Embed
Email

GOALS

Document Sample

Shared by: dfhdhdhdhjr
Categories
Tags
Stats
views:
1
posted:
1/14/2012
language:
pages:
14
Impact of Deploying

Labor Planning at

Hi-Tech

04:00 pm– 04:30 pm



Presenter:

Michael Gurick

(Hi-Tech)

Background

• Hi-Tech has been in business for 20 Years



• Go Live Date – JULY 2003



• 3 Sites



• Atlanta



• Orlando



• Las Vegas



• Labor Module Go Live – January 2007

Operations Structure

• Warehouse Operations



• Show Operations

• Order Scrubbing

• Labor Resource Fulfillment

– Labor Coordinator per Site

• Internal & External Labor

Prior to Labor Module

• Excel Database – Resource List

– Contact Information

– Business License / Insurance

– Skill Set / Level

– Rate per Position



• Excel Template – Call Sheet

Challenges with Excel

• Creation of Excel templates cumbersome



• Large opportunity for Error



• Disconnect from Resource Database & R2



• No solid way to track Resource availability



• Waste of Paper



• Multiple Locations – No Central Database

– Sharing Information a Problem

The Benefits

• Pre Show Benefits

– Centralized Database – Increased Efficiency

– Multiple Coordinators can look at one location,

order at the same time

– Filter Capability

• City

• Position

• Rate

• Rank

– Resource Availability very easy to determine

– Job History easy to obtain

• Same Crew

• Job performance

– Multiple Rates for a Resource (Per Skill set)

The Benefits

• Post Show Benefits

– Contract Labor verification

much easier

– Travel costs captured with

each job

– Profitability Reports

– Labor Accruals for unbilled

Labor easy to generate

Pre Show Procedure

• Search By Date Range For Unfilled

Orders (Example)

• Place Full Time Staff First

• Search by Position using Database

• Confirm and Assign the Resource

Electronically

– Non-availability is noted in the

Resource Profile

• Once Labor is completely booked:

– Call Sheet printed and sent to show

site with P.M.

• Travel Cost entered in to UDF’s.

Post Show

• Labor Logs are returned from show

completed and signed off by the Project

Manager.

• Any onsite labor additions are placed

into Labor Module by Show Operations.

• Information forwarded to Accounting for

Invoicing.

• Billing Coordinator enters Actual

hours/Travel Expenses.

• B.C. prints “Labor Schedule by Order”

– Used to verify Labor Billing is complete

and accurate

– Used to verify Margin meets Hi-Tech goal

(Example).

Post Show - Continued

• Travel Report printed and used to

verify accuracy.



• Accounts Payable:

– Verification of Labor Invoices against

actual hours entered

– AP Coordinator notates lines

completed with Payment Date (Show

Example)

– Month End Accruals generated for

Accounting based on this

information.

Business Requirements

• Rate Improvement

• Actual Hours - should be stored

• Contract Description – a

Searchable Field

• “Labor Requirements” tab should

include “Headers” and

“Comments” from Account

Module.

• Subtotal on Labor Order.

• Default Status for new Resources

– similar to New Customer Set Up.

Closing Remarks



Q&A

Thank You!



Related docs
Other docs by dfhdhdhdhjr
Bild 1
Views: 0  |  Downloads: 0
BHIVA Feedback 09 - UK-CAB
Views: 0  |  Downloads: 0
hobbycentral.com
Views: 0  |  Downloads: 0
Profile of Research
Views: 0  |  Downloads: 0
Power Teaching
Views: 0  |  Downloads: 0
Donate
Views: 0  |  Downloads: 0
From Cells to Organisms
Views: 0  |  Downloads: 0
ETM5221MSIS5600 Virtual Teams Defined
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!