Embed
Email

AT-ATT

Document Sample

Shared by: dandanhuanghuang
Categories
Tags
Stats
views:
5
posted:
1/15/2012
language:
pages:
42
UNIT PLAN INSTRUCTIONS & TIPS (print these for reference)

Overview

Each unit plan is made up of one excel workbook which has several worksheets.

Identification – enter basic information about the department/unit

Main Unit Plan – enter the unit plan objectives, outcomes, types of resources requested, etc.

Financial Resources – enter details of your financial requests

IT Resources – enter the description and rationale for your IT request

Facilities Resources - enter the description and rationale for your facilities request

You can switch from one worksheet to another using the tabs that show at the bottom of the screen. Some information is

automatically filled in from one worksheet to another so you don’t have to re-enter the same information – please note that you

can't add columns or merge cells. We have set it up this way as changing columns or merging cells will mess up the autofill

function.



Identification Worksheet Enter the following information:

CSA: One of four College Service Areas identified by the title of the President or Vice President – Student Services,

Instruction, Administrative Services, and President’s Office. (Use the drop down box)

Division (Use the drop down box)

Department/Unit (Use the drop down box)

Contact person: name, phone number and email (typically this will be the department chair)

Date/revision date: It’s useful to change this each time you revise the unit plan so that you can keep track of what version is

the most recent.

Planning year: This has been filled in for you. This is the year you are planning for; remember that in this year, we are

planning for next year’s work.

Unit Mission: The mission of your department or unit is the main role or function(s) that the department or unit fills at the

college. This should align with the overall Mission of the College. For example, an instructional department’s mission may

include providing general education, basic skills development, degree or certificate courses, courses which develop specific

job skills, etc. A student services unit may have a mission that includes specific types of support for student learning, the use

of data to improve the success of students from diverse backgrounds, etc.



Main Unit Plan Worksheet Enter the following information:

Identification: This information will automatically be filled in from the “Identification” worksheet.

Enter the following information:

Objective ID: Name each objective using the abbreviation for your unit and a number (e.g. PRIE-1, HIST-1, EOPS-1). Be

careful to keep the same formatting for all objective IDs.

Unit objective: A unit plan objective is a specific measurable action that you plan to accomplish over the year that the plan

is implemented or over a few years including the planning year. If you have a multi-year objective, you’ll be asked to indicate

the year you began working on the objective and the year you plan to complete the objective.

Outcome measure: The outcome measure is the indicator that you have achieved the objective. When you’ve accomplished

this, you know you’ve completed your objective.

Multi-year plan: If you have a multi-year objective, you’ll be asked to indicate the year you began working on the objective

and the year you plan to complete the objective. If you have a multi-year objective, use the drop down menus to show the

start year and the end year for the objective.

Resources required: There are several types of resources that you need to indicate in this set of boxes. These are labelled –

Financial Resources, Facility Resources, IT Resources, Hire FT faculty, and Hire Classified. Put an X in the box for each type of

resource that you are requesting. (This “X” is what triggers the autofill to the other worksheets.)

Prioritization: These columns allow the priority assigned to each objective by the department and division to be recorded.

The College Service Area (CSA) priorities will be filled in later.

Type of change: The unit plan allows you to indicate some important types of actions:

Curriculum changes such as modifying course outlines, adding pre-requisites, developing new courses, etc.

Teaching method implementation such as different classroom practices, new teaching materials, use of supplementary

instruction or tutors, etc.

Administrative processes such as modifications to paperwork, data collection, staff processes, etc.

Outreach to community outside of the college – work with high schools, transfer universities, local community groups,

advisory boards, industry partners, etc.

College Goals: Put an X in the box for each College Goal that is supported by the objective. If you place the cursor over the

number of the goal, you will see the wording of the goal. You should check all of the goals with which an objective is aligned,

but remember that there are no “bonus points” for checking off a large number of goals.

Financial Resources Worksheet Fill out the main unit plan worksheet before you do this one. On this worksheet you will enter

the details of your financial resource requests. The objID, objective, and outcome measures will automatically be filled in from

the main unit plan page for those objectives with financial resource requests (there will be some blank rows where objectives

didn't have financial resource requests; this is OK). Enter the details of your financial resource requests (columns with green

headers).

Description: Briefly describe what financial resources will be needed and what they will be used to purchase.

Rationale: Briefly describe how the financial resources will support the unit objective; i.e. why are the resources needed at

this time.

Nature of Request: Use the drop down menu to chose from the following: Maintenance of effort, New Initiative, or

Emergent/urgent.

