Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Definition of Terms
of Reference for Conclude TORs for the preparation of the TORs for the Resettlement
MCA Honduras’ August 01-15,
Gordon Appleby USD 5,700.00
2006
-------- Plan of CA-5 road. Train MCA-H personnel regarding resettlement
Resettlement Plan policies.
for CA-5 Road
Analysis of
Honduras’ legal
frame for application
of the involuntary
Resettlement October 10 to Analyze the Honduran legal regulatory frame regarding involuntary
policies for Mario Vallejo USD 8,000.00 December 5, ------- resettlement of people. Prepare a proposal for implementation of the
populations and the 2006 Involuntary Resettlement Policy of the World Bank.
cleaning of right of
way for the project of
road CA-5 north
improvement
Preparation of
Terms of Reference
for the selection and
award for the Conclude the TOR prepared by SOPTRAVI. Propose to MCA-H,
external deliverables to be required to the consultant firms. Propose technical
April 27 to May
management firm for Roberto Ordóñez Lps 37,400.00 ------ evaluation criteria to evaluate proposals participating in the process.
30, 2006
the Transport Project Elaborate estimated costs regarding personnel, logistics support and
of the Millennium materials required for each deliverable.
Challenge
Agreement
Preparation of Propose MCA-H and FONADERS the deliverables to be requested in
Terms of Reference the TORs in accordance with the procurement method to be use.
March 30 to May Review and customize the general TOR guide prepared by the
for Farmers Training Danilo Alvarado Lps 37,840.00
15, 2006
--------
and Technical international consultant in accordance with the Rural Development
Assistance project and procurement method approved by MCC.
Transportation Project Management services to assist MCA-Honduras
Services for the January 22, 2007 Increase of USD 584,580 for
with the implementation of the Transportation Project and the Farm to
Transportation The Louis Berger Group USD 2,955,000.00 to December 31, additional services related to the
Market Roads Project Activity of the Rural Development Project,
Project Manager 2009 original contract
including the following:
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
• Supporting Monitoring and Compliance of Compact Terms
• Finalization of Designs for Project Works
• Management of Procurement Processes
• Monitor Project Implementation
• Financial Management
• Environmental Impact Management
• Resettlement and Social Impact Management
Centro de
Investigaciones
Develop and populate a Geographical Information System (GIS) to
Rural Roads Económicas y Sociales February 12,
Finalization of services July 18, inform MCA-Honduras in its selection of investments for the
Selection Tool (CIES) / Consejo USD 29,850.00 2007 to May 31,
2007 improvement or construction of rural roads in the Farm to Market Roads
Hondureño de la 2007
Activity of the Rural Development Project.
Empresa Privada
(COHEP)
Preparation of a Resettlement Policy Framework (RPF) for two urban
Addendum No. 1 Finalization of segments of CA-5 where the technical designs are not yet developed
Phase II (Implementation of RAPs):
and to prepare a Resettlement Action Plan (RAP) for each of the four
October 31, 2008. USD 994,439.63
sectors of CA-5 North Highway projects for which technical designs
Preparation of a
Addendum No.2 Phase II of already exist. Specifically, the Consultant will prepare an RFP for those
Resettlement Policy
Services for the Implementation of sections of CA-5 of which technical designs have yet to be decided (i.e.,
Framework,
April 30, 2007 to the RAP for the CA-5 North Zambrano and Las Flores). Preparation of a RAP for each of the four
Resettlement Plans, ASP Consultores /
USD 348,813.82 November 16, Highway: USD 59,805.38 sections of CA-5 where the technical designs are now available (1.
and Complementary Giraldo Calle & Cia.
2007 Tegucigalpa – Río Del Hombre; 2 Río Del Hombre – Inicio Valle de
Social Impact Addendum No. 3 Preparation of Comayagua (except Las Flores and Zambrano); 3. Final Valle de
Reports for the CA-5 ARAP Choluteca- Orocuina Road Comayagua – Siguatepeque; 4 Siguatepeque – Taulabe). Field work for
North Highway and Sonaguera-Km 35 Road and its
the RAP will entail a census of the affected population and asset
implementation: December 15th,
2008. USD 472,521.00 inventories, as well as socio-economic studies and the engineering
design and drafting of replacement structures where necessary.
Financial auditing of the MCC resources managed by MCA-Honduras
under the Compact in accordance with U.S. Government Auditing
Standards issued by the Comptroller General of the United States and
May 22, 2007 to
Audit Services PriceWaterhouseCoopers USD 38,005.00 ----------- the “Millennium Challenge Corporation Guidelines for Financial Audits
August 15, 2007
Contracted by Foreign Recipients” (MCC Audit Guidelines) issued by the
MCC Inspector General (IG).
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Coordination and execution of the Evaluation Component of the M&E
Plan. Drafting of the terms of reference for any survey work required to
Design and execute the M&E Plan. Services under the following four categories:
May 25, 2007 to
Implementation of National Opinion
USD 1,610, 253.00 September 1, ----------- • Evaluation Design
the MCA Honduras Research Center (NORC)
2010 • Evaluation Planning
Program Evaluation • Technical Support for Procurement
• Implementation of Evaluation
The Consultant will assist financial institutions interested in expanding
Farmer Access To services to farmers, value chain enterprises and other rural enterprises
Credit Technical USD 3,689,420.00 June 1, 2007 to and will assist MCA Honduras in establishing the Program Farmer Loan
ACDI VOCA ----------- Fund. The Consultant will work with banks, credit unions and
Assistance January 31, 2010
microfinance institutions to help them improve their supply of services to
the agriculture sector and to strengthen value chain financing.
