PROFILE - Meta-con Design
Shared by: linxiaoqin
-
Stats
- views:
- 146
- posted:
- 1/6/2012
- language:
- English
- pages:
- 77
Document Sample


PROFILE
We mean Change, within
And without
Contact us:
9-Canal Park, Gulberg-II Lahore, Pakistan.
Voice: +92-42-5755919
Cell: 0321-4422579
0333-4473005
E-mail: info@meta-con.com
Web: www.meta-con.com
Table of Contents
1. INTRODUCTION
2. PARTICULARS
3. DISCIPLINE OF PRACTICE
4. LIST OF PROJECTS
5. LIST OF CONSTRUCTION EQUIPMENT
6. LIST OF TECHNICAL STAFF & ASSOCIATES
7. RESUME
8. NATIONAL TAX NO.
9. SALES TAX NO.
10. PAKISTAN ENGINEERING COUNCIL LICENCE
11. COMPLETION CERTIFICATES/ RECOMMENDATIONS
12. AFFIDAVIT OF NO LITIGATION
13. BANK CERTIFICATES
14. INCOME TAX RETURNS
1
INTRODUCTION
INTRODUCTION
• A brief history
Meta-Con design was established as a Sole Proprietorship concern in 2000 to bring new
ideas in the market by providing a platform to young emerging architects and designers.
Our vision is to carve a new shape to the traditional services being offered by designers
and architect firms in the current market. Our mission is to strive for making dreams and
visions of our clients into reality.
• Areas of Operations
The business operations are carried out from our office situated in Lahore, the heart of
Pakistan’s business and cultural life. Based in Lahore, we have provided services to our
customers throughout the country.
We are determined to provide services of supreme quality in the fields of Interior
designing, architectural design, consultancy and model making.
• Our Achievements
To achieve our goal we have acquired the expertise of people renowned in their
respective fields who bear matchless vigor and ambition and can pave way to our
success. In the past several years we have had experience of working for well known
organizations including National Bank of Pakistan, Habib Bank Of Pakistan, Bank Of
Punjab, Fazal Din & Sons, Shaukat Khannum Memorial Research Hospital, Mede quips,
Punjab Group of Colleges, and many others. The experience we have gained through
providing a variety of services to such established organizations has given us a better
understanding of client needs, which would prove an asset for us in future.
• The Core Values
Our values are to:-
• Consciously unfold the subconscious needs of the client.
• Be Creative, Simple & Expressive.
Our Core Services:
Our objective is to enhance the impact of nature’s physical laws on human life and environment using our
capabilities of molding and remolding in a wide-open perspective of information technology. We admit the
task is not easy in this transitional era of computing and technology. Meta-Con strives to meet one end —
“Change”. We make a conscious effort to alter the theories and set beliefs in the world of creativity by
introducing novelty with experiments.
We mean change within and without and our product(s) reflect our intentions.
Guided by our goals we provide the following core services to our clients:
Architectural Design Consultancy
Interior Design Consultancy
Interior Design Production
Furniture Design and Productions
4
Model Making
A brief description of the services being offered by us in each of the above areas is as
follows:
Architectural Design Consultancy:
We view architecture in two necessary ways. The design must be true according to the
programme and also according to the methods of construction. First is to fulfill the
conditions imposed by need and second is to employ the materials according to their
qualities and properties.
We perceive architecture design as a masterly, correct and magnificent play of spaces
brought together in light. To make the desires and visions of our clients intelligible,
capable of execution and communicable we take guidance from nature, as it is the most
important model of architecture.
Interior Design Consultancy:
A good design is simple, straightforward and reaches out to the masses. An idea or object
reduced to its simplest visual form speaks to us directly- there is no language or cultural
barriers. As designers our mission is to work with our clients to create design solutions
that are appropriate, creative, timely, environment sensitive, and economically feasible.
As designers, we create a body of work, which is recognizable as that of Meta-Con
design; because, we believe that this work will exhibit a purpose and an aesthetic that is
singular to our firm.
As design professionals, we demand more from ourselves than easy answers or facile
solutions. Our work is guided by a commitment to pursue excellence in our work,
developing intelligent solutions to the needs of our clients, and fostering sustainable,
livable communities
We work on the principle that each client, whether individual or institutional, brings a
specific set of issues and constraints to a project. Our approach is solution oriented, based
on a commitment to fulfill the needs of our clients and our methodology is very simple-
we derive solutions from your needs. Designing features of Meta-Con widely covers the
following,
Interior decoration
Floor planning
Space management
Colour coordination
Interior Design Turnkey Contracts:
In addition to interior design consultancy one of the major areas of our expertise is to
provide innovative turnkey solutions to various design problems of our clients. In this
regard we work from the very beginning that is identifying the needs through listening
carefully what clients desire and then we strive for the development of the final product,
which meets all their demands. To achieve this we have a skilled and experienced team
5
working at Meta-Con which is able to produce the desired results in all aspects of office,
commercial and residential interior projects. We provide service in the following areas:
Wall Finishes
Flooring
Lighting
Ceiling
Furniture
Metal
Glass
Partitioning
Furniture Design and Production:
Designer Furniture is an output of the cultural moods and tastes of clients, blended with
the overall concept of the designer and décor and color schemes in fashion. We provide
from the traditional to the contemporary to the functional, all encompassing array of
designs, materials and patterns to create whatever ambience you desire in your
environment.
We specialize in design and production of customized furniture of all types for
commercial shops, offices and residences. The combined efforts of a team of skilled
labour and technical expertise of design staff results in a product of high quality, a
trademark of Meta-Con.
Model making:
In architecture and Interior, model making is a pre- implementation of design solution in
form to look at out put result. Model making of any interior and architecture space is
normally expected to oversee implementation of an accepted solution.
The Future:
The speed with which our environment has had a shift from the use of traditional designs
for interior, architecture and furniture for commercial and residential purposes to the use
of more modern, stylish and innovative designs suggests that the future of the market is
bright. In Addition the use of more and more innovative and rather new ideas over the
established theories of contemporary designers is a sign that young firms with a new
vision like MetaCon will attract more and more customers with Style and Taste. Thus we
see the future brighter for us as we take chances and to do innovative as well as
traditional projects.
Our People:
6
Meta-Con is owned and managed by the Sole Proprietor with team of Architects,
Designers, Engineers and other technical staff enjoying an area of specialization and
expertise. The Sole Proprietor is responsible for policy making and strategic management
as well as coordination and supervision of jobs being executed through operational
management.
Sole Properietor
Muhammad Tahir Khan Khalidi
Architect & Interior Designer
Bachelor in architecture from National College Of Arts and member of Pakistan Council
Of Architects And Town Planners.
Chief Architect
Muhammad Tariq Khalidi
Architect & Urban Designer
Master of Architecture in Urban Design, University Of Oklahoma, USA.
National Diploma in Architecture, National College Of Arts, Lahore, Pakistan.
7
2
PARTICULARS
8
PARTICULARS
Name Meta-Con Design
Office 9 Canal Park Gulberg II,
Lahore.
Phone No. 5755919
Fax No. 5761075
E-mail info@meta-con.com
Web: www.meta-con.com
9
3
DISCIPLINE OF PRACTICE
DISCIPLINE OF PRACTICE
10
A. ARCHITECHTURE
- Residential Buildings
- Commercial Buildings
- Industrial Buildings
- Recreational Buildings
- Educational Buildings
- Landscaping
B. INTERIOR DESIGN
- Residential Buildings
- Commercial Buildings
- Offices
- Hospitals
- Recreational Buildings
- Banks
C. FURNITURE DESIGNING
- Office Furniture
- Residential Furniture
- Children Furniture (Schools)
D. STRUCTURAL DESIGN
- Residential Buildings
- Commercial Buildings
- Industrial Buildings
- Recreational Buildings
- Monuments
E. ELECTRICAL DESIGN
- Internal Electrocution for Building
- External Electrification
- Security and Alarm Systems
- Publics Address and Surveillance Systems.
- Fire Fighting System
F. PUBLIC HEALTH DESIGN
- Water Supply for Buildings
- Sewerage System
G. CONSTRUCTION AND MANAGEMENT
- Residential buildings
- Educational buildings
11
- Commercial buildings
- Industrial buildings
- Recreation buildings
- Hospitals
12
4
LIST OF PROJECTS
13
LIST OF PROJECTS
Client Portfolio
A selective list of major clients in various sectors is as follows:
Project
Sr. No Client Name Nature of Service Provided
Cost (Rs)
NATIONAL SAVING
CENTERS (April 2007 to Interior Design Consultancy & Execution: 38.6 Million
Nov 2007) Renovation, Ugradation, refurbishment (Completed)
Nsc Abbot Road, Bhatti gate, Gulberg, Hamid Nizami, Jail Raod,
1 KotLakh Pat, Model Town, Multan Road, Mustafabad, New
Muslim town RDNS Gulberg Head office
National Bank of Pakistan Design Consultancy:
Oct 2004-to Date NBP Gujranwala Civil lines, Faisalabad Civil Line
Branch, NBP Wapda House Branch, NBP
2 Ladywillington Branch, NBP Badami Bagh Branch,
NBP Krishen Nagar Branch, NBP Multan road,
NBP ladywillington, Garhi shahu, NBP RHQ 4th &
6th floor, NBP Main Branch Mall Road.
Civil work/Renovation/refurbishment & Furniture
turnkey:
NBP Lytton road Branch, NBP Bund Road
Branch, NBP Davis Road Branch, NBP Railway
Headquarter Branch, NBP Garden Town
(Furniture Supply), NBP Wahdat Road Branch
(Furniture Supply). NBP Regional Headquarter 25.0
RMC office, NBP Model Branch Gulberg Million
(Furniture Supply), NBP Gawal Mandi
(Furniture Supply), NBP Lady Walington. NBP
Garhi Shahu, NBP Kotli Behram Sialkot –
Furniture Supply, NBP Staff College- Furniture
Supply, NBP Rehman Plaza- Furniture Supply,
NBP Grade Trust Branch Lahore-Furniture
Supply, NBP RHQ Eng. Deptt. Furniture Supply
Habib Bank of Pakistan Design Consultancy: HBL Panaorama Branch, 3.5
Dec 2005-to Oct 06 HBL Fatima Jinnah Medical College Branch, HBL Million
3
Gulshan-e-ravi Branch, HBL Gujranwala Branch,
Defence Z block branch.