General Funding Type: Indicate the general funding type(s) being requested; choose from the list shown below. You may

enter more than one type of funding. (A pop up box will remind you of the list below)

Continuing CDF base augmentation – request for an ongoing increase in the base budget for the unit. (Used for

supplies, repairs, software, travel, student help, temporary classified staff, etc.)

One time only (OTO) base augmentation – request for a one time only increase in the base budget for the unit.

Continuing IR base augmentation – request for an ongoing increase in the “IR” monies used to support extensions of

classroom instruction such as athletics, theatre, forensics, student newspaper, student-centered cultural activities,

etc.

Equipment – tangible property which can be used for a year or more and has a purchase price of over $200.

VTEA funds – request for VTEA (Vocational and Technical Education Act) funding.

Basic Skill Initiative funds

Matriculation funds

EOPS funds

DSPS funds

CalWORKS funds

TANF funds

Health Grant funds

Specific Expenditure Type: Choose from the list below. You may enter more than one type of funding. (A pop up box will

remind you of the list)

Dues and membership fees

Equipment purchase

Repair

Instructional supplies

Non-instructional supplies

Marketing costs

Operating base

Personal/Consulting services

Postage

Printing

Rents & Leases

Software

Student Help

Temporary Staffing

Travel/Conference

Hours or Quantity: Indicate the number of hours or quantity of the item requested.

Unit Cost: Indicate the cost of one hour or one item.

Total financial request for objective: Enter the total amount for the item - the combined total of what will be requested

from the budget committee and what will come from other sources of funding. (Note: The entire amount may be

requested from the budget committee).

Amount requested from the Budget Committee: Enter the amount of financial resources that you are requesting from the

Budget Committee. This may be less than the total financial request if the only part of the total cost is being requested

from the Budget Committee.

Grand total project cost = Financial + IT + Facilities: This column specifies the grand total of the project, including financial

resources needed and the cost of the IT and/or facilities resources requested.



A note on long term financial commitments: If a resource request results in a long term resource commitment on the part of the

college this should be made clear at the meeting with IT and Facilities and should be part of the presentation provided to the

Budget Committee. If a resource request results in ongoing intermittent costs to the department/division (e.g. a software update

every three years) the department/division may work with the VPA to put aside a part of the money each year toward the coming

expenditure.

Facilities Resources Worksheet

Fill out the main unit plan worksheet before you do this one. The objID, objective, and outcome measures will automatically be

filled in from the main unit plan page for those objectives with facilities resource requests (there will be some blank rows where

objectives didn't have faciilities resource requests; this is OK). Enter the description and rationale for your facilities resource

request (columns with orange headers).



Description: Briefly describe what facilities resources will be needed and what they will be used to purchase.



Rationale: Briefly describe how the facilities resources will support the unit objective; i.e. why are the resources needed at this

time.



Facilities and the IT department will conduct a mandatory meeting in October for all departments which have objectives with

facilities or IT components. You may also want to schedule a meeting with the Facilities staff earlier in the process. They can help

you figure out how to meet your resource needs in the most effective way and avoid unnecessary costs.



A note on long term financial commitments: If a resource request results in a long term resource commitment on the part of the

college this should be made clear at the meeting with IT and Facilities and should be part of the presentation provided to the

Budget Committee. If a resource request results in ongoing intermittent costs to the department/division (e.g. a software update

every three years) the department/division may work with the VPA to put aside a part of the money each year toward the coming

expenditure.



The following columns are completed by Operations:

ASF Impacted: Available Square Footage



Estimated Cost: Enter estimated cost for all IT components needed to meet the unit's objective



Time Required: Enter estimated time to complete project. Alt-Enter for multiple timelines.



Feasibility/Target Date: Enter assessment of feasibility to complete the project based on time, funding, and personnel.



Funding Assessment: Potential funding sources that are eligible to support this project.



Options for Funding Assessment: (more than one may be indicated) College Discretionary Funds (CDF): Formula-driven funds

allocated to the College for spending during the annual budget development process. Institutional: Historic base allocation

used to fund institutional requirements. Categorical Funds: Restricted funds that must be used in accordance with guidelines

dictated by the funding source. Examples include but are not limited to VTEA, EOP&S and DSP&S. Foundation/Trust: Funds

provided by SCC Foundation or Trust Account . Other = Can include but not limited to HAZMAT, Americans with Disabilities Act

(ADA), Scheduled Maintenance/Special Repairs (SMSR), and Type II.



Comments: Enter additional comments required to complete this project

IT Resources Worksheet:

Fill out the main unit plan worksheet before you do this one. The objID, objective, and outcome measures will automatically be

filled in from the main unit plan page for those objectives with IT resource requests (there will be some blank rows where

objectives didn't have IT resource requests; this is OK). Enter the description and rationale for your IT resource request (columns

with orange headers).