Topographic Topographic works will be developed along Sections I and II of the
Surveying of the Ca- Project, in accordance to the following definitions (see the location map
5 Segment I, at the end of this ToR). Section I runs from Tegucigalpa to Rio del
Sections I and II, Hombre with a length by 25.5 km. Section II runs from Rio del Hombre
including the Section Técnica de Ingeniería until the interchange to the Villa San Antonio with an approximate length
July 2, 2007 to by 38 km. This section also comprises a section of 3.3 Kms alongside of
from Las Flores – (Tecnisa) / Consultores USD 123,064.41 -----------
August 21, 2007 the new alignment between stations 43+300 to 46+600. The total length
Interchange to San en Ingeniería (Cinsa)
Antonio, Comayagua of Section II is approximately of 41.3 Kms.
(CA-5, under the
Transportation
project)
Services for Increase of USD 1,000.00 and Yoro, Atlántida, Islas de la Bahía
Cirilo Reyes USD 14,462.94
socialization and finalization November 5, 2007
formulation of rural Increase of USD 4,845.00 and Tegucigalpa
Jorge Pagoaga USD 12,500.00
roads projects finalization November 12, 2007
June 26, 2007 to
(under Rural Roads Increase of USD 1,000.00 and Juticalpa, Colón
Manuel Sosa USD 13,000.00 September 27,
of the Rural finalization November 5, 2007
2007
Development Increase of USD 4,191.18 and Lempira, Intibucá, La Paz
Project) Marco Flores USD 12,595.86
finalization November 12, 2007
Increase of USD 4,814.00 and Choluteca
Said Rodríguez USD 12,020.00
finalization November 12, 2007
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Increase of USD 1,000.00 and San Pedro Sula
Irma Escobar USD 13,305.04
finalization November 5, 2007
The purpose of these Terms of Reference (TOR) is to define the scope
of work for the services of a consultant to prepare the Environmental
Management Plan (EMP) for the Improvement of the CA-5 North
Preparation of Highway Project. Specifically, the Consultant will prepare EMPs for
Environmental Sections I and II of southern segment and for sections III and IV for the
Management Plan northern segments of the CA-5 North Highway. Each EMP will include
August 27th,
for Improvement of ESA Consultores / detailed mitigation measures, risks and contingencies prevention,
USD 39,381.00 2007 to October -----------
CA-5 North Highway Gatesa monitoring and restoring activities to be implemented along project
8th, 2007
under the execution stages. Field work for the RAP will entail verifying and
Transportation identifying in situ, the potential environmental impacts as well as their
Project corresponding mitigation and relief measures.
The FOA shall Review all relevant documentation in order to gain a
sound understanding of Compact agreements, policies, procedures and
reporting mechanisms as they relate to financial management and
September 13, control, at a minimum:
Fiscal Oversight • MCC Compact with the Government of Honduras
2007 to
Services for MCA DPK Consulting USD 471,752.00 -----------
December 31, • Memorandum of Agreement Regarding Fiscal Agent Services
Honduras
2009 • Disbursement Agreement
• Bank Agreement
• Fiscal Accountability Plan
• Other relevant financial documents
Air Conditioning Maintenance of all air conditioning units of the MCA - Honduras office
August 1st, 2007
Maintenance
AYRE L. 48,000.00 to July 31st, -----------
Contract
2008
Contract for the September Supply of backpack sprayers for agricultural use for the FTDA program
purchase of 26th,2007 to beneficiaries for the period (Sept/2007- May/2008)
SEAGRO USD 39,790.00 -----------
backpack sprayers December 14th,
for agricultural use 2007
Contract for the October 30th, Supply of seedling trays for agricultural use for the FTDA program
purchase of seedling 2007 to beneficiaries for the period (October/2007- May/2008)
SEAGRO USD 103,700.00 -----------
trays December
14Th,2007
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Contract for the Supply of plastic crates for agricultural use for the FTDA program
September 30,
purchase of plastic beneficiaries for the period (September/2007- May/2008)
NEW MARK 2007 to
crates for agricultural USD 124,099.20 -----------
REPRESENTACIONES December
use
14th,2007
Contract for the Supply and installation of drip irrigation systems for the FTDA program
purchase and Agropecuaria del Campo, December 2007 beneficiaries for the period (December/2007- May/2008)
installation of Drip USD 586,390.48 -----------
S. de R.L. to May/2008
irrigation Systems
Contract for the Supply of sand filters for the FTDA program beneficiaries for the period
purchase of Sand June 09,2008 – Extending the (December/2007- May/2008)
December/2007
Filters for agricultural DICOSA L. 5,400,00.00 delivery period until June 30,
to May/2008
use 2008
Contract for the May 21, 2008, extending the Supply of three species of fruit trees to be distributed among the FTDA
purchase of fruit August 2007 to beneficiaries.
FHIA L. 3,650,000.00 delivery period until June 30,
trees June 2008
2008
Addendum No.1- Resettlement Services for the Trust Fund administration to facilitate Access to
Contract for services December 6th, Services, modifications to: Agricultural Credit.
of the Trust Fund 2007 to Appendix A “Descripción de Duties related to resettlement activities performed directly to the
BAMER **
Administration December 31st, Servicios” and Appendix B identified persons that will be affected by the resettlement process.
2009 “Requisitos para la Banking services resulting from the resettlement activities.
