ARB_Slides_LCA_F06_T15_v1.0

Shared by: changcheng2
Categories
Tags
-
Stats
views:
1
posted:
1/5/2012
language:
pages:
55
Document Sample
scope of work template
							 LANI Database
 Management System


Life Cycle Architecture
             – Architecture Review Board Session


                     Tuesday, November 28th 2006
  Introduction to Team 15

• Mayank Agarwal    - Project Manager
• Abhishek Mehta    - COTS Evaluator
• Aishwarya Goyal   - Project Planner
• Mayank Gupta      - Domain Analyst
• Saurabh Gupta     - Project Planner
• Sona Malik        - Requirement Analyst
Introduction to the Project
The Clients:

LANI–Los Angeles Neighborhood Initiative


•   A non profit organization involved in the
    revitalization of the neighborhood.



Represented by: Ms.Veronica Hahni
              & Ms. Anna Apostolos
Introduction to the LANI Organization

   A non – profit organization

   Receives funds from organizations

   Puts those funds to good use – takes up
    enhancement projects in the neighborhood

   Gives Los Angeles a better neighborhood
Introduction to the LANI Organization

Setup

   Total staff size: 6
    ◦ One executive director, 5 Program Managers


   The executive director heads the organization

   Each Program Manager involved in some project
    ◦ Keeps track of funds, progress, schedule
COTS Assessment Background
           CAB
             By:
         Mayank Gupta
          Sona Malik
 New Benefit Chain




LEGEND: –   Outcome,   -- Initiative,   – Stakeholders
Added Stakeholders
   Users – Project Managers and Executive Director of
    LANI
   Customer – Los Angeles Neighborhood Organization
   Client – Veronica Hahni
   Evaluators – CS577A Team 15,
   IV & V – Delano Anderson & Patrick Stevens
   CSCI 577a teaching staff- Instructors & Teaching
    Assistants
   COTS expert – Jesal Bhuta
   COTS Vendor/System Maintainer –            Larry
    Madison- Owner of Corporate Niche
Organization Background
Users of the system


   LANI


Maintainer of the system (Corporate Niche)


Clients:


   Lower Hudson Technology, Inc. - New York City, NY


   Carolina Inspection Seminars - Princeton, NC

   Top 2 Bottom Real Estate Inspectors - Richmond, TX

   Ritter Enterprises, Inc. - Des Moines, IA

   The HUD GUY - Radford, NC

   Value Home Inspections, Inc. - Glenside, PA

   Minnesota's Real Estate Team - www.mnrealestateteam.com
Organizational Goals

 Better Project record maintenance
 Reduce manual overhead for project
  report generation
 Improve time management
 Improved report generation
Process Diagram
    Comparison between new and current
    system

                           CURRENT SYSTEM                    NEW SYSTEM
Roles and                Distributed Efforts         Centralized Practices
Responsibilities

User Interactions        Manual Overhead             Automated efforts
                         Poor Time Management        Improved Efficiency
                         Redundant Practices         Minimum Redundancy

Infrastructure           Inconsistencies in format   Consistent Graphical User
                         Poor log maintenance        Interface(GUI)
                                                      Better logs maintained

Stakeholder Essentials   Lack of accurate figures    Accurate data at hand for
and Amenities                                         Marketing Executives
                                                      Analytical Data Interpretation
                                                      for Top Level Management
                                                      Intra Organization transparency
                                                      for Project Managers
System Capabilities
   Capability to provide Fund/Budget summary sheet


   Capability to provide multiple funds per contract sheet


   Capability to provide multiple contracts per funding organization


   Capability to provide Contract Reconciliation sheet


   Capability to provide 10% retention tracking ability


   Capability to provide Executive Director access to Project
    Manager’s funding request details
System Capabilities (cont..)
   Capability to provide integration of funding request draw and summary sheets



