E-Light-Quarter3-2011-Newsletter

Shared by: dandanhuanghuang
Categories
Tags
-
Stats
views:
17
posted:
1/14/2012
language:
pages:
12
Document Sample
scope of work template
							                                                                                          employeeupdate
A Publication of e light electric services, inc. & e light Wind and solar, inc.




                                                                              fastest
                                                                              GrOWinG
                                                                              coMpany                      By Sarah Klobnak, Senior Marketing Specialist




                                         e
                                              light electric named fifth      for fiscal years 2008, 2009 and    fastest growing companies in
                                              for fastest growing private     2010. participating companies      the denver area,” said Perry
             Excellence in Electrical
                                              companies                       were then grouped to achieve       Herrmann, president/ceo of e
                                                                              the maximum amount of              light, “our success is achieved
                                         e light electric services, inc., a   competition among like-sized       through employing the best
                                         leading commercial electrical        companies. this year’s list        electricians and the integrity of
                                         contractor, announced that           ranked private companies in five   our installations.”
                                         it was named the fifth fastest       flights, based on total revenue.
                                         growing private company in           e light was recognized as the      Other interesting stats
        Our VisiOn statement             denver by the Denver Business        fifth fastest growing privately    e light electric ranked #56 in
                                         Journal newspaper. e light           held company in the “flight ii”    overall denver-area private
  We strive to be the best provider of   earned its high ranking by           category, designated for private   companies (ranked by revenue)
                                         growing more than 74.36%             companies       with    revenues   in 2011. previously we were
 high-quality electrical installations
                                         over the past three years.           between $15.1 million and $49.2    #65 and #92 for 2010 and 2009,
   and to alWays provide a superior                                           million.                           respectively. additionally, the
                                         the newspaper ranked the                                                newspaper listed e light electric
    product at a reasonable cost         surveyed companies based             “We are very honored to be         as the 3rd largest denver area
                                         on the percentage of growth          ranked so high among the           electrical contractor.
employee update                                                  By Roseanne Mullis, Director of Human Resources




a
        s e light continues to          •     Welcome aboard michael            •     congratulations to Philip     •     congratulations to riki
        grow, we have had some                egri, our newest project                andries on his promotion            Kyner on becoming our
        positive changes in the               Manager in the englewood                to project Manager.                 administrative      assistant
office. if you get a chance, stop             office.                                                                     after   working       several
by to congratulate the following                                                •     Welcome aboard randy                months as a part-time intern.
people:                                 •     Welcome back Leticia                    Gellner,     our  newest
                                              Kyner, who accepted a                   service/plant    facilities   •     Welcome back to angela
•    congratulations to Jason                 position working in the                 account Manager working             sullivan,    our    new
     Wheeler, our new vice                    construction group as our               in the frederick office.            accounting Manager.
     president operations.                    newest project coordinator.




                 aBOVe: e light electric services, inc. was ranked #3 in the denver area electrical contractors by the denver business Journal.
                                                               this is up from the 2010 ranking of #7. ranking was based on colorado revenue.



estate planning                                           By Roseanne Mullis, Director of Human Resources




d
          id you know? in today’s       spouse, including:                          your personal information.          authorizes            medical
          world,    you      should                                                                                     personnel to treat your
          consider an estate plan if:   •   standard Will                       • education and tools -                 child if you are not present.
                                        •   healthcare power of attorney          provides     an    educational
• you are the parent of minor           •   durable power of attorney             library, useful legal links and   Questions?
  children                              •   living Will                           a legal terms glossary.           (303) 754-0001 or
• you own property                                                                                                  rmullis@elightelectric.com
• you want to have a say in your        you also receive access to              • medical         treatment
  healthcare treatment                  additional tools such as the:             authorization for minors
                                                                                  Document - this document
principal life and arag® believe        • Personal          information
in the power of proactive                 Organizer - a tool that will help
planning in protecting your               you organize your personal
family and finances.                      affairs by creating a one-stop
                                          directory of your legal and
if you have supplemental life             financial information.
insurance through principal
then this site (www.aragwills.          • identity theft Kit - a kit to
com/principal) provides you               learn the best ways to protect
with a package of free planning
documents, for you and your                        www.aragwills.com/principal
page  2
   november 4                           november 24                          December 26                                 January 2

   ace awards banquet                   thanksgiving day                     christmas day (observed)                    new year’s day, observed
                                        (offices closed)                     (offices closed)                            (offices closed)




eMployee spotlight                                                  By Roseanne Mullis, Director of Human Resources




