Embed
Email

Method of Statement of Chilled Water & Piping Accessories

Document Sample
Method of Statement of Chilled Water & Piping Accessories
Description

Method of Statement of Chilled Water & Piping Accessories sample documentation.

FOR MORE DOWNLOAD OF DOCUMENT CLICK ON THIS BELOW LINK
http://unfoldsecrets.com/Engineering-Files.php

OFFICIAL UNFOLD SECRETS WEBSITE
http://www.unfoldsecrets.com

OUR BLOG ARTICLE PAGE
http://www.unfoldsecrets.com/revealed

SIGN OUR GUESTBOOK
http://unfoldsecrets.com/Guest-book.php

JOIN US NOW
http://unfoldsecrets.com/login/index.php

METHOD STATEMENT FOR INSTALLATION

OF

CHILLED WATER PIPING & ACCESSORIES



Page 1 of 8 Doc. Ref . :





TABLE OF CONTENTS

S.NO. DESCRIPTION PAGE NO.



01 Scope & Purpose 2



02 Reference Documents 2



03 Work Sequence & Methodology 2



04 Plant 3



05 Safety 3



60 Methods 3



60 Installation of Chilled Water Piping 4



60 Testing of Chilled Water Piping 5



60 Insulation of Chilled Water Piping 6



06 Inspection 8



00 Attachment 8

Sketch for installation of Flexible Pipe

0010 8

Connector in Expansion Joints

Sketch for Piping passing through walls &

0011

Slabs

0012 Supports Details



0013 Risk Assessment Record









FOR MORE DOWNLOAD OF DOCUMENTS CLICK THIS BELOW LINK

http://www.unfoldsecrets.com/forum

METHOD STATEMENT FOR INSTALLATION

OF

CHILLED WATER PIPING & ACCESSORIES



Page 2 of 8 Doc. Ref . :









1.0 SCOPE AND PURPOSE



1.1 This "Method Statement" covers the nature and type of work for the installation of

Chilled Water Piping and Accessories in the building and the frequency of which the

inspections are to be carried out.



1.2 This procedure also covers the method of installation and inspection of Chilled Water

Piping with Accessories.





2.0 REFERENCE & RELATED DOCUMENTS



2.1 Ministry of Foreign Affairs Specification Section 15180 & 15950



2.2 Approved Shop Drawings.



2.3 Manufacturer Recommendations.





3.0 WORK SEQUENCE AND METHODOLOGY



3.1 All the materials delivered to site are inspected properly and stored as per the

manufacturer recommendations.



3.2 Request for Inspection shall be issued, for the inspection of materials received to the

Consultant for their approval.



3.3 Work shall be carried out by the site staff under the strict supervision and guidance of

the concerned Supervisors / Engineers.



3.4 Thermo Engineer shall check as per the checklist attached, shall further checked by

the Consultant.



3.5 Request for Inspection shall be prepared by Thermo Engineer and shall be issued to

Sixco for further inspection with Consultant.



3.6 Thermo / Sixco Engineer shall co-ordinate with Client / Consultant and arrange for

their inspection.



3.7 Thermo / Sixco Engineer is responsible for getting the work inspected / approved by

Client / Consultant.

FOR MORE DOWNLOAD OF DOCUMENTS CLICK THIS BELOW LINK

http://www.unfoldsecrets.com/forum

METHOD STATEMENT FOR INSTALLATION

OF

CHILLED WATER PIPING & ACCESSORIES



Page 3 of 8 Doc. Ref . :





4.0 PLANT



4.1 Following indicative hand tools list shall be used for the installation works.



Drilling Machine

Hammer

Sprit Level

Pipe Wrench

Grooving Machine

Thread Cutting Machine

Pipe work Tools box



5.0 SAFETY



5.1 Only trained persons shall operate the power tools.



5.2 Ensure all concerned personals shall use PPE and all other items as required.



5.3 Ensure adequate lighting is provided in the working area.



5.4 Ensure deep manhole excavations / shaft openings are protected with barricade, tape,

safety nets.



5.5 Refer Risk Assessment record in attachment 11.4



6.0 METHODS



6.1 All the materials delivered to site shall be inspected and stored properly as per the

manufacturer recommendations.



6.2 Work shall be carried out by the site staff under the strict supervision and guidance of

the concerned Supervisors / Engineers.



6.3 Thermo Engineer / Sixco Engineer shall check the installations as per the approved

inspection test plan.



6.4 Request for inspection shall be prepared by Thermo Engineer and shall be issued to

Sixco for further inspection with Consultant.



6.5 Thermo Engineer / Sixco Engineer shall co-ordinate with Client / Consultant and

arrange for their inspection.



6.6 Thermo Engineer / Sixco Engineer is responsible for getting work inspected and

approved by Client / Consultant.