   Capability to provide contract change order



   Capability to provide integration of Insurance Log



   Capability to provide closeout report



   Capability to provide Project Manager access to Executive Director’s payout
    details
  Level of Services
LOS               Desired                     Acceptable

Accuracy          All the entries should be   All fund related entries
                  properly validated          should be properly
                                              validated
Correctness       Reports generated          Same as desired
                  should list same
                  transaction and figures as
                  maintained by the
                  organization manually
Expandability     System expandable           System should
                  enough to incorporate       incorporate evolutionary
                  any new features            features
Usability         System should not take      Maximum of 3hrs of
                  more than 5 hours to be     training
                  well versed with
Maintainability   Monthly maintenance         Reasonable maintenance
                  should not be more than     required should not
                  2 hours                     exceed 4 hours
                                   CAP

   Assumptions
   Overall Strategy
   Down Selection Iterations
   Evaluation Criteria
   Stakeholder Responsibilities
   Plans for Spring 2007
   Assessment and Analysis
   Risk Mitigation
   Resources


                                          - SAURABH GUPTA
                                         - AISHWARYA GOYAL
                     Assumptions
The following assumptions must continue to be valid in order to implement
    the plans below within the resources specified:

   The Project Manager-GCT must be able to communicate with the server.

   The client must be able to provide the assessment team full access to
    application server.

   The client continues the support contract with Corporate Niche after
    project deployment, and Corporate Niche will serve as the primary
    Database and System Maintainer.

   Purchasing of all COTS products will be made by the Client.
Overall Strategy
Iterations for choosing COTS product

  Iteration ONE Timed during LCO, involved looking at
 the possible COTS products and initial filtering

 Iteration TWO Timed at the end of LCO, select top
 1-3 COTS product for the given set of requirements

 Iteration THREE Timed during LCA, involved choosing
 the best possible COTS product.
 Main Evaluation Criteria’s for the COTS product

1.   Functionality ->It is the most important criteria for assessing the COTS.

2.   Cost ->Cost is an Independent variable for assessment since the maximum
     available budget is $ 2000.

3.   Vendor support ->Must provide support as clients do not have a
     maintainer currently. The vendor must maintain the software

4.   Ease of use ->Generally simple - not much scope for complexity

5.   Ease of maintenance ->Does not hold much importance since the Vendor
     would provide the maintenance.

6.   Vendor viability/stability ->Since vendor is the maintainer, it is important
     that he remains in business for the period the software will be used.
       Stakeholder Responsibilities
Stakeholders            Responsibilities                         When                          Where
Users- Project          Participate in the Win-Win               During Inception and          Win-Win negotiations and
Managers and            negotiations and ARBs.                   Elaboration phases            ARBs
Executive Director of   Evaluate the prototype and beta          During Elaboration,
LANI(represented by     versions of the system.                  Construction and Transition   Pre installations and testing
Anna Apostolos)         Provide feedback for system              phase
                        (COTS) usability and accessibility.      Throughout                    Client Meetings, emails
                        Review the artifacts produced by
                        the team and provide feedback on         Throughout
                        it.                                                                    Client Meetings, emails


Customer- LANI          Actively participate in the Win-Win      During Inception and          Win-Win Negotiations and
Organization (          negotiations and ARBs                    Elaboration phases            ARBs
represented by          Assist in transitioning of the system.   Transition phase              Pre Installations
                        Review prototypes and provide
Veronica Hahni)         feedback.                                During Construction phase     Client Meetings and emails
                        Review the artifacts produced by                                       Emails
                        the team and provide feedback on         Throughout life cycle of
                        it.                                      project as required.
                         Give a basic understanding
                        regarding the current system in                                        Client and IV&V interactions
                        place.
                        Provide the resources necessary to       During Inception phase
                        fund the project.
                                                                                               Emails
                        Submit formal Purchase Order to          During Elaboration phase
                        COTS Vendor.
        Responsibilities Continued
Evaluators( Team 15)   Efficiently map win             During Inception and        Developer Interactions
                       conditions into                 Elaboration phases
                       requirements
                       Risk management                 Throughout                  Developer and Client
                       Prepare the artifacts for the   Throughout                  Interactions
                       system
                       Participate in client and       Throughout life cycle of    ARBs, Client, IV&V and
                       IV&V interactions, ARBs         project as required.        developer interactions
                       and Prototyping.
                       Start constructing the
                       proposed system. Code key
                       system capabilities. Plan       During Construction phase   Developer Meetings
                       initial tests. Test system
                       capabilities.
                       Transition the proposed
                       system to the users.
                       Develop the system based
                       on SSAD. Prototype.                                         Developer Meetings and
                                                       During Transition phase
                       Arrange the training                                        Pre Installations
                       program for users. Deliver
                       all necessary documents to
                       the users, e.g. User Manual,

