16le:LancasterCountyRoadWork REVISION#1 * format rev. 03/24/05
Lancaster County Road Work
August 31 through September 03
www.co.lancaster.pa.us/planning
Prepared by
LCPC Transportation Division
Notes:
>Headlights: Must be “Turned On” while driving through Construction Areas.
>Normal work hours are 7:00am to 3:30pm except where noted.
>Roads and Streets may be partially or completely closed Mon. through Fri.
>Inclement weather may delay or postpone scheduled work
PennDOT MAJOR ROAD PROJECTS
Municipalities Location Traffic Control Est. Est. Comp.
Affected Activity/Project /Actual Date
Start Date
Mt Joy Twp SR 4010 None Closed
Bridge Over a Tributary of the Indefinitely
Little Chickies Creek. Closed/Detour
Replace Risser Mill Covered
Bridge
Elizabethtown Boro. Rt. 241 – SR 4008 (High Street) Monday October
Masonic Homes to Rt. 283 Lane 06/22/09 2009
Restriction/Flaggi
Curbs/Inlets/Repair/Resurface & ng
Roadway
W. Hempfield Twp. Rt 30 Tuesday
Prospect Rd. Bridge over Rt30 Night Time
Closure
Rehab Evaluation for Bridge
Repair
York County – Rt. 30 06/15/06 October
Hellam Twp. Hellam Exit to Susquehanna Lane 2009
River Restriction
Repair and Resurface Hours 7:00pm to
7:00am
EXPECT
DELAYS
Sunday -
Thursday
Rapho Twp. SR 4027 (Colebrook Rd.) Monday Mid
Elizabethtown Rd. to Meadow 08/03/09 September
View Rd. Closed/Detour
Replace Box Culvert
2
PennDOT MAJOR ROAD PROJECTS (Continue)
Municipalities Location Traffic Control Est. Est. Comp.
Affected Activity/Project /Actual Date
Start Date
Clay Twp. SR 1026 (Mt. Airy Rd.) Monday Sept. ‘09
Bridge over Middle Creek Start 01/12
Closed/Detour
Replace Bridge
Manheim/Warwick/ Rt. 222 06/29/09 December
W. Earl/Ephrata Oregon Exit to South of Ephrata Lane Closure. 2009
(Twp(s). Exit Single Lane North
& South Bound
Concrete Patching & Replace Bridge
Approach Slab.
Manheim Twp. Bushong Rd. Bridge Over 07/06/09 October
Rt. 222 2009
Closed/
Detour
Repair Bridge
W. Earl Twp. Farmersville Rd. Bridge Over Rt. 07/20/09 October
222 2009
Closed/
Detour
Repair Bridge
Ephrata Boro. SR 1045 (Old Mill Rd. Bridge) 06/01/09 November
Over Cocalico Creek 2009
Closed/
Detour
Bridge Replacement
x Caernarvon/E. Earl/ Rt. 322 (28th Division Hwy.) 06/12/09 October
Salisbury Twp(s). Rt. 23 to Chester Co. Line Flagging 2010
and/orTemporary
Drainage Pipes/Inlets Installation Lane Restriction
Paving
Washington Rt. 999 (Penn St.) October
Boro./Manor Twp. Penn/Water St(s). to Central Flagging 2009
Manor Rd. and/orTemporary
Lane Restriction
Base Replacement/Shoulder
Repair/Drainage Improvement/
Paving
Pequea/W. Lampeter Rt. 741 (Long Lane) 07/06/09 Sept. 2009
Twp(s). Rt. 324 to Rt.272 Flagging/
Lane Restriction
Repair and Resurface Night Time Paving
Martic/Pequea Rt. 324 Bridge over Pequea Creek. Monday December
Twp(s). 08/24/09 2009
Closed/
Replace Bridge Deck/Steel
Detour
Girders/Pave Bridge
Approaches/Guiderail Installation
3
PennDOT MAJOR ROAD PROJECTS (Continue)
Municipalities Location Traffic Control Est. /Actual Est. Comp. Date
Affected Activity/Project Start Date
Strasburg Twp./Boro Rt. 896 / Historic Dr. 07/06/09 10/20/09
Periodic
Intersection Reconstruction
Closure/Detour
Work
Area
USE CAUTION
Strasburg Twp. SR2022 (Winter Hill Rd.) WK. October 2009
Bridge over Tributary to Closed 08/24/09
Beaver Creek.