FOR MORE DOWNLOAD OF DOCUMENTS CLICK THIS BELOW LINK

http://www.unfoldsecrets.com/forum

METHOD STATEMENT FOR INSTALLATION

OF

CHILLED WATER PIPING & ACCESSORIES



Page 4 of 8 Doc. Ref . :







7.0 INSTALLATION OF CHILLED WATER PIPING



7.1 Fix the sleeves as per approved shop drawings and specification, during the

construction of structural elements.



7.2 Ensure All chilled water pipes shall be painted with two coats of red oxide primer prior

to application of insulation.



7.3 Piping connection 2” (inch) and below shall be made by threaded joints and piping

connection 2-1/2 inch and above are made by Grooved Joints.



7.4 The piping grooves shall be done by using grooving machine and depth and width of a

groove shall be maintained as per Groove fitting manufacturer recommendations.



7.5 Mark the location of piping as per specification and approved shop drawing.



7.6 Install approved supports, brackets for piping as per specification, approved shop

drawings and site requirements for each individual case (ie. Slab, Wall etc.).



7.7 Supports shall be installed as per pipe manufacturer’s recommendations. (Ref.

attachment. 11.3)



7.8 Ready made hardwood shall be used for supporting the vertical chilled water piping,

which is placed on galvanized L angle or U channels and fastened with GI threaded

rods.



7.9 Roller supports shall be installed for the pipes 200mm and above and in the expansion

joints.



7.10 Flexible Pipe connectors shall be installed in all Expansion Joints and Equipment

piping connections (Ref. attachment 11.1).



7.11 Pipes shall be laid with gradient as per approved shop drawings and site conditions.



7.12 All the open ends of the pipes shall be protected properly at the end of each day’s

work.



7.13 Drains shall be installed at low points in mains and branch lines consisting of gate

valve and short threaded nipple and cap so that the system shall be drained

completely.



7.14 Valves, Piping specialties and accessories shall be installed as per manufacturer

recommendation and approved shop drawings.

FOR MORE DOWNLOAD OF DOCUMENTS CLICK THIS BELOW LINK

http://www.unfoldsecrets.com/forum

METHOD STATEMENT FOR INSTALLATION

OF

CHILLED WATER PIPING & ACCESSORIES



Page 5 of 8 Doc. Ref . :





7.15 Unions shall be provided in direction of flow after valves for sizes 2” and below &

21/2” and above flange connection shall be provided.



7.16 All valves shall be installed suitably to permit easy access for future maintenance.



7.17 Eccentric reducers shall be installed in Horizontal chilled water system & concentric

reducers shall be installed in vertical chilled water system.



7.18 Automatic Air vents shall be installed at high points and where ever required in order

to trap air from the chilled water system.



7.19 Condensate drain piping shall be connected to the equipment drain pan connections

as per approved shop drawings.



7.20 Condensate drain piping will be extended to the nearest floor drain and connected to

the drain system.



7.21 Plug all open ends of pipes at the end of each day’s work using end caps.



7.22 Raise Request for Inspection of Installation of Chilled Water Piping and fittings

including supports / brackets, valves, piping specialties and accessories as per the

approved shop drawing, by Consultant



7.23 After approval of installation of pipes and fittings, flushing shall be done for chilled

water Pipes with clean water to remove dust and debris that might have been present

during construction work.



7.24 Plug all connections / branches / drains and fill with clean water for hydro testing.



8.0 TESTING OF CHILLED WATER PIPES & FITTINGS



8.1 Care shall be taken to all the equipments, apparatus, devices to a pressure exceeding

its prescribed test pressure as obtained from its name plate data or product

catalogues.



8.2 Care shall be taken to Equipments, apparatus and devices that might be damaged by

the test pressure shall be removed or blanked off.



8.3 Ensure All Valves are in open condition before starting pressure test, NO pressure

shall be applied against closed valves.



8.4 Ensure Temporary blank flanges are anchored firmly in a way to accommodate all

developed end trust.



FOR MORE DOWNLOAD OF DOCUMENTS CLICK THIS BELOW LINK

http://www.unfoldsecrets.com/forum

METHOD STATEMENT FOR INSTALLATION

OF

CHILLED WATER PIPING & ACCESSORIES



Page 6 of 8 Doc. Ref . :





8.5 The Piping system shall be tested closed by plugging all openings in the system in a

proper way and filled slowly with water.



8.6 Ensure all system is free from air lock, if so all the vent all entrapped air from the

system.



8.7 Ensure water is reached to the entire system by releasing plugs temporarily.



8.8 Pressure shall be applied to the system by means of hand pump drawing from a water

container. The pump discharge shall be connected to the system through a globe

valve, check valve and calibrated pressure gauge of suitable range to have the test

pressure range in the middle of the range.



8.9 Subject the Cold Water piping to hydro test at 10 Bar Pressure for 24 hours.



8.10 Ensure Test pressure is same at highest point of the system.



8.11 Repair the leaks and defects if any until satisfactory results are obtained.



8.12 Raise Request for Inspection of hydro testing to witness the same, by Consultant.



8.13 After approval of inspection of hydro testing, release the water gradually and protect

the piping installation, and end cap the pipe.