Description: Briefly describe what IT resources will be needed and what they will be used to purchase.



Rationale: Briefly describe how the IT resources will support the unit objective; i.e. why are the resources needed at this

time.



Facilities and the IT department will conduct a mandatory meeting in October for all departments which have objectives with

facilities or IT components. You may also want to schedule a meeting with the IT staff earlier in the process. They can help you

figure out how to meet your resource needs in the most effective way and avoid unnecessary costs. (Note: Smart classrooms

are moving to a replacement cycle on a regular basis and so will not often be requested through the unit planning process in the

future.)



A note on long term financial commitments: If a resource request results in a long term resource commitment on the part of

the college (e.g. ongoing IT support) this should be made clear at the meeting with IT and Facilities and should be part of the

presentation provided to the Budget Committee. If a resource request results in ongoing intermittent costs to the

department/division (e.g. a software update every three years) the department/division may work with the VPA to put aside a

part of the money each year toward the coming expenditure.



The following columns are completed by the IT Department:

Component Assessment: List all IT components needed to meet the unit's objective. Alt-Enter to list individual

components in the same cell.



Estimated Cost: Enter estimated cost for all IT components needed to meet the unit's objective



Feasibility/Target Date: Enter expected dates of completion



Funding Assessment: Potential funding sources that are eligible to support this project. Options for Funding Assessment:

(more than one may be chosen)

College Discretionary Funds (CDF): Formula-driven funds allocated to the College for spending during the annual budget

development process.

Institutional: Historic base allocation used to fund institutional requirements.

Categorical Funds: Restricted funds that must be used in accordance with guidelines dictated by the funding source. Examples

include but are not limited to VTEA, EOP&S and DSP&S.

Foundation/Trust: Funds provided by SCC Foundation or Trust Account

Other = Can include but not limited to HAZMAT, Americans with Disabilities Act (ADA), Scheduled Maintenance/Special Repairs

(SMSR), and Type II.



Comments: Enter additional comments required to complete this project

h time you revise the unit plan so that you can keep track of what version is









se









year objective, you’ll be asked to indicate



indicator that you have achieved the objective. When you’ve accomplished

Sacramento City College

2011-12 Planning Year Unit Plan



Unit Description Data: Use the drop-down menus for College Service Area, Division and Department/Unit by clicking in

the cell and then clicking on the arrow that appears to the right of the cell. Then click on the appropriate selection.

College Service Area (CSA): VPI

Division: AT

Department/Unit: AERO

Point of Contact Name: Phil Cypret

Phone: 263-1352

Email: cypretp@scc.losrios.edu

Date/Revision Date: 12/7/2010

Planning Year 2011-12



Unit Mission: (Note: Align with College Mission)

The Electronics Department offers a comprehensive curriculum in Telecommunication Technician, Electronics

Facilities Maintenance Technician, Automated Systems Technician, and Microcomputer Technician. The

department offers both career certificates and A.S. degrees in each of these disciplines. Electronics Mechanic

career certificates is also one of the program offerings. The Telecommunications and Facilities Maintenance

options are certified training programs for the Federal Aviation Administration Electronic Technician positions. All

of the programs prepare the graduates for entry level employment in the Career Technical trades of the Blue

Collar or Green Collar variety.









College Mission: Sacramento City College is an open-access, comprehensive community college, serving a diverse student

population. We provide a wide range of educational opportunities and support services leading to transfer, career advancement,

basic skill development, degree and certificate attainment, and personal enrichment. Our commitment to continuous

improvement thruogh outcome-guided assessment, planning, and evaluation promotes student learning. Through these efforts,

we contribute to the intellectual, cultural, and economic vitality of the community.

1/15/2012



Sacramento City College

2011-12 Planning Year - Unit Plan

If multi-yr objective, use Resources(s)

the drop down menu

below for start date and Required (Place Xs Prioritization

end date appropriately)









Hire Classified

Hire Faculty

IT Request

Financial

Facilities

Objective

Objective

Obj ID Unit Objective Outcome Measures End Dept Div CSA

Start Year

Year



Aero-1 Increase operational budget Operational budget increased 2010-11 2012-13 x 4

Develop student breakroom/study Student breakroom/study space

Aero-2 2010-11 2012-13 x x 26

space developed

Install computer drops in NDT/ATC Computer drops installed

Aero-3 2009-10 x x 5

labs

Aero-4 Acquire cascade computers Cascade computers acquired 2009-10 x 6

Aero-5 Acquire Faculty technical training Faculty technical training acquired 2008-09 x 15