Presentación de Informes”
Contract for the Consultant Services for the implementation of the Movable Guarantee
Implementation of National Law Center for October 9th ,2007 Law, their regulations and operation.
the Movable Inter-American Free USD 1,915,000.00 to December Increase of USD 31,250.00
Warranties Law Trade (NLCIFT) 31,2009
Contract for the Supply of backpack sprayers for agricultural use for the FTDA program
purchase of beneficiaries for the period (January/2007- June/2007)
December
backpack sprayers SEAGRO L. 186,750 -----------
13th,2007
for agricultural use
Contract for the Supply of seedling trays for agricultural use for the FTDA program
December beneficiaries for the period (January/2007- June/2007)
purchase of seedling REMAGRO L. 630,00.00 -----------
13th,2006
trays
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Contract for the Supply of plastic crates for agricultural use for the FTDA program
purchase of plastic December beneficiaries for the period (January/2007- June/2007)
crates for agricultural REMAGRO L. 1,102,500.00 -----------
13th,2006
use
Contract for the Supply and installation of drip irrigation systems for the FTDA program
purchase and January 15th, beneficiaries for the period (January/2007 – June/2007)
installation of Drip DICOSA L. 2,866,185.00 -----------
2007
irrigation Systems
Contract for the Supply of sand filters for the FTDA program beneficiaries for the period
purchase of Sand January 22nd to (January/2007- April/2007)
Filters for agricultural Adalid Vásquez L. 2,277,186.75 -----------
April 13th/ 2007
use
Development of the Development of the MCA Honduras MIS.
Management October 18th,
Information System Eraldo Ventura USD 18,0000.00 2007 to February -----------
(MIS) 18, 2008
Monitoring and reporting of all MCA Honduras related activities that
Press Monitoring July 1st, 2007 to appear in national communications media.
SEPROC L. 204,000.00 -----------
Services June 30th, 2008
MCA Honduras’ Maintenance of MCA Honduras’ gardens.
offices Garden July 30th, 2007
Jardines Modernos, S. de
maintenance L. 54,000.00 to July 29th, -----------
R.L.
services 2008
Preparation of the Assistance and preparation of technical specifications and bidding
Standard Bidding document for the procurement of a drill rig and equipment.
Document for the Jun 05th,2007 to
purchase of water David Lardizabal USD 641.00 -----------
July 04th, 2007
well drill rig
equipment
Assistance to MCA • Preparation of a plan for the implementation of the National Movable
Honduras for the January 8th, Property Registry.
implementation of Daniel Meza USD 20,000.00
2007 to April ----------- • Technical assistance in the selection of an implementing firm for the
the Farmer Access 30th, 2007 FACA.
to Credit Program
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
• Elaboration of a financial instrument to facilitate MCA Honduras with
the implementation of the loans fund for the FTDA beneficiaries.
Design and Design of MCA Honduras’s corporate image, including stationary, logos,
development of the August 21st, and media plan.
corporate image for Liliana Villeda L. 39,365.00 2007 to October -----------
MCA Honduras 4th, 2007
Consultant services • Evaluation of the current rural credit in Honduras.
for the preparation of
October 23rd, • Preparation of an strategy for MCA Honduras and the basic
the previous principles for the FACA program.
2006 to
elements to the Daniel Meza USD 7,500.00 -----------
December 05th,
Implementation of
2006
the Farmers Access
to Credit activity
Conceptual design Define the requirements for the MCA Honduras’ SIG based on MCA
February 05th,
of the Management María de los Ángeles Honduras’ requirements of information, their clients and users.
USD 7,000.00 2007 to April -----------
Information System Ponce
02nd, 2007
(MIS)
• Market identification and development
• Farmer selection and activity promotion
Technical • FTDA promotion
August 07,2006
Assistance for the • Agri-business skills development
FINTRAC USD 22,392,600.00 to December 31, -----------
agricultural sector • Facilitate Access to Credit
2009
• Production and post-harvest skills development
• Ensuring sustainability of FTDA’s services
• Environmental and social assessment
Development of the Develop a SIG prototype and its technical specifications.
model and technical
specifications for the June 06th, 2007
Eraldo Ventura USD 3,000.00
-----------
Management to July 06th,
Information System 2007
Radio spots for MCA Radio spots, nation-wide for the MCA-Honduras activities and
Honduras’s January 7 to information related to its projects: Transport and Rural Development.
HRN L. 86,400.00 -----------
information March 7, 2008
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Radio spots for MCA Radio spots, nation-wide for MCA-Honduras activities and information
June 1 to
Honduras’s related to its projects: Transport and Rural Development.
HRN L. 301,000.00 December 31, -----------
information
2008
Radio spots for MCA Radio spots, nation-wide for MCA-Honduras activities and information
June 1 to
Honduras’s related to its projects: Transport and Rural Development.
Radio América L. 82,401.20 December 31, -----------
information
2008
Develop the System Implementation Plan; provide necessary technical
assistance to SOPTRAVI (Honduran Ministry of Public Works,
Transportation, and Housing) and other office´s responsible for the
Development of the
April 4 to maintenance of national highways; coordinate with SOPTRAVI,
Weights Control
Gabriel Luongo Caselli USD 36,750.00 September 30, ----------- Millennium Challenge Account, and the Millennium Challenge
System
2008 Corporation, the implementation of various Plan Activities; and subject to
Implementation Plan
the results of the before mentioned activities; monitor progress of these
activities and provide red-light alert in cases where there are delays.
Supervision for the Identify, assist and supervise technicians that will help identify potential
Identification of farmers that could be eligible to participate in the FTDA program.
Potential Farmers of Marcial Rodríguez February 18 to Develop the “Información para la Ubicación de Agricultores” format (a
USD 7,560.00 -----------
the Rural Rodríguez July 17, 2008 format to locate potential farmers). Develop the recluting and training
Development Project plan for technicians. Elaborate progress reports.