                       System Maintaining Manual.
                Responsibilities contd.
Maintainer    Provide technical support and remote            Throughout life cycle of   Emails & Phone
              software updates and system                     project as required.       conversations
              maintenance.
              Provide feedback on COTS prototype
              feasibility.

IV & V(       Check whether all the artifacts produced        Throughout life cycle of   IV&V and developer
Patrick       are following Lean MBase Guidelines.                                       interactions, regular emails,
Stevens and   Check the documents for consistency and         project as required.       Team website
Delano        correctness. Provide an independent
              perspective to the developers through their
Anderson)     regular feedbacks and reviews, create
              quality management plans, Attend win-win
              negotiations and ARBs.

COTS          Providing COTS documentation, price             Throughout life cycle of   Phone conversations, email
Vendor        model, possible future release info, and                                   interactions, through the
              helping to identify difficulty of meeting the   project as required.
              requirements gap.                                                          COTS website.
              Provide the current market knowledge with
              respect to various COTS products, their
              costs, product details, their models,
              documentation and alternatives for each
              products/packages, if available.



Domain        Explain the technology required for             Throughout life cycle of   Regular meetings with prior
Expert        implementing the features of the system                                    appointments.
              and guide to appropriate COTS Vendors           project as required.
              and other researchers.
              Explain the feasibility of providing certain
              features, feasibility of integrating various
             Plans for Spring’07
Plans to complete the project

First set of modifications for the COTS will be ready by the first
week of December

Then the project can head in three directions:
Either the client can go ahead with CS 577b team and then sign the
contract with the vendor
Or the As the client is very much involved in the development of the
project, the client can go ahead and deal with the modifications herself.
Or some team members of the CS 577a team takes Directed Research
under Prof. Boehm and continues the project.
              Plan for the Spring’07
                     Milestone                                   Date
LCA (Life Cycle Architecture) ARB                             11/28/2006
LCA (Life Cycle Architecture) Package                         12/04/2006
First set of modifications ready (provided by client)   First week of December
Sign-up of contract with the vendor                      First week of January
Modifications given to the vendor for alteration        Second week of January
Second Prototype ready from vendor side                 Fourth week of January
Prepare User Manuals & support documentation             First week of February
for the transition
Installation and Transition( includes one week          Second week of February
training of the LANI staff)
Final set of modifications/bug fixes(if any)              First week of April
Final phase out of documents & completion of              Third week of April
project
Plans for the TRANSITION phase
Transfer of DATA If data needs to be transferred for the existing
projects, it will be transferred by a LANI staff member during the
transition phase.
Training Manual The training manual will be prepared by the
team 577b during the first week of march. Much help will be
provided to the team 577b by the training manual provided by the
vendor.
 Support The vendor is providing bug fixing in the software for
free and any additional features or modifications in the software
will cost $50 per hour. For support there will be only one point of
contact with the vendor.
                   For 577b Team

   Artifacts- CAB, CAP & CAR. Also so that team 577b can have
    better understanding of the system, the artifacts for the custom
    development are also provided( OCD, SSRD, SSAD, LCP, FRD &
    SID)
   To aid Team 577b have a better understanding of the system, all of
    the 577a team members have agreed to personally handover the
    project to the team 577b through a transition meeting.
               Assessment & Analysis
                           COTS Assessment Process