Acquire large aircraft training devices Large aircraft training devices acquired

Aero-6 2009-10 x 2

Aero-7 Utilize federal work study students Federal work study students utilized 2008-09 25

Aero-8 Increase tutoring program Tutoring program increased 2008-09 24

Install welding station ventilation Welding station ventilation system

Aero-9 2009-10 x x 3

system installed

Aero-10 Develop additional curriculum Additional curriculum developed 2008-09 23

Offer existing Nondestructive Testing Nondestructive Testing courses offered

Aero-11 2010-11 2012-13 22

courses

Acquire five Bell 47 helicopter Bell 47 helicopter maintenance trainers

BH-1 2010-11 2012-13 16

maintenance trainers acquired

Acquire three Lycoming piston engines Lycoming piston engines acquired

BH-2 2009-10 2012-13 18

Send two SCC Aero faculty to BHTA for SCC Aero faculty trained at BHTA

BH-3 2009-10 2012-13 17

training

Offer Bell approved Bell 47 Bell 47 helicopter maintenance training

BH-4 2010-11 2012-13 19

maintenance training at SCC offered at SCC

Increase by 100% the number of BHTA BHTA/SCC graduates increased by

BH-5 graduates receiving SCC credit for 100% 2010-11 2012-13 x 27

BHTA courses completed





Page 7

1/15/2012









Hire Classified

Hire Faculty

IT Request

Financial

Facilities

Objective

Objective

Obj ID Unit Objective Outcome Measures End Dept Div CSA

Start Year

Year



Increase BHTA/SCC Aero joint BHTA/SCC Aero marketing activities

BH-6 2009-10 2012-13 21

marketing activities increased

Acquire ground training devices for the Ground training devices acquired

FLTEC-1 2011-12 2012-13 x x 1

ATC, AD, and FLTEC Programs

Expand ATC, AD, and FLTEC Program ATC, AD, and FLTEC class offerings

FLTEC-2 2011-12 2012-13 8

class offerings expanded

Offer college credit for flight training College credit offered for flight training

FLTEC-3 through for-profit and not-for-profit 2011-12 2012-13 3

industry partners

FLTEC - Hire additional full time faculty Additional full time faculty hired

2011-12 2013-14 x 4

4

FLTEC - Hire half time Instructional Aid Half time Instructional Aid hired

2011-12 2013-14 x 9

5

MC-1 Perform DACUM study DACUM study performed 2010-11 28

MC-2 Develop or modify curriculum Curriculum developed or modified 2011-12 29

MC-3 Increase lecture/lab space Lecture/lab space increased 2010-11 2012-13 x x 31

MC-4 Hire full time motorcycle instructor Full time motorcycle instructor hired 2011-12 2012-13 x 20

MC-5 Hire half time instructional aid Half time instructional aid hired 2011-12 2012-13 x 14

MC-6 Utilize federal work study students Federal work study students utilized 2011-12 30

Hire full time Railroad Operations Full time Railroad Operations instructor

RR-1 2010-11 x 11

instructor hired

Develop agreement with railroad Industry partner agreement finalized

industry partner in order to share

RR-2 2011-12 12

working space for the Railroad

Operations Program

RR-3 Acquire additional Smart Cart Additional Smart Cart acguired 2011-12 x 13









Page 8

1/15/2012









Hire Classified

Hire Faculty

IT Request

Financial

Facilities

Objective

Objective

Obj ID Unit Objective Outcome Measures End Dept Div CSA

Start Year

Year







ADD NEEDED ROW(S) ABOVE THIS LINE.









Page 9

1/15/2012



Sacramento City College

2011-12 Planning Year - Unit Plan



Type of change (Place

Xs appropriately) Identification

College Goals

(Place X in each column









Administrative





Community

Curriculum









Processes

corresponding to the









Outreach

Teaching

Methods

goal/s for the objective.)