                                                                          angela sullivan, accounting manager
                                                                          englewood Office




W
         elcome back angela!         the past twelve years and            they enjoy camping, fishing,                somewhere. When she was here
         after     three     years   has a bachelor of science in         bowling, traveling and various              three years ago, she was known
         of working in the           public administration and the        sporting events such as soccer,             as the resident “book worm”.
public sector, angela sullivan       fundamentals of accounting.          hockey and football.
returns to e light electric as the                                                                                    We are really happy to have
accounting Manager!                  angela and her husband chris         her special interests include               angela back and look forward to
                                     have three children: blake 16,       science and european history.               working with her for a long, long
angela has been working in           anthony 13, and liam going on        you will usually find angela                time.
accounting and finance for           5. her family keeps her very busy.   at lunch reading a book



emPLOYee of the quarter                                                              By Roseanne Mullis, Director of Human Resources




                                nOminees                                                                                     nOminateD BY

                                David Kistler                                                                                      ted smith
                                matt adams                                                                                         ted smith
                                troy swain                                                                                         ted smith
                                David Vigil                                                                                        ted smith
                                David Derry                                                                                      David Kistler
                                Brian Jacks                                                                                     Kevin Kosters
                                Chris schaefer                                                                                     Bill Kolson




c
      ongratulations to Brian        best electrical contractor.          commissions the photovoltaic                the      installation    exceeds
      Jacks our employee of the                                           system and completes all the                the     client’s     expectations.
      quarter!!!                     brian has always been willing        quality control with the pile               brian’s detailed record keeping
                                     to take on extra responsibilities    driving and metal erection.                 has helped the project run
brian     is   an     exceptional    when needed and his current                                                      smoothly and makes the
apprentice and has been with         assignment at the san luis solar     brian demonstrates tireless                 workload of the supervisors and
e light electric from the start of   ranch is no exception.               efforts as he supports his                  project management lighter.
his training. he demonstrates                                             supervisors, the safety manager
the qualities we expect here at      at this project, he is taking        and project management in                   great Job, brian! thank you for
e light, in our efforts to be the    on a lead role, as he tests and      helping us be safe and ensuring             helping us be better everyday.
                                                                                                                                                page  3
Congratulations graduates & JourneyMen
                                                                                             Excellence in Electrical




                                                                                                   Graduates
                                                                                                                        E Light Electric

                                                                                             Class of 2011

                                                                                                                         Recognition of
                                                                                                                     Student Continuation &
                                                                                                                    New Licensed Journeymen




                                                                                          Thursday, May 26th, 2011                            WIND AND SOLAR




e Light is one of the only electrical subcontractors in the state of Colorado to have our own in-house, apprenticeship program.




t
      he class of 2011 graduation   2nd Year student:              2nd Year student:                                     rapella,  esquiel    sandoval,
      was held on thursday, May                                    anthony hill                                          Michael “Miles” standish, anita
      26th at the englewood         •   Jon sanft                                                                        ternyak.
office. over 32 students were       •   runner-up: Kyle seaman     3rd Year student:
honored, including top student                                     gerald Walton                                         2nd Year Continuation students
award, Most improved student        3rd Year student:                                                                    Joe bialke, Mark haselhorst,
award,     leadership      award,                                  4th Year student:                                     anthony hill, richard Jacquez,
excellence in education award       •   Kacey smith                Kacey card                                            Kevin Musgrove, Jon sanft, Kyle
and honoring all newly licensed     •   runner-up (tie): Josh                                                            seaman
journeymen. congratulations!            brantley & Kody inman      LeaDersHiP aWarD
                                                                   bessie lopez                                          3rd Year Continuation students
neW LiCenseD JOurneYmen             4th Year student:                                                                    colin beckham, Josh brantley,
roy blanco, blake ely, nate                                        exCeLLenCe in eDuCatiOn                               tedros habteslassie, thomas
Muniz, James torres, t.J. Wodark    •   Kris dobler                aWarD                                                 hull, Kody inman, brian Jacks,
                                    •   runner-up: bessie lopez    Kris dobler                                           Jaya Maltsberger, Kacey smith,
tOP stuDent aWarD                                                                                                        gerald Walton.
1st Year Student (tie):             mOst imPrOVeD stuDent          1st Year Continuation students
                                    aWarD                          howard freeman, evan grace,                           Class of 2011 Graduates
•    brenton parmenter &            1st Year student:              andrew      haselhorst,  aaron                        Kasey card, Kris dobler, Jose
     Michael “Miles” standish                                      James, Kenneth lundgren,                              gomez, Joe Madrid, yonas
•    runner-up: aaron James         aaron James                    brenton parmenter, andrew                             Mebrahtu, bessie lopez.




