Embed
Email

Sw Outsourcing Mou Template

Document Sample
Sw Outsourcing Mou Template
Description

Sw Outsourcing Mou Template document sample

Shared by: yje20549
Categories
Tags
Stats
views:
13
posted:
1/20/2012
language:
pages:
171
Main ID Name Description Total Cost Donor Sector Total Loan Amount

Total Grant Amount Total Investment Amount

Description: Distribution Project (PTDP)

Power Transmission and Switzerland finances two(CH)

ALB-ENE-G-CHE 01 components on a non-reimbursable grant basis:0(i) Technical as

13950009 Switzerland Energy 13949124 0

Energy Description: The objective is to improve the safety of the hydropower dams, constructing a transmissi

95000 Japan Energy APL5

ALB-ENE-G-JAP 01Community of South Eastern Europe(JP) Energy 94998 0 0

Promotion the use of Installation in Albania

50000 Spain (ESP)Energy 50000 0 0

ALB-ENE-G-SPA 01 ofDescription:solar energyof a photovoltaic system at the Politechnic University of Tirana, training for stu

Energy Description: The project consists Programme - APL 5 for (1) physical SAFETY

32510880 World Bank (WB) Energy 0 27003780

ALB-ENE-L-WB 01 Community of South East Europe APLof two main components:Albania DAMinfrastructure investments; and0

Privatization Description: This operation is expected to be similarPartial previous Bank PRG provided for the privati

ALB-ENE-L-WB 02 56019000 System Operator Energy 0 56019000

of the Power Distribution World Bank (WB) (OSSH) to the Risk Guarantee 0

Regional Description: Developing the Quark Shkodra, sectorsregional administration and infrastructure upgradin

3500000 Austria

ALB-SOC-G-AUT 03 Development Programme Shkodra (AUT) Social TA for 3500000 0 0

Kukes 03 Description: Rehabilitation and/or reconstruction of small community public infrastructure works encom

168715 United Nations Development Programme (UNDP)

ALB-SOC-G-UNDPRegional Development Initiative Phase 2 Social sectors 168715 0 0

Support for Description: This278018 United designed to directly support mine/ERW survivors in 39 mine affected

programme is Nations Development 278018

Social sectors Programme (UNDP)

ALB-SOC-G-UNDP 02 social and economic reintegration of mine ERW survivors 0 0

Albanian Description: The proposed programme combines infrastructure rehabilitation and capacity building wit

14380000 Council of Works Programme 3rd Phase.

Social sectors 180000 10000000

ALB-SOC-L-CEB 02 Development Fund (ADF) - CommunityEurope Development Bank (CEB) 0

TB 02 Description: Loan Lending

20000000 European Investment Bank (EIB) projects

Private infrastructure 0 20000000 0

ALB-PSD-L-EIBLoan for SMEs and Priority for financing SME projects,sector development promoted by local authorities and

Credit for Description: The goal of this

3400000 Germany (GER) sustainable improvement of access to market-orientated

is the

ALB-PSD-L-GER 01 SMEs i.rural a.urban regions measure Private sector development 3400000 0 0

Economic Description: 400000 Austria (AUT) Social sectors 400000 0

ALB-SOC-G-AUT 01 School ProjectModernization of economic education at 11 secondary vocational schools0 Albania. in

Mobile ClinicDescription: Establishemnt and operation of a mobile clinic in the district of Puka

ALB-SOC-G-AUT 02 73000

in the district of Puka Austria (AUT) Social sectors 73000 0 0

Description: Early Childhood Curriculum

ALB-SOC-G-CAN Childhood Curriculum Project Canada (CAN) Project (ECCP) is based on Québec's Preschool Program. Th

Early 01 534999 Social sectors 534999 0 0

Social statusDescription: The 247666 Canada (CAN) problems framework. Tetraplegics people?s 0

ALB-SOC-G-CAN 02 projects addresses theSocial legal of 247666

of paraplegic and Tetraplegics invalids. Thesectors Para and 0 category who d

Support Description: The project will focus(CAN) following areas: (i) furnishing the kindergarten; (ii) provision o

ALB-SOC-G-CAN 03to Pre-School Education 73190 Canada on the Social sectors 73190 0 0

Development of the Specialised Pedagogyat improving the quality2921520 the handicaped persons, facilitating thu

ALB-SOC-G-CHE 01 2921520 Switzerland (CH) University life of

Social 0

Description: The project aims Section at thesectors ofof Vlora (DSPS) (PHASE III) 0

Programme to build up the professional Development System (PDS/CCE) care services through capacities buildin

ALB-SOC-G-CHE 02 1075368 Switzerland (CH) sectors of health

Social

Description: The overall goal is to improve the quality 1075368 0 0

Rehabilitation of the elementary school in Kalur, Lezhe the access 200018 quality of education for 0

ALB-SOC-G-CHE 03 project Switzerland (CH)

Social

Description: The 200019 aims at improving sectors and the 0 children in rural

Improving of Other projects references: IPA 2008 - Social sectors 5700000

ALB-SOC-G-EC 01 5700000 European Commission

diseases

consumer protection against zoonotic Project 18 (EC) 0 0

Strengthening the Vocational Education and Training in Albania 7000000 schools/works; provision of didactic too

ALB-SOC-G-EC 02 8000000 European Commission (EC)

Social sectors

Description: Support for construction and rehabilitation of VET 0 0

Assistance to the Justice The present European Commission (EC)3300000

ALB-SOC-G-EC 03 3300000 project regards the sectors of technical assistance to the Ministry of Justice

Description: system Social provision 0 0

Support Description: This project European Commission (EC)

Infrastructure further improvement of 0 0

ALB-SOC-G-EC 04 to the Penitentiary10000000 will serve theSocial sectors10000000 existing capacities of the penitentiary an

Support Description: This project will (IPA 2008)

6500000 European Commission outlined objectives by building detention and pre-det

Social sectors

ALB-SOC-G-EC 05 to the Penitentiary Infrastructure partially address the(EC)5500000 0 0

Tempus, This is the contribution to the EC's Commission (EC)2000000

Social sectors

ALB-SOC-G-EC 06 Erasmus Mundus 2000000 Europeanstudent and education mobility programme. 0 0

Health Sector Reform TC for capacity development of sectorsinsurance instituteObjectives: The 0

ALB-SOC-G-GER 01 Description: Social

300000 Germany (GER) health 300000 0 objective is to im

Support Description: The 200000 focusses its activities on the pilot regions Korca, 0

ALB-SOC-G-GER 02to handicapped children Social

project Germany (GER) sectors 200000 Shkodra and0Tirana. The me

Sustainable economic development through vocational education 1000000 cooperative education called "Dual Fac

ALB-SOC-G-GER 03 1000000 Germany (GER) Social of a university of

Description: The key issue is the constitutionsectors 0 0

VT in 04 Description: TC for improving vocational training in North East

Social

ALB-SOC-G-GER North Eastern Albania1800000 Germany (GER) sectors 1800000 Albania. In 0 first stage 0 a vocational and

Modernization of emergency treatment unit of (GR)Social sectors unit of hospital of Gjirokastra

ALB-SOC-G-GRE 03 100000 Greece hospital of Gjirokastra

Description: Modernization of emergency treatment 100000 0 0

Prevention Description: Prevention of genetical diseases in Albania 8903

8903 Greece

ALB-SOC-G-GRE 04 of genetical diseases in Albania (GR)Social sectors 0 0

Rehabilitation of 'Seferis' Rehabilitation of 'Seferis' schoolsectors 1500000

ALB-SOC-G-GRE 05 1500000 Greece (GR)Social in Korca

Description: school in Korca 0 0

Defense 569481 Italy (IT) Social sectors 569481 0

ALB-SOC-G-ITA 01 of the rights of persons affected by chronical mental diseases: realization of a services network 0

Development of the transfusional medicine towards European standards

ALB-SOC-G-ITA 02 390000 Italy (IT) Social sectors 390000 0 0

Diagnosis 803888 Italy (IT)

ALB-SOC-G-ITA 03 and social integration of umpaired minors Social sectors 803888 0 0

Italian support to the reform of the Albanian healthSocial sectors and Technical Assistance Unit at0 Ministry of H

ALB-SOC-G-ITA 04 793000 Italy (IT) system: Study 793000 0 the

Nothern 879410 Italy (IT) drug sectors 879410

ALB-SOC-G-ITA 05 Albania: integrated community service forSocialand alcohol addicted 0 0

Nothern 1004930 Italy (IT) Social services of the professional centre "Bardaj-Bleran"

ALB-SOC-G-ITA 06 Albania: strenghtening of education and training sectors 1004930 0 0

Prevention, care and physical829966 Italy (IT)

ALB-SOC-G-ITA 07 Social sectors 829966

therapy in the Northern and Center regions of Albania 0 0

Strengtening the emergency aid system in (IT) regional hospital of Shkoder

ALB-SOC-G-ITA 10 891604 Italy the Social sectors 891604 0 0

Support 188000 Italy (IT)

ALB-SOC-G-ITA 12 to the National Institute of Public Health Social sectors 188000 0 0

UNICEF Description: Develop an Netherlands Social sectors 1593280

(NL) 0 0

ALB-SOC-G-NLD 01 CLEEN TIR 16569 1593280 environmental curriculum in the Albanian primary school system based on the

Increasing Description: The through the strengthening ofconditions and Kosovar Educational system.of vulnerabilit

project Spain improve life Albanian of children who are in a situation Supporting e

ALB-SOC-G-SPA 01 human capacities 960010 aims to(ESP)Social sectors 960010 0 0

Reduction retention and high drop-out rates in primary sectors in the region environment

goal of Spain (ESP)Social school 255155 0 0

ALB-SOC-G-SPA 02 ofDescription: The 255155 the project is to upgrade the educational of Skhoder of children, upgrading o

Reduction the high drop-out rate in Spain (ESP)Social sectors 298396

project primary school and improving the quality of the educational 0 implementa

0 the

ALB-SOC-G-SPA 03 ofDescription: The 298396 consists of rehabilitation of schools, training for teachers andsystem in the Co

Reduction the high drop-out rate in Spain improveand Velipoje (Shkodra)

project school in Dajc educational 347424 0 0

ALB-SOC-G-SPA 04 ofDescription: The 347424 tries to (ESP)Social sectors environment in two primary and secondary schoo

Support Description: This multilateral project, coordinated by 1400000

Maternity and Children´s Health Services

ALB-SOC-G-SPA 05 of the reform of the 1400000 Spain (ESP)Social sectors WHO, aims to improve in general0the maternity a

0

Western Balkans Fight against67150 Sweden (SW) HIV epidemics in the Western Balkans by creating an enabli

HIV/AIDS Phase II the

REG-SOC-G-SWE 01 Description: The goal is to slow down Social sectors 67150 0 0

ConstructionDescription: The 340000 for the construction sectors 340000 Vlora is being prepared.

ALB-SOC-G-TUR 01 of Blood Bank project Turkey (TR) Social of a Blood Bank in 0 0

Equipment Description: Equipment Mental Disordered People in Berat

29991 Turkey (TR) Social sectors

ALB-SOC-G-TUR 02 support for the Center forsupport for this center. 29991 0 0

Description: The windows the doors and the sectors of the crechecity changed and 0

Reconstraction of the kindergarden Mustafa Kemal Atatürk in Orikum 7580

ALB-SOC-G-TUR 03 7580 Turkey (TR) Social parquet in Vlora were 0 there were done

Description: primary school of the 2, Social sectors 119500

119500 Turkey (TR) in Berat

The reconstruction of theRe-constructionÇlirimi primary school building and its surroindings.

ALB-SOC-G-TUR 09 0 0

Rehabilitation for the Regional Shkodra the realization Phase

ALB-SOC-L-CEB 01 10500000 Council of - 3rd of departments Bank (CEB)

Social sectors 169000 6000000 0

Description: Completion of Hospital Europe Development and services comprised in the initial Master

Social Service Delivery Project Additional Financing

ALB-SOC-L-WB 01 3982475 World the additional financing would include; (i) development of the IT system

Social

Description: It is envisaged that Bank (WB) sectors 0 3980000 0

Albanian Maritime Sector– construction of the new quay and

Improving of Description: To 3600000the Rehabilitation of Shengjini Port the operating square and other facilities

ALB-TRA-G-EC 01 Transport

support European Commission (EC)3100000 0 0

Pre-feasibility/feasibility studies - highway routesCommission (EC)2500000 road system in Albania by providing d

ALB-TRA-G-EC 02 contribute towards inTransport

Albania

Description: To 2500000 Europeanimproving the standard of the 0 0

Reconstruction of the secondary and contracts 1Commission (EC)8000000 road Antigone, Gjirokaster 2. Reconst

ALB-TRA-G-EC 03 8880000 European - Transport

IPA 2008

Description: Civil Works local roads Reconstruction of the rural 0 0

Improvement of rural roads in AlbaniaCouncil ofRoadsproject:(i)the improvement of priority sections of the seconda

ALB-TRA-G-EC 04 49000000 - Feeder Europe Development Bank (CEB)

the

There are three main Components in Transport 9000000 40000000 0

Support/Twinning to Albanian Civil Aviation Safety Transport (EC)1000000

ALB-TRA-G-EC 05 1000000 of the project: Trainings Systems

Management 0

Description: ComponentsEuropean Commission in: (1) Implementing EC Reg. & Dir.0 civil aviation in

Technical Assistance to Ministry of Publiccapacity Transport and Telecommunications 0 Institute of 0

ALB-TRA-G-EC 06 enhance the Works, Transport

of the MPWTT, Directorates and the

Description: To 1000000 European Commission (EC)1000000 Transport to pla

ConstructionDescription: ConstructionGreece (GR)Transport

ALB-TRA-G-GRE 01 23896000 of Sagiada-Konispol-Saranda road

of Sagiada-Konispol-Saranda road 23896000 0 0

Durres Bypass and Vora The project consist of land acquisition, consultancy services, 0

ALB-TRA-G-KUW 01 6000006 Project on the Durre-Vore road

Description: Interchange Kuwait (KW)Transport 6000006 0

and the construction of earth

ORET DutchDescription: This grant will facilitate the manufacturing of four offshore patrol vessels for the Albanian

ALB-TRA-G-NLD 01 31128500 coastguard Transport

Government concerningNetherlands vessels (NL) 31128500 0 0

Strengthening of the Albanianproject supports MPWTT in its task of strengthening the 0

ALB-TRA-G-SPA 01 Maritime Administration

Description: The 100000 Spain (ESP)Transport 100000 0

Maritime Administration in a

Levan-Vlore Description: The proposed project willTransportBank (EIB) 0 of a 24km road section0from Levan to

ALB-TRA-L-EIB 02 support

Road Project 64260000 European Investmentthe construction 48000000

Port of Durres 40000000 European Bank for Reconstruction and 32000000

Transport 2200000 Development (EBRD) 0

ALB-TRA-L-EBRD 02 Description: The project will increase the capacity of the ferry passenger terminal, improve the adjacen

Tirana Airport - Phase B 22600000 European Bank for Reconstruction i) extension of

Transport 0 Development passenger terminal to

ALB-TRA-L-EBRD 03 Description: Phase B development consists of the following: and 22600000 the (EBRD) 0

Tirana Outer Ring Road 39975000 European Bank for Reconstruction and 24000000

providing 0 Development (EBRD)

ALB-TRA-L-EBRD 04 Description: The EBRD is consideringTransport up to EUR 24 million for the construction of road and 0

Fier Bypass Description: The project involves the construction of a 19.5 km bypass expressway between the North

ALB-TRA-L-EIB 01 Transport

64000000 European Investment Bank (EIB) 0 32000000 0

Secondary The project is part of a wider

137000000 European Bank of Reconstruction and Development (EBRD)

Transport 4000000 100000000

ALB-TRA-L-EBRD 05 and Local Roads Programme programme forregional and local road rehabilitation, parallel-financed by 0

Albania Description: -42728000 World Bank Transport

Phase I

ALB-TRA-L-WB 01 Transport ProjectThe Project includes four(WB) 0 30520000 0

components: (i) Construction o f the 26 kilometer section betwe

Secondary and Local Roads - Phase II of priority sections of secondary and local roads, and implementation and in

ALB-TRA-L-WB 02 25427480 World Bank (WB)

Description: Improvement Transport 0 22260000 0

Building Description: Institutional support (AUT)

200000 Austria Water and Environment

200000 0

ALB-WAE-G-AUT 01Capacity to Access Carbon Finance in Albania for capacity building and implementation of0CDM projects;

Building Description: The 303224 will help (AUT)

project Austria the Government of Albania to

Water 303220 0

ALB-WAE-G-AUT 02Capacity to Access Carbon Finance in Albania and Environment develop its public and private sector ca 0

Water Supply and Environmentalrehabilitation of the water supply 1900000

ALB-WAE-G-AUT 03 1900000 Austria (AUT) Water and

Description: Further Lake Protection Shkodra Environment 0

and sewerage systems including0institutional sup

Ensuring Description: To in Environmental(CAN) Assessments/Strategic Environmentalfor public consultation

24000 Canada Impact institutions introduce formal mechanisms Assessments

ALB-WAE-G-CAN 01 Public Participationsupport relevant GoA Water and Environment 24000 0 0

Pogradec Description: The overall project is contributing toEnvironment improvement of the water quality in the

ALB-WAE-G-CHE 01 Water Supply Project Water 11299280

11299996 Switzerland (CH) and the regional 0 0

Shkodra Description: The objective of the Project is toand Environment condition 0 the people living in Shkod

ALB-WAE-G-CHE 02 Water Supply Project Water

9299985 Switzerland (CH) improve9299395 the living of 0

Trans-boundary Cooperation 124000 is focused at(CH) ofand EnvironmentResources 0

ALB-WAE-G-CHE 03 project the Management

Shkodra alke : Natural

123992 0

Description: The through Switzerland Water Shared establishing mechanisms for sustainable use of s

Description: Oil 1000000Albania Republicthe and Environment Region, Albania

for Oil Industry, Kuçova

Implementation of New Environmental TechnologyWater serious threat for local habitants and also 0 the environm

ALB-WAE-G-CZE 01 fields in Czech present (CZ) 1000000 0 for

Consolidation of the Environmental Monitoring system indata (EC)2000000 expansion and consolidation of a sus

ALB-WAE-G-EC 01 2000000 European Commission quality through

Water Albania

Description: Improvement of environmental and Environment 0 0

Improvement of Water Supplyoverall project purposes areAlbania

ALB-WAE-G-EC 02 25500000 European Commission following: Upgrade the disposal of wastewater throug

Water as Environment

Description: The and Sewerage Systems in and (EC) 24000000 0 0

Kukes Description: The purpose of the project stems from the Region?s geographic opportunity and potentia

Environment Promotion Water and Environment

ALB-WAE-G-EC 03Region Tourism and 1137000 European Commission (EC)1137000 0 0

Support Description: The project aims at theCommission (EC) rehabilitation of the sewerage 0

48970000 European construction Environment

ALB-WAE-G-EC 04 for water supply and sewerage infrastructure Water and and/or 23100000 0 networks (prima

Support to Description: TC for betterGermany (GER) and Environment

330000 supply of drinking 330000 0 0

ALB-WAE-G-GER 01 the decentralisation in the water sector Water water & basic sanitary serv. The project provides adivsory

Institutional Support to the Albanian Ministry of Environment for Sustainable Use and Conservation0of Use and Con

ALB-WAE-G-ITA 02 2215190 Italy (IT) Water and Environment

2215190 0

Description: Institutional Support to the Albanian Ministry of Environment for Sustainable Biodiversity.

Course for Description: Building Sustainability: Strategies, Methodologies, on good 0

84416 Netherlands Water and Environment

(NL) 84416 environmental governance,

ALB-WAE-G-NLD 01 Good Governance andcapacities of national and local stakeholderPolicies ans Actions for SEE QE 1850 0

EmpoweringDescription: Strengthen local governance in the area 18995

ALB-WAE-G-NLD 02 467281 Netherlands Water and Environment

(NL) 467281 0

Environmental Local Governance Performance TIR of environmental management and the impleme 0

IdentificationDescription: The proposed project willWater and Albanian Government to 0

ALB-WAE-G-NLD 03 1299688 Netherlands (NL) in Albania

assist 1299669

and prioritization of Environmental Hotspots the Environment 0

carry out identification and p

IdentificationDescription: This project aims at identification, assesment, developing a web based database, building

ALB-WAE-G-NLD 04 1299688 Netherlands Water in Albania TIR 17168

(NL) 1299670

and prioritization of 'environmental hotspots'and Environment 0 0

Impl. 05 Description: Providing information and(NL) and Environment

100000 Netherlands Water 100000

ALB-WAE-G-NLDCLRTAP & Protocols (Air Pollution) QE 15723developing the necessary skills for0 0

implementing the Conventio

NEWEN Description: To 4178360 Netherlands Watercooperationthat aims at

implement a programme of and Environment

(NL) 4178360 0

ALB-WAE-G-NLD 07 (Netherlands and Western Balkans Environmental Network) QE 18507 establishing a network between u 0

NEWEN Description: (Netherlands and Western Balkans Environmental Network)0 a network

758 Netherlands (NL)

of cooperationthat aims

758 QE

ALB-WAE-G-NLD 08 Inception phaseTo develop a programmeWater and Environment at establishing 17357 0 between univ

ORET DutchDescription: This grant wilVlora WaterWater and Environment

ALB-WAE-G-NLD 09 13788500 finance part Infrastructure13788500

of the 0

Government concerningNetherlands (NL) Vlora infrastructure Rehabilitation Project. 0

REC 10 Description: Support NGOs and local authorities Environment

(NL) funds for 0 0

ALB-WAE-G-NLDtrustfund II TIR 17114 1000000 Netherlands Water and with 1000000 the implementation of locally initiated s

Strengthening Albanian Civil Society for Albanian CivilEnvironment TIR 17208 Environment by strengthening capa

ALB-WAE-G-NLD 11 669530 Netherlands Water and for an Improved

(NL)

Description: Strengthening an Improved SocietyEnvironment 669530 0 0

Strengthening capacities This programme aims to Water andmitigate environmental problems through remediation

ALB-WAE-G-NLD 12 1565002 Netherlands effectively Environment

(NL) 1564979 0 0

Description: in the western balkans countries to address cross-border environmental hot-spots in the

Strengthening capacities Aswesternthe Westernaddress environmental Hotspots - Bajza

ALB-WAE-G-NLD 13 part of Balkans to Balkans regional 2118807

(NL)

Description: in 2118837 Netherlands Water and Environment 0 0

programme, UNDP Country Office in Albania wil

Twinning Description: Establishment of - Agency for Environment and Forests TIR 0

1505380 Netherlands Water Environment and

(NL) 1505380 8706 0

ALB-WAE-G-NLD 14 project Oranjewoud Consultancy the Agency forand Environment Forests and the accreditation of its labo

Description: Environmental restoration through reforestation. affected by the catastrophe.

180000 and restoration of and Communities

Post-Gërdec: environmental recovery Spain (ESP)WaterthoseEnvironmentImproving public zones affected by the e

ALB-WAE-G-SPA 01 180000 0 0

Support Description: The 145000 will support the implementation of Local Environmental Action0Plans protecti

project Spain lake for the and Environment

145000 0

ALB-WAE-G-SPA 02to the local communities of Shkoder(ESP)Water implementation of Action Plans on environmentaland prom

Support to Description: Bridging project between previous Albanian41242

41243 Sweden (SW)

ALB-WAE-G-SWE 01 National forest association, phase 2 Water and Environment 0 0

Forestry Project and NRMP. Support to Regio

ConstructionDescription: Water transmission (TR)is underand Environment

ALB-WAE-G-TUR 01 220000 Turkey village of Kryevidh in Kavaja

220000 0 0

of water transmission line in the line Water construction to serve 6 villages in Kryevidh in Kavaja

Project for Description: Clearance beach in Shengjin.

22285 Shengjin

ALB-WAE-G-TUR 02 protection of the seaside ofTurkey (TR) Water and Environment 22285 0 0

Programme Lakeproject includes the repair, reorganization and expansion of the production, transportation, storag

ALB-WAE-L-GER 01 11900000 Germany (GER) and Environment

Water 7000000

The Ohrid, Water Supply Pogradec and Environmental Protection 4900000 0

Sector Programme Water II 1785000 Germanythe Water and Environment

ALB-WAE-L-GER 03 The measure should contribute to (GER) 0 1500000 0

improvement of living conditions of the population in the selecte

Sewerage In the framework of this project a storm water overflow will be constructed, the sewer network in the o

ALB-WAE-L-GER 04 Korca IV Water 4100000

19100000 Germany (GER) and Environment 15000000 0

Environmental Protection ProgrammeGermany (GER) Ohrid Lake aims II 0protect the lake situated0on the border b

ALB-WAE-L-GER 05 6740000 Lake Ohrid,WaterSewerage Pogradec to

The environmental protection programme and Environment 5000000

Sewerage Description: The project "Environmental Protection of the Shkodra7500000

ALB-WAE-L-GER 06 Shkodra Water

7500000 Germany (GER) and Environment 0 the

lake" comprises of 0 rehabilitation

Albania Other projects references: WB projectWater and

1067954 World Bank (WB) number: P085089

ALB-WAE-L-WB 01 Butrint Global Biodiversity and Heritage ConservationEnvironment 0 826800 0

Disaster Description: TheAdaptation Project Water and Environment

first phase is designed to 0 5960880 0

ALB-WAE-L-WB 03 Risk Mitigation and6609300 World Bank (WB)consolidate and upgrade Albania?s capacity to plan for, mi

ConstructionDescription: The final goal of the initiative of ZP Elektro Doboj a.d. is the construction of a system of h

BIH-ENE-G-EC 01 50000000 European IIIEnergy

of small hydro power plant Cijevna Commission (EC)5500000 39500000 0

Electrification of Kvarc

BIH-ENE-G-NLD 01 75047 Netherlands Energy

(NL)

Rehabilitation of the media infrastructure in Srebrenica 75047 0 0

Support Description: Reconstruction of HV and(NL)network in Zepa of Zepa

in larger Srebrenica Energy

LV 268871 0 0

BIH-ENE-G-NLD 02 to sustainable return 268871 Netherlands region - Electrificationwhere some 50 families have returned but

Energy

BIH-ENE-G-NOR 01Efficiency 188543 Norway (NOR) Energy 188543 0 0

Electrokrajina Power Distribution Project

BIH-ENE-L-EBRD 01 20000000 European network and facilities and upgrade of

Energy 0 Development (EBRD) 0

Reconstruction of power distributionBank for Reconstruction and 15000000metering system (the Projec

Gasification of Central Bosnia CantonEuropean Bank for Reconstruction and 20000000enable natural gas supply to

BIH-ENE-L-EBRD 02 24703000 Energy 0 Development (EBRD)

Construction of new 40km highpressured natural gas transport pipeline to 0

ISO & TRANSCO Loan Novation Project

BIH-ENE-L-EBRD 03 272000000 a SCADA/EMS system for the electricity transmission(EBRD) in the Federa

Energy 0 Development network

Supply and installation of European Bank for Reconstruction and 70000000 0

Mostar and Hydro is expected to compriseInvestment Bank (EIB) 0 170000000 four small0

275790000 European three wind farms (about 130 MW), and

BIH-ENE-L-EIB 01 WindThe project Energy Energy hydro plants (ab

Rehabilitation of HPP Rama turbines,Germany (GER) transformers. Extension of switch yard. Consulting services.

