Microsoft Project 2010 Professional by fcs16896

VIEWS: 0 PAGES: 26

More Info
									Description
When you use the Visual Reports feature in Project 2010, you receive an error message that states that you do not
Some Visual Basic for ApplicationsExcel workbook and then paste them into the Task Name column indo not raise
You copy formatted cells from an (VBA) methods such as FileOpen, FileOpenEx, and OutlineIndent, Project 2010.
When you click to select the Match Destination Formatting option from the Paste Options list, Project 2010 may
crash.
Note If you use the option button directly, this issue does not occur.
You insert many tasks into a project that is connected to a server. When you save, close, and then reopen the
When you print or preview a project that has a dependency to a task and that task ends up as the last task on the
page, the link line goes off the left side of the page toward infinity.
When you click Replace All, Project 2010 crashes. For example, Project 2010 crashes when you click Replace All to
If a subproject task on the timeline is deleted from thatsubproject, XMLtimeline data becomes corrupted, and tasks
When you save a project as an XML file, the values the are in that the file do not have a period as the XML decimal
symbol. Instead, the values have a decimal symbol that is determined by the regional settings. For example, the
values are the cost values..mpp file from a document library in the Explorer View. When you open a second .mpp file,
Assume that you open an
Microsoft Project 2010 crashes. Additionally, you receive the following error message: Microsoft Project has stopped
working. A problem caused the program to stop working correctly. Windows will close the program and notify you if
a solution is available.
In Microsoft Project 2010, when you change an create a project deliverablecode, the
Project 2010 is not designed to enable users to assignment value by using against Project Summary Task. However,
you can create a project deliverable against Project Summary Task in Project 2010. Therefore, when you try to
manage the project deliverable, you receive the following error message:
An error has occurred in the script on this page.
Line: line number
Char: character number
Error:error
Code: code number
URL: URL
Consider the following scenario:
- You insert two custom text fields into a Project 2010 plan.
- You type text in a column of the first text field.
- You copy the whole column from the first text field and then paste it into the second text field.
In this scenario, the second text field contains additional spaces within the values that are pasted.
When you save a project plan resources are disconnected from a pool of shared resources. Specifically, this issue
Project 2010 may crash when in Microsoft Project 2010, and then you reopen this project plan, you experience one
of the following symptoms:
   * Assignments are moved to other tasks.
   * Data is missing.
   * Data is moved around.
Consider the following scenario:
   * You configure a Project Server 2010 server to operate in Backwards Compatibility mode.
   * You have a project plan that contains cross-project dependencies.
   * You connect to the Project server by using Project Professional 2010, and then you open the project plan.
   * You try to save the project.
In this scenario, Project 2010 crashes. Additionally, you receive an error message that resembles the following:
Problem Event Name: APPCRASH / Application Name: WINPROJ.EXE / Application Version: 14.0.4751.1000 / ...
Project 2010 crashes when you update cross-project links through the Links Between Projects dialog box.
            try to to display a baseline in the Gantt 2010, the bars to represent milestones Finish1 to Finish10
When you select save a project in Microsoft ProjectChart view,Start1thatStart10 fields, and the or summary tasks do
fields that are related to a task’s interim baseline may be lost. This issue occurs when the fields are not visible in an
active table when you save you project.task in a master project that contains a local custom field. This issue specially
Project 2010 crashes when the copy a
occurs when the local custom field in the master project has a lookup table defined. However, the local custom field
in a subproject does not have a lookup table defined.
Project Professional 2010 may crash when you try to save a project in Project Professional 2010.
Consider the following scenario:
   * You create a deliverable that has a finish date for a task in Project 2010.
   * You create another task.
   * You add a dependency for the two tasks.
In this scenario, the dependency finish date that is shown in the Gantt chart differs from the finish date that is shown
in Microsoft Project pane. report enables you to select and print a specific data range. For example, you can print all
A the Dependency 2010
tasks, resources, assignments or all time scaled dates. When you try to print a specific data range in a report in
Project 2010, the whole data range is printed.
Project Professional 2010 may crash or suddenly disappear without any crash error message when you save a project
You cannot receive correct values for the % Complete field, and the Cumulative % Complete field by using the VBA
Project 2010 may stop responding (hang) when you use the Team Planner view.
Assume that you use Project Web Application to apply status updates to a task. When you open the task in Project
After you import a project plan in Project 2010 from a format such as TXT, CSV or Excel, all new baselines (baseline 1
to baseline 10) are duplicated as the default baseline for all tasks.
When you clear the baseline in a view, such as the Task Usage view, certain assignment baseline cost values are not
When you open a Project 2003 plan in Project 2010, the task outline collapsed or expanded state displays incorrectly.
Additionally, the percentage complete status of the summary tasks also displays incorrectly.
Consider the following scenario:
   * You create a project plan that contains a task in Project 2010.
   * You configure a baseline for the project plan.
   * You click the Project Information command to change the project status date.
   * You change the date in the Reschedule uncompleted work to start after: list in the Update Project window.
   * You click the File tab, and then you select the Options option to change to a date format that does not include
elements such as the year or the time.
In this scenario, the Gantt bar fornew task's baselinethen you editincorrect place. on task name field in Project 2010.