Obj ID Unit Objective Dept Div CSA



1 2 3 4 5 6 7 8 9

Aero-1 Increase operational budget x x x AERO AT VPI

Develop student breakroom/study

Aero-2 x x x x AERO AT VPI

space

Install computer drops in NDT/ATC

Aero-3 x x x x x x x x AERO AT VPI

labs

Aero-4 Acquire cascade computers x x x x x x x x AERO AT VPI

Aero-5 Acquire Faculty technical training x x x AERO AT VPI

Acquire large aircraft training devices

Aero-6 x x x x AERO AT VPI

Aero-7 Utilize federal work study students x x AERO AT VPI

Aero-8 Increase tutoring program x x x x x x AERO AT VPI

Install welding station ventilation

Aero-9 x x AERO AT VPI

system

Aero-10 Develop additional curriculum x x AERO AT VPI

Offer existing Nondestructive Testing

Aero-11 x x x AERO AT VPI

courses

Acquire five Bell 47 helicopter

BH-1 x x x x x AERO AT VPI

maintenance trainers

Acquire three Lycoming piston engines

BH-2 x x x x AERO AT VPI

Send two SCC Aero faculty to BHTA for

BH-3 x x x x x AERO AT VPI

training

Offer Bell approved Bell 47

BH-4 x x x x x AERO AT VPI

maintenance training at SCC

Increase by 100% the number of BHTA

BH-5 graduates receiving SCC credit for x x x x AERO AT VPI

BHTA courses completed





Page 10

1/15/2012

(Place X in each column









Administrative





Community

Curriculum









Processes

corresponding to the









Outreach

Teaching

Methods

goal/s for the objective.)

Obj ID Unit Objective Dept Div CSA



1 2 3 4 5 6 7 8 9

Aero-1 Increase operational budget

BHTA/SCC Aero joint

BH-6 x x x x AERO AT VPI

marketing activities

Acquire ground training devices for the

FLTEC-1 x x x x x AERO AT VPI

ATC, AD, and FLTEC Programs

Expand ATC, AD, and FLTEC Program

FLTEC-2 x x x AERO AT VPI

class offerings

Offer college credit for flight training

FLTEC-3 through for-profit and not-for-profit x x x x x AERO AT VPI

industry partners

FLTEC - Hire additional full time faculty

x x x AERO AT VPI

4

FLTEC - Hire half time Instructional Aid

x x x x x AERO AT VPI

5

MC-1 Perform DACUM study x x x x x x x x x AERO AT VPI

MC-2 Develop or modify curriculum x x x x x x x x x AERO AT VPI

MC-3 Increase lecture/lab space x x x x AERO AT VPI

MC-4 Hire full time motorcycle instructor x x x AERO AT VPI

MC-5 Hire half time instructional aid x x x AERO AT VPI

MC-6 Utilize federal work study students x AERO AT VPI

Hire full time Railroad Operations

RR-1 x x x x x AERO AT VPI

instructor

Develop agreement with railroad

industry partner in order to share

RR-2 x x x AERO AT VPI

working space for the Railroad

Operations Program

RR-3 Acquire additional Smart Cart x x AERO AT VPI









Page 11

1/15/2012

(Place X in each column









Administrative





Community

Curriculum









Processes

corresponding to the









Outreach

Teaching

Methods

goal/s for the objective.)

Obj ID Unit Objective Dept Div CSA



1 2 3 4 5 6 7 8 9

Aero-1 Increase operational budget

EEDED ROW(S) ABOVE THIS LINE. ADD NEEDED ROW(S) ABOVE THIS LINE.









Page 12

1/15/2012



Sacramento City College

2011-12 Planning Year - Financial Unit Plan







Description of Financial Rationale for Financial

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request





Increase operational budget Operational budget increased An example of consumable The consumables cost of

materials required would be aircraft required materials has been

aluminum and steel sheetmetal, increasing along with an

aircraft hardware, composite repair increase in the amount of

Aero-1 chemicals and fabric, paint, materials consumed due to an

lubricants, fuel, minor engine parts, increase in the number of

electrical connectors,updated students being accommadated.

manuals, and required FAA

subscriptions.

Develop student breakroom/study Student breakroom/study space developed A room 25 feet by 25 feet would Due to being located at

space accommadate tables with chairs, McClellan Park, students have

refrigerator, microwave oven, and no facility to study or work with a

white board. tutor before or after classes.

Also, because of the isolated

location of the facility, we need

Aero-2

a location for a refrigerator,

microwave oven, and tables.

This room could be scheduled

and shared with the ATCAD and

Railroad students.



Install computer drops in NDT/ATC Computer drops installed Computers need to be compatible The Federal Aviation

labs with software and internet use for Administration requirers aviation

website viewing. maintenance students to access

the FAA website as well as

Aero-3

various manufacturing websites

in order to complete various

FAA required student projects.









13

1/15/2012







Description of Financial Rationale for Financial

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request





Acquire Faculty technical training Faculty technical training acquired Industry partners that make training The Federal Aviation

courses available are Bell Administration requirers aviation

Helicopter, Robinson Helicopter, maintenance instructors to

Boeing Aircraft, United Airlines, and remain current their teaching

Rolls Royce Turbine Engines. area. Our industry partners

Aero-5 make available various

technical courses during

summer and winter break free

of charge. The only expense not

covered is transportation.