4 Design Consultancy: 3.0
The Bank of Punjab Million
Islampura, Mcleod Road ( Lahore) Ghakkar mandi,
Aug 2005-Oct 2005 Kmoke, Darya Khan, Jauharabad, Mianwali,
14
Project
Sr. No Client Name Nature of Service Provided
Cost (Rs)
NATIONAL SAVING
CENTERS (April 2007 to Interior Design Consultancy & Execution: 38.6 Million
Nov 2007) Renovation, Ugradation, refurbishment (Completed)
Nsc Abbot Road, Bhatti gate, Gulberg, Hamid Nizami, Jail Raod,
1 KotLakh Pat, Model Town, Multan Road, Mustafabad, New
Muslim town RDNS Gulberg Head office
National Bank of Pakistan Design Consultancy:
Oct 2004-to Date NBP Gujranwala Civil lines, Faisalabad Civil Line
Branch, NBP Wapda House Branch, NBP
2 Ladywillington Branch, NBP Badami Bagh Branch,
NBP Krishen Nagar Branch, NBP Multan road,
NBP ladywillington, Garhi shahu, NBP RHQ 4th &
6th floor, NBP Main Branch Mall Road.
Bhakkar, Kallur Kot, Kalabagh, Mulsim
Bazar( Sargodha), Bhalwal, Karor Lalesan.
Servis shoes
Oct 2006-to Feb -2007 Interior Design Execution: 2.5
5 Million
Tandlianwala shop, Sony Square Sialkot
(Completed)
Soul Office
Jan-2007-Feb-2007 Interior Design Consultancy & Execution: 1.2
6 Million
Renovation, refurbishment and furniture supply
(Completed)
H.A Fibre Office
Dec-2006-to May -07 Interior Design Consultancy & Execution: 1.5
7 Million
Civil work, Renovation, refurbishment and
furniture supply (Completed)
Corel Medical Office Interior Design consultancy & execution of Office 1.5
8 In Shadman Lahore. Million
July 2005-Oct 2005
PMU Office Refurbishment and interior of the Programme Management Unit
9 (National Programme for improvement of Water Courses in
Jan 2005-March 2005
Punjab) office.
Nexus forex house Interior Design consultancy & execution of Interior 62.0
10
Feb of 2003 Design of new branch of Nexus, Jail Road Million
Hasher Textile Mills Interior Design consultancy & execution of hasher 2.0
11
March 2003 Textile Mills Office at regency plaza. Million
12 Global Design Design Consultancy & execution 1 Million
May of 2000-May 2001 Punjab Group of Colleges
Interior Design & execution of ISP section,
15
Project
Sr. No Client Name Nature of Service Provided
Cost (Rs)
NATIONAL SAVING
CENTERS (April 2007 to Interior Design Consultancy & Execution: 38.6 Million
Nov 2007) Renovation, Ugradation, refurbishment (Completed)
Nsc Abbot Road, Bhatti gate, Gulberg, Hamid Nizami, Jail Raod,
1 KotLakh Pat, Model Town, Multan Road, Mustafabad, New
Muslim town RDNS Gulberg Head office
National Bank of Pakistan Design Consultancy:
Oct 2004-to Date NBP Gujranwala Civil lines, Faisalabad Civil Line
Branch, NBP Wapda House Branch, NBP
2 Ladywillington Branch, NBP Badami Bagh Branch,
NBP Krishen Nagar Branch, NBP Multan road,
NBP ladywillington, Garhi shahu, NBP RHQ 4th &
6th floor, NBP Main Branch Mall Road.
Gulberg Branch
Interior Design & execution of Office block,
Muslim Town Branch.
Dynamic Solutions Interior Design & execution of Dynamic solutions, 0.5
13
May of 2000-May 2001 Hafeez Center Lahore. Million
Zamana Interiors Furniture Design of Beacon House Informatics, Gulberg, Lahore
Office Interior Ejaz Group of Companies, Lahore
14 Design Supervision Muslim Commercial Bank Mughalpura,
Lahore.
Office Interior and Supervision ABN-AMRO First Capital
Securities Gulberg, Lahore.
College of Physicians and Interior Design Consultancy and Execution of Newely 14 Million
surgeon constructed (Four Floors) building of College of Physicians and
s Lahore Surgeons Lahore ( Approximately Area 35,000 SFT)
15 (March
09 to
date)
Urban Sole Interior Design and renovation of Urban Sole, Nishter Chowk 07 million
Multan, Gulgasht Multan, Urban Sole Pattoki, Sahiwal,
16 Faisalabad, Peshawar, Liberty and Pace Lahore, Model Town
Link Road Lahore, Muridke, Gujrnawala, Kamonki, Hayderabad.
17 Guardian Pharmacy Interior Design Consultancy & Execution: 15
June2005-to Date Million
Main Market Gulberg, Township Main Bazar,
Wapda town, Defence H-Block, Gulshan-e-ravi,
M.M Alam Raod, Pace Link Road, Allama Iqbal
Town, Ravi Road, Garden Town Barkat Market,
Baghbanpura, Krishan nagar , Daroghawala , Allah
16
Project
Sr. No Client Name Nature of Service Provided
Cost (Rs)
NATIONAL SAVING
CENTERS (April 2007 to Interior Design Consultancy & Execution: 38.6 Million
Nov 2007) Renovation, Ugradation, refurbishment (Completed)
Nsc Abbot Road, Bhatti gate, Gulberg, Hamid Nizami, Jail Raod,
1 KotLakh Pat, Model Town, Multan Road, Mustafabad, New
Muslim town RDNS Gulberg Head office
National Bank of Pakistan Design Consultancy:
Oct 2004-to Date NBP Gujranwala Civil lines, Faisalabad Civil Line
Branch, NBP Wapda House Branch, NBP
2 Ladywillington Branch, NBP Badami Bagh Branch,
NBP Krishen Nagar Branch, NBP Multan road,
NBP ladywillington, Garhi shahu, NBP RHQ 4th &
6th floor, NBP Main Branch Mall Road.
Hoo Chowk Johar Town Lahore (Completed)
Fazal Din & Sons Renovation, refurbishment and furniture supply to Fazal Din & 1 Million
18 Sons Hall & Medical Office Mall Road Lahore.
April 2005-May 2005
Fazal Din & Sons Interior Design consultancy & execution complete 1.0
July of 2002 –Dec 2005 turnkey solutions of Fazal Din shop at Defense Million
Lahore.(completed)
Interior Design consultancy & execution complete
turnkey solutions of Fazal Din shop at Main Market
Gulberg Lahore. (Completed) 2.5
Million
19 Interior Design consultancy & execution complete
turnkey solutions of Fazal Din shop at AIlama Iqbal
Town Lahore (completed) 2.0
Interior Design consultancy of Fazal Din shop at Million
Lady Wallington Road Lahore.
Interior Design consultancy & execution Fazal 1.5
Din shop at Misri Shah Lahore. Million
Medequips Interior Design consultancy & execution of Interior Design and 4.0 Million
20 complete turnkey solutions of Medequips office 30 Shahra-e-
Dec of 2001-April of 2002
Quaid-e- Azam, Lahore.
MRI & Ct Scan At Shiekh
Zayed Hospital Interior Design Consultancy & Execution: 3
21 Million
Civil work, Renovation, refurbishment and
furniture supply (Completed)
Ct Scan At Punjab Institute
of Cardiology Interior Design Consultancy & Execution: 2.5
22 Million
Civil work, Renovation, refurbishment and
furniture supply (Completed)
17
Project
Sr. No Client Name Nature of Service Provided
Cost (Rs)
NATIONAL SAVING
CENTERS (April 2007 to Interior Design Consultancy & Execution: 38.6 Million
Nov 2007) Renovation, Ugradation, refurbishment (Completed)
Nsc Abbot Road, Bhatti gate, Gulberg, Hamid Nizami, Jail Raod,
1 KotLakh Pat, Model Town, Multan Road, Mustafabad, New
Muslim town RDNS Gulberg Head office
National Bank of Pakistan Design Consultancy:
Oct 2004-to Date NBP Gujranwala Civil lines, Faisalabad Civil Line
Branch, NBP Wapda House Branch, NBP
2 Ladywillington Branch, NBP Badami Bagh Branch,
NBP Krishen Nagar Branch, NBP Multan road,
NBP ladywillington, Garhi shahu, NBP RHQ 4th &
6th floor, NBP Main Branch Mall Road.
Irnum Hospital Peshawar
Oct-2006-to Jan -2007 Architectural Design Consultancy : 8.5
23 Million
Cyclotron Machine area development, interior for
console and waiting and construction
Auditorium Renovation and refurbishment of the K.E. M.C College Pathology 0.5 Million
24 Department Auditorium.
Aug of 2004 to Feb. of 2005
Mayo Hospital Mar 04 Renovation and up gradation of new cath lab at Mayo Cardiology 1.5 Million
25 Ward, Lahore.
to Nov 04
Hope Color Lab Interior Design consultancy and supervision of the Hope Color 1 Million
26 Lab Gulberg Branch.
Nov 2004-Jan 2005
Mayo Pediatrics Block Interior Design construction and supervision of the 1.5
27
Pediatric Ward at Mayo Hospital. Million
Shauka Khannum Memorial Renovation and refurbishment of the Gamma and 0.5
Research Hospital C.T room .Interior Design consultancy of lower Million
28
Oct of 2002–Dec 2002 basement floor-department, Johar town Lahore.
Sheikh Zaid Hospital Renovation and up gradation of new cath lab at 1
29
March 2000-May 2001 Sheikh Zaid Hospital Cardiology Ward, Lahore. Million
Ittefaq Hospital Renovation and up gradation of new cath lab at 0.5
30
Feb 2000-April 2000 Ittefaq Hospital Cardiology Ward, Lahore. Million
Kamran Bahria Farm House
(Mr. Kamran Masood ) Architectural Design Consultancy and supervision, 1.2 Million
31 ( May 08 to date) (Covered Interior DESIGN Consultany of Bahria Executive
area 18580 SFT) Lodges
18
Project
Sr. No Client Name Nature of Service Provided
Cost (Rs)
NATIONAL SAVING
CENTERS (April 2007 to Interior Design Consultancy & Execution: 38.6 Million
Nov 2007) Renovation, Ugradation, refurbishment (Completed)
Nsc Abbot Road, Bhatti gate, Gulberg, Hamid Nizami, Jail Raod,
1 KotLakh Pat, Model Town, Multan Road, Mustafabad, New
Muslim town RDNS Gulberg Head office
National Bank of Pakistan Design Consultancy:
Oct 2004-to Date NBP Gujranwala Civil lines, Faisalabad Civil Line
Branch, NBP Wapda House Branch, NBP
2 Ladywillington Branch, NBP Badami Bagh Branch,
NBP Krishen Nagar Branch, NBP Multan road,
NBP ladywillington, Garhi shahu, NBP RHQ 4th &
6th floor, NBP Main Branch Mall Road.