Assume that you view a task in a the Window, and draws in an the task name
When you reproduce these two steps for many times, the data in the task disappears. Additionally, Project 2010 may
stop responding.
You add actual cost values to a resource assignment in a project. Then, you open the project in Project 2010. In this
Consider the following scenario:
   * You add a new task into a project in Project 2010.
   * You receive a prompt to save and check in the project when you close the project.
   * You click OK on the prompt dialog box to save and check in the project.
   * You immediately close the prompt dialog box before the project is checked in.
   * You click Yes when another prompt dialog box pops out to prompt to check in the project.
In this scenario, the project is saved. However, it is not checked in.
You clear the Link to Project check box in the Insert Project dialog box when you try to insert tasks into a project in
Project Professional 2010. Then, you open the project. In this situation, Project Professional 2010 crashes.
Assume that a SOAP error occurs in Project Professional 2010. When you view more information about the error in
the error dialog box for a while, character you click OK on in a project. When you want Professional 2010 crashes.
Assume that you type a Korean and then as a task name the error dialog box, Project to change the task name to
another Korean character that has the same initial consonant and middle consonant as the former Korean character,
Project 2010 generates the final consonant as the former Korean character automatically. Additionally, you cannot
change the final consonant.
Note: A Korean character consists of three components, initial consonant, middle consonant and final consonant in
The ProjectBeforeTaskChange event does not trigger inmissing in Project Professional 2010 when Track button in
Certain actual work and orphaned pending updates are Project 2010 when you click the Mark On you select the
Save for Sharing option for a project file from a Project server.
Note: This issue occurs because the project file is saved locally with different GUIDs when you select the Save for
Sharing option for the project file.
When you restore projects from backups in Project 2010, the deliverables and dependencies are restored incorrectly.
Assume that you have a milestone that has a task link in its own project and a cross-project link from a different
project. In this case, the cross-project link incorrectly schedules if the date format does not display the time.
When you create a visual report in a master project, Project 2010 crashes.
Assume that you clear the local cache after you change the task data. In this case, the custom flag field values are
Assume that you click a resource after the Links Between Projects dialog box appears. In this case, Project 2010
crashes when you switch to the Resource Sheet view on a customer file.
Consider the following scenario:
   * You create a deliverable that has a finish date for a task in Project 2010.
   * You create another task.
   * You add a dependency for the two tasks. In this scenario, the dependency finish date that is shown in the Gantt
chart differs from the finish date that is shown in the Dependency pane.
When you click the Reschedule uncompleted work to start after button, remaining work is not rescheduled if only a
Project 2010 crashes when projects in a master project calculate contour information.
Task names and other demand-loaded properties are lost after you perform undo actions in Project 2010.
When you change certain values in a project that contains many tasks in Project 2010, Project 2010 takes a long time
Consider the following scenarios:
   * You change the timephased work in a Project 2010 project.
   * You change the remaining work for a task or assignment in a Project 2010 project.
   * You enter a time value for the timephased work, and the time scale granularity is more than one day.
In these scenarios, the actual work is rescheduled unexpectedly. Additionally, you do not receive a message that
notifies you that the project is out of sync with the Project server.
When you try to print an .mpp filedirectly from Windows Explorer, you receive the following error message:
An unexpected error occurred.
Project 2010 stopsNetwork Diagram view tryProject 2010, and you print or print preview a project, the fill color of the
When you open a responding when you in to open a project that contains incorrect, manually scheduled task date
task boxes is the same as the border color of the task boxes. Therefore, the text inside the task boxes appears fuzzy
or unreadable. This issue specifically occurs when you use a black-and-white printer to print preview a project or to
print a project.
When the custom duration fields are defined in an Office Project 2007 project, you may be unable to open the
            use VBA code to create a or dependencies in a project that in Project 2010, and then you change the
When you try to update deliverablescustom solution for a custom field contains more than 159 deliverables, the
value of the custom field in the Project Information dialog box, the ProjectBeforeTaskChange event is not raised as
expected. try to save a project in Project 2010, the save operation fails and you receive the following error message:
When you
The following job failed to complete.
Job Type: Save
Error ID: 9000(0x2328)
Error Description:
The project could not be saved to the server. Please retry saving the project. If the problem persists, save the project
as a MPP file and contact your system administrator.
Note: To resolve this issue, applyYou select the Actual costs Project client computer and the Project server.
Consider the following scenario. this hotfix package on the are always calculated by project option in a project and
you manually enter the actual costs of a cost resource into the project. You save and close the project. Then, you
open the project in Project 2010. In this situation, Project 2010 crashes.
Assume that the status updates for a project are accepted. When you open, save, and then publish the project plan
for the project in Project 2010, not all the accepted actual overtime work values are displayed in the project plan.
When you change a custom field in a project and then publish the project in Project 2010, the graphical indicator for
the custom field is not displayed in the Project Center.
     Fixed In
  June 2010 CU
  June 2010 CU