Acquire large aircraft training devices Large aircraft training devices acquired The large aircraft training devices Our present large aircraft

or computer simulation programs training devices are

are needed to replace our approaching 50 years of age

hydraulic, fuel, fire and are no longer used in the

detection/protection, electrical, industry. They are beyond repair

APU, and pressurization system because finding parts has

Aero-6

trainers. become impossible. Boeing

737 training devices or

computer simulation programs

for Boeing 737 systems would

meet current FAA requirements.







Install welding station ventilation Welding station ventilation system installed A suitable welding ventalation A welding ventalation system

system system will be determind by will allow us to meet OSHA

Aero-9 Facilities. standards and to keep airborn

soot from entering the rest of

the hanger facility.









14

1/15/2012







Description of Financial Rationale for Financial

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request





Increase by 100% the number of BHTA/SCC graduates increased by 100%

BH-5 BHTA graduates receiving SCC credit

for BHTA courses completed



Acquire ground training devices for the Ground training devices acquired Federal Aviation Administration We will utilize whatever funding

ATC, AD, and FLTEC Programs (FAA) approved training devices we receive, such as the $10,000

can be used in simulation for the requested, as matching funds to

Air Traffic Control, Aircraft pursue matching grants from

Dispatcher, and Flight Technology federal, state, and private

Programs. These devices, with organizations, as well as

software can be purchaced for as outright donations from Aero

low as $20,000 for a basic Program alumni and industry

approved unit to well over $200,000 partners. This will be an

for a more advanced unit. State of ongoing, multi-year project. We

FLTEC-1 the art units that creat an exact already have a purpose built

working environment can cost well simulator lab room that is ideal

over a $1,000,000. to house the simulators, or what

the FAA calls training devices.

This simulator lab is air

conditioned, insulated, well

lighted, and has sufficient

electrical power to operate

possible high end training

devices.









15

1/15/2012







Description of Financial Rationale for Financial

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request









ADD NEEDED RO









16

1/15/2012



Sacramento City College

Identification

2011-12 Planning Year - Financial Unit Plan





Nature of Amount

Total

Request Specific Requested

General Hours or Financial

Obj ID Unit Objective (use drop Expenditure Unit Cost from

Funding Type Quantity Need for

down Type Budget

Objective

menu) Committee

Increase operational budget







Maintenance

Aero-1 $3,000.00 $3,000.00

of Effort









Develop student breakroom/study

space







Emergent/Ur

Aero-2

gent









Install computer drops in NDT/ATC

labs



Maintenance

Aero-3

of Effort









17

1/15/2012



Nature of Amount

Total

Request Specific Requested

General Hours or Financial

Obj ID Unit Objective (use drop Expenditure Unit Cost from

Funding Type Quantity Need for

down Type Budget

Objective

menu) Committee



Acquire operational budget

IncreaseFaculty technical training Base and VTEA

Industry

partners will

offer free

tuition to full $3000.00 in

Aero-1

Maintenance time and part travel expences

Aero-5

of Effort time will partially cover

instructors cost of travel.

averaging

$5400.00 per

course.

Acquire large aircraft training devices Base and VTEA

Each training

device will

$4000.00 cost about

per training $4000.00 so

Maintenance $4000.00 to

Aero-6 device for a anywhere

of Effort $16000.00

total of four from $4000.00

devices. for one to

$16000.00 for

all four.









Install welding station ventilation

system

Maintenance

Aero-9

of Effort









18

1/15/2012



Nature of Amount

Total

Request Specific Requested

General Hours or Financial

Obj ID Unit Objective (use drop Expenditure Unit Cost from

Funding Type Quantity Need for

down Type Budget

Objective

menu) Committee

Increase operational budget of

by 100% the number

BH-5 BHTA graduates receiving SCC credit

for BHTA courses completed



Aero-1 Acquire ground training devices for the VTEA , Equipment, OTO Base Augmentation

ATC, AD, and FLTEC Programs









New 1 at this

FLTEC-1 $10,000.00 $300,000.00 $5,000.00

Initiative time









19

1/15/2012



Nature of Amount

Total

Request Specific Requested

General Hours or Financial

Obj ID Unit Objective (use drop Expenditure Unit Cost from

Funding Type Quantity Need for

down Type Budget

Objective

menu) Committee

Increase operational budget







Aero-1









ADD NEEDED ROW(S) ABOVE THIS LINE. ADD NEEDED RO









20

1/15/2012



Sacramento City College

Objective

2011-12 Planning Year - Financial Unit Plan

Prioritization



Grand Total

Project Cost

Obj ID Unit Objective (Financial + Dept. Div CSA Dept Div CSA

IT+Facilities)