1.438 Kanal House at
Defence Lahore (Mr. Ali Architectural & Interior Design Consultancy and 0.75 Million
Umair) (Covered Area 6,475 supervision of 1.438 Kanal House of Mr. Ali Umair
32 SFT) (April 09 to date) at Defence Lahore
Choudhry Nawaz Farm
House at Mandi Bahauddin Architectural and Interior Design and Supervision 1.9 Million
33 of 11.5 Kanal Farm House of Choudhry Nawaz at
(May 09 to date)
Mandi Baha ud Din (Area 51,282 SFT)
Choudhry Nawaz House at
Defence Lahore ( May 09 to Architectural and Interior Design and Supervision 0.95 Million
date) of of Choudhry Nawaz House at Defence Lahore
34
(Area 7,000 SFT)
Mr. Faizan House (April 09
to May 09) Architectural & Interior Design and supervision of 0.35 Million
35 Mr. Faizan House at Model Town Lahore (Area
2055 SFT).
Mr. Khawaja Abdul Jalil
House at Defence Lahore Architectural and Interior Design & supervision of 1.5 Million
36 Mr. Khawaja Abdul Jalil House at Defence Lahore
(Jan 09 to date)
(Area 9,500 SFT- 2.15 Kanal
Baghbanpura House (5-1/4
37 Marla) Own Project Interior Design and renovation of 5-1/4 Marla 01 Million
Baghban Pura House
House of Dr. Zahid Hussain Interior Design and renovation of 9 Marla House at Cantt Lahore
38 03 million
Cantt Lahore (9 Marla)
Saman Abad House (5
39 Architectural Design and construction 8 Million
Marla ) May 08 to Oct 08
Model Town House
40 Jan 2007-to April 07 Architectural construction of the I kanal house. 3.5
Million
19
Project
Sr. No Client Name Nature of Service Provided
Cost (Rs)
NATIONAL SAVING
CENTERS (April 2007 to Interior Design Consultancy & Execution: 38.6 Million
Nov 2007) Renovation, Ugradation, refurbishment (Completed)
Nsc Abbot Road, Bhatti gate, Gulberg, Hamid Nizami, Jail Raod,
1 KotLakh Pat, Model Town, Multan Road, Mustafabad, New
Muslim town RDNS Gulberg Head office
National Bank of Pakistan Design Consultancy:
Oct 2004-to Date NBP Gujranwala Civil lines, Faisalabad Civil Line
Branch, NBP Wapda House Branch, NBP
2 Ladywillington Branch, NBP Badami Bagh Branch,
NBP Krishen Nagar Branch, NBP Multan road,
NBP ladywillington, Garhi shahu, NBP RHQ 4th &
6th floor, NBP Main Branch Mall Road.
Farm House Design Consultancy of the Farm House at the Bedian Road. 0.3 Million
41
May 2005-Aug 2005
B.O. R House Design, Construction & interior design of 12-Marla house at 4 Million
42 B.OR Johar Town, Lahore.
June 2005-March 2006
Mian Aamir Mahmood Design & Execution of the Dressing room in making of the 2 Million
43
House Interior cabinet’s glass.
Johar Town House Design, Construction & interior design of 6 Million
44
June 2005-March 2006 1-Kanal house at B.OR Johar Town, Lahore.
Wapda Town House Designing and construction of a 1-kanal House at Wapda Town,
45 Lahore.
Apr. of 2004 to Jan. 2005 6 Million
The firm continues to strive for diversity and as such does not have any plans to restrict it to particular
markets or areas.
20
5
LIST OF CONSTRUCTION
EQUIPMENT
21
LIST OF CONSTRUCTION EQUIPMENT
1. Concrete Mixture 2 Nos.
2. Vibrators 4 “
3. Compactors 2 “
4. Hoist lift 50’ High 2 “
5. Floor Grinding Machines 3 “
6. Shuttering & Scaffolding Steel 5000 sft.
7. Shuttering & Scaffolding Wooden 7000 sft.
8. Water Pumping Sets 5 Nos.
9. Wheel Barrows 20 “
10. Theodolite 1 “
11. Spindle 1 “
12. Guage 2 “
13. Hand Cutter 4 “
14. Hand Saw 5 “
15. Hand Chapakka 2 “
16. Drill machine 4 “
17. Wood Cutting and molding machine 1 ‘’
18. Compressor 2 “
19. Welding Plant 1 “
20. Glass grinding Machine 1 ‘’
21. Aluminum Cutter 1“
22. Router Machine 1“
23. Wood Planner Machine 1“
22
6
LIST OF TECHNICAL STAFF
23
LIST OF TECHNICAL STAFF
Following is the list of our key technical staff.
Qualification/Special Training Experience/
Name Specializations
Course Years
Tahir Khan Bachelors of Architecture 08 Architectural design of houses,
commercial buildings, factories
M. Tariq Khalidi Master of Architecture in Urban Design 26 Architectural Design of ;
(USA)
Residential Buildings
National Diploma in Architecture
Commercial Buildings
Industrial Buildings
Recreational Buildings
Educational Buildings
Landscaping
M. Zafar Ullah Bachelors of Architect (NCA) 34 Communication and Interior
Design
Mureed Hussain B.Com, ICMA 06 Accountant
M. Samiullah Ansari Network Administrator 08 B.S in Computer Science
Muhammad Rehan Network Administrator 05 B.S in Computer Science
Aamir Siddique Associate Engineer 12 Construction Supervision
Tayyab Junior Architect 03 Architectural Design
Imran Rafiq Associate Engineer 23 Draftsman/Construction
Supervision
Bachelors of Arts (Punjab University)
Electrical Supervisor
Muhammad Afzal Associate Engineer 05
Construction Supervisor
Akhtar Supervision 03
Waqas Draftsman 03 Auto-Cad, Drafting
Sameer Draftsman 04 Auto-Cad, Drafting
Muhammad Athar Draftsman 08 Auto-Cad, Drafting, 3-D Max,
Adobe Photo Shop
Muhammad Jameel Foreman 10
Muhammad Shakeel Carpenter 04
24
Muhammad Asif Electrician 12 Diploma in Electrical
LIST OF TECHNICAL ASSOCIATES
25
LIST OF TECHNICAL ASSOCIATES
Following is the List of Our Technical Associates.
Name Qualification/Special Training Experience/ Specializations
Years
Course
Nadeem ud Din Khan Town Planner (UET) 14 Town Planning
Atiq-ur-Rehman Khan B.Sc Civil Engineering (UET) 24 Civil Work
Commercial Buildings
Industrial Buildings
Residential Buildings
M. Rizwan Khan B.Sc. Electrical Engineering (Power) 25 Building Electrification, Fire
Alarm Systems, Smoke & Heat
Foreign Trainings, Courses & Diploma
Detection, MATV, CCTV, PA
Auto CAD System, Telephone System.
Professional Management Courses
Sabir Naseer B – Tech in Electrical Technology 27 Electrical Engineering
Zafar Ahmad Khan Post-graduate courses in Structural 14 Structure Engineering
Engineering
Bachelor of Science in Civil
Engineering
Imran Yasin Sheikh B.Sc Mech 17 Water Supply and Sewerage
Systems, Construction
Diploma in Computer Aid Design
Managements,
Courses on Solid Waste Management
Fir Fighting Systems
Course in Environmental Engineering
Public Health Engineering
Pipe Lines and Plumbing
Stations, Environmental Eng.
26
7
RESUME
27
RESUME
Following pages carry RESUME of the key personals of META-CON Design.
28
CURRICULUM VITAE
1. NAME OF FIRM MetaCon Design
2. NAME M. TAHIR KHAN KHALIDI.
3. POSITION IN FIRM Chief Executive.
4. DATE OF BIRTH June 23rd, 1977
5. NATIONALITY Pakistani
6. MARITAL STATUS Married
7. EDUCATION
Name of Institution Year Degree
National College of Arts 2000 Bachelor of Architecture
(Grade Hons.)
8. MEMBERSHIP OF PROFESSIONAL ASSOCIATIONS
(IAP) Institute of Architects, Pakistan.
(PCATP) Member of Pakistan Council of Architects and Town Planners.
( LCCI ) Member of Lahore Chamber of Commerce & Industry.
9. EXPERIENCE
I. April 2001 to date
Employer Meta-Con Design
Position Held Chief Executive
DESCRIPTION OF DUTIES
Planning and design of several architectural and design projects in various fields.
The major includes;
- General Management
- Consultancy
- Architecture
- Interior Designing
- Office Management
- Interior Projects (National Bank, Habib Bank of Pakistan, Hospitals, Offices,
shops)
29
II. January 2001 to March 2001
Employer Global Design
Position Held Consultant Architect
DESCRIPTION OF DUTIES
Planned and designed Micro net Software House.
- Designing of Software House
- Designing of Office Interior
- Execution of above Said projects.
- Interior Works Execution (B.T. Exports)
- Workshop Production Management (Global Design)
- Product’s Design and Development of Modular Workstation (Global Design)
III. Feb. 2001 to May 2001
Employer Solari Software House
Position Held Free Lance Consultant Interior
Designer
DESCRIPTION OF DUTIES
Planning of solari software house.
- Design layout
- Furniture Design and Execution
IV. Aug. 2000 to Sep. 2000
Employer Dynamic Solutions
Position Held Free Lance Designer
DESCRIPTION OF DUTIES
Following is the description of duties performed in Dynamic Solutions.
- Design of Reception of Reception Counter
- Design of Books and Cd Rack’s
- Design of Dynamic Solutions Insignia
V. May 2000 to Aug. 2000
Employer Global Furniture
Position Held Consultant Interior Designer
DESCRIPTION OF DUTIES
- Design of Wall Paneling (Army Offices Project)
- Design of Executive Tables (Army Offices Project)
- Design of ISP Computer Workstations (Punjab Group of Colleges)
- Design of ISP Networking Room (Punjab Group of Colleges)
- Design of Executive Tables (Punjab Group of Colleges)
30
VI. July 1999
Employer R.A.D Associates
Position Held Contract Architect Designer
DESCRIPTION OF DUTIES
- 3-D Design of (Govt. Housing Apartment Buildings”), Lahore.
VII. Aug 1999
Employer Chishti Brother’s And
Associates
Position Held Contract Architect Designer
DESCRIPTION OF DUTIES
- 3-D Design of (Govt. Housing Apartment Buildings”), Lahore.
VIII. Aug 1999 to May 2000.
Employer A.Rehman Khan Associates
Position Held Assistant Architect Designer
DESCRIPTION OF DUTIES
- Design and Construction Supervision of Mr.Naveed’s House, Shalimar,
Lahore.
