Main ID Name Description Total Cost Donor Sector Total Loan Amount
Total Grant Amount Total Investment Amount
Description: Distribution Project (PTDP)
Power Transmission and Switzerland finances two(CH)
ALB-ENE-G-CHE 01 components on a non-reimbursable grant basis:0(i) Technical as
13950009 Switzerland Energy 13949124 0
Energy Description: The objective is to improve the safety of the hydropower dams, constructing a transmissi
95000 Japan Energy APL5
ALB-ENE-G-JAP 01Community of South Eastern Europe(JP) Energy 94998 0 0
Promotion the use of Installation in Albania
50000 Spain (ESP)Energy 50000 0 0
ALB-ENE-G-SPA 01 ofDescription:solar energyof a photovoltaic system at the Politechnic University of Tirana, training for stu
Energy Description: The project consists Programme - APL 5 for (1) physical SAFETY
32510880 World Bank (WB) Energy 0 27003780
ALB-ENE-L-WB 01 Community of South East Europe APLof two main components:Albania DAMinfrastructure investments; and0
Privatization Description: This operation is expected to be similarPartial previous Bank PRG provided for the privati
ALB-ENE-L-WB 02 56019000 System Operator Energy 0 56019000
of the Power Distribution World Bank (WB) (OSSH) to the Risk Guarantee 0
Regional Description: Developing the Quark Shkodra, sectorsregional administration and infrastructure upgradin
3500000 Austria
ALB-SOC-G-AUT 03 Development Programme Shkodra (AUT) Social TA for 3500000 0 0
Kukes 03 Description: Rehabilitation and/or reconstruction of small community public infrastructure works encom
168715 United Nations Development Programme (UNDP)
ALB-SOC-G-UNDPRegional Development Initiative Phase 2 Social sectors 168715 0 0
Support for Description: This278018 United designed to directly support mine/ERW survivors in 39 mine affected
programme is Nations Development 278018
Social sectors Programme (UNDP)
ALB-SOC-G-UNDP 02 social and economic reintegration of mine ERW survivors 0 0
Albanian Description: The proposed programme combines infrastructure rehabilitation and capacity building wit
14380000 Council of Works Programme 3rd Phase.
Social sectors 180000 10000000
ALB-SOC-L-CEB 02 Development Fund (ADF) - CommunityEurope Development Bank (CEB) 0
TB 02 Description: Loan Lending
20000000 European Investment Bank (EIB) projects
Private infrastructure 0 20000000 0
ALB-PSD-L-EIBLoan for SMEs and Priority for financing SME projects,sector development promoted by local authorities and
Credit for Description: The goal of this
3400000 Germany (GER) sustainable improvement of access to market-orientated
is the
ALB-PSD-L-GER 01 SMEs i.rural a.urban regions measure Private sector development 3400000 0 0
Economic Description: 400000 Austria (AUT) Social sectors 400000 0
ALB-SOC-G-AUT 01 School ProjectModernization of economic education at 11 secondary vocational schools0 Albania. in
Mobile ClinicDescription: Establishemnt and operation of a mobile clinic in the district of Puka
ALB-SOC-G-AUT 02 73000
in the district of Puka Austria (AUT) Social sectors 73000 0 0
Description: Early Childhood Curriculum
ALB-SOC-G-CAN Childhood Curriculum Project Canada (CAN) Project (ECCP) is based on Québec's Preschool Program. Th
Early 01 534999 Social sectors 534999 0 0
Social statusDescription: The 247666 Canada (CAN) problems framework. Tetraplegics people?s 0
ALB-SOC-G-CAN 02 projects addresses theSocial legal of 247666
of paraplegic and Tetraplegics invalids. Thesectors Para and 0 category who d
Support Description: The project will focus(CAN) following areas: (i) furnishing the kindergarten; (ii) provision o
ALB-SOC-G-CAN 03to Pre-School Education 73190 Canada on the Social sectors 73190 0 0
Development of the Specialised Pedagogyat improving the quality2921520 the handicaped persons, facilitating thu
ALB-SOC-G-CHE 01 2921520 Switzerland (CH) University life of
Social 0
Description: The project aims Section at thesectors ofof Vlora (DSPS) (PHASE III) 0
Programme to build up the professional Development System (PDS/CCE) care services through capacities buildin
ALB-SOC-G-CHE 02 1075368 Switzerland (CH) sectors of health
Social
Description: The overall goal is to improve the quality 1075368 0 0
Rehabilitation of the elementary school in Kalur, Lezhe the access 200018 quality of education for 0
ALB-SOC-G-CHE 03 project Switzerland (CH)
Social
Description: The 200019 aims at improving sectors and the 0 children in rural
Improving of Other projects references: IPA 2008 - Social sectors 5700000
ALB-SOC-G-EC 01 5700000 European Commission
diseases
consumer protection against zoonotic Project 18 (EC) 0 0
Strengthening the Vocational Education and Training in Albania 7000000 schools/works; provision of didactic too
ALB-SOC-G-EC 02 8000000 European Commission (EC)
Social sectors
Description: Support for construction and rehabilitation of VET 0 0
Assistance to the Justice The present European Commission (EC)3300000
ALB-SOC-G-EC 03 3300000 project regards the sectors of technical assistance to the Ministry of Justice
Description: system Social provision 0 0
Support Description: This project European Commission (EC)
Infrastructure further improvement of 0 0
ALB-SOC-G-EC 04 to the Penitentiary10000000 will serve theSocial sectors10000000 existing capacities of the penitentiary an
Support Description: This project will (IPA 2008)
6500000 European Commission outlined objectives by building detention and pre-det
Social sectors
ALB-SOC-G-EC 05 to the Penitentiary Infrastructure partially address the(EC)5500000 0 0
Tempus, This is the contribution to the EC's Commission (EC)2000000
Social sectors
ALB-SOC-G-EC 06 Erasmus Mundus 2000000 Europeanstudent and education mobility programme. 0 0
Health Sector Reform TC for capacity development of sectorsinsurance instituteObjectives: The 0
ALB-SOC-G-GER 01 Description: Social
300000 Germany (GER) health 300000 0 objective is to im
Support Description: The 200000 focusses its activities on the pilot regions Korca, 0
ALB-SOC-G-GER 02to handicapped children Social
project Germany (GER) sectors 200000 Shkodra and0Tirana. The me
Sustainable economic development through vocational education 1000000 cooperative education called "Dual Fac
ALB-SOC-G-GER 03 1000000 Germany (GER) Social of a university of
Description: The key issue is the constitutionsectors 0 0
VT in 04 Description: TC for improving vocational training in North East
Social
ALB-SOC-G-GER North Eastern Albania1800000 Germany (GER) sectors 1800000 Albania. In 0 first stage 0 a vocational and
Modernization of emergency treatment unit of (GR)Social sectors unit of hospital of Gjirokastra
ALB-SOC-G-GRE 03 100000 Greece hospital of Gjirokastra
Description: Modernization of emergency treatment 100000 0 0
Prevention Description: Prevention of genetical diseases in Albania 8903
8903 Greece
ALB-SOC-G-GRE 04 of genetical diseases in Albania (GR)Social sectors 0 0
Rehabilitation of 'Seferis' Rehabilitation of 'Seferis' schoolsectors 1500000
ALB-SOC-G-GRE 05 1500000 Greece (GR)Social in Korca
Description: school in Korca 0 0
Defense 569481 Italy (IT) Social sectors 569481 0
ALB-SOC-G-ITA 01 of the rights of persons affected by chronical mental diseases: realization of a services network 0
Development of the transfusional medicine towards European standards
ALB-SOC-G-ITA 02 390000 Italy (IT) Social sectors 390000 0 0
Diagnosis 803888 Italy (IT)
ALB-SOC-G-ITA 03 and social integration of umpaired minors Social sectors 803888 0 0
Italian support to the reform of the Albanian healthSocial sectors and Technical Assistance Unit at0 Ministry of H
ALB-SOC-G-ITA 04 793000 Italy (IT) system: Study 793000 0 the
Nothern 879410 Italy (IT) drug sectors 879410
ALB-SOC-G-ITA 05 Albania: integrated community service forSocialand alcohol addicted 0 0
Nothern 1004930 Italy (IT) Social services of the professional centre "Bardaj-Bleran"
ALB-SOC-G-ITA 06 Albania: strenghtening of education and training sectors 1004930 0 0
Prevention, care and physical829966 Italy (IT)
ALB-SOC-G-ITA 07 Social sectors 829966
therapy in the Northern and Center regions of Albania 0 0
Strengtening the emergency aid system in (IT) regional hospital of Shkoder
ALB-SOC-G-ITA 10 891604 Italy the Social sectors 891604 0 0
Support 188000 Italy (IT)
ALB-SOC-G-ITA 12 to the National Institute of Public Health Social sectors 188000 0 0
UNICEF Description: Develop an Netherlands Social sectors 1593280
(NL) 0 0
ALB-SOC-G-NLD 01 CLEEN TIR 16569 1593280 environmental curriculum in the Albanian primary school system based on the
Increasing Description: The through the strengthening ofconditions and Kosovar Educational system.of vulnerabilit
project Spain improve life Albanian of children who are in a situation Supporting e
ALB-SOC-G-SPA 01 human capacities 960010 aims to(ESP)Social sectors 960010 0 0
Reduction retention and high drop-out rates in primary sectors in the region environment
goal of Spain (ESP)Social school 255155 0 0
ALB-SOC-G-SPA 02 ofDescription: The 255155 the project is to upgrade the educational of Skhoder of children, upgrading o
Reduction the high drop-out rate in Spain (ESP)Social sectors 298396
project primary school and improving the quality of the educational 0 implementa
0 the
ALB-SOC-G-SPA 03 ofDescription: The 298396 consists of rehabilitation of schools, training for teachers andsystem in the Co
Reduction the high drop-out rate in Spain improveand Velipoje (Shkodra)
project school in Dajc educational 347424 0 0
ALB-SOC-G-SPA 04 ofDescription: The 347424 tries to (ESP)Social sectors environment in two primary and secondary schoo
Support Description: This multilateral project, coordinated by 1400000
Maternity and Children´s Health Services
ALB-SOC-G-SPA 05 of the reform of the 1400000 Spain (ESP)Social sectors WHO, aims to improve in general0the maternity a
0
Western Balkans Fight against67150 Sweden (SW) HIV epidemics in the Western Balkans by creating an enabli
HIV/AIDS Phase II the
REG-SOC-G-SWE 01 Description: The goal is to slow down Social sectors 67150 0 0
ConstructionDescription: The 340000 for the construction sectors 340000 Vlora is being prepared.
ALB-SOC-G-TUR 01 of Blood Bank project Turkey (TR) Social of a Blood Bank in 0 0
Equipment Description: Equipment Mental Disordered People in Berat
29991 Turkey (TR) Social sectors
ALB-SOC-G-TUR 02 support for the Center forsupport for this center. 29991 0 0
Description: The windows the doors and the sectors of the crechecity changed and 0
Reconstraction of the kindergarden Mustafa Kemal Atatürk in Orikum 7580
ALB-SOC-G-TUR 03 7580 Turkey (TR) Social parquet in Vlora were 0 there were done
Description: primary school of the 2, Social sectors 119500
119500 Turkey (TR) in Berat
The reconstruction of theRe-constructionÇlirimi primary school building and its surroindings.
ALB-SOC-G-TUR 09 0 0
Rehabilitation for the Regional Shkodra the realization Phase
ALB-SOC-L-CEB 01 10500000 Council of - 3rd of departments Bank (CEB)
Social sectors 169000 6000000 0
Description: Completion of Hospital Europe Development and services comprised in the initial Master
Social Service Delivery Project Additional Financing
ALB-SOC-L-WB 01 3982475 World the additional financing would include; (i) development of the IT system
Social
Description: It is envisaged that Bank (WB) sectors 0 3980000 0
Albanian Maritime Sector– construction of the new quay and
Improving of Description: To 3600000the Rehabilitation of Shengjini Port the operating square and other facilities
ALB-TRA-G-EC 01 Transport
support European Commission (EC)3100000 0 0
Pre-feasibility/feasibility studies - highway routesCommission (EC)2500000 road system in Albania by providing d
ALB-TRA-G-EC 02 contribute towards inTransport
Albania
Description: To 2500000 Europeanimproving the standard of the 0 0
Reconstruction of the secondary and contracts 1Commission (EC)8000000 road Antigone, Gjirokaster 2. Reconst
ALB-TRA-G-EC 03 8880000 European - Transport
IPA 2008
Description: Civil Works local roads Reconstruction of the rural 0 0
Improvement of rural roads in AlbaniaCouncil ofRoadsproject:(i)the improvement of priority sections of the seconda
ALB-TRA-G-EC 04 49000000 - Feeder Europe Development Bank (CEB)
the
There are three main Components in Transport 9000000 40000000 0
Support/Twinning to Albanian Civil Aviation Safety Transport (EC)1000000
ALB-TRA-G-EC 05 1000000 of the project: Trainings Systems
Management 0
Description: ComponentsEuropean Commission in: (1) Implementing EC Reg. & Dir.0 civil aviation in
Technical Assistance to Ministry of Publiccapacity Transport and Telecommunications 0 Institute of 0
ALB-TRA-G-EC 06 enhance the Works, Transport
of the MPWTT, Directorates and the
Description: To 1000000 European Commission (EC)1000000 Transport to pla
ConstructionDescription: ConstructionGreece (GR)Transport
ALB-TRA-G-GRE 01 23896000 of Sagiada-Konispol-Saranda road
of Sagiada-Konispol-Saranda road 23896000 0 0
Durres Bypass and Vora The project consist of land acquisition, consultancy services, 0
ALB-TRA-G-KUW 01 6000006 Project on the Durre-Vore road
Description: Interchange Kuwait (KW)Transport 6000006 0
and the construction of earth
ORET DutchDescription: This grant will facilitate the manufacturing of four offshore patrol vessels for the Albanian
ALB-TRA-G-NLD 01 31128500 coastguard Transport
Government concerningNetherlands vessels (NL) 31128500 0 0
Strengthening of the Albanianproject supports MPWTT in its task of strengthening the 0
ALB-TRA-G-SPA 01 Maritime Administration
Description: The 100000 Spain (ESP)Transport 100000 0
Maritime Administration in a
Levan-Vlore Description: The proposed project willTransportBank (EIB) 0 of a 24km road section0from Levan to
ALB-TRA-L-EIB 02 support
Road Project 64260000 European Investmentthe construction 48000000
Port of Durres 40000000 European Bank for Reconstruction and 32000000
Transport 2200000 Development (EBRD) 0
ALB-TRA-L-EBRD 02 Description: The project will increase the capacity of the ferry passenger terminal, improve the adjacen
Tirana Airport - Phase B 22600000 European Bank for Reconstruction i) extension of
Transport 0 Development passenger terminal to
ALB-TRA-L-EBRD 03 Description: Phase B development consists of the following: and 22600000 the (EBRD) 0
Tirana Outer Ring Road 39975000 European Bank for Reconstruction and 24000000
providing 0 Development (EBRD)
ALB-TRA-L-EBRD 04 Description: The EBRD is consideringTransport up to EUR 24 million for the construction of road and 0
Fier Bypass Description: The project involves the construction of a 19.5 km bypass expressway between the North
ALB-TRA-L-EIB 01 Transport
64000000 European Investment Bank (EIB) 0 32000000 0
Secondary The project is part of a wider
137000000 European Bank of Reconstruction and Development (EBRD)
Transport 4000000 100000000
ALB-TRA-L-EBRD 05 and Local Roads Programme programme forregional and local road rehabilitation, parallel-financed by 0
Albania Description: -42728000 World Bank Transport
Phase I
ALB-TRA-L-WB 01 Transport ProjectThe Project includes four(WB) 0 30520000 0
components: (i) Construction o f the 26 kilometer section betwe
Secondary and Local Roads - Phase II of priority sections of secondary and local roads, and implementation and in
ALB-TRA-L-WB 02 25427480 World Bank (WB)
Description: Improvement Transport 0 22260000 0
Building Description: Institutional support (AUT)
200000 Austria Water and Environment
200000 0
ALB-WAE-G-AUT 01Capacity to Access Carbon Finance in Albania for capacity building and implementation of0CDM projects;
Building Description: The 303224 will help (AUT)
project Austria the Government of Albania to
Water 303220 0
ALB-WAE-G-AUT 02Capacity to Access Carbon Finance in Albania and Environment develop its public and private sector ca 0
Water Supply and Environmentalrehabilitation of the water supply 1900000
ALB-WAE-G-AUT 03 1900000 Austria (AUT) Water and
Description: Further Lake Protection Shkodra Environment 0
and sewerage systems including0institutional sup
Ensuring Description: To in Environmental(CAN) Assessments/Strategic Environmentalfor public consultation
24000 Canada Impact institutions introduce formal mechanisms Assessments
ALB-WAE-G-CAN 01 Public Participationsupport relevant GoA Water and Environment 24000 0 0
Pogradec Description: The overall project is contributing toEnvironment improvement of the water quality in the
ALB-WAE-G-CHE 01 Water Supply Project Water 11299280
11299996 Switzerland (CH) and the regional 0 0
Shkodra Description: The objective of the Project is toand Environment condition 0 the people living in Shkod
ALB-WAE-G-CHE 02 Water Supply Project Water
9299985 Switzerland (CH) improve9299395 the living of 0
Trans-boundary Cooperation 124000 is focused at(CH) ofand EnvironmentResources 0
ALB-WAE-G-CHE 03 project the Management
Shkodra alke : Natural
123992 0
Description: The through Switzerland Water Shared establishing mechanisms for sustainable use of s
Description: Oil 1000000Albania Republicthe and Environment Region, Albania
for Oil Industry, Kuçova
Implementation of New Environmental TechnologyWater serious threat for local habitants and also 0 the environm
ALB-WAE-G-CZE 01 fields in Czech present (CZ) 1000000 0 for
Consolidation of the Environmental Monitoring system indata (EC)2000000 expansion and consolidation of a sus
ALB-WAE-G-EC 01 2000000 European Commission quality through
Water Albania
Description: Improvement of environmental and Environment 0 0
Improvement of Water Supplyoverall project purposes areAlbania
ALB-WAE-G-EC 02 25500000 European Commission following: Upgrade the disposal of wastewater throug
Water as Environment
Description: The and Sewerage Systems in and (EC) 24000000 0 0
Kukes Description: The purpose of the project stems from the Region?s geographic opportunity and potentia
Environment Promotion Water and Environment
ALB-WAE-G-EC 03Region Tourism and 1137000 European Commission (EC)1137000 0 0
Support Description: The project aims at theCommission (EC) rehabilitation of the sewerage 0
48970000 European construction Environment
ALB-WAE-G-EC 04 for water supply and sewerage infrastructure Water and and/or 23100000 0 networks (prima
Support to Description: TC for betterGermany (GER) and Environment
330000 supply of drinking 330000 0 0
ALB-WAE-G-GER 01 the decentralisation in the water sector Water water & basic sanitary serv. The project provides adivsory
Institutional Support to the Albanian Ministry of Environment for Sustainable Use and Conservation0of Use and Con
ALB-WAE-G-ITA 02 2215190 Italy (IT) Water and Environment
2215190 0
Description: Institutional Support to the Albanian Ministry of Environment for Sustainable Biodiversity.
Course for Description: Building Sustainability: Strategies, Methodologies, on good 0
84416 Netherlands Water and Environment
(NL) 84416 environmental governance,
ALB-WAE-G-NLD 01 Good Governance andcapacities of national and local stakeholderPolicies ans Actions for SEE QE 1850 0
EmpoweringDescription: Strengthen local governance in the area 18995
ALB-WAE-G-NLD 02 467281 Netherlands Water and Environment
(NL) 467281 0
Environmental Local Governance Performance TIR of environmental management and the impleme 0
IdentificationDescription: The proposed project willWater and Albanian Government to 0
ALB-WAE-G-NLD 03 1299688 Netherlands (NL) in Albania
assist 1299669
and prioritization of Environmental Hotspots the Environment 0
carry out identification and p
IdentificationDescription: This project aims at identification, assesment, developing a web based database, building
ALB-WAE-G-NLD 04 1299688 Netherlands Water in Albania TIR 17168
(NL) 1299670
and prioritization of 'environmental hotspots'and Environment 0 0
Impl. 05 Description: Providing information and(NL) and Environment
100000 Netherlands Water 100000
ALB-WAE-G-NLDCLRTAP & Protocols (Air Pollution) QE 15723developing the necessary skills for0 0
implementing the Conventio
NEWEN Description: To 4178360 Netherlands Watercooperationthat aims at
implement a programme of and Environment
(NL) 4178360 0
ALB-WAE-G-NLD 07 (Netherlands and Western Balkans Environmental Network) QE 18507 establishing a network between u 0
NEWEN Description: (Netherlands and Western Balkans Environmental Network)0 a network
758 Netherlands (NL)
of cooperationthat aims
758 QE
ALB-WAE-G-NLD 08 Inception phaseTo develop a programmeWater and Environment at establishing 17357 0 between univ
ORET DutchDescription: This grant wilVlora WaterWater and Environment
ALB-WAE-G-NLD 09 13788500 finance part Infrastructure13788500
of the 0
Government concerningNetherlands (NL) Vlora infrastructure Rehabilitation Project. 0
REC 10 Description: Support NGOs and local authorities Environment
(NL) funds for 0 0
ALB-WAE-G-NLDtrustfund II TIR 17114 1000000 Netherlands Water and with 1000000 the implementation of locally initiated s
Strengthening Albanian Civil Society for Albanian CivilEnvironment TIR 17208 Environment by strengthening capa
ALB-WAE-G-NLD 11 669530 Netherlands Water and for an Improved
(NL)
Description: Strengthening an Improved SocietyEnvironment 669530 0 0
Strengthening capacities This programme aims to Water andmitigate environmental problems through remediation
ALB-WAE-G-NLD 12 1565002 Netherlands effectively Environment
(NL) 1564979 0 0
Description: in the western balkans countries to address cross-border environmental hot-spots in the
Strengthening capacities Aswesternthe Westernaddress environmental Hotspots - Bajza
ALB-WAE-G-NLD 13 part of Balkans to Balkans regional 2118807
(NL)
Description: in 2118837 Netherlands Water and Environment 0 0
programme, UNDP Country Office in Albania wil
Twinning Description: Establishment of - Agency for Environment and Forests TIR 0
1505380 Netherlands Water Environment and
(NL) 1505380 8706 0
ALB-WAE-G-NLD 14 project Oranjewoud Consultancy the Agency forand Environment Forests and the accreditation of its labo
Description: Environmental restoration through reforestation. affected by the catastrophe.
180000 and restoration of and Communities
Post-Gërdec: environmental recovery Spain (ESP)WaterthoseEnvironmentImproving public zones affected by the e
ALB-WAE-G-SPA 01 180000 0 0
Support Description: The 145000 will support the implementation of Local Environmental Action0Plans protecti
project Spain lake for the and Environment
145000 0
ALB-WAE-G-SPA 02to the local communities of Shkoder(ESP)Water implementation of Action Plans on environmentaland prom
Support to Description: Bridging project between previous Albanian41242
41243 Sweden (SW)
ALB-WAE-G-SWE 01 National forest association, phase 2 Water and Environment 0 0
Forestry Project and NRMP. Support to Regio
ConstructionDescription: Water transmission (TR)is underand Environment
ALB-WAE-G-TUR 01 220000 Turkey village of Kryevidh in Kavaja
220000 0 0
of water transmission line in the line Water construction to serve 6 villages in Kryevidh in Kavaja
Project for Description: Clearance beach in Shengjin.
22285 Shengjin
ALB-WAE-G-TUR 02 protection of the seaside ofTurkey (TR) Water and Environment 22285 0 0
Programme Lakeproject includes the repair, reorganization and expansion of the production, transportation, storag
ALB-WAE-L-GER 01 11900000 Germany (GER) and Environment
Water 7000000
The Ohrid, Water Supply Pogradec and Environmental Protection 4900000 0
Sector Programme Water II 1785000 Germanythe Water and Environment
ALB-WAE-L-GER 03 The measure should contribute to (GER) 0 1500000 0
improvement of living conditions of the population in the selecte
Sewerage In the framework of this project a storm water overflow will be constructed, the sewer network in the o
ALB-WAE-L-GER 04 Korca IV Water 4100000
19100000 Germany (GER) and Environment 15000000 0
Environmental Protection ProgrammeGermany (GER) Ohrid Lake aims II 0protect the lake situated0on the border b
ALB-WAE-L-GER 05 6740000 Lake Ohrid,WaterSewerage Pogradec to
The environmental protection programme and Environment 5000000
Sewerage Description: The project "Environmental Protection of the Shkodra7500000
ALB-WAE-L-GER 06 Shkodra Water
7500000 Germany (GER) and Environment 0 the
lake" comprises of 0 rehabilitation
Albania Other projects references: WB projectWater and
1067954 World Bank (WB) number: P085089
ALB-WAE-L-WB 01 Butrint Global Biodiversity and Heritage ConservationEnvironment 0 826800 0
Disaster Description: TheAdaptation Project Water and Environment
first phase is designed to 0 5960880 0
ALB-WAE-L-WB 03 Risk Mitigation and6609300 World Bank (WB)consolidate and upgrade Albania?s capacity to plan for, mi
ConstructionDescription: The final goal of the initiative of ZP Elektro Doboj a.d. is the construction of a system of h
BIH-ENE-G-EC 01 50000000 European IIIEnergy
of small hydro power plant Cijevna Commission (EC)5500000 39500000 0
Electrification of Kvarc
BIH-ENE-G-NLD 01 75047 Netherlands Energy
(NL)
Rehabilitation of the media infrastructure in Srebrenica 75047 0 0
Support Description: Reconstruction of HV and(NL)network in Zepa of Zepa
in larger Srebrenica Energy
LV 268871 0 0
BIH-ENE-G-NLD 02 to sustainable return 268871 Netherlands region - Electrificationwhere some 50 families have returned but
Energy
BIH-ENE-G-NOR 01Efficiency 188543 Norway (NOR) Energy 188543 0 0
Electrokrajina Power Distribution Project
BIH-ENE-L-EBRD 01 20000000 European network and facilities and upgrade of
Energy 0 Development (EBRD) 0
Reconstruction of power distributionBank for Reconstruction and 15000000metering system (the Projec
Gasification of Central Bosnia CantonEuropean Bank for Reconstruction and 20000000enable natural gas supply to
BIH-ENE-L-EBRD 02 24703000 Energy 0 Development (EBRD)
Construction of new 40km highpressured natural gas transport pipeline to 0
ISO & TRANSCO Loan Novation Project
BIH-ENE-L-EBRD 03 272000000 a SCADA/EMS system for the electricity transmission(EBRD) in the Federa
Energy 0 Development network
Supply and installation of European Bank for Reconstruction and 70000000 0
Mostar and Hydro is expected to compriseInvestment Bank (EIB) 0 170000000 four small0
275790000 European three wind farms (about 130 MW), and
BIH-ENE-L-EIB 01 WindThe project Energy Energy hydro plants (ab
Rehabilitation of HPP Rama turbines,Germany (GER) transformers. Extension of switch yard. Consulting services.