Replace Bridge
Colerain Twp. SR 2014 )Maple Shade Rd.) 07/13/09 Mid – Sept 2009
Bell Rd. to Rt. 896
Closed/
Detour
Replace Bridge over Ball Run
Little Britain Twp. Rt. 272 Bridge over Octoraro Thursday End of
Lancaster Co. & Creek 08/27/09 September 3 –
West Nottingham Closed/Detour weeks.
Twp. Chester Co. Install Steel Supports for
Delivery of Steam Generators
Lancaster City Various State Routes in City of June 2009 Complete Wk.
Lancaster (Rt.(s). 462, 222,23 Work 08/31/09
Area
etc) Daily
USE CAUTION
Construction of ADA Ramps
Lancaster City Duke & King St(s). Wednesday Thursday
Intersection Lane 08/26/09 08/27/09
Restriction
Curb Work 10:00pm to Noon Monday
08/31/09
Lancaster City Prince & King St(s). Tuesday Wednesday
Intersection Lane 09/01/09 09/02/09
Restriction
Curb Work 10:00pm to Noon
PennDOT Maintenance - PROJECTS
Municipalities Location Traffic Control Dates
Affected Activity/Projects Start: - Complete:
E. Donegal Twp. SR 4035 (Fairview Rd.) Monday & Tuesday
Flagging
Shoulder Stabilization
E. Donegal Twp SR 4046 (Colebrook Rd.) Monday - Wednesday
Flagging
Crack Sealing
W. Donegal Twp. SR 4034 (Beatty’s Tollgate Tuesday - Friday
Rd.) Flagging
Shoulder Stabilization
4
PennDOT Maintenance – PROJECTS (continue)
Municipalities Location Traffic Control Dates
Affected Activity/Projects Start: - Complete:
Mt. Joy Twp. SR 4017 (Musser Ave.) Wednesday - Friday
Flagging
Cracking Sealing
Rapho Twp. Meadowview Rd. Thursday - Friday
Flagging
Shoulder Back-up
COUNTY MUNICIPALITIES - ROAD PROJECTS
Municipalities Affected Location Traffic Control Dates
Activity/Projects Start: -
Complete:
Columbia Boro. Linden St. Eastbound @ Rt. 441 Wk. 08/10/09 to
(3rd St.) Wk. 08/31/09
Closed/Det
our
Road Work
7:00am to 6:30pm
Mt. Joy Boro New St. & Walnut St. Monday – Friday
Intersection Wk. 08/31/09
DaytimeClosure
Paving
Mt. Joy Boro. Rt. 230 (E. Main St.) Continue
Work
Market St. to Barbara St. Area
Water/Sewer Main Replacement USE CAUTION
Flagging/Lane
Closure/Restriction
Rapho Twp. Esbenshade Rd.
Back Run Rd. to Fairview Rd. Lane
Restriction/Closure
Road Edge Seeding
E. Hempfield Twp. Various Township Roads Daily
Flagging 08/31/09 - 08/17/09
Line Painting Lane Restriction
Manheim Twp. /City of Harrisburg Pike Daily
Lancaster College Ave. to Rail Road Lane Restriction
Over-Pass
EXPECT DELAYS
Work on Water Main
5
COUNTY MUNICIPALITIES - ROAD PROJECTS (continued)
Municipalities Location Traffic Control Dates
Affected Activity/Projects Start: -
Complete:
East Petersburg Boro/ Miller Rd. August
E. Hempfield/ Rt. 72 to Little Conestoga Creek September
Closed/
Manheim Twp(s). 2009 2009
Detour
Buch Ave.