           1                                         2
Define High Level COTS                   Absolute Analysis
Attributes based on Win-             Identify possible COTS solution              3a
    Win Negotiations                                                          Define Test
                                                                              Procedures




                                                                                3b
                                                                          Perform Tests
                                                                                &
                                                                       Generate Test Results

                                          3c
                            Substantiate the chosen COTS
                            product with evaluation scores
        ASSESSMENT & ANALYSIS
                   Product Line Analysis
Explains how the Project manager GCT fit in for use in the LANI system.




                  Client Workstation
                       Project
                       Manager
                        GCT
                                         LAN


                                                      Server

                                          LAN       Centralized
                   Client Workstation                Database
                        Project
                        Manager
                         GCT
                 RISK MITIGATION
Risk Name: Failure of the server

Description: A failure in the Active Directory Server will affect the entire network and make

   project manager gct useless.

Mitigation Plan: Mirror the AD server to a secondary server to serve as a backup in case the

   primary server fails to avoid any client down time



Risk Name: COTS installation issues

Description:There might be some problems while installing the software on to the clients

   side.

Mitigation Plan: We need to run the COTS demos on to the clients network.
                  RISK MITIGATION
Risk Name: COTS Vendor support

Description: In this case if there is lack of vendor support there might be significant delay in

    the project deployment.

Mitigation Plan: The licensing of COTS products must account for vendor support

details.



Risk Name: Upgrading side-effects.

Description: Upgrading may result in re-tailoring of the COTS package.

Mitigation Plan: Ensure that features used to implement the capabilities still exist in the new

    version before the upgrade.
Resources
     Resources continued..
Hence the effort comes out to be 6.58 person
months , which satisfies our resources.
Thank You !




              Questions???
  COTS Assessment Report
Outline
• Background

• COTS Evaluation
    • Evaluation Criteria
    • Evaluation Results

• Business Case Analysis
     •Cost analysis
     •Benefits Analysis
     •Return on Investment



                             - Mayank Agarwal
                             - Abhishek Mehta
   Background
• Since at the end of the LCO Phase, a COTS Product on the basis
of cost & functionality, namely, Project Manager GCT was chosen
to be the solution for the client, the high level objectives of the
COTS Assessment has been to substantiate this choice and
provide results and conclusions.


• Hence, during the LCA Phase, a shift in track has occurred and
the documents have been shifted to COTS documents from the
earlier Lean MBASE documents.

• Therefore, a clean assessment of only the chosen COTS Product
has been carried out in an absolute manner. It has not been
compared to any other COTS Product due to time constraints.
         COTS Evaluation Criteria
          Evaluation
          Criteria - COTS
S. No.    Attributes            Weight   Rationale for assigning weights

   1             Cost              20    Cost is an Independent variable for assessment
                                         since the maximum available budget is $ 2000.
                                         It is the most important criteria for assessing the
   2         Functionality         50
                                         COTS.
               Product                   No performance requirements have been
   3                               5
             performance                 specified.
           Documentation                 Not much important since the software is very
   4                               5
          Understandability              basic.
                                         Does not hold much importance since only the
   5      Maturity of product      5
                                         basic functionality is required.
                                         Must provide support as clients do not have a
   6       Vendor support          15    maintainer currently. The vendor must maintain
                                         the software
                                         Security is not a major concern. Basic login
   7           Security            5
                                         security must be provided
     COTS Evaluation Criteria
                                 Generally simple - not much scope for
8       Ease of use         10
                                 complexity
          Ease of                Does not hold much importance since the
9       installation /      5    577 team or the Vendor would provide the
          upgrade                installation / upgrade.
         Ease of                 Does not hold much importance since the
10                          10
       maintenance               Vendor would provide the maintenance.
                                 Evolutionary requirements are less. So this
11       Scalability        3
                                 criterion does not hold much importance.
                                 Since vendor is the maintainer, it is
          Vendor
12                          10   important that he remains in business for
      viability/stability
                                 the period the software will be used.
                                 Evolutionary requirements are less. So this
13    Evolution Ability     3
                                 criterion does not hold much importance.
                                 Since this is a non-profit organization, a
         Vendor
14                          5    concession by the vendor is important to
       Concessions
                                 accommodate the costs within the budget.
     COTS Feature Checklist
Importanc
  e (from
 Win Win
  Report
   v1.1)    Weight*   Features