BIH-ENE-L-GER 01 of
Rehabilitation 25800000 generators and Energy 0 17000000 0
Wind Farm Mesihovina with a capacity of 44MW and a yearly output of approx. 128 GWh will be built in Mesihova
BIH-ENE-L-GER 02 A windpark 78000000 Germany (GER) Energy 0 72000000 0
Reconstruction of Social and 500000 European Commission (EC) 500000 fulfil their role in the return small bridge
BIH-SOC-G-EC 60 Technical acquire the capacities to effectively
Social sectors 0 0
Description: BiH authoritiesInfrastructure facilities (schools, kindergartens, health centers, and reinteg
Project Description: Partial financing of investment Developmentpartial (CEB)
20000000 Council Municipalities through Bank financing of capital investments
Social sectors 0 10000000 0
BIH-SOC-L-CEB 02 for the benefit of Bosnian-Herzegovinaof Europe sub-projects undertaken by Bosnian-Herzegovine municip
IRBRS for SME & Credit line for financingInvestment Bankprojects 0 small and medium-sized enterprises a
50000000 European of limited-scale development
BIH-PSD-L-EIB 10 LoanDescription:Priority Projects Private sector (EIB) of 50000000 0
HAA Group BiH GL II
BIH-PSD-L-EIB 09 300000000 European of limitedsector development
Private scale (EIB) 0 150000000 0
Description: Credit line for financingInvestment Bankprojects of small and medium enterprises and loc
INTESA Description: Loan operation for the Investment small (EIB)medium
50000000 European Private sector and 0 50000000 0
BIH-PSD-L-EIB 03 Loan for SMEs and Priority Projects financing of Bankdevelopment scale projects promoted by SMEs o
Unicredit Description: Credit line for financing of limitedsector development
GL Private scale (EIB) 0 25000000
BIH-PSD-L-EIB 07 Bank Banja Luka50000000 European Investment Bankprojects of small and medium enterprises and loc 0
RLBH Description: Loan operation for
80000000 European Investment of small and medium scale projects promoted by SME
Private sector (EIB) 0 40000000
BIH-PSD-L-EIB 08 Loan for SMEs and Priority Projects lease-financing Bankdevelopment 0
UCL Loan for SMEs & Priority Projects lease-financing of limited development of small and medium-sized enterpr
BIH-PSD-L-EIB 04 30000000 European Investment Bankscale projects
Description: Credit line for Private sector (EIB) 0 30000000 0
UPI Banka GL
BIH-PSD-L-EIB 05 50000000 European of limitedsector development
Private scale (EIB) 0 25000000 0
Description: Credit line for financingInvestment Bankprojects of small and medium-sized enterprises a
Credit Guarantee Fund
BIH-PSD-L-GER 01 12828381 promotion of SME sector development
Private
Credit guarantee fund forGermany (GER) and setting up businesses.0 12828381 0
European The EFBH Fund is Herzegowina (EFBH)
and administared by KfW.Private sector development
0 18384000
BIH-PSD-L-GER 02 Fund for Bosnia 18384000 Germany (GER)A funding agreement has been signed with the Council of M 0
Raiffeisen Loan EE-Finance (Promotional Loan) measures from KfW Entwicklungsbank
9000000 Germany (GER) 0 0
BIH-PSD-L-GER 03 Bosnia for refinancing energy efficiency Private sector development 9000000 that allows the local ban
Raiffeisen Loan Energy Efficiency Germany (GER)
6000000 measures from KfW Entwicklungsbank
0 0
BIH-PSD-L-GER 04 Bosnia for refinancing energy efficiency Private sector development 6000000 that allows the local ban
Community Development Additional Financing credit for Bosnia and Herzegovina is to help finance0a subset of the
BIH-SOC-L-WB 05 4687500 World Bank (WB) sectors
The proposed additional financing Social 0 3905000
NGO Snaga Description: Core fundingNetherlands Social sectors 797239
BIH-SOC-G-NLD 01 (NL) 0 0
Zene 2007-2010797239 for NGO Snaga Zene in order to enable it to provide adequate psycho-socia
Avian Description: The ProjectWorld Bank (WB) sectors
4768889 Social 0 3725000 0
BIH-SOC-L-WB 01Influenza Preparednessproject would finance activities under five components: (i) Strategic Communications
The 01 Description: In order to maintain roads Machinery
4757090 Construction in BH properly, road maintenance 0
BIH-TRA-G-JAP Project for Procurement of Road Japan (JP) Transport 4757090 equipment is0to be procured
Corridor 605000000 of new priority for Reconstruction and Development (EBRD)
Transport 0 480000000 0
BIH-TRA-L-EBRD 01 Vc Description: ConstructionEuropean Bankmotorway sections of the main north-south road through Bosn
Road 03 Description: The
230500000 European Bank for Reconstruction and Development (EBRD)
project is 0 193200000 0
BIH-TRA-L-EBRD Rehabilitation Project main purpose of this Transport to bring the primary road network in BiH up to a maint
Corridor - First phase 158390000 European Investment Bank (EIB) 0 already under preparation or construc
- North Transport
BIH-TRA-L-EIB 01 VC The project concerns a new motorway section adjacent to those 75000000 0
Corridor - Second phase339620000 European Investment Bank (EIB) 0 166000000
Transport 0
BIH-TRA-L-EIB 02 VC The project concerns a new motorway section adjacent to those already under preparation or construc
Road The objectives20618190 World Bank (WB)
of project Transport for 17175000 0
BIH-TRA-L-WB 01infrastructure and safetythe Road Infrastructure and Safety Project 0 Bosnia and Herzegovina are to reduce
ConstructionDescription: Collectors in European Commission (EC)1500000
BIH-WAE-G-EC 01 1500000 of this Water protect the environment from the adverse effects of urba
of Sewage The purposeZiviniceproject is to and Environment 0 0
Green Pack Description: Support in a Netherlands Water and Environment
BIH-WAE-G-NLD 01 287362 Western Balkans (NL) 287362 0 0
Education Project for the practical way the Education for Sustainable Development (ESD) activities in
Strengthening capacities Projectto address environmentaland Environment remediation of in BiH: -Reconstruction
BIH-WAE-G-NLD 04 1565000 Netherlands Water problems through
(NL) environmental hot spots high priority hot spots
Description: in BiH Objective: (i) Remediation of two 1565000 0 0
Forest The project focuses on improving(FMPAP)
6638500 Project the Water
management effectiveness of four existing PAs,0
BIH-WAE-L-WB 06 and Mountain Protected Areas World Bank (WB) and Environment 2199800 1952500 bringing two ad
Bijeljina Waste Water Collection System
11500000 European Bank for a loan towards the Development (EBRD)the
Water Reconstruction and 7000000
0
BIH-WAE-L-EBRD 03 Description: The proposed project concerns and Environment cost of construction of 0 priority was
Banja The project consists of European Investment Bank (EIB)
35300000 Water and Environment 26000000 0
BIH-WAE-L-EIB 01Luka Municipal Infrastructure two components : development of the0solid waste management system and re
Water The project concerns the European Investment Bank (EIB) investment programme for0the water and s
121300000 implementation of a country-wide
Water and Environment
BIH-WAE-L-EIB 02and Sanitation Federation Bosnia and Herzegovina (BiH) 18250000 60000000
Water The project concerns the European Investment Bank (EIB) water 50000000 sanitation0infrastructure in
100000000 constructionWater and Environment supply and
BIH-WAE-L-EIB 03and Sanitation Republika Srpska 1250000
and rehabilitation of
Second The overall development objective of (WB) and Solid Waste 31240000
33984400 Water 0
BIH-WAE-L-WB 01 Waste Management Project World Bank the SecondEnvironment Management Project for Bosnia and He 0
Urban Description: Component 1. Institutional Strengthening; Component 2. Urban Management Developme
4210035 World Water
BIH-WAE-L-WB 02Infrastructure Additional Financing Bank (WB) and Environment 0 3725000 0
PLINACRO Gas Pipelines II second phase (2007Energy of investment programme for the modernization and exp
CRO-ENE-L-EIB 01 190000000 European Investment Bank (EIB) 0 190000000
Description: The - 2011) 0
Mitigation climate change Croatia Germany (GER)
56000000 Energy 0 50000000 0
CRO-ENE-L-GER 01 of Description: KfW?s involvement through the Climate Protection Programme consists in setting up a lo
Promotion Energy Efficiency and Renewable (GER)
26000000 Germany Energy Energy 0 of energy 0
CRO-ENE-L-GER 02 ofDescription: The programme aims to contribute to the promotion 19500000 efficiency and the utilisatio
ESB Loan Description: Priority Lending
40000000 European Investment Bankdevelopment
Private sector (EIB) 0 40000000 0
CRO-PSD-L-EIB 01 for SMEs and EIB financing will be made available to SMEs and private and public promoters targeted b
HBOR 200000000 European of limitedsector development
Private scale (EIB) 0 100000000 0
CRO-PSD-L-EIB 06GL II Description: Credit line for financingInvestment Bankprojects of small and medium enterprises and loc
HBOR for SMEs and Mid-Cap European Investment Bank (EIB) financing SME and medium-sized compan
250000000 a Mid-cap tranche for 0 250000000
CRO-PSD-L-EIB 07Loan Description: Credit line for SMEs with Private sector development 0
Privedna Description: Credit line for leasing or Medium sector development
CRO-PSD-L-EIB 09 Banka GL II Private and Long Term 60000000 0
120000000 European Investment Bank (EIB) 0financing of SME projects and infrastruc
SB Loan SMEs & Priority Lending European Investment Bank (EIB) projects
40000000 Private infrastructure 0 40000000 0
CRO-PSD-L-EIB 10 for Description: Loan for financing SME projects,sector development promoted by local authorities and
ULC Loan Description: Priority lending
100000000 European Investment Bankdevelopment
Private sector (EIB) 0 100000000 0
CRO-PSD-L-EIB 11 for SMEs and Credit line for lease-financing of small and medium-scale projects promoted by SMEs or
Unicredit Description: Credit line for SME projects, infrastructure projects promoted by local authorities, and ind
CRO-PSD-L-EIB 08 Zagrebacka Banka GL Private sector (EIB) 0 40000000
80000000 European Investment Bankdevelopment 0
Line Rehabilitation Novska phases: (i) European Commission (EC) km (ii) Kutina ? Novoselec: 27.7 km (iii) Novsk
CRO-TRA-G-EC 02 135000000 Novoselec Dugo Selo: 101200000
Description: 3 to Dugo Selo Section ?Transport 27.1 0 0
Line Rehabilitation Okucani to Novska section Commission (EC) telecommunications and interlocking system, el
CRO-TRA-G-EC 03 38500000 European Transport
Description: Upgrading and construction of signalling, 28900000 0 0
Line rehabilitation Savski Activities: (i) European Commission (EC) double track line with replacement of the perma
CRO-TRA-G-EC 04 25000000 track overhaul of the 7.5 18750000
Description: Marof - Zapresic SectionTransport km 0 0
Reconstruction of the Port 40000000 European Commission wall 700m, Reconstruction of rail tracks and port road
CRO-TRA-G-EC 05 of Vukovar - New port East
Transport
Description:Phase 1) Infrastructure: Vertical key (EC) 12000000 0 0
Rehabilitation and Improvement of theExecute dredging works to30000000
CRO-TRA-G-EC 06 40000000 Sava River Transport
Waterway
Description: Activities: (i) European Commission (EC) 0 0
improve Sava fairway depth in Sections I - XIV (ii
Zagreb Station Signalling and Interlocking System
17900000 European Commission (EC)
Transport 13400000 0 0
CRO-TRA-G-EC 07 MainDescription: The project aims at adjusting railway station technical parameters to Trans-European net
Plinacro Gas Storage Project 70000000 European Bank for Reconstruction and Development (EBRD) plina d.o.o., t
be used 0 of Podzemno skladiste
CRO-TRA-L-EBRD 03 Description: The proposed project willTransportfor the acquisition70000000 0
Zadar New Port
CRO-TRA-L-EIB 02 200500000 European Investment Bank of a 0 100000000
Transport 0
Description: The project will concern the construction (EIB)new ferry port in Zadar (area of Gazenica),
Port of Zadar Project
CRO-TRA-L-GER 01 236000000 Germany (GER) Transport 0 120000000 0
Rijeka Gateway II
CRO-TRA-L-WB 01 126868672 World Bank (WB) Transport 0 122500000 0
Description: The Project includes three components: (i) Port Terminal Development; (ii) Port Service E
Rijeka Gateway II - Additional proposed additional loan for Rijeka Gateway project for Croatia will help finance the c
CRO-TRA-L-WB 02 42564500 World Bank (WB)
Description: The financing Transport 0 37511430 0
Regional Main activities: (i) Construction of newWater and (EC)
64000000 for County of WMC (ii) Environment
Zadar 35600000 0 0
CRO-WAE-G-EC 03 Waste Management Centre European Commission Construction of transfer stations (iii) Providing of the s
Regional Description: Main activities: (i) Construction of new RWMC-Ka?tijun including MBT facility (ii) Waste re
45000000 for the County of Istria Environment
Water and
CRO-WAE-G-EC 04 Waste Management Centre European Commission (EC) 19125000 4500000 0
Regional Description: Construction for an integral centre in Environment
55700000 of the County of Split which
Water and Dalmatia
15000000 0
CRO-WAE-G-EC 05 Waste Management Centre European Commission?(EC) municipal and non-hazardous industrial waste 0
Regional Description: (i)40672400 bridge and waste registration
Weighing Mariscina Water and Environment
11430000 0
CRO-WAE-G-EC 06 Waste Management Centre European Commission (EC) at the Centre?s entrance, and car-tyre wash (ii 0
RemediationDescription: Main activities: (i) Excavation and Primorje-Gorski Kotarhazardous waste 0 Stabilizing o
CRO-WAE-G-EC 07 25000000 Sovjak pit, County of disposal/treatment of
Water and Environment
and closing down of the European Commission (EC) 18750000 0 (ii)
Waste Management Centre for County of Brodsko-Posavska (EC)centre and other facilities needed for developmen
CRO-WAE-G-EC 08 16000000 European Commission Environment
Water and
Description: The construction of waste management 1000000 0 0
Waste Management Centre for County of Virovitica-Podravina
CRO-WAE-G-EC 09 14000000 European Commission (EC)5900000
Water and Environment 0 0
Description: The construction of waste management centre and other facilities needed for developmen
Waste Management Centre for Karlovac CountyCommission (EC)centre and other facilities needed for developmen
CRO-WAE-G-EC 10 16000000 European Water and Environment
Description: The construction of waste management16000000 0 0
Waste Management Centre for North-West Croatia management42500000 other facilities needed for developmen
CRO-WAE-G-EC 11 53100000 European Commission (EC)centre and
Description: The construction of waste Water and Environment 0 0
Waste Management Centre for Sisak-MoslavinaCommission (EC)centre and other facilities needed for developmen
CRO-WAE-G-EC 12 21000000 European County and Environment
Water
Description: The construction of waste management 6000000 0 0
Waste Management Centre for the Countyof waste management19840000 other facilities needed for developmen
CRO-WAE-G-EC 13 24800000 European Commission Environment
Water Neretva
Description: The construction of Dubrovnik- and (EC)centre and 0 0
Waste waterDescription: Improvement and rehabilitation of sewer network and water supplyConstruction of waste
CRO-WAE-G-EC 14 16399999 European Commission Environment
Drnis
treatment and water supply for Knin -Water and (EC) 16399999 0 0
Waste waterDescription: ConstructionEuropean Commission treatment plant for 80.000 PE, mechanical and biolog
CRO-WAE-G-EC 15 27000000 of for Slavonski water Environment
Water and
treatment and water supply central waste Brod (EC) 27000000 0 0
Waste waterDescription: ConstructionEuropean Commission treatment plant for 20.000 PE, mechanical and biolog
CRO-WAE-G-EC 16 Djakovo Water and Environment
treatment for 16500000 of central waste water (EC) 16500000 0 0
Waste waterDescription: ConstructionEuropean Commissiontreatment plant for 50.000 PE, with mechanical and bi
CRO-WAE-G-EC 17 Dugo Selo Water and Environment
treatment for 14800000 of central wastewater (EC) 14800000 0 0
Waste waterDescription: ConstructionEuropean Commission treatment plant for 20.000 PE, mechanical and biolog
CRO-WAE-G-EC 18 5800000 of central waste water (EC)5800000
treatment for Krapina Water and Environment 0 0
Waste waterDescription: ConstructionEuropean Commission treatment plant for 26.000 PE, mechanical and biolog
CRO-WAE-G-EC 19 Nova Gradiska Water and Environment
treatment for 10000000 of central waste water (EC) 10000000 0 0
Waste waterDescription: ConstructionEuropean Commission treatment plant for up to 0
CRO-WAE-G-EC 20 Osijek Water and Environment
treatment for 23000000 of central waste water (EC) 23000000 250.000 PE, 0mechanical and
Waste waterDescription: ConstructionEuropean Commissiontreatment plant for 40.000 PE with mechanical and bio
CRO-WAE-G-EC 21 Samobor Water and Environment
treatment for 10000000 of central wastewater (EC) 10000000 0 0
Waste waterDescription: ConstructionEuropean Commission treatment plant for 74.000 PE, mechanical and biolog
CRO-WAE-G-EC 22 Sisak Water and Environment
treatment for 31000000 of central waste water (EC) 31000000 0 0
Waste waterDescription: Reconstruction and upgrade of existing wastewater treatment plant in order to complete c
CRO-WAE-G-EC 23 5500000 European Commission (EC)5500000
treatment for Velika Gorica Water and Environment 0 0
Waste waterDescription: ConstructionEuropean Commission treatment plant for 20.400 PE, mechanical and biolog
CRO-WAE-G-EC 24 6000000 Water and Environment
treatment for Vrbovec of central waste water (EC)6000000 0 0
Waste waterDescription: ConstructionEuropean Commission treatment plant for 84.000 PE, mechanical and biolog
CRO-WAE-G-EC 25 Vukovar Water and Environment
treatment for 19000000 of central waste water (EC) 19000000 0 0
Water supply for Bjelovar-Bilogora European Commission (EC) facilities (pipelines, 0
CRO-WAE-G-EC 26 55000000 Water and Environment
Description: Construction of the regional water supply 55000000 0
storage tanks, pumping stat
Water supply for Koprivnica-Krizevci European Commission (EC) facilities (pipelines, 0
CRO-WAE-G-EC 27 52000000 Water and Environment
Description: Construction of the regional water supply 52000000 0
storage tanks, pumping stat
provide finance to upgrade and extend
CRO-WAE-L-EBRD 02 Description: The proposed project willWater and Environment 10000000 the sewage network and
30300000 European Bank for Reconstruction and Development (EBRD)
Sisak Wastewater Management Project 15000000 0
Municipal Necessary and Sewerage II
15000000 Germany the area of municipal drinking water and
Water 0
CRO-WAE-L-GER 01 Water Supplyinvestment measures in(GER) and Environment 15000000 sewerage disposal as we 0
Coastal Description: The Project will have the (WB) threeEnvironment as APL1: Wastewater Investments; Ins
129579275 World Bank Water and components 64750000
CRO-WAE-L-WB 01 Cities Pollution Control Project (IBRD Loan) same 0 0
Inland Waters Project Component I: Technical Assistance to Hrvatske 0 98589990 participating utilities to im
CRO-WAE-L-WB 03 Water
Description: 103519140 World Bank (WB) and Environment Vode (HV) and 0
Zagreb 03 Description: The investments are Project expected to include 30000000
Sewer Investment currently Reconstruction and Development (EBRD)
Water 0
CRO-WAE-L-EBRD Holding Water and 60000000 European Bank for and Environment water and wastewater network rehabili0
Further Description: Component 1 - Promoting Energy Efficiency and
17000000 European Energy Community of SEE
Energy
KOS-ENE-G-EC 01 Support for Kosovo's Participation in theCommission (EC)9500000Renewable 0 0
Energy Resources: (i) Energ
Meeting Description: the Energy sector
3000000 European Commission (EC)3000000
following 0 0
KOS-ENE-G-EC 02 EU Standards inAssistance will cover the Energy mutually reinforcing areas:1. Further Assistance to ER
Support Description: The project will be implemented in two activities. Activity 1 includes actions for upgrading
KOS-ENE-G-EC 03 to transport and energy Energy
15000000 European Commission (EC) 15000000 0 0
Kosovo Description: The additional grant would
4522612 World Bank (WB) Energy
KOS-ENE-G-WB 01 Energy Sector Clean-up of Gasification Site assist the beneficiary0 4522612 0
(KEK, the publicly owned Kosovar Energ
Lignite Power Technical Assistance Project Additional Financing two consultancies was US$4.60 million and the h
KOS-ENE-G-WB 02 1477978 World Bank (WB) Energy
Description: The original estimated budget for these 0 1477978 0
Promotion Energy Sector Kosovo the project is to
22740000 Energy 0 22462000 0
KOS-ENE-L-GER 01 ofThe envisaged impact of Germany (GER)contribute to the stabilisation of the electricity - thereby cont
Municipal Description: Activity 1: Detailed Design, review and supervision of projectsThis activity0 assist muni
15400000 European Social sectors14000000
KOS-SOC-G-EC 26 Social and Economic Infrastructure Commission (EC) 0 will
Energy Efficiency Credit Line to Raiffeisen Bank(GER)
KOS-PSD-L-GER 01 10000000 Germany Kosovo measures that allows the local bank to finance investments for t
Loan for refinancing energy efficiency Private sector development 0 10000000 0
Education Description: Component 1 ? Implementation sectors10000000
KOS-SOC-G-EC 01 and Employment Social of a sector-wide approach in0
11700000 European Commission (EC) 0
education (including an IT p
Education Kosovo: Inter-culturalismEuropeanlegal advice to(EC)
1550000 and the Commission reform primary, secondary and higher educationItem
Social sectors
KOS-SOC-G-EC 02 in Description: Capacity building and Bologna Process 1550000 0 0
General The purpose of 6000000 (GTAF) & Programme (EC)6000000
the General TechnicalSocial sectors
Assistance Facility 0 0
KOS-SOC-G-EC 03 Technical Assistance FacilityEuropean Commission Reserve (GTAF) is to allow project preparation to pro
IPF 04 Description: Priority infrastructure projects identified and prepared for financing through Bank loans1 a
KOS-SOC-G-ECKosovo Window Social sectors25000000
61000000 European Commission (EC) 0 0
Support Description: Component 1
10900000 European Commission(i) Training of
training : (EC) 0 0
KOS-SOC-G-EC 05 to employment and education - Teacher'sSocial sectors10300000 in-service teachers in Kosovo (ii) Trainin
Support Description: 1500000 European Commission (EC)Health: feasibility study & mappingComponent 2:
Social sectors
KOS-SOC-G-EC 06 to Health Sector Component 1: Sector Wide Approach in 1500000 0 0
Support Description: The project aims
1500000 European Commission (EC)1500000
Social sectors of 0
KOS-SOC-G-EC 07 to the Statistical Office of Kosovo to support SOK in finalizing the preparation 0 the Population and Housi
Supporting local government and1decentralisation Social sectors12400000 Ministry of Local Government Admini
KOS-SOC-G-EC 08 14900000 European Commission (EC)
Description: Activity - Further institution building support to the 0 0
Reform of Components (i) Consultancy services Social sectors 2600000
to the 0
KOS-SOC-G-GER 01 Basic Education 2600000 Germany (GER) Ministry of Education, Science and Technology. GTZ offe 0
Reform of Description: Drop-outs basic education sectors concern
2000000 Social 0
KOS-SOC-G-GER 02 Non-Formal Education of Germany (GER) are of high 2000000 to the Ministry. Therefore GTZ offers co 0
Institutional DevelopmentThe Education project would support four key elements of the government's Pre-Universit
KOS-SOC-L-WB 02 8989200 World Bank Social
Description: for proposed Project (WB) sectors 0 6810000 0
Avian Influenza Control and 2304147 World Bank (WB) are: public awareness2304000
KOS-SOC-L-WB 01 Human Pandemic Preparedness and
Social 0
Description: The components of the project sectors Response Project 0
and information; animal health; hum
Reconstruction of roads and bridges European bridges on the M28000000to Blace border crossing road to Euro co
KOS-TRA-G-EC 01 10500000 Transport
Description: Reconstruction of five Commission (EC) Pristina 0 0
Support Description: (a) 1000000 European Commission Aviation staff
Capacity building for the CARO (EC)1000000
Common 0 0
KOS-TRA-G-EC 02 for Kosovo's Participation in the EuropeanTransport technical Area in the following areas: (i) Personnel lice
Further Activity 1: Construction ofEuropean plant in Vucitrn.18000000 comprises of preparation of design, t
24000000 treatment in Kosovo Environment
Water and
KOS-WAE-G-EC 01 support to water and environment sectorCommission (EC) This activity 0 0
Support Description: Component European institutional (EC)4800000
5700000 Water and Environment 0
KOS-WAE-G-EC 02 to the environment sector 1 - FurtherCommissionsupport to the Environment Sector in KosovoCompon 0
Municipal The project concerns the rehabilitation of
Sanitation Prishtina (Kosovo VII) supply system and the sewerage system by both r
Water water 8000000
KOS-WAE-L-GER 01 Water Supply and8000000 Germany (GER) theand Environment 0 0
Energy Description: The project consists of Commission (EC)2000000
2000000 European two components: (i)
Energy 0
MAC-ENE-G-EC 01 Regulatory Commission and Insurance Supervisory Agency Support to the Energy Regulatory Commissio 0
Establishing Description: The project is supported through the CEI KEP - Know-how Exchange Programme. The C
MAC-ENE-G-ITA 01 40000 Italy (IT)
Centre for implementation of low-costEnergy 40000 0 0
technologies for sollar cells in Macedonia (CHEAP-CELL) (Ref.
Promotion sustainable agricultural practices,of the efficiency and usage of renewable energies0 rural areas o
overall Sweden energyEnergy 457004 of
MAC-ENE-G-SWE 01 ofDescription: The 457004 objective (SW) project is to support Government 0 Macedonia in formulating in
ESM II: Distribution Grid The investment programme for be focused on and 70000000
70000000 European Energy 0 Development (EBRD) of
MAC-ENE-L-EBRD 01 Description: Efficiency Investment Bank will Reconstructionfour main areas: Upgrade 0 grid lines and
Thematic Description: The 748720 in the Area of conducting thematic evaluation of 5 projects: Solid waste mana
project Switzerland (CH)Social Service 748720
MAC-SOC-G-CHE 02 Evaluation of Five Projects is focused onSocial sectors Delivery 0 0
Local infrastructure for Social and Economic Cohesion of small-scale infrastructure projects in municipalities.Com
MAC-SOC-G-EC 17 8700000 European Commission (EC)
Social
Description: Component 1 - Implementation sectors 7000000 0 0
MBDP for credit line is intended to support SME projects and any size industrial investments0in the fields of
100000000 European Investment Bankdevelopment
MAC-PSD-L-EIB 01Loan TheSMEs and Priority Lending Private sector (EIB) 0 100000000
Municipal Description: Component I: Sub-loans (WB) and Environment 25000000 revenue-generating public
25000000 World Bank to municipalities for investments in: (i)
MAC-WAE-L-WB 01 Services Improvement Project Water 0 0
Tour Reg Description: Supporting Tourism (AUT) in the country in the area of Curricula reform0and developme
265000 Austria Schools
MAC-SOC-G-AUT 01 - Support to Tourism Schools Social sectors 265000 0
School Rehabilitation in The project Switzerland (CH) to the reinforcement of equal education opportunities in t
2000000 Social
MAC-SOC-G-CHE 01 Description:Macedonia aims at contributing sectors 2000000 0 0
Administration of the operational programme implementation the OP management will0 charged 0
MAC-SOC-G-EC 01 Operating structure createdsectors
Social for
Description: The 648000 European Commission (EC) 486000 be with specific tas
Capacity Description: The project purpose is Commission (EC)2000000
2000000 European to Social sectors
MAC-SOC-G-EC 02 Building for the Management of EU fundshelp the government institutions to 0 manage EU 0 funds according
Further Description: The project European to Social sectors
judiciary support the implementation of an investigative database in the f
MAC-SOC-G-EC 03 strengthening of the 1800000 purpose is Commission (EC)1600000 0 0
Information, Description:monitoring and control activities sectors 364000
MAC-SOC-G-EC 04 assistance relates toSocial
the organisation 0 0
evaluation, The 486000 European Commission (EC) and technical support of sectoral monitoring co
Judicial
MAC-SOC-G-EC 05 Reform 1100000 European to Social sectors
support the implementation of the Judicial Reform Strategy at o
Description: The project purpose is Commission (EC)1100000 0 0
Preparation of investment projects and programmes measures, which are mostly oriented towards activities resu
MAC-SOC-G-EC 06 2106000 European Commission (EC)1579500
This measure complements the previous Social sectors 0 0
Project Description: The Project Preparation and Support Facility will support the 0
3022000 European Commission (EC)3022000
MAC-SOC-G-EC 07Preparation and Support Facility Social sectors 0
preparation and implementa
Project Description: The main purpose of the Social sectors
Audit and Evaluation Project Preparation Facility (PPF) is0to complement the program
MAC-SOC-G-EC 08Preparation Facility, 3000000 European Commission (EC)3000000 0
Public Administration Reform project purpose is Commission to a professional public administration that will enable
MAC-SOC-G-EC 09 Description: The contribute (EC)
2000000 European to Social sectors 2000000 0 0
State Statistical Office The project purposes areSocial sectorsto2000000
MAC-SOC-G-EC 10 Description: to contribute 0 0
2070000 European Commission (EC) a professional management of the State Statisti
Strengthening the capacity of following activitiesmanageimplemented: a) the Operational Programmes (IPA 2008 Ax
MAC-SOC-G-EC 11 1600000 European will be and (EC)1600000
Social sectors 0 0
Description: The the institutions to Commissionimplement Human Resource Development: (i) implem
Support Description: Supervision of the project is to sectors the Agency
1000000 Fully Funded Pension Insurance
Social provide 0
MAC-SOC-G-EC 12 to the Agency forThe purposeEuropean Commission (EC)1000000 for Supervision of Fully Funded Pens 0
We are all the circle! Establishing United for PET (UK)
728477 model for primary PET and Collection in High0 system
Social sectors 728477 0
MAC-SOC-G-GBR 01 inDescription:Establishing aaModelKingdom Selectionselection and collectingSchools in all 4 high schools
Informal Description: The overal Japan (JP) focused upon communities of rural Macedonia
school girls and boys in multi-ethnic 38455 0 0
MAC-SOC-G-JAP 01 education for primary 38455project goal isSocial sectors capacity building of primary schools in 7 rural mu
Project for Description: of a sub school in(JP) Social sectors down the building, and after strengthening the ba
43563 Japan assistance to take
MAC-SOC-G-JAP 02 reconstructionProvision -of financialDrenovo village 43563 0 0
Reconstruction of a primary school from the (JP) Social sectors the purchase of the0products and services for th
MAC-SOC-G-JAP 03 51660 Romanovce will be
Description: The grant in Japan donor village used for 51660 0
Refurbishment of a Primary School in Japan (JP) Socialreconstruction of a primary school "7 Mart"0in the village of
MAC-SOC-G-JAP 04 55394 the this project of sectors
Description: The puropose of Municipality is Brvenica 55394 0
The project Description: The overall objective of the project is focused on capacity building of the JZU
14142 Japan (JP) Social sectors 14142 0
MAC-SOC-G-JAP 05 for Building the capacity of the JZU Zdravstven dom - Bitola for Mobile Medical Services Zdravstven 0