BIH-ENE-L-GER 01 of

Rehabilitation 25800000 generators and Energy 0 17000000 0

Wind Farm Mesihovina with a capacity of 44MW and a yearly output of approx. 128 GWh will be built in Mesihova

BIH-ENE-L-GER 02 A windpark 78000000 Germany (GER) Energy 0 72000000 0

Reconstruction of Social and 500000 European Commission (EC) 500000 fulfil their role in the return small bridge

BIH-SOC-G-EC 60 Technical acquire the capacities to effectively

Social sectors 0 0

Description: BiH authoritiesInfrastructure facilities (schools, kindergartens, health centers, and reinteg

Project Description: Partial financing of investment Developmentpartial (CEB)

20000000 Council Municipalities through Bank financing of capital investments

Social sectors 0 10000000 0

BIH-SOC-L-CEB 02 for the benefit of Bosnian-Herzegovinaof Europe sub-projects undertaken by Bosnian-Herzegovine municip

IRBRS for SME & Credit line for financingInvestment Bankprojects 0 small and medium-sized enterprises a

50000000 European of limited-scale development

BIH-PSD-L-EIB 10 LoanDescription:Priority Projects Private sector (EIB) of 50000000 0

HAA Group BiH GL II

BIH-PSD-L-EIB 09 300000000 European of limitedsector development

Private scale (EIB) 0 150000000 0

Description: Credit line for financingInvestment Bankprojects of small and medium enterprises and loc

INTESA Description: Loan operation for the Investment small (EIB)medium

50000000 European Private sector and 0 50000000 0

BIH-PSD-L-EIB 03 Loan for SMEs and Priority Projects financing of Bankdevelopment scale projects promoted by SMEs o

Unicredit Description: Credit line for financing of limitedsector development

GL Private scale (EIB) 0 25000000

BIH-PSD-L-EIB 07 Bank Banja Luka50000000 European Investment Bankprojects of small and medium enterprises and loc 0

RLBH Description: Loan operation for

80000000 European Investment of small and medium scale projects promoted by SME

Private sector (EIB) 0 40000000

BIH-PSD-L-EIB 08 Loan for SMEs and Priority Projects lease-financing Bankdevelopment 0

UCL Loan for SMEs & Priority Projects lease-financing of limited development of small and medium-sized enterpr

BIH-PSD-L-EIB 04 30000000 European Investment Bankscale projects

Description: Credit line for Private sector (EIB) 0 30000000 0

UPI Banka GL

BIH-PSD-L-EIB 05 50000000 European of limitedsector development

Private scale (EIB) 0 25000000 0

Description: Credit line for financingInvestment Bankprojects of small and medium-sized enterprises a

Credit Guarantee Fund

BIH-PSD-L-GER 01 12828381 promotion of SME sector development

Private

Credit guarantee fund forGermany (GER) and setting up businesses.0 12828381 0

European The EFBH Fund is Herzegowina (EFBH)

and administared by KfW.Private sector development

0 18384000

BIH-PSD-L-GER 02 Fund for Bosnia 18384000 Germany (GER)A funding agreement has been signed with the Council of M 0

Raiffeisen Loan EE-Finance (Promotional Loan) measures from KfW Entwicklungsbank

9000000 Germany (GER) 0 0

BIH-PSD-L-GER 03 Bosnia for refinancing energy efficiency Private sector development 9000000 that allows the local ban

Raiffeisen Loan Energy Efficiency Germany (GER)

6000000 measures from KfW Entwicklungsbank

0 0

BIH-PSD-L-GER 04 Bosnia for refinancing energy efficiency Private sector development 6000000 that allows the local ban

Community Development Additional Financing credit for Bosnia and Herzegovina is to help finance0a subset of the

BIH-SOC-L-WB 05 4687500 World Bank (WB) sectors

The proposed additional financing Social 0 3905000

NGO Snaga Description: Core fundingNetherlands Social sectors 797239

BIH-SOC-G-NLD 01 (NL) 0 0

Zene 2007-2010797239 for NGO Snaga Zene in order to enable it to provide adequate psycho-socia

Avian Description: The ProjectWorld Bank (WB) sectors

4768889 Social 0 3725000 0

BIH-SOC-L-WB 01Influenza Preparednessproject would finance activities under five components: (i) Strategic Communications

The 01 Description: In order to maintain roads Machinery

4757090 Construction in BH properly, road maintenance 0

BIH-TRA-G-JAP Project for Procurement of Road Japan (JP) Transport 4757090 equipment is0to be procured

Corridor 605000000 of new priority for Reconstruction and Development (EBRD)

Transport 0 480000000 0

BIH-TRA-L-EBRD 01 Vc Description: ConstructionEuropean Bankmotorway sections of the main north-south road through Bosn

Road 03 Description: The

230500000 European Bank for Reconstruction and Development (EBRD)

project is 0 193200000 0

BIH-TRA-L-EBRD Rehabilitation Project main purpose of this Transport to bring the primary road network in BiH up to a maint

Corridor - First phase 158390000 European Investment Bank (EIB) 0 already under preparation or construc

- North Transport

BIH-TRA-L-EIB 01 VC The project concerns a new motorway section adjacent to those 75000000 0

Corridor - Second phase339620000 European Investment Bank (EIB) 0 166000000

Transport 0

BIH-TRA-L-EIB 02 VC The project concerns a new motorway section adjacent to those already under preparation or construc

Road The objectives20618190 World Bank (WB)

of project Transport for 17175000 0

BIH-TRA-L-WB 01infrastructure and safetythe Road Infrastructure and Safety Project 0 Bosnia and Herzegovina are to reduce

ConstructionDescription: Collectors in European Commission (EC)1500000

BIH-WAE-G-EC 01 1500000 of this Water protect the environment from the adverse effects of urba

of Sewage The purposeZiviniceproject is to and Environment 0 0

Green Pack Description: Support in a Netherlands Water and Environment

BIH-WAE-G-NLD 01 287362 Western Balkans (NL) 287362 0 0

Education Project for the practical way the Education for Sustainable Development (ESD) activities in

Strengthening capacities Projectto address environmentaland Environment remediation of in BiH: -Reconstruction

BIH-WAE-G-NLD 04 1565000 Netherlands Water problems through

(NL) environmental hot spots high priority hot spots

Description: in BiH Objective: (i) Remediation of two 1565000 0 0

Forest The project focuses on improving(FMPAP)

6638500 Project the Water

management effectiveness of four existing PAs,0

BIH-WAE-L-WB 06 and Mountain Protected Areas World Bank (WB) and Environment 2199800 1952500 bringing two ad

Bijeljina Waste Water Collection System

11500000 European Bank for a loan towards the Development (EBRD)the

Water Reconstruction and 7000000

0

BIH-WAE-L-EBRD 03 Description: The proposed project concerns and Environment cost of construction of 0 priority was

Banja The project consists of European Investment Bank (EIB)

35300000 Water and Environment 26000000 0

BIH-WAE-L-EIB 01Luka Municipal Infrastructure two components : development of the0solid waste management system and re

Water The project concerns the European Investment Bank (EIB) investment programme for0the water and s

121300000 implementation of a country-wide

Water and Environment

BIH-WAE-L-EIB 02and Sanitation Federation Bosnia and Herzegovina (BiH) 18250000 60000000

Water The project concerns the European Investment Bank (EIB) water 50000000 sanitation0infrastructure in

100000000 constructionWater and Environment supply and

BIH-WAE-L-EIB 03and Sanitation Republika Srpska 1250000

and rehabilitation of

Second The overall development objective of (WB) and Solid Waste 31240000

33984400 Water 0

BIH-WAE-L-WB 01 Waste Management Project World Bank the SecondEnvironment Management Project for Bosnia and He 0

Urban Description: Component 1. Institutional Strengthening; Component 2. Urban Management Developme

4210035 World Water

BIH-WAE-L-WB 02Infrastructure Additional Financing Bank (WB) and Environment 0 3725000 0

PLINACRO Gas Pipelines II second phase (2007Energy of investment programme for the modernization and exp

CRO-ENE-L-EIB 01 190000000 European Investment Bank (EIB) 0 190000000

Description: The - 2011) 0

Mitigation climate change Croatia Germany (GER)

56000000 Energy 0 50000000 0

CRO-ENE-L-GER 01 of Description: KfW?s involvement through the Climate Protection Programme consists in setting up a lo

Promotion Energy Efficiency and Renewable (GER)

26000000 Germany Energy Energy 0 of energy 0

CRO-ENE-L-GER 02 ofDescription: The programme aims to contribute to the promotion 19500000 efficiency and the utilisatio

ESB Loan Description: Priority Lending

40000000 European Investment Bankdevelopment

Private sector (EIB) 0 40000000 0

CRO-PSD-L-EIB 01 for SMEs and EIB financing will be made available to SMEs and private and public promoters targeted b

HBOR 200000000 European of limitedsector development

Private scale (EIB) 0 100000000 0

CRO-PSD-L-EIB 06GL II Description: Credit line for financingInvestment Bankprojects of small and medium enterprises and loc

HBOR for SMEs and Mid-Cap European Investment Bank (EIB) financing SME and medium-sized compan

250000000 a Mid-cap tranche for 0 250000000

CRO-PSD-L-EIB 07Loan Description: Credit line for SMEs with Private sector development 0

Privedna Description: Credit line for leasing or Medium sector development

CRO-PSD-L-EIB 09 Banka GL II Private and Long Term 60000000 0

120000000 European Investment Bank (EIB) 0financing of SME projects and infrastruc

SB Loan SMEs & Priority Lending European Investment Bank (EIB) projects

40000000 Private infrastructure 0 40000000 0

CRO-PSD-L-EIB 10 for Description: Loan for financing SME projects,sector development promoted by local authorities and

ULC Loan Description: Priority lending

100000000 European Investment Bankdevelopment

Private sector (EIB) 0 100000000 0

CRO-PSD-L-EIB 11 for SMEs and Credit line for lease-financing of small and medium-scale projects promoted by SMEs or

Unicredit Description: Credit line for SME projects, infrastructure projects promoted by local authorities, and ind

CRO-PSD-L-EIB 08 Zagrebacka Banka GL Private sector (EIB) 0 40000000

80000000 European Investment Bankdevelopment 0

Line Rehabilitation Novska phases: (i) European Commission (EC) km (ii) Kutina ? Novoselec: 27.7 km (iii) Novsk

CRO-TRA-G-EC 02 135000000 Novoselec Dugo Selo: 101200000

Description: 3 to Dugo Selo Section ?Transport 27.1 0 0

Line Rehabilitation Okucani to Novska section Commission (EC) telecommunications and interlocking system, el

CRO-TRA-G-EC 03 38500000 European Transport

Description: Upgrading and construction of signalling, 28900000 0 0

Line rehabilitation Savski Activities: (i) European Commission (EC) double track line with replacement of the perma

CRO-TRA-G-EC 04 25000000 track overhaul of the 7.5 18750000

Description: Marof - Zapresic SectionTransport km 0 0

Reconstruction of the Port 40000000 European Commission wall 700m, Reconstruction of rail tracks and port road

CRO-TRA-G-EC 05 of Vukovar - New port East

Transport

Description:Phase 1) Infrastructure: Vertical key (EC) 12000000 0 0

Rehabilitation and Improvement of theExecute dredging works to30000000

CRO-TRA-G-EC 06 40000000 Sava River Transport

Waterway

Description: Activities: (i) European Commission (EC) 0 0

improve Sava fairway depth in Sections I - XIV (ii

Zagreb Station Signalling and Interlocking System

17900000 European Commission (EC)

Transport 13400000 0 0

CRO-TRA-G-EC 07 MainDescription: The project aims at adjusting railway station technical parameters to Trans-European net

Plinacro Gas Storage Project 70000000 European Bank for Reconstruction and Development (EBRD) plina d.o.o., t

be used 0 of Podzemno skladiste

CRO-TRA-L-EBRD 03 Description: The proposed project willTransportfor the acquisition70000000 0

Zadar New Port

CRO-TRA-L-EIB 02 200500000 European Investment Bank of a 0 100000000

Transport 0

Description: The project will concern the construction (EIB)new ferry port in Zadar (area of Gazenica),

Port of Zadar Project

CRO-TRA-L-GER 01 236000000 Germany (GER) Transport 0 120000000 0

Rijeka Gateway II

CRO-TRA-L-WB 01 126868672 World Bank (WB) Transport 0 122500000 0

Description: The Project includes three components: (i) Port Terminal Development; (ii) Port Service E

Rijeka Gateway II - Additional proposed additional loan for Rijeka Gateway project for Croatia will help finance the c

CRO-TRA-L-WB 02 42564500 World Bank (WB)

Description: The financing Transport 0 37511430 0

Regional Main activities: (i) Construction of newWater and (EC)

64000000 for County of WMC (ii) Environment

Zadar 35600000 0 0

CRO-WAE-G-EC 03 Waste Management Centre European Commission Construction of transfer stations (iii) Providing of the s

Regional Description: Main activities: (i) Construction of new RWMC-Ka?tijun including MBT facility (ii) Waste re

45000000 for the County of Istria Environment

Water and

CRO-WAE-G-EC 04 Waste Management Centre European Commission (EC) 19125000 4500000 0

Regional Description: Construction for an integral centre in Environment

55700000 of the County of Split which

Water and Dalmatia

15000000 0

CRO-WAE-G-EC 05 Waste Management Centre European Commission?(EC) municipal and non-hazardous industrial waste 0

Regional Description: (i)40672400 bridge and waste registration

Weighing Mariscina Water and Environment

11430000 0

CRO-WAE-G-EC 06 Waste Management Centre European Commission (EC) at the Centre?s entrance, and car-tyre wash (ii 0

RemediationDescription: Main activities: (i) Excavation and Primorje-Gorski Kotarhazardous waste 0 Stabilizing o

CRO-WAE-G-EC 07 25000000 Sovjak pit, County of disposal/treatment of

Water and Environment

and closing down of the European Commission (EC) 18750000 0 (ii)

Waste Management Centre for County of Brodsko-Posavska (EC)centre and other facilities needed for developmen

CRO-WAE-G-EC 08 16000000 European Commission Environment

Water and

Description: The construction of waste management 1000000 0 0

Waste Management Centre for County of Virovitica-Podravina

CRO-WAE-G-EC 09 14000000 European Commission (EC)5900000

Water and Environment 0 0

Description: The construction of waste management centre and other facilities needed for developmen

Waste Management Centre for Karlovac CountyCommission (EC)centre and other facilities needed for developmen

CRO-WAE-G-EC 10 16000000 European Water and Environment

Description: The construction of waste management16000000 0 0

Waste Management Centre for North-West Croatia management42500000 other facilities needed for developmen

CRO-WAE-G-EC 11 53100000 European Commission (EC)centre and

Description: The construction of waste Water and Environment 0 0

Waste Management Centre for Sisak-MoslavinaCommission (EC)centre and other facilities needed for developmen

CRO-WAE-G-EC 12 21000000 European County and Environment

Water

Description: The construction of waste management 6000000 0 0

Waste Management Centre for the Countyof waste management19840000 other facilities needed for developmen

CRO-WAE-G-EC 13 24800000 European Commission Environment

Water Neretva

Description: The construction of Dubrovnik- and (EC)centre and 0 0

Waste waterDescription: Improvement and rehabilitation of sewer network and water supplyConstruction of waste

CRO-WAE-G-EC 14 16399999 European Commission Environment

Drnis

treatment and water supply for Knin -Water and (EC) 16399999 0 0

Waste waterDescription: ConstructionEuropean Commission treatment plant for 80.000 PE, mechanical and biolog

CRO-WAE-G-EC 15 27000000 of for Slavonski water Environment

Water and

treatment and water supply central waste Brod (EC) 27000000 0 0

Waste waterDescription: ConstructionEuropean Commission treatment plant for 20.000 PE, mechanical and biolog

CRO-WAE-G-EC 16 Djakovo Water and Environment

treatment for 16500000 of central waste water (EC) 16500000 0 0

Waste waterDescription: ConstructionEuropean Commissiontreatment plant for 50.000 PE, with mechanical and bi

CRO-WAE-G-EC 17 Dugo Selo Water and Environment

treatment for 14800000 of central wastewater (EC) 14800000 0 0

Waste waterDescription: ConstructionEuropean Commission treatment plant for 20.000 PE, mechanical and biolog

CRO-WAE-G-EC 18 5800000 of central waste water (EC)5800000

treatment for Krapina Water and Environment 0 0

Waste waterDescription: ConstructionEuropean Commission treatment plant for 26.000 PE, mechanical and biolog

CRO-WAE-G-EC 19 Nova Gradiska Water and Environment

treatment for 10000000 of central waste water (EC) 10000000 0 0

Waste waterDescription: ConstructionEuropean Commission treatment plant for up to 0

CRO-WAE-G-EC 20 Osijek Water and Environment

treatment for 23000000 of central waste water (EC) 23000000 250.000 PE, 0mechanical and

Waste waterDescription: ConstructionEuropean Commissiontreatment plant for 40.000 PE with mechanical and bio

CRO-WAE-G-EC 21 Samobor Water and Environment

treatment for 10000000 of central wastewater (EC) 10000000 0 0

Waste waterDescription: ConstructionEuropean Commission treatment plant for 74.000 PE, mechanical and biolog

CRO-WAE-G-EC 22 Sisak Water and Environment

treatment for 31000000 of central waste water (EC) 31000000 0 0

Waste waterDescription: Reconstruction and upgrade of existing wastewater treatment plant in order to complete c

CRO-WAE-G-EC 23 5500000 European Commission (EC)5500000

treatment for Velika Gorica Water and Environment 0 0

Waste waterDescription: ConstructionEuropean Commission treatment plant for 20.400 PE, mechanical and biolog

CRO-WAE-G-EC 24 6000000 Water and Environment

treatment for Vrbovec of central waste water (EC)6000000 0 0

Waste waterDescription: ConstructionEuropean Commission treatment plant for 84.000 PE, mechanical and biolog

CRO-WAE-G-EC 25 Vukovar Water and Environment

treatment for 19000000 of central waste water (EC) 19000000 0 0

Water supply for Bjelovar-Bilogora European Commission (EC) facilities (pipelines, 0

CRO-WAE-G-EC 26 55000000 Water and Environment

Description: Construction of the regional water supply 55000000 0

storage tanks, pumping stat

Water supply for Koprivnica-Krizevci European Commission (EC) facilities (pipelines, 0

CRO-WAE-G-EC 27 52000000 Water and Environment

Description: Construction of the regional water supply 52000000 0

storage tanks, pumping stat

provide finance to upgrade and extend

CRO-WAE-L-EBRD 02 Description: The proposed project willWater and Environment 10000000 the sewage network and

30300000 European Bank for Reconstruction and Development (EBRD)

Sisak Wastewater Management Project 15000000 0

Municipal Necessary and Sewerage II

15000000 Germany the area of municipal drinking water and

Water 0

CRO-WAE-L-GER 01 Water Supplyinvestment measures in(GER) and Environment 15000000 sewerage disposal as we 0

Coastal Description: The Project will have the (WB) threeEnvironment as APL1: Wastewater Investments; Ins

129579275 World Bank Water and components 64750000

CRO-WAE-L-WB 01 Cities Pollution Control Project (IBRD Loan) same 0 0

Inland Waters Project Component I: Technical Assistance to Hrvatske 0 98589990 participating utilities to im

CRO-WAE-L-WB 03 Water

Description: 103519140 World Bank (WB) and Environment Vode (HV) and 0

Zagreb 03 Description: The investments are Project expected to include 30000000

Sewer Investment currently Reconstruction and Development (EBRD)

Water 0

CRO-WAE-L-EBRD Holding Water and 60000000 European Bank for and Environment water and wastewater network rehabili0

Further Description: Component 1 - Promoting Energy Efficiency and

17000000 European Energy Community of SEE

Energy

KOS-ENE-G-EC 01 Support for Kosovo's Participation in theCommission (EC)9500000Renewable 0 0

Energy Resources: (i) Energ

Meeting Description: the Energy sector

3000000 European Commission (EC)3000000

following 0 0

KOS-ENE-G-EC 02 EU Standards inAssistance will cover the Energy mutually reinforcing areas:1. Further Assistance to ER

Support Description: The project will be implemented in two activities. Activity 1 includes actions for upgrading

KOS-ENE-G-EC 03 to transport and energy Energy

15000000 European Commission (EC) 15000000 0 0

Kosovo Description: The additional grant would

4522612 World Bank (WB) Energy

KOS-ENE-G-WB 01 Energy Sector Clean-up of Gasification Site assist the beneficiary0 4522612 0

(KEK, the publicly owned Kosovar Energ

Lignite Power Technical Assistance Project Additional Financing two consultancies was US$4.60 million and the h

KOS-ENE-G-WB 02 1477978 World Bank (WB) Energy

Description: The original estimated budget for these 0 1477978 0

Promotion Energy Sector Kosovo the project is to

22740000 Energy 0 22462000 0

KOS-ENE-L-GER 01 ofThe envisaged impact of Germany (GER)contribute to the stabilisation of the electricity - thereby cont

Municipal Description: Activity 1: Detailed Design, review and supervision of projectsThis activity0 assist muni

15400000 European Social sectors14000000

KOS-SOC-G-EC 26 Social and Economic Infrastructure Commission (EC) 0 will

Energy Efficiency Credit Line to Raiffeisen Bank(GER)

KOS-PSD-L-GER 01 10000000 Germany Kosovo measures that allows the local bank to finance investments for t

Loan for refinancing energy efficiency Private sector development 0 10000000 0

Education Description: Component 1 ? Implementation sectors10000000

KOS-SOC-G-EC 01 and Employment Social of a sector-wide approach in0

11700000 European Commission (EC) 0

education (including an IT p

Education Kosovo: Inter-culturalismEuropeanlegal advice to(EC)

1550000 and the Commission reform primary, secondary and higher educationItem

Social sectors

KOS-SOC-G-EC 02 in Description: Capacity building and Bologna Process 1550000 0 0

General The purpose of 6000000 (GTAF) & Programme (EC)6000000

the General TechnicalSocial sectors

Assistance Facility 0 0

KOS-SOC-G-EC 03 Technical Assistance FacilityEuropean Commission Reserve (GTAF) is to allow project preparation to pro

IPF 04 Description: Priority infrastructure projects identified and prepared for financing through Bank loans1 a

KOS-SOC-G-ECKosovo Window Social sectors25000000

61000000 European Commission (EC) 0 0

Support Description: Component 1

10900000 European Commission(i) Training of

training : (EC) 0 0

KOS-SOC-G-EC 05 to employment and education - Teacher'sSocial sectors10300000 in-service teachers in Kosovo (ii) Trainin

Support Description: 1500000 European Commission (EC)Health: feasibility study & mappingComponent 2:

Social sectors

KOS-SOC-G-EC 06 to Health Sector Component 1: Sector Wide Approach in 1500000 0 0

Support Description: The project aims

1500000 European Commission (EC)1500000

Social sectors of 0

KOS-SOC-G-EC 07 to the Statistical Office of Kosovo to support SOK in finalizing the preparation 0 the Population and Housi

Supporting local government and1decentralisation Social sectors12400000 Ministry of Local Government Admini

KOS-SOC-G-EC 08 14900000 European Commission (EC)

Description: Activity - Further institution building support to the 0 0

Reform of Components (i) Consultancy services Social sectors 2600000

to the 0

KOS-SOC-G-GER 01 Basic Education 2600000 Germany (GER) Ministry of Education, Science and Technology. GTZ offe 0

Reform of Description: Drop-outs basic education sectors concern

2000000 Social 0

KOS-SOC-G-GER 02 Non-Formal Education of Germany (GER) are of high 2000000 to the Ministry. Therefore GTZ offers co 0

Institutional DevelopmentThe Education project would support four key elements of the government's Pre-Universit

KOS-SOC-L-WB 02 8989200 World Bank Social

Description: for proposed Project (WB) sectors 0 6810000 0

Avian Influenza Control and 2304147 World Bank (WB) are: public awareness2304000

KOS-SOC-L-WB 01 Human Pandemic Preparedness and

Social 0

Description: The components of the project sectors Response Project 0

and information; animal health; hum

Reconstruction of roads and bridges European bridges on the M28000000to Blace border crossing road to Euro co

KOS-TRA-G-EC 01 10500000 Transport

Description: Reconstruction of five Commission (EC) Pristina 0 0

Support Description: (a) 1000000 European Commission Aviation staff

Capacity building for the CARO (EC)1000000

Common 0 0

KOS-TRA-G-EC 02 for Kosovo's Participation in the EuropeanTransport technical Area in the following areas: (i) Personnel lice

Further Activity 1: Construction ofEuropean plant in Vucitrn.18000000 comprises of preparation of design, t

24000000 treatment in Kosovo Environment

Water and

KOS-WAE-G-EC 01 support to water and environment sectorCommission (EC) This activity 0 0

Support Description: Component European institutional (EC)4800000

5700000 Water and Environment 0

KOS-WAE-G-EC 02 to the environment sector 1 - FurtherCommissionsupport to the Environment Sector in KosovoCompon 0

Municipal The project concerns the rehabilitation of

Sanitation Prishtina (Kosovo VII) supply system and the sewerage system by both r

Water water 8000000

KOS-WAE-L-GER 01 Water Supply and8000000 Germany (GER) theand Environment 0 0

Energy Description: The project consists of Commission (EC)2000000

2000000 European two components: (i)

Energy 0

MAC-ENE-G-EC 01 Regulatory Commission and Insurance Supervisory Agency Support to the Energy Regulatory Commissio 0

Establishing Description: The project is supported through the CEI KEP - Know-how Exchange Programme. The C

MAC-ENE-G-ITA 01 40000 Italy (IT)

Centre for implementation of low-costEnergy 40000 0 0

technologies for sollar cells in Macedonia (CHEAP-CELL) (Ref.

Promotion sustainable agricultural practices,of the efficiency and usage of renewable energies0 rural areas o

overall Sweden energyEnergy 457004 of

MAC-ENE-G-SWE 01 ofDescription: The 457004 objective (SW) project is to support Government 0 Macedonia in formulating in

ESM II: Distribution Grid The investment programme for be focused on and 70000000

70000000 European Energy 0 Development (EBRD) of

MAC-ENE-L-EBRD 01 Description: Efficiency Investment Bank will Reconstructionfour main areas: Upgrade 0 grid lines and

Thematic Description: The 748720 in the Area of conducting thematic evaluation of 5 projects: Solid waste mana

project Switzerland (CH)Social Service 748720

MAC-SOC-G-CHE 02 Evaluation of Five Projects is focused onSocial sectors Delivery 0 0

Local infrastructure for Social and Economic Cohesion of small-scale infrastructure projects in municipalities.Com

MAC-SOC-G-EC 17 8700000 European Commission (EC)

Social

Description: Component 1 - Implementation sectors 7000000 0 0

MBDP for credit line is intended to support SME projects and any size industrial investments0in the fields of

100000000 European Investment Bankdevelopment

MAC-PSD-L-EIB 01Loan TheSMEs and Priority Lending Private sector (EIB) 0 100000000

Municipal Description: Component I: Sub-loans (WB) and Environment 25000000 revenue-generating public

25000000 World Bank to municipalities for investments in: (i)

MAC-WAE-L-WB 01 Services Improvement Project Water 0 0

Tour Reg Description: Supporting Tourism (AUT) in the country in the area of Curricula reform0and developme

265000 Austria Schools

MAC-SOC-G-AUT 01 - Support to Tourism Schools Social sectors 265000 0

School Rehabilitation in The project Switzerland (CH) to the reinforcement of equal education opportunities in t

2000000 Social

MAC-SOC-G-CHE 01 Description:Macedonia aims at contributing sectors 2000000 0 0

Administration of the operational programme implementation the OP management will0 charged 0

MAC-SOC-G-EC 01 Operating structure createdsectors

Social for

Description: The 648000 European Commission (EC) 486000 be with specific tas

Capacity Description: The project purpose is Commission (EC)2000000

2000000 European to Social sectors

MAC-SOC-G-EC 02 Building for the Management of EU fundshelp the government institutions to 0 manage EU 0 funds according

Further Description: The project European to Social sectors

judiciary support the implementation of an investigative database in the f

MAC-SOC-G-EC 03 strengthening of the 1800000 purpose is Commission (EC)1600000 0 0

Information, Description:monitoring and control activities sectors 364000

MAC-SOC-G-EC 04 assistance relates toSocial

the organisation 0 0

evaluation, The 486000 European Commission (EC) and technical support of sectoral monitoring co

Judicial

MAC-SOC-G-EC 05 Reform 1100000 European to Social sectors

support the implementation of the Judicial Reform Strategy at o

Description: The project purpose is Commission (EC)1100000 0 0

Preparation of investment projects and programmes measures, which are mostly oriented towards activities resu

MAC-SOC-G-EC 06 2106000 European Commission (EC)1579500

This measure complements the previous Social sectors 0 0

Project Description: The Project Preparation and Support Facility will support the 0

3022000 European Commission (EC)3022000

MAC-SOC-G-EC 07Preparation and Support Facility Social sectors 0

preparation and implementa

Project Description: The main purpose of the Social sectors

Audit and Evaluation Project Preparation Facility (PPF) is0to complement the program

MAC-SOC-G-EC 08Preparation Facility, 3000000 European Commission (EC)3000000 0

Public Administration Reform project purpose is Commission to a professional public administration that will enable

MAC-SOC-G-EC 09 Description: The contribute (EC)

2000000 European to Social sectors 2000000 0 0

State Statistical Office The project purposes areSocial sectorsto2000000

MAC-SOC-G-EC 10 Description: to contribute 0 0

2070000 European Commission (EC) a professional management of the State Statisti

Strengthening the capacity of following activitiesmanageimplemented: a) the Operational Programmes (IPA 2008 Ax

MAC-SOC-G-EC 11 1600000 European will be and (EC)1600000

Social sectors 0 0

Description: The the institutions to Commissionimplement Human Resource Development: (i) implem

Support Description: Supervision of the project is to sectors the Agency

1000000 Fully Funded Pension Insurance

Social provide 0

MAC-SOC-G-EC 12 to the Agency forThe purposeEuropean Commission (EC)1000000 for Supervision of Fully Funded Pens 0

We are all the circle! Establishing United for PET (UK)

728477 model for primary PET and Collection in High0 system

Social sectors 728477 0

MAC-SOC-G-GBR 01 inDescription:Establishing aaModelKingdom Selectionselection and collectingSchools in all 4 high schools

Informal Description: The overal Japan (JP) focused upon communities of rural Macedonia

school girls and boys in multi-ethnic 38455 0 0

MAC-SOC-G-JAP 01 education for primary 38455project goal isSocial sectors capacity building of primary schools in 7 rural mu

Project for Description: of a sub school in(JP) Social sectors down the building, and after strengthening the ba

43563 Japan assistance to take

MAC-SOC-G-JAP 02 reconstructionProvision -of financialDrenovo village 43563 0 0

Reconstruction of a primary school from the (JP) Social sectors the purchase of the0products and services for th

MAC-SOC-G-JAP 03 51660 Romanovce will be

Description: The grant in Japan donor village used for 51660 0

Refurbishment of a Primary School in Japan (JP) Socialreconstruction of a primary school "7 Mart"0in the village of

MAC-SOC-G-JAP 04 55394 the this project of sectors

Description: The puropose of Municipality is Brvenica 55394 0

The project Description: The overall objective of the project is focused on capacity building of the JZU

14142 Japan (JP) Social sectors 14142 0

MAC-SOC-G-JAP 05 for Building the capacity of the JZU Zdravstven dom - Bitola for Mobile Medical Services Zdravstven 0

The project The project of the building of extension of sectors Delcev" -

51448 Japan (JP) School "Goce of primary school.

MAC-SOC-G-JAP 06 for extensiongoal is focused onPrimarySocialthe building 51448 Ilinden, Skopje 0 0

The project The project is focused onJapan (JP) SocialCentra; Bitola

51638 reconstruction of sectors 51638

MAC-SOC-G-JAP 07 for reconstruction of Central School "Goce Delcev" -School "Goce Delcev"0in Bitola. 0

The project Description: The overall roof of the the project is focused on School

of the Japan (JP) Social sectors 56481 0 0

MAC-SOC-G-JAP 08 for Reconstruction 56481 objective ofSande Shterjoski Primary providing support in reconstruction of th

The project Description: Renovation of the primary tabanovce village

33941 Japan (JP) Social sectors

MAC-SOC-G-JAP 09 for refurbishment of a primary school in school in Tabanovce village33941 0 0

Campaign Description: The overall objective of the project action was focused

9500 Netherlands pupils sectors

(NL) 9500 0

MAC-SOC-G-NLD 01 for senzibilization and accepting Roma Social by non-Roma parents on awareness raising through cam0

Through Description: The project Netherlands Social sectors

99650 to social integration 2

(NL) 99650 0 0

MAC-SOC-G-NLD 02education and emancipationis aimed at supporting the capacity building of organization that works the wid

Vocational Description: Vocational training for Inspectorate Staff 99650

99650 Netherlands Social Administrative Inspectorate Staff. The training should ens

State

MAC-SOC-G-NLD 03 Training for the State Administrative the(NL) sectors TF054139 0 0

Project for Description: of schools rehabilitation and sectors 460000

460000 Social 0 0

MAC-SOC-G-NOR 01 reconstructionCarrying out Norway (NOR) refurbishment activities in six schools located in six munici

Reconstruction of schools of 247500 activities are Social sectors

project 2007 (Project aimed at reconstruction 0

MAC-SOC-G-NOR 02 Description: TheProgramNorway (NOR) No. 2070282) 247500of schools as capacity building of the ed 0