page  4
company PiCniC




                                                             Over 244 participants attended the 2011 e Light employee Company Picnic!




e
     light’s annual company           the clown for face paint fun!     Many thanks to our vendors for
     picnic was a huge success                                          donating many of our giveaways
     with over 244 participants       over $15,000 in prizes were       this year.
attending.                            raffled off with 13 big winners
                                      going home with a new             all pre-registered employees
catering by design was our            television:                       were given e light Wind and
caterer and the food was great                                          solar gift bags that included a
as always. lunch included             Bill Bicket, CJ Bliss, Hunter     tervis® tumbler and an e light
beef brisket, bbq chicken,            Bowes, eric Duran, nate           squirt gun. the employees had
hamburgers and hot dogs along         Durkin,     adam      Loveless,   more fun with the squirt guns
with fruit salad, potato salad and    miguel Lopez, Justin Ortega,      than the children!
creamy coleslaw.                      anthony      martinez,     Phil
                                      robertson (tim Holderman          it was great spending time with
this year’s picnic was not quite as   won, but gave it to Phil),        our co-workers in a relaxed and
hot as last year, but the children    richard stanton, Zurihum          festive environment. the day
still enjoyed the bouncy house,       teketsel, and travis thurman.     wrapped up with a heart-felt
small kiddie pools and suzy-q                                           speech from perry herrmann.




                                                                                                                               page  5
          (aBOVe) Congratulations to the e Light employees who won a new television.



          (BeLOW) Over $15,000 in prizes were raffled to employees.




page  6
page  7
neW Projects                                  By David Wright, Vice President Preconstruction




                                                                                t
                                                                                      he project consists of the    39,961 square feet consisting of
                                      Project Manager michael egri                    development of a storage      a 30,000sf hangar and 9,961sf
                                                                                      hangar and office/shop on     of    office/support     spaces.
  rare air LimiteD HanGar                Preconstruction eric Duran             a site on the existing denver Jet
  centennial, co                                Superintendent tBD              center leasehold at centennial      the 12 month project will start in
                                                                                airport.                            december 2011. the hangar will
                         General Contractor tectonic Construction
                                                                                                                    include specialized equipment
                                                                                the project is approximately        and taxiway lighting.



                                      Project Manager michael egri
  Hines eOs OFFiCe                       Preconstruction eric Duran
  BuiLDinG
  broomfield, co                                Superintendent tBD
                                General Contractor Whiting- turner




t
     his class a, core/shell office   the building’s 10-foot, floor-to-
     building features electric       ceiling windows will provide
     car charging stations and        daylighting and unobstructed
led site lighting. the 4-story,       mountain views. construction is
192,000 square foot project is        slated to begin 1st quarter 2012
pursuing leed® gold.                  and last for 12 months.



this office building is called “eos” for the goddess of dawn.




                                                                                t
                                                                                     he project is a 55,924         exam rooms, seclusion rooms,
                                                                                     square foot, one-story         classrooms, medical offices and
                                   Project Manager toby Burley
                                                                                     psychiatric hospital on a      stations, a pharmacy and secure
  PeaK VieW BeHaViOraL               Preconstruction eric Duran                 7-acre site.                        courtyards.
  HeaLtH CLiniC
  colorado springs, co              Superintendent aron Bowen
                                                                                the scope includes: patient         construction has already began
                       General Contractor thomas Construction
                                                                                bedrooms, bathrooms, a gym, a       for this 12 month project.
                                                                                kitchen and dining area, offices,
page  8
Closing proJects




                             Project Manager ron schwab
CLYFFOrD stiLL                   Preconstruction Joe Diehl
museum
denver, co                  Superintendent randy roberts
                 General Contractor saunders Construction




                                                                                             Project Manager Kevin Kosters
                                                             DenVer FeDeraL
                                                             Center sOLar:                Preconstruction aaron mcDonald
                                                             PHase ii, 3.5 mW Superintendent troy swain/micah Whitney
                                                             lakewood, co
                                                                            General Contractor e Light Wind and solar, inc.