The project The project of the building of extension of sectors Delcev" -
51448 Japan (JP) School "Goce of primary school.
MAC-SOC-G-JAP 06 for extensiongoal is focused onPrimarySocialthe building 51448 Ilinden, Skopje 0 0
The project The project is focused onJapan (JP) SocialCentra; Bitola
51638 reconstruction of sectors 51638
MAC-SOC-G-JAP 07 for reconstruction of Central School "Goce Delcev" -School "Goce Delcev"0in Bitola. 0
The project Description: The overall roof of the the project is focused on School
of the Japan (JP) Social sectors 56481 0 0
MAC-SOC-G-JAP 08 for Reconstruction 56481 objective ofSande Shterjoski Primary providing support in reconstruction of th
The project Description: Renovation of the primary tabanovce village
33941 Japan (JP) Social sectors
MAC-SOC-G-JAP 09 for refurbishment of a primary school in school in Tabanovce village33941 0 0
Campaign Description: The overall objective of the project action was focused
9500 Netherlands pupils sectors
(NL) 9500 0
MAC-SOC-G-NLD 01 for senzibilization and accepting Roma Social by non-Roma parents on awareness raising through cam0
Through Description: The project Netherlands Social sectors
99650 to social integration 2
(NL) 99650 0 0
MAC-SOC-G-NLD 02education and emancipationis aimed at supporting the capacity building of organization that works the wid
Vocational Description: Vocational training for Inspectorate Staff 99650
99650 Netherlands Social Administrative Inspectorate Staff. The training should ens
State
MAC-SOC-G-NLD 03 Training for the State Administrative the(NL) sectors TF054139 0 0
Project for Description: of schools rehabilitation and sectors 460000
460000 Social 0 0
MAC-SOC-G-NOR 01 reconstructionCarrying out Norway (NOR) refurbishment activities in six schools located in six munici
Reconstruction of schools of 247500 activities are Social sectors
project 2007 (Project aimed at reconstruction 0
MAC-SOC-G-NOR 02 Description: TheProgramNorway (NOR) No. 2070282) 247500of schools as capacity building of the ed 0
Together European Macedonia-2060293 (NOR)
project Norway Social sectors 490950 0
MAC-SOC-G-NOR 03 for Description: The 490950 will provide educational opportunities and access0to new technologies for the
Youth 04 Description: The 210000 Norway (NOR)
III (project no.2070258) sectors project
Social 0
MAC-SOC-G-NOREntrepreneurial ServiceYouth Entrepreneurial Service (YES) 210000seeks to develop a comprehensive syst0
Chemicals The overall objectives of Sweden (SW)
in Macedonia 2007-2010 sectors 729260
Social 0 0
MAC-SOC-G-SWE 01 Risk Management729260 the project are: Contribution to the minimization of adverse effects of chemic
Keeping HIV Prevalence Low in Macedonia: Nations Development Programme (UNDP)
2895040 seeks to further develop and focus Macedonia?s
Social sectors 2895040 0
MAC-SOC-G-UNDP 01 Description: The programUnited Scalling-up and Focusing Interventions 0 national response to HIV/A
Project for Description: The project foresees the Social sectors
2497 United States of America (USA)2496
instalation of computer labs in every primary and secondary sch
MAC-SOC-G-USA 01 Installation of Servers in Primary and Secondary Schools in Macedonia 0 0
Strategic Description: In12334300 with States of America (USA)
accordance Social sectors12334300 0 0
MAC-SOC-G-USA 02 Medical Re-supply Program United the Agreement of Cooperation between Ministry of Health of Republic
ConstructionDescription: education facilities of construction of 30 PEFs and(CEB) elements with0 to 87% of th
MAC-SOC-L-CEB 01 14300000 Council Social sectors
of physical Co-finance the cost of Europe Development Bank related 0 12500000 up
Housing Description: Proposed Council of Europe sectors construction of 37
50700000 co-finance the 0 27350000
MAC-SOC-L-CEB 02 for low-income persons project aims toSocialDevelopment Bank (CEB) buildings with 0 1,708 rental hou
Conditional Cash Transfers Project World Bank (WB) sectors
MAC-SOC-L-WB 01 18895151 Social 0 18025000
Description: The first component of the project is enhancing the human capital links to0 cash assistanc
ConstructionDescription: ConstructionEuropean Commission (EC)Demir Kapija - Udovothe Pan-European Corriorr
MAC-TRA-G-EC 01 300000000 of a completely the 28 km
Transport 27000000 section on 0
of new carriage way and rehabilitation of newsection motorway237000000 - Smokvica (Corridor X)
Improving Description: The network European single-trackedCore all at 1.435 mm standard international gauge a
2824560 the South East Europe and Regional
Transport
MAC-TRA-G-EC 02 the Rail Infrastructure alongis entirely Commission (EC)2131920 Network 0 0
Improving Description: Concerning road infrastructure Europe Core Regional Network
1218240 European Commission Corridor VIII,
East along
MAC-TRA-G-EC 03 the Road Infrastructure along the SouthTransport (EC) 913680 at present0only 27,6 %0 the Corridor of
Completion
MAC-TRA-G-GRE 01 of Corridor X 50000000 Greece (GR)Transport 50000000 0 0
Regional and Local Roads Programmeand rehabilitation Reconstruction and Development (EBRD)
132900000 Transport 3000000 120000000 0
MAC-TRA-L-EBRD 01 Description: MaintenanceEuropean Bank forof regional and local roads in the various parts of the coun
Regional Description: Component World Bank (WB)
Program Transport 0 68274800 0
MAC-TRA-L-WB 01 and Local Roads 68274800 I: Rehabilitation and periodic maintenance of regional roads. It will provide fu
Second Description: The project will Project (WB)
20348212 World Bank Transport 14798700 0
MAC-TRA-L-WB 02 Trade and Transport Facilitation include (i)upgrading to motorway0standards o f the road corridor X section
National Environmental Investment Strategy (AUT)
overall Austria Water and Environment
116619 0
MAC-WAE-G-AUT 01 Description: The 116619 project goal is aimed upon development of National Environmental Investmen0
Water 02
MAC-WAE-G-AUT Supply in Lipkovo 1250000 Austria (AUT) 1250000
Water and Environment 0 0
Consultancy contract: ImplementationSwitzerland for WWTP Environment
49690 of the consulting and in Kumanovo
Water 49690 0
MAC-WAE-G-CHE 01 Description: The objectiveAssistance (CH) services to be provided is to assist the J.P0 Vodovod in Kum
OXO- 02 Education on environmental issues- a spareand our planet
189296 don?t have (CH) planet") 189296
Water
MAC-WAE-G-CHEEnvironmental Education ("We Switzerlandhow to save Environment 0 0
Project for Description: Pelister National Park ManagementEnvironment
aim of Switzerland Waterto support Plan 286647
Implementation 0 0
MAC-WAE-G-CHE 03 Support to theThe 286647this project is (CH) and the realisation of the main activities of the Vision for t
ConstructionDescription: The main project and treatment (i) upgrading of existing of Prilep system 0 extension of
MAC-WAE-G-EC 01 13000000 European Commission (EC) Municipality sewerage
Water and Environment
for
of the waste water collection activities are: system 13000000 0 (ii)
Establishing Description: Within the framework of this operational programme, the IPA0allocation for environment in
MAC-WAE-G-EC 02 2030400 European Commission Environment
Water and Waste Management System
of an Integrated and Financially Self-sustainable (EC)2030400 0
Strengthening the centralThe project purpose is Commission (EC)3100000level government to strengthen the adm
MAC-WAE-G-EC 03 3100000 European to Water central and local
for environmental management 0
Description: and local level capacitiesassist and Environment 0
Our Climate is Changing So Must We! - awareness on (UK)
43547 United Kingdom the effect of the climate change
Water Awareness43547 Raising 0
MAC-WAE-G-GBR 01 Description: To raise public Climate Change and Environment Caravan0 and to initiate actions that w
Environmental Management Audit Scheme in Municipality
12038 Department Water and Environment
for (UK) 12038
MAC-WAE-G-GBR 02 Description: To establish United KingdomSustainable Development in the 0 0
Municipalities of Gazi Baba
Healthcare Description: To set up a pilot Kingdom (UK) Environment
53248 Water and 53248 0
MAC-WAE-G-GBR 03 Waste Training System of United training system on health-care waste (HCW) management for the Mac 0
Support to Description: Formation ofGermanyframework directive 200000
200000 a water (GER) and Environment
Water 0
MAC-WAE-G-GER 01 the implementation of the EU reponsible department in the Ministry for Environment and0 Physical Plann
Co-operation in the Field The 200000this project is Water and Environment in the field of environment and sustain
MAC-WAE-G-ITA 01 aim of Italy (IT) to assist the local Ministry
Description: of Environment and Sustainable Development 200000 0 0
Study 01 Description: The study area is city of Water andEnvironment
1245090 Skopje in the Republic the 1245090 study will 0 0
MAC-WAE-G-JAP on wastewater management in Japan (JP) Skopje,and of Macedonia cover the following: (i) To develop a ba
Strengthening capacities in the Western Balkan countriesand Environment
1578240 Netherlands Water hot spots environmental of0Macedonia,0
(NL) 1578240 especially in th
MAC-WAE-G-NLD 01 Description: The project resolves a part of theto addressin the Republic problems through remediation
Macedonia-Water Supply for aimJegunovce Municipality and Environment
of Norway (NOR) Water (Project No.2060256)conditions in the Municipality Jeguno
MAC-WAE-G-NOR 01 Description: The the 625the project is to improve the water 625 supply 0 0
Improved Description: Bilateral municipal waste Water of the administration working0in the field of
of institutional (SW) Macedonia (IP 804 MK,
in 23039
MAC-WAE-G-SWE 01system for collection23040 Swedenassistance and Environment dnr 122-8266-07 Up) 0 environment r
Strenghtening the Ecological, project United Nations Development 745156 Protected0
Institutional and is long-term conservation of
Water and Environment
Programme (UNDP) Areas System
MAC-WAE-G-UNDP 01 Description: The 745156 objective Financial Sustainability of theMacedonia?s biological0diversity. It is e
Water Supply and Wastewater Collection
MAC-WAE-L-EIB 01 100000000 European Investment Bank (EIB) 0
promoter?s capital investment programme for the years 2009 to
Description: The project concerns the Water and Environment 50000000 0
Irrigation The programme should increase agricultural output and productivity in a sustainable way in the chose
21500000 Germany (GER) Water
MAC-WAE-L-GER 01 Programme Southern Vardar Valley Phase II and Environment 11250000 0 0
Transbound. Biosphere Reserve Prespa
1530000 Germany (GER) and Environment
Water 0 1530000
MAC-WAE-L-GER 02 This measure is structured as an open programme in which two neighbouring national0parks in the Pre
Water 03 Two phases are foreseen for this (GER) and order to qualify 8635000
12700000 Germany Water 1500000
MAC-WAE-L-GER and Sewerage Programme Macedonia programme. In Environment for the programme municipalities and 0
4-E-Hydro 1
MTN-ENE-L-GER 01 Power Plant Piva6000000 Germany (GER) Energy 0 16000000 0
Energy Description: It 12890600 World Bank Montenegro Project 0
will consist of APL 3 - (WB)
Energy 7029000
MTN-ENE-L-WB 01 Community of South East Europethree components. Component 1, telecommunications system developme 0
Energy Description: Energy efficiency improvements
7341400 Energy 0 7341400 0
MTN-ENE-L-WB 02 Efficiency in Public Buildings World Bank (WB) in selected public buildings such as schools and other bu
HAA Group Montenegro GL
MTN-PSD-L-EIB 02 60000000 European Investmentsmall and medium-scale projects promoted by SMEs or
Private Bank (EIB) 0 30000000
Description: Credit line operation for financingsector development 0
Montenegro Description: Credit line for financingInvestment Bankprojects of small and medium enterprises and of p
MTN-PSD-L-EIB 01 Loan for SMEs Private scale (EIB) 0 100000000
100000000 European of limitedsector development 0
Deposit Protection Fund Montenegro the DPF in(GER)
MTN-PSD-G-GER 01 2500000 Private sector development
2500000
Financial contribution to Germany Montenegro for initial capitalization. 0 0
Loan 04 Loan for 15000000 Germany (GER) Private sector investments 15000000
0
MTN-PSD-L-GER for SME to CKBrefinancing Medium and Small Enterprises developmentin Montenegro. 0
Loan 05 Loan to refinance SME subloans in Montenegro.
MTN-PSD-L-GER to AgroInvest for SME 5000000 Germany (GER) 0
Private sector development 5000000 0
Loan 06 Modus Micro 5000000 Germany Montenegro.
MTN-PSD-L-GER to AlterLoan to refinance SME subloans in(GER) 0
Private sector development 5000000 0
Loan 05 for EE 12000000 Germany (GER)
MTN-ENE-L-GER to CKBLoan for refinancing energy efficiency Energy 0 12000000 0
measures that allows the local bank to finance investments for t
Development of the Transport Sector EuropeantheTransport (EC)6200000enhance institutional capacity related to
MTN-TRA-G-EC 01 23400000 Transport
Description: Activity 1 - Support to Commission Sector: (i) to 10150000 0
Rail Infrastructure Emergency ProjectEuropean Bank for Reconstruction and 30000000
30000000 consist of 0 Development (EBRD) 0
MTN-TRA-L-EBRD 02 Description: The proposed project willTransport two components: (i) implementation of the priority tra
Montenegro Description: The proposed project consists of the rehabilitation of railway infrastructure along the main
MTN-TRA-L-EIB 01 Transport
Railways II 68070000 European Investment Bank (EIB) 0 34000000 0
Upgrading Environmental project includes three major elements: Construction of the Niksic wastewater treatme
12400000 European Commission (EC)3500000
MTN-WAE-G-EC 02 ofDescription: Theinfrastructure Water and Environment 6200000 0
Regional Water Supply Project 52463400 European Bank regional water supply 24000000
Water Reconstruction and Development (EBRD)
15000000 0
MTN-WAE-L-EBRD 01 Description: The proposed project is for afor and Environment scheme that will provide potable wate
Montenegro Description: Creation of aEuropeansystem of and Environment managementObjectives: The envisage
MTN-WAE-L-EIB 01 Water sustainable waste
Solid Waste 54000000 national Investment Bank (EIB) 0 27000000 0
Water and This project aims at a substantial (GER) and the sewerage 25000000
25000000 Germany Water 0
MTN-WAE-L-GER 02 Sanitation Adriatic Coast Phase IV improvement ofEnvironment disposal along the Adriatic Coast and0
Sustainable Tourism Development Project (Montenegro) and Environment
MTN-WAE-L-WB 01 32109400 World Bank (WB)Water
Description: The project has three components summarized 0 7810000 0
below:Component 1: Integrated Coastal Z
Open 01 Description: The sub-measures coordinated by the 6000000
6000000 Germany (GER) Energy 0 0
REG-ENE-G-GER Regional Fund for South-East Europe - Energy Efficiency ORF-E promote initiatives? in which normally partn
Filters Pljevlja and Substations
REG-ENE-L-GER 01 15000000 Germany (GER) Energy 0 15000000 0
Reg. 02 Objectives: Promotion of Germany (GER) and energy efficiency 8500000
8500000 renewable energy
REG-ENE-L-GERRenew.Energies+Energy Efficiency Energy 0 in Southeast Europe0and a contribut
Raiffeisen Bank Kosovo Global line for financingInvestment Bankprojects of small and medium enterprises and loc
REG-PSD-L-EIB 02 20000000 Private scale (EIB) 0 10000000
Description: Credit loan European of limitedsector development 0
Water and Description: The project shall comprise four infrastructure sub-projects:
105880000 Council of Europe and Environment 57000000
the Municipal Window
14180000
REG-WAE-L-CEB 01 sanitation investments with KfW under WaterDevelopment Bank (CEB) two in Albania, one in Bosnia 0
150000000 of (a) construction Reconstruction and Development (EBRD)
SER-ENE-L-EBRD 02 The project is comprised European Bank for a second underground gas storage in Serbia. The gas sto
Srbijagas Energy 0 150000000 0
EMS Electricity Network Upgrading European Investmentoperation of six power substations.Objectives: The proj
SER-ENE-L-EIB 01 49580000 Energy
Description: Design, supply, construction, and Bank (EIB) 0 24500000 0
Environmental Measures in Thermal Power PlantsEnergy the rehabilitation of lignite mills in TPP Nikola Tesla A a
SER-ENE-L-GER 01 56800000 of two components:
The programme consistsGermany (GER) 0 46000000 0
Energy The Project Additional Financing
23437500 World Bank Energy
of the 0 o f the Nis 0
SER-ENE-L-WB 01 Efficiencyproject includes: (a) rehabilitation(WB) heat supply system 21868000 Clinical Center along with
Municipal Description: (i)55400000 European Commission (EC) framework for municipal infrastructure services
To improve institutional and regulatory
SER-SOC-G-EC 58 Infrastructure Support Programme Social sectors45400000 0 0
2nd Phase Description: Component A: Construction of Development Serbia 20000000in28 municipalities (Brus, O
31250000 Council of Europe Landslides houses/apartment
SER-SOC-L-CEB 02 for rehabilitation works after the SpringSocialaround 174 in Bank (CEB)
2006 sectors 0 0
APEX Description: The Apex Loan for SMEsPrivate sector development SME projects, small 0
SER-PSD-L-EIB 01Loan for SMEs is intended for financing 250000000
250000000 European Investment Bank (EIB) 0 of and medium sc
EB 09 SMEs and Priority line for
50000000 European small and Bankdevelopment
Private sector (EIB) projects promoted by SMEs (within the B
SER-PSD-L-EIBLoan for Description: CreditProjectsfinancingInvestmentmedium-sized0 25000000 0
EFG Bank and Leasing Loan for SMEs SME projects, infrastructure projects promoted by local authorities and any
SER-PSD-L-EIB 02 50000000 European Investment Bankdevelopment
Description: Credit line for Private sector (EIB) 0 50000000 0
HAALS Description: Credit line operation for lease-financing small and medium-scale projects 0
Priority projects Private sector (EIB) 0 50000000
SER-PSD-L-EIB 03 Loan for SME and 50000000 European Investment Bankdevelopment promoted by SM
KBC loan SMEs and Credit projects
20000000 European SME projects, infrastructure 20000000
Private sector (EIB) 0
SER-PSD-L-EIB 10 forDescription:priority line for financingInvestment Bankdevelopmentprojects promoted by0local authoritie
Municipal Description: The project European Investment Bank
financing of different 0 75000000
SER-SOC-L-EIB 04 and Regional Infrastructureconcerns the Social sectors (EIB) multi-sector investment schemes mainly in
200060000 Loan 0
PB 11 SMEs and Priority Projects
40000000 European Investment Bankdevelopmentpromoted
Private sector (EIB) 0 0
SER-PSD-L-EIBLoan for Description: Loan for financing small and medium-sized projects 20000000 by SMEs (within the Bank?
Raiffeisen Beograd SMEs Priority Loans
SER-PSD-L-EIB 04 40000000 European Investment Bank (EIB) 0financing of SME projects, small and me
Private and Long Term 40000000
Description: Credit line for leasing or Medium sector development 0
Sogelease Srbija Loan for SMEs for lease-financing SMEBankdevelopment
SER-PSD-L-EIB 05 20000000 Private sector (EIB) 0 20000000 0
Description: Credit line European Investment projects, infrastructure projects promoted by local aut
Unicredit Description: Credit line for
40000000 European Investment projects, infrastructure projects promoted by local aut
Private sector (EIB) 0 40000000
SER-PSD-L-EIB 06 Leasing Srbija Loan for SMEslease-financing SMEBankdevelopment 0
Energy Efficiency Loan Programme Cacanska Banka
SER-ENE-L-GER 02 5000000 Germany (GER) measures from KfW Entwicklungsbank that allows Cacanska B
Loan for refinancing energy efficiency Energy 0 5000000 0
SME 03 Loan for refinancing
20000000 Germany (GER) portfolio development
loan 0 20000000
SER-PSD-L-GER Loan for ProCredit Serbia ProCredit Bank's Private sector in Serbia's rural area. Through the0investment of a
Energy Efficiency Loan Programme ProCredit Leasing
SER-ENE-L-GER 03 15000000 Germany (GER) measures that allows ProCredit Leasing to finance investments
Loan for refinancing energy efficiency Energy 0 15000000 0
Energy Efficiency Loan Programme Raiffeisen Bank
SER-ENE-L-GER 04 15000000 Germany (GER) measures that allows Raiffeisen Bank Serbia to 0
Loan for refinancing energy efficiency Energy 0 15000000 finance investm
Energy Efficiency Loan Programme Volksbank (GER)
SER-ENE-L-GER 05 10000000 Germany measures that allows Volksbank Serbia to finance investments
Loan for refinancing energy efficiency Energy 0 10000000 0
Securitisation ProCredit Bank KfW in cooperation with the sector development Funds (EIF), ProCredit Holding AG
SER-PSD-L-GER 04 50000000
Securitisation by Serbia Germany (GER) 0 50000000
Private European Investment 0
Delivery Description: Component I: Making Fiscal Decentralization Work.;36238400 II: Improving Outreach a
Services World Social
SER-SOC-L-WB 03 of Improved Local36238400Project Bank (WB) sectors 0 Component 0
Reconstruction of the school building roof of the Primary for the process of education in the Primary School "Dr Ibra
SER-SOC-G-CHE 01 1 needed conditions sectors
Social 1 0 0
Description: Providing of Switzerland (CH) School "Dr Ibrahim Bakic" in village Leskova, Tutin munic
Improvement of the Penalty 9000000 European Commission (EC)9000000 by construction of new and reconstructi
SER-SOC-G-EC 05 System Social sectors
Description: Improvement of prison conditions for the inmates 0 0
Improving Description: The project aims at completing the upgrading of SORS infrastructure in order to ensure fu
2000000 European Commission (EC)2000000
SER-SOC-G-EC 07 Capacity of Statistical Office Social sectors 0 0
Modernisation of the vocational education and training system in Serbia
SER-SOC-G-EC 08 4000000 effective Commission (EC)4000000
Social sectors 0 0
Description: Efficient and Europeanpreparation and implementation of infrastructure projects in the Rep
Treatment ofDescription: Waste
SER-SOC-G-EC 16 improve European Commission (EC)6000000
Social sectors 0 0
Healthcare To 6000000 infectious healthcare waste management in 35 healthcare facilities in Serbia
Strengthening of local selfThe project Germany (GER) selected municipalities assistance so they can catch up on
SER-SOC-G-GER 02 3000000 aims at providing
Description: governance in Serbia Social sectors 3000000 0 0
Reconstruction of the school building roof andconditions forroof process of education in the Primary School "Brank
SER-SOC-G-JAP 03 43117 needed the gym hall the of 43117
Description: Providing of Japan (JP) Social sectors the Primary School 0 0
"Branko Radicevic" in Mali Z
Housing The mortgages and medium-income groups sectors
60000000 Council of Europe Development Bank (CEB)
Social in Serbia of 30000000 0
SER-SOC-L-CEB 01 Programme for low will be used to partially finance the purchase 0 primary residences especially in the m
Serbia Description: The additional loan will finance sectors
10546875 Social
SER-SOC-L-WB 01Health Additional Financing World Bank (WB) activities started 0 10543500 0
under the Serbia Health Project (SHP) to
Danube Description: (i)11000000 the
Enhance European Commission (EC)
Transport 11000000 0
SER-TRA-G-EC 01 River Information System (RIS) traffic safety by monitoring and managing the0traffic on the Danube water
Facilitating Intermodal Transport in Serbia
SER-TRA-G-EC 02 2000000 European Commission (EC)2000000
Transport 0 0
To establish the institutional framework for development of intermodal transport and logistic centres in
Supervision of Belgrade City Road By-Pass, Section B
SER-TRA-G-EC 05 3500000 efficient and effective (EC)3500000
Transport 0 0
Description: (i) To assureEuropean Commissionsupervision of motorway construction works of Belgra
System Description: To 3000000 and introduceTransport (EC)3000000
develop European Commission
SER-TRA-G-EC 06 for the Analysis of Track Conditions 0 0
a track infrastructure survey and information system as an assi
TA 07 Description: Efficient and Europeanpreparation and implementation of infrastructure projects in the Rep
4000000 effective Commission (EC)
Transport
SER-TRA-G-ECto Support Implementation of Infrastructure Projects in Serbia 4000000 0 0
Belgrade Description: The project is
285600000 European Bank for Reconstruction Gazela Bridge and approach roads, whic
Transport 6100000 160000000
SER-TRA-L-EBRD 01Highway and Bypass Project for the urgent rehabilitation of the and Development (EBRD) 0
Corridor 10 795300000 of a new Bank for road Corridor and Development (EBRD)
Transport 568800000
SER-TRA-L-EBRD 03 Description: ConstructionEuropean section ofReconstructionX0from Nis to Dimitrovgrad0(E-80), located
Serbia Railways EMUs 221000000 European Bank for 25 up to Reconstruction and Development (EBRD) Units (EMUs
SER-TRA-L-EBRD 04 Description: The EBRD would financeTransporttwo or three car 100000000 0
0 sets of Electrical Multiple
Belgrade Description: The project concerns the TransportBank (EIB) of bypass roads located in the West and
SER-TRA-L-EIB 01 bypass construction of 47 km 0 180000000
361180000 European Investment 0
Gazela Description: The 77070000 European Investment Bank (EIB) 0 33000000
Transport 0
SER-TRA-L-EIB 04 bridge rehabilitation project concerns (i) the rehabilitation of the Gazela bridge on the E70/E75 Highway c
Corridor Description: Component 1 - TheBank road to FYR Macedonia (E-75) ? Corridor XdComponent 2 - The
SER-TRA-L-WB 01 X Highway Project 318073100 World M-1 (WB) Transport 0 275480000 0
Transport Description: (i)43679700 World Bank (WB)
rolling Financing Transport 0 39050000
SER-TRA-L-WB 02 Rehabilitation Additionalover and extending in scope the ongoing performance-based road maintenance0
Emissions Description: The project European Commission (EC) two electrostatic precipitators. Under the Europ
the Nikola Tesla thermal power plants
Water and Environment
SER-WAE-G-EC 03 reductions from 12000000 involves the reconstruction 12000000 of 0 0
Environmental ProtectionA 17000000 procured andWater and (EC) Nikola Tesla B Unit B1. Equipment for continuo
SER-WAE-G-EC 04 new Electric Power Commission Environment
Description: at the ESP Europeanof Serbia 11000000
installed at TPP 0 0
Duboko Solid Waste 16200000 European Bank for and Environment Development (EBRD)
Water Reconstruction and 5000000
6500000 0
SER-WAE-L-EBRD 01 Description: The proposed project is for the construction of the regional solid waste landfill that will ser
Water and The programme is open for participation of up to Environment 54050000
58600000 Germany (GER) and 8 medium-sized municipalities. The investments inclu
Water
SER-WAE-L-GER 01 Sewerage Programme in Medium-sized Municipalities 0 0
Bor Regional Development31347000 I: Environmental Management and Remediation: (i) strengthening the capaci
SER-WAE-L-WB 01 Project Water
Description: Component World Bank (WB) and Environment 31347000 0 0
Irrigation Description: The largest World Bank (WB) Financing
46447687 Project Additional and Environment 36681910
Water 0 0
SER-WAE-L-WB 02 and Drainage Rehabilitationsingle basin effort covered by the Additional Financing would be the Tisza Riv
Overall Objective:
IIIT
the
Roma Support Project – Phase o enhance and facilitate active and full participation of 0 Roma national minority i
CRO-SOC-G-EC 06 Social sectors
3333330 European Commission (EC)2500000 0
Strengthening the Market ComponentEuropean Commission (EC)1616700
CRO-SOC-G-EC 09 2155600 of RepublicSocial sectorsstrengthening the market component of the fisheri
of Fisheries
Overall Objective:To supportthe Croatian Croatia in Sector 0 0
Improvement of regional transport infrastructure Commission (EC) financial and economic crisis 0 improving ec
BIH-TRA-G-EC 01 contribute to the alleviation of the in 14000000 Herzegovina
Transport
The EC grants78200000 European core network current Bosnia and 64200000 by
Municipal The overall objective is toEuropean Commission
SER-SOC-G-EC 60 Infrastructure Support programme – MISP 2010 (EC)Social sectors31120000 0 0
41120000 contribute to the decentralization process and to preparing Serbian municip
Higher Support the developmentEuropean Commission (EC)
25000000 of knowledge sectors25000000
Social 0 0
SER-SOC-G-EC 23Education Teaching InfrastructureaProgramme based economy in Serbia that responds to future labour mar
Removal Develop the full3800000 European the Danube (EC)3800000inland waterway transport sector for soc
potential and the competitiveness of Serbia's
Water and Environment
SER-WAE-G-EC 10 of Unexploded ordinances (UXO) fromCommission River 0 0
Preparation of the necessarythe restoration and Commission (EC)2000000navigation selected locations along the D
SER-WAE-G-EC 11 documentation for creation and Environment
Water of safe and swift 0 0
To contribute to2000000 European river training and dredging works on on the Danube River(Corrido
To contribute to the works on the of traffic flows (EC)
Supervision of road construction enhancementCorridor X (Grdelica – Vladicin Han and0Pirot – Ciflc0
SER-TRA-G-EC 08 10000000 European Commission on 10000000
Transport sections)
Euro Corridor X and to improve environmental an
ConstructionTo assist in the creation of Vranje-4 Commissionin Serbia in conformity with the requirementsof the En
SER-ENE-G-EC 03 400/110 Kv an electricity market (EC)
of Substation 28000000 European & Energy Leskovac-2 15500000 0 0
Increase the Main Railway performance and reliability of railway transport in Montenegro through imp
Major rehabilitation of the attractiveness,Line Bar-Vrbnica (Miatovo5000000
MTN-TRA-G-EC 02 Transport
12000000 European Commission (EC) kolo- Mojkovac) section7000000 0
Upgrading To enhance Montenegro’s ecological development by ensuring 5000000
MTN-WAE-G-EC 03 the Pljevlja waste water treatment Commission (EC)3500000 that economic development is environ
11000000 European Water and Environment 0
Alpha 01 The EBRD and Corporate Credit a total of Reconstruction Alpha Bank (ABG)(EBRD)
Private sector developmentDevelopment subsidiaries in Roman
SER-PSD-L-EBRDBank Serbia-SMEhas signed loans worthLine for €200 million for and 50000000
50000000 European Bank 0 0
socio-economic recovery of
Upper Drina To promote the7594912 Netherlands Water multiethnic communities with 0
BiH-WAE-G-NLD 01 Regional Development Programme (NL) and Environment 4194261 strengthened local governm
0
Neretva Trebisnjica River and global environmental and Environment
16611870 World Bank Water Project 0 6248000
REG-WAE-L-WB 01 and The development Basin Management (WB) objective of the Neretva and Trebisnjica River Basin Mana0
Eurobank The EBRD -230000000 European Bank of Reconstruction 0 Development (EBRD)
Senior Loan Private sector development Eurobank
with
SER-PSD-L-EBRD 03 EFG Beogradhas signed loans worth a totalfor EUR 230 millionand 60000000 EFG subsidiaries across 0
20000000 a participation for risk sharing framework with Crédit(EBRD) Serbia with a
Private sector developmentDevelopment Agricole
SER-PSD-L-EBRD WHRThe EBRD is consideringEuropean Bankin a Reconstruction and 20000000
Serbia 04 - Credit Agricole 0 0
Societe Generale Banka Srbija SME Credit Line worth a Reconstruction 0 Development (EBRD)
20000000 European Private sector development with Société Générale subsidiarie
SER-PSD-L-EBRD 05 The EBRD has signed investments Bank fortotal of EUR 215and 20000000 million 0
- Societe Generale Serbia participation for risk sharing framework with Société Générale Serbia with
44400000 a
SER-PSD-L-EBRD WHRThe EBRD is consideringEuropean Bankin a Reconstruction and 20000000
Serbia 06 0
Private sector developmentDevelopment (EBRD) 0
Serbian Railways Corridor considering providing a sovereign guaranteed and of €100 million to finance:
a progra
SER-TRA-L-EBRD 05 The EBRD is296400000 European Bank for Reconstruction loan Development (EBRD)
X Transport 0 250000000 0 (i)
EPS Metering 80050000 European Bank for Reconstruction and 80000000
Energy EUR Development (EBRD) 0
SER-ENE-L-EBRD 01 EBRD is providing a sovereign guaranteed loan of up to5000040,000,000, to Elektroprivreda Srbije ("E
Komercijalna banka SME considering a EUR 30 million 5 year SME loan with Development (EBRD)
Private sector development a two year
SER-PSD-L-EBRD 07 The EBRD is Credit Line European Bank for Reconstruction and 30000000 grace period for on-lendin
30000000 0 0
The Water and Wastewater Projecta senior and of up to €30 30000000
35000000 providing Water Reconstruction and Development (EBRD)
BIH-WAE-L-EBRD 01 Canton EBRD is consideringEuropean Bank for loan Environment million to the Canton of Sarajevo to fina
Sarajevo 0 0
Overall Objective: To environment forSocialKosovo’s communities
all of sectors11000000
Developing an enabling economic develop an enabling environment for private sector development0and jobs creati
KOS-SOC-G-EC 09 11500000 European Commission (EC) 0
Overall Development
Trade and Regional Objective: To promote Kosovo’s integration into the world economy and to develop and create
KOS-SOC-G-EC 10 Social sectors
8000000 European Commission (EC)7800000 0 0
Zeljezara The 50000000 European Bank for of Zeljezara Split post-privatisation. The loan will be a pa
CRO-PSD-L-EBRD 03Split EBRD loan will finance the restructuring Reconstruction and 20000000
0
Private sector developmentDevelopment (EBRD) 0
PBZ SME The Line 50000000 making a senior loan of updevelopmentDevelopment (EBRD)
Private sector to EUR 0 50000000
50 0
CRO-PSD-L-EBRD 02 Credit EBRD is consideringEuropean Bank for Reconstruction andmillion in the form of a credit line for S
Zagrebacka banka SME Credit line (Unicredit Group) for Reconstruction and Development (EBRD)
making investments worth Private sector development 432400000
CRO-PSD-L-EBRD 01 The EBRD is432400000 European Banka total of EUR 432.40million to UniCredit subsidiaries across e0
43000000 European ofEnergyReconstruction and 35000000
up to 0 Development Gore AD
EPCG 01 EBRD is providing a corporate loan Bank for €38 million to Elektroprivreda Crne(EBRD) Nikšić ("EPC
MTN-ENE-L-EBRD Metering and Distribution Project 0
Investment in senior A tranche of regional A&B sub-fund provided(EIB) local financial sector and 0 the developm
REG-PSD-L-EIB 01 complement financial support sector by the 0 30000000
Private
EFSE aims to 30000000 European Investment Bankdevelopment by
Public The objectives84027000 World Bank (WB) sectors
of Social Development 0
BIH-SOC-L-WB 03 Expenditure Crisis DPL the First Programmatic Public Expenditure 0 84027000 Policy Loan (DPL) Program
Enhancing SME Access development World Bank (WB) sector development
BIH-PSD-L-WB 01 Finance Private 0 51240000 0
The project to 51248400 objective of the Enhancing Small and Medium Enterprises (SME) Access to
Export The objective of the Export Finance Intermediation development Croatia
94476180 Private 0 for
CRO-PSD-L-WB 01Finance Intermediation Loan World Bank (WB) sectorLoan Project 94476180 is to support the preserva 0
Programmatic Private Financial Development Policy Loan sector series of 0 67100000
SER-PSD-L-WB 01 67100000 World Bank Private 2
second three
This program document presents the (WB) in the development Programmatic Private and Financia 0
Volksbank BH DD Global loan
BIH-PSD-L-EIB 01 40000000 European Investment of small and 0 20000000
Private sector (EIB) medium enterprises and 0
Credit line for financing of limited scale projectsBankdevelopment local infrastructu
MicrofinanceProjects undertaken by small and very small businesses, in the sectors of agriculture, 0
BIH-PSD-L-EIB 02 SMEs Private sector (EIB) 0 20000000
LOK Loan for20000000 European Investment Bankdevelopment trade, manufact
providing a €210 million Energy INA to enable and Development (EBRD)
loan to 0 company to
CRO-ENE-L-EBRD 01 The EBRD is494000000 European Bank for Reconstructionthe 150000000 complete the first stage of
INA 0
Support Overall Objective: The overall objective of this intervention is to support the Government of Kosovo in
4000000 European Commission (EC)4000000
KOS-SOC-G-EC 11 to Agency for European Integration Social sectors 0 0
Return Overall Objective: The creation of a climate for inter-ethnic tolerance, sustainable multi-ethnicityand th
Kosovo Social sectors
KOS-SOC-G-EC 12and Reintegration in 5100000 European Commission (EC)4000000 0 0
Rehabilitation of Cultural Heritage in Kosovo
KOS-SOC-G-EC 13 3675000 European Commission (EC) of Cultural
Social sectors
Overall Objective: Ensure the long-term sustainability2500000 Heritage0 0
sites in Kosovo.Project purp
Support The and Minerals SectorEuropean Commission (EC)1000000
1000000 in Kosovo revitalisation of the Kosovo economy throughsustainable and en
KOS-ENE-G-EC 04 to Minesoverall objective of this project is Energy 0 0
To develop an enabling environment for for all sector development and II for
Developing an enabling socio-economic environmentprivateof Kosovo’s communities job creation
0 all communitie
KOS-SOC-G-EC 14 Social sectors
6900000 European Commission (EC)6600000 0
Support Overall and Taxation Administrations Social sectors 3000000
3000000 European Commission (EC) 0 0
KOS-SOC-G-EC 15 to Customs Objective: Creating a business friendly environment in Kosovo, clear and efficient revenue col
Programme for the Promotion of Energy EfficiencyEnergy
CRO-ENE-L-GER 03 1500000 Germany (GER) 0 1500000 0
Climate 600000 Germany (GER)
CRO-ENE-L-GER 04Protection Programme Croatia Energy 0 600000 0
Sewerage
BIH-WAE-L-GER 04 Bihac Water 500000
17500000 Germany (GER) and Environment 17000000 0
Renewable 3500000 Germany (GER)
MTN-ENE-L-GER 02 Energy and Energy Facility Montenegro Energy 0 3500000 0
Erste 01 Loan for refinancing Medium and Small Enterprises developmentin Montenegro.
