30 SA8000

2.31 Minority Supplier Requirements (US only)

2.32 Tier II Minority Supplier Requirements (US only)



Supplier Concurrence Signature: Inteva Products Signature:

Title: Title:

Date: Date:



Rev. A, Month X, 2007

a3dd6152-153c-4e20-9f61-3efa89a4173a.xls

Tooling Information Requirement (Per Tool)

Component tool information:



Buyer: Buyer C2C Program: 0



Inteva Products Lead Plant: 0 C2C Program Manager: Program Manager



Product Type or Description:



Product Part / Component Number: Desired Completion Date:



Engineering Drawing Level: Customer PPAP Date:



Tool Information:



- Is the tool new or modified:? If Modified: Stock Quantity before modification:



- Tool description:









Quantity of tools: Quantities of Cavities: Tool Type:



Material: Weight: Size: Height mm



Width mm

Length mm

- Tool identification tag / plaque:



Inteva Products ID Number: Customer ID Number (if any):



Minimum requirements: Customer: Component Name: Customer component No.



Closed Height: Ejection Stroke:- Tool No:-



- Tool picture: - JPG format, max. 500 KB ( no PowerPoint, no PDF etc.! ) - ownership tag to be visible in pictures

Open closed









Tool Location:



Company Name:



Street:



City: Zip code: Country:



Key Contact (s) Name Email Phone Handy



contact 1:



Contact 2:



Contact 3:



Tool Maker:



Company Name:



Street:



City: Zip code: Country:



Key Contact (s) Name Email Phone Handy



contact 1:



Contact 2:



Contact 3:







* On receipt of PPAP approval the supplier is to send a copy of the latest up to date tool drawings, on CD, is to

be sent to Inteva Products for the attention of the Tooling Specialist.



Any doubt do not hesitate to check the "Inteva Products

TOOLING MANUAL" to be provided by Buyer or Supplier Development.

Special Logistics table (contract between

supplier & Inteva Products )

Standards of Delivery condition

Incoterms DDP/DDU via consignment Warehouse

Freight organisation including returnable packaging if applicable

delivery frequency minimum once a week



Consigment stock managed and paid by the supplier



Minimum - Maximum Days of stock

FG at Supplier Transportation Stock in Consignment Stock in Consignment

minimum maximum





Fields AA BB CC DD



European supplier 2 1-2 5 10



USA supplier 5 20 10 20



Asia /Mexican Supplier 5 30 15 30









Packaging Table packaging has do be inline with the Inteva Products Logistics Guidlines and included in quotation





Qtd of returnable

Package agreed Agreed Delivery

Part No.: one-way / returnable Packaging description Package seize on Incoterm Frequency

Acronym List



Glossary

AIAG Automotive Industry Action Group

ANSI : American National Standards Institute

APQP : Advanced Product Quality Planning

ASN : Advanced Shipping Notice

CAD : Computer Aided Design

CGM : Computer Graphics Metafile

CI : Continuous Improvement - Kaizen

DDP Delivered Duty Paid; Incoterms

DDU Delivered Duty Unpaid; IncoTerms

DMAIC : Define, Measure, Analyse, Improve & Control

DSL : Digital subscriber line

DUNS : Dunn & Bradstreet

DXF : Drawing Exchange Format

ECN: Electronic Communication Network

EDI : Electronic Data Interchange

ELV: End of Live Vehicle Directive 2000/53EC:

FIFO : First In, First Out.

FMEA : Failure Mode Effect and Analysis

GD&T

Ty

Ty

A

A

S

S

A

A

N

N

c

i

s

o

c

i

s

o

O

O







m

c



t

m

s

c

pe

pe

t



s

Fo

u



u





B

Fo

u

r



u

i

u

B

re

r



a

i

l

u

r

r

m







a

a

l

m

a

r

e

n

m







l

a

m

a

u

c

n

of



r



c

l

l

c

e



E

r

p

c

u





of



E



k

a







E



t

p

k

l

t

e

R

E

x

E



g

x

i

a

i







p



t

o

r

o

a

v

E

x





g

t

R







x

p

i

o

n









n

i

t

i

e

p

e

o

r

v



p



u

o

a

i

de

r



n

o

i

e

r



n

n

i



e

n

g

t



e

i



u

i

de

r

e



d

nc

i

n

r



n

n

e

i

c

c

e



d

n

e

nc

g



e

n

n

c

ec

e

e

e

Geometric Dimensioning and Tolerancing

O

L

O

cc

o w

1

2

3

--

u

cc

L

u

rrerre

n

o

1

2

3

--

ce

w

n

Fr

M

ce

M

e

a

q

od

t

u

M

M

e

4

5

6

-

ri

Fr

e









-

r

x

n

a

a

e

t

c

q

t

od

y

e

u



4

5

6

e









-

e









-

r

n

a

c

t

H

y

ei









1

7

8

9

gh









0

Hi









1

7

8

9

ri

gh









0

x









IGES : Initial Graphics Exchange Specification

JPEG: Joint Photographic Experts Group - Standard for compression images

MSDS: Material safety data sheet (MSDS) describes in detail the hazards and safety precautions associated with