  June 2010 CU
  June 2010 CU

  June 2010 CU
  June 2010 CU
  June 2010 CU

  June 2010 CU


 October 2010 CU
December 2010 CU




December 2010 CU




December 2010 CU
December 2010 CU




February 2011 CU




February 2011 CU
February 2011 CU
February 2011 CU

  April 2011 CU

  April 2011 CU
  April 2011 CU
April 2011 CU

 June 2011 CU
 June 2011 CU
 June 2011 CU
 June 2011 CU
 June 2011 CU

 June 2011 CU
 June 2011 CU

 June 2011 CU




 June 2011 CU

 June 2011 CU
 June 2011 CU




 June 2011 CU

 June 2011 CU

 June 2011 CU




 June 2011 CU
 June 2011 CU


 June 2011 CU
August 2011 CU

August 2011 CU
August 2011 CU
August 2011 CU
 August 2011 CU




August 2011 CU
August 2011 CU
August 2011 CU
August 2011 CU
October 2011 CU




October 2011 CU

October 2011 CU
October 2011 CU


October 2011 CU
October 2011 CU
October 2011 CU

December 2011 CU




December 2011 CU

December 2011 CU

December 2011 CU

December 2011 CU
Description
The tracking GUID that is specified in the Project Server Interface (PSI) headers is not honored as the Job Group
If the project uses a Force-in alias or a Force-out alias, you cannot switch a project to automatic scheduling.
Additionally, recalculation fails, and you receive the following error message: An unknown error has occurred.
You set a baseline to the NA status for any project task. However, this baseline is not updated when you publish
You cannot create enterprise projects or templates on the server from certain Microsoft Office Project 2007
If the value of the ChangeXML parameter is a large number, the UpdateStatus PSI method requires a long time
to update many tasks that apply to different users. This behavior blocks the Team Foundation Server (TFS).
When you attach some databases and then provision a site, the upgrade fails if you load a language pack that is
The New-SPProjectWebInstance cmdlet does not work together with the host header when a site collection
Project Server administrators now can resolve user names by using email addresses. For example, depending on
how the claims providers are configured, the user logon account can be entered and validated as an email
After you provision a Project Web Access (PWA) site, the queue service process restarts unexpectedly. This
The queue service may consume large amounts of memory, such as several gigabytes (GB), when there are
If users cannot be resolved in Active Directory because of intermittent connectivity issues, the users are
Consider the following scenario. You apply the hotfix package that is described in Microsoft Knowledge Base
article 2075990. You connect the Project client to Project Server 2010 and use manually scheduled tasks. Then,
you update the % complete column on a manually scheduled task in the project. In this scenario, the baseline
Assume that you create a custom field together with a formula that uses the semicolon separator. When you
create another custom field together with a formula that refers to the first custom field, you receive the
Consider the following scenario. In Project Server 2010 you create a site by using the Microsoft Project Site
template. Then, you try to access the Cost column in the Risks page of the new project site. In this scenario, you
receive the following error message:
In Project Web App (PWA), you cannot change the value in the Actual Start field on the My Work Tasks page.
Consider the following scenario:
- You are a team member of a project in Project Server 2010.
- You only have permissions to view projects in PWA.
- You drill into the project.
In this scenario, you receive the following error message:
An unexpected error has occurred.
In Project Professional 2010 you save the baselines for a project. Then, you use the Update Tasks command to
update the tasks in the project. In this situation, the baseline values that you previously saved are lost.
In Project Server 2010, you try to change the owner for a project in the Project Information Project Detail Page
(PDP). However, you cannot change the project owner in the Owner field when the new owner does not have
In Project Server 2010, you cannot create a PWA site that uses a host header name. Instead, the site can only
You enable Single Entry Mode on a Microsoft Project Server 2010 server, and then you send a timesheet. In this
situation, the task status manager does not receive an email message notification for status updates.
Consider the following scenario:
   * You create a custom field in a Project Web App site.
   * The site is hosted on a Project Server 2010 server and has a non-English locale.
   * The custom field contains a graphical indicator that is based on formulas.
   * You save the custom field, and then you open it again.
In this scenario, the formulas displays in English instead of non-English. Additionally, you cannot save the custom
When you calculate a plan in a Project Web Access site, you receive the following error message:
