Method Statement Building Management System

Document Sample
Method Statement Building Management  System
Doc. No.:

*INSERT CLIENT NAME HERE





*INSERT LOGO HERE REV.

*INSERT PROJECT NAME HERE

0

METHOD STATEMENT FOR INSTALLATION

Page No. : 1 of 6

OF BMS SYSTEM









METHOD STATEMENT FOR INSTALLATION

of BMS SYSTEM









Project : *INSERT PROJECT NAME HERE



Contractor : *INSERT CONTRACTOR NAME HERE



Document No. :

Document revision status : 0









0 13-07-2008 Issued for Review & Comments IDS MT



Prepared by Checked by Approved by

Rev. Date Description

*INSERT CONTRACTOR NAME HERE









DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.unfoldsecrets.com/forum

PROJECT MANAGER

Doc. No.:

*INSERT CLIENT NAME HERE





*INSERT LOGO HERE REV.

*INSERT PROJECT NAME HERE

0

METHOD STATEMENT FOR INSTALLATION

Page No. : 2 of 6

OF BMS SYSTEM









REVISION CONTROL SHEET





REV. NO. DATE PAGE NO. DESCRIPTION









DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.unfoldsecrets.com/forum

PROJECT MANAGER

Doc. No.:

*INSERT CLIENT NAME HERE





*INSERT LOGO HERE REV.

*INSERT PROJECT NAME HERE

0

METHOD STATEMENT FOR INSTALLATION

Page No. : 3 of 6

OF BMS SYSTEM









TABLE OF CONTENTS







1 Purpose…………………………………………………………………………….. 4

2 Scope of Work…………………………………………………………………….. 4

3 Responsible Personnel on Site..……………………………………………… 4

4 Delivery, Storage, and Handling ..…………………………….………………. 4

5 Pre-Installation…………………………………………………………………… 5

6 Installation………………………………………………………………………… 5

7 Reference Documents…………………………………………………………. 5

8 Safety……………………………………………………………………………… 6









DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.unfoldsecrets.com/forum

PROJECT MANAGER

Doc. No.:

*INSERT CLIENT NAME HERE





*INSERT LOGO HERE REV.

*INSERT PROJECT NAME HERE

0

METHOD STATEMENT FOR INSTALLATION

Page No. : 4 of 6

OF BMS SYSTEM









1. Purpose



This method of statement covers the in-site installations of Building Management

system as defined in the General Specification.







2. Scope of Work



This procedure will define the method to be used to ensure that the Building

Management system, on-site assembly, final connection and workmanship are

acceptable, correct, safe and conforms the Contract Documents and Specification.







3. Responsible Personnel on Site



3.1. Construction Manager

3.2. Electrical Field Engineers

3.3. Safety Officer

3.4. QA/QC Engineer

3.5. Electrical Supervisors







4. Delivery, Storage, and Handling



4.1 Deliver equipment in fully enclosed vans after specified environmental

conditions have been permanently established in spaces where equipment is

to be placed.



4.2 Unload the Building management system panels to the designated unloading area. Use

fork lift to unload self standing panels.



4.3 Store equipment in spaces with non condensing environments that are

controlled within manufacturer’s ambient tolerances for non operating

equipment.



4.4 Ensure that the Panels are stored in dry and clean locations.

DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.unfoldsecrets.com/forum

PROJECT MANAGER

Doc. No.:

*INSERT CLIENT NAME HERE





*INSERT LOGO HERE REV.

*INSERT PROJECT NAME HERE

0

METHOD STATEMENT FOR INSTALLATION

Page No. : 5 of 6

OF BMS SYSTEM



4.5 Make sure that the storage area is safe.









5. Pre-Installation



5.1 All materials and documentation relevant to this particular section of works shall be

checked prior to installation.



5.2 Ensure that the location where the panels were installed are accessible, clean and free

of debris and foreign materials and suitable for installations.







6. Installation



6.1 Install systems according to manufacturer's printed instructions.



6.2 Maintaining minimum working space at equipment according to

manufacturer's shop drawings.



6.3 Connections: Interconnect system components. Make connections to

circuits according to manufacturer's wiring diagrams and as indicated.



6.4 Manufacturer's Field Services: Arrange for the services of a factory-

authorized service representative to supervise the connection, tests,

and adjustment of the unit.



6.5 Upon completion of installation, inspect system components. Remove

paint splatters and other spots, dirt, and debris. Repair scratches and

marks of finish to match original finish. Clean components internally

using methods and materials recommended by manufacturer.



6.6 Raise Request for Inspection for BMS installation.







7. Reference Documents



7.1 Approved BMS Shop Drawings

7.2 Approved Material Submittals for BMS

DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.unfoldsecrets.com/forum

PROJECT MANAGER

Doc. No.:

*INSERT CLIENT NAME HERE





*INSERT LOGO HERE REV.

*INSERT PROJECT NAME HERE

0

METHOD STATEMENT FOR INSTALLATION

Page No. : 6 of 6

OF BMS SYSTEM

7.3 Approved QA/QC Installation and Test Plan

7.4 Factory Test Certificates of the said equipments

7.5 Operation and Maintenance Manuals for BMS

7.6 Approved Material Inspection Report

7.7 Approved Safety Plan









8. Safety



8.1 All safety precautions shall be followed as per approved safety plan & procedure.

Ensure all involved persons are aware of the same.



8.2 Ensure that tradesman will keep their working places clean, tidy and free from

rubbish.





------------------------ Procedure End----------------------







GENERAL INFORMATION





THIS DOCUMENT IS ENTENDED FOR REFRENCE PURPOSES

ONLY. YOU CAN EDIT & MODIFY THE CONTENT.



DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.unfoldsecrets.com/forum



OFFICIAL UNFOLD SECRETS WEBSITE

http://www.unfoldsecrets.com



OUR BLOG ARTICLE PAGE

http://www.unfoldsecrets.com/articles



SIGN OUR GUESTBOOK

http://unfoldsecrets.com/Guest-book.php



JOIN US NOW

http://unfoldsecrets.com/login/index.php









DOWNLOAD THIS DOCUMENT ON THIS BELOW LINK

http://www.unfoldsecrets.com/forum

PROJECT MANAGER


Related docs
Other docs by airgil daviss
Expense Reimbursement New Version New Version
Views: 3  |  Downloads: 0
MOS Fixing Manholes Part 1
Views: 2  |  Downloads: 0
Specification of Carpentry & Joinery
Views: 3  |  Downloads: 0
Specification of Airoutlet & Inlets
Views: 4  |  Downloads: 0
Method of Statement for Cable Tray Revised
Views: 24  |  Downloads: 0
Specification of Waterproofing New Versions
Views: 2  |  Downloads: 0
Minutes of Meeting templates Part 1
Views: 1  |  Downloads: 0
Minutes of Meeting templates Part 1
Views: 1  |  Downloads: 0