Embed
Email

2-24-09

Document Sample

Shared by: Kerala g
Categories
Tags
Stats
views:
0
posted:
1/2/2012
language:
pages:
2
2/24/09





The following are the meeting minutes from the Health and Safety Committee 2/24/09.



Committee members present: Tom G., Toni, Jeanne S., Joan M., Julie H., Dave H. , Mike P.



The Agenda



1) Update on classroom soap dispensers and chemicals in the classrooms. --



Outcome: Tom and Toni will be making visits to classrooms to ensure that all rooms have soap

dispensers, and to check that all chemicals are school approved.



Jeanne will identify locations in the building that may benefit from have (wall hung)

hand sanitization dispensers available.



2) Update on electrical status in classrooms.



Outcome: This situation is how to address the multiple electrical needs in each classroom. In

November, 2008 SPPS sent in 2 electrical inspectors to identify how to address electrical needs.

The first option to purchase multiple surge protectors (i..e electrical strips) was viewed as a

potential "problem" by the electrical inspectors. thus BVS has not purchased additional electrical

strips. The second option was to add electrical outlets to rooms. BVS continues to wait for an

update from the electrical inspectors. Staff are reminded that multiple electrical cords being run

to one outlet or circuit could become a problem.



3) Staff training for CPR.



Outcomes: Jeanne will work with the staff development committee to create a data base for all

certified CPR and First Aid staff. The data base will be created by Bernae or Teri, for the BVS

office and Staff Development Committee access and update.



4) CPI and the Crisis Response Team.



Outcome: Rich V,. will be asked to come to the next H & S meeting to give an update on the

#of CPI certified staff, the effectiveness of the Green Team", and any plans for future CPI

training.



5) School Classroom emergency bags.



Outcome: These are the bags that will be in each classroom, and will be available in case of

building evacuation ( i.e. fire, bomb, etc). Each bag will have a list of supplies. When the bag

arrives to the classroom, the classroom staff will need to add all necessary student specific items.

Joan M. will work with students to equip the bags, and then forward to each classroom. The bags

will be identified by room number and not by teacher name. KEEP IN MIND, THE BAG IS

TAKEN OUT OF THE CLASSROOM ONLY WHEN THE BVS IS BEING EVACUATED.



6) Fire Drills



Outcome: Remind staff that students are not to stop for their coats or other items, when a fire

alarm is activated. Toni and Tom will draft a Fire drill procedure directive, that will include helping

to secure for the pool area--supportive emergency clothing , towels etc....





7) Tornado Drill Evacuation Plan.

Outcome; The Tornado drill evacuation ( where do we go?) will be updated by Toni and Tom and

distributed within one week.



8) Look-down Procedure



Outcome: BVS will be drafting a revised Look-down Procedure that will include. 1) Directions for

how all areas can be "locked down". 2) The request to get a "key pad" for entering from the

schools plat ground areas. 3) How to contact students who are in the community. 4) Explaining

the importance of why each community outing requires a phone contact #. The lock down

procedure will be drafted by Toni, Dave , Tom.



9) Pool and body excrement , fecal matter, poop, you get the idea. The committee agreed that

pool contamination must be addressed in a more formal and deliberate manner. Deb F., Toni,

Mike P , Mike P, and Jeanne S., will meet ,to outline concerns and necessary responses.



10) BVS has been directed to update its Site Specific School Emergency School Plan by 6/1/09,

the Health and Safety Committee will hopefully meet this target date.





Meeting minutes by Mike Piersak



Related docs
Other docs by Kerala g
union-budget-2012-13-highlights
Views: 102  |  Downloads: 0
notification M.Tech_05-03-09
Views: 59  |  Downloads: 0
India_Customs Regulation 1
Views: 56  |  Downloads: 0
CE Notification 39-2011-12.9.2011
Views: 54  |  Downloads: 0
STATISTICS
Views: 72  |  Downloads: 0
A Hero (R.K. Narayan)
Views: 91  |  Downloads: 6
RRBPatna-Info-HN
Views: 116  |  Downloads: 0
RRB-Notice-Para
Views: 113  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!