An error occurred while scheduling the project. Try to schedule the project again in a moment. If the problem
When many users try to create timesheets on a Project Server 2010 server at the same time, the user who first
submits a timesheet creation request receives an error message. In this situation, the rest of users can create
You assign a resource to an existing project plan in Project Server 2010. Then, the resource inserts a row in a
timesheet. In this situation, there is no top-level summary task that is listed for the plan in the menu of the row.
When lots of users try to create timesheets at the same time on a Project Server 2010 server, the following
issues occur:
   * Certain users cannot create timesheets successfully. Additionally they receive an error message.
Assume that you edit a project in a project detail page (PDP) in Project Server 2010. When you select to save and
check in the project, then you visit another page before the save and check in request is completed. In this
When you try to save a project in Project Server 2010, you receive the following error message:
Cannot insert duplicate key row in object 'dbo.MSP_ASSN_CUSTOM_FIELD_VALUES_SHADOW' with unique index
Assume that a master project has a subproject that contains more than 100 tasks in Microsoft Project Server
2010. You try to view the master project tasks from Project Detail Pages. In this situation, not all the tasks are
Consider the following scenario:
   * You have a single entry mode in Project Server 2010.
   * You update the timesheet line for a task assignment.
   * You submit the task status and the timesheet.
   * You try to delete the project that contains the task after the timesheet is approved.
In this scenario, the project cannot be deleted. Additionally, you receive an error message.
You try to select certain time periods on the My Tasks page through Project Web App (PWA). You click the Next
button multiple times on the My Tasks page. In this situation, a time period start date is a day earlier than what
Assume that you edit a project plan through a Project Web App (PWA) site that is hosted in Microsoft Project
Server 2010. When you try to calculate the project plan, you receive the following error message:
An error occurred while scheduling the project. Try to schedule the project again in a moment. If the problem
No cancellation feedback message displays when you perform a cancel operation in a PWA site that is hosted on
Assume that you perform a cancel operation for the Project Publishing event, the Project Summary Publishing
event, or the Project Updating Scheduling Project event in a project detail page (PDP) in Project Server 2010. In
An exception occurs when you synchronize users from a domain that does not contain a Project Server 2010
You cannot create timesheets when you migrate databases from Office Project Server 2007 to Project Server
2010.
When you enable Single Entry Mode on a Project Server 2010 server, resources can remove themselves from a
task through PWA even though they have added actual work to the task. Therefore, the approved actual work is
You edit a project plan that contains a custom field in a project detail page in Project Server 2010. Additionally,
the custom field includes a formula. You save and check in the project plan, and then you visit another page
Assume that you try to approve a task that has a summary task as its predecessor or successor in Project Server
2010. When you preview the task’s status update in the Status Update Preview page, you receive the following
error message:
You cannot open multiple projects from the PWA that is hosted on a Project Server 2010 server when the list
The PSI returns incorrect results when lots of Project Server Interface (PSI) calls are sent to the ASMX interface
Consider the following scenario:
   * You log on to the My Timesheets page through PWA.
   * You open an already approved timesheet in the My Timesheets page.
   * You recall your timesheet.
   * You change actual work on a task in the timesheet.
   * You add actual work to a nonworking administrative time category.
   * You save the timesheet, and then you submit it.
   * You open the project plan in a Project 2010 client after actual work is synchronized with the project plan.
In this scenario, the actual work contour is incorrect. For example, a value that displayed as 0.5d before, now
You cannot sort your assignments on the My Timesheet page in Project Server 2010.
When you log on to a project site through PWA, and then you try to view an issue that links to a deleted project
task, you receive one of the following error messages:
An error has occurred in the script on this page.
Or
When you enable the Use this field for matching generic resources option in PWA, the Roll down, unless
manually specified option in the Calculation for Assignment rows section is disabled unexpectedly.
Assume that you delete values in the Enterprise Custom Field (ECF) of a task through PWA. In this situation, any