Identify, assist and supervise technicians that will help identify potential
Supervision for the
farmers that could be eligible to participate in the FTDA program.
Identification of
Benjamín Alonso Rovelo February 18 to Develop the “Información para la Ubicación de Agricultores” format (a
Potential Farmers of USD 7,560.00 -----------
Morales July 17, 2008 format to locate potential farmers). Develop the recluting and training
the Rural
plan for technicians. Elaborate progress reports.
Development Project
Identify, assist and supervise technicians that will help identify potential
Supervision for the
farmers that could be eligible to participate in the FTDA program.
Identification of
Fernando José Funez February 18 to Develop the “Información para la Ubicación de Agricultores” format (a
Potential Farmers of USD 7,560.00 -----------
Larios July 17, 2008 format to locate potential farmers). Develop the recluting and training
the Rural
plan for technicians. Elaborate progress reports.
Development Project
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Identification of Identify potential farmers that could be eligible to participate in the FTDA
potential farmers for June 13, 2008, increase of the Program. Interview potential farmers, identify at least 5 lead farmers per
the Rural Héctor Martín Lagos March 04 to July contract amount in USD 399.00, “aldea” and collect general information for each of them. Fill and
USD 4,000.00
Development Project Macias 17, 2008 for identification of potential complete the “Información para la Ubicación de agricultores” format.
farmers in additional Aldeas. Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
Jaime Nelson Mondragón March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00 -----------
Coello 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
Leonel Armando Ávila March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00 -----------
Enamorado 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
Juan Carlos García March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00 -----------
Muñoz 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
Wilfredo Ramón Romero March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00 -----------
Gamoneda 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identification of Identify potential farmers that could be eligible to participate in the FTDA
June 13, 2008, increase of the
potential farmers for Program. Interview potential farmers, identify at least 5 lead farmers per
March 04 to July contract amount in USD 399.00,
the Rural Marco Tulio Rodríguez USD 4,000.00 “aldea” and collect general information for each of them. Fill and
17, 2008 for identification of potential
Development Project complete the “Información para la Ubicación de agricultores” format.
farmers in additional Aldeas.
Provide weekly reports regarding the activities progress.
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
June 13, 2008, increase of the Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
March 04 to July contract amount in USD 399.00, “aldea” and collect general information for each of them. Fill and
the Rural Sara Elisa Flores Pavón USD 4,000.00
17, 2008 for identification of potential complete the “Información para la Ubicación de agricultores” format.
Development Project
farmers in additional Aldeas. Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
Heber Abner Bojorque March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00 -----------
Espinal 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
Oscar Moisés Meza March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00 -----------
Flores 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
Javier Antonio Interiano March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00 -----------
Osorio 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
Marvin Javier Chinchilla March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00 -----------
Hernández 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identification of Identify potential farmers that could be eligible to participate in the FTDA
potential farmers for Program. Interview potential farmers, identify at least 5 lead farmers per
Jessica Julissa Orellana March 04 to July
the Rural USD 4,000.00 ----------- “aldea” and collect general information for each of them. Fill and
Martínez 17, 2008
Development Project complete the “Información para la Ubicación de agricultores” format.
Provide weekly reports regarding the activities progress.
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Identify potential farmers that could be eligible to participate in the FTDA
Identification of Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for Oscar Leonardo Martínez March 04 to July “aldea” and collect general information for each of them. Fill and
USD 4,000.00 -----------
the Rural Navarro 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
June 13, 2008, increase of the Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
Jorge Alberto March 04 to July contract amount in USD 399.00, “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00
Castellanos Herrera 17, 2008 for identification of potential complete the “Información para la Ubicación de agricultores” format.
Development Project
farmers in additional Aldeas. Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural Romain Viera Mejia USD 4,000.00 -----------
17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
José Adán Pérez March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00 -----------
Velásquez 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identify potential farmers that could be eligible to participate in the FTDA
Identification of
Program. Interview potential farmers, identify at least 5 lead farmers per
potential farmers for
Andrés Felipe Ortiz March 04 to July “aldea” and collect general information for each of them. Fill and
the Rural USD 4,000.00 -----------
Tabón 17, 2008 complete the “Información para la Ubicación de agricultores” format.
Development Project
Provide weekly reports regarding the activities progress.
Identification of Identify potential farmers that could be eligible to participate in the FTDA
potential farmers for Program. Interview potential farmers, identify at least 5 lead farmers per
Wilmer Miguel Amador March 04 to July
the Rural USD 4,000.00 ----------- “aldea” and collect general information for each of them. Fill and
Macias 17, 2008
Development Project complete the “Información para la Ubicación de agricultores” format.
Provide weekly reports regarding the activities progress.
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Services for transcription of data for identification and location of
Services for surveys
Aimee Aracely Lagos June 24 to July potential lead farmers for evaluation purposes in accordance with the
transcription (Data USD 300.00 -----------
Paz 07, 2008 MCA Honduras’ Rural Development Program.
Transcription)
Inter institutional Services to perform surveys and all the concerning data reports covering
cooperation the following themes: Home baseline for the FTDA program; Home
Agreement for the baseline for the Transport Project including prices and products; Surveys
performance of Instituto Nacional de June, 2008- April for the FTDA program beneficiaries; Follow up surveys for FTDA homes
USD 892,640.06 ----------
Home, Farmers, Estadística (INE) 2010 and prices and products for the FTDA Program; Home Surveys for follow
Price and Products up of the Transport Project related to Process and Products.