Once Known

Increase operational budget







Aero-1 $3,000.00 AERO AT VPI 4 0 0









Develop student breakroom/study

space









Aero-2 AERO AT VPI 26 0 0









Install computer drops in NDT/ATC

labs





Aero-3 AERO AT VPI 5 0 0









21

1/15/2012



Grand Total

Project Cost

Obj ID Unit Objective (Financial + Dept. Div CSA Dept Div CSA

IT+Facilities)

Once Known



Acquire operational budget

IncreaseFaculty technical training







Aero-1

Aero-5 AERO AT VPI 15 0 0









Acquire large aircraft training devices









Aero-6 AERO AT VPI 2 0 0









Install welding station ventilation

system

Aero-9 AERO AT VPI 3 0 0









22

1/15/2012



Grand Total

Project Cost

Obj ID Unit Objective (Financial + Dept. Div CSA Dept Div CSA

IT+Facilities)

Once Known

Increase operational budget of

by 100% the number

BH-5 BHTA graduates receiving SCC credit AERO AT VPI 27 0 0

for BHTA courses completed



Aero-1 Acquire ground training devices for the

ATC, AD, and FLTEC Programs









FLTEC-1 AERO AT VPI 1 0 0









23

1/15/2012



Grand Total

Project Cost

Obj ID Unit Objective (Financial + Dept. Div CSA Dept Div CSA

IT+Facilities)

Once Known

Increase operational budget







Aero-1









ADD NEEDED RO









24

1/15/2012



Sacramento City College

2011-12 Planning Year - Facility Resource Request Unit Plan Form







Description of Facility Rationale for Facility

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request



Develop student Student breakroom/study space We need an area of about 25 by 25 feet The facility at McClellan Park offers no

breakroom/study space developed where we can have tables and chairs facilities for students to study outside

for study, tutoring, and eating. We also of the classroom or an area where

Aero-2

need to be able to install a refrigerator they can heat up a lunch or keep it

and microwave oven. cold until break or lunch time.









Install welding station ventilation Welding station ventilation system Develop a smoke removal system that We need to have the ability to meet all

system installed will allow welding in the lab area without OSHA building requirements for

creating a smoke hazard. smoke removal while performing FAA

required welding projects. The

Aero-9

absence of a suitable smoke removal

system creates a health hazard for

faculty, staff, and students.









25

1/15/2012



Description of Facility Rationale for Facility

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request





Increase lecture/lab space Lecture/lab space increased Classroom and lab space to be We need to be able to accommodate

determined by facilities study. Possible additional student demand for the

location for the lecture/lab facility could Motorcycle Program.

MC-3 be McClellan Park because the Aero,

ATC, AD, FLTEC, and Railroad

Programs are already located at that

location.









ADD NEEDED ROW(S) ABOVE THIS LINE.









26

1/15/2012



Sacramento City College

2011-12 Planning Year - Facility Resource Request Unit Plan Form

To be Completed by Operations Identification





ASF Estimated Time Feasibility/ Funding

Obj ID Unit Objective Comments

Impacted Cost Required Target Date Assessment



Develop student

breakroom/study space

Aero-2









Install welding station ventilation

system





Aero-9









27

1/15/2012



ASF Estimated Time Feasibility/ Funding

Obj ID Unit Objective Comments

Impacted Cost Required Target Date Assessment





Increase lecture/lab space





MC-3









ADD NEEDED ROW(S) ABOVE THIS LINE. ROW(S) ABOVE THIS LINE.

ADD NEEDED









28

1/15/2012



Sacramento City College

2011-12 Planning Year - Facility Resource Request Unit Plan Form

Identification Objective

Prioritization



Campus

Obj ID Unit Objective Dept. Div CSA Dept Div CSA

Development



Develop student

breakroom/study space

Aero-2 AERO AT VPI 26 0 0









Install welding station ventilation

system





Aero-9 AERO AT VPI 3 0 0









29

1/15/2012



Campus

Obj ID Unit Objective Dept. Div CSA Dept Div CSA

Development





Increase lecture/lab space





MC-3 AERO AT VPI 31 0 0









ROW(S) ABOVE THIS LINE. ADD NEEDED LINE.

ADD NEEDED ROW(S) ABOVE THISROW(S) ABOVE THIS LINE.









30

1/15/2012



Sacramento City College

2011-12 Planning Year - Information Technology Resource Request Unit Plan Form







Description of IT Rationale for IT

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request





Install computer drops in NDT/ATC labs Computer drops installed Twelve computer drops in the The Federal Aviation

NDT lab and twelve computer Administration suggests that we

drops in the ATC room have can transition to computer

Aero-3 been suggested. based testing for tracking the

progress of students as well as

develop computer based

training curriculum.

