Geant4 Collaboration Collaboration Agreement – Annex 1

Geant4 Collaboration Collaboration Agreement – Annex 1 12th July 2005 (Following text is identical to Draft Version 1.01: 16th December, 2004) Effective date of this agreement, and process for transition from the pre-existing organizational structures This agreement becomes effective when the Collaboration Agreement has been signed by parties representing 15 FTEs of effort on Geant4. At this time the existing Technical Steering Board becomes the transitional Steering Board and the existing Collaboration Board becomes the transitional Oversight Board and the existing Working Groups become the transitional Working Groups, all as defined in the Collaboration Agreement. The transitional boards and groups initiate, within one year, the processes defined in the Collaboration Agreement and the Regulations to choose the members of the Oversight Board and the Steering Board.

Related docs
uk dark matter collaboration (ukdmc)
Views: 0  |  Downloads: 0
Geant4-‐-a-simulation-toolkit
Views: 1  |  Downloads: 0
Geant4_ EPS-HEP 2001
Views: 0  |  Downloads: 0
Introduction to GEANT4
Views: 12  |  Downloads: 1
LCFI Collaboration Status Report
Views: 0  |  Downloads: 0
Overview of Geant4 Examples
Views: 125  |  Downloads: 5
Geant4 Space Workshop - DNA
Views: 0  |  Downloads: 0
Introduction to Geant4 User Interface
Views: 61  |  Downloads: 7
Other docs by Mattlater