following update for the task cannot be saved. Additionally, there is no message that indicates the save
The OnUpdatingScheduledProject event handler method that cancels updates for a project does not work in
Assume that you try to manage users on the Manage Users page in Project Server 2010. When you try to
deactivate a user who is not listed on the first page, you receive an error message.
The NullRefrenceException exception may occur when you create a project by using the PSI in Project Server
Consider the following scenario:
   * A project manager accesses the Approval Center page by using PWA.
   * The project manager accepts task status updates from a team member.
   * The project manager verifies that the status update queue job is finished successfully.
   * The project manager opens the project plan, and then views the updated task status.
In this scenario, the task status updates are not applied to the project plan.
Assume that you perform a cube building operation on a PWA site that uses Claims based authentication. In this
situation, Windows NT accounts are not automatically added to the Online Analytical Processing (OLAP) cube
The user delegation feature does not work for pages that directly call Windows Communication Foundation
When a status manager accepts updates for tasks in Project Server 2010, the status of the update job is listed as
Consider the following scenario:
   * You enable Single Entry Mode in a PWA site.
   * You create a delegation for a user.
   * You start a delegation session as the user’s delegation.
   * You create a timesheet, and then you save it.
In this scenario, the user or you as the delegation cannot open the timesheet. Additionally, you receive the
following error message:
Consider the following scenario:
   * You create a user account in a PWA site.
   * You add the user account to a group that only has the permission to see a project's details, but not to open
the project.
   * You use the account to log on to the PWA site to see the project’s details.
In this scenario, you cannot see the projects details. Additionally, you receive the following error message:
Consider the following scenario. You edit a project through PWA. The edit operation starts a server-side
scheduling process. In this scenario, you cannot save the project successfully. Additionally, you receive the
following error message in the Unified Logging Service (ULS) log:
GeneralProject:ProjectSchedulingEngineException (9133). Details: id='9133'
When you apply updates on a completed task that does not have an actual start date, task scheduling fails in
Assume that you first set a large value for the actual work on a material assignment in Project Server 2010. Then,
you reduce the value. In this case, the actual work is saved incorrectly for the material resource.
Assume that you click Send to submit a timesheet in Project Server 2010. You click Send again when the
timesheet is being processed in the queue. In this case, a TimesheetIncorrectMode error occurs.
Task scheduling fails in Project Server 2010 if a project contains links to tasks that do not exist.
Consider the following scenario:
   * You have a project that has a material resource.
   * The material resource is assigned to a task.
   * The material resource has no cost.
   * The cost accrual is set to the start of the assignment.
In this scenario, task scheduling fails in Project Server 2010.
The scheduling feature changes a task’s start date to an earlier date under certain conditions. This issue may
Assume that you open a timesheet for a future period of time. Then, you click Save. In this case, additional lines
You may experience one or more of the following issues in Project Server 2010:
   * When you update a timesheet line, you may receive the following error message:
An unhandled exception occurred in
Microsoft.Office.Project.Server.BusinessLayer.Statuing.StatusingSendGridUpdatesForNodeConsistency.
   * When you save a timesheet, the queue job fails. Additionally, the following message is logged in the Unified
When a project manager makes a change to an assignment in Project Server 2010, resources receive an email
The reporting database update job fails in Project Server 2010. Therefore, other jobs that are marked with
"waiting to be processed" that follow the update job in the queue are auto canceled.
When you click the This is an Enterprise Project. Click this icon to open the Project for editing in Project
Professional icon to open a project in read/write mode in the Project Center, the project opens in read-only
You cannot use the QueueUpdateProject project server interface (PSI) to change a project owner if you do not
When you use the TimesheetCreated event to customize a timesheet in Project Server 2010, the timesheet does
When you accept updates for a task in Project Web App (PWA), the duration and actual work values for certain
Consider the following scenario:
