Docstoc

CAF 01255.06 Detailed Breakdown of Material and Labour Costs XLS

Document Sample
CAF 01255.06 Detailed Breakdown of Material and Labour Costs XLS Powered By Docstoc
					                                                                                       Detailed Breakdown of
                                                                                      Material & Labour Costs


                                             Proposal Number:                                 Date:


Breakdown of General Contractor's Work

Material
                                                              $
                                                              $
                                                              $
                                                              $
                                                    Total     $                0.00              $       0.00

Equipment
                                                              $
                                                              $
                                                              $
                                                              $
                                                    Total     $                0.00              $       0.00

Labour
                                                              $
                                                              $
                                                              $
                                                              $
                                                    Total     $                0.00              $       0.00
                                                                           Total                 $       0.00
                                                     General Contractor's Markup        10%              0.00
                                                                                  Sub-Total              0.00
                                                   General Contractor's Overhead   10%                   0.00
                                                                            Grand Total                  0.00


SubContactor's Breakdown*
                                                              $
                                                              $
                                                              $
                                                              $
                                                    Total     $                0.00
                                 General Contractor's 5%      $                0.00
                                                    Total     $                0.00              $       0.00
                                                                               Grand Total       $       0.00

                     *Note: Backup Sheets from subcontractors must be attached with all submissions

AI 01 26 63.06 Rev. 2008-08-05

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:4
posted:1/22/2012
language:English
pages:1