- 3-D Design of “3-type Govt. Housing Apartment Buildings”, Lahore.
IX. March 1999 to July 1999
Employer Zamana Interiors
Position Held Consultant Interior Designer
DESCRIPTION OF DUTIES
- Furniture Design of “Beacon house Informatics”, (Computer College),
Gulberg, Lahore.
- Office Interiors “Ejaz Group of Companies”, Gulberg, Lahore.
- Design Supervision “Muslim Commercial Bank”, Mughalpura, Lahore.
- Office Interior and Supervision “ABN Amro First Capital Securities”,
Gulberg, Lahore.
X. July 1998 to Oct. 1998
Employer Imran Rashid & Associates
Position Held Assistant Architect Designer
DESCRIPTION OF DUTIES
- Design Supervision “Lahore Gymkhana Library”, Mall, Lahore.
- Shops Interior “Pace Shopping Center”, Gulberg, Lahore.
31
CURRICULUM VITAE
1. NAME OF FIRM MetaCon Design
2. NAME M.TARIQ KHALIDI
3. POSITION IN FIRM Chief Executive.
4. DATE OF BIRTH May 7th, 1958
5. NATIONALITY Pakistani
6. MARITIAL STATUS Married
7. EDUCATION
Name of Institution Year Degrees
University of Oklahoma, 1988 Master of Architect in
Urban Design.
USA.
National College of Arts, 1983 National Diploma in
Lahore, Pakistan. Architecture.
8. MEMBERSHIP OF PROFESSIONAL ASSOCIATIONS
(IAP) Institute of Architects, Pakistan.
(PCATP) Member of Pakistan Council of Architects and Town Planners.
9. COUNTRIES WORK EXPERIENCE
Pakistan, USA.
10. EXPERIENCE
I. 2000 to date Meta-con Design
Employer Meta-con Design
Position Held Chief Executive
DESCRIPTION OF DUTIES
32
In-charge of consultant’s team on the project, including supervision, scheduling,
quality control, and coordination between various sub-contractors to complete the
project, meeting all clients requirements; within budgetary and time constrains.
.
II. 1998 to date
Employer National College Of Arts, Lahore.
Position Held Associate Professor
DESCRIPTION OF DUTIES
Visiting teacher in the Department of Architecture, as thesis advisor.
III. 1998 to 2002
Employer A. Rahman Khan Associates
5-A, Canal Park, Gulberg II,
Lahore.
Position Held Project Coordinator
DESCRIPTION OF DUTIES
In-charge of consultant’s team on the project, including supervision, scheduling,
quality control, and coordination between various sub-contractors to complete the
project, meeting all clients requirements; within budgetary and time constrains.
- Community hall and restaurant at Baltimore USA.
- Pakistan Foundation Hospital at Toba Tek Singh
- Tannery for Mr. Saleem at Sialkot.
- Mir Yousaf Leatherwear at Sialkot.
- Vetting of the King Faisal University (Al-Ahsa Campus), Riyadh, Saudi
Arabia drawings.
- Several houses at various locations.
- Commercial Complex at Gulberg, Lahore.
IV. 1993 to 1998
Employer Pakistan Environmental Planning
and Architectural Consultants,
Ltd.
58-Abu Bakar Block, New Garden
Town, Lahore.
Position Held Project Coordinator
DESCRIPTION OF DUTIES
33
In-charge of consultant’s team on the project, including supervision, scheduling,
quality control, and coordination between various sub-contractors to complete the
project, meeting all clients requirements; within budgetary and time constrains.
- Renovation of six major railway stations in Pakistan.
- Construction of Ghazi Palace on Canal bank, Lahore.
V. 1988 to 1992
Employer Pakistan Environmental
Planning & Architectural
Consultants, Ltd.
58-Abu Bakar Block, New Garden
Town, Lahore.
Position Held Project Architect
DESCRIPTION OF DUTIES
In-charge of project team. Duties included planning, designing, guiding designs
team, Co-ordination of various disciplines and meeting budget and time schedule.
- District Special Education Center for Handicapped Children at Faisalabad,
Sahiwal, Okara, and Karachi (200 Students at each location).
- Provincial Special Education Center at Karachi.
- Post Graduate Medical Institute Sheikh Zaid Hospital, Lahore. (12 stories high
tower)
- I.S.I. Housing Colony, Margalla Road, Islamabad.
- PUDP Walled city Lahore, comprising the Following: -
- Conservation of Bhati Gate, Sheranwala gate, Victoria Girls High School,
Audience Hall Raja Dhyan Singh and project # H/1088 Chowk Wazir Khan.
- Income Tax Office building Allama Iabal Road, Lahore.
- Landscaping of Regi Lalma Scheme Peshawar, River Neelum Bank 2.5 miles
long belt and circular Garden Yeki Gate to Akbari Gate and City Muslim boys
High School.
- Community center Choona Mandi conservation pilot project. Delhi Gate
Bazar Lahore.
V. 1987 to 1988
Employer QUINN & ASSOCIATES
Suit 101 1390 S. Douglas Blvd.
Midwest City, Oklahoma, USA
Position Held Architect
DESCRIPTION OF DUTIES
Design of Mackegee Center, an Office building in Oklahoma City.
VII. 1983 to 1986
Employer Pakistan Environmental Planning
& Architectural Consultants, Ltd.
34
58-Abu Bakar Block, New Garden
Town, Lahore.
Position Held Junior Architect
DESCRIPTION OF DUTIES
Part of design Team, Duties included designing, planning, preparing presentation
drawings, working drawings and supervision of draftsman.
- UBL, Head Office, Karachi. (23 stories high tower).
- War Memorial, Islamabad.
- Oil & Gas Development Corp., Islamabad Head Office.
- Hayatabad Hospital Complex Peshawar (600 Beds)
- Prime Minister’s House, Muzaffarabad.
- National Vocational Training Center.
- Major Development Schemes of Pakistan Rangers at Shakargarh.
- District Headquarters Hospital Abbottabad.
35
CURRICULUM VITAE
1. NAME OF FIRM Meta Con Design
2. NAME MOHAMMAD ZAFARULLAH
3. DATE OF BIRTH Feb 2nd, 1952
4. NATIONALITY Pakistani
5. MARITAL STATUS Married
6. POSITION IN FIRM Interior Designer
7. EDUCATION
Name of the Institution Year Degree
NCA 1974 Bachelors of communication Design
and
Interior Design.
8. COUNTRIES WORK EXPERIENCE
Pakistan, Canada & USA.
9. EXPERIENCE
I. September2001to date
Employer: Hunerkada College of Fine Arts
and Design.
Position Held Head of design Faculty.
II. September2001 to date.
Employer METACON Consultants
Position Held Interior Designer
III. May 1985 to Dec.1991
Employer: PEPAC (Pvt.) Limited, Lahore.
Position held Deputy Manager (Design and
Documentation)
IV. Nov. 1983 to May 1985
Employer PEPAC ({Pvt.) Limited, Lahore.
Position Held Deputy Manager
(Design and services)
V. Sep. 1975 to Nov.1983
36
Employer PEPAC (Pvt.) Limited, Lahore.
Position Held Graphic Designer.
VI. 1975
Employer Ontario College of Arts, Toronto,
Canada.
Position Held Internship Student for Two Terms
VII. 1974 to 1975
Employer Lance Litho Corporation,
Chicago, USA.
Position Held. Graphic Designer.
Graphic Design
1. Designed a number of following types of documents:
- Company’s Brochures.
- Company’s Annual Reports
- Companies Seasonal Souvenirs including Diaries.
- Architectural and Planning Reports
- Architectural competition presentations
2. Designed a comprehensive campaign for national integrity, sponsored by
Pakistan
National Center.
Interior Design and Art Works
Interior design works, comprising interior planning, color scheming, furnishings,
artwork on ceilings and doors, flooring, lighting and indoor landscaping, for
residential, office, commercial and institutional buildings, including the following
major projects:
- NWFP houses, Islamabad.
- Commissioner’s collectorate office at Peshawar.
- Kashmir House, Muzzaffarabad.
- Aiwan-e-Iqbal Complex, Lahore. (Library and Auditorium)
- Villa of Prince Khalifa Bin Sultan Alnaihyan, Karachi.
- Irfan Seamless Pipe Industries, Lahore.
- Dominion Fiance Company, Islamabad.
- Minhala Farm House, Lahore (150 kanals)
- Global Links Foreign Stocks, Lahore.
- Global Links Foreign Office, Rawalpinidi.
- Honorary Consulate Office, Kazakhstan, Lahore.
- Ventage Printers (Pvt.) Ltd.
Architectural and Industrial Photography.
37
1. Architectural and industrial photography, comprising about 3000 snaps, for
various large projects including:
- Pakistan Steels, Karachi (Factory and Housing)
- Pak-Arab Fertilizers, Multan (Factory and Housing)
- Pak-Saudi Fertilizers, Mirpur Methalo, Sind.
- National Insurance Company, Karachi.
- LDA, Plaza, Lahore.
- Aiwan-e-Iqbal, Lahore.
- Poonch House, Offices building, Rawalpindi.
- HBFC Building Islamabad.
- Nishat Group of Industries, through out Punjab.
- NAFDEC Complex, Islamabad.
- Ayub Medical College and Hospital Complex, Peshawar.
- Hayatabad Medical Complex, Peshawar.
- Sheikh Zaid Hospital Housing Colony.
- BHT Hospital Complex, Lahore.
2. Prepared 2500 slides for Walled City Conservation Plan, Lahore (A World Bank
Sponsored Project).
Painting and Allied Commissioned Art Work Activity
About 300 Paintings (Oil Medium), displayed as follows.
One Man Shows
- Ejaz Galleries, Lahore (2003)
- La Gallery Chen-One, Lahore (2001)
- La Gallery Chen-One, Karachi (1999)
- Alhamra Art Council, Lahore (1986)
- Art Gallaries, Golf Road, Lahore/(1974)
Various Group Shows
- Royaat Galleries, Defence Lahore (2002)
- Chokandi Art Gallery, Karachi (1986)
- Ejaz Galleries, Lahore
- Punjab Artists Association Exhibitions through out Pakistan.
- Pakistan National Council of Arts, Islamabad.
- Pakistan National Council of Arts, Karachi.
- Karachi School of Art and Craft, Karachi
- Chicago School of Art (1975)
- Industrial Art and Craft Festival, Dubai (1999)
Permanent Displays
- Lahore Museum
- Ejaz Gallaries, Gulberg, Lahore.
- Hamail Art Gallaries, Defence, Lahore.
- Pakistan National Council of Arts, Islamabad.
- 128,Atta Turk Block, New Garden Town, Lahore.