   * You add an enterprise custom field which is based on a lookup table to a timesheet in Project Server 2010.
   * You update the timesheet.
   * You submit the timesheet.
   * You view the Approval Center.
In this scenario, the Approval Center displays two items that have to be approved. However, the Approval Center
Consider the following scenario:
   * You set yourself as the assignment owner of a material resource in the Assignment Owner field in Project
Server 2010.
   * You assign the material resource to a new task in a project.
   * You save and publish the project.
   * You view the new task on the My Tasks page in PWA.
Assume that you close a task to prevent that task from being updated in a timesheet in Project Server 2010.
When you recall a timesheet to which the task was previously added, the task disappears from the timesheet.
When you group by projects in the Timesheet view in PWA, PWA displays duplicate project names.
Consider the following scenario:
   * You create custom fields that are associated with tasks in PWA.
   * You update a task together with the custom field information on the My Timesheets page.
   * You import the results into the My Tasks page.
In this scenario, the Timesheet view does not display the custom field value. Additionally, the Timesheet view
does not display the custom field value when you create additional timesheets.
Consider the following scenario. You add a Task Hierarchy field to the Timesheet view in PWA. Then, you add a
new assignment to the timesheet. In this situation, the Task Hierarchy field does not display the task hierarchy
Consider the following scenario. You log on to PWA as a project manager. You approve a task and enter many
characters into the comments text box in the Approval Center. In this scenario, you receive the following error
message:
An Error occurred while processing one or more items. This was caused by one of the following:
A timesheet job is failed and blocking correlation in the queue.
The approval item no longer exists or has already been approved.
This hotfix configures the Approval Center to highlight task updates when a task is updated in Project Server
Consider the following scenario:
   * You create a Project Web App (PWA) site on a Project Server 2010 server that has single entry mode
enabled.
   * You recall a timesheet through the PWA site.
   * You review the timesheet on the PWA site.
Assume a PWA site administrator disables the Allow future time reporting setting on a Project Server 2010
server that has single entry mode enabled. In this situation, when you submit a timesheet, an error occurs.
When you create a project template that contains a custom calendar, you cannot use Project Server Interface
When a timesheet approval job fails, the timesheet appears in the approval list. Then, when you approve the
timesheet for the second time, a TimesheetIncorrectMode error occurs. Additionally, you receive the following
detailed information about the error:
There has been an error processing a timesheet for which you are/were responsible. Check your approvals list to
locate the offending timesheet if one exists. The error condition may be related to the fact that Timesheets are a
Consider the following scenario:
   * You apply Service Pack 1 for a non-English language pack on a Project Server 2010 server.
   * You create a PWA site that uses the same non-English language.
   * You apply the hotfix package that is described in Microsoft Knowledge Base (KB) article 2536600.
   * You log on to the PWA site.
In this scenario, the column headers on the Project Center page, My Tasks page and Resource Center page are
displayed in English instead of the non-English language that you used to create the site.
Consider the following scenario:
   * You add an enterprise custom field that includes a formula to a project.
   * The formula references a baseline field that is set to NA.
   * You save the project from a Project Detail page.
   * You review the project through PWA.
In this scenario, the data in the enterprise custom field is lost.
Assume that you specify a minimum version level required by Project clients to connect to a Project server in
Project Server 2010. When you use a Project client that does not meet the minimum version level required to
connect to the Project server, the client connects to the server successfully. However, the client should be
When you try to save a project to a Project Server 2010 server, you receive the following error message:
The following job failed to complete.
Job Type: Save
Error ID: 9000(0x2328)
Error Description:
The project could not be saved to the server. Please retry saving the project. If the problem persists, save the
Assume that you set the Publish field to No for a task that is already published in a project. After you publish the
project to a Project Server 2010 server, all the pending status approval items are rejected on the Approval
Center page.