Together European Macedonia-2060293 (NOR)

project Norway Social sectors 490950 0

MAC-SOC-G-NOR 03 for Description: The 490950 will provide educational opportunities and access0to new technologies for the

Youth 04 Description: The 210000 Norway (NOR)

III (project no.2070258) sectors project

Social 0

MAC-SOC-G-NOREntrepreneurial ServiceYouth Entrepreneurial Service (YES) 210000seeks to develop a comprehensive syst0

Chemicals The overall objectives of Sweden (SW)

in Macedonia 2007-2010 sectors 729260

Social 0 0

MAC-SOC-G-SWE 01 Risk Management729260 the project are: Contribution to the minimization of adverse effects of chemic

Keeping HIV Prevalence Low in Macedonia: Nations Development Programme (UNDP)

2895040 seeks to further develop and focus Macedonia?s

Social sectors 2895040 0

MAC-SOC-G-UNDP 01 Description: The programUnited Scalling-up and Focusing Interventions 0 national response to HIV/A

Project for Description: The project foresees the Social sectors

2497 United States of America (USA)2496

instalation of computer labs in every primary and secondary sch

MAC-SOC-G-USA 01 Installation of Servers in Primary and Secondary Schools in Macedonia 0 0

Strategic Description: In12334300 with States of America (USA)

accordance Social sectors12334300 0 0

MAC-SOC-G-USA 02 Medical Re-supply Program United the Agreement of Cooperation between Ministry of Health of Republic

ConstructionDescription: education facilities of construction of 30 PEFs and(CEB) elements with0 to 87% of th

MAC-SOC-L-CEB 01 14300000 Council Social sectors

of physical Co-finance the cost of Europe Development Bank related 0 12500000 up

Housing Description: Proposed Council of Europe sectors construction of 37

50700000 co-finance the 0 27350000

MAC-SOC-L-CEB 02 for low-income persons project aims toSocialDevelopment Bank (CEB) buildings with 0 1,708 rental hou

Conditional Cash Transfers Project World Bank (WB) sectors

MAC-SOC-L-WB 01 18895151 Social 0 18025000

Description: The first component of the project is enhancing the human capital links to0 cash assistanc

ConstructionDescription: ConstructionEuropean Commission (EC)Demir Kapija - Udovothe Pan-European Corriorr

MAC-TRA-G-EC 01 300000000 of a completely the 28 km

Transport 27000000 section on 0

of new carriage way and rehabilitation of newsection motorway237000000 - Smokvica (Corridor X)

Improving Description: The network European single-trackedCore all at 1.435 mm standard international gauge a

2824560 the South East Europe and Regional

Transport

MAC-TRA-G-EC 02 the Rail Infrastructure alongis entirely Commission (EC)2131920 Network 0 0

Improving Description: Concerning road infrastructure Europe Core Regional Network

1218240 European Commission Corridor VIII,

East along

MAC-TRA-G-EC 03 the Road Infrastructure along the SouthTransport (EC) 913680 at present0only 27,6 %0 the Corridor of

Completion

MAC-TRA-G-GRE 01 of Corridor X 50000000 Greece (GR)Transport 50000000 0 0

Regional and Local Roads Programmeand rehabilitation Reconstruction and Development (EBRD)

132900000 Transport 3000000 120000000 0

MAC-TRA-L-EBRD 01 Description: MaintenanceEuropean Bank forof regional and local roads in the various parts of the coun

Regional Description: Component World Bank (WB)

Program Transport 0 68274800 0

MAC-TRA-L-WB 01 and Local Roads 68274800 I: Rehabilitation and periodic maintenance of regional roads. It will provide fu

Second Description: The project will Project (WB)

20348212 World Bank Transport 14798700 0

MAC-TRA-L-WB 02 Trade and Transport Facilitation include (i)upgrading to motorway0standards o f the road corridor X section

National Environmental Investment Strategy (AUT)

overall Austria Water and Environment

116619 0

MAC-WAE-G-AUT 01 Description: The 116619 project goal is aimed upon development of National Environmental Investmen0

Water 02

MAC-WAE-G-AUT Supply in Lipkovo 1250000 Austria (AUT) 1250000

Water and Environment 0 0

Consultancy contract: ImplementationSwitzerland for WWTP Environment

49690 of the consulting and in Kumanovo

Water 49690 0

MAC-WAE-G-CHE 01 Description: The objectiveAssistance (CH) services to be provided is to assist the J.P0 Vodovod in Kum

OXO- 02 Education on environmental issues- a spareand our planet

189296 don?t have (CH) planet") 189296

Water

MAC-WAE-G-CHEEnvironmental Education ("We Switzerlandhow to save Environment 0 0

Project for Description: Pelister National Park ManagementEnvironment

aim of Switzerland Waterto support Plan 286647

Implementation 0 0

MAC-WAE-G-CHE 03 Support to theThe 286647this project is (CH) and the realisation of the main activities of the Vision for t

ConstructionDescription: The main project and treatment (i) upgrading of existing of Prilep system 0 extension of

MAC-WAE-G-EC 01 13000000 European Commission (EC) Municipality sewerage

Water and Environment

for

of the waste water collection activities are: system 13000000 0 (ii)

Establishing Description: Within the framework of this operational programme, the IPA0allocation for environment in

MAC-WAE-G-EC 02 2030400 European Commission Environment

Water and Waste Management System

of an Integrated and Financially Self-sustainable (EC)2030400 0

Strengthening the centralThe project purpose is Commission (EC)3100000level government to strengthen the adm

MAC-WAE-G-EC 03 3100000 European to Water central and local

for environmental management 0

Description: and local level capacitiesassist and Environment 0

Our Climate is Changing So Must We! - awareness on (UK)

43547 United Kingdom the effect of the climate change

Water Awareness43547 Raising 0

MAC-WAE-G-GBR 01 Description: To raise public Climate Change and Environment Caravan0 and to initiate actions that w

Environmental Management Audit Scheme in Municipality

12038 Department Water and Environment

for (UK) 12038

MAC-WAE-G-GBR 02 Description: To establish United KingdomSustainable Development in the 0 0

Municipalities of Gazi Baba

Healthcare Description: To set up a pilot Kingdom (UK) Environment

53248 Water and 53248 0

MAC-WAE-G-GBR 03 Waste Training System of United training system on health-care waste (HCW) management for the Mac 0

Support to Description: Formation ofGermanyframework directive 200000

200000 a water (GER) and Environment

Water 0

MAC-WAE-G-GER 01 the implementation of the EU reponsible department in the Ministry for Environment and0 Physical Plann

Co-operation in the Field The 200000this project is Water and Environment in the field of environment and sustain

MAC-WAE-G-ITA 01 aim of Italy (IT) to assist the local Ministry

Description: of Environment and Sustainable Development 200000 0 0

Study 01 Description: The study area is city of Water andEnvironment

1245090 Skopje in the Republic the 1245090 study will 0 0

MAC-WAE-G-JAP on wastewater management in Japan (JP) Skopje,and of Macedonia cover the following: (i) To develop a ba

Strengthening capacities in the Western Balkan countriesand Environment

1578240 Netherlands Water hot spots environmental of0Macedonia,0

(NL) 1578240 especially in th

MAC-WAE-G-NLD 01 Description: The project resolves a part of theto addressin the Republic problems through remediation

Macedonia-Water Supply for aimJegunovce Municipality and Environment

of Norway (NOR) Water (Project No.2060256)conditions in the Municipality Jeguno

MAC-WAE-G-NOR 01 Description: The the 625the project is to improve the water 625 supply 0 0

Improved Description: Bilateral municipal waste Water of the administration working0in the field of

of institutional (SW) Macedonia (IP 804 MK,

in 23039

MAC-WAE-G-SWE 01system for collection23040 Swedenassistance and Environment dnr 122-8266-07 Up) 0 environment r

Strenghtening the Ecological, project United Nations Development 745156 Protected0

Institutional and is long-term conservation of

Water and Environment

Programme (UNDP) Areas System

MAC-WAE-G-UNDP 01 Description: The 745156 objective Financial Sustainability of theMacedonia?s biological0diversity. It is e

Water Supply and Wastewater Collection

MAC-WAE-L-EIB 01 100000000 European Investment Bank (EIB) 0

promoter?s capital investment programme for the years 2009 to

Description: The project concerns the Water and Environment 50000000 0

Irrigation The programme should increase agricultural output and productivity in a sustainable way in the chose

21500000 Germany (GER) Water

MAC-WAE-L-GER 01 Programme Southern Vardar Valley Phase II and Environment 11250000 0 0

Transbound. Biosphere Reserve Prespa

1530000 Germany (GER) and Environment

Water 0 1530000

MAC-WAE-L-GER 02 This measure is structured as an open programme in which two neighbouring national0parks in the Pre

Water 03 Two phases are foreseen for this (GER) and order to qualify 8635000

12700000 Germany Water 1500000

MAC-WAE-L-GER and Sewerage Programme Macedonia programme. In Environment for the programme municipalities and 0

4-E-Hydro 1

MTN-ENE-L-GER 01 Power Plant Piva6000000 Germany (GER) Energy 0 16000000 0

Energy Description: It 12890600 World Bank Montenegro Project 0

will consist of APL 3 - (WB)

Energy 7029000

MTN-ENE-L-WB 01 Community of South East Europethree components. Component 1, telecommunications system developme 0

Energy Description: Energy efficiency improvements

7341400 Energy 0 7341400 0

MTN-ENE-L-WB 02 Efficiency in Public Buildings World Bank (WB) in selected public buildings such as schools and other bu

HAA Group Montenegro GL

MTN-PSD-L-EIB 02 60000000 European Investmentsmall and medium-scale projects promoted by SMEs or

Private Bank (EIB) 0 30000000

Description: Credit line operation for financingsector development 0

Montenegro Description: Credit line for financingInvestment Bankprojects of small and medium enterprises and of p

MTN-PSD-L-EIB 01 Loan for SMEs Private scale (EIB) 0 100000000

100000000 European of limitedsector development 0

Deposit Protection Fund Montenegro the DPF in(GER)

MTN-PSD-G-GER 01 2500000 Private sector development

2500000

Financial contribution to Germany Montenegro for initial capitalization. 0 0

Loan 04 Loan for 15000000 Germany (GER) Private sector investments 15000000

0

MTN-PSD-L-GER for SME to CKBrefinancing Medium and Small Enterprises developmentin Montenegro. 0

Loan 05 Loan to refinance SME subloans in Montenegro.

MTN-PSD-L-GER to AgroInvest for SME 5000000 Germany (GER) 0

Private sector development 5000000 0

Loan 06 Modus Micro 5000000 Germany Montenegro.

MTN-PSD-L-GER to AlterLoan to refinance SME subloans in(GER) 0

Private sector development 5000000 0

Loan 05 for EE 12000000 Germany (GER)

MTN-ENE-L-GER to CKBLoan for refinancing energy efficiency Energy 0 12000000 0

measures that allows the local bank to finance investments for t

Development of the Transport Sector EuropeantheTransport (EC)6200000enhance institutional capacity related to

MTN-TRA-G-EC 01 23400000 Transport

Description: Activity 1 - Support to Commission Sector: (i) to 10150000 0

Rail Infrastructure Emergency ProjectEuropean Bank for Reconstruction and 30000000

30000000 consist of 0 Development (EBRD) 0

MTN-TRA-L-EBRD 02 Description: The proposed project willTransport two components: (i) implementation of the priority tra

Montenegro Description: The proposed project consists of the rehabilitation of railway infrastructure along the main

MTN-TRA-L-EIB 01 Transport

Railways II 68070000 European Investment Bank (EIB) 0 34000000 0

Upgrading Environmental project includes three major elements: Construction of the Niksic wastewater treatme

12400000 European Commission (EC)3500000

MTN-WAE-G-EC 02 ofDescription: Theinfrastructure Water and Environment 6200000 0

Regional Water Supply Project 52463400 European Bank regional water supply 24000000

Water Reconstruction and Development (EBRD)

15000000 0

MTN-WAE-L-EBRD 01 Description: The proposed project is for afor and Environment scheme that will provide potable wate

Montenegro Description: Creation of aEuropeansystem of and Environment managementObjectives: The envisage

MTN-WAE-L-EIB 01 Water sustainable waste

Solid Waste 54000000 national Investment Bank (EIB) 0 27000000 0

Water and This project aims at a substantial (GER) and the sewerage 25000000

25000000 Germany Water 0

MTN-WAE-L-GER 02 Sanitation Adriatic Coast Phase IV improvement ofEnvironment disposal along the Adriatic Coast and0

Sustainable Tourism Development Project (Montenegro) and Environment

MTN-WAE-L-WB 01 32109400 World Bank (WB)Water

Description: The project has three components summarized 0 7810000 0

below:Component 1: Integrated Coastal Z

Open 01 Description: The sub-measures coordinated by the 6000000

6000000 Germany (GER) Energy 0 0

REG-ENE-G-GER Regional Fund for South-East Europe - Energy Efficiency ORF-E promote initiatives? in which normally partn

Filters Pljevlja and Substations

REG-ENE-L-GER 01 15000000 Germany (GER) Energy 0 15000000 0

Reg. 02 Objectives: Promotion of Germany (GER) and energy efficiency 8500000

8500000 renewable energy

REG-ENE-L-GERRenew.Energies+Energy Efficiency Energy 0 in Southeast Europe0and a contribut

Raiffeisen Bank Kosovo Global line for financingInvestment Bankprojects of small and medium enterprises and loc

REG-PSD-L-EIB 02 20000000 Private scale (EIB) 0 10000000

Description: Credit loan European of limitedsector development 0

Water and Description: The project shall comprise four infrastructure sub-projects:

105880000 Council of Europe and Environment 57000000

the Municipal Window

14180000

REG-WAE-L-CEB 01 sanitation investments with KfW under WaterDevelopment Bank (CEB) two in Albania, one in Bosnia 0

150000000 of (a) construction Reconstruction and Development (EBRD)

SER-ENE-L-EBRD 02 The project is comprised European Bank for a second underground gas storage in Serbia. The gas sto

Srbijagas Energy 0 150000000 0

EMS Electricity Network Upgrading European Investmentoperation of six power substations.Objectives: The proj

SER-ENE-L-EIB 01 49580000 Energy

Description: Design, supply, construction, and Bank (EIB) 0 24500000 0

Environmental Measures in Thermal Power PlantsEnergy the rehabilitation of lignite mills in TPP Nikola Tesla A a

SER-ENE-L-GER 01 56800000 of two components:

The programme consistsGermany (GER) 0 46000000 0

Energy The Project Additional Financing

23437500 World Bank Energy

of the 0 o f the Nis 0

SER-ENE-L-WB 01 Efficiencyproject includes: (a) rehabilitation(WB) heat supply system 21868000 Clinical Center along with

Municipal Description: (i)55400000 European Commission (EC) framework for municipal infrastructure services

To improve institutional and regulatory

SER-SOC-G-EC 58 Infrastructure Support Programme Social sectors45400000 0 0

2nd Phase Description: Component A: Construction of Development Serbia 20000000in28 municipalities (Brus, O

31250000 Council of Europe Landslides houses/apartment

SER-SOC-L-CEB 02 for rehabilitation works after the SpringSocialaround 174 in Bank (CEB)

2006 sectors 0 0

APEX Description: The Apex Loan for SMEsPrivate sector development SME projects, small 0

SER-PSD-L-EIB 01Loan for SMEs is intended for financing 250000000

250000000 European Investment Bank (EIB) 0 of and medium sc

EB 09 SMEs and Priority line for

50000000 European small and Bankdevelopment

Private sector (EIB) projects promoted by SMEs (within the B

SER-PSD-L-EIBLoan for Description: CreditProjectsfinancingInvestmentmedium-sized0 25000000 0

EFG Bank and Leasing Loan for SMEs SME projects, infrastructure projects promoted by local authorities and any

SER-PSD-L-EIB 02 50000000 European Investment Bankdevelopment

Description: Credit line for Private sector (EIB) 0 50000000 0

HAALS Description: Credit line operation for lease-financing small and medium-scale projects 0

Priority projects Private sector (EIB) 0 50000000

SER-PSD-L-EIB 03 Loan for SME and 50000000 European Investment Bankdevelopment promoted by SM

KBC loan SMEs and Credit projects

20000000 European SME projects, infrastructure 20000000

Private sector (EIB) 0

SER-PSD-L-EIB 10 forDescription:priority line for financingInvestment Bankdevelopmentprojects promoted by0local authoritie

Municipal Description: The project European Investment Bank

financing of different 0 75000000

SER-SOC-L-EIB 04 and Regional Infrastructureconcerns the Social sectors (EIB) multi-sector investment schemes mainly in

200060000 Loan 0

PB 11 SMEs and Priority Projects

40000000 European Investment Bankdevelopmentpromoted

Private sector (EIB) 0 0

SER-PSD-L-EIBLoan for Description: Loan for financing small and medium-sized projects 20000000 by SMEs (within the Bank?

Raiffeisen Beograd SMEs Priority Loans

SER-PSD-L-EIB 04 40000000 European Investment Bank (EIB) 0financing of SME projects, small and me

Private and Long Term 40000000

Description: Credit line for leasing or Medium sector development 0

Sogelease Srbija Loan for SMEs for lease-financing SMEBankdevelopment

SER-PSD-L-EIB 05 20000000 Private sector (EIB) 0 20000000 0

Description: Credit line European Investment projects, infrastructure projects promoted by local aut

Unicredit Description: Credit line for

40000000 European Investment projects, infrastructure projects promoted by local aut

Private sector (EIB) 0 40000000

SER-PSD-L-EIB 06 Leasing Srbija Loan for SMEslease-financing SMEBankdevelopment 0

Energy Efficiency Loan Programme Cacanska Banka

SER-ENE-L-GER 02 5000000 Germany (GER) measures from KfW Entwicklungsbank that allows Cacanska B

Loan for refinancing energy efficiency Energy 0 5000000 0

SME 03 Loan for refinancing

20000000 Germany (GER) portfolio development

loan 0 20000000

SER-PSD-L-GER Loan for ProCredit Serbia ProCredit Bank's Private sector in Serbia's rural area. Through the0investment of a

Energy Efficiency Loan Programme ProCredit Leasing

SER-ENE-L-GER 03 15000000 Germany (GER) measures that allows ProCredit Leasing to finance investments

Loan for refinancing energy efficiency Energy 0 15000000 0

Energy Efficiency Loan Programme Raiffeisen Bank

SER-ENE-L-GER 04 15000000 Germany (GER) measures that allows Raiffeisen Bank Serbia to 0

Loan for refinancing energy efficiency Energy 0 15000000 finance investm

Energy Efficiency Loan Programme Volksbank (GER)

SER-ENE-L-GER 05 10000000 Germany measures that allows Volksbank Serbia to finance investments

Loan for refinancing energy efficiency Energy 0 10000000 0

Securitisation ProCredit Bank KfW in cooperation with the sector development Funds (EIF), ProCredit Holding AG

SER-PSD-L-GER 04 50000000

Securitisation by Serbia Germany (GER) 0 50000000

Private European Investment 0

Delivery Description: Component I: Making Fiscal Decentralization Work.;36238400 II: Improving Outreach a

Services World Social

SER-SOC-L-WB 03 of Improved Local36238400Project Bank (WB) sectors 0 Component 0

Reconstruction of the school building roof of the Primary for the process of education in the Primary School "Dr Ibra

SER-SOC-G-CHE 01 1 needed conditions sectors

Social 1 0 0

Description: Providing of Switzerland (CH) School "Dr Ibrahim Bakic" in village Leskova, Tutin munic

Improvement of the Penalty 9000000 European Commission (EC)9000000 by construction of new and reconstructi

SER-SOC-G-EC 05 System Social sectors

Description: Improvement of prison conditions for the inmates 0 0

Improving Description: The project aims at completing the upgrading of SORS infrastructure in order to ensure fu

2000000 European Commission (EC)2000000

SER-SOC-G-EC 07 Capacity of Statistical Office Social sectors 0 0

Modernisation of the vocational education and training system in Serbia

SER-SOC-G-EC 08 4000000 effective Commission (EC)4000000

Social sectors 0 0

Description: Efficient and Europeanpreparation and implementation of infrastructure projects in the Rep

Treatment ofDescription: Waste

SER-SOC-G-EC 16 improve European Commission (EC)6000000

Social sectors 0 0

Healthcare To 6000000 infectious healthcare waste management in 35 healthcare facilities in Serbia

Strengthening of local selfThe project Germany (GER) selected municipalities assistance so they can catch up on

SER-SOC-G-GER 02 3000000 aims at providing

Description: governance in Serbia Social sectors 3000000 0 0

Reconstruction of the school building roof andconditions forroof process of education in the Primary School "Brank

SER-SOC-G-JAP 03 43117 needed the gym hall the of 43117

Description: Providing of Japan (JP) Social sectors the Primary School 0 0

"Branko Radicevic" in Mali Z

Housing The mortgages and medium-income groups sectors

60000000 Council of Europe Development Bank (CEB)

Social in Serbia of 30000000 0

SER-SOC-L-CEB 01 Programme for low will be used to partially finance the purchase 0 primary residences especially in the m

Serbia Description: The additional loan will finance sectors

10546875 Social

SER-SOC-L-WB 01Health Additional Financing World Bank (WB) activities started 0 10543500 0

under the Serbia Health Project (SHP) to

Danube Description: (i)11000000 the

Enhance European Commission (EC)

Transport 11000000 0

SER-TRA-G-EC 01 River Information System (RIS) traffic safety by monitoring and managing the0traffic on the Danube water

Facilitating Intermodal Transport in Serbia

SER-TRA-G-EC 02 2000000 European Commission (EC)2000000

Transport 0 0

To establish the institutional framework for development of intermodal transport and logistic centres in

Supervision of Belgrade City Road By-Pass, Section B

SER-TRA-G-EC 05 3500000 efficient and effective (EC)3500000

Transport 0 0

Description: (i) To assureEuropean Commissionsupervision of motorway construction works of Belgra

System Description: To 3000000 and introduceTransport (EC)3000000

develop European Commission

SER-TRA-G-EC 06 for the Analysis of Track Conditions 0 0

a track infrastructure survey and information system as an assi

TA 07 Description: Efficient and Europeanpreparation and implementation of infrastructure projects in the Rep

4000000 effective Commission (EC)

Transport

SER-TRA-G-ECto Support Implementation of Infrastructure Projects in Serbia 4000000 0 0

Belgrade Description: The project is

285600000 European Bank for Reconstruction Gazela Bridge and approach roads, whic

Transport 6100000 160000000

SER-TRA-L-EBRD 01Highway and Bypass Project for the urgent rehabilitation of the and Development (EBRD) 0

Corridor 10 795300000 of a new Bank for road Corridor and Development (EBRD)

Transport 568800000

SER-TRA-L-EBRD 03 Description: ConstructionEuropean section ofReconstructionX0from Nis to Dimitrovgrad0(E-80), located

Serbia Railways EMUs 221000000 European Bank for 25 up to Reconstruction and Development (EBRD) Units (EMUs

SER-TRA-L-EBRD 04 Description: The EBRD would financeTransporttwo or three car 100000000 0

0 sets of Electrical Multiple

Belgrade Description: The project concerns the TransportBank (EIB) of bypass roads located in the West and

SER-TRA-L-EIB 01 bypass construction of 47 km 0 180000000

361180000 European Investment 0

Gazela Description: The 77070000 European Investment Bank (EIB) 0 33000000

Transport 0

SER-TRA-L-EIB 04 bridge rehabilitation project concerns (i) the rehabilitation of the Gazela bridge on the E70/E75 Highway c

Corridor Description: Component 1 - TheBank road to FYR Macedonia (E-75) ? Corridor XdComponent 2 - The

SER-TRA-L-WB 01 X Highway Project 318073100 World M-1 (WB) Transport 0 275480000 0

Transport Description: (i)43679700 World Bank (WB)

rolling Financing Transport 0 39050000

SER-TRA-L-WB 02 Rehabilitation Additionalover and extending in scope the ongoing performance-based road maintenance0

Emissions Description: The project European Commission (EC) two electrostatic precipitators. Under the Europ

the Nikola Tesla thermal power plants

Water and Environment

SER-WAE-G-EC 03 reductions from 12000000 involves the reconstruction 12000000 of 0 0

Environmental ProtectionA 17000000 procured andWater and (EC) Nikola Tesla B Unit B1. Equipment for continuo

SER-WAE-G-EC 04 new Electric Power Commission Environment

Description: at the ESP Europeanof Serbia 11000000

installed at TPP 0 0

Duboko Solid Waste 16200000 European Bank for and Environment Development (EBRD)

Water Reconstruction and 5000000

6500000 0

SER-WAE-L-EBRD 01 Description: The proposed project is for the construction of the regional solid waste landfill that will ser

Water and The programme is open for participation of up to Environment 54050000

58600000 Germany (GER) and 8 medium-sized municipalities. The investments inclu

Water

SER-WAE-L-GER 01 Sewerage Programme in Medium-sized Municipalities 0 0

Bor Regional Development31347000 I: Environmental Management and Remediation: (i) strengthening the capaci

SER-WAE-L-WB 01 Project Water

Description: Component World Bank (WB) and Environment 31347000 0 0

Irrigation Description: The largest World Bank (WB) Financing

46447687 Project Additional and Environment 36681910

Water 0 0

SER-WAE-L-WB 02 and Drainage Rehabilitationsingle basin effort covered by the Additional Financing would be the Tisza Riv

Overall Objective:
IIIT


the

Roma Support Project – Phase o enhance and facilitate active and full participation of 0 Roma national minority i

CRO-SOC-G-EC 06 Social sectors

3333330 European Commission (EC)2500000 0

Strengthening the Market ComponentEuropean Commission (EC)1616700

CRO-SOC-G-EC 09 2155600 of RepublicSocial sectorsstrengthening the market component of the fisheri

of Fisheries

Overall Objective:To supportthe Croatian Croatia in Sector 0 0

Improvement of regional transport infrastructure Commission (EC) financial and economic crisis 0 improving ec

BIH-TRA-G-EC 01 contribute to the alleviation of the in 14000000 Herzegovina

Transport

The EC grants78200000 European core network current Bosnia and 64200000 by

Municipal The overall objective is toEuropean Commission

SER-SOC-G-EC 60 Infrastructure Support programme – MISP 2010 (EC)Social sectors31120000 0 0

41120000 contribute to the decentralization process and to preparing Serbian municip

Higher Support the developmentEuropean Commission (EC)

25000000 of knowledge sectors25000000

Social 0 0

SER-SOC-G-EC 23Education Teaching InfrastructureaProgramme based economy in Serbia that responds to future labour mar

Removal Develop the full3800000 European the Danube (EC)3800000inland waterway transport sector for soc

potential and the competitiveness of Serbia's

Water and Environment

SER-WAE-G-EC 10 of Unexploded ordinances (UXO) fromCommission River 0 0

Preparation of the necessarythe restoration and Commission (EC)2000000navigation selected locations along the D

SER-WAE-G-EC 11 documentation for creation and Environment

Water of safe and swift 0 0

To contribute to2000000 European river training and dredging works on on the Danube River(Corrido

To contribute to the works on the of traffic flows (EC)

Supervision of road construction enhancementCorridor X (Grdelica – Vladicin Han and0Pirot – Ciflc0

SER-TRA-G-EC 08 10000000 European Commission on 10000000

Transport sections)

Euro Corridor X and to improve environmental an

ConstructionTo assist in the creation of Vranje-4 Commissionin Serbia in conformity with the requirementsof the En

SER-ENE-G-EC 03 400/110 Kv an electricity market (EC)

of Substation 28000000 European & Energy Leskovac-2 15500000 0 0

Increase the Main Railway performance and reliability of railway transport in Montenegro through imp

Major rehabilitation of the attractiveness,Line Bar-Vrbnica (Miatovo5000000

MTN-TRA-G-EC 02 Transport

12000000 European Commission (EC) kolo- Mojkovac) section7000000 0

Upgrading To enhance Montenegro’s ecological development by ensuring 5000000

MTN-WAE-G-EC 03 the Pljevlja waste water treatment Commission (EC)3500000 that economic development is environ

11000000 European Water and Environment 0

Alpha 01 The EBRD and Corporate Credit a total of Reconstruction Alpha Bank (ABG)(EBRD)

Private sector developmentDevelopment subsidiaries in Roman

SER-PSD-L-EBRDBank Serbia-SMEhas signed loans worthLine for €200 million for and 50000000

50000000 European Bank 0 0

socio-economic recovery of

Upper Drina To promote the7594912 Netherlands Water multiethnic communities with 0

BiH-WAE-G-NLD 01 Regional Development Programme (NL) and Environment 4194261 strengthened local governm

0

Neretva Trebisnjica River and global environmental and Environment

16611870 World Bank Water Project 0 6248000

REG-WAE-L-WB 01 and The development Basin Management (WB) objective of the Neretva and Trebisnjica River Basin Mana0

Eurobank The EBRD -230000000 European Bank of Reconstruction 0 Development (EBRD)

Senior Loan Private sector development Eurobank

with

SER-PSD-L-EBRD 03 EFG Beogradhas signed loans worth a totalfor EUR 230 millionand 60000000 EFG subsidiaries across 0

20000000 a participation for risk sharing framework with Crédit(EBRD) Serbia with a

Private sector developmentDevelopment Agricole

SER-PSD-L-EBRD WHRThe EBRD is consideringEuropean Bankin a Reconstruction and 20000000

Serbia 04 - Credit Agricole 0 0

Societe Generale Banka Srbija SME Credit Line worth a Reconstruction 0 Development (EBRD)

20000000 European Private sector development with Société Générale subsidiarie

SER-PSD-L-EBRD 05 The EBRD has signed investments Bank fortotal of EUR 215and 20000000 million 0

- Societe Generale Serbia participation for risk sharing framework with Société Générale Serbia with

44400000 a

SER-PSD-L-EBRD WHRThe EBRD is consideringEuropean Bankin a Reconstruction and 20000000

Serbia 06 0

Private sector developmentDevelopment (EBRD) 0

Serbian Railways Corridor considering providing a sovereign guaranteed and of €100 million to finance:
a progra

SER-TRA-L-EBRD 05 The EBRD is296400000 European Bank for Reconstruction loan Development (EBRD)

X Transport 0 250000000 0 (i)




EPS Metering 80050000 European Bank for Reconstruction and 80000000

Energy EUR Development (EBRD) 0

SER-ENE-L-EBRD 01 EBRD is providing a sovereign guaranteed loan of up to5000040,000,000, to Elektroprivreda Srbije ("E

Komercijalna banka SME considering a EUR 30 million 5 year SME loan with Development (EBRD)