Surveys
Review, analyze and propose adjustments to the MCA Honduras’ model
Consultant for the for selecting rural roads; analyze the inclusion of rural roads in the
preparation of the second round of selection; analyze the rural road net that is not covered
Investment Plan for April 22 to July by the Fondo Vial in its Road Maintenance Plan for 2008-2010;
Roberto Ordoñez USD 13,500.00 --------
the second round of 30, 2008 Elaborate the proposal for the second round Investment Plan for farms
Rural Roads to markets roads; Elaborate an specific program to strength the local
and municipal capacity for the maintenance of the rural roads.
Design of a Program Design the implementation of a pilot Project to create Access to goods,
for the Development equipment and technological materials, suing the existing market in the
of Basic country and ways to perform payments for this goods and equipment
Technological May 28 to July (Voucher System). Design methods for purchasing and delivery of
María Elena Kafati USD 4,000.00 -------
Markets furnace for 23, 2008 goods, equipment, technological materials and/or technical assistance
agricultural required by farmers participating in the FTDA program.
production (Voucher
System)
Consulting Services Design review and Supervision Services for the Construction of
for Supervision Segment II of the CA-5 road (Sections 3 and 4).
Services for the
Construction of DMJM+Harris / Saybe y
May 1st, 2008 to
Segment II (North Asociados USD 1,855,490.31 --------
July 2010
Segment) of the CA-
5
North Highway
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Construction Works of Section 3 of the CA-5 Road. Includes 23.5 km of
the North end of Comayagua Valley and ends just South of
Construction Works Siguatepeque. In the construction activities along the North Segment
July 23rd,t 2008,
of Section 3 North include a third climbing lane in sections with steep and sustained
Astaldi S.p.A. USD 16,190,321.44 to July 22nd, ------
Segment of the CA-5 grades, has been provided in the design. In The North Segment
2010
North Highway “passing lanes” in highway sections with greater traffic volume, has also
been included.
Construction of Section 4 of the CA-5 Road. Includes 26 km of road from
Siguatepeque to Taulabé. In the construction activities along the North
Construction Works
July 23rd,t 2008, Segment include a third climbing lane in sections with steep and
of Section 4 North
Astaldi S.p.A. USD 23,240,259.73 to July 22nd, ----- sustained grades, has been provided in the design. In The North
Segment of the CA-5
2010 Segment “passing lanes” in highway sections with greater traffic volume,
North Highway
has also been included.
The objective of the services is to ensure that the construction works for
Consulting Services the Comayagua-Ajuterique-La Paz Road (works that will be supervised
for Construction Joint Venture under this Contract include the 14.8 km of road) are completed in
Supervision for the Gabinete Técnico S. A. June 16th 2008 accordance with the project’s quality, time, and cost specifications. This
Comayagua – de C. V. (Gatesa) / Cal y USD 470,578.12 to February 16th ----- includes supervision and control over the implementation of the works to
Ajuterique - La Paz Mayor y Asociados, S. C. 2010 mitigate the environmental impact of road construction activities
Road throughout the Project and ensure that MCC’s environmental guidelines
are always followed.
Resettlement The works are Resettlement Infrastructure on Section 4 of the CA-5 North
Infrastructure Works Highway located at Lot No.1 within Section 4 of the CA-5 North Highway.
September 01,
on Section 4 of the Ingenieros Calona de These works include: Construction of small buildings, potable water
US$ 1,906,417.13 2008 to February ------
CA-5 North Honduras S.A. de C. V. systems, sewage systems, electrical systems.
01, 2009
Highway, Lot 1
Resettlement The works are Resettlement Infrastructure on Section 4 of the CA-5 North
Infrastructure Works Highway located at Lot No.2 within Section 4 of the CA-5 North Highway.
September 01,
on Section 4 of the Ingenieros Calona de These works include: Construction of small buildings, potable water
US$ 850,965.35 2008 to February ------
CA-5 North Honduras S.A. de C. V. systems, sewage systems, electrical systems.
01, 2009
Highway, Lot 2
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Resettlement The works are Resettlement Infrastructure on Section 4 of the CA-5 North
Infrastructure Works September 01, Highway located at Lot No.3 within Section 4 of the CA-5 North Highway.
Ingenieros Calona de
on Section 4 of the US$ 1,582,338.08 2008 to February ------ These works include: Construction of small buildings, potable water
Honduras S.A. de C. V.
CA-5 North 01, 2009 systems, sewage systems, electrical systems.
Highway, Lot 3
The works include the upgrading of the road to a double treatment
wearing course of two lanes with 1.2m wide shoulders. The road is
approximately 18.32 km long with a section of approximately 3.2 km that
Construction of the bypasses the towns of Ajuterique and Lejamani approximately mid way
Comayagua – Profesionales de la August 28th along the road (from stake value 10+000 to 13+200). The bypass
Ajuterique - La Paz Construcción S.A. de C. US$ 6,287,522.77 2008 to February section will not be constructed at this stage until better viability in terms
Road V. (Prodecon) 28th, 2010 of costs, environmental and resettlement issues, and available funds is
obtained. The road will be improved to a double treatment wearing
course with modifications to the vertical and horizontal alignment to
improve visibility and riding quality of service.
Resettlement The works are Resettlement Infrastructure on Section 3 of the CA-5 North
Infrastructure Works Highway located at Lot No.1 within Section 3 of the CA-5 North Highway.
Servicios de Ingeniería September 23,
on Section 3 of the These works include: Construction of small buildings, potable water
Salvador García y US$ 1,429,062.38 2008 to February ------
CA-5 North systems, sewage systems, electrical systems.