                                                                                                                       page  9
training & safety Department                                                                                     By Ted Smith, Dir. of Education & Loss Prevention


traininG                              the sunpower and cogentrix             safety goals      and stringent       2.) 2,000,000 man hours without


e
    light is once again expand-       projects in alamosa, co.               monitoring,     including sub-        a loss time accident.
    ing and improving our                                                    contractors’     incidents,  are
    training department.              bruce provided a “pr/first aid/        part of every    e light project.     i know that we can achieve both
                                      aed/bloodborne      pathogen“                                                goals and i look forward to an-
We have relocated the training        training program for certifica-        e light is committed to work-         nouncing these accomplish-
facility to a separate location and   tion to our employees and to           ing toward zero incidents on our      ments.
expanded our classroom size           iberdrola renewables and sun-          jobsites so each team member
and lab work area. We have up-        power employees.                       goes home injury free. fewer          i also want to thank Bryan Kas-
graded our remote training pro-                                              injuries means less time lost         sahn, David Vigil, Gerald Wal-
cesses and equipment and now          saFetY                                 in production. our employees          ton and Jace Warren, site safety
have complete remote training         safety is a top priority at e light    have worked hard to attain this       supervisors, for all their efforts in
facilities in colorado springs and    electric services. in fact, it’s our   goal and we appreciate their fo-      assisting our project managers
alamosa, co and hobbs, nM. We         #1 core value. e light’s commit-       cus on safety.                        and superintendents in keeping
now have the ability to record        ment to pre-planning and dedi-                                               our projects a safe working envi-
and re-broadcast all of our train-    cation to safety goes beyond           Our new goal is twofold:              ronment.
ing sessions as well.                 what is required by osha.
                                                                             1.) 100,000 manhours without          sunbelt, one of our preferred
these improvements allow us to        safety    training,    measurable      any accidents.                        equipment rental providers,
provide live, interactive training                                                                                 came to our englewood office
to our employees anywhere in                                                                                       to provide extensive safety and
the world and also allow access                                                                                    operational training on scissor,
to training sessions for refresher                                                                                 large aerial boom and articulat-
courses.                                                                                                           ing lifts.

We have tested the process in                                                                                      the training included pre-use
several classes now and have                                                                                       inspections, how to safely op-
found that we are experiencing                                                                                     erate the equipment, safety re-
smoother video resolution and                                                                                      quirements, operational tips and
better sound with the new soft-                                                                                    hands-on operation on three dif-
ware and hardware.                                                                                                 ferent lifts.

We have put the system to full                                                                                     the students really enjoyed the
use this past summer and have                                                                                      presentation, the hands-on use
been able to offer competent                                                                                       of the lifts and learned a great
person and nec training to both                                                                                    deal about operating lifts safely.
our employees in three states
but also to some of our clients,                                                                                   We have had some difficult chal-
such as: Mortenson, boeing, sun                                                                                    lenges this past quarter with
power and tharco.                                                                                                  long shifts, hard work and ex-
                                                                                                                   treme heat conditions. the su-
i want to take a moment to                                                                                         pervisors, management and the
thank Bryan Kassahn, site safe-                                                                                    site safety supervisors have risen
ty supervisor and Bruce Brown,                                                                                     to the challenge to address each
account Manager, for their as-                                                                                     problem with efficiency and pro-
sistance in providing training                                                                                     fessionalism. thank you all!
for our clients at sunpower and
Mortenson construction.                                                                                            We would also like to thank our
                                                                                                                   clients and employees for help-
bryan provided a very compre-                                                                                      ing us reach the 1,000,000 man-
hensive “trenching competent                                                                                       hours recently without a lost
person” training course for our                                                                                    time accident (May 2008 - sep-
employees and for several exca-                                                                                    tember 2011)!
vating subcontractors for both


                                                      e Light’s advertisement in the september 16th issue of The Denver Business Journal.


page  10
service Department                                                   By Sarah Klobnak, Senior Marketing Specialist




e Light completes Henderson Parking Garage: Lighting retrofit saves 50% in electricity Costs.


                                                                         easily transferred and reused
                                                                         throughout the project, as this
  HenDersOn ParKinG                 Project Manager Phil robertson       process provided a very efficient,
  GaraGe                                                                 cost effective and customer
                                        Superintendent Joe Calkum        friendly work environment for
  aurora, co
                                                                         our electricians.