MTN-PSD-L-GER Bank Montenegro SME 13000000 Germany (GER) 0
Private sector investments 13000000 0
NLB 02 Loan for refinancing
14000000 Germany (GER) Private sector investments 14000000
0
MTN-PSD-L-GERMontenegro SME-Finance Medium and Small Enterprises developmentin Montenegro. 0
Erste 03 Loan for refinancing energy efficiency Energy
MTN-ENE-L-GER Bank Energy Efficiency 2000000 Germany (GER) 0 2000000 0
measures that allows the local bank to finance investments for t
NLB 04 Efficiency 2000000 Germany (GER)
MTN-ENE-L-GEREnergy Loan for refinancing energy efficiency Energy 0 2000000 0
measures that allows the local bank to finance investments for t
Promotional CreditVolksbank HousingGermany fund private individual housing 7000000
SER-SOC-L-GER 01 7000000 Social
Loan line for Volksbank Serbia to (GER) sectors 0 0
loans, refurbishment and reconstruc
Loan 02 Credit line for 31600000 Germany private sector housing loans,
Municipal Finance Private 1600000 30000000
SER-PSD-L-GER to Banca Intesa 2009Banca Intesa to fund (GER) individualdevelopment refurbishment and reconstruction 0
110-kV-Circuit Line South Albania110kV transmission network in South Albania comprises the rehabilitation and ex
ALB-ENE-L-GER 01 of the
The extension50000000 Germany (GER) Energy 0 50000000 0
400 02 Albania-Kosovo 51400000 transmission line
Energy 42000000
ALB-ENE-L-GERkV Line Construction of a 400 kV Germany (GER) from Tirana to the0border of Kosovo. 0
400 kV Transmission Lineof a 400 kV Germany (GER) from Prishtina to the border of Albania.
KOS-ENE-L-GER 02 Albania-Kosovo
Construction 39900000 transmission line Energy 0 33500000 0
Municipal The project concerns the Germany (GER) the water supply system6000000sewerage system. The proj
17500000 rehabilitation of
KOS-WAE-L-GER 02 Water Supply and Sanitation Prishtina II Water and Environment 11000000 and the 0
IPF-MW The 2008 used to finance two (GER) and Environment 16500000
Water supply and
KOS-WAE-L-GER 03Kosovo funds are 42700000 Germany projects: a) water25000000 sanitation Prishtina II 0 b) Prishtina and
– Windpark Development
33400000 European Commission (EC) 400000 generation
Pilot Project The Energy Law has created a framework for renewable energy 33000000 and a strategy for its deve
MAC-ENE-G-EC 02 Energy 0
Electricity The aim of the project is to support Montenegrin Electric Enterprise in identifying and prioritizing individ
1850000 European Energy
MTN-ENE-G-EC 02 Network Development Programme Commission (EC)1850000 0 0
Uprating The project network upgrade of the existing network 500000
500000 European Commission operation
Energy 0 0
SER-ENE-G-EC 05 of transmission of 400kV in Western Serbia to 400kV(EC) in Western Serbia is centred around the necess
of OHL 400kV FYROM-Serbia transmission system operator, 11000000
11100000 electro
ConstructionThe business activities ofEuropean Commission (EC) 100000 transmission asset manager and mar
MAC-ENE-G-EC 03 Energy 0
In 2005, a Heating Phase 2 - CHP Commission (EC) 300000
Improvement of DistrictSlovenian engineering company IBE prepared a detailed Feasibility Study for supplying hea
KOS-ENE-G-EC 05 300000 European Energy 0 0
Energy Co-financing is in Public European Commission (EC) 600000
600000 Buildings
KOS-ENE-G-EC 06 Efficiency Measures envisaged from KfW Energy 0 0
Plava The project aims600000 European Commission (EC) 600000 and future 0
to provide a secure and sufficient for present
BiH-WAE-G-EC 08Voda Regional Water Supply Project Water and Environment needs water0 supply on a reg
Podgorica The Infrastructure Project
300000 European and expansion of water and
Water and Environment 0
MTN-WAE-G-EC 06 Water project concerned rehabilitationCommission (EC) 300000 wastewater infrastructure in the City 0
Wastewater The town of Berane is situated in the mountainous north-eastern part of Montenegro on the River Lim
MTN-WAE-G-EC 07 150000 Water and Environment
treatment plant Berane European Commission (EC) 150000 0 0
Project co-financing is envisaged for Waste Water Treatment Plants in
1750000 from KfW Water and Environment
KOS-WAE-G-EC 03preparation Feasibility StudiesEuropean Commission (EC)1750000 Kosovo 0 0
Wastewater Rozaje Municipality is in the northern eastern part of Montenegro, located0 the triangle which connec
MTN-WAE-G-EC 08 200000 European Commission (EC) 200000
treatment plant and network in Rozaje Water and Environment in 0
Wastewater IPF TA forplant and network in Danilovgrad and (EC) 200000
MTN-WAE-G-EC 09 200000 European states the need for development of a 0
Water
treatment Danilovgrad Municipality Commission Environment waste water 0 treatment plant
Wastewater Kolasin Municipality network inin the central region of Montenegro, surrounded by UNESCO protected
MTN-WAE-G-EC 10 200000 European Commission (EC) 200000
treatment plant and is located Kolasin Water and Environment 0 0
Contsructionco-financing Landfills in Plijevlja and Zablijakand (EC) 150000
MTN-WAE-G-EC 11 150000 from EIB Water
of Regional is envisagedEuropean Commission Environment 0 0
Constructionco-financing Landfills in Montenegro Water and (EC) 750000
MTN-WAE-G-EC 12 750000 from EIB
of Regional is envisagedEuropean Commission Environment 0 0
Municipal The project concerns the European of an investment programme
1000000 financing Commission Environment
SER-WAE-G-EC 12 Water - Nis and Novi Sad Municipalities Water and (EC)1000000 managed directly by the cities of Nov
0 0
The project consists FYR Macedonia and new construction works at four 0
MAC-SOC-G-EC 13 Prison Reform Project in of refurbishment Social sectors 500000
Idrizovo 500000 European Commission (EC) institutions: Idrizovo Penal C
0
Center
MTN-SOC-G-EC 11for Elderly – Pljevlja 150000 European Commission (EC) 150000
Social sectors 0 0
Municipal Following the150000000
establishment of a PMUSocial sectors
(Project Management Unit) as a structure within the Ministry of
SER-SOC-L-EIB 02 and Regional Infrastructure European Commission (EC) 375000 75000000 0
ConstructionThe Prison Service of Croatia operates fourteen establishments which are mainly in the north and eas
CRO-SOC-G-EC 01 800000 European Sibenik sectors
Social
of a penitentiary/prison complex in Commission (EC) 800000 0 0
Health Provider Institutions (HPIs) has structured a comprehensive reform of the health care sector into three ph
MAC-SOC-G-EC 14 2000000 Social sectors
The Ministry of Finance European Commission (EC)2000000 0 0
The political 70000 Balkan region in the late 90ies faced
Social Housing - Serbia crises in the European Commission (EC) 70000 Serbia with0strong wave of refugees fro
SER-SOC-G-EC 35 Social sectors 0
The Prison Facilities-Providing the penal institutions in the Serbia are evident and severe prison overc
Modernization of poor physical conditions in Human and Safe (EC) 700000
SER-SOC-G-EC 34 Social sectors
700000 European Commission Prison System 0 0
In the last 50 Facilities European facilities sectors
Social have been poorly
Modernization of Judiciaryyears current judiciaryCommission (EC) 720000 renovated 0
SER-SOC-G-EC 26 720000 while some of them have ch
0
Building co-financing is envisagedEuropean Social sectors
600000 from Research and Development Infrastructure0Initiative/Teaching Infrastru
SER-SOC-G-EC 11 the knowledge economy of Serbia, EIB Commission (EC) 600000 0
Tirana track renewal andEuropean Commission (EC)1500000 in the whole network 0 Albanian Rai
1500000 signalling and in the centre of Albania
Feasibility study for area (Qark/Prefecture) is located communication systemsand includes the city of Tirana, the ca
ALB-TRA-G-EC 07 Transport 0 of
Corridor B&H’s Motorway in Corridor Vc is partTransport
of the Trans-European
BIH-TRA-G-EC 04 Vc – second phase 500000 European Commission (EC) 500000Network of 0 inland corridors. This corrido
0
ConstructionThe project seeks to upgradeDrini)-Hum
BIH-TRA-G-EC 05 700000 na the road between (EC) 700000
Transport 0
of Main Road Foca(BrodEuropean CommissionFoca in the Republica Srpska and the0 Montenegrin bo
The project deals Presevo-Macedonia border years old that has
500000 European over 100
Reconstruction of the line Nis- with a railway lineCommission (EC) 500000 not had any significant repair or devel
SER-TRA-G-EC 09 Transport 0 0
The Kosovo Rail 500000 European Commission (EC) track. The network 0 i Elezit) form was built a
network comprises 333 km of single 500000 in
Rehabilitation of Railway Route 10 (Leshak – Mitrovicë – Fushë Kosovë – Ferizaj – Hani its current 0
KOS-TRA-G-EC 03 Transport
Improvement of the Scepan Polje-Pluzine Main1Commission (EC)study for improvement of the main road Pluzine-
MTN-TRA-G-EC 03 700000 European of the Feasibility 700000
Transport
This project represents the Phase Road, Phase 1 Feasibility Study 0 0
FS & 05 co-financing envisaged from KfW/CEB Water and Environment 17350000
11200000
ALB-WAE-G-CEBDD Regional landfillis30000000 Council of Europe Development Bank (CEB) 0
ALB-TRA-L-EC for Project implementation for Project implementation road sector.
TA 06 WBIF Project TA800000Sector
Road European Commission (EC) 800000
Transport
co-financing is envisaged from EIB, estimate
0 0
Belgrade
SER-TRA-L-EIB 05 City Sava Bridge Transport
404900000 European Investment Bank (EIB) 240000 160000000 0
Corridor Co finaced Motorway European Transport
969300000
SER-TRA-L-EIB 06 X Serbia (E 75)envisaged from EBRD? Investment Bank (EIB) 4500000 579000000 0
TA 08 168700000 European Investment Bank (EIB)
SER-TRA-L-EIBfor Railways rehabilitation II Transport 1000000 144000000 0
Upgrade 180000 European Commission (EC) transmission system and conducted a review o
The study identified bottlenecks in Albania’s electricity 180000
ALB-ENE-G-EC 01 of Transmission System Energy 0 0
Tirana of new SubstationEuropean Commissioncapacity for reinforcement of the city of Tirana, the ca
ALB-ENE-G-ECfor construction area (Qark/Prefecture) is located in the centre of Albania and includes Tirana Ring
FS 02 577605 Tirana3 withEnergy120MVA (EC) 577605 0 0
Feasibility Study forregion, the most densely populated area in line - Tirana 2 (Razhbull) centre of Albania and acco
ALB-ENE-G-EC 03 577000 European double circuit Albania, is located in the
Energy
Tirana the Construction of 220/110 Commission (EC) 577000 0 0
Feasibility Development of Long Term and Treatment and (EC) 250000 water collection and 0
250000 European Commission Environment
Investment Plan for waste 0
SER-WAE-G-EC 13 Study for Collection, transport Strategic Waterof Waste Waters in Municipality of Vranjetreatment in orde
of
Upgrading ofKavaja municipality and Golemi commune are located in the western part0 central Albania, very clos
ALB-WAE-G-EC 05 Water Treatment Plant and completion of the
Water and Environment
Kavaja Waste 9700000 European Commission (EC)7050000sewerage network for Golemi 0
The Municipality 450000 European Commission (EC) 450000
of Kamza Kamza Water and Environment
ALB-WAE-G-EC 06 of Water Supply & Sewerage of is located in the Greater Tirana Region and includes the Town of Kamza, f
Project 0 0
sanitation of 180000 European Commission (EC) western
located in Environment
ALB-WAE-G-EC 07waterThe towns in Lezha and Shengjin are Water and North 180000 Albania along the Adriatic Sea several
Waste 0 0
Feasibility In Albania, the rivers constitute the Commission risk 400000 Infrastructure in Albania0
Design for Improvement flood Environment
ALB-WAE-G-EC 08 Study and Detailed400000 European highestofand (EC)affecting near 130,000 hectares of agricultural la
Water Flood Protection 0
Detailed Elbasani, one of 500000 sewerage systems for population of
biggest European Commission (EC) 500000
Water and Environment 0 0
ALB-WAE-G-EC 09 Design for water supply and cities of Albania with a Elbasan city near 100,000 inhabitants, is located in ce
1500000 from CEB/EIB Rehabilitation of Tirana Schools – 2nd Phase
and
Education, Excellence and Equity Project (EEE-P) Social sectors 1500000
ALB-SOC-G-EC 07 co-financing is envisagedEuropean Commission (EC) 0 0
Tirana The Hospital Centre Reform Programme in Albania- 2nd Phase by CEB,0aims to upgrade the infrastr
580000 European Commission (EC) supported
Social sectors
ALB-SOC-G-EC 08 University project, initiated by the Albanian Government and 580000 0
Wastewater eventual co-financing is envisaged from CEB/KfW 3500000
ALB-WAE-G-EC 11 Pogradec Water and Environment
3500000 European Commission (EC) 0 0
Water Supply & Sewage, Gjirokastra, European from ceb/KFW
ALB-WAE-G-EC 12 4500000 Fier Water and Environment
eventual co-financing is envisaged Commission (EC)4500000 0 0
Kamza eventual co-financing is envisaged from CEB/KfW 5500000
ALB-WAE-G-EC 13 Water and Sanitation Water and Environment
5500000 European Commission (EC) 0 0
Bijeljina The EBRD, EU and the Swedish International Development Agency (SIDA) are supporting further mod
26000000 - Phase II Water and Environment
BIH-WAE-G-EC 10 Waste Water System Project European Commission (EC) 11300000 5000000 0
Belgrade 120000000 European Investment Bank (EIB)
SER-TRA-L-EIB 07 City integrated transport Transport 6000000 60000000 0
Rehabilitation and construction of water and wasteWater and (EC)5000000
MTN-WAE-G-EC 14 5000000 European water infrastructure in North
Co-financing envisaged from EIB Commission Environment 0 0
SME Support
BIH-PSD-G-EC 04 3666600 generate economicsector development
Private growth and employment by0
The overall objective is toEuropean Commission (EC)3500000 0
strengthening the competitiv
MTN-WAE-G-EC 15
• Water
The overall objective of the project is
Alignment of waste management system with EU standards.
ro
Environmental Alignment and Solid Waste Management and (EC)4800000
14155648 European Commission Environment 0 0 P
Assisting The overall approximating project is the in statisticsdevelopment
800000 European Commission (EC) 800000
Private sector 0 0
MTN-PSD-G-EC 07 Montenegro in objective of theEU standards provision of advisory support to the StatisticalOffice of Monte
Return, Overall Objective: The creation of aCommission (EC)8700000
10250000 European climate sectors
Social 0 0
KOS-SOC-G-EC 16 Reintegration and Cultural Heritage in Kosovo for inter-ethnic tolerance, sustainable multi-ethnicityand th
Support Overall Objective: To contribute to theSocial sectors 3125000
KOS-SOC-G-EC 17 to Communities stabilisation of
3135000 European Commission (EC) the socio-economic 0 0
situation of ethnic minority c
Support Overall Objective: Contribute to strengthen the social
24500000 Social sectors14000000 0 0
KOS-SOC-G-EC 18 to Culture, Youth and Sport European Commission (EC) cohesion & solidarity in Kosovo.Project purpose:
Overall objective
ctivity European Commission (EC)5000000
A
Reintegration
Communities and Education6462000 1: Return andSocial sectors in Kosovo (phase III)
he creation0of a climate for
KOS-SOC-G-EC 19
T
0
Overall Objective:
Strengthening the Rule of Law To strengthen the rule of law in Kosovo, including increased respect for minority rig
KOS-SOC-G-EC 20 Social sectors
7400000 European Commission (EC)7000000 0 0
Strengthening the Rule of Law in Kosovo
KOS-SOC-G-EC 21 14225000 European the capacity of Kosovo's institutions to provide legal education, ap
Social sectors13000000
2.1 Overall Objective:To strengthenCommission (EC) 0 0
Upgrade 2.1 Overall Objective:To strengthen Sector of law sector in Kosovo2.2 Project purpose:The purpose
25000000 European the rule sectors25000000
Social
KOS-SOC-G-EC 22 of the Infrastructure in the Rule of Law Commission (EC) 0 0
Strengthening the Rule of Law
KOS-SOC-G-EC 23 15350000 European the rule of law in
Social sectors12050000 0
2.1 Overall Objective:To strengthenCommission (EC)Kosovo through further reform of0the relevant ins
Strengthening the rule of law
KOS-SOC-G-EC 24 15552000 European Commission (EC)
Social sectors12300000 0 0
2.1 Overall objective:Support the efforts of Kosovo authorities to enforce the rule of law by strengtheni
Regional 2.1 Overall Objective:Economic regeneration, job creation and infrastructure development in five econ
KOS-SOC-G-EC 25 economic development Social sectors17500000
20955000 European Commission (EC) 0 0
Human 2.1 Overall ObjectiveThe European Commission (EC)3000000
3300000 overall Private sector development 0 0
ALB-PSD-G-EC 04 Resources Development in Albania objective of the project is to have improved labour market functioning
PAMECA 5518790 main goal ofSocial sectors to bring
PAMECA III is 0 0
ALB-SOC-G-EC 10 III 2.1 Overall objective:The European Commission (EC)5518790the Albanian State Police closer to EU s
Project 2.1 Overall Objective:To European Commission (EC) the rule
2130000 democracy and 0 0
ALB-SOC-G-EC 11 against Corruption in Albania contribute to Social sectors 2000000 of law through the prevention and contr
Support 2.1 Overall ObjectiveCrime reduction through reinforcing strengthening of0 capacities of the four ke
1500000 European Crime Investigations Structures
Social sectors
ALB-SOC-G-EC 12 to Anti-Money Laundering and FinancialCommission (EC)1500000 the 0
2.1 operational1050000 European the Albanian Criminal Justice SystemProtection of providing the a
T
Enhancement ofOverall Objective
o ensure thatCommission (EC)1000000 Persons 0is capableUnit
ALB-SOC-G-EC 13 Social sectors
and logistical capacities of Witness and Special 0
2.1 Overall Objective:
he overall improvement of project and accommodation capacities in the of law
Infrastructure and objective ofsectors18200000
T
ALB-SOC-G-EC 14 to the Penitentiary21250000 European Commission (EC) is to have in place a strengthened rule Police
Support Social the training 0 0
Modernisation of Overall Objective:To European Commission transparency and quality0 service delivery of the jus
ALB-SOC-G-EC 15 3530000 system efficiency, (EC)
2.1. the Albanian Justice improve the Social sectors 3000000 of 0
Supporting SMEs to become more competitive in the EU Market developmenthigh quality services 0private sector a
ALB-PSD-G-EC 02 3400000 European Commission (EC)3400000
Private sector by providing 0
2.1 Overall Objective:Maintain sustainable growth and increase competitiveness of thein modern mana
2.1 Overall Directorate ofEuropean Government of Albania in strengthening the fiscal system in line wi
2500000 Tax the Commission (EC)2500000
T
ALB-SOC-G-EC 17 for the General Objective:
o assistof Albania
Support Social sectors 0 0
2.1 Overall Albanian Improving theEU standards
2850000 European Albanian Statistics in order
ALB-SOC-G-EC 18 for alignment ofObjective:Statistics with Commission (EC)2850000 to meet the EU requirements and offe
Support Social sectors 0 0
Support 2.1 Overall ObjectiveTo support
1500000 European Commission (EC) to EU standards as 0
Social sectors
ALB-SOC-G-EC 19 for Public Procurement in Albania Albania approximate1500000 0
requested under the SAA in
Support 2.1 Overall Objective:Assist the Government of Albania in aligning the Albanian customs procedures w
3500000 European Commission (EC)
Social Standards
ALB-SOC-G-EC 20 to the alignment of Customs Procedures with EUsectors 3500000 0 0
Centralised National Programme in support toobjective issectors 3000000 reduction of the technical barriers to t
ALB-SOC-G-EC 21 3400000 overall Metrology to (EC)
Social
2.1 Overall Objective:TheEuropean Commissioncontribute to the 0 0
Support 2.1 Overall Competition Authority Commission (EC)1500000
1500000 overall objective is to Department
Private sector development 0 0
ALB-PSD-G-EC 05 for the AlbanianObjective:TheEuropeanand State Aidcontribute toward ensuring a competitive environment
ALB-SOC-G-EC 23 T
1240000 European Commission (EC)the Copenhagen economicof banking supervisio
2.1 Overall objective
o contribute to the fulfillment of 1000000
Strengthening the institutional capacity of the Albanian Central Bank particularly in the 0
Social sectors areas criterion by ensuring
0
Centralised National programmes Support to Copyrights sector development property in Albania at a similar level
ALB-PSD-G-EC 01 800000 European Commission (EC) 800000
the protection of intellectual
2.1 Overall Objective:To contribute to Private 0 0
Developing the Industrial Property Rights System in Albania (EC)1000000align the IP 0
ALB-PSD-G-EC 03 1100000 overall objective of sector development
Private the
2.1 Overall Objective:TheEuropean Commission project is to 0
regulatory systems of Albani
Overall Objective
1000000 European and Youth in (EC) programmes to improve and monitor the effe
TLifelong Learning Commission Action measures is
of the preparatory
Preparatory measures for the
he overall objectiveSocial sectors 900000
MAC-SOC-G-EC 15 0 0
Overall Objective
civil sector in decision the project 1200000 in providing social services
T of making process and
MAC-SOC-G-EC 16 the participation of the he overall objectiveSocial sectors is to promote an active civil society sector.