Note: This hotfix package does not change the rejection behavior for reassigned, self-assigned, or newly created
Assume that a workflow for a project is successfully completed. When you try to open the project by using PWA
after 60 days, you receive the following error message:
     Fixed In
  June 2010 CU

  June 2010 CU
  June 2010 CU
  June 2010 CU

  June 2010 CU
  June 2010 CU
 August 2010 CU

 August 2010 CU
 August 2010 CU
 August 2010 CU
 August 2010 CU


 August 2010 CU

October 2010 CU


December 2010 CU
December 2010 CU




December 2010 CU

December 2010 CU

December 2010 CU
December 2010 CU

February 2011 CU




February 2011 CU

February 2011 CU

February 2011 CU
February 2011 CU


February 2011 CU

February 2011 CU

February 2011 CU

 April 2011 CU




 April 2011 CU

 April 2011 CU


 June 2011 CU
 June 2011 CU

 June 2011 CU
 June 2011 CU

 June 2011 CU

 June 2011 CU

 June 2011 CU


 June 2011 CU
 June 2011 CU
 June 2011 CU




 June 2011 CU
 June 2011 CU
 June 2011 CU

 June 2011 CU

 June 2011 CU
 June 2011 CU

 June 2011 CU
 June 2011 CU




 June 2011 CU

 June 2011 CU
 June 2011 CU
 June 2011 CU




 June 2011 CU




 June 2011 CU




 June 2011 CU
August 2011 CU

August 2011 CU

August 2011 CU
August 2011 CU
August 2011 CU
August 2011 CU
August 2011 CU




August 2011 CU
August 2011 CU

August 2011 CU

August 2011 CU
August 2011 CU
October 2011 CU
October 2011 CU




October 2011 CU




October 2011 CU

October 2011 CU
October 2011 CU




October 2011 CU

October 2011 CU
October 2011 CU
October 2011 CU




December 2011 CU

December 2011 CU
December 2011 CU




December 2011 CU




December 2011 CU




December 2011 CU


December 2011 CU




December 2011 CU




December 2011 CU
December 2011 CU
Hotfix package
Project 2010 hotfix package (Project-x-none.msp): June 29, 2010
Project Server 2010 hotfix package (Pjsrvwfe-x-none.msp): June 29, 2010
Project Server 2010 hotfix package (Wosrv-x-none.msp, Pjsrvwfe-x-none.msp, Osrv-x-none.msp): August 31, 2010
Project 2010 hotfix package (Project.msp): October 26, 2010

Project Server 2010 Cumulative Update Server Hotfix Package (Project server-package): October 26, 2010
Project 2010 hotfix package (project-x-none.msp): December 14, 2010
Project Server 2010 Cumulative Update Server Hotfix Package (Project server-package): December 31, 2010
Project 2010 hotfix package (project-x-none.msp): February 22, 2011
Project Server 2010 hotfix package (pjsrvwfe-x-none.msp): February 22, 2011
Project 2010 hotfix package (project-x-none.msp): April 26, 2011
Project Server 2010 hotfix package (pjsrvwfe-x-none.msp): April 26, 2011
Project 2010 Service Pack 1
Project Server 2010 Service Pack 1
Project 2010 hotfix package (project-x-none.msp): June 28, 2011
Project Server 2010 hotfix package (pjsrvwfe-x-none.msp): June 28, 2011
Project 2010 hotfix package (project-x-none.msp): August 30, 2011
Project Server 2010 hotfix package (Pjsrvwfe-x-none.msp): August 30, 2011
Project 2010 hotfix package (Project-x-none.msp): October 25, 2011
Project Server 2010 hotfix package (Pjsrvwfe-x-none.msp): October 25, 2011
Project 2010 hotfix package (x86 Project-x-none.msp, x64 Project-x-none.msp): December 13, 2011
Project Server 2010 hotfix package (Pjsrvwfe-x-none.msp): December 13, 2011
Download link
http://support.microsoft.com/kb/2075992
http://support.microsoft.com/kb/2075990
http://support.microsoft.com/kb/2276341
http://support.microsoft.com/kb/2413663
http://support.microsoft.com/kb/2394322
http://support.microsoft.com/kb/2413667
http://support.microsoft.com/kb/2466263
http://support.microsoft.com/kb/2459258
http://support.microsoft.com/kb/2496946
http://support.microsoft.com/kb/2479792
http://support.microsoft.com/kb/2516479
http://support.microsoft.com/kb/2516483
http://support.microsoft.com/kb/2460052
http://support.microsoft.com/kb/2460047
http://support.microsoft.com/kb/2536590
http://support.microsoft.com/kb/2536586
http://support.microsoft.com/kb/2584056
http://support.microsoft.com/kb/2553047
http://support.microsoft.com/kb/2596495
http://support.microsoft.com/kb/2596498
http://support.microsoft.com/kb/2597006
http://support.microsoft.com/kb/2596997

								
To top