Private sector development a two year

SER-PSD-L-EBRD 07 The EBRD is Credit Line European Bank for Reconstruction and 30000000 grace period for on-lendin

30000000 0 0

The Water and Wastewater Projecta senior and of up to €30 30000000

35000000 providing Water Reconstruction and Development (EBRD)

BIH-WAE-L-EBRD 01 Canton EBRD is consideringEuropean Bank for loan Environment million to the Canton of Sarajevo to fina

Sarajevo 0 0

Overall Objective: To environment forSocialKosovo’s communities

all of sectors11000000

Developing an enabling economic develop an enabling environment for private sector development0and jobs creati

KOS-SOC-G-EC 09 11500000 European Commission (EC) 0

Overall Development

Trade and Regional Objective: To promote Kosovo’s integration into the world economy and to develop and create

KOS-SOC-G-EC 10 Social sectors

8000000 European Commission (EC)7800000 0 0

Zeljezara The 50000000 European Bank for of Zeljezara Split post-privatisation. The loan will be a pa

CRO-PSD-L-EBRD 03Split EBRD loan will finance the restructuring Reconstruction and 20000000

0

Private sector developmentDevelopment (EBRD) 0

PBZ SME The Line 50000000 making a senior loan of updevelopmentDevelopment (EBRD)

Private sector to EUR 0 50000000

50 0

CRO-PSD-L-EBRD 02 Credit EBRD is consideringEuropean Bank for Reconstruction andmillion in the form of a credit line for S

Zagrebacka banka SME Credit line (Unicredit Group) for Reconstruction and Development (EBRD)

making investments worth Private sector development 432400000

CRO-PSD-L-EBRD 01 The EBRD is432400000 European Banka total of EUR 432.40million to UniCredit subsidiaries across e0

43000000 European ofEnergyReconstruction and 35000000

up to 0 Development Gore AD

EPCG 01 EBRD is providing a corporate loan Bank for €38 million to Elektroprivreda Crne(EBRD) Nikšić ("EPC

MTN-ENE-L-EBRD Metering and Distribution Project 0

Investment in senior A tranche of regional A&B sub-fund provided(EIB) local financial sector and 0 the developm

REG-PSD-L-EIB 01 complement financial support sector by the 0 30000000

Private

EFSE aims to 30000000 European Investment Bankdevelopment by

Public The objectives84027000 World Bank (WB) sectors

of Social Development 0

BIH-SOC-L-WB 03 Expenditure Crisis DPL the First Programmatic Public Expenditure 0 84027000 Policy Loan (DPL) Program

Enhancing SME Access development World Bank (WB) sector development

BIH-PSD-L-WB 01 Finance Private 0 51240000 0

The project to 51248400 objective of the Enhancing Small and Medium Enterprises (SME) Access to

Export The objective of the Export Finance Intermediation development Croatia

94476180 Private 0 for

CRO-PSD-L-WB 01Finance Intermediation Loan World Bank (WB) sectorLoan Project 94476180 is to support the preserva 0

Programmatic Private Financial Development Policy Loan sector series of 0 67100000

SER-PSD-L-WB 01 67100000 World Bank Private 2

second three

This program document presents the (WB) in the development Programmatic Private and Financia 0

Volksbank BH DD Global loan

BIH-PSD-L-EIB 01 40000000 European Investment of small and 0 20000000

Private sector (EIB) medium enterprises and 0

Credit line for financing of limited scale projectsBankdevelopment local infrastructu

MicrofinanceProjects undertaken by small and very small businesses, in the sectors of agriculture, 0

BIH-PSD-L-EIB 02 SMEs Private sector (EIB) 0 20000000

LOK Loan for20000000 European Investment Bankdevelopment trade, manufact

providing a €210 million Energy INA to enable and Development (EBRD)

loan to 0 company to

CRO-ENE-L-EBRD 01 The EBRD is494000000 European Bank for Reconstructionthe 150000000 complete the first stage of

INA 0

Support Overall Objective: The overall objective of this intervention is to support the Government of Kosovo in

4000000 European Commission (EC)4000000

KOS-SOC-G-EC 11 to Agency for European Integration Social sectors 0 0

Return Overall Objective: The creation of a climate for inter-ethnic tolerance, sustainable multi-ethnicityand th

Kosovo Social sectors

KOS-SOC-G-EC 12and Reintegration in 5100000 European Commission (EC)4000000 0 0

Rehabilitation of Cultural Heritage in Kosovo

KOS-SOC-G-EC 13 3675000 European Commission (EC) of Cultural

Social sectors

Overall Objective: Ensure the long-term sustainability2500000 Heritage0 0

sites in Kosovo.Project purp

Support The and Minerals SectorEuropean Commission (EC)1000000

1000000 in Kosovo revitalisation of the Kosovo economy throughsustainable and en

KOS-ENE-G-EC 04 to Minesoverall objective of this project is Energy 0 0

To develop an enabling environment for for all sector development and II for




Developing an enabling socio-economic environmentprivateof Kosovo’s communities job creation
0 all communitie

KOS-SOC-G-EC 14 Social sectors

6900000 European Commission (EC)6600000 0

Support Overall and Taxation Administrations Social sectors 3000000

3000000 European Commission (EC) 0 0

KOS-SOC-G-EC 15 to Customs Objective: Creating a business friendly environment in Kosovo, clear and efficient revenue col

Programme for the Promotion of Energy EfficiencyEnergy

CRO-ENE-L-GER 03 1500000 Germany (GER) 0 1500000 0

Climate 600000 Germany (GER)

CRO-ENE-L-GER 04Protection Programme Croatia Energy 0 600000 0

Sewerage

BIH-WAE-L-GER 04 Bihac Water 500000

17500000 Germany (GER) and Environment 17000000 0

Renewable 3500000 Germany (GER)

MTN-ENE-L-GER 02 Energy and Energy Facility Montenegro Energy 0 3500000 0

Erste 01 Loan for refinancing Medium and Small Enterprises developmentin Montenegro.

MTN-PSD-L-GER Bank Montenegro SME 13000000 Germany (GER) 0

Private sector investments 13000000 0

NLB 02 Loan for refinancing

14000000 Germany (GER) Private sector investments 14000000

0

MTN-PSD-L-GERMontenegro SME-Finance Medium and Small Enterprises developmentin Montenegro. 0

Erste 03 Loan for refinancing energy efficiency Energy

MTN-ENE-L-GER Bank Energy Efficiency 2000000 Germany (GER) 0 2000000 0

measures that allows the local bank to finance investments for t

NLB 04 Efficiency 2000000 Germany (GER)

MTN-ENE-L-GEREnergy Loan for refinancing energy efficiency Energy 0 2000000 0

measures that allows the local bank to finance investments for t

Promotional CreditVolksbank HousingGermany fund private individual housing 7000000

SER-SOC-L-GER 01 7000000 Social

Loan line for Volksbank Serbia to (GER) sectors 0 0

loans, refurbishment and reconstruc

Loan 02 Credit line for 31600000 Germany private sector housing loans,

Municipal Finance Private 1600000 30000000

SER-PSD-L-GER to Banca Intesa 2009Banca Intesa to fund (GER) individualdevelopment refurbishment and reconstruction 0

110-kV-Circuit Line South Albania110kV transmission network in South Albania comprises the rehabilitation and ex

ALB-ENE-L-GER 01 of the

The extension50000000 Germany (GER) Energy 0 50000000 0

400 02 Albania-Kosovo 51400000 transmission line

Energy 42000000

ALB-ENE-L-GERkV Line Construction of a 400 kV Germany (GER) from Tirana to the0border of Kosovo. 0

400 kV Transmission Lineof a 400 kV Germany (GER) from Prishtina to the border of Albania.

KOS-ENE-L-GER 02 Albania-Kosovo

Construction 39900000 transmission line Energy 0 33500000 0

Municipal The project concerns the Germany (GER) the water supply system6000000sewerage system. The proj

17500000 rehabilitation of

KOS-WAE-L-GER 02 Water Supply and Sanitation Prishtina II Water and Environment 11000000 and the 0

IPF-MW The 2008 used to finance two (GER) and Environment 16500000

Water supply and

KOS-WAE-L-GER 03Kosovo funds are 42700000 Germany projects: a) water25000000 sanitation Prishtina II 0 b) Prishtina and

– Windpark Development

33400000 European Commission (EC) 400000 generation

Pilot Project The Energy Law has created a framework for renewable energy 33000000 and a strategy for its deve

MAC-ENE-G-EC 02 Energy 0

Electricity The aim of the project is to support Montenegrin Electric Enterprise in identifying and prioritizing individ

1850000 European Energy

MTN-ENE-G-EC 02 Network Development Programme Commission (EC)1850000 0 0

Uprating The project network upgrade of the existing network 500000

500000 European Commission operation

Energy 0 0

SER-ENE-G-EC 05 of transmission of 400kV in Western Serbia to 400kV(EC) in Western Serbia is centred around the necess

of OHL 400kV FYROM-Serbia transmission system operator, 11000000

11100000 electro

ConstructionThe business activities ofEuropean Commission (EC) 100000 transmission asset manager and mar

MAC-ENE-G-EC 03 Energy 0

In 2005, a Heating Phase 2 - CHP Commission (EC) 300000

Improvement of DistrictSlovenian engineering company IBE prepared a detailed Feasibility Study for supplying hea

KOS-ENE-G-EC 05 300000 European Energy 0 0

Energy Co-financing is in Public European Commission (EC) 600000

600000 Buildings

KOS-ENE-G-EC 06 Efficiency Measures envisaged from KfW Energy 0 0

Plava The project aims600000 European Commission (EC) 600000 and future 0

to provide a secure and sufficient for present

BiH-WAE-G-EC 08Voda Regional Water Supply Project Water and Environment needs water0 supply on a reg

Podgorica The Infrastructure Project

300000 European and expansion of water and

Water and Environment 0

MTN-WAE-G-EC 06 Water project concerned rehabilitationCommission (EC) 300000 wastewater infrastructure in the City 0

Wastewater The town of Berane is situated in the mountainous north-eastern part of Montenegro on the River Lim

MTN-WAE-G-EC 07 150000 Water and Environment

treatment plant Berane European Commission (EC) 150000 0 0

Project co-financing is envisaged for Waste Water Treatment Plants in

1750000 from KfW Water and Environment

KOS-WAE-G-EC 03preparation Feasibility StudiesEuropean Commission (EC)1750000 Kosovo 0 0

Wastewater Rozaje Municipality is in the northern eastern part of Montenegro, located0 the triangle which connec

MTN-WAE-G-EC 08 200000 European Commission (EC) 200000

treatment plant and network in Rozaje Water and Environment in 0

Wastewater IPF TA forplant and network in Danilovgrad and (EC) 200000

MTN-WAE-G-EC 09 200000 European states the need for development of a 0

Water

treatment Danilovgrad Municipality Commission Environment waste water 0 treatment plant

Wastewater Kolasin Municipality network inin the central region of Montenegro, surrounded by UNESCO protected

MTN-WAE-G-EC 10 200000 European Commission (EC) 200000

treatment plant and is located Kolasin Water and Environment 0 0

Contsructionco-financing Landfills in Plijevlja and Zablijakand (EC) 150000

MTN-WAE-G-EC 11 150000 from EIB Water

of Regional is envisagedEuropean Commission Environment 0 0

Constructionco-financing Landfills in Montenegro Water and (EC) 750000

MTN-WAE-G-EC 12 750000 from EIB

of Regional is envisagedEuropean Commission Environment 0 0

Municipal The project concerns the European of an investment programme

1000000 financing Commission Environment

SER-WAE-G-EC 12 Water - Nis and Novi Sad Municipalities Water and (EC)1000000 managed directly by the cities of Nov

0 0

The project consists FYR Macedonia and new construction works at four 0

MAC-SOC-G-EC 13 Prison Reform Project in of refurbishment Social sectors 500000

Idrizovo 500000 European Commission (EC) institutions: Idrizovo Penal C

0

Center

MTN-SOC-G-EC 11for Elderly – Pljevlja 150000 European Commission (EC) 150000

Social sectors 0 0

Municipal Following the150000000

establishment of a PMUSocial sectors

(Project Management Unit) as a structure within the Ministry of

SER-SOC-L-EIB 02 and Regional Infrastructure European Commission (EC) 375000 75000000 0

ConstructionThe Prison Service of Croatia operates fourteen establishments which are mainly in the north and eas

CRO-SOC-G-EC 01 800000 European Sibenik sectors

Social

of a penitentiary/prison complex in Commission (EC) 800000 0 0

Health Provider Institutions (HPIs) has structured a comprehensive reform of the health care sector into three ph

MAC-SOC-G-EC 14 2000000 Social sectors

The Ministry of Finance European Commission (EC)2000000 0 0

The political 70000 Balkan region in the late 90ies faced

Social Housing - Serbia crises in the European Commission (EC) 70000 Serbia with0strong wave of refugees fro

SER-SOC-G-EC 35 Social sectors 0

The Prison Facilities-Providing the penal institutions in the Serbia are evident and severe prison overc

Modernization of poor physical conditions in Human and Safe (EC) 700000

SER-SOC-G-EC 34 Social sectors

700000 European Commission Prison System 0 0

In the last 50 Facilities European facilities sectors

Social have been poorly

Modernization of Judiciaryyears current judiciaryCommission (EC) 720000 renovated 0

SER-SOC-G-EC 26 720000 while some of them have ch

0

Building co-financing is envisagedEuropean Social sectors

600000 from Research and Development Infrastructure0Initiative/Teaching Infrastru

SER-SOC-G-EC 11 the knowledge economy of Serbia, EIB Commission (EC) 600000 0

Tirana track renewal andEuropean Commission (EC)1500000 in the whole network 0 Albanian Rai

1500000 signalling and in the centre of Albania

Feasibility study for area (Qark/Prefecture) is located communication systemsand includes the city of Tirana, the ca

ALB-TRA-G-EC 07 Transport 0 of

Corridor B&H’s Motorway in Corridor Vc is partTransport

of the Trans-European

BIH-TRA-G-EC 04 Vc – second phase 500000 European Commission (EC) 500000Network of 0 inland corridors. This corrido

0

ConstructionThe project seeks to upgradeDrini)-Hum

BIH-TRA-G-EC 05 700000 na the road between (EC) 700000

Transport 0

of Main Road Foca(BrodEuropean CommissionFoca in the Republica Srpska and the0 Montenegrin bo

The project deals Presevo-Macedonia border years old that has

500000 European over 100

Reconstruction of the line Nis- with a railway lineCommission (EC) 500000 not had any significant repair or devel

SER-TRA-G-EC 09 Transport 0 0

The Kosovo Rail 500000 European Commission (EC) track. The network 0 i Elezit) form was built a

network comprises 333 km of single 500000 in

Rehabilitation of Railway Route 10 (Leshak – Mitrovicë – Fushë Kosovë – Ferizaj – Hani its current 0

KOS-TRA-G-EC 03 Transport

Improvement of the Scepan Polje-Pluzine Main1Commission (EC)study for improvement of the main road Pluzine-

MTN-TRA-G-EC 03 700000 European of the Feasibility 700000

Transport

This project represents the Phase Road, Phase 1 Feasibility Study 0 0

FS & 05 co-financing envisaged from KfW/CEB Water and Environment 17350000

11200000

ALB-WAE-G-CEBDD Regional landfillis30000000 Council of Europe Development Bank (CEB) 0

ALB-TRA-L-EC for Project implementation for Project implementation road sector.


TA 06 WBIF Project TA800000Sector

Road European Commission (EC) 800000

Transport


co-financing is envisaged from EIB, estimate

0 0

Belgrade

SER-TRA-L-EIB 05 City Sava Bridge Transport

404900000 European Investment Bank (EIB) 240000 160000000 0

Corridor Co finaced Motorway European Transport

969300000

SER-TRA-L-EIB 06 X Serbia (E 75)envisaged from EBRD? Investment Bank (EIB) 4500000 579000000 0

TA 08 168700000 European Investment Bank (EIB)

SER-TRA-L-EIBfor Railways rehabilitation II Transport 1000000 144000000 0

Upgrade 180000 European Commission (EC) transmission system and conducted a review o

The study identified bottlenecks in Albania’s electricity 180000

ALB-ENE-G-EC 01 of Transmission System Energy 0 0

Tirana of new SubstationEuropean Commissioncapacity for reinforcement of the city of Tirana, the ca

ALB-ENE-G-ECfor construction area (Qark/Prefecture) is located in the centre of Albania and includes Tirana Ring

FS 02 577605 Tirana3 withEnergy120MVA (EC) 577605 0 0

Feasibility Study forregion, the most densely populated area in line - Tirana 2 (Razhbull) centre of Albania and acco

ALB-ENE-G-EC 03 577000 European double circuit Albania, is located in the

Energy

Tirana the Construction of 220/110 Commission (EC) 577000 0 0

Feasibility Development of Long Term and Treatment and (EC) 250000 water collection and 0

250000 European Commission Environment

Investment Plan for waste 0

SER-WAE-G-EC 13 Study for Collection, transport Strategic Waterof Waste Waters in Municipality of Vranjetreatment in orde

of

Upgrading ofKavaja municipality and Golemi commune are located in the western part0 central Albania, very clos

ALB-WAE-G-EC 05 Water Treatment Plant and completion of the

Water and Environment

Kavaja Waste 9700000 European Commission (EC)7050000sewerage network for Golemi 0

The Municipality 450000 European Commission (EC) 450000

of Kamza Kamza Water and Environment

ALB-WAE-G-EC 06 of Water Supply & Sewerage of is located in the Greater Tirana Region and includes the Town of Kamza, f

Project 0 0

sanitation of 180000 European Commission (EC) western

located in Environment

ALB-WAE-G-EC 07waterThe towns in Lezha and Shengjin are Water and North 180000 Albania along the Adriatic Sea several

Waste 0 0

Feasibility In Albania, the rivers constitute the Commission risk 400000 Infrastructure in Albania0

Design for Improvement flood Environment

ALB-WAE-G-EC 08 Study and Detailed400000 European highestofand (EC)affecting near 130,000 hectares of agricultural la

Water Flood Protection 0

Detailed Elbasani, one of 500000 sewerage systems for population of

biggest European Commission (EC) 500000

Water and Environment 0 0

ALB-WAE-G-EC 09 Design for water supply and cities of Albania with a Elbasan city near 100,000 inhabitants, is located in ce

1500000 from CEB/EIB Rehabilitation of Tirana Schools – 2nd Phase

and

Education, Excellence and Equity Project (EEE-P) Social sectors 1500000

ALB-SOC-G-EC 07 co-financing is envisagedEuropean Commission (EC) 0 0

Tirana The Hospital Centre Reform Programme in Albania- 2nd Phase by CEB,0aims to upgrade the infrastr

580000 European Commission (EC) supported

Social sectors

ALB-SOC-G-EC 08 University project, initiated by the Albanian Government and 580000 0

Wastewater eventual co-financing is envisaged from CEB/KfW 3500000

ALB-WAE-G-EC 11 Pogradec Water and Environment

3500000 European Commission (EC) 0 0

Water Supply & Sewage, Gjirokastra, European from ceb/KFW

ALB-WAE-G-EC 12 4500000 Fier Water and Environment

eventual co-financing is envisaged Commission (EC)4500000 0 0

Kamza eventual co-financing is envisaged from CEB/KfW 5500000

ALB-WAE-G-EC 13 Water and Sanitation Water and Environment

5500000 European Commission (EC) 0 0

Bijeljina The EBRD, EU and the Swedish International Development Agency (SIDA) are supporting further mod

26000000 - Phase II Water and Environment

BIH-WAE-G-EC 10 Waste Water System Project European Commission (EC) 11300000 5000000 0

Belgrade 120000000 European Investment Bank (EIB)

SER-TRA-L-EIB 07 City integrated transport Transport 6000000 60000000 0

Rehabilitation and construction of water and wasteWater and (EC)5000000

MTN-WAE-G-EC 14 5000000 European water infrastructure in North

Co-financing envisaged from EIB Commission Environment 0 0

SME Support

BIH-PSD-G-EC 04 3666600 generate economicsector development

Private growth and employment by0

The overall objective is toEuropean Commission (EC)3500000 0

strengthening the competitiv

MTN-WAE-G-EC 15


• Water

The overall objective of the project is
Alignment of waste management system with EU standards.
ro

Environmental Alignment and Solid Waste Management and (EC)4800000

14155648 European Commission Environment 0 0 P




Assisting The overall approximating project is the in statisticsdevelopment

800000 European Commission (EC) 800000

Private sector 0 0

MTN-PSD-G-EC 07 Montenegro in objective of theEU standards provision of advisory support to the StatisticalOffice of Monte

Return, Overall Objective: The creation of aCommission (EC)8700000

10250000 European climate sectors

Social 0 0

KOS-SOC-G-EC 16 Reintegration and Cultural Heritage in Kosovo for inter-ethnic tolerance, sustainable multi-ethnicityand th

Support Overall Objective: To contribute to theSocial sectors 3125000

KOS-SOC-G-EC 17 to Communities stabilisation of

3135000 European Commission (EC) the socio-economic 0 0

situation of ethnic minority c

Support Overall Objective: Contribute to strengthen the social

24500000 Social sectors14000000 0 0

KOS-SOC-G-EC 18 to Culture, Youth and Sport European Commission (EC) cohesion & solidarity in Kosovo.Project purpose:

Overall objective
ctivity European Commission (EC)5000000

A


Reintegration

Communities and Education6462000 1: Return andSocial sectors in Kosovo (phase III)
he creation0of a climate for

KOS-SOC-G-EC 19


T

0

Overall Objective:

Strengthening the Rule of Law To strengthen the rule of law in Kosovo, including increased respect for minority rig

KOS-SOC-G-EC 20 Social sectors

7400000 European Commission (EC)7000000 0 0

Strengthening the Rule of Law in Kosovo

KOS-SOC-G-EC 21 14225000 European the capacity of Kosovo's institutions to provide legal education, ap

Social sectors13000000

2.1 Overall Objective:To strengthenCommission (EC) 0 0

Upgrade 2.1 Overall Objective:To strengthen Sector of law sector in Kosovo2.2 Project purpose:The purpose

25000000 European the rule sectors25000000

Social

KOS-SOC-G-EC 22 of the Infrastructure in the Rule of Law Commission (EC) 0 0

Strengthening the Rule of Law

KOS-SOC-G-EC 23 15350000 European the rule of law in

Social sectors12050000 0

2.1 Overall Objective:To strengthenCommission (EC)Kosovo through further reform of0the relevant ins

Strengthening the rule of law

KOS-SOC-G-EC 24 15552000 European Commission (EC)

Social sectors12300000 0 0

2.1 Overall objective:Support the efforts of Kosovo authorities to enforce the rule of law by strengtheni

Regional 2.1 Overall Objective:Economic regeneration, job creation and infrastructure development in five econ

KOS-SOC-G-EC 25 economic development Social sectors17500000

20955000 European Commission (EC) 0 0

Human 2.1 Overall ObjectiveThe European Commission (EC)3000000

3300000 overall Private sector development 0 0

ALB-PSD-G-EC 04 Resources Development in Albania objective of the project is to have improved labour market functioning

PAMECA 5518790 main goal ofSocial sectors to bring

PAMECA III is 0 0

ALB-SOC-G-EC 10 III 2.1 Overall objective:The European Commission (EC)5518790the Albanian State Police closer to EU s

Project 2.1 Overall Objective:To European Commission (EC) the rule

2130000 democracy and 0 0

ALB-SOC-G-EC 11 against Corruption in Albania contribute to Social sectors 2000000 of law through the prevention and contr

Support 2.1 Overall ObjectiveCrime reduction through reinforcing strengthening of0 capacities of the four ke

1500000 European Crime Investigations Structures

Social sectors

ALB-SOC-G-EC 12 to Anti-Money Laundering and FinancialCommission (EC)1500000 the 0

2.1 operational1050000 European the Albanian Criminal Justice SystemProtection of providing the a




T

Enhancement ofOverall Objective
o ensure thatCommission (EC)1000000 Persons 0is capableUnit

ALB-SOC-G-EC 13 Social sectors

and logistical capacities of Witness and Special 0

2.1 Overall Objective:
he overall improvement of project and accommodation capacities in the of law

Infrastructure and objective ofsectors18200000

T




ALB-SOC-G-EC 14 to the Penitentiary21250000 European Commission (EC) is to have in place a strengthened rule Police

Support Social the training 0 0

Modernisation of Overall Objective:To European Commission transparency and quality0 service delivery of the jus

ALB-SOC-G-EC 15 3530000 system efficiency, (EC)

2.1. the Albanian Justice improve the Social sectors 3000000 of 0

Supporting SMEs to become more competitive in the EU Market developmenthigh quality services 0private sector a

ALB-PSD-G-EC 02 3400000 European Commission (EC)3400000

Private sector by providing 0

2.1 Overall Objective:Maintain sustainable growth and increase competitiveness of thein modern mana

2.1 Overall Directorate ofEuropean Government of Albania in strengthening the fiscal system in line wi

2500000 Tax the Commission (EC)2500000

T




ALB-SOC-G-EC 17 for the General Objective:
o assistof Albania

Support Social sectors 0 0

2.1 Overall Albanian Improving theEU standards

2850000 European Albanian Statistics in order

ALB-SOC-G-EC 18 for alignment ofObjective:Statistics with Commission (EC)2850000 to meet the EU requirements and offe

Support Social sectors 0 0

Support 2.1 Overall ObjectiveTo support

1500000 European Commission (EC) to EU standards as 0

Social sectors

ALB-SOC-G-EC 19 for Public Procurement in Albania Albania approximate1500000 0

requested under the SAA in

Support 2.1 Overall Objective:Assist the Government of Albania in aligning the Albanian customs procedures w

3500000 European Commission (EC)

Social Standards

ALB-SOC-G-EC 20 to the alignment of Customs Procedures with EUsectors 3500000 0 0

Centralised National Programme in support toobjective issectors 3000000 reduction of the technical barriers to t

ALB-SOC-G-EC 21 3400000 overall Metrology to (EC)

Social

2.1 Overall Objective:TheEuropean Commissioncontribute to the 0 0

Support 2.1 Overall Competition Authority Commission (EC)1500000

1500000 overall objective is to Department

Private sector development 0 0

ALB-PSD-G-EC 05 for the AlbanianObjective:TheEuropeanand State Aidcontribute toward ensuring a competitive environment

ALB-SOC-G-EC 23 T




1240000 European Commission (EC)the Copenhagen economicof banking supervisio

2.1 Overall objective
o contribute to the fulfillment of 1000000

Strengthening the institutional capacity of the Albanian Central Bank particularly in the 0

Social sectors areas criterion by ensuring

0

Centralised National programmes Support to Copyrights sector development property in Albania at a similar level

ALB-PSD-G-EC 01 800000 European Commission (EC) 800000

the protection of intellectual

2.1 Overall Objective:To contribute to Private 0 0

Developing the Industrial Property Rights System in Albania (EC)1000000align the IP 0

ALB-PSD-G-EC 03 1100000 overall objective of sector development

Private the

2.1 Overall Objective:TheEuropean Commission project is to 0

regulatory systems of Albani

Overall Objective


1000000 European and Youth in (EC) programmes to improve and monitor the effe

TLifelong Learning Commission Action measures is

of the preparatory

Preparatory measures for the
he overall objectiveSocial sectors 900000

MAC-SOC-G-EC 15 0 0

Overall Objective
civil sector in decision the project 1200000 in providing social services




T of making process and

MAC-SOC-G-EC 16 the participation of the he overall objectiveSocial sectors is to promote an active civil society sector.
roject

Support 1300000 European Commission (EC) 0 0 P




Local infrastructure for Social and Economic Cohesion stimulate7000000 economic cohesion through support t

MAC-TRA-G-EC 04 8700000 European Commission (EC) social and

Transport

Overall Objective:The overall objective is to 0 0

Overall Objective
overall objectivePrivate project is to achieve

Tof of the sector

MAC-PSD-G-EC 01 to the implementation
hethe Customs Reform Strategy development further alignment of the Аcquis in the

Support 3200000 European Commission (EC)3000000 0 0

Support Overall ObjectiveThe overall objectivePrivate project development the performance of the Public Reve

MAC-PSD-G-EC 02 to Tax Reform of the sector is to improve

2132000 European Commission (EC)2000000 0 0

Implementation of the TAM/BAS Programme Commission (EC)2100000

MAC-PSD-G-EC 03 2830000 European of the sector development 0 0

Overall ObjectiveThe overall objectivePrivate TAM/BAS Programme is to promote the transition to mar

Support Overall ObjectiveThe overall objectivePrivate project is to contribute

2900000 European Commission (EC)1800000

of the 0

MAC-PSD-G-EC 04 to free movement of goods - quality infrastructuresector development to free movement 0 goods with thof

REG-SOC-G-EC 01 Action Programme 1250000 European Window and civil society in the Western Balkans by facilitating the

Youth in T

Overall Objective:
o strengthen democracy sectors 1000000


Social

- Western Balkans Commission (EC) 0 0

Erasmus Overall Objective:
he overall objective of the Erasmus Mundus




T

REG-SOC-G-EC 02 Mundus – External Cooperation WindowSocial sectors 6000000 External Cooperation Window (EMEC

6000000 European Commission (EC) 0 0

Erasmus 4000000 Window

REG-SOC-G-EC 03 Mundus – Western Balkans European Commission (EC)4000000

Social sectors 0 0

Overall Objective:To enhance the quality of European higher education by fostering cooperation with t

Regional Overall Objective:The overall objective is and Social 2000000

2222000 European Commission (EC)the coordination of the social security systems a

Social sectors

REG-SOC-G-EC 04 Programme for Social Security Coordination to enhance Protection reforms in South East 00 Europe

Overall Objective:
his project aims Commission (EC)1000000

1250000 European to Social sectors

T




Social Inclusion: Regional support to the marginalised communities increased legal and social inclusion of the mar

REG-SOC-G-EC 05 contribute to the 0 0

Civil 06

REG-SOC-G-EC Society Overall Objective:
he overall objective is Assistance, People 2 People Programme, Partnership Action

Facility – Horizontal Activities (Technical to strengthen civil society within 0 participative democracy, s

T




14675000 European Commission (EC)

Social sectors13800000 a 0

Regional Overall Objective:Foster and in the Commission (EC)

1000000 European Western Balkans

durable, sustainable solutions, namely voluntary repatriation an

REG-SOC-G-EC 07 Programme for Refugee Return enhanceSocial sectors 1000000 0 0

Overall Objective:
o strengthen democracy and (EC)1500000




T

REG-SOC-G-EC 08 Action Programme 1875000 European Commission civil society in the Western Balkans by facilitating the