roject
Support 1300000 European Commission (EC) 0 0 P
Local infrastructure for Social and Economic Cohesion stimulate7000000 economic cohesion through support t
MAC-TRA-G-EC 04 8700000 European Commission (EC) social and
Transport
Overall Objective:The overall objective is to 0 0
Overall Objective
overall objectivePrivate project is to achieve
Tof of the sector
MAC-PSD-G-EC 01 to the implementation
hethe Customs Reform Strategy development further alignment of the Аcquis in the
Support 3200000 European Commission (EC)3000000 0 0
Support Overall ObjectiveThe overall objectivePrivate project development the performance of the Public Reve
MAC-PSD-G-EC 02 to Tax Reform of the sector is to improve
2132000 European Commission (EC)2000000 0 0
Implementation of the TAM/BAS Programme Commission (EC)2100000
MAC-PSD-G-EC 03 2830000 European of the sector development 0 0
Overall ObjectiveThe overall objectivePrivate TAM/BAS Programme is to promote the transition to mar
Support Overall ObjectiveThe overall objectivePrivate project is to contribute
2900000 European Commission (EC)1800000
of the 0
MAC-PSD-G-EC 04 to free movement of goods - quality infrastructuresector development to free movement 0 goods with thof
REG-SOC-G-EC 01 Action Programme 1250000 European Window and civil society in the Western Balkans by facilitating the
Youth in T
Overall Objective:
o strengthen democracy sectors 1000000
Social
- Western Balkans Commission (EC) 0 0
Erasmus Overall Objective:
he overall objective of the Erasmus Mundus
T
REG-SOC-G-EC 02 Mundus – External Cooperation WindowSocial sectors 6000000 External Cooperation Window (EMEC
6000000 European Commission (EC) 0 0
Erasmus 4000000 Window
REG-SOC-G-EC 03 Mundus – Western Balkans European Commission (EC)4000000
Social sectors 0 0
Overall Objective:To enhance the quality of European higher education by fostering cooperation with t
Regional Overall Objective:The overall objective is and Social 2000000
2222000 European Commission (EC)the coordination of the social security systems a
Social sectors
REG-SOC-G-EC 04 Programme for Social Security Coordination to enhance Protection reforms in South East 00 Europe
Overall Objective:
his project aims Commission (EC)1000000
1250000 European to Social sectors
T
Social Inclusion: Regional support to the marginalised communities increased legal and social inclusion of the mar
REG-SOC-G-EC 05 contribute to the 0 0
Civil 06
REG-SOC-G-EC Society Overall Objective:
he overall objective is Assistance, People 2 People Programme, Partnership Action
Facility – Horizontal Activities (Technical to strengthen civil society within 0 participative democracy, s
T
14675000 European Commission (EC)
Social sectors13800000 a 0
Regional Overall Objective:Foster and in the Commission (EC)
1000000 European Western Balkans
durable, sustainable solutions, namely voluntary repatriation an
REG-SOC-G-EC 07 Programme for Refugee Return enhanceSocial sectors 1000000 0 0
Overall Objective:
o strengthen democracy and (EC)1500000
T
REG-SOC-G-EC 08 Action Programme 1875000 European Commission civil society in the Western Balkans by facilitating the
Youth in Social sectors 0 0
Overall Objective:
he Tempus programme will pursue
T
REG-SOC-G-EC 09 Programme in the20685000Balkans Commission (EC) a series of overall 0
Tempus Western European Social sectors19700000 objectives which are commo
0
Regional Overall ObjectiveFoster and enhance Social sectors 2500000 solutions, namely voluntary repatriation
3125000 European Commission (EC)
durable and sustainable 0 0
REG-SOC-G-EC 10 Programme for refugee return and provision of durable solutions for refugees and Internally Displaced Pe
REG-SOC-G-EC Society Overall Objective
o strengthen civilCommission (EC)
Civil 11 Facility 12500000 European society within a participative democracy, stimulating a civil society
T Social sectors10000000 0 0
Tempus 17277775 European Commission (EC) development (applying equal opportunities asp
Social economic
REG-SOC-G-EC 12 IV Overall Objective:To contribute to social andsectors15550000 0 0
Youth in – Western Balkans Commission (EC)
REG-SOC-G-EC 13 Action Programme 1875000 European Window sectors 1500000 inclusion 0 the Western Balkans byfa
Social
Overall ObjectiveStrengthen democracy, civil society and social in 0
Migration Overall ObjectiveIncrease the benefitsWestern Balkans
2222222 European Commission (EC)2000000
of temporary 0
REG-SOC-G-EC 14 and socio-economic development in the Social sectors labour migration on the socio-economic developm 0
Regional T
integration of
Overall Objective:
o contribute to the Social sectorsminority groups in the0
Integration
REG-SOC-G-EC 15 Initiative for Roma 3333333 European Commission (EC)3000000 Western Balkans in
ccorda
0 a
REG-SOC-G-EC Society Overall Objective:
he overall objective is to strengthen civil society within 0 participative democracy an
Civil 17 Facility
T
12825000 European Commission (EC)
Social sectors12000000 a 0
Youth in – Western Balkans Social sectors
REG-SOC-G-EC 18 Action Programme 1875000 European Commission (EC)1500000 inclusion 0 the Western Balkans byfa
Overall ObjectiveStrengthen democracy, civil society and social in 0
Tempus 15333331 European Commission (EC) development (applying equal opportunities asp
Social economic
REG-SOC-G-EC 19 IV Overall Objective:To contribute to social andsectors13800000 0 0
Fight againstOverall Objective:Improve Beneficiaries' capacities and the prevention of terrorism crime, in particul
REG-SOC-G-EC 20 2500000 European drug trafficking to prevent
Social sectors 0
organised crime, in particular illicit Commission (EC)2500000 and combat organised 0
Overall Objective:
Southeast European Cooperative Initiative (SECI) 0
I the
REG-SOC-G-EC 21 support to strengthen mprove regional and international law enforcement capacities and coordination in p
Regional Social sectors
1500000 European Commission (EC)1500000 0
Witness Overall ObjectiveStrengthen cooperation and Terrorism (WINPRO)
4210526 European Commission (EC)4000000
Social sectors 0 0
REG-SOC-G-EC 22 Protection in the Fight against Serious Crime to support the fight against serious crime and terrorism at re
Regional Overall ObjectiveImproveEuropean Commission (EC)2500000
2777778 Beneficiaries' capacities to prevent and against cyber crime.Project purpose
Social sectors
REG-SOC-G-EC 23 Cooperation in Criminal Justice: Strengthening capacities in the fight combat0 0
Fight againstOverall ObjectiveImproveEuropean Commission the Prosecutors'cooperation in the Beneficiaries to inv
REG-SOC-G-EC 24 5263158 cross-border and international judicial
Social sectors
organised crime and corruption: Strengthening (EC)5000000 Network0 0
REG-PSD-G-EC 01 Programme on Trade and Investment in Privateincrease in trade relations and investment between the B
Regional T
Overall Objective:
he overall objective is an sector development
the Western Balkans
1125000 European Commission (EC) 800000 0 0
IPA 02 Overall ObjectiveTo contribute to the stabilization of development
735450000 Package Private sector financial markets and economies 0 the Western
REG-PSD-G-EC Multi-Beneficiary Crisis ResponseEuropean Commission (EC) 125450000 0 in
Regional Overall ObjectiveThis Centre
2000000 European Commission (EC)1700000 more developed entrepreneurship cultu
Private foundations for a
REG-PSD-G-EC 03 Entrepreneurial Learning project shall create the sector development 0 0
Economic Project Development Policy Loan Recovery Development Policy
143562000 World Bank (WB) Private 0 143562000
CRO-PSD-L-WB 02 Recovery Description: The Economic(ERDPL) sector development Loan for Croatia aims to support the 0
Additional The objective of the Additional Financing for and Environment Project Montenegro 0
5382090 World Bank (WB) Montenegro Areas 4169000
Water 0
MTN-WAE-L-WB 02 Financing for Montenegro Environmentally Sensitive TouristEnvironmentally Sensitive Tourist Areas Pro
HAA Group Bosnia line for financing of limited scale projectsBankdevelopment
BIH-PSD-L-EIB 06 Loan Private sector (EIB) medium enterprises and 0
Credit Global 75000000 European Investment of small and 0 25000000 local infrastructu
ZABA LOANThe European Investment PROJECTS lending EUR(EIB)million to Zagrebacka Banka d.d. to finance
CRO-PSD-L-EIB 02 & PRIORITY Bank (EIB)Private sector 100 0 100000000
is
FOR SMES 100000000 European Investment Bankdevelopment 0
The project, with an estimated
SER-PSD-L-EIB 07Sector Research and Development investment cost of EUR 420 million, concerns a series of investments a
Public Private sector (EIB) 0 200000000
200000000 European Investment Bankdevelopment 0
HBOR Private projects and 0 250000000
The loan of EUR 250 million will finance SMEsector (EIB) medium-sized companies projects in the a
AND MID-CAP II
CRO-PSD-L-EIB 03LOAN FOR SMES250000000 European Investment Bankdevelopment 0
Cofinancing TheIPA ISPA200000000eligible investments under the Croatian 200000000
CRO-WAE-L-EIB 02 2007-2011 Water and Environment
EU project will support European Investment Bank (EIB) 0 Strategic Coherence Framework and, 0
For Member States Projects
PCH Loan for SMEs and Priority and Western Balkans: Loan for financing0small and medium-sized0projects promo
REG-PSD-L-EIB 03 Private sector (EIB)
55000000 European Investment Bankdevelopment 55000000
RLB Steiermark Cross of projects of limited scale in the fields of infrastructure, environmental protection and impro
CRO-PSD-L-EIB 05 10000000 Loan Private sector (EIB) 0 10000000
Financing Border Global European Investment Bankdevelopment 0
APEX The Apex Loan for SMEs II is intended for financing of SME projects, small and medium scale infrastr
150000000 Private sector (EIB) 0 150000000
SER-PSD-L-EIB 08Loan for SMEs and Mid-Cap II European Investment Bankdevelopment 0
Feasibility The project relates to feasibility study Water of Waste 250000
250000 European Commission Environment
for development of sewerage Municipality for collection and tre
0
SER-WAE-G-EC 14 Study for Collection, Transport and Treatment and (EC) Waters in theinfrastructureof Uzice 0
European • Strengthening3108033 demands for Social sectors 3107957
citizens’ Switzerland better
– PROGRES
•
SER-SOC-G-CHE 02 Support to South and Southwest Serbia(CH) governance
Assistance to municipalities 0 enhancing se
0 in
Upgrade/rehabilitation of the monitoring and control8726980of the Nikola Tesla Thermal Plant B
Nikola Tesla•Thermal Plant B
SER-ENE-G-CHE 02 87207192 Switzerland (CH) Energy system 0 0
SER-SOC-G-CHE 05 S housing
•
upport to basic296395 infrastructure (hygiene, water and electricity)
0
Social
Social Inclusion of Roma in VojvodinaSwitzerland (CH) sectors 296388 •P
rofessional development, ac
0
Western Balkans Sustainable Energy European Bank for (WeBSECLF) Energy Credit
76000000 Credit Line Facility Reconstruction
Private sector 16000000 Development (EBRD)
development
REG-PSD-L-EBRD 02 The EBRD has developed the Western Balkans Sustainable and 60000000 Line Facility (WeBSECLF) 0
Corridor Vc The EBRD Project providing a €60.7 millionTransport Croatian Motorways (“HAC”), (EBRD)
facility to
CRO-TRA-L-EBRD 05 Completion is166300000 European Bank for Reconstruction and 60700000 the state-owned compa
0 Development 0
Montenegro: ZPCg Rolling 16000000 providing funds to Reconstruction and 13550000 0 Development (EBRD)rail
MTN-TRA-L-EBRD 03 The EBRD is consideringEuropean Bank for finance priority upgrade of the passenger 0 fleet operate
Stock Renewal Project Transport
6000000 providing a sovereign Environment €5.35 million to finance the
MTN-WAE-L-EBRD 02 The EBRD is consideringEuropean Bank for andloan of up toand Development (EBRD) construction
Danilovgrad Municipal Infrastructure Project Water Reconstruction 0 5350000 0
Premises of the the Civil Engineering Social of the Džemal Bijedić University which has
449375 Turkey (TR) Faculty of the 449375
Reconstruction of the Civil Engineering Faculty Premises sectors DžemalBijedić University in Mostar been damage
BiH-SOC-G-TR 01 0 0
ConstructionA pre-school was constructed in (TR) Social sectors 240728
BiH-SOC-G-TR 02 240728 Fatih in Novi Travnik 0 0
of the pre-school Sultan Turkey Novi Travnik. Construction work was completed in September 2010.
Reconstruction of 7 schools in the 1 vocational school located in the Central Bosnia Canton were reconstructed by
BiH-SOC-G-TR 03 and Central Bosnia Social
6 village schools 614765 Turkey (TR) Cantonsectors 614765 0 0
Reconstruction of the Konjic1047292 Turkey (TR) Social sectors 1047292 the war was reconstructed by TIKA. Re
BiH-SOC-G-TR 04 Hospital
The Konjic Hospital which has been severely damaged during 0 0
Development of the Bosnian e-Justice System
BiH-SOC-G-TR 06 the technical infrastructure of the Bosnian e-Justice System was supported by donat
Establishment of129502 Turkey (TR) Social sectors 129502 0 0
Gorazde 90 reconstruction 431400 Turkey (TR) Social Bosnian 431400 0 In
BiH-SOC-G-TR 07 house houses located in Gorazde that belong to sectors war victims were reconstructed. 0 addition, 5 ne
Restoration of the historicalthe historical Konjic Bridge -which was1743516
BiH-TRA-G-TR 01 Konjic Bridge
Restoration of 1743516 Turkey (TR) Transport 0 0
built in 1682 and damaged during WW II- was c
Reconstruction of the primary184834School Rovinskiin thesectors 184834Podgorica was reconstructed by TIKA. (
MTN-SOC-G-TR 01 school Turkey (TR) Social Stari Aerodrom,
Pavle Rovinski Primary Pavle located in Podgorica 0 0
ConstructionA new premise school Sukriye Mecidovic in Bijelo Polje164779Bosnian village located near Bijelo Polje
MTN-SOC-G-TR 02 164779 Turkey (TR) Social sectors
of the primary for the Sukriye Mecidovic Primary School in a 0 0
The Annex of Institute of Turkey (TR) of the sectors Montenegro
193320 History of the University of of Montenegro
Reconstruction of the Annex of Institute of History Social University 193320 was reconstructed by0TİKA. (2010)
MTN-SOC-G-TR 03 0
Medical Medical equipment was donated (TR) ENT sectors - ENT Clinic by TIKA. (2010) 0
140816 Turkey to the Ulcinj Hospital 140816
MTN-SOC-G-TR 04 equipment support for the Ulcinj Hospital -SocialClinic 0
The Gynaecology Clinic of the RožajeSocial Hospital was
127876 Turkey (TR) State sectors 127876
Reconstruction of the Gynaecology Clinic of the Rožaje State Hospital reconstructed by TIKA. In addition, medical
MTN-SOC-G-TR 05 0 0
Rehabititation of a 300m village road in PetnicaPetnica to Berane was rehabilitated by0
MTN-TRA-G-TR 01 196633 Turkey (TR) Transport
A 300m of village road connecting 196633 TIKA. (2010)0
The Annex of the University of Novi Novi Pazar
735775 Turkey of Pazar is being reconstructed
Reconstruction of the Annex of the University(TR) Social sectors 735775 by TİKA. (2010)
SER-SOC-G-TR 01 0 0
Reconstruction of the techincal high school Vrbas inwas reconstructed by TIKA. (2010-2011)
SER-SOC-G-TR 02 182974 Turkey (TR) Social Sad
Vrbas High School located in Novi Sad Novisectors 182974 0 0
Tutin Water Pipeline Project 750000 Turkey (TR) Water free Environment
SER-WAE-G-TR 01 Replacing the water pipelines with asbestos and ones 750000 (2009) 0 0
Tutin Industrial Zone Project1464484 Turkey (TR) Private sector development
SER-PSD-G-TR 01 TIKA. (2009-2010) 0
Projects of the Tutin Industrial Zone was prepared by1464484 0
Ecodevelopment in rural areas Contributeand Herzegovina and Serbia
REG-PSD-G-SPA 01 266069 Spain the sustainable socioeconomic growth and the recuperation of biodive
238696
Overall Objective: of Bosnia to (ESP)Private sector development 0 0
As part of the Research European Commission (EC) 800000
Designing Medical Faculty,construction and equipping of the Medical Faculty in Banja Luka, at the Paprikovac loca
BIH-SOC-G-EC 59 Social
800000 Center and School sectors 0 0
Additional restructuring works272000centre(IT)hydrotherapy and rehabilitation of the Gradska Banja0of Mostar
BIH-SOC-G-ITA 04 ITALIAN REPRESENTATION Link to Italian Cooperation http://www.cooperazionea
Type of resource: in the Italy of Social sectors 272000 0
Horticulture The project Kosovo
7200000 Switzerland (CH) sector development sustainable and broad-based empl
KOS-PSD-G-CHE-01 Promotion insupports horticulture agribusiness sector 5402880
Private in generating 0 0
Vocational The project supports the Vocational Education System in Kosovo by developing market-oriented trade
KOS-SOC-G-CHE-02 Education Support Social
3470000 Switzerland (CH) sectors 2302692 0 0
Enhancing The Employability 495000 Switzerland (CH) sectors 437085
Social 0 0
KOS-SOC-G-CHE-03 Youthproject contributes to increase the employment opportunities of the youngsters going out from VE
Support to The project contributes to the
1000000 Switzerland (CH) of an impartial correctional system that functions in comp
Social
KOS-SOC-G-CHE-04 Kosovo Correctional Services establishment sectors 665700 0 0
Rural Water and project contributes in improving (CH) and Environment
2060000 Switzerland Water 1784578 0
KOS-WAE-G-CHE-01 This Sanitation Support Programme the health and well-being of communities through0sustainable wa
Rural Water Supply and contributes in improving (CH) and Environment
1500000 Switzerland Water 1012200 0
KOS-WAE-G-CHE-02 This project Sanitation Programme the health conditions of selected rural communities through wate0
Small Infrastructure for goal of this program Programmeand Environment
KOS-WAE-G-CHE-03 The overallWater and Sanitation is to improve health conditions and socio-economic well being of the
1196250 Switzerland (CH) Water 953052 0 0
Kosovo Water Task Force 1000000 Switzerland Water and Environment
of a 623600 0
KOS-WAE-G-CHE-04 The project aims at the establishment(CH) systematic management of the water resources in Kosovo 0
Gjilani V rehabilitation plan and envisages the constructio
The project Gjilani V is part of Kosovo’s power sector6348248
KOS-ENE-G-CHE-01Substation 10180000 Switzerland (CH) Energy 0 0
Water Management – Operational and Financial Monitoring Project 76462
125000 Switzerland (CH) of Regional Water Companies in key areas of operations, finan
KOS-WAE-G-CHE-05 The project will enhance transparencyWater and Environment 0 0
a
KOS-SOC-G-CHE-05 The project will support the Psychiatric University Clinic Pristina (PUC-P) in becoming 0 Learning Res
900000 Switzerland (CH) sectors
Social
Swiss & Liechtenstein Support Project to Mental Health in Kosovo 561240 0
Economic The project contributes to Roma, Ashkali andsectors Communities in Kosovo
114720 the social (CH) Egyptian 75669
Social 0
KOS-SOC-G-CHE-06 and Social Development ofSwitzerlandand economic development of specifically disadvantaged membe 0
Roma, Ashkali and Egyptian Housing Switzerland (CH) sectors 438620
650000 & Integration Project
Social 0
KOS-SOC-G-CHE-07 The project targets the sustainable improvement of living conditions of Roma, Ashkali 0 and Egyptian co
Employment and income promotion for RAE communities in Eastern Kosovo
to improve the living Social
conditions of 223230 0
KOS-SOC-G-CHE-08 The project aims371000 Switzerland (CH) sectorsRoma, Ashkali and Egyptian communities in Koso 0
Regional Equal access of citizens to quality public services – Joint Programme with ADA
2400000 Northern Albania sectors 1922400
ALB-SOC-G-CHE 04 Development Programme inSwitzerland (CH) (RDP) and economic opportunities in the regions of Shkod
Social 0 0
to the Council of 750000 Switzerland (CH) and build up stronger local government structures in Alba
Europe (CoE) for theSocial “Reinforcing local
project
Contribution Contribute to strengthening local democracy sectors 506100 and regional structures in Albania”
ALB-SOC-G-CHE 05 0 0
to the project “Developing Women’s the skills and resources necessary to campaign for municipal off
150000 Switzerland (CH) Leadership in Albania”
Contribution Provide politically active women with Politicalsectors 105255
ALB-SOC-G-CHE 06 Social 0 0
Development of the phase 2 is to Health and contribute to the improvement of quality health care fo
Professional The main goal System (PDS) in thesupport Sector
ALB-SOC-G-CHE 07 Social
1835000 Switzerland (CH) sectors 1603606 0 0
Alternated •
he number of2220000 Switzerland (CH) sectors 1470084
T beneficiary Roma children
ALB-SOC-G-CHE 08 Education and Vocational Training (CEFA) who attend education in public0
Social schools remains at 320 and
0
Corporate •
he first phase2100000 Switzerland (CH)
T Private results 1539510
and based
ALB-PSD-G-CHE 01 Governance (CG) of CG project produced goodsector developmenton these, Phase II was launched.
h
Project 0 0 •T
Corporate •
he Accounting Enhancement Project
T
ALB-SOC-G-CHE 09 Financial Reportingand Auditing (A&A ROSC) assessment demonstrated that Albania needs to take furt
Social
1750000 Switzerland (CH) sectors 1282925 0 0
ALB-PSD-G-CHE 02Investment Advisory ServicesSwitzerland (CH) Trust Fund program is toFund Program: Albania Sub-nat
Foreign •
he main objective of the(FIAS) Partnership sector development
T 300000 Western Balkans Western 219930 Trust assist the governments of the W
Private Balkans 0 0
•
he Fund For 3500000 Switzerland (CH) sector Bank Project
T Emerging Credins Bank project is to 2329950 to
contribute
Swiss Investment main objective of theMarkets (SIFEM): Credins development strengthening Albania’s banking inf
ALB-PSD-G-CHE 03 Private 0 0
S
Promotion Programme Switzerland on five sector development
Swiss Import•
IPPO’s programme activities focus (CH) main objectives: (i) to increase the competitiveness of SM
ALB-PSD-G-CHE 04 6000000 Private 3670200 0 0
•
evelop suitable and Training Support Programme (AlbVET)
D 5500000 approachesSocial sectors 3627800
for
ALB-SOC-G-CHE 10 Vocational EducationtrainingSwitzerland (CH)the 2+1+1 system and support their implementation in two s
Albanian 0 0
•
ommercial, technological and institutional sector development
C
Sustainable Agriculture Support in Albania (SASA)Privateinnovations, all contributing to take advantage of existing
ALB-PSD-G-CHE 05 1420000 Switzerland (CH) 936632 0 0
•
and Environmental LakeSupply and Shkodra 2008-2012 Protection Shkodra project 0 be improved
this Water Protection Water
Environmental Lake
Water SupplyThe impact of16900000 Switzerland (CH) and Environment
ALB-WAE-G-CHE 04 16900000 0 will
•
this Water Lezha City Sewerage Project in Lezha City will be a contribution to an effici
Water SupplyThe impact of13600000 inSupply and(CH) andInfrastructure Program I 2011-2014 0
ALB-WAE-L-CHE 05 and Sewerage Project Switzerland Water 10500000
Municipal Environment 3100000
Dam 02 Five hydropower plants on Rivers and Mat Rivers – 4904320 2014
ALB-ENE-G-CHE Safety Project on the Drin and Matthe Drin Cascades 2007 produce about 90% of0Albania’s installed power ca
7900000 Switzerland (CH) Energy 0
Line of to support SME's in Serbia through the national banking system and to support
707332 Italy (IT) Private sector development 707332
0 0
SER-PSD-L-ITA 01 creditLink to Italian Cooperation http://www.cooperazioneallosviluppo.esteri.it/pdgcs/ local development thr
The Project for2080000 SwitzerlandProject for Large2080000
Large Gas Building (CH) Gas Albania with Developments in (Trans with
ALB-ENE-G-CHE 04 Buildingimpact of this Capacity Infrastructure Developments in Infrastructurethe Private Sector AlbaniaAdri
Capacity Energy 0 0
•
DC contribution
S it
Roma Education Fund (REF) is earmarked for the countries of Western Balkans and0 will be represented in the
ALB-SOC-G-CHE 11 Social
1566000 Switzerland (CH) sectors 1056736 0
ALB-SOC-G-CHE 12to Regional Police Cooperation
egional Community Policing Platform
ommunity Policing Award
egi
Support •
apacity building of SEPCA
C
•R Social
4900000 Switzerland (CH) sectors 2997330
•C 0
0 •R
Southeast The main objectives of the program (former Private•To contribute to regional poverty alleviation, econo
4500000 Switzerland (CH) sector
ALB-PSD-G-CHE 06 Europe Infrastructure Advisory (SEIA) are as follows:
3036600 Partnership for Southeast Europe Infra
Private Enterprise
development 0 0
IFC PEP-SEImprovement of4832500Project
MAC-PSD-G-CHE 01 corporate governance of companies 3122278 through knowledge dissemination, in-
Private
Corporate Governance Switzerland (CH) sector development and banks 0 0
EBRD TradeProvision of Programme to international banks to cover commitments of local banks from trade transa
MAC-PSD-G-CHE 02 5000000 Switzerland (CH) sector development
Facilitation guarantees (TFP) Private 3112000 0 0
Berovo Urban Water Supply the Sanitation
10100000 Switzerland Water
sanitation Environment
6516520 0 0
MAC-WAE-G-CHE 04 Improvement of and water supply and (CH) andin Berovo through reconstruction of the water supply n
Rehabilitation of Pumping of 966230 Switzerland on the main Environment waste water in area of Ohrid East
six pumping station (CH) and collector for
MAC-WAE-G-CHE 05 Rehabilitation Stations Ohrid East Water 623411 0 0
Waste 06 Treatment Plant GevgelijaWater Treatment Plant for 6800000
the Waste Water Gevgelija, 0 0
MAC-WAE-G-CHE waterConstruction of 6800000 Switzerland (CH) and Environment with financial contribution of Switzerla
Wastewater Treatment Plant in Wastewater Treatment Plant and the main
16300000 Switzerland (CH) MEAP) 11154090 0 0
MAC-WAE-G-CHE 07 Construction of the Kumanovo (part ofWater and Environment collector for municipal wastewater of K
Bregalnica The Basin Management Project -Decision Note Environment
support Switzerland (CH) functioning
and 3417368 0 0
MAC-WAE-G-CHE 08 River project will 4360000establishmentWater andPhase of the river basin management bodies and will p
Restoration Finalisation of the construction works (CH) and Environment of the Golema River in 0 urban sectio
1250000 Switzerland Water
MAC-WAE-G-CHE 09 of Golema River, Phase 2 770125
for restoration/regulation 0 the
Integration Integration of environmental education in theand Environment of the primary and secondary schools a
Education in Macedonian
Water existing 1799591
curricula
MAC-WAE-G-CHE 10 of Environmental2657400 Switzerland (CH) Education System, Scale-up Phase 0 0
Biodegradable Waste Management inSwitzerland Region
806000 the for management Environment
Water 545823 0 0
MAC-WAE-G-CHE 11 Development of a pilot projectPrespa (CH) andof the biodegradable waste through construction of the
Nature Preservation Programme - Phase Entry proposal
90000 Switzerland (CH)
selection Environment
60948 0
MAC-WAE-G-CHE 12 Definition of the Programme Concept,Water andof the Implementer and preparation of0the Project Doc
Efficient Replacement and 12100000 of condenser batteries, instalment of energy meters, assistance in the field o
MAC-ENE-G-CHE 01Energy Distribution 1 supply Switzerland (CH) Energy 7730690 0 0
Efficient PoPs unit continued the Switzerland (CH)Energy of the 0 0
MAC-ENE-G-CHE 02Energy Distribution 2165000 activities within the framework101656GEF Medium Size Project "Phasing-out
Efficient Contribution to 3176000 Switzerland (CH)Energy 117744 0
MAC-ENE-G-CHE 03Energy Distribution the project "Enabling the Environment for Energy Efficiency in Building 0 Measures in the
ConstructionA primary school was constructed in Mamusa. (2007 - 298385
KOS-SOC-G-TR 01 1265900 Turkey
of the primary school Mamusa (TR) Social sectors 2010) 0 0
Reconstruction of the High school Alaaddinin Prizren was sectors 174490 TIKA. Equipment support was also prov
KOS-SOC-G-TR 02 335767 Turkey Prizren
Alaaddin high School located in(TR) Social reconstructed by 0 0
Reconstruction of the high school Anton Cettain Skenderaj was reconstructed by TIKA. Equipment 0
KOS-SOC-G-TR 03 341500 located in Skenderaj
Anton Cetta High School Turkey (TR) Social sectors 341500 0 support was als
ConstructionBuilding of the Mamusa Municipality was constructed by52487 (2007-2009)
KOS-SOC-G-TR 04 52487 Turkey (TR)
of the Mamusa Municipality Building Social sectors TIKA 0 0
of a primary school in Kılavuzlu Village
ConstructionA primary school was constructed in Kılavuzlu Village (2010)
MAC-SOC-G-TR 01 40762 Turkey (TR) Social sectors 40762 0 0
Tefeyyüz Primary school Turkey (TR)Skopje sectors 258795
School located in Social
Reconstruction of the primary258795 Tefeyyüzin Skopje was reconstructed by TIKA. (2010)
MAC-SOC-G-TR 02 0 0
Reconstruction of 3 schools in Lipkova region(TR) Social sectors 125975
MAC-SOC-G-TR 03 located Turkey
3 village schools 125975 in Lipkova were reconstructed by TIKA. (2010) 0 0
Central Potable Water Project Jupa were provided potable water. (2008-2009) 0
988337
MAC-WAE-G-TR 01Jupa4600 residents of central Turkey (TR) Water and Environment 988337 0
Equipment Medical equipment was donated (TR) Social sectors Center
316800 Turkey to the Children 0 0
ALB-SOC-G-TUR 10 support for the Center of Dialysis for Tirana University - 316800of Dialysis for Children. (2009-2010)
Improvement of the Intensive Care Units in Albania
ALB-SOC-G-TUR 11 79707 Turkey to various sectors
Medical equipment was donated (TR) Socialhospitals. (2010) 79707 0 0
Seenet
REG-SOC-G-ITA 01II 8280000 Italy (IT) Social sectors 8280000 0
Link to Italian Cooperation http://www.cooperazioneallosviluppo.esteri.it/pdgcs/ 0
Support Type of resource: BANCA MONDIALE - IBRD Link to3000000
3000000 Italy (IT) Social sectors Italian Cooperation http://www.cooperazioneallo
KOS-SOC-G-ITA 01 to the programme of sustainable employment - contribution to the world bank 0 trust fund 0
REG-PSD-L-EBRD 01 The Western Balkans Sustainable Energy Direct-Financing Facility (WeBSEDFF) is an investment fac
63000000 Direct Funding for Reconstruction and Development (EBRD)
Private sector 13000000
development
Western Balkans Sustainable Energy European Bank Facility WeBSEDFF 50000000 0
EU/EBRD EU/EBRD Private Sector European Bank for Reconstruction Energy Financing (EBRD) a part of a larg
110000000 Support Facility for Western Balkans – Development Facility0
development WBPSSF
REG-PSD-L-EBRD 03 Western Balkans Private Sector Support Facility - Sustainable and 87500000 – SEEF is (WBPSSF – SE
Private sector 22500000
The sustainable energy project Bank (WB) EE and
World Bank GEFobjective of this project is to develop a sustainable market for2025000RE by supporting the devel
MAC-ENE-L-WB 01 6150000 World Energy 4125000 0
The Fund Southeast Europe
REG-ENE-F-EC 01for Growthmain objective is to help the countries of Southeast Europe achieve 20% savings in energy or 20%
Green Energy
128000000 European Commission (EC) 0 0 128000000
Credit 30000000 Italy to public enterprises of municipalities, that thanks to the0
SER-PSD-L-ITA 02Line IICredit Line II will be extended (IT) Private sector development0 30000000 access to soft l