                                                                         saFetY tOP PriOritY


e
      light electric services,       fixtures have a 100,000-rated       safety is a top priority at e light         garage. and finally, the existing
      inc. recently completed a      lamp life and require little to     electric, as our electricians               fixtures were brought up to nec
      lighting efficiency upgrade    no maintenance. this retrofit is    used hardhats mounted with                  code by adding luminaire safety
at the henderson parking             estimated to save nearly 50% in     spotlights and wore fluorescent             disconnects.
garage for the university of         annual electricity costs.           safety vests at all times to remain
colorado anschutz Medical                                                visible in the active parking
campus. located at the corner        instaLLatiOn maDe easY
of east Montview boulevard           a clever way of communicating
and scranton street in aurora,       the lighting retrofit to garage
this 6-level, 1,535 space parking    users was designed and
garage was completed in              constructed by e light’s
september 2007 and received          creative team. temporary “no
lighting upgrades in July 2011.      parKing” signs were hung on
                                     the fixtures positioned directly
this lighting retrofit project       above parking spaces using
reused the existing fixture          custom, prefabricated sign
housings by replacing all 408,       hangers. roping off entire levels
150-watt metal halide lamps          of this busy garage was not an
and ballasts with 80-watt            option. to beat the traffic, our
induction driven lamps. the old      electricians started work early
ballasts, lamps and sockets were     each day to close-off individual
collected and recycled. the new      parking spaces. the signs were
                                                                                                                                               page  11
Lean Construction in action                                                                         By David Kistler, Prefabrication Manager


                                                                            the plan included:                     • the north shop bay was
                                                                                                                     partitioned out and dedicated
                                                                            • updating safety items and              to the service/plant facilities
                                                                              materials to remain osha               department to house parts
                                                                              compliant.                             and material inventory.

                                                                            • updating egress and walkways         • a rally wall, which will be
                                                                              for office employee safety.            dedicated to the memory of e
                                                                                                                     light employee, Kathy Garcia,
                                                                            • expanding and re-organizing            will be created to house
                                                                              assembly and work areas.               the following information:
                                                                                                                     schedules, calendars, open
                                                                            • re-directing overall workflow          work items, current work
                                                                              pattern across shop space to           items, forms and general
                                                                              create a circular flow pattern.        paperwork, communication
                                                                                                                     items, the 5 s’s, pictures, and
                                                                            • expanding and dedicating               case studies.
                                                                              large raw material storage
                                                                              and      holding     areas.              In Memory of Kathy Garcia



e
     light’s      prefabrication        conditions.                         through       these    efforts,
     department has taken a                                                 substantial changes have been
     “big picture” view of the          the goals for the new layout        made, including:
current operating conditions            included: more space, circular
within the shop and created             workflow, less overstock, and       • a wall was removed to join
models to apply the current             better use of current resources.      two separate shops into one
operations to future conditions.                                              large shop.
                                        a detailed solution and
With the assistance of David            recommendation was presented        • the old apprentice lab was
Kistler, prefabrication Manager         based on the lean construction        demolished and relocated to
& aaron James, cad/biM                  methodology and the “five             the new training facility. the
operator, a shop design was             s’s” (sort, set-in-order, shine,      new space is dedicated to
finalized with a new layout             standardize, sustain).                large equipment and ladder
to create extreme workflow                                                    storage.



          www.elightelectric.com                                                                                www.ewindsolar.com




             Excellence in Electrical                 WIND AND SOLAR

361 inverness drive south, suite b englewood, co 80112
308 West fillmore, suite 201 colorado springs, co 80907


                                                                  employeeupdate
7800 Miller drive, unit b frederick, co 80504

www.elightelectric.com www.ewindsolar.com



          Join the discussion on Facebook!




A Publication of e light electric services, inc. & e light Wind and solar, inc.

						
Related docs
Other docs by dandanhuanghuang
jowers
Views: 0  |  Downloads: 0
Tree Structured Index
Views: 1  |  Downloads: 0
32_sales_per_qtr_bv
Views: 859  |  Downloads: 0
LATEST STAFF DETAILS
Views: 5  |  Downloads: 0
4grandparents
Views: 208  |  Downloads: 0
CommunicationsElectronicCommunicationsAnalyst
Views: 3  |  Downloads: 0
Lire un message SWIFT
Views: 167  |  Downloads: 0
David Cracknell EPC CIC
Views: 1  |  Downloads: 0