                      The system should generate a project reconciliation report which lists all the
                      upto date transactions in a particular project viz. invoice details, draw details,
    8.875    0.13     & check details.



    3.875    0.06     The system should retain 10% of the allocated funds for a particular project.

                      The system should incorporate any change orders that may come up during
    5.875    0.09     the course of a particular project


     4.12    0.06     The system should generate a close out report at the end of each project


                      The system should generate a fund and budget summary sheet which gives
     9.12    0.13     the summary of the funds spent out of the allocated budget

                      The system should maintain all the details( invoice details, check issue details,
     8.75    0.13     draw request details, draw approval details)
COTS Feature Checklist

               The system should incorporate multiple funding
               organizations for each contract and multiple contracts for
  8.5   0.12   each funding organization for a particular project.
               The system should allow limited access to executive
               director(read only rights to all the information and issue
 6.87   0.10   checks right)



 4.87   0.07   The system should maintain insurance log for each project

               The system should provide a read only access to the project
7.625   0.11   manager for the executive director's payout details



68.48    1     = TOTAL
   Features Evaluation Results

Weight* Features                                              Rank   Score Rationale

        The system should generate a project
        reconciliation report which lists all the upto date
        transactions in a particular project viz. invoice                   Report is generated
 0.13   details, draw details, & check details.                10    1.30   by the COTS.
                                                                            The COTS provides
                                                                            this functionality with
                                                                            added benefit of
        The system should retain 10% of the allocated                       modification of the %
 0.06   funds for a particular project.                        10    0.57   figure.
        The system should incorporate any change
        orders that may come up during the course of a                      Is provided by the
 0.09   particular project                                     10    0.86   COTS
        The system should generate a close out report                       Report is generated
 0.06   at the end of each project                             10    0.60   by the COTS.

        The system should generate a fund and budget
        summary sheet which gives the summary of the                        Report is generated
 0.13   funds spent out of the allocated budget                10    1.33   by the COTS.
        The system should maintain all the details(
        invoice details, check issue details, draw                          Feature is provided by
 0.13   request details, draw approval details)                9     1.15   the COTS.
  Features Evaluation Results
       The system should incorporate multiple                          Can be provided
       funding organizations for each contract and                     after modifications
       multiple contracts for each funding                             to the COTS
0.12   organization for a particular project.             5     0.62   Product.
                                                                       Can be provided
       The system should allow limited access to                       after modifications
       executive director(read only rights to all the                  to the COTS
0.10   information and issue checks right)                6     0.60   Product.
                                                                       Provides almost the
                                                                       same functionality
                                                                       with some different
       The system should maintain insurance log                        name tags. Can be
0.07   for each project                                   7     0.50   modified.
                                                                       Can be provided
       The system should provide a read only                           after modifications
       access to the project manager for the                           to the COTS
0.11   executive director's payout details                7     0.78   Product.



 1     = TOTAL                                          TOTAL   8.30
      Evaluation Results
S.                                 Weight (on
No Evaluation Criteria             a scale of
 . - COTS Attributes      Weight      100)      Rank    Score     Rationale for Rank

                                                                  The cost of the COTS is well
1   Cost                   20      13.2          9     119.2053   within the client's budget.

2   Functionality          50      33.1         8.3    274.8344   Refer to
                                                                  Mostly bug free
    Product                                                       performance. Quick
3   performance             5      3.3           7     23.17881   response.