IPA 04 The implementation of EEFF 2007 started in sector 13500000 54800000
68300000 European Investment Bankdevelopment
Private (EIB) 0
REG-PSD-L-EIB 2007/ Energy Efficiency Finance Facility (EEFF) 2007November 2009 and covers the seven countries of the W
IPA 2007/ The implementation of EEFF 2007 (GER) in sector development
38500000 Germany startedPrivate 7700000 30800000 0
REG-PSD-L-GER 01 Energy Efficiency Finance Facility (EEFF) 2007November 2009 and covers the seven countries of the W
Water Supply of Tirana - Grant85632 Italy (IT)
ALB-WAE-G-ITA 03 Water
and Credit Operations and Environment 85632 0 0
Electricity
ALB-ENE-G-ITA 02 Emergency in Albania 309882 Italy (IT) Energy 309882 0 0
Child Support Policies - Institutional StrengtheningSocial sectors 266527
ALB-SOC-G-ITA 14 266527 Italy (IT) 0 0
for Decentralisation of Social Services and the National Service
Rehabilitation of the port of Valona Italy (IT)
ALB-TRA-G-ITA 01 146176 Transport 146176 0 0
Solid Waste Management in Tirana Italy (IT)
ALB-WAE-G-ITA 04 32028 32028
Water and Environment 0 0
Strengthening of Albanian Structurese for the Control of Food development
ALB-PSD-G-ITA 02 1419451 Italy (IT) Private sector 1419451 0 0
Support 594299 Italy (IT) Transport project 0
ALB-TRA-G-ITA 02 and Technical Assistance to the PIU at the MLPTT for the 594299management in transport sector 0
Equipment and Rehabilitation of 5 outpatient clinics
ALB-SOC-G-ITA 15 74439 Italy (IT) Social sectors 74439 0 0
Programme for Strengthening the Services for training and the national service for employment 0
ALB-SOC-G-ITA 16 214274 Italy (IT) Social sectors 214274 0
Construction of a Service Centre and Italy (IT)
ALB-PSD-G-ITA 03 Private sector development
596299
596299 a data communication network for universities 0 0
A line SMEs
ALB-PSD-L-ITA 01of Credit for Albanian 1332094 Italy (IT) 0
Private sector development 1332094 0
Centre 223527
ALB-SOC-G-ITA 17for Rehabilitation Therapies Italy (IT) Social sectors 223527 0 0
Integrated Social Action for the Promotion (IT)
ALB-SOC-G-ITA 18 Social sectors 186992
186992 Italy of Childhood and Youth at Risk 0 0
Urban 203731 of the Works for the rehabilitation of two historical squares Scanderberg His
ALB-PSD-G-ITA 04Development of Tirana: DesignItaly (IT) 203731
Private sector development 0 0
Study for 89975 Italy (IT) Water and
ALB-WAE-G-ITA 05 the evaluation of water resources of South Albania Environment 89975 0 0
Tourist 393447 Italy Permet Area and its typical products
ALB-PSD-G-ITA 05 and Environmental Development in(IT) 393447
Private sector development 0 0
Early diagnosis and social integration Italy (IT)
ALB-SOC-G-ITA 19 Social sectors 650321
650321 of deaf children 0 0
Integrated Services and Community Based Services for Alcholics, Drug Additcs and other forms of0
ALB-SOC-G-ITA 20 565873 Italy (IT) Social sectors 565873 0 discomfort
Integrated training and support operation for families of the slum in 562255
ALB-SOC-G-ITA 21 562255 Italy (IT) Social sectors kombinat 0 0
Strengthening of educational 775853 Italyservices Social sectors 775853 centre of Bardhaj Bleran
ALB-SOC-G-ITA 22 and training (IT) of the vocational training 0 0
Protection of the Rights of mentally ill Italy (IT) affected bysectors mental illnes and implementation of a network of
ALB-SOC-G-ITA 23 400442 patients Social chronic 400442 0 0
Teaching dimension
ALB-PSD-G-ITA 06 ICT in an European283304 Italy (IT) 283304
Private sector development 0 0
Prevention, care and physiotherapy service for disabled people in central and northern0Albania
ALB-PSD-G-ITA 07 564147 Italy (IT) 564147
Private sector development 0
Support 451397 Italy roadmap to exit from violence
ALB-SOC-G-ITA 24 to Women's Centre New Moon: A (IT) Social sectors 451397 0 0
North Albania: Strengthening 730584 Italy HospitalSocial sectors 730584
ALB-SOC-G-ITA 25 the First Aid (IT) in Scutari 0 0
Creation 362787 Italy (IT)
ALB-PSD-G-ITA 08 of Industry Chain Consortia in North Albania 362787
Private sector development 0 0
Support 280556 Italy (IT) Private sector development
ALB-PSD-G-ITA 09 to Local Development Dynamics in the Rural Zone of Zadrima 280556 0 0
Strengthening of Socio-Educational Services for Social and Cultural Promotion and Work Placement of Young Peo
ALB-SOC-G-ITA 26 385456 Italy (IT) Social sectors 385456 0 0
Rural Development integrated project Italy (IT)
ALB-PSD-G-ITA 10 Private of Kelmend and Shkrel, Malaysia Emahde District, North
559259
559259 in the municipalitiessector development 0 0
Strengthening of Socio-Educational Services for Social and Cultural Development of Children and Young Women
ALB-SOC-G-ITA 27 208635 Italy (IT) Social sectors 208635 0 0
Italian Support to the Reform 501380 Italy (IT) System: Studies Unit and Technical Assistance to the Ministry of H
ALB-SOC-G-ITA 28 of Albania Health Social sectors 501380 0 0
Assistance Programme for the Ministry of Environment for biodiversity - Systematic Management of Protected Are
ALB-WAE-G-ITA 06 1107595 Italy (IT) 1107595
Water and Environment 0 0
Recognition and Training of Migrants returned in Northern Albania 271099
ALB-SOC-G-ITA 29 271099 Italy (IT) Social sectors 0 0
North Albania: Educational Support and Training for Children and Adolescents in Disadvantaged areas and openin
ALB-SOC-G-ITA 30 112000 Italy (IT) Social sectors 112000 0 0
Strengthening of Primary Education and Improvement of sectors teachers in the Scutari district North Albania
ALB-SOC-G-ITA 31 279983 Italy (IT) Social skills for 279983 0 0
Support 122320 Italy (IT) Social sectors 122320 0 0
ALB-SOC-G-ITA 32 to the process of European Integration of Albania through activities supporting Albanian Institutions
Training 422493 Italy (IT) Social sectors Perspective
ALB-SOC-G-ITA 33 of teachers of Albanian Secondary Schools in a European 422493 0 0
SDISEE
REG-ENE-L-WB 01 1900826 World Bank (WB) Energy 0 1900826 0
Eu Desk
REG-SOC-G-ITA 02 II 78430 Italy (IT) Social sectors 78430 0 0
Kosovo the Ministry of Agriculture, Forestry and Rural Development for the improvement of t
KOS-SOC-G-ITA 02 - IAM - Strengthening858495 Italy (IT) Social sectors 858495 0 0
Cultural 135600 Italy (IT) Social sectors 135600
KOS-SOC-G-ITA 03 Diversity, Intercultural Dialogue, Heritage Protection and Reconciliation in Kosovo 0 0
Support 12011 Italy
KOS-SOC-G-ITA 04 to the Health System in Kosovo (IT) Social sectors 12011 0 0
Support 632527 Italy (IT) for disability in 632527
KOS-SOC-G-ITA 05 to the implementation of the national plan Social sectors Kosovo 0 0
Institutional Building in support of the Ministry of Culture, Youth and378000 for the Implementation of a Manageme
KOS-SOC-G-ITA 06 378000 Italy (IT) Social sectors Sports 0 0
Development of the Livestock561304 through the creation sectorartificial insemination centre
KOS-PSD-G-ITA 01 Sector Italy (IT) 561304
Private of an development 0 0
Training, 963278 Italy (IT) Private sector 963278
KOS-PSD-G-ITA 02 Microcredit and Agricultural Development in Kosovo development 0 0
Rationalization of Health Care 16737 Italy (IT)
MAC-SOC-G-ITA 01 Social sectors 16737
and Modernization of Technology Park in FYR Macedonia 0 0
Citizens
MAC-SOC-G-ITA 02 of FYR Macedonia 473054 Italy (IT) Social sectors 473054 0 0
Environmental Protection, Economic DevelopmentWater and Environment
MAC-WAE-G-ITA 02 994111 Italy (IT) 994111 0
and Promotion of Eco-Tourism in the Park Mavrovo 0
Integration 1112183 Italy South-East of sectors 1112183 Macedonia, Kosovo and Montenegro
MAC-SOC-G-ITA 03 and Support of Minorities in the(IT) Social the Balkans FYR 0 0
Support 73522 Cooperation Water and Environment Lake District of Ohrid and Prespa
MAC-WAE-G-ITA 03Programme to Cross-Border Italy (IT) 73522
in Protected Areas of the 0 0
OSSH electricity proposed 50000000 improvementmillion long-term senior loan to the
transaction is a EUR 50 program
ALB-ENE-L-EBRD 01 The distribution efficiencyEuropean Bank for Reconstruction and 50000000Electricity Distribution Comp
Energy 0 Development (EBRD) 0
Tirana Bank Credit Line 40000000 European worth a Reconstruction and with Piraeus (EBRD)
ALB-PSD-L-EBRD 01 The EBRD has signed investments Bank fortotal of €200 million 40000000 Group subsidiaries in Bu
0
Private sector developmentDevelopment 0
Macedonian Railways - is consideringEuropean Bank formillion sovereignand 17600000 track renewal along the C
MAC-TRA-L-EBRD 02 The EBRD Corridor X loan to finance
19700000 providing a €17.6 Reconstruction 0 Development (EBRD)
Transport 0
Boskov Most Hydro Power 84000000 hydro powerEnergyReconstruction and Developmentthe town of Debar in we
Project plant
MAC-ENE-L-EBRD 02 The 70MW Boskov Most European Bank for(the Project) is to0be 84000000 located near (EBRD) 0
5600000 making an investment to enhance the Development (EBRD)
MAC-TRA-L-EBRD 03 The EBRD is consideringEuropean Bank for Reconstruction andmobility of Skopje’s residents and imp
Skopje Urban Transport Project Transport 0 5600000 0
The overall Trade Developmenttrade Private sector development
1197222 boost in the Western (EC)1000000
and investment in II
REG-PSD-G-EC 04 Programme onobjective is toEuropean Commission BalkansSouth Eastern Europe through
Regional 0 0
facilitating imp
Regional Overall ObjectiveTo increase trade relations sector development
1020000 European Commission investment between the 0
the Western Balkans III
REG-PSD-G-EC 05 Programme on Trade and Investment in Privateand (EC) 500000 0
Beneficiaries.Project purpos
Regional Overall ObjectiveTo increase trade relations sector development
857500 European Commission investment between the 0
the Western Balkans IV
REG-PSD-G-EC 06 Programme on Trade and Investment in Privateand (EC) 500000 0
Beneficiaries.Project purpos
Overall follow-up340000Small Business Act (SBA) is to improve
T Private project
Implementation and Objective:
he overall objective of this sector development the business environment in gener
REG-PSD-G-EC 07 of the European Commission (EC) 300000 0 0
Solid Waste Management is2000000capacities in the
to build Austria -2011) Water and Environment
2000000 0
REG-WAE-G-AUT 01 The objective TA Program (2008(AUT) waste sector in the Western Balkans by building the legal an 0
Renewable Preparation and implementation of legal, financial and technical framework for microhydropower proje
4000000 Austria (AUT)
REG-ENE-G-AUT 01 Energy Development Program (2009 -2015) Energy 4000000 0 0
Urban Development Program for Western Balkan (2011 workshops/seminars of the World Bank Institute for leade
REG-PSD-G-AUT 01 4000000 Austria (AUT) Private sector 4000000
Financing the training and capacity building -2014) development 0 0
ECA 02 The goal is Program (2010 –of (AUT)
improvement 2015) Energy
REG-ENE-G-AUTCleaner Productionthe 1500000 Austriaoperational processes to make more efficient use of inputs such as en
1500000 0 0
Impact of 144675 Spain of Southeastern Environment
REG-WAE-G-SPA 01 climate change on the biodiversity(ESP)Water and Europe countries 144675 0 0
Promotion a better understanding Spain (ESP)Social sectors
Strengthening participation capacity and citizens access framework of public adm
50000 the 0
ALB-SOC-G-SPA 07 ofOverall Objective: 50000by the Albanian society about Gender Equality in 0 to the activity ofEuropean
Investment Program in the region of Mirdita decentralization and democratization in decision-making
ALB-PSD-G-SPA 01 andOverall Objective : Support to the process of (Albania) 121570
Training 121570 Spain (ESP)Private sector development 0 0
Support of a Programme of Activities and Measures which facilitate the reintegration of those
ALB-SOC-G-SPA 08 to the establishment 210000 Spain (ESP)Social sectors 210000 0 0
Conflicts 40574 Spain (ESP)Social sectors of the 0 0
REG-SOC-G-SPA 01 and territorial structure in Europe. Elements for the renewal40574 political and social debate through the
Overall Objective Contribute to the Legal Services the Rule of of guaranteeing the effective defense
ALB-SOC-G-SPA 09 to the consolidation of: the State General strengthening ofwith the aim Law in Albania. Specific Objective : S
Support 170000 Spain (ESP)Social sectors 170000 0 0
My book Objective: Strengthening Spain (ESP)Social sectors the69000
69000 of the education system of Albanian education 0 0
ALB-SOC-G-SPA 10 on gender equality: Promotion of gender equality in upper secondary society in terms of promotion of gen
Strengthening the judicial system of Albania (ESP)Social sectors the Rule of Law in Albania. Specific Objective: Su
ALB-SOC-G-SPA 11 235000 Spain
Overall Objective: Contribute to the strengthening of 235000 0 0
Strengthening the Agricultural Extension Services inagricultural of the Diber north of Albania. Specific Objective: S
ALB-PSD-G-SPA 02 120000 Spain (ESP)Private sector development
120000
Overall Objective: Strengthening of the the region sector in the 0 0
Capacity 160000 Spain (ESP)Private sector development
160000 0
REG-PSD-G-SPA 02 building of local administration officials in candidate countries and potential candidates on0municipal dece
Support Overall Objective: system: Application of environmental legislation and the European 0 internationa
120000 Spain (ESP)Water and system and 120000 0 and
ALB-WAE-G-SPA 03to the Albanian judicialSupport to the Albania judicial Environmentother institutions to strengthen the applic
Support 120000 Spain (ESP)Private and cooperativism in
120000 0
ALB-PSD-G-SPA 03 to the development of agricultural associationism sector development Albania (phase II) 0
Training 120000 Spain (ESP)Private sector development
120000 0
REG-PSD-G-SPA 03 enlargement countries on the Spanish experience in common agricultural policy and rural 0 development
Improved 75000 Spain (ESP)Social sectors 75000
ALB-SOC-G-SPA 12 networking among local actors and their capacity to increase participation in0 0
regional cooperation progra
Support Overall Objective: Contribute to (ESP)Social sectors the Rule of Law in II)
450000 Spain the Strengthening of 450000 0 0
ALB-SOC-G-SPA 13 to the reform and modernization of the Albanian penitentiary system (Phase Albania. Specific Objective: Su
Sustainable Development in the NorthSpain (ESP)Water and Environment Development local policies in the nor
ALB-WAE-G-SPA 04 174000 of to the 174000
Overall Objective: ContributeAlbaniaimprovement of Sustainable 0 0
Seminar 159712 Spain (ESP)Water candidate potential
159712
REG-WAE-G-SPA 02on Environmental policy for the European Unionand Environment candidate countries 0 0
Training 56000 in the field of European studies
ALB-SOC-G-SPA 14 of officials and professionals Spain (ESP)Social sectors 56000 0 0
Feasibility The bellow proposed activities for Durres identification, preparation and implementation of priority me
ALB-WAE-G-EIB 01 study and Design Documentationwill support city and Durres region Water Supply and Sanitation Measu
Water and Environment
900000 European Investment Bank (EIB) 450000 450000 0
The Kosovo* railways links (East – Commission (EC) track that
600000 European West) Kosovo
Feasibility Study for the key railwaynetwork is non-electrified single 600000 has suffered significant damages dur
KOS-TRA-G-EC 04 Transport 0 0
„National gasification system 170000 European BankRepublic gas 170000 Technicalof the former Yugoslav Re
of the former inclusion for Reconstruction and
in the energy sector Assistance
MAC-ENE-G-EBRD 01 Considering the importance of Yugoslav of naturalof Macedonia”: Development (EBRD) for preparation
Energy 0 0
Feasibility The construction850000 Environmental between the power Study) of 400 and Montenegro is Serbi
REG-ENE-G-EC 01 Study (including Social andEuropeancable Impact Assessmentsystems for Italy kV Interconnection plann
Energy
of the submarine Commission (EC) 850000 0 0
Feasibility The Ionian-Adriatic Pipeline Project Commission (EC)3500000
3500000 European is Energy
to interconnect the existing and planned – lead, Croatia, syste
REG-ENE-G-EC 02 Study and EIA/SIA- Regional Project Ionian Adriatic Pipeline Plinacro Ltd, Zagrebgas transmissionBosni
0 0
and Development of European Centre for Entrepreneurial Learning) is an0
East the Centre for Entrepreneurial Learning initiative providing for struct
ConstructionSEECEL South1584000 European Commission (EC)1584000and Strengthening Competitiveness Eco
REG-SOC-G-EC 25 Social sectors 0
Advisory Services in Enforcingthe water management Law Environment
the Macedonian Water and
Water 250000 0
MAC-WAE-G-GER 02 The capacities of250000 Germany (GER) organizational unit of the Macedonian Ministry of Environme 0
Program Regional and Local Economic Development in Macedonia
2800000 Germany (GER) Private sector development
2800000 0 0
MAC-PSD-G-GER 01 for Responsible institutions for regional development fulfil their functions effectively to support an EU com
companies
Investment The international competitiveness of the Macedonian 1900000 in the supported areas (textile and cl
MAC-PSD-G-GER 02 and Export Promotion 1900000 Germany (GER) Private sector development 0 0
Harmonization of the Macedonian taxGermany (GER) Law
250000 Law with the EU sector development
Private 250000 0
MAC-PSD-G-GER 03 Macedonian VAT and Tax procedure legislation has been harmonised with the European directives.1.T 0
Integration Selected EU Directives from the “Free Trade”sector development and “Energy”
Private movement of goods”
MAC-PSD-G-GER 04 of the technical EU Directives concerning “Free and “Energy” Domains of Priority are anchored in the M
250000 Germany (GER) 250000 0 0
Integration Selected EU directives fromthe regulated priority“Environment“ are anchored in the Macedonian legi
250000 in the domain of and „Environment“
MAC-WAE-G-GER 03 of technical EU Standards Germany (GER) area of Environment
Water 250000 0 0
Introduction Sustainable and 391000 environmental-friendly Environment
self-financing environmental-friendly pilot management system for collection and re-u
Water
MAC-WAE-G-GER 04 and implementation of anGermany (GER) and management system for0391000 waste oil 0
Open 01 The Network of Modernization of Municipal and EnvironmentEast the political and 0
Associations of Local Water
Authorities of in South
5500000 0
REG-WAE-G-GERRegional Fund (ORF) 5500000 Germany (GER) ServicesSEE improves Europe (SEE) institutional framew
ORF Foreign Trade Promotion FundGermany (GER) Promotion takes an approach of strengthening competitiv
REG-PSD-G-GER 01 7150000 for Foreign Trade sector development
The Open Regional Private 7150000 0 0
ORF Legal Law reform in 6916000 Projects (GER) sectors 6916000
REG-SOC-G-GER 01 Reform in SEE the region; Germanywith Macedonian participation:
.
Social 1 Introduction of Regional Master Pr
0 0
ORF Energy1.Capacity (SEE) for Monitoring, Verification and Evaluation of the Energy Efficiency0
REG-ENE-G-GER 02 6000000 Germany (GER)
Efficiency building Energy 6000000 0 Policy in SEE c
project reads as follows “Selected services provided by state and non-state actors for
Social 02 The goal of the 2000000 Social
REG-SOC-G-GER Inclusion of Trafficked PersonsGermany (GER) sectors 2000000 0 0
and construction of water and and Environment
Water waste water infrastructure of municipalities. Objectives: Im
Montenegro Rehabilitation 21500000 European Investment Bank (EIB) 0 21500000
MTN-WAE-L-EIB 02 Water and Sanitation 0
Airports investments in Podgorica 1000000
The proposed project includes urgent TransportBank (EIB) 0 and Tivat Airports to meet with basic c
MTN-TRA-L-EIB 02 modernisation 1000000 European Investment 0
20000000 European Investment Bankpromoted by
SER-PSD-L-EIBLoan for Loan for financing small and medium-sized projects development SMEs (within the Bank’s usual eligib
PB 12 SMEs and Priority Projects Private sector (EIB) 0 20000000 0
Raiffeisen Beogradline for leasing or Medium and Long Term financing of0SME projects, small and0
SER-PSD-L-EIB 13 40000000 Private sector (EIB)
Credit Loan for SMEs European Investment Bankdevelopment 40000000 medium scale i
Status Date
Project Status WBIF Project
Approval Date Effective
Initiatives Other Info Expected Completion Completion
Approved 01.01.2008 01.01.2008 false 20.01.2009
IB (Institution Building), MI (Municipal Infrastructures)
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.03.2008
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 01.03.2009
Approved 01.01.2008 01.01.2008 false Environmental aspects: Treaty), EE (Energy Efficiency), to (Mun
ECT (Support to Energy Community As the objective of the project is MI safe
Approved 01.01.2009 01.01.2009 false Environmental aspects: Building)
EE (Energy Efficiency), IB (InstitutionThe Partial Risk Guarantee does not co
Approved 01.01.2008 01.01.2008 false 01.01.2011
MI (Municipal Infrastructures), ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false 30.10.2008
MI (Municipal Infrastructures)
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2009
09.05.2011
Under implementation 15.06.2007 false 30.09.2011
MI (Municipal Infrastructures)
Approved 01.01.2009 01.01.2009 false MI (Municipal Infrastructures), SME (Support to SME)
Appraisal 01.01.2005 01.01.2005 false SME (Support to SME)
Approved 01.01.2009 01.01.2009 false 01.11.2011
IB (Institution Building), MI (Municipal Infrastructures)
Approved 01.01.2007 01.01.2007 false 01.06.2009
IB (Institution Building), MI (Municipal Infrastructures)
Approved 01.01.2008 01.01.2008 false IB (Institution Building) 01.06.2009
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 01.03.2008
Approved 01.01.2008 01.01.2008 false IB (Institution Building) 01.04.2008
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2009 31.12.2009
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect) 30.06.2010 30.06.2010
Approved 01.01.2008 01.01.2008 false 30.11.2009
IB (Institution Building), MI (Municipal Infrastructures)
Approved 17.10.2008 17.10.2008 false IB (Institution Building)
Approved 01.01.2008 01.01.2008 false Environmental aspects: This project includes significant amount
01.07.2010
ENV (Environmental Aspect), IB (Institution Building)
Appraisal 16.10.2009 16.10.2009 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false Environmental aspects: A CARDS 2005 MI (Municipal Infrastru
01.04.2012
ENV (Environmental Aspect), IB (Institution Building),project designed for imp
Approved 01.01.2008 01.01.2008 false Environmental aspects: Throughout the building works Infrastru
01.04.2011
ENV (Environmental Aspect), IB (Institution Building), MI (Municipal intervent
Appraisal 16.10.2009 16.10.2009 false Financed through
ENV (Environmental Aspect) IPA 09 Multibeneficiary programme
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2009
Approved 01.01.2007 01.01.2007 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2010
Approved 01.01.2007 01.01.2007 false 07.06.2009
IB (Institution Building), MI (Municipal Infrastructures)
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2008
Approved 01.01.2008 01.01.2008 false 01.12.2009
MI (Municipal Infrastructures)
Approved 01.01.2008 01.01.2008 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false IB (Institution Building)
Approved 01.01.2008 01.01.2008 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false IB (Institution Building)
Approved 01.01.2008 01.01.2008 false IB (Institution Building)
Approved 01.01.2008 01.01.2008 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false 31.07.2010
ENV (Environmental Aspect), IB (Institution Building)
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 30.06.2009
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 15.11.2009
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 01.04.2010
Approved 01.01.2008 01.01.2008 false 31.12.2010
ENV (Environmental Aspect), IB (Institution Building), MI (Municipal Infrastru
Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2009
Approved 01.01.2007 01.01.2007 false 31.12.2010
Approved 01.01.2009 01.01.2009 false IB (Institution Building) 31.12.2009
Approved 01.01.2008 01.01.2008 false IB (Institution Building) 29.07.2008
Approved 01.01.2007 01.01.2007 false MI (Municipal Infrastructures) 12.04.2007
Approved 01.01.2008 01.01.2008 false MI (Municipal Infrastructures)
09.05.2011
Under implementation 13.11.2007 false Environmental aspects: Various environmental
31.08.2012
ENV (Environmental Aspect), MI (Municipal Infrastructures) and climatic crite
Approved 01.01.2009 01.01.2009 false IB (Institution Building)
Approved 01.01.2008 01.01.2008 false Environmental aspects: The secured operation of the ships will r
ENV (Environmental Aspect) 31.12.2011
Approved 01.01.2008 01.01.2008 false Environmental aspects: This project shall include full EIA for all p
ENV (Environmental Aspect) 31.12.2011
Approved 01.01.2008 01.01.2008 false Environmental aspects: The Albanian Development Fund has a
31.03.2011
ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 16.10.2009 16.10.2009 true The overall length
MI (Municipal Infrastructures) of the road network in Albania is about 15,000
Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect) 30.09.2010
Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect) 30.09.2011
Approved 01.01.2008 01.01.2008 false 01.03.2011
ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 01.01.2008 01.01.2008 false MI (Municipal Infrastructures)
Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false Environmental aspects: The project involves construction of a ne
ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 01.01.2007 01.01.2007 false Environmental aspects: The construction of a new ferry terminal
ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 01.01.2008 01.01.2008 false Environmental aspects: The project has been screened as B/1 r
ENV (Environmental Aspect)
Appraisal 01.01.2009 01.01.2009 false Environmental aspects: The Project is located
ENV (Environmental Aspect), MI (Municipal Infrastructures)for the most part
Appraisal 01.01.2008 01.01.2008 false Environmental aspects: The Bank?s services will
ENV (Environmental Aspect), MI (Municipal Infrastructures) take particular
07.10.2009
Under implementation 07.10.2009 true Environmental aspects: The proposed sub-projects of the projec
30.12.2012
ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 01.01.2007 01.01.2007 false Environmental aspects: The main activity supported by the Proje
31.03.2011
ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 01.01.2008 01.01.2008 false Environmental aspects: An Environmental Management Framew
31.12.2012
ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 01.01.2007 01.01.2007 false 03.01.2009
Approved 01.01.2007 01.01.2007 false 12.01.2009
Approved 01.01.2008 01.01.2008 false 12.01.2010
Approved 01.01.2008 01.01.2008 false 04.01.2009
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false 02.01.2009
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false Environmental aspects: Environmentally sensitive areas located
ENV (Environmental Aspect) 30.06.2012
Approved 01.01.2008 01.01.2008 false 31.03.2010
Environmental aspects: The project is not expected to have an a
Approved 16.10.2009 16.10.2009 false ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false 31.12.2009
Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect) 01.01.2010
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false 03.01.2010
Environmental aspects: Approval date: 2007.0Preparation or tim
Approved 01.01.2007 01.01.2007 false 04.01.2010
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false 31.12.2009
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2007 01.01.2007 false 06.07.2007
Approved 03.05.2005 03.05.2005 false 31.12.2007 31.12.2007
Approved 23.12.2008 23.12.2008 false ENV (Environmental Aspect)
Approved 08.10.2008 08.10.2008 false Environmental aspects: The project aims at ensuring an ecologi
ENV (Environmental Aspect)31.12.2012
Approved 06.02.2007 06.02.2007 false Environmental aspects: The project contributes to the reduction
ENV (Environmental Aspect)31.12.2009 31.12.2010
Approved 01.01.2007 01.01.2007 false Environmental aspects: The measures of this project contribute
ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false 30.09.2010
Environmental aspects: The project is likely to have minimal or n
Approved 19.06.2008 19.06.2008 false Environmental aspects: While the project does not trigger the Ba
ENV (Environmental Aspect) 31.03.2012
Approved 01.01.2009 01.01.2009 false ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 01.08.2007 01.08.2007 false 31.12.2008
MI (Municipal Infrastructures)
Approved 15.06.2007 15.06.2007 false 14.06.2008
MI (Municipal Infrastructures)
Approved 01.01.2007 01.01.2007 false EE (Energy Efficiency) 31.12.2007
Approved 03.06.2009 03.06.2009 false EE (Energy Efficiency), MI (Municipal Infrastructures)
Approved 21.10.2009 21.10.2009 false ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 20.11.2007 20.11.2007 false MI (Municipal Infrastructures)
Approved 21.10.2009 21.10.2009 false ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 23.06.2008 23.06.2008 false 31.12.2014
Approved 23.02.2010 23.02.2010 false 31.12.2014
ENV (Environmental Aspect), MI (Municipal Infrastructures)
Approved 30.12.2007 30.12.2007 false 30.09.2009
MI (Municipal Infrastructures)
10.05.2011
Under implementation 09.10.2007 false 31.12.2010
MI (Municipal Infrastructures), ENV (Environmental Aspect)
Approved 22.04.2009 22.04.2009 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 18.12.2008 18.12.2008 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 01.01.2009 01.01.2009 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 03.06.2008 03.06.2008 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 01.01.2009 01.01.2009 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 01.01.2008 01.01.2008 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 25.01.2008 25.01.2008 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 01.06.2001 01.06.2001 false SME (Support to SME)
Approved 11.12.2006 11.12.2006 false SME (Support to SME)
Approved 29.12.2008 29.12.2008 false EE (Energy Efficiency), SME (Support to SME)
Approved 29.12.2008 29.12.2008 false 31.12.2015
EE (Energy Efficiency), SME (Support to SME)
Approved 09.01.2007 09.01.2007 false MI (Municipal Infrastructures), IB (Institution Building)
Approved 01.10.2007 01.10.2007 false 30.09.2010
Approved 20.06.2007 20.06.2007 false 30.12.2010
Approved 01.04.2007 01.04.2007 false 15.10.2008
MI (Municipal Infrastructures)
Approved 16.03.2008 16.03.2008 false SEETO (South East European Transport Observatory)