Youth in Social sectors 0 0

Overall Objective:
he Tempus programme will pursue

T




REG-SOC-G-EC 09 Programme in the20685000Balkans Commission (EC) a series of overall 0

Tempus Western European Social sectors19700000 objectives which are commo

0

Regional Overall ObjectiveFoster and enhance Social sectors 2500000 solutions, namely voluntary repatriation

3125000 European Commission (EC)

durable and sustainable 0 0

REG-SOC-G-EC 10 Programme for refugee return and provision of durable solutions for refugees and Internally Displaced Pe

REG-SOC-G-EC Society Overall Objective
o strengthen civilCommission (EC)

Civil 11 Facility 12500000 European society within a participative democracy, stimulating a civil society




T Social sectors10000000 0 0

Tempus 17277775 European Commission (EC) development (applying equal opportunities asp

Social economic

REG-SOC-G-EC 12 IV Overall Objective:To contribute to social andsectors15550000 0 0

Youth in – Western Balkans Commission (EC)

REG-SOC-G-EC 13 Action Programme 1875000 European Window sectors 1500000 inclusion 0 the Western Balkans byfa

Social

Overall ObjectiveStrengthen democracy, civil society and social in 0

Migration Overall ObjectiveIncrease the benefitsWestern Balkans

2222222 European Commission (EC)2000000

of temporary 0

REG-SOC-G-EC 14 and socio-economic development in the Social sectors labour migration on the socio-economic developm 0

Regional T


integration of

Overall Objective:
o contribute to the Social sectorsminority groups in the0

Integration

REG-SOC-G-EC 15 Initiative for Roma 3333333 European Commission (EC)3000000 Western Balkans in
ccorda

0 a




REG-SOC-G-EC Society Overall Objective:
he overall objective is to strengthen civil society within 0 participative democracy an

Civil 17 Facility


T

12825000 European Commission (EC)

Social sectors12000000 a 0

Youth in – Western Balkans Social sectors

REG-SOC-G-EC 18 Action Programme 1875000 European Commission (EC)1500000 inclusion 0 the Western Balkans byfa

Overall ObjectiveStrengthen democracy, civil society and social in 0

Tempus 15333331 European Commission (EC) development (applying equal opportunities asp

Social economic

REG-SOC-G-EC 19 IV Overall Objective:To contribute to social andsectors13800000 0 0

Fight againstOverall Objective:Improve Beneficiaries' capacities and the prevention of terrorism crime, in particul

REG-SOC-G-EC 20 2500000 European drug trafficking to prevent

Social sectors 0

organised crime, in particular illicit Commission (EC)2500000 and combat organised 0

Overall Objective:
Southeast European Cooperative Initiative (SECI) 0




I the

REG-SOC-G-EC 21 support to strengthen mprove regional and international law enforcement capacities and coordination in p

Regional Social sectors

1500000 European Commission (EC)1500000 0

Witness Overall ObjectiveStrengthen cooperation and Terrorism (WINPRO)

4210526 European Commission (EC)4000000

Social sectors 0 0

REG-SOC-G-EC 22 Protection in the Fight against Serious Crime to support the fight against serious crime and terrorism at re

Regional Overall ObjectiveImproveEuropean Commission (EC)2500000

2777778 Beneficiaries' capacities to prevent and against cyber crime.Project purpose

Social sectors

REG-SOC-G-EC 23 Cooperation in Criminal Justice: Strengthening capacities in the fight combat0 0

Fight againstOverall ObjectiveImproveEuropean Commission the Prosecutors'cooperation in the Beneficiaries to inv

REG-SOC-G-EC 24 5263158 cross-border and international judicial

Social sectors

organised crime and corruption: Strengthening (EC)5000000 Network0 0

REG-PSD-G-EC 01 Programme on Trade and Investment in Privateincrease in trade relations and investment between the B

Regional T

Overall Objective:
he overall objective is an sector development


the Western Balkans

1125000 European Commission (EC) 800000 0 0

IPA 02 Overall ObjectiveTo contribute to the stabilization of development

735450000 Package Private sector financial markets and economies 0 the Western

REG-PSD-G-EC Multi-Beneficiary Crisis ResponseEuropean Commission (EC) 125450000 0 in

Regional Overall ObjectiveThis Centre

2000000 European Commission (EC)1700000 more developed entrepreneurship cultu

Private foundations for a

REG-PSD-G-EC 03 Entrepreneurial Learning project shall create the sector development 0 0

Economic Project Development Policy Loan Recovery Development Policy

143562000 World Bank (WB) Private 0 143562000

CRO-PSD-L-WB 02 Recovery Description: The Economic(ERDPL) sector development Loan for Croatia aims to support the 0

Additional The objective of the Additional Financing for and Environment Project Montenegro 0

5382090 World Bank (WB) Montenegro Areas 4169000

Water 0

MTN-WAE-L-WB 02 Financing for Montenegro Environmentally Sensitive TouristEnvironmentally Sensitive Tourist Areas Pro

HAA Group Bosnia line for financing of limited scale projectsBankdevelopment

BIH-PSD-L-EIB 06 Loan Private sector (EIB) medium enterprises and 0

Credit Global 75000000 European Investment of small and 0 25000000 local infrastructu

ZABA LOANThe European Investment PROJECTS lending EUR(EIB)million to Zagrebacka Banka d.d. to finance

CRO-PSD-L-EIB 02 & PRIORITY Bank (EIB)Private sector 100 0 100000000

is

FOR SMES 100000000 European Investment Bankdevelopment 0

The project, with an estimated

SER-PSD-L-EIB 07Sector Research and Development investment cost of EUR 420 million, concerns a series of investments a

Public Private sector (EIB) 0 200000000

200000000 European Investment Bankdevelopment 0

HBOR Private projects and 0 250000000

The loan of EUR 250 million will finance SMEsector (EIB) medium-sized companies projects in the a

AND MID-CAP II

CRO-PSD-L-EIB 03LOAN FOR SMES250000000 European Investment Bankdevelopment 0

Cofinancing TheIPA ISPA200000000eligible investments under the Croatian 200000000

CRO-WAE-L-EIB 02 2007-2011 Water and Environment

EU project will support European Investment Bank (EIB) 0 Strategic Coherence Framework and, 0

For Member States Projects

PCH Loan for SMEs and Priority and Western Balkans: Loan for financing0small and medium-sized0projects promo

REG-PSD-L-EIB 03 Private sector (EIB)

55000000 European Investment Bankdevelopment 55000000

RLB Steiermark Cross of projects of limited scale in the fields of infrastructure, environmental protection and impro

CRO-PSD-L-EIB 05 10000000 Loan Private sector (EIB) 0 10000000

Financing Border Global European Investment Bankdevelopment 0

APEX The Apex Loan for SMEs II is intended for financing of SME projects, small and medium scale infrastr

150000000 Private sector (EIB) 0 150000000

SER-PSD-L-EIB 08Loan for SMEs and Mid-Cap II European Investment Bankdevelopment 0

Feasibility The project relates to feasibility study Water of Waste 250000

250000 European Commission Environment

for development of sewerage Municipality for collection and tre

0

SER-WAE-G-EC 14 Study for Collection, Transport and Treatment and (EC) Waters in theinfrastructureof Uzice 0

European • Strengthening3108033 demands for Social sectors 3107957

citizens’ Switzerland better

– PROGRES




SER-SOC-G-CHE 02 Support to South and Southwest Serbia(CH) governance
Assistance to municipalities 0 enhancing se

0 in

Upgrade/rehabilitation of the monitoring and control8726980of the Nikola Tesla Thermal Plant B

Nikola Tesla•Thermal Plant B

SER-ENE-G-CHE 02 87207192 Switzerland (CH) Energy system 0 0

SER-SOC-G-CHE 05 S housing


upport to basic296395 infrastructure (hygiene, water and electricity)
0

Social

Social Inclusion of Roma in VojvodinaSwitzerland (CH) sectors 296388 •P


rofessional development, ac


0

Western Balkans Sustainable Energy European Bank for (WeBSECLF) Energy Credit

76000000 Credit Line Facility Reconstruction

Private sector 16000000 Development (EBRD)

development

REG-PSD-L-EBRD 02 The EBRD has developed the Western Balkans Sustainable and 60000000 Line Facility (WeBSECLF) 0

Corridor Vc The EBRD Project providing a €60.7 millionTransport Croatian Motorways (“HAC”), (EBRD)

facility to

CRO-TRA-L-EBRD 05 Completion is166300000 European Bank for Reconstruction and 60700000 the state-owned compa

0 Development 0

Montenegro: ZPCg Rolling 16000000 providing funds to Reconstruction and 13550000 0 Development (EBRD)rail

MTN-TRA-L-EBRD 03 The EBRD is consideringEuropean Bank for finance priority upgrade of the passenger 0 fleet operate

Stock Renewal Project Transport

6000000 providing a sovereign Environment €5.35 million to finance the

MTN-WAE-L-EBRD 02 The EBRD is consideringEuropean Bank for andloan of up toand Development (EBRD) construction

Danilovgrad Municipal Infrastructure Project Water Reconstruction 0 5350000 0

Premises of the the Civil Engineering Social of the Džemal Bijedić University which has

449375 Turkey (TR) Faculty of the 449375

Reconstruction of the Civil Engineering Faculty Premises sectors DžemalBijedić University in Mostar been damage

BiH-SOC-G-TR 01 0 0

ConstructionA pre-school was constructed in (TR) Social sectors 240728

BiH-SOC-G-TR 02 240728 Fatih in Novi Travnik 0 0

of the pre-school Sultan Turkey Novi Travnik. Construction work was completed in September 2010.

Reconstruction of 7 schools in the 1 vocational school located in the Central Bosnia Canton were reconstructed by

BiH-SOC-G-TR 03 and Central Bosnia Social

6 village schools 614765 Turkey (TR) Cantonsectors 614765 0 0

Reconstruction of the Konjic1047292 Turkey (TR) Social sectors 1047292 the war was reconstructed by TIKA. Re

BiH-SOC-G-TR 04 Hospital

The Konjic Hospital which has been severely damaged during 0 0

Development of the Bosnian e-Justice System

BiH-SOC-G-TR 06 the technical infrastructure of the Bosnian e-Justice System was supported by donat

Establishment of129502 Turkey (TR) Social sectors 129502 0 0

Gorazde 90 reconstruction 431400 Turkey (TR) Social Bosnian 431400 0 In

BiH-SOC-G-TR 07 house houses located in Gorazde that belong to sectors war victims were reconstructed. 0 addition, 5 ne

Restoration of the historicalthe historical Konjic Bridge -which was1743516

BiH-TRA-G-TR 01 Konjic Bridge

Restoration of 1743516 Turkey (TR) Transport 0 0

built in 1682 and damaged during WW II- was c

Reconstruction of the primary184834School Rovinskiin thesectors 184834Podgorica was reconstructed by TIKA. (

MTN-SOC-G-TR 01 school Turkey (TR) Social Stari Aerodrom,

Pavle Rovinski Primary Pavle located in Podgorica 0 0

ConstructionA new premise school Sukriye Mecidovic in Bijelo Polje164779Bosnian village located near Bijelo Polje

MTN-SOC-G-TR 02 164779 Turkey (TR) Social sectors

of the primary for the Sukriye Mecidovic Primary School in a 0 0

The Annex of Institute of Turkey (TR) of the sectors Montenegro

193320 History of the University of of Montenegro

Reconstruction of the Annex of Institute of History Social University 193320 was reconstructed by0TİKA. (2010)

MTN-SOC-G-TR 03 0

Medical Medical equipment was donated (TR) ENT sectors - ENT Clinic by TIKA. (2010) 0

140816 Turkey to the Ulcinj Hospital 140816

MTN-SOC-G-TR 04 equipment support for the Ulcinj Hospital -SocialClinic 0

The Gynaecology Clinic of the RožajeSocial Hospital was

127876 Turkey (TR) State sectors 127876

Reconstruction of the Gynaecology Clinic of the Rožaje State Hospital reconstructed by TIKA. In addition, medical

MTN-SOC-G-TR 05 0 0

Rehabititation of a 300m village road in PetnicaPetnica to Berane was rehabilitated by0

MTN-TRA-G-TR 01 196633 Turkey (TR) Transport

A 300m of village road connecting 196633 TIKA. (2010)0

The Annex of the University of Novi Novi Pazar

735775 Turkey of Pazar is being reconstructed

Reconstruction of the Annex of the University(TR) Social sectors 735775 by TİKA. (2010)

SER-SOC-G-TR 01 0 0

Reconstruction of the techincal high school Vrbas inwas reconstructed by TIKA. (2010-2011)

SER-SOC-G-TR 02 182974 Turkey (TR) Social Sad

Vrbas High School located in Novi Sad Novisectors 182974 0 0

Tutin Water Pipeline Project 750000 Turkey (TR) Water free Environment

SER-WAE-G-TR 01 Replacing the water pipelines with asbestos and ones 750000 (2009) 0 0

Tutin Industrial Zone Project1464484 Turkey (TR) Private sector development

SER-PSD-G-TR 01 TIKA. (2009-2010) 0

Projects of the Tutin Industrial Zone was prepared by1464484 0

Ecodevelopment in rural areas Contributeand Herzegovina and Serbia

REG-PSD-G-SPA 01 266069 Spain the sustainable socioeconomic growth and the recuperation of biodive

238696

Overall Objective: of Bosnia to (ESP)Private sector development 0 0

As part of the Research European Commission (EC) 800000

Designing Medical Faculty,construction and equipping of the Medical Faculty in Banja Luka, at the Paprikovac loca

BIH-SOC-G-EC 59 Social

800000 Center and School sectors 0 0

Additional restructuring works272000centre(IT)hydrotherapy and rehabilitation of the Gradska Banja0of Mostar

BIH-SOC-G-ITA 04 ITALIAN REPRESENTATION Link to Italian Cooperation http://www.cooperazionea

Type of resource: in the Italy of Social sectors 272000 0

Horticulture The project Kosovo

7200000 Switzerland (CH) sector development sustainable and broad-based empl

KOS-PSD-G-CHE-01 Promotion insupports horticulture agribusiness sector 5402880

Private in generating 0 0

Vocational The project supports the Vocational Education System in Kosovo by developing market-oriented trade

KOS-SOC-G-CHE-02 Education Support Social

3470000 Switzerland (CH) sectors 2302692 0 0

Enhancing The Employability 495000 Switzerland (CH) sectors 437085

Social 0 0

KOS-SOC-G-CHE-03 Youthproject contributes to increase the employment opportunities of the youngsters going out from VE

Support to The project contributes to the

1000000 Switzerland (CH) of an impartial correctional system that functions in comp

Social

KOS-SOC-G-CHE-04 Kosovo Correctional Services establishment sectors 665700 0 0

Rural Water and project contributes in improving (CH) and Environment

2060000 Switzerland Water 1784578 0

KOS-WAE-G-CHE-01 This Sanitation Support Programme the health and well-being of communities through0sustainable wa

Rural Water Supply and contributes in improving (CH) and Environment

1500000 Switzerland Water 1012200 0

KOS-WAE-G-CHE-02 This project Sanitation Programme the health conditions of selected rural communities through wate0

Small Infrastructure for goal of this program Programmeand Environment

KOS-WAE-G-CHE-03 The overallWater and Sanitation is to improve health conditions and socio-economic well being of the

1196250 Switzerland (CH) Water 953052 0 0

Kosovo Water Task Force 1000000 Switzerland Water and Environment

of a 623600 0

KOS-WAE-G-CHE-04 The project aims at the establishment(CH) systematic management of the water resources in Kosovo 0

Gjilani V rehabilitation plan and envisages the constructio

The project Gjilani V is part of Kosovo’s power sector6348248

KOS-ENE-G-CHE-01Substation 10180000 Switzerland (CH) Energy 0 0

Water Management – Operational and Financial Monitoring Project 76462

125000 Switzerland (CH) of Regional Water Companies in key areas of operations, finan

KOS-WAE-G-CHE-05 The project will enhance transparencyWater and Environment 0 0

a

KOS-SOC-G-CHE-05 The project will support the Psychiatric University Clinic Pristina (PUC-P) in becoming 0 Learning Res

900000 Switzerland (CH) sectors

Social

Swiss & Liechtenstein Support Project to Mental Health in Kosovo 561240 0

Economic The project contributes to Roma, Ashkali andsectors Communities in Kosovo

114720 the social (CH) Egyptian 75669

Social 0

KOS-SOC-G-CHE-06 and Social Development ofSwitzerlandand economic development of specifically disadvantaged membe 0

Roma, Ashkali and Egyptian Housing Switzerland (CH) sectors 438620

650000 & Integration Project

Social 0

KOS-SOC-G-CHE-07 The project targets the sustainable improvement of living conditions of Roma, Ashkali 0 and Egyptian co

Employment and income promotion for RAE communities in Eastern Kosovo

to improve the living Social

conditions of 223230 0

KOS-SOC-G-CHE-08 The project aims371000 Switzerland (CH) sectorsRoma, Ashkali and Egyptian communities in Koso 0

Regional Equal access of citizens to quality public services – Joint Programme with ADA

2400000 Northern Albania sectors 1922400

ALB-SOC-G-CHE 04 Development Programme inSwitzerland (CH) (RDP) and economic opportunities in the regions of Shkod

Social 0 0

to the Council of 750000 Switzerland (CH) and build up stronger local government structures in Alba

Europe (CoE) for theSocial “Reinforcing local

project

Contribution Contribute to strengthening local democracy sectors 506100 and regional structures in Albania”

ALB-SOC-G-CHE 05 0 0

to the project “Developing Women’s the skills and resources necessary to campaign for municipal off

150000 Switzerland (CH) Leadership in Albania”

Contribution Provide politically active women with Politicalsectors 105255

ALB-SOC-G-CHE 06 Social 0 0

Development of the phase 2 is to Health and contribute to the improvement of quality health care fo

Professional The main goal System (PDS) in thesupport Sector

ALB-SOC-G-CHE 07 Social

1835000 Switzerland (CH) sectors 1603606 0 0

Alternated •
he number of2220000 Switzerland (CH) sectors 1470084

T beneficiary Roma children

ALB-SOC-G-CHE 08 Education and Vocational Training (CEFA) who attend education in public0

Social schools remains at 320 and

0

Corporate •
he first phase2100000 Switzerland (CH)

T Private results 1539510

and based

ALB-PSD-G-CHE 01 Governance (CG) of CG project produced goodsector developmenton these, Phase II was launched.
h

Project 0 0 •T





Corporate •
he Accounting Enhancement Project

T

ALB-SOC-G-CHE 09 Financial Reportingand Auditing (A&A ROSC) assessment demonstrated that Albania needs to take furt

Social

1750000 Switzerland (CH) sectors 1282925 0 0

ALB-PSD-G-CHE 02Investment Advisory ServicesSwitzerland (CH) Trust Fund program is toFund Program: Albania Sub-nat

Foreign •
he main objective of the(FIAS) Partnership sector development

T 300000 Western Balkans Western 219930 Trust assist the governments of the W

Private Balkans 0 0


he Fund For 3500000 Switzerland (CH) sector Bank Project

T Emerging Credins Bank project is to 2329950 to

contribute

Swiss Investment main objective of theMarkets (SIFEM): Credins development strengthening Albania’s banking inf

ALB-PSD-G-CHE 03 Private 0 0

S

Promotion Programme Switzerland on five sector development

Swiss Import•
IPPO’s programme activities focus (CH) main objectives: (i) to increase the competitiveness of SM

ALB-PSD-G-CHE 04 6000000 Private 3670200 0 0


evelop suitable and Training Support Programme (AlbVET)

D 5500000 approachesSocial sectors 3627800

for

ALB-SOC-G-CHE 10 Vocational EducationtrainingSwitzerland (CH)the 2+1+1 system and support their implementation in two s

Albanian 0 0


ommercial, technological and institutional sector development

C

Sustainable Agriculture Support in Albania (SASA)Privateinnovations, all contributing to take advantage of existing

ALB-PSD-G-CHE 05 1420000 Switzerland (CH) 936632 0 0


and Environmental LakeSupply and Shkodra 2008-2012 Protection Shkodra project 0 be improved

this Water Protection Water

Environmental Lake

Water SupplyThe impact of16900000 Switzerland (CH) and Environment

ALB-WAE-G-CHE 04 16900000 0 will


this Water Lezha City Sewerage Project in Lezha City will be a contribution to an effici

Water SupplyThe impact of13600000 inSupply and(CH) andInfrastructure Program I 2011-2014 0

ALB-WAE-L-CHE 05 and Sewerage Project Switzerland Water 10500000

Municipal Environment 3100000

Dam 02 Five hydropower plants on Rivers and Mat Rivers – 4904320 2014

ALB-ENE-G-CHE Safety Project on the Drin and Matthe Drin Cascades 2007 produce about 90% of0Albania’s installed power ca

7900000 Switzerland (CH) Energy 0

Line of to support SME's in Serbia through the national banking system and to support

707332 Italy (IT) Private sector development 707332

0 0

SER-PSD-L-ITA 01 creditLink to Italian Cooperation http://www.cooperazioneallosviluppo.esteri.it/pdgcs/ local development thr

The Project for2080000 SwitzerlandProject for Large2080000

Large Gas Building (CH) Gas Albania with Developments in (Trans with

ALB-ENE-G-CHE 04 Buildingimpact of this Capacity Infrastructure Developments in Infrastructurethe Private Sector AlbaniaAdri

Capacity Energy 0 0


DC contribution

S it

Roma Education Fund (REF) is earmarked for the countries of Western Balkans and0 will be represented in the

ALB-SOC-G-CHE 11 Social

1566000 Switzerland (CH) sectors 1056736 0

ALB-SOC-G-CHE 12to Regional Police Cooperation
egional Community Policing Platform
ommunity Policing Award
egi

Support •
apacity building of SEPCA


C


•R Social

4900000 Switzerland (CH) sectors 2997330


•C 0


0 •R





Southeast The main objectives of the program (former Private•To contribute to regional poverty alleviation, econo

4500000 Switzerland (CH) sector


ALB-PSD-G-CHE 06 Europe Infrastructure Advisory (SEIA) are as follows:
3036600 Partnership for Southeast Europe Infra

Private Enterprise

development 0 0

IFC PEP-SEImprovement of4832500Project

MAC-PSD-G-CHE 01 corporate governance of companies 3122278 through knowledge dissemination, in-

Private

Corporate Governance Switzerland (CH) sector development and banks 0 0

EBRD TradeProvision of Programme to international banks to cover commitments of local banks from trade transa

MAC-PSD-G-CHE 02 5000000 Switzerland (CH) sector development

Facilitation guarantees (TFP) Private 3112000 0 0

Berovo Urban Water Supply the Sanitation

10100000 Switzerland Water

sanitation Environment

6516520 0 0

MAC-WAE-G-CHE 04 Improvement of and water supply and (CH) andin Berovo through reconstruction of the water supply n

Rehabilitation of Pumping of 966230 Switzerland on the main Environment waste water in area of Ohrid East

six pumping station (CH) and collector for

MAC-WAE-G-CHE 05 Rehabilitation Stations Ohrid East Water 623411 0 0

Waste 06 Treatment Plant GevgelijaWater Treatment Plant for 6800000

the Waste Water Gevgelija, 0 0

MAC-WAE-G-CHE waterConstruction of 6800000 Switzerland (CH) and Environment with financial contribution of Switzerla

Wastewater Treatment Plant in Wastewater Treatment Plant and the main

16300000 Switzerland (CH) MEAP) 11154090 0 0

MAC-WAE-G-CHE 07 Construction of the Kumanovo (part ofWater and Environment collector for municipal wastewater of K

Bregalnica The Basin Management Project -Decision Note Environment

support Switzerland (CH) functioning

and 3417368 0 0

MAC-WAE-G-CHE 08 River project will 4360000establishmentWater andPhase of the river basin management bodies and will p

Restoration Finalisation of the construction works (CH) and Environment of the Golema River in 0 urban sectio

1250000 Switzerland Water

MAC-WAE-G-CHE 09 of Golema River, Phase 2 770125

for restoration/regulation 0 the

Integration Integration of environmental education in theand Environment of the primary and secondary schools a

Education in Macedonian

Water existing 1799591

curricula

MAC-WAE-G-CHE 10 of Environmental2657400 Switzerland (CH) Education System, Scale-up Phase 0 0

Biodegradable Waste Management inSwitzerland Region

806000 the for management Environment

Water 545823 0 0

MAC-WAE-G-CHE 11 Development of a pilot projectPrespa (CH) andof the biodegradable waste through construction of the

Nature Preservation Programme - Phase Entry proposal

90000 Switzerland (CH)

selection Environment

60948 0

MAC-WAE-G-CHE 12 Definition of the Programme Concept,Water andof the Implementer and preparation of0the Project Doc

Efficient Replacement and 12100000 of condenser batteries, instalment of energy meters, assistance in the field o

MAC-ENE-G-CHE 01Energy Distribution 1 supply Switzerland (CH) Energy 7730690 0 0

Efficient PoPs unit continued the Switzerland (CH)Energy of the 0 0

MAC-ENE-G-CHE 02Energy Distribution 2165000 activities within the framework101656GEF Medium Size Project "Phasing-out

Efficient Contribution to 3176000 Switzerland (CH)Energy 117744 0

MAC-ENE-G-CHE 03Energy Distribution the project "Enabling the Environment for Energy Efficiency in Building 0 Measures in the

ConstructionA primary school was constructed in Mamusa. (2007 - 298385

KOS-SOC-G-TR 01 1265900 Turkey

of the primary school Mamusa (TR) Social sectors 2010) 0 0

Reconstruction of the High school Alaaddinin Prizren was sectors 174490 TIKA. Equipment support was also prov

KOS-SOC-G-TR 02 335767 Turkey Prizren

Alaaddin high School located in(TR) Social reconstructed by 0 0

Reconstruction of the high school Anton Cettain Skenderaj was reconstructed by TIKA. Equipment 0

KOS-SOC-G-TR 03 341500 located in Skenderaj

Anton Cetta High School Turkey (TR) Social sectors 341500 0 support was als

ConstructionBuilding of the Mamusa Municipality was constructed by52487 (2007-2009)

KOS-SOC-G-TR 04 52487 Turkey (TR)

of the Mamusa Municipality Building Social sectors TIKA 0 0

of a primary school in Kılavuzlu Village

ConstructionA primary school was constructed in Kılavuzlu Village (2010)

MAC-SOC-G-TR 01 40762 Turkey (TR) Social sectors 40762 0 0

Tefeyyüz Primary school Turkey (TR)Skopje sectors 258795

School located in Social

Reconstruction of the primary258795 Tefeyyüzin Skopje was reconstructed by TIKA. (2010)

MAC-SOC-G-TR 02 0 0

Reconstruction of 3 schools in Lipkova region(TR) Social sectors 125975

MAC-SOC-G-TR 03 located Turkey

3 village schools 125975 in Lipkova were reconstructed by TIKA. (2010) 0 0

Central Potable Water Project Jupa were provided potable water. (2008-2009) 0

988337

MAC-WAE-G-TR 01Jupa4600 residents of central Turkey (TR) Water and Environment 988337 0

Equipment Medical equipment was donated (TR) Social sectors Center

316800 Turkey to the Children 0 0

ALB-SOC-G-TUR 10 support for the Center of Dialysis for Tirana University - 316800of Dialysis for Children. (2009-2010)

Improvement of the Intensive Care Units in Albania

ALB-SOC-G-TUR 11 79707 Turkey to various sectors

Medical equipment was donated (TR) Socialhospitals. (2010) 79707 0 0

Seenet

REG-SOC-G-ITA 01II 8280000 Italy (IT) Social sectors 8280000 0

Link to Italian Cooperation http://www.cooperazioneallosviluppo.esteri.it/pdgcs/ 0

Support Type of resource: BANCA MONDIALE - IBRD Link to3000000

3000000 Italy (IT) Social sectors Italian Cooperation http://www.cooperazioneallo

KOS-SOC-G-ITA 01 to the programme of sustainable employment - contribution to the world bank 0 trust fund 0

REG-PSD-L-EBRD 01 The Western Balkans Sustainable Energy Direct-Financing Facility (WeBSEDFF) is an investment fac

63000000 Direct Funding for Reconstruction and Development (EBRD)

Private sector 13000000

development

Western Balkans Sustainable Energy European Bank Facility WeBSEDFF 50000000 0

EU/EBRD EU/EBRD Private Sector European Bank for Reconstruction Energy Financing (EBRD) a part of a larg

110000000 Support Facility for Western Balkans – Development Facility0

development WBPSSF

REG-PSD-L-EBRD 03 Western Balkans Private Sector Support Facility - Sustainable and 87500000 – SEEF is (WBPSSF – SE

Private sector 22500000

The sustainable energy project Bank (WB) EE and

World Bank GEFobjective of this project is to develop a sustainable market for2025000RE by supporting the devel

MAC-ENE-L-WB 01 6150000 World Energy 4125000 0

The Fund Southeast Europe

REG-ENE-F-EC 01for Growthmain objective is to help the countries of Southeast Europe achieve 20% savings in energy or 20%

Green Energy

128000000 European Commission (EC) 0 0 128000000

Credit 30000000 Italy to public enterprises of municipalities, that thanks to the0

SER-PSD-L-ITA 02Line IICredit Line II will be extended (IT) Private sector development0 30000000 access to soft l

IPA 04 The implementation of EEFF 2007 started in sector 13500000 54800000

68300000 European Investment Bankdevelopment

Private (EIB) 0

REG-PSD-L-EIB 2007/ Energy Efficiency Finance Facility (EEFF) 2007November 2009 and covers the seven countries of the W

IPA 2007/ The implementation of EEFF 2007 (GER) in sector development

38500000 Germany startedPrivate 7700000 30800000 0

REG-PSD-L-GER 01 Energy Efficiency Finance Facility (EEFF) 2007November 2009 and covers the seven countries of the W

Water Supply of Tirana - Grant85632 Italy (IT)

ALB-WAE-G-ITA 03 Water

and Credit Operations and Environment 85632 0 0

Electricity

ALB-ENE-G-ITA 02 Emergency in Albania 309882 Italy (IT) Energy 309882 0 0

Child Support Policies - Institutional StrengtheningSocial sectors 266527

ALB-SOC-G-ITA 14 266527 Italy (IT) 0 0

for Decentralisation of Social Services and the National Service

Rehabilitation of the port of Valona Italy (IT)

ALB-TRA-G-ITA 01 146176 Transport 146176 0 0

Solid Waste Management in Tirana Italy (IT)