Asociados S. de R. L. 16, 2009
Highway, Lot 1
Resettlement The works are Resettlement Infrastructure on Section 3 of the CA-5 North
Infrastructure Works Highway located at Lot No.3 within Section 3 of the CA-5 North Highway.
Servicios de Ingeniería September 23,
on Section 3 of the These works include: Construction of small buildings, potable water
Salvador García y US$ 1,636,719.54 2008 to February ------
CA-5 North systems, sewage systems, electrical systems.
Asociados S. de R. L. 16, 2009
Highway, Lot 3
The Sonaguera – km 35 road is approximately 26.6 km long. The works
Design Completion/ that will be supervised under this contract include the section of road that
Rewiew and Joint Venture Gabinete September 16th starts at Sonaguera at approximately station 8+640 and ends at station
Construction Tecnico S.A. de C. V. to 2008 35+240 (“the Project”). The road currently has a gravel wearing course
US$ 552,211.32 ----
Supervision of the (Gatesa)/ Cal y Mayor y September 16th and the Project aims to improve it to higher standard to reduce vehicle
Sonaguera-Km 35 Asociados S.C. 2010 operating costs and to increase transport efficiency including traffic speed
Road and safety.
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Addendum No.1 Collection of data needed for the evaluation of the Transport Project. The
Increase in he original contract Consultant will collect traffic data on four segments of the principal CA-5
price in US$ 18,047.61 (Additional highway, twelve secondary road segments and approximately 75
Services adding new roads and segments of rural roads. For all road segments, the Consultant will
September 1st, highway sections)
Gabinete Técnico, S.A. conduct a baseline data collection before all road construction projects
Traffic Surveys US$ 182,220.09 2008 to January
(GATESA) Addendum No.2 begin. Data will be collected through traffic surveys on vehicle counts and
1st, 2009
Increase in the original contract types and number of passengers and short surveys of motorists and
price in US$ 9,750.00 (Additional drivers.
Services for counting of traffic
surveys on 13 new locations)
Section 2 from Río del Hombre-Beginning of the Comayagua Valley runs
from Station 24 +300 (located 68,44 m from the northern abutment of the
Construction Works bridge over the Rio del Hombre) up to Station 57 + 600, at the beginning
January 10th,
for Section 2 of the of the Comayagua Valley (Las Mercedes). It has a length of 33,3 km
Consortium M&S/Santa 2009 to January
South Segment of US$ 48,442,216.44 ---- The Works required in the Project include the rehabilitation of the existing
Fe Ltda. 9th, 2011
the CA-5 North lanes and the construction of new lanes so as to turn this stretch of the
Highway road into a four lane road, two lanes in each direction, signaled with
yellow paint and vibraline strip. Each lane shall be 3,60 m wide and 2,40
m at the shoulders.
Evaluation panel Consultant services as Member of the Evaluation Panel for the analysis
member for the and evaluation of bid s received for the procurement of Water Well Drill
procurement of July 14 to July Rig, Equipment and Training of Personnel.
David Lardizabal US$ 337.50 ----
Water Well Drill Rig, 16, 2008
Equipment and
Training of Personnel
Services for Services for scan and organize F01’s administrative documents for the
Scanning of August 27, 2008 year 2007 and first semester of 2008.
administrative Aimee Aracely Lagos US$ 1,000.00 to September 26, ----
documents 2008
Preparation of Loan Preparation of the Loan Agreement document, revise MCA-H governing
Agreement laws and regulations, revise MCA-H FAP, prepare a detail financial plan
August 12, 2008
Document between for each section of CA-5 (segments 1 and 2) reflecting CABEI and MCC
José Arnoldo Sermeño US$ 21,000.00 to November 30, ----
the Government of co financing, prioritization of certificates from SEFIN and UNAT required
2008
Honduras and the by the Central Bank in order to agree on the signature of the loan
CABEI agreement.
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Addendum No. 1 Extend the period of services for one year January 1, 2007 to December
Extend the period of services for one 31, 2007
year January 1, 2007 to December
31, 2007
May 24, 2006 to Addendum No. 2 Extend the period of services for one year January 1, 2008 to December
Provide Internet
Multidata L.4,400.00 December 31, Extend the period of services for one 31, 2008
Services year January 1, 2008 to December
2006
31, 2008
Addendum No. 3
Modify monthly Internet Services thereby changing monthy rate to US$
Modifiy monthly price due to change 750.00 per month (effective July 1, 2008) due to a change in the broad
in Broad Band band from 512Kpbs to 1,536 Kpbs.
Design, Elaborate,
Provide Moving • Design the distribution of MCA Honduras personnel in the new
Services and Install premises, and provide the corresponding drawings.
furniture in New September 5, • Provide Moving Services.
MCA-Honduras 2008 to • Install furniture in new MCA Honduras Offices, and locate archives in
Johny W. Casco Lps. 597,107.42 ----
Offices; carry out September 25, the designated areas.
repairs in previous 2008 • Provide furniture needed to finish installing all personnel.
MCA-Honduras • Carry out repairs in previous MCA Honduras offices (windows, general
offices. painting, repairs in walls, etc).
September 10, Install and leave operational the Information and Financial Administration
SIAFI Connection for Soluciones Técnicas, S. 2008 to System (or SIAFI) connection for new MCA-Honduras Office
Lps. 71,300.00 ----
MCA Honduras de R.L. September 21,
2008
Carry out diagnostic Carry out diagnostic services related to Telephone Central System
September 8,
services related to
2008 to
Telephone Central Victor A. Hidalgo F. US$ 1,850.00 ----
September 16,
System
2008
Evaluation and pre- Evaluation of technical proposals participating in the second round of the
certification of MCA-Honduras Grants Fund.