Approved 10.07.2007 10.07.2007 false Environmental aspects: The proposed project has been screene
Approved 18.12.2008 18.12.2008 false SEETO (South East European Transport Observatory)
Approved 01.01.2008 01.01.2008 false
Approved 13.12.2007 13.12.2007 false 30.12.2011
Approved 30.12.2007 30.12.2007 false 30.03.2011
MI (Municipal Infrastructures)
Approved 01.12.2007 01.12.2007 false 31.12.2009
Approved 01.10.2007 01.10.2007 false 31.03.2010
MI (Municipal Infrastructures)
Approved 29.05.2008 29.05.2008 false 30.12.2012
ENV (Environmental Aspect), IB (Institution Building)
Approved 10.07.2007 10.07.2007 false (Priority Environmental Environmental due diligence needs to I
PEIP/RENA Environmental aspects:Investment Programme), MI (Municipalb
Approved 04.12.2007 04.12.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 18.08.2008 18.08.2008 true 30.09.2012
MI (Municipal Infrastructures)
Approved 22.09.2010 22.09.2010 true 30.12.2012
MI (Municipal Infrastructures)
Approved 23.11.2008 23.11.2008 false IB (Institution Building) 30.03.2014
Approved 19.06.2007 19.06.2007 false 30.12.2010
PEIP/RENA (Priority Environmental Investment Programme), IB (Institution B
Approved 31.07.2007 31.07.2007 false
Approved 17.12.2008 17.12.2008 false EE (Energy Efficiency)
Approved 08.11.2007 08.11.2007 false ENV (Environmental Aspect)
Approved 19.11.2008 19.11.2008 false ENV (Environmental Aspect), SME (Support to SME), EE (Energy Efficiency)
Approved 16.10.2007 16.10.2007 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 24.03.2009 24.03.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic
Approved 02.06.2008 02.06.2008 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 18.09.2009 18.09.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic
Approved 18.12.2008 18.12.2008 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic
Approved 26.06.2009 26.06.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic
Approved 07.12.2007 07.12.2007 false Preparation or timing: Start date: Q1 2010
30.12.2013
SEETO (South East European Transport Observatory)
Approved 07.12.2007 07.12.2007 false Preparation or timing: Start date: Q2 2009
30.06.2011
SEETO (South East European Transport Observatory)
Approved 07.12.2007 07.12.2007 false Preparation or timing: Start date: Q3 2010
30.09.2013
SEETO (South East European Transport Observatory)
Approved 07.12.2007 07.12.2007 false 31.03.2012
Approved 07.12.2007 07.12.2007 false Preparation or timing: Start date: Q2 2008
30.06.2010
SEETO (South East European Transport Observatory)
Approved 07.12.2007 07.12.2007 false 30.12.2010
SEETO (South East European Transport Observatory), MI (Municipal Infrast
Approved 06.05.2009 06.05.2009 false Environmental aspects: Use of proceeds is not associated with a
Approved 07.09.2007 07.09.2007 false
Approved 07.09.2007 07.09.2007 false
Approved 11.12.2008 11.12.2008 false 30.09.2014
MI (Municipal Infrastructures)
Approved 30.05.2007 30.05.2007 false 30.12.2010
Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2011
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.09.2011
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2010
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2009
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false (Priority Environmental Investment Programme), MI (Municipal I
PEIP/RENA Preparation or timing: The Norwegian MoFA technical assistanc
Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2009
MI (Municipal Infrastructures)
Approved 29.11.2007 29.11.2007 false 30.12.2010
MI (Municipal Infrastructures)
Approved 29.11.2007 29.11.2007 false 30.12.2010
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2012
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2012
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2012
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2011
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2012
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2011
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2011
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2012
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 30.12.2013
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.11.2007 29.11.2007 false 31.12.2013
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 30.06.2009 30.06.2009 false (Priority Environmental The environmental due diligence is bein
PEIP/RENA Environmental aspects:Investment Programme), MI (Municipal I
Approved 16.12.2008 16.12.2008 false MI (Municipal Infrastructures)
Approved 11.12.2008 11.12.2008 false MI (Municipal Infrastructures)
Approved 30.05.2007 30.05.2007 false 30.12.2012
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 06.11.2007 06.11.2007 false MI (Municipal Infrastructures)
Approved 01.01.2008 01.01.2008 false Environmental aspects: This project will promote environmental
ENV (Environmental Aspect)31.12.2012
Approved 01.01.2007 01.01.2007 false Environmental aspects: The Energy Community Treaty includes
ENV (Environmental Aspect)
Approved 01.01.2009 01.01.2009 false Environmental aspects: Environmental impact assessment will b
ENV (Environmental Aspect) 31.12.2013
Approved 01.01.2007 01.01.2007 false Environmental aspects: The proposed clean-up component i s a
ENV (Environmental Aspect)31.12.2010
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect) 31.12.2009
Approved 04.07.2006 04.07.2006 false ENV (Environmental Aspect)31.12.2011
Approved 01.01.2008 01.01.2008 false Environmental aspects: The Project?s Aspect)
31.12.2012
MI (Municipal Infrastructures), ENV (Environmental infrastructure component
Approved 16.12.2008 16.12.2008 false Environmental aspects: Energy efficiency investments shall lead
ENV (Environmental Aspect)31.12.2012
Approved 01.01.2008 01.01.2008 false Environmental aspects: The project will promote and advance re
ENV (Environmental Aspect)30.06.2012
Approved 01.01.2007 01.01.2007 false Environmental aspects: This project will foster the sustainable d
ENV (Environmental Aspect)31.12.2010
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)31.12.2010
Approved 01.01.2008 01.01.2008 false Environmental aspects: With regard to environment, this is one
ENV (Environmental Aspect)31.12.2015
Approved 01.01.2009 01.01.2009 false Environmental aspects: Beautiful Kosovo will be instrumental in
ENV (Environmental Aspect)31.12.2012
Approved 01.01.2008 01.01.2008 false Environmental aspects: The Project implementation should cont
ENV (Environmental Aspect)30.06.2012
Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect)31.12.2011
Approved 01.01.2007 01.01.2007 false Environmental aspects: The Project?s infrastructure component
ENV (Environmental Aspect)31.12.2011
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
Approved 13.12.2007 13.12.2007 false Environmental aspects: The construction proposed under this P
30.06.2012
ENV (Environmental Aspect)
Approved 01.02.2007 01.02.2007 false Environmental aspects: Activities under the Project are not expe
31.12.2010
ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false Environmental aspects: This activity relates to replacement/refur
31.12.2010
ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false Environmental aspects: The new and upgraded legislation on Ci
ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false Environmental aspects: The Project?s infrastructure component
30.06.2012
ENV (Environmental Aspect)
Approved 01.01.2009 01.01.2009 false Environmental aspects: Results of all projects will impact the en
31.12.2012
ENV (Environmental Aspect)
Approved 06.11.2008 06.11.2008 false Environmental aspects: By reducing technical and administrative
31.12.2013
ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false Environmental aspects: The support to the institutions will includ
ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2007 01.01.2007 false Environmental aspects: The project involves the provision of fun
ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false MI (Municipal Infrastructures) 31.12.2008
Approved 01.01.2007 01.01.2007 false Environmental aspects: The present project will
31.12.2012
MI (Municipal Infrastructures), ENV (Environmental Aspect) support the imp
Approved 01.01.2009 01.01.2009 false Environmental aspects: Final beneficiaries will be requested to c
Approved 01.01.2009 01.01.2009 false Environmental aspects: The interventions envisaged under the p
31.12.2015
MI (Municipal Infrastructures), ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false 31.12.2009
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false 31.12.2010
ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false Environmental aspects: The European Community has a longsta
ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false 31.12.2010
ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false Preparation or timing: At this stage it is not possible to identify th
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false Environmental aspects: The training activities will include a spec
31.12.2010
ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false Environmental aspects: The support will include a specific comp
31.12.2010
ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false Environmental aspects: The training activities will include a spec
ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false 31.03.2012
ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2009 01.01.2009 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false 11.01.2011
Approved 01.01.2008 01.01.2008 false 31.12.2013
ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
09.12.2010
Under implementation 18.09.2007 false ENV (Environmental Aspect)
01.01.2009
Under implementation 01.01.2009 false Environmental aspects: Borrowers expects no direct environmen
31.12.2012
ENV (Environmental Aspect)
Approved 16.06.2009 16.06.2009 false 31.03.2014
ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false 31.12.2011
SEETO (South East European Transport Observatory), ENV (Environmental
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)
Approved 19.02.2009 19.02.2009 false ENV (Environmental Aspect)
Approved 01.01.2009 01.01.2009 false Environmental aspects: The project will consist mainly of road re
ENV (Environmental Aspect)
Approved 13.05.2008 13.05.2008 false The project will consist mainly of road rehabilitation and potentia
31.03.2013
ENV (Environmental Aspect)
Approved 29.05.2007 29.05.2007 false 31.12.2011
Environmental aspects: Considering the proposed types of inter
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false (Priority Environmental The project is directly related (Environm
31.12.2012
PEIP/RENA Environmental aspects:Investment Programme), ENVand contri
Approved 01.01.2007 01.01.2007 false (Priority Environmental The project is directly related (Environm
PEIP/RENA Environmental aspects:Investment Programme), ENVand contri
Approved 01.01.2008 01.01.2008 false Environmental aspects: The project is directly related and contri
31.12.2012
ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false
Approved 16.10.2008 16.10.2008 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2007 01.01.2007 false
Appraisal 01.01.2009 01.01.2009 false Environmental aspects: The project will generally benefit the env
ENV (Environmental Aspect)
Approved 01.04.2011 01.04.2011 false Environmental aspects: The investment promotes the conversio
31.12.2015
ENV (Environmental Aspect)
Approved 04.04.2007 04.04.2007 false 31.12.2012
ENV (Environmental Aspect)
Approved 04.12.2009 04.12.2009 false Environmental aspects: The reduction of water losses contribute
31.12.2013
ENV (Environmental Aspect)
Approved 28.12.2007 28.12.2007 false ENV (Environmental Aspect)
Approved 06.07.2007 06.07.2007 false 31.12.2011
ECT (Support to Energy Community Treaty), ENV (Environmental Aspect)
Approved 09.12.2008 09.12.2008 false 30.12.2012
ENV (Environmental Aspect)
Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect), EE (Energy Efficiency), SME (Support to SME)
Approved 24.07.2009 24.07.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), SME (Support to SME)
Approved 04.01.2007 04.01.2007 false
Approved 10.11.2008 10.11.2008 false SME (Support to SME) 31.12.2015
Approved 19.09.2008 19.09.2008 false SME (Support to SME) 31.12.2015
Approved 15.12.2008 15.12.2008 false SME (Support to SME) 31.12.2015
Approved 10.11.2008 10.11.2008 false 31.12.2015
ENV (Environmental Aspect), SME (Support to SME)
Approved 14.11.2007 14.11.2007 false IB (Institution Building) 30.09.2010
Approved 23.10.2007 23.10.2007 false SEETO (South East European Transport Observatory)
Approved 30.09.2008 30.09.2008 false
Approved 30.12.2008 30.12.2008 false 30.03.2011
PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 23.10.2007 23.10.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 16.06.2009 16.06.2009 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I
Approved 29.12.2009 29.12.2009 false 31.12.2014
MI (Municipal Infrastructures)
Approved 12.06.2007 12.06.2007 false IB (Institution Building) 30.09.2011
Approved 10.07.2008 10.07.2008 false ENV (Environmental Aspect)
Approved 11.12.2008 11.12.2008 false
Approved 11.12.2008 11.12.2008 false
Approved 01.01.2007 01.01.2007 false Environmental aspects: The financial intermediaries will be requ
MI (Municipal Infrastructures)
30.05.2009
Under implementation 12.06.2009 false ENV (Environmental Aspect)31.12.2015
Approved 22.03.2011 18.02.2010 false
Approved 12.06.2009 12.06.2009 false
Approved 02.01.2008 02.01.2008 false ENV (Environmental Aspect)31.12.2012
Approved 20.06.2007 20.06.2007 false 30.06.2010
MI (Municipal Infrastructures)
Approved 30.12.2008 30.12.2008 false 30.12.2014
MI (Municipal Infrastructures)
09.05.2011
Under implementation 19.09.2007 false 31.12.2011
MI (Municipal Infrastructures)
Approved 12.03.2009 12.03.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), SME (Support to SME)
Approved 28.08.2009 28.08.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic
Approved 12.06.2009 12.06.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), SME (Support to SME)
Approved 11.12.2008 11.12.2008 false ENV (Environmental Aspect), EE (Energy Efficiency), SME (Support to SME)
Approved 16.06.2009 16.06.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic
Approved 12.12.2008 12.12.2008 false MI (Municipal Infrastructures)
Approved 28.08.2009 28.08.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic
Approved 26.05.2009 26.05.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), MI (Municipal Infrastru
Approved 26.06.2009 26.06.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), MI (Municipal Infrastru
Approved 10.06.2009 10.06.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), MI (Municipal Infrastru
Approved 28.11.2008 28.11.2008 false 31.12.2013
ENV (Environmental Aspect), SME (Support to SME)
Approved 23.03.2007 23.03.2007 false 31.12.2012
Approved 19.12.2008 19.12.2008 false 31.12.2012
ENV (Environmental Aspect), SME (Support to SME)
Approved 19.12.2008 19.12.2008 false 31.12.2015
ENV (Environmental Aspect), SME (Support to SME)
Approved 19.12.2008 19.12.2008 false 31.12.2015
ENV (Environmental Aspect), SME (Support to SME)
Approved 08.07.2008 08.07.2008 false SME (Support to SME) 31.12.2022
Approved 18.03.2008 18.03.2008 false 30.12.2012
MI (Municipal Infrastructures)
Approved 01.01.2007 01.01.2007 false MI (Municipal Infrastructures)
Approved 30.12.2007 30.12.2007 false 30.12.2011
Approved 30.12.2007 30.12.2007 false 30.12.2010
Approved 30.12.2007 30.12.2007 false 30.12.2010
Approved 01.01.2008 01.01.2008 false 31.12.2013
Approved 17.10.2008 17.10.2008 false ENV (Environmental Aspect), IB (Institution Building), MI (Municipal Infrastru
Approved 01.01.2007 01.01.2007 false MI (Municipal Infrastructures)
10.05.2011
Under implementation 19.09.2007 false 31.12.2011
Approved 19.03.2009 19.03.2009 false 30.12.2011
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)30.12.2010
Approved 01.01.2008 01.01.2008 false 30.12.2012
Approved 01.01.2007 01.01.2007 false 30.12.2012
SEETO (South East European Transport Observatory)
Approved 01.01.2008 01.01.2008 false 31.12.2013
Approved 01.01.2008 01.01.2008 false 31.12.2013
Approved 09.10.2007 09.10.2007 false SEETO (South East European Transport Observatory)
Approved 29.07.2009 29.07.2009 false
Approved 06.05.2009 06.05.2009 false
Approved 19.10.2007 19.10.2007 false
Approved 16.07.2007 16.07.2007 false
Approved 09.06.2009 09.06.2009 false 30.09.2015
SEETO (South East European Transport Observatory)
Approved 20.06.2007 20.06.2007 false 30.06.2011
Approved 01.01.2007 01.01.2007 false 30.12.2011
ECT (Support to Energy Community Treaty)
Approved 01.01.2008 01.01.2008 false 30.12.2012
PEIP/RENA (Priority Environmental Investment Programme)
Approved 23.10.2007 23.10.2007 false MI (Municipal Infrastructures)
Approved 18.05.2007 18.05.2007 false MI (Municipal Infrastructures)
Approved 20.07.2007 20.07.2007 false 30.09.2012
Approved 20.06.2007 20.06.2007 false
Approved 05.06.2009 05.06.2009 false 30.09.2010
MI (Municipal Infrastructures)
Approved 05.06.2009 05.06.2009 false IB (Institution Building) 30.06.2012
Approved 09.10.2008 09.10.2008 false 30.09.2012
SEETO (South East European Transport Observatory)
Approved 15.10.2010 15.10.2010 false MI (Municipal Infrastructures)
Approved 15.10.2010 15.10.2010 false
Approved 15.10.2010 15.10.2010 false
Approved 15.10.2010 15.10.2010 false
Approved 15.10.2010 15.10.2010 false
Approved 15.10.2010 15.10.2010 false ECT (Support to Energy Community Treaty), ENV (Environmental Aspect), M
Approved 15.10.2010 15.10.2010 false 30.12.2013
This project will be delivered through one works contract finance
Approved 15.10.2010 15.10.2010 false 30.12.2013
Approved 20.06.2010 20.06.2010 false
Completed 01.02.2006 01.02.2006 false 17.12.2009
MI (Municipal Infrastructures)
Approved 29.05.2008 23.05.2008 false ENV (Environmental Aspect)30.12.2013
Approved 20.06.2010 20.06.2010 false SME (Support to SME)
Approved 10.11.2010 10.11.2010 false
Approved 29.07.2009 29.07.2009 false SME (Support to SME)
Approved 22.06.2010 22.06.2010 false
Approved 01.09.2010 01.09.2010 false
Approved 20.06.2010 20.06.2010 false 31.03.2014
Approved 30.09.2009 30.09.2009 false SME (Support to SME)
Approved 29.09.2010 29.09.2010 false MI (Municipal Infrastructures)
Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)
Approved 01.01.2010 01.01.2010 false
Approved 19.02.2008 19.02.2008 false MI (Municipal Infrastructures)
Approved 21.04.2009 21.04.2009 false SME (Support to SME)
Approved 06.05.2009 06.05.2009 false SME (Support to SME)
Appraisal 26.09.2009 26.09.2009 false 31.12.2014
Approved 09.07.2010 09.07.2010 false Part of EFSE
SME (Support to SME)
Approved 08.04.2010 08.04.2010 false
Approved 15.12.2009 15.12.2009 false SME (Support to SME)
Approved 04.08.2009 04.08.2009 false SME (Support to SME) 13.08.2013
Approved 17.11.2009 17.11.2009 false
Approved 08.01.2010 08.01.2010 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 23.10.2009 23.10.2009 false SME (Support to SME)
Approved 20.06.2010 20.06.2010 false EE (Energy Efficiency)
Approved 17.10.2008 17.10.2008 false From IPA 2008
ENV (Environmental Aspect)
Approved 19.10.2007 19.10.2007 false ENV (Environmental Aspect)
Approved 17.10.2008 17.10.2008 false ENV (Environmental Aspect)
Approved 17.10.2008 17.10.2008 false ENV (Environmental Aspect)
Approved 17.10.2008 17.10.2008 false From IPA 2008
ENV (Environmental Aspect)
Approved 17.10.2008 17.10.2008 false ENV (Environmental Aspect)
Approved 05.03.2009 05.03.2009 false ENV (Environmental Aspect)
Approved 03.02.2009 03.02.2009 false ENV (Environmental Aspect)
Approved 09.12.2009 09.12.2009 false MI (Municipal Infrastructures)
Approved 24.06.2009 24.06.2009 false ENV (Environmental Aspect)
Approved 24.06.2009 24.06.2009 false SME (Support to SME)
Approved 26.10.2009 26.10.2009 false SME (Support to SME) 31.12.2015
Approved 24.06.2009 24.06.2009 false 31.12.2015
ENV (Environmental Aspect), SME (Support to SME)
Approved 26.10.2009 26.10.2009 false 31.12.2015
ENV (Environmental Aspect), SME (Support to SME)
Approved 07.12.2009 07.12.2009 false
Approved 29.12.2009 29.12.2009 false
Approved 04.01.2010 04.01.2010 false 31.12.2014
EE (Energy Efficiency), MI (Municipal Infrastructures)
Approved 04.01.2010 04.01.2010 false 31.12.2013
ECT (Support to Energy Community Treaty), MI (Municipal Infrastructures)
Approved 28.12.2009 28.12.2009 false ENV (Environmental Aspect)31.12.2013
Approved 07.09.2010 07.09.2010 false ENV (Environmental Aspect)
Approved 07.09.2010 07.09.2010 false 31.12.2014
MI (Municipal Infrastructures), ENV (Environmental Aspect)
30.04.2009
Under implementation 30.04.2009 true KfW Loan Agreemnt publicly announced for Bogdanci phase 1 (
ENV (Environmental Aspect)30.12.2010
Completed 30.01.2009 30.01.2009 true 30.12.2010
30.09.2009
Under implementation 30.09.2009 true 30.06.2011
30.09.2009
Under implementation 30.09.2009 true ENV (Environmental Aspect)30.12.2010
Approved 30.06.2010 30.06.2010 true ENV (Environmental Aspect)
Approved 30.01.2011 30.01.2011 true 30.12.2011
Approved 30.11.2008 30.11.2008 true MI (Municipal Infrastructures)
Completed 30.07.2009 30.07.2009 true 28.02.2010
MI (Municipal Infrastructures)
Approved 28.02.2010 28.02.2010 true 30.12.2010
MI (Municipal Infrastructures)
Appraisal 28.02.2011 28.02.2011 true 30.07.2012
30.01.2011
Preparation phase 30.01.2011 true 30.03.2012
MI (Municipal Infrastructures)
Put on hold 08.12.2009 08.12.2009 true 30.09.2011
MI (Municipal Infrastructures)
15.10.2010
Under implementation 15.10.2010 true 28.02.2011
MI (Municipal Infrastructures)
Approved 30.11.2010 30.11.2010 true 30.12.2010
MI (Municipal Infrastructures)
Approved 30.11.2010 30.11.2010 true 30.12.2010
MI (Municipal Infrastructures)
Approved 30.11.2010 30.11.2010 true 30.12.2010
MI (Municipal Infrastructures)
30.08.2008
Under implementation 30.08.2008 true 30.08.2011
Approved 30.10.2010 30.10.2010 true 30.05.2012
MI (Municipal Infrastructures)
30.11.2009
Under implementation 30.11.2009 true IB (Institution Building) 28.02.2011
Approved 30.09.2009 30.09.2009 true 30.12.2012
MI (Municipal Infrastructures)
Approved 30.01.2011 30.01.2011 true 30.12.2012
Approved 30.06.2010 30.06.2010 true 30.12.2010
Approved 30.03.2010 30.03.2010 true 30.12.2012
01.01.2010
Preparation phase 01.01.2010 true 30.12.2010
Approved 30.06.2010 30.06.2010 true 30.11.2010
Approved 28.02.2011 28.02.2011 true 30.10.2011
Approved 30.12.2009 30.12.2009 true 30.12.2012
Approved 30.10.2009 30.10.2009 true 30.05.2011
MI (Municipal Infrastructures)
30.11.2009
Under implementation 30.11.2009 true 30.12.2010
Approved 30.04.2010 30.04.2010 true 30.10.2010
30.09.2009
Under implementation 30.09.2009 true 30.04.2011
Appraisal 10.05.2011 10.05.2011 true ENV (Environmental Aspect)
Appraisal 30.12.2010 30.12.2010 true 30.12.2012
MI (Municipal Infrastructures)
30.12.2009
Under implementation 30.12.2009 true 30.12.2012
30.12.2009
Under implementation 30.12.2009 true 30.12.2014
30.12.2010
Under implementation 31.12.2010 true 30.12.2013
Completed 30.01.2010 30.01.2010 true 30.12.2010
Appraisal 28.02.2011 28.02.2011 true 30.10.2011
Completed 30.07.2010 30.07.2010 true 30.12.2010
Approved 30.09.2009 30.09.2009 true 30.12.2010
MI (Municipal Infrastructures)
Completed 30.03.2010 30.03.2010 true 30.12.2010
Completed 30.04.2010 30.04.2010 true 30.11.2010
Appraisal 20.03.2009 20.03.2009 true 30.08.2012
Appraisal 28.02.2011 28.02.2011 true 30.11.2011
Appraisal 30.01.2011 30.01.2011 true 30.08.2011
30.11.2009
Under implementation 30.11.2009 true 30.11.2011
IB (Institution Building), MI (Municipal Infrastructures)
Completed 30.03.2010 30.03.2010 true 30.12.2012
IB (Institution Building), MI (Municipal Infrastructures)
30.08.2009
Preparation phase 30.08.2009 true 30.12.2010
30.08.2009
Preparation phase 30.08.2009 true 30.12.2010
30.08.2009
Preparation phase 30.08.2009 true 30.12.2010
Approved 30.12.2010 30.12.2010 true 30.12.2010
MI (Municipal Infrastructures)
30.11.2009
Under implementation 30.11.2009 true 30.12.2010
30.11.2009
Preparation phase 30.11.2009 true 30.12.2010
MI (Municipal Infrastructures)
Approved 30.12.2010 30.12.2010 false 30.09.2012
MI (Municipal Infrastructures), SME (Support to SME)
Approved 30.12.2010 30.12.2010 false 30.06.2011
MI (Municipal Infrastructures)
Approved 30.10.2007 30.12.2007 false IB (Institution Building) 30.09.2010
Approved 30.06.2007 30.06.2007 false ENV (Environmental Aspect) 30.06.2012
Approved 31.03.2010 31.03.2010 false ENV (Environmental Aspect) 31.12.2011
Approved 31.12.2009 31.12.2009 false ENV (Environmental Aspect) 30.09.2012
Approved 01.01.2011 01.01.2011 false 31.03.2014
Completed 30.09.2008 30.09.2008 false 30.09.2008 31.03.2010
Approved 30.09.2009 30.09.2009 false 30.09.2010
Approved 31.12.2010 31.12.2010 false 31.12.2014
Approved 30.06.2010 30.06.2010 false 30.09.2012
Approved 01.04.2011 01.04.2011 false 30.09.2014
Approved 31.03.2011 31.03.2011 false 31.12.2014
Approved 31.03.2011 31.03.2011 false IB (Institution Building), SME (Support to SME)
Approved 31.03.2008 31.03.2008 false IB (Institution Building) 30.04.2011
Approved 31.03.2009 31.03.2009 false IB (Institution Building) 31.03.2012
Approved 01.04.2011 01.04.2011 false IB (Institution Building) 31.03.2012
Approved 31.12.2010 31.12.2010 false IB (Institution Building) 30.06.2012
Approved 31.03.2010 31.03.2010 false 31.12.2014
IB (Institution Building), MI (Municipal Infrastructures)
Approved 01.04.2011 01.04.2011 false IB (Institution Building) 31.12.2014
Completed 31.03.2008 31.03.2008 false to SME)
IB (Institution Building), SME (Support31.03.2011
Completed 31.03.2008 31.03.2008 false IB (Institution Building) 31.03.2011
Completed 30.06.2008 30.06.2008 false IB (Institution Building) 31.12.2010
Approved 31.03.2010 31.03.2010 false IB (Institution Building) 31.03.2012
Approved 31.03.2010 31.03.2010 false IB (Institution Building) 31.12.2011
Approved 31.03.2009 31.03.2009 false IB (Institution Building) 30.06.2011
Approved 30.06.2009 30.06.2009 false 30.09.2012
IB (Institution Building), SME (Support to SME)
Approved 31.03.2010 31.03.2010 false IB (Institution Building) 31.12.2011
Completed 30.06.2009 30.06.2009 false 30.06.2010
Approved 31.12.2010 31.12.2010 false IB (Institution Building) 31.12.2012
Completed 31.03.2008 31.03.2008 false
Approved 30.06.2010 30.06.2010 false 30.06.2012
Approved 30.09.2008 30.09.2008 false 30.11.2012
Completed 30.09.2007 30.09.2007 false
Completed 31.12.2007 31.12.2007 false
Approved 31.12.2009 31.12.2009 false 30.09.2012
Approved 31.03.2010 31.03.2010 false 31.12.2012
Completed 01.12.2007 01.12.2007 false
Approved 31.12.2008 31.12.2008 false 31.12.2010
ENV (Environmental Aspect)
Approved 31.12.2008 31.12.2008 false 31.12.2010
Completed 31.12.2007 31.12.2007 false ENV (Environmental Aspect)
Approved 30.06.2009 30.06.2009 false 31.12.2010
Approved 31.12.2009 31.12.2009 false 31.12.2012
Completed 30.06.2008 30.06.2008 false
Approved 01.09.2008 01.09.2008 false 30.06.2010
Approved 31.03.2009 31.03.2009 false 31.12.2012
Approved 30.06.2009 30.06.2009 false 31.12.2011
Approved 31.12.2009 31.12.2009 false 30.09.2012
Approved 31.03.2010 31.03.2010 false 31.12.2013
Approved 01.09.2009 01.09.2009 false 31.10.2011
Approved 28.02.2010 28.02.2010 false 30.09.2012
Approved 30.06.2010 30.06.2010 false 30.09.2013
Approved 30.06.2010 30.06.2010 false 30.09.2013
Approved 01.09.2010 01.09.2010 false 30.10.2012
Approved 30.06.2010 30.06.2010 false 31.12.2010
Approved 30.06.2009 30.06.2009 false 31.12.2011
Approved 30.06.2009 30.06.2009 false 30.09.2011
Approved 31.12.2009 31.12.2009 false 31.12.2012
Approved 30.09.2010 30.09.2010 false 31.03.2013
Approved 30.09.2010 30.09.2010 false 30.06.2013
Completed 30.09.2010 30.09.2010 false
Approved 30.11.2009 30.11.2009 false 30.11.2015
Approved 31.10.2009 31.10.2009 false 31.12.2012
Approved 05.05.2011 05.05.2011 false
Approved 20.12.2010 20.12.2010 false MI (Municipal Infrastructures)
Approved 19.02.2007 19.02.2007 false MI (Municipal Infrastructures), SME (Support to SME)
Approved 19.12.2009 19.12.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), MI (Municipal Infrastru
Approved 04.03.2010 04.03.2010 false
Approved 15.04.2010 15.04.2010 false ENV (Environmental Aspect), EE (Energy Efficiency), MI (Municipal Infrastru
Approved 30.09.2010 30.09.2010 false
Approved 19.04.2011 19.04.2011 false
Approved 02.05.2011 02.05.2011 false EE (Energy Efficiency), ENV (Environmental Aspect), MI (Municipal Infrastru
Approved 16.05.2011 16.05.2011 false EE (Energy Efficiency), ENV (Environmental Aspect), MI (Municipal Infrastru
Completed 11.11.2010 30.09.2009 true MI (Municipal Infrastructures) 11.11.2010
01.01.2010
Under implementation 01.01.2010 false 30.12.2013
MI (Municipal Infrastructures), SME (Support to SME)
01.01.2009
Under implementation 01.01.2009 false 30.12.2013
01.01.2010
Under implementation 01.01.2010 false 30.12.2011
01.12.2009
Under implementation 01.12.2009 false 31.12.2011
EE (Energy Efficiency), SME (Support to SME)
Approved 26.08.2010 26.08.2010 false
Approved 26.08.2010 26.08.2010 false IB (Institution Building)
Approved 17.08.2010 17.08.2010 false MI (Municipal Infrastructures)
Completed 30.11.2008 30.11.2008 false 30.09.2010
MI (Municipal Infrastructures)
Completed 30.03.2010 30.03.2010 false 30.09.2010
MI (Municipal Infrastructures)
Approved 30.03.2010 30.03.2010 false 30.09.2010
MI (Municipal Infrastructures)
Completed 30.03.2009 30.03.2009 false 30.11.2010
MI (Municipal Infrastructures)
Completed 30.03.2009 30.09.2009 false 30.05.2009
Completed 30.03.2009 30.03.2009 false 30.11.2009
MI (Municipal Infrastructures)
Completed 30.05.2007 30.05.2007 false 30.06.2010
MI (Municipal Infrastructures)
Completed 30.01.2009 30.01.2009 false 30.05.2009
MI (Municipal Infrastructures)
Completed 30.05.2009 30.05.2009 false 30.11.2009
MI (Municipal Infrastructures)
Completed 30.06.2011 30.06.2010 false 30.08.2010
MI (Municipal Infrastructures)
Completed 30.08.2010 30.08.2010 false 30.08.2010
Completed 30.10.2009 30.10.2009 false 30.04.2010
MI (Municipal Infrastructures)
Completed 30.06.2010 30.06.2010 false 30.08.2010
MI (Municipal Infrastructures)
30.06.2010
Under implementation 30.06.2010 false 30.11.2010
MI (Municipal Infrastructures)
Completed 30.07.2009 30.07.2009 false 30.06.2010
MI (Municipal Infrastructures)
30.09.2009
Under implementation 30.09.2009 false 30.12.2009
MI (Municipal Infrastructures)
Completed 30.06.2009 30.06.2009 false 30.05.2010