                                                                  Not much documentation
    Documentation                                                 available. However, easy to
4   Understandability       5      3.3           5     16.55629   understand.

                                                                  This is the first version of the
5   Maturity of product     5      3.3           0        0       product.
                                                                  Vendor is ready to provide
                                                                  support for bugs free of cost.
                                                                  Maintenance charges are
6   Vendor support         15      9.9           6     59.60265   extra

                                                                  Basic login functionality is
7   Security                5      3.3           5     16.55629   provided.
       Evaluation Results
                                                           Pretty easy to use per client's
8    Ease of use                  10    6.6   8   52.98013 feedback.
     Ease of installation /
9    upgrade                       5    3.3   8   26.49007 Basic .exe files are provided.


                                                             Vendor provides maintenance.
10   Ease of maintenance          10    6.6   6   39.7351    However, backups are easy.

                                                           Can be expanded to a certain
                                                           extent to incorporate evolving
11   Scalability                   3    2.0   7   13.90728 features.
                                                             Vendor has a few other
                                                             products in the market with
                                                             frequent newer versions of
12   Vendor viability/stability   10    6.6   6   39.7351    each

                                                           Easy to add new features
                                                           since the COTS is based on
13   Evolution Ability             3    2.0   8   15.89404 MS Access.

14   Vendor Concessions            5    3.3   8   26.49007 Vendor has provided a

                   TOTAL:         151   100       725.16
Business Case Analysis
Costs Analysis
•   Hardware is free
      • Currently installed at the client’s site

•   Software costs
      • The COTS product cost is the only cost to the client.

      • The cost of COTS has changed.
         • One time cost has gone up while the recurring cost of
           maintenance has been bargained and reduced.

    Cost of COTS Product for 2 licenses                            $525
    Therefore, Costs for procuring 6 licenses                   $1,575

    Less 25% discount for Non Profit Organization                  $400
    Net Cost of the COTS Product                                $1,175
     Business Case Analysis
• Personnel Costs for Development and Transition
     •Earlier we had targeted end of Fall 2006 as the completion
     deadline.
     •However due to delays in assessing the modifications required,
     the implementation would be done in Spring 2007.

 A Inception and Elaboration Time Invested (CS577a - Fall 2006)        Hours
   Preparation of requirements document for the developers &             4
 1 prioritization
 2 Discussion with the organization members on the requirements          3
 3 Easy Win Win Sessions                                                 4
   Meetings with Full Team & Individual Members (4 hours time per
 4 week for 12 weeks)                                                   48
 5 Email time (1 hr per week for 12 weeks)                              12
 6 Architecture Review Board(s)                                          6
    Total (Inception and Elaboration Time)                                   77
     Business Case Analysis
  Construction and Transition Time Invested (CS577b - Spring
B 2007)                                                              Hours

   Meetings with Full Team & Individual Members (5 hr per week for
 1 12 weeks)                                                           60
 2 Email time (1 hr per week for 12 weeks)                             12
 3 Architecture Review Board(s)                                         6
 4 Transition & Training (5hrs per member)                             30
   Total (Construction/Transition Time)                                     108
   TOTAL DEVELOPMENT TIME (ONE TIME)                                        185

Assuming that each hour spent by the client is worth $ 40, we can
estimate the personnel cost for development phase to be: $ 185x40
= $ 7400
Hence total one time costs for 2006-07 = $ 1175 + $ 7400 = $ 8575.
   Business Case Analysis
Operational & Maintenance Cost


        Annual Maintenance                                      Hours

        Administrators' Maintenance Time - Granting rights,
      1 managing accounts. (1 hr per week)                       52
      2 Working with maintenance team (1 hours per month)        12
        Maintenance team's effort – (4 hours per month) -
        Maintenance team is the same as the COTS Vendor- $ 50
      3 per hour                                                 48
      4 Total (Maintenance Time)                                   112

Assuming each hour spent by the client is worth $ 40 and as quoted by
the Vendor, each hour spent in maintenance is worth $ 50, the
maintenance costs can be calculated as:


$ 52x40 + 12x40 + 48x50 = $ 4960 per annum.
       Business Case Analysis
    Maintenance Costs

    • Bug fixing would be provided free of cost by the COTS Vendor.
    • Hence, the maintenance would involve addition of features during the
    course of usage & administrative maintenance.