38
- Royaat Art Gallaries, Lahore.
39
CURRICULUM VITAE
1. NAME OF FIRM Meta-Con Design
2. NAME Mureed Hussain
3. POSITION IN FIRM Accountant
4. DATE OF BIRTH April 2, 1982
5. NATIONALITY Pakistani
6. MARITIAL STATUS Married
7. EDUCATION
Name of Institution Year Degree
Govt College of Commerce 2004 B. Com (Bachelor of
Multan. Commerce)
ICMA (Up to Stage –III) Institute of Cost &
Management Accountant of
Pakistan
8. OTHER TRAINING
One Weak Training on Leadership Style during employment in Foot Lib (Pvt.) Limited
9. EXPERIENCE
I- February 2008 to Date
Employer Meta-Con Design
Position Held Management & Accounts Officer
DESCRIPTION OF DUTIES
Accounts Responsibilities include daily Bank & Cash Position. Payables &
Receivables report. Detail of Projects in hand. Preparation of Bank Reconciliation
statement & reconciliation with parties.
Verify Purchase parties’ bills with purchase order rates and maintain parties’
ledgers. Preparation of receipt and payment account on monthly, quarterly, half
40
yearly and yearly basis. Preparation of salary statement. Keep Record of
Advances. (Both against salary & against expenses)
Preparation of profit & loss Project –wise, semi annually & annually. Posting of
vouchers (Journal, Sales, Purchase, Receipt, Cash Payment, and Bank Payment
vouchers). Preparation of Sales Invoices and Sales Tax Invoices.
To submit running bills & Final bill to Parties during & after completion of
projects. Supervision of Inventory Store, Maintain a summary of daily & monthly
stock in & out from the store.
Preparation of summary and filing of sales Tax Return. Filing of Income Tax
Returns & other legal issues of the Firm.
A progress report of different projects on daily basis is maintained including
Percentage of work done, Cost incurred, Comparison of actual cost of project to
Budget on daily basis.
Management Responsibilities include arrangement of Management meeting on
weakly basis, recording of minutes of meetings, Coordinate the decisions of
management to site staff. Arrangement of raw material according to requirement
of the project. Ensure record of daily attendance of the staff. Make proposals to
Pre-qualify the Firm with various Govt, semi-Govt and Private Organizations
time by time & according to the requirements of these organizations. Preparation
of bid documents, Quotation & BOQ of Tenders advertised in Newspapers for
Interior work, Architectural Design, Interior design consultancy, Supply of
Furniture etc.
II- December 2005- January 2008
Employer Footlib (Pvt.) Limited
Position Held Senior Accounts Executive
DESCRIPTION OF DUTIES
Worked as senior Accounts Executive in Footlib (Pvt.) Limited, a subsidiary of
servis Group of Industries that is engaged in manufacturing & export of Leather
Shoes & Import of Raw Material.
Responsibilities include daily Bank & Cash Position. Payables & Receivables
report. Detail in hand, order under process, order executed and shipped.
Preparation of Bank Reconciliation statement on weakly basis & reconciliation
with parties.
Verify Purchase parties’ bills with purchase order rates and maintain parties’
ledgers. Preparation of receipt and payment account on monthly, quarterly, half
41
yearly and yearly basis. Preparation of salary statement. Keep Record of
Advances. (Both against salary & against expenses)
Preparation of monthly profit & loss account. Posting of vouchers (Journal, Sales,
Purchase, Receipt, Cash Payment, and Bank Payment Vouchers). Preparation of
Sales Invoices and Sales Tax Invoices.
Preparation of summary and filing of sales Tax Return. Dealing with Sales Tax
refund cases by Submitting application by hard & soft copy, information in CBR
Software, Payment Proof from Banks, and Verification Letter by Parties to CBR
etc.
Visiting Banks Follow up Bank Guarantees, Maintain L.C Register, Foreign
Parties Payment by TT, DD etc.
Assisting Auditors in stock count and provide complete information for audit of
books of accounts. Drafting Letter, Faxes etc. Assisting Chief Accountant for
Income Tax Returns, Employees, Directors & the Company.
III- July 2002 – December 2005
Employer HARIS Enterprises
Position Held In charge Cable Advertisement and
Accounts Assistant
DESCRIPTION OF DUTIES
Supervise the team of five people working in the field & coordinate their work
Take steps to Increase their work performance and building their trust on the
Organization.
Preparation of bills, make records of Payables, receivables, Order in Hand, Work
Performance of Field Staff, Making of Cheques, Reconciliation with Banks &
Parties. Handling all matters relating Payments.
.
42
CURRICULUM VITAE
1. NAME OF FIRM Meta-Con Design
2. NAME Sami Ullah Ansari
3. POSITION IN FIRM Network Administrator/IT
Engineer
4. DATE OF BIRTH September 16th, 1983
5. NATIONALITY Pakistani
6. MARITIAL STATUS Single
7. EDUCATION
Name of Institution Year Degree
Foremen Christen College 2007 BS.IT (Bachelor in
Lahore. Information Technology)
8. OTHER TRAINING
1. MCSE – Microsoft Certified Professional System Engineer – „Corvit Systems“ – Lahore, Pakistan
2. CCNA – Cisco Certified Network Associate – „Corvit Systems“ – Lahore, Pakistan
3. RedHat Linux ISP Setup – „Corvit Systems“ – Lahore, Pakistan
4. A+ Certification Training - „NK FACT I .T Center“- Lahore, Pakistan
5. Diploma in Office Application - „NK FACT I .T Center“- Lahore, Pakistan
9. KEY QUALIFICATIONS
• TCP/IP Protocol (routing, forwarding...)
• HTTP (Hypertext Transfer Protocol)
• FTP (File Transfer Protocol)
• POP3 (Post Office Protocol version 3)
• SMTP (Simple Mail Transfer Protocol)
• PPTP (Point to Point Tunneling Protocol)
• VPN (Virtual Private Networking)
• MS Systems based Firewalls (protiction of the networks)
• Active Directory planing and implementation
43
• DNS (Domain Name System) configuration and installation
• DHCP configuration and installation
• IT Companies Infrastructure
• LAN Network constructions and configurations
• WAN Networks constructions and configurations
• Hardware/Software installation & maintenance
10. EXPERIENCE
2003-2004
Employer Computer micro Systems
Position Held Structured Network Designer
DESCRIPTION OF DUTIES
O/S configuration, Computer services
OS: Microsoft Windows 98, Windows 2000, XP Pro
Platform: Branded & Non-brand Intel Pentium & AMD & Cyrix
. 2004-2005
Employer Pulse Tone Communications
Position Held Operating System Expert
DESCRIPTION OF DUTIES
OS: Microsoft Windows 2003 server, XP pro
Platform: Branded & Non-brand Pentium III & 4 Number of servers: 1
Network users (workstations): 27
. 2005-2006
Employer ABM INFO TECH (PVT.) LTD
Position Held System Engineer & Network
designer
DESCRIPTION OF DUTIES
44
OS: Microsoft Windows 2003 Server
Platform: HP ProLiant ML530 (Intel Pentium 900MHz Quad, 1.5GB
Ram, 80GB HDD…)
Number of servers: 2
Network users (workstations) : 32
2002-2006
Employer Dewan Farooq Spinning Mills Lahore
Position Held IT Manager
DESCRIPTION OF DUTIES
OS: Windows 2003 Server Enterprise
Platform: HP ProLiant G3 (Dual Intel Xeon 2, 6GHz, 1024MB Ram,
76GB HDD Scsi…)
HP ProLiant ML370 (Intel Xeon 3, 6GHz, 1024MB Ram, 36GB HDD
Scsi…)
HP ProLiant BL Blade (Xeon 2,4GHz, 1024MB Ram, 36GB HDD Scsi…)
Number of servers: 3
Network users (workstations) : ~67
2006-2007
Employer Berlitz Language Center Lahore
Position Held IT Engineer / Network
Administrator/ Wireless Network
Designer
DESCRIPTION OF DUTIES
OS: Microsoft Windows 2003 Enterprise Edition
Number of servers: 3
Platform: HP ProLiant ML 370 G5 (Dual Core 2 Duo Intel Xeon
2.33GHz, 4096MB Ram, 136GB HDD …)
Network users (workstations): 18
45
10. Software implementation/configuration experience
Server OS:
Microsoft Windows NT4 Server
Microsoft Windows 2000 Server
Microsoft Windows 2003 Server (Standard, Enterprise)
RedHat Linux
Workstation OS:
Microsoft Widows 98 SE
Microsoft Windows Me Edition
Microsoft Windows 2000
Microsoft Windows XP
Microsoft Windows VISTA Business
Microsoft Windows VISTA Ultimate
Mail servers:
Microsoft Exchange Server2003
Firewalls:
Microsoft ISA server firewall (ver. 2000, 2004 and 2006)
Kerio server firewall
McAfee Total protection firewall
Remote Acess:
Symantec PC Anywhere 10
Symantec PC Anywhere 11.5
Remote Admin
Antivirus:
Symantec Antivirus Corporate v9 & V10
McAffe Corporate Antivirus suite (total protection)
Node 32
kespersky
Backup strategy:
Symantec Norton Ghost
Microsoft System Backup Utility (Ntbackup)
Application Softwares:
Have a Complete knowledge to install Application Software’s.
46
11. Hardware implementation experience
Routers:
Asus WL-530G & WL-330G (WLAN & LAN)
3Com Router 3030 (LAN)
Linksys WRT54GL Series
Dlink (lots of diferent models)
Switches:
Linksys Cisco 24port switch 10/100btx+1 port gigabit
3Com Super Stack 3 Switch 4400 24port
Dlink (lots of diferent models)
Bay Lan (lots of diferent models)
Misc/Other:
Multiple RAID Arrays (RAID0,RAID1,RADI 0+1,RAID5...)
Diferent RAID PCI Cards (when there is no RAID Onboard)
Experience of handling all types of INTEL & AMD based Systems (All
types of Configurations, Assembling and All Types of Hardware Drivers
Maintenance). Having Experience of Handling all types of external
Hardware (Scanners & Printers etc) & their Drivers.
47
CURRICULUM VITAE
1. NAME OF FIRM Meta -Con Design
2. NAME Aamir Siddique
3. POSITION IN FIRM Chief Site Supervisor
4. DATE OF BIRTH 1975
5. NATIONALITY Pakistani
6. MARITAL STATUS Married
7. EDUCATION
Name of Institution Year Degree
Technical Training College 1997 Diploma in Civil Draftsman
Center, Lahore.
Private 1993 F.A.