MI (Municipal Infrastructures)
Approved 30.11.2006 30.11.2006 false
Approved 24.06.2011 24.06.2011 true 30.12.2011
MI (Municipal Infrastructures)
Approved 05.06.2008 05.06.2008 false 30.12.2011
MI (Municipal Infrastructures)
Approved 01.10.2010 01.10.2010 false 31.12.2012
Approved 01.01.2009 01.01.2009 false
Approved 01.08.2011 01.08.2011 false
Completed 01.01.2009 01.01.2009 false 31.12.2009 31.12.2009
Approved 01.01.2011 01.01.2011 false 31.12.2011
Completed 01.01.2010 01.01.2010 false 30.11.2010 30.11.2010
Approved 31.12.2010 31.12.2010 false 31.12.2011
Approved 01.09.2008 01.09.2008 false 31.12.2011
Approved 01.09.2008 01.09.2008 false 31.12.2012
Completed 01.01.2008 01.01.2008 false 31.07.2010
Completed 30.09.2008 30.09.2008 false 28.02.2011
Completed 01.07.2009 01.07.2009 false 28.02.2011
Approved 31.12.2009 31.12.2009 false
Completed 31.10.2007 31.10.2007 false 31.10.2010
Approved 01.01.2011 01.01.2011 false IB (Institution Building) 31.12.2014
Approved 01.01.2010 01.01.2010 false IB (Institution Building) 31.12.2011
Completed 01.05.2010 01.05.2010 false IB (Institution Building) 28.02.2011
Approved 01.03.2011 01.03.2011 false IB (Institution Building) 28.04.2014
Approved 01.05.2009 01.05.2009 false IB (Institution Building) 30.06.2012
Approved 01.01.2009 01.01.2009 false IB (Institution Building) 31.12.2011
Approved 01.01.2011 01.01.2011 false IB (Institution Building) 31.12.2013
Approved 01.01.2009 01.01.2009 false IB (Institution Building) 31.12.2011
Approved 01.01.2009 01.01.2009 false 31.12.2011
IB (Institution Building), SME (Support to SME)
Approved 01.01.2008 01.01.2008 false 31.12.2011
IB (Institution Building), SME (Support to SME)
Approved 01.07.2009 01.07.2009 false IB (Institution Building) 30.06.2014
Approved 01.09.2009 01.09.2009 false 31.12.2011
IB (Institution Building), SME (Support to SME)
Approved 01.01.2008 01.01.2008 false 31.12.2012
Approved 01.01.2011 01.01.2011 false 31.12.2014
Approved 01.01.2007 01.01.2007 false EE (Energy Efficiency) 31.12.2014
Approved 28.02.2008 28.02.2008 false 30.12.2011
MI (Municipal Infrastructures), SME (Support to SME)
Approved 01.01.2010 01.01.2010 false 31.12.2013
ECT (Support to Energy Community Treaty)
Approved 01.08.2010 01.08.2010 false IB (Institution Building) 31.12.2011
Approved 01.01.2008 01.01.2008 false IB (Institution Building) 31.12.2011
Appraisal 01.01.2011 01.01.2011 false 31.12.2015
IB (Institution Building), MI (Municipal Infrastructures)
Approved 01.01.2005 01.01.2005 false 31.12.2011
Approved 01.01.1999 01.01.1999 false
01.01.2006
Under implementation 01.01.2006 false 31.12.2011
01.01.2006
Under implementation 01.01.2006 false 01.01.2011
01.01.2006
Under implementation 01.01.2006 false 31.12.2013
01.01.2003
Under implementation 01.01.2003 false 31.12.2011
01.01.2011
Under implementation 01.01.2011 false 31.12.2013
01.01.2008
Under implementation 01.01.2008 false 31.12.2011
01.01.2010
Under implementation 01.01.2010 false 31.12.2013
01.01.2010
Under implementation 01.01.2010 false 31.12.2012
01.01.2010
Under implementation 01.01.2010 false 31.12.2011
Completed 01.01.2004 01.01.2004 false 31.12.2009
01.01.2008
Under implementation 01.01.2008 false 31.12.2011
01.01.2009
Under implementation 01.01.2009 false 31.12.2012
Completed 01.01.2007 01.01.2007 false 01.01.2010 01.01.2010
Completed 01.01.2009 01.01.2009 false 31.12.2010
Completed 01.01.2008 01.01.2008 false 31.12.2009
Completed 01.01.2007 01.01.2007 false MI (Municipal Infrastructures) 31.12.2009
Completed 01.01.2009 01.01.2009 false 31.12.2010
Completed 01.01.2010 01.01.2010 false 01.01.2010
Completed 01.01.2010 01.01.2010 false 31.12.2010
Completed 01.01.2008 01.01.2008 false 31.12.2009
Completed 01.01.2009 01.01.2009 false 31.12.2010
IB (Institution Building), MI (Municipal Infrastructures)
Completed 01.01.2010 01.01.2010 false IB (Institution Building) 31.12.2010
Approved 31.07.2008 31.07.2008 false 30.12.2011
Approved 31.07.2008 31.07.2008 false 30.12.2011
01.06.2011
Under implementation 01.01.2009 false 31.12.2011
SME (Support to SME), EE (Energy Efficiency)
Approved 01.07.2010 01.07.2010 false 31.12.2013
EE (Energy Efficiency), SME (Support to SME)
Approved 01.01.2007 01.01.2007 false 01.01.2013
EE (Energy Efficiency), MI (Municipal Infrastructures), SME (Support to SME
Approved 01.12.2009 01.12.2009 false EE (Energy Efficiency), ENV (Environmental Aspect), MI (Municipal Infrastru
Approved 01.01.2008 01.01.2008 false MI (Municipal Infrastructures)
Approved 01.01.2008 01.01.2008 false 01.01.2016
EE (Energy Efficiency), MI (Municipal Infrastructures), SME (Support to SME
Approved 01.01.2008 01.01.2008 false 01.01.2016
EE (Energy Efficiency), MI (Municipal Infrastructures), SME (Support to SME
Approved 03.01.1999 03.01.1999 false
Approved 16.06.1999 16.06.1999 false
Approved 27.06.2002 27.06.2002 false IB (Institution Building)
Approved 08.06.2004 08.06.2004 false MI (Municipal Infrastructures)
Approved 26.03.2003 26.03.2003 false
Approved 20.12.2005 20.12.2005 false IB (Institution Building)
Approved 28.04.2004 28.04.2004 false MI (Municipal Infrastructures)
Approved 23.07.2003 23.07.2003 false IB (Institution Building), MI (Municipal Infrastructures)
Approved 27.02.2004 27.02.2004 false IB (Institution Building)
Approved 06.08.2004 06.08.2004 false MI (Municipal Infrastructures)
Approved 30.07.2004 30.07.2004 false SME (Support to SME)
Approved 08.10.2004 08.10.2004 false MI (Municipal Infrastructures)
Approved 16.05.2005 16.05.2005 false IB (Institution Building)
Approved 22.11.2005 22.11.2005 false IB (Institution Building), MI (Municipal Infrastructures)
Approved 07.03.2006 07.03.2006 false
Approved 03.02.2008 03.02.2008 false ENV (Environmental Aspect), IB (Institution Building)
Approved 11.05.2007 11.05.2007 false IB (Institution Building)
Approved 22.11.2007 22.11.2007 false IB (Institution Building)
Approved 03.02.2008 03.02.2008 false
Approved 11.05.2007 11.05.2007 false IB (Institution Building)
Approved 28.02.2008 28.02.2008 false IB (Institution Building)
Approved 31.07.2008 31.07.2008 false IB (Institution Building)
Approved 21.12.2007 21.12.2007 false IB (Institution Building)
Approved 14.10.2008 14.10.2008 false
Approved 24.04.2008 24.04.2008 false IB (Institution Building)
Approved 10.03.2009 10.03.2009 false IB (Institution Building), SME (Support to SME)
Approved 10.03.2009 10.03.2009 false IB (Institution Building)
Approved 14.10.2008 14.10.2008 false IB (Institution Building)
Approved 09.12.2008 09.12.2008 false IB (Institution Building), SME (Support to SME)
Approved 15.03.2010 15.03.2010 false IB (Institution Building)
Approved 22.07.2008 22.07.2008 false IB (Institution Building)
Approved 31.07.2008 31.07.2008 false
Approved 10.03.2009 10.03.2009 false IB (Institution Building)
Approved 15.03.2010 15.03.2010 false IB (Institution Building), MI (Municipal Infrastructures)
Approved 10.03.2009 10.03.2009 false IB (Institution Building)
Approved 23.12.2009 23.12.2009 false IB (Institution Building)
Approved 17.06.2010 17.06.2010 false IB (Institution Building)
Approved 01.12.2003 01.12.2003 false
Approved 02.03.2011 02.03.2011 false
Approved 14.10.2008 14.10.2008 false
Approved 15.04.2009 15.04.2009 false
Approved 15.03.2003 15.03.2003 false
Approved 20.11.2009 20.11.2009 false
Approved 20.11.2009 20.11.2009 false
Approved 15.11.2007 15.11.2007 false
Approved 09.02.2008 09.02.2008 false
Approved 06.03.1998 06.03.1998 false
Approved 28.02.2008 28.02.2008 false
Approved 05.11.2007 05.11.2007 false
Approved 02.09.2008 02.09.2008 false
Approved 25.11.2003 25.11.2003 false
Approved 15.03.2011 15.10.2010 false EE (Energy Efficiency), IB (Institution Building)
Approved 20.07.2010 20.07.2010 false SME (Support to SME)
Approved 16.03.2010 06.07.2010 true
Approved 04.05.2011 08.11.2011 false
Approved 11.05.2011 12.07.2011 false
Approved 31.03.2008 31.03.2008 false
Approved 30.11.2010 30.11.2010 false 30.11.2013
Approved 30.11.2010 30.11.2010 false 30.11.2013
Approved 30.11.2010 30.11.2010 false 30.11.2013
Approved 21.08.2008 21.08.2008 false
Approved 15.12.2010 15.12.2010 false
Approved 27.08.2011 27.08.2011 false
Approved 25.10.2010 25.10.2010 false
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false IB (Institution Building)
Approved ######### 01.01.2007 false IB (Institution Building)
Approved 01.01.2007 01.01.2007 false
Approved 01.01.2007 01.01.2007 false IB (Institution Building)
Approved 01.01.2008 01.01.2008 false IB (Institution Building)
Approved 01.01.2008 01.01.2008 false IB (Institution Building)
Approved 01.01.2008 01.01.2008 false IB (Institution Building)
Approved 01.01.2008 01.01.2008 false
Approved 01.01.2009 01.01.2009 false
Approved 01.01.2009 01.01.2009 false IB (Institution Building), SME (Support to SME)
Approved 01.01.2009 01.01.2009 false
Approved 01.01.2009 01.01.2009 false IB (Institution Building)
Approved 01.01.2009 01.01.2009 false IB (Institution Building)
Approved 01.01.2009 01.01.2009 false
Approved 01.01.2009 01.01.2009 false
Approved 01.01.2010 01.01.2010 false IB (Institution Building)
Approved 01.10.2010 01.10.2010 true 31.12.2014
Approved 23.06.2011 23.06.2011 true
Approved 23.06.2011 23.06.2011 true
Approved 23.06.2011 23.06.2011 true
Approved 23.06.2011 23.06.2011 true
Approved 23.06.2011 23.06.2011 true
Completed 01.10.2010 01.10.2010 false 31.12.2011
Completed 01.08.2008 31.12.2010 false
Approved 01.01.2010 01.01.2010 false 31.12.2012
Completed 01.07.2009 01.07.2009 false 30.06.2011
Completed 01.08.2009 01.08.2009 false 31.12.2011
Completed 01.01.2010 01.01.2010 false 31.12.2011
Approved 31.12.2009 31.12.2009 false 28.02.2012
Approved 01.01.2007 01.01.2007 false 30.06.2012
Approved 01.01.2007 01.01.2007 false 31.12.2012
Completed 01.01.2007 01.01.2007 false 31.12.2011
Approved 01.07.2008 false 31.12.2012
Approved 31.12.2010 31.12.2010 false 30.11.2012
Approved 03.04.2006 03.04.2006 false Project components will be beneficial to the environment, either
MI (Municipal Infrastructures)
Approved 18.08.2008 18.08.2008 false
Approved 22.12.2009 22.12.2009 false EE (Energy Efficiency), MI (Municipal Infrastructures), SME (Support to SME
Approved 18.12.2009 18.12.2009 false EE (Energy Efficiency), ENV (Environmental Aspect), MI (Municipal Infrastru
A
ctive of the project is to safeguard the hydroelectric plants of
lbania and improve their operational efficiency, it is important to emphasize tha
Risk Guarantee does not cover any physical works, therefore this is an Environmental Category C project. No safeguards policies are trigger
iciary programme
rk in Albania is about 15,000 km.The network comprises 3,412 km of national, or primary, roads administered by theMinistry of Public Works
involves construction of a new 24.2 km road with 4-lanes from Levan to Vlore crossing the River Vjosa valley and along the edge of the Nart
ction of a new ferry terminal and rehabilitation of Quays 7 and 8 are anticipated to have limited environmental impacts, which can be readily
has been screened as B/1 requiring an environmental analysis and review of the environmental status and performance of the existing facilit
is located for the most part in an urban setting and has therefore limited impacts on the biological environment. It intersects, or comes close
services will take particular care to ensure that proper attention is given to all environmental concerns and appropriate mitigation measures
es of this project contribute significantly to the protection of Lake Shkodra and the water resources of the region. Both by separating the sew
ed project has been screened IEE, requiring a site visit to review the scope of the investment programme and establish whether the project le
tal due diligence needs to be carried out to identify current environmental conditions and to predict potential impacts of the construction of th
Programme), MI (Municipal Infrastructures)
SME), EE (Energy Efficiency), MI (Municipal Infrastructures)
tal Aspect), EE (Energy Efficiency), SME (Support to SME)
tal Aspect), EE (Energy Efficiency), SME (Support to SME)
tal Aspect), EE (Energy Efficiency), SME (Support to SME)
tal Aspect), EE (Energy Efficiency), SME (Support to SME)
eeds is not associated with a major expansion and/or modernisation of the existing Okoli gas storage facility. Moreover, potential significant a
Programme), MI (Municipal Infrastructures)
Programme), MI (Municipal Infrastructures)
Programme), MI (Municipal Infrastructures)
Programme), MI (Municipal Infrastructures)
an MoFA technical assistance project has been completed.
Programme), MI (Municipal Infrastructures)
Programme), MI (Municipal Infrastructures)
Programme), MI (Municipal Infrastructures)
mental due diligence is being carried out by Consultants as part of the feasibility study and project preparation. The due diligence comprises
Community Treaty includes the requirement that acquis on the Environment is complied with. Previous CARDS funded assistance has helpe
d upgraded legislation on Civil Aviation must take in consideration all the requirements of the Commission Regulation laying down implemen
to the institutions will include a specific component to assist the beneficiary to implement an ?internal environment assessment? to identify
involves the provision of funds for investments at an electricity distribution company. In line with the Bank?s Environmental Policy a corporat
ciaries will be requested to comply with applicable national and EU legislation, as appropriate.
an Community has a longstanding commitment to address environmental concerns in its assistance programmes (as part as a wider commi
t is not possible to identify the precise implementing schedule of the individual contracts. But clearly the intention is to have contracted the to
activities will include a specific component to train beneficiary staff in the different aspects of mainstreaming environment in programme and
will consist mainly of road rehabilitation and potential environmental impacts will be temporary and will cause only minor and localised negat
is directly related and contributes to environmental improvement.
will generally benefit the environment and public health, either by providing betterdrinking water to the population, improving the efficiency of
ncy), SME (Support to SME)
ncy), SME (Support to SME)
Programme), MI (Municipal Infrastructures)
Programme), MI (Municipal Infrastructures)
al intermediaries will be requested to ensure compliance of the sub-projects with relevant national and EU environmental laws, as appropriate
ncy), SME (Support to SME), MI (Municipal Infrastructures)
tal Aspect), EE (Energy Efficiency), SME (Support to SME)
ncy), SME (Support to SME), MI (Municipal Infrastructures)
ncy), SME (Support to SME), MI (Municipal Infrastructures)
tal Aspect), EE (Energy Efficiency), SME (Support to SME)
tal Aspect), EE (Energy Efficiency), SME (Support to SME)
ncy), MI (Municipal Infrastructures), SME (Support to SME)
ncy), MI (Municipal Infrastructures), SME (Support to SME)
ncy), MI (Municipal Infrastructures), SME (Support to SME)
ing), MI (Municipal Infrastructures)
V (Environmental Aspect), MI (Municipal Infrastructures)
ncy), MI (Municipal Infrastructures), SME (Support to SME)
ncy), MI (Municipal Infrastructures), SME (Support to SME)
ect), MI (Municipal Infrastructures), SME (Support to SME)
ect), MI (Municipal Infrastructures), SME (Support to SME)
ect), MI (Municipal Infrastructures), SME (Support to SME)
al to the environment, either by providing better drinking water to the population or by collecting and cleaning wastewaters before discharging
ures), SME (Support to SME)
ect), MI (Municipal Infrastructures), SME (Support to SME)
ncy, it is important to emphasize that the project would have overall long-term very positive impact on the environment. Its focus on improvin
ct. No safeguards policies are triggered.
stered by theMinistry of Public Works, Transport and Telecommunications (MPWTT) and directlymanaged by the General Roads Directorate
valley and along the edge of the Narta Lagoon. In accordance with EBRD Environmental Policy, the construction of a new road of four or mo
mental impacts, which can be readily identified and mitigated in an environmental analysis. The ferry terminal works present an upgrade of th
and performance of the existing facilities.An Environmental Analysis of the planned development programme has been undertaken to identify
onment. It intersects, or comes close to, the botanical and zoological park of Tirana and an artificial lake which is part of it. Fauna and flora in
and appropriate mitigation measures are implemented, in line with the Bank?s relevant guidelines, including issues relating to natureApprova
e region. Both by separating the sewerage from the drain water system in the city of Shkodra and some surrounding villages and by treating
e and establish whether the project level is ?A? according to EBRD Environmental Policy. Based on the review of the programme, the projec
ntial impacts of the construction of the wastewater collection system, and to assess the ability of the project to bring the facilities towards com
cility. Moreover, potential significant adverse environmental and social impacts are readily identified and addressed through mitigation measu
aration. The due diligence comprises of an environmental audit, which will identify measures that would be needed for the existing facilities to
CARDS funded assistance has helped to mitigate pollution from thermal power plants in Kosovo, and hence move towards compliance with
on Regulation laying down implementing rules for the airworthiness and environmental certification of aircraft and related products, parts and
T
nvironment assessment? to identify areas where it could improve its internal performance vis-à-vis environmental aspects.
he training activi
k?s Environmental Policy a corporate Environmental Audit of the Company and an Environmental Analysis of the proposed investment prog
grammes (as part as a wider commitment to sustainable development). Key references include art. 6 of the Treaty and also the Cardiff proc
intention is to have contracted the total amount before the contracting deadline. It is envisaged to deploy approximately 18 to 20
ming environment in programme and project development as well as monitoring, evaluation and implementation.
ause only minor and localised negative effects (dust, noise, sourcing and disposal of materials, etc.), which can be mitigated through well-es
opulation, improving the efficiency of the treatment and distributionfacilities, or by collecting and cleaning wastewater before discharging into
U environmental laws, as appropriate.Approval date: 27.07.2007Preparation or timing: Signature: 27/07/2007Currency: EURExchange rate:
ning wastewaters before discharging into receiving waters. The Bank’s services will take care to ensure that proper attention is given to all en
e environment. Its focus on improving hydrological analysis and monitoring and better water management will result in further positive enviro
ed by the General Roads Directorate (GRD), and about 12,000 km of secondaryand local roads. The secondary and local road network cons
struction of a new road of four or more lanes, where such new road would be 10 km or more in a continuous length is classified in environme
minal works present an upgrade of the existing ferry terminal facilities and consists entirely of on-shore works within the port. The constructio
mme has been undertaken to identify the potential impacts of the development and the mitigation measures to mitigate those impact. The En
which is part of it. Fauna and flora inventories have revealed the presence of a number of endangered reptile and amphibian species. Speci
ding issues relating to natureApproval date: noPreparation or timing: Entry in the EIB approval process: 23/05/2008Under Appraisal at 15/05/
surrounding villages and by treating the sewage in the villages of Shiroke and Zogaj eutrophication of the lake is averted. This has a great im
review of the programme, the project category will be determined and environmental due diligence level defined.
ect to bring the facilities towards compliance with national and EU environmental standards. It should be noted that the proposed Phase 1 pr
addressed through mitigation measures. An integrated audit covering environmental, social and occupation, health and safety issues relate
be needed for the existing facilities to achieve full compliance with applicable Croatian regulatory requirements and EU environmental standa
ence move towards compliance with the provisions of the acquis. The Energy Strategy of Kosovo defines a set of priorities regarding the prot
craft and related products, parts and appliances, as well as for the certification of design and production organisations. Furthermore the env
T
ronmental aspects.
he training activities will include a specific component to train beneficiary staff in the different aspects of mainstreaming
ysis of the proposed investment programme has been undertaken as part of the due diligence. The implementation of the ESAP will allow the
the Treaty and also the Cardiff process which foresees the systematic consideration of environmental aspects into EC development cooper
y approximately 18 to 20
entation.
hich can be mitigated through well-established proper management methods.
g wastewater before discharging into receiving waters. As an EU candidate member state, the project will contribute to FYROM?s future com
2007Currency: EURExchange rate: 1.0Loan or grant amount: 10.0High priority:
that proper attention is given to all environmental concerns and that appropriate mitigation measures are implemented, in line with the Bank’
H
ent will result in further positive environmental impacts.
owever, as with any construction works or operation of the large energy units, some
condary and local road network consists of: (i) 4,411 km ofdistrict (or secondary) roads, which provide rural links of district importance and a
uous length is classified in environmental category A. Moreover, the project is required to be classified as A category because it is to be carri
works within the port. The construction-related environmental impacts are expected to be temporary and confined within the port area. A com
ures to mitigate those impact. The Environmental Analysis did not identify any significant environmental or social issues. TIA's compliance wit
reptile and amphibian species. Specific measures have been incorporated in the design to ensure that migration corridors of these species a
23/05/2008Under Appraisal at 15/05/08Currency: EURExchange rate: 1.0Loan or grant amount: 26.0High priority:
he lake is averted. This has a great impact on the flora and fauna at the lake and the adjacent wetlands.
l defined.
e noted that the proposed Phase 1 project will only involve sewerage collection and no wastewater treatment. Therefore, it will not fully comp
ation, health and safety issues related to Plinarco and the Okoli gas storage facility will be conducted by an independent consultant. Results
ments and EU environmental standards; and an environmental analysis to assess environmental benefits and impacts of the project and ma
s a set of priorities regarding the protection of the environment and pollution mitigation, and the implementation plan (for which technical ass
n organisations. Furthermore the environmental protection requirements will be based in the legislative acts laid down in the Chicago Conven
different aspects of mainstreaming environment in programme and project development as well as monitoring the implementation.
ementation of the ESAP will allow the Company to maintain compliance and develop best practice. The planned investment programme will
aspects into EC development cooperation AND in other policies (hence very important for the acquis). The support will include a specific com
ll contribute to FYROM?s future compliance with EUstandards and regulations on water, sanitation and the environment.Compliance with na
e implemented, in line with the Bank’s relevant guidelines.
ation of the large energy units, some negative impacts on the environment are expected. Potential environmental impacts concern mainly the
ural links of district importance and aremaintained by district road departments on behalf of the Ministry of Interior (MoI); (ii)4,980 km of com
s A category because it is to be carried out in a sensitive location within Vjosa-Narta Landscape Protected Area. For the above reasons, the
confined within the port area. A comprehensive Environmental Management Plan with preventative, corrective and mitigation measures will
or social issues. TIA's compliance with the environmental and social requirements agreed for the first loan has been reviewed by EBRD. App
migration corridors of these species and other animals are maintained after the ring road is constructed.The key impact of the Project is phys
h priority:
ment. Therefore, it will not fully comply with the EBRD?s Environmental Policy requirements.
an independent consultant. Results from this audit will be included in an Environmental and Social Action Plan that will need to be agreed w
ts and impacts of the project and make recommendations for mitigation measures. Preparation or timing: Passed final review, Pending boar
entation plan (for which technical assistance will be provided) provides for both legal measures, and investment in pollution mitigation measur
cts laid down in the Chicago Convention.
nitoring the implementation.
planned investment programme will also allow for substantial energy efficiency gains as well as improve the safety to the system in terms of
he support will include a specific component to assist the beneficiary to implement an ?internal environment assessment? to identify areas w
the environment.Compliance with national EIA legislation that has been drafted by transposing EU EIA Directive 85/337/EEC, amended by d
onmental impacts concern mainly the management and disposal of limited waste during rehabilitation works. Changes in reservoir levels duri
of Interior (MoI); (ii)4,980 km of communal roads, including private access roads, which provide rural linksof communal importance and are m
ed Area. For the above reasons, the project requires an Environmental Impact Assessment (?EIA?) and public consultation in accordance w
rective and mitigation measures will be developed in accordance with international standards and EU requirements regarding such issues as
an has been reviewed by EBRD. Approval date: 22.01.2008Preparation or timing: SignedOperationalCurrency: EURExchange rate: 1.0Loan
The key impact of the Project is physical displacement of households currently living in the Project footprint. A total of 206 residential structur
on Plan that will need to be agreed with the Company and implemented over an agreed timeframe. In addition, a Stakeholder Engagement P
g: Passed final review, Pending board approval
stment in pollution mitigation measures. A detailed programme for Energy Efficiency and Renewable Energy has been prepared under CAR
the safety to the system in terms of staff and the general public.
ment assessment? to identify areas where it could improve its internal performance vis-à-vis environmental aspects.
Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC will be verified during the appraisal. With regards to regulations con
S
orks. Changes in reservoir levels during plant shutdowns for rehabilitation works would be within normal operating levels.
ee the Environmen
ksof communal importance and are maintained by commune road departments on behalfof the Ministry of Interior (MoI); and (iii) 2,500 km o
public consultation in accordance with the EBRD?s Category A project requirements.
quirements regarding such issues as waste handling, oil spill response planning, dredging, and transportation arrangements during construc
rency: EURExchange rate: 1.0Loan or grant amount: 22.6High priority: no
int. A total of 206 residential structures are potentially affected by the Project. About two thirds of the affected structures were established wi
dition, a Stakeholder Engagement Plan will be prepared and released to the public domain.
nergy has been prepared under CARDS funding, covering 2007 ? 2009. Technical assistance to be provided to the Ministry of Energy and Mi
isal. With regards to regulations concerning the protection of habitats, respective EU Directives are considered to be transposed, subject to
S
operating levels.
ee the Environmental Assessment n° E1896
pproval date: 30.06.2008
reparation or timing: Operational
tart date : Q3 20
A
P
S
of Interior (MoI); and (iii) 2,500 km of urban or municipal roads,which are maintained by the Municipal road departments on behalf of the Min
rtation arrangements during construction & operation, considering the increase of both land-based and maritime traffic. Approval date: 14.05
ected structures were established without title. The majority (almost 80%) of the affected structures are located in the section between Kavaj
ided to the Ministry of Energy and Mining which covers the areas of improving energy efficiency, demand-side management and promoting t
sidered to be transposed, subject to verification during appraisal. FYROM is part of the international EMERALD network, and procedures for
S
E
timing: Operational
tart date : Q3 2008
xpected completion: Q4 2013
urrency: USD
xchange rate: 1.28
oan or grant amount: 27.5781
ig
C
E
L
H
oad departments on behalf of the Ministry ofTerritorial Planning and Tourism (MTPT)1.The priority given to the expansion of the national road
maritime traffic. Approval date: 14.05.2007Preparation or timing: OperationalCurrency: EURExchange rate: 1.0Loan or grant amount: 14.0Hi
ocated in the section between Kavaja Road and the zoo. About 80% of affected structures are residential and 620 individuals will need to mo
d-side management and promoting the wider use of renewable energy will have a direct environmental benefit due to the reduction in energy
ERALD network, and procedures for compliance herewith will also be verified. A social assessment will also be undertaken as part of the app
L
H
28
oan or grant amount: 27.5781
ig
to the expansion of the national road networ
ate: 1.0Loan or grant amount: 14.0High p
al and 620 individuals will need to mo
benefit due to the reduction in energy production and use.Approval date: 28.1
also be undertaken as part of the appraisal.