GLAST LAT Project









Gamma-ray Large

GLAST Large Area Telescope

Area Space

Telescope WBS 4.1.D SAS

GSFC Monthly Review



Period Ending: Jan 2005





Richard Dubois

LAT SAS Subsystem Manager









GSFC Monthly Review Jan 5 2005 - SAS 1

GLAST LAT Project





Dec Accomplishments

• Flight Integration Support

– Released bulk of code on Dec 12

• Tkr ToT calibrations by end January

• Updated CAL calibrations delivered after Xmas

– Pipeline handled Xmas-break data fine

• Still an issue with error handling of scripting errors in user scripts

• User Workbook going great guns

– More polishing on the New User introduction

– Documenting use of FRED event display now

• Java data handling tools proposal

– We have adopted this approach

– Tony Johnson (SLAC) has agreed to manage our data handling projects

– First new system tests interface to hit the street Jan 15. Things are

happening.

– J-P Lefevre from Saclay to arrive for 6-month sabbatical around 1/24

• Has java experience for data servers on 2 astro missions

• Software developer in charge of Release Manager left group

– Replacement req just hit the street

• DC2 Coordinating Committee

– Starting to define sky model

– Aiming for end Feb for a testable model





GSFC Monthly Review Jan 5 2005 - SAS 2

GLAST LAT Project





Upcoming for January

• I&T deliverables

– Keep working on TKR Tot

– Keep working on more sophisticated CAL calibrations based on

what’s been learned during assembly at NRL

• Gino pipeline functioning

– Keep testing it

– Ran 2 allGamma MC runs over Xmas (twice, in fact)

• Completely smooth. Now have tools for metering MC jobs into

the pipeline and for accessing the data catalogue from

compiled code

• TkrRecon upgrade

– First major tag released 1/4

– Plan to run 1M allGammas to see how it looks

• CalRecon upgrade (Nov-Jan probably) – repeat from Dec report

– Waiting for TkrRecon to finish up

– David Chamont (LLR/Paris) visiting next week to discuss the

changes

– Add clustering and “MIP-segment” finding

• Send out req for Infrastructure position





GSFC Monthly Review Jan 5 2005 - SAS 3

GLAST LAT Project



Timeline





Tkr Tower

Cal Response/ Cal Response/ B?

Calibs Calibs

Part Deux

Tkr Tower 2 Tower

A? Int?

DC2

EM2?



Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug









Main Revamp Revamp Start Bkg

TkrRecon CalRecon Rejection Code Start Evt

Complete Complete Freeze Generation



Slipped from Dec report

SciTools Continue

checkup Pipeline

Debugging









GSFC Monthly Review Jan 5 2005 - SAS 4

GLAST LAT Project





Key Milestones

 Start of Flight Integration – Jan 2005



 File transfer test with GSSC/ISOC – Jan 2005 - delayed



 Mission GRT1 – Feb 2005 – delayed a few months



 DC2 – July 2005









GSFC Monthly Review Jan 5 2005 - SAS 5

GLAST LAT Project





Issues & Concerns

 I&T support has been heavy load



 Hardware will start arriving sometime… all our pieces have to be



in place.



 Thinking about DC2 – must juggle I&T support with DC schedule



 Getting the background rejection done in a timely fashion will be



hard. May need to start it in parallel with CalRecon revamp









GSFC Monthly Review Jan 5 2005 - SAS 6



Related docs
Other docs by yurtgc548
Grease
Views: 0  |  Downloads: 0
Gray Wolves
Views: 0  |  Downloads: 0
Gravity True or False Game
Views: 0  |  Downloads: 0
Graviton Propagators on Fuzzy GH
Views: 0  |  Downloads: 0
Grand View Garden
Views: 0  |  Downloads: 0
Grammar Unit II Pronouns
Views: 0  |  Downloads: 0
Grammar Unit II Lesson 1.2
Views: 0  |  Downloads: 0
Grace of The Holy Garden
Views: 0  |  Downloads: 0
GPS Training
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!