October 20, 2008
technical proposals
José Roberto Banegas US$ 2,000.00 to November 05, ---
received for the
2008
second round of the
MCA-H Grants Fund.
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Evaluation and pre- Evaluation of technical proposals participating in the second round of the
certification of MCA-Honduras Grants Fund.
October 20, 2008
technical proposals
Milton Flores Barahona US$ 2,000.00 to November 05, ----
received for the
2008
second round of the
MCA-H Grants Fund.
Evaluation and pre- Evaluation of technical proposals participating in the second round of the
certification of MCA-Honduras Grants Fund.
October 30, 2008
technical proposals
Roduel Rodriguez Ardón US$ 2,000.00 to November 10, ----
received for the
2008
second round of the
MCA-H Grants Fund.
Consulting Services
The works that will be supervised under this contract start at the
for Design
intersection with the Choluteca bypass of the CA-1 at approximately
Completion/Review,
October 27th, station 4+149 and ends at station 25+228 (“the Project”). The road
and Construction Consortium ASP/Conash
US$ 549,166.80 2008 to October ---- currently has a gravel wearing course and the Project aims to improve it
Supervision of the
27th, 2010 to higher standard to reduce vehicle operating costs and to increase
Choluteca - Orocuina
transport efficiency including traffic speed and safety.
Road
Consulting Services
for review, edition October 24th, to
and translation of Jacqueline Greene US$ 960.00 October 31st, ---- Revision, edition and translation of document Narrative Report.
annual narrative 2008
report October 2008
The Sonaguera – km 35 road is approximately 26.6 km long. The works
under this contract include the section of road that starts at Sonaguera at
November 25th, approximately station 8+640 and ends at station 35+240 (“the Project”).
Construction of the Empresa de
2008 to April The road currently has a gravel wearing course and the Project aims to
Sonaguera – Km 35 Construcción y US$ 7,246,557.44 ----
25th, 2010 improve it to higher standard to reduce vehicle operating costs and to
Road Transporte - Eterna S.A
increase transport efficiency including traffic speed and safety.
The construction period is eighteen months.
The Services consist on: (1) Construction Supervision of Section 2 of the
Supervision Services Consortium November 10th, CA-5: Rio del Hombre - Inicio Valle de Comayagua, and (2)Development
Segment I CA-5 Tecnisa/Cinsa/Inocsa US$ 2,216,151.00 2008 February ---- of the Final Designs of the Tegucigalpa Beltway (Anillo Periférico)/CA-5
North Highway Ingenieria SL 2011 Highway Interchange, including the Western Return (approx 2+000).
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Addendum No.1 Supply of sand filters for agricultural use to be delivered and installed to
November
Sand Filters for Diseño y Construcción, Change in the brand and country lead farmers participating in the FTDA program.
US$ 76,166.00 11th,2008 to
Agricultural Use S.A. (DICONSA) of origin for the sand filters
January 30, 2009
originally offered
November Supply of drip irrigation systems to be delivered and installed to farmers
Drip Irrigation Diseño y Construcción, participating in the FTDA program.
US$ 357,621.25 11th,2008 to ----
Systems S.A. (DICONSA)
January 30, 2009
New Mark November 11th, Supply of seedling trays for agricultural use to farmers participating in
Seedling Trays for the FTDA program.
Representaciones, S. de US$ 46,287.50 2008 to February ----
Agricultural Use
R.L. 28, 2009
New Mark November 11th, Supply of plastic crates for agricultural use to farmers participating in the
Plastic Crates for FTDA program.
Representaciones, S. de US$ 99,618.75 2008 to February ----
Agricultural Use
R.L. 28, 2009
November 10th, Provide Cleaning and Fumigation Services to the MCA-Honduras
Cleaning Services Honduran Service and
2008 to Offices for a period of one year.
for MCA-Honduras Investment Company L.298,185.00 ----
November 11,
Offices (Service Master)
2009
Provide consulting services to collect data needed for the evaluation of
Consultores Financieros December 02, the Transportation Project. Data will be collected through business
Business Enterprise
Internacionales, S.A. US$ 94,000.00 2008 to April 02, ---- surveys that collect data on firm productivity and income, employment,
Surveys
(COFINSA) 2009 transport and shipping costs, and client profile.
Water Well Drill Rig Water well drill rig, equipment and accessories. Include training of
Equipment, personnel responsible to operate the equipment.
Auxiliar Euro Industrial, January 30, 2009
Accessories and US$ 1,042,149.18 ----
S.L. (AEI) to June 30, 2009
Training of
Personnel
Section 1, Tegucigalpa-Rio del Hombre runs from Station 0 + 000
Tegucigalpa where it meets with the end of the Boulevard Fuerzas
Contract Armadas up to Station 24 +300 (located at 68,44 m from the Northern
Construction Works
signature: March abutment of the bridge over Rio del Hombre). Its length is of 24.3 km
for Section 1 of the Empresa de
10th, 2009 and runs through a partially mountainous area at the exit of Tegucigalpa,
South Segment of Construcción y US$ 39,732,136.50 ----
Pending Notice continuing with the Amarateca Valley, in its final portion. The
the CA-5 North Transporte - Eterna S.A
to Proceed mountainous area extends from the starting of the Project at the current
Highway
exit to the North at a length of approximately 17 kilometers and then in
the Amarateca Valley it has an approximate length of 7 kilometers.