ALB-WAE-G-ITA 04 32028 32028

Water and Environment 0 0

Strengthening of Albanian Structurese for the Control of Food development

ALB-PSD-G-ITA 02 1419451 Italy (IT) Private sector 1419451 0 0

Support 594299 Italy (IT) Transport project 0

ALB-TRA-G-ITA 02 and Technical Assistance to the PIU at the MLPTT for the 594299management in transport sector 0

Equipment and Rehabilitation of 5 outpatient clinics

ALB-SOC-G-ITA 15 74439 Italy (IT) Social sectors 74439 0 0

Programme for Strengthening the Services for training and the national service for employment 0

ALB-SOC-G-ITA 16 214274 Italy (IT) Social sectors 214274 0

Construction of a Service Centre and Italy (IT)

ALB-PSD-G-ITA 03 Private sector development

596299

596299 a data communication network for universities 0 0

A line SMEs

ALB-PSD-L-ITA 01of Credit for Albanian 1332094 Italy (IT) 0

Private sector development 1332094 0

Centre 223527

ALB-SOC-G-ITA 17for Rehabilitation Therapies Italy (IT) Social sectors 223527 0 0

Integrated Social Action for the Promotion (IT)

ALB-SOC-G-ITA 18 Social sectors 186992

186992 Italy of Childhood and Youth at Risk 0 0

Urban 203731 of the Works for the rehabilitation of two historical squares Scanderberg His

ALB-PSD-G-ITA 04Development of Tirana: DesignItaly (IT) 203731

Private sector development 0 0

Study for 89975 Italy (IT) Water and

ALB-WAE-G-ITA 05 the evaluation of water resources of South Albania Environment 89975 0 0

Tourist 393447 Italy Permet Area and its typical products

ALB-PSD-G-ITA 05 and Environmental Development in(IT) 393447

Private sector development 0 0

Early diagnosis and social integration Italy (IT)

ALB-SOC-G-ITA 19 Social sectors 650321

650321 of deaf children 0 0

Integrated Services and Community Based Services for Alcholics, Drug Additcs and other forms of0

ALB-SOC-G-ITA 20 565873 Italy (IT) Social sectors 565873 0 discomfort

Integrated training and support operation for families of the slum in 562255

ALB-SOC-G-ITA 21 562255 Italy (IT) Social sectors kombinat 0 0

Strengthening of educational 775853 Italyservices Social sectors 775853 centre of Bardhaj Bleran

ALB-SOC-G-ITA 22 and training (IT) of the vocational training 0 0

Protection of the Rights of mentally ill Italy (IT) affected bysectors mental illnes and implementation of a network of

ALB-SOC-G-ITA 23 400442 patients Social chronic 400442 0 0

Teaching dimension

ALB-PSD-G-ITA 06 ICT in an European283304 Italy (IT) 283304

Private sector development 0 0

Prevention, care and physiotherapy service for disabled people in central and northern0Albania

ALB-PSD-G-ITA 07 564147 Italy (IT) 564147

Private sector development 0

Support 451397 Italy roadmap to exit from violence

ALB-SOC-G-ITA 24 to Women's Centre New Moon: A (IT) Social sectors 451397 0 0

North Albania: Strengthening 730584 Italy HospitalSocial sectors 730584

ALB-SOC-G-ITA 25 the First Aid (IT) in Scutari 0 0

Creation 362787 Italy (IT)

ALB-PSD-G-ITA 08 of Industry Chain Consortia in North Albania 362787

Private sector development 0 0

Support 280556 Italy (IT) Private sector development

ALB-PSD-G-ITA 09 to Local Development Dynamics in the Rural Zone of Zadrima 280556 0 0

Strengthening of Socio-Educational Services for Social and Cultural Promotion and Work Placement of Young Peo

ALB-SOC-G-ITA 26 385456 Italy (IT) Social sectors 385456 0 0

Rural Development integrated project Italy (IT)

ALB-PSD-G-ITA 10 Private of Kelmend and Shkrel, Malaysia Emahde District, North

559259

559259 in the municipalitiessector development 0 0

Strengthening of Socio-Educational Services for Social and Cultural Development of Children and Young Women

ALB-SOC-G-ITA 27 208635 Italy (IT) Social sectors 208635 0 0

Italian Support to the Reform 501380 Italy (IT) System: Studies Unit and Technical Assistance to the Ministry of H

ALB-SOC-G-ITA 28 of Albania Health Social sectors 501380 0 0

Assistance Programme for the Ministry of Environment for biodiversity - Systematic Management of Protected Are

ALB-WAE-G-ITA 06 1107595 Italy (IT) 1107595

Water and Environment 0 0

Recognition and Training of Migrants returned in Northern Albania 271099

ALB-SOC-G-ITA 29 271099 Italy (IT) Social sectors 0 0

North Albania: Educational Support and Training for Children and Adolescents in Disadvantaged areas and openin

ALB-SOC-G-ITA 30 112000 Italy (IT) Social sectors 112000 0 0

Strengthening of Primary Education and Improvement of sectors teachers in the Scutari district North Albania

ALB-SOC-G-ITA 31 279983 Italy (IT) Social skills for 279983 0 0

Support 122320 Italy (IT) Social sectors 122320 0 0

ALB-SOC-G-ITA 32 to the process of European Integration of Albania through activities supporting Albanian Institutions

Training 422493 Italy (IT) Social sectors Perspective

ALB-SOC-G-ITA 33 of teachers of Albanian Secondary Schools in a European 422493 0 0

SDISEE

REG-ENE-L-WB 01 1900826 World Bank (WB) Energy 0 1900826 0

Eu Desk

REG-SOC-G-ITA 02 II 78430 Italy (IT) Social sectors 78430 0 0

Kosovo the Ministry of Agriculture, Forestry and Rural Development for the improvement of t

KOS-SOC-G-ITA 02 - IAM - Strengthening858495 Italy (IT) Social sectors 858495 0 0

Cultural 135600 Italy (IT) Social sectors 135600

KOS-SOC-G-ITA 03 Diversity, Intercultural Dialogue, Heritage Protection and Reconciliation in Kosovo 0 0

Support 12011 Italy

KOS-SOC-G-ITA 04 to the Health System in Kosovo (IT) Social sectors 12011 0 0

Support 632527 Italy (IT) for disability in 632527

KOS-SOC-G-ITA 05 to the implementation of the national plan Social sectors Kosovo 0 0

Institutional Building in support of the Ministry of Culture, Youth and378000 for the Implementation of a Manageme

KOS-SOC-G-ITA 06 378000 Italy (IT) Social sectors Sports 0 0

Development of the Livestock561304 through the creation sectorartificial insemination centre

KOS-PSD-G-ITA 01 Sector Italy (IT) 561304

Private of an development 0 0

Training, 963278 Italy (IT) Private sector 963278

KOS-PSD-G-ITA 02 Microcredit and Agricultural Development in Kosovo development 0 0

Rationalization of Health Care 16737 Italy (IT)

MAC-SOC-G-ITA 01 Social sectors 16737

and Modernization of Technology Park in FYR Macedonia 0 0

Citizens

MAC-SOC-G-ITA 02 of FYR Macedonia 473054 Italy (IT) Social sectors 473054 0 0

Environmental Protection, Economic DevelopmentWater and Environment

MAC-WAE-G-ITA 02 994111 Italy (IT) 994111 0

and Promotion of Eco-Tourism in the Park Mavrovo 0

Integration 1112183 Italy South-East of sectors 1112183 Macedonia, Kosovo and Montenegro

MAC-SOC-G-ITA 03 and Support of Minorities in the(IT) Social the Balkans FYR 0 0

Support 73522 Cooperation Water and Environment Lake District of Ohrid and Prespa

MAC-WAE-G-ITA 03Programme to Cross-Border Italy (IT) 73522

in Protected Areas of the 0 0

OSSH electricity proposed 50000000 improvementmillion long-term senior loan to the

transaction is a EUR 50 program

ALB-ENE-L-EBRD 01 The distribution efficiencyEuropean Bank for Reconstruction and 50000000Electricity Distribution Comp

Energy 0 Development (EBRD) 0

Tirana Bank Credit Line 40000000 European worth a Reconstruction and with Piraeus (EBRD)

ALB-PSD-L-EBRD 01 The EBRD has signed investments Bank fortotal of €200 million 40000000 Group subsidiaries in Bu

0

Private sector developmentDevelopment 0

Macedonian Railways - is consideringEuropean Bank formillion sovereignand 17600000 track renewal along the C

MAC-TRA-L-EBRD 02 The EBRD Corridor X loan to finance

19700000 providing a €17.6 Reconstruction 0 Development (EBRD)

Transport 0

Boskov Most Hydro Power 84000000 hydro powerEnergyReconstruction and Developmentthe town of Debar in we

Project plant

MAC-ENE-L-EBRD 02 The 70MW Boskov Most European Bank for(the Project) is to0be 84000000 located near (EBRD) 0

5600000 making an investment to enhance the Development (EBRD)

MAC-TRA-L-EBRD 03 The EBRD is consideringEuropean Bank for Reconstruction andmobility of Skopje’s residents and imp

Skopje Urban Transport Project Transport 0 5600000 0

The overall Trade Developmenttrade Private sector development

1197222 boost in the Western (EC)1000000

and investment in II

REG-PSD-G-EC 04 Programme onobjective is toEuropean Commission BalkansSouth Eastern Europe through


Regional 0 0
facilitating imp

Regional Overall ObjectiveTo increase trade relations sector development

1020000 European Commission investment between the 0

the Western Balkans III

REG-PSD-G-EC 05 Programme on Trade and Investment in Privateand (EC) 500000 0

Beneficiaries.Project purpos

Regional Overall ObjectiveTo increase trade relations sector development

857500 European Commission investment between the 0

the Western Balkans IV

REG-PSD-G-EC 06 Programme on Trade and Investment in Privateand (EC) 500000 0

Beneficiaries.Project purpos

Overall follow-up340000Small Business Act (SBA) is to improve




T Private project

Implementation and Objective:
he overall objective of this sector development the business environment in gener

REG-PSD-G-EC 07 of the European Commission (EC) 300000 0 0

Solid Waste Management is2000000capacities in the

to build Austria -2011) Water and Environment

2000000 0

REG-WAE-G-AUT 01 The objective TA Program (2008(AUT) waste sector in the Western Balkans by building the legal an 0

Renewable Preparation and implementation of legal, financial and technical framework for microhydropower proje

4000000 Austria (AUT)

REG-ENE-G-AUT 01 Energy Development Program (2009 -2015) Energy 4000000 0 0

Urban Development Program for Western Balkan (2011 workshops/seminars of the World Bank Institute for leade

REG-PSD-G-AUT 01 4000000 Austria (AUT) Private sector 4000000

Financing the training and capacity building -2014) development 0 0

ECA 02 The goal is Program (2010 –of (AUT)

improvement 2015) Energy

REG-ENE-G-AUTCleaner Productionthe 1500000 Austriaoperational processes to make more efficient use of inputs such as en

1500000 0 0

Impact of 144675 Spain of Southeastern Environment

REG-WAE-G-SPA 01 climate change on the biodiversity(ESP)Water and Europe countries 144675 0 0

Promotion a better understanding Spain (ESP)Social sectors

Strengthening participation capacity and citizens access framework of public adm

50000 the 0

ALB-SOC-G-SPA 07 ofOverall Objective: 50000by the Albanian society about Gender Equality in 0 to the activity ofEuropean

Investment Program in the region of Mirdita decentralization and democratization in decision-making

ALB-PSD-G-SPA 01 andOverall Objective : Support to the process of (Albania) 121570

Training 121570 Spain (ESP)Private sector development 0 0

Support of a Programme of Activities and Measures which facilitate the reintegration of those

ALB-SOC-G-SPA 08 to the establishment 210000 Spain (ESP)Social sectors 210000 0 0

Conflicts 40574 Spain (ESP)Social sectors of the 0 0

REG-SOC-G-SPA 01 and territorial structure in Europe. Elements for the renewal40574 political and social debate through the

Overall Objective Contribute to the Legal Services the Rule of of guaranteeing the effective defense

ALB-SOC-G-SPA 09 to the consolidation of: the State General strengthening ofwith the aim Law in Albania. Specific Objective : S

Support 170000 Spain (ESP)Social sectors 170000 0 0

My book Objective: Strengthening Spain (ESP)Social sectors the69000

69000 of the education system of Albanian education 0 0

ALB-SOC-G-SPA 10 on gender equality: Promotion of gender equality in upper secondary society in terms of promotion of gen

Strengthening the judicial system of Albania (ESP)Social sectors the Rule of Law in Albania. Specific Objective: Su

ALB-SOC-G-SPA 11 235000 Spain

Overall Objective: Contribute to the strengthening of 235000 0 0

Strengthening the Agricultural Extension Services inagricultural of the Diber north of Albania. Specific Objective: S

ALB-PSD-G-SPA 02 120000 Spain (ESP)Private sector development

120000

Overall Objective: Strengthening of the the region sector in the 0 0

Capacity 160000 Spain (ESP)Private sector development

160000 0

REG-PSD-G-SPA 02 building of local administration officials in candidate countries and potential candidates on0municipal dece

Support Overall Objective: system: Application of environmental legislation and the European 0 internationa

120000 Spain (ESP)Water and system and 120000 0 and

ALB-WAE-G-SPA 03to the Albanian judicialSupport to the Albania judicial Environmentother institutions to strengthen the applic

Support 120000 Spain (ESP)Private and cooperativism in

120000 0

ALB-PSD-G-SPA 03 to the development of agricultural associationism sector development Albania (phase II) 0

Training 120000 Spain (ESP)Private sector development

120000 0

REG-PSD-G-SPA 03 enlargement countries on the Spanish experience in common agricultural policy and rural 0 development

Improved 75000 Spain (ESP)Social sectors 75000

ALB-SOC-G-SPA 12 networking among local actors and their capacity to increase participation in0 0

regional cooperation progra

Support Overall Objective: Contribute to (ESP)Social sectors the Rule of Law in II)

450000 Spain the Strengthening of 450000 0 0

ALB-SOC-G-SPA 13 to the reform and modernization of the Albanian penitentiary system (Phase Albania. Specific Objective: Su

Sustainable Development in the NorthSpain (ESP)Water and Environment Development local policies in the nor

ALB-WAE-G-SPA 04 174000 of to the 174000

Overall Objective: ContributeAlbaniaimprovement of Sustainable 0 0

Seminar 159712 Spain (ESP)Water candidate potential

159712

REG-WAE-G-SPA 02on Environmental policy for the European Unionand Environment candidate countries 0 0

Training 56000 in the field of European studies

ALB-SOC-G-SPA 14 of officials and professionals Spain (ESP)Social sectors 56000 0 0

Feasibility The bellow proposed activities for Durres identification, preparation and implementation of priority me

ALB-WAE-G-EIB 01 study and Design Documentationwill support city and Durres region Water Supply and Sanitation Measu

Water and Environment

900000 European Investment Bank (EIB) 450000 450000 0

The Kosovo* railways links (East – Commission (EC) track that

600000 European West) Kosovo

Feasibility Study for the key railwaynetwork is non-electrified single 600000 has suffered significant damages dur

KOS-TRA-G-EC 04 Transport 0 0

„National gasification system 170000 European BankRepublic gas 170000 Technicalof the former Yugoslav Re

of the former inclusion for Reconstruction and

in the energy sector Assistance

MAC-ENE-G-EBRD 01 Considering the importance of Yugoslav of naturalof Macedonia”: Development (EBRD) for preparation

Energy 0 0

Feasibility The construction850000 Environmental between the power Study) of 400 and Montenegro is Serbi

REG-ENE-G-EC 01 Study (including Social andEuropeancable Impact Assessmentsystems for Italy kV Interconnection plann

Energy

of the submarine Commission (EC) 850000 0 0

Feasibility The Ionian-Adriatic Pipeline Project Commission (EC)3500000

3500000 European is Energy

to interconnect the existing and planned – lead, Croatia, syste

REG-ENE-G-EC 02 Study and EIA/SIA- Regional Project Ionian Adriatic Pipeline Plinacro Ltd, Zagrebgas transmissionBosni

0 0

and Development of European Centre for Entrepreneurial Learning) is an0

East the Centre for Entrepreneurial Learning initiative providing for struct

ConstructionSEECEL South1584000 European Commission (EC)1584000and Strengthening Competitiveness Eco

REG-SOC-G-EC 25 Social sectors 0

Advisory Services in Enforcingthe water management Law Environment

the Macedonian Water and

Water 250000 0

MAC-WAE-G-GER 02 The capacities of250000 Germany (GER) organizational unit of the Macedonian Ministry of Environme 0

Program Regional and Local Economic Development in Macedonia

2800000 Germany (GER) Private sector development

2800000 0 0

MAC-PSD-G-GER 01 for Responsible institutions for regional development fulfil their functions effectively to support an EU com

companies

Investment The international competitiveness of the Macedonian 1900000 in the supported areas (textile and cl

MAC-PSD-G-GER 02 and Export Promotion 1900000 Germany (GER) Private sector development 0 0

Harmonization of the Macedonian taxGermany (GER) Law

250000 Law with the EU sector development

Private 250000 0

MAC-PSD-G-GER 03 Macedonian VAT and Tax procedure legislation has been harmonised with the European directives.1.T 0

Integration Selected EU Directives from the “Free Trade”sector development and “Energy”

Private movement of goods”

MAC-PSD-G-GER 04 of the technical EU Directives concerning “Free and “Energy” Domains of Priority are anchored in the M

250000 Germany (GER) 250000 0 0

Integration Selected EU directives fromthe regulated priority“Environment“ are anchored in the Macedonian legi

250000 in the domain of and „Environment“

MAC-WAE-G-GER 03 of technical EU Standards Germany (GER) area of Environment

Water 250000 0 0

Introduction Sustainable and 391000 environmental-friendly Environment

self-financing environmental-friendly pilot management system for collection and re-u

Water

MAC-WAE-G-GER 04 and implementation of anGermany (GER) and management system for0391000 waste oil 0

Open 01 The Network of Modernization of Municipal and EnvironmentEast the political and 0

Associations of Local Water

Authorities of in South

5500000 0

REG-WAE-G-GERRegional Fund (ORF) 5500000 Germany (GER) ServicesSEE improves Europe (SEE) institutional framew

ORF Foreign Trade Promotion FundGermany (GER) Promotion takes an approach of strengthening competitiv

REG-PSD-G-GER 01 7150000 for Foreign Trade sector development

The Open Regional Private 7150000 0 0

ORF Legal Law reform in 6916000 Projects (GER) sectors 6916000

REG-SOC-G-GER 01 Reform in SEE the region; Germanywith Macedonian participation:
.


Social 1 Introduction of Regional Master Pr

0 0

ORF Energy1.Capacity (SEE) for Monitoring, Verification and Evaluation of the Energy Efficiency0

REG-ENE-G-GER 02 6000000 Germany (GER)

Efficiency building Energy 6000000 0 Policy in SEE c

project reads as follows “Selected services provided by state and non-state actors for

Social 02 The goal of the 2000000 Social

REG-SOC-G-GER Inclusion of Trafficked PersonsGermany (GER) sectors 2000000 0 0

and construction of water and and Environment

Water waste water infrastructure of municipalities. Objectives: Im

Montenegro Rehabilitation 21500000 European Investment Bank (EIB) 0 21500000

MTN-WAE-L-EIB 02 Water and Sanitation 0

Airports investments in Podgorica 1000000

The proposed project includes urgent TransportBank (EIB) 0 and Tivat Airports to meet with basic c

MTN-TRA-L-EIB 02 modernisation 1000000 European Investment 0

20000000 European Investment Bankpromoted by

SER-PSD-L-EIBLoan for Loan for financing small and medium-sized projects development SMEs (within the Bank’s usual eligib

PB 12 SMEs and Priority Projects Private sector (EIB) 0 20000000 0

Raiffeisen Beogradline for leasing or Medium and Long Term financing of0SME projects, small and0

SER-PSD-L-EIB 13 40000000 Private sector (EIB)

Credit Loan for SMEs European Investment Bankdevelopment 40000000 medium scale i

Status Date

Project Status WBIF Project

Approval Date Effective

Initiatives Other Info Expected Completion Completion

Approved 01.01.2008 01.01.2008 false 20.01.2009

IB (Institution Building), MI (Municipal Infrastructures)

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.03.2008

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 01.03.2009

Approved 01.01.2008 01.01.2008 false Environmental aspects: Treaty), EE (Energy Efficiency), to (Mun

ECT (Support to Energy Community As the objective of the project is MI safe

Approved 01.01.2009 01.01.2009 false Environmental aspects: Building)

EE (Energy Efficiency), IB (InstitutionThe Partial Risk Guarantee does not co

Approved 01.01.2008 01.01.2008 false 01.01.2011

MI (Municipal Infrastructures), ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false 30.10.2008

MI (Municipal Infrastructures)

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2009

09.05.2011

Under implementation 15.06.2007 false 30.09.2011

MI (Municipal Infrastructures)

Approved 01.01.2009 01.01.2009 false MI (Municipal Infrastructures), SME (Support to SME)

Appraisal 01.01.2005 01.01.2005 false SME (Support to SME)

Approved 01.01.2009 01.01.2009 false 01.11.2011

IB (Institution Building), MI (Municipal Infrastructures)

Approved 01.01.2007 01.01.2007 false 01.06.2009

IB (Institution Building), MI (Municipal Infrastructures)

Approved 01.01.2008 01.01.2008 false IB (Institution Building) 01.06.2009

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 01.03.2008

Approved 01.01.2008 01.01.2008 false IB (Institution Building) 01.04.2008

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2009 31.12.2009

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect) 30.06.2010 30.06.2010

Approved 01.01.2008 01.01.2008 false 30.11.2009

IB (Institution Building), MI (Municipal Infrastructures)

Approved 17.10.2008 17.10.2008 false IB (Institution Building)

Approved 01.01.2008 01.01.2008 false Environmental aspects: This project includes significant amount

01.07.2010

ENV (Environmental Aspect), IB (Institution Building)

Appraisal 16.10.2009 16.10.2009 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false Environmental aspects: A CARDS 2005 MI (Municipal Infrastru

01.04.2012

ENV (Environmental Aspect), IB (Institution Building),project designed for imp

Approved 01.01.2008 01.01.2008 false Environmental aspects: Throughout the building works Infrastru

01.04.2011

ENV (Environmental Aspect), IB (Institution Building), MI (Municipal intervent

Appraisal 16.10.2009 16.10.2009 false Financed through

ENV (Environmental Aspect) IPA 09 Multibeneficiary programme

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2009

Approved 01.01.2007 01.01.2007 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2010

Approved 01.01.2007 01.01.2007 false 07.06.2009

IB (Institution Building), MI (Municipal Infrastructures)

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2008

Approved 01.01.2008 01.01.2008 false 01.12.2009

MI (Municipal Infrastructures)

Approved 01.01.2008 01.01.2008 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false IB (Institution Building)

Approved 01.01.2008 01.01.2008 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false IB (Institution Building)

Approved 01.01.2008 01.01.2008 false IB (Institution Building)

Approved 01.01.2008 01.01.2008 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false 31.07.2010

ENV (Environmental Aspect), IB (Institution Building)

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 30.06.2009

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 15.11.2009

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 01.04.2010

Approved 01.01.2008 01.01.2008 false 31.12.2010

ENV (Environmental Aspect), IB (Institution Building), MI (Municipal Infrastru

Approved 01.01.2007 01.01.2007 false IB (Institution Building) 31.12.2009

Approved 01.01.2007 01.01.2007 false 31.12.2010

Approved 01.01.2009 01.01.2009 false IB (Institution Building) 31.12.2009

Approved 01.01.2008 01.01.2008 false IB (Institution Building) 29.07.2008

Approved 01.01.2007 01.01.2007 false MI (Municipal Infrastructures) 12.04.2007

Approved 01.01.2008 01.01.2008 false MI (Municipal Infrastructures)

09.05.2011

Under implementation 13.11.2007 false Environmental aspects: Various environmental

31.08.2012

ENV (Environmental Aspect), MI (Municipal Infrastructures) and climatic crite

Approved 01.01.2009 01.01.2009 false IB (Institution Building)

Approved 01.01.2008 01.01.2008 false Environmental aspects: The secured operation of the ships will r

ENV (Environmental Aspect) 31.12.2011

Approved 01.01.2008 01.01.2008 false Environmental aspects: This project shall include full EIA for all p

ENV (Environmental Aspect) 31.12.2011

Approved 01.01.2008 01.01.2008 false Environmental aspects: The Albanian Development Fund has a

31.03.2011

ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 16.10.2009 16.10.2009 true The overall length

MI (Municipal Infrastructures) of the road network in Albania is about 15,000

Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect) 30.09.2010

Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect) 30.09.2011

Approved 01.01.2008 01.01.2008 false 01.03.2011

ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 01.01.2008 01.01.2008 false MI (Municipal Infrastructures)

Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false Environmental aspects: The project involves construction of a ne

ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 01.01.2007 01.01.2007 false Environmental aspects: The construction of a new ferry terminal

ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 01.01.2008 01.01.2008 false Environmental aspects: The project has been screened as B/1 r

ENV (Environmental Aspect)

Appraisal 01.01.2009 01.01.2009 false Environmental aspects: The Project is located

ENV (Environmental Aspect), MI (Municipal Infrastructures)for the most part

Appraisal 01.01.2008 01.01.2008 false Environmental aspects: The Bank?s services will

ENV (Environmental Aspect), MI (Municipal Infrastructures) take particular

07.10.2009

Under implementation 07.10.2009 true Environmental aspects: The proposed sub-projects of the projec

30.12.2012

ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 01.01.2007 01.01.2007 false Environmental aspects: The main activity supported by the Proje

31.03.2011

ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 01.01.2008 01.01.2008 false Environmental aspects: An Environmental Management Framew

31.12.2012

ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 01.01.2007 01.01.2007 false 03.01.2009

Approved 01.01.2007 01.01.2007 false 12.01.2009

Approved 01.01.2008 01.01.2008 false 12.01.2010

Approved 01.01.2008 01.01.2008 false 04.01.2009

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false 02.01.2009

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false Environmental aspects: Environmentally sensitive areas located

ENV (Environmental Aspect) 30.06.2012

Approved 01.01.2008 01.01.2008 false 31.03.2010

Environmental aspects: The project is not expected to have an a

Approved 16.10.2009 16.10.2009 false ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false 31.12.2009

Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect) 01.01.2010

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false 03.01.2010

Environmental aspects: Approval date: 2007.0Preparation or tim

Approved 01.01.2007 01.01.2007 false 04.01.2010

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false 31.12.2009

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2007 01.01.2007 false 06.07.2007

Approved 03.05.2005 03.05.2005 false 31.12.2007 31.12.2007

Approved 23.12.2008 23.12.2008 false ENV (Environmental Aspect)

Approved 08.10.2008 08.10.2008 false Environmental aspects: The project aims at ensuring an ecologi

ENV (Environmental Aspect)31.12.2012

Approved 06.02.2007 06.02.2007 false Environmental aspects: The project contributes to the reduction

ENV (Environmental Aspect)31.12.2009 31.12.2010

Approved 01.01.2007 01.01.2007 false Environmental aspects: The measures of this project contribute

ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false 30.09.2010

Environmental aspects: The project is likely to have minimal or n

Approved 19.06.2008 19.06.2008 false Environmental aspects: While the project does not trigger the Ba

ENV (Environmental Aspect) 31.03.2012

Approved 01.01.2009 01.01.2009 false ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 01.08.2007 01.08.2007 false 31.12.2008

MI (Municipal Infrastructures)

Approved 15.06.2007 15.06.2007 false 14.06.2008

MI (Municipal Infrastructures)

Approved 01.01.2007 01.01.2007 false EE (Energy Efficiency) 31.12.2007

Approved 03.06.2009 03.06.2009 false EE (Energy Efficiency), MI (Municipal Infrastructures)

Approved 21.10.2009 21.10.2009 false ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 20.11.2007 20.11.2007 false MI (Municipal Infrastructures)

Approved 21.10.2009 21.10.2009 false ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 23.06.2008 23.06.2008 false 31.12.2014

Approved 23.02.2010 23.02.2010 false 31.12.2014

ENV (Environmental Aspect), MI (Municipal Infrastructures)

Approved 30.12.2007 30.12.2007 false 30.09.2009

MI (Municipal Infrastructures)

10.05.2011

Under implementation 09.10.2007 false 31.12.2010

MI (Municipal Infrastructures), ENV (Environmental Aspect)

Approved 22.04.2009 22.04.2009 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 18.12.2008 18.12.2008 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 01.01.2009 01.01.2009 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 03.06.2008 03.06.2008 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 01.01.2009 01.01.2009 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 01.01.2008 01.01.2008 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 25.01.2008 25.01.2008 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 01.06.2001 01.06.2001 false SME (Support to SME)

Approved 11.12.2006 11.12.2006 false SME (Support to SME)

Approved 29.12.2008 29.12.2008 false EE (Energy Efficiency), SME (Support to SME)

Approved 29.12.2008 29.12.2008 false 31.12.2015

EE (Energy Efficiency), SME (Support to SME)

Approved 09.01.2007 09.01.2007 false MI (Municipal Infrastructures), IB (Institution Building)

Approved 01.10.2007 01.10.2007 false 30.09.2010

Approved 20.06.2007 20.06.2007 false 30.12.2010

Approved 01.04.2007 01.04.2007 false 15.10.2008

MI (Municipal Infrastructures)

Approved 16.03.2008 16.03.2008 false SEETO (South East European Transport Observatory)

Approved 10.07.2007 10.07.2007 false Environmental aspects: The proposed project has been screene

Approved 18.12.2008 18.12.2008 false SEETO (South East European Transport Observatory)

Approved 01.01.2008 01.01.2008 false

Approved 13.12.2007 13.12.2007 false 30.12.2011

Approved 30.12.2007 30.12.2007 false 30.03.2011

MI (Municipal Infrastructures)

Approved 01.12.2007 01.12.2007 false 31.12.2009

Approved 01.10.2007 01.10.2007 false 31.03.2010

MI (Municipal Infrastructures)

Approved 29.05.2008 29.05.2008 false 30.12.2012

ENV (Environmental Aspect), IB (Institution Building)

Approved 10.07.2007 10.07.2007 false (Priority Environmental Environmental due diligence needs to I

PEIP/RENA Environmental aspects:Investment Programme), MI (Municipalb

Approved 04.12.2007 04.12.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 18.08.2008 18.08.2008 true 30.09.2012