Acquire cascade computers Cascade computers acquired We need to be added to the Students will have the ability to

facilities that can utilize test on required technical

cascaded computers that are subjects as well as utilize

Aero-4 able to run the software computer based training. These

available for this project. computers could be shared with

Aero, ATC, AD, and FLTEC

students.









31

1/15/2012



Description of IT Rationale for IT

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request

Acquire ground training devices for the ATC, Ground training devices acquired Computer and software FAA approved training devices

AD, and FLTEC Programs maintenance. or simulators, are computer

based with software that is

periodically updated. The

FLTEC-1

computers and software will

need to be upgraded,

maintained, and updated by IT

on a continuing bases.









Increase lecture/lab space Lecture/lab space increased We need to be added to the Students will have the ability to

facilities that can utilize test on required technical

MC-3 cascaded computers that are subjects as well as utilize

able to run the software computer based training.

available for this project.









Acquire additional Smart Cart Additional Smart Cart acguired A portable Smart Cart with An additional Smart Cart will

deicated train simulation allow us to operate a dedicated

RR-3 software. software program in order to

utilize the train related

simulation device.









32

1/15/2012



Description of IT Rationale for IT

Obj ID Unit Objective Outcome Measures

Resource Request Resource Request

ADD NEEDED ROW(S) ABOVE THIS LINE.









33

1/15/2012



Sacramento City College

2011-12 Planning Year - Information Technology Resource Request Unit Plan Form

To be Completed by IT Identification



Component Estimated Time Feasibility/T Funding

Obj ID Unit Objective

Assessment Cost Required arget Date Assessment





Install computer drops in NDT/ATC labs





Aero-3







Acquire cascade computers





Aero-4









34

1/15/2012



Component Estimated Time Feasibility/T Funding

Obj ID Unit Objective

Assessment Cost Required arget Date Assessment

Acquire ground training devices for the ATC,

AD, and FLTEC Programs





FLTEC-1









Increase lecture/lab space



MC-3









Acquire additional Smart Cart



RR-3









35

1/15/2012



Component Estimated Time Feasibility/T Funding

Obj ID Unit Objective

Assessment Cost Required arget Date Assessment

LINE.

ADD NEEDED ROW(S) ABOVE THIS ADD NEEDED ROW(S) ABOVE THIS LINE.









36

1/15/2012



Sacramento City College

2011-12 Planning Year - Information Technology Resource Request Unit Plan Form

Objective

Identification Prioritization





Obj ID Unit Objective Comments Dept Div CSA Dept Div





Install computer drops in NDT/ATC labs





Aero-3 AERO AT VPI 5 0







Acquire cascade computers





Aero-4 AERO AT VPI 6 0









37

1/15/2012



Obj ID Unit Objective Comments Dept Div CSA Dept Div

Acquire ground training devices for the ATC,

AD, and FLTEC Programs





FLTEC-1 AERO AT VPI 1 0









Increase lecture/lab space



MC-3 AERO AT VPI 31 0









Acquire additional Smart Cart



RR-3 AERO AT VPI 13 0









38

1/15/2012



Obj ID Unit Objective Comments Dept Div CSA Dept Div



ADD NEEDED ROW(S) ABOVE THIS LINE.

ADD NEEDED ROW(S) ABOVE THIS LINE. ADD NEEDED ROW(S) ABOV









39

1/15/2012



Sacramento City College

2011-12 Planning Year - Information Technology Resource Request Unit Plan Form







IT

Obj ID Unit Objective CSA

Committee





Install computer drops in NDT/ATC labs





Aero-3 0







Acquire cascade computers





Aero-4 0









40

1/15/2012



IT

Obj ID Unit Objective CSA

Committee

Acquire ground training devices for the ATC,

AD, and FLTEC Programs





FLTEC-1 0









Increase lecture/lab space



MC-3 0









Acquire additional Smart Cart



RR-3 0









41

1/15/2012



IT

Obj ID Unit Objective CSA

Committee

ADD ABOVE ROW(S) ABOVE THIS LINE.

ADD NEEDED ROW(S)NEEDEDTHIS LINE.









42



Related docs
Other docs by dandanhuanghua...
GEOL 104 – Earth Through Time Laboratory
Views: 0  |  Downloads: 0
WECC
Views: 1  |  Downloads: 0
FA
Views: 6  |  Downloads: 0
MMARS Liaisons - Mass.Gov
Views: 4  |  Downloads: 0
Papua New Guinea Update
Views: 1  |  Downloads: 0
INF739_PH
Views: 0  |  Downloads: 0
Dashboard
Views: 21  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!