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Resettlement The works are Resettlement Infrastructure on Section 3 of the CA-5
Servicios para el
Infrastructure Works North Highway located at Lot No.2 within Section 3 of the CA-5 North
Desarrollo de la January 16 to
on Section 3 of the US$ 1,166,427.19 ------ Highway. These works include: Construction of small buildings, potable
Construccion S. de R.L. July 15, 2009
CA-5 North water systems, sewage systems, electrical systems.
de C.V. - Sedeco
Highway, Lot 2
Resettlement The works are Resettlement Infrastructure on Section 2 of the CA-5
Servicios para el
Infrastructure Works North Highway located at Lot No.2 within Section 2 of the CA-5 North
Desarrollo de la January 16 to
on Section 2 of the US$ 850,352.82 ------ Highway. These works include: Construction of small buildings, potable
Construccion S. de R.L. July 15, 2009
CA-5 North water systems, sewage systems, electrical systems.
de C.V. - Sedeco
Highway, Lot 2
The Choluteca - Orocuina road starts on the Pan-American Highway
approximately 500 meters from the Suspended metal bridge that
provides access to Choluteca over the Choluteca River. At
February 04, approximately km 4+144 from the start, the road intersects the
Construction of the
2009 to August Choluteca Bypass which takes all the through traffic along the Pan-
Choluteca - Santos y Compañía US$ 7,523,992.70 ----
04, 2010 American Highway. This point of intersection is regarded as the
Orocuina Road
beginning of the Project which has approximately 21.1 km in length until
the road reaches Orocuina.
The construction period is eighteen months.
Consulting Services
for review, edition
March 23rd, to
and translation of
Jacqueline Greene US$ 960.00 December 31st, ---- Revision, edition and translation of document Narrative Report.
narrative report from
2009
January to March
2009
Written translation
US$ 0.04 for March 6th, to
Translation services translated word and December 31st, Translation of documents, and simultaneous translations for MCA
Lena Xochil Zuniga ----
for MCA Honduras US$ 200.00 per day 2009 Honduras.
for simultaneous
translation.
March 6th, to
Written translation
Translation services December 31st,
Maria Rosario Matute US$ 0.03 for ---- Translation of documents for MCA Honduras.
for MCA Honduras 2009
translated word
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Design and creation
of messages and
signs as part of the Take photographs, create and design messages for the signs to be
March 23rd to
road security plan for Josué Daniel Avila Uclés US$ 490.00 ---- placed on the CA-5 road, as part of the security plan for MCA Honduras’
April 6th, 2009
MCA Honduras’ Transport Project.
Transport Project
Consultant for
Evaluation of
proposals for the Commencement The consultant will be part of the Evaluation Panel of Proposals received
process RFP Cynthia Morales Rosales US$ 3,000.00 February 17th to ----- for the process RFP 012-2008 Consulting Services for Supervision of
Supervision of Rural end of evaluation Rural Roads.
Roads
Consultant for
Evaluation of
proposals for the US$ 2,500.00 (plus Commencement The consultant will be part of the Evaluation Panel of Proposals received
process RFP Maximo Rafael Mendoza travelling allowance February 17th to ----- for the process RFP 012-2008 Consulting Services for Supervision of
Supervision of Rural and expenses) end of evaluation Rural Roads.
Roads
Consultant for
Evaluation of
proposals for the Commencement The consultant will coordinate the Evaluation Panel of Proposals received
process RFP Ana Lourdes Pavón US$ 3,000.00 February 17th to ----- for the process RFP 012-2008 Consulting Services for Supervision of
Supervision of Rural end of evaluation Rural Roads.
Roads
Consultant for
Evaluation of bids for US$ 2,500.00 (plus Commencement
the process BD The consultant will be part of the Evaluation Panel of Bids received for the
Chester Javier Sequeira travelling allowance February 19th to -----
Construction Works process IFB/CB-017-2008 Construction Works of Rural Roads.
and expenses) end of evaluation
of Rural Roads
Consultant for
The consultant will be part of the Evaluation Panel of Bids received for the
Evaluation of bids for Commencement
process IFB/CB-017-2008 Construction Works of Rural Roads and for the
the process BD Martha Lidia Flores US$ 5,000.00 February 3rd to -----
process IFB/CB-016-2008 Resettlement Works for Lot 1 of Section 2 CA-
Construction Works end of evaluation
5 Road
of Rural Roads
Name of Awarded Duration of
Procurement Contract Price Addendum Summary of the Scope of Contract
Consultant the Services
Consultant for
Evaluation of bids for Commencement
The consultant will be part of the Evaluation Panel of Bids received for the
the process BD Carlos Omar Durón US$ 3,000.00 February 19th to -----
process IFB/CB-017-2008 Construction Works of Rural Roads.
Construction Works end of evaluation
of Rural Roads
PROCESSES CANCELLED
Process Number and Identification Reason for Cancelling the Procurement
As per the provisions indicated in Clause 2.61 of the MCC Program Procurement Guidelines, MCA
Honduras rejects all bids for the following reasons:
IFB/CB/No.011-2008 Construction Works for Rural Roads • Bids not substantially responsive, and
• Bid prices substantially higher than estimated budget
As per the provisions indicated in Clause 2.30 of the MCC Program Procurement Guidelines, MCA
RFP/No.002-2008 Consulting Services for Construction Honduras has cancelled the process for the following reasons:
Supervision of the Rural Roads, Lot I and III • Major changes in the scope of services.
As per the provisions indicated in Clause 2.61 of the MCC Program Procurement Guidelines, MCA
CB/No.004-2008 Backpack Sprayers, Seedling Trays and Plastic Honduras rejects bids received for Lot No.1 Backpack Sprayers, for the following reason:
Crates, Lot No.1 • Bid prices substantially higher than estimated budget