8. EXPERIENCE
I. Dec. 2000 to date
Employer Meta-Con Design
Position Held Chief Site Supervisor
DESCRIPTION OF DUTIES
Carried on various projects as chief site supervisor.
- Theorist Design
- Dynamic Solutions
- Medequips
- Many other Construction, Exterior and Interior Design Projects.
II. May 2000 to Nov. 2000
Employer Global Reach
Position Held Site Supervisor
DESCRIPTION OF DUTIES
48
Did purchasing and production of interior works project.
- PCBA (ASP) office
- PCBA (IT) college
- Army Cantonment Offices
- Askari Leasing.
III. 1997 to 2000
Employer PEPAC
Position Held Assistant Model Maker
DESCRIPTION OF DUTIES
- Crystal Center
- Sahowari Mosque
- Big City
- Jail Road Bus Stops and Public Toilets
- Rehman
- Mosque of Nadia Tex. Mills Ltd.
- Sarina Hotel Islamabad(Ceiling)
- Pavilion of Stadium, Iqbal town.
- Construction projects
- Interior Projects
49
CURRICULUM VITAE
1. NAME OF FIRM Meta Con Design
2. NAME Muhammad Afzal
3. POSITION IN FIRM Chief Electrical Supervisor
4. DATE OF BIRTH 1980
5. NATIONALITY Pakistani
6. MARITAL STATUS Single
7. EDUCATION Diploma Electrical
Name of Institution Year Degree
Vocational Training Institute
Green Town Lahore 2004 Diploma Electrical Engineering
Kananow, Ferozpur road,
Lahore 1996 Matric.
8. EXPERIENCE
a) Dec. 2004 to date
Employer Meta-Con Design
Position Held Electrical Supervisor
DESCRIPTION OF DUTIES
Carried on various projects as Electrical supervisor.
- National Bank of Pakistan, Bund Road Branch
- National Bank of Pakistan, Davis Road Branch
- Medequips Office Lahore
- Fazal Din & Sons Sales Office Mall Road, Lahore
- Coral Medical Office, Cricket House Lahore
- Guardian Pharmacy, Wapda Town, Township, Defence, Gulberg, M.M alma
Road, Iqbal Town & Gulshan-e- Ravi
- I-Kanal House in B.O.R Society
- Many other Construction, Exterior and Interior Design Projects.
50
b) May 2003 to Dec. 2005 Civil Contractor
Employer Electrical
Position Held Supervisor
DESCRIPTION OF DUTIES
- Electrical Wiring 2-Kanal House, Defence
- Electrical Wiring 1-Kanal House, Wapda Town
- On Site Inspection
51
CURRICULUM VITAE
1. NAME OF FIRM Meta-Con Design
2. NAME Imran Rafiq
3. POSITION IN FIRM General Manager
4. DATE OF BIRTH 15-01-1966
5. NATIONALITY Pakistani
6. MARITAL STATUS Married
7. EDUCATION
Name of Institution Year Degree
Technical Training College 1983 Diploma in Civil Draftsman
Center, Lahore.
Matric 1982 Matric.
8. EXPERIENCE
I. Dec. 2003 to date
Employer Meta-Con Design
Position Held General Manager
DESCRIPTION OF DUTIES
Carried on various projects as General Manger.
- National bank Of Pakistan
- Guardian Pharmacies
- Many other Construction, Exterior and Interior Design Projects.
II. April 1990 to Nov. 2000
Employer M/s Pakistan Environmental
Planning & Architectural
Consultants, Limited (PEPAC)
Lahore
Position Held Draftsman
DESCRIPTION OF DUTIES
- Aiwan-e-Iqbal Complex, Lahore
- Special Education Centres Project (throughout Pakistan)
- Natural History Museum, Islamabad
- S.D.A House, Peshawar.
- Supreme Court Of Pakistan Building (SCOP) Islamabad.
52
- Choona Mandi Haveli Complex, Lahore
III. 1989 to 1990
Employer M/ s Picolite Industries (M.E) Ltd,
Sharjah.
Position Held Draftsman
DESCRIPTION OF DUTIES
- Research and Development building for industrial Plastic, Sharjah.
IV. 1986 to 1988
Employer M/ s Progressive Consultants (Pvt)
Ltd, Lahore.
Position Held Electrical Draftsman
DESCRIPTION OF DUTIES
- National Defence College, Islamabad
- Al-Khalili Residential & commercial Plaza, Masqat.
- Nipa Office Building, Lahore
V. 1984 to 1986
Employer M/s Pakistan Environmental
Planning & Architectural
Consultants, Limited (PEPAC)
Lahore
Position Held Draftsman (Architectural, Electrical
& Civil)
DESCRIPTION OF DUTIES
- Sheikh Zyed Hospital, Lahore.
- Kashmir Colony, Residential Project at Muridkay.
- Locomotive Manufauring Factory & Residential Colony, Risalpur.
- Income Tax Office building at DOT Complex, Lahore.
VI. 1983 to 1984
Employer M/s Wilaz Construction Ltd.,
Shadman, Lahore.
Position Held Draftsman (Architectural, Electrical
& Site Supervision)
DESCRIPTION OF DUTIES
- Green Villaz Lahore.
53
RESUME
Following pages carry RESUME of the Technical Associates of META-CON Design.
54
CURRICULUM VITAE
1. NAME OF FIRM Vista Consultant
2. NAME NADEEMUDDIN
3. DATE OF BIRTH 29th July 1967
4. NATIONALITY Pakistani
5. MARITAL STATUS Married
6. POSITION IN FIRMS Director
7. EDUCATION
Name Of Institution Year Degree
University of Engineering 1991 Bachelors in City and
& Technology, Lahore Regional Planning
8. MEMBERSHIP OF PROFESSIONAL SOCIETIES
Participation in International Conference For Geographical Information
9. COUNTRIES WORK EXPERIENCE
Pakistan
10. EXPERIENCE
COMMERCIAL AND INDUSTRIAL JOBS
1. Interior Wood Display (Commercial Abu Yousaf Show Room Third
Designing & Supervision) Floor Ferozepur Road Lahore.
Area 23,000 SFT
2. Kanal Wood Master Factory Sundar Adda Multan Road Lahore
(Designing)
3. Medicima Head Office (Commercial 84-E Muslim Town Lahore.
55
Interior + Construction)
4. Medicine Pharma 16 KM Raiwind Road Lahore.
5.Caylex Pharma (Designing First Floor Opposite Lake City Raiwind Road
+ Ground Floor) Lahore.
6. Selemore Pharma (Designing) 27 KM Multan Road Lahore.
7. Ice Cream Factory (Designing only) Shekikhupura Road, Lahore.
8. Bagh Ban International Yaqub Shadi Hall, Ravi Road,
Display Department. Lahore
9. Umer Garden 28 kanal off. Jinnah Hospital, Lahore.
Designing Sewerage and civil work
10. Good Luck Bakers G.Block, Johar Town, Lahore.
11. Shahid Optics Main Peer Ghazi Road, Lahore.
12. Office Interiors Jaz Arcade, Jail Road, Lahore.
13. 3rd floor interior sports shop Pace Lahore.
14. Target Department Allama Iqbal Road, Lahore.
15. Boby Electronics Cavalry Ground, main road, Lahore.
16. Exterior Finish for Macdonald’s Fortress Stadium, Lahore.
Fortress.
RESIDENTIAL JOBS
1. 400 kanal (H-Society) Back Side, Marguzar colony, Multan
Ali Town Designing only. Road, Lahore.
2. 174 Kanal (Area 200,000 SFT) Johar Town Lahore.
ResidentialGigantic Project
(Supervision Project Director)
56
3.12 Kanal Two Houses Jallo Mor Lahore.
(Designing & Construction)
4.10 Marla House (Designing & Sabzazar Colony, Lahore
Construction)
5. 8 Kanal Factory Katar Band Road.
6. 4 Kanal House 244-245 J. EME
7. 3 Kanal House 1- Off. Canal View, Lahore.
8. 2 Kanal Interior 22-A Model Town Lahore
9. 2 Kanal House 179-D Model Town, Lahore.
10. 2 Kanal House 79-80F Johar Town.
11. 1 Kanal Residence Murgazar Colony Lahore
Designing and Consultants
12. 1 Kanal Interior P.C.S.I.R Phase –I Lahore
13. 10 Marla House Civil Lines Road, Lahore.
14. 10 Marlas house 352 Humza Block, Allama Iqbal
town, Lahore
15. 5 Marla House Waheed Brothers Hosing Society,
Ferozepur Road, Lahore.
16. Three 5 marla house Canal Road, Lahore.
17. Some other small projects relating to civil work were carried out by Vitae.
Services
- Construction, all civil matters.
- Surveys and Inspection.
- Interior, (Wood, Glass, Aluminum, steel, marbles, tiles, ceilings, Termite,
Finishes)
- Designing
- Building Management system.
57
CURRICULUM VITAE
1. NAME OF FIRM Meta-Con Design
2. NAME Muhammad Rizwan Khan.
3. POSITION IN FIRM Principal. Electrical Engineer
5. DATE OF BIRTH 8th Oct. 1961
6. NATIONALITY Pakistani
7. MARITAL STATUS Married
8. EDUCATION
Name of Institution Year Degree
University Of Engineering 1984 Bachelor Of Science In
& Technology Electrical Engineering
9. OTHER TRAININGS
Foreign Trainings, Courses & Diploma.
Auto CAD Courses (UET)
Professional Management Courses (PIM)
10. MEMBERSHIP OF PROFESSIONAL SOCIETIES
Life Member Of Pakistan Engineering Council (PEC)
Life Member Of Institution Of Electrical and Electronics Engineers Pakistan
(IEEEP)
58
Associate Member Of Pakistan Institute Of Management (AMPIM)
Member of Illumination Society of Pakistan. (ISP)
Member of Engineers Foundation Pakistan (MEFP)
11. EXPERIENCE
I. April 2001 to date
Employer Meta-Con Design Position
Held Associate Consultant
LIST OF PROJECTS DONE:
- Pediatrics Block (I C U) Mayo Hospital, Lahore
- College of Physicians and Surgeons, Lahore
- Beaconet Commercial Centre, 15-S, Gulberg –II Lahore
- Ahla-Hadeth Head Office, 106-Ravi Road, Lahore
- 300-Bed PESSI Hospital, Faisalabad
- Pakistan Foundation Hospital, Toba Tek Singh, Faisalabad.
- 50-Bed PESSI Hospital Shahdara
- Deptt of Information Tech, Lahore Collage for Women
- Deptt of M.S, National University, (FAST), Lahore.
- Zainab Towers, Model Town, Link Road, Lahore.
- Samadh Rajet Singh, Ateeq Stadium, Lahore.
