METHOD STATEMENT
Page No. : 1 of 6
METHOD STATEMENT FOR INSTALLATION
OF building wires
Project : ADD PROJECT NAME HERE *
Contractor : ADD CONTRACTOR NAME HERE *
Document No. :
Document revision status : 0
0 03-02-2008 Issued for Review & Comments EM MT
Prepared by Checked by Approved by
Rev. Date Description
ADD CONTRACTOR NAME HERE *
*ADD LOGO’S HERE
Doc. No.:
ADD CLEINT COMPNAY NAME HERE *
INSERT LOGO HERE* REV.
ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 2 of 6
REVISION CONTROL SHEET
REV. NO. DATE PAGE NO. DESCRIPTION
0 03-02-2008 ALL FIRST ISSUE
*ADD LOGO’S HERE
Doc. No.:
ADD CLEINT COMPNAY NAME HERE *
INSERT LOGO HERE* REV.
ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 3 of 6
TABLE OF CONTENTS
1 Purpose…………………………………………………………………………….. 4
2 Scope of Work…………………………………………………………………….. 4
3 Responsible Personnel on Site..……………………………………………… 4
4 Storage…………………………………………………………….………………. 4
5 Pre-Installation…………………………………………………………………… 4
6 Installation………………………………………………………………………… 5
7 Reference Documents…………………………………………………………. 5
8 Safety……………………………………………………………………………… 6
*ADD LOGO’S HERE
Doc. No.:
ADD CLEINT COMPNAY NAME HERE *
INSERT LOGO HERE* REV.
ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 4 of 6
1. Purpose
This method of statement covers the on-site installation of Building Wires as defined in
the General Specification.
2. Scope of Works
This procedure will define the method to be used to ensure that building wire
installations are correct and acceptable and shall conform to the Contract Documents
and Specification.
3. Responsible Personnel on Site
3.1. Construction Manager
3.2. Electrical Field Engineers
3.3. Safety Officer
3.4. QA/QC Engineer
3.5. Electrical Supervisors
4. Storage
4.1 The Building Wires shall be stored in clean and dry area.
4.2 Building Wires shall be stacked in one area. Size and colors shall be segregated to each
other.
5. Pre-Installation
5.1 All materials and documentation relevant to this particular Section of works will be
checked by the Construction Department prior to the commencement of works ensuring
that these are correct type.
5.2 Check the area where in the works to commence are ready, accessible and suitable for
permanent works.
5.3 Check the tools to be used for wire pulling such as ladders, wires, scaffoldings etc are
readily available in site and in good condition.
*ADD LOGO’S HERE
Doc. No.:
ADD CLEINT COMPNAY NAME HERE *
INSERT LOGO HERE* REV.
ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 5 of 6
6. Installation
It is presumed that conduits and trunkings installation has been completed before starting
this works.
6.1 Clear all boxes from cement stains and other foreign materials.
6.2 Check all embedded conduits from blockage. If there are blockage encounter, clear the
blockage before start pulling the wires.
6.3 Scaffoldings and Ladders to be used during installation shall be erected properly to
ensure that safety of people working on it.
6.4 Prepare wires for pulling. Make sure that the wires are properly marked for their circuit
number designation.
6.5 Pull wires on the conduits and trunking. Proper care shall be exercised when pulling the
wires. Only approved pulling compound to be used if required. Where more than one
conductor is used for phase, each phase, neutral and ground wires shall be run in the
same conduit. Building wires shall be continuous from outlet to outlet and no splices
shall be made except within the outlet or junction boxes. Different phases shall not be
drawn in one conduit.
6.6 Connect the wire on the outlet boxes using plastic connectors to ensure the continuity of
wires during testing. Ensure the connections are correct.
6.7 Conduct insulation resistance test and continuity test shall be conducted in the
presence of Consultant for their acceptance.
6.8 Install Ceiling Rosette for the light points.
6.9 Raise Request for Inspection for wires Installation.
7. Reference Documents
7.1 Approved Electrical Shop Drawings
7.2 Approved Material Submittals
7.3 Approved Material Inspection Report
7.4 Approved Safety Plan
7.5 Approved QA/QC Inspection & Test Plan.
*ADD LOGO’S HERE
Doc. No.:
ADD CLEINT COMPNAY NAME HERE *
INSERT LOGO HERE* REV.
ADD PROJECT NAME HERE Date:
0
METHOD STATEMENT
Page No. : 6 of 6
8. Safety
8.1 All safety precautions shall be followed as per approved safety plan & procedure.
Ensure all involved persons are aware of the same.
8.2 Safety Officer shall ensure that all ladders and scaffoldings are safe.
8.3 Tradesman shall ensure that before leaving their working places, it must be clean,
tidy and free from rubbish.
------------------------ Procedure End----------------------
GENERAL INFORMATION
THIS DOCUMENT IS ENTENDED FOR REFRENCE PURPOSES
ONLY. YOU CAN EDIT & MODIFY THE CONTENT.
DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK
http://www.unfoldsecrets.com/forum
OFFICIAL UNFOLD SECRETS WEBSITE
http://www.unfoldsecrets.com
OUR BLOG ARTICLE PAGE
http://www.unfoldsecrets.com/articles
SIGN OUR GUESTBOOK
http://unfoldsecrets.com/Guest-book.php
JOIN US NOW
http://unfoldsecrets.com/login/index.php
*ADD LOGO’S HERE