Fruitville Pike to Little Conestoga
Creek
Road Work
Lititz Boro. Rt. 772 / E. Main St. Monday - Friday
Water St. to Cherry St. Work 0 8/31/09 - 09/11/09
Area
Replace Storm Water Pipe USE CAUTION
Lane Restriction
x E. Cocalico Twp. S. Reamstown Rd. 08/10/09 - End
Church St. to Stony Run Daytime Closure. August
Tributary Bridge. 7:00am to 5:00pm
Open to Local Traffic
Replace Sewer Line
Brecknock Twp. Black Creek Rd. Wk. 08/24/09
Flagging
Level - Low Areas of Roadway/Pave
Brecknock Twp. Various Roads As Required
Work
Bank and Shoulder Mowing Area
USE CAUTION
New Holland Boro. Various Streets August 2009 to
Lane Restriction September 2009
Patching
USE CAUTION
New Holland Boro. W. Franklin St. August 2009 to
Lane Restriction September 2009
Curb & Sidewalk Installation
USE CAUTION
Earl Twp. S. Custer Ave. Monday to Friday
Summitville Rd. to Peters Rd. Closed 08/03/09 to 9/04/09
Bridge Replacement
6
COUNTY MUNICIPALITIES - ROAD PROJECTS
Municipalities Location Traffic Control Dates
Affected Activity/Projects
Paradise Twp. Rt. 30 Wk. 08/03/09 -
Church St. to N. Kinzer Rd. Work Wk. 08/31/09
Area
Sewer Installation
Lane
Restriction/Closure
E. Lampeter Twp. Various Township Roads Monday - Friday
Flagging/ 08/31/09 - 09/04/09
Painting Stop Bars/Turn Arrows/ Lane Restriction/
Cross Walks Lane Closure
Manor Twp. Stehman Church Rd. Daily
Indian Run Rd. to Walnut Hill Rd. 08/24/09 - 09/04/09
Closed/Detour
Road Widening
Millersville Boro. George and Fredrick Streets Daily
Intersection Work
Area
Intersection Improvements
USE CAUTION
Temporarily
Removed Traffic
Signals
W. Lampeter Twp. Pioneer Rd. Wk. 08/24/09 to
Lampeter to Book Rd. Flagging Wk. 09/07/09
Storm Water Pipe Installation
Sadsbury Twp. White Oak Rd. Monday & Tuesday
Upper Valley Rd. to Lower Valley Daytime Road
Rd. Closure
Rail Road Structure Removal
Quarryville Boro. Fourth St. 07/06/09 to 09/07/09
W. State St. to South Church St.
Water Main Replacement`
Flagging/Lane
Restriction/
Daytime Closure/
Detour
Fulton Twp. Bicknell Rd. Bridge 06/08/09 to 09/08/09
Peach Bottom Rd. to Arcadia Trace
Closed
Rd.
Detour
Bridge Replacement
Salisbury Twp. Red Hill Rd. 07/06/09 Sept. 09
Wanner Rd. to Meadville Rd. Closed
Install Storm Water Pipes &
Boxes/Road Widening/
Roadway Reclamation
7
LANCASTER COUNTY BRIDGE PROJECTS
Municipalities Location Traffic Control Dates
Affected Activity/Projects Start: - Complete:
Warwick/W. Earl Log Cabin Rd. Sept ’09
Twp(s). Over Cocalico Creek. Closed
Covered Bridge Unsafe
Manor Twp. Creek Rd. Indefinite
Bridge over Little Conestoga Closed
Creek
To Be Replaced
Martic/Conestoga Loop Rd. Bridge over Pequea Indefinite
Twp(s). Creek Closed
Bridge Repair Evaluation
Utilities – PPL
Municipalities Affected Location Traffic Control Dates
Activity Start Complete
x Lancaster City 1st Block East &West King St. 08/17/09 – End Sept.
Market St. to Christian St. Lane Restriction 2009
1 – Lane East Bound
PPL Construction
Expect Delays
Utilities – UGI
Municipalities Affected Location Traffic Control Dates
Activity Start Complete
Manheim Twp. Homeland Dr. Wk. 08/31/09
Oregon Boulevard to Center Daytime Closure
Ave.
Replace Gas Main