NA : Not Applicable

OSHAS 18001: BS OHSAS 18001 Occupational Health and Safety

PAM Pre-Award Meeting

PPAP : Part Production Approval Process

Pro/Engineer : 3D CAD parametric feature solid modeling software

QCC: Quality Critical Characteristic

QMS : Quality Management Systems

REACH Registration, Evaluation, Authorisation and Restriction of Chemicals (regulation of chemicals in the Europe

ROsH Directive on the Restriction of the use of certain Hazardous substances in electrical and electronic equipm

SA8000: Social Accountability International (SAI)’s

SERS : Supplier Evaluation Report from Dun & Bradstreet (D&B)

SPICE: International Standard for Software Process Assessment

SPR: Inteva Products Supplier Performance Rating

SQSR: Inteva Products Supplier Quality System Requirements manual

STEP : Standard for the Exchange of Product model data

TIF / TIFF : Tagged Image File Format (abbreviated TIFF) is a file format for mainly storing images

tribology: Includes the study and application of the principles of friction, lubrication and wear in design.

VA/VE: Value Analysis Value Engineering

VAN : Value Added Network, based on EDI but process-oriented.

VCI : Value Chain Improvement - to make the Inteva Products "lean" core values available to the supply base

VSM : Value Stream Mapping: establishes a method for linking material and information flow between cells

WYSIWYG What You See Is What You Get

http://www.aiag.org/Index.cfm

http://www.ansi.org/

http://en.wikipedia.org/wiki/Advanced_Product_Quality_Planning

http://en.wikipedia.org/wiki/Advanced_Shipping_Notice

http://es.wikipedia.org/wiki/AutoCAD

http://en.wikipedia.org/wiki/Computer_Graphics_Metafile

http://en.wikipedia.org/wiki/Kaizen

http://en.wikipedia.org/wiki/Incoterms

http://en.wikipedia.org/wiki/Incoterms

http://en.wikipedia.org/wiki/DMAIC#DMAIC

http://en.wikipedia.org/wiki/DSL

http://www.dnb.com/us/

http://en.wikipedia.org/wiki/DXF

http://en.wikipedia.org/wiki/Electronic_communication_network

http://en.wikipedia.org/wiki/Electronic_Data_Interchange

http://europa.eu.int/eur-lex/pri/en/oj/dat/2000/l_269/l_26920001021en00340042.pdf

http://en.wikipedia.org/wiki/FIFO

http://mows.aiag.org/source/Orders/index.cfm?section=orders&task=3&CATEGORY=CORETOOLS&PRODUCT_TYPE=SALES&P



http://en.wikipedia.org/wiki/IGES

http://en.wikipedia.org/wiki/JPEG

http://www.mdsystem.com/

http://mows.aiag.org/source/Orders/index.cfm?section=orders&task=3&CATEGORY=CORETOOLS&PRODUCT_TYPE=SALES&P

http://www.bsigroup.co.uk/en/Assessment-and-Certification-services/Management-systems/Standards-and-Schemes/BS-OHSAS-1



http://mows.aiag.org/source/Orders/index.cfm?task=3&CATEGORY=CORETOOLS&PRODUCT_TYPE=SALES&SKU=PPAP-4&DE

http://en.wikipedia.org/wiki/Pro/Engineer

Special Characteristic

http://en.wikipedia.org/wiki/Quality_management_system

http://echa.europa.eu/

http://www.reach-compliance.eu/english/rohs-weee/rohs-legislation.html

http://www.sa-intl.org/index.cfm?&stopRedirect=1

https://www.dnb.com/sir/help/supplier_risk.htm

http://www.sqi.gu.edu.au/spice//

http://supplier.Inteva.com/supplier_performance/

http://tradeexchange.Inteva.com/SupplierDir/Supplier Requirements/corporate/files.htm