MI (Municipal Infrastructures)

Approved 22.09.2010 22.09.2010 true 30.12.2012

MI (Municipal Infrastructures)

Approved 23.11.2008 23.11.2008 false IB (Institution Building) 30.03.2014

Approved 19.06.2007 19.06.2007 false 30.12.2010

PEIP/RENA (Priority Environmental Investment Programme), IB (Institution B

Approved 31.07.2007 31.07.2007 false

Approved 17.12.2008 17.12.2008 false EE (Energy Efficiency)

Approved 08.11.2007 08.11.2007 false ENV (Environmental Aspect)

Approved 19.11.2008 19.11.2008 false ENV (Environmental Aspect), SME (Support to SME), EE (Energy Efficiency)

Approved 16.10.2007 16.10.2007 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 24.03.2009 24.03.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic

Approved 02.06.2008 02.06.2008 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 18.09.2009 18.09.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic

Approved 18.12.2008 18.12.2008 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic

Approved 26.06.2009 26.06.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic

Approved 07.12.2007 07.12.2007 false Preparation or timing: Start date: Q1 2010

30.12.2013

SEETO (South East European Transport Observatory)

Approved 07.12.2007 07.12.2007 false Preparation or timing: Start date: Q2 2009

30.06.2011

SEETO (South East European Transport Observatory)

Approved 07.12.2007 07.12.2007 false Preparation or timing: Start date: Q3 2010

30.09.2013

SEETO (South East European Transport Observatory)

Approved 07.12.2007 07.12.2007 false 31.03.2012

Approved 07.12.2007 07.12.2007 false Preparation or timing: Start date: Q2 2008

30.06.2010

SEETO (South East European Transport Observatory)

Approved 07.12.2007 07.12.2007 false 30.12.2010

SEETO (South East European Transport Observatory), MI (Municipal Infrast

Approved 06.05.2009 06.05.2009 false Environmental aspects: Use of proceeds is not associated with a

Approved 07.09.2007 07.09.2007 false

Approved 07.09.2007 07.09.2007 false

Approved 11.12.2008 11.12.2008 false 30.09.2014

MI (Municipal Infrastructures)

Approved 30.05.2007 30.05.2007 false 30.12.2010

Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2011

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.09.2011

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2010

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2009

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false (Priority Environmental Investment Programme), MI (Municipal I

PEIP/RENA Preparation or timing: The Norwegian MoFA technical assistanc

Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2009

MI (Municipal Infrastructures)

Approved 29.11.2007 29.11.2007 false 30.12.2010

MI (Municipal Infrastructures)

Approved 29.11.2007 29.11.2007 false 30.12.2010

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2012

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2012

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2012

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2011

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2012

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2011

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2011

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2012

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 30.12.2013

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.11.2007 29.11.2007 false 31.12.2013

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 30.06.2009 30.06.2009 false (Priority Environmental The environmental due diligence is bein

PEIP/RENA Environmental aspects:Investment Programme), MI (Municipal I

Approved 16.12.2008 16.12.2008 false MI (Municipal Infrastructures)

Approved 11.12.2008 11.12.2008 false MI (Municipal Infrastructures)

Approved 30.05.2007 30.05.2007 false 30.12.2012

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 06.11.2007 06.11.2007 false MI (Municipal Infrastructures)

Approved 01.01.2008 01.01.2008 false Environmental aspects: This project will promote environmental

ENV (Environmental Aspect)31.12.2012

Approved 01.01.2007 01.01.2007 false Environmental aspects: The Energy Community Treaty includes

ENV (Environmental Aspect)

Approved 01.01.2009 01.01.2009 false Environmental aspects: Environmental impact assessment will b

ENV (Environmental Aspect) 31.12.2013

Approved 01.01.2007 01.01.2007 false Environmental aspects: The proposed clean-up component i s a

ENV (Environmental Aspect)31.12.2010

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect) 31.12.2009

Approved 04.07.2006 04.07.2006 false ENV (Environmental Aspect)31.12.2011

Approved 01.01.2008 01.01.2008 false Environmental aspects: The Project?s Aspect)

31.12.2012

MI (Municipal Infrastructures), ENV (Environmental infrastructure component

Approved 16.12.2008 16.12.2008 false Environmental aspects: Energy efficiency investments shall lead

ENV (Environmental Aspect)31.12.2012

Approved 01.01.2008 01.01.2008 false Environmental aspects: The project will promote and advance re

ENV (Environmental Aspect)30.06.2012

Approved 01.01.2007 01.01.2007 false Environmental aspects: This project will foster the sustainable d

ENV (Environmental Aspect)31.12.2010

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)31.12.2010

Approved 01.01.2008 01.01.2008 false Environmental aspects: With regard to environment, this is one

ENV (Environmental Aspect)31.12.2015

Approved 01.01.2009 01.01.2009 false Environmental aspects: Beautiful Kosovo will be instrumental in

ENV (Environmental Aspect)31.12.2012

Approved 01.01.2008 01.01.2008 false Environmental aspects: The Project implementation should cont

ENV (Environmental Aspect)30.06.2012

Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect)31.12.2011

Approved 01.01.2007 01.01.2007 false Environmental aspects: The Project?s infrastructure component

ENV (Environmental Aspect)31.12.2011

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

Approved 13.12.2007 13.12.2007 false Environmental aspects: The construction proposed under this P

30.06.2012

ENV (Environmental Aspect)

Approved 01.02.2007 01.02.2007 false Environmental aspects: Activities under the Project are not expe

31.12.2010

ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false Environmental aspects: This activity relates to replacement/refur

31.12.2010

ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false Environmental aspects: The new and upgraded legislation on Ci

ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false Environmental aspects: The Project?s infrastructure component

30.06.2012

ENV (Environmental Aspect)

Approved 01.01.2009 01.01.2009 false Environmental aspects: Results of all projects will impact the en

31.12.2012

ENV (Environmental Aspect)

Approved 06.11.2008 06.11.2008 false Environmental aspects: By reducing technical and administrative

31.12.2013

ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false Environmental aspects: The support to the institutions will includ

ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2007 01.01.2007 false Environmental aspects: The project involves the provision of fun

ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false MI (Municipal Infrastructures) 31.12.2008

Approved 01.01.2007 01.01.2007 false Environmental aspects: The present project will

31.12.2012

MI (Municipal Infrastructures), ENV (Environmental Aspect) support the imp

Approved 01.01.2009 01.01.2009 false Environmental aspects: Final beneficiaries will be requested to c

Approved 01.01.2009 01.01.2009 false Environmental aspects: The interventions envisaged under the p

31.12.2015

MI (Municipal Infrastructures), ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false 31.12.2009

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false 31.12.2010

ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false Environmental aspects: The European Community has a longsta

ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false 31.12.2010

ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false Preparation or timing: At this stage it is not possible to identify th

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false Environmental aspects: The training activities will include a spec

31.12.2010

ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false Environmental aspects: The support will include a specific comp

31.12.2010

ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false Environmental aspects: The training activities will include a spec

ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false 31.03.2012

ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2009 01.01.2009 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false 11.01.2011

Approved 01.01.2008 01.01.2008 false 31.12.2013

ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

09.12.2010

Under implementation 18.09.2007 false ENV (Environmental Aspect)

01.01.2009

Under implementation 01.01.2009 false Environmental aspects: Borrowers expects no direct environmen

31.12.2012

ENV (Environmental Aspect)

Approved 16.06.2009 16.06.2009 false 31.03.2014

ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false 31.12.2011

SEETO (South East European Transport Observatory), ENV (Environmental

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)

Approved 19.02.2009 19.02.2009 false ENV (Environmental Aspect)

Approved 01.01.2009 01.01.2009 false Environmental aspects: The project will consist mainly of road re

ENV (Environmental Aspect)

Approved 13.05.2008 13.05.2008 false The project will consist mainly of road rehabilitation and potentia

31.03.2013

ENV (Environmental Aspect)

Approved 29.05.2007 29.05.2007 false 31.12.2011

Environmental aspects: Considering the proposed types of inter

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false (Priority Environmental The project is directly related (Environm

31.12.2012

PEIP/RENA Environmental aspects:Investment Programme), ENVand contri

Approved 01.01.2007 01.01.2007 false (Priority Environmental The project is directly related (Environm

PEIP/RENA Environmental aspects:Investment Programme), ENVand contri

Approved 01.01.2008 01.01.2008 false Environmental aspects: The project is directly related and contri

31.12.2012

ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false

Approved 16.10.2008 16.10.2008 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2007 01.01.2007 false

Appraisal 01.01.2009 01.01.2009 false Environmental aspects: The project will generally benefit the env

ENV (Environmental Aspect)

Approved 01.04.2011 01.04.2011 false Environmental aspects: The investment promotes the conversio

31.12.2015

ENV (Environmental Aspect)

Approved 04.04.2007 04.04.2007 false 31.12.2012

ENV (Environmental Aspect)

Approved 04.12.2009 04.12.2009 false Environmental aspects: The reduction of water losses contribute

31.12.2013

ENV (Environmental Aspect)

Approved 28.12.2007 28.12.2007 false ENV (Environmental Aspect)

Approved 06.07.2007 06.07.2007 false 31.12.2011

ECT (Support to Energy Community Treaty), ENV (Environmental Aspect)

Approved 09.12.2008 09.12.2008 false 30.12.2012

ENV (Environmental Aspect)

Approved 01.01.2008 01.01.2008 false ENV (Environmental Aspect), EE (Energy Efficiency), SME (Support to SME)

Approved 24.07.2009 24.07.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), SME (Support to SME)

Approved 04.01.2007 04.01.2007 false

Approved 10.11.2008 10.11.2008 false SME (Support to SME) 31.12.2015

Approved 19.09.2008 19.09.2008 false SME (Support to SME) 31.12.2015

Approved 15.12.2008 15.12.2008 false SME (Support to SME) 31.12.2015

Approved 10.11.2008 10.11.2008 false 31.12.2015

ENV (Environmental Aspect), SME (Support to SME)

Approved 14.11.2007 14.11.2007 false IB (Institution Building) 30.09.2010

Approved 23.10.2007 23.10.2007 false SEETO (South East European Transport Observatory)

Approved 30.09.2008 30.09.2008 false

Approved 30.12.2008 30.12.2008 false 30.03.2011

PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 23.10.2007 23.10.2007 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 16.06.2009 16.06.2009 false PEIP/RENA (Priority Environmental Investment Programme), MI (Municipal I

Approved 29.12.2009 29.12.2009 false 31.12.2014

MI (Municipal Infrastructures)

Approved 12.06.2007 12.06.2007 false IB (Institution Building) 30.09.2011

Approved 10.07.2008 10.07.2008 false ENV (Environmental Aspect)

Approved 11.12.2008 11.12.2008 false

Approved 11.12.2008 11.12.2008 false

Approved 01.01.2007 01.01.2007 false Environmental aspects: The financial intermediaries will be requ

MI (Municipal Infrastructures)

30.05.2009

Under implementation 12.06.2009 false ENV (Environmental Aspect)31.12.2015

Approved 22.03.2011 18.02.2010 false

Approved 12.06.2009 12.06.2009 false

Approved 02.01.2008 02.01.2008 false ENV (Environmental Aspect)31.12.2012

Approved 20.06.2007 20.06.2007 false 30.06.2010

MI (Municipal Infrastructures)

Approved 30.12.2008 30.12.2008 false 30.12.2014

MI (Municipal Infrastructures)

09.05.2011

Under implementation 19.09.2007 false 31.12.2011

MI (Municipal Infrastructures)

Approved 12.03.2009 12.03.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), SME (Support to SME)

Approved 28.08.2009 28.08.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic

Approved 12.06.2009 12.06.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), SME (Support to SME)

Approved 11.12.2008 11.12.2008 false ENV (Environmental Aspect), EE (Energy Efficiency), SME (Support to SME)

Approved 16.06.2009 16.06.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic

Approved 12.12.2008 12.12.2008 false MI (Municipal Infrastructures)

Approved 28.08.2009 28.08.2009 false MI (Municipal Infrastructures), ENV (Environmental Aspect), EE (Energy Effic

Approved 26.05.2009 26.05.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), MI (Municipal Infrastru

Approved 26.06.2009 26.06.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), MI (Municipal Infrastru

Approved 10.06.2009 10.06.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), MI (Municipal Infrastru

Approved 28.11.2008 28.11.2008 false 31.12.2013

ENV (Environmental Aspect), SME (Support to SME)

Approved 23.03.2007 23.03.2007 false 31.12.2012

Approved 19.12.2008 19.12.2008 false 31.12.2012

ENV (Environmental Aspect), SME (Support to SME)

Approved 19.12.2008 19.12.2008 false 31.12.2015

ENV (Environmental Aspect), SME (Support to SME)

Approved 19.12.2008 19.12.2008 false 31.12.2015

ENV (Environmental Aspect), SME (Support to SME)

Approved 08.07.2008 08.07.2008 false SME (Support to SME) 31.12.2022

Approved 18.03.2008 18.03.2008 false 30.12.2012

MI (Municipal Infrastructures)

Approved 01.01.2007 01.01.2007 false MI (Municipal Infrastructures)

Approved 30.12.2007 30.12.2007 false 30.12.2011

Approved 30.12.2007 30.12.2007 false 30.12.2010

Approved 30.12.2007 30.12.2007 false 30.12.2010

Approved 01.01.2008 01.01.2008 false 31.12.2013

Approved 17.10.2008 17.10.2008 false ENV (Environmental Aspect), IB (Institution Building), MI (Municipal Infrastru

Approved 01.01.2007 01.01.2007 false MI (Municipal Infrastructures)

10.05.2011

Under implementation 19.09.2007 false 31.12.2011

Approved 19.03.2009 19.03.2009 false 30.12.2011

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)30.12.2010

Approved 01.01.2008 01.01.2008 false 30.12.2012

Approved 01.01.2007 01.01.2007 false 30.12.2012

SEETO (South East European Transport Observatory)

Approved 01.01.2008 01.01.2008 false 31.12.2013

Approved 01.01.2008 01.01.2008 false 31.12.2013

Approved 09.10.2007 09.10.2007 false SEETO (South East European Transport Observatory)

Approved 29.07.2009 29.07.2009 false

Approved 06.05.2009 06.05.2009 false

Approved 19.10.2007 19.10.2007 false

Approved 16.07.2007 16.07.2007 false

Approved 09.06.2009 09.06.2009 false 30.09.2015

SEETO (South East European Transport Observatory)

Approved 20.06.2007 20.06.2007 false 30.06.2011

Approved 01.01.2007 01.01.2007 false 30.12.2011

ECT (Support to Energy Community Treaty)

Approved 01.01.2008 01.01.2008 false 30.12.2012

PEIP/RENA (Priority Environmental Investment Programme)

Approved 23.10.2007 23.10.2007 false MI (Municipal Infrastructures)

Approved 18.05.2007 18.05.2007 false MI (Municipal Infrastructures)

Approved 20.07.2007 20.07.2007 false 30.09.2012

Approved 20.06.2007 20.06.2007 false

Approved 05.06.2009 05.06.2009 false 30.09.2010

MI (Municipal Infrastructures)

Approved 05.06.2009 05.06.2009 false IB (Institution Building) 30.06.2012

Approved 09.10.2008 09.10.2008 false 30.09.2012

SEETO (South East European Transport Observatory)

Approved 15.10.2010 15.10.2010 false MI (Municipal Infrastructures)

Approved 15.10.2010 15.10.2010 false

Approved 15.10.2010 15.10.2010 false

Approved 15.10.2010 15.10.2010 false

Approved 15.10.2010 15.10.2010 false

Approved 15.10.2010 15.10.2010 false ECT (Support to Energy Community Treaty), ENV (Environmental Aspect), M

Approved 15.10.2010 15.10.2010 false 30.12.2013

This project will be delivered through one works contract finance

Approved 15.10.2010 15.10.2010 false 30.12.2013

Approved 20.06.2010 20.06.2010 false

Completed 01.02.2006 01.02.2006 false 17.12.2009

MI (Municipal Infrastructures)

Approved 29.05.2008 23.05.2008 false ENV (Environmental Aspect)30.12.2013

Approved 20.06.2010 20.06.2010 false SME (Support to SME)

Approved 10.11.2010 10.11.2010 false

Approved 29.07.2009 29.07.2009 false SME (Support to SME)

Approved 22.06.2010 22.06.2010 false

Approved 01.09.2010 01.09.2010 false

Approved 20.06.2010 20.06.2010 false 31.03.2014

Approved 30.09.2009 30.09.2009 false SME (Support to SME)

Approved 29.09.2010 29.09.2010 false MI (Municipal Infrastructures)

Approved 01.01.2007 01.01.2007 false ENV (Environmental Aspect)

Approved 01.01.2010 01.01.2010 false

Approved 19.02.2008 19.02.2008 false MI (Municipal Infrastructures)

Approved 21.04.2009 21.04.2009 false SME (Support to SME)

Approved 06.05.2009 06.05.2009 false SME (Support to SME)

Appraisal 26.09.2009 26.09.2009 false 31.12.2014

Approved 09.07.2010 09.07.2010 false Part of EFSE

SME (Support to SME)

Approved 08.04.2010 08.04.2010 false

Approved 15.12.2009 15.12.2009 false SME (Support to SME)

Approved 04.08.2009 04.08.2009 false SME (Support to SME) 13.08.2013

Approved 17.11.2009 17.11.2009 false

Approved 08.01.2010 08.01.2010 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 23.10.2009 23.10.2009 false SME (Support to SME)

Approved 20.06.2010 20.06.2010 false EE (Energy Efficiency)

Approved 17.10.2008 17.10.2008 false From IPA 2008

ENV (Environmental Aspect)

Approved 19.10.2007 19.10.2007 false ENV (Environmental Aspect)

Approved 17.10.2008 17.10.2008 false ENV (Environmental Aspect)

Approved 17.10.2008 17.10.2008 false ENV (Environmental Aspect)

Approved 17.10.2008 17.10.2008 false From IPA 2008

ENV (Environmental Aspect)

Approved 17.10.2008 17.10.2008 false ENV (Environmental Aspect)

Approved 05.03.2009 05.03.2009 false ENV (Environmental Aspect)

Approved 03.02.2009 03.02.2009 false ENV (Environmental Aspect)

Approved 09.12.2009 09.12.2009 false MI (Municipal Infrastructures)

Approved 24.06.2009 24.06.2009 false ENV (Environmental Aspect)

Approved 24.06.2009 24.06.2009 false SME (Support to SME)

Approved 26.10.2009 26.10.2009 false SME (Support to SME) 31.12.2015

Approved 24.06.2009 24.06.2009 false 31.12.2015

ENV (Environmental Aspect), SME (Support to SME)

Approved 26.10.2009 26.10.2009 false 31.12.2015

ENV (Environmental Aspect), SME (Support to SME)

Approved 07.12.2009 07.12.2009 false

Approved 29.12.2009 29.12.2009 false

Approved 04.01.2010 04.01.2010 false 31.12.2014

EE (Energy Efficiency), MI (Municipal Infrastructures)

Approved 04.01.2010 04.01.2010 false 31.12.2013

ECT (Support to Energy Community Treaty), MI (Municipal Infrastructures)

Approved 28.12.2009 28.12.2009 false ENV (Environmental Aspect)31.12.2013

Approved 07.09.2010 07.09.2010 false ENV (Environmental Aspect)

Approved 07.09.2010 07.09.2010 false 31.12.2014

MI (Municipal Infrastructures), ENV (Environmental Aspect)

30.04.2009

Under implementation 30.04.2009 true KfW Loan Agreemnt publicly announced for Bogdanci phase 1 (

ENV (Environmental Aspect)30.12.2010

Completed 30.01.2009 30.01.2009 true 30.12.2010

30.09.2009

Under implementation 30.09.2009 true 30.06.2011

30.09.2009

Under implementation 30.09.2009 true ENV (Environmental Aspect)30.12.2010

Approved 30.06.2010 30.06.2010 true ENV (Environmental Aspect)

Approved 30.01.2011 30.01.2011 true 30.12.2011

Approved 30.11.2008 30.11.2008 true MI (Municipal Infrastructures)

Completed 30.07.2009 30.07.2009 true 28.02.2010

MI (Municipal Infrastructures)

Approved 28.02.2010 28.02.2010 true 30.12.2010

MI (Municipal Infrastructures)

Appraisal 28.02.2011 28.02.2011 true 30.07.2012

30.01.2011

Preparation phase 30.01.2011 true 30.03.2012

MI (Municipal Infrastructures)

Put on hold 08.12.2009 08.12.2009 true 30.09.2011

MI (Municipal Infrastructures)

15.10.2010

Under implementation 15.10.2010 true 28.02.2011

MI (Municipal Infrastructures)

Approved 30.11.2010 30.11.2010 true 30.12.2010

MI (Municipal Infrastructures)

Approved 30.11.2010 30.11.2010 true 30.12.2010

MI (Municipal Infrastructures)

Approved 30.11.2010 30.11.2010 true 30.12.2010

MI (Municipal Infrastructures)

30.08.2008

Under implementation 30.08.2008 true 30.08.2011

Approved 30.10.2010 30.10.2010 true 30.05.2012

MI (Municipal Infrastructures)

30.11.2009

Under implementation 30.11.2009 true IB (Institution Building) 28.02.2011

Approved 30.09.2009 30.09.2009 true 30.12.2012

MI (Municipal Infrastructures)

Approved 30.01.2011 30.01.2011 true 30.12.2012

Approved 30.06.2010 30.06.2010 true 30.12.2010

Approved 30.03.2010 30.03.2010 true 30.12.2012

01.01.2010

Preparation phase 01.01.2010 true 30.12.2010

Approved 30.06.2010 30.06.2010 true 30.11.2010

Approved 28.02.2011 28.02.2011 true 30.10.2011

Approved 30.12.2009 30.12.2009 true 30.12.2012

Approved 30.10.2009 30.10.2009 true 30.05.2011

MI (Municipal Infrastructures)

30.11.2009

Under implementation 30.11.2009 true 30.12.2010

Approved 30.04.2010 30.04.2010 true 30.10.2010

30.09.2009

Under implementation 30.09.2009 true 30.04.2011

Appraisal 10.05.2011 10.05.2011 true ENV (Environmental Aspect)

Appraisal 30.12.2010 30.12.2010 true 30.12.2012

MI (Municipal Infrastructures)

30.12.2009

Under implementation 30.12.2009 true 30.12.2012

30.12.2009

Under implementation 30.12.2009 true 30.12.2014

30.12.2010

Under implementation 31.12.2010 true 30.12.2013

Completed 30.01.2010 30.01.2010 true 30.12.2010

Appraisal 28.02.2011 28.02.2011 true 30.10.2011

Completed 30.07.2010 30.07.2010 true 30.12.2010

Approved 30.09.2009 30.09.2009 true 30.12.2010

MI (Municipal Infrastructures)

Completed 30.03.2010 30.03.2010 true 30.12.2010

Completed 30.04.2010 30.04.2010 true 30.11.2010

Appraisal 20.03.2009 20.03.2009 true 30.08.2012

Appraisal 28.02.2011 28.02.2011 true 30.11.2011

Appraisal 30.01.2011 30.01.2011 true 30.08.2011

30.11.2009

Under implementation 30.11.2009 true 30.11.2011

IB (Institution Building), MI (Municipal Infrastructures)

Completed 30.03.2010 30.03.2010 true 30.12.2012

IB (Institution Building), MI (Municipal Infrastructures)

30.08.2009

Preparation phase 30.08.2009 true 30.12.2010

30.08.2009

Preparation phase 30.08.2009 true 30.12.2010

30.08.2009

Preparation phase 30.08.2009 true 30.12.2010

Approved 30.12.2010 30.12.2010 true 30.12.2010

MI (Municipal Infrastructures)

30.11.2009

Under implementation 30.11.2009 true 30.12.2010

30.11.2009

Preparation phase 30.11.2009 true 30.12.2010

MI (Municipal Infrastructures)

Approved 30.12.2010 30.12.2010 false 30.09.2012

MI (Municipal Infrastructures), SME (Support to SME)

Approved 30.12.2010 30.12.2010 false 30.06.2011

MI (Municipal Infrastructures)

Approved 30.10.2007 30.12.2007 false IB (Institution Building) 30.09.2010

Approved 30.06.2007 30.06.2007 false ENV (Environmental Aspect) 30.06.2012

Approved 31.03.2010 31.03.2010 false ENV (Environmental Aspect) 31.12.2011

Approved 31.12.2009 31.12.2009 false ENV (Environmental Aspect) 30.09.2012

Approved 01.01.2011 01.01.2011 false 31.03.2014

Completed 30.09.2008 30.09.2008 false 30.09.2008 31.03.2010

Approved 30.09.2009 30.09.2009 false 30.09.2010

Approved 31.12.2010 31.12.2010 false 31.12.2014

Approved 30.06.2010 30.06.2010 false 30.09.2012

Approved 01.04.2011 01.04.2011 false 30.09.2014

Approved 31.03.2011 31.03.2011 false 31.12.2014

Approved 31.03.2011 31.03.2011 false IB (Institution Building), SME (Support to SME)

Approved 31.03.2008 31.03.2008 false IB (Institution Building) 30.04.2011

Approved 31.03.2009 31.03.2009 false IB (Institution Building) 31.03.2012

Approved 01.04.2011 01.04.2011 false IB (Institution Building) 31.03.2012

Approved 31.12.2010 31.12.2010 false IB (Institution Building) 30.06.2012

Approved 31.03.2010 31.03.2010 false 31.12.2014

IB (Institution Building), MI (Municipal Infrastructures)

Approved 01.04.2011 01.04.2011 false IB (Institution Building) 31.12.2014

Completed 31.03.2008 31.03.2008 false to SME)

IB (Institution Building), SME (Support31.03.2011

Completed 31.03.2008 31.03.2008 false IB (Institution Building) 31.03.2011

Completed 30.06.2008 30.06.2008 false IB (Institution Building) 31.12.2010

Approved 31.03.2010 31.03.2010 false IB (Institution Building) 31.03.2012

Approved 31.03.2010 31.03.2010 false IB (Institution Building) 31.12.2011

Approved 31.03.2009 31.03.2009 false IB (Institution Building) 30.06.2011

Approved 30.06.2009 30.06.2009 false 30.09.2012

IB (Institution Building), SME (Support to SME)

Approved 31.03.2010 31.03.2010 false IB (Institution Building) 31.12.2011

Completed 30.06.2009 30.06.2009 false 30.06.2010

Approved 31.12.2010 31.12.2010 false IB (Institution Building) 31.12.2012

Completed 31.03.2008 31.03.2008 false

Approved 30.06.2010 30.06.2010 false 30.06.2012

Approved 30.09.2008 30.09.2008 false 30.11.2012

Completed 30.09.2007 30.09.2007 false

Completed 31.12.2007 31.12.2007 false

Approved 31.12.2009 31.12.2009 false 30.09.2012

Approved 31.03.2010 31.03.2010 false 31.12.2012

Completed 01.12.2007 01.12.2007 false

Approved 31.12.2008 31.12.2008 false 31.12.2010

ENV (Environmental Aspect)

Approved 31.12.2008 31.12.2008 false 31.12.2010

Completed 31.12.2007 31.12.2007 false ENV (Environmental Aspect)

Approved 30.06.2009 30.06.2009 false 31.12.2010

Approved 31.12.2009 31.12.2009 false 31.12.2012

Completed 30.06.2008 30.06.2008 false

Approved 01.09.2008 01.09.2008 false 30.06.2010

Approved 31.03.2009 31.03.2009 false 31.12.2012

Approved 30.06.2009 30.06.2009 false 31.12.2011

Approved 31.12.2009 31.12.2009 false 30.09.2012

Approved 31.03.2010 31.03.2010 false 31.12.2013

Approved 01.09.2009 01.09.2009 false 31.10.2011

Approved 28.02.2010 28.02.2010 false 30.09.2012

Approved 30.06.2010 30.06.2010 false 30.09.2013

Approved 30.06.2010 30.06.2010 false 30.09.2013

Approved 01.09.2010 01.09.2010 false 30.10.2012

Approved 30.06.2010 30.06.2010 false 31.12.2010

Approved 30.06.2009 30.06.2009 false 31.12.2011

Approved 30.06.2009 30.06.2009 false 30.09.2011

Approved 31.12.2009 31.12.2009 false 31.12.2012

Approved 30.09.2010 30.09.2010 false 31.03.2013

Approved 30.09.2010 30.09.2010 false 30.06.2013

Completed 30.09.2010 30.09.2010 false

Approved 30.11.2009 30.11.2009 false 30.11.2015

Approved 31.10.2009 31.10.2009 false 31.12.2012

Approved 05.05.2011 05.05.2011 false

Approved 20.12.2010 20.12.2010 false MI (Municipal Infrastructures)

Approved 19.02.2007 19.02.2007 false MI (Municipal Infrastructures), SME (Support to SME)

Approved 19.12.2009 19.12.2009 false ENV (Environmental Aspect), EE (Energy Efficiency), MI (Municipal Infrastru

Approved 04.03.2010 04.03.2010 false

Approved 15.04.2010 15.04.2010 false ENV (Environmental Aspect), EE (Energy Efficiency), MI (Municipal Infrastru

Approved 30.09.2010 30.09.2010 false

Approved 19.04.2011 19.04.2011 false

Approved 02.05.2011 02.05.2011 false EE (Energy Efficiency), ENV (Environmental Aspect), MI (Municipal Infrastru

Approved 16.05.2011 16.05.2011 false EE (Energy Efficiency), ENV (Environmental Aspect), MI (Municipal Infrastru

Completed 11.11.2010 30.09.2009 true MI (Municipal Infrastructures) 11.11.2010

01.01.2010

Under implementation 01.01.2010 false 30.12.2013

MI (Municipal Infrastructures), SME (Support to SME)

01.01.2009

Under implementation 01.01.2009 false 30.12.2013

01.01.2010

Under implementation 01.01.2010 false 30.12.2011

01.12.2009

Under implementation 01.12.2009 false 31.12.2011

EE (Energy Efficiency), SME (Support to SME)

Approved 26.08.2010 26.08.2010 false

Approved 26.08.2010 26.08.2010 false IB (Institution Building)

Approved 17.08.2010 17.08.2010 false MI (Municipal Infrastructures)

Completed 30.11.2008 30.11.2008 false 30.09.2010

MI (Municipal Infrastructures)

Completed 30.03.2010 30.03.2010 false 30.09.2010

MI (Municipal Infrastructures)

Approved 30.03.2010 30.03.2010 false 30.09.2010

MI (Municipal Infrastructures)