                                                                       Ho
C Annual Maintenance                                                   urs Amount

  Administrators' Maintenance Time - Granting rights, managing
1 accounts. (1 hr per week) ($ 40 per hour)                             52   $2,080
2 Working with maintenance team (1 hours per month) ( $ 40 per hour) 12       $480

  Maintenance team's effort – (4 hours per month) - Maintenance team
3 is the same as the COTS Vendor- $ 50 per hour                      48      $2,400

4   Total (Maintenance Time)                                           112   $4,960
      Business Case Analysis
Benefits Analysis
• On a conservative estimate, the new software would save each staff member
at LANI at least 2 hours per week

•The savings per annum equals 2x6x52 = 624 person hours = $ 24960*

•Non financial benefits & Value added:

     Some value is also added in the form of automated reports available for
     marketing managers at LANI, which would help them in better fund raising.


*Assuming each staff member’s average cost per hour is $ 40
       Business Case Analysis


ROI Analysis
             Year --->              2006 -
                                     2007    2007-2008 2008-2009 2009-2010 2010-2011
Costs(a) ($)                        8575       4960      4960      4960      4960

Costs Paid for Externally (b) ($)   1175       2400      2400      2400      2400


Benefits ( c ) ($)                    0       24960     24960      24960     24960

Net Costs ($)                       8575       2400      2400      2400      2400

Net Benefit ( d = c - a - b ) ($)     0       17600     17600      17600     17600

Cum. Net Cost C ($)                 8575      10975     13375      15775     18175

Cum. Net Benefit B ($)                0       17600     35200      52800     70400

ROI=Cum(B-C)/C                      -1.00      0.60      1.63      2.35      2.87
                                Business Case Analysis

                                                                  R .O .I
R etrun on Inves tmnt (R O I)



                                 3.50
                                 3.00
                                 2.50
                                 2.00
                                 1.50
                                 1.00
                                 0.50
                                 0.00
                                -0.50   2006 - 2007   2007-2008       2008-2009    2009-2010   2010-2011
                                -1.00
                                -1.50
                                                                            Year
                  Business Case Analysis
                      - for COTS Product

                                                     Break Even Analysis

                  80000

                  70000

                  60000

                  50000
Benefits - Cost




                  40000

                  30000

                  20000

                  10000

                      0
                           2006 - 2007   2007-2008     2008-2009   2009-2010   2010-2011
                  -10000

                  -20000
                                                         Year
   Conclusions & Recommendation

Conclusion


Project Manager GCT is by far the most suited COTS Product
to suit the client’s requirements, within the available budget.
However, some critical functionality is missing in the COTS.

Recommendation

The COTS Product, Project Manager GCT can be modified by
the vendor to incorporate the critical functionality at a certain
charge. That would make it the most suitable COTS product for
the client.
Thank You !




              Questions???

						
Related docs
Other docs by changcheng2
78_10_1246
Views: 0  |  Downloads: 0
menu
Views: 2  |  Downloads: 0
GEORGE OF THE JUNGLE SCRIPT
Views: 12  |  Downloads: 0
The Broadway Corporate Plan_1_
Views: 0  |  Downloads: 0
nr0151
Views: 0  |  Downloads: 0
100044_1_softassignment
Views: 4  |  Downloads: 0
gilk-talk
Views: 0  |  Downloads: 0
2011_EGUE_Sessions_24OCT11_Workshops
Views: 12  |  Downloads: 0
050512PR-Pre
Views: 0  |  Downloads: 0