- Sandal College for Women, Millat Road, Faisalabad.
- Auditorium, DPS, Faisalabad.
- Crescent Young Hostel, Crescent Sports Complex, FSD
- College of Physicians and Surgeons, Faisalabad
- SNGPL Staff Hostel, Regional office Flow Proving Cell, FSD
- Auditorium, BZU, Multan
- Auditorium, Islamia Universities, Bahawalpur.
- Girl’s Hostel Islamia Universities, Bahawalpur
- Deptt of Mechanical Engg. BZU, Multan
- Deptt of Electrical Engg. BZU, Multan
- Law College BZU, Multan.
- PMA Trade Centre, Shama Chowk, Lahore.
- Civil Secretariat Complex, Peshawar.
- NWFP Provincial Assembly Complex, Peshawar.
- SNGPL, Regional office, Hayatabad, Peshawar.
- College of Physicians and Surgeons, Peshawar.
- Junior Campus, School, Shad Bagh, Lahore.
- Abbas Literacy College, Lake Road, Near Planetarium
- Mohammadi Free Welfare Trust Hospital, Shalimar Town Benazir Road, Okara.
- Hanif Surgicare Hospital, G-Block, Vehari
PROJECTS IN SIALKOT:
- M/S COSPO Industries (Pvt) Ltd, Duska Road, Sialkot
- M/S Kapoor Surgical Ind. Site.
- M/S Al Sheikh Commercial Centre, Urdu Bazzar, Fort Road
- M/S HighRise Stitching Ind. (K.M Ashraf & Sons Group)
59
- M/S SAGA Bladder Factory, SITE
- M/S SAGA Rubber Plant, SITE
- M/S J M Instruments / Surgical Ind, SITE.
- M/S SAGA House
- M/S Bhinder Surgical Ind.
- M/S Qazi Eye Hospital, Opp to Civil Hospital, Sialkot
- Commercial Office of Mr Shakeel Sb, Sialkot
CURRICULUM VITAE
1. NAME OF FIRM Meta-Con Design
2. NAME ZAFAR AHMAD KHAN
3. POSITION IN FIRM Senior Engineer
4. DATE OF BIRTH May 29, 1970
5. NATIONALITY Pakistani
6. MARITAL STATUS Married
7. EDUCATION
Name of Institution Year Degree
University of Engineering 1993 Bachelor of Science in
& Technology, Lahore Civil Engineering.
University of Engineering 1995 Post-graduate courses in
& Technology, Lahore Structural Engineering
8. OTHER TRAINING
Participated in "Dynamic Learning and Management Skills Workshop for
Calibrated I.T. Professionals" conducted by Punjab Information Technology Board
at Lahore University of Management Sciences (LUMS) (January 2001).
Microsoft Certified Systems Engineer (MCSE) since June1999. Microsoft Certified
Professional in Implementing and Designing Databases with Microsoft SQL Server.
60
Highly skilled in the use of computer software for structural engineering, e.g.,
SAP90, STAAD3, ETABS, AutoCAD, MS Project, PCACOL, PCABEAM etc.
Computer programmer with skills in following software/development
environments: Visual Basic, MS Fortran, Auto LISP, HTML, ASP, and VBScript
etc.
9. MEMBERSHIP OF PROFESSIONAL SOCIETIES
Member of Pakistan Engineering Council, Civil/15342
Member Pakistan Engineering Congress (no. 2380)
10. COUNTRIES WORK EXPERIENCE
Pakistan
11. KEY QUALIFICATIONS
Practicing Professional Engineer since 1993.
Possess solid experience in structural design & construction engineering.
Experience includes international level projects like “Ghazi-Barotha Hydropower
Project” and “Chashma Nuclear Power Project (Cooling Water Intake
Structure)”. Other major works undertaken include the analysis and design of
“Century Towers, Kalma Chowk, Lahore” (15 storied commercial building),
“New Auriga Shopping Mall, Gulberg, Lahore” (7 storied commercial building),
“Square One” (6 storied commercial building), Prime Minister Housing
Scheme”, “Rehabilitation of Shadan-Lund Bridge at Dera Ghazi Khan”,
“Feasibility study of Gomal Zam Dam” and “Saudi Embassy and
Ambassador’s Residence, Islamabad”.
Areas of experience include structural design of large hydraulic structures, multi-
storey buildings etc., road geometrics, culverts, bridges, survey and construction
supervision & quality control of massive concrete structures.
Highly skilled in the use of computer methods and latest codes of practice like ACI
318, UBC, ASCE Hydraulic code etc.
Possess advanced level computer skills. Experienced in the use of state-of-the art
engineering software, programming and networking. Developed a number of
software solutions for various engineering and business needs using MS office,
Visual Basic, QBASIC and Auto LISP. Participated in Fifth All Pakistan Software
Competition and Exhibition organized by Dr. A. Q. Khan Research Laboratories.
12. EXPERIENCE
I. 2003 to date
Employer Meta-con Design
Position Held Senior Engineer
DESCRIPTION OF DUTIES
61
- Structural design of different residential and industrial projects.
II. March 2002 to date
Employer Jers Engineering Consultants
Position Held Senior Engineer
DESCRIPTION OF DUTIES
Project Manager for the Digital Survey work for Punjab Community Water Supply
and Sanitation (Sector) Project (PCWSSP). Client: Public Health Engineering
Department, Govt. of Punjab. Project involves survey and mapping of about 700
rural areas of Punjab.
Project Manager for Digital Survey of 12 villages of Punjab.
Structural design of Al-Russ Water Treatment Plant, Saudi Arabia.
Structural analysis/design of several buildings. The major includes;
- Structural Design of Square One, Q-Block, Gulberg II, Lahore (6 stories
commercial building)
- Structural design of Royal Saudi Embassy at Islamabad. (Project cost Rs.850
Millions)
- Structural design of Saudi Ambassador Residence at Islamabad (Project cost
Rs.350 Millions)
- Structural design of Prince Fahad Palace at Riyadh, KSA.
- Structural design of Fiat Motors Showroom at Sialkot
- Structural design of New Look Beauty Parlour
- Structural design of Shapes Gymnasium at Sialkot & Township Lahore
- Structural design of numerous residences
Involved in the review of design of Infrastructure for King Faisal University, Al-
Ahsa Campus, Saudi-Arabia.
Involved in the design of roads for following projects:
- Shere-Bengal Labour Colony at Lahore
- Unihomes Housing Scheme Lahore
- Paragon City Housing Scheme Lahore
- KB Housing Scheme Lahore
- Tariq Garden Housing Scheme Lahore
III. February 2000 February 2002
Employer Noor Durrani & Associates
Position Held Senior Engineer
DESCRIPTION OF DUTIES
62
Structural design of several commercial and industrial buildings. The major work
includes;
- Structural analysis and design of Century Tower (a 15-storeyed
commercial building)
- Structural analysis and design of New Auriga Shopping Mall (7
storied commercial building)
- Structural analysis and design of Jafri Heights (Computer IT
Market) (9 storied commercial building)
- Structural analysis and design of Grace Tower (6 storied apartment
building)
- Review of Shadan Lund Bridge Piles
- Feasibility stage study of Structure of Gomal Zam Dam using
SAP2000
- Structural analysis and design of Prime Minister Housing Scheme
4 storied engineered masonry apartments
IV. August 1995 to February 2000
Employer Associated Consulting Engineers
(Pvt.) Ltd.
Position Held Structural Design Engineer
DESCRIPTION OF DUTIES
Deputed at Pakistan Hydro Consultants, an International Consortium. It was constituted for
the design and construction supervision of the World Bank funded Ghazi Barotha
Hydropower Project, which has a design net head of 69m and a total generating capacity of
1450 MW. The project has an estimated cost of US$ 2.25 Billion. The Project comprises
of three major components, namely, Barrage, Power Channel & Power Complex.
Involved in the analysis & design and preparation of construction drawings of various
structures. Analysis and design was performed using state-of-the art computer software
such as STAAD-III, SAP90, PCACOL, PCABEAM, RCBIAXU etc. Carried out the design
work in accordance with ACI Building code, ASCE code for hydraulic structures,
AASHTO, AREA, ASTM ASD and other relevant codes of practice. All the tasks carried
out using a combination of state of the art computer and manual methods.
Barrage: Worked on the structural stability analysis of Standard Bays and Under
sluices. Contributed towards the design of various structural components such as
structure monoliths, gantry crane beams, cable trenches, drainage gallery, drainage
sump, approach slabs etc.
Developed spreadsheets for the stability analysis and design of wing walls
(retaining walls) on the right and left guide banks both upstream and downstream of
Standard bays and Under sluices.
Performed complete analysis and design of Barrage Control Building using
STAAD3.
Analyzed and designed Skimming Platform; a multi-tunnel concrete structure
heavily loaded by the accumulation of silt over the top slab.
63
Put substantial amount of time & effort into the preparation of construction
drawings for Standard Bays, Under sluices, Skimming Platform and Barrage
Control Building. Detailed concrete and reinforcement as per international codes of
practice.
Power Channel: Designed keeper anchorages, splices and connections for the
110m span Railway Bridge (multi-truss steel structure) over power channel.
Reviewed shop drawings for the same.
Designed no. of super-passages (culvert-like structures carrying water courses over
power channel).
Involved in the design of numerous bridges of spans ranging from 12m to 30m.
Power Complex: Performed stability analysis and design of Powerhouse Intake
structure (a massive water regulating structure at the start of Powerhouse
Penstocks). Prepared reinforcement drawings for the same.
Designed a number of ancillary structures of Spillway. Designed and prepared
drawings for the gantry crane beams, parking area, stop logs storage area and gate
control equipment area of Tail Regulator. Carried out analysis and design of
miscellaneous ancillary structures of Powerhouse, North Low Level Outlet and
North Sill. Worked on the revisions to construction drawings as per the
changes/revisions in the mechanical and electrical equipment details.
Designed a no. of culverts. Performed geometric design of roads for power complex
and ancillary areas.
V. August 1994 to July 1995
Employer
MacDonald Layton Company
(MLC) Ltd.
Position Held Site Engineer
DESCRIPTION OF DUTIES
Worked for the Contractor, on Cooling Water Intake Structure of Chashma Nuclear
Power Project. As a site engineer I was responsible for on-site management of
construction activity. Supervised the surveying, excavation, de-watering,
compaction, concrete placement and other related construction site activities. Toiled
for the best utilization of available manpower and equipment. Developed and
implemented quality control procedures and documentation. Implemented material
quality control through liaison with Chinese material testing laboratory and by
establishing a site laboratory. Accomplished quality control at batching plants.