Completed 30.03.2009 30.03.2009 false 30.11.2010

MI (Municipal Infrastructures)

Completed 30.03.2009 30.09.2009 false 30.05.2009

Completed 30.03.2009 30.03.2009 false 30.11.2009

MI (Municipal Infrastructures)

Completed 30.05.2007 30.05.2007 false 30.06.2010

MI (Municipal Infrastructures)

Completed 30.01.2009 30.01.2009 false 30.05.2009

MI (Municipal Infrastructures)

Completed 30.05.2009 30.05.2009 false 30.11.2009

MI (Municipal Infrastructures)

Completed 30.06.2011 30.06.2010 false 30.08.2010

MI (Municipal Infrastructures)

Completed 30.08.2010 30.08.2010 false 30.08.2010

Completed 30.10.2009 30.10.2009 false 30.04.2010

MI (Municipal Infrastructures)

Completed 30.06.2010 30.06.2010 false 30.08.2010

MI (Municipal Infrastructures)

30.06.2010

Under implementation 30.06.2010 false 30.11.2010

MI (Municipal Infrastructures)

Completed 30.07.2009 30.07.2009 false 30.06.2010

MI (Municipal Infrastructures)

30.09.2009

Under implementation 30.09.2009 false 30.12.2009

MI (Municipal Infrastructures)

Completed 30.06.2009 30.06.2009 false 30.05.2010

MI (Municipal Infrastructures)

Approved 30.11.2006 30.11.2006 false

Approved 24.06.2011 24.06.2011 true 30.12.2011

MI (Municipal Infrastructures)

Approved 05.06.2008 05.06.2008 false 30.12.2011

MI (Municipal Infrastructures)

Approved 01.10.2010 01.10.2010 false 31.12.2012

Approved 01.01.2009 01.01.2009 false

Approved 01.08.2011 01.08.2011 false

Completed 01.01.2009 01.01.2009 false 31.12.2009 31.12.2009

Approved 01.01.2011 01.01.2011 false 31.12.2011

Completed 01.01.2010 01.01.2010 false 30.11.2010 30.11.2010

Approved 31.12.2010 31.12.2010 false 31.12.2011

Approved 01.09.2008 01.09.2008 false 31.12.2011

Approved 01.09.2008 01.09.2008 false 31.12.2012

Completed 01.01.2008 01.01.2008 false 31.07.2010

Completed 30.09.2008 30.09.2008 false 28.02.2011

Completed 01.07.2009 01.07.2009 false 28.02.2011

Approved 31.12.2009 31.12.2009 false

Completed 31.10.2007 31.10.2007 false 31.10.2010

Approved 01.01.2011 01.01.2011 false IB (Institution Building) 31.12.2014

Approved 01.01.2010 01.01.2010 false IB (Institution Building) 31.12.2011

Completed 01.05.2010 01.05.2010 false IB (Institution Building) 28.02.2011

Approved 01.03.2011 01.03.2011 false IB (Institution Building) 28.04.2014

Approved 01.05.2009 01.05.2009 false IB (Institution Building) 30.06.2012

Approved 01.01.2009 01.01.2009 false IB (Institution Building) 31.12.2011

Approved 01.01.2011 01.01.2011 false IB (Institution Building) 31.12.2013

Approved 01.01.2009 01.01.2009 false IB (Institution Building) 31.12.2011

Approved 01.01.2009 01.01.2009 false 31.12.2011

IB (Institution Building), SME (Support to SME)

Approved 01.01.2008 01.01.2008 false 31.12.2011

IB (Institution Building), SME (Support to SME)

Approved 01.07.2009 01.07.2009 false IB (Institution Building) 30.06.2014

Approved 01.09.2009 01.09.2009 false 31.12.2011

IB (Institution Building), SME (Support to SME)

Approved 01.01.2008 01.01.2008 false 31.12.2012

Approved 01.01.2011 01.01.2011 false 31.12.2014

Approved 01.01.2007 01.01.2007 false EE (Energy Efficiency) 31.12.2014

Approved 28.02.2008 28.02.2008 false 30.12.2011

MI (Municipal Infrastructures), SME (Support to SME)

Approved 01.01.2010 01.01.2010 false 31.12.2013

ECT (Support to Energy Community Treaty)

Approved 01.08.2010 01.08.2010 false IB (Institution Building) 31.12.2011

Approved 01.01.2008 01.01.2008 false IB (Institution Building) 31.12.2011

Appraisal 01.01.2011 01.01.2011 false 31.12.2015

IB (Institution Building), MI (Municipal Infrastructures)

Approved 01.01.2005 01.01.2005 false 31.12.2011

Approved 01.01.1999 01.01.1999 false

01.01.2006

Under implementation 01.01.2006 false 31.12.2011

01.01.2006

Under implementation 01.01.2006 false 01.01.2011

01.01.2006

Under implementation 01.01.2006 false 31.12.2013

01.01.2003

Under implementation 01.01.2003 false 31.12.2011

01.01.2011

Under implementation 01.01.2011 false 31.12.2013

01.01.2008

Under implementation 01.01.2008 false 31.12.2011

01.01.2010

Under implementation 01.01.2010 false 31.12.2013

01.01.2010

Under implementation 01.01.2010 false 31.12.2012

01.01.2010

Under implementation 01.01.2010 false 31.12.2011

Completed 01.01.2004 01.01.2004 false 31.12.2009

01.01.2008

Under implementation 01.01.2008 false 31.12.2011

01.01.2009

Under implementation 01.01.2009 false 31.12.2012

Completed 01.01.2007 01.01.2007 false 01.01.2010 01.01.2010

Completed 01.01.2009 01.01.2009 false 31.12.2010

Completed 01.01.2008 01.01.2008 false 31.12.2009

Completed 01.01.2007 01.01.2007 false MI (Municipal Infrastructures) 31.12.2009

Completed 01.01.2009 01.01.2009 false 31.12.2010

Completed 01.01.2010 01.01.2010 false 01.01.2010

Completed 01.01.2010 01.01.2010 false 31.12.2010

Completed 01.01.2008 01.01.2008 false 31.12.2009

Completed 01.01.2009 01.01.2009 false 31.12.2010

IB (Institution Building), MI (Municipal Infrastructures)

Completed 01.01.2010 01.01.2010 false IB (Institution Building) 31.12.2010

Approved 31.07.2008 31.07.2008 false 30.12.2011

Approved 31.07.2008 31.07.2008 false 30.12.2011

01.06.2011

Under implementation 01.01.2009 false 31.12.2011

SME (Support to SME), EE (Energy Efficiency)

Approved 01.07.2010 01.07.2010 false 31.12.2013

EE (Energy Efficiency), SME (Support to SME)

Approved 01.01.2007 01.01.2007 false 01.01.2013

EE (Energy Efficiency), MI (Municipal Infrastructures), SME (Support to SME

Approved 01.12.2009 01.12.2009 false EE (Energy Efficiency), ENV (Environmental Aspect), MI (Municipal Infrastru

Approved 01.01.2008 01.01.2008 false MI (Municipal Infrastructures)

Approved 01.01.2008 01.01.2008 false 01.01.2016

EE (Energy Efficiency), MI (Municipal Infrastructures), SME (Support to SME

Approved 01.01.2008 01.01.2008 false 01.01.2016

EE (Energy Efficiency), MI (Municipal Infrastructures), SME (Support to SME

Approved 03.01.1999 03.01.1999 false

Approved 16.06.1999 16.06.1999 false

Approved 27.06.2002 27.06.2002 false IB (Institution Building)

Approved 08.06.2004 08.06.2004 false MI (Municipal Infrastructures)

Approved 26.03.2003 26.03.2003 false

Approved 20.12.2005 20.12.2005 false IB (Institution Building)

Approved 28.04.2004 28.04.2004 false MI (Municipal Infrastructures)

Approved 23.07.2003 23.07.2003 false IB (Institution Building), MI (Municipal Infrastructures)

Approved 27.02.2004 27.02.2004 false IB (Institution Building)

Approved 06.08.2004 06.08.2004 false MI (Municipal Infrastructures)

Approved 30.07.2004 30.07.2004 false SME (Support to SME)

Approved 08.10.2004 08.10.2004 false MI (Municipal Infrastructures)

Approved 16.05.2005 16.05.2005 false IB (Institution Building)

Approved 22.11.2005 22.11.2005 false IB (Institution Building), MI (Municipal Infrastructures)

Approved 07.03.2006 07.03.2006 false

Approved 03.02.2008 03.02.2008 false ENV (Environmental Aspect), IB (Institution Building)

Approved 11.05.2007 11.05.2007 false IB (Institution Building)

Approved 22.11.2007 22.11.2007 false IB (Institution Building)

Approved 03.02.2008 03.02.2008 false

Approved 11.05.2007 11.05.2007 false IB (Institution Building)

Approved 28.02.2008 28.02.2008 false IB (Institution Building)

Approved 31.07.2008 31.07.2008 false IB (Institution Building)

Approved 21.12.2007 21.12.2007 false IB (Institution Building)

Approved 14.10.2008 14.10.2008 false

Approved 24.04.2008 24.04.2008 false IB (Institution Building)

Approved 10.03.2009 10.03.2009 false IB (Institution Building), SME (Support to SME)

Approved 10.03.2009 10.03.2009 false IB (Institution Building)

Approved 14.10.2008 14.10.2008 false IB (Institution Building)

Approved 09.12.2008 09.12.2008 false IB (Institution Building), SME (Support to SME)

Approved 15.03.2010 15.03.2010 false IB (Institution Building)

Approved 22.07.2008 22.07.2008 false IB (Institution Building)

Approved 31.07.2008 31.07.2008 false

Approved 10.03.2009 10.03.2009 false IB (Institution Building)

Approved 15.03.2010 15.03.2010 false IB (Institution Building), MI (Municipal Infrastructures)

Approved 10.03.2009 10.03.2009 false IB (Institution Building)

Approved 23.12.2009 23.12.2009 false IB (Institution Building)

Approved 17.06.2010 17.06.2010 false IB (Institution Building)

Approved 01.12.2003 01.12.2003 false

Approved 02.03.2011 02.03.2011 false

Approved 14.10.2008 14.10.2008 false

Approved 15.04.2009 15.04.2009 false

Approved 15.03.2003 15.03.2003 false

Approved 20.11.2009 20.11.2009 false

Approved 20.11.2009 20.11.2009 false

Approved 15.11.2007 15.11.2007 false

Approved 09.02.2008 09.02.2008 false

Approved 06.03.1998 06.03.1998 false

Approved 28.02.2008 28.02.2008 false

Approved 05.11.2007 05.11.2007 false

Approved 02.09.2008 02.09.2008 false

Approved 25.11.2003 25.11.2003 false

Approved 15.03.2011 15.10.2010 false EE (Energy Efficiency), IB (Institution Building)

Approved 20.07.2010 20.07.2010 false SME (Support to SME)

Approved 16.03.2010 06.07.2010 true

Approved 04.05.2011 08.11.2011 false

Approved 11.05.2011 12.07.2011 false

Approved 31.03.2008 31.03.2008 false

Approved 30.11.2010 30.11.2010 false 30.11.2013

Approved 30.11.2010 30.11.2010 false 30.11.2013

Approved 30.11.2010 30.11.2010 false 30.11.2013

Approved 21.08.2008 21.08.2008 false

Approved 15.12.2010 15.12.2010 false

Approved 27.08.2011 27.08.2011 false

Approved 25.10.2010 25.10.2010 false

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false IB (Institution Building)

Approved ######### 01.01.2007 false IB (Institution Building)

Approved 01.01.2007 01.01.2007 false

Approved 01.01.2007 01.01.2007 false IB (Institution Building)

Approved 01.01.2008 01.01.2008 false IB (Institution Building)

Approved 01.01.2008 01.01.2008 false IB (Institution Building)

Approved 01.01.2008 01.01.2008 false IB (Institution Building)

Approved 01.01.2008 01.01.2008 false

Approved 01.01.2009 01.01.2009 false

Approved 01.01.2009 01.01.2009 false IB (Institution Building), SME (Support to SME)

Approved 01.01.2009 01.01.2009 false

Approved 01.01.2009 01.01.2009 false IB (Institution Building)

Approved 01.01.2009 01.01.2009 false IB (Institution Building)

Approved 01.01.2009 01.01.2009 false

Approved 01.01.2009 01.01.2009 false

Approved 01.01.2010 01.01.2010 false IB (Institution Building)

Approved 01.10.2010 01.10.2010 true 31.12.2014

Approved 23.06.2011 23.06.2011 true

Approved 23.06.2011 23.06.2011 true

Approved 23.06.2011 23.06.2011 true

Approved 23.06.2011 23.06.2011 true

Approved 23.06.2011 23.06.2011 true

Completed 01.10.2010 01.10.2010 false 31.12.2011

Completed 01.08.2008 31.12.2010 false

Approved 01.01.2010 01.01.2010 false 31.12.2012

Completed 01.07.2009 01.07.2009 false 30.06.2011

Completed 01.08.2009 01.08.2009 false 31.12.2011

Completed 01.01.2010 01.01.2010 false 31.12.2011

Approved 31.12.2009 31.12.2009 false 28.02.2012

Approved 01.01.2007 01.01.2007 false 30.06.2012

Approved 01.01.2007 01.01.2007 false 31.12.2012

Completed 01.01.2007 01.01.2007 false 31.12.2011

Approved 01.07.2008 false 31.12.2012

Approved 31.12.2010 31.12.2010 false 30.11.2012

Approved 03.04.2006 03.04.2006 false Project components will be beneficial to the environment, either

MI (Municipal Infrastructures)

Approved 18.08.2008 18.08.2008 false

Approved 22.12.2009 22.12.2009 false EE (Energy Efficiency), MI (Municipal Infrastructures), SME (Support to SME

Approved 18.12.2009 18.12.2009 false EE (Energy Efficiency), ENV (Environmental Aspect), MI (Municipal Infrastru




A

ctive of the project is to safeguard the hydroelectric plants of
lbania and improve their operational efficiency, it is important to emphasize tha

Risk Guarantee does not cover any physical works, therefore this is an Environmental Category C project. No safeguards policies are trigger









iciary programme

rk in Albania is about 15,000 km.The network comprises 3,412 km of national, or primary, roads administered by theMinistry of Public Works









involves construction of a new 24.2 km road with 4-lanes from Levan to Vlore crossing the River Vjosa valley and along the edge of the Nart

ction of a new ferry terminal and rehabilitation of Quays 7 and 8 are anticipated to have limited environmental impacts, which can be readily

has been screened as B/1 requiring an environmental analysis and review of the environmental status and performance of the existing facilit

is located for the most part in an urban setting and has therefore limited impacts on the biological environment. It intersects, or comes close

services will take particular care to ensure that proper attention is given to all environmental concerns and appropriate mitigation measures

es of this project contribute significantly to the protection of Lake Shkodra and the water resources of the region. Both by separating the sew









ed project has been screened IEE, requiring a site visit to review the scope of the investment programme and establish whether the project le









tal due diligence needs to be carried out to identify current environmental conditions and to predict potential impacts of the construction of th

Programme), MI (Municipal Infrastructures)

SME), EE (Energy Efficiency), MI (Municipal Infrastructures)



tal Aspect), EE (Energy Efficiency), SME (Support to SME)



tal Aspect), EE (Energy Efficiency), SME (Support to SME)

tal Aspect), EE (Energy Efficiency), SME (Support to SME)

tal Aspect), EE (Energy Efficiency), SME (Support to SME)









eeds is not associated with a major expansion and/or modernisation of the existing Okoli gas storage facility. Moreover, potential significant a









Programme), MI (Municipal Infrastructures)







Programme), MI (Municipal Infrastructures)



Programme), MI (Municipal Infrastructures)

Programme), MI (Municipal Infrastructures)

an MoFA technical assistance project has been completed.

Programme), MI (Municipal Infrastructures)

Programme), MI (Municipal Infrastructures)









Programme), MI (Municipal Infrastructures)









mental due diligence is being carried out by Consultants as part of the feasibility study and project preparation. The due diligence comprises









Community Treaty includes the requirement that acquis on the Environment is complied with. Previous CARDS funded assistance has helpe

d upgraded legislation on Civil Aviation must take in consideration all the requirements of the Commission Regulation laying down implemen







to the institutions will include a specific component to assist the beneficiary to implement an ?internal environment assessment? to identify





involves the provision of funds for investments at an electricity distribution company. In line with the Bank?s Environmental Policy a corporat





ciaries will be requested to comply with applicable national and EU legislation, as appropriate.









an Community has a longstanding commitment to address environmental concerns in its assistance programmes (as part as a wider commi







t is not possible to identify the precise implementing schedule of the individual contracts. But clearly the intention is to have contracted the to







activities will include a specific component to train beneficiary staff in the different aspects of mainstreaming environment in programme and

will consist mainly of road rehabilitation and potential environmental impacts will be temporary and will cause only minor and localised negat









is directly related and contributes to environmental improvement.









will generally benefit the environment and public health, either by providing betterdrinking water to the population, improving the efficiency of









ncy), SME (Support to SME)

ncy), SME (Support to SME)

Programme), MI (Municipal Infrastructures)

Programme), MI (Municipal Infrastructures)









al intermediaries will be requested to ensure compliance of the sub-projects with relevant national and EU environmental laws, as appropriate









ncy), SME (Support to SME), MI (Municipal Infrastructures)

tal Aspect), EE (Energy Efficiency), SME (Support to SME)

ncy), SME (Support to SME), MI (Municipal Infrastructures)

ncy), SME (Support to SME), MI (Municipal Infrastructures)

tal Aspect), EE (Energy Efficiency), SME (Support to SME)



tal Aspect), EE (Energy Efficiency), SME (Support to SME)

ncy), MI (Municipal Infrastructures), SME (Support to SME)

ncy), MI (Municipal Infrastructures), SME (Support to SME)

ncy), MI (Municipal Infrastructures), SME (Support to SME)









ing), MI (Municipal Infrastructures)

V (Environmental Aspect), MI (Municipal Infrastructures)

ncy), MI (Municipal Infrastructures), SME (Support to SME)



ncy), MI (Municipal Infrastructures), SME (Support to SME)





ect), MI (Municipal Infrastructures), SME (Support to SME)

ect), MI (Municipal Infrastructures), SME (Support to SME)

ect), MI (Municipal Infrastructures), SME (Support to SME)

al to the environment, either by providing better drinking water to the population or by collecting and cleaning wastewaters before discharging



ures), SME (Support to SME)

ect), MI (Municipal Infrastructures), SME (Support to SME)

ncy, it is important to emphasize that the project would have overall long-term very positive impact on the environment. Its focus on improvin

ct. No safeguards policies are triggered.

stered by theMinistry of Public Works, Transport and Telecommunications (MPWTT) and directlymanaged by the General Roads Directorate









valley and along the edge of the Narta Lagoon. In accordance with EBRD Environmental Policy, the construction of a new road of four or mo

mental impacts, which can be readily identified and mitigated in an environmental analysis. The ferry terminal works present an upgrade of th

and performance of the existing facilities.An Environmental Analysis of the planned development programme has been undertaken to identify

onment. It intersects, or comes close to, the botanical and zoological park of Tirana and an artificial lake which is part of it. Fauna and flora in

and appropriate mitigation measures are implemented, in line with the Bank?s relevant guidelines, including issues relating to natureApprova

e region. Both by separating the sewerage from the drain water system in the city of Shkodra and some surrounding villages and by treating









e and establish whether the project level is ?A? according to EBRD Environmental Policy. Based on the review of the programme, the projec









ntial impacts of the construction of the wastewater collection system, and to assess the ability of the project to bring the facilities towards com

cility. Moreover, potential significant adverse environmental and social impacts are readily identified and addressed through mitigation measu









aration. The due diligence comprises of an environmental audit, which will identify measures that would be needed for the existing facilities to









CARDS funded assistance has helped to mitigate pollution from thermal power plants in Kosovo, and hence move towards compliance with

on Regulation laying down implementing rules for the airworthiness and environmental certification of aircraft and related products, parts and










T

nvironment assessment? to identify areas where it could improve its internal performance vis-à-vis environmental aspects.
he training activi





k?s Environmental Policy a corporate Environmental Audit of the Company and an Environmental Analysis of the proposed investment prog









grammes (as part as a wider commitment to sustainable development). Key references include art. 6 of the Treaty and also the Cardiff proc







intention is to have contracted the total amount before the contracting deadline. It is envisaged to deploy approximately 18 to 20







ming environment in programme and project development as well as monitoring, evaluation and implementation.

ause only minor and localised negative effects (dust, noise, sourcing and disposal of materials, etc.), which can be mitigated through well-es









opulation, improving the efficiency of the treatment and distributionfacilities, or by collecting and cleaning wastewater before discharging into

U environmental laws, as appropriate.Approval date: 27.07.2007Preparation or timing: Signature: 27/07/2007Currency: EURExchange rate:

ning wastewaters before discharging into receiving waters. The Bank’s services will take care to ensure that proper attention is given to all en

e environment. Its focus on improving hydrological analysis and monitoring and better water management will result in further positive enviro

ed by the General Roads Directorate (GRD), and about 12,000 km of secondaryand local roads. The secondary and local road network cons









struction of a new road of four or more lanes, where such new road would be 10 km or more in a continuous length is classified in environme

minal works present an upgrade of the existing ferry terminal facilities and consists entirely of on-shore works within the port. The constructio

mme has been undertaken to identify the potential impacts of the development and the mitigation measures to mitigate those impact. The En

which is part of it. Fauna and flora inventories have revealed the presence of a number of endangered reptile and amphibian species. Speci

ding issues relating to natureApproval date: noPreparation or timing: Entry in the EIB approval process: 23/05/2008Under Appraisal at 15/05/

surrounding villages and by treating the sewage in the villages of Shiroke and Zogaj eutrophication of the lake is averted. This has a great im









review of the programme, the project category will be determined and environmental due diligence level defined.









ect to bring the facilities towards compliance with national and EU environmental standards. It should be noted that the proposed Phase 1 pr

addressed through mitigation measures. An integrated audit covering environmental, social and occupation, health and safety issues relate









be needed for the existing facilities to achieve full compliance with applicable Croatian regulatory requirements and EU environmental standa









ence move towards compliance with the provisions of the acquis. The Energy Strategy of Kosovo defines a set of priorities regarding the prot

craft and related products, parts and appliances, as well as for the certification of design and production organisations. Furthermore the env










T

ronmental aspects.
he training activities will include a specific component to train beneficiary staff in the different aspects of mainstreaming





ysis of the proposed investment programme has been undertaken as part of the due diligence. The implementation of the ESAP will allow the









the Treaty and also the Cardiff process which foresees the systematic consideration of environmental aspects into EC development cooper







y approximately 18 to 20







entation.

hich can be mitigated through well-established proper management methods.









g wastewater before discharging into receiving waters. As an EU candidate member state, the project will contribute to FYROM?s future com

2007Currency: EURExchange rate: 1.0Loan or grant amount: 10.0High priority:

that proper attention is given to all environmental concerns and that appropriate mitigation measures are implemented, in line with the Bank’




H

ent will result in further positive environmental impacts.
owever, as with any construction works or operation of the large energy units, some

condary and local road network consists of: (i) 4,411 km ofdistrict (or secondary) roads, which provide rural links of district importance and a









uous length is classified in environmental category A. Moreover, the project is required to be classified as A category because it is to be carri

works within the port. The construction-related environmental impacts are expected to be temporary and confined within the port area. A com

ures to mitigate those impact. The Environmental Analysis did not identify any significant environmental or social issues. TIA's compliance wit

reptile and amphibian species. Specific measures have been incorporated in the design to ensure that migration corridors of these species a

23/05/2008Under Appraisal at 15/05/08Currency: EURExchange rate: 1.0Loan or grant amount: 26.0High priority:

he lake is averted. This has a great impact on the flora and fauna at the lake and the adjacent wetlands.









l defined.









e noted that the proposed Phase 1 project will only involve sewerage collection and no wastewater treatment. Therefore, it will not fully comp

ation, health and safety issues related to Plinarco and the Okoli gas storage facility will be conducted by an independent consultant. Results









ments and EU environmental standards; and an environmental analysis to assess environmental benefits and impacts of the project and ma









s a set of priorities regarding the protection of the environment and pollution mitigation, and the implementation plan (for which technical ass

n organisations. Furthermore the environmental protection requirements will be based in the legislative acts laid down in the Chicago Conven










different aspects of mainstreaming environment in programme and project development as well as monitoring the implementation.






ementation of the ESAP will allow the Company to maintain compliance and develop best practice. The planned investment programme will









aspects into EC development cooperation AND in other policies (hence very important for the acquis). The support will include a specific com

ll contribute to FYROM?s future compliance with EUstandards and regulations on water, sanitation and the environment.Compliance with na

e implemented, in line with the Bank’s relevant guidelines.

ation of the large energy units, some negative impacts on the environment are expected. Potential environmental impacts concern mainly the

ural links of district importance and aremaintained by district road departments on behalf of the Ministry of Interior (MoI); (ii)4,980 km of com









s A category because it is to be carried out in a sensitive location within Vjosa-Narta Landscape Protected Area. For the above reasons, the

confined within the port area. A comprehensive Environmental Management Plan with preventative, corrective and mitigation measures will

or social issues. TIA's compliance with the environmental and social requirements agreed for the first loan has been reviewed by EBRD. App

migration corridors of these species and other animals are maintained after the ring road is constructed.The key impact of the Project is phys

h priority:

ment. Therefore, it will not fully comply with the EBRD?s Environmental Policy requirements.

an independent consultant. Results from this audit will be included in an Environmental and Social Action Plan that will need to be agreed w









ts and impacts of the project and make recommendations for mitigation measures. Preparation or timing: Passed final review, Pending boar









entation plan (for which technical assistance will be provided) provides for both legal measures, and investment in pollution mitigation measur

cts laid down in the Chicago Convention.










nitoring the implementation.






planned investment programme will also allow for substantial energy efficiency gains as well as improve the safety to the system in terms of









he support will include a specific component to assist the beneficiary to implement an ?internal environment assessment? to identify areas w

the environment.Compliance with national EIA legislation that has been drafted by transposing EU EIA Directive 85/337/EEC, amended by d

onmental impacts concern mainly the management and disposal of limited waste during rehabilitation works. Changes in reservoir levels duri

of Interior (MoI); (ii)4,980 km of communal roads, including private access roads, which provide rural linksof communal importance and are m









ed Area. For the above reasons, the project requires an Environmental Impact Assessment (?EIA?) and public consultation in accordance w

rective and mitigation measures will be developed in accordance with international standards and EU requirements regarding such issues as

an has been reviewed by EBRD. Approval date: 22.01.2008Preparation or timing: SignedOperationalCurrency: EURExchange rate: 1.0Loan

The key impact of the Project is physical displacement of households currently living in the Project footprint. A total of 206 residential structur

on Plan that will need to be agreed with the Company and implemented over an agreed timeframe. In addition, a Stakeholder Engagement P









g: Passed final review, Pending board approval









stment in pollution mitigation measures. A detailed programme for Energy Efficiency and Renewable Energy has been prepared under CAR

the safety to the system in terms of staff and the general public.












ment assessment? to identify areas where it could improve its internal performance vis-à-vis environmental aspects.


Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC will be verified during the appraisal. With regards to regulations con




S

orks. Changes in reservoir levels during plant shutdowns for rehabilitation works would be within normal operating levels.
ee the Environmen

ksof communal importance and are maintained by commune road departments on behalfof the Ministry of Interior (MoI); and (iii) 2,500 km o









public consultation in accordance with the EBRD?s Category A project requirements.

quirements regarding such issues as waste handling, oil spill response planning, dredging, and transportation arrangements during construc

rency: EURExchange rate: 1.0Loan or grant amount: 22.6High priority: no

int. A total of 206 residential structures are potentially affected by the Project. About two thirds of the affected structures were established wi

dition, a Stakeholder Engagement Plan will be prepared and released to the public domain.









nergy has been prepared under CARDS funding, covering 2007 ? 2009. Technical assistance to be provided to the Ministry of Energy and Mi

isal. With regards to regulations concerning the protection of habitats, respective EU Directives are considered to be transposed, subject to




S

operating levels.
ee the Environmental Assessment n° E1896
pproval date: 30.06.2008
reparation or timing: Operational
tart date : Q3 20

A


P


S




of Interior (MoI); and (iii) 2,500 km of urban or municipal roads,which are maintained by the Municipal road departments on behalf of the Min









rtation arrangements during construction & operation, considering the increase of both land-based and maritime traffic. Approval date: 14.05



ected structures were established without title. The majority (almost 80%) of the affected structures are located in the section between Kavaj

ided to the Ministry of Energy and Mining which covers the areas of improving energy efficiency, demand-side management and promoting t

sidered to be transposed, subject to verification during appraisal. FYROM is part of the international EMERALD network, and procedures for




S


E

timing: Operational
tart date : Q3 2008
xpected completion: Q4 2013
urrency: USD
xchange rate: 1.28
oan or grant amount: 27.5781
ig

C


E


L


H




oad departments on behalf of the Ministry ofTerritorial Planning and Tourism (MTPT)1.The priority given to the expansion of the national road









maritime traffic. Approval date: 14.05.2007Preparation or timing: OperationalCurrency: EURExchange rate: 1.0Loan or grant amount: 14.0Hi



ocated in the section between Kavaja Road and the zoo. About 80% of affected structures are residential and 620 individuals will need to mo

d-side management and promoting the wider use of renewable energy will have a direct environmental benefit due to the reduction in energy

ERALD network, and procedures for compliance herewith will also be verified. A social assessment will also be undertaken as part of the app




L


H

28
oan or grant amount: 27.5781
ig

to the expansion of the national road networ









ate: 1.0Loan or grant amount: 14.0High p



al and 620 individuals will need to mo

benefit due to the reduction in energy production and use.Approval date: 28.1

also be undertaken as part of the appraisal.


Related docs
Other docs by yje20549
Switzerland Fill Application Form
Views: 3  |  Downloads: 0
Swiss Chalet Income Statements
Views: 8  |  Downloads: 0
Tanker Charter Contract
Views: 33  |  Downloads: 0
Syntel Agreement
Views: 0  |  Downloads: 0
T 1100 Bill of Sale Form
Views: 0  |  Downloads: 0
Swot Analysis of Leather Industry of Pakistan
Views: 37  |  Downloads: 0
Tally Accounting Project
Views: 1  |  Downloads: 0
Targeted Selection Interview Training
Views: 0  |  Downloads: 0
Sydney Institute of Technology
Views: 0  |  Downloads: 0
Tabular Presentation on Operational Plan
Views: 2  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!