http://en.wikipedia.org/wiki/Standard_for_the_Exchange_of_Product_model_data

http://en.wikipedia.org/wiki/Tagged_Image_File_Format

http://en.wikipedia.org/wiki/Tribology



http://en.wikipedia.org/wiki/Value-added_network

http://en.wikipedia.org/wiki/Value_chain

http://en.wikipedia.org/wiki/Value_Stream_Mapping

GORY=CORETOOLS&PRODUCT_TYPE=SALES&PRODUCT_CODE=FMEA%2D3&SKU=FMEA%2D3&DESCRIPTION=&FindSpec=fmea&CFTOKEN=









GORY=CORETOOLS&PRODUCT_TYPE=SALES&PRODUCT_CODE=PPAP%2D4&SKU=PPAP%2D4&DESCRIPTION=&FindSpec=PPAP&CFTOKEN

ent-systems/Standards-and-Schemes/BS-OHSAS-18001/ http://www.osha.gov/



OLS&PRODUCT_TYPE=SALES&SKU=PPAP-4&DESCRIPTION=CORETOOLS&FindSpec=&CFTOKEN=81597765&continue=1&SEARCH_TYPE=find

3&DESCRIPTION=&FindSpec=fmea&CFTOKEN=61621420&continue=1&SEARCH_TYPE=FIND&StartRow=1&PageNum=1&FindIn=1









4&DESCRIPTION=&FindSpec=PPAP&CFTOKEN=61621420&continue=1&SEARCH_TYPE=FIND&StartRow=1&PageNum=1&FindIn=1





EN=81597765&continue=1&SEARCH_TYPE=find&StartRow=1&PageNum=1

rtRow=1&PageNum=1&FindIn=1









artRow=1&PageNum=1&FindIn=1

Revision History Change Updated text in blue.



August '10 Revision 0 Pre-Award_Meeting_September (tooling details).xls



September 21st, 2010 Revision 1 PAM Overview







PAM Checklist









SQSR Concurrence Template

Tooling Requirements

Appendix Logistics table

Acronym List

October 4th, 2010 Revision 2 Document History

November 11th, 2010 Revision 3 All

SQSR Concurrence Template

SQSR Concurrence Template



PAM Checklist









Prepared



Sebastià Bigaire

Supplier Development Manager, Europe









12 November, 2010





Storage:

http://newton.Inteva.com/livelinkprod/livelink?func=UniteAtlas.ToggleTreeDisplay&TreeNam

%2Flivelink%3Ffunc%3Dll%26objId%3D6368018%26objAction%3Dbrowse%26sort%3Dna

Remark:

The approved document is valid and stored in Livelink (see storage link)

Printed copies and stored documents only for reference

What Where

Creation

Change: * PDF copy to be stored in the Amsterdam Hard Drive

"Z:Procurement Public\Custoimer Projects\...." instead of D40

providing copy to Suzanne

Change:

- will be automatically shared with

2.13

With:

- will be available upon request with

Change:

- Has tooling design been approved by Inteva Products Regional

Tooling Specialist?

With: 3.13

- Has tooling design been approved by Inteva Products Regional

Tooling Specialist? NOTE: approval is mandatory before supplier

can cut steel.

none

Spread

added September

sheet

none

none

checked update

Change Body Systems reference to Inteva Products all

Removed link storage "SQSR" F3

Replaced section 2.30 Supplier Scorecard with SA8000

A-B 30

requirements

Inteva Products Tooling Manual PDF removed as not Inteva

L152

Products version







Approved



Pierre Blanchard



Sr Dr Advanced Manufacturing Engineering Body Systems









?func=UniteAtlas.ToggleTreeDisplay&TreeName=LL&Show&Content=%2Flivelinkprod

8018%26objAction%3Dbrowse%26sort%3Dname

ee storage link)

Why





Each one to maintain files





rewording as not implies supplier to forward but to submit under

requirement









rewording to permit same understanding









Reflects VW requirement









--


Related docs
Other docs by rvd20586
Template of Company Profiles
Views: 1  |  Downloads: 0
Template for Short Report
Views: 5  |  Downloads: 0
Terms and Conditions Template for Transport
Views: 31  |  Downloads: 1
Template Ms 6424
Views: 1  |  Downloads: 0
Terms and Conditions Template Mobile App
Views: 53  |  Downloads: 0
Tenant Lease Addendum Form
Views: 0  |  Downloads: 0
Term Sheet Template Venture Capital
Views: 38  |  Downloads: 0
Tender Proposal Chartered Accountant
Views: 2  |  Downloads: 0
Template Menggunakan Css
Views: 29  |  Downloads: 0
Templates Pain Management Clinice
Views: 4  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!