9.0 INSULATION OF CHILLED WATER PIPING



9.1 Check all required approved chilled water pipe insulations materials are readily

available on site.



9.2 Approved 40mm thick fiber glass insulation pipe sections shall be used for up to

40mm diameter chilled water piping and 50mm thick for 50mm and above diameter

chilled water pipes which installed inside the building.



9.3 Approved 50mm thick fiber glass insulation pipe sections shall be used for up to

45mm diameter chilled water piping and 75mm thick for 50mm and above diameter

chilled water pipes which installed inside the building.



9.4 Moke-up for pipe insulation shall be provided for consultant review and approval.



9.5 Apply the approved insulation materials and accessories according to specification

and manufacturer instructions.



9.6 Ensure all insulation materials are in dry condition during the application.



FOR MORE DOWNLOAD OF DOCUMENTS CLICK THIS BELOW LINK

http://www.unfoldsecrets.com/forum

METHOD STATEMENT FOR INSTALLATION

OF

CHILLED WATER PIPING & ACCESSORIES



Page 7 of 8 Doc. Ref . :





9.7 Pipe surface shall be cleaned properly and painted as per specification.



9.8 Apply insulation with longitudinal seams at top and horizontal pipe runs.



9.9 Pipe insulation shall be applied with least number of joints.



9.10 Approved adhesive (Ideal 81-10) shall be applied in longitudinal seam and end faces

of the insulation and entire pipe surfaces.



9.11 For flanges, elbows, fittings and valves mitered section of pipe insulation of same

material shall be used.



9.12 Permissible access shall be maintained to the valves to operate without disturbing the

insulation.



9.13 Removable type insulation sections shall be prepared and provided to valves including

check valves and strainer basket and other valves.



9.14 In case of rising steam valves used in chilled water system, insulation shall be

extended and insulation joints and valve specialties seams shall be sealed properly in

order to prevent passage of air to pipe surface.



9.15 Aluminium tape of 75mm width shall be applied on the joints of insulation segments

properly.



9.16 Pipe penetrations through roof, exterior wall, interior wall, fire rated wall, floor etc.,

through sleeves shall be closed by ram packed with loose fiber glass insulation and

sealed with approved mastic and for fire rated walls approved fire proof sealant shall

be used (Ref. Sec. 11.2).



9.17 Cover the approved THERMOFOIL sheet properly on the entire circumference of the

Insulated duct and pull sheet tight and smooth.



9.18 Use Thermo foil recommended Tape to seal the joints in a way no air can penetrate

through the joints



9.19 Raise request for inspection of Insulation of Chilled Water Piping, by consultant.



9.20 Identification for Chilled Water Supply and return line and valves and specialties shall

be done as per specification with approved identification materials.



9.21 Raise request for inspection of Identification of Chilled Water Piping and Accessories,

by Consultant.



FOR MORE DOWNLOAD OF DOCUMENTS CLICK THIS BELOW LINK

http://www.unfoldsecrets.com/forum

METHOD STATEMENT FOR INSTALLATION

OF

CHILLED WATER PIPING & ACCESSORIES



Page 8 of 8 Doc. Ref . :









10 INSPECTION



10.1 A notification of Inspection of installation Chilled Water Piping with all Accessories

shall be submitted one day prior to the Engineer through a inspection request.



10.2 All Inspection stages shall be followed respective to Inspection Test Plan





11 ATTACHMENT



11.1 Sketch for Installation of Flexible Pipe Connector in Expansion Joints



11.2 Sketch for Piping passing through walls & Slabs



11.3 Support Details



11.4 Risk Assessment Record.



FOR MORE DOWNLOAD CLICK THE LINK BELOW

http://www.unfoldsecrets.com/forum



OFFICIAL UNFOLD SECRETS WEBSITE

http://www.unfoldsecrets.com



OUR BLOG ARTICLE PAGE

http://www.unfoldsecrets.com/articles



SIGN OUR GUESTBOOK

http://unfoldsecrets.com/Guest-book.php



JOIN US NOW

http://unfoldsecrets.com/login/index.php









FOR MORE DOWNLOAD OF DOCUMENTS CLICK THIS BELOW LINK

http://www.unfoldsecrets.com/forum


Related docs
Other docs by airgil daviss
Expense Reimbursement New Version New Version
Views: 3  |  Downloads: 0
MOS Fixing Manholes Part 1
Views: 2  |  Downloads: 0
Specification of Carpentry & Joinery
Views: 3  |  Downloads: 0
Specification of Airoutlet & Inlets
Views: 4  |  Downloads: 0
Method of Statement for Cable Tray Revised
Views: 24  |  Downloads: 0
Specification of Waterproofing New Versions
Views: 2  |  Downloads: 0
Minutes of Meeting templates Part 1
Views: 1  |  Downloads: 0
Minutes of Meeting templates Part 1
Views: 1  |  Downloads: 0