Doc. No.:
*ADD CLIENT NAME HERE *ADD DOCUMENT REFERENCE
HERE
*ADD LOGO HERE REV.
*ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 1 of 6
METHOD STATEMENT FOR INSTALLATION
OF busways
Project : *ADD LOGO PROJECT NAME HERE
Contractor : *ADD CONTRACTOR NAME HERE
Document No. : *ADD REFERENCE # HERE
Document revision status : 0
0 03-31-2008 Issued for Review & Comments EM MT
Prepared by Checked by Approved by
Rev. Date Description
*ADD CONTRACTOR NAME HERE
Doc. No.:
*ADD CLIENT NAME HERE *ADD DOCUMENT REFERENCE
HERE
*ADD LOGO HERE REV.
*ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 2 of 6
REVISION CONTROL SHEET
REV. NO. DATE PAGE NO. DESCRIPTION
Doc. No.:
*ADD CLIENT NAME HERE *ADD DOCUMENT REFERENCE
HERE
*ADD LOGO HERE REV.
*ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 3 of 6
TABLE OF CONTENTS
1 Purpose…………………………………………………………………………….. 4
2 Scope of Work…………………………………………………………………….. 4
3 Responsible Personnel on Site..……………………………………………… 4
4 Storage…………………………………………………………….………………. 4
5 Pre-Installation…………………………………………………………………… 4
6 Installation………………………………………………………………………… 4
7 Reference Documents…………………………………………………………. 5
8 Safety……………………………………………………………………………… 5
Doc. No.:
*ADD CLIENT NAME HERE *ADD DOCUMENT REFERENCE
HERE
*ADD LOGO HERE REV.
*ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 4 of 6
1. Purpose
This method of statement covers the on-site installation of Busways as defined in the
General Specification.
2. Scope of Works
This procedure will define the method to be used to ensure that busways are correct
and acceptable and shall conform to the Contract Documents and Specification.
3. Responsible Personnel on Site
3.1. Construction Manager
3.2. Electrical Field Engineers
3.3. Safety Officer
3.4. QA/QC Engineer
3.5. Electrical Supervisors
4. Storage
4.1 Busway materials shall be stored in proper location. Ensure that they are packed and
stacked neatly.
5. Pre-Installation
5.1 All materials and documentation relevant to this particular section of works will be
checked and verified ensuring that these are correct and approved type.
5.2 Prior to the commencement of works, ensure that the areas for permanent installation
are ready, accessible and in suitable condition.
6. Installation
6.1 The busbar trunk system shall be supported throughout the entire length as per
manufacturer’s recommendation to withstand the mechanical load and abnormal forces
created under short-circuit conditions. Expansion fittings shall be provided at places,
where the busbar trunk crosses building expansion joints.
6.2 Install busway, accessories and associated fittings, as indicated on the drawings and in
accordance with manufacturer’s recommendations. Support and hanger spacing shall
be noted on layout drawings and shall not exceed manufacturer’s recommendations.
6.3 Provide curb around interior floor penetrations.
6.4 Install busway with integral weather seal located where busway penetrates exterior wall
and/or roof. Provide wall and/or roof flange and seal around opening to maintain
weather tight installation.
Doc. No.:
*ADD CLIENT NAME HERE *ADD DOCUMENT REFERENCE
HERE
*ADD LOGO HERE REV.
*ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 5 of 6
6.5 Tighten the joint bolts to the required torque in accordance with manufacturer’s
recommendation.
6.6 Cover the busway with plastic wrappers until the building is clean and busway are ready
to be tested and energized.
6.7 Megger the busway in the presence of the Consultant and re-torque the joint bolts as
recommended by the manufacturer.
6.8 The complete installation shall be tested and inspected to ensure that it complies with
the requirements of the Specification, the IEE Wiring Regulations, British Standards and
the Local Authorities. The tests shall be carried out in accordance with the IEE Wiring
Regulations and to the satisfaction of the Consultant.
6.9 The inspection and tests shall be carried out in the same sequence as set out in the IEE
Wiring Regulations, Local Authorities and the Consultant requirements and in such time
as to allow any remedial work to be completed prior to Practical Completion.
6.10 All instruments necessary for inspection and testing shall be supplied and shall be
properly calibrated and operated by personnel skilled in their use.
6.11 Allowance shall be made for disconnection or similar operations to satisfy the
requirements for testing, etc., and the reinstatement of the installation.
7. Reference Documents
7.1 Approved Electrical Shop Drawings
7.2 Approved Material Submittals
7.3 Approved Material Inspection Report
7.4 Approved Resistance Test Report
7.5 Approved Safety Plan
7.6 QA/QC Inspection & Test Plan
8. Safety
8.1 All safety precautions shall be followed as per approved safety plan & procedure.
Ensure all involved persons are aware of the same.
8.2 Safety Officer shall ensure that all ladders and scaffoldings are safe.
8.3 Ensure that tradesman will keep their working places clean and tidy.
----------Procedure End----------
Doc. No.:
*ADD CLIENT NAME HERE *ADD DOCUMENT REFERENCE
HERE
*ADD LOGO HERE REV.
*ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 6 of 6
GENERAL INFORMATION
THIS DOCUMENT IS ENTENDED FOR REFRENCE PURPOSES
ONLY. YOU CAN EDIT & MODIFY THE CONTENT.
DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK
http://www.unfoldsecrets.com/forum
OFFICIAL UNFOLD SECRETS WEBSITE
http://www.unfoldsecrets.com
OUR BLOG ARTICLE PAGE
http://www.unfoldsecrets.com/articles
SIGN OUR GUESTBOOK
http://unfoldsecrets.com/Guest-book.php
JOIN US NOW
http://unfoldsecrets.com/login/index.php