Prepared shop drawings and bar bending schedules. Designed and executed the
construction of a no. of temporary structures such as site laboratory, water storage
tanks, water channels & conduits for draining of water from de-watering
operations, etc.
VI. December 1993 to July 1994
64
Employer Gammon Pakistan Ltd.
Position Held Site Engineer
DESCRIPTION OF DUTIES
Supervised the construction work at Thal Canal Bridge Project, Chashma. The
bridge foundation consisted of cast in-situ concrete piles. Gained a deep
understanding of pre-casting, stressing & launching of priestesses concrete girders.
CURRICULUM VITAE
1. NAME OF FIRM Meta-Con Design
2. NAME IMRAN YASIN SHEIKH
3. POSITION IN FIRM Public Health Engineer
4. DATE OF BIRTH April 17th, 1964
5. NATIONALITY Pakistani
6. MARITIAL STATUS Married
7. EDUCATION
Name of Institution Year Degree
University of Engineering 1988 Bachelor of Science in
& Technology, Peshawar. Mechanical Engineering.
8. OTHER TRAINING
Fully conversant with World Bank programs like “WATER”, “LOOP”, and other
latest software like Word, Excel, Windows XP, Auto-Cad, D-Base, and
“CYBERNET”- for the designing of water supply networks, “STORM CAD” for
designing drainage systems. Attended courses on Environmental Impact
Assessment, Solid Waste Management and ISO 9000.
65
9. MEMBERSHIP OF PROFESSIONAL SOCIETIES
Member of Pakistan Engineering Council, Mech. /6997
10. COUNTRIES WORK EXPERIENCE
Pakistan
11. KEY QUALIFICATIONS
Practicing Professional Engineer since 1988.
As professional Engineer working in the fields of engineering design, water
supply, sewerage and drainage systems, water and wastewater treatment plant
design and environmental impact assessment. Carried out topographic survey for
various projects. Carried out various studies on Environmental Impact Assessment
and Initial Environmental Examination. Managing all the technical as well as
administrative matters of the company.
As Project Manager – NESPAK, prepared conceptual design report, tender
documents, bill of quantities and cost estimates for water treatment plant for
Sukkur.
As Environmentalist carried out environmental impact assessment for Khan
Khawar Hydro Power Project, AES Lalpir Thermal Power Project and Burj Aziz
Khan Dam Project. Responsible for carrying out Socio Economic Survey in
Besham area. Remain In charge of Environmental Laboratory of the organization
for several years.
As Project Engineer worked on the design and development of Race Cource Park
Rawalpindi, fountain complex for Pakistan Atomic Energy Commission,
plumbing for Mangla Hydro-electric power station, State Life buildings
Islamabad and Faisalabad.
As Design Engineer NESPAK responsible for topographic surveys, planning,
feasibility studies, PC-1, detailed design, tender documents, construction
drawings, tender evaluation, testing and commissioning of various projects of
water supply, sewerage, roads and water treatment plants. Some of the major
projects include water supply system for Gilgit and Skardu, design of roads for
WAPDA Town Sheikhupura, up gradation of road network for Gujranwala and
Sialkot, water supply and disposal pipelines for Muzaffargarh Thermal Power
Station, Bulk Water Supply Scheme for Port Qasim Industrial Estate, Dammam
Wastewater Reuse project, water supply and Sewerage for developing areas in
Kharj city, drainage system for Pasni Diesel Power Station, Akra Kaur Dam
project, 18 MGD additional treatment plant for Simly, water intake and pipeline
for Hingol Dam Project, water treatment plant for Chashma Nuclear Power plant.
As Maintenance/mechanical Engineer worked on the operation and maintenance
of effluent treatment plant for Packages Pvt. Ltd.- Paper and Board Industry.
66
As In charge Computer Application Cell responsible for the maintenance of
computer systems of the division including software and hardware.
Responsibilities also included the training of the Drafting and Typing Staff with
latest software.
12. EXPERIENCE
I. October 1996 to date
Employer Jers Engineering Consultants
Position Held Public Health Engineer
DESCRIPTION OF DUTIES
Planning and design of several engineering design projects in various fields. The
major includes;
- Urban Infrastructure design for 21 cities of Southern Punjab.
- Design of plumbing system for Sarafa Market at Kandhar.
- Design of plumbing system for Saudi Embassy at Turkmenistan.
- Design of plumbing system for Royal Saudi Embassy at Islamabad.
- Design of plumbing system for Saudi Ambassador Residence at Islamabad.
- Design of plumbing system for Prince Fahad Palace Riyadh.
- Design of plumbing system for Fiat Motors Showroom at Sialkot.
- Design and road drainage system for Gojra town.
- Worked on the report for Pakistan Water Vision 2025.
- Carried out Socio economic Survey for Khan Khawar Hydro Power Project.
- Design and construction supervision and mechanical installations of wastewater
treatment plants for Highnoon Textile and Angora Textile at Lahore. Also
designed the wastewater treatment plants for AES Lalpir Thermal Power Plant
Colony and STYLE Textile.
- Planning and design of Soda Ash Plant for Olympia Chemicals. The work
involved Environmental Impact Assessment of the project. Carried out survey
and soil Investigations of selected site, selection and design of raw water
pipelines.
- Preparation of as-built drawings of various Installations of Shell Pakistan Limited
located in various parts of the country.
- Design of water supply system of various cities of Punjab for Public Health
Engineering Department, Punjab.
- Plumbing and design of external works for Labour Colony at Gujrat.
- Plumbing and design of external works for Sher-e-Bengal Labour Colony at
Lahore.
- Plumbing and and design of external works for Labour Colony at Multan.
- Design of water supply and sewerage system for labour colony at Pasrur Road
Sialkot.
- Plumbing and design of external works for GCET at Skardu. Improvement in
Sewerage System of Gujrat.
Carried out surveys for following projects;
67
- Topographic Survey for Mian Mir Drain Project.
- Topographic Survey for Ghazi Brotha Dam Project- Ghazi and Khalo Towns.
- Topographic Survey of under Pass at shakarparina Junction.
- Topographic Survey of Sewerage Scheme Phase V, Multan.
- Topographic Survey of Walton Cantt, Lahore.
II. Employer National Engineering Services
Pakistan (Pvt.) Limited.
Position Held Environmental Engineer
DESCRIPTION OF DUTIES
As Environmentalist, Worked on the following major projects.
- Worked on environmental impact assessment of Khan Khawar Hydro Power
Project.
- The duties included collection and evaluation of existing baseline conditions,
carrying out socio economic survey, study of social anthropology, sampling of
water from the streams and rivers of the area, sampling and testing for noise
and air, checking of proposed alignment of road, which was likely to be
submerged in the dam, assessment of possible impacts, preparation of
monitoring and mitigation plans and costing of various mitigation. Prepared
resettlement plan and its cost. Prepared the checklist of possible negative and
positive impacts.
- Worked on the preliminary environmental impact assessment of Burj Aziz Khan
Dam Project.
- The duties included collection and evaluation of existing baseline conditions,
Study of various environmental impacts and the affects. Prepared the checklist
of possible negative and positive impacts.
- Worked on the EIA of AES Lalpir Thermal Power Plant Project. Compared the
project viability with other sources of energy. Studied the smoke emissions
effecting the environment and suggested various mitigation.
- Being In charge established the Environmental Laboratory of the Organization.
Trained staff and familiarize them in using various detection and testing
equipment.
As Project Manager:
- Responsible for the preparation of conceptual design, detailed design,
tender documents, bill of quantities, cost estimates and tender evaluation for
2.5 MGD water treatment plant for Sukkur.
As a Design Engineer, Worked on the following major projects;
- Worked on the preparation of feasibility report, PC-1, detailed design,
Tender documents, bill of quantities, cost estimates of Water Supply System
for Gilgit Town.
68
- Worked on the preparation of inception report, feasibility report, PC-1,
detailed design, Tender Documents, bill of quantities, cost estimates of Roads
network for Skardu Town.
- Worked on the preparation of detailed design, Tender Documents, bill of
quantities, cost estimates and Construction drawings for Akra Kaur Dam
Project.
- Worked on planning and design report, of drainage system for Pasni
Diesel Power Station. The report included design of drains for the collection
of rain water and Wastewater from the power station and its disposal to the
sea.
- Worked on the preparation of detailed design, tender documents and bill of
quantities for 10 MGD water treatment plant for Port Qasim Industrial Estate
and transmission main from Haliji Lake to the treatment plant including
Booster Pumping station.
- Worked on the preparation of detailed design tender documents and bill of
quantities for water treatment plant for 300 Mwe Chashma Nuclear Power
Plant.
- Participated in the design and construction supervision of effluent
treatment for Packages (Paper, Board and Packaging Industry). Supervised the
installation of all Mechanical equipment and commissioning of the plant.
- Worked on preliminary design, detailed design, tender documents and bill
of quantities for Dammam wastewater Reuse Project, Saudi Arabia.
- Worked on the preliminary design, detailed design and tender documents
for the developing areas in Kharj City, Saudi Arabia.
- Worked on detailed design tender documents, B.O.Q’s and cost estimates
for 18 MGD Additional Water Treatment plant at Simly and 48 inch dia
transmission main to Islamabad.
- Worked on the preparation of detailed design, Tender Documents, bill of
quantities, cost estimates for water supply and disposal pipelines for 3*210
Multan 2, Muzaffargarh Thermal Power Station. Also worked for plumbing
design for various buildings like Fire Station, Workshop etc.
- Worked on the design of intake structure and 10 ft. dia raw water pipe for
the conveyance of 100 MGD water for Hingol Dam Project.
- Responsible for landscaping, planning, design and supervised the
construction of Race Course Park Rawalpindi which included the design,
construction and commissioning Of first computer controlled fountain
complex in Pakistan.
- Prepared design of fountain complex for a building of Pakistan Atomic
Energy Commission.
- Prepared plumbing design for administration building and colony at
Mangla Hydro Electric Power Station.
- Worked on the design, BOQ’s and cost estimates for the plumbing design
for State Life Buildings at Islamabad and Faisalabad.
As Maintenance Mechanical Engineer, worked on the following major projects.
- Supervised the commissioning and trained the operators for the smooth running
of effluent treatment for Packages Ltd.
69
.
8
NATIONAL TAX NO.
70
Company METACON DESIGN
NTN 1432559-4
71
9
SALES TAX NO.
Company METACON DESIGN
GST 03-04-9505-007-91
72
10
REGISTRATION
73
11
COMPLETION CERTIFICATES/
RECOMMENDATIONS
74
12
AFFIDAVIT OF NO LITIGATION
75
13
BANK CERTIFICATES
76
14
INCOME TAX RETURNS
77
Get documents about "